Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
June 8, 2017 2017 165004050307384 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Magsalisi, Jaen, Nueva Ecija
June 8, 2017 2017 WIN7G01482 RA 10924 December 29, 2016 Region XIII Butuan City District Engineering Office
Modified:
LFP: LIP - Roads and Bridges - Local Roads

Concreting of Local Road, Mahogany Bridge to Purok 6-A, Brgy. Mahogany, Sta. 0+000-Sta. 0+231.50 w/exception

Allocation : ₱ 2.000 Million

Physical Target : 0.402 lane km
June 8, 2017 2017 WIN7G01541 RA 10924 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Network Development - Improvement/Widening of National Roads - N1

Improvement/Widening of National Roads, N1, Daang Maharlika (Agusan-Davao Sect), Prosperidad, Agusan del Sur, K1283+973 - K1284+200

Allocation : ₱ 17.499 Million (Total)
: ₱ 9,097,896.15 (Road Widening)
: ₱ 8,401,103.85 (Construction of Road Slope Protection Structure)

Physical Target : 0.462 lane km (Road Widening)
: 1,513.60 sq.m. (Construction of Road Slope Protection Structure)
June 8, 2017 2017 WIN7G01542 RA 10924 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Network Development: Improvement/Widening of National Roads - N1

Improvement/Widening of National Roads, N1, Daang Maharlika (Agusan-Davao Sect), Prosperidad, Agusan del Sur, K1266+620 - K1268+003

Allocation : ₱ 29.931 Million

Physical Target : 2.804 lane km
June 8, 2017 2017 WIN7G01544 RA 10924 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Network Development: Improvement/Widening of National Roads - N1

Improvement/Widening of National Roads, N1, Daang Maharlika (Agusan-Davao Sect), Prosperidad, Agusan del Sur, K1272+000 - K1272+584

Allocation : ₱ 17.57 Million

Physical Target : 1.168 lane km
June 8, 2017 2017 WIN7G01525 RA 10924 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW

Construction of Gravel Road - Completion of the East-West Lateral Road connecting Agusan del Sur/Agusan del Norte to Bukidnon, Agusan-Malaybalay Road, Esperanza, Package 2, Agusan del Sur, Sta. 1306+420 - Sta. 1307+520

Allocation : ₱ 20.000 Million

Physical Target : 2.20 lane km
June 8, 2017 2017 WIN7G01530 RA 10924 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW

Construction of Gravel Road - Completion of the East-West Lateral Road connecting Agusan del Sur/Agusan del Norte to Bukidnon, Agusan-Malaybalay Road, Esperanza, Package 1, Agusan del Sur, Sta. 1305+420.90 - Sta. 1306+420

Allocation : ₱ 20.000 Million

Physical Target : 1.9982 lane km
June 8, 2017 2017 WIN7G01531 Ra 10924 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW

Construction of Gravel Road - Completion of the East-West Lateral Road connecting Agusan del Sur/Agusan del Norte to Bukidnon, Agusan-Malaybalay Road, Esperanza, Package 3, Agusan del Sur, Sta. 1307+520 - Sta. 1308+568

Allocation : ₱ 20.000 Million

Physical Target : 2.096 lane km
June 8, 2017 2017 WIN7G01538 RA 10924 December 29, 2016 Region XIII Agusan del Sur 1st District Engineering Office
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW

Construction of Gravel Road - Butuan City - Pianing - Tandag Rd (Brgy. Kolambogan - Padiay, Sibagat), Sta. 1257+600 - Sta. 1258+300

Allocation : ₱ 20.000 Million

Physical Target : 1.400 lane km
June 8, 2017 2017 WIN7G01557 RA 10924 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified;
Network Development: Construction of Missing Gaps connecting National Roads, including ROW

Construction of Missing Gaps connecting National Roads including ROW, along Bdry. Bukidnon/Agusan del Norte, Buenavista, (Lawan-lawan Section), Agusan del Norte, Sta. 0+000 - Sta. 1+1776

Allocation : ₱ 44.40 Million (Total)
: ₱ 43,684,605.87 (Construction of Concrete Road)
: ₱ 715,394.13 (ROW Acquisition)

Physical Target : 3.552 lane km (Construction of Concrete Road)
: 35,520.00 sq.m. (ROW Acquisition)
June 8, 2017 2017 WIN7G01554 RA 10924 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW

Construction of Missing Gaps connecting National Roads including ROW, along Agusan-Bukidnon Road, Agusan del Norte, Sta. 2+733 - Sta. 2+958

Allocation : ₱ 5.50 Million (Total)
: ₱ 5,140,692.66 (Construction of Concrete Road)
: ₱ 359,307.34 (ROW Acquisition)

Physical Target : 0.45 lane km (Construction of Concrete Road)
: 4,500.00 sq.m. (ROW Acquisition)
June 8, 2017 2017 WIN7G01558 RA 10924 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes

Widening of Permanent Bridges to more than 2 lanes at Sanghan Br. (B00845MN) along Daang Maharlika (Surigao-Agusan Section), Cabadbaran, Agusan del Norte

Allocation : ₱ 32.00 Million (Total)
: ₱ 29,811,415.26 (Bridge)
: ₱ 2,188,584.74 (ROW)

Physical Target : 238.00 sq.m. (Bridge)
: 266.00 sq.m. (ROW)
June 8, 2017 2017 WIN7G01552 RA 10924 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes

Widening of Permanent Bridges to more than 2 lanes, including ROW, Sta. Ana Bridge (B00838MN) along Daang Maharlika (Surigao-Agusan Section)

Allocation : ₱ 99.00 Million (Total) : ₱ 98,700,000.00 (Bridge)
: ₱ 300,500.00 (ROW)

Physical Target : 943.00 sq.m. (Bridge)
: 200.00 sq.m. (ROW)
June 8, 2017 2017 WIN7G01562 RA 10924 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes

Widening of Permanent Bridges to more than 2 lanes at Baleguian Br. (B00830MN) along Daang Maharlika (Surigao-Agusan Section), Jabonga, Agusan del Norte

Allocation : ₱ 27.96 Million (Total)
: ₱ 23,856,721.46 (Bridge)
: ₱ 4,103,278.54 (ROW)

Physical Target : 256.00 sq.m. (Bridge)
: 200.00 sq.m. (ROW)
June 8, 2017 2017 WIN7G01556 RA 10924 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes

Widening of Permanent Bridges to more than 2 lanes at Sayadion Br. (B00831MN) along Daang Maharlika (Surigao-Agusan Section), Jabonga, Agusan del Norte

Allocation : ₱ 18.00 Million (Total)
: ₱ 15,280,602.74 (Bridge)
: ₱ 2,719,397.26 (ROW)

Physical Target : 165.00 sq.m. (Bridge)
: 200.00 sq.m. (ROW)
June 8, 2017 2017 WIN7G01560 RA 10924 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Improvement of Sta. Ana River, Tubay, Agusan del Norte, Sta. 0+000 - Sta. 0+500

Allocation : ₱ 40.00 Million (Total)
: ₱ 39,958,714.27 (Construction of Flood Mitigation Structure)
: ₱ 41,285.73 (ROW Acquisition)

Physical Target : 500.00 l.m. (Construction of Flood Mitigation Structure)
: 5,000.00 sq.m. (ROW Acquisition)
June 8, 2017 2017 WIN7G01559 RA 10924 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction/Rehabilitation/Improvement of Magallanes River Dike, Magallanes, Agusan del Norte

Allocation : ₱ 45.00 Million (Total)
: ₱ 44,249,250.00 (Construction of Dike)
: ₱ 750,750.00 (ROW Acquisition)

Physical Target : 301.00 l.m. (Construction of Dike)
: 3,010.00 sq.m. (ROW Acquisition)
June 8, 2017 2017 WIN7G01555 Ra 10924 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Improvement/Construction of River Dike along Cabadbaran River, City of Cabadbaran, Agusan del Norte, Sta. 0+000 - Sta. 0+194

Allocation : ₱ 50.00 Million (Total)
: ₱ 49,842,843.17 (Construction of Dike)
: ₱ 157,156.83 (ROW Acquisition)

Physical Target : 194.00 l.m. (Construction of Dike)
: 1,940.00 sq.m. (ROW Acquisition)
June 8, 2017 2017 WIN7G01553 RA 10924 December 29, 2016 Region XIII Agusan del Norte District Engineering Office
Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Project in Karak-an River, City of Cabadbaran, Agusan del Norte, Sta. 0+000 - Sta. 0+180

Allocation : ₱ 45.00 Million (Total)
: ₱ 44,848,605.00 (Construction of Flood Mitigation Structure)
: ₱ 151,395.00 (ROW Acquisition)

Physical Target : 180.00 l.m. (Construction of Flood Mitigation Structure)
: 1,800.00 sq.m. (ROW Acquisition)
June 7, 2017 2017 WIN7F04776 FY 2017 GAA RA 10924 December 29, 2016 Region V Camarines Sur 3rd District Engineering Office
As per GAA:
Locally-Funded Projects - Buildings and Other Structures Multipurpose/Facilities : Construction of Multi-Purpose
Building (Covered Court), Brgy. Sumaoy, Garchitorena,
Camarines Sur ( Construction of Multi-Purpose Building)
Physical Target: 1 building
Unit Cost (P'000): P1,500/ building
Allocation Cost (P'000): P1,500

As MODIFIED:
Locally-Funded Projects - Buildings and Other Structures Multipurpose/Facilities : Construction of Multi-Purpose
Building, Brgy. Sumaoy, Garchitorena, Camarines Sur (Construction of Multi-Purpose Building)
Physical Target: 1 building
Unit Cost (P'000): P1,500/ building
Estimated Cost (P'000): P1,500
June 7, 2017 2017 WIN7F04599 SR2017-01-000420 January 28, 2017 Region V Regional Office V
As per GAA:
MFO-3 Construction and Maintenance Services of Other
Infra: Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations to Seaports: Construction Of Concrete Road - Cumadcad-Macalaya Port Road, Castilla, Sorsogon
(Construction of Concrete Road)
Physical target: 7.47 lane-km
Unit Cost (P'000): P18,741.63/lane-km
Allocation: P140M

As MODIFIED:
MFO-3 Construction and Maintenance Services of Other
Infra: Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations to Seaports: Construction Of Concrete Road - Cumadcad-Macalaya Port Road, Castilla, Sorsogon
(Construction of Concrete Road)
Physical target: 6.9582 lane-km
Unit Cost (P'000): P20,120.15/lane-km
Estimated Cost: P140M
June 7, 2017 2017 WIN7E01695 SR2017-01-000403 January 28, 2017 Region V Regional Office V
As per GAA:
MFO-2 Flood Management Services: Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Drainage Structure - Legaspi City
Urban Drainage Project (Construction of Drainage Structure)
Physical Target: 500 Lm
Unit Cost: P200.00/lm
Allocation: Php 100M

As MODIFIED:
MFO-2 Flood Management Services: Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Drainage Structure - Legaspi City
Urban Drainage Project Sta. 2+100 - Sta. 2+539.60 (Construction of Drainage Structure)
Physical Target: 439.60 Lm
Unit Cost: P227.479/lm
Estimated Cost: Php 100M
June 7, 2017 2017 WIN7F04594 SR2017-01-000317 January 28, 2017 Region V Regional Office V
As per GAA:
MFO-1 National Road Network Services: Network
Development - Off-Carriageway Improvement including drainage — Secondary: Off-Carriageway Improvement:
Shoulder Paving / Construction - Masbate-Cataingan-Placer Rd K0036 + 862 - K0037 + 526, K0040 + 715 - K0041 + 478, K0041 + 491 - K0041 + 621, K0080 + 000 - K0081+ 521 (Off-Carriageway Improvement: Shoulder Paving / Construction)
Physical Target: 3,110 sq.m.
Unit Cost: P27.04T/sq.m.
Allocation: P84.107M

As MODIFIED:
MFO-1 National Road Network Services: Network
Development - Off-Carriageway Improvement including drainage — Secondary: Off-Carriageway Improvement:
Shoulder Paving / Construction - Masbate-Cataingan-Placer Rd K0036 + 862 - K0037 + 526, K0040 + 715 - K0041 + 478, K0041 + 491 - K0041 + 621, K0080 + 000 - K0081+ 521 (Shoulder Paving / Construction)
Physical Target: 24,535 sq.m.
Unit Cost: P3.428T/sq.m.
Estimated Cost: P84.107M
June 7, 2017 2017 WIN7F04606 SR2017-01-000308 January 28, 2017 Region V Regional Office V
As per GAA:
MFO-1 National Road Network Services: Network
Development - Off-Carriageway Improvement including drainage — Secondary: Off-Carriageway Improvement:
Shoulder Paving / Construction - Masbate-Cataingan-Placer Rd - K0025 + 420 - K0026 + 160, K0027 + 040 - K0028 + 568, K0032 + 000 - K0032 + 686, K0032 + 723 - K0033 + 527, K0036 + 000 - K0036 + 850 (Off-Carriageway Improvement: Shoulder Paving / Construction)
Physical Target: 4,646 sq.m.
Unit Cost: P29.57T/sq.m.
Allocation: P137.408M

As MODIFIED:
MFO-1 National Road Network Services: Network
Development - Off-Carriageway Improvement including drainage — Secondary: Off-Carriageway Improvement:
Shoulder Paving / Construction - Masbate-Cataingan-Placer Rd - K0025 + 420 - K0026 + 160, K0027 + 040 - K0028 + 568, K0032 + 000 - K0032 + 686, K0032 + 723 - K0033 + 527, K0036 + 000 - K0036 + 850 (Shoulder Paving / Construction)
Physical Target: 34,292 sq.m.
Unit Cost: P4.0T/sq.m.
Estimated Cost: P137.408M
June 7, 2017 2017 WIN7E01703 SR2017-01-000248 January 27, 2017 Region V Regional Office V
As per GAA:
MFO-1 National Road Network Services -Network
Development - Improvement / Widening Of National Roads
- Other Primary: Road Widening - Rolando A Andaya Highway - K0336 + 496 - K0338 + 000, K0339 + 000 - K0341 + 637 (Road Widening)
Physical target: 9.174 lane-km
Unit Cost (P'000): P14,768.80/lane km
Allocation: P135.489M

As MODIFIED:
MFO-1 National Road Network Services -Network
Development - Improvement / Widening Of National Roads
- Other Primary: Road Widening - Rolando A Andaya Highway - K0336 + 496 - K0337 + 700, K0340 + 520 - K0341 + 637(Road Widening / Construction of Drainage Structure)
Physical target:
Road Widening: 4.94080 lane-km
Const. of Drainage Structure: 2,064 lm
Unit Cost (P'000):
Road Widening: P18,182.76/lane-km
Const. of Drainage Structure: P22.11/lm
Estimated Cost: P135.489M

June 7, 2017 2017 WIN7E01702 SR2017-01-000244 January 27, 2017 Region V Regional Office V
As per GAA:
MFO-1 National Road Network Services -Network
Development - Improvement / Widening Of National Roads
- Other Primary: Road Widening - Rolando A Andaya Highway - K0319+938 - K0320+961, K0320+992 - K0321+376, K0322 + 592 - K0324+000, K0324+000 - K0325+00, K0325+000 - K0326 + 196 (Road Widening)
Physical target: 10.076 lane-km
Unit Cost (P'000): P15,334.55/lane km
Allocation: P154.511M

As MODIFIED:
MFO-1 National Road Network Services -Network
Development - Improvement / Widening Of National Roads
- Other Primary: Road Widening - Rolando A Andaya Highway - K0319+938 - K0320+961, K0320+992 - K0321+376, K0322 + 592 - K0324+300 (Road Widening / Construction of Drainage Structure along Road)
Physical target:
Road Widening: 6.2604 lane-km
Const. of Drainage Structure: 1,659 lm
Unit Cost (P'000):
Road Widening: P18,576.91/lane-km
Const. of Drainage Structure: P23.03/lm
Estimated Cost: P154.511M
June 7, 2017 2017 WIN7F04607 SR2017-01-000152 January 27, 2017 Region V Regional Office V
As per GAA:
MFO-1 National Road Network Services: Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) - Tertiary: Reconstruction from Concrete to Concrete - Sn PascuaI-CIaveria Rd - K0001+548 - K0001+706, K0001+776 - K0002+000, K0042+204 - K0042+927, K0044+523 - K0045+000, K0049+000 - K0049+025, K0049+130 - K0049+212, K0054+000 - K0055+310, K0014+407 - K0014+486, K0014+516 - K0014+521, K0014+536 - K0014+541, K0014+571 - K0014+617, K0022+854 - K0023+000(Reconstruction from Concrete to Concrete)
Physical Target: 6.99 lane-km
Unit Cost (P'000): P14,306.15/lane km
Allocation: P100M

As MODIFIED:
MFO-1 National Road Network Services: Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) - Tertiary: Reconstruction from Concrete to Concrete - Sn PascuaI-CIaveria Rd - K0001+548 - K0001+706, K0001+776 - K0002+000, K0014+407 - K0014+486, K0014+516 - K0014+521, K0014+536 - K0014+541, K0014+571 - K0014+617, K0022+854 - K0023+000, K0042+204 - K0042+927, K0044+523 - K0045+000, K0049+000 - K0049+025, K0049+130 - K0049+212, K0054+000 - K0054+320,
(Reconstruction from Concrete to Concrete)
Physical Target: 4.6332 lane-km
Unit Cost (P'000): P21,583.35/lane km
Estimated Cost: P100M
June 7, 2017 2017 WIN7E01583 SR2017-01-000170 January 27, 2017 Region V Regional Office V
As per GAA:
MFO-1 National Road Network Services: Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) - Tertiary: Reconstruction from Concrete to Concrete - Sn Pascual-Claveria Rd - K0004+482 - K0005+017, K0049+212 - K0051+805, K0014+617 - K0015+000 (Reconstruction from Concrete to Concrete)
Physical Target: 7.062 lane-km
Unit Cost (P'000): P15,073.92/lane km
Allocation: P106.452M

As MODIFIED:
MFO-1 National Road Network Services: Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) - Tertiary: Reconstruction from Concrete to Concrete - Sn PascuaI-CIaveria Rd - Sn Pascual-Claveria Rd - K0004+482 - K0005+017, K0014+617 - K0015+000, K0049+212 - K0051+780 (Reconstruction from Concrete to Concrete / Construction of Drainange Structure)
Physical Target:
Reconst. form Concrete to Concrete: 4.6332 lane-km
Construction of Drainage: 2,095.70 lm.
Unit Cost (P'000):
Reconst. form Concrete to Concrete: P15,653.34/lane-km
Construction of Drainage: P13.21/ lm.
Estimated Cost: P106.452M
June 7, 2017 2017 WIN7F04623 SR2017-01-000196 January 27, 2017 Region V Regional Office V
As per GAA:
MFO 1 - National Road Network Services - Asset preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary - Construction of Road Slope Protection Structure — Masbate-Cataingan-Placer Rd - K0019+-258 - K0019+100, K0022+330 - K0022+667, K0023+500 - K0023+650, K0054+440 - K0054+510, K0062+900 - K0062+1000, K0064+400 - K0064+540, K0073+488 - K0073+538, K0075+496 - K0075+596, K0078+631 - K0078+681, K0086+227 - K0086+277[Construction of Slope Protection]
Physical Target: 8,037 sq.m.
Unit Cost (P'000): P9.283/sq.m.
Allocation (P'000): P74,563.00

As MODIFIED:
MFO 1 - National Road Network Services - Asset preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary - Construction of Road Slope Protection Structure — Masbate-Cataingan-Placer Rd - K0019+-258 - K0019+100, K0022+330 - K0022+667, K0023+500 - K0023+650, K0054+440 - K0054+510, K0062+900 - K0062+1000, K0064+400 - K0064+540, K0073+488 - K0073+538, K0075+496 - K0075+596, K0078+631 - K0078+681, K0086+227 - K0086+277[Construction of Slope Protection]
Physical Target: 5,143 sq.m.
Unit Cost (P'000): P14.50/sq.m.
Estimated Cost (P'000): P74,563.00


June 6, 2017 2017 165003030600040 FY 2017 GAA January 1, 2017 Region III Aurora District Engineering Office
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Airports - Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism - Baler Airport Access Road, San Luis, Aurora
June 6, 2017 2017 165003015200115 FY 2017 GAA January 1, 2017 Region III Tarlac District Engineering Office
Network Development - Improvement/Widening of National Roads - Tertiary - Road Widening including Slope Protection Capas - San Jose - Mayantoc - Malacampa Road
K0125+436 - K0128+000, K0141+000 - K0144+175
June 6, 2017 2017 WIN7F04626 FY 2017 GAA RA 10924 December 29, 2016 Region V Sorsogon District Engineering Office
As per GAA:
Locally Funded Projects: Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures/Facilities, Construction of Aguada Norte River Control, Barangay Aguada Norte, Magallanes, Sorsogon (Construction of Flood Mitigation Structure)
Physical Target: 50 Lm.
Unit Cost: P60T/Lm
Allocation: Php 3M

As MODIFIED:
Locally Funded Projects: Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures/Facilities, Construction of Aguada Norte Seawall, Barangay Aguada Norte, Magallanes, Sorsogon (Construction of Flood Mitigation Structure)
Physical Target: 35 Lm.
Unit Cost: P85.71T/Lm
Estimated Cost: Php 3M
June 6, 2017 2017 165003016900042 FY 2017 GAA January 1, 2017 Region III Tarlac District Engineering Office
Network Development - Off-Carriageway Improvement including drainage - Tertiary - Off-Carriageway Improvement including drainage Victoria - La Paz Rd
K0141+-433 - K0143+693
June 6, 2017 2017 WIN7F04627 FY 2017 GAA RA 10924 December 29, 2016 Region V Sorsogon District Engineering Office
As per GAA:
Locally Funded Projects: Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures/Facilities, Construction of Aguada Sur River Control, Barangay Aguada Sur, Magallanes, Sorsogon (Construction of Flood Mitigation Structure)
Physical Target: 50 Lm.
Unit Cost: P60T/Lm
Allocation: Php 3M

As MODIFIED:
Locally Funded Projects: Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures/Facilities, Construction of Aguada Sur Seawall, Barangay Aguada Sur, Magallanes, Sorsogon (Construction of Flood Mitigation Structure)
Physical Target: 65 Lm.
Unit Cost: P46.15T/Lm
Estimated Cost: Php 3M
June 6, 2017 2017 165003016800048 FY 2017 GAA January 1, 2017 Region III Tarlac District Engineering Office
Network Development - Off-Carriageway Improvement including drainage - Secondary - Paniqui - Camiling - Wawa Rd
K0157+650 - K0158+000, K0158+320 - K0159+855, K0167+745 - K0168+328, K0171+014 - K0171+867
June 6, 2017 2017 165003015200137 FY 2017 GAA January 1, 2017 Region III Tarlac District Engineering Office
Network Development - Improvement/Widening of National Roads - Tertiary - Victoria - Pura Rd
K0148+675 - K0151+336, K0151+431 - K0152+471, K0153+281 - K0153+611
June 6, 2017 2017 165003016900009 FY 2017 GAA January 1, 2017 Region III Tarlac District Engineering Office
Network Development - Off-Carriageway Improvement including drainage - Tertiary - Tarlac City - Sn Jose via Tibag - Burgos Rd
K0129+827 - K0129+202, K0129+214 - K0129+284, K0129+290 - K0131+000, K0131+000 - K0132+038, K0135+533 - K0136+464, K0136+476 - K0136+983
June 6, 2017 2017 WIN7E01698 FY 2017 GAA RA 10924 December 29, 2016 Region V Albay 3rd Engineering Office
As per GAA:
MFO 1: National Road Services Construction and Maintenance of Bridges along National Roads Retrofitting/Strengthening of Permanent Bridges, Retrofitting / Strengthening of Bridge - Guinobatan Br. (30029212) along Daang Maharlika (LZ) (Retrofitting/Strengthening of Bridge)
Physical Target:
CW-1 Retrofitting/Strengthening of Bridge : 1 Bridge
Unit Cost:CW-1 Retrofitting/Strengthening of Bridge : P16,500.00/Bridge
Allocation: Php 16.500M

As MODIFIED:
MFO 1: National Road
Network Services Construction and
Maintenance of Bridges along National Roads Retrofitting/Strengthening of Permanent Bridges, Retrofitting / Strengthening of Bridge - Guinobatan Br. (B00292LZ) along Daang Maharlika (LZ)
(Retrofitting/Strengthening of Bridge)
(Construction of Slope Protectjon Structure)
Physical Target:
CW-1 Retrofitting/Strengthening of Bridge : 1 Bridge
CW-2 Cost. of Slope Protection Structure: 1,519.95 Sq.m.
Unit Cost:CW-1 Retrofitting/Strengthening of Bridge : P5,979.00/Bridge
CW-2 Cost. of Slope Protection Structure: P6.92T/ Sq.m.
Estiamted Cost: Php 16.500M
June 6, 2017 2017 165003014200225 FY 2017 GAA January 1, 2017 Region III Tarlac 2nd District Engineering Office
Asset Preservation of National Roads - Rehabilitation / Reconstruction / Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System / Highway Development Management - 4 (HDM-4) – Secondary - PCWR
K0151+880 - K0153+196

June 6, 2017 2017 WIN7E01699 FY 2017 GAA RA 10924 December 29, 2016 Region V Albay 3rd Engineering Office
As per GAA:
MFO-2 Flood Management Services: Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Mitigation Structure - Rehabilitation of Cabilogan Dam, Retaining Dike (Cavasi-Tagpo Section) and Bridge Elements, Ligao, Albay
(Construction of Flood Mitigation Structure)
Physical target: 100 Lm
Unit Cost: P400T/Lm
Allocation: Php 40M

As MODIFIED:
MFO-2 Flood Management Services: Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Mitigation Structure - Rehabilitation of Cabilogan Dam, Retaining Dike (Cavasi-Tagpo Section) and Bridge Elements, Ligao, Albay
(Construction of Flood Mitigation Structure)
Physical target: 410 Lm
Unit Cost: P97.56T/Lm
Estimated Cost: Php 40M
June 6, 2017 2017 165003014300316 FY 2017 GAA January 1, 2017 Region III Tarlac District Engineering Office
Asset Preservation of National Roads - Rehabilitation / Reconstruction / Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System / Highway Development Management - 4 (HDM-4) – Tertiary - Capas - San Jose - Mayantoc - Malacampa Rd
K0154+000 - K0156+000
June 6, 2017 2017 103004010311170 FY 2017 GAA January 1, 2017 Region III Tarlac District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction of Multi-Purpose Building (Municipal Hall), Anao, Tarlac

June 6, 2017 2017 103001040311172 FY 2017 GAA January 1, 2017 Region III Tarlac District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction of 2 - Storey Multi-Purpose Building Hall, Barangay Quezon, Gerona, Tarlac
June 6, 2017 2017 268004010101408 FY 2017 GAA January 1, 2017 Region III Tarlac District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - School Buildings - Construction of Classrooms for the Balanti Integrated School, Brgy. Balanti, Tarlac City, Tarlac
June 6, 2017 2017 WIN7F04777 SR2017-01-000560 January 28, 2017 Region V Regional Office V
As per GAA:
MFO 3 - Construction and Maintenance of Other Infrastructures - Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations: Construction of concrete Road Matnog-Sta. Magdalena-Bulusan Road leading to Bulusan National Park (Section Il), Sorsogon (Construction of Concrete Road)
Physical Target: 5.000 lane-km
Unit Cost (P'000): P30,000/lane-km
Allocation Cost (P'000): P150,000

As MODIFIED:
MFO 3 - Construction and Maintenance of Other Infrastructures - Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations: Construction of concrete Road Matnog-Sta. Magdalena-Bulusan Road leading to Bulusan National Park (Section Il), Sorsogon (Construction of Concrete Road)
Physical Target: Road: 4.85584 lane-km
Drainage Structure: 3774.74 lm
Unit Cost (P'000): Road: P21,727/lane-km
Drainage Structure: P11.79T/ lm
Estiamated Cost (P'000): P150,000
June 6, 2017 2017 WIN7F04788 SR2017-01-000551 January 28, 2017 Region V Regional Office V
As per GAA:
MFO 3 - Construction and Maintenance of Other Infrastructures - Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations: Construction of concrete Road Matnog-Sta. Magdalena-Bulusan Road leading to Bulusan National Park (Section I), Sorsogon (Construction of Concrete Road)
Physical Target: 10.940 lane-km
Unit Cost (P'000): P13,711.15/lane-km
Allocation Cost (P'000): P150,000

As MODIFIED:
MFO 3 - Construction and Maintenance of Other Infrastructures - Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations: Construction of concrete Road Matnog-Sta. Magdalena-Bulusan Road leading to Bulusan National Park (Section l), Sorsogon (Construction of Concrete Road)
Physical Target:
CW1-Road: 6.21778 lane-km
CW2-Drainage Structure: 4059.12lm
Unit Cost (P'000):
CW1-Road: P16,909.38/ lane-km
CW2-Drainage Structure: p11.05T/ lm
Estimated Cost (P'000): P150,000
June 6, 2017 2017 WIN7F04783 SR2017-01-000567 January 28, 2017 Region V Regional Office V
As per GAA:
MFO 3 - Construction and Maintenance of Other Infrastructures - Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations: Construction of Concrete Road San Juan Alas-Tagpu-Dayao Road leading to Mandaon Ecotourism Sites, Mandaon, Masbate (Construction of Concrete Road)
Physical Target: 6.240 lane-km
Unit Cost (P'000): P16,025.64/lane-km
Allocation Cost (P'000): P100,000

As MODIFIED:
MFO 3 - Construction and Maintenance of Other Infrastructures - Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations: Construction of Concrete Road San Juan Alas-Tagpu-Dayao Road leading to Mandaon Ecotourism Sites including Bridge, Mandaon, Masbate
(Construction of Concrete Road)
(Construction of Concrete Bridge)
Physical Target:
CW1-Road: 3.87848 Lane-km
CW2-Bridge: 721.224 Sq.m.
Unit Cost (P'000):
CW1-Road: P12,389.04/ Lane-km
CW2-Bridge: P72.029T/ Sq.m.
Estimated Cost (P'000): P100,000
June 6, 2017 2017 WIN7F04789 SR2017-01-000337 January 28, 2017 Region V Regional Office V
As per GAA:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary, Road Upgrading Gravel to Paved - Jct Catanduanes Cir Rd-Panganiban-Sabloyon Rd - K0078 + 647 - K0082 + 000 (Road Upgrading Gravel to Paved)
Physical Target: 6.404 Lane-km
Unit Cost: P14,996.88/lane-km
Allocation: Php 96.040M

As MODIFIED:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary, Road Upgrading Gravel to Paved - Jct Catanduanes Cir Rd-Panganiban-Sabloyon Rd - K0078 + 647 - K0080 + 810 (Road Upgrading Gravel to Paved)
Physical Target: 4.30502 Lane-km
Unit Cost: P22,308.84/lane-km
Estimated Cost: Php 96.040M
June 6, 2017 2017 WIN7F04771 SR2017-01-000325 January 28, 2017 Region V Regional Office V
As per GAA:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary, Road Upgrading Gravel to Paved - Jct Catanduanes Cir Rd-Panganiban-Sabloyon Rd - K0066 + 585 - K0067 + 275, K0068 + 312 - K0068 + 352, K0069 + 000 - K0069 + 560, K0069 + 609 - K0071 + 191, K0071 + 245 - K0072 + 037, K0072 + 058 - K0072 + 338 (Road Upgrading Gravel to Paved)
Physical Target: 7.806 Lane-km
Unit Cost: P15,373/lane-km
Allocation: Php 120.00M

As MODIFIED:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary, Road Upgrading Gravel to Paved - Jct Catanduanes Cir Rd-Panganiban-Sabloyon Rd - K0069 + 086.00 - K0071 + 600 (Road Upgrading Gravel to Paved)
Physical Target: 4.84578 Lane-km
Unit Cost: P24,764/lane-km
Estimated Cost: Php 120.00M
June 6, 2017 2017 WIN7F04738 SR2017-01-000330 January 28, 2017 Region V Regional Office V
As per GAA:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary, Road Upgrading Gravel to Paved - Jct Catanduanes Cir Rd-Panganiban-Sabloyon Rd - K0073 + 481 - K0074 + 010, K0074 + 037 - K0074 + 826, K0074 + 855 - K0075 + 310 (S00037CN) (Road Upgrading Gravel to Paved)
Physical Target: 7.806 Lane-km
Unit Cost: P15,373/lane-km
Allocation: Php 50.960M

As MODIFIED:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary, Road Upgrading Gravel to Paved - Jct Catanduanes Cir Rd-Panganiban-Sabloyon Rd -K0073 + 481 - K0074 + 150 (S00037CN) (Road Upgrading Gravel to Paved)
Physical Target: 1.302 Lane-km
Unit Cost: P38,932.41/lane-km
Estimated Cost: Php 50.690M
June 6, 2017 2017 WIN7F046147 SR2017-01-000357 January 28, 2017 Region V Regional Office V
As per GAA:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary, Road Upgrading Gravel to Paved - Sta. Elena-Capalonga By Pass Coastal Rd - Chainage 8453 - Chainage 12410 (Road Upgrading Gravel to Paved)
Physical Target: 7.914 Lane-km
Unit Cost: P14,404.85/lane-km
Allocation: Php 114.0M

As MODIFIED:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary, Road Upgrading Gravel to Paved - Sta. Elena-Capalonga By Pass Coastal Rd - Chainage 3800 - Chainage 5120, K0287+332.50 - K0289+500 (Road Upgrading Gravel to Paved)
Physical Target: 6.975 Lane-km
Unit Cost: P16,344.09/lane-km
Estimated Cost: Php 114.0M
June 6, 2017 2017 WIN7F04784 SR2017-01-000146 January 27, 2017 Region V Regional Office V
As per GAA:
MFO-1 National Road Network Services: Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management - 4 (HDM-4) - Primary, Rehabilitation of Concrete Road - Daang Maharlika (LZ) - K0634 + 500 - K0635 + 000 (Rehabilitation of Concrete Road)
Physical Target: 0.976 Lane-km
Unit Cost: P153,688.52/Lane-km
Allocation: Php 150M

As MODIFIED:
MFO-1 National Road Network Services: Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management - 4 (HDM-4) - Primary, Rehabilitation of Asphalt Road - Daang Maharlika (LZ) - K0610+127.70 - K0611+000, K0631+500 - K0632+000, K0634+000 - K0635+480, K0641+000 - K0641+873, K0642+000 - K0644+136 (Rehabilitation of Asphalt Road)
Physical Target: 11.7926 Lane-km
Unit Cost: P12,719.84/Lane-km
Estimated Cost: Php 150M


June 6, 2017 2017 WIN7E01705 SR2017-01-000240 January 27, 2017 Region V Regional Office V
As per GAA:
MFO 1 - National Road Network Services - Network Development - Improvement/Widening of National Roads - N1 - Road Widening - Daang Maharlika (LZ) - K0613 + 498 - K0615 + 500, K0615 + 700 - K0616 + 290, K0616 + 514 - K0618 + 000, K0629 + 170 - K0629 + 402, K0629+600 - K0629+912.77, K0635+686 - K0636+164 (Road Widening)
Physical Target: 10.16 lane-km
Unit Cost (P'000): P17,816.93/ lane km
Allocation (P'000): P181,020.00

As MODIFIED:
MFO 1 - National Road Network Services - Network Development - Improvement/Widening of National Roads - N1 - Road Widening - Daang Maharlika (LZ) - K0613 + 498 - K0615 + 500, K0615 + 700 - K0616 + 290, K0616 + 514 - K0618 + 000, K0629 + 170 - K0629 + 402, (Road Widening)
Physical Target: 8.6057 lane-km
Unit Cost (P'000): P21,034.90/ lane km
Estimated Cost (P'000): P181,020.00
June 6, 2017 2017 WIN7F04621 SR2017-01-000267 January 28, 2017 Region V Regional Office V
As per GAA:
MFO 1 - National Road Network Services - Network Development - Improvement/ Widening of National Roads - Tertiary - Masbate Circumferential Rd including RROW - K0004 + 000 - K0005 + 559 [CW1 - Road Widening] [ROW - ROW Acquisition]
Physical Target: CW1 - 3.024 ln-km
ROW - 18,144 sq.m.
Unit Cost (P'000): CW1 - P15,068.78/ln-km
ROW - P3.0/sq.m.
Allocation (P'000): P100,000.00

As per GAA:
MFO 1 - National Road Network Services - Network Development - Improvement/ Widening of National Roads - Tertiary - Masbate Circumferential Rd including RROW - K0004 + 000 - K0005 + 480 [CW1 - Road Widening] [ROW - ROW Acquisition]
Physical Target: CW1 - 2.862 ln-km
ROW - 7,770 sq.m.
Unit Cost (P'000): CW1 - P33,130.60/ln-km
ROW - P0.6667/sq.m.
Estimated Cost (P'000): P100,000.00
June 6, 2017 2017 WIN7F04759 SR2017-01-000300 January 28, 2016 Region V Regional Office V
As per GAA:
MFO 1 - National Road Network Services - Network Development - Off-Carriageway Improvement of National Roads including drainage - Secondary - Off-Carriageway Improvement: Shoulder paving / Construction -Jct Sorsogon-Bacon-Manito Rd - K0582 + 400 - K0584 + 000, K0585 + 000 - K0585 + 259, K0585 + 277 - K0587 + 003, K0587 + 012 - K0588 + 000 (Shoulder paving / Construction)
Physical Target: 13,332 sq.m.
Unit Cost (P'000): P8.64T/sq.m.
Allocation : P115.193M

As MODIFIED:
MFO 1 - National Road Network Services - Network Development - Off-Carriageway Improvement of National Roads including drainage - Secondary - Off-Carriageway Improvement: Shoulder paving / Construction -Jct Sorsogon-Bacon-Manito Rd - K0582 + 400 - K0584 + 000, K0585 + 000 - K0585 + 259, K0585 + 277 - K0587 + 003, K0587 + 012 - K0588 + 000 (Shoulder paving / Construction)
Physical Target: 30,157 sq.m.
Unit Cost (P'000): P3.82T/sq.m.
Estimated Cost: P115.193M
June 6, 2017 2017 WIN7F04735 SR2017-01-000278 January 28, 2017 Region V Regional Office V
As MODIFIED:
MFO 1 - National Road Network Services - Network Development - Construction of By-Passes/ Diversion Roads, including ROW - Daraga Albay Diversion Road, including ROW, Road Concreting, Slope Protection and Bridge, Albay (Construction of Concrete Bridge)
(Construction of Concrete Road)
(Construction of Road Slope Protection Structure)
(ROW Acquisition)
Physical Target:
CW-1: 600.72 Sq.m.
CW-2: 5.48084 Lane-km
CW-3: 5,777 Sq.m.
ROW Acquisition: 7,082 Sq.m.
Unit Cost :
CW-1: P87.714T/Sq.m.
CW-2: P16,849.00/Lane-km
CW-3: P8.944T/ Sq.m.
ROW Acquisition: P0.42361/Sq.m.
Estimated Cost : P200M

June 5, 2017 2017 165003015100259 GAA FY 2017 January 1, 2017 Region II Cagayan 1st District Engineering Office
Network Development - Improvement/Widening of National Roads - Secondary: Road Widening - Cagayan Valley Rd (Magapit-Jct Aparri Airport Sect) K0571+000 - K0572+427.90 (L/S), K0572+431.90 - K0572+577.90 (L/S), K0572+581.90 - K0572+749 (L/S), K0572+753 - K0573+497.10 (L/S), K0573+499.60 - K0574+332.60 (L/S), K0574+336.60 - K0574+794 (L/S), K0571+000 - K0572+756.40 (R/S), K0572+760.40 - K0573+493.10 (R/S), K0573+495.60 - K0574+794 (R/S), (S00662LZ)
June 5, 2017 2017 165003016500103 GAA FY 2017 January 1, 2017 Region II Cagayan 1st District Engineering Office
Network Development - Improvement/Widening of National Roads - N1: Road Widening - Jct Logac-Magapit Rd - K0708+580 - K0711+633.40
June 5, 2017 2017 165003016800004 GAA FY 2017 January 1, 2017 Region II Cagayan 1st District Engineering Office
Network Development - Off-Carriageway Improvement including Drainage - Secondary: Off-Carriageway Improvement: Shoulder Paving/Construction - Cagayan Valley Rd (Magapit-Jct Aparri Airport Sect) - K0554+(-240) - K0557+000, K0559+000 - K0560+012.90, (S00662LZ)
June 5, 2017 2017 165003014600163 GAA FY 2017 January 1, 2017 Region II Cagayan 1st District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary: Construction of Road Slope Protection - San Vicente-Gutan-Lubac-Anguib Rd - K0648+361 - K0648+394.10 (L/S), K0648+641 - K0648+690 (L/S), K0648+830 - K0648+930 (L/S), K0648+930 - K0648+945 (B/S)
June 5, 2017 2017 WIN7F04656 FY 2017 GAA January 1, 2017 Region III Bataan 1st District Engineering Office
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary, Rehabilitation/Major Repair of Road Slope Protection Structure - Roman Expressway, K0107+100 - K0107+407, K0110+879 - K0111+110
June 5, 2017 2017 165003014500137 GAA FY 2017 January 1, 2017 Region II Regional Office II
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary, Construction of Road Slope Protection Structure - Cordon-Aurora Bdry Rd (Jct Dumabato-Aurora Bdry) - K0385+600 - K0385+890, K0394+103 - K0394+130, K0394+436 - K0394+540, K0394+791 - K0394+881, K0396+000 - K0396+048, K0399+200 - K0399+229, K0399+650 - K0399+1067, K0400+000 - K0400+190, K0400+510 - K0400+847, K0401+393, K0401+1056, K0402+320 - K0402+475
June 3, 2017 FY 2017 WIN7F04663 UACS No. 292003020401969 January 1, 2017 National Capital Region Quezon City 1st Engineering District Office
As Per GAA
MFO 2: Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Rehabilitation/Improvement of Flood Control Structure, Holy Spirit Drive, Brgy. Holy Spirit, Quezon City (Construction of Flood Mitigation Structure)
UACS No. 292003020401969
Physical Target/Cost
Per GAA/Original: 1,650 Lm
Unit Cost: P15.151T/Lm
Allocation: Php 25M
WIN7F04663

As Modified
As Per GAA
MFO 2: Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Rehabilitation/Improvement of Flood Control Structures & Tributaries of Brgy. Holy Spirit Phase III, Quezon City (Repair/Rehabilitation of Drainage Structures)
UACS No. 292003020401969
Physical Target/Cost
As Modified: 228 Lm
Unit Cost: P109.649T/Lm
Estimated Cost: Php 25M
WIN7F04663
June 2, 2017 2017 WIN7E04780 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction of Multi-Purpose Building (Training Center), Cut-Cot, Pulilan, Bulacan, Phase I
June 2, 2017 2017 WIN7E04653 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading - Tertiary
Bigaa-Plaridel via Bulacan & Malolos Rd - K0033+000 - K0033+624, K0033+1005 - K0034+009, K0034+710 - K0034+201, K0036+107 - K0036+226, K0037+000 - K0037+125, K0040+520 - K0041+000, K0041+000 - K0041+263, K0041+500 - K0041+1065, K0042+078 - K0042+268, K0042+320 - K0042+337, K0042+407 - K0042+422, K0042+268 - K0042+320, K0042+422 - K0042+569, K0042+337 - K0042+407, K0048+993.80 - K0049+324, K0050+866 - K0051+000
June 2, 2017 2017 WIN7F04653 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction/Improvement of Multi-Purpose Building, Biñang 1st, Bocaue, Bulacan
June 2, 2017 2017 WIN7F04643 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction of Multi-Purpose Building, Brgy. Lugam, Malolos, Bulacan
June 2, 2017 2017 WIN7F04651 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction/Rehabilitation of Multi-Purpose Building (Daycare Center), Longos, Pulilan, Bulacan
June 2, 2017 2017 WIN7F04634 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads - Concreting of Roads, San Marcos, Calumpit, Bulacan
June 2, 2017 2017 WIN7F04654 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Repair/Rehabilitation of Multi-Purpose Building, Brgy. San Vicente, Paombong, Bulacan
June 2, 2017 2017 WIN7F04646 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads - Concreting of Roads, Tilapayong, Baliuag, Bulacan
June 2, 2017 2017 WIN7F04659 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Revetment along Sergio Bayan, Calumpit, Bulacan
June 2, 2017 2017 WIN7F04629 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction of Multi-Purpose Building, Tampok, Hagonoy, Bulacan
June 2, 2017 2017 WIN7F04661 FY 2017 GAA January 1, 2017 Region III Bulacan 1st District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Repair/Rehabilitation of Multi-Purpose Building, San Agustin, Hagonoy, Bulacan
June 2, 2017 2017 WIN7F04785 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 1st District Engineering Office
Network Development - Improvement/Widening of National Roads - Secondary - Off-Carriageway Improvement including Drainage, Nueva Ecija - Pangasinan Road
K0139+382.50 - K0139+993.50
June 2, 2017 2017 WIN7F04778 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 1st District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction of Barangay Hall, Santa Veronica District, Guimba, Nueva Ecija
June 2, 2017 2017 WIN7F04765 FY 2017 GAA January 1, 2017 Region III Pampanga 3rd District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Improvement of Barangay Hall at Brgy. Camachiles, Mabalacat, Pampanga
June 2, 2017 2017 WIN7F04761 FY 2017 GAA January 1, 2017 Region III Pampanga 3rd District Engineering Office
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Improvement of Barangay Hall at Brgy. San Francisco, Mabalacat, Pampanga
June 2, 2017 2 WIN7F04637 FY 2017 GAA January 1, 2017 Region III Zambales 1st District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading - Tertiary
Zambales - Tarlac Rd, K0201+322.50 - K0201+939.50
June 2, 2017 2017 WIN7F04639 FY 2017 GAA January 1, 2017 Region III Zambales 1st District Engineering Office
Construction/Improvement of access Roads leading to Airports, Seaports and Declared Tourism Destinations - to Declared Tourism Destinations - Construction of Road Slope Protection Structure - Dampay Salaza Access Road leading to Mount Tapulao Eco Tourism Project (Slope Protection), Palauig, Zambales
June 1, 2017 FY 2017 WIN7F04773 UACS No.165003014200186 January 1, 2017 National Capital Region Metro Manila 3rd District Engineering Office
As Per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) – Secondary: Reconstruction from Asphalt to Concrete – C-3 Road – K0010+867 – K0010+910, K0010+964 – K0011+074 (Reconstruction from Asphalt to Concrete)
UACS No. 165003014200186
Physical Target/Cost
Original: 0.240 lane-km (2 lanes)
Unit Cost (‘000): P15,408/lane-km
Allocation (‘000): P3,698
WIN7F04773

As Modified
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) – Secondary: Reconstruction from Asphalt to Concrete – C-3 Road – K0010+867 – K0010+910, K0010+964 – K0011+043 (Reconstruction from Asphalt to Concrete)
UACS No. 165003014200186
Physical Target/Cost
Modified: 0.267 lane-km (3 lanes)
Unit Cost (‘000): P13,850/lane-km
Allocation (‘000): P3,698
WIN7F04773
June 1, 2017 FY 2017 WIN7F04762 UACS No. 165004050306357 January 1, 2017 National Capital Region Metro Manila 3rd District Engineering Office
As Per GAA
Locally Funded Projects – Roads and Bridges – Local Roads: Rehabilitation of Road with Drainage Improvement along Malinis Road, Valenzuela City (Rehabilitation of Concrete Road)
UACS No. 165004050306357
Physical Target/Cost
Original: 0.743 lane-km
Unit Cost (‘000): P26,918/lane-km
Allocation (‘000): P20,000
WIN7F04762

As Modified
Locally Funded Projects – Roads and Bridges – Local Roads: Rehabilitation of Road with Drainage Improvement along ITC Road, Valenzuela City (Rehabilitation of Concrete Road)
UACS No. 165004050306357
Physical Target/Cost
Modified: 1.405 lane-km
Unit Cost (‘000): P14,235/lane-km
Estimated Cost (‘000): P20,000
WIN7F04762
June 1, 2017 FY 2017 WIN7F04764 UACS No. 165003014100113 January 1, 2017 National Capital Region Metro Manila 3rd District Engineering Office
As Per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) – Primary: Reconstruction from Asphalt to Concrete – MacArthur H-way – K0014+368 – K0015+878 (Reconstruction from Asphalt to Concrete)
UACS No. 165003014100113
Physical Target/Cost
Original: 2.974 lane-km
Unit Cost (‘000): P16,812/lane-km
Allocation Cost (‘000): P50,000
WIN7F04764

As Modified
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) – Primary: Reconstruction from Asphalt to Concrete – MacArthur H-way – K0015+198 – K0015+878 (Reconstruction from Asphalt to Concrete)
UACS No. 165003014100113
Physical Target/Cost
Modified: 2.720 lane-km
Unit Cost (‘000): P18,382/lane-km
Allocation Cost (‘000): P50,000
WIN7F04764
June 1, 2017 FY 2017 WIN7F04763 UACS No. 165003014300238 January 1, 2017 National Capital Region Metro Manila 3rd District Engineering Office
As Per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) – Tertiary: Reconstruction from Asphalt to Concrete – B Serrano St. K0010+985 – K0010+1064, K0010+(-172) – K0010+(-119), K0010+(-094) – K0010+081 (Reconstruction from Asphalt to Concrete)
UACS No. 165003014300238
Physical Target/Cost
Original: 0.614 lane-km
Unit Cost (‘000): P13,500/lane-km
Allocation Cost (‘000): P8,289
WIN7F04763

As Modified
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) – Tertiary: Reconstruction from Asphalt to Concrete – B Serrano St. K0010+985 – K0010+1064, K0010+(-172) – K0010+(-119), K0010+(-094) – K0010+018 (Reconstruction from Asphalt to Concrete)
UACS No. 165003014300238
Physical Target/Cost
Modified: 0.488 lane-km
Unit Cost (‘000): P16,986/lane-km
Estimated Cost (‘000): P8,289
WIN7F04763
June 1, 2017 FY 2017 WIN7F04766 UACS No. 165003014300240 January 1, 2017 National Capital Region Metro Manila 3rd District Engineering Office
As Per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) – Tertiary: Rehabilitation of Concrete Road – MH Del Pilar St K0015+713 – K0017+124 (Rehabilitation of Concrete Road)
UACS No. 165003014300240
Physical Target/Cost
Original: 2.596 lane-km
Unit Cost (‘000): P15,408/lane-km
Allocation Cost (‘000): P40,000
WIN7F04766

As Modified
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) – Tertiary: Rehabilitation of Concrete Road – MH Del Pilar St K0017+574 – K0018+459 (Rehabilitation of Concrete Road)
UACS No. 165003014300240
Physical Target/Cost
Modified: 1.612 lane-km
Unit Cost (‘000): P24,814/lane-km
Estimated Cost (‘000): P40,000
WIN7F04766
June 1, 2017 2017 WIN7C01795 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Construction and Maintenance of Bridges along National Roads - Construction of New Permanent Bridges

Construction of Steel Bridge - New Tagbuane Br. Along Tagbilaran East Rd (Tagbilaran-Jagna)

Allocation - ₱ 9.18 Million
Physical Target - 246.60 square meters
Unit Cost - ₱ 37,226.28/ square meter
June 1, 2017 FY 2017 WIN7F04769 UACS No. 103004010310194 January 1, 2017 National Capital Region North Manila District Engineering Office
As Per GAA
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multipurpose Building (Center), Barangay 202, Tondo, Manila City [Construction of Multipurpose Building]
UACS No. 103004010310194
Physical Target/Cost (‘000)
Original: 1 bldg
Unit Cost (‘000): P5,000.0/bldg.
Allocation (‘000): P5,000.0
WIN7F04769

As Modified
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multipurpose Building (Center), Barangay 176, Zone 15, Tondo, Manila City [Construction of Multipurpose Building]
UACS No. 103004010310194
Physical Target/Cost (‘000)
New: 1 bldg
Unit Cost (‘000): P5,000.0/bldg.
Estimated Cost (‘000): P5,000.0
WIN7F04769
June 1, 2017 2017 WIN7C01796 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Construction and Maintenance of Bridges along National Roads - Construction of New Permanent Bridges

Construction of Steel Bridge - New Abatan Br. along Tagbilaran North Rd (Tagbilaran-Jetafe Sect)

Allocation - ₱ 19.56 Million
Physical Target - 672.53 square meters
Unit Cost - ₱ 29,084.20/ square meter
June 1, 2017 2017 WIN7C01818 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Construction and Maintenance of Bridges along National Roads - Construction of New Permanent Bridges

Construction of Steel Bridge - New Moalong Br. along Tagbilaran North Rd (Tagbilaran-Jetafe Sect)

Allocation - ₱ 11.26 Million
Physical Target - 336.26 square meters
Unit Cost - ₱ 33,485.99/square meter
June 1, 2017 2017 WIN7C01807 R.A 10924 January 12, 2017 Region VII Bohol 3rd District Engineering Office
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destination - to Declared Tourism Destinations

Construction of Concrete Road - Candijay-Cogtong Road leading to beaches and resorts Candijay Bohol 3rd

Allocation - ₱ 15,000,000.00
- ₱ 11,757,367.00 (CW1)
- ₱ 3,242,633.00 (CW2)
Physical Target - 1.398 Lane km
- 1,444.00 sq.m
Unit Cost - ₱ 8,410,133.76 / Lane km
- ₱ 2,245.59/sq.m
June 1, 2017 2017 WIN7C01797 R.A 10924 January 12, 2017 Region VII Bohol 3rd District Engineering Office
Locally Funded Projects
LIP - Roads and Bridges - Local Roads

Concreting of Barangay Roads, Cogtong, Candijay, Bohol

Allocation - ₱ 20,000,000.00
Physical Target - 3.44572 Lane km.
Unit Cost - ₱ 5,804,302.15/ Lane km
June 1, 2017 FY 2017 WIN7F04658 UACS No. 292003020401611 January 1, 2017 National Capital Region Quezon City 1st Engineering District Office
As per GAA
MFO 2: Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Malabon – Tullahan River Improvement, Sta.8+100 to Sta.8+750, Tullahan, Quezon City (Construction of Flood Mitigation Structures)
UACS No. 292003020401611
Physical Target/Cost
Per GAA/Original: 908 lm
Unit Cost: P110.132T/Lm
Allocation: Php 100M
WIN7F04658

As Modified
MFO 2: Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Malabon – Tullahan River Improvement, Brgy. Sta. Lucia, Quezon City (Construction of Flood Mitigation Structures)
UACS No. 292003020401611
Physical Target/Cost
As Modified: 993 lm
Unit Cost: P100.705T/Lm
Estimated Cost: Php 100M
WIN7F04658
June 1, 2017 FY 2017 WIN7F04641 UACS No. 292003020401608 January 1, 2017 National Capital Region Quezon City 1st Engineering District Office
As Per GAA
MFO 2: Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Malabon-Tullahan River Improvement, Brgy. Bagbag, Quezon City (Construction of Flood Mitigation Structure)
UACS No. 292003020401608
Physical Target/Cost
Per GAA/Original: 908 Lm
Unit Cost: P110.132T/Lm
Allocation: Php100M
WIN7F04641

As Modified
MFO 2: Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Malabon-Tullahan River Improvement, Brgy. San Bartolome Phase V, Quezon City (Construction of Flood Mitigation Structure)
UACS No. 292003020401608
Physical Target/Cost
As Modified: 968 Lm
Unit Cost: P103.306T/Lm
Estimated Cost: Php100M
WIN7F04641
June 1, 2017 FY 2017 WIN7F04635 UACS No. 292003020401540 January 1, 2017 National Capital Region Quezon City 1st Engineering District Office
As Per GAA
MFO 2: Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, - Construction of Slope in Marikina River – Brgy. Silangan, Quezon City (Construction of Flood Mitigation Structure)
UACS No. 292003020401540
Physical Target/Cost
Per GAA/Original: 200 Lm
Unit Cost: P500T/Lm
Allocation: Php 100M
WIN7F04635

As Modified
MFO 2: Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, - Construction of Slope Protection in Marikina River – Brgy. Batasan Hills Phase IV, Quezon City (Construction of Slope Protection Structure)
UACS No. 292003020401540
Physical Target/Cost
As Modified: 205 Lm
Unit Cost: P487.804T/Lm
Estimated Cost: Php 100M
WIN7F04635
June 1, 2017 FY 2017 WIN7F04633 UACS No. 292003020401963 January 1, 2017 National Capital Region Quezon City 1st Engineering District Office
As Per GAA
MFO 2: Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Rehabilitation/ Improvement of Pasong Tamo Creek & Tributaries, Pingkian I & II, Brgy. Pasong Tamo, Quezon City (Construction of Flood Mitigation Structure)
UACS No. 292003020401963
Physical Target/Cost
Per GAA/Original: 576.00 Lm
Unit Cost: P34.722T/Lm
Allocation: Php 20M
WIN7F04633

As Modified
MFO 2: Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Rehabilitation/ Improvement of Pasong Tamo Creek & Tributaries, (Marcel Sherwood & Pantranco). Pasong Tamo, Quezon City (Construction of Flood Mitigation Structure)
UACS No. 292003020401963
Physical Target/Cost
Modified: 897.00 Lm
Unit Cost: P22.296T/Lm
Estimated Cost: Php 20M
WIN7F04633
May 31, 2017 2017 WIN7E01638 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Concrete River Wall along Pampanga River, Sta. 15+342.59 - Sta. 15+609.39, Brgy. Tabuating, San Leonardo, Nueva Ecija
May 31, 2017 2017 WIN7E01637 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Concrete River Wall along Pampanga River, Sta. 3+214.04 - Sta. 3+494.64, Brgy. San Anton, San Leonardo, Nueva Ecija
May 31, 2017 2017 WIN7E01630 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Local Infrastructure Program - Roads and Bridges - Local Roads - Concreting of Road, Brgy. San Fernando Norte, Cabiao, Nueva Ecija
May 31, 2017 2017 WIN7E01622 FY 2017 GAA January 1, 2017 Region III Nueva Ecija 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Rehabilitation / Improvement of Digmala River Control, Ariendo Section, Sta. 4+590.36 - Sta. 4+831.36, Bongabon, Nueva Ecija
May 31, 2017 2017 WIN7F04751 FY 2017 GAA January 1, 2017 Region III Pampanga 2nd District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Slope Protection along GPDC, Sta. Theresa - Sta. Rita Section A, Lubao, Pampanga, Sta. 0+000 - Sta. 0+205

Pages