Office | Description | Date Published | Closing Date | ||
---|---|---|---|---|---|
Pangasinan 2nd District Engineering Office | Supplemental Bulletin No. 049 - Change in Quantities of Work to be Done | December 6, 2024 | December 13, 2024 | ||
Apayao 2nd District Engineering Office | BID BULLETIN NO.2 FOR 25PC0023 | December 6, 2024 | December 13, 2024 | ||
Lanao del Norte 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO.: 0024-2025-(REVISED CONTRACT DURATION, BILL OF QUANTITIES (BOQ), PLANS AND EQUIPMENT REQUIREMENT FOR THE CONTRACT ID 25KG0028) |
December 6, 2024 | December 13, 2024 | ||
Pangasinan 2nd District Engineering Office | Supplemental Bulletin No. 048 - Change in Quantities of Work to be Done | December 6, 2024 | December 13, 2024 | ||
Apayao 2nd District Engineering Office | BID BULLETIN NO.2 FOR 25PC0010 | December 6, 2024 | December 13, 2024 | ||
Lanao del Norte 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO.: 0021-2025-(REVISED PLANS FOR CONTRACT ID. 25KG0025) | December 6, 2024 | December 13, 2024 | ||
Pangasinan 2nd District Engineering Office | Supplemental Bulletin No. 047 - Change in Quantities of Work to be Done | December 6, 2024 | December 13, 2024 | ||
Pangasinan 2nd District Engineering Office | Supplemental Bulletin No. 046 - Change in Quantities of Work to be Done | December 6, 2024 | December 13, 2024 | ||
Regional Office VII | Supplemental Bulletin No. 02 for Contract ID No. 25H00043 | December 6, 2024 | December 16, 2024 | ||
Regional Office VII | Supplemental Bulletin No. 02 for Contract ID No. 25H00035 | December 6, 2024 | December 13, 2024 | ||
Pangasinan 2nd District Engineering Office | Supplemental Bulletin No. 045 - Change in Quantities of Work to be Done | December 6, 2024 | December 13, 2024 | ||
Misamis Oriental 2nd District Engineering Office | 25KL0068 - Supplemental Bulletin no. 1 | December 6, 2024 | December 13, 2024 | ||
Misamis Oriental 2nd District Engineering Office | 25KL0067 - Supplemental Bulletin no. 1 | December 6, 2024 | December 13, 2024 | ||
Regional Office II |
25B00041, Supplemental Bulletin No. 4 (Amendment is made in the schedule of Receipt and Opening of Bids pending revision of Plans) Receipt and Opening of Bids: December 16, 2024 at 10:00 A.M |
December 6, 2024 | December 16, 2024 | ||
Regional Office X |
SUPPLEMENTAL BULLETIN NO.1 - Postponement of Dropping and Opening of Bids for 25K00128 |
December 6, 2024 | December 13, 2024 | ||
Pangasinan 1st District Engineering Office | 25AG0029-SUPPLEMENTAL BULLETIN N0. 004 | December 6, 2024 | December 13, 2024 | ||
Las Piñas - Muntinlupa District Engineering Office | ADDITIONAL ITEM (BOQ) | December 6, 2024 | December 13, 2024 | ||
Pangasinan 1st District Engineering Office | 25AG0007-SUPPLEMENTAL BULLETIN N0. 004 | December 6, 2024 | December 13, 2024 | ||
Camarines Sur 1st District Engineering Office |
Supplemental Bulletin No. 2024-43: Contract ID Number 24FD0101 REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS – PRIMARY ROADS, ROLANDO R. ANDAYA HIGHWAY – K0336+496 – K0337+000, K0337+000 – K0337+597, K0337+597 – K0337+704 |
December 6, 2024 | December 18, 2024 | ||
Zamboanga del Sur 1st District Engineering Office | REVISED BILL OF QUANTITIES, MINIMUM EQUIPMENT REQUIREMENT AND CHECKLIST | December 6, 2024 | December 13, 2024 | ||
Camarines Sur 1st District Engineering Office |
Supplemental Bulletin No. 2024-42- Contract ID Number 24FD0100 REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS – PRIMARY ROADS, ROLANDO R. ANDAYA HIGHWAY – K0295+000 – K0295+400, K0296+736 – K0296+974 |
December 6, 2024 | December 18, 2024 | ||
Zamboanga del Sur 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 78-S. OF 2024 SUBJECT: AMENDMENT OF APPROVED BUDGET FOR THE CONTRACT, AND BILL OF QUANTITIES |
December 6, 2024 | December 13, 2024 | ||
Misamis Oriental 1st District Engineering Office |
Supplemental Bulletin No. 2 for Contract ID No. 25KK0041 – Construction of Multi-Purpose Building, Community College of Gingoog City, Brgy. 22, Gingoog City, Misamis Oriental |
December 6, 2024 | December 17, 2024 | ||
Surigao del Sur 2nd District Engineering Office | 25NI0031 - Supplemental Bulletin | December 6, 2024 | December 13, 2024 | ||
Regional Office II |
25B00047, Supplemental Bulletin No. 3 (Amendments are made in the Approved Budget for the Contract (ABC), and in Parts C, D, and F of Section VIII. Bill of Quantities) Receipt and Opening of Bids are reset from December 11, 2024 to December 16, 2024 |
December 6, 2024 | December 16, 2024 | ||
Pampanga 3rd District Engineering Office |
Supplemental Bid Bulletin No. 127 Subject : (1) Revision of Approved Budget for the Contract (ABC) (2) Change of Bill of Quantities |
December 6, 2024 | December 13, 2024 | ||
Pampanga 3rd District Engineering Office |
Supplemental Bid Bulletin No. 126 Subject : (1) Revision of Approved Budget for the Contract (ABC) (2) Change of Bill of Quantities |
December 6, 2024 | December 13, 2024 | ||
Iloilo 3rd District Engineering Office |
Bid Bulletin No. 01 for 24GH0190 Repainting of Pavement Markings - Iloilo East Coast Capiz Road |
December 6, 2024 | December 16, 2024 | ||
Pampanga 3rd District Engineering Office |
Supplemental Bid Bulletin No. 125 Subject : (1) Revision of Approved Budget for the Contract (ABC) (2) Change of Bill of Quantities (3) Corrected Contract Duration |
December 6, 2024 | December 13, 2024 | ||
Pampanga 2nd District Engineering Office | BID BULLETIN 24-0054 | December 6, 2024 | December 13, 2024 | ||
Pampanga 2nd District Engineering Office | BID BULLETIN 24-0054 | December 6, 2024 | December 13, 2024 | ||
Pampanga 2nd District Engineering Office | BID BULLETIN 24-0054 | December 6, 2024 | December 13, 2024 | ||
Pampanga 2nd District Engineering Office | BID BULLETIN 24-0054 | December 6, 2024 | December 13, 2024 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 4 - CORRECTION & RESUMPTION OF PROCUREMENT ACTIVITIES FOR CONTRACT ID NO. 25CD0046 - Rehabilitation of Road (Phase 1), Area A, Barangay Minuyan, City of San Jose Del Monte, Bulacan |
December 6, 2024 | December 13, 2024 | ||
Regional Office I | Postponement of Procurement Activities | December 6, 2024 | December 13, 2024 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 4 - CORRECTION & RESUMPTION OF PROCUREMENT ACTIVITIES FOR CONTRACT ID NO. 25CD0045 - Rehabilitation of Road (Phase 1), Area B, Barangay Bagong Buhay, City of San Jose Del Monte, Bulacan |
December 6, 2024 | December 13, 2024 | ||
Pampanga 2nd District Engineering Office | BID BULLETIN 24-0054 | December 6, 2024 | December 13, 2024 | ||
Regional Office I | Postponement of Procurement Activities | December 6, 2024 | December 13, 2024 | ||
Regional Office I | Revision of Bill of Quantities | December 6, 2024 | December 13, 2024 | ||
Misamis Occidental 1st District Engineering Office | Supplemental Bulletin No. 59 - 25KI0007 | December 6, 2024 | December 13, 2024 | ||
Negros Occidental 2nd District Engineering Office |
25GL0081 - SUPPLEMENTAL BID BULLETIN NO. 1 (CHANGES IN BILL OF QUANTITIES AND SCOPE OF WORK) |
December 6, 2024 | December 16, 2024 | ||
Agusan del Sur 1st District Engineering Office | SUPPLEMENTAL BULLETIN & BILL OF QUANTITIES (24NB0095) | December 6, 2024 | December 16, 2024 | ||
Agusan del Sur 1st District Engineering Office | SUPPLEMENTAL BULLETIN & BILL OF QUANTITIES (24NB0094) | December 6, 2024 | December 16, 2024 | ||
Agusan del Sur 1st District Engineering Office | SUPPLEMENTAL BULLETIN & BILL OF QUANTITIES (24NB0093) | December 6, 2024 | December 16, 2024 | ||
Bulacan 2nd District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 3 - CORRECTION FOR CONTRACT ID NOS. 24CD0292 UP TO 24CD0307 |
December 6, 2024 | December 13, 2024 | ||
Eastern Samar District Engineering Office |
No. 002 25IB0056 - Construction of Revetment along BERI River Side, Brgy. 8, Lawaan, Eastern Samar |
December 6, 2024 | December 13, 2024 | ||
Eastern Samar District Engineering Office |
No. 001 25IB0056 - Construction of Revetment along BERI River Side, Brgy. 8, Lawaan, Eastern Samar |
December 6, 2024 | December 13, 2024 | ||
Eastern Samar District Engineering Office |
25IB0055 - Construction of Road, Barangay 06 - Barangay Mabini, Quinapondan, Eastern Samar |
December 6, 2024 | December 13, 2024 | ||
Bukidnon 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO. 1 - 25KA0043 | December 6, 2024 | December 13, 2024 | ||
Bukidnon 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO. 1 - 25KA0042 | December 6, 2024 | December 13, 2024 | ||
Bukidnon 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO. 1 - 25KA0041 | December 6, 2024 | December 13, 2024 | ||
Bukidnon 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO. 1 - 25KA0040 | December 6, 2024 | December 13, 2024 | ||
Bukidnon 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO. 1 - 25KA0039 | December 6, 2024 | December 13, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No.147 For 24PA0206: CONSTRUCTION OF LIGUIS FLOOD CONTROL ALONG ABRA RIVER BASIN, La Paz, Abra |
December 6, 2024 | December 13, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No.146 For 24PA0205: CONSTRUCTION OF TOON FLOOD CONTROL ALONG ABRA RIVER BASIN, Barangay Toon, La Paz, Abra |
December 6, 2024 | December 13, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No.145 For 24PA0204: CONSTRUCTION OF DAOIDAO FLOOD CONTROL ALONG ABRA RIVER BASIN, Barangay Daoidao, San Juan, Abra |
December 6, 2024 | December 13, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No.144 For 24PA0203: CONSTRUCTION OF KIWAS FLOOD CONTROL ALONG ABRA RIVER BASIN, Lagayan, Abra |
December 6, 2024 | December 13, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No.143 For 24PA0202: CONSTRUCTION OF LIPCAN FLOOD CONTROL ALONG ABRA RIVER BASIN, Barangay Lipcan, Bangued, Abra |
December 6, 2024 | December 13, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No.142 For 24PA0201: CONSTRUCTION OF AGTANGAO FLOOD CONTROL ALONG ABRA RIVER BASIN, Barangay Agtangao, Bangued, Abra |
December 6, 2024 | December 13, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No.141 For 24PA0200: CONSTRUCTION OF SOOT FLOOD CONTROL ALONG ABRA RIVER BASIN, La Paz, Abra |
December 6, 2024 | December 13, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No.140 For 24PA0199: CONSTRUCTION OF KAWITAN FLOOD CONTROL ALONG ABRA RIVER BASIN, Danglas, Abra |
December 6, 2024 | December 13, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No.139 For 24PA0198: CONSTRUCTION OF LACUB FLOOD CONTROL ALONG ABRA RIVER BASIN, Lacub, Abra |
December 6, 2024 | December 13, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No.138 For 24PA0197: CONSTRUCTION OF CARDONA FLOOD CONTROL ALONG ABRA RIVER BASIN, Barangay Cardona, Dolores, Abra |
December 6, 2024 | December 13, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No.137 For 24PA0196: CONSTRUCTION OF BULBULALA FLOOD CONTROL ALONG ABRA RIVER BASIN, Barangay Bulbulala, La Paz, Abra |
December 6, 2024 | December 13, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No.136 For 24PA0195: CONSTRUCTION OF AGUET FLOOD CONTROL ALONG ABRA RIVER BASIN, Barangay Aguet, Lagangilang, Abra |
December 6, 2024 | December 13, 2024 | ||
Apayao 1st District Engineering Office |
BID BULLETIN 25PB0008-01 for Contract ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers, Construction of Flood Control Structure along Chico River Basin, Nabuangan (Upstream), Sta. 42+818 - Sta. 43+418 (R/S), Barangay Cupis, Conner, Apayao |
December 6, 2024 | December 13, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No.135 For 24PA0194: CONSTRUCTION OF POBLACION FLOOD CONTROL ALONG ABRA RIVER BASIN, Barangay Poblacion, Lagayan, Abra |
December 6, 2024 | December 13, 2024 | ||
Bulacan 1st District Engineering Office |
Postponement of Bid Submission & bid opening on December 17, 2024 at 10AM for Contract ID 25CC0186 |
December 6, 2024 | December 13, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No.134 For 24PA0193: CONSTRUCTION OF PULOT FLOOD CONTROL ALONG ABRA RIVER BASIN, Barangay Pulot, Lagayan, Abra |
December 6, 2024 | December 13, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No.133 For 24PA0192: CONSTRUCTION OF PANG-OT FLOOD CONTROL ALONG ABRA RIVER BASIN, Barangay Pang-Ot, Lagayan, Abra |
December 6, 2024 | December 13, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No.132 For 24PA0191: CONSTRUCTION OF MALIBCONG FLOOD CONTROL ALONG ABRA RIVER BASIN, Malibcong, Abra |
December 6, 2024 | December 13, 2024 | ||
Bulacan 1st District Engineering Office |
Postponement of Bid Submission & bid opening on December 17, 2024 at 10AM for Contract ID 25CC0185 |
December 6, 2024 | December 13, 2024 | ||
Bataan 1st District Engineering Office |
25CA0037 - Basic Infrastructure Program – Multi-Purpose Buildings/Facilities to support Social Services – Rehabilitation of Multi-Purpose Building, Barangay Apollo, Orani, Bataan Supplemental Bid Bulletin No. 2025-11 |
December 6, 2024 | December 18, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No.131 For 24PA0190: CONSTRUCTION OF MAPISLA FLOOD CONTROL ALONG ABRA, RIVER BASIN, Licuan-Baay, Abra |
December 6, 2024 | December 13, 2024 | ||
Bulacan 1st District Engineering Office |
Postponement of Bid Submission & bid opening on December 17, 2024 at 10AM for Contract ID 25CC0184 |
December 6, 2024 | December 13, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No.130 For 24PA0189: CONSTRUCTION OF QUIDAOEN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, Barangay Quidaoen, San Juan, Abra |
December 6, 2024 | December 13, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No.129 For 24PA0188: CONSTRUCTION OF DAMALIN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, Luba, Abra |
December 6, 2024 | December 13, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No.128 For 24PA0187: CONSTRUCTION OF CATACDEGAN VIEJO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, Barangay Catacdegan Viejo, Manabo, Abra |
December 6, 2024 | December 13, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No.127 For 24PA0186: CONSTRUCTION OF CALAO FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, Barangay Calao, Bucay, Abra |
December 6, 2024 | December 13, 2024 | ||
Bulacan 1st District Engineering Office |
Postponement of Bid Submission & bid opening on December 17, 2024 at 10AM for Contract ID 25CC0183 |
December 6, 2024 | December 13, 2024 | ||
Abra District Engineering Office |
Bid Bulletin No.126 For 24PA0185: CONSTRUCTION OF NAGUILLAN FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN, La Paz, Abra |
December 6, 2024 | December 13, 2024 | ||
Regional Office VI |
Notice of Postponement for 25G00055 Bacolod Negros Occidental Economic Highway (BANOCEH), Section 1, Silay City, Negros Occidental |
December 6, 2024 | December 17, 2024 | ||
Bukidnon 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO. 2 - 24KA0189 | December 6, 2024 | December 13, 2024 | ||
Bukidnon 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO. 2 - 24KA0187 | December 6, 2024 | December 13, 2024 | ||
Bukidnon 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO. 2 - 24KA0184 | December 6, 2024 | December 13, 2024 | ||
Bukidnon 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO. 2 - 24KA0186 | December 6, 2024 | December 13, 2024 | ||
Bukidnon 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO. 2 - 24KA0188 | December 6, 2024 | December 13, 2024 | ||
Bukidnon 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO. 2 - 24KA0185 | December 6, 2024 | December 13, 2024 | ||
Bukidnon 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO. 2 - 24KA0183 | December 6, 2024 | December 13, 2024 | ||
Bukidnon 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO. 2 - 24KA0180 | December 6, 2024 | December 13, 2024 | ||
Bukidnon 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO. 2 - 24KA0182 | December 6, 2024 | December 13, 2024 | ||
Bukidnon 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO. 2 - 24KA0181 | December 6, 2024 | December 13, 2024 | ||
Bukidnon 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO. 2 - 24KA0179 | December 6, 2024 | December 13, 2024 | ||
Bukidnon 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO. 2 - 24KA0178 | December 6, 2024 | December 13, 2024 | ||
Bukidnon 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO. 2 - 24KA0177 | December 6, 2024 | December 13, 2024 | ||
Bukidnon 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO. 2 - 24KA0176 | December 6, 2024 | December 13, 2024 | ||
Bukidnon 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO. 2 - 24KA0175 | December 6, 2024 | December 13, 2024 | ||
Bukidnon 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO. 2 - 24KA0174 - | December 6, 2024 | December 13, 2024 | ||
Bukidnon 1st District Engineering Office | SUPPLEMENTAL BULLETIN NO. 2 - 24KA0174 - | December 6, 2024 | December 13, 2024 | ||
Cagayan de Oro City 1st District Engineering Office |
25KH0025:SUPPLEMENTAL/BID BULLETIN NO. 01 Subject: Revised Schedule for the Submission/Dropping and Opening of Bids |
December 6, 2024 | December 18, 2024 |