June 27, 2024 |
FY 2024 |
WIN4E03443 |
31010110131000 |
April 30, 2024 |
Region IX |
Regional Office IX |
UACS No. 31010110131000
Project ID: P00802719MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Lanao-Pagadian-Zamboanga City Rd (S01113MN) - K1817+874 - K1820+755, K1824+726 - K1825+823.05
CW1- Preventive Maintenance of Road: Asphalt Overlay/ 10.0747 Lane km
Unit Cost: ₱ 14,367,673.48/Lane-km
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00 |
June 27, 2024 |
FY 2024 |
|
300214100812000 |
May 29, 2024 |
Region IX |
Regional Office IX |
UACS No. 300214100812000 Project ID: P00833084MN Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Tucuran Jct- Karomatan Jct Rd - K1652+400 - K1652+520, K1652+900 - K1653+395
CW1 - Rehabilitation of Paved Road: 1.23 Lane-km
Unit Cost: ₱ 8,180,532.52/ Lane-km
EAO: ₱ 364,945.00
Allocation: ₱ 10,427,000.00 |
June 27, 2024 |
FY 2024 |
|
300221104838000 |
April 17, 2024 |
Region IX |
Regional Office IX |
UACS No. 300221104838000
Project ID: P00833306MN
Convergence and Special Support Program (CSSP)– Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Construction of Road, Barangay Lahi, Maimbung, Sulu
CW1- Construction of Concrete Road: 1.546 Lane-km
Unit Cost: ₱ 22,412,677.88/ Lane-km
EAO: ₱350,000.00
Allocation: ₱35,000,000.00 |
June 27, 2024 |
FY 2024 |
|
300221104846000 |
April 17, 2024 |
Region IX |
Regional Office IX |
UACS No. 300221104846000
Project ID: P00833314MN
Convergence and Special Support Program (CSSP)– Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Construction of Road, Landing, (Banguingui) Tongkil, Sulu
CW1- Construction of Concrete Road: 1.230 Lane-km
Unit Cost: ₱ 16,097,560.98/ Lane-km
EAO: ₱200,000.00
Allocation: ₱20,000,000.00 |
June 27, 2024 |
FY 2024 |
|
300215103999000 |
April 25, 2024 |
Region IX |
Regional Office IX |
UACS No. 300215103999000
Project ID: P00834833MN
Convergence and Special Support Program (CSSP)– Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities
Construction of Road - Siay - Godod Road, Zamboanga Sibugay
CW1- Construction of Concrete Road: 7.680 Lane km
Unit Cost: ₱ 20,104,166.67/ Lane km
EAO: ₱ 5,600,000.00
Allocation: ₱ 160,000,000.00 |
June 27, 2024 |
FY 2024 |
WIN4E03449 |
300215104002000 |
May 7, 2024 |
Region IX |
Regional Office IX |
UACS No. 300215104002000
Project ID: P00834836MN
Convergence and Special Support Program (CSSP)– Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities
Construction of Road - Siay - Diplahan Road, Diplahan, Zamboanga Sibugay
CW1- Construction of Concrete Road: 3.622 Lane km
Unit Cost: ₱ 42,552,168.35/ Lane km
EAO: ₱ 5,600,000.00 Excess: ₱ 276,046.22
Allocation: ₱ 160,000,000.00 |
June 27, 2024 |
FY 2024 |
|
300217100271000 |
April 25, 2024 |
Region IX |
Regional Office IX |
UACS No. 300217100271000
Project ID: P00835098MN
Convergence and Special Support Program (CSSP)– Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities
Construction of road along NRJ Barangay Camul - NRJ Barangay Lumbayao Package 1, Zamboanga del Norte
CW1- Construction of Concrete Road: 9.231 Lane km
Unit Cost: ₱ 18,817,029.57/ Lane km
EAO: ₱ 6,300,000.00
Allocation: ₱ 180,000,000.00 |
June 27, 2024 |
FY 2024 |
|
300221104843000 |
April 17, 2024 |
Region IX |
Regional Office IX |
UACS No. 300221104843000
Project ID: P00835909MN
Convergence and Special Support Program (CSSP)– Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabilitation of Jolo-Kasanyangan Road Sta. 0+008.54 - Sta. 0+640.00
CW1- Rehabilitation of Paved Road: 1.263 Lane-km
Unit Cost: ₱ 15,676,959.62/ Lane-km
EAO: ₱200,000.00
Allocation: ₱20,000,000.00 |
June 27, 2024 |
FY 2024 |
|
300221104848000 |
April 17, 2024 |
Region IX |
Regional Office IX |
UACS No. 300221104848000
Project ID: P00835911MN
Convergence and Special Support Program (CSSP)– Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabilitation of Jolo-Pantao Road Sta. 5+050 - Sta. 6+320 (with exception)
CW1- Rehabilitation of Paved Road: 2.540 Lane-km
Unit Cost: ₱ 19,488,188.98/ Lane-km
EAO: ₱500,000.00
Allocation: ₱50,000,000.00 |
June 27, 2024 |
FY 2024 |
|
300221104858000 |
April 17, 2024 |
Region IX |
Regional Office IX |
UACS No. 300221104858000
Project ID: P00835912MN
Convergence and Special Support Program (CSSP)– Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Improvement of Roads, Maimbung and Indanan Roads, Sulu
CW1- Construction of Concrete Road: 3.010 Lane-km
Unit Cost: ₱ 16,445,182.72/ Lane-km
EAO: ₱500,000.00
Allocation: ₱50,000,000.00 " |
June 27, 2024 |
FY 2024 |
|
300221104860000 |
April 17, 2024 |
Region IX |
Regional Office IX |
UACS No. 300221104860000
Project ID: P00835914MN
Convergence and Special Support Program (CSSP)– Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabilitation of Pagsalipangan-Maimbung Road, Sta. 14+455 - Sta. 16+400, Maimbung, Sulu
CW1- Rehabilitation of Paved Road: 3.875 Lane-km
Unit Cost: ₱ 12,774,193.55/ Lane-km
EAO: ₱500,000.00
Allocation: ₱50,000,000.00 " |
June 26, 2024 |
2024 |
P00803768MN |
SR2024-01-003025 |
January 27, 2024 |
Region X |
Regional Office X |
P00803768MN
310101101344000
OO1:Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
FROM:
Sayre Highway, K1430 + 610 - K1431 + 220, K1431 + 220 - K1431 + 900
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-2.394 Lane Km
Allocation:
Total: Php 300,000,000.00
CW1: Php 289,500,000.00
EAO: Php 10,500,000.00
TO:
Sayre Highway, K1432 + 575 - K1436 + 267, K1436 + 702 - K1437 + 799
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-23.002 Lane Km
Allocation:
Total: Php 300,000,000.00
CW1: Php 289,500,000.00
EAO: Php 10,500,000.00 |
June 26, 2024 |
2024 |
P00803864MN |
SR2024-01-003131 |
January 29, 2024 |
Region X |
Regional Office X |
P00803864MN
310204102722000
OO1:Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
FROM:
Bukidnon-Davao (Jct. Sinuda-Kalagangan, San Fernando) Package 38, Bukidnon
Type of Work:
CW1-Construction of Concrete Road
Physical Target:
CW1-16.667 Lane Km
Allocation:
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00
TO:
Bukidnon-Davao (Jct. Sinuda-Kalagangan, San Fernando) Package 38, Bukidnon
Type of Work:
CW1-Construction of Concrete Bridge
Physical Target:
CW1-1,448.800 Square meters
Allocation:
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00 |
June 26, 2024 |
2024 |
P00834859MN |
SR2024-01-005684 |
January 30, 2024 |
Region X |
Regional Office X |
P00834859MN
300215104026000
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road, Jct SH Malaybalay By- Pass Road, San Jose Section - Capitan Juan Road, Bukidnon
Type of Work:
CW1-Construction of Gravel Road
Physical Target:
CW1-7.000 Lane Km
Allocation:
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00
TO:
Construction of Road, Jct SH Malaybalay By- Pass Road, San Jose Section - Capitan Juan Road, Bukidnon
Type of Work:
CW1-Construction of Concrete Road
Physical Target:
CW1-8.000 Lane Km
Allocation:
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00 |
June 26, 2024 |
FY 2024 GAA |
WIN4E03477 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circumferential Rd - K1465 + 990 - K1471 + 826,
K1474 + 923 - K1472 + 731, Davao del Norte
Physical Target:
CW1: 16.646 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circumferential Rd - K1470 + 000 - K1471 + 826,
K1474 + 923 - K1472 + 128, Davao del Norte
Physical Target:
CW1: 8.204 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,078,921.89 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
EXC: P 421,078.11 (Excess) |
June 26, 2024 |
FY 2024 GAA |
WIN4E03466 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao City 2nd District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road, Mintal (Toril Dist), Davao City
Physical Target:
CW1: 1.660 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00
TO: Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road, Mintal (Tugbok Dist), Davao City
Physical Target:
CW1: 1.660 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00 |
June 26, 2024 |
FY 2024 GAA |
WIN4E03467 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation/Application/Construction of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, Pedestrian Island, and Street Lights along Digos-Makar Rd (S00184MN) - K1566 + 182 - K1567 + 118, San Jose, Digos City, Davao del Sur
Physical Target:
CW1: 960.000 square meters (Off-Carriageway Improvement: Construction of Traffic Island)
CW2: 31.00 number of units (Road Safety: Roadway Lighting)
CW3: 800.00 lineal meters (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 10,455,000.00
CW1: P 6,162,490.00 (Off-Carriageway Improvement: Construction of Traffic Island)
CW2: P 3,193,185.00 (Road Safety: Roadway Lighting)
CW2: P 733,400.00 (Road Safety: Pavement Markings)
EAO: P 365,925.00
TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation/Application/Construction of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, Pedestrian Island, and Street Lights along Digos-Makar Rd (S00184MN) - K1566 + 182 - K1567 + 118, San Jose, Digos City, Davao del Sur
Physical Target:
CW1: 630.000 square meters (Off-Carriageway Improvement: Construction of Traffic Island)
CW2: 21.00 number of units (Road Safety: Roadway Lighting)
CW3: 771.10 lineal meters (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 10,455,000.00
CW1: P 5,415,672.00 (Off-Carriageway Improvement: Construction of Traffic Island)
CW2: P 2,528,960.00 (Road Safety: Roadway Lighting)
CW2: P 2,144,443.00 (Road Safety: Pavement Markings)
EAO: P 365,925.00 |
June 26, 2024 |
FY 2024 GAA |
WIN4E03481 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Daang Maharlika (MN) - K1428 + 281 - K1428 + 400, K1433 + 850 - K1433 + 920
Physical Target:
CW1: 1,911.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 29,000,000.00
CW1: P 27,985,000.00 (Construction of Road Slope Protection Structure)
EAO: P 1,015,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Daang Maharlika (MN) - K1428 + 281 - K1428 + 400, K1433 + 850 - K1433 + 920
Physical Target:
CW1: 1,256.11 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 29,000,000.00
CW1: P 27,985,000.00 (Construction of Road Slope Protection Structure)
EAO: P 1,015,000.00 |
June 25, 2024 |
2024 |
P00803793MN |
SR2024-01-003055 |
January 28, 2024 |
Region X |
Regional Office X |
P00803793MN
310102101630000
OO1:Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
FROM:
Gingoog-Claveria-Villanueva Rd - K1329 + 850 - K1330 + 393, K1330 + 408 - K1330 + 448, K1333 + 000 - K1334 + 100
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-3.404 Lane Km
Allocation:
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00
TO:
Gingoog-Claveria-Villanueva Rd - K1330 + 320 - K1330 + 393, K1330 + 408 - K1332 + 700
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-8.850 Lane Km
Allocation:
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00 |
June 25, 2024 |
2024 |
P00803794MN |
SR2024-01-003057 |
January 27, 2024 |
Region X |
Regional Office X |
P00803794MN
310102101631000
OO1:Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
FROM:
Gingoog-Claveria-Villanueva Rd - K1334 + 100 - K1335 + 000, K1337 + 370 - K1337 + 509, K1337 + 524 - K1338 + 353
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-3.758 Lane Km
Allocation:
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00
TO:
Gingoog-Claveria-Villanueva Rd - K1332 + 700 - K1335 + 000, K1337 + 189 - K1337 + 509, K1337 + 524 - K1338 + 528
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-8.810 Lane Km
Allocation:
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00 |
June 25, 2024 |
2024 |
P00803795MN |
SR2024-01-003059 |
January 27, 2024 |
Region X |
Regional Office X |
P00803795MN
310102101632000
OO1:Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
FROM:
Gingoog-Claveria-Villanueva Rd - K1338 + 353 - K1339 + 219, K1339 + 234 - K1339 + 884, K1340 + 503 - K1342 + 074
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-6.216 Lane Km
Allocation:
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00
TO:
Gingoog-Claveria-Villanueva Rd - K1338 + 528 - K1339 + 219, K1339 + 234 - K1342 + 074
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-8.840 Lane Km
Allocation:
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00 |
June 25, 2024 |
2024 |
P00803767MN |
SR2024-01-003024 |
January 27, 2024 |
Region X |
Regional Office X |
P00803767MN
310101101343000
OO1:Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
FROM:
Sayre Highway K1527 + 000 - K1528 + 500, K1528 + 500 - K1530 + 000
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-6.172 Lane Km
Allocation:
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00
TO:
Sayre Highway K1527 + 000 - K1528 + 920, K1528 + 980 - K1529 + 007, K1531 + 484 - K1535 + 089
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-16.918 Lane Km
Allocation:
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00 |
June 25, 2024 |
2024 |
P00803585MN |
SR2024-01-001957 |
January 27, 2024 |
Region X |
Regional Office X |
P00803585MN
310106101063000
OO1:Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
FROM:
Kibawe-Kadingilan-Kalilangan Rd - K1605 + (-043) - K1605 + 000, K1605 + (-091) - K1605 + (-043), K1605 + (-100) - K1605 + (-091), K1605 + (-171) - K1605 + (-100), K1605 + (-180) - K1605 + (-171), K1605 + (-283) - K1605 + (-180), K1605 + (-303) - K1605 + (-283), K1605 + (-335) - K1605 + (-303), K1605 + (-401) - K1605 + (-335), K1605 + 000 - K1605 + 294
Type of Work:
CW1-Reconstruction to Concrete Pavement
Physical Target:
CW1-1.390 Lane Km
Allocation:
Total: Php 50,000,000.00
CW1: Php 48,250,000.00
EAO: Php 1,750,000.00
TO:
Kibawe-Kadingilan-Kalilangan Rd - K1605 + (-043) - K1605 + 000, K1605 + (-091) - K1605 + (-043), K1605 + (-100) - K1605 + (-091), K1605 + (-171) - K1605 + (-100), K1605 + (-180) - K1605 + (-171), K1605 + (-283) - K1605 + (-180), K1605 + (-303) - K1605 + (-283), K1605 + (-335) - K1605 + (-303), K1605 + (-401) - K1605 + (-335), K1605 + 000 - K1605 + 738, K1606 + 000 - K16106 + 749
Type of Work:
CW1-Reconstruction to Concrete Pavement
Physical Target:
CW1-3.780 Lane Km
Allocation:
Total: Php 50,000,000.00
CW1: Php 48,250,000.00
EAO: Php 1,750,000.00 |
June 25, 2024 |
2024 |
P00803760MN |
SR2024-01-003022 |
January 27, 2024 |
Region X |
Regional Office X |
P00803760MN
310101101336000
OO1:Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
FROM:
Sayre Highway K1492 + 000 - K1492 + 540, K1519 + 324 - K1520 + 452, K1520 + 452 - K1521 + 862
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-6.100 Lane Km
Allocation:
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00
TO:
Sayre Highway K1496 + 000 - K1499 + 000, K1500 + 000 - K1500 + 548, K1504 + 000 - K1506 + 1283
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-14.340 Lane Km
Allocation:
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00 |
June 25, 2024 |
2024 |
P00803763MN |
SR2024-01-003023 |
January 27, 2024 |
Region X |
Regional Office X |
P00803763MN
310101101339000
OO1:Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
FROM:
Sayre Highway K1515 + 850 - K1517 + 918
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-3.796 Lane Km
Allocation:
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00
TO:
Sayre Highway K1507 + 018 - K1512 + 366
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-17.050 Lane Km
Allocation:
Total: Php 200,000,000.00
CW1: Php 193,000,000.00
EAO: Php 7,000,000.00 |
June 25, 2024 |
2024 |
|
SR2024-01-008068 |
January 31, 2024 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K0899 + 314 - K0899 + 987, K0900 + 965 - K0901 + 247
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 52.46512 M
Asphalt Overlay: 3.824 Lane Km
EAO P 1.90288 M
Total P 54.368 M
AS MODIFIED:
Daang Maharlika (LT) - K0899 + 215 - K0899 + 987, K0900 + 965 - K0901 + 030
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 52.46512 M
Asphalt Overlay: 3.352 Lane Km
EAO P 1.90288 M
Total P 54.368 M
|
June 25, 2024 |
2024 |
|
SR2024-02-008134 |
February 1, 2024 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K1051 + 665 - K1052 + 114, K1052 + 129 - K1054 + 434
Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 65.71843 M
Asphalt Overlay: 5.468 Lane Km
EAO P 2.38357 M
Total P 68.102 M
AS MODIFIED:
Daang Maharlika (LT) - K1051 + 665 - K1052 + 114, K1052 + 129 - K1054 + 136
Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 65.71843 M
Asphalt Overlay: 4.872 Lane Km
EAO P 2.38357 M
Total P 68.102 M
|
June 24, 2024 |
2024 |
WIN4E03450 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 310105101067000
Project ID: P00801213MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads
- Secondary Roads
FROM:
NJR Bah-Bah-Talacogon Rd - K1307 + 000 - K1308 + 894, K1309 + 423 - K1310 + 006
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 4.894 Lane Km
Allocation:
TOTAL: 57,395,000
CW1: P 55,386,175
EAO: P 2,008,825
Unit Cost:
CW1: P 11,317,158.77/Lane Km
TO:
NJR Bah-Bah-Talacogon Rd - K1304+672 – K1304+766, K1304+840.50 – K1305+000, K1306+599 – K1306+702, K1307+812.90 – K1308+239.50, K1308+313.40 – K1308+475.40, K1309+036 – K1309+153.30, K1309+423 – K1310+006
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 3.14 Lane Km
Allocation:
TOTAL: 57,395,000
CW1: P 55,386,175
EAO: P 2,008,825
Unit Cost:
CW1: P 17,638,909.24/Lane Km
|
June 24, 2024 |
2024 |
WIN4E03452 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 310105101261000
Project ID: P00801214MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads
- Secondary Roads
FROM:
NJR Bah-Bah-Talacogon Rd - K1311 + (-1003) - K1311 + (-707), K1311 + (-501) - K1311 + 776
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 3.146 Lane Km
Allocation:
TOTAL: 36,895,000
CW1: P 36,157,100
EAO: P 737,900
Unit Cost:
CW1: P 11,493,038.78/Lane Km
TO:
NJR Bah-Bah-Talacogon Rd – K1311+(-1003) – K1311+(-607), K1311+(-574) – K1311+(-501), K1311+(-217) – K1311+(-067), K1311+000 – K1311+520.24
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 2.241 Lane Km
Allocation:
TOTAL: 36,895,000
CW1: P 36,157,100
EAO: P 737,900
Unit Cost:
CW1: P 16,134,359.66/Lane Km
|
June 24, 2024 |
2024 |
WIN4E03479 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 300215104145000
Project ID: P00834953MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of NRJ (Sibagat) San Vicente-Esperanza Road (San Agustin-Bentahon Section), Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 7.482 Lane Km
Allocation:
TOTAL: 85,000,000
CW1: P 82,025,000
EAO: P 2,975,000
Unit Cost:
CW1: P 10,962,977.81/Lane Km
TO:
Construction of NRJ (Sibagat) San Vicente-Esperanza Road (San Agustin-Bentahon Section), Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 5.96 Lane Km
Allocation:
TOTAL: 85,000,000
CW1: P 82,025,000
EAO: P 2,975,000
Unit Cost:
CW1: P 13,762,583.89/Lane Km
|
June 24, 2024 |
2024 |
WIN4E03453 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 300215104135000
Project ID: P00834943MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Concrete Road, Alternate Road along Daang Maharlika (Bypassing Andanan and Wawa Bridge), Bayugan City, Agusn del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 8.802 Lane Km
Allocation:
TOTAL: 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000
Unit Cost:
CW1: P 10,963,417.4/Lane Km
TO:
Construction of Concrete Road, Alternate Road along Daang Maharlika (Bypassing Andanan and Wawa Bridge), Bayugan City, Agusn del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 5.89 Lane Km
Allocation:
TOTAL: 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000
Unit Cost:
CW1: P 16,383,701.19/Lane Km
|
June 24, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 300221106981000
Project ID: P00837270MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Tabon-tabon Brgy. Sta. Cruz Road, Sibagat, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 2.641 Lane Km
Allocation:
TOTAL: 30,000,000
CW1: P 29,700,000
EAO: P 300,000
Unit Cost:
CW1: P 11,245,740.25/Lane Km
TO:
Construction of Tabon-tabon Brgy. Sta. Cruz Road, Sibagat, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 1.93 Lane Km
CW2- 986 Lineal meters
Allocation:
TOTAL: 30,000,000
CW1: P 24,404,650
CW2: P 5,295,350
EAO: P 300,000
Unit Cost:
CW1: P 12,644,896.37/Lane Km
CW2: P 5,370.54/Lineal meters
|
June 22, 2024 |
2024 |
WIN4E03478 |
SR2024-01-003957 |
January 1, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Installation of Roadway Lighting Structures along Cong. Andres Acop Cosalan Road K0343+(-746) - K0365+865;
Type of Work:
Road Safety: Roadway Lighting;
Physical Target:
665 Number of Units;
Allocation:
Php 125,000,000"
"To:
Installation of Roadway Lighting Structures along Cong. Andres Acop Cosalan Road K0355+000 - K0365+865;
Type of Work:
Road Safety: Roadway Lighting;
Physical Target:
529 Number of Units;
Allocation:
Php 125,000,000"
|
June 22, 2024 |
2024 |
|
SR2024-03-012869 |
March 5, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Construction of Napsong-Oliwek-Sakaang-Saleng Road, Kibungan, Benguet;
Type of Work:
Construction of Gravel Road;
Physical Target:
16.938 Lane Km;
Allocation:
Php 153,000,000"
"To:
Construction of Napsong-Oliwek-Sakaang-Saleng Road, Kibungan, Benguet;
Type of Work:
CW1: Construction of Gravel Road
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 12.2 Lane Km
CW2: 1,709 Square meter;
Allocation:
Php 153,000,000"
|
June 22, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Construction of Upper Chico River Irrigation System Main Diversion Canal Service Road, Tabuk City, Kalinga (KATUBIGAN - Kalsada Tungo sa Patubigan);
Type of Work:
Construction of Concrete Road;
Physical Target:
3.038;
Allocation:
Php 43,651,000"
"To:
Construction of Upper Chico River Irrigation System Main Diversion Canal Service Road, Tabuk City, Kalinga (KATUBIGAN - Kalsada Tungo sa Patubigan);
Type of Work:
CW1: Construction of Concrete Road
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 4.62 Lane Km
CW2: 4.43 Square meters;
Allocation:
Php 43,651,000"
|
June 22, 2024 |
FY 2024 |
|
310202101591000 |
March 25, 2024 |
Region IX |
Regional Office IX |
UACS No. 310202101591000
Project ID: P00800037MN
OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Secondary Roads
Liloy-Siocon Rd - K1973+991.72 - K1977+985.72
CW1- Road Widening: 7.988 Lane km
Unit Cost: ₱ 18,055,207.81/ Lane km ROW Acquisition: 30,000.00 Sq.m. Unit Cost: ₱ 500.00/sq.m.
EAO: ₱ 5,775,000.00
Allocation: ₱ 165,000,000.00 |
June 22, 2024 |
FY 2024 |
|
310107100638000 |
March 25, 2024 |
Region IX |
Regional Office IX |
UACS No. 310107100638000
Project ID: P00800407MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Lanao-Pagadian-Zamboanga City Rd - K1834+140 - K1834+540
CW1- Construction of Road Slope Protection Structure/ 6,451.60 sq. m.
Unit Cost: ₱ 8,974.52 sq. m.
EAO: ₱ 2,100,000.00
Allocation: ₱ 60,000,000.00 |
June 22, 2024 |
FY 2024 |
WIN4E03345 |
310107100638000 |
April 4, 2024 |
Region IX |
Regional Office IX |
UACS No. 310107100639000
Project ID: P00800414MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Pagadian City-Zamboanga City Rd- K1703+300 - K1703+316, K1703+349.66 - K1703+790
CW1- Construction of Road Slope Protection Structure/ 3,767.775 sq. m.
Unit Cost: ₱ 21,289.92 sq. m.
EAO: ₱ 2,909,375.00
Allocation: ₱ 83,125,000.00 |
June 22, 2024 |
FY 2024 |
|
310107100645000 |
March 25, 2024 |
Region IX |
Regional Office IX |
UACS No. 310107100645000
Project ID: P00800611MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Dipolog-Sindangan-Liloy Road - K1898+440 - K1899+030
CW1- Construction of Road Slope Protection Structure/ 63,916.00 sq. m.
Unit Cost: ₱ 2,284.59 sq. m.
EAO: ₱ 5,296,130.00
Allocation: ₱ 151,318,000.00 |
June 22, 2024 |
FY 2024 |
|
300214100806000 |
March 25, 2024 |
Region IX |
Regional Office IX |
UACS No. 300214100806000 Project ID: P00833087MN Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Dipolog-Sindangan-Liloy Rd - K1848 + 060 - K1848 + 208.09, K1875 + 450 - K1871 + 000, K1883 + 400 - K1885 + 820, K1887 + 1028 _ K1887 + 1902.64, K1887 + 2014 - K1890+307, K1900 + 000 - K1900 + 988.22, K1905 + 505 - K1906 + 941.06, K1906 +985.36 - K1908 + 000, K1920 + 791 - K1920 + 907.61, K1925 + 1007 - K1926 + 337, K1928 + 297 - K1928 + 902.65; K1885 + 140.00 - K1885 + 778.03, K1900 + 000.00 - K1900 + 580.55, K1928 + 297.00 - K1928 + 902.65
CW1 - Reconstruction to Concrete Pavement: 21.554 Lane-km
Unit Cost: ₱ 8,719,699.76/ Lane-km CW2 - Road Widening: 3.648 Lane-km
Unit Cost: ₱ 18,470,436.24/Lane-km
EAO: ₱ 9,552,935.00
Allocation: ₱ 272,941,000.00 |
June 22, 2024 |
FY 2024 |
WIN4E03386 |
300214100807000 |
April 4, 2024 |
Region IX |
Regional Office IX |
UACS No. 300214100807000 Project ID: P00833088MN Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Dipolog-Sindangan-Liloy Rd - K1877 + 642 - K3873 + 836, K1878 + 368 - K1880 + 400, K1883 + 000 - K1883 + 400, K1885 + 820 - K1887 + 1028, K1847 + (-576) - K1847 + (-003.80), K1847 + 717 - K1847 + 802, K1847 + 969 - K1848 + 060, K18948 + 208.09 - K1848 + 278.36, K1877 + 642 - K1878 + 220
CW1 - Rehabilitation of Paved Road: 12.305 Lane-km
Unit Cost: ₱ 11,442,755.91/ Lane-km CW2 - Road Widening: 1.156 Lane-km
Unit Cost: ₱ 17,526,971.003/Lane-km
EAO: ₱ 5,841,710.00
Allocation: ₱ 166,906,000.00 |
June 22, 2024 |
FY 2024 |
|
300214100808000 |
March 25, 2024 |
Region IX |
Regional Office IX |
UACS No. 300214100808000 Project ID: P00833089MN Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Lanao-Pagadian-Zamboanga City Rd - K1724+000 - K1726+060.92
CW1 - Rehabilitation of Paved Road: 4.27 Lane-km
Unit Cost: ₱ 12,304,314.99/ Lane-km
EAO: ₱ 1,905,575.00
Allocation: ₱ 54,445,000.00 |
June 22, 2024 |
FY 2024 |
WIN4E03438 |
310101101315000 |
April 30, 2024 |
Region IX |
Regional Office IX |
UACS No. 310101101315000
Project ID: P00800980MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Preventive Maintenance - Primary Roads
Lanao-Pagadian-Zamboanga City Rd - K1653+50 - K1655+468.22
CW1- Preventive Maintenance of Road: Asphalt Overlay/ 8.8729 Lane-km
Unit Cost: ₱ 13,317,324.10/Lane-km
EAO: ₱ 4,285,715.00
Allocation: ₱ 122,449,000.00 |
June 22, 2024 |
FY 2024 |
|
310202101594000 |
March 25, 2024 |
Region IX |
Regional Office IX |
UACS No. 310202101594000
Project ID: P00802647MN
OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Secondary Roads
Zamboanga Ctiy-Labuan-Limpapa Rd - K1955+700 - K1957+644
CW1- Road Widening: 4.100 Lane km
Unit Cost: ₱ 17,772,762.11/ Lane km CW2- Construction of Road Slope Protection Structure: 4,795.00 sq.m.
Unit Cost: ₱ 3,259.99/ sq.m. ROW Acquisition: 16,000.00 Sq.m. Unit Cost: ₱ 500.00/sq.m.
EAO: ₱ 8,000,000.00
Allocation: ₱ 100,000,000.00 |
June 22, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310101101423000
Project ID: P00801115MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
FROM:
Daang Maharlika (Surigao-Agusan Sect) - K1220 + 476 - K1220 + 570
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 0.376 Lane Km
Allocation:
TOTAL: P 5,000,000
CW1: P 4,825,000
EAO: P 175,000
Unit Cost:
CW1: P 12,832,446.81/Lane Km
TO:
Daang Maharlika (Surigao-Agusan Sect) - K1220 + 369 - K1220 + 476
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 0.428 Lane Km
Allocation:
TOTAL: P 5,000,000
CW1: P 4,825,000
EAO: P 175,000
Unit Cost:
CW1: P 11,273,364.49/Lane Km
|
June 22, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310205101295000
Project ID: P00800323MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads
FROM:
East-West lateral road connecting Agusan Del Sur/ Agusan del Norte to Bukidnon, Sampaguita-Makilos (Agusan del Sur/Bukidnon Boundary), Package 11-F, Agusan del Sur
Type of Work:
CW1- Construction of Gravel Road
Physical Target:
CW1- 3.528 Lane Km
Allocation:
TOTAL: P 150,000,000
CW1: P 144,750,000
EAO: P 5,250,000
Unit Cost:
CW1: P 41,028,911.56/Lane Km
TO:
East-West lateral road connecting Agusan Del Sur/ Agusan del Norte to Bukidnon, Sampaguita-Makilos (Agusan del Sur/Bukidnon Boundary), Package 11-F, Agusan del Sur
Type of Work:
CW1- Construction of Gravel Road
Physical Target:
CW1- 3.720 Lane Km
Allocation:
TOTAL: P 150,000,000
CW1: P 144,750,000
EAO: P 5,250,000
Unit Cost:
CW1: P 38,911,290.32/Lane Km
|
June 22, 2024 |
2024 |
WIN4E03455 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 300214100862000
Project ID: P00833092MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
FROM:
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (Agusan-Davao Sect) - K1367 + 000 - K1367 + 576, K1367 + 662 - K1367 + 685, K1367 + 788 - K1367 + 854, K1368 + 032 - K1368 + 228, K1372 + 000 - K1372 + 400, K1373 + 220 - K1374 + 475, K1374 + 519 - K1375 + 000, K1375 + 666 - K1376 + 840
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 13.765 Lane Km
Allocation:
TOTAL: P 249,009,000
CW1: P 240,293,685
EAO: P 8,715,315
Unit Cost:
CW1: P 17,456,860.52/Lane Km
TO:
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (Agusan-Davao Sect) - K1367 + 000 - K1367 + 576, K1367 + 662 - K1367 + 685, K1367 + 788 - K1367 + 854, K1368 + 032 - K1368 + 228, K1372 + 000 - K1372 + 400, K1373 + 220 - K1374 + 475, K1374 + 519 - K1375 + 000, K1375 + 666 - K1376 + 840, K1376 + 881 - K1376 + 896
Type of Work:
CW1- Rehabilitation of Paved Road
CW2- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 10.124 Lane Km
CW2- 3.026 Lane Km
Allocation:
TOTAL: P 249,009,000
CW1: P 191,347,920
CW2: P 48,945,765
EAO: P 8,715,315
Unit Cost:
CW1: P 18,900,426.71/Lane Km
CW2: P 16,175,071.05/Lane Km
|
June 22, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310101101361000
Project ID: P00803775MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
FROM:
Asphalt Overlay along Butuan City - Cagayan de Oro City - Iligan City Road - K1259+812 - K1262 + 812 18, CARAGA
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 6.020 Lane Km
Allocation:
TOTAL: P 180,000,000
CW1: P 173,700,000
EAO: P 6,300,000
Unit Cost:
CW1: P 28,853,820.60/Lane Km
TO:
Asphalt Overlay along Butuan City - Cagayan de Oro City - Iligan City Road - K1259+812 - K1263 + 828, CARAGA
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 16.148 Lane Km
Allocation:
TOTAL: P 180,000,000
CW1: P 173,700,000
EAO: P 6,300,000
Unit Cost:
CW1: P 10,756,750.06/Lane Km
|
June 22, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310101101422000
Project ID: P00801067MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
FROM:
Daang Maharlika (Surigao-Agusan Sect) - K1222 + (-016) - K1223 + 010, K1223 + 925 - K1224 + 300, K1224 + 400 - K1224 + 721, K1224 + 740 - K1225 + 048, K1225 + 068 - K1225 + 860
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 13.820 Lane Km
Allocation:
TOTAL: P 118,266,000
CW1: P 114,126,690
EAO: P 4,139,310
Unit Cost:
CW1: P 8,258,081.76/Lane Km
TO:
Daang Maharlika (Surigao-Agusan Sect) - K1222 + (-016) - K1223 + 010, K1223 + 925 - K1224 + 300, K1224 + 400 - K1224 + 721, K1224 + 740 - K1225 + 048, K1225 + 068 - K1225 + 632.5
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 12.897 Lane Km
Allocation:
TOTAL: P 118,266,000
CW1: P 114,126,690
EAO: P 4,139,310
Unit Cost:
CW1: P 8,849,088.16/Lane Km
|
June 22, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310204102774000
Project ID: P00800946MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads
FROM:
Butuan City West Diversion Road, Package 8, Butuan City
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 4.988 Lane Km
Allocation:
TOTAL: P 121,000,000
CW1: P 116,765,000
EAO: P 4,235,000
Unit Cost:
CW1: P 23,409,182.04/Lane Km
TO:
Butuan City West Diversion Road, Package 8, Butuan City
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 5.276 Lane Km
Allocation:
TOTAL: P 121,000,000
CW1: P 116,765,000
EAO: P 4,235,000
Unit Cost:
CW1: P 22,131,349.51/Lane Km
|
June 22, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310101101421000
Project ID: P00801133MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
FROM:
Daang Maharlika (Lipata-Surigao Sect) - K1114 + 000 - K1115 + 000, K1115 + 474 - K1115 + 626, K1120 + 200 - K1121 + 673
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 10.336 Lane Km
Allocation:
TOTAL: P 138,913,000
CW1: P 134,051,045
EAO: P 4,861,955
Unit Cost:
CW1: P 12,969,334.84/Lane Km
TO:
Daang Maharlika (Lipata-Surigao Sect) - K1115 + 474 - K1120 + 200
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 9.642 Lane Km
Allocation:
TOTAL: P 138,913,000
CW1: P 134,051,045
EAO: P 4,861,955
Unit Cost:
CW1: P 13,902,825.66/Lane Km
|
June 22, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310101101386000
Project ID: P00803784MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
FROM:
Surigao-Davao Coastal Rd, San Agustin, Surigao del Sur
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 12.950 Lane Km
Allocation:
TOTAL: P 250,000,000
CW1: P 241,250,000
EAO: P 8,750,000
Unit Cost:
CW1: P 18,629,343.63/Lane Km
TO:
Surigao-Davao Coastal Rd, San Agustin, Surigao del Sur
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 26.693 Lane Km
Allocation:
TOTAL: P 250,000,000
CW1: P 241,250,000
EAO: P 8,750,000
Unit Cost:
CW1: P 9,037,950.02/Lane Km
|
June 22, 2024 |
2024 |
P00801217MN |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 310106101064000
Project ID: P00801217MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads
- Tertiary Roads
FROM:
NRJ Bayugan-Esperanza Rd - K1271 + 648 - K1272 + 255, K1272 + 390 - K1272 + 470, K1273 + 153 - K1274 + 250
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 4.520 Lane Km
Allocation:
TOTAL: P 53,008,000
CW1: P 51,152,720
EAO: P 1,855,280
Unit Cost:
CW1: P 11,316,973.45/Lane Km
TO:
NRJ Bayugan-Esperanza Rd – K1271+648 – K1272+255, K1272+390 – K1272+470, K1273+153 – K1273+972
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 3.156 Lane Km
Allocation:
TOTAL: P 53,008,000
CW1: P 51,152,720
EAO: P 1,855,280
Unit Cost:
CW1: P 16,208,086.19/Lane Km
|
June 22, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 310106101213000
Project ID: P00801218MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads
- Tertiary Roads
FROM:
Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1309 + 828 - K1310 + 110, K1310 + 400 - K1310 + 775, K1313 + 597 - K1313 + 780
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 2.182 Lane Km
Allocation:
TOTAL: P 25,589,000
CW1: P 25,077,220
EAO: P 511,780
Unit Cost:
CW1: P 11,492,768.10/Lane Km
TO:
Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1309 + 828 - K1310 + 241, K1310 + 400 - K1310 + 775, K1313 + 597 - K1313 + 847
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 2.014 Lane Km
Allocation:
TOTAL: P 25,589,000
CW1: P 25,077,220
EAO: P 511,780
Unit Cost:
CW1: P 12,451,,449.85/Lane Km
|
June 22, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 300221106982000
Project ID: P00837271MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road along Napo, Prosperidad, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.440 Lane Km
Allocation:
TOTAL: 5,000,000
CW1: P 4,950,000
EAO: P 50,000
Unit Cost:
CW1: P 11,250,000/Lane Km
TO:
Construction of Road along Napo, Prosperidad, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.390 Lane Km
Allocation:
TOTAL: 5,000,000
CW1: P 4,950,000
EAO: P 50,000
Unit Cost:
CW1: P 12,692,307.69/Lane Km
|
June 22, 2024 |
2024 |
WIN4E03405 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 310105101260000
Project ID: P00801211MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads
- Secondary Roads
FROM:
NJR Bah-Bah-Talacogon Rd - K1295 + 633 - K1296 + 000, K1297 + 493 - K1297 + 791
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 1.914 Lane Km
Allocation:
TOTAL: 22,447,000
CW1: P 21,998,060
EAO: P 448,940
Unit Cost:
CW1: P 11,493,239.29/Lane Km
TO:
NJR Bah-Bah-Talacogon Rd - K1295 + 633 - K1296 + 000, K1296 + 255 - K1296 +320, K1297 + 493 - K1297 + 791
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 1.432 Lane Km
Allocation:
TOTAL: 22,447,000
CW1: P 21,998,060
EAO: P 448,940
Unit Cost:
CW1: P 15,361,773.74/Lane Km
|
June 21, 2024 |
FY 2024 GAA |
P00800245MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) - K1427 + 251 - K1429 + 326
Physical Target:
CW1: 2,086.00 square meters (Off-Carriageway Improvement: Construction of Traffic Island)
CW2: 92.00 number of units (Road Safety: Roadway Lighting)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 21,423,000.00 (Off-Carriageway Improvement: Construction of Traffic Island)
CW2: P 7,527,000.00 (Road Safety: Roadway Lighting)
EAO: P 1,050,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) - K1427 + 251 - K1429 + 917
Physical Target:
CW1: 2,527.10 square meters (Off-Carriageway Improvement: Construction of Traffic Island)
CW2: 13.00 number of units (Road Safety: Roadway Lighting)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 27,941,997.00 (Off-Carriageway Improvement: Construction of Traffic Island)
CW2: P 1,008,003.00 (Road Safety: Roadway Lighting)
EAO: P 1,050,000.00 |
June 21, 2024 |
FY 2024 GAA |
P00803886MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika, Mawab Section to Nabunturan Section, Davao de Oro
Physical Target:
CW1: 12,236.00 square meters (Off-Carriageway Improvement: Paving of Shoulders)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Off-Carriageway Improvement: Paving of Shoulders)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika, Mawab Section to Nabunturan Section, Davao de Oro
Physical Target:
CW1: 5,068.72 square meters (Off-Carriageway Improvement: Paving of Shoulders)
CW2: 6,490.82 square meters (Off-Carriageway Improvement: Construction of Traffic Island)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 14,938,339.00 (Off-Carriageway Improvement: Paving of Shoulders)
CW2: P 81,561,661.00 (Off-Carriageway Improvement: Construction of Traffic Island)
EAO: P 3,500,000.00 |
June 21, 2024 |
FY 2024 |
|
300215105004000 |
April 15, 2024 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
UACS No. 300215105004000
Project ID: P00834974MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Alleviating Gaps (SIPAG) – SIPAG – Access Roads and/pr Bridges from the National Roads/s leading to Major/Strategic Public Buildings/ Facilities
Construction of Circumferential Road (S01188MN) (NRJ Biswangan - Suminalom Section), Lakewood, Zamboanga del Sur
CW1- Construction of Concrete Road: 1.34 Lane km
Unit Cost: ₱ 14,626,865.67/ Lane km
EAO: ₱ 400,000.00
Allocation: ₱ 20,000,000.00 |
June 21, 2024 |
FY 2024 |
|
20102106994000 |
April 15, 2024 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
UACS No. 320102106994000
Project ID: P00821215MN
OO2: Protect Lives and Properties Against Major Floods – Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure, Barangay Punta Flecha, Pitogo, Zamboanga del Sur
CW1- Construction of Flood Mitigation Structure: 520 Lineal meters
Unit Cost: ₱ 28,269.23/ Lineal meters
EAO: ₱ 300,000.00
Allocation: ₱ 15,000,000.00 |
June 21, 2024 |
FY 2024 |
|
320102106995000 |
April 15, 2024 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
UACS No. 320102106995000
Project ID: P00821216MN
OO2: Protect Lives and Properties Against Major Floods – Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure, Barangay Colojo, Pitogo, Zamboanga del Sur
CW1- Construction of Flood Mitigation Structure: 600 Lineal meters
Unit Cost: ₱ 24,500.00/ Lineal meters
EAO: ₱ 300,000.00
Allocation: ₱ 15,000,000.00 |
June 21, 2024 |
FY 2024 |
|
310107100644000 |
April 15, 2024 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 310107100644000
Project ID: P00802688MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Lanao – Pagadian – Zamboanga City Road (RN9) K1640+268 – K1640+519 L/S
CW1- Construction of Road Slope Protection Structure: 232.49 sq.m.
Unit Cost: ₱ 39,183.3/ sq.m. CW2- Preventive Maintenance of Road/Concrete Reblocking: 0.238 Lane km
Unit Cost: ₱ 10,379,571.43/ Lane km.
EAO: ₱ 420,000.00
Allocation: ₱ 12,000,000.00 |
June 21, 2024 |
FY 2024 |
|
310106101203000 |
April 24, 2024 |
Region IX |
Zamboanga del Norte 2nd District Engineering Office |
UACS No. 310106101203000
Project ID: P00802661MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
Dipolog – Polanco – Piñan – Jct Oroquieta Rd – K1831+(-358) – K1833+080
CW1- Rehabilitation of Paved Road: 4.83 Lane km
Unit Cost: ₱ 9,089,855.07/ Lane km
EAO: ₱ 896,000.00
Allocation: ₱ 44,800,000.00 |
June 21, 2024 |
FY 2024 |
|
310101101313000 |
April 15, 2024 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 310101101313000
Project ID: P00800978MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Jct. Aurora-Ozamis City Rd – K1630+(-200) – K1632+316
CW1 - Preventive Maintenance - Asphalt Overlay: 9.164 Lane km
Unit Cost: ₱ 4,835,319.73/ Lane km
EAO: ₱ 1,607,130.00
Allocation: ₱ 45,918,000.00 |
June 21, 2024 |
FY 2024 |
|
300215104009000 |
April 15, 2024 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 300215104009000
Project ID: P00834843MN
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Road, Barangay Dontulan – Barangay Bogo Clabar – Barangay Nopulan – Barangay Leonardo Road, Zamboanga del Sur, Phase I
CW1 - Construction of Concrete Road: 1.278 Lane Km
Unit Cost: ₱ 12,810,520.34 CW2- Construction of Drainage Structure along Road: 1,096.50 Lineal meters
Unit Cost: ₱ 3,550.53/ Lineal meters
EAO: ₱ 735,000.00
Allocation: ₱ 21,000,000.00 |
June 21, 2024 |
FY 2024 |
|
310101101311000 |
April 11, 2024 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
"UACS No. 310101101311000
Project ID: P00802720MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance- Primary Roads
Dipolog-Oroquieta National Road (S01316MN) K1797+681 – K1797+999, K1798+996 – K1800+470 (S01062MN) Chainage 58 – Chainage 208
CW1- Preventive Maintenance of Road/Asphalt Overlay: 7.468 Lane km
Unit Cost: ₱ 16,152,249.60/ Lane km
EAO: ₱ 4,375,000.00
Allocation: ₱ 125,000,000.00 |
June 21, 2024 |
FY 2024 GAA |
P00800260MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) - K1384 + 178 - K1386 + 000
Physical Target:
CW1: 1,847.00 square meters (Off-Carriageway Improvement: Construction of Traffic Island)
CW2: 95.00 number of units (Off-Carriageway Improvement: Roadway Lighting)
Allocation:
TOTAL: P 24,949,000.00
CW1: P 16,978,210.00 (Off-Carriageway Improvement: Construction of Traffic Island)
CW2: P 7,097,575.00 (Off-Carriageway Improvement: Roadway Lighting)
EAO: P 873,215.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) - K1384 + 178 - K1386 + 503
Physical Target:
CW1: 2,410.047 square meters (Off-Carriageway Improvement: Construction of Traffic Island)
CW2: 7.00 number of units (Off-Carriageway Improvement: Roadway Lighting)
Allocation:
TOTAL: P 24,949,000.00
CW1: P 16,978,210.00 (Off-Carriageway Improvement: Construction of Traffic Island)
CW2: P 7,097,575.00 (Off-Carriageway Improvement: Roadway Lighting)
EAO: P 873,215.00 |
June 21, 2024 |
FY 2024 GAA |
P00801136MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao de Oro 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Benigno S. Aquino Jr. National Highway (S01432MN) - K1599 + 522 - K1601 + 816,
K1601 + 835 - K1606 + 000, K1596 + 000 - K1597 + 291,
K1599 + 000 - K1599 + 491, K1613 + 320 - K1613 + 500
Physical Target:
CW1: 16.842 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,250,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Benigno S. Aquino Jr. National Highway (S01432MN) - K1596 + 000 - K1597 + 366,
K1599 + 000 - K1599 + 471, K1599 + 522 - K1601 + 816,
K1601 + 835 - K1606 + 000, K1613 + 320 - K1613 + 604,
K1613 + 651 - K1615 + 588, K1615 + 620 - K1615 + 778
Physical Target:
CW1: 18.925 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,250,000.00 |
June 21, 2024 |
FY 2024 GAA |
P00803821MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao de Oro 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Montevista-Compostela-Mati Bdry Rd - K1428 + 000 - K1431 + 983 (Section 1)
Physical Target:
CW1: 7.912 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,250,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Montevista-Compostela-Mati Bdry Rd - K1428 + 000 - K1432 + 070,
K1432 + 215 - K1434 + 000, K1478 + 794 - K1479 + 555, K1479 + 588 - K1481 + 062 (Section 1)
Physical Target:
CW1: 19.490 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,250,000.00 |
June 21, 2024 |
FY 2024 GAA |
P00834920MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao de Oro 2nd District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road, Barangay Rizal-Barangay Baylo, Monkayo, Davao de Oro
Physical Target:
CW1: 5.700 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Construction of Concrete Road)
EAO: P 5,250,000.00
TO: Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road, Barangay Rizal-Barangay Baylo, Monkayo, Davao de Oro
Physical Target:
CW1: 9.000 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Construction of Concrete Road)
EAO: P 5,250,000.00 |
June 21, 2024 |
FY 2024 GAA |
WIN4E03461 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Daang Maharlika (MN) - K1377 + (-201) - K1377 + 655, K1377 + 693 - K1378 + 047,
K1380 + 695 - K1380 + 795, K1390 + 1010 - K1391 + 329, K1391 + 851 - K1391 + 856
Physical Target:
CW1: 3.348 lane km (Reconstruction to Concrete Pavement)
CW2: 0.101 lane km (Road Widening)
Allocation:
TOTAL: P 51,500,000.00
CW1: P 45,336,665.00 (Reconstruction to Concrete Pavement)
CW2: P 4,360,835.00 (Road Widening)
EAO: P 1,802,500.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Daang Maharlika (MN) - K1377 + (-201) - K1377 + 655, K1377 + 693 - K1378 + 047,
K1380 + 695 - K1380 + 795, K1390 + 1014 - K1391 + 323, K1392 + 266 - K1392 + 287
Physical Target:
CW1: 3.397 lane km (Reconstruction to Concrete Pavement)
CW2: 0.166 lane km (Road Widening)
ROW: 1,360.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 51,500,000.00
CW1: P 38,453,320.00 (Reconstruction to Concrete Pavement)
CW2: P 7,094,680.00 (Road Widening)
ROW: P 4,149,500.00 (ROW Acquisition)
EAO: P 1,802,500.00 |
June 21, 2024 |
FY 2024 GAA |
WIN4E03464 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Daang Maharlika (MN) - (S00064MN) K1479 + 006 - K1479 + 397,
(S01364MN) K1478 + 615 - K1479 + 1006
Physical Target:
CW1: 1.564 lane km (Road Widening)
CW2: 7,820.00 square meters (Off-Carriageway Improvement: Construction of Sidewalk)
Allocation:
TOTAL: P 66,345,000.00
CW1: P 40,526,140.00 (Road Widening)
CW2: P 23,496,785.00 (Off-Carriageway Improvement: Construction of Sidewalk)
EAO: P 2,322,075.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Daang Maharlika (MN) - (S00064MN) K1479 + 005 - K1479 + 390,
(S01364MN) K1478 + 622 - K1479 + 1007
Physical Target:
CW1: 0.958 lane km (Road Widening)
CW2: 2,921.90 square meters (Off-Carriageway Improvement: Construction of Bike Lanes)
CW3: 769.00 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 66,345,000.00
CW1: P 26,883,978.00 (Road Widening)
CW2: P 18,133,818.00 (Off-Carriageway Improvement: Construction of Bike Lanes)
CW3: P 19,005,129.00 (Construction of Drainage Structure along Road)
EAO: P 2,322,075.00 |
June 20, 2024 |
FY 2024 |
|
310201101446000 |
April 19, 2024 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
UACS No. 310201101446000
Project ID: P00800038MN
OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads
Dipolog-Oroquieta National Rd - K1826+600 - K1836+945.60
CW1- Road Widening: 0.72795 Lane km
Unit Cost: ₱ 20,399,597.50/ Lane km CW2- Construction of Road Slope Protection Structure: 1,503.00 sq. m.
Unit Cost: ₱ 1,686.64/ sq. m. CW3- Construction of Drainage Structure along Road: 311.40 Lineal Meters
Unit Cost: ₱ 7,011.80/Lineal Meters ROW Acquisition: 433.333 Sq.m. Unit Cost: ₱ 1,500.00/sq.m.
EAO: ₱ 412,620.00
Allocation: ₱ 20,631,000.00 |
June 20, 2024 |
FY 2024 |
|
300204101459000 |
April 19, 2024 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 300204101459000 Project ID: P00832832MN CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program (ROLL-IT)
Buenavista – Sinai Barangay Road, in support of Corn and Vegetables Production at Barangay Buenavista, Sergio Osmeña, Zamboanga del Norte
CW1 - Off-Carriageway Improvement/ Paving of Shoulders: 2,083.04 sq. m.
Unit Cost: ₱ 2,352.33/ sq. m.
EAO: ₱ 100,000.00
Allocation: ₱ 5,000,000.00 |
June 20, 2024 |
FY 2024 |
|
300204101615000 |
April 19, 2024 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 300204101615000 Project ID: P00832717MN CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program (ROLL-IT)
Situbo, Antonino, Penacio Farmers Association in support of Coconut, Rubber and Abaca Industries, Sergio Osmeña, Zamboanga del Norte
CW1 - Off-Carriageway Improvement/ Paving of Shoulders: 1,505.00 sq. m.
Unit Cost: ₱ 1,783.63/ sq. m. CW2 - Road Safety/ Guardrails: 317.20 Lineal meters
Unit Cost: ₱ 4,000.53/ Lineal meters CW3 - Road Safety/ Road Signs: 58.00 Number of Signs
Unit Cost: ₱ 16,321.91/ Number of Sign
EAO: ₱ 100,000.00
Allocation: ₱ 5,000,000.00 |
June 20, 2024 |
FY 2024 |
|
300204101452000 |
April 19, 2024 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 300204101452000 Project ID: P00832704MN CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program (ROLL-IT)
Tubac-New Siquijor- Bergado Barangay Road, connecting Provincial Road and El Paraiso in support of Abaca and Coconut Industries, Mutia, Zamboanga del Norte
CW1 - Off-Carriageway Improvement/ Paving of Shoulders: 2,180.20 sq. m.
Unit Cost: ₱ 1,951.68/ sq. m. CW2 - Road Safety/ Guardrails: 160.00 Lineal meters
Unit Cost: ₱ 4,030.97/ Lineal meters
EAO: ₱ 100,000.00
Allocation: ₱ 5,000,000.00 |
June 20, 2024 |
FY 2024 |
|
310201101307000 |
April 24, 2024 |
Region IX |
Zamboanga del Norte 2nd District Engineering Office |
UACS No. 310201101307000
Project ID: P00800016MN
OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads
Dipolog-Sindangan-Liloy Rd - K1892+531 - K1893+892
CW1- Road Widening: 2.70756 Lane km
Unit Cost: ₱ 18,324,127.11/ Lane km CW2- Construction of Road Slope Protection Structure: 3,306.81 sq. m.
Unit Cost: ₱ 2,603.60/ sq. m.
EAO: ₱ 2,111,725.00
Allocation: ₱ 60,335,000.00 |
June 20, 2024 |
FY 2024 |
|
310212100267000 |
April 15, 2024 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
UACS No. 310212100267000
Project ID: P00800209MN
OO1: Ensure Safe and Reliable National Road System – Network Development – Paving of Unpaved Roads - Tertiary Roads
Sindangan-Bayog-Lakewood Rd - K1741 + 646.00 - K1744 + 717.43, K1750 + 236.00 - K1750 + 322.64, K1750 + 353.18 - K1750 + 397.00, K1753 + 185.00 - K1753 + 375.78, K1753 + 452.41 - K1753 + 621.11
CW1- Paving of Unpaved Roads: 3.123 Lane km
Unit Cost: ₱ 15,923,904.01/ Lane km CW2- Construction of Road Slope Protection Structure: 1,080.00 sq. m.
Unit Cost: ₱ 6,670.97/ sq. m.
EAO: ₱ 2,065,000.00
Allocation: ₱ 59,000,000.00 |
June 20, 2024 |
FY 2024 |
|
300215104010000 |
April 15, 2024 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 300215104010000
Project ID: P00834844MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Alleviating Gaps (SIPAG)
Construction of Road, Barangay Dontulan – Barangay Bogo Calabat – Barangay Nopulan – Barangay Leonardo Road, Zamboanga del Sur, Phase II
CW1- Construction of Concrete Road: 0.444 Lane km
Unit Cost: ₱ 11,849,351.35/ Lane km CW2- Construction of Drainage Structure akong road: 385.50 Lineal meters
Unit Cost: ₱ 3,875.20/ sq. m.
EAO: ₱ 245,000.00
Allocation: ₱ 7,000,000.00 |
June 20, 2024 |
FY 2024 |
|
310105101055000 |
April 15, 2024 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310105101055000
Project ID: P00803893MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Rizal – Dakak – Dapitan Coastal Loop Road – K1799+897 – K1800+000, K1800+460 – K1801+587, K1856+005 – K1856+985
CW1- Rehabilitation of Paved Road: 4.422 Lane km
Unit Cost: ₱ 16,795,739.48/ Lane km CW2- Construction of Road Slope Protection Structure: 3,562.00 sq. m.
Unit Cost: ₱ 6,002.03/ sq. m. ROW Acquisition: 566.667 sq. m.
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
June 20, 2024 |
2024 |
320102106236000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Isabela 3rd District Engineering Office |
FROM:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of River Flood Control Project along Ganano River Bank, Barangay San Antonio Upstream (Sta. 0+000 - Sta. 0+477.60), Alicia, Isabela
TO:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of River Flood Control Project along Ganano River Bank, Barangay San Antonio Upstream (Sta. 0+000 - Sta. 0+067.90, Sta. 0+465.50), Alicia, Isabela |
June 20, 2024 |
2024 |
320102106239000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Isabela 3rd District Engineering Office |
FROM:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of River Flood Control Project along Ganano River Bank, Barangay San Maria (Sta. 0+472.20 - Sta. 0+938.00), Alicia, Isabela
TO:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of River Flood Control Project along Ganano River Bank, Barangay Sta. Maria (Sta. 0+468.30 - Sta. 0+928.90), Alicia, Isabela |
June 20, 2024 |
2024 |
320102106238000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Isabela 3rd District Engineering Office |
FROM:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of River Flood Control Project along Ganano River Bank, Barangay San Maria (Sta. 0+000 - Sta. 0+472.20), Alicia, Isabela
TO:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of River Flood Control Project along Ganano River Bank, Barangay Sta. Maria (Sta. 0+000 - Sta. 0+468.30), Alicia, Isabela |
June 20, 2024 |
2024 |
320102106237000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Isabela 3rd District Engineering Office |
FROM:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of River Flood Control Project along Ganano River Bank, Barangay San Antonio Upstream (Sta. 0+477.60 - Sta. 0+950.80), Alicia, Isabela
TO:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of River Flood Control Project along Ganano River Bank, Barangay San Antonio Upstream (Sta. 0+465.60 - Sta. 0+928.20), Alicia, Isabela |
June 20, 2024 |
2024 |
320102106169000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Isabela 3rd District Engineering Office |
FROM:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Pinacanauan River Flood Control Project, Barangay Maluno, Sta. 0+000 - Sta. 0+229, Benito Soliven, Isabela
TO:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Pinacanauan River Flood Control Project, Barangay Maluno, Sta. 0+000 - Sta. 0+727, Benito Soliven, Isabela |
June 20, 2024 |
2024 |
320102106170000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Isabela 3rd District Engineering Office |
FROM:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Pinacanauan River Flood Control Project, Barangay Maluno, Sta. 0+000 - Sta. 0+658, Benito Soliven, Isabela
TO:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Pinacanauan River Flood Control Project, Barangay Maluno, Sta. 0+000 - Sta. 0+722, Benito Soliven, Isabela |
June 20, 2024 |
2024 |
300215104462000 |
GAA 2024 |
January 3, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road , Brgy. La Suerte-Nagsabaran-Bacring, Amulung, Cagayan |
June 20, 2024 |
FY 2024 |
|
310104100770000 |
April 24, 2024 |
Region IX |
Zamboanga del Norte 2nd District Engineering Office |
UACS No. 310104100770000
Project ID: P00802657MN
OO1: Asset Preservation – Rehabilitation/Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
Dipolog-Oroquieta National Rd - K1833 + 100 - K1834 + 486
CW1- Rehabilitation of Paved Road: 2.782 Lane km
Unit Cost: ₱ 8,679,094.18/ Lane km
EAO: ₱ 492,760.00
Allocation: ₱ 24,638,000.00 |
June 20, 2024 |
2024 |
310110100502000 |
GAA 2024 |
January 3, 2024 |
Region II |
Isabela 3rd District Engineering Office |
FROM:
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads - Santiago-Tuguegarao Rd (Jct Kalinga-Tuguegarao Sect) - K0441 + 000 - K0442 + 198, K0442 + 222 - K0444 + 000
TO:
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads - Santiago-Tuguegarao Rd (Jct Kalinga-Tuguegarao Sect) - K0441 + 000 - K0441 + 420, K0441 + 220 - K0441 + 470, K0441 + 740 - K0442 + 200, K0442 + 452 - K0443 + 112, K0443 + 626 - K0443 + 846 |
June 20, 2024 |
FY 2024 |
|
310104100773000 |
April 24, 2024 |
Region IX |
Zamboanga del Norte 2nd District Engineering Office |
UACS No. 310104100773000
Project ID: P00802660MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
Dipolog-Sindangan-Liloy Rd - K1868 + 160 - K1868 + 526.28, K1872 + 115 - K1872 + 285, K1872 +
326 - K1873 + 320
CW1- Reconstruction to Concrete Pavement: 2.52456 Lane km
Unit Cost: ₱ 10,481,034.32/ Lane km
EAO: ₱ 540,000.00
Allocation: ₱ 27,000,000.00 |
June 19, 2024 |
CY 2024 |
|
CAA No. 2024-04-0029 |
April 29, 2024 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA/Original
UACS No. 300226110497000
Project ID.: P00846479LZ
Convergence and Special Support Program
Basic Infrastructure Program (BIP) – Multi-Purpose Buildings/ Facilities to support Social Services
Completion of Mutlipurpose Building, Brgy. Sumilang, Pasig City
Physical Target: CW1 = Rehabilitation/Major Repair of Multi-Purpose Building – 1 bldg.
Unit Cost (P’000) = P 2,970/ bldg.
Allocation = P 2,970,000.00
EAO = P 30,000.00
Total = P 3,000,000.00
As Modified
Convergence and Special Support Program
Basic Infrastructure Program (BIP) – Multi-Purpose Buildings/ Facilities to support Social Services
Completion of Multipurpose Building, Brgy. Sumilang, Pasig City
Physical Target: CW1 = Rehabilitation/Major Repair of Multi-Purpose Building – 1 bldg.
Unit Cost (P’000) = P 2,970/ bldg.
Allocation = P 2,970,000.00
EAO = P 30,000.00
Total = P 3,000,000.00
|
June 19, 2024 |
CY 2024 |
|
CAA No. 2024-04-0031 |
April 29, 2024 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA/Original
UACS No. 300226110464000
Project ID.: P00846446LZ
Convergence and Special Support Program
Basic Infrastructure Program (BIP) – Multi-Purpose Buildings/ Facilities to support Social Services
Construction (Completion) of Multi-Purpose Building (PUP Gym), Polytechnic Unversity of the Philippines
(PUP) Compound, Brgy. Lower Bicutan, Taguig City
Physical Target: CW1 = Construction of Multi-Purpose Building = 1 bldg.
Unit Cost (P’000) = P 49,500.00/ bldg.
Allocation = P 49,500,000.00
EAO = P 500,000.00
Total = P 50,000,000.00
As Modified
Convergence and Special Support Program
Basic Infrastructure Program (BIP) – Multi-Purpose Buildings/ Facilities to support Social Services
Construction (Completion) of Multi-Purpose Building (PUP Gym), Polytechnic University of the Philippines
(PUP) Compound, Brgy. Lower Bicutan, Taguig City
Physical Target: CW1 = Construction of Multi-Purpose Building = 1 bldg.
Unit Cost (P’000) = P 49,500.00/ bldg.
Allocation = P 49,500,000.00
EAO = P 500,000.00
Total = P 50,000,000.00
|
June 19, 2024 |
FY 2024 |
P00800552MN |
GAA 2024 |
January 1, 2024 |
Region XII |
Cotabato 1st District Engineering Office |
Contract ID: 24MD0048
From: Dualing-New Panay-Midsayap Rd - K1708 + 700 - K1708 + 768
To: Dualing-New Panay-Midsayap Rd - K1708 + 625.00 - K1708 + 740.00
Amount: ₱ 16,320,000.00 |
June 18, 2024 |
2024 |
WIN4E03359 |
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Gov. Bado Dangwa National Rd - K0275 + 790 - K0275 + 895, K0279 + 650 - K0279 + 758, K0280 + 250 - K0280 + 398, K0281 + 108 - K0281 + 200;
Type of Work:
CW1: Construction of Road Slope Protection Structure
CW2: Rehabilitation / Major Repair of Road Slope Protection Structure;
Physical Target:
CW1: 570 Square meters
CW2: 245.01 Square meters;
Allocation:
Php 8,970,000"
"To:
Gov. Bado Dangwa National Rd - K0275 + 790 - K0275 + 895, K0279 + 650 - K0279 + 758, K0280 + 250 - K0280 + 398, K0281 + 108 - K0281 + 200;
Type of Work:
Construction of Road Slope Protection Structure;
Physical Target:
513 Square meters;
Allocation:
Php 8,970,000"
|
June 18, 2024 |
2024 |
WIN4E03350 |
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
"From:
Improvement of Road, Sayangan Road, Barangay Paoay, Atok, Benguet;
Type of Work:
Construction of Concrete Road;
Physical Target:
0.425 Lane Km;
Allocation:
Php 5,000,000"
"To:
Improvement of Road, Sayangan Road, Barangay Paoay, Atok, Benguet;
Type of Work:
CW1: Construction of Concrete Road
CW2: Construction of Drainage Structure along Road;
Physical Target:
CW1: 0.117 Lane Km
CW2: 115.86 Lineal meter;
Allocation:
Php 5,000,000"
|
June 18, 2024 |
2024 |
WIN4E03429 |
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
"From:
Installation of Road Signs and Pavement Markings along Nueva Vizcaya-Ifugao-Mt. Province Road - K0292 + 400, Barangay Poblacion West, Lamut, Ifugao;
Type of Work:
Road Safety: Pavement Markings;
Physical Target:
1000 Lineal meters;
Allocation:
Php 200,000"
"To:
Installation of Road Signs and Pavement Markings along Nueva Vizcaya-Ifugao-Mt. Province Road - K0292 + 125 - K0292 + 400, Barangay Poblacion West, Lamut, Ifugao;
Type of Work:
Road Safety: Road Signs;
Physical Target:
12 Number of Signs;
Allocation:
Php 200,000"
|
June 18, 2024 |
2024 |
320102106232000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Isabela 3rd District Engineering Office |
FROM:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Ganano River Flood Control Project, Barangay Apanay Downstream (Sta.
0+400 - Sta. 0+800), Alicia, Isabela
TO:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Ganano River Flood Control Project, Barangay Apanay Downstream (Sta.
0+470.40 - Sta. 0+819.70), Alicia, Isabela |
June 18, 2024 |
2024 |
WIN4XY00262 |
GAA 2024 |
March 25, 2024 |
Region VIII |
Southern Leyte District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
AS PER GAA/ORIGINAL:
Bdry Southern Leyte - Maasin- Macrohon - Sogod -Jct. Daang Maharlikha - K1125 + 581 - K1128 + 058
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 96.500 M
Asphalt Overlay: 9.856 Lane Km
EAO P 3.500 M
Total P 100.00 M
AS MODIFIED:
Bdry Southern Leyte - Maasin- Macrohon - Sogod -Jct. Daang Maharlikha - K1135 + 366 – K1135 + 546, K1136 + 000 – K1136 + 784.40, K1136 + 807 – K1136 + 1019, K1137 + 000 – K1137 + 886, K1138 + 378 – K1138 + 406, K1139 + 264 – K1139 + 511, K1139 + 1057 – K1140 + 300.60, K1140 + 390.50 – K1140 + 901
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 96.500 M
Asphalt Overlay: 7.3382 Lane Km
EAO P 3.500 M
Total P 100.00 M
|
June 18, 2024 |
2024 |
320102106141000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Isabela 3rd District Engineering Office |
FROM:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Cagayan River Flood Control Project, Barangay District 1 Continuation
(Sta.0+204 - Sta. 0+612), Reina Mercedes, Isabela
TO:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Cagayan River Flood Control Project, Barangay District 1 Continuation
(Sta.0+246.80 - Sta. 0+701.10), Reina Mercedes, Isabela |
June 18, 2024 |
2024 |
320102106231000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Isabela 3rd District Engineering Office |
FROM:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Ganano River Flood Control Project, Barangay Apanay Downstream (Sta. 0+000 - Sta. 0+400), Alicia, Isabela
TO:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Ganano River Flood Control Project, Barangay Apanay Downstream (Sta. 0+000 - Sta. 0+470.40), Alicia, Isabela |