Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
May 23, 2018 FY - 2018 WIN8F05494 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Mindoro Oriental District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

FROM:
Cadre Rd - (S00004MR ) Chainage 000 - Chainage 522

CW1: 1.044 lane Km ( Preventive Maintenance of Road:
Asphalt Overlay )
Allocation: 6,320,000 Php

TO:
Cadre Rd - ( S00004MR ) Chainage 000 - Chainage 340

CW1: .0680 Lane Km ( Preventive Maintenance of Road:
Asphalt Overlay )
Allocation: 6,320,000 Php

May 23, 2018 FY - 2018 WIN8F05489 FY - 2018 GAA DPWH Infra program December 19, 2017 Region IV-B Mindoro Oriental District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

FROM:
CSR Jct - Minas Rd
K0039+544 - K0039+649,
K0037+531 - K0038+204

CW1: 1.034 Lane Km ( Preventive Maintenance of Road:
Asphalt overlay )
Allocation: 6,259,000 Php

TO:
CSR Jct - Minas Rd
K0037+531 - K0038+202

CW1: 0.820 Lane Km ( Preventive Maintenance of Road:
Asphalt Overlay )
Allocation: 6,259,000 Php


May 23, 2018 FY 2018 WIN8G02191 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300202100001000
Project ID: P00230349LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Seaports - Access Road Leading to Bahao Port, Camarines Sur
Physical Target - CW1- Construction of Concrete Road/ 7.00 lane-km
Unit Cost: Php 20.68M/lane-km
Estimated Cost: Php 150.00M
(As Modified)
May 23, 2018 FY - 2018 WIN8F05499 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Mindoro Oriental District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

FROM:
CSR Jct - Pola Rd
K0065+914 - K0066+983

CW1: 2.088 Lane Km ( Preventive maintenance of Road:
Asphalt Overlay )
Allocation:12,645,000 Php

TO:
CSR Jct - Pola Rd
K0065+914 - K0066+748

CW1: 1.618 Lane Km ( Preventive Maintenance of Road:
Asphalt Overlay )
Allocation: 12,645,000 Php
May 23, 2018 FY 2018 WIN8G02164 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300204100015000
Project ID: P00230360LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones – Brgy. 3-Brgy. 4-Brgy.5 Road connecting Ligao-Pioduran Road and Albay West Coast Road in support to Agribusiness (Food Resource Based Processing) Pio-Duran, Albay
Physical Target - CW1 – Construction of Concrete Road/ 0.774 lane-km
CW2 - Construction of Road Slope Protection Structure/ 2,001.50 sq.m.
Unit Cost: CW1 – Php 25.444M /lane-km
CW2 – Php 23.910T/sq.m.
Estimated Cost: Php 70.0M
(As Modified)
May 23, 2018 FY 2018 WIN8G02161 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300203100061000
Project ID: P00230363LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Bulan-Matnog-Sta. Magdalena-Bulusan Road (Matnog Section) leading to Bulusan National Park, Sorsogon
Physical Target - CW1 – Construction of Concrete Road/ 4.54 lane-km
CW2 - Construction of Drainage Structure along Road/ 2,880.39 lm.
Unit Cost: CW1 – Php 17.373M /lane-km
CW2 – Php 12.82T/lm.
Estimated Cost: Php 120.0M
(As Modified)
May 23, 2018 FY - 2018 WIN8F05495 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Regional Office IV-B
002 - Protect Lives and Properties Against Major Floods

Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage Systems

FROM:
Construction of Flood Control Structure along
Busuanga River ( Pitogo Section ), Rizal,
Occidental Mindoro

CW1: - ( Construction of Flood Mitigation Structure
Allocation: 150,000,000 Php

TO:
Construction of Flood Control Structure along
Busuanga River ( Pitogo Section ), Rizal,
Occidental Mindoro

CW1: 1,740 lineal meters ( Construction of Flood Mitigation
Structure )
Allocation: 150,000,000 Php

May 23, 2018 FY 2018 WIN8G02170 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300203100111000
Project ID: P00230388LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Matnog-Sta. Magdalena-Bulusan Road leading to Bulusan National Park, Sorsogon
Physical Target - CW1 – Construction of Concrete Road/ 4.16 lane-km
CW2 - Construction of Drainage Structure along Road/ 508.10 lm.
Unit Cost: CW1 – Php 16.648M /lane-km
CW2 – Php 91.600T/lm.
Estimated Cost: Php 120.0M
(As Modified)
May 23, 2018 FY 2018 WIN8G02189 FY 2018 GAA R.A. 10964 December 29, 2017 Region V Regional Office V
UACS No.: 300203100113000
Project ID: P00230390LZ
Convergence and Special Support Program – Construction/Improvement of Access Roads leading to Declared Tourism Destinations – Naga City (del Rosario)–Cararayan–Langon–San Isidro-Carolina Road leading to Mt. Isarog Natural Park and Est Highland Tourism Zone, Brgy. Del Rosario, Naga City, Camarines Sur
Physical Target - CW1 – Road Widening/ 6.72 lane-km
CW2 - Construction of Drainage Structure along Road/ 5,699.74 sq.m.
Unit Cost: CW1 – Php 12.910M /lane-km
CW2 – Php 10.05T/sq.m.
Estimated Cost: Php 149.25M
(As Modified)
May 23, 2018 FY 2018 GAA WIN8C03035 FY 2018 GAA RA 10964 January 1, 2018 Region XI Regional Office XI

MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Secondary Roads
Nabunturan-Maragusan Rd incl. ROW – K1456 + 060 - K1458 + 400
Physical Target:
CW1: 4.680 Lane Km (Road Widening)
ROW: 35,100.00 sq. m.
Allocation:
TOTAL: P 169,171,000.00
CW1: P 158,067,000.00 (Road Widening)
ROW: P 5,183,015.00
EAO: P 5,920,985.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development Program
Road Widening – Secondary Roads
Nabunturan-Maragusan Rd incl. ROW – K1450 + 567 - K1450 + 810
K1453 + 061 - K1453 + 312, K1456 + 315 - K1457 + 581
Physical Target:
CW1: 1.277 Lane Km (Road Widening)
CW2: 0.486 Lane Km (Paving of Unpaved Roads)
CW3: 1.749 Lane Km (Reconstruction to Concrete Pavement)
ROW: 35,100.00 sq. m.
Allocation:
TOTAL: P 169,171,000.00
CW1: P 87,250,982.32 (Road Widening)
CW2: P 34,675,665.96 (Paving of Unpaved Roads)
CW3: P 36,140,351.72 (Reconstruction to Concrete Pavement)
ROW: P 5,183,015.00
EAO: P 5,920,985.00