Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
June 28, 2021 2021 WIN1C04031 GAA 2021 June 9, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Peñarrubia Road, Peñarrubia, Abra;
Physical Target: CW1: 1.76 Lane Km;
Allocation= Php 10,000,000

To: Construction of Peñarrubia Road, Peñarrubia, Abra;
Physical Target: CW1: 2.871 Lane Km;
Allocation= Php 10,000,000

June 28, 2021 2021 WIN1C04000 GAA 2021 June 9, 2021 Cordillera Administrative Region Apayao 2nd District Engineering Office
From: Claveria-Calanasan-Kabugao Road – K0716 + 000 - K0716 + 040, K0716 + 070 - K0716 + 129;
Physical Target: CW1: 0.198 Lane Km;
Allocation= Php 5,600,000

To: Claveria-Calanasan-Kabugao Road – K0713 + 383 - K0713 + 503;
Physical Target: CW1: 0.240 Lane Km;
Allocation= Php 5,600,000

June 28, 2021 2021 WIN1C03996 GAA 2021 June 9, 2021 Cordillera Administrative Region Apayao 2nd District Engineering Office
From: San Sebastian-San Jose-San Francisco Road in support of Handicraft, Furniture, Processed High Value Crops, Vegetable Rice and Corn Industries, Luna, Apayao;
Type of Work: CW1: Construction of Concrete Road;
Physical Target: CW1: 0.830 Lane Km;
Allocation= Php 50,233,000

To: San Sebastian-San Jose-San Francisco Road in support of Handicraft, Furniture, Processed High Value Crops, Vegetable Rice and Corn Industries, Luna, Apayao;
Type of Work: CW1: Construction of Concrete Road
CW2: Replacement of Bridge;
Physical Target: CW1: 0.360 Lane Km
CW2: 477 Square meters;
Allocation= Php 50,233,000

June 28, 2021 2021 WIN1C04036 GAA 2021 June 18, 2021 Cordillera Administrative Region Baguio City District Engineering Office
From: Gov Pack Rd - (S04724LZ) Chainage 027 - Chainage 270;
Physical Target: CW1: 0.337 Lane Km;
Allocation= Php 10,935,000

To: Gov Pack Rd – (S00408LZ) Chainage 0 - Chainage 36, (S00521LZ) Chainage 0 - Chainage 100, (S04724LZ) Chainage 176 - Chainage 627;
Physical Target: CW1: 0.587 Lane Km;
Allocation= Php 10,935,000
June 28, 2021 2021 WIN1C03999 GAA 2021 June 17, 2021 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Construction of Madayag - Dagdag Access Road Lusod, Kabayan, Benguet;
Type of Work: Construction of Concrete Road;
Physical Target: CW1: 0.304 Lane Km;
Allocation= Php 3,000,000

To: Construction of Madayag - Dagdag Access Road Lusod, Kabayan, Benguet;
Type of Work: Construction of Gravel Road;
Physical Target: CW1: 1 Lane Km;
Allocation= Php 3,000,000

June 28, 2021 2021 WIN1C03991 GAA 2021 June 8, 2021 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Improvement of Local Road, Dangpa - Lengaoan Road, Barangay Amgaleyguey/Lengaoan, Buguias, Benguet;
Physical Target: CW1: : 0.7 Lane Km;
Allocation= Php 10,000,000

To: Improvement of Local Road, Dangpa - Lengaoan Road, Barangay Amgaleyguey/Lengaoan, Buguias, Benguet; Physical Target: CW1: 0.925 Lane Km; Allocation= Php 10,000,000

June 28, 2021 2021 WIN1C03998 GAA 2021 June 9, 2021 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Improvements and Road Opening of Sitio Upper Inlanded, Brgy Paoy, Atok, Benguet ;
Physical Target: CW1: : 0.3 Lane Km;
Allocation= Php 5,000,000

To: Improvements and Road Opening of Sitio Upper Englandad, Brgy Paoay, Atok, Benguet ;
Physical Target: CW1: 0.3 Lane Km;
Allocation= Php 5,000,000

June 28, 2021 2021 WIN1C04005 GAA 2021 June 11, 2021 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From: Banaue-Mayoyao-A Lista-Isabela Bdry Rd K407 + 000 – K0411 + 000, K0411 + 180 – K0411 + 400, K0411 + 700 – K0412 + 000, K0413 + 303 – K0415 + 000;
Physical Target: CW1: 9,318 Square meters;
Allocation= Php 27,954,000

To: Banaue-Mayoyao-A Lista-Isabela Bdry Rd K0407 + 000 – K0411 + 000, K0411 + 180 – K0411 + 400;
Physical Target: CW1: 4,954.50 Square meters;
Allocation= Php 27,954,000

June 28, 2021 2021 WIN1C03987 GAA 2021 June 11, 2021 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From: Nueva Vizcaya-Ifugao-Mt Province Rd K0335 + (-358) – K0337 + 334;
Physical Target: CW1: 5.446 Lane Km;
Allocation= Php 32,603,000

To: Nueva Vizcaya-Ifugao-Mt Province Rd K0335 + (-358) – K0336 + 752;
Physical Target: CW1: 4.270 Lane Km;
Allocation= Php 32,603,000

June 28, 2021 2021 WIN1C03995 GAA 2021 June 14, 2021 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Rizal Natl Rd (Liwan West-Babalag-Macutay Sect) - K0522 + 686 - K0522 + 741;
Physical Target: CW1: 0.110 Lane Km;
Allocation= Php 1,966,000

To: Rizal Natl Rd (Liwan West-Babalag-Macutay Sect) - K0522 + 445 - K0522 + 529.50, K0522 + 606 - K0522 + 669.50, K0522 + 686 - K0522 + 763.50;
Physical Target: CW1: 0.451 Lane Km;
Allocation= Php 1,966,000

June 28, 2021 2021 WIN1C03981 GAA 2021 June 14, 2021 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect) - K0496 + (-700) - K0496 + 000;
Physical Target: CW1: 1.40 Lane Km;
Allocation= Php 24,840,000

To: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect) - K0496+(-700) - K0496+475, K0508+189-K0508+654;
Physical Target: CW1: 3.28 Lane Km;
Allocation= Php 24,840,000

June 28, 2021 2021 WIN1C03905 GAA 2021 June 8, 2021 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: Lubuagan-Batongbuhay-Abra Bdry Rd - K0473 + 738-K0475 + 823;
Physical Target: CW1: 1.921 Lane Km;
Allocation= Php 38,428,000

To: Lubuagan-Batongbuhay-Abra Bdry Rd - K0473 + 738-K0474 + 690;
Physical Target: CW1: 1.708 Lane Km;
Allocation= Php 38,428,000

June 28, 2021 FY 2021 GAA WIN1E02348 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Buhangin-Lapanday - K1506+325 - K1506+423
Physical Target:
CW1: 0.588 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 4,305,000.00
CW1: P 4,218,900.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 86,100.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Buhangin-Lapanday - K1506+325 - K1506+397
Physical Target:
CW1: 0.288 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 4,305,000.00
CW1: P 4,218,900.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 86,100.00
June 28, 2021 FY 2021 GAA WIN1E02378 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance (Asphalt Overlay) - Davao-Cotabato Road (Davao City-Jct. Digos Sect.) - K1519+606 - K1520+151
Physical Target:
CW1: 3.511 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 42,060,000.00
CW1: P 40,587,900.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,472,100.00

TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance (Asphalt Overlay) - Davao-Cotabato Road (Davao City-Jct. Digos Sect.) - K1522+379 - K1522+764
Physical Target:
CW1: 2.310 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 42,060,000.00
CW1: P 40,587,900.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,472,100.00
June 28, 2021 FY 2021 GAA WIN1E02365 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd -
K1491+631 - K1491+985, K1492+474 - K1492+500,
K1504+989 - K1505+800, K1509+000 - K1510+000
Physical Target:
CW1: 8.148 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 29,168,000.00
CW1: P 28,584,640.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 583,360.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1491+593 - K1492+324
Physical Target:
CW1: 2.908 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 29,168,000.00
CW1: P 28,584,640.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 583,360.00
June 28, 2021 FY 2021 GAA WIN1E02380 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Carmen-DAPECOL Cmpd Rd - K1481+336 - K1482+297
Physical Target:
CW1: 1.896 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 17,064,000.00
CW1: P 16,722,720.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 341,280.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Carmen-DAPECOL Cmpd Rd - K1481+336 - K1482+292
Physical Target:
CW1: 1.886 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 17,064,000.00
CW1: P 16,722,720.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 341,280.00
June 28, 2021 FY 2021 GAA WIN1E02333 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1560+878 - K1560+1983
Physical Target:
CW1: 2.210 Lane Km (Road Widening)
ROW: 14,697.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 42,727,000.00
CW1: P 39,422,460.00 (Road Widening)
ROW: P 2,450,000.000 (ROW Acquisition)
EAO: P 854,540.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1560+807 - K1560+1912
Physical Target:
CW1: 2.210 Lane Km (Road Widening)
ROW: 14,697.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 42,727,000.00
CW1: P 39,422,460.00 (Road Widening)
ROW: P 2,450,000.000 (ROW Acquisition)
EAO: P 854,540.00
June 28, 2021 FY 2021 GAA WIN1E02383 FY 2021 GAA RA 11518 January 1, 2020 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Mapantad-Tagbobolo-Taguibo Road, Davao Oriental
Physical Target:
CW1: 1.960 Lane Km (Construction of Concrete Road)
CW2: 1.640 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 42,960,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
CW2: P 22,500,800.00 (Reconstruction to Concrete Pavement)
EAO: P 859,200.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Mapantad-Tagbobolo-Taguibo Road, Davao Oriental
Physical Target:
CW1: 1.000 Lane Km (Construction of Concrete Road)
CW2: 1.622 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 42,960,000.00
CW1: P 19,600,000.00 (Construction of Concrete Road)
CW2: P 22,500,800.00 (Reconstruction to Concrete Pavement)
EAO: P 859,200.00
June 25, 2021 FY 2021 GAA WIN1F06255 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 300116204155000
Project ID : P00562416LZ

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Concreting of Road,
Sitio Bulago, Palhi, Calapan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.486 Lane Km
Allocation : Php 3.00 Million

TO :

Concreting of Road,
Sitio Bulago, Palhi, Calapan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.604 Lane Km
Allocation : Php 3.00 Million

June 25, 2021 FY 2021 GAA WIN1F06256 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 310202100814000
Project ID : P00505132LZ

001 : Ensure safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:

Calapan North Road
K0025 + 565 - K0026 + 030
Physical Target - CW1 - Network Development -
Road Widening : 0.324 Lane Km
Allocation : Php 4.966 Million

TO :

Calapan North Road
K0025 + 482 - K0026 + 030,
K0030 + 887 - K0030 + 969,
K0031 + 467 - K0031 + 504
Physical Target - CW1 - Network Development -
Road Widening : 0.628 Lane Km
Allocation : Php 4.966 Million
June 25, 2021 FY 2021 WIN1C03770 FY 2021 GAA RA 11518 December 28, 2020 Region V Regional Office V
UACS No.: 310204101087000
Project ID: P00506299LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Juban-Bulan Diversion Road, Juban Section, Sorsogon
Physical Target: CW1-Construction of Concrete Road – 2.596 Lane km.
ROW- ROW Acquisition- 0 sq.m.
Allocation: Php 100,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Juban-Bulan Diversion Road, Juban Section, Sorsogon
Physical Target: CW1-Construction of Concrete Road – 2.48 Lane km.
ROW- ROW Acquisition- 24,793.00 sq.m.
Allocation: Php 100,000,000.00
June 25, 2021 FY 2021 GAA WIN1F06230 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310202100824000
Project ID : P00505144LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Bongabong - Sagana - Roxas - San Aquilino Road
K0126 + 017 - K0126 + 553
Physical Target - CW1 - Road Widening : 1.072 Lane Km
Allocation : Php 16.20 Million

TO :

Bongabong - Sagana - Roxas - San Aquilino Road
K00125 + 915 - K0126 + 540
Physical Target - CW1 - Road Widening : 1.143 Lane Km
Allocation : Php 16.20 Million
June 25, 2021 FY 2021 WIN1C03717 FY 2021 GAA RA 11518 December 28, 2020 Region V Regional Office V
UACS No.: 310205100576000
Project ID: P00506301LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads - Bacon-Manito Rd, Package 1, Sorsogon
Physical Target: CW1-Construction of Concrete Road – 2.083 Lane km.
CW2- Construction of Drainage Structure along Road – 2,082.667 Lineal meters
CW3- Construction of Road Slope Protection Structure – 5,085.711 Square meters
Allocation: Php 110,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads - Bacon-Manito Rd, Package 1, Sorsogon
Physical Target: CW1-Construction of Concrete Road – 1.9754 Lane km.
CW2- Construction of Drainage Structure along Road – 1,962.65 Lineal meters
CW3- Construction of Road Slope Protection Structure – 5,269.76 Square meters
CW4- Construction of Gravel Road - 0.2835 Lane Km
Allocation: Php 110,000,000.00
June 25, 2021 FY 2021 WIN1C03790 FY 2021 GAA RA 11518 December 28, 2020 Region V Regional Office V
UACS No.: 310205100577000
Project ID: P00506302LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads - Bacon-Manito Rd, Package 2, Sorsogon
Physical Target: CW1- Construction of Road Slope Protection Structure – 3,702.6 Square meters
Allocation: Php 110,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads - Bacon-Manito Rd, Package 1, Sorsogon
Physical Target: CW1- Construction of Road Slope Protection Structure – 7,164.3 Square meters
CW2-Construction of Concrete Road – 1.76 Lane km.
CW3- Construction of Gravel Road – 1.103 Lane Km
CW4- Construction of Drainage Structure along Road – 1,752.80 Lineal meters
Allocation: Php 110,000,000.00
June 25, 2021 FY 2021 GAA WIN1F06248 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310208100347000
Project ID : P00505146LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement
- Secondary Roads

FROM :

Calapan South Road
K0102 + 550 - K0102 + 934
Physical Target - CW1 - Shoulder Paving/Construction :
2,304.00 sq.m.
Allocation : Php 6.903 Million

TO :

Calapan South Road
K0102 + 550 - K0102 + 791
Physical Target - CW1 - Shoulder Paving/Construction :
1,470.10 sq.m.
Allocation : Php 6.903 Million
June 25, 2021 FY 2021 WIN1C03854 FY 2021 GAA RA 11518 December 28, 2020 Region V Regional Office V
UACS No.: 310205100576000
Project ID: P00506301LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0441 + 150 - K0442 + 335
Physical Target: CW1- Road Widening – 1.88 Lane Km
Allocation: Php 55,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0441 + 150 - K0442 + 335
Physical Target: CW1- Road Widening – 1.60 Lane Km
CW2- Construction of Drainage Structure along Road – 1,591.40 Lineal meters
ROW - ROW Acquisition – 16,000 Square meters
Allocation: Php 55,000,000.00
June 25, 2021 FY 2021 WIN1C03816 FY 2021 GAA RA 11518 December 28, 2020 Region V Regional Office V
UACS No.: 310201100657000
Project ID: P00505280LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0508 + 000 - K0508 + 258
Physical Target: CW1- Road Widening – 0.516 Lane Km
Allocation: Php 14,916,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0508 + 000 - K0508 + 169
Physical Target: CW1- Road Widening – 0.338 Lane Km
CW2- Construction of Drainage Structure along Road – 338.00 Lineal meters
CW3- Construction of Road Slope Protection Structure – 475.58 Square meters
ROW - ROW Acquisition – 3,380 Square meters
Allocation: Php 14,916,000.00
June 25, 2021 FY 2021 WIN1C03813 FY 2021 GAA RA 11518 December 28, 2020 Region V Regional Office V
UACS No.: 310201100654000
Project ID: P00505281LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0353 + 930 - K0354 + 461
Physical Target: CW1- Road Widening – 1.05 Lane Km
Allocation: Php 20,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0354 + 021 - K0354 + 292.50
Physical Target: CW1- Road Widening – 0.543 Lane Km
CW2- Construction of Drainage Structure along Road – 338.00 Lineal meters
CW3- Construction of Road Slope Protection Structure – 529.16 Square meters
Allocation: Php 20,000,000.00
June 25, 2021 FY 2021 WIN1C03917 FY 2021 GAA RA 11518 December 28, 2020 Region V Regional Office V
UACS No.: 310201100656000
Project ID: P00505291LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0472 + 556 - K0472 + 888
Physical Target: CW1- Road Widening – 0.664 Lane Km
Allocation: Php 10,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0472 + 556 - K0472 + 691
Physical Target: CW1- Road Widening – 0.27 Lane Km
CW2- Construction of Drainage Structure along Road – 195.00 Lineal meters
CW3- Construction of Road Slope Protection Structure – 303.63 Square meters
ROW - ROW Acquisition – 2,700 Square meters
Allocation: Php 10,000,000.00
June 25, 2021 FY 2021 WIN1C03805 FY 2021 GAA RA 11518 December 28, 2020 Region V Regional Office V
UACS No.: 310201100658000
Project ID: P00505320LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Rolando A Andaya Highway - K0301 + 395 - K0301 + 840
Physical Target: CW1- Road Widening – 0.89 Lane Km
Allocation: Php 20,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Rolando A Andaya Highway - K0301 + 395 - K0301 + 628.60
Physical Target: CW1- Road Widening – 0.4672 Lane Km
CW2- Construction of Drainage Structure along Road – 467.20 Lineal meters
CW3- Construction of Road Slope Protection Structure – 422.44 Square meters
Allocation: Php 10,000,000.00
June 25, 2021 2021 WIN1C04047 SR2021-02-004549 February 15, 2021 Region VI Regional Office VI
FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

President Corazon C. Aquino Ave. - (S00558PN) Chainage 1233.5 - Chainage 2467

CW1 - Construction of Drainage Structure along Road: 2,467 lineal meters
3.52 / lineal meter - 8,685.00

EAO - 315.00

Total: 9,000.00

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

President Corazon C. Aquino Ave. - (S00558PN) Chainage 1203 - Chainage 1857

CW1 - Construction of Drainage Structure along Road: 654 lineal meters
13.28 / lineal meter - 8,685.00

EAO - 315.00

Total: 9,000.00
June 25, 2021 2021 WIN1C03963 FY 2021 GAA December 28, 2020 Region III Bulacan 1st District Engineering Office
Local - Flood Control and Drainage / Protection Works - Local Infrastructure Program

Construction / Rehabilitation of Flood Mitigation Structures and Drainage Systems, Sta. 00+000 - Sta. 02+281, Poblacion, Baliuag, Bulacan
June 25, 2021 2021 WIN1F06337 SR2021-04-008117 April 23, 2021 Region VI Regional Office VI
FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/ New Roads

San Remigio - Bugo - Gen. Fullon - Valderrama Road, Antique

CW1- Construction of Gravel Road: 0.732 lane km
38,890.03 /lane km - 28,467.50

ROW Acquisition: 3,658 sq.m
0.132 / sq.m - 482.50

EAO - 1,050.00

Total: 30,000.00

TO:

OO1: Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/ New Roads

San Remigio - Bugo - Gen. Fullon - Valderrama Road, Antique

CW1- Construction of Gravel Road: 1.515 lane km
18,778.88 /lane km - 28,450.00

ROW Acquisition: 7,567.70 sq.m
0.066 / sq.m - 500.00

EAO - 1,050.00

Total: 30,000.00
June 25, 2021 2021 WIN1E02336 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Agusan del Sur 2nd District Engineering Office
UACS No. 310201100856000
Project ID: P00501570MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

FROM:

Daang Maharlika (Agusan-Davao Sect) - K1318 + 544 - K1319 + 641

Type of Work / Physical Target: CW1 - Road Widening: 2.194 lane km

Unit Cost: P13,400,182.32 / lane km

Allocation: P 29,400,000.00

EAO: P 600,000.00

TOTAL: P 30,000,000.00

TO:

Daang Maharlika (Agusan-Davao Sect) - K1318 + 544 - K1319 + 581

Type of Work / Physical Target: CW1 - Road Widening: 2.074 lane km

Unit Cost: P14,175,506.27 / lane km

Allocation: P 29,400,000.00

EAO: P 600,000.00

TOTAL: P 30,000,000.00
June 25, 2021 2021 WIN1E02343 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Regional Office XIII
UACS No. 310204101277000
Project ID: P00502176MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads

FROM:

Lianga Coastal Bypass Road (SDCR Alternate Route), Surigao del Sur

Type of Work / Physical Target:
CW1 - Construction of Gravel Road: 0.187 lane km
CW2 - Construction of Road Slope Protection Structure: 865.457 sq.m.

Unit Cost:
CW1: P283,823.53 / lane km
CW2: P55,750.89 / sq.m.

Allocation:
CW1: P53,075,000.00
CW2: P48,250,000.00

EAO: P 3,675,000.00

TOTAL: P 105,000,000.00

TO:

Lianga Coastal Bypass Road (SDCR Alternate Route), Surigao del Sur

Type of Work / Physical Target:
CW1 - Construction of Gravel Road: 1.442 lane km
CW2 - Construction of Road Slope Protection Structure: 3,052.30 sq.m.

Unit Cost:
CW1: P40,184,088.56 / lane km
CW2: P14,212.08 / sq.m.

Allocation:
CW1: P57,945,455.70
CW2: P43,379,544.30

EAO: P 3,675,000.00

TOTAL: P 105,000,000.00
June 24, 2021 FY 2021 GAA WIN1F06162 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 310202100815000
Project ID : P00505128LZ

001: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:

Calapan South Road
K0047 + 986 - K0048 + 000
Physical Target - CW1 - Network Development - Road Widening
0.402 Lane Km
Allocation : Php 7.387 Million

TO :

Calapan South Road
K0047 + 986 - K0047 + 1178,
K0048 + 200 - K0048 + 327
Physical Target - CW1 - Network Development - Road Widening
0.634 Lane Km
Allocation : Php 7.387 Miilion
June 24, 2021 FY 2021 GAA WIN1F06175 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 310202100812000
Project ID : P00505130LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM:

Calapan North Road
K0018 + 456 - K0018 + 690
Physical Target - CW1 - Network Development - Road Widening
0.468 Lane Km
Allocation : Php 4.345 Million

TO :

Calapan North Road
K0018 + 456 - K0018 + 680
Physical Target - CW1 - Network Development - Road Widening
0.448 Lane Km
Allocation : Php 40345 Million
June 24, 2021 FY 2021 GAA WIN1F06175 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 300116204171000
Project ID : P00562432LZ

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Concreting of Road, Brgy. Sta. Rosa I - Mangangan II,
Baco, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
4.236 Lane Km
Allocation : Php 25.00 Million

TO :

Concreting of Road, Brgy. Sta. Rosa I - Mangangan II,
Baco, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
4.023 Lane Km
Allocation : Php 25.00 Million
June 24, 2021 FY 2021 GAA WIN1F06189 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 300116204173000
Project ID : P00562434LZ

LOCALPROGRAM

Local - Local Roads and Bridges - Local roads
Construction/Repair/Rehabilitation/Improvement
of Various Infrastructure including Local Projects

FROM :

Concreting of Road,
Brgy. Tagumpay - Brgy. Misong,
Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
3.940 Lane Km
Allocation : Php 25.00 Million

TO;

Concreting of Road,
Brgy. Tagumpay - Brgy. Misong
Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.688 Lane Km
Allocation : Php 25.00 Million
June 24, 2021 2021 WIN1C04021 FY 2021 GAA December 28, 2020 Region III Bataan 2nd District Engineering Office
Network Development - Road Widening - Secondary Roads

Roman Expressway - K0136+958 - K0137+246, K0144+600 - K0145+623
June 24, 2021 2021 WIN1C03969 FY 2021 GAA December 28, 2021 Region III Bataan 2nd District Engineering Office
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure along Talisay River Cupang Proper Section, Sta. 0+000 - Sta. 0+419, Balanga City, Bataan

June 24, 2021 2021 WIN1C03962 FY 2021 GAA December 28, 2020 Region III Bataan 2nd District Engineering Office
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure Talisay River, Ala-uli Section (Upstream), Sta. 0+000 - Sta. 0+419, Pilar, Bataan

June 24, 2021 2021 WIN1C03957 FY 2021 GAA December 28, 2020 Region III Bataan 2nd District Engineering Office
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Sitio Gasile River Control, Sta. 0+000 - Sta. 0+350, Pilar, Bataan

June 24, 2021 FY 2021 GAA WIN1F06192 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 300116204164000
Project ID : P00562425LZ

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Concreting of Road,
Brgy. Calima, Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.702 Lane Km
Allocation : Php 15.00 Million

TO :

Concreting of Road,
Brgy. Calima, Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
20456 Lane Km
Allocation : Php 15.00 Million
June 24, 2021 2021 300104220360000 GAA FY 2021 January 25, 2021 Region II Nueva Vizcaya District Engineering Office
Local Program - Local - Buildings and Other Structures - Multipurpose/ Facilities - Local Infrastructure Program - Construction (Phase 2) of Multi-Purpose Building, Municipality of Villaverde, Nueva Vizcaya
June 24, 2021 2021 WIN1F06327 GAA FY 2021 January 1, 2021 Region VIII Northern Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

AS PER GAA/ORIGINAL:

Sn Policarpo-Arteche-Lapinig Rd - K0860 + 000 - K0861 + 000

Physical Target: Allocation:

CW1-Road Widening: 1.994 Lane Km P 20.2762 M

EAO P 0.4138 M

Total P 20.690M

AS MODIFIED:

Sn Policarpo-Arteche-Lapinig Rd - K0860 + 245 - K0861 + 000

Physical Target: Allocation:

CW1-Road Widening: 1.400 Lane Km P 20.2762 M

EAO P 0.4138 M

Total P 20.690M
June 24, 2021 2021 300117208326000 GAA FY 2021 January 25, 2021 Region II Nueva Vizcaya District Engineering Office
Local Program - Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Concreting of Road in Purok 5, Barangay Bagahabag, Solano, Nueva Vizcaya
June 24, 2021 2021 320101106607000 GAA FY 2021 January 25, 2021 Region II Nueva Vizcaya District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Magat River Control, (Phase 1), Baretbet, Bagabag, Nueva Vizvaya
June 24, 2021 2021 300117208320000 GAA FY 2021 January 25, 2021 Region II Nueva Vizcaya District Engineering Office
Local Program - Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Concreting of Road at Purok 1, Barangay Balete, Diadi, Nueva Vizcaya
June 24, 2021 2021 WIN1F06301 GAA FY 2021 February 1, 2021 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Secondary Road

AS PER GAA/ORIGINAL:

Preventive Maintenance of Road: Asphalt Overlay – Dayhagan-Salvacion-Coob-Libertad Road, K1009+363 – K1010+000


Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 14.700 M
Asphalt Overlay : 2.612 Lane Km

EAO P 0.300 M

Total P 15.00 M

AS MODIFIED:

Preventive Maintenance of Road: Asphalt Overlay – Dayhagan-Salvacion-Coob-Libertad Road, K1010+549 – K1010+982


Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 14.700 M
Asphalt Overlay : 1.732 Lane Km

EAO P 0.300 M

Total P 15.00 M
June 24, 2021 2021 WIN1F06300 GAA FY 2021 January 1, 2021 Region VIII Northern Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Secondary Roads

AS PER GAA/ORIGINAL:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0800 + 714 - K0802 + 000

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 15.3223 M
Asphalt Overlay: 2.608 Lane Km

EAO P 0.3127 M

Total P 15.635 M

AS MODIFIED:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0800 + 714 - K0801 + 848

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 15.3223 M
Asphalt Overlay: 2.292 Lane Km

EAO P 0.3127 M

Total P 15.635 M
June 24, 2021 2021 WIN1F06295 GAA FY 2021 January 25, 2021 Region VIII Samar 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0724 + 444 - K0724 + 659

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 49.00 M
Structure: 3,333,333 Square Meters
EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0724 + 447.5 – K0724 + 655, K0724 + 742.4 – K0724 + 840.4

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 46.55 M
Structure: 2,058.00 Square Meters

ROW- ROW Acquisition: 1,697.85 Square Meters P 2.50 M

EAO P 0.950 M

Total P 50.00 M
June 24, 2021 2021 WIN1F06302 GAA FY 2021 January 2, 2021 Region VIII Eastern Samar District Engineering Office
Local Program

Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

AS PER GAA/ORIGINAL:

Rehabilitation/Improvement of Road, Barangay Caiwasan, Balangkayan, Eastern Samar

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: 4.882 Lane Km P 24.50 M

EAO P 0.50 M

Total P 25.00 M

AS MODIFIED:

Rehabilitation/Improvement of Road, Barangay Caiwasan, Balangkayan, Eastern Samar

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: 4.37 Lane Km P 24.50 M

EAO P 0.50 M

Total P 25.00 M
June 24, 2021 FY 2021 GAA WIN1F06193 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 310111100298000
Project ID : P00516191LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Construction/Upgrading/Rehabilitation
of Drainage along National Roads
- Secondary Roads

FROM ;

Calapan South Road,
K0010 + 521 - K0011 + 188
Physical Target - CW1 - Construction of Drainage Structure
along National Road :
1.332.00 Lineal meters
Allocation : Php 10.00 Million

TO :

Calapan South Road,
K0010 + 637 - K0011 + 188
Physical Target - CW1 - Construction of Drainage Structure
along National Road :
1,100.00 Lineal meters
Allocation : Php 10.00 Million
June 24, 2021 2021 WIN1F06314 GAA FY 2021 January 4, 2021 Region VIII Leyte 5th District Engineering Office
Local Program

Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

AS PER GAA/ORIGINAL:

Concreting of Roads, Barangay Capilian, Abuyog, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road: 0.173 Lane Km P 1.98 M

EAO P 0.02 M

Total P 2.00 M

AS MODIFIED:

Concreting of Roads, Barangay Capilian, Abuyog, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road: 1.364 Lane Km P 1.98 M

EAO P 0.02 M

Total P 2.00 M
June 24, 2021 2021 WIN1F06311 GAA FY 2021 January 4, 2021 Region VIII Leyte 5th District Engineering Office
Local Program

Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

AS PER GAA/ORIGINAL:

Concreting of Roads, Barangay Guadalupe, Baybay City, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road: 0.086 Lane Km P1.00 M

Total P 1.00 M

AS MODIFIED:

Concreting of Roads, Barangay Guadalupe, Baybay City, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road: 0.326 Lane Km P1.00 M

Total P 1.00 M
June 24, 2021 2021 WIN1B01172 GAA FY 2021 January 4, 2021 Region VIII Leyte 5th District Engineering Office
Local Program

Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

AS PER GAA/ORIGINAL:

Concreting of Roads, Barangay Libertad, Abuyog, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road: 0.173 Lane Km P 1.980 M

EAO P 0.02 M

Total P 2.00 M

AS MODIFIED:

Concreting of Roads, Barangay Libertad, Abuyog, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road: 0.692 Lane Km P 1.980 M

EAO P 0.02 M

Total P 2.00 M
June 24, 2021 2021 WIN1F06330 GAA FY 2021 January 4, 2021 Region VIII Leyte 5th District Engineering Office
Local Program

Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

AS PER GAA/ORIGINAL:

Concreting of Roads, Barangay Maitum, Abuyog, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road: 0.173 Lane Km P 1.980 M

EAO P 0.02 M

Total P 2.00 M

AS MODIFIED:

Concreting of Roads, Barangay Maitum, Abuyog, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road: 0.664 Lane Km P 1.980 M

EAO P 0.02 M

Total P 2.00 M
June 24, 2021 FY 2021 GAA WIN1F06244 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Mindoro Oriental District Engineering Office
UACS no. : 300116204176000
Project ID : P00562437LZ

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :
Concreting of Road,
Sitio Libtong, Brgy. Balatero, Puerto Galera, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.430 Lane Km
Allocation : Php 15.00 Million

TO :
Concreting of Road,
Sitio Libtong, Brgy. Balatero, Puerto Galera, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
1.936 Lane Km
Allocation : Php 15.00 Million

June 23, 2021 FY 2021 WIN1C03717 FY 2021 GAA RA 11518 December 28, 2020 Region V Masbate 2nd District Engineering Office
UACS No.: 310108100528000
Project ID: P00505992LZ
AS PER GAA:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Secondary Roads - Jct Milagros-Baleno-Lagta Rd - K0038+110 - K0038+190
Physical Target : CW1-Construction of Road Slope Protection Structure - 2,050 sq.m.
Allocation: Php 100,000,000.00

AS MODIFIED:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide - Secondary Roads - Jct Milagros-Baleno-Lagta Rd - K0038+350 - K0038+478
Physical Target : CW1-Construction of Road Slope Protection Structure - 4,290 sq.m.
Allocation: Php 100,000,000.00
June 23, 2021 FY 2021 WIN1C03754 FY 2021 GAA RA 11518 December 28, 2020 Region V Masbate 2nd District Engineering Office
UACS No.: 300117209330000
Project ID: P00564883LZ
AS PER GAA:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Concreting of Road, Junction National Road, Masbate Institute of Fisheries and Tech., Masbate City, Masbate
Physical Target: CW1-Construction of Concrete Road – 0.162 Lane km
Allocation: Php 3,000,000.00

AS MODIFIED:
Local Program - Local Roads and Bridges – Local Roads – Local Infrastructure Program – Concreting of Road, Junction National Road, Masbate Institute of Fisheries and Tech., Milagros, Masbate
Physical Target: CW1-Construction of Concrete Road – 0.162 Lane km
Allocation: Php 3,000,000.00
June 23, 2021 FY 2021 WIN1C03719 FY 2021 GAA RA 11518 December 28, 2020 Region V Camarines Norte District Engineering Office
UACS No.: 310111100306000
Project ID: P00505404LZ
AS PER GAA:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Construction/Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads – Tagas-Daet Poblacion-Magang Rd – K0341+587 – K0341+795
Physical Target: CW1-Construction of Drainage Structure along Road – 208 Ln.m.
Allocation: Php 10,000,000.00

AS MODIFIED:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Construction/Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads – Tagas-Daet Poblacion-Magang Rd – K0341+587 – K0341+795, K0343+397.50-K0343+780
Physical Target: CW1-Construction of Drainage Structure along Road – 590.5 Ln.m.
Allocation: Php 10,000,000.00
June 23, 2021 2021 320102104061000 GAA FY 2021 January 25, 2021 Region II Regional Office II
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities along major River Basins and Principal Rivers - Construction of Flood Control System, Package 1, Sta. 0+000 - Sta. 0+296 (Upstream), Balasig, Cabagan, Isabela
June 23, 2021 FY 2021 WIN1C03750 FY 2021 GAA RA 11518 December 28, 2020 Region V Camarines Norte District Engineering Office
UACS No.: 300104222328000
Project ID: P00560858LZ
AS PER GAA:
Local Program – Buildings and Other Structures- Multipurpose/Facilities – Local Infrastructure Program – Construction of Multi-Purpose Building, Tarum elementary School, Barangay Tarum, Basud, Camarines Norte
Physical Target: CW1- Construction of Multi-Purpose Building – 1 Number of Buildings
Allocation: Php 2,500,000.00

AS MODIFIED:
Local Program – Buildings and Other Structures- Multipurpose/Facilities – Local Infrastructure Program – Construction of Multi-Purpose Building, Tarum elementary School, Barangay Tarum, Mercedes, Camarines Norte
Physical Target: CW1- Construction of Multi-Purpose Building – 1 Number of Buildings
Allocation: Php 2,500,000.00
June 23, 2021 2021 320102104063000 GAA FY 2021 January 25, 2021 Region II Regional Office II
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers - Construction of Flood Control Systems, Barangay Salinas, Bambang, Nueva Vizcaya
June 23, 2021 2021 310203100430000 GAA FY 2021 January 25, 2021 Region II Isabela 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Tertiary Roads - Ilagan - Bigao - Palanan Rd - K0413+839 - K0414+382
June 23, 2021 FY 2021 GAA WIN1E02329 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Jct. ABS-CBN Quimpo Blvd. Div. Rd - Jct. Davao City Coastal Rd, Barangay Bucana, Davao City
Physical Target:
CW1: 32.223 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 322,096,000.00
CW1: P 310,822,640.00 (Reconstruction to Concrete Pavement)
EAO: P 11,273,360.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Jct. ABS-CBN Quimpo Blvd. Div. Rd - Jct. Davao City Coastal Rd, Barangay Bucana, Davao City
Physical Target:
CW1: 3.6915 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 322,096,000.00
CW1: P 52,592,500.00 (Reconstruction to Concrete Pavement)
EAO: P 1,907,500.00
EXC: P 267,596,000.00
June 23, 2021 FY 2021 GAA WIN1E02324 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Digos-Makar Rd - K1568+636 - K1570+960
Physical Target:
CW1: 11,685.00 sq. m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
Allocation:
TOTAL: P 23,372,000.00
CW1: P 22,904,560.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
EAO: P 467,440.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Digos-Makar Rd - K1569+040 - K1570+033
Physical Target:
CW1: 5,000.00 sq. m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
CW2: 0.860 km (Road Safety: Street Lighting)
Allocation:
TOTAL: P 23,372,000.00
CW1: P 14,957,198.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
CW2: P 7,947,362.00 (Road Safety: Street Lighting)
EAO: P 467,440.00
June 23, 2021 FY 2021 GAA WIN1E02331 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Carmen - Panabo Diversion Road
Physical Target:
CW1: 5.840 Lane Km (Construction to Concrete Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Construction to Concrete Road)
EAO: P 1,750,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Carmen - Panabo Diversion Road
Physical Target:
CW1: 5.190 Lane Km (Construction to Concrete Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Construction to Concrete Road)
EAO: P 1,750,000.00
June 23, 2021 FY 2021 GAA WIN1E02328 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Concreting of Road at Barangay Mambago-B to Sitio Maslob, Sto. Niño to Barangay Tagbitan-ag, Island Garden City of Samal, Davao Del Norte
Physical Target:
CW1: 6.160 Lane Km (Construction to Concrete Road)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction to Concrete Road)
EAO: P 2,450,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Concreting of Road at Barangay Mambago-B to Sitio Maslob, Sto. Niño to Barangay Tagbitan-ag, Island Garden City of Samal, Davao Del Norte
Physical Target:
CW1: 5.980 Lane Km (Construction to Concrete Road)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction to Concrete Road)
EAO: P 2,450,000.00
June 23, 2021 FY 2021 GAA WIN1E02330 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Surigao-Davao Coastal Rd -
K1781+692 - K1782+000, K1783+135 - K1783+550
Physical Target:
CW1: 2.702 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 12,007,000.00
CW1: P 11,766,860.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 240,140.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Surigao-Davao Coastal Rd -
K1781+692 - K1782+000, K1783+135 - K1783+550
Physical Target:
CW1: 1.872 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 12,007,000.00
CW1: P 11,766,860.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 240,140.00
June 23, 2021 2021 WIN1C03989 FY 2021 GAA December 28, 2020 Region III Pampanga 1st District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads

Manila North Road - K0053+639 - K0053+810, K0059+000 - K0059+650

June 23, 2021 FY 2021 GAA WIN1E02326 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1585+000 - K1592+000
Physical Target:
CW1: 28.000 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 98,031,000.00
CW1: P 94,599,915.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,431,085.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1585+000 - K1592+000
Physical Target:
CW1: 14.000 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 98,031,000.00
CW1: P 94,599,915.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,431,085.00
June 23, 2021 2021 WIN1C04032 FY 2021 GAA December 28, 2020 Region III Pampanga 1st District Engineering Office
Network Development - Off-Carriageway Improvement - Tertiary Roads

Baliwag - Candaba - Sta. Ana Rd - K0068+000 - K0068+017.30, K0068+477 - K0068+794
June 23, 2021 FY 2021 WIN1C03775 FY 2021 GAA RA 11518 December 28, 2020 Region V Regional Office V
UACS No.: 300211100151000
Project ID: P00534724LZ
AS PER GAA:
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide, Catanduanes Cir Rd K0146+850-K0146+950, Catanduanes
Physical Target: CW1-Construction of Road Slope Protection Structure – 1,289.182 sq.m.
Allocation: Php 50,000,000.00

AS MODIFIED:
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide, Catanduanes Cir Rd K0146+910.76 - K0146+950.00, Catanduanes
Physical Target: CW1-Construction of Road Slope Protection Structure – 2,626.00 sq.m.
Allocation: Php 50,000,000.00
June 23, 2021 2021 WIN1C03948 FY 2021 GAA December 28, 2020 Region III Pampanga 1st District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads

Manila North Rd, K0055+144 - K0055+291
June 23, 2021 2021 WIN1C03949 FY 2021 GAA December 28, 2020 Region III Pampanga 1st District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads

Tulaoc - Sto. Domingo Rd, K0063+288 - K0063+713

June 23, 2021 FY 2021 GAA WIN1G02943 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction of Flood Mitigation Structure, F. Torres Bridge (Downstream), Davao River, Brgy. 9-A, Davao City
Physical Target:
CW1: 348.706 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Flood Mitigation Structure)
EAO: P 600,000.00

TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction of Flood Mitigation Structure, F. Torres Bridge (Downstream), Davao River, Brgy. 9-A, Davao City
Physical Target:
CW1: 102.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Flood Mitigation Structure)
EAO: P 600,000.00
June 23, 2021 FY 2021 GAA WIN1G02944 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage, Barangay 22-C, Davao City
Physical Target:
CW1: 210.00 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Drainage Structure)
EAO: P 30,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage, Barangay 22-C, Davao City
Physical Target:
CW1: 80.00 Lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 3,000,000.00
CW1: P 2,970,000.00 (Construction of Drainage Structure)
EAO: P 30,000.00
June 23, 2021 FY 2021 GAA WIN1G02941 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Flood Control and Drainage - Drainage and Protection Works - Local Infrastructure Program
Improvement of Drainage Structure, Barangay 2-A, Davao City
Physical Target:
CW1: 177.00 Lineal meters (Rehabilitation/Major Repair of Drainage Structure)
Allocation:
TOTAL: P 3,500,000.00
CW1: P 3,465,000.00 (Rehabilitation/Major Repair of Drainage Structure)
EAO: P 35,000.00

TO: Local Program - Flood Control and Drainage - Drainage and Protection Works - Local Infrastructure Program
Improvement of Drainage Structure, Barangay 2-A, Davao City
Physical Target:
CW1: 218.00 Lineal meters (Rehabilitation/Major Repair of Drainage Structure)
Allocation:
TOTAL: P 3,500,000.00
CW1: P 3,465,000.00 (Rehabilitation/Major Repair of Drainage Structure)
EAO: P 35,000.00
June 23, 2021 FY 2021 GAA WIN1G02942 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance of Road: Asphalt Overlay - Davao-Cotabato Old Rd -
K1523+518 - K1524+489, K1524+507 - K1525+570
Physical Target:
CW1: 13.638 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 163,400,000.00
CW1: P 157,681,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,719,000.00

TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance of Road: Asphalt Overlay - Davao-Cotabato Old Rd -
K1523+518 - K1524+489, K1524+507 - K1525+570
Physical Target:
CW1: 9.528 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 163,400,000.00
CW1: P 157,681,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,719,000.00
June 23, 2021 FY 2021 WIN1C03900 FY 2021 GAA RA 11518 December 28, 2020 Region V Sorsogon District Engineering Office
UACS No.: 310106100607000
Project ID: P00505792LZ
AS PER GAA:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation/Reconstruction /Upgrading of Damage Paved Roads – Tertiary Roads -Jct Donsol -Banuang Gurang Rd – K0590+169 – K0590+295
Physical Target: CW1-Reconstruction of Concrete Pavement – 0.252 Lane km.
Allocation: Php 5,000,000.00

AS MODIFIED:
Rehabilitation/Reconstruction /Upgrading of Damage Paved Roads – Tertiary Roads -Jct Donsol -Banuang Gurang Rd – K0590+185 – K0590+325
Physical Target: CW1-Reconstruction of Concrete Pavement – 0.28 Lane km.
CW2-Construction of Drainage Structure along Road – 280 Ln.m.
Allocation: Php 5,000,000.00
June 23, 2021 FY 2021 GAA WIN1G02938 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction of Revetment along Kingking River, Ayan Section R/S, Brgy. Kingking, Pantukan, Davao de Oro (Sta. 3+500 - Sta. 4+983 RS)
Physical Target:
CW1: 666.050 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 55,000,000.00
CW1: P 53,075,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,925,000.00

TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction of Revetment along Kingking River, Ayan Section R/S, Brgy. Kingking, Pantukan, Davao de Oro (Sta. 4+517.070 ‐ Sta. 4+727.280 RS, Sta. 4+741.699 ‐ Sta. 5+187.529 RS)
Physical Target:
CW1: 666.050 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 55,000,000.00
CW1: P 53,075,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,925,000.00
June 23, 2021 FY 2021 GAA WIN1G02950 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction of Revetment along Hijo River at Hijo Br.2 (Downstream) Brgy. Hijo, Maco, Davao de Oro (Sta. 1+560 - Sta. 2+180 LS)
Physical Target:
CW1: 411.180 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,100,000.00

TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction of Revetment along Hijo River at Hijo Br.2 (Downstream) Brgy. Hijo, Maco, Davao de Oro (Sta. 1+569.233 - Sta. 1+980.413 LS)
Physical Target:
CW1: 411.180 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,100,000.00
June 23, 2021 FY 2021 GAA WIN1G02948 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Road, Brgy. Pangibiran, Mabini, Davao de Oro
Physical Target:
CW1: 0.900 Lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Road, Brgy. Pangibiran, Mabini, Davao de Oro
Physical Target:
CW1: 1.264 Lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,900,000.00 (Construction of Concrete Road)
EAO: P 100,000.00
June 23, 2021 2021 WIN1C04070 FY 2021 GAA December 28, 2020 Region III Pampanga 2nd District Engineering Office
Network Development - Road Widening - Primary Roads

Jose Abad Santos Ave (JASA), K0080+240 - K0081+448, K0082+951.58 - K0083+348.43
June 23, 2021 2021 WIN1C03913 FY 2021 GAA December 28, 2020 Region III Bataan 2nd District Engineering Office
Convergence and Special Support - Construction / Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructures Program - ROLL-IT)

Bagac - Mariveles By-pass Road connecting Bagac - Mariveles Road to Freeport Area of Bataan in support to Mix-Used Industry-Electronics, Garments, Fashion Bags, FAB, Mariveles, Bataan
June 23, 2021 2021 WIN1C04027 FY 2021 GAA December 28, 2020 Region III Bataan 2nd District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads

Roman Expressway, K0143+100 - K0143+300, K0144+400 - K0144+900
June 23, 2021 2021 WIN1C04007 FY 2021 GAA December 28, 2020 Region III Bataan 2nd District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Secondary Roads\

Roman Expressway - K0130+640 - K0130+906, K0136+670 - K0136+958
June 23, 2021 FY 2021 GAA WIN1E02339 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way - K1702+192 - K1703+265
Physical Target:
CW1: 1.402 Lane Km (Road Widening)
Allocation:
TOTAL: P 21,808,000.00
CW1: P 21,371,840.00 (Road Widening)
EAO: P 436,160.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way - K1702+192 - K1703+447
Physical Target:
CW1: 1.402 Lane Km (Road Widening)
Allocation:
TOTAL: P 21,808,000.00
CW1: P 21,371,840.00 (Road Widening)
EAO: P 436,160.00
June 22, 2021 2021 WIN1F06293 GAA FY 2021 February 2, 2021 Region VIII Regional Office VIII
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods

Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers

AS PER GAA/ORIGINAL:

Construction of Cadac-an Flood Control Structure along Cadac-an River, Cadac-an River Basin,Right Side Bank, Abuyog, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 96.500 M
Structure: 945.579 Lineal meters
EAO P 3.500 M

Total P 100.00 M

AS MODIFIED:

Construction of Cadac-an Flood Control Structure along Cadac-an River, Cadac-an River Basin,Right Side Bank, Abuyog, Leyte

Physical Target: Allocation:

CW1-Construction of Flood Mitigation P 96.500 M
Structure: 360.00 Lineal meters
EAO P 3.500 M

Total P 100.00 M
June 22, 2021 2021 WIN1F06305 GAA FY 2021 February 2, 2021 Region VIII Leyte 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement - Tertiary Roads

AS PER GAA/ORIGINAL:

La Paz-Javier-Bito Rd - K0952 + 710 - K0953 + 186

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: Shoulder P 9.80 M
Paving /Construction: 2,380.00 Square Meters

EAO P 0.20 M

Total P 10.00 M

AS MODIFIED:

La Paz-Javier-Bito Rd - K0953 + 120 - K0953 + 596

Physical Target: Allocation:

CW1-Off-Carriageway Improvement: Shoulder P 9.80 M
Paving /Construction: 1,904.00 Square Meters

EAO P 0.20 M

Total P 10.00 M
June 22, 2021 2021 WIN1F06298 GAA FY 2021 February 1, 2021 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Primary Roads

AS PER GAA/ORIGINAL:

Construction of Drainage Structure along Road – Palo-Carigara-Ormoc Rd – K0998+952.05 – K1000+126

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 9.800 M
Road: 2,265.900 Lineal Meters
EAO P 0.200 M

Total P 10.00 M

AS MODIFIED:

Construction of Drainage Structure along Road – Palo-Carigara-Ormoc Road, K0998+952.05 – K1000+126; K1002+303 – K1002+520

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 9.800 M
Road: 2,269.00 Lineal Meters
EAO P 0.200 M

Total P 10.00 M
June 22, 2021 FY 2021 GAA WIN1E02320 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Bukidnon Rd - K1692+117 - K1695+000
Physical Target:
CW1: 5.776 Lane Km (Road Widening)
Allocation:
TOTAL: P 171,686,000.00
CW1: P 165,852,620.00 (Road Widening)
EAO: P 6,015,380.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Bukidnon Rd - K1692+117 - K1695+000
Physical Target:
CW1: 2.770 Lane Km (Road Widening)
ROW: 13,850.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 171,686,000.00
CW1: P 90,875,980.00 (Road Widening)
ROW: P 74,976,640.00 (ROW Acquisition)
EAO: P 6,015,380.00
June 22, 2021 FY 2021 GAA WIN1E02309 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Road - Primary Roads
Daang Maharlika (MN) -
K1454+997 - K1456+620, K1635+157 - K1635+660
Physical Target:
CW1: 4.288 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Reconstruction to Concrete Pavement)
EAO: P 1,750,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Road - Primary Roads
Daang Maharlika (MN) - K1455+346 - K1456+010
Physical Target:
CW1: 2.526 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Reconstruction to Concrete Pavement)
EAO: P 1,750,000.00
June 22, 2021 2021 WIN1F06321 GAA FY 2021 January 4, 2021 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Ormoc-Baybay-Southern Leyte Bdry Rd - K1059 + 400 - K1059 + 610

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 1.6464 M
Road: 210.00 Lineal Meters

EAO P 0.0336 M

Total P 1.68 M

AS MODIFIED:

Ormoc-Baybay-Southern Leyte Bdry Rd - K1059 + 817 - K1060 + 019

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 1.6464 M
Road: 150.00 Lineal Meters

EAO P 0.0336 M

Total P 1.68 M
June 22, 2021 2021 WIN1F06294 GAA FY 2021 January 1, 2021 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0908 + (-797) – K0908 + (-515)

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 7.840 M
along Road: 282 Lineal Meters

EAO P 0.160 M

Total P 8.00 M

AS MODIFIED:

Daang Maharlika (S00022LT) - K0908 +(-830) - K0908 + (-446), K0908+043-K0908+051

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 7.840 M
along Road: 392 Lineal Meters

EAO P 0.160 M

Total P 8.00 M
June 22, 2021 2021 WIN1F06306 GAA FY 2021 February 1, 2021 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Tertiary Roads

AS PER GAA/ORIGINAL:

Kananga-Tungonan Hot Spring Rd – K0993+300 – K0993+672

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement: P 16.575720 M
0.744 Lane Km
EAO P 0.338280 M

Total P 16.914 M

AS MODIFIED:

Reconstruction to Concrete Pavement – Kananga-Tungonan Hot Spring Rd – K0990+(-926) – K0990+(-913) (B); K0990+(-847) – K0990+(-781) – K0990+(-762) (B); K0990+(-227) – K0990+057 (B); K0990+066 – K0990+137(B); K0990+146 – K0990+227 (B); K0993+000 – K0993+285 (B); K0993+318 – K0993+336 (B); K0993+350 – K0993+370 (B); K0993+461 (B); K0993+480 – K0993+582 (B); K0993+592 – K0993+665 (B); K0996+056 – K0996+097 (B); K0996+316 - K0996+376 (B); K0997+127 – K0997+159 (B); K0997+214 – K0997+251 (B); K0997+271 – K0997+299 (B); K0997+324 – K0997+384 (B)


Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement: P 16.575720 M
2.594 Lane Km
EAO P 0.338280 M

Total P 16.914 M
June 22, 2021 FY 2021 WIN1C03758 FY 2021 GAA RA 11518 December 28, 2020 Region V Sorsogon 2nd District Engineering Office
AS PER GAA:
Construction of By-Pass Road, Barangay Carriedo-Liang-Hidhid, Irosin-Matnog, Sorsogon Sta. 4+608 – Sta. 5+424
Physical Target:
CW1 – Construction of Concrete Road
4.29 Lane km
Allocation: ₱50,000,000.00

AS MODIFIED:
Construction of By-Pass Road, Barangay Carriedo-Liang-Hidhid, Irosin-Matnog, Sorsogon Sta. 11+185 – Sta. 12+212
Physical Target:
CW1 – Construction of Concrete Road
2.64 Lane km
Allocation: ₱50,000,000.00
June 22, 2021 2021 WIN1B01166 GAA FY 2021 February 1, 2021 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Tertiary Roads

AS PER GAA/ORIGINAL:

Kananga – Tungonan Hot Spring Rd – K0995+200 – K0995+305

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement: P 4.678520 M
0.210 Lane Km
EAO P 0.095480 M

Total P 4.774 M

AS MODIFIED:

Kananga – Tungonan Hot Spring Rd – K0995+200 – K0995+305 (B); K0996+103 – K0996+229 (B); K0998+063 – K0998+081 (B); K0998+142 – K0998+194 (B); K0998+239 – K0998+252 (B)

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement: P 4.678520 M
0.628 Lane Km
EAO P 0.095480 M

Total P 4.774 MM