July 18, 2025 |
FY 2025 |
WIN5E038000 |
300203103071000 |
June 18, 2025 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
UACS No. 300203103071000
Project ID: P00934897MN
Convergence and Special Support Program (CSSP) – Construction / Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program – TRIP)
National Road Junction Leading to Malangas Boulevard, Malangas, Zamboanga Sibugay
CW1- Construction of Concrete Road - 0.180 Lane-km
Unit Cost: ₱ 13,611,111.11/ Lane-km
EAO: ₱ 50,000.00
Allocation: ₱ 2,500,000.00 |
July 18, 2025 |
2025 |
310102102355000 |
FY 2025 GAA |
January 2, 2025 |
Region II |
Quirino District Engineering Office |
FROM:
Asset Preservation - Preventive Maintenance - Secondary Roads - Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0331 + 640 - K0333 + 000
TO:
Asset Preservation - Preventive Maintenance - Secondary Roads - Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0331 + 640 - K0332 + 651
|
July 18, 2025 |
2025 |
310103102013000 |
FY 2025 GAA |
January 2, 2025 |
Region II |
Quirino District Engineering Office |
FROM:
Asset Preservation - Preventive Maintenance - Tertiary Roads - Dumabato-Balligui Rd - K0372 + 877 - K0373 + 000, K0374 + 000 - K0375 + 000
TO:
Asset Preservation - Preventive Maintenance - Tertiary Roads - Dumabato-Balligui Rd - K0372 + 877 - K0373 + 000, K0374 + 000 - K0374 + 468 |
July 18, 2025 |
2025 |
310103102014000 |
FY 2025 GAA |
January 2, 2025 |
Region II |
Quirino District Engineering Office |
FROM:
Asset Preservation - Preventive Maintenance - Tertiary Roads - Echague-Jones-Madella Rd (Villa Norte-Panang Sect) - K0377 + (-836) - K0377 + 612
TO:
Asset Preservation - Preventive Maintenance - Tertiary Roads - Echague-Jones-Maddela Rd (Villa Norte-Panang Sect) - K0377 + (-836) - K0377 + (-046) |
July 18, 2025 |
2025 |
310103102015000 |
FY 2025 GAA |
January 2, 2025 |
Region II |
Quirino District Engineering Office |
FROM:
Asset Preservation - Preventive Maintenance - Tertiary Roads - Echague-Jones-Madella Rd (Villa Norte-Panang Sect) - K0377 + 612 - K0378 + 176
TO:
Asset Preservation - Preventive Maintenance - Tertiary Roads - Echague-Jones-Maddela Rd (Villa Norte-Panang Sect) - K0377 + 612 - K0377 + 918 |
July 18, 2025 |
2025 |
|
SR2025-02-002596 |
March 3, 2025 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
AS PER GAA/ORIGINAL:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0696 + 365 - K0696 + 411, K0696 + 481 - K0696 + 563, K0696 + 588 - K0696 + 660, K0696 + 851 - K0696 + 870, K0696 + 933 - K0696 + 972, K0697 + 202 - K0697 + 217, K0697 + 055 - K0697 + 220, K0698 + 300 - K0698 + 553, K0698 + 613 - K0698 + 720, K0699 + 034 - K0699 + 039, K0702 + 857 - K0703 + 000, K0705 + 101 - K0705 + 485, K0705 + 790 - K0705 + 811, K0705 + 872 - K0705 + 1110
Physical Target: Allocation:
CW1-Road Widening: 2.085 Lane Km P 31.699285 M
EAO P 1.149715 M
Total P 32.849 M
AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0696 + 365 - K0696 + 411, K0696 + 481 - K0696 + 563, K0696 + 588 - K0696 + 692, K0696 + 851 - K0696 + 972, K0697 + 055 - K0697 + 217, K0698 + 300 - K0698 + 553, K0698 + 613 - K0698 + 720, K0699 + 034 - K0699 + 039, K0702 + 857 - K0703 + 000, K0705 + 101 - K0705 + 167, K0705 + 308 - K0705 + 485, K0705 + 790 - K0705 + 811, K0705 + 872 - K0705 + 1110
Physical Target: Allocation:
CW1-Road Widening: 1.469 Lane Km P 31.699285 M
EAO P 1.149715 M
Total P 32.849 M
|
July 18, 2025 |
FY 2025 |
WIN5E03804 |
310102102501000 |
May 5, 2025 |
Region IX |
Zamboanga del Norte 2nd District Engineering Office |
UACS No. 310102102501000
Project ID: P00901522MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Sindangan-Siayan-Dumingag-Mahayag Rd (S01060MN) – K1924+000 - K1924+725, K1924+968 - K1929+436, K1929+475 – K1929+750
CW1- Preventive Maintenance of Road: Asphalt Overlay - 10.922 Lane-km
Unit Cost: ₱ 8,972,715.62/ Lane-km
EAO: ₱ 2,000,000.00
Allocation: ₱ 100,000,000.00 |
July 18, 2025 |
FY 2025 |
|
310108102182000 |
May 5, 2025 |
Region IX |
Zamboanga del Norte 2nd District Engineering Office |
UACS No. 310108102182000
Project ID: P00909011MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads
Sindangan-Siayan-Dumingag-Mahayag Rd (Sindangan-Siayan Sect) - K1945 + 370 - K1945 + 400
CW1- Rehabilitation/ Major Repair of Road Slope Protection Structure - 481.96 sq.m.
Unit Cost: ₱ 10,166.822/ sq.m.
EAO: ₱ 100,000.00
Allocation: ₱ 5,000,000.00 |
July 18, 2025 |
FY 2025 |
WIN5E03771 |
310110100631000 |
May 26, 2025 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310110100631000
Project ID: P00909016MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads – Primary Roads
Dipolog-Oroquieta National Rd – K1827+000 – K1829+000
CW1- Construction of Drainage Structure along Road: 2,105.00 Ln.m.
Unit Cost: ₱ 4,998.99/ ln.m.
CW2- Off-Carriadgeway Improvement/ Paving of Shoulders: 4,165.100 sq.m.
Unit Cost: ₱ 970.60/ sq.m. ROW Acquisition: 333.333 sq.m. EAO: ₱ 307,460.00
Allocation: ₱ 15,373,000.00 |
July 18, 2025 |
FY 2025 |
|
310109101679000 |
May 5, 2025 |
Region IX |
Zamboanga del Norte 2nd District Engineering Office |
UACS No. 310109101679000
Project ID: P00909033MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Sindangan-Bayog-Lakewood Rd - K1936 + 660 - K1936 + 780
CW1- Construction of Road Slope Protection Structure: 3,228.92 sq.m.
Unit Cost: ₱ 17,931.69/ sq.m.
EAO: ₱ 2,100,000.00
Allocation: ₱ 60,000,000.00 |
July 18, 2025 |
FY 2025 |
WIN5E03825 |
310109101678000 |
May 5, 2025 |
Region IX |
Zamboanga del Norte 2nd District Engineering Office |
UACS No. 310109101678000
Project ID: P00909034MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Sindangan-Bayog-Lakewood Rd – K1934+640 – K1934+690, K1946+780 – K1946+860
CW1- Construction of Road Slope Protection Structure: 3,544.38 sq.m.
Unit Cost: ₱ 21,018.08/ sq.m.
EAO: ₱ 2,701,930.00
Allocation: ₱ 77,198,000.00 |
July 18, 2025 |
FY 2025 |
|
310201101696000 |
May 5, 2025 |
Region IX |
Zamboanga del Norte 2nd District Engineering Office |
UACS No. 310201101696000
Project ID: P00909353MN
OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads
Dipolog-Sindangan-Liloy Rd – K1923+904 – K1924+540
CW1- Road Widening: 1.272 Lane km
Unit Cost: ₱ 24,530,047.17/ Lane km
EAO: ₱ 636,780.00
Allocation: ₱ 31,839,000.00 |
July 18, 2025 |
FY 2025 |
|
310201101582000 |
May 5, 2025 |
Region IX |
Zamboanga del Norte 2nd District Engineering Office |
UACS No. 310201101582000
Project ID: P00909354MN
OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads
Dipolog-Sindangan-Liloy Rd - K1861 + 760 - K1863+660
CW1- Road Widening: 3.772 Lane km
Unit Cost: ₱ 19,170,946.30/ Lane km CW2- Construction of Drainage Structure along Road: 2,592.69 ln.m.
Unit Cost: ₱ 12,367.27/ Ln.m.
EAO: ₱ 3,785,705.00
Allocation: ₱ 108,163,000.00 |
July 18, 2025 |
FY 2025 |
|
310103102130000 |
May 16, 2025 |
Region IX |
Zamboanga del Norte 2nd District Engineering Office |
UACS No. 310103102130000
Project ID: P00909759MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Tertiary Roads
Katipunan By-Pass Rd (S01058MN) Chainage 1393.50 – Chainage 1631
CW1- Preventive Maintenance of Road: Asphalt Overlay - 0.475 Lane-km
Unit Cost: ₱ 8,029,810.53/ Lane-km
EAO: ₱ 77,840.00
Allocation: ₱ 3,892,000.00 |
July 18, 2025 |
FY 2025 |
WIN5E03766 |
310305102484000 |
May 26, 2025 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310305102484000
Project ID: P00910040MN
OO1: Ensure Safe and Reliable National Road System – Bridge – Widening of Permanent Bridges
Guinles Parallel Br. Along Dipolog-Polanco- Piñan-Jct Oroquieta Rd
CW1- Construction of Parallel Bridge: 246.514 sq.m.
Unit Cost: ₱ 108,711.94/ sq.m.
CW2- Construction of Bridge Approach: 0.47832 Lane Km
Unit Cost: ₱ 16,685,451.16/ Lane Km ROW Acquisition: 333.333 sq.m. EAO: ₱ 720,000.00
Allocation: ₱ 36,000,000.00 |
July 18, 2025 |
FY 2025 |
|
300214102102000 |
April 22, 2025 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 300214102102000
Project ID: P00935126MN
Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation/Application of Road Safety Facilities (Roadway Signs, Roadway Lighting) along Dipolog-Oroquieta National Rd – K1795+(-415) – K1802+500
CW1- Road Safety/ Road Signs: 110 Number of Signs
Unit Cost: ₱ 23,334.60/ Number of Signs
CW2- Road Safety/ Street Lighting: 61 Number of Units
Unit Cost: ₱ 153,921.21/ Number of Signs EAO: ₱ 244,000.00
Allocation: ₱ 12,200,000.00 |
July 17, 2025 |
FY 2025 |
WIN5E03758 |
310102102233000 |
May 6, 2025 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310102102233000
Project ID: P00901471MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Rizal-Dakak-Dapitan Coastal Lood Road - K1823+899 - K1824+000, K1824+000 - K1825+000, K1827+000 - K1829+000, K1828+000 - K1828+673.20
CW1- Preventive Maintenance of Road: Asphalt Overlay - 4.8964 Lane-km
Unit Cost: ₱ 19,708,357.16/ Lane-km
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
July 17, 2025 |
FY 2025 |
WIN5E03750 |
310102102234000 |
May 6, 2025 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310102102234000
Project ID: P00901472MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Rizal-Dakak-Dapitan Coastal Lood Road - K1828+673.20 - K1829+000, K1829+000 - K1830+000, K1830+000 - K1831+000, K1831+000 - K1831+208.31
CW1- Preventive Maintenance of Road: Asphalt Overlay - 4.9762 Lane-km
Unit Cost: ₱ 19,392,307.38/ Lane-km
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
July 17, 2025 |
FY 2025 |
WIN5E03759 |
310103101883000 |
May 6, 2025 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310103101883000
Project ID: P00901531MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Piñan-Mutia Road - K1823+266 - K1824+000, K1825+000 - K1826+000, K1828+000 - K1828+799, K1829+777 - K1830+000
CW1- Preventive Maintenance of Road: Asphalt Overlay - 5.510 Lane-km
Unit Cost: ₱ 17,513,611.62/ Lane-km
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
July 17, 2025 |
2025 |
|
SR2025-03-009635 |
March 18, 2025 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Network Development - Network Development Program - Off-Carriageway Improvement - Primary Roads
AS PER GAA/ORIGINAL:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0734 + 578 - K0735 + 526, K0736 + 030 - K0736 + 254, K0738 + 215 - K0738 + 384, K0742 + 108 - K0742 + 430
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: P 16.815125 M
Paving of Shoulders: 4,340 Square meters
EAO P .609875 M
Total P 17.425 M
AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0734 + 578 - K0735 + 526, K0736 + 030 - K0736 + 254, K0738 + 215 - K0738 + 384, K0740 + 000 - K0740 + 170, K0742 + 108 - K0742 + 430
Physical Target: Allocation:
CW1-Off-Carriageway Improvement: P 14.69375366 M
Paving of Shoulders: 4,066 Square meters
CW2-Costruction of Drainage Structure along P 2.12137134 M
Road: 214.00 Lineal meters
EAO P .609875 M
Total P 17.425 M
|
July 17, 2025 |
2025 |
|
SR2025-03-009490 |
March 17, 2025 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
AS PER GAA/ORIGINAL:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0696 + 411 - K0696 + 563, K0705 + 045 - K0705 + 108
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 8.223730 M
: 0.430 Lane Km
EAO P 0.298270 M
Total P 8.522 M
AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0696 + 411 - K0696 + 563, K0705 + 055 - K0705 + 108
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 8.223730 M
: 0.508 Lane Km
EAO P 0.298270 M
Total P 8.522 M
|
July 17, 2025 |
FY 2025 |
WIN5E03752 |
310103101884000 |
May 6, 2025 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310103101884000
Project ID: P00901532MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Polanco-Macleodes Road - K1832+013.40 - K1833+000, K1833+000 - K1834+704.10
CW1- Preventive Maintenance of Road: Asphalt Overlay - 5.0833 Lane-km
Unit Cost: ₱ 18,983,731.04/ Lane-km
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
July 17, 2025 |
FY 2025 |
WIN5E03752 |
310103101884000 |
May 6, 2025 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310103101884000
Project ID: P00901532MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Polanco-Macleodes Road - K1832+013.40 - K1833+000, K1833+000 - K1834+704.10
CW1- Preventive Maintenance of Road: Asphalt Overlay - 5.0833 Lane-km
Unit Cost: ₱ 18,983,731.04/ Lane-km
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
July 17, 2025 |
FY 2025 |
WIN5E03751 |
310103101885000 |
May 6, 2025 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310103101885000
Project ID: P00901533MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Polanco-Macleodes Road - K1834+704.10 - K1835+000, K1837+000 - K1838+000, K1839+000 - K1840+302.90
CW1- Preventive Maintenance of Road: Asphalt Overlay - 5.0496 Lane-km
Unit Cost: ₱ 19,110,424.59/ Lane-km
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
July 17, 2025 |
FY 2025 |
WIN5E03755 |
310103101886000 |
May 6, 2025 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310103101886000
Project ID: P00901534MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Polanco-Macleodes Road - K1840+302.90 - K1841+000, K1841+000 - K1842+000, K1842+000-K1843+000
CW1- Preventive Maintenance of Road: Asphalt Overlay - 5.07855 Lane-km
Unit Cost: ₱ 19,001,486.64/ Lane-km
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
July 17, 2025 |
FY 2025 |
|
310101101750000 |
May 6, 2025 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310101101750000
Project ID: P00909572MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Dipolog-Punta-Dansullan- S Osmena-Zamboanga del Noerte/Sur Bdry Rd - K1872+402 - K1873+887.70
CW1- Preventive Maintenance of Road: Asphalt Overlay - 2.7094 Lane-km
Unit Cost: ₱ 19,777,264.34/ Lane-km
EAO: ₱ 1,943,480.00
Allocation: ₱ 58,528,000.00 |
July 17, 2025 |
FY 2025 |
|
300214101645000 |
May 26, 2025 |
Region IX |
Regional Office IX |
UACS No. 300214101645000
Project ID: P00935228MN
Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1769+845 - K1769+900, K1813+000 - K1813+817, K1816+975 - K1817+061, K1842+000 - K1843+000, K1843+561 - K1844+193
CW1- Reconstruction to Concrete Pavement: 5.234 Lane-km
Unit Cost: ₱ 8,182,587.88/ Lane-km
EAO: ₱ 1,553,335.00
Allocation: ₱ 44,381,000.00 |
July 17, 2025 |
FY 2025 |
|
300211401644000 |
May 26, 2025 |
Region IX |
Regional Office IX |
UACS No. 300211401644000
Project ID: P00935227MN
Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance - Primary Roads along Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1757 + (-757) - K1757+740, K1757+780 - K1757+831
CW1- Preventive Maintenance of Road: Asphalt Overlay: 5.910 Lane-km
Unit Cost: ₱ 13,602,581.22/ Lane-km
EAO: ₱ 2,915,745.00
Allocation: ₱ 83,307,000.00 |
July 17, 2025 |
FY 2025 |
|
300214101643000 |
May 26, 2025 |
Region IX |
Regional Office IX |
UACS No. 300214101643000
Project ID: P00935226MN
Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance - Primary Roads along Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1773+361 - K1775+181
CW1- Preventive Maintenance of Road: Asphalt Overlay: 7.29 Lane-km
Unit Cost: ₱ 15,242,896.43/ Lane-km
EAO: ₱ 4,030,285.00
Allocation: ₱ 115,151,000.00 |
July 17, 2025 |
FY 2025 |
|
300214101642000 |
May 26, 2025 |
Region IX |
Regional Office IX |
UACS No. 300214101642000
Project ID: P00935225MN
Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance - Primary Roads along Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1726+098 - K1726+253, K1726+253 - K1726+298, K1749+000 - K1749+635
CW1- Preventive Maintenance of Road: Asphalt Overlay: 2.94 Lane-km
Unit Cost: ₱ 14,242,940.48/ Lane-km
EAO: ₱ 41,874,245.00
Allocation: ₱ 43,393,000.00 |
July 17, 2025 |
FY 2025 |
|
300214101641000 |
May 30, 2025 |
Region IX |
Regional Office IX |
UACS No. 300214101641000
Project ID: P00935224MN
Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance - Primary Roads along Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1676+722 - K1677+000, K1677+853 - K1678+091, K1680+380 - K1680+603
CW1- Preventive Maintenance of Road: Asphalt Overlay: 2.956 Lane-km
Unit Cost: ₱ 14,179,558.53/ Lane-km
EAO: ₱ 1,520,225.00
Allocation: ₱ 43,435,000.00 |
July 17, 2025 |
FY 2025 |
|
300214101639000 |
May 28, 2025 |
Region IX |
Regional Office IX |
UACS No. 300214101639000
Project ID: P00935222MN
Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance - Primary Roads along Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1651+060 - K1653+244.03
CW1- Preventive Maintenance of Road: Asphalt Overlay: 7.759 Lane-km
Unit Cost: ₱ 14,068,926.41/ Lane-km
EAO: ₱ 3,959,200.00
Allocation: ₱ 113,120,000.00 |
July 17, 2025 |
FY 2025 |
|
310101101753000 |
May 28, 2025 |
Region IX |
Regional Office IX |
UACS No. 310101101753000
Project ID: P00909576MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Maharlika Highway (Pagadian-Zamboanga City Rd) - K1684+300 - K1684+597.68, K1688+500 - K1689+000, K1700+360 - K1702+561.50
CW1- Preventive Maintenance of Road: Asphalt Overlay: 6.998 Lane-km
Unit Cost: ₱ 13,789,654.19/ Lane-km
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
July 17, 2025 |
2025 |
P00920332MN |
SR2025-02-000327 |
February 1, 2025 |
Region XII |
Cotabato 1st District Engineering Office |
Contract ID: 25MD0049
UACS: 320102107661000
Amount: ₱ 100,000,000.00
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Project Name: Construction of Flood Control Structure, Libungan River, Camansi Bridge (Upstream, Downstream and Both Sides), Camansi, Alamada, Cotabato
Type of Work: Construction of Flood Mitigation Structure
Physical Target:
From: 1,307.740 Lineal meters
To: 1,179.740 Lineal meters |
July 17, 2025 |
2025 |
P00920417MN |
GAA 2025 |
January 1, 2025 |
Region XII |
Cotabato 1st District Engineering Office |
Contract ID: 25MD0062
UACS: 320102107918000
Amount: ₱ 15,000,000.00
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Project Name: Construction of Maridagao RIS Protection dike at Pulangi River, Nabundas, Pikit, Cotabato
Type of Work: Construction of Flood Mitigation Structure
Physical Target:
From: 196.161 Lineal meters
To: 39.270 Lineal meters |
July 17, 2025 |
2025 |
P00920584MN |
SR2025-03-009554 |
March 17, 2025 |
Region XII |
Cotabato 1st District Engineering Office |
Contract ID: 25MD0065
UACS: 320102107657000
Amount: ₱ 80,000,000.00
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Project Name: Construction of Libungan River Flood Control Project (Upstream and Downstream of Mapurok Bridge - Polayagan Section), Polayagan, Alamada, North Cotabato
Type of Work: Construction of Flood Mitigation Structure
Physical Target:
From: 966.732 Lineal meter
To: 722.25 Lineal meter
|
July 17, 2025 |
2025 |
|
FY2025 GAA |
December 20, 2024 |
Region III |
Regional Office III |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Nueva Ecija - Aurora Rd - K0174+090 - K0174+200 |
July 17, 2025 |
2025 |
P00938055MN |
SR2025-03-009689 |
March 18, 2025 |
Region XII |
Cotabato 1st District Engineering Office |
Contract ID: 25MD0039
UACS: 300215106108000
Amount: ₱ 60,000,000.00
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities
Project Name: Construction of Bridge Approaches connecting Camansi and Barangay Pacao, Alamada, North Cotabato
Type of Work:
From:
CW1 - Construction of Bridge Approach
To:
CW1 - Construction of Bridge Approach
CW2 - Construction of Road Slope Protection Structure
Physical Target:
From: 6.058 Lane Km
To:
CW1 - 2.7134 Lane Km
CW2 - 5,016.20 Square Meter |
July 17, 2025 |
2025 |
P00938489MN |
SARO-BMB-A-25-0008277 |
March 11, 2025 |
Region XII |
Cotabato 1st District Engineering Office |
Contract ID: 25MD0044
UACS: 300221109044000
Amount: ₱ 5,000,000.00
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Project Name: Construction of Road, Sitio Pinamulaan - Barangay North Manuangan - Barangay South
Manuangan, Pigcawayan, North Cotabato
Type of Work: Construction of Concrete Road
Physical Target:
From: 0.647 Lane Km
To: 0.443 Lane Km
|
July 16, 2025 |
2025 |
WIN5XY00551 |
FY2025 GAA |
December 20, 2024 |
Region III |
Regional Office III |
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R. A. 11239
Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads along Maharlika Highway - K0199+684.80 - K0199+761.40, K0199+745 - K0199+749.50, K0199+824.50 - MK0199+829, K0200+000 - K0200+380, K0199+889 - K0200+000
|
July 16, 2025 |
2025 |
WIN5E03802 |
FY 2025 GAA, RA 12116 |
December 30, 2024 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. : 300214102161000
Project ID: P00935205MN
Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
FROM:
Installation/Application of Road Safety Facilities (Roadway Lighting) along NRJ Cuevas-Sampaguita Rd - K1373 + 000 - K1375 + 389
Type of Work:
CW1- Road Safety: Roadway Lighting
Physical Target:
CW1- 150 Number of Units
Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000
Unit Cost:
CW1: P 196,000/ Number of Units
TO:
Installation/Application of Road Safety Facilities (Roadway Lighting) along NRJ Cuevas-Sampaguita Rd - K1373 + 212 - K1373 + 912
Type of Work:
CW1- Road Safety: Roadway Lighting
Physical Target:
CW1- 72 Number of Units
Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000
Unit Cost:
CW1: P 408,333.33/ Number of Units
|
July 16, 2025 |
2025 |
WIN5XY00547 |
FY2025 GAA |
December 20, 2024 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Jose Abad Santos Ave (JASA) - K0097+(-062) - K0097+(-044), K0097+792 - K0097+956 |
July 16, 2025 |
FY 2025 |
P00909158MN |
SR2025-02-002399 |
February 3, 2025 |
Region XII |
Regional Office XII |
Contract ID: P00909158MN
UACS: 310107100773000
Amount: ₱ 32,000,000.00
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Project Name:
From: Maharlika Highway (Digos-Makar Rd) - K1600 + 500 - K1600 + 525, K1603 + 060 - K1603 + 090, K1603 + 200 - K1603 + 250, K1603 + 650 - K1603 + 670
To: Maharlika Highway (Digos-Makar Rd) - K1603 + 200 - K1603 + 229
Type of Work: Construction of Road Slope Protection Structure
Physical Target:
From: 2133.330 Square Meters
To: 754.000 Square Meters |
July 15, 2025 |
FY 2025 |
|
310104100860000 |
April 25, 2025 |
Region IX |
Regional Office IX |
UACS No. 310104100860000
Project ID: P00900589MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1839+364.13 - K1840+026.49, K1840+183.29 - K1840+440.00, K1840+512.61 - K1841+234.90, K1841+440.00, K1842+392.40, K1843+171.89 - K1843+200, K1843+221.18 - K1843+270.95, K1843+573.10 - K1843+972.23, K1844+260.00 - K1844+678.32, K1844+789.79 - K1845+911.52, K1845+969.91 - K1846+825.77, K1846+868.13 - K1847+145.83, K1847+421.13 - K1847+578.00
CW1- Reconstruction to Concrete Pavement: 11.93 Lane-km
Unit Cost: ₱ 8,364,034.37/ Lane-km
EAO: ₱ 3,619,070.00
Allocation: ₱ 103,402,000.00 |
July 15, 2025 |
FY 2025 |
|
310104100859000 |
April 10, 2025 |
Region IX |
Regional Office IX |
UACS No. 310104100859000
Project ID: P00909571MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Maharlika Highway (Pagadian-Zamboanga City Rd) - K1879+000 - K1879+057, K1896+906 - K1897+048, K1899+868 - K1899+968
CW1- Reconstruction to Concrete Pavement: 0.415 Lane-km
Unit Cost: ₱ 12,031,108.43/ Lane-km
EAO: ₱ 181,090.00
Allocation: ₱ 5,174,000.00 |
July 15, 2025 |
FY 2025 |
|
310101101754000 |
April 14, 2025 |
Region IX |
Regional Office IX |
UACS No. 310101101754000
Project ID: P00909577MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Maharlika Highway (Pagadian-Zamboanga City Rd) - K1711+000 - K1712+810, K1712+810 - K1712+834
CW1- Preventive Maintenance of Road: Asphalt Overlay: 7.224 Lane-km
Unit Cost: ₱ 13,358,250.28/ Lane-km
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
July 15, 2025 |
FY 2025 |
|
POSTED APPROVED MODIFICATIONS 2019 Revised POSTED APPROVED MODIFICATIONS 2019 Revised 100% 10 D6 310101101755000 310101 |
April 14, 2025 |
Region IX |
Regional Office IX |
UACS No. 310101101755000
Project ID: P00909578MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1813+842 - K1814+000, K1829+364 - K1830+300, K1830+375 - K1832+010
CW1- Preventive Maintenance of Road: Asphalt Overlay: 5.374 Lane-km
Unit Cost: ₱ 14,362,979.40/ Lane-km CW2- Reconstruction to Concrete Pavement: 1.521 Lane-km Unit Cost: ₱ 9,349,164.18
EAO: ₱ 3,315,270.00
Allocation: ₱ 94,722,000.00 |
July 15, 2025 |
FY 2025 |
|
310101101756000 |
April 22, 2025 |
Region IX |
Regional Office IX |
UACS No. 310101101756000
Project ID: P00909580MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1794+215 - K1794+582, K1800+642.30 - K1800+699.90, K1800+780.30 - K1800+835.10, K1800 + 930.40 - K1801+006.40, K1801+072.50 - K1801+135.50, K1801+163 - K1801+301, K1801+301 - K1801+565, K1808+000 - K1809+313, K1810+460 - K1811+000
CW1- Preventive Maintenance of Road: Asphalt Overlay: 5.504 Lane-km
Unit Cost: ₱ 14,348,432.46/ Lane-km CW2- Reconstruction to Concrete Pavement: 2.177 Lane-km
Unit Cost: ₱ 8,136,627.34/ Lane-km
EAO: ₱ 3,506,790.00
Allocation: ₱ 100,194,000.00 |
July 15, 2025 |
FY 2025 |
|
310104100861000 |
April 10, 2025 |
Region IX |
Regional Office IX |
UACS No. 310104100861000
Project ID: P00909582MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1758 + 370.51 - K1758 + 649.61, K1764+187 - K1764+330, K1768+000 - K1768+042, K1816+310 - K1816+975
CW1- Reconstruction to Concrete Pavement: 2.258 Lane-km
Unit Cost: ₱ 10,019,247.12/ Lane-km
EAO: ₱ 820,540.00
Allocation: ₱ 23,444,000.00 |
July 15, 2025 |
FY 2025 |
|
310104100862000 |
April 10, 2025 |
Region IX |
Regional Office IX |
UACS No. 310104100862000
Project ID: P00909583MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1846+858 - K1848+000, K1849+352 - K1849+407, K1849+607 -K1849+735
CW1- Reconstruction to Concrete Pavement: 2.632 Lane-km
Unit Cost: ₱ 9,413,516.34/ Lane-km
EAO: ₱ 898,625.00
Allocation: ₱ 25,675,000.00 |
July 15, 2025 |
FY 2025 |
|
300214101648000 |
April 14, 2025 |
Region IX |
Regional Office IX |
UACS No. 300214101648000
Project ID: P00935254MN
Convergence and Special Support Program (CSSP) - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance - Primary Roads along Maharlika Highway (Lanao-Pagadian-Zamboanga City Rd) - K1768+090 - K1768+407, K1794+000 - K1794+215
CW1- Preventive Maintenance of Road: Asphalt Overlay: 2.128 Lane-km
Unit Cost: ₱ 15,191,494.36/ Lane-km
EAO: ₱ 1,172,500.00
Allocation: ₱ 33,500,000.00 |
July 14, 2025 |
2025 |
WIN5E03823 |
GAA 2025 |
January 20, 2025 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
"Project ID: P00916209LZ
UACS: 310105101381000
FROM:
Project Name:
Sagada-Besao-Quirino Rd - (S03998LZ) Chainage 6053 - Chainage 6510, Chainage 8652 - Chainage 9144
Type of Work:
CW1 - Reconstruction to Concrete Pavement
Physical Target:
CW1 - 1.898 Lane Km
Allocation:
Php 19,740,000
TO:
Project Name:
Sagada-Besao-Quirino Rd - (S03998LZ) Chainage 8760 - Chainage 9110
Type of Work:
CW1 - Reconstruction to Concrete Pavement
CW2 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 0.700 Lane Km
CW2 - 1061.500 Square meters
Allocation:
19740000"
|
July 14, 2025 |
2025 |
WIN5XY00518 |
FY2025 GAA |
December 20, 2024 |
Region III |
Regional Office III |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Maharlika Highway - K0048+458 - K0048+640 |
July 14, 2025 |
2025 |
WIN5XY00514 |
FY2025 GAA |
December 20, 2024 |
Region III |
Zambales 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Olongapo-Bugallon Rd - K0224+684 - K0225+330, K0225+369 - K0225+620, K0258+000 - K0258+546, K0258+866 - K0259+304 |
July 14, 2025 |
2025 |
WIN5E03809 |
FY 2025 GAA, RA 12116 |
December 30, 2024 |
Region XIII |
Regional Office XIII |
UACS No. : 310201101653000
Project ID: P00909429MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
FROM:
Maharlika Highway (Agusan-Davao Sect) - K1241 + (-321) - K1241 + 098
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 0.838 Lane Km
Allocation:
TOTAL: P 11,421,000
CW1: P 11,021,265
EAO: P 399,735
Unit Cost:
CW1: P 13,151,867.542/Lane Km
TO:
Maharlika Highway (Agusan- Davao Sect) K1241 + (-321) - K1241 +040
Type of Work:
CW1- Road Widening
ROW - ROW Acquisition
Physical Target:
CW1- 0.722 Lane Km
ROW - 3723.6 Square meters
Allocation:
TOTAL: P 11,421,000
CW1: P 10,249,265
ROW: P 772,000
EAO: P 399,735
Unit Cost:
CW1: P 14,195,657.895/Lane Km
ROW: - |
July 14, 2025 |
2025 |
WIN5E03806 |
FY 2025 GAA, RA 12116 |
December 30, 2024 |
Region XIII |
Regional Office XIII |
UACS No. : 310201101673000
Project ID: P00909502MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
FROM:
Maharlika Highway (Agusan-Davao Sect) - K1241 + 098 - K1241 + 498, K1242 + 983 - K1243 + 800
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 2.438 Lane Km
Allocation:
TOTAL: P 33,227,000
CW1: P 32,064,055
EAO: P 1,162,945
Unit Cost:
CW1: P 13,151,786.300/Lane Km
TO:
Maharlika Highway (Agusan Davao Sect) K1241 + 040 - K1241 + 498, K1242 + 983 - K1243 + 530
Type of Work:
CW1- Road Widening
ROW- ROW Acquisition
Physical Target:
CW1- 2.014 Lane Km
ROW- 13773.900 Square meters
Allocation:
TOTAL: P 33,227,000
CW1: P 30,906,055
ROW: P 1,158,000
EAO: P 1,162,945
Unit Cost:
CW1: P 15,345,605.242/Lane Km
ROW: - |
July 14, 2025 |
2025 |
WIN5E03816 |
FY 2025 GAA, RA 12116 |
December 30, 2024 |
Region XIII |
Regional Office XIII |
UACS No. : 310201101676000
Project ID: P00909505MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
FROM:
Maharlika Highway (Surigao-Agusan Sect) - K1150 + 571 - K1150 + 993, K1158 + 580 - K1158 + 583.02, K1160 + 500 - K1162 + 242, K1162 + 264 - K1162 + 326, K1162 + 341 - K1163 + 142, K1163 + 160 - K1163 + 310, K1163 + 326 - K1163 + 489, K1164 + 317 - K1164 + 388, K1164 + 638 - K1164 + 773, K1165 + 645 - K1165 + 700, K1165 + 745 - K1165 + 800
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 7.330 Lane Km
Allocation:
TOTAL: P 99,901,000
CW1: P 96,404,465
EAO: P 3,496,535
Unit Cost:
CW1: P 13,152,041.61/Lane Km
TO:
Maharlika Highway (Surigao - Agusan Sect) – 1150 + 571 - K1150 + 993, K1160 + 784 - K1162 + 180, K1162 + 440 - K1162 + 640
Type of Work:
CW1- Road Widening
ROW - ROW Acquisition
Physical Target:
CW1- 7.330 Lane Km
ROW – 33,642 Square meters
Allocation:
TOTAL: P 99,901,000
CW1: P 87,719,465
ROW: P 8,685,000
EAO: P 3,496,535
Unit Cost:
CW1: P 13,152,041.61/Lane Km
ROW: - |
July 14, 2025 |
2025 |
WIN5E03816 |
FY 2025 GAA, RA 12116 |
December 30, 2024 |
Region XIII |
Regional Office XIII |
UACS No. : 310201101676000
Project ID: P00909505MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
FROM:
Maharlika Highway (Surigao-Agusan Sect) - K1150 + 571 - K1150 + 993, K1158 + 580 - K1158 + 583.02, K1160 + 500 - K1162 + 242, K1162 + 264 - K1162 + 326, K1162 + 341 - K1163 + 142, K1163 + 160 - K1163 + 310, K1163 + 326 - K1163 + 489, K1164 + 317 - K1164 + 388, K1164 + 638 - K1164 + 773, K1165 + 645 - K1165 + 700, K1165 + 745 - K1165 + 800
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 7.330 Lane Km
Allocation:
TOTAL: P 99,901,000
CW1: P 96,404,465
EAO: P 3,496,535
Unit Cost:
CW1: P 13,152,041.61/Lane Km
TO:
Maharlika Highway (Surigao - Agusan Sect) – 1150 + 571 - K1150 + 993, K1160 + 784 - K1162 + 180, K1162 + 440 - K1162 + 640
Type of Work:
CW1- Road Widening
ROW - ROW Acquisition
Physical Target:
CW1- 7.330 Lane Km
ROW – 33,642 Square meters
Allocation:
TOTAL: P 99,901,000
CW1: P 87,719,465
ROW: P 8,685,000
EAO: P 3,496,535
Unit Cost:
CW1: P 13,152,041.61/Lane Km
ROW: - |
July 14, 2025 |
GAA 2025 |
P00938257MN |
SR2025-03-009691 |
March 18, 2025 |
Region XII |
South Cotabato 1st District Engineering Office |
Contract ID: 25MB0010
UACS No.: 300234100358000
Amount: ₱ 81,443,000.00
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities
Project Name: Construction of Revetment along Silway River Boulevard, General Santos City, South Cotabato
Type of Work: Construction of Revetment
Physical target:
From: 636.00 Lineal meters
To: 608.00 Lineal meters |
July 11, 2025 |
2024 |
300214101833000 |
FY 2025 GAA |
January 2, 2025 |
Region II |
Cagayan 1st District Engineering Office |
FROM:
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Installation/Application of Road Safety Facilities (Roadway Lighting) along Jct Magapit-Capissayan Rd - K0557 + (-265) - K0563 + 010
TO:
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Installation/Application of Road Safety Facilities (Roadway Lighting) along Jct Magapit-Capissayan Rd – K0557 + (- 234.80) – K0569 + 621.30 |
July 11, 2025 |
2025 |
300214101834000 |
FY 2025 GAA |
January 2, 2025 |
Region II |
Cagayan 1st District Engineering Office |
FROM:
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Installation/Application of Road Safety Facilities (Roadway Lighting) along Cagayan Valley Rd (Magapit-Jct Aparri Airport Sect) - K0554 + (-334) - K0557 + 735
TO:
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Installation/Application of Road Safety Facilities (Roadway Lighting) along Cagayan Valley Rd (Magapit – Jct Aparri Airport Sect) – K0564 + 096 – K0571 + 525 |
July 11, 2025 |
2025 |
310106101299000 |
FY 2025 GAA |
January 2, 2025 |
Region II |
Cagayan 1st District Engineering Office |
FROM:
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Jct Magapit-Capissayan Rd - K0560 + 283 - K0562 + 006
TO:
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Tertiary Roads – Jct Magapit – Capissayan Rd – K0560+000 – K0562+672.60, K0563+030.80 – K0564+257.40 |
July 11, 2025 |
2025 |
|
FY 2025 GAA, RA 12116 |
December 30, 2025 |
Region XIII |
Regional Office XIII |
UACS No. : 310103101906000
Project ID: P00909516MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
FROM:
Butuan City-Malaybalay Rd (S00431MN) - K1241 + (-435) - K1240 + 954, (S00433MN) - K1240 + (-995) - K1240 + (-535), K1240 + 390 - K1241 + 000, K1241 + 183 - K1241 + 384, K1266 + 000 - K1269 + 000
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 18.849 Lane Km
Allocation:
TOTAL: P 200,000,000
CW1: P 193,000,000
EAO: P 7,000,000
Unit Cost:
CW1: P 10,239,269.99/Lane Km
TO:
Butuan City-Malaybalay Rd (S00431MN) - K1241 + 336 - K1241 + 401, (S00433MN) - K1241 + 398 - K1241 + 500, K1261 + 600 - K1261 + 942, K1262 + 000 - K1263 + 384, K1263 + 455 - K1264 + 405, K1264 + 476 - K1265 + 480, K1266 + 000 - K1268 + 100
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 20.067 Lane Km
Allocation:
TOTAL: P 200,000,000
CW1: P 193,000,000
EAO: P 7,000,000
Unit Cost:
CW1: P 9,617,780.43/Lane Km
|
July 11, 2025 |
2025 |
|
FY 2025 GAA, RA 12116 |
December 30, 2024 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 310109101784000
Project ID: P00909131MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
FROM:
Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1280 + 955 - K1280 + 987, K1292 + 482 - K1292 + 495.70
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 1000 Square meters
Allocation:
TOTAL: P 25,000,000
CW1: P 24,500,000
EAO: P 500,000
Unit Cost:
CW1: P 24,500/Square meters
TO:
Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1281 + 955 - K1281 + 991, K1292 + 482 - K1292 + 495.70
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 1044.77 Square meters
Allocation:
TOTAL: P 25,000,000
CW1: P 24,500,000
EAO: P 500,000
Unit Cost:
CW1: P 23,450.14/Square meters
|
July 11, 2025 |
2025 |
310105101385000 |
FY 2025 GAA |
January 2, 2025 |
Region II |
Cagayan 1st District Engineering Office |
FROM:
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Magapit-Mission Rd - K0585 + 1139 - K0587 + 887
TO:
Damaged Paved Roads –Secondary Roads – Magapit-Mission Rd – K0554 + (-267.50) – K0555+275.50, K0556+205.40, K0557+298.20, K0584+018 - K0584+765.50, K0587+279 – K0587+1482
|
July 11, 2025 |
2025 |
310202101908000 |
FY 2025 GAA |
January 2, 2025 |
Region II |
Cagayan 1st District Engineering Office |
FROM:
Network Development - Road Widening - Secondary Roads - Dugo-Sn Vicente Rd (Mission-Sta Ana Sect) - K0633 + 094 - K0634 + 689
TO:
Network Development - Road Widening - Secondary Roads - Dugo-Sn Vicente Rd (Mission – Sta. Ana Sect) – K0632+324.48 – K0634+689 |
July 11, 2025 |
2025 |
310106101300000 |
FY 2025 GAA |
January 2, 2025 |
Region II |
Cagayan 1st District Engineering Office |
FROM:
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Baybayog-Baggao-Dalin-Sta. Margarita Rd - K0525 + 087- K0526 + 658.6, K0542 + 000 - K0542 + 702
TO:
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Baybayog-Baggao-Dalin-Sta. Margarita Rd. – K0525+087.70 – 0526+729.40, K0527+389.70– K0527+465.70, K0531+142.70 –K0531+987.30,K0532+543–K0533+125.50, K0542+000 – K0542+208 |
July 11, 2025 |
2025 |
WIN5E03827 |
GAA 2025 |
January 20, 2025 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
"Project ID: P00917186LZ
UACS: 310108101983000
FROM:
Project Name:
Mt Prov-Cagayan via Tabuk-Enrile Rd - K0396 + 800 - K0396 + 900
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 3000 Square meters
Allocation:
Php 75,000,000
TO:
Project Name:
Mt Prov-Cagayan via Tabuk-Enrile Rd - K0396 + 800 - K0396 + 900
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 2714 Square meters
Allocation:
Php 75,000,000"
|
July 10, 2025 |
2025 |
|
SR2025-03-008691 |
March 12, 2025 |
Cordillera Administrative Region |
CAR - Regional Office |
"Project ID: P00917185LZ
UACS: 310108101976000
FROM:
Project Name:
Mt Prov-Ilocos Sur via Tue Rd - K0388 + 770 - K0388 + 870
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 4380 Square meters
Allocation:
Php 100,000,000
TO:
Project Name:
Mt Prov-Ilocos Sur via Tue Rd - K0388 + 770 - K0388 + 870
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 4440 Square meters
Allocation:
Php 100,000,000"
|
July 10, 2025 |
2025 |
|
SR2025-03-008691 |
March 12, 2025 |
Cordillera Administrative Region |
CAR - Regional Office |
"Project ID: P00917185LZ
UACS: 310108101976000
FROM:
Project Name:
Mt Prov-Ilocos Sur via Tue Rd - K0388 + 770 - K0388 + 870
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 4380 Square meters
Allocation:
Php 100,000,000
TO:
Project Name:
Mt Prov-Ilocos Sur via Tue Rd - K0388 + 770 - K0388 + 870
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 4440 Square meters
Allocation:
Php 100,000,000"
|
July 10, 2025 |
2025 |
|
SR2025-03-008691 |
March 12, 2025 |
Cordillera Administrative Region |
CAR - Regional Office |
"Project ID: P00917185LZ
UACS: 310108101976000
FROM:
Project Name:
Mt Prov-Ilocos Sur via Tue Rd - K0388 + 770 - K0388 + 870
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 4380 Square meters
Allocation:
Php 100,000,000
TO:
Project Name:
Mt Prov-Ilocos Sur via Tue Rd - K0388 + 770 - K0388 + 870
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 4440 Square meters
Allocation:
Php 100,000,000"
|
July 10, 2025 |
2025 |
|
SR2025-03-008691 |
March 12, 2025 |
Cordillera Administrative Region |
CAR - Regional Office |
"Project ID: P00917185LZ
UACS: 310108101976000
FROM:
Project Name:
Mt Prov-Ilocos Sur via Tue Rd - K0388 + 770 - K0388 + 870
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 4380 Square meters
Allocation:
Php 100,000,000
TO:
Project Name:
Mt Prov-Ilocos Sur via Tue Rd - K0388 + 770 - K0388 + 870
Type of Work:
CW1 - Construction of Road Slope Protection Structure
Physical Target:
CW1 - 4440 Square meters
Allocation:
Php 100,000,000"
|
July 10, 2025 |
FY 2025 GAA |
P00901446MN |
FY 2025 GAA RA 12116 |
January 1, 2025 |
Region XI |
Regional Office XI |
P00901446MN (Regional Office XI_10)
UACS No. 310101101792000
Project ID: P00901446MN
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Maharlika Highwaya - Davao-Cotobato Road (Davao City-Jct Digos Section) - K1562 + 000 - K1563 + 000
Physical Target:
CW1: 4.024 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Maharlika Highway - Davao-Cotabato Road (Davao City-Jct Digos Section) - K1561 + 686 - K1562 + 729
Physical Target:
CW1: 6.310345 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00 |
July 10, 2025 |
FY 2025 GAA |
P00901445MN |
FY 2025 GAA RA 12116 |
January 1, 2025 |
Region XI |
Regional Office XI |
P00901445MN (Regional Office XI_11)
UACS No. 310101101791000
Project ID: P00901445MN
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Maharlika Highway - Davao-Cotobato Road (Davao City-Jct Digos Section) - K1552 + 000 - K1553 + 000
Physical Target:
CW1: 4.116 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Maharlika Highway - Davao-Cotabato Road (Davao City-Jct Digos Section) - K1551 + 695 - K1553 + 000
Physical Target:
CW1: 5.376244 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00 |
July 10, 2025 |
FY 2025 GAA |
P00901450MN |
FY 2025 GAA RA 12116 |
January 1, 2025 |
Region XI |
Davao del Sur District Engineering Office |
P00901450MN (Davao del Sur District Engineering Office_01)
UACS No. 310101101802000
Project ID: P00901450MN
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Davao-Cotabato Road (Jct. Digos-Cotabato Section) - K1588 + 500 - K1590 + 050
Physical Target:
CW1: 5.776 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Davao-Cotabato Road (Jct. Digos-Cotabato Section) - K1580 + 625 - K1581 + 434, K1582 + 118 - K1582 + 670
Physical Target:
CW1: 6.040 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00 |
July 10, 2025 |
FY 2025 GAA |
P00909529MN |
FY 2025 GAA RA 12116 |
January 1, 2025 |
Region XI |
Davao del Sur District Engineering Office |
P00909529MN (Davao del Sur District Engineering Office_02)
UACS No. 310101101778000
Project ID: P00909529MN
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Davao-Cotabato Road (Jct. Digos-Cotabato Section) - K1572 + 000 - K1573 + 032, K1588 + 000 - K1588 + 763
Physical Target:
CW1: 5.674 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Davao-Cotabato Road (Jct. Digos-Cotabato Section) - K1572 + 000 - K1573 + 032, K1575 + 322 - K1575 + 565
Physical Target:
CW1: 5.606 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00 |
July 10, 2025 |
FY 2024 GAA |
P00909530MN |
FY 2025 GAA RA 12116 |
January 1, 2025 |
Region XI |
Davao del Sur District Engineering Office |
P00909530MN (Davao del Sur District Engineering Office_03)
UACS No. 310101101777000
Project ID: P00909530MN
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Davao-Cotabato Road (Jct. Digos-Cotabato Section) - K1584 + 087 - K1584 + 965, K1586 + 000 - K1586 + 922
Physical Target:
CW1: 5.444 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Davao-Cotabato Road (Jct. Digos-Cotabato Section) - K1579 + 093 - K1580 + 625
Physical Target:
CW1: 6.148 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00 |
July 9, 2025 |
2025 |
|
GAA 2025 |
January 20, 2025 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"Project ID: P00914946LZ
UACS: 310205101489000
FROM:
Project Name:
Tabuk-Banawe via Tanudan-Barlig Road, Kalinga
Type of Work:
CW1 - Road Widening
Physical Target:
CW1 - 5.2 Lane Km
Allocation:
Php 50,000,000
TO:
Project Name:
Tabuk-Banawe via Tanudan-Barlig Road, Kalinga
Type of Work:
CW1 - Construction of Gravel Road
Physical Target:
CW1 - 5.2 Lane Km
Allocation:
Php 50,000,000"
|
July 9, 2025 |
2025 |
|
SR2025-03-008310 |
March 12, 2025 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
"Project ID: P00915519LZ
UACS: 310105101276000
FROM:
Project Name:
Baguio-Bontoc Rd - K0254+400 - K0254+411, K0255+000 - K0255+380, K0256 + 951 - K0257 + 683
Type of Work:
CW1 - Reconstruction to Concrete Pavement
Physical Target:
CW1 - 2.938 Lane Km
Allocation:
Php 67,600,000
TO:
Project Name:
Baguio-Bontoc Rd - K0254+279 - K0255+250
Type of Work:
CW1 - Reconstruction to Concrete Pavement
Physical Target:
CW1 - 3.720 Lane Km
Allocation:
Php 67,600,000"
|
July 9, 2025 |
2025 |
P00909392MN |
GAA2025 |
January 3, 2025 |
Region X |
Camiguin District Engineering Office |
P00909392MN
310202102027000
OO1: Ensure Safe and Reliable National Road System, Network Development- Road Widening-Secondary Road
FROM:
Camiguin Circumferential Rd - K0005+585 - K0005+858
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 0.546 Lane Km
Allocation:
CW1: Php 6,727,700.00
EAO: Php 137,300.00
TO:
Camiguin Circumferential Rd - K0011+118.50 - K0011+344, K0011+344 - K0011+402
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 0.509 Lane Km
Allocation:
CW1: Php 6,727,700.00
EAO: Php 137,300.00 |
July 9, 2025 |
2025 |
P00901564MN |
GAA2025 |
January 1, 2025 |
Region X |
Lanao del Norte 1st District Engineering Office |
P00901564MN
310104100867000
OO1: Ensure Safe and Reliable National Road System, Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
FROM:
Linamon-Zamboanga Road (S00914MN), K1590+408 - K1591+611, K1591+631 - K1593+488, K1593+504-K1593+774, Lanao Del Norte
Type of Work:
CW1- Reconstruction to Concrete Pavement
Physical Target:
CW1- 6.672 Lane Km
Allocation:
CW1: Php 96,500,000.00
EAO: Php 3,500,000.00
TO:
Linamon-Zamboanga Road (S00914MN) - K1556+961 - K1557+000, K1558+464 - K1560+096, K1560+134 - K1561+014, K1590+408 - K1591+531, Lanao Del Norte
Type of Work:
CW1- Reconstruction to Concrete Pavement
CW2- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 5.188 Lane Km
CW2- 3.778 Lane Km
Allocation:
CW1: Php 57,859,832.70
CW2: Php 38,640,167.30
EAO: Php 3,500,000.00
|
July 9, 2025 |
2025 |
P00901565MN |
GAA2025 |
January 1, 2025 |
Region X |
Lanao del Norte 1st District Engineering Office |
P00800059MN
310202101759000
OO1: Ensure Safe and Reliable National Road System, Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
FROM:
Linamon-Zamboanga Road (S00914MN) K1588+285-K1590+000, Lanao Del Norte
Type of Work:
CW1- Reconstruction to Concrete Pavement
Physical Target:
CW1- 5.184 Lane Km
Allocation:
CW1: Php 96,500,000.00
EAO: Php 3,500,000.00
TO:
Linamon-Zamboanga Road (S00914MN) K1580+691 - K1580+896, K1580+910 - K1580+933, K1582+000 - K1582+386, K1582+441 - K1583+137, K1583+503 - K1583+655, K1583+788 - K1584+293, K1585+871 - K1586+000, K1588+225 - K1588+813, Lanao Del Norte
Type of Work:
CW1- Reconstruction to Concrete Pavement
CW2- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 4.284 Lane Km
CW2- 3.048 Lane Km
Allocation:
CW1: Php 64,315,125.47
CW2: Php 32,184,874.53
EAO: Php 3,500,000.00 |
July 9, 2025 |
2025 |
P00901423MN |
GAA2025 |
January 1, 2025 |
Region X |
Misamis Oriental 1st District Engineering Office |
P00901423MN
310101101761000
OO1: Ensure Safe and Reliable National Road System, Asset Preservation Program - Preventive Maintenance - Primary Roads
FROM:
Butuan City-Cagayan de Oro City-Iligan City Rd - K1309 + 420 - K1309 + 700
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 3.920 Lane Km
Allocation:
CW1: Php 96,500,000.00
EAO: Php 3,500,000.00
TO:
Butuan City-Cagayan de Oro City-Iligan City Rd - K1308 + 814 - K1311 + 395
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 8.496 Lane Km
Allocation:
CW1: Php 96,500,000.00
EAO: Php 3,500,000.00 |
July 9, 2025 |
2025 |
P00909288MN |
GAA2025 |
January 3, 2025 |
Region X |
Lanao del Norte 2nd District Engineering Office |
P00909288MN
310209100560000
OO1: Ensure Safe and Reliable National Road System, Network Development - Off-Carriageway Improvement - Tertiary Roads
FROM:
Dobleston-Butadon Rd - K2002 + 915 - K2003 + 408
Type of Work:
CW1- Off-Carriageway Improvement: Paving of Shoulders
Physical Target:
CW1- 2,036.00 Square Meters
Allocation:
CW1: Php 7,482,300.00
EAO: Php 152,700.00
TO:
Dobleston-Butadon Rd - K2002 + 860 - K2003 + 408
Type of Work:
CW1- Off-Carriageway Improvement: Paving of Shoulders
Physical Target:
CW1- 2,046.00 Square Meters
Allocation:
CW1: Php 7,482,300.00
EAO: Php 152,700.00 |
July 9, 2025 |
2025 |
P00909510MN |
GAA2025 |
January 3, 2025 |
Region X |
Camiguin District Engineering Office |
P00909510MN
31020210203000
OO1: Ensure Safe and Reliable National Road System, Network Development Program - Road Widening - Secondary Roads
FROM:
Camiguin Circumferential Rd – K0006+918.53-K0007+585,K0007+600-K0007+972
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 2.077 Lane Km
Allocation:
CW1: Php 26,647,960.00
EAO: Php 522,300.00
TO:
Camiguin Circumferential Rd – K0011+402 - K0011+857, K11+857 - K0011+883.50, K0027+320-K0027+473, K0027+473 - K0027+852
Type of Work:
CW1- Road Widening
CW2- Construction of Drainage Structure along Road
Physical Target:
CW1- 1.193 Lane Km
CW2- 929.50 Linear Meter
Allocation:
CW1: Php 13,847,464.81
CW2: Php 11,745,235.19
EAO: Php 522,300.00 |
July 9, 2025 |
2025 |
P00901386MN |
GAA2025 |
January 3, 2025 |
Region X |
Misamis Occidental 2nd District Engineering Office |
P00901386MN
310201101614000
OO1: Ensure Safe and Reliable National Road System, Network Development - Road Widening - Primary Roads
FROM:
Ozamiz - Pagadian Rd., K1667 + 847 - K1669 + 521 , K1669 + 541 - K1670 + 070, K1691 + 324 - K1692 + 129 , K1692 + 141 - K1692 + 471
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 6.666 Lane Km
Allocation:
CW1: Php 82,893,500.00
EAO: Php 3,006,500.00
TO:
Ozamiz - Pagadian Rd., K1669+287 - K1669 + 516.500 , K1669 + 545.500 - K1670 + 070, K1691 + 324 - K1692 + 124.500 , K1692 + 145.500 - K1692 + 566.982, K1692+678.941 - K1692+789
Type of Work:
CW1- Road Widening
CW2- Construction of Drainage Structure along Road
CW3- Construction of Road Slope Protection Structure
Physical Target:
CW1- 4.156 Lane Km
CW2- 2,836.453 Linear Meter
CW3- 1,584.478 Square Meter
Allocation:
CW1: Php 60,541,510.980
CW2: Php 14,366,944.989
CW3: Php 7,985,044.031
EAO: Php 3,006,500.00 |
July 9, 2025 |
2025 |
P00909051MN |
GAA2025 |
January 3, 2025 |
Region X |
Bukidnon 2nd District Engineering Office |
P00909051MN
310107100755000
OO1: Ensure Safe and Reliable National Road System, Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
FROM:
Bukidnon-Davao City Rd - K1607 + 455 - K1607 + 580 (RS)
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 5,100.00 Square Meter
Allocation:
CW1: Php 49,215,000.00
EAO: Php 1,785,000.00
TO:
Bukidnon-Davao City Rd - K1612 + 308- K1612 + 343, K1613 + 032- K1613 + 070, K1613 + 410- K1613 + 442, K1614 + 270- K1614 + 330,
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 1,312.00 Square Meter
Allocation:
CW1: Php 49,215,000.00
EAO: Php 1,785,000.00 |
July 9, 2025 |
2025 |
P00909587MN |
GAA2025 |
January 3, 2025 |
Region X |
Bukidnon 3rd District Engineering Office |
P00909587MN
310104100911000
OO1: Ensure Safe and Reliable National Road System, Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved
FROM:
Sayre Highway - K1443 + 088 - K1443 + 190, K1439 + 880 - K1439 + 935
Type of Work:
CW1- Reconstruction to Concrete Pavement
Physical Target:
CW1- 0.314 Lane Km
Allocation:
CW1: Php 6,511,120.00
EAO: Php 132,880.00
TO:
Sayre Highway - K1439 + 880 - K1439 + 935, K1443 + 088 - K1443 + 190, K1443+1001 - K1444 + 126
Type of Work:
CW1- Reconstruction to Concrete Pavement
Physical Target:
CW1- 0.574 Lane Km
Allocation:
CW1: Php 6,511,120.00
EAO: Php 132,880.00 |
July 9, 2025 |
FY 2025 |
P00910027MN |
SR2025-02-001791 |
February 3, 2025 |
Region XII |
Regional Office XII |
Contract ID: 25M00117
UACS: 310305102407000
Amount: ₱ 37,200,000.00
OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges
Project Name: Langkong Br. (B02133MN) along Maharlika Highway( Cotabato-Lanao Rd)
Type of Work: Widening of Bridge
Physical Target:
From: 295.740 Square Meters
To: 305.280 Square Meters |
July 9, 2025 |
FY 2025 |
P00901007MN |
SR2025-03-009275 |
March 17, 2025 |
Region XII |
Regional Office XII |
Contract ID: 25M00123
UACS: 310101101814000
Amount: ₱ 70,000,000.00
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Asset Preservation - Preventive Maintenance - Primary Roads
Project Name:
From: Kidapawan- Ala Junction Rd. (Datu Paglas Section) - K1646 + 615 -K1648 + 065
To: Kidapawan- Ala Junction Rd. (Datu Paglas Section) - K1647 + 442 – K1648 + 080, K1648 + 694 – K1648 + 827, K1648 + 827 – K1648+845, K1648 + 845 – 1648 + 880
Type of Work: Preventive Maintenance - Asphalt Overlay
Physical Target:
From: 3.500 Lane Km
To: 3.384 Lane Km |
July 8, 2025 |
2025 |
WIN5F08556 |
GAA 2025 |
January 11, 2025 |
Region V |
Sorsogon 2nd District Engineering Office |
UACS : 310203100906000
Project ID : P00915098LZ
FROM :
ORGANIZATIONA OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Tertiary Roads - Jct Abuyog - Gubat - Ariman Rd - K0597 + 091 - K0598 + 507, K0598 + 685 - K0600 + 818, K0600 + 844 - K0601 + 164
Physical Target :
CW1 - Road Widening - 7.59 Lane Km
TO :
ORGANIZATIONA OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Tertiary Roads - Jct Abuyog - Gubat - Ariman Rd - K0596 + 000 - K0596 + 326, K0596 + 351 - K0598 + 507, K0600 + 514 - K0600 + 744, K0601 + 105 - K0601 + 160
Physical Target :
CW1 - Road Widening - 5.45 Lane Km
CW2 - Construction of Road Slope Protection Structure - 7,392.50 sq.m. |
July 8, 2025 |
2025 |
|
GAA 2025 |
January 11, 2025 |
Region V |
Camarines Norte District Engineering Office |
UACS : 310102102166300
Project ID : P00917320LZ
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads - Talobatib - Jose Panganiban Pob- Port Rd - K0321 + 137 - 322 + 177, K0334 + 871 - K0335 + 326
Physical Target :
CW1 - Preventive Maintenance of Road - Asphalt Overlay - 2.976 Lane Km
TO
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads - Talobatib - Jose Panganiban Pob- Port Rd - K0321 + 137 - K0322 + 177, K0334 + 940 - K0335 + 318
Physical Target :
CW1 - Preventive Maintenance of Road - Asphalt Overlay - 2.822 Lane Km |
July 8, 2025 |
2025 |
WIN5XY00561 |
GAA 2025 |
January 11, 2025 |
Region V |
Regional Office V |
UACS : 300237100218000
Project ID : P00941108LZ
FROM :
CONVERGE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities - Construction of Road Dike Structure along Quirangay River, Package 1, Barangay Quirangay, Camalig, Albay
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 232.50 Lineal meters
TO :
CONVERGE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities - Construction of Road Dike Structure along Quirangay River, Package 1, Barangay Quirangay, Camalig, Albay
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 108.18 Lineal meters
Allocation :
70,000.000 |
July 8, 2025 |
2025 |
WIN5XY00523 |
GAA 2025 |
January 11, 2025 |
Region V |
Regional Office V |
UACS : 300214101572000
Project ID : P00938033LZ
FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Installation/ Application of Road Safety Facilities along Maharlika Highway - K0513 + (-194) - K0524 + 555
Physical Target :
CW1 - Road Safety Pavement Markings - 11759 Lineal meters
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Installation/ Application of Road Safety Facilities along Maharlika Highway - K0514 + 440 - K0515 + 248, K0515 + 493 - K0516 + 005. K0519 + 000 - K0520 + 251, K0522 + 560 - K0522 + 860
Physical Target :
CW1 - Road Safety - Road Lighting - 149 Number of Units
Allocation : 30,000.00 |
July 8, 2025 |
2025 |
WIN5XY00517 |
GAA 2025 |
January 11, 2025 |
Region V |
Regional Office V |
UACS : 310204103052000
Project ID : P00917157LZ
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Camarines Sur - Albay Diversion Road, Camarines Sur
Physical Target :
CW1 - Construction of Concrete Road - 3.754 Lane Km
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Camarines Sur - Albay Diversion Road, Camarines Sur
Physical Target :
CW1 - Construction of Concrete Road - 1.02 Lane Km
CW2 - Reconstruction to Concrete Pavement - 1.556 Lane Km
CW3 - Construction of Road Slope Protection Struction - 2931.66 Square meters
Allocation :
75,000.000 |
July 8, 2025 |
FY 2025 |
P00910026MN |
SR2025-02-001685 |
February 3, 2025 |
Region XII |
Regional Office XII |
Contract ID: 25M00113
UACS: 310305102406000
Amount: ₱ 37,200,000.00
OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges
Project Name: Bugasan Br. (B02130MN) along Maharlika Highway (Cotabato-Lanao Rd)
Type of Work: Widening of Bridge
Physical Target:
From: 295.740 Square Meters
To: 572.400 Square Meters |
July 7, 2025 |
2025 |
|
SR2025-03-009507 |
March 17, 2025 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
AS PER GAA/ORIGINAL:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0797 + 660 - K0799 + 100
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 28.950 M
: 1.894 Lane Km
EAO P 1.050 M
Total P 30.00 M
AS MODIFIED:
Maharlika Highway (Sn Isidro-Sn Juanico Br) - K0790 + 200 - K0791 + 322
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 28.950 M
: 2.22 Lane Km
EAO P 1.050 M
Total P 30.00 M
|
July 7, 2025 |
2025 |
P00909520MN |
SR2025-02-001074 |
February 1, 2025 |
Region X |
Regional Office X |
P00909520MN
310103101893000
OO1:Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
FROM:
Jct SH Aglayan-Zamboanguita Rd - K1544 + 119 - K1549 + 109, K1554 + 462 - K1555 + 000, K1556 + 000 - K1557 + 029, K1564 + 146 - K1565 + 000, K1569 + 187 - K1570 + 000
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-17.396 Lane Km
Allocation:
Total: Php 164,300,000.00
CW1: Php 158,549,500.00
EAO: Php 5,750,500.00
TO:
Jct SH Aglayan-Zamboanguita Rd - K1544 + 119 - K1549 + 109, K1554 + 462 - K1555 + 000, K1556 + 000 - K1557 + 029, K1564 + 146 - K1564 + 841.53
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-14.527 Lane Km
Allocation:
Total: Php 164,300,000.00
CW1: Php 158,549,500.00
EAO: Php 5,750,500.00 |
July 7, 2025 |
2025 |
P00910049MN |
SR2025-02-001135 |
February 1, 2025 |
Region X |
Regional Office X |
P00910049MN
310204103126000
OO1:Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
FROM:
Sayre Highway Parallel Road II (Manolo Fortich-Valencia City Section) , Package 42, Bukidnon
Type of Work:
CW1-Construction of Concrete Road
Physical Target:
CW1-10.631 Lane Km
Allocation:
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00
TO:
Sayre Highway Parallel Road II (Manolo Fortich-Valencia City Section) , Package 42, Bukidnon
Type of Work:
CW1-Construction of Gravel Road
Physical Target:
CW1-18.520 Lane Km
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00 |
July 7, 2025 |
2025 |
P00910175MN |
SR2025-02-001099 |
February 1, 2025 |
Region X |
Regional Office X |
P00910175MN
310204102711000
OO1:Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
FROM:
Talakag Bypass Road, Bukidnon
Type of Work:
CW1-Off-Carriageway Improvement: Paving of Shoulders
CW2-Construction of Drainage Structure along Road
Physical Target:
CW1-6,511.628 Square meters
CW2-11,059.155 Square meters
Allocation:
Total: Php 65,000,000.00
CW1: Php 33,775,000.00
CW2: Php 28,950,000.00
EAO: Php 2,275,000.00
TO:
Talakag Bypass Road, Bukidnon
Type of Work:
CW1-Preventive Maintenance of Road : Asphalt Overlay
Physical Target:
CW1-5.708 Lane Km
Total: Php 65,000,000.00
CW1: Php 62,725,000.00
EAO: Php 2,275,000.00 |