Office | Description | Date Published | Closing Date | ||
---|---|---|---|---|---|
Aklan District Engineering Office | Construction of Road, Brgy. Sugnod, Malinao, Aklan | March 5, 2025 | March 12, 2025 | ||
Zamboanga Sibugay 2nd District Engineering Office |
REVISION OF BILL OF QUANTITIES / CHANGES IN THE APPROVED BUDGET FOR THE CONTRACT for 25JF0004 |
March 5, 2025 | March 12, 2025 | ||
Cebu City District Engineering Office |
Supplemental Bulletin No.174 for Contract ID No. 25HH0093 -Convergence and Special Support Program–Basic Infrastructure Program (BIP)–Multi-Purpose Buildings/Facilities to support Social Services-Rehabilitation of Multi-Purpose Building, Brgy. Sambag II, Cebu City (Bid Bulletin, Revised BOQ and Plans) |
March 5, 2025 | March 12, 2025 | ||
Cebu City District Engineering Office |
Supplemental Bulletin No.175 for Contract ID No.25HH0148 -Convergence and Special Support Program–Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major / Strategic Public Buildings/Facilities–Construction of Road including Slope Protection Structure, Barangay Agsungot, Cebu City, Cebu (Bid Bulletin, Revised BOQ and Plans) |
March 5, 2025 | March 12, 2025 | ||
Cebu 7th District Engineering Office | 25HO0156 Supplemental Bulletin No. 1 | March 5, 2025 | March 12, 2025 | ||
Cebu 7th District Engineering Office | Bid Bulletin No. 1 | March 5, 2025 | March 12, 2025 | ||
NCR - Regional Office | Supplemental Bulletin No. 1 for Contract ID No. 24O00228 | March 5, 2025 | March 24, 2025 | ||
Iligan City District Engineering Office | Supplemental Bulletin No. 1 -25KM0037 - Revision of Project Name | March 5, 2025 | March 12, 2025 | ||
Cebu 7th District Engineering Office | 25HO0154 Supplemental Bulletin No. 1 | March 5, 2025 | March 12, 2025 | ||
Cebu 7th District Engineering Office | 25HO0153 Supplemental Bulletin No. 1 | March 5, 2025 | March 12, 2025 | ||
Cebu 7th District Engineering Office | 25HO0152 Supplemental Bulletin No. 1 | March 5, 2025 | March 12, 2025 | ||
Cebu 7th District Engineering Office | 25HO0151 Supplemental Bulletin No. 1 | March 5, 2025 | March 12, 2025 | ||
Cebu 7th District Engineering Office | 25HO0150 Supplemental Bulletin No. 1 | March 5, 2025 | March 12, 2025 | ||
Cebu 7th District Engineering Office | 25HO0149 Supplemental Bulletin No. 1 | March 5, 2025 | March 12, 2025 | ||
Cebu 7th District Engineering Office | 25HO0148 Supplemental Bulletin No. 1 | March 5, 2025 | March 12, 2025 | ||
South Manila District Engineering Office |
Supplemental Bulletin No. 3 for Contract aid No. 25OH0137: Construction of Evacuation Center at Brgy. 145, Zone 16, Pasay City. Postponement of the Scheduled Bidding Due to Verification of Detailed Unit Price Analysis (DUPA) |
March 5, 2025 | March 12, 2025 | ||
Cebu 7th District Engineering Office | 25HO0147 Supplemental Bulletin No. 1 | March 5, 2025 | March 12, 2025 | ||
Cebu 7th District Engineering Office | 25HO0146 Supplemental Bulletin No. 1 | March 5, 2025 | March 12, 2025 | ||
Cebu 7th District Engineering Office | 25HO0145 Supplemental Bulletin No. 1 | March 5, 2025 | March 12, 2025 | ||
South Manila District Engineering Office |
Supplemental Bulletin No. 1 for Contract ID No. 25OH0143: Construction of Multi-Purpose Building, Brgy. 773 Zone 84, Sta. Ana, District 5, Manila. Due to Rectification in Contract Name |
March 5, 2025 | March 12, 2025 | ||
South Manila District Engineering Office |
Supplemental Bulletin No. 1 for contract ID No. 24OH0160: Repair and Rehabilitation of DPWH Central Office including Fire Detection and Alarm System (FDAS), Bonifacio Drive, Port Area, Manila. Postponement of the Scheduled Bidding Due to Verification of Detailed Unit Price Analysis (DUPA) |
March 5, 2025 | March 12, 2025 | ||
Marinduque District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 09, s. 2025 - Correction of Station Limits for Contract ID Nos. 25EA0079 and 25EA0084, Correction of Approved Budget for the Contract and Contract Duration for Contract ID Nos. 25EA0063 and 25EA0064, Correction of Major and Similar Categories of Work for Contract ID Nos. 25EA0063 and 25EA0064, Modification Scope of Works for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079, 25EA0084, Modification of Minimum Equipment Requirements for Contract ID Nos. 25EA0063 and 25EA0064 and 25EA0084 and Modification of Bill of Quantities for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079 and 25EA0084 (Part 6 of 6) |
March 4, 2025 | March 11, 2025 | ||
Marinduque District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 09, s. 2025 - Correction of Station Limits for Contract ID Nos. 25EA0079 and 25EA0084, Correction of Approved Budget for the Contract and Contract Duration for Contract ID Nos. 25EA0063 and 25EA0064, Correction of Major and Similar Categories of Work for Contract ID Nos. 25EA0063 and 25EA0064, Modification Scope of Works for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079, 25EA0084, Modification of Minimum Equipment Requirements for Contract ID Nos. 25EA0063 and 25EA0064 and 25EA0084 and Modification of Bill of Quantities for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079 and 25EA0084 (Part 5 of 6) |
March 4, 2025 | March 11, 2025 | ||
Marinduque District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 09, s. 2025 - Correction of Station Limits for Contract ID Nos. 25EA0079 and 25EA0084, Correction of Approved Budget for the Contract and Contract Duration for Contract ID Nos. 25EA0063 and 25EA0064, Correction of Major and Similar Categories of Work for Contract ID Nos. 25EA0063 and 25EA0064, Modification Scope of Works for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079, 25EA0084, Modification of Minimum Equipment Requirements for Contract ID Nos. 25EA0063 and 25EA0064 and 25EA0084 and Modification of Bill of Quantities for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079 and 25EA0084 (Part 4 of 6) |
March 4, 2025 | March 11, 2025 | ||
Marinduque District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 09, s. 2025 - Correction of Station Limits for Contract ID Nos. 25EA0079 and 25EA0084, Correction of Approved Budget for the Contract and Contract Duration for Contract ID Nos. 25EA0063 and 25EA0064, Correction of Major and Similar Categories of Work for Contract ID Nos. 25EA0063 and 25EA0064, Modification Scope of Works for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079, 25EA0084, Modification of Minimum Equipment Requirements for Contract ID Nos. 25EA0063 and 25EA0064 and 25EA0084 and Modification of Bill of Quantities for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079 and 25EA0084 (Part 3 of 6) |
March 4, 2025 | March 11, 2025 | ||
Marinduque District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 09, s. 2025 - Correction of Station Limits for Contract ID Nos. 25EA0079 and 25EA0084, Correction of Approved Budget for the Contract and Contract Duration for Contract ID Nos. 25EA0063 and 25EA0064, Correction of Major and Similar Categories of Work for Contract ID Nos. 25EA0063 and 25EA0064, Modification Scope of Works for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079, 25EA0084, Modification of Minimum Equipment Requirements for Contract ID Nos. 25EA0063 and 25EA0064 and 25EA0084 and Modification of Bill of Quantities for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079 and 25EA0084 (Part 2 of 6) |
March 4, 2025 | March 11, 2025 | ||
Marinduque District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 09, s. 2025 - Correction of Station Limits for Contract ID Nos. 25EA0079 and 25EA0084, Correction of Approved Budget for the Contract and Contract Duration for Contract ID Nos. 25EA0063 and 25EA0064, Correction of Major and Similar Categories of Work for Contract ID Nos. 25EA0063 and 25EA0064, Modification Scope of Works for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079, 25EA0084, Modification of Minimum Equipment Requirements for Contract ID Nos. 25EA0063 and 25EA0064 and 25EA0084 and Modification of Bill of Quantities for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079 and 25EA0084 (Part 1 of 6) |
March 4, 2025 | March 11, 2025 | ||
Marinduque District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 09, s. 2025 - Correction of Station Limits for Contract ID Nos. 25EA0079 and 25EA0084, Correction of Approved Budget for the Contract and Contract Duration for Contract ID Nos. 25EA0063 and 25EA0064, Correction of Major and Similar Categories of Work for Contract ID Nos. 25EA0063 and 25EA0064, Modification Scope of Works for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079, 25EA0084, Modification of Minimum Equipment Requirements for Contract ID Nos. 25EA0063 and 25EA0064 and 25EA0084 and Modification of Bill of Quantities for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079 and 25EA0084 (Part 6 of 6) |
March 4, 2025 | March 11, 2025 | ||
Marinduque District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 09, s. 2025 - Correction of Station Limits for Contract ID Nos. 25EA0079 and 25EA0084, Correction of Approved Budget for the Contract and Contract Duration for Contract ID Nos. 25EA0063 and 25EA0064, Correction of Major and Similar Categories of Work for Contract ID Nos. 25EA0063 and 25EA0064, Modification Scope of Works for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079, 25EA0084, Modification of Minimum Equipment Requirements for Contract ID Nos. 25EA0063 and 25EA0064 and 25EA0084 and Modification of Bill of Quantities for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079 and 25EA0084 (Part 5 of 6) |
March 4, 2025 | March 11, 2025 | ||
Marinduque District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 09, s. 2025 - Correction of Station Limits for Contract ID Nos. 25EA0079 and 25EA0084, Correction of Approved Budget for the Contract and Contract Duration for Contract ID Nos. 25EA0063 and 25EA0064, Correction of Major and Similar Categories of Work for Contract ID Nos. 25EA0063 and 25EA0064, Modification Scope of Works for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079, 25EA0084, Modification of Minimum Equipment Requirements for Contract ID Nos. 25EA0063 and 25EA0064 and 25EA0084 and Modification of Bill of Quantities for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079 and 25EA0084 (Part 4 of 6) |
March 4, 2025 | March 11, 2025 | ||
Marinduque District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 09, s. 2025 - Correction of Station Limits for Contract ID Nos. 25EA0079 and 25EA0084, Correction of Approved Budget for the Contract and Contract Duration for Contract ID Nos. 25EA0063 and 25EA0064, Correction of Major and Similar Categories of Work for Contract ID Nos. 25EA0063 and 25EA0064, Modification Scope of Works for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079, 25EA0084, Modification of Minimum Equipment Requirements for Contract ID Nos. 25EA0063 and 25EA0064 and 25EA0084 and Modification of Bill of Quantities for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079 and 25EA0084 (Part 3 of 6) |
March 4, 2025 | March 11, 2025 | ||
Marinduque District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 09, s. 2025 - Correction of Station Limits for Contract ID Nos. 25EA0079 and 25EA0084, Correction of Approved Budget for the Contract and Contract Duration for Contract ID Nos. 25EA0063 and 25EA0064, Correction of Major and Similar Categories of Work for Contract ID Nos. 25EA0063 and 25EA0064, Modification Scope of Works for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079, 25EA0084, Modification of Minimum Equipment Requirements for Contract ID Nos. 25EA0063 and 25EA0064 and 25EA0084 and Modification of Bill of Quantities for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079 and 25EA0084 (Part 2 of 6) |
March 4, 2025 | March 11, 2025 | ||
Marinduque District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 09, s. 2025 - Correction of Station Limits for Contract ID Nos. 25EA0079 and 25EA0084, Correction of Approved Budget for the Contract and Contract Duration for Contract ID Nos. 25EA0063 and 25EA0064, Correction of Major and Similar Categories of Work for Contract ID Nos. 25EA0063 and 25EA0064, Modification Scope of Works for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079, 25EA0084, Modification of Minimum Equipment Requirements for Contract ID Nos. 25EA0063 and 25EA0064 and 25EA0084 and Modification of Bill of Quantities for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079 and 25EA0084 (Part 1 of 6) |
March 4, 2025 | March 11, 2025 | ||
Marinduque District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 09, s. 2025 - Correction of Station Limits for Contract ID Nos. 25EA0079 and 25EA0084, Correction of Approved Budget for the Contract and Contract Duration for Contract ID Nos. 25EA0063 and 25EA0064, Correction of Major and Similar Categories of Work for Contract ID Nos. 25EA0063 and 25EA0064, Modification Scope of Works for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079, 25EA0084, Modification of Minimum Equipment Requirements for Contract ID Nos. 25EA0063 and 25EA0064 and 25EA0084 and Modification of Bill of Quantities for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079 and 25EA0084 |
March 4, 2025 | March 11, 2025 | ||
Davao Oriental 2nd District Engineering Office |
Supplemental Bulletin No. CW-2025-097_25LG0070 Link for Bidding Documents: https://drive.google.com/drive/folders/1XJ3dICwIH4gt0Ezhe-iRljJyy49cn-Vb |
March 4, 2025 | March 11, 2025 | ||
Marinduque District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 09, s. 2025 - Correction of Station Limits for Contract ID Nos. 25EA0079 and 25EA0084, Correction of Approved Budget for the Contract and Contract Duration for Contract ID Nos. 25EA0063 and 25EA0064, Correction of Major and Similar Categories of Work for Contract ID Nos. 25EA0063 and 25EA0064, Modification Scope of Works for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079, 25EA0084, Modification of Minimum Equipment Requirements for Contract ID Nos. 25EA0063 and 25EA0064 and 25EA0084 and Modification of Bill of Quantities for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079 and 25EA0084 (Part 4 of 5) |
March 4, 2025 | March 11, 2025 | ||
Marinduque District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 09, s. 2025 - Correction of Station Limits for Contract ID Nos. 25EA0079 and 25EA0084, Correction of Approved Budget for the Contract and Contract Duration for Contract ID Nos. 25EA0063 and 25EA0064, Correction of Major and Similar Categories of Work for Contract ID Nos. 25EA0063 and 25EA0064, Modification Scope of Works for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079, 25EA0084, Modification of Minimum Equipment Requirements for Contract ID Nos. 25EA0063 and 25EA0064 and 25EA0084 and Modification of Bill of Quantities for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079 and 25EA0084 (Part 5 of 5) |
March 4, 2025 | March 11, 2025 | ||
Davao Oriental 2nd District Engineering Office |
Supplemental Bulletin No. CW-2025-096_25LG0069 Link for Bidding Documents: https://drive.google.com/drive/folders/1GO27MLDltCaCFRcFk9c74vYGSZH4WTZd |
March 4, 2025 | March 11, 2025 | ||
Marinduque District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 09, s. 2025 - Correction of Station Limits for Contract ID Nos. 25EA0079 and 25EA0084, Correction of Approved Budget for the Contract and Contract Duration for Contract ID Nos. 25EA0063 and 25EA0064, Correction of Major and Similar Categories of Work for Contract ID Nos. 25EA0063 and 25EA0064, Modification Scope of Works for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079, 25EA0084, Modification of Minimum Equipment Requirements for Contract ID Nos. 25EA0063 and 25EA0064 and 25EA0084 and Modification of Bill of Quantities for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079 and 25EA0084 (Part 3 of 5) |
March 4, 2025 | March 11, 2025 | ||
Marinduque District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 09, s. 2025 - Correction of Station Limits for Contract ID Nos. 25EA0079 and 25EA0084, Correction of Approved Budget for the Contract and Contract Duration for Contract ID Nos. 25EA0063 and 25EA0064, Correction of Major and Similar Categories of Work for Contract ID Nos. 25EA0063 and 25EA0064, Modification Scope of Works for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079, 25EA0084, Modification of Minimum Equipment Requirements for Contract ID Nos. 25EA0063 and 25EA0064 and 25EA0084 and Modification of Bill of Quantities for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079 and 25EA0084 (Part 2 of 5) |
March 4, 2025 | March 11, 2025 | ||
Marinduque District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 09, s. 2025 - Correction of Station Limits for Contract ID Nos. 25EA0079 and 25EA0084, Correction of Approved Budget for the Contract and Contract Duration for Contract ID Nos. 25EA0063 and 25EA0064, Correction of Major and Similar Categories of Work for Contract ID Nos. 25EA0063 and 25EA0064, Modification Scope of Works for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079, 25EA0084, Modification of Minimum Equipment Requirements for Contract ID Nos. 25EA0063 and 25EA0064 and 25EA0084 and Modification of Bill of Quantities for Contract ID Nos. 25EA0063, 25EA0064, 25EA0079 and 25EA0084 (Part 1 of 5) |
March 4, 2025 | March 11, 2025 | ||
Davao Oriental 2nd District Engineering Office |
Supplemental Bulletin No. CW-2025-095 for CID No, 25LG0068 Link for DED Plans https://drive.google.com/file/d/19YGD1YcKr2z7NvuFrjgRg_FM4zI0yMzJ/view?usp=sharing |
March 4, 2025 | March 11, 2025 | ||
Davao Oriental 2nd District Engineering Office | Supplemental Bulletin No. CW-2025-094_25LG0067 | March 4, 2025 | March 11, 2025 | ||
Batangas 4th District Engineering Office | SUPPLEMENTAL BID BULLETIN NO. CW-2025-120 : CID 25DD0256 | March 4, 2025 | March 11, 2025 | ||
Batangas 4th District Engineering Office | SUPPLEMENTAL BID BULLETIN NO. CW-2025-111 : CID 25DD0257 | March 4, 2025 | March 11, 2025 | ||
Batangas 4th District Engineering Office | SUPPLEMENTAL BID BULLETIN NO. CW-2025-119 : CID 25DD0250 | March 4, 2025 | March 11, 2025 | ||
Batangas 4th District Engineering Office | SUPPLEMENTAL BID BULLETIN NO. CW-2025-118 : CID 25DD0249 | March 4, 2025 | March 11, 2025 | ||
Davao Oriental 2nd District Engineering Office |
Supplemental Bulletin No. CW-2025-093_25LG0066 Link of Bidding Documents: https://drive.google.com/drive/folders/1ezbuHrPeYssuJwJODewZ8Lwo8NKsbBQn |
March 4, 2025 | March 11, 2025 | ||
Batangas 4th District Engineering Office | SUPPLEMENTAL BID BULLETIN NO. CW-2025-117 : CID 25DD0252 | March 4, 2025 | March 11, 2025 | ||
Batangas 4th District Engineering Office | SUPPLEMENTAL BID BULLETIN NO. CW-2025-116 : CID 25DD0254 | March 4, 2025 | March 11, 2025 | ||
Batangas 4th District Engineering Office | SUPPLEMENTAL BID BULLETIN NO. CW-2025-115 : CID 25DD0266 | March 4, 2025 | March 11, 2025 | ||
Batangas 4th District Engineering Office | SUPPLEMENTAL BID BULLETIN NO. CW-2025-114 : CID 25DD0247 - PART 2 | March 4, 2025 | March 11, 2025 | ||
Batangas 4th District Engineering Office | SUPPLEMENTAL BID BULLETIN NO. CW-2025-114 : CID 25DD0247 - PART 1 | March 4, 2025 | March 11, 2025 | ||
Batangas 4th District Engineering Office | SUPPLEMENTAL BID BULLETIN NO. CW-2025-113 : CID 25DD0265 | March 4, 2025 | March 11, 2025 | ||
Batangas 4th District Engineering Office | SUPPLEMENTAL BID BULLETIN NO. CW-2025-112 : CID 25DD0258 | March 4, 2025 | March 11, 2025 | ||
Cagayan de Oro City 2nd District Engineering Office | 25KD0069 – FMR in Barangay Balubal | March 4, 2025 | March 11, 2025 | ||
Davao Oriental 2nd District Engineering Office | Supplemental Bulletin No. CW-2025-092 for CID No. 25LG0065 | March 4, 2025 | March 11, 2025 | ||
Davao Oriental 2nd District Engineering Office | Supplemental Bulletin No. CW-2025-091 for CID No. 25LG0064 | March 4, 2025 | March 11, 2025 | ||
Davao Oriental 2nd District Engineering Office |
Supplemental Bulletin No. CW-2025-090 for CID No. 25LG0063 Link for DED Plans https://drive.google.com/file/d/1TaxgDE-nQXmFirnmuAlH5PPb7WFi_dWy/view?usp=sharing |
March 4, 2025 | March 11, 2025 | ||
Davao Oriental 2nd District Engineering Office | Supplemental Bulletin No. CW-2025-089 for CID No. 25LG0062 | March 4, 2025 | March 11, 2025 | ||
Davao Oriental 2nd District Engineering Office | Supplemental Bulletin No. CW-2025-088 for CID No. 25LG0061 | March 4, 2025 | March 11, 2025 | ||
Northern Samar 1st District Engineering Office | Supplemental Bulletin No.1 CID 25IH0034 | March 4, 2025 | March 11, 2025 | ||
Batangas 4th District Engineering Office | SUPPLEMENTAL BID BULLETIN NO. CW-2025-110 : CID 25DD0274 | March 4, 2025 | March 11, 2025 | ||
Batangas 4th District Engineering Office | SUPPLEMENTAL BID BULLETIN NO. CW-2025-109 : CID 25DD0269 | March 4, 2025 | March 11, 2025 | ||
Batangas 4th District Engineering Office | SUPPLEMENTAL BID BULLETIN NO. CW-2025-108 : CID 25DD0260 | March 4, 2025 | March 11, 2025 | ||
Batangas 4th District Engineering Office | SUPPLEMENTAL BID BULLETIN NO. CW-2025-107 : CID 25DD0259 | March 4, 2025 | March 11, 2025 | ||
Batangas 4th District Engineering Office | SUPPLEMENTAL BID BULLETIN NO. CW-2025-106 : CID 25DD0246 - PART 2 | March 4, 2025 | March 11, 2025 | ||
Batangas 4th District Engineering Office | SUPPLEMENTAL BID BULLETIN NO. CW-2025-106 : CID 25DD0246 - PART 1 | March 4, 2025 | March 11, 2025 | ||
Batangas 4th District Engineering Office | SUPPLEMENTAL BID BULLETIN NO. CW-2025-105 : CID 25DD0271 | March 4, 2025 | March 11, 2025 | ||
Batangas 4th District Engineering Office | SUPPLEMENTAL BID BULLETIN NO. CW-2025-104 : CID 25DD0251 | March 4, 2025 | March 11, 2025 | ||
Batangas 4th District Engineering Office | SUPPLEMENTAL BID BULLETIN NO. CW-2025-103 : CID 25DD0273 | March 4, 2025 | March 11, 2025 | ||
Batangas 4th District Engineering Office | SUPPLEMENTAL BID BULLETIN NO. CW-2025-102 : CID 25DD0255 | March 4, 2025 | March 11, 2025 | ||
La Union 1st District Engineering Office | Supplemental Bulletin No. 25-0059 | March 4, 2025 | March 11, 2025 | ||
La Union 1st District Engineering Office | Supplemental Bulletin No. 25-0060 | March 4, 2025 | March 11, 2025 | ||
Davao Oriental 2nd District Engineering Office |
Supplemental Bulletin No. CW-2025-087 for 25LG0060 Link for DED Plans https://drive.google.com/file/d/1hmbhGN8EnTCR5dSHuQhQd6aBJW3GoLaY/view?usp=sharing |
March 4, 2025 | March 11, 2025 | ||
La Union 1st District Engineering Office | Supplemental Bulletin No. 25-0062 | March 4, 2025 | March 11, 2025 | ||
Davao Oriental 2nd District Engineering Office | Supplemental Bulletin No. CW-2025-086 for 25LG0059 | March 4, 2025 | March 11, 2025 | ||
La Union 1st District Engineering Office | Supplemental Bulletin No. 25-0063 | March 4, 2025 | March 11, 2025 | ||
La Union 1st District Engineering Office | Supplemental bulletin No. 25-0061 | March 4, 2025 | March 12, 2025 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2 - CORRECTION FOR CONTRACT ID NOS. 25CD0197 - Construction of Valenzuela - Obando - Meycauayan (VOM) Flood Control Structure along Meycauayan River, Sta. 5+750 - Sta. 6+100, Barangay Saluysoy, Meycauayan City, Bulacan |
March 4, 2025 | March 11, 2025 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2 - CORRECTION FOR CONTRACT ID NOS. 25CD0196 - Construction of Flood Control Structure along Meycauayan River Sta. 05+860 - Sta. 06+025, Barangay Calvario to Barangay Saluysoy, Meycauayan City, Bulacan |
March 4, 2025 | March 11, 2025 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2 - CORRECTION FOR CONTRACT ID NOS. 25CD0185 - Replacement of Permanent Weak Bridges New Norzagaray Br. (Lawang Br.) (B00139LZ) along Norzagaray - Bigte Rd |
March 4, 2025 | March 11, 2025 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2 - CORRECTION FOR CONTRACT ID NOS. 25CD0184 - Rehabilitation of Road, Barangay Pulong Buhangin and Barangay Mag-asawang Sapa, Santa Maria, Bulacan |
March 4, 2025 | March 11, 2025 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2 - CORRECTION FOR CONTRACT ID NOS. 25CD0183 - Construction of Roads and Drainage at Northville 1, Barangay Libtong, Meycauayan City (Phase 1) |
March 4, 2025 | March 11, 2025 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2 - CORRECTION FOR CONTRACT ID NOS. 25CD0180 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads Gen. Alejo Santos Highway - K0064+000 - K0064+260, K0064+470 - K0064+800, K0065+000 - K0065+140, K0065+355 - K0065+405, K0065+576 - K0065+848, K0065+877 - K0065+1022, K0066+000 - K0066+100 |
March 4, 2025 | March 11, 2025 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2 - CORRECTION FOR CONTRACT ID NOS. 25CD0181 - Rehabilitation of Road, Barangays Lalakhan, Santa Clara, Santa Cruz and Manggahan, Santa Maria, Bulacan |
March 4, 2025 | March 11, 2025 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2 - CORRECTION FOR CONTRACT ID NOS. 25CD0180 - Construction of Road, Barangay Pulong Buhangin and Mag-asawang Sapa, Santa Maria, Bulacan |
March 4, 2025 | March 11, 2025 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2 - CORRECTION FOR CONTRACT ID NOS. 25CD0179 - Construction of Road, DPWH Compound, Brgy. Pulong Buhangin, Santa Maria, Bulacan |
March 4, 2025 | March 11, 2025 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2 - CORRECTION FOR CONTRACT ID NOS. 25CD0178 - Construction of Barangay Roads, Brgy. Caysio, Caypombo and Mag-asawang Sapa, Santa Maria, Bulacan |
March 4, 2025 | March 11, 2025 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2 - CORRECTION FOR CONTRACT ID NOS. 25CD0177 - Construction of Barangay Roads, Brgy. Bigte and Minuyan, Norzagaray, Bulacan |
March 4, 2025 | March 11, 2025 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2 - CORRECTION FOR CONTRACT ID NOS. 25CD0176 - Construction of Barangay Roads, Brgy. Parada San Vicente and Buenavista, Santa Maria, Bulacan |
March 4, 2025 | March 11, 2025 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2 - CORRECTION FOR CONTRACT ID NOS. 25CD0173 - Construction of Flood Control Structure along Meycauayan River, Sta 04+475 – Sta 04+575 (Liputan-Nagbalon Section), Meycauayan, Bulacan |
March 4, 2025 | March 11, 2025 | ||
La Union 1st District Engineering Office | Supplemental Bulletin 25-0055 | March 4, 2025 | March 11, 2025 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2 - CORRECTION FOR CONTRACT ID NOS. 25CD0172 - Construction of Flood Control Structure along Meycauayan River and its Tributaries, Sta. 08+700 - Sta. 08+875, Barangay Caingin, Meycauyan, Bulacan |
March 4, 2025 | March 11, 2025 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2 - CORRECTION FOR CONTRACT ID NOS. 25CD0170 - Construction of Flood Control Structure along Meycauayan River and It's Tributaries, Sta. 06+980 - Sta. 07+160 (Saluysoy Section), Meycauayan, Bulacan |
March 4, 2025 | March 11, 2025 | ||
La Union 1st District Engineering Office | Supplemental Bulletin No. 25-0058 | March 4, 2025 | March 11, 2025 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2 - Indefinite Suspension of Procurement Activities for Contract ID No. 25CD0166 - Construction of Multi-Purpose Building, Brgy. Fatima 2, San Jose Del Monte, Bulacan |
March 4, 2025 | March 11, 2025 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2 - Indefinite Suspension of Procurement Activities for Contract ID No. 25CD0165 - Construction of Multi-Purpose Building, Brgy. Sta. Cruz 3, San Jose Del Monte, Bulacan |
March 4, 2025 | March 11, 2025 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2 - Indefinite Suspension of Procurement Activities for Contract ID No. 25CD0164 - Construction of Multi-Purpose Building, Brgy. Tungkong Mangga, San Jose Del Monte, Bulacan |
March 4, 2025 | March 11, 2025 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2 - Indefinite Suspension of Procurement Activities for Contract ID No. 25CD0163 - Construction of Multi-Purpose Building, Brgy. Dulong Bayan, San Jose Del Monte, Bulacan |
March 4, 2025 | March 11, 2025 |