Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
February 28, 2024 FY 2023 WIN3E02986 300214100456000 May 16, 2023 Region IX Regional Office IX
UACS No. 300214100456000
Project ID: P00733759MN

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

Installation of Solarization along National Road and Bridge with the following Section (Cabaluay-Mampang Zamboanga City Diversion Road) Sta. 13+732.95 to Sta. 17+220.64

CW1- Road Safety: Street Lighting: 464 No. of Units
Unit Cost: 103,987.07/ No. of Units
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00
February 28, 2024 FY 2023 WIN3E03051 300219101755000 May 15, 2023 Region IX Regional Office IX
UACS No. 300219101755000
Project ID: P00733978MN


Convergence and Special Support Program (CSSP)– Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities

Construction of Flood Control Structure along Layawan River, De Venta Perla Bridge (Upstream) Sergio Osmeña, Zamboanga del Norte


CW1- Construction of Flood Mitigation Structure: 217.0 ln.m
Unit Cost: ₱ 316,849.07/ln.m
EAO: ₱ 2,493,750.00
Allocation: ₱ 71,250,000.00
February 28, 2024 FY 2023 WIN3E03035 300215102731000 May 8, 2023 Region IX Regional Office IX
UACS No. 300215102731000
Project ID: P00733799MN


Convergence and Special Support Program (CSSP)– Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities

Construction of Bunguiao-Tolosa-Lapakan Bypass Road, Zamboanga City


CW1- Construction of Gravel Road: 6.08 Lane km
Unit Cost: ₱ 23,807,565.79 Lane km
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
February 28, 2024 2023 300215102734000 May 8, 2023 Region IX Regional Office IX
UACS NO. 300215102734000
Project ID: P00733802MN


Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Muti - Buenavista Bypass Road Package 1, Zamboanga City


CW1: Construction of Concrete Road: 18.68 Lane Km

Unit Cost: ₱ 7,748,929.34/Lane Km
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00

February 28, 2024 2023 WIN3E02968 300215102733000 May 8, 2023 Region IX Regional Office IX
UACS NO. 300215102733000
Project ID: P00733801MN

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Mangusu - Muti Coastal Road Package 1, Zamboanga City

CW1: Construction of Concrete Road: 8.08 Lane Km
Unit Cost: ₱ 17,914,603.96/ Lane Km
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00

February 28, 2024 2023 WIN3E03060 300215102732000 May 8, 2024 Region IX Regional Office IX
UACS NO. 300215102732000
Project ID: P00733800MN

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Bunguiao - Quiniput Road, Zamboanga City

CW1: Construction of Concrete Road: 6.59 Lane Km
Unit Cost: ₱ 21,965,098.63/ Lane Km
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00



February 28, 2024 2023 WIN3E03000 300219101756000 May 17, 2023 Region IX Regional Office IX
UACS NO. 300219101756000
Project ID: P00733979MN

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities

Construction of Flood Control Structure (Revetment/Bank Protection) along Salug Daku River, Salug Daku Bridge, Sergio Osmeña, Zamboanga del Norte

CW1: Construction of Flood Mitigation Structure: 560.0 ln.m

Unit Cost: ₱ 172,321.42/ ln.m
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00


February 27, 2024 FY 2023 310104100492000 March 9, 2023 Region IX Regional Office IX
UACS No. 310104100492000
Project ID: P00706252MN

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads

Lanao-Pagadian-Zamboanga City Rd - K1758 + 650 - K1759 + 231, K1759 + 261 - K1760 + 075, K1760 + 153 - K1760 + 776, K1764 + 330 - K1764 + 849, K1767 + 000 - K1768 + 000, K1769 + 000.00 – K1770 + 000.00, K1771 + 576.00 – K1771 + 759.00

CW1- Reconstruction to Concrete Pavement 9.44 lane-km
Unit Cost: ₱10,733,580.51 /lane-km
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00
February 27, 2024 FY 2023 310305101843000 April 25, 2023 Region IX Regional Office IX
UACS No. 310305101843000
Project ID: P00706632MN

OO1: Ensure Safe and Reliable National Road System – Bridge - Widening of Permanent Bridges

Talinga Br. (B00458MN) along Dipolog-Sindangan-Liloy Rd (Phase I)

CW1- Widening of Bridge: 2,312.50 Square Meters
Unit Cost: ₱ 62,594.59/Square Meters
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
February 27, 2024 FY 2023 310306100249000 May 31, 2023 Region IX Regional Office IX
UACS No. 310306100249000
Project ID: P00706633MN

OO1: Ensure Safe and Reliable National Road System – Bridge - Construction of New Bridges


Liba Br. along Sindangan-Bayog-Lakewood Road (Phase II)

CW1- Construction of Bridge: 867.186 Square Meters
Unit Cost: ₱ 114,695.31 /Square Meters
CW2- Construction of Road Slope Protection Structure: 1,510.62 Square Meters
Unit Cost: ₱ 29,979.63 /Square Meters
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
February 27, 2024 FY 2023 WIN3E03169 310204102140000 July 31, 2023 Region IX Regional Office IX
UACS No. 310204102140000
Project ID: P00706812MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads


Buenavista - Bolong By-Pass Road, Package 8, Zamboanga City

CW1- Construction of Gravel Road: 1.09 Lane Km
Unit Cost: ₱ 134,083,512.14/Lane Km
ROW Acquisition 4,666.667 sq.m.
Unit Cost: ₱ 1,500.00/sq.m.
EAO: ₱ 5,300,814.50
Excess: ₱ 548,157.27
Allocation: ₱ 159,000,000.00

February 27, 2024 2023 WIN3F07367 GAA FY 2023 January 2, 2023 Region VIII Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0788 + 000 - K0792 + 000

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road P 107.333090 M
: 11.861 Lane Km

EAO P 3.892910M

Total P 111.226 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0789+000 - K0789+083, K0789+310 - K0789+467, K0789+817 - K0789+841, K0789+916 - K0790+184, K0790+401- K0790+475, K0790+535 - K0790+556, K0790+614 - K0790+820, K0791+74 - K0791+192, K0791+390 - K0791+451, K0791+629 - K0791+649, K0792+286 - K0792+312, K0792+821 - K0792+857, K0792+943 - K0792+985, K0831+277 - K0831+409, K0831+481 - K0831+503, K0831+610 - K0831+954, K0834+107 - K0834+170, K0834+299 - K0834+450, K0834+571 - K0834+775, K0834+838 – K0834+862, K0835+42 – K0835+057, K0835+216 – K0835+254, K0835+508 – K0835+552, K0835+844 – K0835+883, K0835+960 – K0836+018, K0836+123 – K0836+274, K0836+313 – K0836+372, K0836+467 – K0836+470, K0836+557 – K0836+950, K0837+083 - K0837+098, K0837+191 - K0837+410, K0837+500 - K0837+580, K0837+642 - K0837+686, K0837+893 - K0838+000, K0848+000 - K0848+874, K0848+968 - K0849+474

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road P 107.333090 M
: 9.776 Lane Km

EAO P 3.892910M

Total P 111.226 M
February 27, 2024 FY 2023 310204102142000 March 16, 2023 Region IX Regional Office IX
UACS No. 310204102142000
Project ID: P00706814MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads

Buenavista - Bolong By-Pass Road, Package 10, Zamboanga City

CW1- Construction of Concrete Road/ 6.72 Lane-km
Unit Cost: ₱ 20,913,690.48 /Lane-km
ROW Acquisition 57,000.00 sq.m.
Unit Cost: ₱ 175.44/sq.m.
EAO: ₱ 5,460,000.00
Allocation: ₱ 156,000,000.00
February 27, 2024 FY 2023 310204102143000 March 16, 2023 Region IX Regional Office IX
UACS No. 310204102143000
Project ID: P00706815MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads

Buenavista - Bolong By-Pass Road, Package 11, Zamboanga City

CW1- Construction of Concrete Road: 7.02 lane-km
Unit Cost: ₱ 19,195,156.70 /Lane-km
ROW Acquisition 50,020.00 sq.m
Unit Cost: ₱ 199.92/sq.m.
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
February 27, 2024 2023 WIN3F07740 GAA FY 2023 January 2, 2023 Region VIII Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

Wright - Taft - Borongan Road (S00123SM) K0828+(-581) - K0859 + 931

Physical Target: Allocation:

CW1-Road Widening: 65.114 Lane Km P 193.00 M

EAO P 7.00 M

Total P 200.00 M

AS MODIFIED:

Wright - Taft - Borongan Road (S00123SM) K0828+(-409) - K0830 + 861

Physical Target: Allocation:

CW1-Road Widening: 7.1 Lane Km P 193.00 M

EAO P 7.00 M

Total P 200.00 M
February 27, 2024 2023 WIN3F07741 GAA FY 2023 January 2, 2023 Region VIII Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

Basey - Marabut - Pinamitinan Rd. (S00124SM) k0909 + (-1024) - k0951 + 169

Physical Target: Allocation:

CW1-Road Widening: 88.890 Lane Km P 241.250 M

EAO P 8.750 M

Total P 250.00 M

AS MODIFIED:

Basey - Marabut - Pinamitinan Rd. (S00124SM) –K0914+000-K0915+000,K0936+000-K0937+000,K0939+000-K0940+000,K0940+000-K0941+000,K0946+000-K0947+000,K0947+000-K0948+000,K0948+000-K0948+875

Physical Target: Allocation:

CW1-Road Widening: 9.652 Lane Km P 241.250 M

EAO P 8.750 M

Total P 250.00 M
February 27, 2024 2023 WIN3F07477 GAA FY 2023 January 2, 2023 Region VIII Samar 2nd District Engineering Office
OO2: Protect Lives and Properties Against Major Floods

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Calbiga Flood Control along Calbiga River, Calbiga Samar

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 110.975 M
Structure: 819.530 Lineal meters

EAO P 4.025 M

Total P 115.00 M

AS MODIFIED:

Construction of Calbiga Flood Control along Calbiga River, Calbiga Samar

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 110.975 M
Structure: 383 Lineal meters

EAO P 4.025 M

Total P 115.00 M
February 27, 2024 FY 2023 310104100494000 April 25, 2023 Region IX Regional Office IX
UACS No. 310104100494000
Project ID: P00706835MN


OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads

Dipolog-Sindangan-Liloy Rd - K1880 + 375 - K1881 + 375, K1881 + 540.00 – K1883 + 000.00

CW1- Reconstruction to Concrete Pavement: 4.920 Lane Km
Unit Cost: ₱ 9,806,910.57/Lane Km
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00
February 27, 2024 2023 WIN3F07557 GAA FY 2023 January 2, 2023 Region VIII Samar 2nd District Engineering Office
OO2: Protect Lives and Properties Against Major Floods

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Flood Control Structure, Golden Bridge San Juanico-Basey-Sohoton Road, Basey, Samar

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 110.975 M
Structure:819.530 Lineal meters
EAO P 4.025 M

Total P 115.00 M

AS MODIFIED:

Construction of Flood Control Structure, Golden Bridge San Juanico-Basey-Sohoton Road, Basey, Samar

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 110.975 M
Structure:220 Lineal meters
EAO P 4.025 M

Total P 115.00 M
February 27, 2024 FY 2023 310104100496000 March 9, 2023 Region IX Regional Office IX
UACS No. 310104100496000
Project ID: P00706837MN

OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads

Pagadian City-Zamboanga City Rd - K1880 + 000 - K1881 + 000, K1883 + 000 - K1883 + 322


CW1- Reconstruction to Concrete Pavement: 2.64 Lane-km
Unit Cost: ₱ 12,334,454.55 /Lane-km
EAO: ₱ 1,181,040.00
Allocation: ₱ 33,744,000.00
February 27, 2024 2023 WIN3F07492 GAA FY 2023 January 2, 2023 Region VIII Samar 2nd District Engineering Office
OO2: Protect Lives and Properties Against Major Floods

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Flood Control Structure, Silaga River, along Daang Maharlika, Silaga Bridge, Barangay Tulay, Sta. Rita, Samar

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 110.975 M
Structure: 819.530 Lineal meters

EAO P 4.025 M

Total P 115.00 M

AS MODIFIED:

Construction of Flood Control Structure, Silaga River, along Daang Maharlika, Silaga Bridge, Barangay Tulay, Sta. Rita, Samar

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 110.975 M
Structure: 250 Lineal meters

EAO P 4.025 M

Total P 115.00 M
February 27, 2024 2023 WIN3F07718 GAA FY 2023 January 2, 2023 Region VIII Samar 2nd District Engineering Office
OO2: Protect Lives and Properties Against Major Floods

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Catbalogan Drainage System (Antiao Creek and Outfalls), Catbalogan City, Samar

Physical Target: Allocation:

CW1-Construction of Drainage P 101.325 M
Structure: 7,953.979 Lineal meters
EAO P 3.675 M

Total P 105.00 M

AS MODIFIED:

Construction of Catbalogan Drainage System (Antiao Creek and Outfalls), Catbalogan City, Samar

Physical Target: Allocation:

CW1-Construction of Drainage P 101.325 M
Structure: 1,531.71 Lineal meters
EAO P 3.675 M

Total P 105.00 M
February 27, 2024 FY 2023 WIN3E02896 310204102116000 April 25, 2023 Region IX Regional Office IX
UACS No. 310204102116000
Project ID: P00707613MN


OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads

By-Pass and Diversion Roads - Cawit to Baluno (Sta. 0+000 to Sta. 0+311.23, Sta. 0+326.41 – Sta. 1+340.00), Zamboanga

CW1- Construction of Concrete Road: 2.65 Lane-km
Unit Cost: ₱ 36,415,094.34/lane-km
EAO: ₱ 3,500,000.00
Allocation: ₱100,000,000.00
February 27, 2024 FY 2023 310104100495000 April 25, 2023 Region IX Regional Office IX
UACS No. 310104100495000
Project ID: P00707780MN

OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads


Pagadian City-Zamboanga City Rd – K1889 + 075.00 – K1889 + 275.00, K1898 + 101.70 – K1901 + 319.020, K1908 + 169.30 – K1908 + 566.30, K1910 + 892.00 – K1912 + 435.90, K1913 + 471.00 – K1913 + 779.00

CW1- Reconstruction to Concrete Pavement: 4.702 lane-km
Unit Cost: ₱ 10,245,993.19 /lane-km
EAO: ₱ 1,747,340.00
Allocation: ₱ 49,924,000.00
February 27, 2024 FY 2023 310104100497000 March 9, 2023 Region IX Regional Office IX
UACS No. 310104100497000
Project ID: P00707781MN

OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads

Pagadian City-Zamboanga City Rd - K1883 + 322 - K1885 + 000, K1886 + 000 - K1887 + 277, K1888 + 570 - K1889 + 017

CW1- Reconstruction to Concrete Pavement: 6.80 lane-km
Unit Cost: ₱ 12,076,265.44 /lane-km
EAO: ₱ 2,978,395.00
Allocation: ₱ 85,097,000.00
February 27, 2024 FY 2023 310104100498000 March 9, 2023 Region IX Regional Office IX
UACS No. 310104100498000
Project ID: P00707782MN

OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads

Pagadian City-Zamboanga City Rd – K1895 + 898.70 – K1896 + 175.60, K1902 + 605.60 – K1906 + 044.90, K1909 + 384.20 – K1909 + 947.30, K1913 + 138.00 – K1913 + 471.00

CW1- Rehabilitation of Paved Road: 4.162 lane-km
Unit Cost: ₱ 10,128,326.53 /lane-km
EAO: ₱ 1,528,905.00
Allocation: ₱ 43,683,000.00
February 27, 2024 FY 2023 WIN3E02705 320101110237000 March 9, 2023 Region IX Regional Office IX
UACS No. 320101110237000
Project ID: P00721221MN


OO2: Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure at Bogayo River, Kumalarang Br. 1 Section(B00549MN) (Downstream - Rightside) along Pagadian City - Zamboanga City Road(S01453MN), Barangay Bogayo, Kumalarang, Zamboanga del Sur

CW1- Construction of Flood Mitigation Structure; 481.00 ineal Meters
Unit Cost: ₱ 220,686.07/Lineal Meters
EAO: ₱ 3,850,000.00
Allocation: ₱110,000,000.00
February 27, 2024 FY 2023 WIN3E02829 320101109326000 March 31, 2023 Region IX Regional Office IX
UACS No. 320101109326000
Project ID: P00721229MN


OO2: Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Upper Tungawan Flood Control Structure along Tungawan River (Phase V) Tungawan, Zamboanga Sibugay

CW1- Construction of Flood Mitigation Structure: 613.00 lineal Meters
Unit Cost: ₱ 173,164.763/Lineal Meters
EAO: ₱ 3,850,000.00
Allocation: ₱110,000,000.00
February 27, 2024 FY 2023 WIN3E02867 320102105920000 April 17, 2023 Region IX Regional Office IX
UACS No. 320102105920000
Project ID: P00721402MN


OO2: Protect Lives and Properties Against Major Floods -
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control at Sibuguey River along Imelda - Bayog - Kumalarang - Lapuyan- Margosatubig Road, Barangay Paradise, Diplahan, Zamboanga Sibugay Package 2

CW1- Construction of Flood Mitigation Structure: 84.60 Lineal Meters
Unit Cost: ₱ 570,330.97 /Lineal Meters
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00
February 27, 2024 FY 2023 WIN3E02866 320102105921000 April 17, 2023 Region IX Regional Office IX
UACS No. 320102105921000
Project ID: P00721403MN


OO2: Protect Lives and Properties Against Major Floods -
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control at Sibuguey River along Imelda - Bayog - Kumalarang - Lapuyan- Margosatubig Road, Barangay Paradise, Diplahan, Zamboanga Sibugay Package 3

CW1- Construction of Flood Mitigation Structure: 81.80 Lineal Meters
Unit Cost: ₱ 589,853.30 /Lineal Meters
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00
February 27, 2024 FY 2023 WIN3E03050 320102105555000 May 15, 2023 Region IX Regional Office IX
UACS No. 320102105555000
Project ID: P00721404MN


OO2: Protect Lives and Properties Against Major Floods – Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control Structure (revetment Wall) along Sibuguey River, Barangay Santa Barbara, Imelda, Zamboanga Sibugay

CW1- Construction of Revetment: 331.0 ln.m
Unit Cost: ₱ 291,540.78/ln.m
EAO: ₱ 3,500,000.00
Allocation: ₱100,000,000.00
February 27, 2024 FY 2023 WIN3E03013 320101109312000 March 31, 2023 Region IX Regional Office IX
UACS No. 320101109312000
Project ID: P00721521MN


OO2: Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure Tumaga River ( Tetuan-Tugbungan Section ), Package
1, Zamboanga City


CW1- Construction of Flood Mitigation Structure: 433.0 lineal Meters
Unit Cost: ₱ 185,590.92/Lineal Meters
CW2- Construction of Flood Mitigation Structure: 433.0 lineal Meters
Unit Cost: ₱ 148,704.69/Lineal Meters
EAO: ₱ 5,250,000.00
Allocation: ₱150,000,000.00
February 27, 2024 FY 2023 320101109313000 May 15, 2023 Region IX Regional Office IX
UACS No. 320101109313000
Project ID: P00721522MN


OO2: Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure, Ilaya Bridge, Abutment B, Downstream Section, Dapitan City, Zamboanga del Norte


CW1- Construction of Flood Mitigation Structure: 361.00 ln.m
Unit Cost: ₱ 267,313.02/ln.m
EAO: ₱ 3,500,000.00
Allocation: ₱100,000,000.00
February 27, 2024 FY 2023 WIN3E02956 320101109314000 April 24, 2023 Region IX Regional Office IX
UACS No. 320101109314000
Project ID: P00721523MN


OO2: Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Conctrol Structure along Kabasalan River (Downstream), Barangay Banker, Kabasalan, Zamboanga Sibugay

CW1- Construction of Flood Mitigation Structure: 463.0ln.m
Unit Cost: ₱ 147,410.94/ln.m
CW2- Construction of Flood Mitigation Structure: 463.0ln.m
Unit Cost: ₱ 102,697.05/ln.m
EAO: ₱ 4,200,000.00
Allocation: ₱120,000,000.00
February 27, 2024 FY 2023 WIN3E03014 320101109315000 April 24, 2023 Region IX Regional Office IX
UACS No. 320101109315000
Project ID: P00721524MN


OO2: Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure along Kabasalan River (Upstream), Barangay Banker, Kabasalan, Zamboanga Sibugay


CW1- Construction of Flood Mitigation Structure: 533.00 ln.m
Unit Cost: ₱ 114,761.32/ln.m
CW2- Construction of Flood Mitigation Structure: 533.00 ln.m
Unit Cost: ₱ 102,499.46/ln.m
EAO: ₱ 4,200,000.00
Allocation: ₱120,000,000.00
February 27, 2024 FY 2023 WIN3E02839 320101109327000 April 3, 2023 Region IX Regional Office IX
UACS No. 320101109327000
Project ID: P00721527MN


OO2: Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure at Bacalan Br. Section (B00497MN), Lanao-Pagadian-Zamboanga City Rd (S01113MN), Ipil, Zamboanga Sibugay



CW1- Construction of Flood Mitigation Structure: 336.85 ln.m
Unit Cost: ₱ 300,801.54/ln.m
EAO: ₱ 3,675,000.00
Allocation: ₱105,000,000.00
February 27, 2024 FY 2023 WIN3E02766 320101109334000 March 9, 2023 Region IX Regional Office IX
UACS No. 320101109334000
Project ID: P00721528MN

OO2: Protect Lives and Properties - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure along Tictapul River, Barangay Tictapul, ZamboangaCity

CW1- Construction of Flood Mitigation Structure: 346.0 ln. m
Unit Cost: ₱ 376,517.34/ln. m.
EAO: ₱ 4,725,000.00
Allocation: ₱ 135,000,000.00
February 27, 2024 FY 2023 WIN3E03048 320102105557000 May 15, 2023 Region IX Regional Office IX
UACS No. 320102105557000
Project ID: P00721631MN


OO2: Protect Lives and Properties Against Major Floods – Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control Structure along Dipolog River, (Conacon-Guinles Section), Polanco, Zamboanga del Norte

CW1- Construction of Flood Mitigation Structure: 192.37 ln.m
Unit Cost: ₱ 351,146.22/ln.m
EAO: ₱ 2,450,000.00
Allocation: ₱ 70,000,000.00
February 27, 2024 FY 2023 WIN3E03078 320102105558000 May 15, 2023 Region IX Regional Office IX
UACS No. 320102105558000
Project ID: P00721632MN


OO2: Protect Lives and Properties Against Major Floods – Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control Structure (Revetment) along Dapitan River, Ilaya-Oyan bridge (Bitoon Section) along Dipolog-Oroquieta Road, Dapitan City, Zamboanga del Norte

CW1- Construction of Flood Mitigation Structure: 372.0 ln.m
Unit Cost: ₱ 259,408.60/ln.m
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00
February 27, 2024 FY 2023 WIN3E03004 320102105559000 May 15, 2023 Region IX Regional Office IX
UACS No. 320102105559000
Project ID: P00721633MN


OO2: Protect Lives and Properties Against Major Floods – Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control Structure (Revetment) along Dapitan River, Barcelona-Leop Section, Dapitan City, Zamboanga del Norte

CW1- Construction of Flood Mitigation Structure: 418.0 ln.m
Unit Cost: ₱ 230,861.24/ln.m
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00
February 27, 2024 FY 2023 WIN3E03052 320102105560000 May 15, 2023 Region IX Regional Office IX
UACS No. 320102105560000
Project ID: P00721634MN


OO2: Protect Lives and Properties Against Major Floods – Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control Structure (Revetment/Bank Protection) along Dipolog River, (Sianib Section), Polanco, Zamboanga del Norte


CW1- Construction of Flood Mitigation Structure: 313.0 ln.m
Unit Cost: ₱ 308,306.71/ln.m
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00
February 27, 2024 FY 2023 300203102202000 April 25, 2023 Region IX Regional Office IX
UACS No. 300203102202000
Project ID: P00731848MN


CSSP: Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)

Brgy. Lukbuton to Brgy. Panigayan leading to White Beach, Malamawi Island, Isabela City, Basilan

CW1- Construction of Concrete Road: 1.46 Lane-km
Unit Cost: ₱ 19,089,154.11/lane-km
EAO: ₱ 1,010,835.00
Allocation: ₱ 28,881,000.00
February 27, 2024 FY 2023 WIN3E02984 300214100448000 May 16, 2023 Region IX Regional Office IX
UACS No. 300214100448000
Project ID: P00733751MN

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239


Installation of Solar LED Street Light along National Road and Bridge with the following Section (Cabaluay-Mampang Zamboanga City Diversion Road) Sta. 00+245.27 - Sta. 10+245.27

CW1- Road Safety: Street Lighting: 1,359 No. of Units
Unit Cost: ₱ 99,411.33/ No. of Units
EAO: ₱ 4,900,000.00
Allocation: ₱ 140,000,000.00

February 27, 2024 FY 2023 WIN3E03031 300214100449000 June 14, 2023 Region IX Regional Office IX
UACS No. 300214100449000
Project ID: P00733752MN

Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

Installation of Road Safety Devices, Pagadian City-Zamboanga City Rd (Licomo-Putik Road) - K1889 + 000 - K1927 + 000, Zamboanga City


CW1- Road Safety: Street Lighting: 950.00 No. of Units
Unit Cost: ₱ 97,969.73 /No. of Units
CW2- Road Safety: Road Signs: 560.0 Number of Signs
Unit Cost: ₱ 12,048.17 /Number of Signs
CW3- Road Safety: Pavement Markings: 111.818 Lane Km
Unit Cost: ₱ 160,125.66/Lane Km
CW4 Road Safety: Guardrails: 7,563.0 Meters
Unit Cost: ₱ 3,573.56/Meters
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
February 27, 2024 FY 2023 WIN3E03095 300214100451000 July 18, 2023 Region IX Regional Office IX
UACS No. 300214100451000
Project ID: P00733754MN

Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

Installation of Solar Studs Lights along Pagadian City-Zamboanga City Rd (Licomo-Putik Road) - K1889 + 000 - K1927 + 000, Zamboanga City

CW1- Road Safety: Solar Studs: 12,547.00 No. of Studs
Unit Cost: ₱ 11,536.62 /No. of Studs
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
February 27, 2024 FY 2023 WIN3E03114 300214100450000 July 18, 2023 Region IX Regional Office IX
February 27, 2024 FY 2023 WIN3E03114 300214100450000 July 18, 2023 Region IX Regional Office IX
UACS No. 300214100450000
Project ID: P00733753MN

Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

Installation of Solar Studs Lights along Pagadian City-Zamboanga City Rd (Licomo-Putik Road) - K1851 + 000 - K1889 + 000, Zamboanga City

CW1- Road Safety: Solar Studs: 12,547.00 No. of Studs
Unit Cost: ₱ 11,536.62/No. of Studs
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
February 27, 2024 FY 2023 WIN3E02983 300214100452000 May 16, 2023 Region IX Regional Office IX
UACS No. 300214100452000
Project ID: P00733755MN

Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239

Installation of Solar LED Street Light along National Road and Bridge with the following Section (Buenavista - Bolong By-pass Road) Sta. 1895+000 - Sta. 1904+499

CW1- Road Safety: Street Lighting: 1,170 No. of Units
Unit Cost: ₱ 98,974.36/ No. of Units
EAO: ₱ 4,200,000.00
Allocation: ₱ 120,000,000.00
February 27, 2024 2023 WIN3E02978 GAA 2023 January 24, 2023 Cordillera Administrative Region Benguet 2nd District Engineering Office
From:
Baguio-Bontoc Rd - K0284+000 - K0284+128, K0284+164 - K0284+452, K0284+492 - K0285+565;
Type of Work: Off-Carriageway Improvement: Paving of Shoulders;
Physical Target: 6000.67 Square Meters;
Allocation: Php 30,000,000.000

To:
Baguio-Bontoc Rd - K0296+000 - K0297+500;
Type of Work:
CW1: Off-Carriageway Improvement: Paving of Shoulders
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 2305.50 Square meters
CW2: 2058 Square meters ;
Allocation: Php 30,000,000.000
February 27, 2024 2023 GAA 2023 January 24, 2023 Cordillera Administrative Region Benguet 2nd District Engineering Office
"From:
Baguio-Bontoc Rd - K0304+000 - K0305+491;
Type of Work: Off-Carriageway Improvement: Paving of Shoulders;
Physical Target: 6008.73 Square Meters;
Allocation: Php 30,000,000.000"

"To:
Baguio-Bontoc Rd - K0298+000 - K0299+600;
Type of Work:
CW1: Off-Carriageway Improvement: Paving of Shoulders
CW2: Construction of Drainage Structures along Road
CW3: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 2,360.50 Square meters
CW2: 1,267 lineal meters
CW3: 1,920.50 Square meters ;
Allocation: Php 30,000,000.000"
February 27, 2024 2023 SR2023-01-001677 March 28, 2023 Cordillera Administrative Region Benguet 2nd District Engineering Office
"From:
Baguio-Bontoc Rd - K0281+438 - K0282+000, K0283+554 - K0284+000, K0284+969 - K0287+755;
Physical Target: 7.46 Lane Km;
Allocation: Php 60,000,000.000"

"To:
Baguio-Bontoc Rd – K0267+813 – K0269+112, K0281+438 - K0284+075;
Physical Target: 7.894 Lane Km;
Allocation: Php 60,000,000.000"
February 27, 2024 2023 WIN3E02998 GAA 2023 January 24, 2023 Cordillera Administrative Region Benguet 2nd District Engineering Office
"From:
Baguio-Bontoc Rd - K0294+000 - K0295+803;
Type of Work: Off-Carriageway Improvement: Paving of Shoulders;
Physical Target: 5770.71 Square Meters;
Allocation: Php 30,000,000.000"

"To:
Baguio-Bontoc Rd - K0294+000 - K0295+993;
Type of Work:
CW1: Off-Carriageway Improvement: Paving of Shoulders
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 2,287.80 Square meters
CW2: 2,764 Square meters ;
Allocation: Php 30,000,000.000"
February 27, 2024 2023 WIN3E03190 SR2023-03-008010 March 22, 2023 Cordillera Administrative Region Abra District Engineering Office
"From:
Construction of Naguillan Flood Control Structure, La Paz, Abra;
Physical Target: 1230.745 Lineal meters;
Allocation: Php 150,000,000.000"

"To:
Construction of Naguillan Flood Control Structure, La Paz, Abra;
Physical Target: 407.4 Lineal meters;
Allocation: Php 150,000,000.000"
February 27, 2024 2023 WIN3E03192 SR2023-03-005871 March 2, 2023 Cordillera Administrative Region Abra District Engineering Office
"From:
Construction of Catacdegan Flood Control, Manabo, Abra;
Physical Target: 820.497 Lineal meters;
Allocation: Php 100,000,000.000"

"To:
Construction of Catacdegan Flood Control, Manabo, Abra;
Physical Target: 279.6 Lineal meters;
Allocation: Php 100,000,000.000"
February 27, 2024 2023 WIN3E03023 GAA 2023 January 24, 2023 Cordillera Administrative Region Abra District Engineering Office
"From:
Rehabilitation of Road, Lagayan, Abra;
Physical Target: 11.831 Lane Km;
Allocation: Php 99,980,000.000"

"To:
Rehabilitation of Road, Lagayan, Abra;
Physical Target: 7.446 Lane Km;
Allocation: Php 99,980,000.000"
February 27, 2024 2023 WIN3E03199 SR2023-03-008036 March 22, 2023 Cordillera Administrative Region Abra District Engineering Office
"From:
Construction of Palaquio Flood Control Structure, Bucay, Abra;
Physical Target: 820.497 Lineal meters;
Allocation: Php 100,000,000.000"

"To:
Construction of Palaquio Flood Control Structure, Bucay, Abra;
Physical Target: 295.2 Lineal meters;
Allocation: Php 100,000,000.000"
February 27, 2024 2023 WIN3E03203 SR2023-01-000789 January 30, 2023 Cordillera Administrative Region Abra District Engineering Office
"From:
Construction of Flood Control Structure along Abra Major River Basin (Phase II), Barangay Caupasan, Danglas, Abra;
Physical Target: 1230.745 Lineal meters;
Allocation: Php 150,000,000.000"

"To:
Construction of Flood Control Structure along Abra Major River Basin (Phase II), Barangay Caupasan, Danglas, Abra;
Physical Target: 939.2 Lineal meters;
Allocation: Php 150,000,000.000"
February 27, 2024 2023 WIN3E03210 SR2023-03-008015 March 22, 2023 Cordillera Administrative Region Abra District Engineering Office
"From:
Construction of Patagui-Dagsian Flood Control Structure, La Paz, Abra;
Physical Target: 1230.745 Lineal meters;
Allocation: Php 150,000,000.000"

"To:
Construction of Patagui-Dagsian Flood Control Structure, La Paz, Abra;
Physical Target: 613.2 Lineal meters;
Allocation: Php 150,000,000.000"
February 27, 2024 2023 WIN3E03204 SR2023-03-005881 March 2, 2023 Cordillera Administrative Region Abra District Engineering Office
"From:
Construction of Bangbangcag Flood Control, Bucay, Abra;
Physical Target: 820.497 Lineal meters;
Allocation: Php 100,000,000.000"

"To:
Construction of Bangbangcag Flood Control, Bucay, Abra;
Physical Target: 313.2 Lineal meters;
Allocation: Php 100,000,000.000"
February 27, 2024 2023 WIN3E03208 SR2023-01-000963 January 30, 2023 Cordillera Administrative Region Abra District Engineering Office
"From:
Construction of Flood Control Structure along Abra Major River Basin, Barangay Palaquio, Bucay, Abra;
Physical Target: 1230.745 Lineal meters;
Allocation: Php 150,000,000.000"

"To:
Construction of Flood Control Structure along Abra Major River Basin, Barangay Palaquio, Bucay, Abra;
Physical Target: 460 Lineal meters;
Allocation: Php 150,000,000.000"
February 27, 2024 2023 WIN3E03211 SR2023-01-000745 January 30, 2023 Cordillera Administrative Region Abra District Engineering Office
"From:
Abra-Kalinga Rd - K0475 + 200 - K0475 + 700;
Physical Target: 5555.56 Square meters;
Allocation: Php 80,000,000.000"

"To:
Abra-Kalinga Rd - K0475 + 200 - K0475 + 700;
Physical Target: 2856 Square meters;
Allocation: Php 80,000,000.000"
February 27, 2024 FY2023 300221102343000 May 29, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300221102343000
Project ID: P00735034MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Concreting of Road at Brgy. Bulabug, Maimbung, Sulu

CW1- Construction of Concrete Road: 0.74 lane km
Unit Cost: ₱ 13,378,378.37 /lane km

EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00
February 27, 2024 FY2023 300222100129000 May 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300222100129000
Project ID: P00732419MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities

Construction of Road, Sitio Bangalan - Imbaw, Barangay Tubig Samin, Maimbung, Sulu

CW1- Construction of Concrete Road: 0.870 lane km
Unit Cost: ₱ 11,379,310.34 /lane km

EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00
February 27, 2024 FY2023 WIN3B01104 310102101176000 April 4, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 2nd District Engineering Office
UACS No. 310102101176000
Project ID: P00706091MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads

Romandier-Camp Andres-Tanduh Bato Rd - KM44+980 - KM45+490

CW1- Preventive Maintenance of Road: Concrete Reblocking: 0.74 lane km
Unit Cost: ₱ 14,082,479.73 /lane km

EAO: ₱ 377,965.00
Allocation: ₱ 10,799,000.00
February 27, 2024 FY2023 300217100184000 May 16, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300217100184000
Project ID: P00733934MN

Convergence and Special Support Program (CSSP - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads
and/or Bridges (or, roads that traverse multiple LGU jurisdictions)

Rehabilitation / Improvement of Jolo Port - Bud Daho - Romainder Road traverse the
jurisdiction of Municipality of Jolo, Patikul and Talipao, Sulu

CW1- Rehabilitation of Concrete Road: 2.08 lane km
Unit Cost: ₱ 13,918,269.23 /lane km

EAO: ₱ 1,050,000.00
Allocation: ₱ 30,000,000.00
February 27, 2024 FY2023 WIN3B01100 320101109332000 May 16, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 2nd District Engineering Office
UACS No. 320101109332000
Project ID: P00721236MN

OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure along Romandier-Camp Andres-Tanduh Bato Road, Luuk, Sulu

CW1- Construction of Flood Mitigation Structure: 254.0 ln.m.
Unit Cost: ₱ 189,960.63 /ln.m.

EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00
February 27, 2024 FY2023 WIN3B01090 310202101311000 April 4, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 2nd District Engineering Office
UACS No. 310202101311000
Project ID: P00705488MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads

Romandier-Camp Andres-Tanduh Bato (S00022SL) - K0028 + 973.29- K0030 + 220

CW1- Road Widening: 2.493 lane km
Unit Cost: ₱ 22,961,376.59 /lane km
CW1 Cost: ₱ 57,242,711.83

ROW Acquisition: ₱ 2,190.96 sq.m.
Unit Cost: ₱ 300.00 /sq.m.
ROW Cost: ₱ 657,288.17

EAO: ₱ 2,100,000.00
Allocation: ₱ 60,000,000.00
February 27, 2024 FY2023 300215102739000 May 16, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 2nd District Engineering Office
UACS No. 300215102739000
Project ID: P00735019MN

Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Improvement of Road, Barangay Kulay-Kulay to Barangay Lingah Section, Barangay Romandier, Luuk, Sulu


CW1- Construction of Concrete Road: 3.72 lane km
Unit Cost: ₱ 12,970,430.10 /lane km

EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00
February 27, 2024 FY2023 WIN3B01098 320101109333000 May 16, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 2nd District Engineering Office
UACS No. 320101109333000
Project ID: P00721663MN

OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure along Seit-Tayungan-Camp Andres Road, Panamao, Sulu

CW1- Construction of Flood Mitigation Structure: 336.0 ln.m.
Unit Cost: ₱ 201,041.67 /ln.m.

EAO: ₱ 2,450,000.00
Allocation: ₱ 70,000,000.00
February 27, 2024 FY2023 WIN3B01082 300215102736000 April 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 2nd District Engineering Office
UACS No. 300215102736000
Project ID: P00735017MN

Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or
Bridges from the National Road/s leading to Major/ Strategic Public Buildings/
Facilities

Concreting of Tandu-Bato-Taindih Road, Luuk, Sulu

CW1- Construction of Concrete Road: 2.05 lane km
Unit Cost: ₱ 33,892,682.93 /lane km

EAO: ₱ 2,520,000.00
Allocation: ₱ 72,000,000.00
February 27, 2024 FY2023 300222100124000 May 29, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300222100124000
Project ID: P00732414MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities

Construction of Road, Gulangan - Binuang (Phase 2), Barangay Gulangan, Maimbung, Sulu

CW1- Construction of Concrete Road: 0.86 lane km
Unit Cost: ₱ 11,511,627.90 /lane km

EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00
February 27, 2024 FY2023 300222100132000 May 8, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300222100132000
Project ID: P00735051MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities

Concreting of Road at Barangay Lower Tambaking, Maimbung. Sulu

CW1- Construction of Concrete Road: 1.20 lane km
Unit Cost: ₱ 16,500,000.00 /lane km

EAO: ₱ 200,000.00
Allocation: ₱ 20,000,000.00
February 27, 2024 FY2023 300221102352000 May 29, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300222100132000
Project ID: P00735040MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Concreting of Road at Brgy. Bilaan, Talipao, Sulu

CW1- Construction of Concrete Road: 0.72 lane km
Unit Cost: ₱ 13,750,000.00 /lane km

EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00
February 27, 2024 FY2023 300222100133000 May 16, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300222100133000
Project ID: P00735052MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities

Concreting of Road at Barangay Batu Ugis. Maimbung, Sulu

CW1- Construction of Concrete Road: 1.72 lane km
Unit Cost: ₱ 20,145,348.83 /lane km

EAO: ₱ 350,000.00
Allocation: ₱ 35,000,000.00
February 27, 2024 FY2023 300221102357000 May 8, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 2nd District Engineering Office
UACS No. 300221102357000
Project ID: P00735044MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Rehabiliation/Improvement of Circumferential National Road, Luuk Section, Sulu

CW1- Rehabilitation of Concrete Road: 5.051 lane km
Unit Cost: ₱ 8,183,033.06 /lane km

EAO: ₱ 417,500.00
Allocation: ₱ 41,750,000.00
February 27, 2024 FY2023 300221102356000 May 8, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300221102356000
Project ID: P00734156MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Rehabilitation of Slope Protection at Bangas, H.P. Tahil, Sulu

CW1- Construction of Slope Protection Structure: 1,477.5 sq.m.
Unit Cost: ₱ 13,401.015 /sq.m.

EAO: ₱ 200,000.00
Allocation: ₱ 20,000,000.00
February 26, 2024 2023 WIN3F07759 GAA 2023 December 26, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00726955LZ
UACS : 320101109075000

From : ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Libmanan River, Brgy. Tampuhan, Libmanan, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 573.003 Lineal meters


TO : ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Libmanan River, Brgy. Tampuhan, Libmanan, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 86 Lineal meters
February 26, 2024 2023 WIN3F07760 GAA 2023 December 26, 2022 Region V Camarines Sur 2nd District Engineering Office
UACS : 320101109076000
Project ID : P00726956LZ

From :
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Libmanan River, Brgy. Mambalite, Libmanan, Camarines Sur

Physical Target :
Construction of Flood Mitigation Structure - 573.003 Lineal meters - 573.003 Lineal meters


TO :
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Libmanan River, Brgy. Mambalite, Libmanan, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 91 Lineal meters
February 26, 2024 2023 WIN3F07763 GAA 2023 December 26, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00726957LZ
UACS : 320101109077000

From :
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Libmanan River, Brgy. Palangon, Libmanan, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 573.003 Lineal meters


ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Libmanan River, Brgy. Palangon, Libmanan, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 92.00 Lineal meters
February 26, 2024 2023 WIN3F07757 GAA 2023 December 26, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00726958LZ
UACS : 320101109078000

From : ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Libmanan River, Brgy. Mambayawas, Libmanan, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 573.003 Lineal meters

TO :
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Libmanan River, Brgy. Mambayawas, Libmanan, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 97.00
February 26, 2024 FY 2023 WIN3B01081 310212100227000 April 13, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Tawi-Tawi District Engineering Office
UACS No. 310212100227000
Project ID: P00705490MN

OO1: Ensure Safe and Reliable National Road System -
Network Development - Paving of Unpaved Roads - Tertiary Roads


Tongusong-Tubig Indangan - (S00008TW) Chainage 10000 - Chainage 13400


CW1- Paving of Unpaved Roads: 6.80 lane km
Unit Cost: ₱ 21,911,176.47 /lane km.
EAO: ₱ 5,404,000.00

Allocation: ₱ 154,000,000.00
February 26, 2024 FY 2023 310204102117000 May 8, 2023 Region IX Regional Office IX
UACs No. 310204102117000
Project ID: P00705491MN


OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads

Sumagdang-Menzi-Lanote By-pass Road, Basilan

CW1- Road Widening/ 1.44 Lane-km
Unit Cost: ₱ 16,631,944.44 /Lane-km
ROW Acquisition 16,000.00 sq.m.
Unit Cost: ₱ 312.5 sq.m.
EAO: ₱ 1,050,000.00
Allocation: ₱ 30,000,000.00
February 26, 2024 2024 WIN3F07761 GAA 2024 December 25, 2024 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00726963LZ
UACS : 320101109079000

From :
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Libmanan River, Brgy. Padlos, Libmanan, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 573.003 Lineal meters


TO :
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Libmanan River, Brgy. Padlos, Libmanan, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 97.00 Lineal meters
February 26, 2024 FY 2023 310204102119000 May 8, 2023 Region IX Regional Office IX
UACs No. 310204102119000
Project ID: P00705493MN


OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads

Panunsulan - Lanote - Calvario - Maligue By-Pass Road, Basilan

CW1- Construction of Concrete Road/ 3.62 Lane-km
Unit Cost: ₱ 18,335,635.36 /Lane-km
ROW Acquisition 37,306.47267 sq.m.
Unit Cost: ₱ 160.83 sq.m.
EAO: ₱ 2,625,000.00
Allocation: ₱ 75,000,000.00
February 26, 2024 2024 WIN3F07762 GAA 2024 December 25, 2023 Region V Camarines Sur 2nd District Engineering Office
ID : P00726961LZ
UACS : 320101109077000

From :
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Libmanan River, Brgy. Potot, Libmanan, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 573.003 Lineal meters


TO :
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control along Libmanan River, Brgy. Potot, Libmanan, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 573.003 Lineal meters
February 26, 2024 2023 WIN3F07756 GAA 2023 December 26, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00727323LZ
UACS : 320102105443000

From :
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Flood Control along Bicol River, Brgy. San Vicente, Milaor, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 573.003 Lineal meters


TO :
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Flood Control along Bicol River, Brgy. San Vicente, Milaor, Camarines Sur

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 188.00 Lineal meters
February 26, 2024 FY 2023 WIN3B01105 300221102354000 May 8, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 2nd District Engineering Office
UACS No. 300221102354000
Project ID: P00735042MN

Convergence and Special Support Program (CSSP) -
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities


Rehabilitation/Improvement of Kan Hadjili- Taiti Road,Kan-Mindus, Luuk, Sulu


CW1- Rehabilitation of Concrete Road : 1.787 lane km
Unit Cost: ₱ 18,836,038.05 /lane km.
EAO: ₱ 340,000.00

Allocation: ₱ 34,000,000.00
February 26, 2024 FY 2023 310204102121000 March 20, 2023 Region IX Regional Office IX
UACs No. 310204102121000
Project ID: P00705495MN


OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads

Zamboanga City By-Pass Road, Package 2, Zamboanga City

CW1- Widening of Bridge/ 348.80 square meters
Unit Cost: ₱ 110,163.417 /square meters
ROW Acquisition 639.17 sq.m.
Unit Cost: ₱ 7,822.63/ sq.m.
EAO: ₱ 1,575,000.00
Allocation: ₱ 45,000,000.00
February 26, 2024 FY 2023 300215102743000 May 16, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 2nd District Engineering Office
UACS No. 300215102743000
Project ID: P00735021MN

Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/
Facilities


Rehabilitation of Road, Barangay Pang, Kalingalan Caluang, Sulu

CW1- Rehabilitation of Concrete Road: 1.20 lane km
Unit Cost: ₱ 12,062,500.00 /lane km
EAO: ₱ 525,000.00
Allocation: ₱ 15,000,000.00
February 26, 2024 FY 2023 310204102123000 March 31, 2023 Region IX Regional Office IX
UACs No. 310204102123000
Project ID: P00705497MN


OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads

Zamboanga City By-Pass Road, Package 4, Zamboanga City

CW1- Widening of Bridge/ 294.214 square meters
Unit Cost: ₱ 81,403.33 /square meters
ROW Acquisition 616.8 sq.m.
Unit Cost: ₱ 8,106.355/ sq.m.
EAO: ₱ 1,050,000.00
Allocation: ₱ 30,000,000.00
February 26, 2024 FY 2023 300222100118000 May 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300222100118000
Project ID: P00732408MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities


Construction of Road, Sitio Kurungan - Barangay Hall, Barangay Tubig Samin, Maimbung, Sulu

CW1- Construction of Concrete Road: 0.69 lane km
Unit Cost: ₱ 14,347,826.08 /lane km
EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00
February 26, 2024 FY 2023 310204102124000 April 25, 2023 Region IX Regional Office IX
UACS No. 310204102124000
Project ID: P00705498MN


OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads

Zamboanga City By-Pass Road, (West Coast Section) Package 1, Zamboanga City

CW1- Construction of Road Slope Protection Structure/
17,974.49 Square Meters
Unit Cost: ₱ 5,905.59/ Square Meters
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00
February 26, 2024 FY 2023 WIN3B01106 300221102355000 May 8, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 2nd District Engineering Office
UACS No. 300221102355000
Project ID: P00735043MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Rehabilitation/Improvement of Kan-Baling-Tandu Bato, housing road, Luuk, Sulu

CW1- Rehabilitation of Concrete Road: 1.031 lane km
Unit Cost: ₱ 18,244,422.89 /lane km
EAO: ₱ 190,000.00
Allocation: ₱ 19,000,000.00
February 26, 2024 FY 2023 310204102125000 March 9, 2023 Region IX Regional Office IX
UACS No. 310204102125000
Project ID: P00705499MN


OO1: Ensure Safe and Reliable National Road System – Network Development – Construction of By-Pass and Diversion Roads


NRJ Sinunuc-Malagutay-San Roque Section, Phase II, Zamboanga City

CW1- Construction of Concrete Road / 2.370 lane-km
Unit Cost: ₱25,759,493.67/lane-km
ROW Acquisition 33,200.00 sq.m.
Unit Cost: ₱ 1,358.43/sq.m.
EAO: ₱3,850,000.00
Allocation: ₱110,000,000.00

February 26, 2024 FY 2023 310201101091000 March 9, 2023 Region IX Regional Office IX
UACS No. 310201101091000
Project ID: P00705502MN


OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads

Pagadian City-Zamboanga City Rd - K1890 + 379 - K1890 + 678, K1890 + 707 - K1893 + 702.24, K1893 +720.96 – K1893+900.00

CW1- Road Widening/ 6.95 lane-km
Unit Cost: ₱16,056,115.11/lane-km
ROW Acquisition 23,270.976 sq.m.
Unit Cost: ₱ 429.72/ sq.m.
EAO: ₱4,410,000.00
Allocation: ₱126,000,000.00


February 26, 2024 FY 2023 300222100131000 April 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
Description
UACS No. 300222100131000
Project ID: P00735050MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities


Concreting of Road at Barangay Duhul Kabbun, Maimbung, Sulu

CW1- Construction of Concrete Road: 1.124 lane km
Unit Cost: ₱ 17,170,818.5 /lane km
EAO: ₱ 200,000.00
EXCESS : ₱ 500,000.00
Allocation: ₱ 20,000,000.00
February 26, 2024 FY 2023 310201101092000 March 29, 2023 Region IX Regional Office IX
UACS No. 310201101092000
Project ID: P00705503MN


OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads

Pagadian City-Zamboanga City Rd - K1870 + 300 - K1871 + 000, K1871 + 420.00 - K1871 + 546.78, K1871 + 800.00 - K1872 + 005.79, K1872 + 460.00 - K1873 + 490.00

CW1- Road Widening/ 4.13 lane-km
Unit Cost: ₱ 23,280,871.67/lane-km
ROW Acquisition 33,333.33sq.m.
Unit Cost: ₱ 300/ sq.m.
EAO: ₱ 3,850,000.00
Allocation: ₱110,000,000.00
February 26, 2024 FY 2023 300222100130000 April 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300222100130000
Project ID: P00735049MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities Facilities

Concreting of Road at Barangay Kandang, Maimbung, Sulu

CW1- Construction of Concrete Road: 1.053 lane km
Unit Cost: ₱ 18,328,584.99 /lane km
EAO: ₱ 200,000.00
EXCESS: ₱ 500,000.00
Allocation: ₱ 20,000,000.00
February 26, 2024 FY 2023 WIN3B01077 300221102346000 April 24, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 2nd District Engineering Office
UACS No. 300221102346000
Project ID: P00735036MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Concreting of Bakud Kan Basir, Brgy. Bual, Luuk, Sulu

CW1- Construction of Concrete Road: 0.852 lane km
Unit Cost: ₱ 24,917,840.38 /lane km
EAO: ₱ 220,000.00
EXCESS: ₱ 550,000.00
Allocation: ₱ 22,000,000.00
February 26, 2024 FY 2023 300222100122000 May 29, 2023 Bangsamoro Autonomous Region in Muslim Mindanao Sulu 1st District Engineering Office
UACS No. 300222100122000
Project ID: P00732412MN

Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities

Construction of Road, Kulasi - Kapok Punggol Access from Parang - Maimbung Road, Barangay Kapok Punggol, Maimbung, Sulu

CW1- Construction of Concrete Road: 0.786 lane km
Unit Cost: ₱ 12,595,419.84 /lane km
EAO: ₱ 100,000.00
Allocation: ₱ 10,000,000.00