Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
May 2, 2018 FY 2018 WIN8C02613 UACS No. 320101102157000 April 24, 2018 Region IX Zamboanga del Norte 1st District Engineering Office
UACS No. 320101102157000
Project ID: P00221457MN
OO2: Protect Lives and Properties
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structure along Ponot Diut River (downstream) both sides, Jose Dalman, Zamboanga del Norte
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 459 l.m
Unit Cost: P 85,000/l.m
EAO: P 800,000.00
Allocation: P 40,000,000.00
May 2, 2018 FY 2018 WIN8C02611 UACS No. 320101102156000 April 24, 2018 Region IX Zamboanga del Norte 1st District Engineering Office
UACS No. 320101102156000
Project ID: P00220346MN
OO2: Protect Lives and Properties
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Dohinob River, Roxas, Zamboanga del Norte
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 545 l.m
Unit Cost: P 89,900/l.m
EAO: P 1,000,000.00
Allocation: P 50,000,000.00
May 2, 2018 FY 2018 WIN8C02629 UACS No. 300204100197000 April 24, 2018 Region IX Zamboanga del Norte 1st District Engineering Office
UACS No. 300204100197000
Project ID: P00230010MN
Convergence and Special Support Program
Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
Jct. Dipolog- Sindangan - Liloy Road connecting to Bago-Siari Section in Support of Rice, Rubber, Coconut, & Abaca Industries, Sindangan, Zamboanga del Norte
Physical Target:
CW-1- Construction of Concrete Road: 4.148 Lane km
Unit Cost: P 11,812,921.89/Lane km
EAO: P 1,000,000.00
Allocation: P 50,000,000.00
May 2, 2018 FY 2018 WIN8C02616 UACS No. 300118200016000 April 24, 2018 Region IX Zamboanga del Norte 1st District Engineering Office
UACS No. 300118200016000
Project ID: P00240240MN
Local Roads and Bridges - Local Bridges - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure Including Local Projects
Replacement of Barra Bridge 1 along Barra- Minaog Road leading to Dipolog City Airport, Dipolog City, Zamboanga del Norte
Physical Target:
CW-1- Replacement of Bridge: 518.549 Sq.m.
Unit Cost: P 97,700.00/Sq.m.
EAO: P 1,838,375.00
Excess: P 12,475,000.00
Allocation: P 65,000,000.00
May 2, 2018 2018 WIN8C02606 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Agusan del Sur 1st District Engineering Office
OO2- Organizational Outcome 2 / Protect Lives and Properties Against Major Floods / Construction/ Maintenance of Flood Mitigation Structures and Drainage System

FROM:
Construction of Hamogaway Flood Control Structure including River Training (Downstream) along Daang Maharlika (Agusan - Davao Section), K0000+000 - K0000+268, Bayugan, Agusan del Sur

Scope of Work: Construction of Flood Mitigation Structure
Physical Target: 268.00 lm
Amount : Php 10,000,000.00

TO:
Construction of Hamogaway Flood Control Structure including River Training (Downstream) along Daang Maharlika (Agusan - Davao Section), Sta.0+000 – Sta.0+134, Bayugan, Agusan del Sur

Scope of Work: Construction of Flood Mitigation Structure
Physical Target: 134.00 lm
Amount : Php 10,000,000.00
May 2, 2018 2018 WIN8C02607 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Agusan del Sur 1st District Engineering Office
OO1- Ensure Safe and Reliable National Road System
Network Development
Construction of By-pass and Diversion Roads

FROM:

Talacogon Bypass Road, incl. ROW, Agusan del Sur

Scope of Work: Construction of Concrete Road
ROW Acquisition
Physical Target: 0.951 lane km
120,000.00 square meters
Amount : Php 26,536,000.00


TO:

Scope of Work: Construction of Concrete Road
ROW Acquisition
Physical Target: 0.612 lane km
18,360.00 square meters
Amount : Php 26,536,000.00
May 1, 2018 FY 2018 WIN8C02646 UACS No. 310204100311000 April 25, 2018 Region IX Regional Office IX
UACS No. 310204100311000
Project ID: P00200309MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Zamboanga City Diversion Road (Cabaluay - Zambowood - Mampang Section), Package 1, Zamboanga City
Physical Target:
CW-1- Construction of Concrete Road: 3.52 lane km
Unit Cost: P 38,380,681.82
EAO: P 4,900,000.00
Allocation: P 140,000,000.00
May 1, 2018 FY 2018 WIN8C02647 UACS No. 310204100312000 April 25, 2018 Region IX Regional Office IX
UACS No. 310204100312000
Project ID: P00200310MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Zamboanga City Diversion Road (Cabaluay - Zambowood - Mampang Section), Package 2, incl. ROW, Zamboanga City
Physical Target:
CW-1- Construction of Concrete Road: 6.75 lane km
Unit Cost: P 19,467,346.22/lane km
Physical Target:
CW-2- ROW: 165,109.71 sq.m
Unit Cost: P 300/sq.m
EAO: P 6,562,500.00
Allocation: P 187,500,000.00
May 1, 2018 FY 2018 WIN8C02476 UACS No. 320101102175000 April 2, 2018 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 320101102175000
Project ID: P00220995MN
OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Flood Control Structure along Bucayan River, Dumingag, Zamboanga del Sur
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 185 l.m
Unit Cost: P 132,432.43/l.m
EAO: P 500,000.00
Allocation: P 25,000,000.00
May 1, 2018 FY 2018 WIN8C02477 UACS No. 320101102171000 April 2, 2018 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 320101102171000
Project ID: P00220992MN
OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Dipolo Flood Control, Sagrada Familia, Tambulig, Zamboanga del Sur
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 490.63 l.m
Unit Cost: P 59,922.96/l.m
EAO: P 600,000.00
Allocation: P 30,000,000.00
May 1, 2018 FY 2018 WIN8C02473 UACS No. 320101102180000 April 2, 2018 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 320101102180000
Project ID: P00220722MN
OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Guitran Flood Control, Brgy. Caridad, Dumingag, Zamboanga del Sur
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 193.00 l.m
Unit Cost: P 101,554.40/l.m
EAO: P 400,000.00
Allocation: P 20,000,000.00
May 1, 2018 FY 2018 WIN8C02474 UACS No. 320101102179000 April 2, 2018 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 320101102179000
Project ID: P00220719MN
OO2: Protect Lives and Properties Against Major Floods
Flood Management Program
Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Guinabot Flood Control, Poblacion, Midsalip, Zamboanga del Sur
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 168 l.m
Unit Cost: P 116,666.67/l.m
EAO: P 400,000.00
Allocation: P 20,000,000.00
May 1, 2018 FY 2018 WIN8C02648 UACS No. 310103100029000 April 25, 2018 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 310103100029000
Project ID: P00201575MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
Asphalt Overlay along Junction Imelda - Alicia Road,
K1758+119.80 - K1759+582.50
Physical Target:
CW-1- Preventive Maintenance of Road: Asphalt Overlay: 2.1074 Lane km
Unit Cost: P 16,141,335.29/Lane km
EAO: P 1,233,750.00
Allocation: P 35,250,000.00
May 1, 2018 FY 2018 WIN8C02645 UACS No. 310107100049000 April 25, 2018 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 310107100049000
Project ID: P00201578MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Lanao - Pagadian - Zamboanga City Rd
K1742+900 - K1742+940
K1743+450 - K1743+480
K1743+550 - K1743+710
K1743+820 - K1744+087
K1752+200 - K1752+270
K1753+030 - K1753+095
Physical Target:
CW-1- Construction of Road Slope Protection Structure: 8,893.39 Sq. m
Unit Cost: P 7,162.62/ sq. m.
EAO: P 1,300,000.00
Allocation: P 65,000,000.00
May 1, 2018 FY 2018 WIN8C02501 UACS No. 320102100511000 April 25, 2018 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 320102100511000
Project ID: P00220494MN
OO2: Protect Lives and Properties
Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Sibuguey River, Brgy. Conception, Alicia, Zamboanga Sibugay
Sta. 00+-002 - Sta. 00+297
Physical Target:
CW-1- Construction of Revetment: 299 l.m
Unit Cost: P 88,494.98/l.m
EAO: P 540,000.00
Allocation: P 27,000,000.00
May 1, 2018 FY 2018 WIN8C02634 UACS No. 310212100070000 April 25, 2018 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 310212100070000
Project ID: P00200874MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Paving of Unpaved Roads - Tertiary Roads
Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Rd.
K1756+311 - K1756+667.30
K1771+590 - K1771+720
K1772+917 - K1773+969
Physical Target:
CW-1- Paving of Unpaved Roads: 3.0766 Lane km
Unit Cost: P 13,755,866.90/Lane km
EAO: P 863,700.00
Allocation: P 43,185,000.00
May 1, 2018 FY 2018 WIN8C02644 UACS No. 310107100050000 April 25, 2018 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 310107100050000
Project ID: P00201579MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Lanao - Pagadian - Zamboanga City Road
K1724+(-483) - K1724+(-385)
K1724+120 - K1724+260
K1724+520 - K1724+535
K1725+244 - K1725+320
K1725+737 - K1725+800
Physical Target:
CW-1- Construction of Road Slope Protection Structure: 8,941 Sq. m
Unit Cost: P 5,480.37/Sq.m.
EAO: P 1,000,000.00
Allocation: P 50,000,000.00
May 1, 2018 FY 2018 WIN8C02642 UACS No. 310104100070000 April 25, 2018 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 310104100070000
Project ID: P00200088MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Lanao - Pagadian - Zamboanga City Rd.
K1743+510 - K1743+906
Physical Target:
CW-1- Reconstruction from Paved to Concrete: 0.792 Lane km
Unit Cost: P 16,035,126.26/ Lane km
EAO: P 259,180.00
Allocation: P 12,959,000.00
May 1, 2018 FY 2018 WIN8C02631 UACS No. 310109100124000 April 25, 2018 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 310109100124000
Project ID: P00200261MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Rd.
K1751+211 - K1751+224
K1751+460 - K1751+490
K1752+544 - K1752+728
K1752+973 - K1753+338
K1753+835 - K1754+173
K1754+306 - K1754+440
K1754+750 - K1754+780
K1754+962 - K1755+019
K1754+928 - K1755+000
K1755+050 - K1755+182
Physical Target:
CW-1- Construction of Road Slope Protection Structure: 7,240.75 Sq. m
Unit Cost: P 5,007.77/Sq.m.
EAO: P 740,000.00
Allocation: P 37,000,000.00
May 1, 2018 FY 2018 WIN8C02632 UACS No. 310103100028000 April 25, 2018 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 310103100028000
Project ID: P00201574MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
Asphalt Overlay along Junction Imelda - Alicia Road
K1757+574.68 - K1758+119.80
Physical Target:
CW-1- Preventive Maintenance of Road: Asphalt Overlay: 1.720 lane km
Unit Cost: P 17,532,703.49/lane km
EAO: P 1,093,750.00
Allocation: P 31,250,000.00
May 1, 2018 FY 2018 WIN8C02633 UACS No. 310109100123000 April 25, 2018 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 310109100123000
Project ID: P00200260MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Diplahan Jct. Malangas Port Rd.
K1747+280 - K1747+540
Physical Target:
CW-1- Construction of Road Slope Protection Structure: 2,938 Sq. m
Unit Cost: P 3,335.60/sq.m
EAO: P 200,000.00
Allocation: P 10,000,000.00
May 1, 2018 FY 2018 WIN8C02554 UACS No. 320101102142000 April 10, 2018 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 320101102142000
Project ID: P00220444MN
OO2: Protect Lives and Properties Against Major Floods
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control at Cawit River, Cawit, Zamboanga City
Physical Target:
CW-1- Construction of Flood Mitigation Structure: 544.15 ln.m.
Unit Cost: P 35,734.59/ln.m.
Physical Target:
ROW: 140 sq. m.
Unit Cost: P 1,107.3/sq.m
EAO: P 400,000.00
Allocation: P 20,000,000.00
May 1, 2018 FY 2018 WIN8C02549 UACS No. 310102100188000 April 10, 2018 Region IX Isabela City District Engineering Office
UACS No. 310102100188000
Project ID: P00201335MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Road
Basilan Circumferential Road
K0004+860 - K0005+553
K0007+585.50 - K0008+867
Physical Target:
CW-1- Preventive Maintenance of Road: Asphalt Overlay: 3.949 lane km
Unit Cost: P 12,395.30010/lane km
EAO: P 998,960.00
Allocation: P 49,948,000.00
May 1, 2018 FY 2018 WIN8C02490 UACS No. 310102100191000 April 10, 2018 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 310102100191000
Project ID: P00200036MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program
Preventive Maintenance - Secondary Roads
Jct. Polo - Dapitan Park National Road
K1829+008 - K1829+527
Physical Target:
CW-1- Preventive Maintenance of Road: Asphalt Overlay: 1.038 lane km
Unit Cost: P 7,148,901.73/lane km
EAO: P 151,440.00
Allocation: P 7,572,000.00
May 1, 2018 FY 2018 WIN8C02542 UACS No. 310107100046000 April 10, 2018 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 310107100046000
Project ID: P00200190MN
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program
Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Dipolog-Punta-Dansullan- Sergio Osmeña-Zamboanga del Norte/Sur Bdry Rd
K1873+210 - K1873+280
K1879+390 - K1879+462
Physical Target:
CW-1- Construction of Road Slope Protection Structure: 790.49 sq.m
Unit Cost: P 7,043.73/sq.m
Physical Target:
ROW: 77 sq.m
Unit Cost: P 1,506.49/sq.m
EAO: P 116,000.00
Allocation: P 5,800,000.00
April 30, 2018 FY - 2018 WIN8F05396 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 3rd District Engineering Office
002 - Protect lives and Properties Against Major Floods

Construction/Maintenance of Flood Mitigation Structure and Drainage Systems

FROM:
Construction of Flood Control and Mitigation Structure at
Tagbarungis - Inagawan Section, Puerto Princesa South Road, Palawan

CW1: 20 lineal Meters ( Construction of Flood Mitigation
Structure )
Allocation: 5,000,000 Php

TO:
Construction of Flood Control and Mitigation Structure at
Tagbarungis - Inagawan Section, Puerto Princesa South Road, Palawan

CW1: 92014 lineal meters ( Construction of Flood Mitigation
Structure )
Allocation: 5,000,000 Php
April 30, 2018 FY - 2018 WIN8F05395 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 3rd District Engineering Office
001 - Ensure safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides
- Tertiary Roads

FROM:
Puerto Princesa South Diversion Rd
Chainage 1060 - Chainage 1170

CW1: 550 square meters ( Construction of Road Slope
Protection Structure )
Allocation: 10,000,000 Php

TO:
Puerto Princesa South Diversion Rd
Chainage 1060 - Chainage 1170

CW1: 1,615 square meters ( Construction of Road Slope
Protection Structure )
Allocation: 10,000,000 Php
April 30, 2018 FY - 2018 WIN8F05342 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 3rd District Engineering Office
Local Program

Local Infrastructure Program - Buildings and Other Structures - School Buildings

FROM:
Construction of 2 CL at Marcelo Bantog Elementary School
Brgy. San Juan, Aborlan, Palawan

CW1: 2 Classrooms ( Construction of Classrooms )
Allocation: 2,000,000 Php

TO:
Construction of 2 Classroom Building, Marcelo Bantog
National High School, Brgy. San Juan, Aborlan, Palawan

CW1: 2 Classrooms ( Construction of Classrooms )
Allocation: 2,000,000 Php
April 30, 2018 FY - 2018 WIN8F05351 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 3rd District Engineering Office
Local Program

Local Infrastructure Program - National Roads and Bridges
- Local roads

FROM:
Concreting of T. Paredes Interior Road along Abad Santos Extn., Brgy. Bagong Sikat, Puerto princesa City, Palawan

CW1: 0.352 lane km ( Construction of Concrete Road )
Allocation: 2,000,000 Php

TO:
Concreting of T. Paredes Interior Road along Abad Santos
Extn., Brgy. Bagong Sikat, Puerto Princesa City, Palawan

CW1: 0.316 lane km ( Construction of Concrete Road )
Allocation: 2,000,000 Php
April 30, 2018 FY 2018 WIN8G02152 FY 2018 GAA January 4, 2018 Region III Regional Office III
Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) incl. ROW - K0047 + 508 - K0047 + 973, K0047 + 989 - K0048 + 770, K0048 + 786 - K0050 + 437, K0050 + 453 - K0050 + 652, K0050 + 662 - K0052 + 592
April 30, 2018 FY 2018 WIN8G02155 SR2018-01-000834 January 26, 2018 Region III Regional Office III
Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ)
K0085 + (-360) - K0085 + 000, K0087 + 225 - K0089 + 098, K0090 + 564 - K0092 + 000
April 30, 2018 FY 2018 WIN8G02154 SR2018-01-000225 January 25, 2018 Region III Regional Office III
OO-1: Ensure Safe and Reliable National Road System
Asset Preservation Program
Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Manila North Rd
K0038 + 306 – K0039 + 151, K0041 + 840 - K0042 + 900, K0043 + 118 – K0044 + 500, K0050 + 741 - K0050 + 1320
April 30, 2018 FY 2018 WIN8G02153 SR2018-01-002056 January 30, 2018 Region III Regional Office III
Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction / Rehabilitation of Eroded Pampanga River Bank (San Jose, San Simon and Sucad, Apalit Section), Pampanga
April 30, 2018 FY 2018 WIN8G02152 SR2018-01-000928 January 26, 2018 Region III Regional Office III
Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) incl. ROW
K0047 + 508 - K0047 + 973, K0047 + 989 - K0048 + 770, K0048 + 786 - K0050 + 437, K0050 + 453 - K0050 + 652, K0050 + 662 - K0052 + 592

Allotment: P152.026M
April 30, 2018 FY - 2018 WIN8F05316 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Concreting of 2 km. Malinao to Purok Mirasol road,
Barangay Malinao, Torrijos, Marinduque

CW1: 1.759 lane km ( Construction of Concrete Road )
Allocationn: 10,000,000 Php

TO:
Concreting of 2 lane km. Malinao to Purok Mirasol road,
Barangay Malinao, Torrijos, Marinduque

CW1: 2.000 lane km ( Construction of Concre Road )
Allocation: 10,000,000 Php
April 30, 2018 FY - 2018 WIN8F05317 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Concreting of 2 km. Bolo to Pulang Lupa road,
Barangay Bolo, Torrijos, Marinduque

CW1: 1.759 Lane km ( Construction of Concrete Road )
Allocation: 10,000,000 Php

TO:
Concreting of 2 lane km. Bolo to Pulang Lupa road,
Barangay Bolo, Torrijos, Marinduque

CW1: 2.000 Lane km ( Construction of Concrete Road )
Allocation: 10,000,000 Php
April 30, 2018 FY - 2018 WIN8F05314 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM:
Concreting of 1.1 km. Makawayan to Purok Star. Ana road
Barangay Makawayan, Torrijos, Marinduque

CW1: 0.967 Lane km ( Construction of Concrete Road )
Allocation: 5,500,000 Php

TO:
Concreting of 1.1 lane km. Makawyan to Sta. Ana road
Barangay Makawayan, Torrijos, Marinduque

CW1: 1.100 Lane km ( Construction of Concrete Road )
Allocation: 5,500,000 Php
April 30, 2018 FY - 2018 WIN8F05326 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local projects

FROM:
Concreting of 3 km. Bayakbakin to payanas road,
Barangay Payanas, Torrijos, Marinduque

CW1: 2.639 Lane km ( Construction of Concrete Road )
Allocation: 15,000,000 Php

TO:
Concreting of 3 lane km. Bayakbakin to Payanas road,
Barangay Payanas, Torrijos, Marinduque

CW1: 3.000 Lane km ( Construction of Concrete Road )
Allocation: 15,000,000 Php
April 30, 2018 FY - 2018 WIN8F05304 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Marinduque District Engineering Office
Local Program

Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

Concreting of 300 m. Bayanan to Mabuhay road,
Barangay Matuyatuya, Torrijos, Marinduque

CW1: 0.264 Lane km ( Construction of Concrete Road )
Allocation: 1,500,000 Php

TO:
Concreting of 0.300 lane km. Bayanan to Mabuhay road,
Barangay Matuyatuya, Torrijos, Marinduque

CW1: 0.300 Lane km. (Construction of Concrete Road )
Allocation: 1,500,000 Php
April 28, 2018 2018 310109100053000 GAA FY 2018 January 1, 2018 Region II Cagayan 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide: Tertiary Roads

Peñablanca-Callao Cave Rd - K0476 + 560 - K0476 + 650, K0477 + 470 - K0477 + 600, K0479 + 560 - K0479 + 670
April 28, 2018 2018 310201100202000 GAA FY 2018 January 1, 2018 Region II Cagayan 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads

Santiago-Tuguegarao Rd (Jct Kalinga-Tuguegarao Sect) - K0442 + 226 - K0442 + 409, K0442 + 880 - K0445 + 500
April 28, 2018 2018 310104100037000 GAA FY 2018 January 1, 2018 Region II Cagayan 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads

Santiago-Tuguegarao Rd (Jct Kalinga-Tuguegarao Sect) - K0437 + (-031) - K0437 + 100, K0437 + 900 - K0438 + 100, K0438 + 700 - K0439 + 000, K0441 + 200 - K0442 + 000, K0442 + 000 - K0442 + 168, K0442 + 252 - K0443 + 047, K0443 + 305 - K0443 + 565, K0444 + 000 - K0445 + 000, K0445 + 000 - K0446 + 150, K0447 + 000 - K0448 + 296
April 28, 2018 2018 310103100007000 GAA FY 2018 January 1, 2018 Region II Cagayan 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Cagayan Apayao Rd - K0492 + 255 - K0493 + 669, K0493 + 685 - K0493 + 965, K0498 + 777 - K0502 + 601, K0502 + 601 - K0503 + 500
April 28, 2018 2018 310201100028000 GAA FY 2018 January 1, 2018 Region II Cagayan 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening: Primary Roads

Cagayan Valley Rd - K0499 + 260 - K0501 + 300, K0503 + 164 - K0503 + 248
April 28, 2018 2018 310209100036000 GAA FY 2018 January 1, 2018 Region II Cagayan 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Tertiary Roads

Cagayan Apayao Rd - K0489 + 625 - K0489 + 655, K0489 + 686 - K0491 + 480, K0489 + 686 - K0491 + 300, K0491 + 360 - K0491 + 480
April 28, 2018 2018 310201100030000 GAA FY 2018 January 1, 2018 Region II Cagayan 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads

Cagayan Valley Rd - K0506 + 277 - K0507 + 342.8, K0507 + 522 - K0509 + 786
April 28, 2018 2018 310207100008000 GAA FY 2018 January 1, 2018 Region II Cagayan 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads

Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0438 + 010 - K0441 + 576, K0441 + 600 - K0443 + 765
April 28, 2018 2018 310101100062000 GAA FY 2018 January 1, 2018 Region II Cagayan 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads

Kalinga - Cagayan Rd (Calanan-Enrile Section) - K0438 + 010 - K0440 + 000, K0440 + 415 - K0441 + 498, K0441 + 668 - K0442 + 813
April 28, 2018 2018 310209100037000 GAA FY 2018 January 1, 2018 Region II Cagayan 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Tertiary Roads

Cagayan Apayao Rd (Tuao-Rizal Sect) - K0525 + 180 - K0525 + 278, K0525 + 360 - K0525 + 478, K0525 + 220 - K0525 + 478, K0525 + 506 - K0526 + 042
April 28, 2018 2018 310201100225000 GAA FY 2018 January 1, 2018 Region II Regional Office II
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads

Santiago-Tuguegarao Rd - K0435 + 144 - K0436 + 226
April 28, 2018 2018 320102100262000 GAA FY 2018 January 1, 2018 Region II Isabela 3rd District Engineering Office
OO2: Protect Lives and Properties: Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers

Construction of Cagayan River Flood Control Project (Phase I), Sta. 0+000 – Sta. 0+170.40, Dabburab, Cauayan City, Isabela
April 28, 2018 2018 300117200653000 GAA FY 2018 January 1, 2018 Region II Isabela 3rd District Engineering Office
Local Program: Local – National Roads and Bridges – Local Roads – Local Infrastructure Program

Concreting of local roads, San Mateo, Isabela
April 28, 2018 2018 320101101011000 GAA FY 2018 January 1, 2018 Region II Isabela 3rd District Engineering Office
OO2: Protect Live and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Magat River Flood Control Projects, Sta. 0+000 - Sta. 0+172.40, Lalog, Luna, Isabela
April 28, 2018 2018 320101101009000 GAA FY 2018 January 1, 2018 Region II Isabela 3rd District Engineering Office
OO2: Protect Live and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Magat River Flood Control Project (Bridge Protection Works) San Roque, San Mateo, Isabela
April 28, 2018 2018 320102100264000 GAA FY 2018 January 1, 2018 Region II Isabela 3rd District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Cagayan River Flood Control Project (Phase I),Sta. 0+000 – Sta. 0+174, Amobocan, Cauayan City, Isabela
April 28, 2018 2018 320101101012000 GAA FY 2018 January 1, 2018 Region II Isabela 3rd District Engineering Office
OO2: Protect Live and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Magat River Flood Control Projects, Sta. 0+000 - Sta. 0+172.40, Pulay, Luna, Isabela
April 27, 2018 FY- 2018 WIN8F05306 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Mindoro Oriental District Engineering Office
Local Program

Local - Flood Control and Drainage - Flood Control Structures/
Facilities - Construction/Repair/Rehabilitation/Improvement
of various Infrastructure including Local Projects

FROM:
Construction of Flood Control/Drainage System,
Bucayao Gabion Armouring BBRIS,
Calapan, Oriental Mindoro

CW1: 134.40 l.m. (Construction of Flood Mitigation Structure)
Allocation: 25,000,000 Php

TO:
Construction of Flood Control/Drainage System,
Bucayao Gabion Armouring BBRIS,
Calapan, Oriental Mindoro

CW1: 114.00 l.m. (Construction of Flood Mitigation Structure)
Allocation: 25,000,000 Php
April 27, 2018 FY - 2018 WIN8F05250 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Mindoro Oriental District Engineering Office
Local Program

Local - Water Management Facilities - Water Supply -
Construction/Repair/Rehabilitation/Improvement of Various
Infrastructure including Local Projects

FROM:
Construction of Water Supply System Level III, Barangays
San Antonio, Loyal, Sampaguita, San Cristobal, Antonio, Pakyas, Victoria, Oriental Mindodo

CW1: 1 ( Number of Water Systems )
Allocation: 30,000,000 Php

TO:
Construction of Water Supply System Level III,
Barangays San Antonio, Loyal, Sampaguita, San Cristobal,
Antonio, Pakyas, Victoria, Oriental Mindodo

CW1: 6 ( Number of Water Systems )
Allocation: 30,000,000 Php
April 27, 2018 FY - 2018 WIN8F05401 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Southern Mindoro Engineering District Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance -
Secondary Roads

FROM:
Calapan South Rd
K0164+650 - K0164+850,
K0168+150 - K0168+500,
K0174+000 - K0174+100,
K0174+785 - K0174+894,
K0175+000 - K0175+041

CW1: 1.6000 lane km ( Preventive Maintenance of Road:
Concrete Reblocking )
Allocation: 7,124,000 Php

TO:
Calapan South Road
K0164+650 - K0164+681.80,
K0164+745.30 - K0164+804.20,
K0164+822.30 - K0164+500,
K0174+068.70 - K0174+100,
K0174+785 - K0174+894,
K0175+000 - K0175+041

CW1: 0.8621 lane km ( Preventive Maintenance of Road:
Concrete Reblocking )
Allocation: 7,124,000 Php
K
April 27, 2018 FY - 2018 WIN8F05363 FY - 2018 DPWH GAA Infra Program December 19, 2017 Region IV-B Southern Mindoro Engineering District Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

FROM:
Calapan South Rd
K0188+000 - K0188+345,
K0189+000 - K0189+122

CW1: 0.934 lane km ( Preventive Maintenance of Road :
Concrete Reblocking )
Allocation: 4,158,000 Php

TO:
Calapan South Road
K0188+060 - K0188+258,
K0189+112.80 - K0189+122

CW1: 0.4144 lane km ( Preventive Maintenance of Road:
Concrete Reblocking )
Allocation: 4,158,000 Php
April 27, 2018 FY - 2018 WIN8F05284 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 3rd District Engineering Office
002 -Protect Lives and Properties Against Major Floods

Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

FROM:
Construction of Flood Control and Mitigation Structure Along Bgy. Sta. Monica, Puerto Princesa South Road

CW1: 20 lineal meters ( Construction of Flood Mitigation
Structure )
Allocation; 5,000,000 Php

TO:
Construction of Flood Control and Mitigation Structure along Bgy. Sta. Monica, Puerto Princesa South Road

CW1: 491 lineal meters ( Construction of Flood Mitigation
Structure )
Allocation: 5,000,000 Php
April 27, 2018 FY 2018 WIN8G02117 FY 2018 GAA January 4, 2018 Region III Pampanga 3rd District Engineering Office
Flood Management Program – Construction / Maintenance of Flood Mitigation Structures and Drainage Systems – Slope Protection works along Quitangil Creek, Brgy. Bundagul and Paralayunan, Mabalacat City, Pampanga
April 27, 2018 FY - 2018 WIN8F05288 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 3rd District Engineering Office
Local Program

Buildings and Other Structures - Multipurpose/Facilities
Local Infrastructure Program

FROM:
Construction of Multi-Purpose Building
(Philippine Councilor's League) at PEO Compound,
Brgy. Bancao-Bancao, Puerto Princesa City, Palawan

CW1: 1 Building ( Construction of Multi-Purpose Building )
Allocation: 1,000,000 Php

TO:
Construction of Multi-Purpose Building
(Philocal Infrastructure Programpine Councilor's League)
at PEO Compound. Brgy. Bancao-Bancao,
Puerto Princesa City

CW1; 1 Building ( Construction of Multi-Purpose Building )
Allocation: 1,000,000 Php

April 27, 2018 FY - 2018 WIN8F05297 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 3rd District Engineering Office
Convergence and Special Support Program

Convergence and Special Support Program -
Construction/Improvement of Access Roads leading to Trades, industries and Economic Zones

FROM:
Sitio Communal Multi-Purpose Cooperative Road
connecting Barangay Road of Iraan in support of Oil Palm Industry, Iraan, Aborlan, Palawan

CW1: 5.60 lane km ( Construction of Concrete Road )
Allocation: 70,000,000 Php

TO:
Road Concreting - Sitio Communal Multi-Purpose Cooperativd Road connecting Barangay Road of Irran
in support of Oil Palm Industry, Iraan, Aborlan, Palawan

CW1: 7.472 lane km
Allocation: 70,000,000


April 27, 2018 FY - 2018 WIN8F05282 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 3rd District Engineering Office
002 - Protect Lives and Properties Against Major Floods

Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

FROM:
Construction of Flood Control and Drainage System along Puerto Princesa North Road
( Jct. PPNR - Honda Bay Road to Inabuyan Bridge ),
Palawan

CW1: 10 lineal meters ( Construction of Flood Mitigation
Structure )
Allocation: 10,000,000 Php

TO:
Construction of Flood Control And Drainage System along Puerto Princesa North Road
( Jct. PPNR - Honda Bay Road to Inabuyan Bridge ),
Palawan

CW1: 984.1 lineal meters ( Construction of Flood Mitigation
Structure )
Allocation: 10,000,000 Php
April 27, 2018 2018 WIN8F05451 R.A. 10964 December 19, 2017 Region VII Siquijor District Engineering Office
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System, Bridge- Construction of New Permanent Bridges, Sinunogan Br. along Luyang-Poo-Lazi Rd
April 27, 2018 2018 WIN8F05447 R.A. 10964 December 19, 2017 Region VII Regional Office VII
Organizational Outcome 1: Ensure Safe and RelIable National Road System, Asset Preservation Program--Rehabilitation/Reconstruction of Roads with slips, slope Collapse and Landslide-Cebu-Toledo Wharf Rd (Jct Naga-Uling)- K0024+240 - K0024+380, K0026+497.5 - K0026+900, K0026+900 - K0027+000, K0028+500 - K0028+550
April 27, 2018 2018 WIN8F05448 R.A. 10964 December 19, 2017 Region VII Regional Office VII
Organizational Outcome 1:Ensure Safe and Reliable National Road System, Asset Preservation Program -Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads- -Secondary Roads, Cebu North Hagnaya Wharf Rd- K0046 + 172 - K0046 +918, K0047 + 668 - K0047 + 777, K0067 + 000- K0068 + 000, K0072 + 110 - K0072 + 650, K0074 + 550 - K0075 + 000, K0075 + 830 -K0075 + 925
April 27, 2018 2018 WIN8F05450 R.A. 10964 December 19, 2017 Region VII Regional Office VII
Local Programs - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/
Improvement of Various Infrastructure including Local Projects - Widening of Punta Engaño road, including ROW Acquisition , Lapu-lapu City, Cebu
April 27, 2018 2018 WIN8F05450 R.A. 10964 December 19, 2017 Region VII Regional Office VII
Local Programs - Local Roads and Bridges - Local Roads - Construction/Repair/Rehabilitation/
Improvement of Various Infrastructure including Local Projects - Widening of Punta Engaño road, including ROW Acquisition , Lapu-lapu City, Cebu
April 27, 2018 2018 WIN8C02637 R.A. 10964 December 19, 2017 Region VII Regional Office VII
Organizational Outcome 1: Ensure Safe and Reliable National Roads system, Network Development Program, Construction of Missing Links/New roads Bayawan-Kabankalan Road , incl ROW, Package A, Negros Oriental
April 27, 2018 2018 WIN8C02636 R.A. 10964 December 19, 2017 Region VII Regional Office VII
Organizational Outcome 1: Ensure Safe and Reliable National Roads system, Network Development Program, Construction of Missing Links/New roads Bayawan-Kabankalan Road , incl ROW, Package B, Negros Oriental
April 27, 2018 2018 WIN8C02638 R.A. 10964 December 19, 2017 Region VII Regional Office VII
Organizatioinal Outcome 1: Ensure Safe and Reliable National Road System, Asset Preservation-Rehabilitation/Reconstruction of Roads, with Slips, Slope Collapse and Landslide-Tertiary Roads, Sibonga-Dumanjug Rd K0055+554 - K0057+580, K0057+937 - K0058+592, K0059+546 - K0059+706.50, K0059+706.50 - K0059+946, K0060+749 - K0061+720, K0062+846 - K0063+406, K0063+406 - K0063+832, K0063+870 - K0065+000
April 27, 2018 2018 WIN8F05449 R.A. 10964 December 19, 2017 Region VII Regional Office VII
Organizational Outcome 1:Ensure Safe and Reliable National Road System, Network Development Program -Road Widening - Secondary Roads - Cebu North Hagnaya Wharf Rd - K0034+648-K0035+000, K0052+000-K0055+648
April 27, 2018 2018 WIN8C02603 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Regional Office XIII
OO 1 : Ensure Safe and Reliable National Road System
Network Development – Construction of Missing Links/New Roads

FROM:

Completion of the East-West lateral road connecting Agusan Del Sur/Agusan del Norte to Bukidnon Sampaguita - Makilos (Agusan del Sur/Bukidnon Boundary), Package 8, Agusan del Sur

Project Component ID: P00200567MN
Scope of Work: Construction of Concrete Road
Physical Target: 19.234 lane km

Allocation: Php 300,000,000 (Total)
Php 289,500,000 (Road)
Php 10,500,000 (EAO)


TO:

Completion of the East-West lateral road connecting Agusan Del Sur/Agusan del Norte to Bukidnon Sampaguita - Makilos (Agusan del Sur/Bukidnon Boundary), Package 8, Agusan del Sur

Project Component ID: P00200567MN
Scope of Work: Construction of Gravel Road
Physical Target: 9.18 lane km

Allocation: Php 300,000,000 (Total)
Php 289,500,000 (Road)
Php 10,500,000 (EAO)
April 27, 2018 2018 WIN8C02604 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Regional Office XIII
OO 1 : Ensure Safe and Reliable National Road System
Network Development – Construction of Missing Links/New Roads

FROM:

Completion of the East-West lateral road connecting Agusan Del Sur/Agusan del Norte to Bukidnon Sampaguita - Makilos (Agusan del Sur/Bukidnon Boundary), Package 13, Agusan del Sur

Project Component ID: P00200563MN
Scope of Work: Construction of Gravel Road
Physical Target: 7.272 lane km

Allocation: Php 200,000,000 (Total)
Php 193,000,000 (Road)
Php 7,000,000 (EAO)

TO:

Completion of the East-West lateral road connecting Agusan Del Sur/Agusan del Norte to Bukidnon Sampaguita - Makilos (Agusan del Sur/Bukidnon Boundary), Package 13, Agusan del Sur

Project Component ID: P00200563MN
Scope of Work: Construction of Gravel Road
Physical Target: 4.40 lane km

Allocation: Php 200,000,000 (Total)
Php 193,000,000 (Road)
Php 7,000,000 (EAO)
April 27, 2018 2018 WIN8C03018 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Regional Office XIII
OO1 : Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/New Roads

FROM:

Cabadbaran – Puting Bato – Lanuza Road, Surigao del Sur

Project Component ID: P00200561MN
Scope of Work: Construction of Gravel Road
Physical Target: 12.10 lane km

Allocation: Php 270,000,000 (Total)
Php 260,550,000 (Road)
Php 9,450,000 (EAO)

TO:

Cabadbaran – Puting Bato – Lanuza Road, Surigao del Sur

Project Component ID: P00200561MN
Scope of Work: Construction of Gravel Road
Physical Target: 7.00 lane km

Allocation: Php 270,000,000 (Total)
Php 260,550,000 (Road)
Php 9,450,000 (EAO)
April 27, 2018 2018 WIN8C02568 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Regional Office XIII
OO1 : Ensure Safe and Reliable National Road System
Network Development – Construction of Missing Links/New Roads

FROM:

Butuan City – Pianing – Tandag Road (Tandag Section), Surigao del Sur

Project Component ID: P00200558MN
Scope of Work: Construction of Gravel Road
Physical Target: 8.00 lane km

Allocation: Php 180,000,000 (Total)
Php 173,700,000 (Road)
Php 6,300,000 (EAO)

TO:

Butuan City – Pianing – Tandag Road (Tandag Section), Surigao del Sur

Project Component ID: P00200558MN
Scope of Work: Construction of Gravel Road
Physical Target: 3.64 lane km

Allocation: Php 180,000,000 (Total)
Php 173,700,000 (Road)
Php 6,300,000 (EAO)
April 27, 2018 2018 WIN8C02630 FY 2018 GAA RA 10964 December 19, 2017 Region XIII Regional Office XIII
OO1 : Ensure Safe and Reliable National Road System
Network Development – Construction of Missing Links/New Roads

FROM:

Completion of the East-West lateral road connecting Agusan Del Sur/Agusan del Norte to Bukidnon Sampaguita - Makilos (Agusan del Sur/Bukidnon Boundary), Package 14, Agusan del Sur

Project Component ID: P00200564MN
Scope of Work: Construction of Gravel Road
Physical Target: 7.272 lane km

Allocation: Php 200,000,000 (Total)
Php 193,000,000 (Road)
Php 7,000,000 (EAO)

TO:

Completion of the East-West lateral road connecting Agusan Del Sur/Agusan del Norte to Bukidnon Sampaguita - Makilos (Agusan del Sur/Bukidnon Boundary), Package 14, Agusan del Sur

Project Component ID: P00200564MN
Scope of Work: Construction of Gravel Road
Physical Target: 4.32 lane km

Allocation: Php 200,000,000 (Total)
Php 193,000,000 (Road)
Php 7,000,000 (EAO)
April 26, 2018 FY - 2018 WIN8F05276 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Support Program

Convergence and Special Support Program -
Construction/Improvement of Access Roads leading to Declared Tourism Destinations

FROM:
Access Road from Coron Town Proper to Borac Roro Port,
Coron, Palawan

CW1: 4.78 lane km ( Construction of Concrete Road )
Allocation; 75,000,000 Php

TO:
Access Road from Coron Town Proper to Borac Roro Port,
Coron, Palawan

CW1: 4.154 lane km ( Construction of Concrete Road )
Allocation: 75,000,000 Php
April 26, 2018 FY - 2018 WIN8F05248 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Special Support Program

Convergence and Special Support Program -
Construction/Improvement of Access Roads leading to Declared Tourism Destinations

FROM:
New Agutaya - Alimanguan Tourism Road leading to
San Vicente Long Beach, San Vicente, Palawan

CW1: 1.18 lane km ( Construction of Concrete Road )
Allocation: 13,000,000 Php

TO:
New Agutaya - Alimanguan Tourism Road leading to
San Vicente Long Beach, San Vicente, Palawan

CW1: 0.816 lane km ( Construction of Concrete Road )
Allocation: 13,000,000 Php
April 26, 2018 FY - 2018 WIN8F05270 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide -
Secondary Roads

FROM:
Puerto Princesa North Rd
K0082+523 - K0082+596,
K0188+257 - K0188+434,
K0225+026 - K0225+085,
K0266+067 - K0266+165,
K0266+190 - K0266+350

CW1: 11,151 sq.m. ( Construction of Road Slope Protection Structure )
Allocation; 97,503,000 Php

TO:
Puerto Princesa North Rd
K0266+067 - K0266+140,
K0266+240 - K0266+290,
K0225+026 - K0225+086

CW1: 5,375 sq.m. ( Construction of Road Slope
Protection Structure )
Allocation: 97,503,000 Php
April 26, 2018 FY - 2018 WIN8F05223 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Preventive maintenance - Tertiary Roads

FROM:
Looc ( Cogon Tulay ) - Odiongan Rd
K0119+000 - K0120+300

CW1: 2.516 lane km ( Preventive Maintenance of Road )
Allocation: 11,203,000 Php

TO:
Looc ( Cogon Tulay ) - Odiongan Rd
K0110+225.70 - K0113+599.70,
K0113+728.4 0- K0115+941.20,
K0116+007.90 - K0117+032.60,
K0117+109.80 - K0117+832.10,
K0117+854.70 - K0120+54+.60

CW1: 2.544 lane km ( Preventive Maintenance of Road )
Allocation: 11,203,000 hp
April 26, 2018 FY - 2018 WIN8F05323 FY - 2018 GAA DPWG Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides
- Secondary Roads

FROM:
Sibuyan Circumferential Rd
K0033+896 - K0034+108

CW1: 5,411 square meters ( Construction of Road Slope Protection Structure )
Allocation: 89,270,000 Php

TO:
Sibuyan Circumferential Rd
K0039+420 - K0039+570

CW1: 3,822.30 square meters ( Construction of Road Slope Protection Structure )
Allocation: 89,270,000 Php
April 26, 2018 FY - 2018 WIN8F05247 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads

FROM:
Dapawan - Torrel Rd
K0001+(-828) - K0001+000,
K0001+971 - K0003+085

CW1: 3.886 lane km ( Rehabilitation of Paved Road )
Allocation: 60,134,000 Php

TO:
Dapawan - Torrel Rd
K0001+( -825 ) - L0001+074,
K0001+971 - K0002+781,
K0002+781 - K0003+085

CW1: 4.026 lane km ( Rehabilitation of paved Road )
Allocation: 60,134,000 Php
April 26, 2018 FY - 2018 WIN8F05310 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
001 - Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement -
Secondary Roads

FROM:
Sibuyan Circumferential Rd
K0000+632 - K0002+850,
K0003+104 - K0006+119,
K0073+1003 - K0075+720

CW1: 20,736 square meters ( Off-Carriageway Improvement )
Allocation: 67,728,000 Php

TO:
Sibuyan Circumferential Rd
K0000+632 - K0002+935,
K0003+104 - K0006+114.25,
K0073+1003 - K0075+677.85

CW1: 20,795.49 square meters ( Off-Carriageway Improvement )
Allocation: 67,728,000 php

April 26, 2018 FY - 2018 WIN8F05295 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
001 - Ensure Safe and Reliable national Road System

Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide -
- Secondary Roads

FROM:
Romblon - Cogon - Sablayan Rd
K00019+300 - K0019+400,
K0015+730 - K0015+780,
K0015+980 - K0016+020,
K0019+000 - K0019+699

CW1: 5,156 square meters ( Construction of Road Slope Protection Structure )
Allocation: 56,500,000 Php

TO:
Romblon - Cogon - Sablayan Rd
K0014+469.40 - K0014+525.30,
K0014+531.20 - K0014+611.50,
K0014+615 - K0014+720,
K0014+734 - K0014+860,
K0015+714 - K0016+020,
K0016+160 - K0016+244.70,
K0016+246.53 - K0016+480,
K0016+498.50 - K0016+600,
K0016+602.18 - K0016+649.17,
K0016+651.35 - K0016+805.40,
K0017+890.20 - K0017+906.80,
K0017+908.63 - K0017+940,
K0017+940.50 - K0017+975.50,
K0017+977.33 - K0018+056.40,
K0018+058.23 - K0018+232.70,
K0018+234.83 - K0018+320,
K0018+321.83 - K0018+455.80,
K0018+457.03 - K0018+622.90,
K0018+624.73 - K0018+820,
K0019+400 - K0019+760

CW1: 7,410.62 square meters
Allocation: 56,500,000 Php



April 26, 2018 FY - 2018 WIN8F05309 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
001 - Ensure Safe and Reliable National Road SYstem

Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged paved Roads - Secondary Roads

FROM:
Sibuyan Circumferential Rd
K0075+937 - K0076+138

CW1: 0.358 lane km ( rehabilitation of Paved road )
Allocation: 5,551,000 Php

TO:
Sibuyan Circumferential Rd
K0075+937 - K0076+252

CW1: 0.586 lane km ( Rehabilitation of Paved Road )
Allocation: 5,551,000 Php
April 26, 2018 FY - 2018 WIN8F05273 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide -
Secondary Roads

FROM;
Tablas Circumferential Road
K0069+000 - K0069+600

CW1: 3,600 square meters ( Construction of Road Slope Protection Structure )
Allocation: 25,000,000 Php

TO:
Tablas Circumferential Rd
K0069+090 - K0069+160,
K0069+190 - K0069+340,
K0069+345 - K0069+538,
K0069+543 - K0069+625,
K0069+635 - K0069+840

CW1: 5,113.15 square meters ( Construction of Road Slope Protection Structure )
Allocation: 25,000,000 Php
April 26, 2018 FY - 2018 WIN8F05312 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and landslide -
Tertiary Roads

FROM:
Looc ( Cogon Tulay ) - Odiongan Rd
K0111+917.37 - K0112+128.40,
K00115+010 - k0115+190

CW1: 3,882 square meters ( Construction of Road Slope Protection Structure )
Allocation: 48,600,000 Php

TO:
Looc ( Cogon Tulay ) - Odiongan Rd
K0111+744 - K0112+000,
K0115+002 - K0115+320

CW1: 3,238.80 square meters ( Construction of Road Slope Protection Structure )
Allocation: 48,600,000 Php
April 26, 2018 FY - 2018 WIN8F05319 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
001 - Ensure Safe and Reliable National Road System

Network Development - Off- Carriageway Improvement
- Secondary Roads

FROM:
Romblon - Cogon - Sablayan Rd
K0007+280 - K0008+708,
K0011+000 - K0013+724,
K0013+915 - K0014+430,
K0015+792 - K0016+009,
K0017+054 - K0017+356,
K0017+659 - K0017+861

CW1: 16,164 square meters ( Off-Carriageway
Improvement )
Allocation: 51,000,000 Php

TO:
Romblon - Cogon - Sablayan Rd
K0007+280 - K0008+699.40,
K0011+000 - K0013+710.40,
K0013+871.30 - K0014+430,
K0015+714.50 - K0016+020,
K0017+035 - K0017+372,
K0017+646.40 - K0017+880

CW1: 15,290.84 square meters ( Off-Carriageway
Improvement )
Allocation: 51,000,000 Php
April 26, 2018 FY - 2018 WIN8F05281 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
001 - Ensure Safe and Reliable National ROad System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads

FROM:
Odiongan - East - West Rd
K0003+ (- 176) - K0003+724,
K0004+633 - K0005+000

CW1: 2.560 lane km ( Rehabilitation oof Paved Road )
Allocation: 39,692,000 Php

TO:
Odiongan - East - West Rd
K0003+ (-176) - K0003+724,
K0004+602 - K0005+000

CW1: 2.62 lane km ( Rehabilitation of Paved Road )
Allocation: 39,692,000





April 26, 2018 FY - 2018 WIN8F05278 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National roads with Slips, Slope Collapse, and Landslide
- Secondary Roads

FROM:
Tablas Circumferential Rd
K0026+580 - K0027+220,
K0027+480 - K0027+930,
K0040+600 - K0040+680

CW1: 7,450 square meters ( Construction of Road Slope Protection Structure )
Allocation: 99,081.000 Php

TO:
Tablas Circumferential Rd
K0026+580 - K0026+722,
K0026+760.75 - K0027+010,
K0040+600 - K0040+720

CW1: 4,346.40 square meters ( Construction of Road Slope Protection Structure )
Allocation: 99,081,000 Php
April 26, 2018 FY - 2018 WIN8F05277 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Romblon District Engineering Office
001 - Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads- Tertiary Roads

FROM:
Looc ( Cogon Tulay ) - Odiongan Rd
K0103+ (-303) - K0103+000,
K0104+409 - K0104+912

CW1: 10612 lane km ( Rehabilitation of Pved Road )
Allocation: 24,994,000 Php

TO:
Looc ( Cogon Tulay ) - Odiongan Road
K0103+(-303) - K0103+008.78,
K0104+409 - K0104+838.68

CW1: 1.483 lane km ( rehabilitation of Paved Road )
Allocation: 24,994,000 Php
April 25, 2018 FY - 2018 WIN8F05230 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
Local Program

Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities

FROM:
Construction of Senior Citizens Federation Building,
Brgy. Poblacion. Sofronio Espanola, Palawan

CW1: 1 Building ( Construction of Multi-Purpose Building )
Allocation: 1,000,000 Php

TO:
Construction of Sr. Citizen Federation Building,
Brgy. Pulot Center, Sofronio Espanola, Palawan

CW1: 1 Building ( Construction of Multi-Purpose Building )
Allocation: 1,000,000 Php
April 25, 2018 FY - 2018 WIN8F05234 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
Local Program

Local Infrastructure Program - Buildings and Other Structures
- School Buildings

FROM:
Construction of one (1) Classroom Building in Pob. 2 Elementary School, Poblacion 2, Balabac, Palawan

CW1: 1 classroom ( Construction of 1-storey Classrooms)
Allocation: 1,100,000 Php

TO:
Construction of one (1) Classroom Building Balabac Central School, Balabac, Palawan

CW1: 1 classroom ( Construction of 1-storey Classrooms )
Allocation: 1,100,000 Php
April 25, 2018 FY - 2018 WIN8F05210 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 2nd District Engineering Office
Local Program

Local Infrastructure Program - Buildings and Other Structures
- Schgool Buildings

FROM:
Construction of one (1) Classroom Building in Pob. 4 Elementary School, Poblacion 4, Balabac, Palawan

CW1: 1 Classroom ( Construction of 1-storey Classrooms )
Allocation; 1,100,000 Php

TO:
Construction of one (1) Classroom Building Balabac Central School, Balabac, Palawan

CW1: 1 Classroom ( Construction of 1-storey Classrooms )
Allocation; 1,100,000 Php
April 25, 2018 FY - 2018 WIN8F05294 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence and Special Support Program

Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations

FROM:
Guadalupe - San Nicolas - Borac - Roro Port, Coron

CW1: 4.0 lane km ( Construction of Concrete Road )
Allocation: 60,000,000 Php

TO:
Guadalupe - San Nicolas - Borac Roro Port, Coron

CW1: 3.45 lane km ( Construction of Concrete Road )
Allocation: 60,000,000 Php
April 25, 2018 FY- 2018 WIN8F5292 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
001 - Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement
- Secondary Roads

FROM;
Puerto Pincesa North Rd.
K0193+000 - K0194+000,
K0206+000 - K0207+000,
K0209+915 - K0211+000

CW1: 8,139 sq.m. ( Off-Carriageway Improvement
Shoulder Paving/Construction )
Allocation: 70,967,000 Php

TO:
Puerto Princesa North Rd
K0192+681 - K0194+000,
K0206+000 - K0207+000,
K0211+ (-667) - K211+000

CW1: 18,234 sq.m. ( Off-Carriageway Imrovement
Shoulde Paving/Construction )
Allocation; 70,967,000 Php
April 25, 2018 FY - 2018 WIN8F05296 FY - 2018 GAA DPWH Infra Program December 19, 2017 Region IV-B Palawan 1st District Engineering Office
Convergence Special Support Program

Convergence and Special Support - Construction/Improvement of Access Roads leading to Declare Tourism Destination

FROM:
San Jose - Port Barton Road leading to various resorts in Port Barton, San Vicente, Palawan

CW1: 2.722 lane km ( Construction of Concrete Road )
Allocation: 55,000,000 Php

TO:
San Jose - Port Barton leading to various resorts in Port Barton, San Vicente, Palawan

CW1: 2.128 lane km ( Construction of Concrete Road )
Allocation; 55,000,000 Php
-

Pages