July 5, 2021 |
2021 |
WIN1C04124 |
GAA 2021 |
June 25, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction/Improvement of Beyeng - Tacadang Road, Tacadang, Kibungan, Benguet;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 100,000,000
To: Construction/Improvement of Beyeng - Tacadang Road, Tacadang, Kibungan, Benguet;
Physical Target: CW1 : 6.36 Lane Km;
Allocation= Php 100,000,000
|
July 5, 2021 |
2021 |
WIN1C04091 |
GAA 2021 |
June 28, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Nueva Vizcaya-Ifugao-Mt. Province Bdry Rd - K0312 + 060 - K0314 + 000, K0321 + 232 - K0322 + 374, K0323 + 770 - K0334 + 500;
Physical Target: CW1 : 27.846 Lane Km;
Allocation= Php 20,000,000
To: Nueva Vizcaya-Ifugao-Mt. Province Bdry Rd - K0312 + 060 - K0313+ 677;
Physical Target: CW1 : 3.246 Lane Km;
Allocation= Php 20,000,000
|
July 5, 2021 |
2021 |
WIN1C04066 |
GAA 2021 |
June 22, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Ilocos Norte Rd - K0434+460 - K0434 + 550;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 0.18 Lane Km;
Allocation= Php 100,000,000
To: Abra-Ilocos Norte Rd - K0450 + 800 - K0451 + 000;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 0.4 Lane Km
CW2: 3,878.73 Square meters;
Allocation= Php 100,000,000
|
July 5, 2021 |
2021 |
WIN1C04061 |
GAA 2021 |
June 22, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Patoc Flood Control, Sta. 0+100 - 0+600, Bucay, Abra;
Physical Target: CW1: 500 Lineal meters;
Allocation= Php 30,000,000
To: Construction of Patoc Flood Control, Sta. 0+100 - 0+600, Bucay, Abra;
Physical Target: CW1: 665 Lineal meters;
Allocation= Php 30,000,000
|
July 5, 2021 |
2021 |
WIN1C04096 |
GAA 2021 |
June 28, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Kalinga Rd - K0455 + 500 - K0456 + 600;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 2.134 Lane Km;
Allocation= Php 99,000,000
To: Abra-Kalinga Rd - K0455 + 100 - K0456 + 600; Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 2.934 Lane Km
CW2: 2,922.93 Square meters;
Allocation= Php 99,000,000
|
July 5, 2021 |
2021 |
WIN1C04095 |
GAA 2021 |
June 28, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Ilocos Norte Rd - K0432+200 - K0432 + 500;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 0.60 Lane Km;
Allocation= Php 99,000,000
To: Abra-Ilocos Norte Rd - K0432+200 - K0432 + 500;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 0.60 Lane Km
CW2: 3,751.56 Square meters;
Allocation= Php 99,000,000
|
July 5, 2021 |
2021 |
WIN1C04099 |
GAA 2021 |
June 28, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Cervantes Rd - K0446 + 000 - K0453 + 769;
Physical Target: CW1: 15.622 Lane Km;
Allocation= Php 50,000,000
To: Abra-Cervantes Rd - K0446 + 000 - K0450 + 114;
Physical Target: CW1: 8.36 Lane Km;
Allocation= Php 50,000,000
|
July 5, 2021 |
2021 |
WIN1C04112 |
GAA 2021 |
June 28, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Ilocos Norte Rd - K0435+050 - K0435 + 250;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 0.40 Lane Km;
Allocation= Php 100,000,000
To: Abra-Ilocos Norte Rd - K0435 + 200 - K0435 + 350;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 0.30 Lane Km
CW2: 3,891.69 Square meters;
Allocation= Php 100,000,000
|
July 5, 2021 |
2021 |
WIN1C04139 |
GAA 2021 |
June 28, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Rehabilitation/Improvement of Villaviciosa Road Phase 1, Villaviciosa, Abra;
Physical Target: CW1: 10 Lane Km;
Allocation= Php 50,000,000
To: Rehabilitation/Improvement of Villaviciosa Road Phase 1, Villaviciosa, Abra;
Physical Target: CW1: 6 Lane Km;
Allocation= Php 50,000,000
|
July 5, 2021 |
2021 |
WIN1C04142 |
GAA 2021 |
June 28, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Danglas Barrio Road, Danglas, Abra;
Physical Target: CW1: 8 Lane Km;
Allocation= Php 50,000,000
To: Construction of Danglas Barrio Road, Danglas, Abra;
Physical Target: CW1: 7.122 Lane Km;
Allocation= Php 50,000,000
|
July 5, 2021 |
2021 |
WIN1C04098 |
GAA 2021 |
June 28, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Kalinga Rd - K0450 + 750 - K0451 + 800;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 2 Lane Km;
Allocation= Php 99,000,000
To: Abra-Kalinga Rd - K0449 + 000 - K0451 + 800;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 5.438 Lane Km
CW2: 2,121.84 Square meters;
Allocation= Php 99,000,000
|
July 5, 2021 |
2021 |
WIN1C04135 |
GAA 2021 |
June 25, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Kalinga Rd - K0451 + 800 - K0453 + 000;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 2.226 Lane Km;
Allocation= Php 99,000,000
To: Abra-Kalinga Rd - K0467 + 000 - K0468 + 000;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 1.922 Lane Km
CW2: 3,204 Square meters;
Allocation= Php 99,000,000
|
July 5, 2021 |
2021 |
WIN1C04111 |
GAA 2021 |
June 25, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Ilocos Norte Rd - K0435 + 600 - K0436 + 000;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 0.492 Lane Km;
Allocation= Php 99,000,000
To: Abra-Ilocos Norte Rd - K0435 + 420 - K0436 + 000;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 0.852 Lane Km
CW2: 3,566.74 Square meters;
Allocation= Php 99,000,000
|
July 5, 2021 |
2021 |
WIN1C04125 |
GAA 2021 |
June 25, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Rehabilitation/Improvement of Lagangilang Access Road, Abra - Kalinga Road Junction - Pagpagatpat, Aguet-Pagpagatpat, Lagangilang, Abra;
Physical Target: CW1: 0.978 Lane Km;
Allocation= Php 20,000,000
To: Rehabilitation/Improvement of Lagangilang Access Road, Abra - Kalinga Road Junction - Pagpagatpat, Aguet-Pagpagatpat, Lagangilang, Abra;
Physical Target: CW1: 2.746 Lane Km;
Allocation= Php 20,000,000
|
July 5, 2021 |
2021 |
WIN1C04126 |
GAA 2021 |
June 25, 2021 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: Construction of Regio Regimental Magulon, Lamut to Sitio Maloy, Cawayan, Asipulo Road, Magulon Cawayan, Lamut Asipulo, Ifugao;
Physical Target: CW1: 0.507 Lane Km;
Allocation= Php 5,000,000
To: Construction of Sitio Regimental, Magulon, Lamut to Sitio Maloy, Cawayan, Asipulo Road, Magulon, Lamut and Cawayan, Asipulo, Ifugao ;
Physical Target: CW1: 2.00 Lane Km;
Allocation= Php 5,000,000
|
July 5, 2021 |
2021 |
WIN1C04126 |
GAA 2021 |
June 25, 2021 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: Construction of Regio Regimental Magulon, Lamut to Sitio Maloy, Cawayan, Asipulo Road, Magulon Cawayan, Lamut Asipulo, Ifugao;
Physical Target: CW1: 0.507 Lane Km;
Allocation= Php 5,000,000
To: Construction of Sitio Regimental, Magulon, Lamut to Sitio Maloy, Cawayan, Asipulo Road, Magulon, Lamut and Cawayan, Asipulo, Ifugao ;
Physical Target: CW1: 2.00 Lane Km;
Allocation= Php 5,000,000
|
July 5, 2021 |
2021 |
WIN1C04068 |
GAA 2021 |
June 11, 2021 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
From: Construction of Barangay Mapawoy to Barangay Bongan Road, Mapawoy, Mayoyao, Ifugao;
Type of Work: Construction of Gravel Road;
Physical Target: CW1: 0.72 Lane Km;
Allocation= Php 5,000,000
To: Construction of Barangay Mapawoy to Barangay Bongan Road, Mapawoy, Mayoyao, Ifugao;
Type of Work: Construction of Concrete Road;
Physical Target: CW1: 0.364 Lane Km;
Allocation= Php 5,000,000
|
July 5, 2021 |
2021 |
WIN1C04078 |
GAA 2021 |
June 23, 2021 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Construction of Katao Flood Control, Sta. 83 + 617 – Sta. 83 + 957 (R.S.), Paracelis, Mountain Province;
Physical Target: CW1: 245 Lineal meters;
Allocation= Php 20,000,000
To: Construction of Katao Flood Control, Sta. 82 + 580 – Sta. 82 + 720 (R.S.), Sta. 83 + 130 – Sta. 83 +192 (R.S.), Paracelis, Mountain Province;
Physical Target: CW1: 245 Lineal meters;
Allocation= Php 20,000,000
|
July 3, 2021 |
CY 2021 |
WIN1F06224 |
UACS NO. 310102100598000 |
May 5, 2021 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA/Original
UACS No. 310102100598000
Project ID.: P00505480LZ
Organizational Outcome 001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Zapote – Alabang – K0019+319 – K0019+689, K0019+691 – K0019+813
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 1.968 km
Unit Cost (P’000) = P4,336.45 / lane km
Allocation = P 8,526,000.00
EAO = P 174,000.00
Total = P 8,700,000.00
As Modified
Organizational Outcome 001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Zapote – Alabang – K0019+319 – K0019+493.03
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 0.696 km
Unit Cost (P’000) = P12,250 / lane km P24M/km.
Allocation = P 8,526,000.00
EAO = P 174,000.00
Total = P 8,700,000.00
WIN1F06224
|
July 3, 2021 |
CY 2021 |
WIN1F0632 |
UACS NO. 310102100574000 |
May 5, 2021 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA/Original
UACS No. 310102100574000
Project ID.: P00505479LZ
Organizational Outcome 001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Zapote – Alabang – K0016+000 – K0016+424
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 1.696 km
Unit Cost (P’000) = P44,251.736 / lane km
Allocation = P 75,050,945.00
EAO = P 2,722,055.00
Total = P 77,773,000.00
As Modified
Organizational Outcome 001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Zapote – Alabang – K0015+000 – K0016+232.71
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 4.931 km
Unit Cost (P’000) = P15,220.228 / lane km P30M/km.
Allocation = P 75,050,945.00
EAO = P 2,722,055.00
Total = P 77,773,000.00
WIN1F06238
|
July 3, 2021 |
CY 2021 |
WIN1F06237 |
UACS NO. 310101100412000 |
May 5, 2021 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA/Original
UACS No. 310101100412000
Project ID.: P00505481LZ
Organizational Outcome 001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Parañaque – Sucat Road – Chainage 0 – Chainage 158
Physical Target: CW1 = Asphalt Overlay 0.632 Lane Km
Unit Cost (P’000) = P6,684.78 / lane km
Allocation = P 4,224,780.00
EAO = P 86,220.00
Total = P 4,311,000.00
As Modified
Organizational Outcome 001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Parañaque – Sucat Road, Ch.0 – Ch. 95.17
Physical Target: CW1 = Asphalt Overlay 0.632 lane km
Unit Cost (P’000) = P6,684.78 / lane km P30M/km.
Allocation = P 4,224,780.00
EAO = P 86,220.00
Total = P 4,311,000.00
WIN1F06237
|
July 3, 2021 |
CY 2021 |
WIN1F06249 |
UACS NO. 300104219083000 |
May 5, 2021 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA/Original
UACS No. 300104219083000
Project ID.: P00557252LZ
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building Phase I, Barangay Pamplona 3, Las Piñas City
Physical Target: CW1 = Construction of Mult-Purpose Building 1 bldg
Unit Cost (P’000) = P 25,740.00 / bldg.
Allocation (P’000) = P25,740.00
EAO (P’000) = P 260.00
Total (P’000) = P 26,000.00
As Modified
Local Program
Local – Buildings and Other Structures – Multipurpose / Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building Phase I, Barangay Pamplona 3, Las Piñas City
Physical Target: CW1 = Construction of Multi-Purpose Building 5 bldg.
Unit Cost (P’000) = P 5,148.00 / bldg.
Allocation (P’000) = P25,740.00
EAO (P’000) = P 260.00
Total (P’000) = P 26,000.00
WIN1F06249
|
July 3, 2021 |
CY 2021 |
WIN1B01169 |
UACS NO. 31011110026900 |
May 6, 2021 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA/Original
UACS No. 310111100269000
Project ID.: P00505332LZ
Organizational Outcome 001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads-
Secondary Roads
PPTA Rd = K0024+(-416) – K0024+384, K0024+391 – K0024+840
Physical Target: CW1 = Construction of Drainage Structure along Road 1,249 Lineal Meters
Unit Cost (P’000) = P 13.60 / Lineal Meter
Allocation = P16,992,220.00
EAO = P 346,780.00
Total = P 17,339,000.00
As Modified
Organizational Outcome 001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads-
Secondary Roads
PPTA Rd = K0027+346 – K0027+093
Physical Target: CW1 = Construction of Drainage Structure along Road 253 Lineal Meters
Unit Cost (P’000) = P 67.16 / Lineal Meter
Allocation = P16,992,220.00
EAO = P 346,780.00
Total = P 17,339,000.00
WIN1B01169
|
July 3, 2021 |
CY 2021 |
WIN1B01171 |
UACS NO. 310110100204000 |
May 6, 2021 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA/Original
UACS No. 310110100204000
Project ID.: P00505331LZ
Organizational Outcome 001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads-
Primary Roads
Quirino Avenue – K0012+176 – K0013+044
Physical Target: CW1 = Construction of Drainage Structure along Road 1,722 Lineal Meters
Unit Cost (P’000) = P 45.16 / Lineal Meter
Allocation = P39,200,000.00
EAO = P 800,000.00
Total = P 40,000,000.00
As Modified
Organizational Outcome 001: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads-
Primary Roads
Quirino Avenue – K0012+176 – K0012+744
Physical Target: CW1 = Construction of Drainage Structure along Road 701 Lineal Meters
Unit Cost (P’000) = P 55.92 / Lineal Meter
Allocation = P39,200,000.00
EAO = P 800,000.00
Total = P 40,000,000.00
WIN1B01171
|
July 3, 2021 |
CY 2021 |
WIN1F06414 |
UACS NO. 310102100628000 |
May 6, 2021 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA/Original
UACS No. 310102100628000
Project ID.: P00515891LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Cordillera St. (S05361LZ) K0006+(-410) – K0006+528
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=1.876 lane km
Unit Cost (P’000) = P 6,268.66/ lane km
Allocation (P’000) = P 11,760.00
EAO (P’000) = P 240.00
Total (P’000) = P 12,000.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Cordillera St. (S05361LZ) K0006+(-155) – K0006+528
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=1.365 lane km
Unit Cost (P’000) = P 8,615.38/ lane km P 17.2 M/Km
Allocation (P’000) = P 11,760.00
EAO (P’000) = P 240.00
Total (P’000) = P 12,000.00
WIN1F06414
|
July 3, 2021 |
CY 2021 |
WIN1F06410 |
UACS NO. 310103100644000 |
May 6, 2021 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA/Original
UACS No. 310103100644000
Project ID.: P00505524LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Tomas Morato – K0009+(-090) – K0009+127, K0009+1073 – K0009+1172,
K0009+127-K0009+1073
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=4.952 lane km
Unit Cost (P’000) = P 4,336.18/ lane km
Allocation (P’000) = P 21,472.78
EAO (P’000) = P 438.22
Total (P’000) = P 21,911.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Tomas Morato – K0009+(-090) – K0009+653,
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=2.972 lane km
Unit Cost (P’000) = P 7,225.03/ lane km P 14.4 M/Km.
Allocation (P’000) = P 21,472.78
EAO (P’000) = P 438.22
Total (P’000) = P 21,911.00
WIN1F06410
|
July 3, 2021 |
CY 2021 |
WIN1F06417 |
UACS No. 320101106441000 |
May 7, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106441000
Project ID.: P00525827LZ
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of RCPC along Blumentritt Extension, Chainage 251.70 to Chainage 963.00, Manila City
Physical Target: CW1 – Construction of Flood Mitigation Structure 895.70 l.m.
CW2 – Construction of Concrete Road
Unit Cost (P’000) = P 31.75 / l.m.
= P 22.97/ l.m.
Allocation (P’000) = P 28,430.00
= P 20,570.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of RCPC along Blumentritt Extension, Chainage 251.70 to Chainage 948 and Chainage 435.20
to Chainage 634.60, Manila City
Physical Target: CW1 – Construction of Flood Mitigation Structure 895.70 l.m.
CW2 – Construction of Concrete Road P 44 M/Km
Unit Cost (P’000) = P 31.75 / l.m.
= P 22.97/ l.m.
Allocation (P’000) = P 28,430.00
= P 20,570.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
WIN1F06417
|
July 2, 2021 |
FY 2021 GAA |
WIN1F06316 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 300117209177000
Project ID : P00564730LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Construction of Road,
Barangay Kaligtasan, Bongabong, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.00 Lane Km
Allocation : Php 1.00 Million
TO :
Construction of Road,
Barangay Kaligtasan, Bongabong, Otiental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.1948 Lane Km
Allocation : Php 1.00 Million |
July 2, 2021 |
CY 2021 |
WIN1B01165 |
UACS NO. 300209100008000 |
May 2, 2021 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 300209100008000
Project ID.: P00531635LZ
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Railway Stations
Old Sauyo Road leading to Quirino Highway Station, Quezon City
Physical Target: CW1 = Construction of Drainage Structure 1200 l.m.
CW2 = Shoulder Paving / Construction 2400 l.m.
Unit Cost (P’000) = P 6.13 / l.m.
= P 2.03 / sq.m.
Allocation (P’000) = P 7,365.85
= P 4,860.71
EAO (P’000) = P 443.35
Total (P’000) = P 12,670.00
As Modified
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Railway Stations
Old Sauyo Road leading to Quirino Highway Station, Quezon City
Physical Target: CW1 = Shoulder Paving / Construction 2965 sq.m.
Unit Cost (P’000) = P 4.12 / l.m.
Allocation (P’000) = P 12,226.55
EAO (P’000) = P 443.35
Total (P’000) = P 12,670.00
WIN1B01165
|
July 2, 2021 |
FY 2021 GAA |
WIN1F06246 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 300104222161000
Project ID : P00560691LZ
LOCAL PROGRAM
Local - Building and Other Structures - Multipurpose/Facilities -
Local Infrastructure Program
FROM :
Construction of Multi-Purpose Building (Phase 2),
Barangay Nasukob, Bulalacao, Oriental Mindoro
Physical Target - CW1 - Construction of Multi-Purpose Building :
1 No. of Building
Allocation : Php 4.00 Million
TO :
Construction of Multi-Purpose Building,
Barangay Nasukob, Bulalacao, Oriental Mindoro
Physical Target - CW1 - Construction of Multi-Purpose Building :
1 No. of Building
Allocation : Php 4.00 Million
|
July 2, 2021 |
CY 2021 |
WIN1F06359 |
UACS NO. 300209100005000 |
May 2, 2021 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 300209100005000
Project ID.: P00531629LZ
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Railway Stations
Genaral Ave. leading to Tandang Sora Station, Quezon City
Physical Target: CW1 = Construction of Drainage Structure 1038 l.m.
CW2 = Shoulder Paving / Construction 2092 l.m.
Unit Cost (P’000) = P 6.07 / l.m.
= P 2.01 / sq.m.
Allocation (P’000) = P 6,299.52
= P 4,199.68
EAO (P’000) = P 380.80
Total (P’000) = P 10,880.00
As Modified
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Railway Stations
Genaral Ave. leading to Tandang Sora Station, Quezon City
Physical Target: CW1 = Construction of Drainage Structure 2478 sq.m.
Unit Cost (P’000) = P 4.24 / sq.m.
Allocation (P’000) = P 10,499.20
EAO (P’000) = P 380.80
Total (P’000) = P 10,880.00
WIN1F06359
|
July 2, 2021 |
CY 2021 |
WIN1F06191 |
UACS NO. 320101106448000 |
May 2, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106448000
Project ID.: P00525814LZ
002: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet File) along Estero dela Reina, Barangay 58, 56 & 51 Sta. 0+628.60
to Sta. 0+702.60 (LS); Sta. 0+757.10 to Sta. 0+841.50 (RS), Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 119.40 l.m.
Unit Cost (P’000) = P328.30 / l.m.
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00
As Modified
002: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet File) along Estero dela Reina, Barangay 58, 56 & 51 (LS) Sta. 0+723.90
to Sta. 0+783.60; (RS) Sta. 0+732.60 to Sta. 0+792.30, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 119.40 l.m.
Unit Cost (P’000) = P328.300 M/ LM
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00
WIN1F06191
|
July 2, 2021 |
CY 2021 |
WIN1F06191 |
UACS NO. 320101106448000 |
May 2, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106448000
Project ID.: P00525814LZ
002: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet File) along Estero dela Reina, Barangay 58, 56 & 51 Sta. 0+628.60
to Sta. 0+702.60 (LS); Sta. 0+757.10 to Sta. 0+841.50 (RS), Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 119.40 l.m.
Unit Cost (P’000) = P328.30 / l.m.
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00
As Modified
002: Protect Lives and Properties
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet File) along Estero dela Reina, Barangay 58, 56 & 51 (LS) Sta. 0+723.90
to Sta. 0+783.60; (RS) Sta. 0+732.60 to Sta. 0+792.30, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 119.40 l.m.
Unit Cost (P’000) = P328.300 M/ LM
Allocation (P’000) = P 39,200.00
EAO (P’000) = P 800.00
Total (P’000) = P 40,000.00
WIN1F06191
|
July 2, 2021 |
CY 2021 |
WIN1F06201 |
UACS NO. 310102100619000 |
May 2, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 310102100619000
Project ID.: P00505439LZ
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
R-10 – K0004+1192 – K0004+1214, K0004+471 – K0004+1192
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=2.972 km
Unit Cost (P’000) = P8,160.18 / lane km
Allocation (P’000) = P 24,252,060.00
EAO = P 494,940.00
Total (P’000) = P 24,747,000.00
As Modified
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
R-10 – K0005+(-591.80) – K0006+(-065.80)
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=2.972 km
Unit Cost (P’000) = P8,160.18 / lane km P16M/lm
Allocation (P’000) = P 24,252,060.00
EAO = P 494,940.00
Total (P’000) = P 24,747,000.00
WIN1F06201
|
July 2, 2021 |
CY 2021 |
WIN1F06207 |
UACS NO. 31010300630000 |
May 2, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 31010300630000
Project ID.: P00505500LZ
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Rodriguez St – Chainage 0 – Chainage 399
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=1.039 lane km
Unit Cost (P’000) = P4,336.35 / lane km
Allocation (P’000) = P 4,501.14
EAO = P 91.86
Total (P’000) = P 4,593.00
As Modified
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Rodriguez St – Chainage 0 – Chainage 184.70
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=1.039 lane km
Unit Cost (P’000) = P4,336.35 / lane km P8.6M/lm
Allocation (P’000) = P 4,501.14
EAO = P 91.86
Total (P’000) = P 4,593.00
WIN1F06207
|
July 2, 2021 |
CY 2021 |
WIN1F06211 |
UACS NO. 310103100632000 |
May 2, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 310103100632000
Project ID.: P00505501LZ
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Vitas St – Chainage 0 – Chainage 573
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=1.146 km
Unit Cost (P’000) = P4,336.45 / lane km
Allocation (P’000) = P 4,969.58
EAO = P 101.42
Total (P’000) = P 5,071.00
As Modified
001: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Vitas St – Chainage 0 – Chainage 289.40
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=1.146 km
Unit Cost (P’000) = P4,336.45 / lane km / P8.6/M
Allocation (P’000) = P 4,969.58
EAO = P 101.42
Total (P’000) = P 5,071.00
WIN1F06211
|
July 2, 2021 |
CY 2021 |
WIN1F06254 |
UACS NO. 310105100521000 |
May 2, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 310105100521000
Project ID.: P00505440LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Roads
R-10 – K0006 + 444 – K0006+516
Physical Target: CW1 = Rehabilitation of Paved Road L=0.216 lane km
Unit Cost (P’000) = P 18,801.48 / lane km
Allocation (P’000) = P 4,061.12
EAO (P’000) = P 82.88
Total (P’000) = P 4,144.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Roads
R-10 – K0006 + (-049.4) – K0006+010.6
Physical Target: CW1 = Rehabilitation of Paved Road L=0.216 lane km
Unit Cost (P’000) = P 18,801.48 / lane km P37.6 M/km
Allocation (P’000) = P 4,061.12
EAO (P’000) = P 82.88
Total (P’000) = P 4,144.
WIN1F06254
|
July 2, 2021 |
CY 2021 |
WIN1F06281 |
UACS NO. 320101106462000 |
May 2, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106462000
Project ID.: P00525828LZ
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of RCPC along Lardizabal Street, Chainage 000.00 to Chainage 2185.10, Manila City
Physical Target: CW1 – Construction of Flood Mitigation Structure 635.00 l.m.
Unit Cost (P’000) = P 77.16 / l.m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of RCPC along Lardizabal Street, Sta. 0+000.00 to Sta. 0+266.00 and
Sta. 0+000.00 to Sta. 0+369.00, Manila City
Physical Target: CW1 – Construction of Flood Mitigation Structure 635.00 l.m.
Unit Cost (P’000) = P 77.16 / l.m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
WIN1F06281
|
July 2, 2021 |
CY 2021 |
WIN1F06320 |
UACS NO. 320101106441000 |
May 2, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106441000
Project ID.: P00525807LZ
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Quiapo, Brgy. 393 (Phase I), Sta. 0+500.00
to Sta. 0+658.40
Physical Target: CW1 – Construction of Flood Mitigation Structure 117.20 l.m.
Unit Cost (P’000) = P 324.321 / l.m.
Allocation (P’000) = P 38,010.28
EAO (P’000) = P 775.72
Total (P’000) = P 38,786.00
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Quiapo, Brgy. 393 (Phase I), Sta. 0+500.00
to Sta. 0+617.20
Physical Target: CW1 – Construction of Flood Mitigation Structure 117.20 l.m.
Unit Cost (P’000) = P 324.321 / l.m. P342,320/lm
Allocation (P’000) = P 38,010.28
EAO (P’000) = P 775.72
Total (P’000) = P 38,786.00
WIN1F06320
|
July 2, 2021 |
CY 2021 |
WIN1F06252 |
UACS NO. 310103100642000 |
May 5, 2021 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA/Original
UACS No. 310103100642000
Project ID.: P00505525LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Hemady St – K0009+(-615) – K0009+(-479), K0009+(-682) – K0009+(-615),
K0009+(-979) – K0009+(-682)
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 1.364 lane km
Unit Cost (P’000) = P 4,336.71 / lane km
Allocation (P’000) = P 5,915.28
EAO (P’000) = P 120.72
Total (P’000) = P 6,036.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Hemady St – K0009+(-979) – K0009+(-698)
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 0.843 lane km
Unit Cost (P’000) = P 7,016.94 / lane km
Allocation (P’000) = P 5,915.28
EAO (P’000) = P 120.72
Total (P’000) = P 6,036.00
WIN1F06252
|
July 2, 2021 |
CY 2021 |
WIN1F06355 |
UACS NO. 310105100494000 |
May 5, 2021 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA/Original
UACS No. 310105100494000
Project ID.: P00505527LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
South Ave (Timog Ave) K0010+(-890) – K0010+(-570),
K0010+(-964) - K0010+(-890)
Physical Target: CW1 = Reconstruction to concrete Pavement 2.02 lane km
Unit Cost (P’000) = P 34,836.5 / lane km
Allocation (P’000) = P 70,369.73
EAO (P’000) = P 2,552.270
Total (P’000) = P 72,922.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
South Ave (Timog Ave) K0010+(-964) – K0010+(-890),
K0010+(-890) - K0010+144, K0009+(-213) – K0009+119
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=2.02 lane km
Unit Cost (P’000) = P 11,354.79 / lane km P22M/km
Allocation (P’000) = P 70,369.73
EAO (P’000) = P 2,552.270
Total (P’000) = P 72,922.00
WIN1F06355
|
July 2, 2021 |
CY 2021 |
WIN1F06334 |
UACS NO. 310106100553000 |
May 5, 2021 |
National Capital Region |
Malabon-Navotas District Engineering Office |
As per GAA/Original
UACS No. 310106100553000
Project ID.: P00505482LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Tertiary Roads
MH Del Pilar St (Malabon) –K0013+462 – K0013+496
Physical Target: CW1 = Rehabilitation of Paved Road: 0.068 lane km
Unit Cost = P 18,375.00 / lane km
Allocation (P’000) = P 1,249.50
EAO (P’000) = P 25.50
Total (P’000) = P 1,275.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Tertiary Roads
MH Del Pilar St (Malabon) –K0013+570 – K0013+601.50
Physical Target: CW1 = Rehabilitation of Paved Road: 0.063 lane km
Unit Cost = P 19,825.29714 / lane km P39.6M/km.
Allocation (P’000) = P 1,248.99
EAO (P’000) = P 25.50
Total (P’000) = P 1,275.00
WIN1F06334
|
July 2, 2021 |
2021 |
WIN1F06283 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 1st District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Roxas City-Cagay-Sibaguan-Balijuagan-Cudian-Ivisan Rd - K0108 + 203 - K0108 + 887
CW1- Road Widening: 1.368 lane km - 17,428.32
EAO - 355.68
Total: 17,784.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Roxas City-Cagay-Sibaguan-Balijuagan-Cudian-Ivisan Rd - K0108 + 203 - K0108 + 879
CW1- Road Widening: 1.352 lane km - 17,428.32
EAO - 355.68
Total: 17,784.00
|
July 2, 2021 |
2021 |
WIN1F06406 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 1st District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Capiz Rd - K0118 + 137 - K0118 + 288
CW1- Reconstruction to Concrete Pavement: 0.365 lane km - 7,491.12
EAO - 152.88
Total: 7,644.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Capiz Rd - K0118 + 137 - K0118 + 288
CW1- Reconstruction to Concrete Pavement: 0.302 lane km - 7,491.12
EAO - 152.88
Total: 7,644.00
|
July 2, 2021 |
2021 |
WIN1F06308 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 1st District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Capiz Rd - K0147 + 000 - K0147 + 300
CW1- Reconstruction to Concrete Pavement: 0.60 lane km - 12,313.70
EAO - 251.30
Total: 12,565.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Capiz Rd - K0147 + 000 - K0147 + 805.5
CW1- Reconstruction to Concrete Pavement: 1.611 lane km - 12,313.70
EAO - 251.30
Total: 12,565.00
|
July 2, 2021 |
2021 |
WIN1F06245 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 1st District Engineering Office |
FROM:
LOCAL PROGRAM
Local – Buildings and Other Structures - Multipurpose / Facilities - National Building Program
Rehabilitation of Multi-Purpose Hall (Evacuation Center) with Artesian Well, Barangay San Pedro, Pontevedra, Capiz, Roxas City
CW1- Rehabilitation /Major Repair of Multi Purpose Building: 1.00 Building - 2,450.00
EAO - 50.00
Total: 2,500.00
TO:
LOCAL PROGRAM
Local – Buildings and Other Structures - Multipurpose / Facilities - National Building Program
Rehabilitation of Multi-Purpose Hall (Evacuation Center) with Artesian Well, Barangay San Pedro, Pontevedra, Capiz
CW1- Rehabilitation /Major Repair of Multi Purpose Building: 1.00 Building - 2,450.00
EAO - 50.00
Total: 2,500.00
|
July 2, 2021 |
2021 |
WIN1F06385 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 1st District Engineering Office |
FROM:
LOCAL PROGRAM
Local – Buildings and Other Structures - Multipurpose / Facilities - National Building Program
Rehabilitation of Multi-Purpose Hall (Evacuation Center) with Artesian Well, Barangay Tacas, Pontevedra, Capiz, Roxas City
CW1- Rehabilitation /Major Repair of Multi Purpose Building: 1.00 Building - 2,450.00
EAO - 50.00
Total: 2,500.00
TO:
LOCAL PROGRAM
Local – Buildings and Other Structures - Multipurpose / Facilities - National Building Program
Rehabilitation of Multi-Purpose Hall (Evacuation Center) with Artesian Well, Barangay Tacas, Pontevedra, Capiz
CW1- Rehabilitation /Major Repair of Multi Purpose Building: 1.00 Building - 2,450.00
EAO - 50.00
Total: 2,500.00
|
July 1, 2021 |
2021 |
WIN1F06323 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Jaime Cardinal Sin Ave - K0284 + 041 - K0286 + 367
CW1- Road Widening: 4.544 lane km - 50,075.78
EAO - 1,816.22
Total: 51,892.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Jaime Cardinal Sin Ave - K0284 + 075 - K0286 + 653
CW1- Road Widening: 5.048 lane km - 48,075.78
ROW Acquisition: 400 sq.m - 2,000.00
EAO - 1,816.22
Total: 51,892.00
|
July 1, 2021 |
2021 |
WIN1F06292 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Aklan East Rd - K0282 + 150 - K0282 + 186, K0282 + 912 - K0283 + 356, K0283 + 706 - K0283 + 806, K0286 + 720 - K0286 + 801, K0286 + 989 - K0287 + 048, K0287 + 114 - K0287 + 142, K0287 + 170 - K0287 + 214, K0287 + 670 - K0287 + 826, K0288 + 130 - K0288 + 290, K0288 + 990 - K0289 + 066, K0289 + 220 - K0289 + 296, K0289 + 300 - K0289 + 536
CW1- Construction of Drainage Structure along Road: 1,569 lineal meters - 26,209.12
EAO - 534.88
Total: 26,744.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Aklan East Rd - K0276 + 720 - K0277 + 282, K0283 + 181 - K0283 + 310, K0283 + 720 - K0283 + 820, K0286 + 716 - K0286 + 798, K0286 + 920 - K0286 + 960, K0287 + 170 - K0287 + 216, K0287 + 670 - K0287 + 822, K0288 + 130 - K0288 + 241, K0288 + 1017 - K0289 + 150, K0289 + 220 - K0289 + 282, K0289 + 302 - K0289 + 536, K0289 + 680 - K0289 + 698
CW1- Construction of Drainage Structure along Road: 1,636 lineal meters - 22,409.12
ROW Acquisition: 380 sq.m - 3,800.00
EAO - 534.88
Total: 26,744.00
|
July 1, 2021 |
2021 |
WIN1F06340 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Aklan District Engineering Office |
FROM:
LOCAL PROGRAM
Local - Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure Program
Construction of Revetment Wall along River/Creek, Barangay Lapnag, Banga, Aklan
CW1 - Construction of Revetment: 16.00 lineal meters - 1,980.00
EAO - 20.00
Total: 2,000.00
TO:
LOCAL PROGRAM
Local - Flood Control and Drainage - Flood Control Structures / Facilities - Local Infrastructure Program
Construction of Revetment Wall along River/Creek, Barangay Lapnag, Banga, Aklan
CW1 - Construction of Revetment: 60.00 lineal meters - 1,980.00
EAO - 20.00
Total: 2,000.00
|
July 1, 2021 |
FY 2021 GAA |
WIN1E02371 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1551+932 - K1551+967,
K1557+807 - K1557+814, K1558+895 - K1558+934,
K1559+167 - K1559+350, K1561+884 - K1561+917,
K1562+022 - K1562+061, K1562+568 - K1562+618
Physical Target:
CW1: 1,227.50 sq. m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: 940 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 6,202,000.00
CW1: P 3,537,800.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: P2,540,160.00 (ROW Acquisition)
EAO: P 124,040.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1551+932 - K1551+967,
K1557+807 - K1557+814, K1558+895 - K1558+934,
K1559+167 - K1559+350, K1561+884 - K1561+917,
K1562+022 - K1562+061, K1562+568 - K1562+618
Physical Target:
CW1: 1,185.00 sq. m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: 940 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 6,202,000.00
CW1: P 3,537,800.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: P2,540,160.00 (ROW Acquisition)
EAO: P 124,040.00 |
July 1, 2021 |
2021 |
WIN1F06325 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Aklan District Engineering Office |
FROM:
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Barangay Road, Barangay Bulwang, Numancia, Aklan
CW1- Construction of Concrete Road: 0.179 lane km - 1,980.00
EAO - 20.00
Total: 2,000.00
TO:
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Barangay Road, Barangay Bulwang, Numancia, Aklan
CW1- Construction of Concrete Road: 0.604 lane km - 1,980.00
EAO - 20.00
Total: 2,000.00
|
July 1, 2021 |
FY 2021 GAA |
WIN1E02405 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Road - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) -
K1543+450 - K1543+545, K1554+393 - K1554+854
Physical Target:
CW1: 2.034 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 19,220,000.00
CW1: P 18,835,600.00 (Reconstruction to Concrete Pavement)
EAO: P 384,400.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Road - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) -
K1543+450 - K1543+545, K1554+393 - K1554+854
Physical Target:
CW1: 1.112 Lane Km (Reconstruction to Concrete Pavement)
CW2: 0.556 Lan Km (Road Safety: Street Lights)
Allocation:
TOTAL: P 19,220,000.00
CW1: P 12,927,035.00 (Reconstruction to Concrete Pavement)
CW2: P 5,905,565.00 (Road Safety: Street Lights)
EAO: P 384,400.00 |
July 1, 2021 |
2021 |
WIN1F06395 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Aklan District Engineering Office |
FROM:
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Barangay Road, Barangay Naile, Ibajay, Aklan
CW1- Construction of Concrete Road: 0.179 lane km - 1,980.00
EAO - 20.00
Total: 2,000.00
TO:
FROM:
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Barangay Road, Barangay Naile, Ibajay, Aklan
CW1- Construction of Concrete Road: 0.616 lane km - 1,980.00
EAO - 20.00
Total: 2,000.00 |
July 1, 2021 |
2021 |
WIN1F06329 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Regional Office VI |
FROM:
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction (Continuing)of Bridge Over Mayudmon River to Connect Barangay Oquendo And Barangay Guanko to Barangay Cortes, Balete, Aklan
CW1- Construction of Concrete Road: 0.00 lane km - 14,850.00
EAO - 150.00
Total: 15,000.00
TO:
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction (Continuing)of Bridge Over Mayudmon River to Connect Barangay Oquendo And Barangay Guanko to Barangay Cortes, Balete, Aklan
CW1- Construction of Concrete Bridge: 228.96 sq.m - 14,850.00
EAO - 150.00
Total: 15,000.00
|
July 1, 2021 |
2021 |
WIN1F06362 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Aklan District Engineering Office |
FROM:
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Road, Barangay Pudiot, Tangalan, Aklan
CW1- Construction of Concrete Road: 0.440 lane km - 1,980.00
EAO - 20.00
Total: 2,000.00
TO:
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Road, Barangay Pudiot, Tangalan, Aklan
CW1- Construction of Concrete Road: 0.560 lane km - 1,980.00
EAO - 20.00
Total: 2,000.00
|
July 1, 2021 |
FY 2021 GAA |
WIN1E02404 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry‐Davao Or Coastal Rd ‐ K1635+165 ‐ K1635+210
Physical Target:
CW1: 1,210.00 sq. nm. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 12,100,000.00
CW1: P 11,858,000.00 (Construction of Road Slope Protection Structure)
EAO: P 242,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry‐Davao Or Coastal Rd ‐ K1633+190 - K1633+300
Physical Target:
CW1: 990.00 sq. nm. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 12,100,000.00
CW1: P 11,858,000.00 (Construction of Road Slope Protection Structure)
EAO: P 242,000.00 |
July 1, 2021 |
FY 2021 GAA |
WIN1E02421 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1596+664 - K1598+000
Physical Target:
CW1: 2.672 Lane Km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Road Widening)
EAO: P 1,750,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1596+664 - K1597+915
Physical Target:
CW1: 2.500 Lane Km (Road Widening)
ROW: 18,750.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 42,255,420.00 (Road Widening)
ROW: P 5,994,580.00 (ROW Acquisition)
EAO: P 1,750,000.00 |
July 1, 2021 |
FY 2021 GAA |
WIN1F06115 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 31010200582000
Project ID : P00516137LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
FROM :
Calapan South Road,
K0001 + 850 - K0002 + 687,
K0022 + 438 - K0025 + 117,
K0039 + 048 - K0039 + 698,
K0048 + 480 - K0050 + 765
Physical Target - CW1 - Preventive Maintenance of Road -
Asphalt Overlay ; 13.124 Lane Km
Allocation : Php 106.813 million
TO :
Calapan South Road,
K0001 + 850 - K0002 + 698,
K0022 + 438 - K0024 + 778,
K0039 + 048 - K0040 + 583,
K0048 + 480 - K0050 + 750
Physical Target - CW1 - Preventive Maintenance of Road -
Asphalt Overlay : 13.884 Lane Km
Allocation : Php 106.813 Million
|
July 1, 2021 |
2021 |
310205100536000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Regional Office II |
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/ New Roads - Aritao - Quirino Road, Package 2, Quirino |
July 1, 2021 |
FY 2021 GAA |
WIN1E02415 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction of Esplanade along Davao River, Brgy. 1-A and 2-A section, Left Bank, Davao City (Sta. 1+840 - Sta. 2+169)
Physical Target:
CW1: 581.176 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Construction of Esplanade along Davao River, Brgy. 1-A and 2-A Section, Left Bank, Davao City (Sta. 2+173 - Sta. 2+478)
Physical Target:
CW1: 305.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00 |
July 1, 2021 |
2021 |
310101100426000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads - Cagayan Valley Rd - K0512+(-009) - K0513+033, K0513+282.5 - K0513+620, K0514+(-004.5) - K0514+290, K0515+811 - K0517+955.50, K0518+000 - K0518+588.50, K0524+041.5 - K0524+677 |
July 1, 2021 |
FY 2021 GAA |
WIN1F06307 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 310208100348000
Project ID : P00505147LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement -
Secondary Roads
FROM :
Calapan South Road,
K0109 + 000 - K0109 + 525
Physical Target - CW1 - Shoulder Paving/Construction :
2,625.00 sq.m.
Allocation : Php 7.350 Million
TO :
Calapan South Road,
K0109 + 053 - K0109 + 480
Physical Target - CW1 - Shoulder Paving/Construction -
2,604.70 sq. m.
Allocation : Php 7.350 Million
|
July 1, 2021 |
2021 |
300211100065000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 3rd District Engineering Office |
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Installation of Road Safety Devices along Cagayan Valley Road (K0480+300 - K0484+800) |
July 1, 2021 |
FY 2021 GAA |
WIN1F06318 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 310208100352000
Project ID : P00505151LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement -
Secondary Roads
FROM :
Mindoro Oriental/Occidental East Coastal Road,
K0199 + 000 - K0199 + 589
Physical Target - CW1 - Shoulder Paving/Construction -
2,356.00 sq. m.
Allocation : Php 6.479 Million
TO :
Mindoro Oriental/Occidental East Coastal Road,
K0199 + 000 - K0199 + 598
Physical Target - CW1 - Shoulder Paving/Construction :
2,813.00 sq. m.
Allocation : Php 6.479 Million |
July 1, 2021 |
FY 2021 GAA |
WIN1F06322 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 300116203388000
Project ID : P00561885LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Roads,
Gloria, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
12.00 Lane Km
Allocation : Php 72.00 Million
TO :
Concreting of Road,
Gloria, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
11.509 Lane Km
Allocation : Php 72.00 Million |
July 1, 2021 |
2021 |
300117208219000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 3rd District Engineering Office |
Local Program - Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Construction of Various Local Roads and Drainages in Tuguegarao City, Cagayan |
July 1, 2021 |
2021 |
WIN1C04026 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation - Preventive Maintenance - Primary Roads
Jose Abad Santos Ave (JASA) ,K0091+965.50 - K0093+000, K0095+000 - K0095+316 |
July 1, 2021 |
2021 |
300116203658000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 3rd District Engineering Office |
Local Program - Local - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects - Construction of Various Local Roads and Drainages in Tuguegarao City Phase III, Cagayan |
July 1, 2021 |
2021 |
310201100745000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 3rd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Cagayan Valley Rd - K0509+701 - K0510+892 |
July 1, 2021 |
2021 |
WIN1C04115 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads
San Antonio - Floridablanca Rd, K0082+281 - K0083+000, K0087+500 - K0088+222.40
|
July 1, 2021 |
FY 2021 GAA |
WIN1E02426 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Occidental District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) -
K1634+596 - K1637+039, K1646+092.50 - K1646+198,
K1646+223.10 - K1646+384, K1656+216 - K1656+503,
K1657+526 - K1657+846, K1657+906.53 - K1657+1029
Physical Target:
CW1: 7.443 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 52,931,000.00
CW1: P 51,078,415.00 (Reconstruction to Concrete Pavement)
EAO: P 1,852,585.00
TO: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) - K1634+596 - K1637+039
Physical Target:
CW1: 5.514 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 52,931,000.00
CW1: P 51,078,415.00 (Reconstruction to Concrete Pavement)
EAO: P 1,852,585.00 |
July 1, 2021 |
FY 2021 GAA |
WIN1F06229 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 1st District Engineering Office |
UACS No. : 300211100135000
Project ID : P00534708LZ
Convergence and Special Support Program
Special Road Fund - Motor Vehicle User's Charge (MVUC)
as per R.A. 11239
FROM :
Concrete Reblocking along PPNR-Langogan-Roxas Road Section
K0084 + 000 - K0132 + 000 (Intermittent)(S00030PW)
Physical Target - CW1 - Preventive Maintenance of Road :
Concrete Reblocking : 0 Lane Km
Allocation : Php 16.2075 Million
TO :
Concrete Reblocking along PPNR-Langogan-Roxas Road Section
K0082 + 000 - K0131 + 000 (Intermittent)(S00030PW)
Physical Target - CW1 - Preventive Maintenance of Road :
Concrete Reblocking : 0.882 Lane Km
Allocation : Php 16.2075 Million
|
July 1, 2021 |
2021 |
300117208220000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 3rd District Engineering Office |
Local Program - Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Construction of Various Local Roads and Drainages in Municipality of Solana, Cagayan |
July 1, 2021 |
FY 2021 GAA |
WIN1F06304 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 300116204223000
Project ID : P00562484LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road,
Bulalacao, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
7.00 Lane Km
Allocation : Php 42.00 Million
TO :
Concreting of Road,
Bulalacao, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
6.178 Lane Km
Allocation : Php 42.00 Million
|
July 1, 2021 |
FY 2021 GAA |
WIN1E02420 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Jct Manikling-Gov Generoso Rd - K1745+000 - K1745+800
Physical Target:
CW1: 1.600 Lane Km (Road Widening)
Allocation:
TOTAL: P 38,446,000.00
CW1: P 37,677,080.00 (Road Widening)
EAO: P 768,920.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Jct Manikling - Gov. Generoso Rd - K1745+200 - K1746+746
Physical Target:
CW1: 3.089 Lane Km (Road Widening)
Allocation:
TOTAL: P 38,446,000.00
CW1: P 37,677,080.00 (Road Widening)
EAO: P 768,920.00 |
July 1, 2021 |
FY 2021 GAA |
WIN1E02419 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1677+060 - K1679+000
Physical Target:
CW1: 3.880 Lane Km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Road Widening)
EAO: P 1,750,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1677+060 - K1678+336
Physical Target:
CW1: 2.560 Lane Km (Road Widening)
ROW: 19,200.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 42,257,350.00 (Road Widening)
ROW: P 5,992,650.00 (ROW Acquisition)
EAO: P 1,750,000.00 |
July 1, 2021 |
FY 2021 GAA |
WIN1E02422 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road (including Bridge), Butay, Barangay Pichon, Caraga, Davao Oriental
Physical Target:
CW1: 3.500 Lane Km (Construction of Concrete Road)
CW2: 238.50 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 130,000,000.00
CW1: P 101,325,000.00 (Construction of Concrete Road)
CW2: P 24,125,000.00 (Construction of Concrete Bridge)
EAO: P 4,550,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road (including Bridge), Butay, Barangay Pichon, Caraga, Davao Oriental
Physical Target:
CW1: 3.788 Lane Km (Construction of Gravel Road)
CW2: 429.30 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 130,000,000.00
CW1: P 65,903,000.00 (Construction of Gravel Road)
CW2: P 59,547,000.00 (Construction of Concrete Bridge)
EAO: P 4,550,000.00 |
July 1, 2021 |
FY 2021 GAA |
WIN1E02408 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road (including Bridge), from Sitio Sangab to Sitio Butay, Barangay Pichon, Caraga, Davao Oriental
Physical Target:
CW1: 3.160 Lane Km (Construction of Concrete Road)
CW2: 238.50 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 120,000,000.00
CW1: P 91,675,000.00 (Construction of Concrete Road)
CW2: P 24,125,000.00 (Construction of Concrete Bridge)
EAO: P 4,200,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road (including Bridge), from Sitio Sangab to Sitio Butay, Barangay Pichon, Caraga, Davao Oriental
Physical Target:
CW1: 5.564 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 120,000,000.00
CW1: P 115,800,000.00 (Construction of Gravel Road)
EAO: P 4,200,000.00 |
June 30, 2021 |
2021 |
310201100746000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 3rd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Cagayan Valley Rd - K0488+993 - K0489+218 |
June 30, 2021 |
2021 |
310201100742000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 3rd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Cagayan Valley Rd - K0465+175 - K0466+106 |
June 30, 2021 |
2021 |
300211100064000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 3rd District Engineering Office |
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Installation of Road Safety Devices along Cagayan - Apayao Road K0488+(-358) - K0513+000 (w/exception), K0519+(-1044) - K0530+603 (w/exception); Cagayan - Apayao Road (Tuao - Rizal Section) K0525+(-243) - K0529+195 (w/exception); Santiago - Tuguegarao Road K0434+(-754) - K0436+971 (w/exception), K0437+(-031) - K0448+298 (w/exception) |
June 30, 2021 |
2021 |
310202100772000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road - Network Development - Road Widening - Secondary Roads - Cagayan Valley Rd (Magapit - Jct Aparri Airport Sect) - K0580+000 - K0580+534.80 (BS), K580+534.80 - K0581+205.83 (RS), K0581+205.63 - K0581+512.74 (BS), K0581+512.74 - K0581+532 (RS) |
June 30, 2021 |
2021 |
300203101522000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 1st District Engineering Office |
Convergence and Special Support Program - Construction/ Improvement of Access Road leading to Declared Tourism Destinations - Access Road Leading to Bagsang Falls, Brgy. Santa Clara, Gonzaga, Cagayan |
June 30, 2021 |
2021 |
310202100773000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Cagayan 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Magapit - Mission Rd - K0565+348 - K0565+600 |
June 30, 2021 |
2021 |
310106100582000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Jct. Na'tl. Road - Bitnong - Belance - NV Bdry. Road, - K0269+579 - K0270+447.50 |
June 30, 2021 |
2021 |
310104100287000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Daang Maharlika (LZ) - K0220+516.74 - K0220+624, K0220+655.50 - K0222+062.90 |
June 30, 2021 |
2021 |
310201100643000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0229+994.50 - K0232+105.50 |
June 30, 2021 |
2021 |
310106100581000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Aritao - Quirino Rd - K0256+373.50 - K0257+029.80 |
June 30, 2021 |
FY 2021 GAA |
WIN1E02401 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, Jct. Davao - Bukidnon Road (Calinan Section) - Wangan - Subasta - Tagakpan - Tungkalan - Tagurano - Bayabas - Catigan - Baracatan - Sibulan - Tibolo - Kapatagan Road (Package 1), Davao del Sur
Physical Target:
CW1: 0.600 Lane Km (Construction of Concrete Road)
CW2: 1,192.50 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 180,000,000.00
CW1: P 28,950,000.00 (Construction of Concrete Road)
CW2: P 144,750,000.00 (Construction of Concrete Bridge)
EAO: P 6,300,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, Jct. Davao - Bukidnon Road (Calinan Section) - Wangan - Subasta - Tagakpan - Tungkalan - Tagurano - Bayabas - Catigan - Baracatan - Sibulan - Tibolo - Kapatagan Road (Package 1), Davao del Sur
Physical Target:
CW1: 4.711 Lane Km (Construction of Gravel Road)
CW2: 715.50 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 180,000,000.00
CW1: P 96,444,778.00 (Construction of Gravel Road)
CW2: P 77,255,222.00 (Construction of Concrete Bridge)
EAO: P 6,300,000.00 |
June 30, 2021 |
2021 |
310110100214000 |
GAA FY 2021 |
January 25, 2021 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads - Daang Maharlika (LZ) - K0216+845 - K0217+508 |
June 30, 2021 |
FY 2021 GAA |
WIN1E02393 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Concrete Road R Campetea, Dama de Noche, Ixora, Plumeria, Lantana, Aster, Mansanitas, Lansones, Kasoy at Barangay Poblacion, Maragusan, Davao de Oro
Physical Target:
CW1: 0.882 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 9,230,000.00
CW1: P 9,137,700.00 (Construction of Concrete Road)
EAO: P 92,300.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Concrete Road R Campetea, Dama de Noche, Ixora, Plumeria, Lantana, Aster, Mansanitas, Lansones, Kasoy at Barangay Poblacion, Maragusan, Davao de Oro
Physical Target:
CW1: 1.240 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 9,230,000.00
CW1: P 9,137,700.00 (Construction of Concrete Road)
EAO: P 92,300.00 |
June 30, 2021 |
FY 2021 GAA |
WIN1E02381 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1580+000 - K1581+434
Physical Target:
CW1: 2.748 Lane Km (Road Widening)
Allocation:
TOTAL: P 72,500,000.00
CW1: P 69,962,500.00 (Road Widening)
EAO: P 2,537,500.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Jct Digos-Cotabato Sect) - K1579+685 - K1581+380
Physical Target:
CW1: 3.280 Lane Km (Road Widening)
Allocation:
TOTAL: P 72,500,000.00
CW1: P 69,962,500.00 (Road Widening)
EAO: P 2,537,500.00 |
June 29, 2021 |
FY 2021 GAA |
WIN1E02386 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1502+150 - K1502+961
Physical Target:
CW1: 3.244 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 32,950,000.00
CW1: P 32,291,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 659,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1502+150 - K1502+961
Physical Target:
CW1: 1.842 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 32,950,000.00
CW1: P 32,291,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 659,000.00 |
June 29, 2021 |
2021 |
WIN1C04018 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Aurora District Engineering Office |
Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Malupa - Dian - Aguang River Control, Sta. 3+900 - Sta. 4+050, Sta. 6+200 - Sta. 6+326, Sta. 8+800 - Sta. 9+046.50, Sta. 9+138 - Sta. 9+185.50, Baler, Aurora |
June 29, 2021 |
2021 |
WIN1C03893 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation - Preventive Maintenance - Tertiary Roads
Calaguiman Vicinal Rd, K0129+000 - K0129+177.40 |
June 29, 2021 |
2021 |
WIN1C04024 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Jose Abad Santos Ave (JASA), K0108+070 - K0108+236, K0109+032 - K0109+455 |
June 29, 2021 |
2021 |
WIN1C03985 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
Bataan Technical Park, Inc. Rd (BTPI), K0177+000 - K0177+801.976 |
June 28, 2021 |
2021 |
WIN1C03966 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bulacan 1st District Engineering Office |
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure, Sta. 0+000 - Sta. 0+266 along Bagna, Malolos, Bulacan |
June 28, 2021 |
2021 |
WIN1C04020 |
SR2021-03-006974 |
March 13, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Ampusongan Flood Control, Bakun, Benguet;
Physical Target: CW1 : 1,185 Lineal meters;
Allocation= Php 100,000,000
To: Construction of Ampusongan Flood Control, Bakun, Benguet;
Physical Target: CW1 : 1142 Lineal meters;
Allocation= Php 100,000,000
|