SOUTHEAST METRO MANILA EXPRESSWAY (C6) PROJECT

Project Description: 
    • The Southeast Metro Manila Expressway (C6) Project is a a toll road project with approximately 32.664 km that is intended to run from Skyway/FTI in Taguig City to Batasan Complex in Quezon City. The project is divided into six sections namely:       

SEGMENT

SECTION

LENGTH (km.)

Segment 1

Section 1: Skyway/FTI - C5/Diego Silang

        • Section 1A: Skyway to FTI
        • Section 1B: FTI to C5/Diego Silang

2.387

Section 2: C5/Diego Silang - C6/Taguig

3.202

Section 3: C6/Taguig - Ortigas Ave. Ext.

11.783

Segment 2

Section 4: Ortigas Ave. Ext. - Marcos Highway

5.337

Section 5: Marcos Highway - Tumana Bridge

6.900

Section 6: Tumana Bridge - Batasan Complex

3.055

The general features of the Project are shown below:

Project Road Type                          : Combination of elevated and At-grade

Carriageway lanes                          : 2 x 3 lanes

Design speed expressway               : 80 kph (60 kph)

Rampway design speed                   : 40 kph

Number of ramps                              : 28

Project Objectives: 

The project aims to:

  • Connect the South Luzon Expressway (SLEX) Skyway via FTI towards Batasan Complex in Quezon City
Project Benefits: 

At the end of construction, the project is expected to:

  • Provide an alternate route from Parañaque to Quezon City passing thru the developing areas of Taguig, Taytay, Antipolo and San Mateo to decongest EDSA, C5 and other major arteries of Metro Manila and Rizal.
Project Concessionaire: 
  • Citra Intercity Tollways Inc. (CITI)
Project Cost: 

• PhP 31.32 Billion (based on Basic Design)
• PhP 45.29 Billion (based on Approved FED)

Project Status: 
  • Right-of-Way Acquisition ongoing.DPWH received TRB’s confirmation to proceed with the ROW Acquisition of properties not affected by the realignment of Section 1
  • For Section 3, ongoing acquisition of affected properties
  • Ongoing construction near C5 Road (Section 1B), Piers 61-67 77.208% completed

 

 

Project Alignment: 
Project Timeline: 

Construction Schedule:

Section 1: 2018 - 2022