Civil Works - Awarded Contracts
A) Date Entered in Civil Works Registry B) Contract ID C) Contract Name D) Implementing Office | 1) Awarded Contractor 2) Awarded Amount 3) Extent Of Participation % 4) Notice to Proceed Date |
---|---|
A) June 26, 2024 B) 24OC0125 C) CONSTRUCTION OF ROAD (FROM MACAPAGAL AVE. EXT. TO BIDGE LPPWP) IN BARANGAY DON GALO, PARA�AQUE CITY D) Metro Manila 2nd District Engineering Office |
1) PETER G. CHUA BUILDERS 2) 3,360,636.97 3) 100 4) -/-/- |
A) June 26, 2024 B) 24OC0055 C) CONSTRUCTION OF DRAINAGE SYSTEM WITHIN BARANGAY SAN ISIDRO, PARA�AQUE CITY, METRO MANILA D) Metro Manila 2nd District Engineering Office |
1) ILFREO CONSTRUCTION CORP. (FORMERLY:ILFREO CONSTRU 2) 7,707,280.25 3) 100 4) -/-/- |
A) June 25, 2024 B) 24OH0101 C) REPAIR/REHABILITATION OF DPWH BLDG., SMDEO MAIN BLDG., AT 8TH ST. CORNER BONIFACIO DRIVE, PORT AREA, D) South Manila District Engineering Office |
1) M.C. LAYGO BUILDERS 2) 4,086,281.21 3) 100 4) -/-/- |
A) June 25, 2024 B) 24OE0190 C) CONSTRUCTION OF COLLEGE BUILDING, THE UNIVERSIDAD DE MANILA, TONDO, MANILA D) North Manila District Engineering Office |
1) AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND 2) 116,402,112.20 3) 100 4) 7/10/2024 |
A) June 25, 2024 B) 24OH0100 C) REPAIR/MAINTENANCE OF DPWH BUILDING BUREAU OF MAINTENANCE, BUILDING I (PHASE III), 2ND ST., PORT ARE D) South Manila District Engineering Office |
1) KPGONZALES CONSTRUCTION SUPPLY AND TRADING 2) 7,680,695.79 3) 100 4) -/-/- |
A) June 24, 2024 B) 24OB0421 C) CONSTRUCTION OF MULTI-PURPOSE BUILDING AT STA. TERESITA, BRGY.MALANDAY, MARIKINA CITY D) Metro Manila 1st District Engineering Office |
1) BELL CONSTRUCTION 2) 48,751,715.80 3) 100 4) 7/12/2024 |
A) June 24, 2024 B) 24OC0116 C) CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG VARIOUS CREEKS AND TRIBUTARIES, PARA�AQUE RIVER (DI D) Metro Manila 2nd District Engineering Office |
1) E.R. RODRIGUEZ CONSTRUCTION CORPORATION (FORMERLY: 2) 96,033,426.99 3) 100 4) 7/8/2024 |
A) June 24, 2024 B) 24OC0120 C) REHABILITATION OF COVERED COURT, BARANGAY STO. NI�O, PARA�AQUE CITY, METRO MANILA D) Metro Manila 2nd District Engineering Office |
1) REND ENTERPRISES AND GENERAL CONTRACTOR 2) 4,801,431.87 3) 100 4) 7/8/2024 |
A) June 24, 2024 B) 24OC0127 C) CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 2), PCC, BRGY. SAN DIONISIO, PARA�AQUE CITY, METRO MA D) Metro Manila 2nd District Engineering Office |
1) AARCON BUILDERS 2) 24,007,726.00 3) 100 4) 7/8/2024 |
A) June 24, 2024 B) 24OB0457 C) REHABILITATION OF CALUMPANG BARANGAY HALL INCLUDING SITE DEVELOPMENT, BARANGAY CALUMPANG, MARIKINA C D) Metro Manila 1st District Engineering Office |
1) KAEL CONSTRUCTION AND SUPPLY 2) 9,600,151.64 3) 100 4) 7/12/2024 |
A) June 24, 2024 B) 24OB0414 C) CONSTRUCTION OF MULTI-PURPOSE BUILDING (MORTUARY) AT BLOCK 34 AT BARANGAY ADDITION HILLS, MANDALUYON D) Metro Manila 1st District Engineering Office |
1) 121 CONSTRUCTION CORPORATION (FORMERLY 121 CONSTUC 2) 24,258,076.76 3) 100 4) 7/12/2024 |
A) June 24, 2024 B) 24OB0481 C) REHABILITATION OF SAN ROQUE BARANGAY HALL INCLUDING SITE DEVELOPMENT, BARANGAY SAN ROQUE, MARIKINA C D) Metro Manila 1st District Engineering Office |
1) ARCEGA ACUZAR CONSTRUCTION AND DEVELOPMENT CORPOR 2) 19,203,756.67 3) 49 4) 7/12/2024 |
A) June 24, 2024 B) 24OB0481 C) REHABILITATION OF SAN ROQUE BARANGAY HALL INCLUDING SITE DEVELOPMENT, BARANGAY SAN ROQUE, MARIKINA C D) Metro Manila 1st District Engineering Office |
1) KAEL CONSTRUCTION AND SUPPLY 2) 19,203,756.67 3) 51 4) 7/12/2024 |
A) June 24, 2024 B) 24OB0482 C) REHABILITATION OF TA�ONG BARANGAY HALL INCLUDING SITE DEVELOPMENT, BARANGAY TA�ONG, MARIKINA CITY D) Metro Manila 1st District Engineering Office |
1) KAEL CONSTRUCTION AND SUPPLY 2) 23,994,416.05 3) 51 4) 7/12/2024 |
A) June 24, 2024 B) 24OB0482 C) REHABILITATION OF TA�ONG BARANGAY HALL INCLUDING SITE DEVELOPMENT, BARANGAY TA�ONG, MARIKINA CITY D) Metro Manila 1st District Engineering Office |
1) ARCEGA ACUZAR CONSTRUCTION AND DEVELOPMENT CORPOR 2) 23,994,416.05 3) 49 4) 7/12/2024 |
A) June 24, 2024 B) 24OB0497 C) RETROFITTING/STRENGTHENING OF PERMANENT BRIDGE - PASIG BLVD - C5 FLYOVER (B01876LZ) ALONG C-5 ROAD, D) Metro Manila 1st District Engineering Office |
1) QUAD-R BUILDING SOLUTIONS 2) 36,902,061.90 3) 100 4) 8/2/2024 |
A) June 24, 2024 B) 24OC0111 C) CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY SAN DIONISIO, PARA�AQUE CITY, METRO MANILA D) Metro Manila 2nd District Engineering Office |
1) AARCON BUILDERS 2) 70,207,716.91 3) 100 4) -/-/- |
A) June 24, 2024 B) 24OC0044 C) REHABILITATION OF DRAINAGE SYSTEM ALONG MULTINATIONAL AVENUE AND ITS VICINITY, BARANGAY MOONWALK, P D) Metro Manila 2nd District Engineering Office |
1) TWO DIMENSION CONSTRUCTION 2) 47,041,884.00 3) 100 4) -/-/- |
A) June 24, 2024 B) 24OC0085 C) CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. MERVILLE, PARA�AQUE CITY, METRO MANILA D) Metro Manila 2nd District Engineering Office |
1) GOLDEN 3T CONSTRUCTION CORPORATION (FORMERLY:GOLDE 2) 14,405,032.61 3) 100 4) 7/8/2024 |
A) June 24, 2024 B) 24OC0088 C) CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SAPANG BUWAYA CREEK NEAR VALLEY 8, BRGY. SAN ANTONI D) Metro Manila 2nd District Engineering Office |
1) JELSIE CONSTRUCTION AND SUPPLY 2) 46,806,359.00 3) 100 4) 7/8/2024 |
A) June 24, 2024 B) 24OC0112 C) CONSTRUCTION OF FLOOD MITIGATION FACILITY AT MARULAS CREEK, BRGY. SAN DIONISIO, PARA�AQUE CITY, MET D) Metro Manila 2nd District Engineering Office |
1) REND ENTERPRISES AND GENERAL CONTRACTOR 2) 70,204,714.00 3) 49 4) -/-/- |
A) June 24, 2024 B) 24OC0112 C) CONSTRUCTION OF FLOOD MITIGATION FACILITY AT MARULAS CREEK, BRGY. SAN DIONISIO, PARA�AQUE CITY, MET D) Metro Manila 2nd District Engineering Office |
1) MRRM TRADING AND CONSTRUCTION 2) 70,204,714.00 3) 51 4) -/-/- |
A) June 21, 2024 B) 24OI0142 C) REHABILITATION OF MULTI PURPOSE BUILDING, PEOPLES PARK IN BRGY. DANIEL FAJARDO, LAS PINAS CITY D) Las Pi�as-Muntinlupa District Engineering Office |
1) DAVHEZ TRADING AND CONSTRUCTION 2) 2,925,193.08 3) 100 4) -/-/- |
A) June 21, 2024 B) 24OI0151 C) CONSTRUCTION OF MULTI PURPOSE BLDG., PAMPLONA 3, LAS PINAS CITY LONE DISTRICT PHASE 3 D) Las Pi�as-Muntinlupa District Engineering Office |
1) E. F. CHUA CONSTRUCTION, INC. 2) 43,616,162.46 3) 100 4) -/-/- |
A) June 21, 2024 B) 24OI0150 C) REHABILITATION OF MULTI - PURPOSE BUILDING, BARANGAY TALON 2, LAS PINAS CITY D) Las Pi�as-Muntinlupa District Engineering Office |
1) DAVHEZ TRADING AND CONSTRUCTION 2) 22,328,034.94 3) 100 4) 7/12/2024 |
A) June 21, 2024 B) 24OI0149 C) REHABILITATION OF MULTI PURPOSE BUILDING (TALON 3 BARANGAY HALL), BRGY. TALON 3, LAS PINAS CITY D) Las Pi�as-Muntinlupa District Engineering Office |
1) ZERO ONE CONSTRUCTION AND TRADING INC. 2) 9,751,334.55 3) 100 4) -/-/- |
A) June 21, 2024 B) 24OI0148 C) REHABILITATION OF MULTI PURPOSE BLDG., PAMPLONA 3, LAS PINAS CITY LONE DISTRICT D) Las Pi�as-Muntinlupa District Engineering Office |
1) ZERO ONE CONSTRUCTION AND TRADING INC. 2) 9,750,837.92 3) 100 4) -/-/- |
A) June 21, 2024 B) 24OI0144 C) CONSTRUCTION OF MULTI PURPOSE BUILDING AT BRGY. PAMPLONA 2, LAS PINAS CITY PHASE 1 D) Las Pi�as-Muntinlupa District Engineering Office |
1) DAVHEZ TRADING AND CONSTRUCTION 2) 4,875,455.40 3) 100 4) -/-/- |
A) June 21, 2024 B) 24OI0147 C) CONSTRUCTION OF SLOPE PROTECTION STRUCTURE INCLUDING ROADS AND OTHER IMPROVEMENTS, BRGY. PULANG LUPA D) Las Pi�as-Muntinlupa District Engineering Office |
1) IANDE CONSTRUCTION CORPORATION (FORMERLY: IANDE CONSTR 2) 29,254,380.39 3) 100 4) -/-/- |
A) June 21, 2024 B) 24OI0152 C) CONSTRUCTION OF MULTI PURPOSE BLDG., ZAPOTE, LAS PINAS CITY LONE DISTRICT D) Las Pi�as-Muntinlupa District Engineering Office |
1) AYANA CONSTRUCTION AND TRADING 2) 4,874,955.35 3) 100 4) 7/12/2024 |
A) June 21, 2024 B) 24OI0143 C) CONSTRUCTION OF MULTI PURPOSE BUILDING (SAMATA), BRGY. TALON 5, LAS PINAS CITY D) Las Pi�as-Muntinlupa District Engineering Office |
1) DAVHEZ TRADING AND CONSTRUCTION 2) 2,925,420.15 3) 100 4) -/-/- |
A) June 21, 2024 B) 24OI0146 C) REHABILITATION OF MULTI PURPOSE BLDG., PULANGLUPA 1, LAS PINAS CITY LONE DISTRICT D) Las Pi�as-Muntinlupa District Engineering Office |
1) OMNICON BUILDERS 2) 16,406,604.01 3) 100 4) 7/12/2024 |
A) June 21, 2024 B) 24OI0145 C) REHABILITATION OF ROAD, SAN ISIDRO SUBDIVISION, BRGY. PAMPLONA 1, LAS PINAS CITY D) Las Pi�as-Muntinlupa District Engineering Office |
1) DAVHEZ TRADING AND CONSTRUCTION 2) 6,826,121.24 3) 100 4) -/-/- |
A) June 20, 2024 B) 24OG0126 C) REHABILITATION OF MULTI-PURPOSE BUILDINGS WITH SITE DEVELOPMENT, UP NCPAG, UNIVERSITY OF THE PHILIPP D) Quezon City 2nd District Engineering Office |
1) AYLAN CONSTRUCTION AND TRADING 2) 96,131,388.40 3) 100 4) -/-/- |
A) June 20, 2024 B) 24OG0125 C) REHABILITATION OF MULTI-PURPOSE BUILDING, UN NCPAG, UNIVERSITY OF THE PHILIPPINES, DILIMAN, QUEZON C D) Quezon City 2nd District Engineering Office |
1) J. SIMEON CONSTRUCTION 2) 67,214,972.64 3) 100 4) -/-/- |
A) June 20, 2024 B) 24OI0134 C) REHABILITATION OF MULTI - PURPOSE BUILDING, BARANGAY TALON 5, LAS PINAS CITY D) Las Pi�as-Muntinlupa District Engineering Office |
1) WAY MAKER GENERAL CONTRACTOR OPC 2) 14,627,022.68 3) 100 4) -/-/- |
A) June 20, 2024 B) 24OG0127 C) CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY UGONG NORTE, PHASE III, QUEZON CITY D) Quezon City 2nd District Engineering Office |
1) LARSEN-DUTCHER CONSTRACTOR CORPORATION (FORMERLY:L 2) 45,125,159.35 3) 100 4) -/-/- |
A) June 19, 2024 B) 24OI0139 C) CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM AT TIONGQUIAO ROAD, LAS PINAS CITY D) Las Pi�as-Muntinlupa District Engineering Office |
1) IANDE CONSTRUCTION CORPORATION (FORMERLY: IANDE CONSTR 2) 19,305,222.50 3) 100 4) -/-/- |
A) June 19, 2024 B) 24OC0061 C) CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), GREENHEIGHTS VILLAGE, BARANGAY SAN ISIDR D) Metro Manila 2nd District Engineering Office |
1) AARCON BUILDERS 2) 19,207,752.00 3) 100 4) 7/4/2024 |
A) June 19, 2024 B) 24OI0135 C) REHABILITATION OF ROAD INCLUDING DRAINAGE, PAMPLONA 1, LAS PINAS CITY D) Las Pi�as-Muntinlupa District Engineering Office |
1) DAVHEZ TRADING AND CONSTRUCTION 2) 17,363,524.82 3) 100 4) -/-/- |
A) June 19, 2024 B) 24OI0140 C) CONSTRUCTION OF MULRI-PURPOSE BUILDING BARANGAY MANUYO 1, LAS PINAS CITY D) Las Pi�as-Muntinlupa District Engineering Office |
1) VAEMAR CONSTRUCTION AND SUPPLY 2) 4,875,407.59 3) 100 4) -/-/- |
A) June 19, 2024 B) 24OI0136 C) COMPLETION OF HOSPITAL (LPGHSTC) IN BRGY. PULANGLUPA 1, LAS PINAS CITY D) Las Pi�as-Muntinlupa District Engineering Office |
1) RAICON DEVELOPMENT CORPORATION (FORMERLY : RA IGNA 2) 46,319,291.40 3) 100 4) 7/12/2024 |
A) June 19, 2024 B) 24OI0137 C) REHABILITATION (COMPLETION) OF MULTI - PURPOSE BUILDING, BRGY. TALON 4, LAS PINAS CITY D) Las Pi�as-Muntinlupa District Engineering Office |
1) ZERO ONE CONSTRUCTION AND TRADING INC. 2) 2,925,444.66 3) 100 4) 7/12/2024 |
A) June 19, 2024 B) 24OI0138 C) CONSTRUCTION OF ROAD, LAS PINAS - PARANAQUE WETLAND PARK, LAS PINAS CITY D) Las Pi�as-Muntinlupa District Engineering Office |
1) DAVHEZ TRADING AND CONSTRUCTION 2) 9,701,886.63 3) 100 4) 7/12/2024 |
A) June 19, 2024 B) 24OI0141 C) REHABILITATION OF VARIOUS ROADS INCLUDING DRAINAGE (GREEN REVOLUTION, SIKAP BISIG, BOHOL, SAGING, AR D) Las Pi�as-Muntinlupa District Engineering Office |
1) L.M.G. CONSTRUCTION INCORPORATED (FORMERLY: LMG CO 2) 71,309,360.39 3) 100 4) 7/19/2024 |
A) June 19, 2024 B) 24OC0106 C) CONSTRUCTION OF REVETMENT AT DON GALO RIVER-MOONWALK CREEK JUNCTION PHASE 2, DISTRICT 2, PARA�AQUE D) Metro Manila 2nd District Engineering Office |
1) RNN CONSTRUCTION CORPORATION (FORMERLY RNN CONSTRU 2) 28,224,090.30 3) 100 4) 7/4/2024 |
A) June 19, 2024 B) 24OC0081 C) CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SUN VALLEY, PARA�AQUE CITY, METRO MANILA D) Metro Manila 2nd District Engineering Office |
1) GOLDEN 3T CONSTRUCTION CORPORATION (FORMERLY:GOLDE 2) 9,603,645.76 3) 100 4) -/-/- |
A) June 19, 2024 B) 24OC0080 C) CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SAN MARTIN DE PORRES, PARA�AQUE CITY, METRO MANILA D) Metro Manila 2nd District Engineering Office |
1) GOLDEN 3T CONSTRUCTION CORPORATION (FORMERLY:GOLDE 2) 4,801,474.00 3) 100 4) 7/4/2024 |
A) June 19, 2024 B) 24OC0078 C) CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (INSTALLATION OF TRASH SCREEN) AT BALISAMPAN CREEK, BARAN D) Metro Manila 2nd District Engineering Office |
1) QUATRIX CONSTRUCTION AND SUPPLY INC. 2) 46,447,332.00 3) 100 4) 7/4/2024 |
A) June 19, 2024 B) 24OC0069 C) REHABILITATION OF DRAINAGE STRUCTURE ALONG SEN. GIL PUYAT AVE. (INCLUDING SIDEWALK AND DRIVEWAY), DI D) Metro Manila 2nd District Engineering Office |
1) E. F. CHUA CONSTRUCTION, INC. 2) 24,007,500.00 3) 100 4) 7/4/2024 |