A) January 5, 2022 B) 22EF0049 C) CONST./IMPROVEMENT OF TAGPINASAO ROAD LEADING TO ECO-TOURISM SITE IN SALOGON, BROOKE'S POINT, PALAWA D) Palawan 2nd District Engineering Office |
1) PALBIC CONSTRUCTION AND SUPPLY 2) 19,015,918.22 3) 100 4) 2/21/2022 |
A) January 5, 2022 B) 22DC0074 C) CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - PUBLIC WATER SUPPLY SY D) Batangas 3rd District Engineering Office |
1) A. SANDOVAL CONSTRUCTION & SUPPLY 2) 4,752,500.00 3) 100 4) -/-/- |
A) January 5, 2022 B) 22DC0073 C) CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROAD/S AND/OR B D) Batangas 3rd District Engineering Office |
1) JERIS CONSTRUCTION AND SUPPLY 2) 9,595,296.10 3) 100 4) 3/25/2022 |
A) January 5, 2022 B) 22HB0103 C) CONVERGENCE AND SPECIAL SUPPORT PROGRAM -CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEW D) Bohol 3rd District Engineering Office |
1) AL CHRIS CONSTRUCTION 2) 26,040,285.60 3) 100 4) 3/23/2022 |
A) January 5, 2022 B) 22CA0050 C) ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE -SECONDARY ROADS- GOV. J.J. LINAO RD - K0166+072 D) Bataan 1st District Engineering Office |
1) AARCON BUILDERS 2) 9,470,531.10 3) 100 4) 5/16/2022 |
A) January 5, 2022 B) 22CA0049 C) CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPA D) Bataan 1st District Engineering Office |
1) M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES 2) 28,812,001.61 3) 100 4) 2/21/2022 |
A) January 5, 2022 B) 22CA0056 C) ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECOND D) Bataan 1st District Engineering Office |
1) AVE-MIRA CONSTRUCTION AND TRADING 2) 3,492,018.30 3) 100 4) 5/12/2022 |
A) January 5, 2022 B) 22CA0057 C) BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACI D) Bataan 1st District Engineering Office |
1) AS MACHA CONSTRUCTION AND TRADING 2) 14,553,971.27 3) 100 4) -/-/- |
A) January 5, 2022 B) 22HB0104 C) LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILIT D) Bohol 3rd District Engineering Office |
1) REBER ENTERPRISES AND CONSTRUCTION 2) 9,786,211.20 3) 100 4) 4/1/2022 |
A) January 5, 2022 B) 22EF0048 C) ROAD WIDENING PPSR JCT-POBLACION BROOKE'S POINT ROAD, K0190+(-050)-K0191+535, BROOKE'S POINT, PALAWA D) Palawan 2nd District Engineering Office |
1) CRISHELLE CONSTRUCTION 2) 24,479,271.04 3) 100 4) 2/21/2022 |
A) January 5, 2022 B) 22K00134 C) CONSTRUCTION OF WATER SUPPLY SYSTEM-LEVEL II, BARANGAY PARA-ABA, GANASSI, LANAO DEL SUR D) Region X |
1) CTML CONSTRUCTION 2) 4,841,681.91 3) 100 4) 3/25/2022 |
A) January 5, 2022 B) 22HB0098 C) ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM D) Bohol 3rd District Engineering Office |
1) C.T. LEONCIO CONSTRUCTION & TRADING 2) 74,593,695.77 3) 100 4) 4/12/2022 |
A) January 5, 2022 B) 22EF0045 C) CONSTRUCTION OF DUMANGUEÑA ROAD (PHASE 2), BRGY. DUMANGUEÑA, NARRA, PALAWAN D) Palawan 2nd District Engineering Office |
1) CRISHELLE CONSTRUCTION 2) 20,935,152.00 3) 100 4) 2/21/2022 |
A) January 5, 2022 B) 22EF0044 C) WIDENING OF PERMANENT BRIDGES CALASAGUEN BR. 2 (B00383PW) ALONG PPSR, BROOKE'S POINT, PALAWAN D) Palawan 2nd District Engineering Office |
1) VCH CONSTRUCTION AND TRADING 2) 30,919,392.00 3) 49 4) 2/21/2022 |
A) January 5, 2022 B) 22DC0072 C) CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROAD/S AND/OR B D) Batangas 3rd District Engineering Office |
1) MICLOVER GENERAL CONSTRUCTION & IRON WORKS 2) 15,358,055.00 3) 100 4) -/-/- |
A) January 5, 2022 B) 22DC0071 C) CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARE D) Batangas 3rd District Engineering Office |
1) N.D.M. SANCHEZ BUILDERS & DEVELOPMENT CORPORATION 2) 28,515,007.00 3) 100 4) 2/8/2022 |
A) January 5, 2022 B) 22HB0099 C) ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM D) Bohol 3rd District Engineering Office |
1) C.T. LEONCIO CONSTRUCTION & TRADING 2) 56,316,019.98 3) 100 4) 4/12/2022 |
A) January 5, 2022 B) 22BH0068 C) BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - D) Isabela 4th District Engineering Office |
1) CASAN CONSTRUCTION AND TRADING 2) 4,801,500.00 3) 100 4) 2/11/2022 |
A) January 5, 2022 B) 22BF0033 C) SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG):ACCESS ROADS AND/OR BRIDGES FROM THE NAT D) Isabela 2nd District Engineering Office |
1) J3P CONSTRUCTION AND DEVELOPER CORPORATION 2) 19,502,512.51 3) 100 4) 4/4/2022 |
A) January 5, 2022 B) 22CA0051 C) CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO D) Bataan 1st District Engineering Office |
1) ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP. 2) 14,405,997.71 3) 100 4) -/-/- |
A) January 5, 2022 B) 22GD0036 C) CONSTRUCTION OF MULTI-PURPOSE BUILDING - CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BARANGAY INTAMPIL D) Capiz 1st District Engineering Office |
1) SALMEGA BUILDERS 2) 4,860,618.25 3) 100 4) 2/21/2022 |
A) January 5, 2022 B) 22GD0035 C) REHABILITATION OF CONCRETE ROAD - REHABILITATION OF CABUG-CABUG-BAYUYAN-YATING-TABUN-ACAN PROVINCIAL D) Capiz 1st District Engineering Office |
1) C.B. GARAY PHILWIDE BUILDERS 2) 33,250,688.75 3) 100 4) 2/21/2022 |
A) January 5, 2022 B) 22GG0067 C) RECONSTRUCTION TO CONCRETE PAVEMENT - ILOILO - CAPIZ ROAD (OLD ROUTE) ( S00216PN) - K0030 + 508 - K0 D) Iloilo 2nd District Engineering Office |
1) TOPMOST DEVELOPMENT & MKTG. CORP. 2) 77,335,006.73 3) 100 4) 3/4/2022 |
A) January 5, 2022 B) 22EF0044 C) WIDENING OF PERMANENT BRIDGES CALASAGUEN BR. 2 (B00383PW) ALONG PPSR, BROOKE'S POINT, PALAWAN D) Palawan 2nd District Engineering Office |
1) C.T. LEONCIO CONSTRUCTION & TRADING 2) 30,919,392.00 3) 51 4) 2/21/2022 |
A) January 5, 2022 B) 22EF0047 C) CONST. OF TUMARBONG RIVER FLOOD CONTROL STRUCTURE, STA. 0+000-STA. 0+150, QUEZON, PALAWAN D) Palawan 2nd District Engineering Office |
1) R NARRAZID TRADING AND CONSTRUCTION 2) 5,210,917.61 3) 100 4) 2/21/2022 |
A) January 5, 2022 B) 22CA0052 C) BASIC INFRASTRUCTURE PROGRAM - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILIT D) Bataan 1st District Engineering Office |
1) M.C.J. VALENZUELA CONSTRUCTION ENTERPRISES 2) 9,602,941.16 3) 100 4) 5/4/2022 |
A) January 5, 2022 B) 22CA0053 C) ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - CALAGUIMAN VICINAL RD - K0124 D) Bataan 1st District Engineering Office |
1) 4B CONSTRUCTION CORPORATION 2) 6,876,451.66 3) 100 4) 4/4/2022 |
A) January 5, 2022 B) 22BH0069 C) BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - D) Isabela 4th District Engineering Office |
1) MONTE CARLO CONST. CORP. 2) 1,930,500.00 3) 100 4) 2/16/2022 |
A) January 5, 2022 B) 22HI0027 C) CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BARANGAY CAWIT, BARANGAY MOABOG, BARANGAY MONTSERRAT, BARA D) Cebu 5th District Engineering Office |
1) A.A. MASONG CONSTRUCTION 2) 6,928,000.00 3) 100 4) 4/18/2022 |
A) January 5, 2022 B) 22MF0035 C) CONSTRUCTION OF ROAD, BARANGAY POBLACION, LAMBAYONG, SULTAN KUDARAT D) Sultan Kudarat 1st District Engineering Office |
1) JARGON CONSTRUCTION & SUPPLY 2) 4,907,997.23 3) 100 4) 2/22/2022 |
A) January 5, 2022 B) 22CA0054 C) CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO D) Bataan 1st District Engineering Office |
1) AFAJI BUILDERS 2) 9,603,996.14 3) 100 4) 5/2/2022 |
A) January 5, 2022 B) 22CA0055 C) ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - NUCLEAR POWER PLANT RD - K016 D) Bataan 1st District Engineering Office |
1) AFAJI BUILDERS 2) 4,446,650.87 3) 100 4) 5/16/2022 |
A) January 5, 2022 B) 22HI0037 C) REHABILITATION OF PAVED ROAD - CEBU NORTH HAGNAYA WHARF RD (OLD ROUTE) - K0034+ (-118) - K0034+ (-01 D) Cebu 5th District Engineering Office |
1) SUPREA PHILS. DEVELOPMENT CORP. 2) 18,023,259.91 3) 100 4) 3/31/2022 |
A) January 5, 2022 B) 22HI0029 C) CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BARANGAY SUBA AND BARANGAY LOOC, DANAO CITY, CEBU D) Cebu 5th District Engineering Office |
1) A.A. MASONG CONSTRUCTION 2) 6,918,536.99 3) 100 4) 4/18/2022 |
A) January 5, 2022 B) 22HB0100 C) ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM D) Bohol 3rd District Engineering Office |
1) LABB CONSTRUCTION 2) 48,599,601.24 3) 100 4) 4/12/2022 |
A) January 5, 2022 B) 22MF0025 C) CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY UDTONG PROPER, LAMBAYONG, SULTAN KUDARAT D) Sultan Kudarat 1st District Engineering Office |
1) CS CONST. AND SUPPLY INC. (FORMERLY: CS CONSTRUCTI 2) 36,122,801.53 3) 100 4) 2/22/2022 |
A) January 5, 2022 B) 22HB0102 C) CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG D) Bohol 3rd District Engineering Office |
1) CLAVITE CONSTRUCTION AND SUPPLY 2) 19,170,276.65 3) 100 4) 4/4/2022 |
A) January 5, 2022 B) 22EF0046 C) CONST./IMPROVEMENT OF PANGOBILIAN ROAD LEADING TO MAINIT SEVEN FALLS, BRGY. MAINIT, BROOKE'S POINT, D) Palawan 2nd District Engineering Office |
1) R NARRAZID TRADING AND CONSTRUCTION 2) 14,665,800.58 3) 100 4) 2/21/2022 |
A) January 5, 2022 B) 22MF0028 C) CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO CONCEPCION, BRGY. TINUMIGUES, LAMBAYONG, SULTAN KUDAR D) Sultan Kudarat 1st District Engineering Office |
1) LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY 2) 37,901,489.13 3) 100 4) 2/22/2022 |
A) January 5, 2022 B) 22MF0019 C) JCT. BRGY. BARAS TO BRGY. NEW PASSI LEADING TO MONTE VICENTEAU RESORT, BRGY. NEW PASSI, TACURONG, SU D) Sultan Kudarat 1st District Engineering Office |
1) PALMARES GENERAL MERCHANDISE 2) 19,944,152.00 3) 100 4) 2/22/2022 |
A) January 5, 2022 B) 22DC0077 C) CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCT D) Batangas 3rd District Engineering Office |
1) P-SQUARE CONTRACTING & SERVICES 2) 4,774,895.00 3) 100 4) 2/8/2022 |
A) January 5, 2022 B) 22DC0078 C) CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEW D) Batangas 3rd District Engineering Office |
1) OIC CONZTRUCT AND SUPPLY CORPORATION(FORMERLY:OIC 2) 4,748,100.00 3) 100 4) 3/25/2022 |
A) January 5, 2022 B) 22IJ0052 C) (RE-ADVERTISE) CONSTRUCTION/UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-PRIMARY ROADS D) Samar 1st District Engineering Office |
1) MDP CONSTRUCTION SERVICES 2) 24,605,000.00 3) 100 4) 3/23/2022 |
A) January 5, 2022 B) 22HB0097 C) CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG D) Bohol 3rd District Engineering Office |
1) N.N. YU CONSTRUCTION, INC. (FORMERLY: YU CONSTRUCT 2) 48,011,398.67 3) 100 4) 5/4/2022 |
A) January 5, 2022 B) 22DC0076 C) CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDING D) Batangas 3rd District Engineering Office |
1) JERIS CONSTRUCTION AND SUPPLY 2) 4,797,540.00 3) 100 4) 3/25/2022 |
A) January 5, 2022 B) 22MF0009 C) CALEAN BR. (B00292MN) ALONG DULAWAN-MARBEL RD, TACURONG CITY, SULTAN KUDARAT D) Sultan Kudarat 1st District Engineering Office |
1) DALANON CONSTRUCTION CORPORATION (FORMERLY:DALANON 2) 16,425,549.39 3) 100 4) 2/22/2022 |
A) January 5, 2022 B) 22BF0039 C) CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (COMMUNITY CENTER),BARANGAY SAN FRANCISCO,SAN MA D) Isabela 2nd District Engineering Office |
1) R.E.A. CONSTRUCTION 2) 2,919,076.11 3) 100 4) 4/4/2022 |
A) January 5, 2022 B) 22HI0038 C) CONSTRUCTION OF DRAINAGE STRUCTURE ALONG ROAD - CEBU NORTH HAGNAYA WHARF RD (OLD ROUTE) - K0034+(-43 D) Cebu 5th District Engineering Office |
1) SUPREA PHILS. DEVELOPMENT CORP. 2) 11,708,590.71 3) 100 4) 3/21/2022 |
A) January 5, 2022 B) 22HI0039 C) CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF ROAD, SAN FRANCISCO, CEBU D) Cebu 5th District Engineering Office |
1) VEN RAY CONSTRUCTION CORPORATION 2) 77,147,221.53 3) 100 4) 3/31/2022 |
A) January 5, 2022 B) 22HI0040 C) CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BARANGAY BAYABAS, BARANGAY TAYTAY, BARANGAY POBLACION, DAN D) Cebu 5th District Engineering Office |
1) A.A. MASONG CONSTRUCTION 2) 6,918,742.75 3) 100 4) 4/18/2022 |