Civil Works - Bid Bulletin - Submissions
Office | Description | Date Published | Closing Date | ||
---|---|---|---|---|---|
Eastern Samar District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 25IB0143 - Construction (Completion) of Multi-Purpose Building, Poblacion, 08, Dolores, Eastern Samar |
July 24, 2025 | July 31, 2025 | ||
Albay 3rd Engineering Office |
25FO0099-ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System- Asset Preservation Program - Preventive Maintenance- Primary Roads- Maharlika Highway (MORMS- BUCAF- Section), (Weighbridge- Xentro Mall Polangui- Caltex- Motorstar Section), Guinobatan, Albay-Bid Bulletin No. 042-2025 (Postponement of Bid) |
July 24, 2025 | July 31, 2025 | ||
Batangas 2nd District Engineering Office | SUPPLEMENTAL BULLETIN 25DE0205 (Rescheduling of Opening of Bids) | July 24, 2025 | July 31, 2025 | ||
Batangas 2nd District Engineering Office | SUPPLEMENTAL BULLETIN 25DE0204 (Rescheduling of Opening of Bids) | July 24, 2025 | July 31, 2025 | ||
Batangas 2nd District Engineering Office | SUPPLEMENTAL BULLETIN 25DE0203 (Rescheduling of Opening of Bids) | July 24, 2025 | July 31, 2025 | ||
Batangas 2nd District Engineering Office | SUPPLEMENTAL BULLETIN 25DE0202 (Rescheduling of Opening of Bids) | July 24, 2025 | July 31, 2025 | ||
Batangas 2nd District Engineering Office | SUPPLEMENTAL BULLETIN 25DE0201 (Rescheduling of Opening of Bids) | July 24, 2025 | July 31, 2025 | ||
Batangas 2nd District Engineering Office | SUPPLEMENTAL BULLETIN 24DE0260 (Rescheduling of Opening of Bids) | July 24, 2025 | July 31, 2025 | ||
Batangas 2nd District Engineering Office | SUPPLEMENTAL BULLETIN 24DE0259 (Rescheduling of Opening of Bids) | July 24, 2025 | July 31, 2025 | ||
Pampanga 2nd District Engineering Office | BID BULLETIN 25-0023 | July 24, 2025 | August 19, 2025 | ||
Pampanga 2nd District Engineering Office | BID BULLETIN 25-0023 | July 24, 2025 | August 19, 2025 | ||
Pampanga 2nd District Engineering Office | BID BULLETIN 25-0023 | July 24, 2025 | August 19, 2025 | ||
Pampanga 2nd District Engineering Office | BID BULLETIN 25-0023 | July 24, 2025 | August 19, 2025 | ||
Pampanga 2nd District Engineering Office | BID BULLETIN 25-0023 | July 24, 2025 | August 19, 2025 | ||
Pampanga 2nd District Engineering Office | BID BULLETIN 25-0023 | July 24, 2025 | August 19, 2025 | ||
Pampanga 2nd District Engineering Office | BID BULLETIN 25-0023 | July 24, 2025 | August 19, 2025 | ||
Quezon 3rd District Engineering Office | 25DM0168 Bid Bulletin | July 24, 2025 | August 12, 2025 | ||
Quezon 3rd District Engineering Office | 25DM0167 Bid Bulletin | July 24, 2025 | August 12, 2025 | ||
Quezon 3rd District Engineering Office | 25DM0166 Bid Bulletin | July 24, 2025 | August 12, 2025 | ||
Regional Office V | Supplemental Bulletin No. 1 - 25F00510 | July 23, 2025 | July 30, 2025 | ||
Regional Office V | Supplemental Bulletin No. 1 - 25F00506 | July 23, 2025 | July 30, 2025 | ||
Regional Office V | Supplemental Bulletin No. 1 - 25F00498 | July 23, 2025 | July 30, 2025 | ||
Regional Office V | Supplemental Bulletin No. 1 - 25F00239 | July 23, 2025 | July 30, 2025 | ||
Regional Office V | Supplemental Bulletin No. 1 - 25F00162 | July 23, 2025 | July 30, 2025 | ||
Regional Office V | Supplemental Bulletin No. 1 - 25F00096 | July 23, 2025 | July 30, 2025 | ||
NCR - Regional Office |
Supplemental Bulletin No. 1 for CID No. 24O00232 - Construction of DPWH – NCR Regional Office Building, JW Diokno Blvd., Pasay City (Phase V) |
July 23, 2025 | July 30, 2025 | ||
NCR - Regional Office |
Supplemental Bulletin No. 1 for CID No. 25O00100 - Construction of DPWH – NCR Regional Office Building, JW Diokno Blvd., Pasay City (Phase V) |
July 23, 2025 | July 30, 2025 | ||
NCR - Regional Office |
Supplemental Bulletin No. 2 for CID No. 25O00001 - Construction of DPWH – NCR Regional Office Building, JW Diokno Blvd., Pasay City (Phase V) |
July 23, 2025 | July 30, 2025 | ||
NCR - Regional Office |
Supplemental Bulletin No. 2 for CID No. 25O00010 - Construction of DPWH – NCR Regional Office Building, JW Diokno Blvd., Pasay City (Phase V) |
July 23, 2025 | July 30, 2025 | ||
NCR - Regional Office |
Supplemental Bulletin No. 5 for CID No. 25O00120 - Construction of DPWH – NCR Regional Office Building, JW Diokno Blvd., Pasay City (Phase V) |
July 23, 2025 | July 30, 2025 | ||
Quezon 1st District Engineering Office |
Bid bulletin - 25DK0148 - CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Rainwater Collector System in Real, Infanta & General Nakar, Quezon |
July 23, 2025 | July 30, 2025 | ||
Quezon 1st District Engineering Office |
Bid bulletin - 25DK0147 - Repair/Maintenance of DILG Building, Bureau of Fire Protection, Lucban Fire Station, Brgy. Tinamnan, Lucban, Quezon |
July 23, 2025 | July 30, 2025 | ||
Quezon 1st District Engineering Office |
Bid bulletin - 25DK0146 - Repair/Maintenance of DILG Building Bureau of Fire Protection, Real Fire Station Brgy. Poblacion 1, Real, Quezon |
July 23, 2025 | July 30, 2025 | ||
Quezon 1st District Engineering Office |
Bid bulletin - 25DK0145 - Construction of White Copra (RBDO Whole Nut Building), San Juan, Panukulan, Quezon |
July 23, 2025 | July 30, 2025 | ||
Quezon 1st District Engineering Office |
Bid bulletin - 25DK0144 - CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Multi-Purpose Buildings/ Facilities to Support Social Services – Construction (Completion) of Multi-Purpose Building at Barangay Ibabang Palale, Tayabas City, Quezon |
July 23, 2025 | July 30, 2025 | ||
Quezon 1st District Engineering Office |
Bid bulletin - 25DK0143 - CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP – Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities – Construction of Flood Control Project at San Roque-Taquico, Sampaloc, Quezon |
July 23, 2025 | July 30, 2025 | ||
Quezon 1st District Engineering Office |
Bid bulletin - 25DK0142 - CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Multi-Purpose Buildings/ Facilities to Support Social Services – Construction (Completion) of Multi-Purpose Building at Burdeos NHS, Burdeos, Quezon |
July 23, 2025 | July 30, 2025 | ||
Quezon 1st District Engineering Office |
Bid bulletin - 25DK0141 - CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road, Brgy San Miguel, Mauban, Quezon |
July 23, 2025 | July 30, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 28 Series of 2025 for Contract ID No. 25CG0255 |
July 23, 2025 | July 31, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 28 Series of 2025 for Contract ID No. 25CG0254 |
July 23, 2025 | July 31, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 28 Series of 2025 for Contract ID No. 25CG0253 |
July 23, 2025 | July 31, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 28 Series of 2025 for Contract ID No. 25CG0252 |
July 23, 2025 | July 31, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 28 Series of 2025 for Contract ID No. 25CG0251 |
July 23, 2025 | July 31, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 28 Series of 2025 for Contract ID No. 25CG0250 |
July 23, 2025 | July 31, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 28 Series of 2025 for Contract ID No. 25CG0249 |
July 23, 2025 | July 31, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 28 Series of 2025 for Contract ID No. 25CG0248 |
July 23, 2025 | July 31, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 28 Series of 2025 for Contract ID No. 25CG0247 |
July 23, 2025 | July 31, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 28 Series of 2025 for Contract ID No. 25CG0246 |
July 23, 2025 | July 31, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 28 Series of 2025 for Contract ID No. 25CG0245 |
July 23, 2025 | July 31, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 28 Series of 2025 for Contract ID No. 25CG0244 |
July 23, 2025 | July 31, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 52-AJ Series of 2024 for Contract ID NO. 25CG0009 |
July 23, 2025 | July 31, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 52-AJ Series of 2024 for Contract ID NO. 25CG0004 |
July 23, 2025 | July 31, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 52-AJ Series of 2024 for Contract ID NO. 25CG0001 |
July 23, 2025 | July 31, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 2-AA Series of 2025 for Contract ID No.25CG0059 |
July 23, 2025 | July 31, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 10-W Series of 2025 for Contract ID No. 25CG0125 |
July 23, 2025 | July 31, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 10-W Series of 2025 for Contract ID No. 25CG0120 |
July 23, 2025 | July 31, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 10-W Series of 2025 for Contract ID No. 25CG0116 |
July 23, 2025 | July 31, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 10-W Series of 2025 for Contract ID No. 25CG0109 |
July 23, 2025 | July 31, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 16-H Series of 2025 for Contract ID No.25CG0194 |
July 23, 2025 | July 31, 2025 | ||
Metro Manila 1st District Engineering Office |
Bid Bulletin 2025-007-004 25OB0465 - Construction of Six (6) Storey Academic Building, PAICOE, AIR,Philippine Army, Legaspi Compound, Fort Andres Bonifacio, Taguig City, Phase V |
July 23, 2025 | July 30, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 19-F Series of 2025 for Contract ID No.25CG0204 |
July 23, 2025 | July 31, 2025 | ||
Metro Manila 1st District Engineering Office |
Bid Bulletin 2025-007-004 25OB0464 - Construction of Regional Engineering Unit-NCR Building, Camp Bagong Diwa, Bicutan, Taguig City, Phase II |
July 23, 2025 | July 30, 2025 | ||
Metro Manila 1st District Engineering Office |
Bid Bulletin 2025-007-004 25OB0437 - Construction of Multi-Purpose Building, SPD Compound, LawtonAve., Barangay Western Bicutan, Taguig City (Phase 1) |
July 23, 2025 | July 30, 2025 | ||
Metro Manila 1st District Engineering Office |
Bid Bulletin 2025-007-004 25OB0409 - Construction of Multi-Purpose Building, NRCPO, Camp Bagong Diwa, Taguig City |
July 23, 2025 | July 30, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 25-D Series of 2025 for Contract ID No.25CG0227 |
July 23, 2025 | July 31, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 25-D Series of 2025 for Contract ID No.25CG0224 |
July 23, 2025 | July 31, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 25-D Series of 2025 for Contract ID No.25CG0223 |
July 23, 2025 | July 31, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 25-D Series of 2025 for Contract ID No.25CG0222 |
July 23, 2025 | July 31, 2025 | ||
Regional Office VIII |
CID No. 24I00417: BID BULLETIN No. 24-002 dated July 23, 2025 - REPOSTING OF PLANS |
July 23, 2025 | July 31, 2025 | ||
Pampanga 1st District Engineering Office |
SUPPLEMENTAL BULLETIN NO. 26-G Series of 2025 for Contract ID No.25CG0240 |
July 23, 2025 | July 31, 2025 | ||
Regional Office VII | Supplemental Bulletin No. 13 for Contract ID No. 25H00078 | July 23, 2025 | August 1, 2025 | ||
Regional Office VII | Supplemental Bulletin No. 09 for Contract ID No. 25H00090 | July 23, 2025 | August 1, 2025 | ||
Regional Office VIII |
CID No. 25I00194: SUPPLEMENTAL BULLETIN No. 25-030 dated July 23, 2025 - Additional Project Component and Category of Works |
July 23, 2025 | July 31, 2025 | ||
Regional Office II |
25B00146, Supplemental Bulletin No. 2 (Amendments are made in the Approved Budget for the Contract (ABC), and in Section VIII. Bill of Quantities) |
July 23, 2025 | July 30, 2025 | ||
Regional Office XII | 25M00042 - SUPPLEMENTAL BULLETIN 3 | July 23, 2025 | August 5, 2025 | ||
Sorsogon District Engineering Office | Supplemental Bulletin No. 35-2025_25FK0080-Revised POW & Bill of Quantity | July 23, 2025 | July 30, 2025 | ||
Sorsogon District Engineering Office | Supplemental Bulletin No. 34-2025_25FK0082-Revised POW & Bill of Quantity | July 23, 2025 | July 30, 2025 | ||
Sorsogon District Engineering Office | Supplemental Bulletin No. 33-2025_25FK0092-Revised POW & Bill of Quantity | July 23, 2025 | July 30, 2025 | ||
Sorsogon District Engineering Office | Supplemental Bulletin No. 32-2025_25FK0091-Revised POW & Bill of Quantity | July 23, 2025 | July 30, 2025 | ||
Sorsogon District Engineering Office | Supplemental Bulletin No. 31-2025_25FK0090-Revised POW & Bill of Quantity | July 23, 2025 | July 30, 2025 | ||
Regional Office IV-A |
1) CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), DAP DAP INTEGRATED SCHOOL, TAYABAS, QUEZON PROVINCE 2) CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), LAKAWAN ELEMENTARY SCHOOL, TAYABAS, QUEZON PROVINCE 3) CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), ALSAM INTEGRATED SCHOOL, TAYABAS, QUEZON PROVINCE 4) CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), ILASAN INTEGRATED SCHOOL, TAYABAS, QUEZON PROVINCE |
July 22, 2025 | July 29, 2025 | ||
Regional Office IV-A |
1) CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), PAMBUHAN ELEMENTARY SCHOOL, PEREZ, QUEZON 2) CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), PEREZ WEST ELEMENTARY SCHOOL, PEREZ, QUEZON 3) CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), DEL PILAR ELEMENTARY SCHOOL, QUEZON, QUEZON 4) CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), PEDRO CABANGON ELEMENTARY SCHOOL, QUEZON, QUEZON |
July 22, 2025 | July 29, 2025 | ||
Regional Office IV-A |
(1) CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), MABUTAG ELEMENTARY SCHOOL BUENAVISTA, QUEZON PROVINCE (2) CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), DELA PAZ ELEMENTARY SCHOOL, BUENAVISTA, QUEZON PROVINCE (3) CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), VILLA AURORA ELEMENTARY SCHOOL, BUENAVISTA, QUEZON PROVINCE |
July 22, 2025 | July 29, 2025 | ||
Regional Office IV-A |
(1) CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), ANDRES CASTILLEJO SCHOOL, SAN FRANCISCO, QUEZON PROVINCE (2) CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), PUGON NATIONAL HIGH SCHOOL SAN FRANCISCO, QUEZON PROVINCE (3) CONSTRUCTION OF RAINWATER COLLECTION SYSTEM (RWCS), BUTANGUIAD ELEMENTARY SCHOOL, SAN FRANCISCO, QUEZON PROVINCE |
July 22, 2025 | July 29, 2025 | ||
Regional Office IV-A |
IMPROVEMENT/ REHABILITATION OF PATIIS ROAD (BOX CULVERT AND ROAD IMPROVEMENT), BRGY. MALANDAY, SAN MATEO, RIZAL |
July 22, 2025 | July 29, 2025 | ||
Regional Office IV-A |
CONSTRUCTION OF RIVER CONTROL ALONG PAGSANJAN RIVER, LUMBAN SECTION, LAGUNA (PHASE 2) |
July 22, 2025 | July 29, 2025 | ||
Regional Office IV-A |
Preventive Maintenance - Tertiary Roads BACOOR-DASMARIÑAS NATIONAL RD – K0017 + 500 - K0019 + 000, K0019 + 664 - K0021 + 511 |
July 22, 2025 | July 29, 2025 | ||
Regional Office IV-A |
CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT MALAKING TUBIG RIVER, SAN PABLO CITY, LAGUNA (PHASE II) |
July 22, 2025 | July 29, 2025 | ||
Cebu 2nd District Engineering Office | SUPPLEMENTAL BULLETIN 25-0037 FOR CONTRACT ID NO. 25HE0122 | July 22, 2025 | July 29, 2025 | ||
Cebu 2nd District Engineering Office | SUPPLEMENTAL BULLETIN 25-0036 FOR CONTRACT ID NO. 25HE0124 | July 22, 2025 | July 29, 2025 | ||
Cebu 2nd District Engineering Office | SUPPLEMENTAL BULLETIN 25-0036 FOR CONTRACT ID NO. 25HE0123 | July 22, 2025 | July 29, 2025 | ||
Cebu 2nd District Engineering Office | SUPPLEMENTAL BULLETIN 25-0036 FOR CONTRACT ID NO. 25HE0087 (RE-BID) | July 22, 2025 | July 29, 2025 | ||
Quezon 1st District Engineering Office |
Bid bulletin for 25DK0148 - CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Rainwater Collector System in Real, Infanta & General Nakar, Quezon |
July 22, 2025 | July 29, 2025 | ||
Quezon 1st District Engineering Office |
Bid bulletin for 25DK0147 - Repair/Maintenance of DILG Building, Bureau of Fire Protection, Lucban Fire Station, Brgy. Tinamnan, Lucban, Quezon |
July 22, 2025 | July 29, 2025 | ||
Quezon 1st District Engineering Office |
Bid bulletin for 25DK0146 - Repair/Maintenance of DILG Building Bureau of Fire Protection, Real Fire Station Brgy. Poblacion 1, Real, Quezon |
July 22, 2025 | July 29, 2025 | ||
Quezon 1st District Engineering Office |
Bid bulletin for 25DK0145 - Construction of White Copra (RBDO Whole Nut Building), San Juan, Panukulan, Quezon |
July 22, 2025 | July 29, 2025 | ||
Quezon 1st District Engineering Office |
Bud bulletin for 25DK0144 - CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Multi-Purpose Buildings/ Facilities to Support Social Services – Construction (Completion) of Multi-Purpose Building at Barangay Ibabang Palale, Tayabas City, Quezon |
July 22, 2025 | July 29, 2025 | ||
Quezon 1st District Engineering Office |
Bid bulletin for 25DK0143 - CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP – Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities – Construction of Flood Control Project at San Roque-Taquico, Sampaloc, Quezon |
July 22, 2025 | July 29, 2025 | ||
Quezon 1st District Engineering Office |
Bid Bulletin for 25DK0142 - CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Multi-Purpose Buildings/ Facilities to Support Social Services – Construction (Completion) of Multi-Purpose Building at Burdeos NHS, Burdeos, Quezon |
July 22, 2025 | July 29, 2025 | ||
Quezon 1st District Engineering Office |
Bid Bulletin for 25DK0141 - CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Access Roads and/or Bridges from the National Roads leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road, Brgy San Miguel, Mauban, Quezon |
July 22, 2025 | July 29, 2025 |