Civil Works - Bid Bulletin - Submissions
Office | Description | Date Published | Closing Date | ||
---|---|---|---|---|---|
Cebu 4th District Engineering Office | Supplemental Bulletin No. 7 for the amendment of Procurement Schedule | February 19, 2025 | February 26, 2025 | ||
Bataan 2nd District Engineering Office |
Supplemental Bulletin No. 2025-B2-010 Resetting of Dropping and Opening of Bids for 25CB0057: Construction of Multi-Purpose Building (Phase II), Barangay San Jose, Balanga City, Bataan |
February 19, 2025 | February 26, 2025 | ||
Surigao del Norte 1st District Engineering Office | 25NF0043_ SUPPLEMENTAL BULLETIN NO.1 | February 19, 2025 | March 4, 2025 | ||
Surigao del Norte 1st District Engineering Office | 25NF0042_ SUPPLEMENTAL BULLETIN NO. 1 | February 19, 2025 | March 4, 2025 | ||
NCR - Regional Office | Supplemental Bulletin No. 2 for Contract ID No. 25O00093 (Postponement) | February 19, 2025 | February 26, 2025 | ||
Surigao del Norte 1st District Engineering Office | 25NF0041_ SUPPLEMENTAL BULLETIN N0. 1 | February 19, 2025 | March 4, 2025 | ||
Surigao del Norte 1st District Engineering Office | 25NF0040_ SUPPLEMENTAL BULLETIN NO. 1 | February 19, 2025 | March 4, 2025 | ||
Surigao del Norte 1st District Engineering Office | 25NF0037_SUPPLEMENTAL BULLETIN NO. 1 | February 19, 2025 | March 4, 2025 | ||
Surigao del Norte 1st District Engineering Office | 25NF0036_SUPPLEMENTAL BULLETIN NO. 1 | February 19, 2025 | March 4, 2025 | ||
Quezon City 1st Engineering District Office | SUPPLEMENTAL BULLETIN NO. 87 - Postponement for Contract ID No. 25OF0075 | February 19, 2025 | February 26, 2025 | ||
Regional Office XII | 24M00103 - Supplemental Bulletin #1 (New Contract Duration) | February 19, 2025 | February 27, 2025 | ||
Regional Office XII | 24M00098 - Supplemental Bulletin #1 (New Contract Duration) | February 19, 2025 | February 27, 2025 | ||
North Manila District Engineering Office |
Supplemental Bid Bulletin No. 3 for Contract ID No. 25OE0186 (POSTPONEMENT OF DEADLINE FOR THE SUBMISSION OF BIDS, ORDER OF PAYMENT AND OPENING OF BIDS) |
February 19, 2025 | February 28, 2025 | ||
North Manila District Engineering Office |
Supplemental Bid Bulletin No. 8 for Contract ID No. 25OE0158 (POSTPONEMENT OF DEADLINE FOR THE SUBMISSION OF BIDS, ORDER OF PAYMENT AND OPENING OF BIDS) |
February 19, 2025 | February 28, 2025 | ||
Cagayan de Oro City 2nd District Engineering Office |
25KD0066 – Construction of CDO River Dike, Taguanao, Brgy. Indahag, Cagayan de Oro City |
February 19, 2025 | February 26, 2025 | ||
Pampanga 3rd District Engineering Office |
Supplemental Bid Bulletin No. 0028 Subject : (1) Change of Bill of Quantities (2) Revision of Approved Budget for the Contract (ABC) |
February 19, 2025 | February 26, 2025 | ||
Cagayan de Oro City 2nd District Engineering Office | 25KD0070 – FMR in Barangay Bugo | February 19, 2025 | February 26, 2025 | ||
Cagayan de Oro City 2nd District Engineering Office | 25KD0069 – FMR in Barangay Balubal | February 19, 2025 | February 26, 2025 | ||
Cagayan de Oro City 2nd District Engineering Office | 25KD0068 – FMR in Barangay Puerto (Phase 2) | February 19, 2025 | February 26, 2025 | ||
South Manila District Engineering Office |
Supplemental Bulletin No. 2 for Contract ID:25OH0121: Improvement of Road and Drainage System along Taft Ave. (From UN Ave. to Ayala Blvd.) Manila City. Due to Rectification of Approved Budget for the Contract (ABC) |
February 19, 2025 | February 26, 2025 | ||
Regional Office V | Supplemental Bulletin No. 1 (with Revised BOQ, Plans) - 25F00380 | February 19, 2025 | February 26, 2025 | ||
Mountain Province 2nd District Engineering Office | Bid Bulletin No. 1 Modification on Bill of Quantities | February 19, 2025 | February 26, 2025 | ||
Mountain Province 2nd District Engineering Office | Bid Bulletin No. 1 Modification on Category of Work forContract 25PM0046 | February 19, 2025 | February 26, 2025 | ||
Regional Office V | Supplemental Bulletin No. 1 (with Revised BOQ, Plans) - 25F00193 | February 19, 2025 | February 26, 2025 | ||
Mountain Province 2nd District Engineering Office | Bid Bulletin No. 1 Modification on Bill of Plan for Contract No. 25PM0043 | February 19, 2025 | February 26, 2025 | ||
Mountain Province 2nd District Engineering Office |
Bid Bulletin No. 1 Modification on Bill of Quantities and Plan for Contract No. 25PM0043 |
February 19, 2025 | February 26, 2025 | ||
Regional Office II |
25B00075, Supplemental Bulletin No. 1 (Amendments are made in the Contract Duration and in Part B of Section VIII. Bill of Quantities) |
February 19, 2025 | March 10, 2025 | ||
Regional Office II |
25B00072, Supplemental Bulletin No. 1 (Amendments are made in the Contract Duration and in Part B of Section VIII. Bill of Quantities) |
February 19, 2025 | March 10, 2025 | ||
Regional Office X |
SUPPLEMENTAL BULLETIN NO.1 - Postponement of Dropping and Opening of Bids for 25K00225 |
February 19, 2025 | February 26, 2025 | ||
Regional Office X |
SUPPLEMENTAL BULLETIN NO.1 - Postponement of Dropping and Opening of Bids for 25K00222 |
February 19, 2025 | February 26, 2025 | ||
Regional Office X |
SUPPLEMENTAL BULLETIN NO.1 - Postponement of Dropping and Opening of Bids for 25K00217 |
February 19, 2025 | February 26, 2025 | ||
Regional Office X |
SUPPLEMENTAL BULLETIN NO.1 - Postponement of Dropping and Opening of Bids for 25K00213 |
February 19, 2025 | February 26, 2025 | ||
Camarines Sur 3rd District Engineering Office |
SUPPLEMENTAL B ULLETIN for Contract ID No. 25FF0002- Convergence and Special Support Program- Construction/ Improvement of Access Roads Leading to Declared Tourism Destinations (Tourism Road Infrastructure Program- TRIP) Almeda Highway connecting Centro Heritage District to Mt. Isarog Natural Park, Naga City, Camarines Sur |
February 19, 2025 | February 26, 2025 | ||
Northern Samar 1st District Engineering Office | Supplemental Bulletin No.1 for CID No.24IH0110 | February 18, 2025 | February 25, 2025 | ||
Northern Samar 1st District Engineering Office | Supplemental Bulletin No.1 for CID No. 25IH0030 | February 18, 2025 | February 25, 2025 | ||
Northern Samar 1st District Engineering Office | Supplemental Bulletin No.1 for CID No.25IH0031 | February 18, 2025 | February 25, 2025 | ||
Northern Samar 1st District Engineering Office | Supplemental Bulletin No.1 for CID No.25IH0027 | February 18, 2025 | February 25, 2025 | ||
Northern Samar 1st District Engineering Office | Supplemental Bulletin No.1 for CID No.25IH0027 | February 18, 2025 | February 25, 2025 | ||
Northern Samar 1st District Engineering Office | Supplemental Bulletin No.1 for CID No.25IH0027 | February 18, 2025 | February 25, 2025 | ||
Northern Samar 1st District Engineering Office | Supplemental Bulletin No.1 for CID No.25IH0027 | February 18, 2025 | February 25, 2025 | ||
Northern Samar 1st District Engineering Office | Supplemental Bulletin No.1 for CID No.25IH0027 | February 18, 2025 | February 25, 2025 | ||
Butuan City District Engineering Office | Contract ID No. 25ND0092 Supplemental BOQ | February 18, 2025 | February 26, 2025 | ||
Butuan City District Engineering Office | Contract ID No. 25ND0092 Supplemental Bulletin No. 46 | February 18, 2025 | February 26, 2025 | ||
Butuan City District Engineering Office | Contract ID No. 25ND0092 Bid Bulletin No. 47 | February 18, 2025 | February 26, 2025 | ||
Butuan City District Engineering Office | Contract ID No. 25ND0091 Supplemental BOQ | February 18, 2025 | February 26, 2025 | ||
Butuan City District Engineering Office | Contract ID No. 25ND0091 Supplemental Bulletin No. 45 | February 18, 2025 | February 26, 2025 | ||
Butuan City District Engineering Office | Contract ID No. 25ND0091 Bid Bulletin No. 47 | February 18, 2025 | February 26, 2025 | ||
Butuan City District Engineering Office | Contract ID No. 25ND0089 Supplemental BOQ | February 18, 2025 | February 26, 2025 | ||
Butuan City District Engineering Office | Contract ID No. 25ND0089 Supplemental Bulletin No. 45 | February 18, 2025 | February 26, 2025 | ||
Butuan City District Engineering Office | Contract ID No. 25ND0089 Bid Bulletin No. 47 | February 18, 2025 | February 26, 2025 | ||
Regional Office IV-A |
Construction of By-Pass and Diversion Roads TAGKAWAYAN-LABO DIVERSION ROAD (TAGKAWAYAN SECTION), PACKAGE D, QUEZON |
February 18, 2025 | February 27, 2025 | ||
Regional Office IV-A | CONSTRUCTION OF BREAKWATER AT BARANGAY ITHAN, BINANGONAN, RIZAL | February 18, 2025 | February 27, 2025 | ||
Regional Office IV-A | CONSTRUCTION OF BREAKWATER (PHASE 2) AT BARANGAY ITHAN, BINANGONAN, RIZAL | February 18, 2025 | February 27, 2025 | ||
Regional Office IV-A |
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads MAHARLIKA HIGHWAY – K0223 + 522 - K0223 + 858 |
February 18, 2025 | February 27, 2025 | ||
Regional Office IV-A |
Road Widening - Primary Roads CALAMBA-STA CRUZ-FAMY JCT RD - K0062 + 402 - K0063 + 005 |
February 18, 2025 | February 27, 2025 | ||
Regional Office IV-A |
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads MAHARLIKA HIGHWAY - K0160 + 315 - K0160 + 560, K0161 + 000 - K0161 + 025, K0163 + 410 - K0163 + 445, K0163 + 495 - K0163 + 755 |
February 18, 2025 | February 27, 2025 | ||
Regional Office IV-A |
Construction of By-Pass and Diversion Roads DASMARIÑAS - GENERAL TRIAS - TANZA DIVERSION ROAD, TANZA SECTION |
February 18, 2025 | February 27, 2025 | ||
Regional Office IV-A |
Preventive Maintenance - Primary Roads MAHARLIKA HIGHWAY - K0158 + (-872) – K0158 + (-552), K0162 + 390 - K0162 + 460 |
February 18, 2025 | February 27, 2025 | ||
Regional Office IV-A |
Construction of Missing Links/ New Roads MAUBAN-TIGNOAN ROAD (MAUBAN SECTION), PACKAGE A, QUEZON |
February 18, 2025 | February 27, 2025 | ||
Regional Office IV-A |
Construction of Missing Links/ New Roads ATIMONAN - MAUBAN ROAD, MAUBAN SECTION, QUEZON, PACKAGE B |
February 18, 2025 | February 27, 2025 | ||
Regional Office IV-A |
Construction of By-Pass and Diversion Roads PAGBILAO-TAYABAS-LUCBAN DIVERSION ROAD (PAGBILAO SIDE), PACKAGE B, QUEZON |
February 18, 2025 | March 28, 2025 | ||
Regional Office IV-A |
CONSTRUCTION OF MULTI-PURPOSE/ TRAINING CENTER, CAMP JOSE P. RAZON, SITIO PALICO, BRGY. BILARAN, NASUGBU, BATANGAS |
February 18, 2025 | February 25, 2025 | ||
Regional Office IV-A |
CONSTRUCTION OF MULTI-PURPOSE BUILDING LAND TRANSPORTATION REGIONAL OFFICE - REGION 4A, LIPA CITY, BATANGAS LINK FOR REVISED PLANS https://drive.google.com/file/d/1ccutCOz4x3Q4aX8M5sFvqT53bak335sn/view?usp=sharing |
February 18, 2025 | February 25, 2025 | ||
Regional Office IV-A |
Preventive Maintenance - Primary Roads MAHARLIKA HIGHWAY - K0213 + 100 – K0213 + 150, K0245 + 200 - K0245 + 617 |
February 18, 2025 | February 25, 2025 | ||
Regional Office IV-A |
CONSTRUCTION OF NCSC PARKING AND FEMALE BARRACKS, NSPL, FORT SAN FELIPE, CAVITE CITY, CAVITE |
February 18, 2025 | February 25, 2025 | ||
Bulacan 1st District Engineering Office |
Notice of Cancellation of Procurement on February 25, 2025 at 1o AM for Contract ID 25CC0389 |
February 18, 2025 | February 25, 2025 | ||
Bulacan 1st District Engineering Office |
Bid Supplement for Contract ID 25CC0204 (changes in the ABC & BOQ) and still postponed indefinitely |
February 18, 2025 | February 25, 2025 | ||
Bulacan 1st District Engineering Office |
Bid Supplement for Contract ID 25CC0388 (changes in the ABC, scope of work & BOQ) |
February 18, 2025 | February 25, 2025 | ||
Bulacan 1st District Engineering Office | Bid Supplement for Contract ID 25CC0391 (changes in the ABC & BOQ) | February 18, 2025 | February 25, 2025 | ||
Bulacan 1st District Engineering Office | Bid Supplement for Contract ID 25CC0394 (changes in the ABC & BOQ) | February 18, 2025 | February 25, 2025 | ||
Bulacan 1st District Engineering Office | Bid Supplement for Contract ID 25CC0395 (correction in the BOQ) | February 18, 2025 | February 25, 2025 | ||
Bulacan 1st District Engineering Office |
Bid Supplement for Contract ID 25CC0393 (changes in the ABC, scope of work & BOQ) |
February 18, 2025 | February 25, 2025 | ||
Bulacan 1st District Engineering Office |
Bid Supplement for Contract ID 25CC0365 (changes in the ABC, scope of work & BOQ) |
February 18, 2025 | February 25, 2025 | ||
Bulacan 1st District Engineering Office | Bid Supplement for Contract ID 25CC0385 (changes in the ABC and BOQ) | February 18, 2025 | February 25, 2025 | ||
Bulacan 1st District Engineering Office |
New Schedule of Bid Submission and Bid Opening for Contract ID 25CC0259 on February 26, 2025 at 10AM |
February 18, 2025 | February 25, 2025 | ||
Bulacan 1st District Engineering Office |
Bid Supplement for Contract ID 25CC0408 (correction in the scope of work , bid data sheet and Major and Similar Work Category) |
February 18, 2025 | February 25, 2025 | ||
Regional Office IV-A |
Preventive Maintenance - Primary Roads MAHARLIKA HIGHWAY – K0079 + 1344 - K0079 + 1967 |
February 18, 2025 | February 25, 2025 | ||
Regional Office IV-A |
Preventive Maintenance - Tertiary Roads SN PABLO - RIZAL - NAGCARLAN - LILIW RD - K0084 + (-1468) - K0084 + (-550), K0092 + 000 - K0092 + 222, K0097 + 982 - K0097 + 1044, K0097 + 1067 - K0097 + 1119, K0097 + 1444 - K0097 + 1543, K0097 + 1579 - K0099 + 123 |
February 18, 2025 | February 25, 2025 | ||
Bukidnon 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO. 2 - (25KA0102) | February 18, 2025 | February 25, 2025 | ||
Bukidnon 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO. 2 - (25KA0101) | February 18, 2025 | February 25, 2025 | ||
Bukidnon 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO. 2 - (25KA0099) | February 18, 2025 | February 25, 2025 | ||
Bukidnon 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO. 2 - (25KA0098) | February 18, 2025 | February 25, 2025 | ||
Iloilo 2nd District Engineering Office |
BID BULLETIN NO. 2025-20 - Amendment of Bill of Quantities, Contract Name, Project Description and Contract Duration. |
February 18, 2025 | February 25, 2025 | ||
Bukidnon 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2 - (25KA0097) Revision of Contract Name, Contract Location, Scope of Work, Contract Duration, Source of Fund and Bill of Quantities |
February 18, 2025 | February 25, 2025 | ||
Bukidnon 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2 - (25KA0100) Revision of Scope of Work, Contract Duration and Bill of Quantities |
February 18, 2025 | February 25, 2025 | ||
Iloilo 2nd District Engineering Office |
BID BULLETIN NO. 2025-21 - Amendment of Bill of Quantities and Project Description. |
February 18, 2025 | February 25, 2025 | ||
Iloilo 2nd District Engineering Office |
BID BULLETIN NO. 2025-19 - Amendment of Bill of Quantities and Project Description. |
February 18, 2025 | February 25, 2025 | ||
Marinduque District Engineering Office |
25EA0063 - Resetting of the Schedule of the Submission and Opening of Bids and Modification of Microsoft Teams Link |
February 18, 2025 | February 25, 2025 | ||
Marinduque District Engineering Office |
25EA0064 - Resetting of the Schedule of the Submission and Opening of Bids and Modification of Microsoft Teams Link |
February 18, 2025 | February 25, 2025 | ||
Iloilo 2nd District Engineering Office |
BID BULLETIN NO. 2025-18 - Amendment of Bill of Quantities and Project Description. |
February 18, 2025 | February 25, 2025 | ||
Marinduque District Engineering Office |
25EA0076 - Correction of Approved Budget for the Contract and Contract Duration and Modification of Scope of Works and Bill of Quantities (Part 4 of 4) |
February 18, 2025 | February 25, 2025 | ||
Iloilo 2nd District Engineering Office |
BID BULLETIN NO. 2025-17 - Amendment of Bill of Quantities and Project Description. |
February 18, 2025 | February 25, 2025 | ||
Marinduque District Engineering Office |
25EA0076 - Correction of Approved Budget for the Contract and Contract Duration and Modification of Scope of Works and Bill of Quantities (Part 3 of 4) |
February 18, 2025 | February 25, 2025 | ||
Marinduque District Engineering Office |
25EA0076 - Correction of Approved Budget for the Contract and Contract Duration and Modification of Scope of Works and Bill of Quantities (Part 2 of 4) |
February 18, 2025 | February 25, 2025 | ||
Marinduque District Engineering Office |
25EA0076 - Correction of Approved Budget for the Contract and Contract Duration and Modification of Scope of Works and Bill of Quantities (Part 1 of 4) |
February 18, 2025 | February 25, 2025 | ||
Quezon City 1st Engineering District Office |
SUPPLEMENTAL BULLETIN NO. 86 - Correction in Bill of Quantities (BOQ) and Project Profile: Major Categories of Work for Contract ID No. 25OF0112 |
February 18, 2025 | February 25, 2025 | ||
Regional Office V | Supplemental Bulletin No. 1 - 25F00325 | February 18, 2025 | February 25, 2025 | ||
Batangas 4th District Engineering Office | SUPPLEMENTAL BID BULLETIN NO. CW-2025-075 : CID 25DD0359 | February 18, 2025 | February 26, 2025 | ||
Batangas 4th District Engineering Office | SUPPLEMENTAL BID BULLETIN NO. CW-2025-074 : CID 25DD0204 | February 18, 2025 | February 25, 2025 | ||
Batangas 4th District Engineering Office | SUPPLEMENTAL BID BULLETIN NO. CW-2025-073 : CID 25DD0202 | February 18, 2025 | February 25, 2025 |