Home Up

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

SORSOGON

 

 

Source: RBIA Database                              Unit of Measure: kilometer (km) 
DEO / Functional Classification / Road Name / Road Number  Condition Rating   Grand Total 
 Good   Fair   Poor   Bad   No Assessment 
  Primary Roads          19.78          28.73          9.13            1.69         1.24           60.59
1 Maharlika Highway          19.78          28.73          9.13            1.69         1.24           60.59
  Concrete             0.20                -             0.06                 -            0.01              0.27
  Asphalt           19.58           28.73           9.08             1.69          1.23             60.32
  Secondary Roads          20.16            7.93          0.20            1.79       31.66           61.74
2 Dancalan-Sta. Cruz, Donsol-Pio Duran Roa                -                  -                -                  -         18.68           18.68
  Concrete                -                  -                -                   -          18.68             18.68
3 Jct Putiao-Pilar-Donsol Rd            8.34                -                -              1.79         6.61           16.74
  Asphalt             8.34                -                -               1.79          6.61             16.74
4 Jct Sorsogon-Bacon-Manito Rd            7.89            4.65          0.20                -           6.13           18.87
  Concrete             2.39             0.49              -                   -            4.82              7.70
  Asphalt             5.51             4.16           0.20                 -            0.72             10.58
  Gravel                -                  -                -                   -            0.59              0.59
5 Salvador H. Escudero III Diversion Rd            3.93            3.28              -                  -           0.24             7.45
  Concrete             2.70             2.09              -                   -            0.16              4.95
  Asphalt             1.24             1.18              -                   -            0.08              2.50
  Tertiary Roads          48.96          13.81          3.52            0.94       19.53           86.75
A Ariman-Casiguran Rd            1.83            4.65          3.02            0.94         0.12           10.55
  Concrete                -                  -                -                   -            0.05              0.05
  Asphalt             1.83             4.65           3.02             0.94          0.08             10.51
B Bacon-Sawanga-Prieto Diaz Rd          19.12            2.60              -                  -           0.12           21.84
  Concrete           17.01             2.60              -                   -            0.07             19.67
  Asphalt             2.11                -                -                   -            0.05              2.16
C Banuang-Gurang-Albay Bdry Rd            1.43                -            0.10                -               -               1.53
  Concrete             1.43                -             0.10                 -               -                1.53
D Cumadcad-San Isidro Rd                -                  -                -                  -           6.00             6.00
  Concrete                -                  -                -                   -            6.00              6.00
E Jct Abuyog-Gubat-Ariman Rd                -                  -                -                  -           2.54             2.54
  Concrete                -                  -                -                   -            2.20              2.20
  Asphalt                -                  -                -                   -            0.34              0.34
F Jct Donsol-Banuang Gurang Rd          13.40            1.51              -                  -           3.30           18.21
  Concrete           10.57                -                -                   -            3.27             13.84
  Asphalt             2.83             1.51              -                   -            0.03              4.37
G Jct Putiao-Pilar-Donsol Rd            2.73            0.67              -                  -           7.38           10.77
  Concrete             2.41             0.20              -                   -            7.38              9.99
  Asphalt             0.32             0.47              -                   -               -                0.79
H Juban-Magallanes Rd          10.39            4.38          0.40                -           0.04           15.21
  Concrete                -                  -                -                   -            0.04              0.04
  Asphalt           10.39             4.38           0.40                 -               -               15.17
I Salvador H. Escudero III Diversion Rd            0.06                -                -                  -           0.04             0.10
  Concrete             0.06                -                -                   -            0.04              0.10
TOTAL          88.90          50.46        12.85            4.42       52.44         209.07

 

Source: RBIA Database      
Road Name / Section ID Route Numbering Start KM End KM
Ariman-Casiguran Rd      
S03767LZ   K0612 + (-328) K0622 + 787
Bacon-Sawanga-Prieto Diaz Rd      
S03746LZ      
S04431LZ   K0591 + (-1000) K0611 + 767
Banuang-Gurang-Albay Bdry Rd      
S04432LZ   K0591 + (-500) K0592 + 028
Cumadcad-San Isidro Rd      
S03748LZ   K0560 + (-492) K0565 + 482
S03749LZ      
Dancalan-Sta. Cruz, Donsol-Pio Duran Roa      
S04437LZ 624    
Jct Abuyog-Gubat-Ariman Rd      
S03747LZ      
S03758LZ   K0590 + (-400) K0592 + 096
Jct Donsol-Banuang Gurang Rd      
S04433LZ   K0571 + (-475) K0590 + 571
Jct Putiao-Pilar-Donsol Rd      
S04429LZ 642 K0544 + (-988) K0560 + 048
S04430LZ   K0561 + (-1073) K0571 + 067
Jct Sorsogon-Bacon-Manito Rd      
S04434LZ 644 K0582 + (-337) K0597 + 198
S04436LZ 644    
Juban-Magallanes Rd      
S03779LZ   K0613 + 000 K0628 + 854
Maharlika Highway      
S03732LZ 1 K0540 + (-547) K0599 + 998
Salvador H. Escudero III Diversion Rd      
S03733LZ 643 K0577 + (-049) K0584 + 445
S03734LZ      
S04435LZ      

Back Home Up Next

 

Albay 1st / Albay 2nd / Albay 3rd / Camarines Norte / Camarines Norte-Sub / Camarines Sur 1st / Camarines Sur 2nd / Camarines Sur 3rd / Camarines Sur 4th / Camarines Sur 5th / Catanduanes / Masbate 1st / Masbate 2nd / Masbate 3rd / Sorsogon / Sorsogon 2nd

Notes:
 

1.) Road data provided are as of  16 October 2024.

2.) The unit of measure for Road Data is kilometers.

3.) No Assessment refers to Road Sections that are either under construction and/or segments with length below the 50-meter gauging length.

4.) National Roads are classified into:

 Primary Roads - A contiguous length of significant road sections extending linearly without any breaks or forks that connect major cities (At least around 100,000 population) comprising the main trunk line or the backbone of the National Road System.   

 Secondary Roads - Directly connect cities to national primary roads (except in metropolitan areas) or those not included in the category of major cities. Likewise, said roads directly connect major ports, major ferry terminals, major airports, tourist service centers, major government infrastructure to national primary roads. They also directly connect provincial capitals within the same region.

Tertiary Roads - Other existing roads under DPWH which perform a local function. (In the map, these roads are represented only by letters.)

 

For questions regarding this Website contact feedback@dpwh.gov.ph

 

Last updated: 02/27/25.

Disclaimer