Civil Works - Bid Bulletin - Submissions
Office | Description | Date Published | Closing Date | ||
---|---|---|---|---|---|
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 10-F Series of 2025 for Contract ID No. 25CG0116 |
April 2, 2025 | April 10, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 10-F Series of 2025 for Contract ID No. 25CG0112 |
April 2, 2025 | April 10, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 10-F Series of 2025 for Contract ID No. 25CG0109 |
April 2, 2025 | April 10, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 10-F Series of 2025 for Contract ID No. 25CG0100 |
April 2, 2025 | April 10, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 10-F Series of 2025 for Contract ID No. 25CG0093 |
April 2, 2025 | April 10, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 10-F Series of 2025 for Contract ID No. 25CG0091 |
April 2, 2025 | April 10, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 10-F Series of 2025 for Contract ID No. 25CG0090 |
April 2, 2025 | April 10, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 10-F Series of 2025 for Contract ID No. 25CG0089 |
April 2, 2025 | April 10, 2025 | ||
Bohol 1st District Engineering Office |
Supplemental Bulletin No. 1 for 25HA0110(Re-Ad) - Construction of Multi-Purpose Building, Hanopol Este, Balilihan, Bohol |
April 2, 2025 | April 21, 2025 | ||
Laguna 3rd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2025CW-04-03 : Revision on Major and Similar Categories of Work for Contract ID No. 25DP0070 |
April 2, 2025 | April 9, 2025 | ||
Bohol 1st District Engineering Office |
Supplemental Bulletin No. 1 for 25HA0084 (Re-Ad) - Construction of Multi-Purpose Building in Barangay Mansasa, Tagbilaran City, Bohol |
April 2, 2025 | April 21, 2025 | ||
Romblon District Engineering Office | CANCELLATION OF BIDDING/PROCUREMENT ACTIVITIES | April 2, 2025 | April 9, 2025 | ||
Bukidnon 4th District Engineering Office | Supplemental Bulletin No. 1 - Revision of Bill of Quantities for 25KN0020 | April 2, 2025 | April 9, 2025 | ||
Iloilo 3rd District Engineering Office |
Bid Bulletin No. 01 for 25GH0160-Concreting of Brgy. Bakabak FMR, Brgy. Bakabak, Sara, Iloilo |
April 2, 2025 | April 15, 2025 | ||
Iloilo 3rd District Engineering Office |
Bid Bulletin No. 01 for 25GH0159 Concreting of Brgy. Amayong to Purok 3, Brgy. Batuan FMR, Brgy. Amayong and Brgy. Batuan, San Dionisio, Iloilo |
April 2, 2025 | April 15, 2025 | ||
Regional Office XII |
24M00101 - SUPPLEMENTAL BULLETIN #4 - RESCHEDULING OF BID DROPPING/SUBMISSION & BID OPENING |
April 2, 2025 | April 23, 2025 | ||
Regional Office XII |
24M00100 - SUPPLEMENTAL BULLETIN #4 - RESCHEDULING OF BID DROPPING/SUBMISSION & BID OPENING |
April 2, 2025 | April 23, 2025 | ||
Cebu 5th District Engineering Office | 24HI0152 - SUPPLEMENTAL BULLETIN NO. 04 | April 2, 2025 | April 15, 2025 | ||
Regional Office XII |
25M00093 - SUPPLEMENTAL BULLETIN #2 - RESCHEDULING OF BID DROPPING/SUBMISSION & BID OPENING |
April 2, 2025 | April 23, 2025 | ||
Regional Office XII |
24M00326 - SUPPLEMENTAL BULLETIN #2 - RESCHEDULING OF BID DROPPING/SUBMISSION & BID OPENING |
April 2, 2025 | April 10, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 11-A Series of 2025 for Contract ID No. 25CG0153 |
April 2, 2025 | April 10, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 11-A Series of 2025 for Contract ID No. 25CG0152 |
April 2, 2025 | April 10, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 11-A Series of 2025 for Contract ID No. 25CG0151 |
April 2, 2025 | April 10, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 11-A Series of 2025 for Contract ID No. 25CG0150 |
April 2, 2025 | April 10, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 11-A Series of 2025 for Contract ID No. 25CG0149 |
April 2, 2025 | April 10, 2025 | ||
Davao del Sur District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2025-031 for Contract ID No. 25LD0201: RESCHEDULE OF PROCUREMENT ACTIVITIES |
April 2, 2025 | May 27, 2025 | ||
Davao del Sur District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2025-031 for Contract ID No. 25LD0169: RESCHEDULE OF PROCUREMENT ACTIVITIES |
April 2, 2025 | May 27, 2025 | ||
Davao del Sur District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2025-031 for Contract ID No. 25LD0161: RESCHEDULE OF PROCUREMENT ACTIVITIES |
April 2, 2025 | May 27, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 52-T Series of 2024 for Contract ID No. 25CG0009 |
April 2, 2025 | April 10, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 52-T Series of 2024 for Contract ID No. 25CG0004 |
April 2, 2025 | April 10, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 52-T Series of 2024 for Contract ID No. 25CG0001 |
April 2, 2025 | April 10, 2025 | ||
Davao del Sur District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2025-031 for Contract ID No. 25LD0158: RESCHEDULE OF PROCUREMENT ACTIVITIES |
April 2, 2025 | May 27, 2025 | ||
Davao del Sur District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2025-031 for Contract ID No. 25LD0156: RESCHEDULE OF PROCUREMENT ACTIVITIES |
April 2, 2025 | May 27, 2025 | ||
Davao del Sur District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2025-031 for Contract ID No. 25LD0155: RESCHEDULE OF PROCUREMENT ACTIVITIES |
April 2, 2025 | May 27, 2025 | ||
Davao del Sur District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2025-031 for Contract ID No. 25LD0150: RESCHEDULE OF PROCUREMENT ACTIVITIES |
April 2, 2025 | May 27, 2025 | ||
Davao del Sur District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2025-031 for Contract ID No. 25LD0149: RESCHEDULE OF PROCUREMENT ACTIVITIES |
April 2, 2025 | May 27, 2025 | ||
Davao del Sur District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2025-031 for Contract ID No. 25LD0144: RESCHEDULE OF PROCUREMENT ACTIVITIES |
April 2, 2025 | May 27, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2-K Series of 2025 for Contract ID No. 25CG0059 |
April 2, 2025 | April 10, 2025 | ||
Tarlac District Engineering Office |
25CJ0288 Construction of Multi-Purpose Building (IT Center), San Isidro, Tarlac City, Tarlac (Annex 4) SUPPLEMENTAL BULLETIN NO. 2 Notice of Postponement |
April 2, 2025 | April 24, 2025 | ||
Regional Office II |
25B00092, Supplemental Bulletin No. 1 (Amendments are made in the schedule of activities due to the absence of a quorum as BAC Chairperson and BAC Vice Chairperson are on official business.) Pre-Bid Conference: April 7, 2025 at 11:00 A.M. Submission, Receipt and Opening of Bids: April 21, 2025 until 10:00 A.M. |
April 2, 2025 | April 21, 2025 | ||
Regional Office II |
25B00091, Supplemental Bulletin No. 1 (Amendments are made in the schedule of activities due to the absence of a quorum as BAC Chairperson and BAC Vice Chairperson are on official business.) Pre-Bid Conference: April 7, 2025 at 11:00 A.M. Submission, Receipt and Opening of Bids: April 21, 2025 until 10:00 A.M. |
April 2, 2025 | April 21, 2025 | ||
Regional Office II |
25B00090, Supplemental Bulletin No. 1 (Amendments are made in the schedule of activities due to the absence of a quorum as BAC Chairperson and BAC Vice Chairperson are on official business.) Pre-Bid Conference: April 7, 2025 at 11:00 A.M. Submission, Receipt and Opening of Bids: April 21, 2025 until 10:00 A.M. |
April 2, 2025 | April 21, 2025 | ||
Regional Office II |
25B00089, Supplemental Bulletin No. 1 (Amendments are made in the schedule of activities due to the absence of a quorum as BAC Chairperson and BAC Vice Chairperson are on official business.) Pre-Bid Conference: April 7, 2025 at 11:00 A.M. Submission, Receipt and Opening of Bids: April 21, 2025 until 10:00 A.M. |
April 2, 2025 | April 21, 2025 | ||
Regional Office II |
25B00088, Supplemental Bulletin No. 1 (Amendments are made in the schedule of activities due to the absence of a quorum as BAC Chairperson and BAC Vice Chairperson are on official business.) Pre-Bid Conference: April 7, 2025 at 11:00 A.M. Submission, Receipt and Opening of Bids: April 21, 2025 until 10:00 A.M. |
April 2, 2025 | April 21, 2025 | ||
Davao City 3rd District Engineering Office |
CLARIFICATION ON BDS FOR 25LK0071 Construction of Road, Sitio Ayagon, Barangay Lumiad to Sitio Salukadang, Barangay Mapula, Paquibato District, Davao City |
April 2, 2025 | April 15, 2025 | ||
Davao City 3rd District Engineering Office |
CLARIFICATION ON BDS FOR 25LK0070 Construction of Road, Sitio Banban to Sitio Ayagon, Barangay Lumiad, Paquibato District, Davao City |
April 2, 2025 | April 15, 2025 | ||
Regional Office II |
25B00086, Notice of Postponement (Opening of Bids scheduled on April 3, 2025 is reset to April 7, 2025 at 10:00 A.M. due to the absence of quorum as BAC Chairperson and BAC Vice Chairperson are on official business until April 4, 2025.) Submission and Receipt of Bids shall remain as scheduled on April 3, 2025 until 10:00 A.M. |
April 2, 2025 | April 9, 2025 | ||
Regional Office II |
25B00085, Notice of Postponement (Opening of Bids scheduled on April 3, 2025 is reset to April 7, 2025 at 10:00 A.M. due to the absence of quorum as BAC Chairperson and BAC Vice Chairperson are on official business until April 4, 2025.) Submission and Receipt of Bids shall remain as scheduled on April 3, 2025 until 10:00 A.M. |
April 2, 2025 | April 9, 2025 | ||
Regional Office II |
25B00084, Notice of Postponement (Opening of Bids scheduled on April 3, 2025 is reset to April 7, 2025 at 10:00 A.M. due to the absence of quorum as BAC Chairperson and BAC Vice Chairperson are on official business until April 4, 2025.) Submission and Receipt of Bids shall remain as scheduled on April 3, 2025 until 10:00 A.M. |
April 2, 2025 | April 9, 2025 | ||
Regional Office II |
25B00083, Notice of Postponement (Opening of Bids scheduled on April 3, 2025 is reset to April 7, 2025 at 10:00 A.M. due to the absence of quorum as BAC Chairperson and BAC Vice Chairperson are on official business until April 4, 2025.) Submission and Receipt of Bids shall remain as scheduled on April 3, 2025 until 10:00 A.M. |
April 2, 2025 | April 9, 2025 | ||
Regional Office V | Supplemental Bulletin No. 1 (with Revised BDS, BOQ, Plans) - 25F00289 | April 2, 2025 | April 9, 2025 | ||
Regional Office V | Supplemental Bulletin No. 1 (with Revised Plans) - 25F00028 | April 2, 2025 | April 9, 2025 | ||
Regional Office V | Supplemental Bulletin No. 1 (with Revised Plans) - 25F00098 | April 2, 2025 | April 9, 2025 | ||
Regional Office V | Supplemental Bulletin No. 1 (with Revised Plans) - 25F00078 | April 2, 2025 | April 9, 2025 | ||
Regional Office V | Supplemental Bulletin No. 1 (with Revised Plans) - 25F00050 | April 2, 2025 | April 9, 2025 | ||
Regional Office V | Supplemental Bulletin No. 1 (with Revised Plans) - 25F00011 | April 2, 2025 | April 9, 2025 | ||
Cavite 1st District Engineering Office |
Bid Bulletin No. 25-34 (Reschedule of Submission and Opening of Bid for Project Nos. 25DF0173, 25DF0175) |
April 2, 2025 | April 9, 2025 | ||
CAR - Regional Office |
Bid Bulletin CW-10/2025: 25P00026 - Local Program – National Building Program – Buildings and Other Structures – Multipurpose/ Facilities – Construction of National Bureau of Investigation (NBI) – Cordillera Administrative Region (NBI-CAR) Office Building, Phase I, Upper Session Road, Baguio City |
April 2, 2025 | April 9, 2025 | ||
Camarines Sur 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2025-30 for Contract ID Number 25FD0074 CONSTRUCTION OF ROAD, BARANGAY PALASPAS, DEL GALLEGO, CAMARINES SUR |
April 2, 2025 | April 9, 2025 | ||
Camarines Sur 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2025-29 for Contract ID Number 25FD0071 CONSTRUCTION OF ROAD, BARANGAY LAGUIO, RAGAY, CAMARINES SUR |
April 2, 2025 | April 9, 2025 | ||
Camarines Sur 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2025-23(2)- Contract ID Number 25FD0067 CONSTRUCTION OF ROAD, BARANGAY SALVACION, RAGAY, CAMARINES SUR |
April 2, 2025 | April 9, 2025 | ||
Capiz 1st District Engineering Office | Bid Bulletin No. 1 for Contract ID No. 25GD0055 | April 2, 2025 | April 9, 2025 | ||
Capiz 1st District Engineering Office | Bid Bulletin No. 1 for Contract ID No. 25GD0054 | April 2, 2025 | April 9, 2025 | ||
Capiz 1st District Engineering Office | Bid Bulletin No. 1 for Contract ID No. 24GD0093 | April 2, 2025 | April 9, 2025 | ||
Capiz 1st District Engineering Office | Bid Bulletin No. 1 for Contract ID No. 25GD0053 | April 2, 2025 | April 9, 2025 | ||
Cebu 2nd District Engineering Office | SUPPLEMENTAL BULLETIN 25-0009 FOR CONTRACT ID NO. 25HE0091 | April 1, 2025 | April 8, 2025 | ||
Cebu 2nd District Engineering Office | SUPPLEMENTAL BULLETIN 25-0009 FOR CONTRACT ID NO. 25HE0090 | April 1, 2025 | April 8, 2025 | ||
Cebu 2nd District Engineering Office | SUPPLEMENTAL BULLETIN 25-0009 FOR CONTRACT ID NO. 25HE0089 | April 1, 2025 | April 8, 2025 | ||
Regional Office IV-A |
CONSTRUCTION OF ISAAC TOLENTINO MEMORIAL MEDICAL CENTER, PHASE 2, BARANGAY GUINHAWA SOUTH, TAGAYTAY CITY, CAVITE LINK FOR REVISED PLANS https://drive.google.com/file/d/15-7TlWUwF5umTvUo_SBS7l-o3V6ulaLH/view?usp=drive_link |
April 1, 2025 | April 10, 2025 | ||
Regional Office IV-A |
CONSTRUCTION OF RIVER CONTROL ALONG PAGSANJAN RIVER, LUMBAN SECTION, LAGUNA (PHASE 2) |
April 1, 2025 | April 10, 2025 | ||
Regional Office IV-A |
CLUSTER 7: 1. IMPROVEMENT OF INTERSECTION AT MAHARLIKA HIGHWAY - K0162 + 475 2. IMPROVEMENT OF INTERSECTION AT MAHARLIKA HIGHWAY - K0196 + 431 3. IMPROVEMENT OF INTERSECTION AT MAHARLIKA HIGHWAY - K0216 + 193 4. IMPROVEMENT OF INTERSECTION AT MAHARLIKA HIGHWAY - K0217 + 279 |
April 1, 2025 | April 10, 2025 | ||
Regional Office IV-A |
CONSTRUCTION OF BRIDGE 2 AT BYPASS/ALTERNATE/DIVERSION ROAD-MUNTINLUPA-CAVITE EXPRESSWAY TO DAANG HARI ROAD, BACOOR, CAVITE |
April 1, 2025 | April 8, 2025 | ||
Regional Office IV-A | Construction of Bypass/Diversion Roads BACOOR DIVERSION ROAD, PACKAGE E, CAVITE | April 1, 2025 | April 8, 2025 | ||
Regional Office IV-A |
ENHANCEMENT AND CONSTRUCTION OF 2ND FLOOR OF NAVAL COMBAT SYSTEMS CENTER’S (NCSC) BARRACKS, NSPL, FORT SAN FELIPE, CAVITE CITY, CAVITE LINK FOR REVISED PLANS https://drive.google.com/file/d/1nJbrxo2q6UExof7K7R7k39RU6b_jVh9F/view?usp=drive_link |
April 1, 2025 | April 8, 2025 | ||
Regional Office IV-A |
CONSTRUCTION OF TAGAYTAY TOURIST (ICONIC TOWER) (PHASE 7), BARANGAY KAYBAGAL SOUTH, TAGAYTAY CITY, CAVITE |
April 1, 2025 | April 8, 2025 | ||
Regional Office IV-A |
Construction of Missing Links/ New Roads MAUBAN-TIGNOAN ROAD (REAL SECTION), PACKAGE A, QUEZON |
April 1, 2025 | April 8, 2025 | ||
Regional Office IV-A | Construction of Bypass/Diversion Roads BACOOR DIVERSION ROAD, PACKAGE C, CAVITE | April 1, 2025 | April 8, 2025 | ||
Regional Office IV-A |
CONSTRUCTION OF BANK IMPROVEMENT ALONG RIO GRANDE RIVER (PHASE IV), BARANGAY SANTIAGO, GEN. TRIAS, CAVITE |
April 1, 2025 | April 10, 2025 | ||
Regional Office IV-A |
CONSTRUCTION OF BANK IMPROVEMENT ALONG RIO GRANDE RIVER (PHASE IV), BARANGAY SANTIAGO, GEN. TRIAS, CAVITE |
April 1, 2025 | April 8, 2025 | ||
Regional Office IV-A |
CONSTRUCTION OF BANK IMPROVEMENT ALONG RIO GRANDE RIVER (PHASE III), BARANGAY SANTIAGO, GEN. TRIAS, CAVITE |
April 1, 2025 | April 8, 2025 | ||
Regional Office IV-A |
REHABILITATION OF DAMAGED SLOPE PROTECTION AT LIAN RIVER (DOWNSTREAM), NASUGBU AND LIAN, BATANGAS (PACKAGE D) |
April 1, 2025 | April 8, 2025 | ||
Regional Office IV-A |
(CLUSTER 6) INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (PAVEMENT MARKINGS, ROAD SIGNS) ALONG MAHARLIKA HIGHWAY - K0099 + 000 - K0099 + 584 INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (PAVEMENT MARKINGS, ROAD SIGNS) ALONG MAHARLIKA HIGHWAY - K0097 + 200 - K0098 + 096 INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES ALONG MAHARLIKA HIGHWAY - K0109 + 000 - K0109 + 903 |
April 1, 2025 | April 10, 2025 | ||
Regional Office IV-A |
(CLUSTER 2) IMPROVEMENT OF INTERSECTION AT MAHARLIKA HIGHWAY (MANILA SOUTH ROAD) - K0050 + 242 IMPROVEMENT OF INTERSECTION AT MAHARLIKA HIGHWAY (MANILA SOUTH ROAD) - K0051 + 000 |
April 1, 2025 | April 10, 2025 | ||
Regional Office IV-A |
(CLUSTER 1) IMPROVEMENT OF INTERSECTION AT MAHARLIKA HIGHWAY - K0061 + 189 IMPROVEMENT OF INTERSECTION AT MAHARLIKA HIGHWAY - K0060+175 IMPROVEMENT OF INTERSECTION AT MAHARLIKA HIGHWAY - K0063+571 |
April 1, 2025 | April 10, 2025 | ||
Regional Office IV-A |
Construction of By-Pass and Diversion Roads BATANGAS CITY - SAN PASCUAL - BAUAN DIVERSION ROAD, BATANGAS (PACKAGE Q) |
April 1, 2025 | April 8, 2025 | ||
Regional Office IV-A |
Construction of Missing Links/ New Roads GENERAL NAKAR - DINGALAN ROAD (GEN. NAKAR SIDE), PACKAGE G, QUEZON |
April 1, 2025 | April 8, 2025 | ||
Marinduque District Engineering Office |
Supplemental Bulletin No. 14, 2025 - Adoption of the Standard Forms and Templates in the Evaluation and Processing of Construction Safety and Health Program based on Department Order No. 46, s. 2025 |
April 1, 2025 | April 8, 2025 | ||
Marinduque District Engineering Office |
Supplemental Bulletin No. 14, 2025 - Adoption of the Standard Forms and Templates in the Evaluation and Processing of Construction Safety and Health Program based on Department Order No. 46, s. 2025 and Modification of Scope of Works for Contract ID No. 25EA0086 |
April 1, 2025 | April 8, 2025 | ||
Marinduque District Engineering Office |
Supplemental Bulletin No. 14, 2025 - Adoption of the Standard Forms and Templates in the Evaluation and Processing of Construction Safety and Health Program based on Department Order No. 46, s. 2025 |
April 1, 2025 | April 8, 2025 | ||
Marinduque District Engineering Office |
Supplemental Bulletin No. 14, 2025 - Adoption of the Standard Forms and Templates in the Evaluation and Processing of Construction Safety and Health Program based on Department Order No. 46, s. 2025 |
April 1, 2025 | April 8, 2025 | ||
Quezon 3rd District Engineering Office |
RESOLUTION-2025-CW-15 Revision on BOQ and Plan |
April 1, 2025 | April 8, 2025 | ||
Quezon 3rd District Engineering Office |
RESOLUTION-2025-CW-15 Revision on BOQ and Plan |
April 1, 2025 | April 8, 2025 | ||
Quezon 3rd District Engineering Office |
RESOLUTION-2025-CW-15 Revision on BOQ and Plan |
April 1, 2025 | April 8, 2025 | ||
Quezon 3rd District Engineering Office |
RESOLUTION-2025-CW-15 Revision on BOQ and Plan |
April 1, 2025 | April 8, 2025 | ||
Quezon 3rd District Engineering Office |
RESOLUTION-2025-CW-15 Revision on BOQ and Plan |
April 1, 2025 | April 8, 2025 | ||
Quezon 3rd District Engineering Office |
RESOLUTION-2025-CW-15 Revision on BOQ and Plan |
April 1, 2025 | April 8, 2025 | ||
Quezon 3rd District Engineering Office |
RESOLUTION-2025-CW-15 Revision on BOQ and Plan |
April 1, 2025 | April 8, 2025 | ||
Quezon 3rd District Engineering Office |
RESOLUTION-2025-CW-15 Revision on BOQ and Plan |
April 1, 2025 | April 8, 2025 | ||
Quezon 3rd District Engineering Office |
RESOLUTION-2025-CW-15 Revision on BOQ and Plan |
April 1, 2025 | April 8, 2025 | ||
Isabela 3rd District Engineering Office | 25BG0134: Bid Bulletin No. 136-2025 (Notice of Correction) | April 1, 2025 | April 8, 2025 |