February 28, 2024 |
FY 2023 |
WIN3E02986 |
300214100456000 |
May 16, 2023 |
Region IX |
Regional Office IX |
UACS No. 300214100456000
Project ID: P00733759MN
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of Solarization along National Road and Bridge with the following Section (Cabaluay-Mampang Zamboanga City Diversion Road) Sta. 13+732.95 to Sta. 17+220.64
CW1- Road Safety: Street Lighting: 464 No. of Units
Unit Cost: 103,987.07/ No. of Units
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00
|
February 28, 2024 |
FY 2023 |
WIN3E03051 |
300219101755000 |
May 15, 2023 |
Region IX |
Regional Office IX |
UACS No. 300219101755000
Project ID: P00733978MN
Convergence and Special Support Program (CSSP)– Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Control Structure along Layawan River, De Venta Perla Bridge (Upstream) Sergio Osmeña, Zamboanga del Norte
CW1- Construction of Flood Mitigation Structure: 217.0 ln.m
Unit Cost: ₱ 316,849.07/ln.m
EAO: ₱ 2,493,750.00
Allocation: ₱ 71,250,000.00 |
February 28, 2024 |
FY 2023 |
WIN3E03035 |
300215102731000 |
May 8, 2023 |
Region IX |
Regional Office IX |
UACS No. 300215102731000
Project ID: P00733799MN
Convergence and Special Support Program (CSSP)– Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities
Construction of Bunguiao-Tolosa-Lapakan Bypass Road, Zamboanga City
CW1- Construction of Gravel Road: 6.08 Lane km
Unit Cost: ₱ 23,807,565.79 Lane km
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00 |
February 28, 2024 |
2023 |
|
300215102734000 |
May 8, 2023 |
Region IX |
Regional Office IX |
UACS NO. 300215102734000
Project ID: P00733802MN
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Muti - Buenavista Bypass Road Package 1, Zamboanga City
CW1: Construction of Concrete Road: 18.68 Lane Km
Unit Cost: ₱ 7,748,929.34/Lane Km
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
|
February 28, 2024 |
2023 |
WIN3E02968 |
300215102733000 |
May 8, 2023 |
Region IX |
Regional Office IX |
UACS NO. 300215102733000
Project ID: P00733801MN
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Mangusu - Muti Coastal Road Package 1, Zamboanga City
CW1: Construction of Concrete Road: 8.08 Lane Km
Unit Cost: ₱ 17,914,603.96/ Lane Km
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
|
February 28, 2024 |
2023 |
WIN3E03060 |
300215102732000 |
May 8, 2024 |
Region IX |
Regional Office IX |
UACS NO. 300215102732000
Project ID: P00733800MN
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Bunguiao - Quiniput Road, Zamboanga City
CW1: Construction of Concrete Road: 6.59 Lane Km
Unit Cost: ₱ 21,965,098.63/ Lane Km
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
|
February 28, 2024 |
2023 |
WIN3E03000 |
300219101756000 |
May 17, 2023 |
Region IX |
Regional Office IX |
UACS NO. 300219101756000
Project ID: P00733979MN
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Control Structure (Revetment/Bank Protection) along Salug Daku River, Salug Daku Bridge, Sergio Osmeña, Zamboanga del Norte
CW1: Construction of Flood Mitigation Structure: 560.0 ln.m
Unit Cost: ₱ 172,321.42/ ln.m
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00
|
February 27, 2024 |
FY 2023 |
|
310104100492000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310104100492000
Project ID: P00706252MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
Lanao-Pagadian-Zamboanga City Rd - K1758 + 650 - K1759 + 231, K1759 + 261 - K1760 + 075, K1760 + 153 - K1760 + 776, K1764 + 330 - K1764 + 849, K1767 + 000 - K1768 + 000, K1769 + 000.00 – K1770 + 000.00, K1771 + 576.00 – K1771 + 759.00
CW1- Reconstruction to Concrete Pavement 9.44 lane-km
Unit Cost: ₱10,733,580.51 /lane-km
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00
|
February 27, 2024 |
FY 2023 |
|
310305101843000 |
April 25, 2023 |
Region IX |
Regional Office IX |
UACS No. 310305101843000
Project ID: P00706632MN
OO1: Ensure Safe and Reliable National Road System – Bridge - Widening of Permanent Bridges
Talinga Br. (B00458MN) along Dipolog-Sindangan-Liloy Rd (Phase I)
CW1- Widening of Bridge: 2,312.50 Square Meters
Unit Cost: ₱ 62,594.59/Square Meters
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00 |
February 27, 2024 |
FY 2023 |
|
310306100249000 |
May 31, 2023 |
Region IX |
Regional Office IX |
UACS No. 310306100249000
Project ID: P00706633MN
OO1: Ensure Safe and Reliable National Road System – Bridge - Construction of New Bridges
Liba Br. along Sindangan-Bayog-Lakewood Road (Phase II)
CW1- Construction of Bridge: 867.186 Square Meters
Unit Cost: ₱ 114,695.31 /Square Meters
CW2- Construction of Road Slope Protection Structure: 1,510.62 Square Meters
Unit Cost: ₱ 29,979.63 /Square Meters
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
|
February 27, 2024 |
FY 2023 |
WIN3E03169 |
310204102140000 |
July 31, 2023 |
Region IX |
Regional Office IX |
UACS No. 310204102140000
Project ID: P00706812MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads
Buenavista - Bolong By-Pass Road, Package 8, Zamboanga City
CW1- Construction of Gravel Road: 1.09 Lane Km
Unit Cost: ₱ 134,083,512.14/Lane Km
ROW Acquisition 4,666.667 sq.m.
Unit Cost: ₱ 1,500.00/sq.m.
EAO: ₱ 5,300,814.50
Excess: ₱ 548,157.27
Allocation: ₱ 159,000,000.00
|
February 27, 2024 |
2023 |
WIN3F07367 |
GAA FY 2023 |
January 2, 2023 |
Region VIII |
Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0788 + 000 - K0792 + 000
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road P 107.333090 M
: 11.861 Lane Km
EAO P 3.892910M
Total P 111.226 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0789+000 - K0789+083, K0789+310 - K0789+467, K0789+817 - K0789+841, K0789+916 - K0790+184, K0790+401- K0790+475, K0790+535 - K0790+556, K0790+614 - K0790+820, K0791+74 - K0791+192, K0791+390 - K0791+451, K0791+629 - K0791+649, K0792+286 - K0792+312, K0792+821 - K0792+857, K0792+943 - K0792+985, K0831+277 - K0831+409, K0831+481 - K0831+503, K0831+610 - K0831+954, K0834+107 - K0834+170, K0834+299 - K0834+450, K0834+571 - K0834+775, K0834+838 – K0834+862, K0835+42 – K0835+057, K0835+216 – K0835+254, K0835+508 – K0835+552, K0835+844 – K0835+883, K0835+960 – K0836+018, K0836+123 – K0836+274, K0836+313 – K0836+372, K0836+467 – K0836+470, K0836+557 – K0836+950, K0837+083 - K0837+098, K0837+191 - K0837+410, K0837+500 - K0837+580, K0837+642 - K0837+686, K0837+893 - K0838+000, K0848+000 - K0848+874, K0848+968 - K0849+474
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road P 107.333090 M
: 9.776 Lane Km
EAO P 3.892910M
Total P 111.226 M
|
February 27, 2024 |
FY 2023 |
|
310204102142000 |
March 16, 2023 |
Region IX |
Regional Office IX |
UACS No. 310204102142000
Project ID: P00706814MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads
Buenavista - Bolong By-Pass Road, Package 10, Zamboanga City
CW1- Construction of Concrete Road/ 6.72 Lane-km
Unit Cost: ₱ 20,913,690.48 /Lane-km
ROW Acquisition 57,000.00 sq.m.
Unit Cost: ₱ 175.44/sq.m.
EAO: ₱ 5,460,000.00
Allocation: ₱ 156,000,000.00 |
February 27, 2024 |
FY 2023 |
|
310204102143000 |
March 16, 2023 |
Region IX |
Regional Office IX |
UACS No. 310204102143000
Project ID: P00706815MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads
Buenavista - Bolong By-Pass Road, Package 11, Zamboanga City
CW1- Construction of Concrete Road: 7.02 lane-km
Unit Cost: ₱ 19,195,156.70 /Lane-km
ROW Acquisition 50,020.00 sq.m
Unit Cost: ₱ 199.92/sq.m.
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
|
February 27, 2024 |
2023 |
WIN3F07740 |
GAA FY 2023 |
January 2, 2023 |
Region VIII |
Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
AS PER GAA/ORIGINAL:
Wright - Taft - Borongan Road (S00123SM) K0828+(-581) - K0859 + 931
Physical Target: Allocation:
CW1-Road Widening: 65.114 Lane Km P 193.00 M
EAO P 7.00 M
Total P 200.00 M
AS MODIFIED:
Wright - Taft - Borongan Road (S00123SM) K0828+(-409) - K0830 + 861
Physical Target: Allocation:
CW1-Road Widening: 7.1 Lane Km P 193.00 M
EAO P 7.00 M
Total P 200.00 M
|
February 27, 2024 |
2023 |
WIN3F07741 |
GAA FY 2023 |
January 2, 2023 |
Region VIII |
Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
AS PER GAA/ORIGINAL:
Basey - Marabut - Pinamitinan Rd. (S00124SM) k0909 + (-1024) - k0951 + 169
Physical Target: Allocation:
CW1-Road Widening: 88.890 Lane Km P 241.250 M
EAO P 8.750 M
Total P 250.00 M
AS MODIFIED:
Basey - Marabut - Pinamitinan Rd. (S00124SM) –K0914+000-K0915+000,K0936+000-K0937+000,K0939+000-K0940+000,K0940+000-K0941+000,K0946+000-K0947+000,K0947+000-K0948+000,K0948+000-K0948+875
Physical Target: Allocation:
CW1-Road Widening: 9.652 Lane Km P 241.250 M
EAO P 8.750 M
Total P 250.00 M
|
February 27, 2024 |
2023 |
WIN3F07477 |
GAA FY 2023 |
January 2, 2023 |
Region VIII |
Samar 2nd District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Calbiga Flood Control along Calbiga River, Calbiga Samar
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 110.975 M
Structure: 819.530 Lineal meters
EAO P 4.025 M
Total P 115.00 M
AS MODIFIED:
Construction of Calbiga Flood Control along Calbiga River, Calbiga Samar
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 110.975 M
Structure: 383 Lineal meters
EAO P 4.025 M
Total P 115.00 M
|
February 27, 2024 |
FY 2023 |
|
310104100494000 |
April 25, 2023 |
Region IX |
Regional Office IX |
UACS No. 310104100494000
Project ID: P00706835MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
Dipolog-Sindangan-Liloy Rd - K1880 + 375 - K1881 + 375, K1881 + 540.00 – K1883 + 000.00
CW1- Reconstruction to Concrete Pavement: 4.920 Lane Km
Unit Cost: ₱ 9,806,910.57/Lane Km
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00 |
February 27, 2024 |
2023 |
WIN3F07557 |
GAA FY 2023 |
January 2, 2023 |
Region VIII |
Samar 2nd District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Flood Control Structure, Golden Bridge San Juanico-Basey-Sohoton Road, Basey, Samar
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 110.975 M
Structure:819.530 Lineal meters
EAO P 4.025 M
Total P 115.00 M
AS MODIFIED:
Construction of Flood Control Structure, Golden Bridge San Juanico-Basey-Sohoton Road, Basey, Samar
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 110.975 M
Structure:220 Lineal meters
EAO P 4.025 M
Total P 115.00 M
|
February 27, 2024 |
FY 2023 |
|
310104100496000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310104100496000
Project ID: P00706837MN
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
Pagadian City-Zamboanga City Rd - K1880 + 000 - K1881 + 000, K1883 + 000 - K1883 + 322
CW1- Reconstruction to Concrete Pavement: 2.64 Lane-km
Unit Cost: ₱ 12,334,454.55 /Lane-km
EAO: ₱ 1,181,040.00
Allocation: ₱ 33,744,000.00 |
February 27, 2024 |
2023 |
WIN3F07492 |
GAA FY 2023 |
January 2, 2023 |
Region VIII |
Samar 2nd District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Flood Control Structure, Silaga River, along Daang Maharlika, Silaga Bridge, Barangay Tulay, Sta. Rita, Samar
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 110.975 M
Structure: 819.530 Lineal meters
EAO P 4.025 M
Total P 115.00 M
AS MODIFIED:
Construction of Flood Control Structure, Silaga River, along Daang Maharlika, Silaga Bridge, Barangay Tulay, Sta. Rita, Samar
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 110.975 M
Structure: 250 Lineal meters
EAO P 4.025 M
Total P 115.00 M
|
February 27, 2024 |
2023 |
WIN3F07718 |
GAA FY 2023 |
January 2, 2023 |
Region VIII |
Samar 2nd District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Catbalogan Drainage System (Antiao Creek and Outfalls), Catbalogan City, Samar
Physical Target: Allocation:
CW1-Construction of Drainage P 101.325 M
Structure: 7,953.979 Lineal meters
EAO P 3.675 M
Total P 105.00 M
AS MODIFIED:
Construction of Catbalogan Drainage System (Antiao Creek and Outfalls), Catbalogan City, Samar
Physical Target: Allocation:
CW1-Construction of Drainage P 101.325 M
Structure: 1,531.71 Lineal meters
EAO P 3.675 M
Total P 105.00 M
|
February 27, 2024 |
FY 2023 |
WIN3E02896 |
310204102116000 |
April 25, 2023 |
Region IX |
Regional Office IX |
UACS No. 310204102116000
Project ID: P00707613MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads
By-Pass and Diversion Roads - Cawit to Baluno (Sta. 0+000 to Sta. 0+311.23, Sta. 0+326.41 – Sta. 1+340.00), Zamboanga
CW1- Construction of Concrete Road: 2.65 Lane-km
Unit Cost: ₱ 36,415,094.34/lane-km
EAO: ₱ 3,500,000.00
Allocation: ₱100,000,000.00
|
February 27, 2024 |
FY 2023 |
|
310104100495000 |
April 25, 2023 |
Region IX |
Regional Office IX |
UACS No. 310104100495000
Project ID: P00707780MN
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
Pagadian City-Zamboanga City Rd – K1889 + 075.00 – K1889 + 275.00, K1898 + 101.70 – K1901 + 319.020, K1908 + 169.30 – K1908 + 566.30, K1910 + 892.00 – K1912 + 435.90, K1913 + 471.00 – K1913 + 779.00
CW1- Reconstruction to Concrete Pavement: 4.702 lane-km
Unit Cost: ₱ 10,245,993.19 /lane-km
EAO: ₱ 1,747,340.00
Allocation: ₱ 49,924,000.00
|
February 27, 2024 |
FY 2023 |
|
310104100497000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310104100497000
Project ID: P00707781MN
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
Pagadian City-Zamboanga City Rd - K1883 + 322 - K1885 + 000, K1886 + 000 - K1887 + 277, K1888 + 570 - K1889 + 017
CW1- Reconstruction to Concrete Pavement: 6.80 lane-km
Unit Cost: ₱ 12,076,265.44 /lane-km
EAO: ₱ 2,978,395.00
Allocation: ₱ 85,097,000.00
|
February 27, 2024 |
FY 2023 |
|
310104100498000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310104100498000
Project ID: P00707782MN
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
Pagadian City-Zamboanga City Rd – K1895 + 898.70 – K1896 + 175.60, K1902 + 605.60 – K1906 + 044.90, K1909 + 384.20 – K1909 + 947.30, K1913 + 138.00 – K1913 + 471.00
CW1- Rehabilitation of Paved Road: 4.162 lane-km
Unit Cost: ₱ 10,128,326.53 /lane-km
EAO: ₱ 1,528,905.00
Allocation: ₱ 43,683,000.00
|
February 27, 2024 |
FY 2023 |
WIN3E02705 |
320101110237000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 320101110237000
Project ID: P00721221MN
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure at Bogayo River, Kumalarang Br. 1 Section(B00549MN) (Downstream - Rightside) along Pagadian City - Zamboanga City Road(S01453MN), Barangay Bogayo, Kumalarang, Zamboanga del Sur
CW1- Construction of Flood Mitigation Structure; 481.00 ineal Meters
Unit Cost: ₱ 220,686.07/Lineal Meters
EAO: ₱ 3,850,000.00
Allocation: ₱110,000,000.00 |
February 27, 2024 |
FY 2023 |
WIN3E02829 |
320101109326000 |
March 31, 2023 |
Region IX |
Regional Office IX |
UACS No. 320101109326000
Project ID: P00721229MN
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Upper Tungawan Flood Control Structure along Tungawan River (Phase V) Tungawan, Zamboanga Sibugay
CW1- Construction of Flood Mitigation Structure: 613.00 lineal Meters
Unit Cost: ₱ 173,164.763/Lineal Meters
EAO: ₱ 3,850,000.00
Allocation: ₱110,000,000.00 |
February 27, 2024 |
FY 2023 |
WIN3E02867 |
320102105920000 |
April 17, 2023 |
Region IX |
Regional Office IX |
UACS No. 320102105920000
Project ID: P00721402MN
OO2: Protect Lives and Properties Against Major Floods -
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control at Sibuguey River along Imelda - Bayog - Kumalarang - Lapuyan- Margosatubig Road, Barangay Paradise, Diplahan, Zamboanga Sibugay Package 2
CW1- Construction of Flood Mitigation Structure: 84.60 Lineal Meters
Unit Cost: ₱ 570,330.97 /Lineal Meters
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00 |
February 27, 2024 |
FY 2023 |
WIN3E02866 |
320102105921000 |
April 17, 2023 |
Region IX |
Regional Office IX |
UACS No. 320102105921000
Project ID: P00721403MN
OO2: Protect Lives and Properties Against Major Floods -
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control at Sibuguey River along Imelda - Bayog - Kumalarang - Lapuyan- Margosatubig Road, Barangay Paradise, Diplahan, Zamboanga Sibugay Package 3
CW1- Construction of Flood Mitigation Structure: 81.80 Lineal Meters
Unit Cost: ₱ 589,853.30 /Lineal Meters
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00 |
February 27, 2024 |
FY 2023 |
WIN3E03050 |
320102105555000 |
May 15, 2023 |
Region IX |
Regional Office IX |
UACS No. 320102105555000
Project ID: P00721404MN
OO2: Protect Lives and Properties Against Major Floods – Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (revetment Wall) along Sibuguey River, Barangay Santa Barbara, Imelda, Zamboanga Sibugay
CW1- Construction of Revetment: 331.0 ln.m
Unit Cost: ₱ 291,540.78/ln.m
EAO: ₱ 3,500,000.00
Allocation: ₱100,000,000.00 |
February 27, 2024 |
FY 2023 |
WIN3E03013 |
320101109312000 |
March 31, 2023 |
Region IX |
Regional Office IX |
UACS No. 320101109312000
Project ID: P00721521MN
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure Tumaga River ( Tetuan-Tugbungan Section ), Package
1, Zamboanga City
CW1- Construction of Flood Mitigation Structure: 433.0 lineal Meters
Unit Cost: ₱ 185,590.92/Lineal Meters
CW2- Construction of Flood Mitigation Structure: 433.0 lineal Meters
Unit Cost: ₱ 148,704.69/Lineal Meters
EAO: ₱ 5,250,000.00
Allocation: ₱150,000,000.00 |
February 27, 2024 |
FY 2023 |
|
320101109313000 |
May 15, 2023 |
Region IX |
Regional Office IX |
UACS No. 320101109313000
Project ID: P00721522MN
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure, Ilaya Bridge, Abutment B, Downstream Section, Dapitan City, Zamboanga del Norte
CW1- Construction of Flood Mitigation Structure: 361.00 ln.m
Unit Cost: ₱ 267,313.02/ln.m
EAO: ₱ 3,500,000.00
Allocation: ₱100,000,000.00 |
February 27, 2024 |
FY 2023 |
WIN3E02956 |
320101109314000 |
April 24, 2023 |
Region IX |
Regional Office IX |
UACS No. 320101109314000
Project ID: P00721523MN
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Conctrol Structure along Kabasalan River (Downstream), Barangay Banker, Kabasalan, Zamboanga Sibugay
CW1- Construction of Flood Mitigation Structure: 463.0ln.m
Unit Cost: ₱ 147,410.94/ln.m
CW2- Construction of Flood Mitigation Structure: 463.0ln.m
Unit Cost: ₱ 102,697.05/ln.m
EAO: ₱ 4,200,000.00
Allocation: ₱120,000,000.00 |
February 27, 2024 |
FY 2023 |
WIN3E03014 |
320101109315000 |
April 24, 2023 |
Region IX |
Regional Office IX |
UACS No. 320101109315000
Project ID: P00721524MN
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Kabasalan River (Upstream), Barangay Banker, Kabasalan, Zamboanga Sibugay
CW1- Construction of Flood Mitigation Structure: 533.00 ln.m
Unit Cost: ₱ 114,761.32/ln.m
CW2- Construction of Flood Mitigation Structure: 533.00 ln.m
Unit Cost: ₱ 102,499.46/ln.m
EAO: ₱ 4,200,000.00
Allocation: ₱120,000,000.00 |
February 27, 2024 |
FY 2023 |
WIN3E02839 |
320101109327000 |
April 3, 2023 |
Region IX |
Regional Office IX |
UACS No. 320101109327000
Project ID: P00721527MN
OO2: Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure at Bacalan Br. Section (B00497MN), Lanao-Pagadian-Zamboanga City Rd (S01113MN), Ipil, Zamboanga Sibugay
CW1- Construction of Flood Mitigation Structure: 336.85 ln.m
Unit Cost: ₱ 300,801.54/ln.m
EAO: ₱ 3,675,000.00
Allocation: ₱105,000,000.00 |
February 27, 2024 |
FY 2023 |
WIN3E02766 |
320101109334000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 320101109334000
Project ID: P00721528MN
OO2: Protect Lives and Properties - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Tictapul River, Barangay Tictapul, ZamboangaCity
CW1- Construction of Flood Mitigation Structure: 346.0 ln. m
Unit Cost: ₱ 376,517.34/ln. m.
EAO: ₱ 4,725,000.00
Allocation: ₱ 135,000,000.00
|
February 27, 2024 |
FY 2023 |
WIN3E03048 |
320102105557000 |
May 15, 2023 |
Region IX |
Regional Office IX |
UACS No. 320102105557000
Project ID: P00721631MN
OO2: Protect Lives and Properties Against Major Floods – Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure along Dipolog River, (Conacon-Guinles Section), Polanco, Zamboanga del Norte
CW1- Construction of Flood Mitigation Structure: 192.37 ln.m
Unit Cost: ₱ 351,146.22/ln.m
EAO: ₱ 2,450,000.00
Allocation: ₱ 70,000,000.00 |
February 27, 2024 |
FY 2023 |
WIN3E03078 |
320102105558000 |
May 15, 2023 |
Region IX |
Regional Office IX |
UACS No. 320102105558000
Project ID: P00721632MN
OO2: Protect Lives and Properties Against Major Floods – Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment) along Dapitan River, Ilaya-Oyan bridge (Bitoon Section) along Dipolog-Oroquieta Road, Dapitan City, Zamboanga del Norte
CW1- Construction of Flood Mitigation Structure: 372.0 ln.m
Unit Cost: ₱ 259,408.60/ln.m
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
February 27, 2024 |
FY 2023 |
WIN3E03004 |
320102105559000 |
May 15, 2023 |
Region IX |
Regional Office IX |
UACS No. 320102105559000
Project ID: P00721633MN
OO2: Protect Lives and Properties Against Major Floods – Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment) along Dapitan River, Barcelona-Leop Section, Dapitan City, Zamboanga del Norte
CW1- Construction of Flood Mitigation Structure: 418.0 ln.m
Unit Cost: ₱ 230,861.24/ln.m
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
February 27, 2024 |
FY 2023 |
WIN3E03052 |
320102105560000 |
May 15, 2023 |
Region IX |
Regional Office IX |
UACS No. 320102105560000
Project ID: P00721634MN
OO2: Protect Lives and Properties Against Major Floods – Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment/Bank Protection) along Dipolog River, (Sianib Section), Polanco, Zamboanga del Norte
CW1- Construction of Flood Mitigation Structure: 313.0 ln.m
Unit Cost: ₱ 308,306.71/ln.m
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
February 27, 2024 |
FY 2023 |
|
300203102202000 |
April 25, 2023 |
Region IX |
Regional Office IX |
UACS No. 300203102202000
Project ID: P00731848MN
CSSP: Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
Brgy. Lukbuton to Brgy. Panigayan leading to White Beach, Malamawi Island, Isabela City, Basilan
CW1- Construction of Concrete Road: 1.46 Lane-km
Unit Cost: ₱ 19,089,154.11/lane-km
EAO: ₱ 1,010,835.00
Allocation: ₱ 28,881,000.00 |
February 27, 2024 |
FY 2023 |
WIN3E02984 |
300214100448000 |
May 16, 2023 |
Region IX |
Regional Office IX |
UACS No. 300214100448000
Project ID: P00733751MN
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of Solar LED Street Light along National Road and Bridge with the following Section (Cabaluay-Mampang Zamboanga City Diversion Road) Sta. 00+245.27 - Sta. 10+245.27
CW1- Road Safety: Street Lighting: 1,359 No. of Units
Unit Cost: ₱ 99,411.33/ No. of Units
EAO: ₱ 4,900,000.00
Allocation: ₱ 140,000,000.00
|
February 27, 2024 |
FY 2023 |
WIN3E03031 |
300214100449000 |
June 14, 2023 |
Region IX |
Regional Office IX |
UACS No. 300214100449000
Project ID: P00733752MN
Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of Road Safety Devices, Pagadian City-Zamboanga City Rd (Licomo-Putik Road) - K1889 + 000 - K1927 + 000, Zamboanga City
CW1- Road Safety: Street Lighting: 950.00 No. of Units
Unit Cost: ₱ 97,969.73 /No. of Units
CW2- Road Safety: Road Signs: 560.0 Number of Signs
Unit Cost: ₱ 12,048.17 /Number of Signs
CW3- Road Safety: Pavement Markings: 111.818 Lane Km
Unit Cost: ₱ 160,125.66/Lane Km
CW4 Road Safety: Guardrails: 7,563.0 Meters
Unit Cost: ₱ 3,573.56/Meters
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00 |
February 27, 2024 |
FY 2023 |
WIN3E03095 |
300214100451000 |
July 18, 2023 |
Region IX |
Regional Office IX |
UACS No. 300214100451000
Project ID: P00733754MN
Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of Solar Studs Lights along Pagadian City-Zamboanga City Rd (Licomo-Putik Road) - K1889 + 000 - K1927 + 000, Zamboanga City
CW1- Road Safety: Solar Studs: 12,547.00 No. of Studs
Unit Cost: ₱ 11,536.62 /No. of Studs
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00 |
February 27, 2024 |
FY 2023 |
WIN3E03114 |
300214100450000 |
July 18, 2023 |
Region IX |
Regional Office IX |
|
February 27, 2024 |
FY 2023 |
WIN3E03114 |
300214100450000 |
July 18, 2023 |
Region IX |
Regional Office IX |
UACS No. 300214100450000
Project ID: P00733753MN
Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of Solar Studs Lights along Pagadian City-Zamboanga City Rd (Licomo-Putik Road) - K1851 + 000 - K1889 + 000, Zamboanga City
CW1- Road Safety: Solar Studs: 12,547.00 No. of Studs
Unit Cost: ₱ 11,536.62/No. of Studs
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00 |
February 27, 2024 |
FY 2023 |
WIN3E02983 |
300214100452000 |
May 16, 2023 |
Region IX |
Regional Office IX |
UACS No. 300214100452000
Project ID: P00733755MN
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of Solar LED Street Light along National Road and Bridge with the following Section (Buenavista - Bolong By-pass Road) Sta. 1895+000 - Sta. 1904+499
CW1- Road Safety: Street Lighting: 1,170 No. of Units
Unit Cost: ₱ 98,974.36/ No. of Units
EAO: ₱ 4,200,000.00
Allocation: ₱ 120,000,000.00 |
February 27, 2024 |
2023 |
WIN3E02978 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From:
Baguio-Bontoc Rd - K0284+000 - K0284+128, K0284+164 - K0284+452, K0284+492 - K0285+565;
Type of Work: Off-Carriageway Improvement: Paving of Shoulders;
Physical Target: 6000.67 Square Meters;
Allocation: Php 30,000,000.000
To:
Baguio-Bontoc Rd - K0296+000 - K0297+500;
Type of Work:
CW1: Off-Carriageway Improvement: Paving of Shoulders
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 2305.50 Square meters
CW2: 2058 Square meters ;
Allocation: Php 30,000,000.000
|
February 27, 2024 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Baguio-Bontoc Rd - K0304+000 - K0305+491;
Type of Work: Off-Carriageway Improvement: Paving of Shoulders;
Physical Target: 6008.73 Square Meters;
Allocation: Php 30,000,000.000"
"To:
Baguio-Bontoc Rd - K0298+000 - K0299+600;
Type of Work:
CW1: Off-Carriageway Improvement: Paving of Shoulders
CW2: Construction of Drainage Structures along Road
CW3: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 2,360.50 Square meters
CW2: 1,267 lineal meters
CW3: 1,920.50 Square meters ;
Allocation: Php 30,000,000.000"
|
February 27, 2024 |
2023 |
|
SR2023-01-001677 |
March 28, 2023 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Baguio-Bontoc Rd - K0281+438 - K0282+000, K0283+554 - K0284+000, K0284+969 - K0287+755;
Physical Target: 7.46 Lane Km;
Allocation: Php 60,000,000.000"
"To:
Baguio-Bontoc Rd – K0267+813 – K0269+112, K0281+438 - K0284+075;
Physical Target: 7.894 Lane Km;
Allocation: Php 60,000,000.000"
|
February 27, 2024 |
2023 |
WIN3E02998 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Baguio-Bontoc Rd - K0294+000 - K0295+803;
Type of Work: Off-Carriageway Improvement: Paving of Shoulders;
Physical Target: 5770.71 Square Meters;
Allocation: Php 30,000,000.000"
"To:
Baguio-Bontoc Rd - K0294+000 - K0295+993;
Type of Work:
CW1: Off-Carriageway Improvement: Paving of Shoulders
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 2,287.80 Square meters
CW2: 2,764 Square meters ;
Allocation: Php 30,000,000.000"
|
February 27, 2024 |
2023 |
WIN3E03190 |
SR2023-03-008010 |
March 22, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
"From:
Construction of Naguillan Flood Control Structure, La Paz, Abra;
Physical Target: 1230.745 Lineal meters;
Allocation: Php 150,000,000.000"
"To:
Construction of Naguillan Flood Control Structure, La Paz, Abra;
Physical Target: 407.4 Lineal meters;
Allocation: Php 150,000,000.000"
|
February 27, 2024 |
2023 |
WIN3E03192 |
SR2023-03-005871 |
March 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
"From:
Construction of Catacdegan Flood Control, Manabo, Abra;
Physical Target: 820.497 Lineal meters;
Allocation: Php 100,000,000.000"
"To:
Construction of Catacdegan Flood Control, Manabo, Abra;
Physical Target: 279.6 Lineal meters;
Allocation: Php 100,000,000.000"
|
February 27, 2024 |
2023 |
WIN3E03023 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
"From:
Rehabilitation of Road, Lagayan, Abra;
Physical Target: 11.831 Lane Km;
Allocation: Php 99,980,000.000"
"To:
Rehabilitation of Road, Lagayan, Abra;
Physical Target: 7.446 Lane Km;
Allocation: Php 99,980,000.000"
|
February 27, 2024 |
2023 |
WIN3E03199 |
SR2023-03-008036 |
March 22, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
"From:
Construction of Palaquio Flood Control Structure, Bucay, Abra;
Physical Target: 820.497 Lineal meters;
Allocation: Php 100,000,000.000"
"To:
Construction of Palaquio Flood Control Structure, Bucay, Abra;
Physical Target: 295.2 Lineal meters;
Allocation: Php 100,000,000.000"
|
February 27, 2024 |
2023 |
WIN3E03203 |
SR2023-01-000789 |
January 30, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
"From:
Construction of Flood Control Structure along Abra Major River Basin (Phase II), Barangay Caupasan, Danglas, Abra;
Physical Target: 1230.745 Lineal meters;
Allocation: Php 150,000,000.000"
"To:
Construction of Flood Control Structure along Abra Major River Basin (Phase II), Barangay Caupasan, Danglas, Abra;
Physical Target: 939.2 Lineal meters;
Allocation: Php 150,000,000.000"
|
February 27, 2024 |
2023 |
WIN3E03210 |
SR2023-03-008015 |
March 22, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
"From:
Construction of Patagui-Dagsian Flood Control Structure, La Paz, Abra;
Physical Target: 1230.745 Lineal meters;
Allocation: Php 150,000,000.000"
"To:
Construction of Patagui-Dagsian Flood Control Structure, La Paz, Abra;
Physical Target: 613.2 Lineal meters;
Allocation: Php 150,000,000.000"
|
February 27, 2024 |
2023 |
WIN3E03204 |
SR2023-03-005881 |
March 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
"From:
Construction of Bangbangcag Flood Control, Bucay, Abra;
Physical Target: 820.497 Lineal meters;
Allocation: Php 100,000,000.000"
"To:
Construction of Bangbangcag Flood Control, Bucay, Abra;
Physical Target: 313.2 Lineal meters;
Allocation: Php 100,000,000.000"
|
February 27, 2024 |
2023 |
WIN3E03208 |
SR2023-01-000963 |
January 30, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
"From:
Construction of Flood Control Structure along Abra Major River Basin, Barangay Palaquio, Bucay, Abra;
Physical Target: 1230.745 Lineal meters;
Allocation: Php 150,000,000.000"
"To:
Construction of Flood Control Structure along Abra Major River Basin, Barangay Palaquio, Bucay, Abra;
Physical Target: 460 Lineal meters;
Allocation: Php 150,000,000.000"
|
February 27, 2024 |
2023 |
WIN3E03211 |
SR2023-01-000745 |
January 30, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
"From:
Abra-Kalinga Rd - K0475 + 200 - K0475 + 700;
Physical Target: 5555.56 Square meters;
Allocation: Php 80,000,000.000"
"To:
Abra-Kalinga Rd - K0475 + 200 - K0475 + 700;
Physical Target: 2856 Square meters;
Allocation: Php 80,000,000.000"
|
February 27, 2024 |
FY2023 |
|
300221102343000 |
May 29, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 1st District Engineering Office |
UACS No. 300221102343000
Project ID: P00735034MN
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Concreting of Road at Brgy. Bulabug, Maimbung, Sulu
CW1- Construction of Concrete Road: 0.74 lane km
Unit Cost: ₱ 13,378,378.37 /lane km
EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00 |
February 27, 2024 |
FY2023 |
|
300222100129000 |
May 24, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 1st District Engineering Office |
UACS No. 300222100129000
Project ID: P00732419MN
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities
Construction of Road, Sitio Bangalan - Imbaw, Barangay Tubig Samin, Maimbung, Sulu
CW1- Construction of Concrete Road: 0.870 lane km
Unit Cost: ₱ 11,379,310.34 /lane km
EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00 |
February 27, 2024 |
FY2023 |
WIN3B01104 |
310102101176000 |
April 4, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 2nd District Engineering Office |
UACS No. 310102101176000
Project ID: P00706091MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Romandier-Camp Andres-Tanduh Bato Rd - KM44+980 - KM45+490
CW1- Preventive Maintenance of Road: Concrete Reblocking: 0.74 lane km
Unit Cost: ₱ 14,082,479.73 /lane km
EAO: ₱ 377,965.00
Allocation: ₱ 10,799,000.00 |
February 27, 2024 |
FY2023 |
|
300217100184000 |
May 16, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 1st District Engineering Office |
UACS No. 300217100184000
Project ID: P00733934MN
Convergence and Special Support Program (CSSP - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads
and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
Rehabilitation / Improvement of Jolo Port - Bud Daho - Romainder Road traverse the
jurisdiction of Municipality of Jolo, Patikul and Talipao, Sulu
CW1- Rehabilitation of Concrete Road: 2.08 lane km
Unit Cost: ₱ 13,918,269.23 /lane km
EAO: ₱ 1,050,000.00
Allocation: ₱ 30,000,000.00 |
February 27, 2024 |
FY2023 |
WIN3B01100 |
320101109332000 |
May 16, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 2nd District Engineering Office |
UACS No. 320101109332000
Project ID: P00721236MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Romandier-Camp Andres-Tanduh Bato Road, Luuk, Sulu
CW1- Construction of Flood Mitigation Structure: 254.0 ln.m.
Unit Cost: ₱ 189,960.63 /ln.m.
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00 |
February 27, 2024 |
FY2023 |
WIN3B01090 |
310202101311000 |
April 4, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 2nd District Engineering Office |
UACS No. 310202101311000
Project ID: P00705488MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Romandier-Camp Andres-Tanduh Bato (S00022SL) - K0028 + 973.29- K0030 + 220
CW1- Road Widening: 2.493 lane km
Unit Cost: ₱ 22,961,376.59 /lane km
CW1 Cost: ₱ 57,242,711.83
ROW Acquisition: ₱ 2,190.96 sq.m.
Unit Cost: ₱ 300.00 /sq.m.
ROW Cost: ₱ 657,288.17
EAO: ₱ 2,100,000.00
Allocation: ₱ 60,000,000.00 |
February 27, 2024 |
FY2023 |
|
300215102739000 |
May 16, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 2nd District Engineering Office |
UACS No. 300215102739000
Project ID: P00735019MN
Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Improvement of Road, Barangay Kulay-Kulay to Barangay Lingah Section, Barangay Romandier, Luuk, Sulu
CW1- Construction of Concrete Road: 3.72 lane km
Unit Cost: ₱ 12,970,430.10 /lane km
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00 |
February 27, 2024 |
FY2023 |
WIN3B01098 |
320101109333000 |
May 16, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 2nd District Engineering Office |
UACS No. 320101109333000
Project ID: P00721663MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Seit-Tayungan-Camp Andres Road, Panamao, Sulu
CW1- Construction of Flood Mitigation Structure: 336.0 ln.m.
Unit Cost: ₱ 201,041.67 /ln.m.
EAO: ₱ 2,450,000.00
Allocation: ₱ 70,000,000.00 |
February 27, 2024 |
FY2023 |
WIN3B01082 |
300215102736000 |
April 24, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 2nd District Engineering Office |
UACS No. 300215102736000
Project ID: P00735017MN
Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or
Bridges from the National Road/s leading to Major/ Strategic Public Buildings/
Facilities
Concreting of Tandu-Bato-Taindih Road, Luuk, Sulu
CW1- Construction of Concrete Road: 2.05 lane km
Unit Cost: ₱ 33,892,682.93 /lane km
EAO: ₱ 2,520,000.00
Allocation: ₱ 72,000,000.00 |
February 27, 2024 |
FY2023 |
|
300222100124000 |
May 29, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 1st District Engineering Office |
UACS No. 300222100124000
Project ID: P00732414MN
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities
Construction of Road, Gulangan - Binuang (Phase 2), Barangay Gulangan, Maimbung, Sulu
CW1- Construction of Concrete Road: 0.86 lane km
Unit Cost: ₱ 11,511,627.90 /lane km
EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00 |
February 27, 2024 |
FY2023 |
|
300222100132000 |
May 8, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 1st District Engineering Office |
UACS No. 300222100132000
Project ID: P00735051MN
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities
Concreting of Road at Barangay Lower Tambaking, Maimbung. Sulu
CW1- Construction of Concrete Road: 1.20 lane km
Unit Cost: ₱ 16,500,000.00 /lane km
EAO: ₱ 200,000.00
Allocation: ₱ 20,000,000.00 |
February 27, 2024 |
FY2023 |
|
300221102352000 |
May 29, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 1st District Engineering Office |
UACS No. 300222100132000
Project ID: P00735040MN
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Concreting of Road at Brgy. Bilaan, Talipao, Sulu
CW1- Construction of Concrete Road: 0.72 lane km
Unit Cost: ₱ 13,750,000.00 /lane km
EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00 |
February 27, 2024 |
FY2023 |
|
300222100133000 |
May 16, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 1st District Engineering Office |
UACS No. 300222100133000
Project ID: P00735052MN
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities
Concreting of Road at Barangay Batu Ugis. Maimbung, Sulu
CW1- Construction of Concrete Road: 1.72 lane km
Unit Cost: ₱ 20,145,348.83 /lane km
EAO: ₱ 350,000.00
Allocation: ₱ 35,000,000.00 |
February 27, 2024 |
FY2023 |
|
300221102357000 |
May 8, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 2nd District Engineering Office |
UACS No. 300221102357000
Project ID: P00735044MN
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Rehabiliation/Improvement of Circumferential National Road, Luuk Section, Sulu
CW1- Rehabilitation of Concrete Road: 5.051 lane km
Unit Cost: ₱ 8,183,033.06 /lane km
EAO: ₱ 417,500.00
Allocation: ₱ 41,750,000.00 |
February 27, 2024 |
FY2023 |
|
300221102356000 |
May 8, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 1st District Engineering Office |
UACS No. 300221102356000
Project ID: P00734156MN
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Rehabilitation of Slope Protection at Bangas, H.P. Tahil, Sulu
CW1- Construction of Slope Protection Structure: 1,477.5 sq.m.
Unit Cost: ₱ 13,401.015 /sq.m.
EAO: ₱ 200,000.00
Allocation: ₱ 20,000,000.00 |
February 26, 2024 |
2023 |
WIN3F07759 |
GAA 2023 |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00726955LZ
UACS : 320101109075000
From : ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Libmanan River, Brgy. Tampuhan, Libmanan, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 573.003 Lineal meters
TO : ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Libmanan River, Brgy. Tampuhan, Libmanan, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 86 Lineal meters |
February 26, 2024 |
2023 |
WIN3F07760 |
GAA 2023 |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
UACS : 320101109076000
Project ID : P00726956LZ
From :
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Libmanan River, Brgy. Mambalite, Libmanan, Camarines Sur
Physical Target :
Construction of Flood Mitigation Structure - 573.003 Lineal meters - 573.003 Lineal meters
TO :
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Libmanan River, Brgy. Mambalite, Libmanan, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 91 Lineal meters |
February 26, 2024 |
2023 |
WIN3F07763 |
GAA 2023 |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00726957LZ
UACS : 320101109077000
From :
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Libmanan River, Brgy. Palangon, Libmanan, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 573.003 Lineal meters
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Libmanan River, Brgy. Palangon, Libmanan, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 92.00 Lineal meters |
February 26, 2024 |
2023 |
WIN3F07757 |
GAA 2023 |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00726958LZ
UACS : 320101109078000
From : ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Libmanan River, Brgy. Mambayawas, Libmanan, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 573.003 Lineal meters
TO :
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Libmanan River, Brgy. Mambayawas, Libmanan, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 97.00 |
February 26, 2024 |
FY 2023 |
WIN3B01081 |
310212100227000 |
April 13, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Tawi-Tawi District Engineering Office |
UACS No. 310212100227000
Project ID: P00705490MN
OO1: Ensure Safe and Reliable National Road System -
Network Development - Paving of Unpaved Roads - Tertiary Roads
Tongusong-Tubig Indangan - (S00008TW) Chainage 10000 - Chainage 13400
CW1- Paving of Unpaved Roads: 6.80 lane km
Unit Cost: ₱ 21,911,176.47 /lane km.
EAO: ₱ 5,404,000.00
Allocation: ₱ 154,000,000.00 |
February 26, 2024 |
FY 2023 |
|
310204102117000 |
May 8, 2023 |
Region IX |
Regional Office IX |
UACs No. 310204102117000
Project ID: P00705491MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads
Sumagdang-Menzi-Lanote By-pass Road, Basilan
CW1- Road Widening/ 1.44 Lane-km
Unit Cost: ₱ 16,631,944.44 /Lane-km
ROW Acquisition 16,000.00 sq.m.
Unit Cost: ₱ 312.5 sq.m.
EAO: ₱ 1,050,000.00
Allocation: ₱ 30,000,000.00 |
February 26, 2024 |
2024 |
WIN3F07761 |
GAA 2024 |
December 25, 2024 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00726963LZ
UACS : 320101109079000
From :
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Libmanan River, Brgy. Padlos, Libmanan, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 573.003 Lineal meters
TO :
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Libmanan River, Brgy. Padlos, Libmanan, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 97.00 Lineal meters
|
February 26, 2024 |
FY 2023 |
|
310204102119000 |
May 8, 2023 |
Region IX |
Regional Office IX |
UACs No. 310204102119000
Project ID: P00705493MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads
Panunsulan - Lanote - Calvario - Maligue By-Pass Road, Basilan
CW1- Construction of Concrete Road/ 3.62 Lane-km
Unit Cost: ₱ 18,335,635.36 /Lane-km
ROW Acquisition 37,306.47267 sq.m.
Unit Cost: ₱ 160.83 sq.m.
EAO: ₱ 2,625,000.00
Allocation: ₱ 75,000,000.00 |
February 26, 2024 |
2024 |
WIN3F07762 |
GAA 2024 |
December 25, 2023 |
Region V |
Camarines Sur 2nd District Engineering Office |
ID : P00726961LZ
UACS : 320101109077000
From :
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Libmanan River, Brgy. Potot, Libmanan, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 573.003 Lineal meters
TO :
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Libmanan River, Brgy. Potot, Libmanan, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 573.003 Lineal meters |
February 26, 2024 |
2023 |
WIN3F07756 |
GAA 2023 |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00727323LZ
UACS : 320102105443000
From :
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Flood Control along Bicol River, Brgy. San Vicente, Milaor, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 573.003 Lineal meters
TO :
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Flood Control along Bicol River, Brgy. San Vicente, Milaor, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 188.00 Lineal meters |
February 26, 2024 |
FY 2023 |
WIN3B01105 |
300221102354000 |
May 8, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 2nd District Engineering Office |
UACS No. 300221102354000
Project ID: P00735042MN
Convergence and Special Support Program (CSSP) -
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Rehabilitation/Improvement of Kan Hadjili- Taiti Road,Kan-Mindus, Luuk, Sulu
CW1- Rehabilitation of Concrete Road : 1.787 lane km
Unit Cost: ₱ 18,836,038.05 /lane km.
EAO: ₱ 340,000.00
Allocation: ₱ 34,000,000.00 |
February 26, 2024 |
FY 2023 |
|
310204102121000 |
March 20, 2023 |
Region IX |
Regional Office IX |
UACs No. 310204102121000
Project ID: P00705495MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads
Zamboanga City By-Pass Road, Package 2, Zamboanga City
CW1- Widening of Bridge/ 348.80 square meters
Unit Cost: ₱ 110,163.417 /square meters
ROW Acquisition 639.17 sq.m.
Unit Cost: ₱ 7,822.63/ sq.m.
EAO: ₱ 1,575,000.00
Allocation: ₱ 45,000,000.00 |
February 26, 2024 |
FY 2023 |
|
300215102743000 |
May 16, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 2nd District Engineering Office |
UACS No. 300215102743000
Project ID: P00735021MN
Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/
Facilities
Rehabilitation of Road, Barangay Pang, Kalingalan Caluang, Sulu
CW1- Rehabilitation of Concrete Road: 1.20 lane km
Unit Cost: ₱ 12,062,500.00 /lane km
EAO: ₱ 525,000.00
Allocation: ₱ 15,000,000.00 |
February 26, 2024 |
FY 2023 |
|
310204102123000 |
March 31, 2023 |
Region IX |
Regional Office IX |
UACs No. 310204102123000
Project ID: P00705497MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads
Zamboanga City By-Pass Road, Package 4, Zamboanga City
CW1- Widening of Bridge/ 294.214 square meters
Unit Cost: ₱ 81,403.33 /square meters
ROW Acquisition 616.8 sq.m.
Unit Cost: ₱ 8,106.355/ sq.m.
EAO: ₱ 1,050,000.00
Allocation: ₱ 30,000,000.00 |
February 26, 2024 |
FY 2023 |
|
300222100118000 |
May 24, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 1st District Engineering Office |
UACS No. 300222100118000
Project ID: P00732408MN
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities
Construction of Road, Sitio Kurungan - Barangay Hall, Barangay Tubig Samin, Maimbung, Sulu
CW1- Construction of Concrete Road: 0.69 lane km
Unit Cost: ₱ 14,347,826.08 /lane km
EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00 |
February 26, 2024 |
FY 2023 |
|
310204102124000 |
April 25, 2023 |
Region IX |
Regional Office IX |
UACS No. 310204102124000
Project ID: P00705498MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads
Zamboanga City By-Pass Road, (West Coast Section) Package 1, Zamboanga City
CW1- Construction of Road Slope Protection Structure/
17,974.49 Square Meters
Unit Cost: ₱ 5,905.59/ Square Meters
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00
|
February 26, 2024 |
FY 2023 |
WIN3B01106 |
300221102355000 |
May 8, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 2nd District Engineering Office |
UACS No. 300221102355000
Project ID: P00735043MN
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Rehabilitation/Improvement of Kan-Baling-Tandu Bato, housing road, Luuk, Sulu
CW1- Rehabilitation of Concrete Road: 1.031 lane km
Unit Cost: ₱ 18,244,422.89 /lane km
EAO: ₱ 190,000.00
Allocation: ₱ 19,000,000.00 |
February 26, 2024 |
FY 2023 |
|
310204102125000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310204102125000
Project ID: P00705499MN
OO1: Ensure Safe and Reliable National Road System – Network Development – Construction of By-Pass and Diversion Roads
NRJ Sinunuc-Malagutay-San Roque Section, Phase II, Zamboanga City
CW1- Construction of Concrete Road / 2.370 lane-km
Unit Cost: ₱25,759,493.67/lane-km
ROW Acquisition 33,200.00 sq.m.
Unit Cost: ₱ 1,358.43/sq.m.
EAO: ₱3,850,000.00
Allocation: ₱110,000,000.00
|
February 26, 2024 |
FY 2023 |
|
310201101091000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310201101091000
Project ID: P00705502MN
OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads
Pagadian City-Zamboanga City Rd - K1890 + 379 - K1890 + 678, K1890 + 707 - K1893 + 702.24, K1893 +720.96 – K1893+900.00
CW1- Road Widening/ 6.95 lane-km
Unit Cost: ₱16,056,115.11/lane-km
ROW Acquisition 23,270.976 sq.m.
Unit Cost: ₱ 429.72/ sq.m.
EAO: ₱4,410,000.00
Allocation: ₱126,000,000.00
|
February 26, 2024 |
FY 2023 |
|
300222100131000 |
April 24, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 1st District Engineering Office |
Description
UACS No. 300222100131000
Project ID: P00735050MN
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities
Concreting of Road at Barangay Duhul Kabbun, Maimbung, Sulu
CW1- Construction of Concrete Road: 1.124 lane km
Unit Cost: ₱ 17,170,818.5 /lane km
EAO: ₱ 200,000.00
EXCESS : ₱ 500,000.00
Allocation: ₱ 20,000,000.00 |
February 26, 2024 |
FY 2023 |
|
310201101092000 |
March 29, 2023 |
Region IX |
Regional Office IX |
UACS No. 310201101092000
Project ID: P00705503MN
OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads
Pagadian City-Zamboanga City Rd - K1870 + 300 - K1871 + 000, K1871 + 420.00 - K1871 + 546.78, K1871 + 800.00 - K1872 + 005.79, K1872 + 460.00 - K1873 + 490.00
CW1- Road Widening/ 4.13 lane-km
Unit Cost: ₱ 23,280,871.67/lane-km
ROW Acquisition 33,333.33sq.m.
Unit Cost: ₱ 300/ sq.m.
EAO: ₱ 3,850,000.00
Allocation: ₱110,000,000.00
|
February 26, 2024 |
FY 2023 |
|
300222100130000 |
April 24, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 1st District Engineering Office |
UACS No. 300222100130000
Project ID: P00735049MN
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities Facilities
Concreting of Road at Barangay Kandang, Maimbung, Sulu
CW1- Construction of Concrete Road: 1.053 lane km
Unit Cost: ₱ 18,328,584.99 /lane km
EAO: ₱ 200,000.00
EXCESS: ₱ 500,000.00
Allocation: ₱ 20,000,000.00 |
February 26, 2024 |
FY 2023 |
WIN3B01077 |
300221102346000 |
April 24, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 2nd District Engineering Office |
UACS No. 300221102346000
Project ID: P00735036MN
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Concreting of Bakud Kan Basir, Brgy. Bual, Luuk, Sulu
CW1- Construction of Concrete Road: 0.852 lane km
Unit Cost: ₱ 24,917,840.38 /lane km
EAO: ₱ 220,000.00
EXCESS: ₱ 550,000.00
Allocation: ₱ 22,000,000.00 |
February 26, 2024 |
FY 2023 |
|
300222100122000 |
May 29, 2023 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Sulu 1st District Engineering Office |
UACS No. 300222100122000
Project ID: P00732412MN
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities
Construction of Road, Kulasi - Kapok Punggol Access from Parang - Maimbung Road, Barangay Kapok Punggol, Maimbung, Sulu
CW1- Construction of Concrete Road: 0.786 lane km
Unit Cost: ₱ 12,595,419.84 /lane km
EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00 |