July 4, 2017 |
2017 |
WIN7E01255 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Albay 2nd Engineering Office |
As per GAA:
MFO 1: National Road Network Services - Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management-4 (HDM-4) - Primary, Reconstruction from Asphalt to Concrete - Daang Maharlika (LZ) - (S03633LZ) K0523+980 - K0525+984 (Reconstruction from Asphalt to Concrete)
Physical Target: 4.0 Lane-km
Unit Cost (P'000): P12,375.00/Lane-km
Allocation: PhP 49.500M
As MODIFIED:
MFO 1: National Road Network Services - Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management-4 (HDM-4) - Primary, Reconstruction from Asphalt to Concrete - Daang Maharlika (LZ) - (S03633LZ) K0524+080 - K0525+510 (Reconstruction from Asphalt to Concrete)
Physical Target: 2.0316 Lane-km
Unit Cost (P'000): P24,365/Lane-km
Estimated Cost: PhP 49.500M |
July 4, 2017 |
2017 |
WIN7E01291 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Albay 2nd Engineering Office |
As per GAA:
MFO 1: National Road Network Services - Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary, Rehabilitation / Major Repair of Drainage Structure along Road - Daang Maharlika Jct-Legazpi-Sto Domingo-Tabaco-Camarines Sur Bdry Rd - K0527+-877 - K0528+853, K0530+796 - K0531+147 (Rehabilitation / Major Repair of Drainage Structure along Road)
Physical Target: 6,170.00 Lm
Unit Cost (P'000): P7.98/Lm
Allocation: PhP 49.265M
As MODIFIED:
MFO 1: National Road Network Services - Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary, Rehabilitation / Major Repair of Drainage Structure along Road - Daang Maharlika Jct-Legazpi-Sto Domingo-Tabaco-Camarines Sur Bdry Rd - K0527+-305.50 - K0528+852, K0530+796 - K0531+127.50 (Rehabilitation / Major Repair of Drainage Structure along Road)
Physical Target: 4,116.70 Lm
Unit Cost (P'000): P11.97/Lm
Estimated Cost: PhP 49.265M |
July 4, 2017 |
2017 |
WIN7E01373 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Albay 2nd Engineering Office |
As per GAA:
MFO 2: Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Cagsawa Ruins Protection Dike, Sta.0+000 - Sta. 0+153 (B/S), (Section "B" Tributary), Brgy. Cullat, Daraga, Albay (Construction of Dike)
Physical Target: 306 Lm
Unit Cost (P'000): P98.039/Lm
Allocation: PhP 30.0M
As MODIFIED:
MFO 2: Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Cagsawa Ruins Protection Dike, Sta.0+692 - Sta. 0+816 (L/S, Tributary "A"), Sta.0+000 - Sta. 0+040 (R/S, tributary "B"), Sta. 0+040 - Sta.0+062 (B/S, Tributary "B"), Brgy. Cullat, Daraga, Albay (Construction of Dike)
Physical Target: 208 Lm
Unit Cost (P'000): P144.23/Lm
Estimated Cost: PhP 30.0M |
July 4, 2017 |
2017 |
WIN7E01376 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Albay 2nd Engineering Office |
As per GAA:
MFO 2: Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Cagsawa Ruins Protection Dike, Sta.0+756 - Sta. 0+861 (B/S), (Section "A" Main), Brgy. Bañag, Daraga, Albay (Construction of Dike)
Physical Target: 210 Lm
Unit Cost (P'000): P95.24/Lm
Allocation: PhP 20.0M
As MODIFIED:
MFO 2: Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Cagsawa Ruins Protection Dike, Sta.0+816 - Sta. 0+970 (L/S), (Section "A" Main), Brgy. Bañag, Daraga, Albay (Construction of Dike)
Physical Target: 154 Lm
Unit Cost (P'000): P129.87/Lm
Estimated Cost: PhP 20.0M |
July 4, 2017 |
2017 |
WIN7E01379 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Albay 2nd Engineering Office |
As per GAA:
MFO 2: Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Cagsawa Ruins Protection Dike, Sta.0+861 - Sta. 0+966 (B/S), (Section "A" Main), Brgy. Bañag, Daraga, Albay (Construction of Dike)
Physical Target: 210 Lm
Unit Cost (P'000): P95.24/Lm
Allocation: PhP 20.0M
As MODIFIED:
MFO 2: Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Cagsawa Ruins Protection Dike, Sta.0+526.40 - Sta. 0+580 (R/S), & Sta. 0+900.80 - Sta. 0+990.20 (R/S) (Section "A" Main), Brgy. Bañag, Daraga, Albay (Construction of Dike)
Physical Target: 143 Lm
Unit Cost (P'000): P139.86/Lm
Estimated Cost: PhP 20.0M |
July 4, 2017 |
2017 |
WIN7E01254 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Albay 2nd Engineering Office |
As per GAA:
MFO 2: Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Mitigation Structure - Rehabilitation of Flood Control System along Bañag River, Sta. 0+435 - Sta. 0+869.80 (R/S) Section A "Main", Sta. 0+689.80 - Sta. 0+756 (B/S Section A "Main", Daraga, Albay (Construction of Flood Mitigation Structure)
Physical Target: 326 Lm
Unit Cost (P'000): P117.81/Lm
Allocation: PhP 38.409M
As MODIFIED:
MFO 2: Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Mitigation Structure - Rehabilitation of Flood Control System along Bañag River, Sta. 0+970 - Sta. 1+245 (L/S) Section A "Main", Daraga, Albay (Construction of Flood Mitigation Structure)
Physical Target: 275 Lm
Unit Cost (P'000): P139.67/Lm
Estimated Cost: PhP 38.409M
|
July 4, 2017 |
2017 |
WIN7F04889 |
RA 10924 |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Maintenance of Flood Mitigation Structures and Drainage System, Coronel River Flood Control, Sta. 20+272.22 - Sta. 20+731.22, Barangay Calabasa, Gabaldon. Nueva Ecija
(Construction of Flood Mitigation Structure) |
July 4, 2017 |
2017 |
WIN7F04905 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Pampanga River, Brgy. Ibabao Bana, Sta. 56+910.95 - Sta. 56+984.30, Cabanatuan City, Nueva Ecija
(Construction of Flood Mitigation Structure) |
July 4, 2017 |
2017 |
WIN7F04911 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/Improvement of Digmala River Control, Palomaria Section, Brgy. Palomaria, Sta. 2+496.22 - Sta. 2+944.22, Bongabon, Nueva Ecija
(Rahbilitation/Major Repair of Flood Control Structure) |
July 4, 2017 |
2017 |
WIN7F04914 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Coronel River, Calabasa, Sta. 22+341.22 - Sta. 22+515.22, Gabaldon, Nueva Ecija
(Construction of Flood Mitigation Structure) |
July 4, 2017 |
2017 |
WIN7F04931 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects: Local Infrastructure Program
Flood Control and Drainage - Flood Control Structures/Facilities
Repair/Rehab of Ibabao Bana Flood Control, Cabanatuan City, Nueva Ecija
(Construction of Flood Mitigation Structure) |
July 4, 2017 |
2017 |
WIN7F04664 |
SR2017-01-000264 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-1 National Road Network Services: Network Development - Improvement / Widening of National Roads — Secondary:
Road Widening - Sorsogon Diversion Rd, including RROW - K0577+475-K0578+956,
K0579+210-K0579+402, K0579+417-K0580+636, K0582+376-K0583+240
ROW Acquisition - Sorsogon Diversion Rd, including RROW - K0577+475-K0578+956,
K0579+210-K0579+402, K0579+417-K0580+636, K0582+376-K0583+240
(Road Widening / ROW Acquisition)
Physical Target:
Road Widening: 7.50 lane-km
ROW Acquisition: 14,776 sq.m.
Unit Cost:
Road Widening: P13.500M/lane-km
ROW Acquisition: P3.299T/sq.m.
Allocation:
Road Widening: P101.250M
ROW Acquisition: P48.750M
MFO-1 National Road Network Services: Network Development - Improvement / Widening of National Roads — Secondary: Sorsogon Diversion Rd including RROW
K0577+475-K0578+956, K0579+210-K0579+402, K0579+417-K0580+636, K0582+376-K0583+240
(Road Widening / ROW Acquisition)
Physical Target:
Road Widening: 6.413360 lane-km
ROW Acquisition: 1,500 sq.m.
Unit Cost:
Road Widening: P22,779.40T/lane-km
ROW Acquisition: P2.601T/sq.m.
Estimated Cost: P150M
|
July 4, 2017 |
GAA FY 2017 |
WIN7F04944 |
UACS No.292003020401873 |
January 1, 2017 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA
MFO – 2 Flood Management Services, Construction/ Maintenance of Flood Mitigation Structures and Drainage System: Rehabilitation of Talilong Creek, Brgy. 28, 31 and 35, Caloocan City (Construction of Flood Mitigation Structure)
UACS No.292003020401873
Physical Target/ Cost
Per GAA/ Original: 508 Lm
Unit Cost: P39.370T/Lm
Allocation: Php 20M
WIN7F04944
As Modified
MFO – 2 Flood Management Services, Construction/ Maintenance of Flood Mitigation Structures and Drainage System: Rehabilitation of Talilong Creek, Brgy. 28, 31 and 35, Caloocan City (Construction of Flood Mitigation Structure)
UACS No.292003020401873
Physical Target/ Cost
As Modified: 1,081 Lm
Unit Cost: P18.501T/Lm
Estimated Cost: Php 20M
WIN7F04944
|
July 4, 2017 |
FY 2017 |
WIN7F04940 |
UACS No. 292003020401868 |
January 1, 2017 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As Per GAA
MFO-2 Flood Management Services, Construction/ Maintenance of Flood Mitigation Structure and Drainage Systems Rehabilitation of Canumay-Maysan Creek (Phase I), Brgy. Canumay, Valenzuela (Construction of Flood Mitigation Structure)
UACS No. 292003020401868
Physical Target/ Cost
Per GAA/ Original: 400 Lm
Unit Cost: P100.000T/Lm
Allocation: Php 40M
WIN7F04940
As Modified
MFO-2 Flood Management Services, Construction/ Maintenance of Flood Mitigation Structure and Drainage Systems Rehabilitation of Canumay-Maysan Creek (Phase I), Brgy. Canumay, Valenzuela (Construction of Flood Mitigation Structure)
UACS No. 292003020401868
Physical Target/ Cost
As Modified: 573 Lm
Unit Cost: P69.808T/Lm
Estimated Cost: Php 40M
WIN7F04940
|
July 4, 2017 |
FY 2017 |
WIN7F04939 |
UACS No. 292003020401872 |
January 1, 2017 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As Per GAA
MFO-2 Flood Management Services, Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems Rehabilitation of Punturin-Bignay Creek (Phase 1), Brgy. Punturin, Valenzuela (Construction of Flood Mitigation Structure)
UACS No. 292003020401872
Physical Target/ Cost
Per GAA/ Original: 500 Lm
Unit Cost: P100.000T/Lm
Allocation: Php 50M
WIN7F04939
As Modified
MFO-2 Flood Management Services, Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems Rehabilitation of Punturin-Bignay Creek (Phase 1), Brgy. Punturin, Valenzuela (Construction of Flood Mitigation Structure)
UACS No. 292003020401872
Physical Target/ Cost
As Modified: 716 Lm
Unit Cost: P69.832T/Lm
Estimated Cost: Php 50M
WIN7F04939
|
July 4, 2017 |
FY 2017 |
WIN7F04942 |
UACS No. 292003020401869 |
January 1, 2017 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA
MFO-2 Flood Management Services, Construction/ Maintenance of Mitigation Structure and Drainage Systems Rehabilitation of De Castro-Bisalao Creek (Phase 1), Brgy. Mapulang Lupa, Valenzuela (Construction of Mitigation Structures)
UACS No. 292003020401869
Physical Target/ Cost
Per GAA/ Original: 460 Lm
Unit Cost: P100.000T/Lm
Allocation: Php 45M
WIN7F04942
As Modified
MFO-2 Flood Management Services, Construction/ Maintenance of Mitigation Structure and Drainage Systems Rehabilitation of De Castro-Bisalao Creek (Phase 1), Brgy. Mapulang Lupa, Valenzuela (Construction of Mitigation Structures)
UACS No. 292003020401869
Physical Target/ Cost
Per GAA/ Original: 644 Lm
Unit Cost: P69.875T/Lm
Estimated Cost: Php 45M
WIN7F04942
|
July 4, 2017 |
FY 2017 |
WIN7F04941 |
UACS No. 292003020401874 |
January 1, 2017 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA
MFO-2 Flood Management Services, Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems Rehabilitation of Viente Reales Creek (Phase 2), Brgy. Viente Reales, Valenzuela (Construction of Flood Mitigation Structure)
UACS No. 292003020401874
Physical Target/ Cost
Per GAA/ Original: 100 Lm
Unit Cost: P100.00T/Lm
Allocation: Php 10M
WIN7F04941
As Modified
MFO-2 Flood Management Services, Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems Rehabilitation of Viente Reales Creek (Phase 2), Brgy. Viente Reales, Valenzuela (Construction of Flood Mitigation Structure)
UACS No. 292003020401874
Physical Target/ Cost
Modified: 140 Lm
Unit Cost: P71.428T/Lm
Estimated Cost: Php 10M
WIN7F04941
|
July 4, 2017 |
FY 2017 |
WIN7F04963 |
UACS No. 292003020401870 |
January 1, 2017 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As Per GAA
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation of Fortune Creek (Phase I), Brgy. Parada, Valenzuela [Construction of Flood Mitigation Structure]
UACS No. 292003020401870
Physical Target/ Cost (‘000)
Original: 300 lm
Unit Cost (‘000): P116.667/lm
Allocation: (‘000): P35,000.00
WIN7F04963
As Modified
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Rehabilitation of Fortune Creek (Phase I), Brgy. Parada, Valenzuela [Construction of Flood Mitigation Structure]
UACS No. 292003020401870
Physical Target/ Cost (‘000)
New: 501 lm
Unit Cost (‘000): P69.86/lm
Estimated Cost: (‘000): P35,000.00
WIN7F04963
|
July 4, 2017 |
FY 2017 |
WIN7F04999 |
UACS No. 165003014600141 |
January 1, 2017 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA
MFO-1 National Road Network Services: Asset Preservation of National Roads – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide-Tertiary, Rehabilitation/ Major Repair of Road Slope Protection Structure – Novaliches-Sn Jose Rd, K0026+834 – K0027+624 (Rehabilitation/Major Repair of Road Slope Protection Structure)
UACS No. 165003014600141
Physical Target/ Cost
Per GAA/ Original: CW-1 Rehab./Major Repair of Road Slope Protection Structure: 4,000.00 Sq.m.
Unit Cost: CW-1 Rehab./Major Repair of Road Slope Protection Structure: 5,000.00/Sq.m.
Allocation: Php 20M
WIN7F04999
As per GAA
MFO-1 National Road Network Services: Asset Preservation of National Roads – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide-Tertiary, Rehabilitation/ Major Repair of Road Slope Protection Structure – Novaliches-Sn Jose Rd, K0025+105 – K0025+178, K0025+591 – K0025++639, K0026+000 – K0026+180, K0027+690 – K0028+200 (Rehabilitation/Major Repair of Road Slope Protection Structure) (Construction of Drainage Structure)
UACS No. 165003014600141
Physical Target/ Cost
As Modified: CW-1 Rehab./Major Repair of Road Slope Protection Structure: 1,354.50 Sq.m.
CW-2 Const. of Drainage Structure: 500.00 lm
Unit Cost: CW-1 Rehab./Major Repair of Road Slope Protection Structure: 10.296T/Sq.m.
CW-2 Const. of Drainage Structure: P12.106T/Lm
Estimated Cost: Php 20M
WIN7F04999
|
July 3, 2017 |
GAA FY 2017 |
WIN7G00903 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Secondary
Road Widening Along Davao City Diversion Road Including RROW, K1512+600 - K1513+000, K1513+000 - K1513+575
TO: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Secondary
Road Widening Along Davao City Diversion Road Including RROW, K1512+600 - K1513+000, K1513+000 - K1513+575
ALLOCATION: Php 81.532 Million |
July 3, 2017 |
CY 2017 |
WIN7F04886 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Regional Office IV-B |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Improvement/Widening of National Roads
- Secondary Road :
Marinduque Circumferential road
K0070+420 - K0072+380,
K0092+000 - K0092+977,
K0098+060 - K0098+980
L = 7.914 lane km
Php = 150.00 Million
( Road Widening )
|
July 3, 2017 |
CY 2017 |
WIN7F04898 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Regional Office IV-B |
as MODIFIED:
MF01 - National Road Network Services
- Construction and Maintenance of Bridges
along National Roads
- Replacement of Permanent Weak Bridges:
Malatgao Bridge along
Puerto Princesa South Road
CW1 = 1463.2 sq.m.
Php = 170.00 million
( Replacement of Bridge ) |
June 30, 2017 |
2017 |
165003016900037 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Network Development - Off-Carriageway Improvement including Drainage - Tertiary - San Antonio - Floridablanca Rd., K0081+000 - K0083+000, K0085+400 - K0085+667
(Shoulder Paving / Construction) |
June 30, 2017 |
2017 |
WIN7F04866 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Network Development - Off-Carriageway Improvement including Drainage - Secondary - Angeles - Porac - Floridablanca - Dinalupihan Rd, K0089+320 - K0091+000
(Off-Carriageway Improvement : Shoulder Paving/Construction)
(Construction of Drainage Structure) |
June 30, 2017 |
2017 |
WIN7F04867 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads – Road Construction in Purok 2, 5 & 6, San Juan, Lubao, Pampanga
(Construction of Concrete Road)
(Construction of Drainage Structure along Road) |
June 30, 2017 |
2017 |
WIN7F04919 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads – Road Concreting in San Antonio - San Juan, Guagua, Pampanga
(Construction of Concrete Road)
(Construction of Drainage Structure along Road) |
June 30, 2017 |
2017 |
WIN7E01766 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads – Road Concreting in Sto. Tomas, Lubao, Pampanga
|
June 30, 2017 |
2017 |
WIN7F04897 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction of Line Canal in Sta. Cruz, Lubao, Pampanga |
June 30, 2017 |
2017 |
WIn7F04883 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction of Line Canal in Villamaria, Porac, Pampanga |
June 30, 2017 |
2017 |
WIN7F04882 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads - Road Concreting in Sapang Uwak, Porac, Pampanga |
June 30, 2017 |
2017 |
WIN7F04896 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures/Facilities - Repair of Dike in Manuali, Porac, Pampanga |
June 30, 2017 |
2017 |
WIN7F04947 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads - Road Concreting in San Vicente, Lubao, Pampanga |
June 30, 2017 |
2017 |
WIN7F04920 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads - Road Concreting in Sta. Barbara, Lubao, Pampanga |
June 30, 2017 |
2017 |
WIN7F04926 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction of Line Canal in San Juan 1, Guagua, Pampanga |
June 30, 2017 |
GAA FY 2017 |
WIN7G01621 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction of Concrete Road and Construction of Road Slope Protection Structure - Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue (Bago Aplaya-Times Beach Section), including Bridge, Davao City (Package 3)
TO: MFO 1 - National Road Network Services
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction of Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue (Bago Aplaya-Times Beach Section), Including Bridge Construction, Davao City (Package 3)
ALLOCATION: Php 300.000 Million
|
June 30, 2017 |
2017 |
WIN7F04893 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Repair/Rehabilitation of Multi-Purpose Building (Barangay Hall), Sto. Nino, Hagonoy, Bulacan |
June 30, 2017 |
FY 2017 |
WIN7E01804 |
UACS No. 292003020401601 |
January 1, 2017 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As Per GAA
MFO 2 –Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Las Piñas River Improvement including ROW, Pulang Lupa/ Tramo Bridge to C-5 Bridge, Las Piñas City [Construction of Flood Mitigation Structure]
UACS No. 292003020401601
Physical Target/ Cost (‘000)
Original: 695 lm
Unit Cost (‘000): P143.885/lm
Allocation (‘000): 100,000.0
WIN7E01804
As Modified
MFO 2 –Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Structures & Other Improvement at Las Piñas River Tributaries including Right-of-Way (C-5 Bridge towards Naga Creek), Las Piñas City [Construction of Flood Mitigation Structure]
UACS No. 292003020401601
Physical Target/ Cost (‘000)
New: 540 lm
Unit Cost (‘000): P185.185/lm
Estimated Cost (‘000): 100,000.0
WIN7E01804
|
June 30, 2017 |
2017 |
WIN7F04895 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads - Construction of Roads, Brgy. Bonga Menor, Bustos, Bulacan |
June 30, 2017 |
2017 |
WIN7F04936 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction/Improvement of Multi-Purpose Building, Biñang 1st, Bocaue, Bulacan |
June 30, 2017 |
2017 |
WIN7F04958 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Improvement/Rehabilitation of Multi-Purpose Buildings in Bunlo and Duhat, Bocaue, Bulacan |
June 30, 2017 |
2017 |
WIN7F04959 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction of Multi-Purpose Building (Covered Court) at Marcelo H. Del Pilar Memorial School, San Nicolas, Bulakan, Bulacan |
June 30, 2017 |
2017 |
WIN7F04960 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Improvement/Rehabilitation of Multi-Purpose Building (Training Center), San Jose, Bulakan, Bulacan |
June 30, 2017 |
FY 2017 |
WIN7F04993 |
UACS No. 292003020401672 |
January 1, 2017 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Mitigation Structure – Zapote River Improvement Works (C5 to Longos) Las Piñas City (Construction of Flood Mitigation Structure)
UACS No. 292003020401672
Physical Target/ Cost
Original: 1,300 lineal meter
Unit Cost (P’000): P76.923T/lineal meter
Allocation Cost (P’000): P100,000
WIN7F04993
As Modified
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Mitigation Structure: Zapote River Improvement Works (C5 to Almanza 2), Las Piñas City (Construction of Revetment)
UACS No. 292003020401672
Physical Target/ Cost
Modified: 452.1 lineal meter
Unit Cost (P’000): P76.923T/lineal meter
Estimated Cost (P’000): P100,000
WIN7F04993
|
June 30, 2017 |
2017 |
WIN7F04962 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Improvement/Repair/Rehabilitation of existing Multi-Purpose Building, Bulakan, Bulacan |
June 30, 2017 |
2017 |
WIN7F04964 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction / Improvement of Barangay Hall, Sta. Barbara, Baliwag, Bulacan |
June 30, 2017 |
FY 2017 |
WIN7F04907 |
UACS No. 292004020200471 |
January 1, 2017 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA
Locally Funded Projects – VIILP, Flood Control and Drainage – Drainage/Protection Works: Construction/ Improvement of Slope Protection along Balimbing Creek, Barangay Putatan, Muntinlupa City (Construction of Flood Mitigation Structure)
UACS No. 292004020200471
Physical Target/ Cost
Original: 124 lineal meter
Unit Cost (P’000): P80.645T/lineal meter
Allocation Cost (P’000): P10,000
WIN7F04907
As Modified
Locally Funded Projects – VIILP, Flood Control and Drainage – Drainage/Protection Works: Construction of Slope Protection along Balimbing Creek, Brgy. Poblacion, Muntinlupa City (Construction of Flood Mitigation Structure)
UACS No. 292004020200471
Physical Target/ Cost
Modified: 93.5 lineal meter
Unit Cost (P’000): P106.952T/lineal meter
Estimated Cost (P’000): P10,000
WIN7F04907
|
June 30, 2017 |
GAA FY 2017 |
WIN7G01628 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction of Concrete Road and Construction of Road Slope Protection Structure - Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue (Bago Aplaya-Times Beach Section), Davao City (Package 4)
TO: MFO 1 - National Road Network Services
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction of Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue (Bago Aplaya-Times Beach Section), Davao City (Package 4)
ALLOCATION: Php 240.000 Million
|
June 30, 2017 |
GAA FY 2017 |
WIN7G01629 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction of Concrete Road and Construction of Road Slope Protection Structure - Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue (Bago Aplaya-Times Beach Section), including ROW, Davao City (Package 5)
TO: MFO 1 - National Road Network Services
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction of Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue (Bago Aplaya-Times Beach Section), including RROW, Davao City (Package 5)
ALLOCATION: Php 440.000 Million
|
June 30, 2017 |
GAA FY 2017 |
WIN7G01634 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction of Concrete Road and Construction of Road Slope Protection Structure - Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue (Bago Aplaya-Times Beach Section), including RROW, Davao City (Package 1)
TO: MFO 1 - National Road Network Services
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction of Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue (Bago Aplaya-Times Beach Section), including RROW, Davao City (Package 1)
ALLOCATION: Php 740.000 Million
|
June 29, 2017 |
2017 |
WIN7C01958 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
Construction of Flood Control Structure at Mangoto River Basin along Toledo-Pinamungajan-Aloguinsan-Mantalongon Road, Sta. 00+110 - Sta. 01+560, Pinamungajan, Cebu
Allocation - ₱ 45,000,000 - CW1
Physical Target - 1,450 l.m. - CW1
Unit Cost - ₱ 31,034.48/l.m. - CW1 |
June 29, 2017 |
GAA FY 2017 |
WIN7G01624 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Locally-Funded Projects
LIP - Buildings and Other Structures - Multipurpose/Facilities
Completion of Multi-Purpose Building (PTV Complex), Davao City
TO: Locally-Funded Projects
LIP - Buildings and Other Structures - Multipurpose/Facilities
Construction of Multi-Purpose Building (PTV Complex), Davao City
ALLOCATION: Php 4.000 Million |
June 29, 2017 |
FY 2017 |
WIN7F04921 |
UACS No. 292003020401919 |
January 1, 2017 |
National Capital Region |
North Manila District Engineering Office |
As per GAA
MFO 2 – Flood Management Services – Construction/Maintenance of Flood Mitigation Structure and Drainage System: Construction of Flood Mitigation Structure-Proposed Feeder Channels for the Blumentritt Interceptors, Manila City (Construction of Flood Mitigation Structure)
UACS No. 292003020401919
Physical Target/ Cost
Original: 28.00 lineal meter
Unit Cost: P839.286T/lineal meter
Allocation Cost: P23.50M
WIN7F04921
Modified
MFO 2 – Flood Management Services – Construction/Maintenance of Flood Mitigation Structure and Drainage System: Proposed Feeder Channels for the Blumentritt Interceptors, Manila City (Construction of Flood Mitigation Structure)
UACS No. 292003020401919
Physical Target/ Cost
Modified: 169.50 lineal meter
Unit Cost: P138.643T/lineal meter
Estimated Cost: P23.50M
WIN7F04921
|
June 29, 2017 |
FY 2017 |
WIN7F04912 |
UACS No. 103004010310284 |
January 1, 2017 |
National Capital Region |
South Manila District Engineering Office |
Per GAA
Locally Funded Projects: Local Infrastructure Program: Buildings and Other Structures – Multi-Purpose/ Facilities: Construction of Multi-Purpose Building (Center), Barangay 183, Pasay City (Construction of Multi-Purpose Building)
UACS No. 103004010310284
Physical Target/ Cost
Per GAA/ Original: Physical Target 1 Bldg.
Unit Cost: P5M/bldg.
Allocation: P5M
WIN7F04912
As Modified
Locally Funded Projects: Local Infrastructure Program: Buildings and Other Structures – Multi-Purpose/ Facilities: Construction of Multi-Purpose Building (center), Barangay 133, Zone 13, Pasay City (Construction of Multi-Purpose Building)
UACS No. 103004010310284
Physical Target/ Cost
As Modified: Physical Target 1 Bldg.
Unit Cost: P5M/bldg.
Estimated Cost: P5M
WIN7F04912
|
June 29, 2017 |
FY 2017 |
WIN7F04928 |
UACS No. 103004010310282 |
January 1, 2017 |
National Capital Region |
South Manila District Engineering Office |
Per GAA
Locally Funded Projects: Local Infrastructure Program: Buildings and Other Structures – Multipurpose/ Facilities: Construction of Multipurpose Building (Center), Barangay 807, Manila City (Construction of Multi-Purpose Building)
UACS No. 103004010310282
Physical Target/ Cost
Per GAA/ Original: Physical Target 1 bldg.
Unit Cost: P5m/bldg..
Allocation: P5M
WIN7F04928
As Modified
Locally Funded Projects: Local Infrastructure Program: Buildings and Other Structures – Multipurpose/ Facilities: Construction of Multipurpose Building (Center), Paraiso ng Batang Maynila, Manila City (Construction of Multi-Purpose Building)
UACS No. 103004010310282
Physical Target/ Cost
As Modified: Physical Target 1 bldg.
Unit Cost: P5m/bldg..
Estimated Cost: P5M
WIN7F04928
|
June 29, 2017 |
GAA FY 2017 |
WIN7G01617 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction of Concrete Road and Construction of Road Slope Protection Structure - Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue (Bago Aplaya-Times Beach Section), Davao City (Package 2)
TO: MFO 1 - National Road Network Services
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction of Davao City Coastal Bypass Road at Jct. Davao-Cotabato Road-Bago Aplaya-Talomo-Matina Aplaya-Roxas Avenue (Bago Aplaya-Times Beach Section), Davao City (Package 2)
ALLOCATION: Php 240.000 Million |
June 29, 2017 |
FY 2017 |
WIN7E001786 |
UACS No. 292004020100397 |
January 1, 2017 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As Per GAA
Locally Funded Projects – LIP – Flood Control and Drainage – Flood Control Structures/ Facilities – Flood Control/ Mitigation Project: Construction/Rehabilitation of Riverwall along Tullahan River (Sta. 7+502 to Sta. 7+328) Marulas, 2nd District, Valenzuela City [Construction of Flood Mitigation Structure]
UACS No. 292004020100397
Physical Target/ Cost (‘000)
Original: 500 lm
Unit Cost (‘000): P100.0/lm
Allocation (‘000): P50,000.00
WIN7E001786
As Modified
Locally Funded Projects – LIP – Flood Control and Drainage – Flood Control Structures/ Facilities – Flood Control/ Mitigation Project: Construction/Rehabilitation of Riverwall along Tullahan River (Sta. 7+502 to Sta. 7+394) Marulas, 2nd District, Valenzuela City [Construction of Flood Mitigation Structure]
UACS No. 292004020100397
Physical Target/ Cost (‘000)
New: 108 lm
Unit Cost (‘000): P462.96/lm
Estimated Cost (‘000): P50,000.00
WIN7E001786
|
June 29, 2017 |
FY 2017 |
WIN7F04950 |
UACS No. 165003014000143 |
January 1, 2017 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Preventive Maintenance based on Pavement Management System/ Highway Development and Management-4 (HDM-4) – Tertiary: Preventive Maintenance of Road: Concrete Reblocking – CP Garcia Ave – K0014+-660 – K0015+718 (Preventive Maintenance of Road: Concrete Reblocking)
UACS No. 165003014000143
Physical Target/ Cost
Original: 4.746 lane-km
Unit Cost: P4.21M/lane-km
Allocation Cost: P20.00M
WIN7F04950
As Modified
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Preventive Maintenance based on Pavement Management System/ Highway Development and Management-4 (HDM-4) – Tertiary: Preventive Maintenance of Road: Concrete Reblocking – CP Garcia Ave – K0014+-660 – K0015+718, Quezon City (Preventive Maintenance of Road: Concrete Reblocking)
UACS No. 165003014000143
Physical Target/ Cost
Modified: 1.77 lane-km
Unit Cost: P11.30M/lane-km
Estimated Cost: P20.00M
WIN7F04950
|
June 29, 2017 |
2017 |
WIN7G01615 |
SR2017-02-002452 |
February 2, 2017 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and declared Tourism Destinations - To declared Tourism Destinations
Construction/Improvement of Access Roads leading to Declared Tourism Destinations - Banza to Magallanes Road leading to Centennial Tree and Beaches, Magallanes, Agusan del Norte
Allocation : ₱ 100.00 Million (Total)
: ₱ 8,057,267.04 (Concrete Road)
: ₱ 91,942,732.96 (Gravel Road)
Physical Target : 0.712 lane km (Concrete Road)
: 1.720 lane km (Gravel Road)
|
June 29, 2017 |
2017 |
WIN7G01600 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Construction and Maintenance of Bridges along National Roads - Replacement of Permanent Weak Bridges
Replacement of Permanent Weak Bridges - Humilog Bridge (B00847MN) along Daang Maharlika (Surigao-Agusan Section), K1219+625 - K1219+643
Allocation : ₱ 40.00 Million (Total)
: ₱ 38,065,726.73 (Bridge Replacement)
: ₱ 1,934,273.27 (ROW Acquisition)
Physical Target : 289.80 sq.m. (Bridge Replacement)
: 200.00 sq.m. (ROW Acquisition)
|
June 29, 2017 |
2017 |
WIN7G01631 |
RA 10924 |
December 29, 2016 |
Region XIII |
Surigao del Norte 1st District Engineering Office |
Modified:
LFP: VIILP - Roads and Bridges - Local Bridges
Rehabilitation/Repair of Bridges along San Francisco - Malimono Road, San Francisco - Malimono Section, Surigao del Norte, Gadong RCDG Br., Oslao Steel Truss Br., Duncilla Steel Truss Br., Balite Steel Girder Br., Tigbaw Steel Girder Br., Sabang Steel Truss Br., Taytay Steel Truss Br., Cuyangan Steel Truss Br., and Malimono RCDG Br.
Allocation : ₱ 50.00 Million (Total)
: ₱ 176,973.13 (Gadong RCDG Br.)
: ₱ 9,218,530.58 (Oslao Steel Truss Br.)
: ₱ 7,171,400.21 (Duncilla Steel Truss Br.)
: ₱ 4,760,824.07 (Balite Steel Girder Br.)
: ₱ 9,261,144.29 (Tigbaw Steel Girder Br.)
: ₱ 5,675,568.60 (Sabang Steel Truss Br.)
: ₱ 4,810,416.38 (Taytay Steel Truss Br.)
: ₱ 8,412,648.10 (Cuyangan Steel Truss Br.)
: ₱ 8,412,648.10 (Malimono RCDG Br.)
Physical Target :
: 1.00 Number of Bridge (Gadong RCDG Br.)
: 1.00 Number of Bridge (Oslao Steel Truss Br.)
: 1.00 Number of Bridge (Duncilla Steel Truss Br.)
: 1.00 Number of Bridge (Balite Steel Girder Br.)
: 1.00 Number of Bridge (Tigbaw Steel Girder Br.)
: 1.00 Number of Bridge (Sabang Steel Truss Br.)
: 1.00 Number of Bridge (Taytay Steel Truss Br.)
: 1.00 Number of Bridge (Cuyangan Steel Truss Br.)
: 1.00 Number of Bridge (Malimono RCDG Br.)
|
June 29, 2017 |
2017 |
WIN7F04864 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction / Improvement / Rehabilitation of Dike Slope Protection along Porac River, Sto. Cristo Section, Lubao, Pampanga |
June 29, 2017 |
2017 |
165003014100132 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation of National Roads - Rehabilitation / Reconstruction / Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System / Highway Development Management - 4 (HDM-4) – Primary - Jose Abad Santos Avenue (JASA), K0077+160 - K0077+408, K0079+600 - K0079+760 |
June 28, 2017 |
CY 2017 |
UACS: 165003030600045 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Southern Mindoro Engineering District Office |
as MODIFIED:
MF03 - Construction and maintenance Services
of Other Infrastructure
- Construction/Improvement of Access Road
leading to Airports
Construction/Improvement of Access Road
leading to Pinamalayan Airport Road
L = 2.6554 lane km
Php = 25.00 Million
( Construction of Concrete Road ) |
June 28, 2017 |
CY 2017 |
UACS: 165003030600044 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Southern Mindoro Engineering District Office |
as MODIFIED:
MF03 - Construction and Maintenance Services
of Other Infrastructure
- Construction/Improvement of Access Roads
leading to Airports
Agos II Bridge along Pinamalayan Airport Road
Pinamalayan, Oriental Mindoro
CW1 = 122.112 sq.m.
Php = 6,858.59666 Million
( Construction of Concrete Bridge )
CW2 = 0.4504 lane km
Php = 5,741.40334 Million
( Construction of Concrete Road )
Total Php = 12.60 Million
|
June 28, 2017 |
CY 2017 |
UACS: 165003015100289 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Southern Mindoro Engineering District Office |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Improvement/Widening of National Roads
- Secondary Road Widening
Calapan South Road
K0181+191 - K0182+010
( Road Widening )
( Construction of Drainage Structure along
along Road )
CW1 = 1.6681 lane km
CW2 = 428.55 lm
Php = 20.00 Million |
June 28, 2017 |
CY 2017 |
UACS: 165003030700097 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Southern Mindoro Engineering District Office |
as MODIFIED:
MF03 - Construction and Maintenance Services of
Other Infrastructures
- Construction/Improvement of Access Road
leading to Seaports
- Construction/Improvement of Access road
leading to Roxas Port
CW1 = 2.61925 lane km
Php = 19.988 Million
( Road Widening )
CW2 = 2,322.25 lm
Php = 15.596 Million
( Construction of Drainage Structure along Road )
CW3 = 1.456 km
Php = 9.416 Million
( Road Safety: Street Lightning )
Total Php = 45.00 Million
|
June 28, 2017 |
FY 2017 |
P00121533VS-CW1 |
292003020403151 |
January 1, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
MODIFICATION:
FROM: MFO2 Flood Management Service
Construction of Flood Control Revetment at Bonbon River Basin along Toledo-Pinamungajan- Aloguinsan-Mantalongon Road, K0071 + 787, Poblacion, Aloguinsan, Cebu
TO: MFO2 Flood Management Service
Construction of Flood Control Structure at Mangoto River Basin along Toledo-Pinamungajan- Aloguinsan-Mantalongon Road, Sta. 00+110 – Sta. 01+560, Pinamungajan, Cebu |
June 28, 2017 |
CY 2017 |
WIN7E01694 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Palawan 3rd District Engineering Office |
as MODIFIED:
Locally Funded Projects
- VIILP
- Roads and Bridges
- Local Roads
Concreting of Socrates Road
( Malvar-Abanico-Jil),
Brgy. San Pedro, Puerto Princesa, Palawan
L = 2.7766 lane km
Php = 76.610 Million
( Construction of Concrete Road ) |
June 28, 2017 |
CY 2017 |
WIN7F04879 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Palawan 3rd District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Construction and Maintenance of Bridges
along National Roads
- Replacement of Permanent Weak Bridges
Replacement of Tagburos Bridge ( B00081PW)
along Puerto Princesa North Road
CW1 = 351.54 sq m
Php = 35.720 Million
( Replacement of Bridge ) |
June 28, 2017 |
CY 2017 |
WIN7E01580 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Palawan 3rd District Engineering Office |
AS MODIFIED:
Locally - Funded Projects :
- Roads and Bridges
- Local Roads
Abrea Road ( Rizal Ave. - Jacana Wharf )
Puerto Princesa City, Palawan
Sta. 1+316.50 - Sta. 2+868.40
( Construction of Local Road )
L = 3.104 lane km
Php = 79.00 Million |
June 28, 2017 |
2017 |
WIN7G02610 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Construction and Maintenance of Bridges along National Roads - Construction of New Permanent Bridges
Construction of Concrete Bridge - Tagpulangao Bridge 2 along Bayugan -Esperanza Rd
Allocation : ₱ 16.020 Million
Physical Target : 168.12 sq.m.
|
June 28, 2017 |
2017 |
WIN7G01608 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges from 1 to 2 lanes
Widening of Dimasalang Bridge (B01795MN) from one to two lanes along Butuan City-Talacogon-Loreto-Veruela-Sta. Josefa Rd.
Allocation : ₱ 12.00 Million
Physical Target : 144.77 sq.m.
|
June 28, 2017 |
2017 |
WIN7G01614 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes
Widening of Bridge - Afga Bridge (B00894MN) along Daang Maharlika (Agusan - Davao Sect)
Allocation : ₱ 18.530 Million
Physical Target : 220.97 sq.m.
|
June 28, 2017 |
2017 |
WIN7G01616 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes
Widening of Bridge - Mambutay Bridge (B00898MN) along Daang Maharlika (Agusan - Davao Sect)
Allocation : ₱ 18.450 Million
Physical Target : 198.10 sq.m.
|
June 28, 2017 |
2017 |
WIN7G01604 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified;
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes
Widening of Bridge - Taglatawan Bridge (B00901MN) along Daang Maharlika (Agusan - Davao Sect)
Allocation : ₱ 20.000 Million
Physical Target : 202.215 sq.m.
|
June 28, 2017 |
2017 |
WIN7G01607 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes
Widening of Hupas Bridge (B00895MN) from two to four lanes along Daang Maharlika (Agusan - Davao Sect)
Allocation : ₱ 31.00 Million
Physical Target : 331.57 sq.m.
|
June 28, 2017 |
2017 |
WIN7G01609 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Concrete Dike along Poblacion-Magtuyon-Talacogon Road, Poblacion, San Luis, Agusan del Sur, Sta. 0+070 - Sta. 0+107
Allocation : ₱ 19.99 Million
Physical Target : 37.00 lm
|
June 28, 2017 |
2017 |
WIN7G01623 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified;
Construction and Maintenance of Bridges along National Roads - Rehabilitation/Major Repair of Permanent Bridges
Rehabilitation/Major Repair of Bridge - Tugpan Bridge (B00595MN) along Butuan City-Talacogon-Loreto-Veruela-Sta. Josefa Rd.
Allocation : ₱ 19.00 Million
Physical Target : 1.00 number of Bridge
|
June 28, 2017 |
2017 |
WIN7E01737 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Rehabilitation of Flood Control Structures along Pampanga River, Sta. 018+000 to Sta. 018+330.80, Brgy. Poblacion Norte, Rizal, Nueva Ecija
(Construction of Flood Mitigation Structure) |
June 28, 2017 |
2017 |
WIN7E01736 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/Improvement of Banco River Control, Brgy. Macapsing, Sta. 4+019-Sta.4+161.80, Rizal, Nueva Ecija
(Rehabilitation/Major Repair of Flood Control Structure) |
June 28, 2017 |
2017 |
103004010310697 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 3rd District Engineering Office |
Buildings and Other Structures - Multipurpose/Facilities: Construction of Motorpool Office Warehouse and Repair Bay, Provincial Capitol Complex, Tuguegarao City, Cagayan |
June 28, 2017 |
2017 |
103004010310699 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 3rd District Engineering Office |
Buildings and Other Structures - Multipurpose/Facilities: Construction of Provincial Engineers Office (Main Building), Provincial Capitol Complex, Tuguegarao City, Cagayan |
June 28, 2017 |
2017 |
103004010310694 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 3rd District Engineering Office |
Buildings and Other Structures - Multipurpose/Facilities: Construction of Multi-purpose Building, Brgy. Carig Norte, Tuguegarao City, Cagayan |
June 28, 2017 |
2017 |
103004010310698 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 3rd District Engineering Office |
Buildings and Other Structures - Multi-purpose/Facilities: Construction of Provincial Engineering Warehouse, Provincial Capitol Center, Tuguegarao City, Cagayan |
June 27, 2017 |
2017 |
292003020401475 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Dike and Slope Protection along Tarlac River Control, Paniqui-Camiling Section (Left Dike), Paniqui and Camiling, Tarlac Sta. 0+000 to Sta. 0+771
(Construction of Dike) |
June 27, 2017 |
2017 |
292003020401674 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Dike and Slope Protection along Tarlac River Control, Paniqui-Camiling Section (Left Dike), Paniqui and Camiling, Tarlac
Sta. 0+771 to Sta. 1+542
(Construction of Flood Mitigation Structure) |
June 27, 2017 |
2017 |
292003020402619 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection along Camiling River Control, Libueg Section, Camiling, Tarlac 1st LD
(Construction of Flood Mitigation Structure) |
June 27, 2017 |
2017 |
292003020402642 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation/Improvement of Slope Protection along Tarlac River Control, Carangi-an-Cutcut I Section, Tarlac City, Tarlac 2nd LD
(Construction of Flood Mitigation Structure) |
June 27, 2017 |
2017 |
292003020402615 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection along Camiling River at Brgy. Telbang (Phase II), Camiling, Tarlac 1st LD
(Construction of Flood Mitigation Structure) |
June 27, 2017 |
2017 |
165003014300234 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Asset Preservation of National Roads
Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Tertiary
Tarlac-Guimba Rd via Victoria
K0127+(-654) - K0127+(-592), K0127+(-592)-K0127+(-219), K0127+(-219)-K0127+000, K0127+000-K0127+794, K0127+794-K0128+000, K0128+000-K0128+155, K0130+800-K0131+000, K0131+000-K0131+625, K0131+625-K0132+000, K0132+000-K0132+332, K0132+984-K0134+000, K0134+000-K0134+296
(Reconstruction from Concrete to Concrete) |
June 27, 2017 |
2017 |
165003015200134 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Network Development
Improvement/Widening of National Roads - Tertiary
Tarlac-Guimba Rd via Victoria
K0133+000 - K0136+000, K0144+989.80-K0146+963.80
(Road Widening) |
June 27, 2017 |
2017 |
165003015200157 |
RA 10294 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Network Development
Improvement/Widening of National Roads - Tertiary
Victoria-Pura Rd
K0152+481 - K0153+611
(CW-1: Road Widening)
(CW-2: Construction of Drainage Structure along Road) |
June 27, 2017 |
2017 |
165003014300317 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Asset Preservation of National Roads
Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4)-Tertiary
Tarlac City-Sn Jose via Tibag-Burgos Rd
K0129+290-K0131+000
(Reconstruction from Concrete to Concrete) |
June 27, 2017 |
2017 |
165003016900041 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Network Development - Off-Carriageway Improvement including drainage - Tertiary
Ramos-Pura Rd
K0155+290-K0156+858
(Off-Carriageway Improvement: Shoulder Paving/Construction) |
June 27, 2017 |
2017 |
292004020200539 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Flood Control and Drainage - Drainage/Protection Works
Construction of Slope Protection along Camiling River Control, Sawat Section, Camiling, Tarlac
(Construction of Slope Protection Structure) |
June 27, 2017 |
2017 |
103004010311171 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Locally-Funded Projects: Local Infrastructure Program
Buildings and Other Structures - Multipurpose/Facilities
Construction of Multi-Purpose Building (Covered Court), Ramos National High School, Brgy. Poblacion South, Ramos, Tarlac
(Construction of Multi-Purpose Building) |
June 27, 2017 |
2017 |
165004050307498 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Locally-Funded Projects: Local Infrastructure Program
Roads and Bridges - Local Roads
Improvement of Maliwalo to Ungot Road, Brgy. Maliwalo, Tarlac City, Tarlac
(Construction of Concrete Raoad) |
June 27, 2017 |
2017 |
165004050307501 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Brgy. Road at Palacpalac, Victoria, Tarlac
(Construction of Concrete Road) |
June 27, 2017 |
2017 |
165004050307496 |
RA 10924 |
January 27, 2017 |
Region III |
Tarlac District Engineering Office |
Locally-Funded Projects: Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Road Network at the NHA-LGU Housing Project, Brgy. estipona, Pura, Tarlac
(Construction of Concrete Road) |
June 27, 2017 |
2017 |
103004010310762 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 3rd District Engineering Office |
Buildings and Other Structures - Multipurpose/Facilities, Construction of Activity Center/Covered Court, La Paz National High School, Brgy. La Paz, Cabatuan, Isabela |