Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
July 5, 2021 2021 WIN1C04124 GAA 2021 June 25, 2021 Cordillera Administrative Region CAR - Regional Office
From: Construction/Improvement of Beyeng - Tacadang Road, Tacadang, Kibungan, Benguet;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 100,000,000

To: Construction/Improvement of Beyeng - Tacadang Road, Tacadang, Kibungan, Benguet;
Physical Target: CW1 : 6.36 Lane Km;
Allocation= Php 100,000,000

July 5, 2021 2021 WIN1C04091 GAA 2021 June 28, 2021 Cordillera Administrative Region CAR - Regional Office
From: Nueva Vizcaya-Ifugao-Mt. Province Bdry Rd - K0312 + 060 - K0314 + 000, K0321 + 232 - K0322 + 374, K0323 + 770 - K0334 + 500;
Physical Target: CW1 : 27.846 Lane Km;
Allocation= Php 20,000,000

To: Nueva Vizcaya-Ifugao-Mt. Province Bdry Rd - K0312 + 060 - K0313+ 677;
Physical Target: CW1 : 3.246 Lane Km;
Allocation= Php 20,000,000

July 5, 2021 2021 WIN1C04066 GAA 2021 June 22, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Ilocos Norte Rd - K0434+460 - K0434 + 550;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 0.18 Lane Km;
Allocation= Php 100,000,000

To: Abra-Ilocos Norte Rd - K0450 + 800 - K0451 + 000;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 0.4 Lane Km
CW2: 3,878.73 Square meters;
Allocation= Php 100,000,000


July 5, 2021 2021 WIN1C04061 GAA 2021 June 22, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Patoc Flood Control, Sta. 0+100 - 0+600, Bucay, Abra;
Physical Target: CW1: 500 Lineal meters;
Allocation= Php 30,000,000

To: Construction of Patoc Flood Control, Sta. 0+100 - 0+600, Bucay, Abra;
Physical Target: CW1: 665 Lineal meters;
Allocation= Php 30,000,000


July 5, 2021 2021 WIN1C04096 GAA 2021 June 28, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Kalinga Rd - K0455 + 500 - K0456 + 600;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 2.134 Lane Km;
Allocation= Php 99,000,000

To: Abra-Kalinga Rd - K0455 + 100 - K0456 + 600; Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 2.934 Lane Km
CW2: 2,922.93 Square meters;
Allocation= Php 99,000,000

July 5, 2021 2021 WIN1C04095 GAA 2021 June 28, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Ilocos Norte Rd - K0432+200 - K0432 + 500;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 0.60 Lane Km;
Allocation= Php 99,000,000

To: Abra-Ilocos Norte Rd - K0432+200 - K0432 + 500;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 0.60 Lane Km
CW2: 3,751.56 Square meters;
Allocation= Php 99,000,000

July 5, 2021 2021 WIN1C04099 GAA 2021 June 28, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Cervantes Rd - K0446 + 000 - K0453 + 769;
Physical Target: CW1: 15.622 Lane Km;
Allocation= Php 50,000,000

To: Abra-Cervantes Rd - K0446 + 000 - K0450 + 114;
Physical Target: CW1: 8.36 Lane Km;
Allocation= Php 50,000,000
July 5, 2021 2021 WIN1C04112 GAA 2021 June 28, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Ilocos Norte Rd - K0435+050 - K0435 + 250;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 0.40 Lane Km;
Allocation= Php 100,000,000

To: Abra-Ilocos Norte Rd - K0435 + 200 - K0435 + 350;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 0.30 Lane Km
CW2: 3,891.69 Square meters;
Allocation= Php 100,000,000

July 5, 2021 2021 WIN1C04139 GAA 2021 June 28, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Rehabilitation/Improvement of Villaviciosa Road Phase 1, Villaviciosa, Abra;
Physical Target: CW1: 10 Lane Km;
Allocation= Php 50,000,000

To: Rehabilitation/Improvement of Villaviciosa Road Phase 1, Villaviciosa, Abra;
Physical Target: CW1: 6 Lane Km;
Allocation= Php 50,000,000

July 5, 2021 2021 WIN1C04142 GAA 2021 June 28, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Danglas Barrio Road, Danglas, Abra;
Physical Target: CW1: 8 Lane Km;
Allocation= Php 50,000,000

To: Construction of Danglas Barrio Road, Danglas, Abra;
Physical Target: CW1: 7.122 Lane Km;
Allocation= Php 50,000,000

July 5, 2021 2021 WIN1C04098 GAA 2021 June 28, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Kalinga Rd - K0450 + 750 - K0451 + 800;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 2 Lane Km;
Allocation= Php 99,000,000

To: Abra-Kalinga Rd - K0449 + 000 - K0451 + 800;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 5.438 Lane Km
CW2: 2,121.84 Square meters;
Allocation= Php 99,000,000

July 5, 2021 2021 WIN1C04135 GAA 2021 June 25, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Kalinga Rd - K0451 + 800 - K0453 + 000;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 2.226 Lane Km;
Allocation= Php 99,000,000

To: Abra-Kalinga Rd - K0467 + 000 - K0468 + 000;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 1.922 Lane Km
CW2: 3,204 Square meters;
Allocation= Php 99,000,000

July 5, 2021 2021 WIN1C04111 GAA 2021 June 25, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Ilocos Norte Rd - K0435 + 600 - K0436 + 000;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 0.492 Lane Km;
Allocation= Php 99,000,000

To: Abra-Ilocos Norte Rd - K0435 + 420 - K0436 + 000;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 0.852 Lane Km
CW2: 3,566.74 Square meters;
Allocation= Php 99,000,000

July 5, 2021 2021 WIN1C04125 GAA 2021 June 25, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Rehabilitation/Improvement of Lagangilang Access Road, Abra - Kalinga Road Junction - Pagpagatpat, Aguet-Pagpagatpat, Lagangilang, Abra;
Physical Target: CW1: 0.978 Lane Km;
Allocation= Php 20,000,000

To: Rehabilitation/Improvement of Lagangilang Access Road, Abra - Kalinga Road Junction - Pagpagatpat, Aguet-Pagpagatpat, Lagangilang, Abra;
Physical Target: CW1: 2.746 Lane Km;
Allocation= Php 20,000,000

July 5, 2021 2021 WIN1C04126 GAA 2021 June 25, 2021 Cordillera Administrative Region Ifugao 1st District Engineering Office
From: Construction of Regio Regimental Magulon, Lamut to Sitio Maloy, Cawayan, Asipulo Road, Magulon Cawayan, Lamut Asipulo, Ifugao;
Physical Target: CW1: 0.507 Lane Km;
Allocation= Php 5,000,000

To: Construction of Sitio Regimental, Magulon, Lamut to Sitio Maloy, Cawayan, Asipulo Road, Magulon, Lamut and Cawayan, Asipulo, Ifugao ;
Physical Target: CW1: 2.00 Lane Km;
Allocation= Php 5,000,000

July 5, 2021 2021 WIN1C04126 GAA 2021 June 25, 2021 Cordillera Administrative Region Ifugao 1st District Engineering Office
From: Construction of Regio Regimental Magulon, Lamut to Sitio Maloy, Cawayan, Asipulo Road, Magulon Cawayan, Lamut Asipulo, Ifugao;
Physical Target: CW1: 0.507 Lane Km;
Allocation= Php 5,000,000

To: Construction of Sitio Regimental, Magulon, Lamut to Sitio Maloy, Cawayan, Asipulo Road, Magulon, Lamut and Cawayan, Asipulo, Ifugao ;
Physical Target: CW1: 2.00 Lane Km;
Allocation= Php 5,000,000

July 5, 2021 2021 WIN1C04068 GAA 2021 June 11, 2021 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From: Construction of Barangay Mapawoy to Barangay Bongan Road, Mapawoy, Mayoyao, Ifugao;
Type of Work: Construction of Gravel Road;
Physical Target: CW1: 0.72 Lane Km;
Allocation= Php 5,000,000

To: Construction of Barangay Mapawoy to Barangay Bongan Road, Mapawoy, Mayoyao, Ifugao;
Type of Work: Construction of Concrete Road;
Physical Target: CW1: 0.364 Lane Km;
Allocation= Php 5,000,000

July 5, 2021 2021 WIN1C04078 GAA 2021 June 23, 2021 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Construction of Katao Flood Control, Sta. 83 + 617 – Sta. 83 + 957 (R.S.), Paracelis, Mountain Province;
Physical Target: CW1: 245 Lineal meters;
Allocation= Php 20,000,000

To: Construction of Katao Flood Control, Sta. 82 + 580 – Sta. 82 + 720 (R.S.), Sta. 83 + 130 – Sta. 83 +192 (R.S.), Paracelis, Mountain Province;
Physical Target: CW1: 245 Lineal meters;
Allocation= Php 20,000,000

July 3, 2021 CY 2021 WIN1F06224 UACS NO. 310102100598000 May 5, 2021 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 310102100598000
Project ID.: P00505480LZ

Organizational Outcome 001: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Secondary Roads
Zapote – Alabang – K0019+319 – K0019+689, K0019+691 – K0019+813
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 1.968 km
Unit Cost (P’000) = P4,336.45 / lane km
Allocation = P 8,526,000.00
EAO = P 174,000.00
Total = P 8,700,000.00


As Modified

Organizational Outcome 001: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Secondary Roads
Zapote – Alabang – K0019+319 – K0019+493.03
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 0.696 km
Unit Cost (P’000) = P12,250 / lane km P24M/km.
Allocation = P 8,526,000.00
EAO = P 174,000.00
Total = P 8,700,000.00
WIN1F06224
July 3, 2021 CY 2021 WIN1F0632 UACS NO. 310102100574000 May 5, 2021 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 310102100574000
Project ID.: P00505479LZ

Organizational Outcome 001: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Secondary Roads
Zapote – Alabang – K0016+000 – K0016+424
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 1.696 km
Unit Cost (P’000) = P44,251.736 / lane km
Allocation = P 75,050,945.00
EAO = P 2,722,055.00
Total = P 77,773,000.00







As Modified

Organizational Outcome 001: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Secondary Roads
Zapote – Alabang – K0015+000 – K0016+232.71
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 4.931 km
Unit Cost (P’000) = P15,220.228 / lane km P30M/km.
Allocation = P 75,050,945.00
EAO = P 2,722,055.00
Total = P 77,773,000.00
WIN1F06238
July 3, 2021 CY 2021 WIN1F06237 UACS NO. 310101100412000 May 5, 2021 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 310101100412000
Project ID.: P00505481LZ

Organizational Outcome 001: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Primary Roads
Parañaque – Sucat Road – Chainage 0 – Chainage 158
Physical Target: CW1 = Asphalt Overlay 0.632 Lane Km
Unit Cost (P’000) = P6,684.78 / lane km
Allocation = P 4,224,780.00
EAO = P 86,220.00
Total = P 4,311,000.00


As Modified

Organizational Outcome 001: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Primary Roads
Parañaque – Sucat Road, Ch.0 – Ch. 95.17
Physical Target: CW1 = Asphalt Overlay 0.632 lane km
Unit Cost (P’000) = P6,684.78 / lane km P30M/km.
Allocation = P 4,224,780.00
EAO = P 86,220.00
Total = P 4,311,000.00
WIN1F06237
July 3, 2021 CY 2021 WIN1F06249 UACS NO. 300104219083000 May 5, 2021 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 300104219083000
Project ID.: P00557252LZ

Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program

Construction of Multi-Purpose Building Phase I, Barangay Pamplona 3, Las Piñas City
Physical Target: CW1 = Construction of Mult-Purpose Building 1 bldg
Unit Cost (P’000) = P 25,740.00 / bldg.
Allocation (P’000) = P25,740.00
EAO (P’000) = P 260.00
Total (P’000) = P 26,000.00

As Modified

Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program

Construction of Multi-Purpose Building Phase I, Barangay Pamplona 3, Las Piñas City
Physical Target: CW1 = Construction of Multi-Purpose Building 5 bldg.
Unit Cost (P’000) = P 5,148.00 / bldg.
Allocation (P’000) = P25,740.00
EAO (P’000) = P 260.00
Total (P’000) = P 26,000.00
WIN1F06249
July 3, 2021 CY 2021 WIN1B01169 UACS NO. 31011110026900 May 6, 2021 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 310111100269000
Project ID.: P00505332LZ

Organizational Outcome 001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads-
Secondary Roads
PPTA Rd = K0024+(-416) – K0024+384, K0024+391 – K0024+840
Physical Target: CW1 = Construction of Drainage Structure along Road 1,249 Lineal Meters
Unit Cost (P’000) = P 13.60 / Lineal Meter
Allocation = P16,992,220.00
EAO = P 346,780.00
Total = P 17,339,000.00

As Modified

Organizational Outcome 001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads-
Secondary Roads
PPTA Rd = K0027+346 – K0027+093
Physical Target: CW1 = Construction of Drainage Structure along Road 253 Lineal Meters
Unit Cost (P’000) = P 67.16 / Lineal Meter
Allocation = P16,992,220.00
EAO = P 346,780.00
Total = P 17,339,000.00
WIN1B01169
July 3, 2021 CY 2021 WIN1B01171 UACS NO. 310110100204000 May 6, 2021 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 310110100204000
Project ID.: P00505331LZ

Organizational Outcome 001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads-
Primary Roads
Quirino Avenue – K0012+176 – K0013+044
Physical Target: CW1 = Construction of Drainage Structure along Road 1,722 Lineal Meters
Unit Cost (P’000) = P 45.16 / Lineal Meter
Allocation = P39,200,000.00
EAO = P 800,000.00
Total = P 40,000,000.00

As Modified

Organizational Outcome 001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads-
Primary Roads
Quirino Avenue – K0012+176 – K0012+744
Physical Target: CW1 = Construction of Drainage Structure along Road 701 Lineal Meters
Unit Cost (P’000) = P 55.92 / Lineal Meter
Allocation = P39,200,000.00
EAO = P 800,000.00
Total = P 40,000,000.00
WIN1B01171
July 3, 2021 CY 2021 WIN1F06414 UACS NO. 310102100628000 May 6, 2021 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 310102100628000
Project ID.: P00515891LZ

OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Secondary Roads
Cordillera St. (S05361LZ) K0006+(-410) – K0006+528
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=1.876 lane km
Unit Cost (P’000) = P 6,268.66/ lane km
Allocation (P’000) = P 11,760.00
EAO (P’000) = P 240.00
Total (P’000) = P 12,000.00

As Modified

OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Secondary Roads
Cordillera St. (S05361LZ) K0006+(-155) – K0006+528
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=1.365 lane km
Unit Cost (P’000) = P 8,615.38/ lane km P 17.2 M/Km
Allocation (P’000) = P 11,760.00
EAO (P’000) = P 240.00
Total (P’000) = P 12,000.00
WIN1F06414
July 3, 2021 CY 2021 WIN1F06410 UACS NO. 310103100644000 May 6, 2021 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 310103100644000
Project ID.: P00505524LZ

OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Tertiary Roads
Tomas Morato – K0009+(-090) – K0009+127, K0009+1073 – K0009+1172,
K0009+127-K0009+1073
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=4.952 lane km
Unit Cost (P’000) = P 4,336.18/ lane km
Allocation (P’000) = P 21,472.78
EAO (P’000) = P 438.22
Total (P’000) = P 21,911.00

As Modified

OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Tertiary Roads
Tomas Morato – K0009+(-090) – K0009+653,
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=2.972 lane km
Unit Cost (P’000) = P 7,225.03/ lane km P 14.4 M/Km.
Allocation (P’000) = P 21,472.78
EAO (P’000) = P 438.22
Total (P’000) = P 21,911.00
WIN1F06410
July 3, 2021 CY 2021 WIN1F06417 UACS No. 320101106441000 May 7, 2021 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 320101106441000
Project ID.: P00525827LZ

002: Protect Lives and Properties

Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of RCPC along Blumentritt Extension, Chainage 251.70 to Chainage 963.00, Manila City
Physical Target: CW1 – Construction of Flood Mitigation Structure 895.70 l.m.
CW2 – Construction of Concrete Road
Unit Cost (P’000) = P 31.75 / l.m.
= P 22.97/ l.m.
Allocation (P’000) = P 28,430.00
= P 20,570.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00


002: Protect Lives and Properties

Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of RCPC along Blumentritt Extension, Chainage 251.70 to Chainage 948 and Chainage 435.20
to Chainage 634.60, Manila City
Physical Target: CW1 – Construction of Flood Mitigation Structure 895.70 l.m.
CW2 – Construction of Concrete Road P 44 M/Km
Unit Cost (P’000) = P 31.75 / l.m.
= P 22.97/ l.m.
Allocation (P’000) = P 28,430.00
= P 20,570.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
WIN1F06417
July 2, 2021 FY 2021 GAA WIN1F06316 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 300117209177000
Project ID : P00564730LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Construction of Road,
Barangay Kaligtasan, Bongabong, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.00 Lane Km
Allocation : Php 1.00 Million

TO :

Construction of Road,
Barangay Kaligtasan, Bongabong, Otiental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.1948 Lane Km
Allocation : Php 1.00 Million
July 2, 2021 CY 2021 WIN1B01165 UACS NO. 300209100008000 May 2, 2021 National Capital Region NCR - Regional Office
As per GAA/Original
UACS No. 300209100008000
Project ID.: P00531635LZ

Convergence and Special Support Program

Construction/Improvement of Access Roads leading to Railway Stations
Old Sauyo Road leading to Quirino Highway Station, Quezon City
Physical Target: CW1 = Construction of Drainage Structure 1200 l.m.
CW2 = Shoulder Paving / Construction 2400 l.m.
Unit Cost (P’000) = P 6.13 / l.m.
= P 2.03 / sq.m.
Allocation (P’000) = P 7,365.85
= P 4,860.71
EAO (P’000) = P 443.35
Total (P’000) = P 12,670.00

As Modified

Convergence and Special Support Program

Construction/Improvement of Access Roads leading to Railway Stations
Old Sauyo Road leading to Quirino Highway Station, Quezon City
Physical Target: CW1 = Shoulder Paving / Construction 2965 sq.m.
Unit Cost (P’000) = P 4.12 / l.m.
Allocation (P’000) = P 12,226.55
EAO (P’000) = P 443.35
Total (P’000) = P 12,670.00
WIN1B01165
July 2, 2021 FY 2021 GAA WIN1F06246 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 300104222161000
Project ID : P00560691LZ

LOCAL PROGRAM

Local - Building and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program

FROM :

Construction of Multi-Purpose Building (Phase 2),
Barangay Nasukob, Bulalacao, Oriental Mindoro
Physical Target - CW1 - Construction of Multi-Purpose Building :
1 No. of Building
Allocation : Php 4.00 Million

TO :

Construction of Multi-Purpose Building,
Barangay Nasukob, Bulalacao, Oriental Mindoro
Physical Target - CW1 - Construction of Multi-Purpose Building :
1 No. of Building
Allocation : Php 4.00 Million
July 2, 2021 CY 2021 WIN1F06359 UACS NO. 300209100005000 May 2, 2021 National Capital Region NCR - Regional Office
As per GAA/Original
UACS No. 300209100005000
Project ID.: P00531629LZ

Convergence and Special Support Program

Construction/Improvement of Access Roads leading to Railway Stations
Genaral Ave. leading to Tandang Sora Station, Quezon City
Physical Target: CW1 = Construction of Drainage Structure 1038 l.m.
CW2 = Shoulder Paving / Construction 2092 l.m.
Unit Cost (P’000) = P 6.07 / l.m.
= P 2.01 / sq.m.
Allocation (P’000) = P 6,299.52
= P 4,199.68
EAO (P’000) = P 380.80
Total (P’000) = P 10,880.00

As Modified

Convergence and Special Support Program

Construction/Improvement of Access Roads leading to Railway Stations
Genaral Ave. leading to Tandang Sora Station, Quezon City
Physical Target: CW1 = Construction of Drainage Structure 2478 sq.m.
Unit Cost (P’000) = P 4.24 / sq.m.
Allocation (P’000) = P 10,499.20
EAO (P’000) = P 380.80
Total (P’000) = P 10,880.00
WIN1F06359
July 2, 2021 CY 2021 WIN1F06191 UACS NO. 320101106448000 May 2, 2021 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 320101106448000
Project ID.: P00525814LZ

002: Protect Lives and Properties

Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet File) along Estero dela Reina, Barangay 58, 56 & 51 Sta. 0+628.60
to Sta. 0+702.60 (LS); Sta. 0+757.10 to Sta. 0+841.50 (RS), Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 119.40 l.m.
Unit Cost (P’000) = P328.30 / l.m.
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00

As Modified

002: Protect Lives and Properties

Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet File) along Estero dela Reina, Barangay 58, 56 & 51 (LS) Sta. 0+723.90
to Sta. 0+783.60; (RS) Sta. 0+732.60 to Sta. 0+792.30, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 119.40 l.m.
Unit Cost (P’000) = P328.300 M/ LM
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00
WIN1F06191
July 2, 2021 CY 2021 WIN1F06191 UACS NO. 320101106448000 May 2, 2021 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 320101106448000
Project ID.: P00525814LZ

002: Protect Lives and Properties

Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet File) along Estero dela Reina, Barangay 58, 56 & 51 Sta. 0+628.60
to Sta. 0+702.60 (LS); Sta. 0+757.10 to Sta. 0+841.50 (RS), Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 119.40 l.m.
Unit Cost (P’000) = P328.30 / l.m.
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00

As Modified

002: Protect Lives and Properties

Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet File) along Estero dela Reina, Barangay 58, 56 & 51 (LS) Sta. 0+723.90
to Sta. 0+783.60; (RS) Sta. 0+732.60 to Sta. 0+792.30, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 119.40 l.m.
Unit Cost (P’000) = P328.300 M/ LM
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00
WIN1F06191
July 2, 2021 CY 2021 WIN1F06201 UACS NO. 310102100619000 May 2, 2021 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 310102100619000
Project ID.: P00505439LZ

001: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Secondary Roads
R-10 – K0004+1192 – K0004+1214, K0004+471 – K0004+1192
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=2.972 km
Unit Cost (P’000) = P8,160.18 / lane km
Allocation (P’000) = P 24,252,060.00
EAO = P 494,940.00
Total (P’000) = P 24,747,000.00

As Modified

001: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Secondary Roads
R-10 – K0005+(-591.80) – K0006+(-065.80)
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=2.972 km
Unit Cost (P’000) = P8,160.18 / lane km P16M/lm
Allocation (P’000) = P 24,252,060.00
EAO = P 494,940.00
Total (P’000) = P 24,747,000.00
WIN1F06201
July 2, 2021 CY 2021 WIN1F06207 UACS NO. 31010300630000 May 2, 2021 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 31010300630000
Project ID.: P00505500LZ

001: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Tertiary Roads
Rodriguez St – Chainage 0 – Chainage 399
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=1.039 lane km
Unit Cost (P’000) = P4,336.35 / lane km
Allocation (P’000) = P 4,501.14
EAO = P 91.86
Total (P’000) = P 4,593.00

As Modified

001: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Tertiary Roads
Rodriguez St – Chainage 0 – Chainage 184.70
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=1.039 lane km
Unit Cost (P’000) = P4,336.35 / lane km P8.6M/lm
Allocation (P’000) = P 4,501.14
EAO = P 91.86
Total (P’000) = P 4,593.00
WIN1F06207

July 2, 2021 CY 2021 WIN1F06211 UACS NO. 310103100632000 May 2, 2021 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 310103100632000
Project ID.: P00505501LZ

001: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Tertiary Roads
Vitas St – Chainage 0 – Chainage 573
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=1.146 km
Unit Cost (P’000) = P4,336.45 / lane km
Allocation (P’000) = P 4,969.58
EAO = P 101.42
Total (P’000) = P 5,071.00

As Modified

001: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Tertiary Roads
Vitas St – Chainage 0 – Chainage 289.40
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=1.146 km
Unit Cost (P’000) = P4,336.45 / lane km / P8.6/M
Allocation (P’000) = P 4,969.58
EAO = P 101.42
Total (P’000) = P 5,071.00
WIN1F06211
July 2, 2021 CY 2021 WIN1F06254 UACS NO. 310105100521000 May 2, 2021 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 310105100521000
Project ID.: P00505440LZ

OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Roads
R-10 – K0006 + 444 – K0006+516
Physical Target: CW1 = Rehabilitation of Paved Road L=0.216 lane km
Unit Cost (P’000) = P 18,801.48 / lane km
Allocation (P’000) = P 4,061.12
EAO (P’000) = P 82.88
Total (P’000) = P 4,144.00


As Modified

OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Roads
R-10 – K0006 + (-049.4) – K0006+010.6
Physical Target: CW1 = Rehabilitation of Paved Road L=0.216 lane km
Unit Cost (P’000) = P 18,801.48 / lane km P37.6 M/km
Allocation (P’000) = P 4,061.12
EAO (P’000) = P 82.88
Total (P’000) = P 4,144.
WIN1F06254
July 2, 2021 CY 2021 WIN1F06281 UACS NO. 320101106462000 May 2, 2021 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 320101106462000
Project ID.: P00525828LZ

002: Protect Lives and Properties

Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of RCPC along Lardizabal Street, Chainage 000.00 to Chainage 2185.10, Manila City
Physical Target: CW1 – Construction of Flood Mitigation Structure 635.00 l.m.
Unit Cost (P’000) = P 77.16 / l.m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00


002: Protect Lives and Properties

Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of RCPC along Lardizabal Street, Sta. 0+000.00 to Sta. 0+266.00 and
Sta. 0+000.00 to Sta. 0+369.00, Manila City
Physical Target: CW1 – Construction of Flood Mitigation Structure 635.00 l.m.
Unit Cost (P’000) = P 77.16 / l.m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
WIN1F06281
July 2, 2021 CY 2021 WIN1F06320 UACS NO. 320101106441000 May 2, 2021 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 320101106441000
Project ID.: P00525807LZ

002: Protect Lives and Properties

Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Quiapo, Brgy. 393 (Phase I), Sta. 0+500.00
to Sta. 0+658.40
Physical Target: CW1 – Construction of Flood Mitigation Structure 117.20 l.m.
Unit Cost (P’000) = P 324.321 / l.m.
Allocation (P’000) = P 38,010.28
EAO (P’000) = P 775.72
Total (P’000) = P 38,786.00


002: Protect Lives and Properties

Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Quiapo, Brgy. 393 (Phase I), Sta. 0+500.00
to Sta. 0+617.20
Physical Target: CW1 – Construction of Flood Mitigation Structure 117.20 l.m.
Unit Cost (P’000) = P 324.321 / l.m. P342,320/lm
Allocation (P’000) = P 38,010.28
EAO (P’000) = P 775.72
Total (P’000) = P 38,786.00
WIN1F06320
July 2, 2021 CY 2021 WIN1F06252 UACS NO. 310103100642000 May 5, 2021 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 310103100642000
Project ID.: P00505525LZ

OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Secondary Roads
Hemady St – K0009+(-615) – K0009+(-479), K0009+(-682) – K0009+(-615),
K0009+(-979) – K0009+(-682)
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 1.364 lane km
Unit Cost (P’000) = P 4,336.71 / lane km
Allocation (P’000) = P 5,915.28
EAO (P’000) = P 120.72
Total (P’000) = P 6,036.00

As Modified

OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Secondary Roads
Hemady St – K0009+(-979) – K0009+(-698)
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 0.843 lane km
Unit Cost (P’000) = P 7,016.94 / lane km
Allocation (P’000) = P 5,915.28
EAO (P’000) = P 120.72
Total (P’000) = P 6,036.00
WIN1F06252

July 2, 2021 CY 2021 WIN1F06355 UACS NO. 310105100494000 May 5, 2021 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 310105100494000
Project ID.: P00505527LZ

OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Secondary Roads
South Ave (Timog Ave) K0010+(-890) – K0010+(-570),
K0010+(-964) - K0010+(-890)
Physical Target: CW1 = Reconstruction to concrete Pavement 2.02 lane km
Unit Cost (P’000) = P 34,836.5 / lane km
Allocation (P’000) = P 70,369.73
EAO (P’000) = P 2,552.270
Total (P’000) = P 72,922.00

As Modified

OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Secondary Roads
South Ave (Timog Ave) K0010+(-964) – K0010+(-890),
K0010+(-890) - K0010+144, K0009+(-213) – K0009+119
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=2.02 lane km
Unit Cost (P’000) = P 11,354.79 / lane km P22M/km
Allocation (P’000) = P 70,369.73
EAO (P’000) = P 2,552.270
Total (P’000) = P 72,922.00
WIN1F06355
July 2, 2021 CY 2021 WIN1F06334 UACS NO. 310106100553000 May 5, 2021 National Capital Region Malabon-Navotas District Engineering Office
As per GAA/Original
UACS No. 310106100553000
Project ID.: P00505482LZ

OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Tertiary Roads
MH Del Pilar St (Malabon) –K0013+462 – K0013+496
Physical Target: CW1 = Rehabilitation of Paved Road: 0.068 lane km
Unit Cost = P 18,375.00 / lane km
Allocation (P’000) = P 1,249.50
EAO (P’000) = P 25.50
Total (P’000) = P 1,275.00

As Modified

OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Tertiary Roads
MH Del Pilar St (Malabon) –K0013+570 – K0013+601.50
Physical Target: CW1 = Rehabilitation of Paved Road: 0.063 lane km
Unit Cost = P 19,825.29714 / lane km P39.6M/km.
Allocation (P’000) = P 1,248.99
EAO (P’000) = P 25.50
Total (P’000) = P 1,275.00
WIN1F06334
July 2, 2021 2021 WIN1F06283 FCR 2021 RA 11518 December 28, 2020 Region VI Capiz 1st District Engineering Office
FROM:


ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Roxas City-Cagay-Sibaguan-Balijuagan-Cudian-Ivisan Rd - K0108 + 203 - K0108 + 887

CW1- Road Widening: 1.368 lane km - 17,428.32

EAO - 355.68

Total: 17,784.00

TO:


ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Roxas City-Cagay-Sibaguan-Balijuagan-Cudian-Ivisan Rd - K0108 + 203 - K0108 + 879


CW1- Road Widening: 1.352 lane km - 17,428.32

EAO - 355.68

Total: 17,784.00
July 2, 2021 2021 WIN1F06406 FCR 2021 RA 11518 December 28, 2020 Region VI Capiz 1st District Engineering Office
FROM:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Iloilo East Coast-Capiz Rd - K0118 + 137 - K0118 + 288

CW1- Reconstruction to Concrete Pavement: 0.365 lane km - 7,491.12

EAO - 152.88

Total: 7,644.00


TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Iloilo East Coast-Capiz Rd - K0118 + 137 - K0118 + 288

CW1- Reconstruction to Concrete Pavement: 0.302 lane km - 7,491.12

EAO - 152.88

Total: 7,644.00
July 2, 2021 2021 WIN1F06308 FCR 2021 RA 11518 December 28, 2020 Region VI Capiz 1st District Engineering Office
FROM:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Iloilo East Coast-Capiz Rd - K0147 + 000 - K0147 + 300

CW1- Reconstruction to Concrete Pavement: 0.60 lane km - 12,313.70

EAO - 251.30

Total: 12,565.00

TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Iloilo East Coast-Capiz Rd - K0147 + 000 - K0147 + 805.5

CW1- Reconstruction to Concrete Pavement: 1.611 lane km - 12,313.70

EAO - 251.30

Total: 12,565.00
July 2, 2021 2021 WIN1F06245 FCR 2021 RA 11518 December 28, 2020 Region VI Capiz 1st District Engineering Office
FROM:

LOCAL PROGRAM

Local – Buildings and Other Structures - Multipurpose / Facilities - National Building Program

Rehabilitation of Multi-Purpose Hall (Evacuation Center) with Artesian Well, Barangay San Pedro, Pontevedra, Capiz, Roxas City

CW1- Rehabilitation /Major Repair of Multi Purpose Building: 1.00 Building - 2,450.00

EAO - 50.00

Total: 2,500.00


TO:

LOCAL PROGRAM

Local – Buildings and Other Structures - Multipurpose / Facilities - National Building Program

Rehabilitation of Multi-Purpose Hall (Evacuation Center) with Artesian Well, Barangay San Pedro, Pontevedra, Capiz

CW1- Rehabilitation /Major Repair of Multi Purpose Building: 1.00 Building - 2,450.00

EAO - 50.00

Total: 2,500.00
July 2, 2021 2021 WIN1F06385 FCR 2021 RA 11518 December 28, 2020 Region VI Capiz 1st District Engineering Office
FROM:

LOCAL PROGRAM

Local – Buildings and Other Structures - Multipurpose / Facilities - National Building Program

Rehabilitation of Multi-Purpose Hall (Evacuation Center) with Artesian Well, Barangay Tacas, Pontevedra, Capiz, Roxas City

CW1- Rehabilitation /Major Repair of Multi Purpose Building: 1.00 Building - 2,450.00

EAO - 50.00

Total: 2,500.00


TO:

LOCAL PROGRAM

Local – Buildings and Other Structures - Multipurpose / Facilities - National Building Program

Rehabilitation of Multi-Purpose Hall (Evacuation Center) with Artesian Well, Barangay Tacas, Pontevedra, Capiz

CW1- Rehabilitation /Major Repair of Multi Purpose Building: 1.00 Building - 2,450.00

EAO - 50.00

Total: 2,500.00
July 1, 2021 2021 WIN1F06323 FCR 2021 RA 11518 December 28, 2020 Region VI Aklan District Engineering Office
FROM:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Jaime Cardinal Sin Ave - K0284 + 041 - K0286 + 367

CW1- Road Widening: 4.544 lane km - 50,075.78

EAO - 1,816.22

Total: 51,892.00

TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Jaime Cardinal Sin Ave - K0284 + 075 - K0286 + 653

CW1- Road Widening: 5.048 lane km - 48,075.78

ROW Acquisition: 400 sq.m - 2,000.00

EAO - 1,816.22

Total: 51,892.00
July 1, 2021 2021 WIN1F06292 FCR 2021 RA 11518 December 28, 2020 Region VI Aklan District Engineering Office
FROM:


ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads

Aklan East Rd - K0282 + 150 - K0282 + 186, K0282 + 912 - K0283 + 356, K0283 + 706 - K0283 + 806, K0286 + 720 - K0286 + 801, K0286 + 989 - K0287 + 048, K0287 + 114 - K0287 + 142, K0287 + 170 - K0287 + 214, K0287 + 670 - K0287 + 826, K0288 + 130 - K0288 + 290, K0288 + 990 - K0289 + 066, K0289 + 220 - K0289 + 296, K0289 + 300 - K0289 + 536

CW1- Construction of Drainage Structure along Road: 1,569 lineal meters - 26,209.12

EAO - 534.88

Total: 26,744.00


TO:

ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads

Aklan East Rd - K0276 + 720 - K0277 + 282, K0283 + 181 - K0283 + 310, K0283 + 720 - K0283 + 820, K0286 + 716 - K0286 + 798, K0286 + 920 - K0286 + 960, K0287 + 170 - K0287 + 216, K0287 + 670 - K0287 + 822, K0288 + 130 - K0288 + 241, K0288 + 1017 - K0289 + 150, K0289 + 220 - K0289 + 282, K0289 + 302 - K0289 + 536, K0289 + 680 - K0289 + 698

CW1- Construction of Drainage Structure along Road: 1,636 lineal meters - 22,409.12

ROW Acquisition: 380 sq.m - 3,800.00

EAO - 534.88

Total: 26,744.00
July 1, 2021 2021 WIN1F06340 FCR 2021 RA 11518 December 28, 2020 Region VI Aklan District Engineering Office
FROM:

LOCAL PROGRAM

Local - Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure Program

Construction of Revetment Wall along River/Creek, Barangay Lapnag, Banga, Aklan

CW1 - Construction of Revetment: 16.00 lineal meters - 1,980.00

EAO - 20.00

Total: 2,000.00


TO:

LOCAL PROGRAM

Local - Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure Program

Construction of Revetment Wall along River/Creek, Barangay Lapnag, Banga, Aklan

CW1 - Construction of Revetment: 60.00 lineal meters - 1,980.00

EAO - 20.00

Total: 2,000.00
July 1, 2021 FY 2021 GAA WIN1E02371 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1551+932 - K1551+967,
K1557+807 - K1557+814, K1558+895 - K1558+934,
K1559+167 - K1559+350, K1561+884 - K1561+917,
K1562+022 - K1562+061, K1562+568 - K1562+618
Physical Target:
CW1: 1,227.50 sq. m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: 940 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 6,202,000.00
CW1: P 3,537,800.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: P2,540,160.00 (ROW Acquisition)
EAO: P 124,040.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1551+932 - K1551+967,
K1557+807 - K1557+814, K1558+895 - K1558+934,
K1559+167 - K1559+350, K1561+884 - K1561+917,
K1562+022 - K1562+061, K1562+568 - K1562+618
Physical Target:
CW1: 1,185.00 sq. m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: 940 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 6,202,000.00
CW1: P 3,537,800.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: P2,540,160.00 (ROW Acquisition)
EAO: P 124,040.00
July 1, 2021 2021 WIN1F06325 FCR 2021 RA 11518 December 28, 2020 Region VI Aklan District Engineering Office
FROM:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Barangay Road, Barangay Bulwang, Numancia, Aklan

CW1- Construction of Concrete Road: 0.179 lane km - 1,980.00

EAO - 20.00

Total: 2,000.00


TO:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Barangay Road, Barangay Bulwang, Numancia, Aklan

CW1- Construction of Concrete Road: 0.604 lane km - 1,980.00

EAO - 20.00

Total: 2,000.00
July 1, 2021 FY 2021 GAA WIN1E02405 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Road - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) -
K1543+450 - K1543+545, K1554+393 - K1554+854
Physical Target:
CW1: 2.034 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 19,220,000.00
CW1: P 18,835,600.00 (Reconstruction to Concrete Pavement)
EAO: P 384,400.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Road - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) -
K1543+450 - K1543+545, K1554+393 - K1554+854
Physical Target:
CW1: 1.112 Lane Km (Reconstruction to Concrete Pavement)
CW2: 0.556 Lan Km (Road Safety: Street Lights)
Allocation:
TOTAL: P 19,220,000.00
CW1: P 12,927,035.00 (Reconstruction to Concrete Pavement)
CW2: P 5,905,565.00 (Road Safety: Street Lights)
EAO: P 384,400.00
July 1, 2021 2021 WIN1F06395 FCR 2021 RA 11518 December 28, 2020 Region VI Aklan District Engineering Office
FROM:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Barangay Road, Barangay Naile, Ibajay, Aklan


CW1- Construction of Concrete Road: 0.179 lane km - 1,980.00

EAO - 20.00

Total: 2,000.00


TO:

FROM:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Concreting of Barangay Road, Barangay Naile, Ibajay, Aklan

CW1- Construction of Concrete Road: 0.616 lane km - 1,980.00

EAO - 20.00

Total: 2,000.00
July 1, 2021 2021 WIN1F06329 FCR 2021 RA 11518 December 28, 2020 Region VI Regional Office VI
FROM:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction (Continuing)of Bridge Over Mayudmon River to Connect Barangay Oquendo And Barangay Guanko to Barangay Cortes, Balete, Aklan

CW1- Construction of Concrete Road: 0.00 lane km - 14,850.00

EAO - 150.00

Total: 15,000.00


TO:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction (Continuing)of Bridge Over Mayudmon River to Connect Barangay Oquendo And Barangay Guanko to Barangay Cortes, Balete, Aklan

CW1- Construction of Concrete Bridge: 228.96 sq.m - 14,850.00

EAO - 150.00

Total: 15,000.00
July 1, 2021 2021 WIN1F06362 FCR 2021 RA 11518 December 28, 2020 Region VI Aklan District Engineering Office
FROM:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction of Road, Barangay Pudiot, Tangalan, Aklan

CW1- Construction of Concrete Road: 0.440 lane km - 1,980.00

EAO - 20.00

Total: 2,000.00

TO:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction of Road, Barangay Pudiot, Tangalan, Aklan

CW1- Construction of Concrete Road: 0.560 lane km - 1,980.00

EAO - 20.00

Total: 2,000.00
July 1, 2021 FY 2021 GAA WIN1E02404 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry‐Davao Or Coastal Rd ‐ K1635+165 ‐ K1635+210
Physical Target:
CW1: 1,210.00 sq. nm. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 12,100,000.00
CW1: P 11,858,000.00 (Construction of Road Slope Protection Structure)
EAO: P 242,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry‐Davao Or Coastal Rd ‐ K1633+190 - K1633+300
Physical Target:
CW1: 990.00 sq. nm. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 12,100,000.00
CW1: P 11,858,000.00 (Construction of Road Slope Protection Structure)
EAO: P 242,000.00
July 1, 2021 FY 2021 GAA WIN1E02421 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1596+664 - K1598+000
Physical Target:
CW1: 2.672 Lane Km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Road Widening)
EAO: P 1,750,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1596+664 - K1597+915
Physical Target:
CW1: 2.500 Lane Km (Road Widening)
ROW: 18,750.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 42,255,420.00 (Road Widening)
ROW: P 5,994,580.00 (ROW Acquisition)
EAO: P 1,750,000.00
July 1, 2021 FY 2021 GAA WIN1F06115 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 31010200582000
Project ID : P00516137LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

FROM :

Calapan South Road,
K0001 + 850 - K0002 + 687,
K0022 + 438 - K0025 + 117,
K0039 + 048 - K0039 + 698,
K0048 + 480 - K0050 + 765
Physical Target - CW1 - Preventive Maintenance of Road -
Asphalt Overlay ; 13.124 Lane Km
Allocation : Php 106.813 million

TO :

Calapan South Road,
K0001 + 850 - K0002 + 698,
K0022 + 438 - K0024 + 778,
K0039 + 048 - K0040 + 583,
K0048 + 480 - K0050 + 750
Physical Target - CW1 - Preventive Maintenance of Road -
Asphalt Overlay : 13.884 Lane Km
Allocation : Php 106.813 Million
July 1, 2021 2021 310205100536000 GAA FY 2021 January 25, 2021 Region II Regional Office II
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/ New Roads - Aritao - Quirino Road, Package 2, Quirino
July 1, 2021 FY 2021 GAA WIN1E02415 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction of Esplanade along Davao River, Brgy. 1-A and 2-A section, Left Bank, Davao City (Sta. 1+840 - Sta. 2+169)
Physical Target:
CW1: 581.176 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00

TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction of Esplanade along Davao River, Brgy. 1-A and 2-A Section, Left Bank, Davao City (Sta. 2+173 - Sta. 2+478)
Physical Target:
CW1: 305.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
July 1, 2021 2021 310101100426000 GAA FY 2021 January 25, 2021 Region II Cagayan 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads - Cagayan Valley Rd - K0512+(-009) - K0513+033, K0513+282.5 - K0513+620, K0514+(-004.5) - K0514+290, K0515+811 - K0517+955.50, K0518+000 - K0518+588.50, K0524+041.5 - K0524+677
July 1, 2021 FY 2021 GAA WIN1F06307 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310208100348000
Project ID : P00505147LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement -
Secondary Roads

FROM :

Calapan South Road,
K0109 + 000 - K0109 + 525
Physical Target - CW1 - Shoulder Paving/Construction :
2,625.00 sq.m.
Allocation : Php 7.350 Million

TO :

Calapan South Road,
K0109 + 053 - K0109 + 480
Physical Target - CW1 - Shoulder Paving/Construction -
2,604.70 sq. m.
Allocation : Php 7.350 Million
July 1, 2021 2021 300211100065000 GAA FY 2021 January 25, 2021 Region II Cagayan 3rd District Engineering Office
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Installation of Road Safety Devices along Cagayan Valley Road (K0480+300 - K0484+800)
July 1, 2021 FY 2021 GAA WIN1F06318 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310208100352000
Project ID : P00505151LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement -
Secondary Roads

FROM :

Mindoro Oriental/Occidental East Coastal Road,
K0199 + 000 - K0199 + 589
Physical Target - CW1 - Shoulder Paving/Construction -
2,356.00 sq. m.
Allocation : Php 6.479 Million

TO :

Mindoro Oriental/Occidental East Coastal Road,
K0199 + 000 - K0199 + 598
Physical Target - CW1 - Shoulder Paving/Construction :
2,813.00 sq. m.
Allocation : Php 6.479 Million
July 1, 2021 FY 2021 GAA WIN1F06322 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 300116203388000
Project ID : P00561885LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Concreting of Roads,
Gloria, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
12.00 Lane Km
Allocation : Php 72.00 Million

TO :

Concreting of Road,
Gloria, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
11.509 Lane Km
Allocation : Php 72.00 Million
July 1, 2021 2021 300117208219000 GAA FY 2021 January 25, 2021 Region II Cagayan 3rd District Engineering Office
Local Program - Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Construction of Various Local Roads and Drainages in Tuguegarao City, Cagayan
July 1, 2021 2021 WIN1C04026 FY 2021 GAA December 28, 2020 Region III Pampanga 2nd District Engineering Office
Asset Preservation - Preventive Maintenance - Primary Roads

Jose Abad Santos Ave (JASA) ,K0091+965.50 - K0093+000, K0095+000 - K0095+316
July 1, 2021 2021 300116203658000 GAA FY 2021 January 25, 2021 Region II Cagayan 3rd District Engineering Office
Local Program - Local - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects - Construction of Various Local Roads and Drainages in Tuguegarao City Phase III, Cagayan
July 1, 2021 2021 310201100745000 GAA FY 2021 January 25, 2021 Region II Cagayan 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Cagayan Valley Rd - K0509+701 - K0510+892
July 1, 2021 2021 WIN1C04115 FY 2021 GAA December 28, 2020 Region III Pampanga 2nd District Engineering Office
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads

San Antonio - Floridablanca Rd, K0082+281 - K0083+000, K0087+500 - K0088+222.40



July 1, 2021 FY 2021 GAA WIN1E02426 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao Occidental District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) -
K1634+596 - K1637+039, K1646+092.50 - K1646+198,
K1646+223.10 - K1646+384, K1656+216 - K1656+503,
K1657+526 - K1657+846, K1657+906.53 - K1657+1029
Physical Target:
CW1: 7.443 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 52,931,000.00
CW1: P 51,078,415.00 (Reconstruction to Concrete Pavement)
EAO: P 1,852,585.00

TO: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1634+596 - K1637+039
Physical Target:
CW1: 5.514 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 52,931,000.00
CW1: P 51,078,415.00 (Reconstruction to Concrete Pavement)
EAO: P 1,852,585.00
July 1, 2021 FY 2021 GAA WIN1F06229 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Palawan 1st District Engineering Office
UACS No. : 300211100135000
Project ID : P00534708LZ

Convergence and Special Support Program

Special Road Fund - Motor Vehicle User's Charge (MVUC)
as per R.A. 11239

FROM :

Concrete Reblocking along PPNR-Langogan-Roxas Road Section
K0084 + 000 - K0132 + 000 (Intermittent)(S00030PW)
Physical Target - CW1 - Preventive Maintenance of Road :
Concrete Reblocking : 0 Lane Km
Allocation : Php 16.2075 Million

TO :

Concrete Reblocking along PPNR-Langogan-Roxas Road Section
K0082 + 000 - K0131 + 000 (Intermittent)(S00030PW)
Physical Target - CW1 - Preventive Maintenance of Road :
Concrete Reblocking : 0.882 Lane Km
Allocation : Php 16.2075 Million
July 1, 2021 2021 300117208220000 GAA FY 2021 January 25, 2021 Region II Cagayan 3rd District Engineering Office
Local Program - Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Construction of Various Local Roads and Drainages in Municipality of Solana, Cagayan
July 1, 2021 FY 2021 GAA WIN1F06304 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 300116204223000
Project ID : P00562484LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Concreting of Road,
Bulalacao, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
7.00 Lane Km
Allocation : Php 42.00 Million

TO :

Concreting of Road,
Bulalacao, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
6.178 Lane Km
Allocation : Php 42.00 Million

July 1, 2021 FY 2021 GAA WIN1E02420 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Jct Manikling-Gov Generoso Rd - K1745+000 - K1745+800
Physical Target:
CW1: 1.600 Lane Km (Road Widening)
Allocation:
TOTAL: P 38,446,000.00
CW1: P 37,677,080.00 (Road Widening)
EAO: P 768,920.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Jct Manikling - Gov. Generoso Rd - K1745+200 - K1746+746
Physical Target:
CW1: 3.089 Lane Km (Road Widening)
Allocation:
TOTAL: P 38,446,000.00
CW1: P 37,677,080.00 (Road Widening)
EAO: P 768,920.00
July 1, 2021 FY 2021 GAA WIN1E02419 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1677+060 - K1679+000
Physical Target:
CW1: 3.880 Lane Km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Road Widening)
EAO: P 1,750,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1677+060 - K1678+336
Physical Target:
CW1: 2.560 Lane Km (Road Widening)
ROW: 19,200.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 42,257,350.00 (Road Widening)
ROW: P 5,992,650.00 (ROW Acquisition)
EAO: P 1,750,000.00
July 1, 2021 FY 2021 GAA WIN1E02422 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road (including Bridge), Butay, Barangay Pichon, Caraga, Davao Oriental
Physical Target:
CW1: 3.500 Lane Km (Construction of Concrete Road)
CW2: 238.50 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 130,000,000.00
CW1: P 101,325,000.00 (Construction of Concrete Road)
CW2: P 24,125,000.00 (Construction of Concrete Bridge)
EAO: P 4,550,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road (including Bridge), Butay, Barangay Pichon, Caraga, Davao Oriental
Physical Target:
CW1: 3.788 Lane Km (Construction of Gravel Road)
CW2: 429.30 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 130,000,000.00
CW1: P 65,903,000.00 (Construction of Gravel Road)
CW2: P 59,547,000.00 (Construction of Concrete Bridge)
EAO: P 4,550,000.00
July 1, 2021 FY 2021 GAA WIN1E02408 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road (including Bridge), from Sitio Sangab to Sitio Butay, Barangay Pichon, Caraga, Davao Oriental
Physical Target:
CW1: 3.160 Lane Km (Construction of Concrete Road)
CW2: 238.50 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 120,000,000.00
CW1: P 91,675,000.00 (Construction of Concrete Road)
CW2: P 24,125,000.00 (Construction of Concrete Bridge)
EAO: P 4,200,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road (including Bridge), from Sitio Sangab to Sitio Butay, Barangay Pichon, Caraga, Davao Oriental
Physical Target:
CW1: 5.564 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 120,000,000.00
CW1: P 115,800,000.00 (Construction of Gravel Road)
EAO: P 4,200,000.00
June 30, 2021 2021 310201100746000 GAA FY 2021 January 25, 2021 Region II Cagayan 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Cagayan Valley Rd - K0488+993 - K0489+218
June 30, 2021 2021 310201100742000 GAA FY 2021 January 25, 2021 Region II Cagayan 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Cagayan Valley Rd - K0465+175 - K0466+106
June 30, 2021 2021 300211100064000 GAA FY 2021 January 25, 2021 Region II Cagayan 3rd District Engineering Office
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Installation of Road Safety Devices along Cagayan - Apayao Road K0488+(-358) - K0513+000 (w/exception), K0519+(-1044) - K0530+603 (w/exception); Cagayan - Apayao Road (Tuao - Rizal Section) K0525+(-243) - K0529+195 (w/exception); Santiago - Tuguegarao Road K0434+(-754) - K0436+971 (w/exception), K0437+(-031) - K0448+298 (w/exception)
June 30, 2021 2021 310202100772000 GAA FY 2021 January 25, 2021 Region II Cagayan 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road - Network Development - Road Widening - Secondary Roads - Cagayan Valley Rd (Magapit - Jct Aparri Airport Sect) - K0580+000 - K0580+534.80 (BS), K580+534.80 - K0581+205.83 (RS), K0581+205.63 - K0581+512.74 (BS), K0581+512.74 - K0581+532 (RS)
June 30, 2021 2021 300203101522000 GAA FY 2021 January 25, 2021 Region II Cagayan 1st District Engineering Office
Convergence and Special Support Program - Construction/ Improvement of Access Road leading to Declared Tourism Destinations - Access Road Leading to Bagsang Falls, Brgy. Santa Clara, Gonzaga, Cagayan
June 30, 2021 2021 310202100773000 GAA FY 2021 January 25, 2021 Region II Cagayan 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Magapit - Mission Rd - K0565+348 - K0565+600
June 30, 2021 2021 310106100582000 GAA FY 2021 January 25, 2021 Region II Nueva Vizcaya 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Jct. Na'tl. Road - Bitnong - Belance - NV Bdry. Road, - K0269+579 - K0270+447.50
June 30, 2021 2021 310104100287000 GAA FY 2021 January 25, 2021 Region II Nueva Vizcaya 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Daang Maharlika (LZ) - K0220+516.74 - K0220+624, K0220+655.50 - K0222+062.90
June 30, 2021 2021 310201100643000 GAA FY 2021 January 25, 2021 Region II Nueva Vizcaya 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0229+994.50 - K0232+105.50
June 30, 2021 2021 310106100581000 GAA FY 2021 January 25, 2021 Region II Nueva Vizcaya 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Aritao - Quirino Rd - K0256+373.50 - K0257+029.80
June 30, 2021 FY 2021 GAA WIN1E02401 FY 2021 GAA RA 11518 January 1, 2021 Region XI Regional Office XI
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, Jct. Davao - Bukidnon Road (Calinan Section) - Wangan - Subasta - Tagakpan - Tungkalan - Tagurano - Bayabas - Catigan - Baracatan - Sibulan - Tibolo - Kapatagan Road (Package 1), Davao del Sur
Physical Target:
CW1: 0.600 Lane Km (Construction of Concrete Road)
CW2: 1,192.50 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 180,000,000.00
CW1: P 28,950,000.00 (Construction of Concrete Road)
CW2: P 144,750,000.00 (Construction of Concrete Bridge)
EAO: P 6,300,000.00

TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, Jct. Davao - Bukidnon Road (Calinan Section) - Wangan - Subasta - Tagakpan - Tungkalan - Tagurano - Bayabas - Catigan - Baracatan - Sibulan - Tibolo - Kapatagan Road (Package 1), Davao del Sur
Physical Target:
CW1: 4.711 Lane Km (Construction of Gravel Road)
CW2: 715.50 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 180,000,000.00
CW1: P 96,444,778.00 (Construction of Gravel Road)
CW2: P 77,255,222.00 (Construction of Concrete Bridge)
EAO: P 6,300,000.00
June 30, 2021 2021 310110100214000 GAA FY 2021 January 25, 2021 Region II Nueva Vizcaya 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads - Daang Maharlika (LZ) - K0216+845 - K0217+508
June 30, 2021 FY 2021 GAA WIN1E02393 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Concrete Road R Campetea, Dama de Noche, Ixora, Plumeria, Lantana, Aster, Mansanitas, Lansones, Kasoy at Barangay Poblacion, Maragusan, Davao de Oro
Physical Target:
CW1: 0.882 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 9,230,000.00
CW1: P 9,137,700.00 (Construction of Concrete Road)
EAO: P 92,300.00

TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Concrete Road R Campetea, Dama de Noche, Ixora, Plumeria, Lantana, Aster, Mansanitas, Lansones, Kasoy at Barangay Poblacion, Maragusan, Davao de Oro
Physical Target:
CW1: 1.240 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 9,230,000.00
CW1: P 9,137,700.00 (Construction of Concrete Road)
EAO: P 92,300.00
June 30, 2021 FY 2021 GAA WIN1E02381 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1580+000 - K1581+434
Physical Target:
CW1: 2.748 Lane Km (Road Widening)
Allocation:
TOTAL: P 72,500,000.00
CW1: P 69,962,500.00 (Road Widening)
EAO: P 2,537,500.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1579+685 - K1581+380
Physical Target:
CW1: 3.280 Lane Km (Road Widening)
Allocation:
TOTAL: P 72,500,000.00
CW1: P 69,962,500.00 (Road Widening)
EAO: P 2,537,500.00
June 29, 2021 FY 2021 GAA WIN1E02386 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1502+150 - K1502+961
Physical Target:
CW1: 3.244 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 32,950,000.00
CW1: P 32,291,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 659,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1502+150 - K1502+961
Physical Target:
CW1: 1.842 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 32,950,000.00
CW1: P 32,291,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 659,000.00
June 29, 2021 2021 WIN1C04018 FY 2021 GAA December 28, 2020 Region III Aurora District Engineering Office
Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers

Construction of Malupa - Dian - Aguang River Control, Sta. 3+900 - Sta. 4+050, Sta. 6+200 - Sta. 6+326, Sta. 8+800 - Sta. 9+046.50, Sta. 9+138 - Sta. 9+185.50, Baler, Aurora
June 29, 2021 2021 WIN1C03893 FY 2021 GAA December 28, 2020 Region III Bataan 1st District Engineering Office
Asset Preservation - Preventive Maintenance - Tertiary Roads

Calaguiman Vicinal Rd, K0129+000 - K0129+177.40
June 29, 2021 2021 WIN1C04024 FY 2021 GAA December 28, 2020 Region III Bataan 1st District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads

Jose Abad Santos Ave (JASA), K0108+070 - K0108+236, K0109+032 - K0109+455
June 29, 2021 2021 WIN1C03985 FY 2021 GAA December 28, 2020 Region III Bataan 1st District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads

Bataan Technical Park, Inc. Rd (BTPI), K0177+000 - K0177+801.976
June 28, 2021 2021 WIN1C03966 FY 2021 GAA December 28, 2020 Region III Bulacan 1st District Engineering Office
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Mitigation Structure, Sta. 0+000 - Sta. 0+266 along Bagna, Malolos, Bulacan
June 28, 2021 2021 WIN1C04020 SR2021-03-006974 March 13, 2021 Cordillera Administrative Region CAR - Regional Office
From: Construction of Ampusongan Flood Control, Bakun, Benguet;
Physical Target: CW1 : 1,185 Lineal meters;
Allocation= Php 100,000,000

To: Construction of Ampusongan Flood Control, Bakun, Benguet;
Physical Target: CW1 : 1142 Lineal meters;
Allocation= Php 100,000,000