June 27, 2017 |
2017 |
165003017100160 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 3rd District Engineering Office |
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes, Widening of Bridge - Burgos Br. (B01183LZ) along Daang Maharlika (LZ) |
June 23, 2017 |
FY 2017 |
WIN7E01746 |
UACS No. 103004010310052 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally-Funded Projects – LIP – Buildings and Other Structures-Multipurpose/Facilities – Construction of Bridge (RCBC)/Rehab along Buli Creek, Brgy. Pinagbuhatan, Pasig City [Construction of Multi-Purpose Bldg.]
UACS No. 103004010310052
Physical Target/Cost
Original: 1 bldg.
Unit Cost (‘000): P12,000.0/Bldg.
Allocation: P12,000.0
WIN7E01746
As Modified
Locally-Funded Projects – LIP – Buildings and Other Structures-Multipurpose/Facilities – Construction of Building at Barangay Dela Paz and Barangay Ugong, Pasig City [Construction of Multi-Purpose Bldg.]
UACS No. 103004010310052
Physical Target/Cost
New: 2 bldgs.
Unit Cost (‘000): P6,000.0/Bldg.
Estimated Cost: P12,000.0
WIN7E01746
|
June 23, 2017 |
FY 2017 |
WIN7E01747 |
UACS No. 103004010310057 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Magat Salamat Multi-Purpose Building, Barangay Concepcion Dos, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310057
Physical Target/Cost (‘000)
Original: 1 bldg.
Unit Cost (‘000): P3,000.0/bldg.
Allocation (‘000): P3,000.0
WIN7E01747
As Modified
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building at Barangay Concepcion Uno, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310057
Physical Target/Cost (‘000)
New: 1 bldg.
Unit Cost (‘000): P3,000.0/bldg.
Estimated Cost (‘000): P3,000.0
WIN7E01747
|
June 23, 2017 |
FY 2017 |
WIN7E01750 |
UACS No. 103004010310117 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Barangay Concepcion Uno Multi-Purpose Buildings, Barangay Concepcion Uno, Marikina City [Construction of Multi-Purpose Bldg.]
UACS No. 103004010310117
Physical Target/Cost (‘000)
Original: 1 bldg.
Unit Cost (‘000): P2,000.0/Bldg.
Allocation (‘000): P2,000.0
WIN7E01750
As Modified
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities – Construction/Completion of Marikit Multipurpose Buildings, Barangay Concepcion Uno, Marikina City [Construction of Multi-Purpose Bldg.]
UACS No. 103004010310117
Physical Target/Cost (‘000)
New: 1 bldg.
Unit Cost (‘000): P2,000.0/Bldg.
Estimated Cost (‘000): P2,000.0
WIN7E01750
|
June 23, 2017 |
FY 2017 |
WIN7E01748 |
UACS No. 103004010310077 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Rancho IV East Multi-Purpose Building, Brgy. Concepcion Dos, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310077
Physical Target/ Cost (‘000)
Original: 1 bldg.
Unit Cost (‘000): P2,000.0/bldg.
Alloc. (‘000): P2,000.0
WIN7E01748
As Modified
As per GAA
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Rancho IV East Multi-Purpose Building including site Development, Brgy. Concepcion Dos, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310077
Physical Target/ Cost (‘000)
New: 1 bldg.
Unit Cost (‘000): P2,000.0/bldg.
Est. Const. (‘000): P2,000.0
WIN7E01748
|
June 23, 2017 |
FY 2017 |
WIN7E01749 |
UACS No. 103004010310062 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building at Sagad Elementary School, Sagad, Pasig City [Construction of Multipurpose Building]
UACS No. 103004010310062
Physical Target/ Cost (‘000)
Original: 1 bldg.
Unit Cost (‘000): P3,000.0/bldg.
Allocation (‘000): P3,000.0
WIN7E01749
As Modified
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building at Eusebio Bliss, Brgy.Maybunga, Pasig City [Construction of Multipurpose Building]
UACS No. 103004010310062
Physical Target/ Cost (‘000)
New: 1 bldg.
Unit Cost (‘000): P3,000.0/bldg.
Estimated Cost (‘000): P3,000.0
WIN7E01749
|
June 23, 2017 |
FY 2017 |
WIN7E01752 |
UACS No. 292003020401765 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
MF0 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structure and Drainage System – Rehabilitation of Drainage System along Farmers 1, Brgy. Tumana, Marikina City 2nd LD [Construction of Drainage Structure]
UACS No. 292003020401765
Physical Target/ Cost (‘000)
Original: 2105 lm
Unit Cost (‘000): P9.501/lm
Allocation (‘000): P20,000.0
WIN7E01752
As Modified
MF0 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structure and Drainage System – Rehabilitation of Drainage System including laterals along Farmers 1, Brgy. Tumana, Marikina City 2nd LD [Construction of Drainage Structure]
UACS No. 292003020401765
Physical Target/ Cost (‘000)
New: 2105 lm
Unit Cost (‘000): P9.501/lm
Estimated Cost (‘000): P20,000.0
WIN7E01752
|
June 23, 2017 |
FY 2017 |
WIN7F04938 |
UACS No. 292003020401837 |
January 1, 2017 |
National Capital Region |
Metro Manila 2nd District Engineering Office |
As of GAA
MFO – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Drainage Structure – Upgrading of Drainage System along Kaingin Road, Brgy. Moonwalk, Parañaque City (Construction of Drainage Structure)
UACS No. 292003020401837
Physical Target/ Cost
Original: 480 lineal meters
Unit Cost: P25.000T/lineal meters
Allocation Cost: 12.00M
WIN7F04938
As Modified
MFO – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Drainage System along Orchid St., Road 5, Zinnia St, Cadena de Amor St., Waling-Waling St., Phase II, Brgy. Marcelo Green, Parañaque City, Metro Manila, Sta. 0+000 to Sta.0+520/ Sta.0+370 to Sta. 0+542 (Construction of Drainage Structure)
UACS No. 292003020401837
Physical Target/ Cost
Modified: 692 lineal meters
Unit Cost: P17.341T/lineal meters
Estimated Cost: 12.00M
WIN7F04938
|
June 23, 2017 |
2017 |
165003017100161 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 3rd District Engineering Office |
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes, Widening of Bridge - Marabulig Br. (B01187LZ) along Daang Maharlika (LZ) |
June 23, 2017 |
2017 |
165003017100162 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 3rd District Engineering Office |
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 Lanes, Widening of Bridge - Minante Br. (B01186LZ) along Daang Maharlika (LZ) |
June 23, 2017 |
2017 |
103004010310763 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 3rd District Engineering Office |
Buildings and Other Structures - Multipurpose/Facilities, Construction of Activity Center/Covered Court, Faustino Elementary School, Brgy. Faustino, Cauayan City, Isabela |
June 23, 2017 |
20117 |
165003016500001 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 2nd District Engineering Office |
National Road Network Services - Network Development - Improvement/Widening of National Roads - N1 - Road Widening - Bangag - Magapit Road - K0688+400 - K0689+900, K0694+000 - K0695+000 |
June 23, 2017 |
2017 |
165003030700087 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 2nd District Engineering Office |
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - To Seaports - Off-carriageway Improvement: Shoulder Paving/Construction - Access Road leading to Claveria Port (Off-carriageway Improvement), Sta. 0+000 - Sta. 0+300 |
June 22, 2017 |
FY 2017 |
WIN7F04878 |
UACS No. 292003020402043 |
January 1, 2017 |
National Capital Region |
South Manila District Engineering Office |
As per GAA
MFO-2, Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Drainage Structure – Drainage improvement Brgy. 862, 863 and 864 Zone 98 and vicinity, Pandacan, Manila City (Construction of Drainage Structure)
UACS No. 292003020402043
Physical Target/Cost
Original: 1,240 lineal meter
Unit Cost (P’000): P16.129T/lineal meter
Allocation Cost (P’000): P20,000
WIN7F04878
Modified
MFO-2, Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Drainage Structure – Drainage improvement Brgy. 860, 861, 862, 863 and 864 Zone 94 and vicinity, Pandacan, Manila City (Repair/Rehabilitation of Drainage Structures)
UACS No. 292003020402043
Physical Target/Cost
Modified: 1,240 lineal meter
Unit Cost (P’000): P16.129T/lineal meter
Estimated Cost (P’000): P20,000
WIN7F04878
|
June 22, 2017 |
FY 2017 |
WINF04890 |
UACS No. 103004010310104 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally Funded Projects: Local Infrastructure Program – Buildings and Other Structures – Multi-Purpose/ Facilities, Construction of Multi-Level Multipurpose Building, Barangay Bagong Tanyag, Taguig City (Construction of Multi-Purpose Building)
UACS No. 103004010310104
Physical Target/Cost
Per GAA/Original: 1 bldg.
Unit Cost: P2M/Bldg.
Allocation: Php 2M
WINF04890
As Modified
Locally Funded Projects: Local Infrastructure Program – Buildings and Other Structures – Multi-Purpose/ Facilities, Construction/Rehabiltation of Multi-Purpose Building, at Brgy. Bagong Tanyag, Taguig City (Rehabilitation/Major Repair Multi Purpose Building)
UACS No. 103004010310104
Physical Target/Cost
As Modified: 1 bldg.
Unit Cost: P2M/Bldg.
Estimated Cost: Php 2M
WINF04890
|
June 22, 2017 |
FY 2017 |
WIN7F04884 |
UACS No. 103004010309902 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally Funded Projects, VIILP – Buildings and Other Structures – Multipurpose/ Facilities: Construction of Multi-Purpose Building (Covered Court) at Rosario 5 & 6, Brgy. Sta. Lucia, Pasig City
UACS No. 103004010309902
Physical Target/Cost
Per GAA/Original: 1 bldg.
Unit Cost (P’000): P7,000.00/bldg..
Allocation: Php7.000M
WIN7F04884
As Modified
Locally Funded Projects, VIILP – Buildings and Other Structures – Multipurpose/ Facilities: Construction of Multi-Purpose Building at Rose Marie Lane, Brgy. Kapitolyo, Pasig City
UACS No. 103004010309902
Physical Target/Cost
As modified: 1 bldg.
Unit Cost (P’000): P7,000.00/bldg..
Estimated Cost: Php7.000M
WIN7F04884
|
June 22, 2017 |
FY 2017 |
WIN7F04881 |
UACS No. 103004010310084 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
Per GAA
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures – Multipurpose/ Facilities: Rehabiltation of Samahang Magkapitbahay Multi-Purpose Bldg., Brgy. Marikina Heights, Marikina City (Rehabilitation/ Major Repair Multi Purpose Building)
UACS No. 103004010310084
Physical Target/Cost
Per GAA/Original: 1 Bldg.
Unit Cost: P3M/bldg.
Allocation: P3M
WIN7F04881
As Modified
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures – Multipurpose/ Facilities: Construction of Samahang Magkakapitbahay Multi-Purpose Bldg., Brgy. Marikina Heights, Marikina City (Construction of Repair Multi Purpose Building)
UACS No. 103004010310084
Physical Target/Cost
As Modified: 1 Bldg.
Unit Cost: P3M/bldg.
Estimated Cost: P3M
WIN7F04881
|
June 22, 2017 |
FY 2017 |
WIN7F04880 |
UACS No. 103004010310061 |
January 1, 2017 |
National Capital Region |
NCR - Regional Office |
Per GAA
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures – Multipurpose/ Facilities: Construction of Multi Purpose Bldg. at Jenny’s Ave. Rosario, Pasig City (Construction of Multi-Purpose Building)
UACS No. 103004010310061
Physical Target/Cost
Per GAA/Original: 1 bldg
Unit Cost: P6M/bldg.
Allocation: P6M
WIN7F04880
As Modified
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures – Multipurpose/ Facilities: Construction of Multi-Purpose Building at Metrogreen Ville, Brgy. Sta. Lucia, Pasig City (Construction of Multi-Purpose Building)
UACS No. 103004010310061
Physical Target/Cost
Per GAA/Original: 1 bldg
Unit Cost: P6M/bldg.
Estimated Cost: P6M
WIN7F04880
|
June 22, 2017 |
FY 2017 |
WIN7F04899 |
UACS No. 103004010310056 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally Funded Projects – LIP, Buildings and Other Structures – Multipurpose/Facilities: Construction of H. Bautista Elem School Multi-Purpose Bldg. including site de, Brgy. Concepcion, Marikina City (Construction of Multi Purpose Building)
UACS No. 103004010310056
Physical Target/Cost
Original: 1 building
Unit Cost (P’000): P2,000/building
Allocation Cost (P’000): P2,000
WIN7F04899
Modified
Locally Funded Projects – LIP, Buildings and Other Structures – Multipurpose/Facilities: Construction of Multi-Purpose Bldg. including site Development at Tierra Vista, , Brgy. Nangka, Marikina City (Construction of Multi-Purpose Building)
UACS No. 103004010310056
Physical Target/Cost
Modified: 1 building
Unit Cost (P’000): P2,000/building
Estimated Cost (P’000): P2,000
WIN7F04899
|
June 22, 2017 |
FY 2017 |
WIN7F04887 |
UACS No. 103004010310098 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally Funded Projects – LIP, Buildings and Other Structures – Multipurpose/ Facilities: Construction of Multi Building (Phase I), Barangay San Roque, Taguig City (Construction of Multi Purpose Building)
UACS No. 103004010310098
Physical Target / Cost
Original: 1 building
Unit Cost (P’000): P10,000/building
Allocation Cost (P’000): P10,000.00
WIN7F04887
Modified
Locally Funded Projects – LIP, Buildings and Other Structures – Multipurpose/ Facilities: Construction of Multi Building (Phase I), Barangay San Roque, Pateros, Pateros-Taguig City (Construction of Multi Purpose Building)
UACS No. 103004010310098
Physical Target / Cost
Original: 1 building
Unit Cost (P’000): P10,000/building
Estimated Cost (P’000): P10,000.00
WIN7F04887
|
June 22, 2017 |
FY 2017 |
WIN7F04901 |
UACS No. 103004010310136 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally Funded Projects – LIP, Buildings and Other Structures – Multi-Purpose Building/ Facilities, Construction of Multi-Purpose Building, Philippine Army Headquarters, Fort Bonifacio, Taguig City (Construction of Multi-Purpose Building)
UACS No. 103004010310136
Physical Target / Cost
Original: 1 building
Unit Cost (P’000): P5,000/building
Allocation Cost (P’000): P5,000.00
WIN7F04901
Modified
Locally Funded Projects – LIP, Buildings and Other Structures – Multi-Purpose Building/ Facilities, Rehabilitation of Multi-Purpose Building, Philippine Army Headquarters, Fort Bonifacio, Taguig City (Rehabilitation/Major Repair of Multi-Purpose Building)
UACS No. 103004010310136
Physical Target / Cost
Original: 1 building
Unit Cost (P’000): P5,000/building
Estimated Cost (P’000): P5,000.00
WIN7F04901
|
June 22, 2017 |
FY 2017 |
WIN7F04894 |
UACS No. 292003020401756 |
January 1, 2017 |
National Capital Region |
NCR - Regional Office |
As per GAA
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Mitigation Structure –Improvement of Creek Bed along Buli Creek, Brgy. Pinagbuhatan and Brgy. San Miguel, Pasig City (Construction of Flood Mitigation Structure)
UACS No. 292003020401756
Physical Target/ Cost
Original: 792 lineal meter
Unit Cost (P’000): P20,202T/lineal meter
Allocation Cost (P’000): P16,000
WIN7F04894
Modified
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structure and Drainage Systems: – Improvement of Creek Bed and Rehabilitation of Slope Protection along Buli Creek, Pasig City (Rehabilitation/Major Repair of Slope Protection Structure)
UACS No. 292003020401756
Physical Target/ Cost
Original: 792 lineal meter
Unit Cost (P’000): P24.502T/lineal meter
Estimated Cost (P’000): P16,000
WIN7F04894
|
June 22, 2017 |
CY 2017 |
WIn7E01550 |
GAA CY 2017 RA 10924 |
November 29, 2016 |
Region IV-B |
Palawan 2nd District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Road Upgrading (Unpaved to Paved )
based on Gravel Road Strategies, Traffic
Benchmark for Upgrading to Paved Road
Standards (HDM-4 Project Analysis)
- Secondary Road
Aramaywan - Berong - Puerto Princesa Road
K0176+(-1033) - K0176+(-878),
K0181+906 - K0182+000,
K0186+801 - K0186+1030,
K0197+960 - K0199+829
L = 4.612 lane km
Php = 100.00 Million
( Road Upgrading Gravel to Paved )
|
June 22, 2017 |
CY 2017 |
WIN7E01549 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Palawan 2nd District Engineering Office |
as MODIFIED:
MF03 - Construction and Maintenance Services of
Other Infrastructure
- Construction/Improvement of Access Roads
leading to Declared Tourism Destination
Balabac Circumferential Road
Catagupan-Melville Lighthouse Road
Sta. 10+545.54 - Sta. 13+593.54
Balabac, Palawan
L = 6.096 lane km
Php = 100.00 Million
( Construction of Concrete Road ) |
June 22, 2017 |
CY 2017 |
UACS # 165003015800380 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Palawan 2nd District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Road Upgrading (Unpaved to Paved) based on
Gravel Road Strategies, Traffic Benchmark for
Upgrading to Paved Road Standards
( HDM-4 Project Analysis) - Tertiary Road
Road Upgrading (Unpaved to Paved)
( Panalingaan - Tagbita - Latud)
K0256+561 - K0256+630,
K0257+815 - K0258+900,
K0259+093 - K0260+530
( Road Upgrading Gravel to Paved )
L = 5.276 lane km
Php = 100.00 Million
|
June 22, 2017 |
2017 |
WIN7F04868 |
FY 2017 GAA |
January 1, 2016 |
Region III |
Bulacan 1st District Engineering Office |
VIILP - Roads and Bridges - Local Roads - Construction / Rehabilitation / Improvement of Roads leading to NHA's Resettlement Site, Poblacion, Pandi, Bulacan |
June 22, 2017 |
2017 |
WIN7F04838 |
SR2017-01-000204 |
January 27, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-1 National Road Network Services, Asset Preservation Of National Roads — Rehabilitation/ Reconstructjon of National
Roads with Slips, Slope Collapse, and Landslide — Tertiary Construction of Road Slope Protection Structure - Sn Pascual-Claveria Rd
Physical Target: 8,492.5 Sq.m.
Unit Cost (P'000): P9.37/Sq.m.
Allocation (P'000): PhP 79,592
As MODIFIED:
MFO-1 National Road Network Services, Asset Preservation Of National Roads — Rehabilitation/ Reconstructjon of National
Roads with Slips, Slope Collapse, and Landslide — Tertiary Construction of Road Slope Protection Structure - Rehabilitation of Concrete Road - Construction of Drainage Structure along Road - Sn Pascual-Claveria Rd
Physical Target:
Const.of Road Slope Protection Structure -
8,443.60 Sq.m.
Rehab. of Concrete Road - 1.124 Lane Km
Const. of Drainage Structure along Road -
3,059.6 Lin.m.
Unit Cost (P'000):
Const.of Road Slope Protection Structure -
P4.203/Sq.m.
Rehab. of Concrete Road - P21,872.776/
Lane Km
Const. of Drainage Structure along Road -
P6.392/Lin.m.
Estimated Cost (P'000): PhP 79,592 |
June 22, 2017 |
2017 |
WIN7F04805 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 1st District Engineering Office |
Network Development - Off-Carriageway Improvement including drainage - Tertiary - Off-Carriageway Improvement including Drainage Cabanatuan City - Carmen Road
K0129+-570 - K0130+000. K0135+542 - K0135+941, K0138+000 - K0141+000 |
June 22, 2017 |
2017 |
WIN7F04859 |
SR2017-01-000274 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO 1 — National Road Network Services - Network Development Construction of By-passes/ Diversion Roads, including ROW :
1. Construction of Concrete Bridge - Camarines Sur-Albay Diversion Road, including Bridge and ROW, Camarines Sur (Construction of Concrete Bridge)
2. Construction of Concrete Road - Camarines Sur-Albay Diversion Road, including Bridge and ROW, Camarines
Sur (Construction of Concrete Road)
3. ROW Acquisition Camarines Sur-Albay Diversion Road, including Bridge and ROW, Camarines Sur (ROW Acquisition)
Physical Target:
Bridge - 183 Sq.m.
Road - 6.66 Lane-km
ROW Acquisition - 20,000 Sq.m.
Unit Cost (P'000):
Bridge - P10,929/Sq.m.
Road - P22,523/Lane-km
ROW Acquisition - P1.50/Sq.m.
Allocation Cost (P'000): Php 200,000
As MODIFIED:
MFO 1 — National Road Network Services - Network Development - Construction of By-Passes/ Diversion Roads, including ROW : Camarines Sur-Albay Diversion Road, including Bridge and ROW, Camarines Sur Sta. 437 + 407.39 - Sta 439 + 800 (Construction of Concrete Road) (ROW Acquisition)
Physical Target:
Road - 4.7997 Lane-km
ROW Acquisition - 47,998 Sq.m.
Unit Cost (P'000):
Road - P39,169/Lane-km
ROW Acquisition - P0.250/Sq.m.
Estimated Cost (P'000): Php 200,000
|
June 22, 2017 |
2017 |
WIN7F04806 |
SR2017-01-000520 |
January 28, 2017 |
Region V |
Regional Office V |
MFO 3 - Construction and Maintenance
Infrastructure - Construction/ of Access Roads leading Seaports, and Declared Destinations - to
Seaports:
1. Construction of Concrete Road - Guinobatan-Jovellar-Donsol Road leading to Pilar Port, including ROW and Bridge, Albay (Constructjon of Concrete Road)
2. Construction of Concrete Bridge - Guinobatan-JoveIIar-Donsol Road leading to Pilar Port, including ROW and Bridge, Albay P00130506LZ (Construction of Bridge)
3. ROW Acquisition - Guinobatan-Jovellar-Donsol Road leading to Pilar Port, including ROW and Bridge, Albay (ROW Acquisition)
Physical Target:
Road - 3.600 lane-km
Bridge - 366 sq.m.
ROW Acquisition - 4,000 sq.m.
Unit Cost (P'000):
Road - P30,000/lane-km
Bridge - P109.290T/sq.m.
ROW Acquisition - P0.50T/sq.m.
Estimated Cost (P'000): PhP150,000
MFO 3 —Construction and
Maintenance of Other Infrastructure
Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations — to Seaports : Construction of Concrete Road - Construction of
Concrete Bridge - ROW Acquisition Guinobatan-Jovellar-Donsol Road leading to Pilar Port, including ROW and Bridge, Albay
(Construction of Concrete Road)
(Construction of Concrete Bridge)
(ROW Acquisition)
Physical Target:
Road - 2.80098 lane-km
Bridge - 1,341.324 sq.m.
ROW Acquisition - 52,092 sq.m.
Unit Cost (P'000):
Road - P25,319/lane-km
Bridge - P58.214T/sq.m.
ROW Acquisition - P0.02T/sq.m.
Estimated Cost (P'000): PhP150,000
|
June 22, 2017 |
2017 |
WIN7F04804 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 1st District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads – Construction of Roads, Sta. Maria, Licab, Nueva Ecija |
June 22, 2017 |
2017 |
WIN7F04840 |
FY 2017 GAA |
February 1, 2017 |
Region III |
Nueva Ecija 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Rehabilitation of Flood Control Dikes along Banco River, San Esteban, Sta. 5+260 - Sta. 5+412.00, Rizal, Nueva Ecija |
June 22, 2017 |
GAA FY 2017 |
WIN7G01561 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary
Construction of Road Slope Protection Structure - Kapalong-Talaingod-Valencia (Bukidnon) Road -
K1515+(-)130 - K1515+(-)016.60, K1515+703 - K1515+726.70, K1516+245 - K1516+286, K1518+(-)215.40 - K1518+(-)184.50,
K1531+870-K1531+945, K1533+320 - K1533+370, K1533+430 - K1533+480
TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary
Rehabilitation/Reconstruction of National Road With Slips, Slope Collapse and Landslides Along Kapalong-Talaingod-Valencia (Bukidnon) Road, Davao del Norte
K1514+851.000 - K1514+969.000, K1515+706.250 - K1515+728.750, K1517+787.425 - K1517+811.275, K1524+540.000 - K1524+800.000
ALLOCATION: Php 112.000 Million |
June 22, 2017 |
GAA FY 2017 |
WIN7G01567 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary
Construction of Road Slope Protection Structure - Kapalong-Talaingod-Valencia (Bukidnon) Road -
K1486+(-)081 - K1486+(-) 065, K1495+064 - K1495+100, K1495+(-)612 - K1495+(-)394, K1496+075 - K1496+120, K1500+(-)173 - K1500+(-)150,
K1500+220 - K1500+276.50, K1503+120 - K1503+258.40, K1508+563.50 - K1508+590, K1513+240 - K1513+270
TO: Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary
Rehabilitation/Reconstruction of National Road With Slips, Slope Collapse and Landslides Along Kapalong-Talaingod-Valencia (Bukidnon) Road, Davao del Norte
K1485+923.619-K1485+933.619, K1494+460.000-K1494+560.000, K1496+078.750-K1496+122.621, K1498+178.875-K1498+261.025, K1499+828.075-K1499+851.925, K1500+495.500-K1500+504.500,
K1501+695.750-K1501+709.250, K1502+588.750-K1502+611.250, K1503+125.719-K1503+288.470, K1508+597.100-K1508+610.600, K1513+200.000-K1513+300.000
ALLOCATION: Php 116.000 Million |
June 22, 2017 |
FY 2017 |
WIN7E01763 |
UACS No. 103004010309908 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally-Funded Projects – VIILP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building including Site Development, Brgy. Parang, Marikina City [Construction of Multi-Purpose Bldg]
UACS No. 103004010309908
Physical Target/ Cost
Original: 1 bldg.
Unit Cost (‘000): P11,000.0/Bldg.
Allocation (‘000): P11,000.0
WIN7E01763
New
Locally-Funded Projects – VIILP – Buildings and Other Structures – Multipurpose/Facilities – Construction/Rehabilitation of Multi-Purpose Building including Site Development, Brgy. Parang, Marikina City [Rehabilitation/Major Repair of Multi-Purpose Building]
UACS No. 103004010309908
Physical Target/ Cost
New: 4 bldgs.
Unit Cost (‘000): P2,750.0/Bldg.
Estimated Cost (‘000): P11,000.0
WIN7E01763
|
June 22, 2017 |
FY 2017 |
WIN7E01757 |
UACS No. 103004010310071 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally-Funded Projects – LIP – Buildings and Other Structures Multipurpose/Facilities-Construction of Multi-Purpose Building, Sto. Niño, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310071
Physical Target/Cost (‘000)
Original: 1 bldg.
Unit Cost (‘000): P3,000.0/bldg..
Allocation (‘000): P3,000.0
WIN7E01757
As Modified
Locally-Funded Projects – LIP – Buildings and Other Structures Multipurpose/Facilities-Construction of 2 units Multi-Purpose Building, Sto. Niño, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310071
Physical Target/Cost (‘000)
New: 2 bldgs.
Unit Cost (‘000): P1,500.0/bldg..
Estimated Cost (‘000): P3,000.0
WIN7E01757
|
June 22, 2017 |
FY 2017 |
WIN7E01765 |
UACS No. 103004010310126 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities-Construction of Multi-Purpose Building, Barangay Tumana, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310126
Physical Target/Cost (‘000)
Original: 1 bldg.
Unit Cost (‘000): P1,000.0/bldg.
Allocation (‘000): P1,000.0
WIN7E01765
As Modified
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities-Construction of Multi-Purpose Building @ Nangka ES, Barangay Nangka, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310126
Physical Target/Cost (‘000)
New: 1 bldg.
Unit Cost (‘000): P1,000.0/bldg.
Estimated Cost (‘000): P1,000.0
WIN7E01765
|
June 22, 2017 |
FY 2017 |
WIN7E01538 |
FY 2017 APPROVED MODIFICATION |
April 20, 2017 |
Cordillera Administrative Region |
Apayao 1st District Engineering Office |
From: MFO-1: National Road Network Services, Construction and Maintenance of Bridges along National Roads - Construction of New Permanent Bridges, Baratan Bridge along Apayao-Ilocos Norte (Construction of Concrete Bridge)
Physical Target = 270.00 sq. m.
To: MFO-1: National Road Network Services, Construction and Maintenance of Bridges along National Roads - Construction of New Permanent Bridges Baratan Bridge along Apayao-Ilocos Norte (Construction of Concrete Bridge)
Physical Target = 286.20 sq. m.
|
June 22, 2017 |
FY 2017 |
WIN7E01714 |
FY 2017 APPROVED MODIFICATION |
May 11, 2017 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: MFO-1 National Road Network Services, Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Banaue Hungduan-Benguet Bdry Rd - K0360+030 - K0360 + 048, K0360 + 080 - K0360+200, K0360 + 090 - K0360 +115, K0361 + 500 - K0361 + 600, K0361 + 850 - K0361 + 918, K0362 + 550 - K0362 + 670, K0363 + 140 - K0363 + 172, K0363 + 200 - K0363 + 260, K0366 + 900 - K0366 + 950, K0367 + 200 - K0367 + 240, K0367 + 850 - K0367 + 870, K0369 + 450 - K0369 + 500, K0369 + 650 - K0369 + 695 (Construction of Road Slope Protection Structure)
Physical Target = 9,617.50 sq. m.
To: MFO-1 National Road Network Services, Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Banaue Hungduan-Benguet Bdry Rd - K0360+022 - K0360 + 043, K0360 + 089 - K0360+144 (LS) , K0360 + 080 - K0360 +195.50 (R.S.), K0361 + 418 - K0361 + 500, K0361 + 512 - K0361 + 534, K0361 + 747 - K0361 + 838, K0362 + 368 - K0362 + 517, K0363 + 098 - K0363 + 136, K0363 + 141 - K0363 + 200, K0366 + 814 - K0366 + 873, K0367 + 200 - K0367 + 260, K0367 + 594 - K0367 + 614, K0369 + 314 - K0369 + 372, K0369 + 525 - K0369 + 571 (Construction of Road Slope Protection Structure)
Physical Target = 8,841.19 sq. m
|
June 22, 2017 |
FY 2017 |
165003014300270 |
FY 2017 APPROVED MODIFICATION |
January 27, 2017 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From:MFO-1 National Road Network Services, Asset Preservation of National Roads - Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-4 (HDM-4)- Tertiary: Reconstruction from Concrete to Concrete- Kiangan-Tinoc-Buguias Rd-Ch. 3417-Ch.3967, Ch. 3967-Ch.4147, Ch.4147- Ch.6147 (Reconstruction from Concrete to Concrete)
Physical Target = 5.46 lane-km
To: MFO-1 National Road Network Services, Asset Preservation of National Roads - Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-4 (HDM-4)- Tertiary- Kiangan-Tinoc-Buguias Rd-Ch. 3417-Ch.3967, Ch. 3967-Ch.4147, Ch.4147- Ch.5607 (Rehabilitation of Concrete Road)
Physical Target=3.692 lane-km
|
June 22, 2017 |
FY 2017 |
165003014200206 |
FY 2017 APPROVED MODIFICATION |
January 27, 2017 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: "MFO-1 National Road Network Services, Asset Preservation of National Roads - Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-4 (HDM-4)- Secondary: Reconstruction from Asphalt to Concrete- Nueva Vizcaya-Ifugao-Mt Province Rd –
K0314+000 - K0314+870, K0324+025 - K0324+738 (Reconstruction from concrete to concrete) (Reconstruction from asphalt to concrete)
Physical Target = 3.166 lane-km
To: "MFO-1 National Road Network Services, Asset Preservation of National Roads - Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-4 (HDM-4)- Secondary- Nueva Vizcaya-Ifugao-Mt Province Rd –
K0314+000 - K0314+776, (Concrete to concrete) K0324+025 - K0324+489 (Asphalt to concrete) (Reconstruction from concrete to concrete) (Reconstruction from asphalt to concrete)
Physical Target = 2.48 lane-km
|
June 22, 2017 |
FY 2017 |
WIN7E01627 |
FY 2017 APPROVED MODIFICATION |
May 3, 2017 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: "MFO2 - Flood Management Services -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment & Embankment Dike, and Channeling/Widening along Chico River, Kalinga [Construction of Flood Mitigation Structure]
To: "MFO2 - Flood Management Services -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment & Embankment Dike, and Channeling/Widening along Chico River, Kalinga [Construction of Flood Mitigation Structure]"
Physical Target = 1,000 lm
|
June 22, 2017 |
FY 2017 |
WIN7E01625 |
FY 2017 APPROVED MODIFICATION |
May 3, 2017 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: MFO2 - Flood Management Services -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Tulyao Flood Control – Tulyao, Tabuk City, Kalinga [Construction of Flood Mitigation Structure]
To:MFO2 - Flood Management Services -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Tulyao Flood Control – Tulyao, Tabuk City, Kalinga [Construction of Flood Mitigation Structure]
Physical Target = 480 lm
|
June 22, 2017 |
FY 2017 |
WIN7E01604 |
FY 2017 APPROVED MODIFICATION |
May 3, 2017 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: MFO2 - Flood Management Services -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Aliganggang Flood Control, Lower, Lubo, Tanudan along Tanudan River, Kalinga [Construction of Flood Mitigation Structure]
To: MFO2 - Flood Management Services -Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Aliganggang Flood Control, Lower, Lubo, Tanudan along Tanudan River, Kalinga [Construction of Flood Mitigation Structure]
Physical Target= 150 lm |
June 22, 2017 |
FY 2017 |
WIN7F04624 |
FY 2017 APPROVED MODIFICATION |
May 15, 2017 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: MFO-2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Bangad Flood Control along Chico River, Kalinga (Construction of Revetment)
Physical Target = 800 Lm
To: MFO-2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Bangad Flood Control along Chico River, Kalinga (Construction of Revetment)
Physical Target = 261.29 Lm |
June 22, 2017 |
FY 2017 |
WIN7E01712 |
FY 2017 APPROVED MODIFICATION |
May 15, 2017 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: MFO-2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Lup-Lupa Flood Control, Kalinga (Construction of Revetment)
Physical Target = 800 Lm
To: MFO-2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Lup-Lupa Flood Control, Kalinga (Construction of Revetment)
Physical Target = 428.50 Lm |
June 22, 2017 |
FY 2017 |
WIN7F04770 |
FY 2017 APPROVED MODIFICATION |
May 23, 2017 |
Cordillera Administrative Region |
CAR - Regional Office |
From: MFO 1 - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide- Tertiary - Banaue- Hungduan-Benguet Bdry Rd - K0347+945-K0347+960, K0348+036-K0348+083, K0348+095-K0348+122, K0348+160-K0348+266, K0348+303-K0348+472, K0348+890-K0348+905, K0350+596-K0350+606, K0350+591-K0350+606 (Construction of Road Slope Protection Structure)
Physical Target = 3,996 sq.m.
To: MFO 1 - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide- Tertiary - Banaue- Hungduan-Benguet Bdry Rd - K0347+750-K0347+783, K0347+830-K0347+845, K0348+722-K0348+768, K0348+803-K0348+846, K0348+846-K0348+905, K0349+231-K0349+472, K0350+594-K0350+615, K0350+596-K0351+000, K0350+615-K0350+683, K0350+683-K0350+717, K0350+735+K0350+770, K0350+873-K0350+888, K0351+020-K0351+040, K0351+040-K0351+088, K0351+088-K0351+147, K0352+155-K352+188, K0352+188-K0352+202, K00352+209-K0352+235, K0352+231-K0352+256, K0352+260-K0352+314, K0352+559-K0352+585, K0352+608-K0352+649, K0352+649-K0352+721, K0352+857-K0352+865, K0352+865-K0352+904
Physical Target = 6,834 sq.m. |
June 22, 2017 |
FY 2017 |
WIN7F04772 |
FY 2017 APPROVED MODIFICATION |
May 23, 2017 |
Cordillera Administrative Region |
CAR - Regional Office |
From: MFO 1 - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide- Tertiary - Banaue- Hungduan-Benguet Bdry Rd - K0342+517 - K0342+529, K0342+560 - K0342+570, K0343+788 - K0343+818, K0343+910 - K0343+923, K0343+966 - K0343+976, K0343+1000 - K0343+1030, K0345+117 - K0345+230, K0345+203 - K0345+226, K0345+508 - K0345+530, K0345+508 - K0345+620, K0345+562 - K0345+594, K0346+508 - K0346+586, K0346+592 - K0346+662, K0346+744 - K0346+760, K0346+840 - K0346+855, K0346+840 - K0346+924
Physical Target = 6,016 sq.m.
To: MFO 1 - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide- Tertiary - Banaue- Hungduan-Benguet Bdry Rd- K0342+517 - K0343+852.50, K0343+910 - K0343+940, K0343+966 - K0343+1030, K0343+1336 - K0343+1403, K0345+007 - K0345+020, K0345+203-K0345+226, K0345+508 - K0345+620, K0346+260 - K0346+292, K0346+510 - K0346+554, K0346+839 - K0346+860
Physical Target = 8,022.65 sq. m. |
June 22, 2017 |
GAA FY 2017 |
WIN7G01564 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Construction of Flyovers/Interchanges/Underpasses
Construction of Bridge - Tagum City Flyover along Davao-Agusan Road, Davao del Norte
TO: MFO 1 - National Road Network Services
Network Development - Construction of Flyovers/Interchanges/Underpasses
Construction of Tagum City Flyover along Agusan-Davao Agusan Road, Tagum City, Davao del Norte
ALLOCATION: Php 300.000 Million |
June 22, 2017 |
FY 2017 |
WIN7E01758 |
UACS No. 103004010310123 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities-Construction of Multi-Purpose Building, Brgy. Marikina Heights, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310123
Physical Target/ Cost (‘000)
Original: 1 bldg.
Unit Cost (‘000): P3,000.0/bldg.
Allocation (‘000): P3,000.0
WIN7E01758
As Modified
Locally-Funded Projects – LIP – Buildings and Other Structures – Multipurpose/Facilities-Construction of Herbosa Multi-Purpose Building, Brgy. Parang, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010310123
Physical Target/ Cost (‘000)
New: 1 bldg.
Unit Cost (‘000): P3,000.0/bldg.
Estimated Cost (‘000): P3,000.0
WIN7E01758
|
June 22, 2017 |
FY 2017 |
WIN7E01764 |
UACS No. 103004010309904 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
Locally-Funded Projects – VIILP – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building including Site Development , Brgy. Concepcion Dos, Marikina City [Construction of Multipurpose Building]
UACS No. 103004010309904
Physical Target/ Cost (‘000)
Original: 1 bldg.
Unit Cost (‘000): P22,000.0/bldg.
Allocation (‘000): P22,000.0
WIN7E01764
New
Locally-Funded Projects – VIILP – Buildings and Other Structures – Multipurpose/Facilities – Construction/Rehabilitation of Multi-Purpose Building including Site Development , Brgy. Nangka, Marikina City [CW1 - Construction of Multipurpose Building][CW2-Rehabilitation/Major Repair of Multi-Purpose Building]
UACS No. 103004010309904
Physical Target/ Cost (‘000)
New: CW1 - 8 bldgs.
CW2 – 1 bldgs.
Unit Cost (‘000): CW1 - P2,612.50/bldg.
CW2 – P1,100.0/bldg.
Estimated Cost (‘000): P22,000.0
CW1-P20,900.0
CW2-P1,100.0
WIN7E01764
|
June 22, 2017 |
GAA FY 2017 |
WIN7G01569 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Locally-Funded Projects
LIP - Buildings and Other Structures - Multipurpose/Facilities
Completion and Improvement of Multipurpose Building (Brgy. Hall), Sumimao, Davao City
TO: Locally-Funded Projects
LIP - Buildings and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building (Brgy. Hall), Sumimao, Davao City
ALLOCATION: Php 3.500 Million
|
June 22, 2017 |
GAA FY 2017 |
WIN7G01570 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Locally-Funded Projects
LIP - Building and Other Structures - Multipurpose/Facilities
Construction of Activity Center/Covered Court, Barangay Aliongto, Davao City
TO: Locally-Funded Projects
LIP - Building and Other Structures - Multipurpose/Facilities
Construction of Activity Center/Covered Court, Barangay Angliongto, Davao City
ALLOCATION: Php 5.000 Million |
June 22, 2017 |
GAA FY 2017 |
WIN7G01571 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Locally-Funded Projects
LIP - Buildings and Other Structures - Multipurpose/Facilities
Repair/Rehabilitation of Building Project, Bucana 76-A, Davao City
TO: Locally-Funded Projects
LIP - Buildings and Other Structures - Multipurpose/Facilities
Completion of Building Project, Bucana 76-A, Davao City
ALLOCATION: Php 3.000 Million |
June 22, 2017 |
GAA FY 2017 |
WIN7G01563 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Locally-Funded Projects
LIP - Roads and Bridges - National Roads
Rehabilitation of Brgy. Road connecting Prk. 8, 10, 13, 2-A, Barangay Sampao (Length: 2 km.), Kapalong, Davao del Norte
TO: Locally-Funded Projects
LIP - Roads and Bridges - Local Roads
Rehabilitation of Brgy. Road connecting Prk. 1, 2, 2-A, 3 & 10, Barangay Sampao (Length: 2.9155 km.), Kapalong, Davao del Norte
ALLOCATION: Php 24.000 Million |
June 22, 2017 |
GAA FY 2017 |
WIN7G01566 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Locally-Funded Projects
LIP - Buildings and Other Structures - School Buildings
Construction of One-Storey 2 Classrooms at Don Ricardo Briz ES, Brgy. Magugpo East, Tagum City, Davao del Norte
TO: Locally-Funded Projects
LIP - Buildings and Other Structures - School Buildings
Completion of One-Storey 2 Classrooms at Don Ricardo Briz ES, Brgy. Magugpo East, Tagum City, Davao del Norte
ALLOCATION: Php 1.000 Million
|
June 22, 2017 |
GAA FY 2017 |
WIN7G01568 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Locally-Funded Projects
LIP - Buildings and Other Structures - Multipurpose/Facilities
Improvement of Two-Storey Barangay Hall, Brgy. Madaum, Tagum City, Davao del Norte
TO: Locally-Funded Projects
LIP - Buildings and Other Structures - Multipurpose/Facilities
Construction of Two-Storey Barangay Hall, Brgy. Madaum, Tagum City, Davao del Norte
ALLOCATION: Php 2.500 Million
|
June 22, 2017 |
2017 |
WIN7F04860 |
SR2017-01-000283 |
January 28, 2017 |
Region III |
Regional Office III |
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations
-to Declared Tourism Destinations
Clark-Bamban-Capas Access Road leading to Clark City including bridge, Tarlac
(CW-1: Construction of Concrete Road)
(CW-2: Construction of Concrete Bridge) |
June 22, 2017 |
2017 |
WIN7F04874 |
SR2017-01-000272 |
January 28, 2017 |
Region III |
Regional Office III |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Almacen River Improvement Project, Hermosa and Orani, Bataan
(Construction of Flood Mitigation Structure) |
June 22, 2017 |
2017 |
165003017100015 |
SR2017-01-000254 |
January 27, 2017 |
Region III |
Regional Office III |
Construction and Maintenance of Bridges along National Roads
Widening of Permanent Bridges to more than 2 lanes
Barangobong Br. 1 (B01364LZ) along Paniqui-Camiling-Wawa Rd
(Widening of Bridge) |
June 21, 2017 |
CY 2017 |
WIN7E01732 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Romblon District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Construction/Upgrading/Rehabilitation of
Drainage along National Roads
- Secondary Roads
Tablas Circumferential Road
K0084+000 - K0090+210,
K0120+920 - K0124+010.11,
K0128+000 - K0129+020,
L = 20,640 lm
Php = 94.00 Million
( Construction of Drainage Structure along Road ) |
June 21, 2017 |
CY 2017 |
WIN7E01733 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Romblon District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Off-Carriageway Improvement including Drainage
- Secondary Roads
Sibuyan Circumferential Road
K0014+878.40 - K0015+680,
K0015+680 - K0016+000,
K0016+000 - K0016+515,
K0016+715 - K0016+900,
K0017+410 - K0017+983,
K0018+180 - K0018+240,
K0018+280 - K0018+730,
K0020+056 - K0020+725,
K0053+000 - K0053+900,
K0054+280 - K0054+450,
K0055+000 - K0056+132.25,
K0056+140 - K0057+343,
K0058+000 - K0060+560
CW1 = 28,985.67 sq.m.
Php = 47.00 Million |
June 21, 2017 |
CY 2017 |
WIN7E01734 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Romblon District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Rehabilitation/Reconstruction/Upgrading
- Secondary Roads
Tablas Circumferential Road
K0035+672 - K0036+458,
K0072+800 - K0072+900,
K0084+315 - K0084+562,
K0098+000 - K0098+128.50,
K0114+000 - K0114+300,
K0115+200 - K0115+360,
K0116+220 - K0116+360,
K0116+673.93 - K0116+820,
K0118+052 - K0118+600,
K0120+000 - K0120+560,
K0124+078.90 - K0124+620,
K0127+600 - K0128+020
CW1 = 7.647 lane km
CW2 = 0.494 lane km
Php CW1 = 85.371 Million
Php CW2 = 5.512 Million
Total = Php 90.883 Million |
June 20, 2017 |
FY 2017 |
WIN7E01753 |
UACS No. 292003020401761 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA
MFO -2 Flood Management Services: Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, - Improvement of Ermitaño Creek, Brgy. Salapan, San Juan City (Construction of Flood Mitigation Structure)
UACS No. 292003020401761
Physical Target:
Per GAA/Original: 600 lm
Unit Cost: P33,333.33/Lm
Allocation: Php 20M
WIN7E01753
As Modified
MFO -2 Flood Management Services: Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, - Improvement of Ermitaño Creek, San Juan City (Construction of Flood Mitigation Structure)
UACS No. 292003020401761
Physical Target:
As Modified: 3,250 lm
Unit Cost: P6,153.85/Lm
Estimated Cost: Php 20M
WIN7E01753
|
June 20, 2017 |
FY 2017 |
WIN7F04870 |
UACS No. 103004010310142 |
January 1, 2017 |
National Capital Region |
Metro Manila 2nd District Engineering Office |
As Per GAA
Locally Funded Projects – LIP, Buildings and Other Structures – Multi-Purpose/Facilities: Construction of Multi-Purpose Building with Fencing Levitown, Brgy. Don Bosco, Parañaque City, Metro Manila (Construction of Multi-Purpose Building)
UACS No. 103004010310142
Physical Target/Cost
Original: 1 building
Unit Cost (P’000): P3,000/building
Allocation Cost (P’000): P3,000
WIN7F04870
As Modified
Locally Funded Projects – LIP, Buildings and Other Structures – Multi-Purpose/Facilities: Construction/ Completion of Multi-Purpose Building at Brgy. B.F. Homes Office/ Hall (Phase II), Brgy. B.F. Homes, Parañaque City 2nd LD, Metro Manila
UACS No. 103004010310142
Physical Target/Cost
Modified: 1 building
Unit Cost (P’000): P3,000/building
Estimante Cost (P’000): P3,000
WIN7F04870
|
June 20, 2017 |
FY 2017 |
WIN7F04865 |
UACS No. 292004020100401 |
January 1, 2017 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA
Locally Funded Projects: Local Infrastructure Program – Flood Control and Drainage – Flood Control Structures/Facilities, Construction of Flood Control (Aranan-Mariblo Creek – San Francisco San Juan River – Mindanao-Tullahan River) West Triangle, Quezon City (Construction of Flood Mitigation Structure)
UACS No. 292004020100401
Physical Target/ Cost
Per GAA / Original: 500 Lm
Unit Cost: P40,000.00/Lm
Allocation: Php 20M
WIN7F04865
As Modified
Locally Funded Projects: Local Infrastructure Program – Flood Control and Drainage – Flood Control Structures/Facilities, Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins & Principal Rivers at Culiat Creek, & Tributaries Brgy. Sto. Cristo, Quezon City (Construction of Slope Protection Structure)
UACS No. 292004020100401
Physical Target/ Cost
As Modified: 786 Lm
Unit Cost: P25,445.29/Lm
Estimated Cost: Php 20M
WIN7F04865
|
June 20, 2017 |
FY 2017 |
WIN7F04869 |
UACS No. 165003015300140 |
January 1, 2017 |
National Capital Region |
NCR - Regional Office |
As Per GAA
MFO -1 National Road Network Services: Network Development – Construction of By-Passes/ Diversion Roads, including ROW, Construction of Concrete Road-By-Pass Road (Marcos Highway to JP Rizal St.), Marikina City (Construction of Concrete Road)
UACS No. 165003015300140
Physical Target/Cost
Per GAA/Original: -
Unit Cost: -
Allocation: Php 100M
WIN7F04869
As Modified
MFO -1 National Road Network Services: Network Development – Construction of By-Passes/ Diversion Roads, including ROW, Construction of Concrete Road-By-Pass Road (Marcos Highway to JP Rizal St.), Marikina City (Construction of Concrete Road)
UACS No. 165003015300140
Physical Target/Cost
As Modified: 3.143 Lane-km
Unit Cost: P31,816,735.6/Lane-km
Estimated: Php 100M
WIN7F04869
|
June 20, 2017 |
2017 |
WIN7E01738 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bataan 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure with Channel Excavation of Abo-Abo River Dangcol Section, Brgy. Dangcol, Balanga City, Bataan |
June 20, 2017 |
2017 |
WIN7G01546 |
FY 2017 (R.A 10924) |
May 16, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System/Highway Development Management -4 (HDM-4) - Primary -
Rehabilitation/Reconstruction of Damaged Paved National Road, Pagadian City - Zamboanga City Road, Zamboanga City, K1903+322 - K1904+935.50.
Allocation: Php 9.00 Million
Physical Target: 0.75845 lane km
Unit Cost: P11,866,306.28/lane km |
June 20, 2017 |
2017 |
WIN7G01545 |
FY 2017 (R.A 10924) |
May 16, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System/Highway Development Management - 4 (HDM-4) - Secondary -
Rehabilitation/Reconstruction of Damaged Paved National Road Labuan Limpapa Road, Zamboanga City -
a. K1952+000 - K1953+000,
b. K1953+000 - K1953+963.80,
c. K1954+235.90 - K1954+930.10,
d. K1955+013.6 - K1955+105,
e. K1958+301.80 - K1958+745.70,
f. K1959+573 - K1959+762,
g. K1962+175.5 - K1963+000,
h. K1963+001.7 - K1963+271,
i. K1963+297 - K1963+990.2,
j. K1964+000 - K1965+291.90,
k. 1966+018.90 - K1966+963.4
Allocation: Php 49.90 Million
Physical Target: 4.9597 lane km
Unit Cost: Php 10,061,092.40/lane km |
June 20, 2017 |
2017 |
WIN7G01598 |
FY 2017 (R.A 10924) |
June 9, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes -
Widening of Permanent Bridge San Ramon Bridge 1 (B01161MN) along Zamboanga City - Labuan - Limpapa Road
Abutment A = Sta. 1959+241.37
Abutment B = Sta. 1959+282.07
Allocation: Php 35.00 Million
Physical Target: 388.278 sq.m.
Unit Cost: Php 90,141.60/sq.m. |
June 20, 2017 |
2017 |
WIN7G01603 |
FY 2017 (R.A 10924) |
June 9, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Concreting of Road Shoulder including Drainage of Cawit/Baluno Road at Brgy. Cawit, Zamboanga City,
Sta. 0+000 - Sta. 1+100 (Left Side)
Sta. 0+000 - Sta. 1+100 (Right Side)
Allocation: Php 4.00 Million
Physical Target: 2,200 lm
Unit Cost: Php 1,818.18/lm |
June 20, 2017 |
2017 |
WIN7G01602 |
FY 2017 (R.A 10924) |
June 9, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Repair/Improvement of Sinunuc Shoreline Protection, Sinunuc, Zamboanga City,
Seg. A Sta. 0+040 - Sta. 0+066
Seg. B Sta. 0+066 - Sta. 0+247
Seg. C Sta. 0+311 - Sta. 0+486
Allocation: Php 15.00 Million
Physical Target: 382.00 lm
Unit Cost: Php 39,267.02/lm |
June 20, 2017 |
2017 |
WIN7G01601 |
FY 2017 (R.A 10924) |
June 9, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Structure along Ayala River, Ayala Section (Both side), including Right of Way Acquisition, Zamboanga City
Seg. A Sta. 0+300 - Sta. 0+390 RS (Downstream)
Seg. B Sta. 0+370 - Sta. 0+400 LS (Downstream)
Seg. C Sta. 0+600 - Sta. 0+830 RS (Downstream)
Seg. D Sta. 0+000 - Sta. 0+407 RS (Upstream)
Seg. E Sta. 0+000 - Sta. 0+407 LS (Upstream)
Allocation: Php 35.00 Million
Physical Target: 1,164.00 lm.
Unit Cost: Php 30,068.73/lm. |
June 20, 2017 |
2017 |
WIN7E01645 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Bagong Sikat, Cabiao, Nueva Ecija |
June 20, 2017 |
2017 |
WIN7F04813 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Network Development - Improvement/Widening of National Roads - Secondary - Pulilan - Calumpit Road, Bulacan,
K0043+-442 to K0043+-196.20, K0043+-053.40 - K0043+547.18, K0045+288.50 - K0045+624.40, K0046+392.00 - K0047+104.00, K0048+138.30 - K0048+325.70, K0050+830.00 - K0052+786.00, K0053+100.00 - K0053+232.00 |
June 20, 2017 |
FY 2017 |
WIN7F04876 |
UACS No. 292003020401918 |
January 1, 2017 |
National Capital Region |
North Manila District Engineering Office |
As per GAA
MFO 2 – Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Flood Mitigation Facility – Installation of Additional Pump Vitas Pumping Station, Tondo, Manila City (Construction of Flood Mitigation Structure)
UACS No. 292003020401918
Physical Target/Cost
Original: -
Unit Cost (P’000): -
Allocation Cost (P’000): P50,000
WIN7F04876
Modified
MFO 2 – Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Revetment Adjacent to Vitas, Manila City (Construction of Revetment)
UACS No. 292003020401918
Physical Target/Cost
Modified: 139.75 lineal meters
Unit Cost (P’000): P357.782T/Lineal meters
Estimated Cost (P’000): P50,000
WIN7F04876
|
June 20, 2017 |
FY 2017 |
WIN7F04871 |
UACS No. 103004010309812 |
January 1, 2017 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA
Locally Funded Project: Local Infrastructure Program – Buildings and Other Structures – Multipurpose/Facilities, Construction of Five (5) Storey with Basement Disability Resource and Development Center (DRDC), NCDA Compound, Isidora St., Barangay Holy Spirit, Quezon City (Construction of Purpose Building)
UACS No. 103004010309812
Physical Target / Cost
Per GAA/Original: 1 building
Unit Cost: P83.000M/Bldg.
Allocation: Php 83M
WIN7F04871
As Modified
Locally Funded Project: Local Infrastructure Program – Buildings and Other Structures – Multipurpose/Facilities, Construction of Seven (7) Storey Building Disability Resource and Development Center (DRDC), NCDA Compound, Isidora St., Barangay Holy Spirit, Quezon City (Construction of Purpose Building)
UACS No. 103004010309812
Physical Target / Cost
As Modified: 1 building
Unit Cost: P83.000M/Bldg.
Estimated: Php 83M
WIN7F04871
|
June 20, 2017 |
FY 2017 |
WIN7F04873 |
UACS No. 103004010310266 |
January 1, 2017 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA
Locally Funded Projects: Local Infrastructure Program – Buildings and Other Structures – Multi-Purpose Building, Brgy. Fairview, Quezon City (Construction of Multi-Purpose Building)
UACS No. 103004010310266
Physical Target / Cost
Per GAA/ Original: 1 Building
Unit Cost: P3.000M/Bldg.
Allocation: Php 3M
WIN7F04873
As Modified
Locally Funded Projects: Local Infrastructure Program – Buildings and Other Structures – Multi-Purpose Building/Facilities, Rehab./Major Repair of Multi-Purpose Building, Brgy. Fairview, Quezon City (Rehabilitation/Major Repair of Multi-Purpose Building)
UACS No. 103004010310266
Physical Target / Cost
As Modified: 1 Building
Unit Cost: P3.000M/Bldg.
Estimated Cost: Php 3M
WIN7F04873
|
June 20, 2017 |
FY 2017 |
WIN7F04900 |
UACS No. 103004010310243 |
January 1, 2017 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA
Locally Funded Projects, VILP – Buildings and Other Structures – Multi-Purpose /Facilities Construction of Multi-Purpose Building D/Antonio Street cor Commonwealth Avenue Holy Spirit, Quezon City (Construction of Multipurpose Building)
UACS No. 103004010310243
Physical Target/Cost
Per GAA/ Original: 1 bldg
Unit Cost: P2.0M/Bldg.
Allocation: Php 2.0M
WIN7F04900
As Modified
Locally Funded Projects, VILP – Buildings and Other Structures – Multi-Purpose /Facilities Construction of Multi-Purpose Building Holy Spirit Drive Corner Commonwealth Avenue Holy Spirit, Quezon City (Construction of Multipurpose Building)
UACS No. 103004010310243
Physical Target/Cost
Modified: 1 bldg
Unit Cost: P2.0M/Bldg.
Estimated Cost: Php 2.0M
WIN7F04900
|
June 20, 2017 |
2017 |
WIN7F04760 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Albay 3rd Engineering Office |
As per GAA:
MFO-1 National Road Network Services: Asset
Preservation of National Roads - Rehabilitation/
Reconstruction Of National Roads with Slips, Slope Collapse, and Landslide - Secondary, Construction of Road Slope Protection Structure - Ligao-Pio Duran Rd - K0518+468 - K0518+512, K0527+185 - K0527+210, K0527+253 - K0527+285 (Construction of Road Slope Protection Structure)
Physical Target: 675 Sq.m.
Unit Cost (P'000): P6.74/Sq.m.
Allocation: PhP 4.547M
As MODIFIED:
MFO-1 National Road Network Services: Asset
Preservation of National Roads - Rehabilitation/
Reconstruction Of National Roads with Slips, Slope Collapse, and Landslide - Secondary, Construction of Road Slope Protection Structure - Ligao-Pio Duran Rd - K0527+120 - K0527+185, K0527+185 - K0527+210, K0527+253 - K0527+285 (Construction of Road Slope Protection Structure)
Physical Target: 299.41 Sq.m.
Unit Cost (P'000): P15.19/Sq.m.
Estimated Cost: PhP 4.547M
|
June 20, 2017 |
FY 2017 |
WIN7E01751 |
UACS No. 268004010101299 |
January 1, 2017 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As Per GAA
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures – School Buildings: Construction of Four (4) Storey Twelve (12) Classroom School Building, San Juan City (Construction of Classroom School Building, San Juan City (Construction of Classrooms)
UACS No. 268004010101299
Physical Target/Cost
Per GAA/Original: Physical Target 12 Classrooms
Unit Cost: P2M/Classroom
Allocation: P24M
WIN7E01751
As Modified
Locally-Funded Projects: Local Infrastructure Program: Buildings and Other Structures – School Buildings: Construction of Four (4) Storey Twelve (12) Classroom School Building, Kabayanan Elementary School, San Juan City (Construction of Classroom School Building, San Juan City (Construction of Classrooms)
UACS No. 268004010101299
Physical Target/Cost
Per GAA/Original: Physical Target 12 Classrooms
Unit Cost: P2M/Classroom
Estimated Cost: P24M
WIN7E01751
|
June 20, 2017 |
2017 |
WIN7E01669 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally - Funded Projects - Roads and Bridges - Local Roads: Concreting of Barangay Road,
Brgy. Cabutagan, Lupi, Camarines Sur
Physical Target: 0.40 lane-km
Unit Cost (P'000): P3,750/lane-km
Allocation (P'000): P1,500
As MODIFIED:
Locally - Funded Projects - Roads and Bridges - Local Roads: Rehabilitation/Concreting of Barangay Road, Brgy. Cabutagan, Lupi, Camarines Sur (Construction of Concrete Road)
Physical Target: 0.2070 lane-km
Unit Cost (P'000): P7,246/lane-km
Estimated Cost(P'000): P1,500
|
June 20, 2017 |
2017 |
WIN7G01580 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Network Development - Construction of Bypasses/Diversion Roads, including ROW
Construction of Concrete Road - Talacogon Bypass Road, incl. ROW, Agusan del Sur
Allocation : ₱ 20.00 Million (Total)
: ₱ 18,320,000.00 (Concrete Road)
: ₱ 1,680,000.00 (ROW Acquisition)
Physical Target : 0.800 lane km (Concrete Road)
: 24,000.00 sq.m. (ROW Acquisition)
|
June 20, 2017 |
2017 |
WIN7G01579 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Network Development - Construction of Bypasses/Diversion Roads, including ROW
Construction of Gravel Road - Daang Maharlika (Alternate Route) (NRJ - Mayor Democrito D. Plaza II Avenue - Las Nieves - Sibagat), (ADN/ADS BDRY., Sibagat Section), Package 2, Sibagat, Agusan del Sur, Sta. 0+820 - Sta. 1+756
Allocation : ₱ 20.00 Million (Total)
: ₱ 16,500,000.00 (Gravel Road)
: ₱ 3,500,000.00 (ROW Acquisition)
Physical Target : 1.872 lane km (Gravel Road)
: 56,160.00 sq.m. (ROW Acquisition)
|
June 20, 2017 |
2017 |
WIN7G01574 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW
Construction of Concrete Road - Esperanza (Crossing Luna) - San Luis Section, Agusan del Sur
Allocation : ₱ 20.00 Million
Physical Target : 1.3462 lane km
|
June 20, 2017 |
2017 |
WIN7G01578 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW
Construction of Gravel Road - Completion of the East-West Lateral Road connecting Agusan del Sur/Agusan del Norte to Bukidnon San Miguel Proper (Surigao del Sur) - Calaitan, Package 2, Bayugan, Agusan del Sur, Sta. 1301+320 - Sta. 1301+880
Allocation : ₱ 20.00 Million
Physical Target : 1.12 lane km
|
June 20, 2017 |
2017 |
WIN7G01575 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Network Development - Construction of Bypasses/Diversion Roads, including ROW
Construction of Gravel Road - Daang Maharlika (Alternate Route) (NRJ - Mayor Democrito D. Plaza II Avenue - Las Nieves - Sibagat), (ADN/ADS BDRY., Sibagat Section), Package 1, Agusan del Sur, Sta. 0+005 - Sta. 0+820
Allocation : ₱ 20.00 Million (Total)
: ₱ 16,500,000.00 (Const.of Gravel Road)
: ₱ 3,500,000.00 (ROW Acquisition)
Physical Target
1.63 lane km (Const.of Gravel Road)
: 48,900.00 sq.m. (ROW Acquisition)
|
June 20, 2017 |
2017 |
WIN7G01576 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW
Construction of Gravel Road - Completion of the East-West Lateral Road connecting Agusan del Sur/Agusan del Norte to Bukidnon San Miguel Proper (Surigao del Sur) - Calaitan, Package 1, Bayugan, Agusan del Sur, Sta. 1300+920 - Sta. 1301+320
Allocation : ₱ 20.00 Million
Physical Target : 0.80 lane km
|
June 20, 2017 |
2017 |
WIN7G01572 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary
Road Upgrading Gravel to Paved - Butuan City-Talacogon-Loreto-Veruela-Sta. Josefa Road, San Luis, Agusan del Sur, Chainage 23,197.20 - Chainage 23,457.20
Allocation : ₱ 5.00 Million
Physical Target : 0.520 lane km
|
June 20, 2017 |
2017 |
WIN7G01577 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Construction and Maintenance of Bridges along National Roads - Replacement of Permanent Weak Bridges
Replacement of Permanent Weak Bridges - Capudlosan Bridge (B00846MN) along Daang Maharlika (Surigao-Agusan Section)
Allocation : ₱ 42.00 Million (Total)
: ₱ 39,449,963.89 (Bridge Replacement) : ₱ 2,550,036.11 (ROW Acquisition)
Physical Target : 289.80 sq.m. (Bridge Replacement)
: 200.00 sq.m. (ROW Acquisition)
|
June 20, 2017 |
2017 |
WIN7G01573 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Construction and Maintenance of Bridges along National Roads - Replacement of Permanent Weak Bridges
Replacement of Bridge to more than 2 lanes at Mina-ano Bridge (B00848MN) along Daang Maharlika (Surigao-Agusan Section)
Allocation : ₱ 36.00 Million (Total) : ₱ 33,218,401.95 (Bridge Replacement)
: ₱ 2,781,598.05 (ROW Acquisition)
Physical Target : 322.00 sq.m. (Bridge Replacement)
: 200.00 sq.m. (ROW Acquisition)
|
June 19, 2017 |
CY 2017 |
292003020402880 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED:
MF02 - Flood Management Services
- Construction/Maintenance of Flood Mitigation
Structures and Drainage Systems
- Construction of Panggalaan River Control
Brgy. San Nicolas Section, Naujan,
Oriental Mindoro
L = 413 lm
Php = 20,000,000.00 Million
( Construction of Flood Mitigation Structure ) |
June 19, 2017 |
CY 2017 |
292003020402878 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED:
MF02 - Flood Management Services
- Construction/Maintenance of Flood Mitigation
Structures and Drainage Systems
- Construction of Dulangan River Control (Gabion),
Baco, Oriental Mindoro
L = 509 lm
Php = 50,000,000.00 Million
( Construction of Flood Mitigation Structure ) |
June 19, 2017 |
CY 2017 |
WIN7F04816 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED:
Locally-Funded Projects
- Local Infrastructure Program
- Roads and Bridges
- National Roads
Repair/Rehabilitation/Improvement
CSR K0054+000 - K0054+419.50
Puerto Galera, Oriental Mindoro
CW1 = 2097.50 sq.m.
Php = 10,000,000.00 Million
( Shoulder Paving/Construction,
Construction of Road Slope Protection Structure )
|
June 19, 2017 |
CY 2017 |
WIN7F048156 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Roads and Bridges
- National Roads
Repair/Rehabilitation/Improvement
CNR
K0042+058 - K0042+270,
K0042+412 - K0042+476,
K0042+864.50 - K0043+574.50
Puerto Galera, oriental Mindoro
CW1 = 2495 sq.m.
Php = 10,000,000.00 million
( Shoulder Paving/Construction,
Construction of Road Slope Protection Structure )
|
June 19, 2017 |
CY 2017 |
WIN7F04823 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Roads and Bridges
- National Roads
Repair/Rehabilitation/Improvement
CSR Jct. Pola
K0069+000 - K0069+619
Pola, Oriental Mindoro
CW1 = 1,857 sq.m.
Php = 10,000,000.00 Million
( Shoulder Paving/Construction,
Construction of Road Slope Protection Structure )
|
June 19, 2017 |
2017 |
165003014900113 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads – Tertiary - San Fernando - Lubao Road, K0084+178 - K0085+020 |
June 19, 2017 |
2017 |
165003014200222 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation of National Roads - Rehabilitation / Reconstruction / Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System / Highway Development Management - 4 (HDM-4) – Secondary - Reconstruction from Asphalt to Concrete - Angeles - Porac - Floridablanca - Dinalupihan Road, K0095+160 - K0096+826 |
June 19, 2017 |
2017 |
165003014900114 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads – Tertiary - Sasmuan - Lubao Road, K0077+782 - K0078+047.30 |