July 10, 2021 |
2021 |
WIN1C04232 |
GAA 2021 |
June 28, 2021 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: Kiangan-Tinoc-Buguias Rd K0335+693 - K0335+713, K0337 + 085 - K0337+101, K0355+680 - K0355+703;
Physical Target: CW1: 484 Square meters;
Allocation= Php 9,000,000
To: Kiangan-Tinoc-Buguias Rd K0330+054 - K0330+074, K0337+085 - K0337+101, K0355+680 - K0355+703;
Physical Target: CW1: 726 Square meters;
Allocation= Php 9,000,000
|
July 10, 2021 |
2021 |
WIN1C04240 |
GAA 2021 |
June 28, 2021 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: Banaue-Hungduan-Benguet Bdry Rd - K0357 + 262 - K0357 + 309, K0358 + 485 - K0358 + 571, K0363 + 116 - K0363 + 141, K0364 + 578 - K0364 + 629, K0365 + 678 - K0365 + 861;
Physical Target: CW1: 2,525.69 Square meters;
Allocation= Php 40,000,000
To: Banaue-Hungduan-Benguet Bdry Rd – K0357+144 - K0357+191, K0357+262 - K0357+309, K0358+485 - K0358+571, K0363+116 - K0363+175, K0364+578 - K0364+629, K0365+486 - K0365+552, K0365+678 - K0365+861, K0366+877 - K0366+890, K0367+270 - K0367+383, K0368+158 - K0368+180, K0370+056 - K0370+156;
Physical Target: CW1: 4,524.95 Square meters;
Allocation= Php 40,000,000
|
July 10, 2021 |
2021 |
WIN1C04239 |
GAA 2021 |
June 29, 2021 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Gov. Bado Dangwa National Rd - K0338 + 500 - K0338 + 731;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 0.462 Lane Km;
Allocation= Php 4,648,000
To: Gov. Bado Dangwa National Rd - K0338 + 500 - K0338 + 600;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 0.2 Lane Km
CW2: 347 Square meters;
Allocation= Php 4,648,000
|
July 10, 2021 |
2021 |
WIN1C04221 |
GAA 2021 |
July 5, 2021 |
Cordillera Administrative Region |
Apayao 1st District Engineering Office |
From: Apayao-Ilocos Norte Rd - K0635 + 692 - K0636 + 000;
Physical Target: CW1: 0.616 Lane Km;
Allocation= Php 12,320,000
To: Apayao-Ilocos Norte Rd - K0635 + 406 - K0635 + 714;
Physical Target: CW1: 0.616 Lane Km;
Allocation= Php 12,320,000
|
July 10, 2021 |
2021 |
WIN1C04208 |
GAA 2021 |
July 7, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Asphalt Overlay along Marcos Highway (S00395LZ), K0270 + 000 - K0272 + 654, K0277 + 402 - K0279 + 149, Tuba Benguet;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 100,000,000
To: Asphalt Overlay along Marcos Highway (S00395LZ), K0270 + 500 - K0273 + 218, K0277 + 402 - K0279 + 149, Tuba Benguet ;
Physical Target: CW1 : 9.056 Lane Km;
Allocation= Php 100,000,000
|
July 9, 2021 |
FY 2021 GAA |
WIN1F06213 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 310202100818000
Project ID : P00505135LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Quezon - Punta Baja Road,
K0158 + 156 - K0160 + 060
Physical Target - CW1 - Road Widening : 4.00 Lane Km
Allocation : Php 25.00 Million
TO :
Quezon - Punta Baja Road
K0158 + 156 - K0159 + 181
Physical Target - CW1 - Road Widening : 2.05 Lane Km
Allocation : Php 25.00 Million |
July 9, 2021 |
FY 2021 GAA |
WIN1F06212 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 310105100552000
Project ID : P00505619LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads - Secondary Roads
FROM :
Quezon - Punta Baja Road,
K0146 + 550 - K0146 + 781
Physical Target - CW1 - Reconstruction of Concrete Pavement :
0.462 Lane Km
Allocation : Php 10.00 Million
TO :
Quezon - Punta Baja Road,
K0146 + 550 - K0147 + 070
Physical Target - CW1 - Reconstruction of Concrete Pavement :
1.130 Lane Km
Allocation : Php 10.00 Million |
July 9, 2021 |
FY 2021 GAA |
WIN1F06227 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 300203101639000
Project ID : P00531964LZ
Convergence and Special Support Program
Convergence and Special Support -
Construction/Improvement of Access Roads leading to
Declared Tourism Destinations
FROM :
Access Road leading to Calasaguen Shore,
Brgy. Calasaguen, Brooke's Point, Palawan
Physical Target - CW1 - Construction of Concrete Road :
0.600 Lane Km
Allocation : Php 7.50 Million
TO :
Access Road leading to Calasaguen Shore,
Brgy. Calasaguen, Brooke's Point, Palawan
Physical Target - CW1 - Construction of Concrete Road :
0.380 Lane Km
Allocation : Php 7.50 Million |
July 9, 2021 |
FY 2021 GAA |
WIN1F06202 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 300117209139000
Project ID : P00564692LZ
LOCAL PROGRAM
Local - National Roads and Bridges - Local Roads
Local Infrastructure Program
FROM :
Concreting of Barangay Road,
Barangay Malinao, Narra, Palawan
Physical Target - CW1 - Construction of Concrete Road :
0.000 Lane Km
Allocation : Php 10.00 Million
TO :
Concreting of Barangay Road,
Barangay Malinao, Narra, Palawan
Physical Target - CW1 - Construction of Concrete Road :
1.588 Lane Km
Allocation : Php 10.00 Million |
July 9, 2021 |
FY 2021 GAA |
WIN1F06206 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 300117209142000
Project ID : P00564695LZ
LOCAL PROGRAM
Local - National Roads and Bridges - Local Roads
Local infrastructure Program
FROM :
Construction of Local Road,
So. Balintang, Barangay Isugod, Quezon, Palawan
Physical Target - CW1 - Construction of Concrete Road :
0.170 Lane Km
Allocation : Php 2.00 Million
TO :
Construction of Local Road,
So. Balintang, Barangay Isugod, Quezon, Palawan
Physical Target - CW1 - Construction of Concrete Road :
0.240 Lane Km
Allocation : Php 2.00 Million |
July 9, 2021 |
FY 2021 GAA |
WIN1F06231 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 300117209144000
Project ID : P00564697LZ
LOCAL PROGRAM
Local - National Roads and Bridges - Local Roads
Local Infrastructure Program
FROM :
Construction of Local Road,
Barangay Aramaywan, Narra, Palawan
Physical Target - CW1 - Construction of Concrete Road :
0.170 Lane Km
Allocation : Php 2.00 Million
TO :
Construction of Local Road,
Barangay Arawaywan, Narra, Palawan
Physical Target - CW1 - Construction of Concrete Road :
0.320 Lane Km
Allocation : Php 2.00 Million |
July 9, 2021 |
FY 2021 GAA |
WIN1E02457 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Digos-Makar Rd - K1591 + 268 - K1591 + 358
Physical Target:
CW1: 5,250.00 Sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 105,000,000.00
CW1: P 101,325,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,675,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Digos-Makar Rd - K1591 + 260 - K1591 + 358
Physical Target:
CW1: 2,481.00 Sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 105,000,000.00
CW1: P 101,325,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,675,000.00 |
July 9, 2021 |
FY 2021 GAA |
WIN1E02503 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Davao City Div Rd -
K1509+115 - K1509+214, K1510+271 - K1510+350
Physical Target:
CW1: 8,751.733 Sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 131,276,000.00
CW1: P 126,681,340.00 (Construction of Road Slope Protection Structure)
EAO: P 4,594,660.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Davao City Div Rd - K1511+524 - K1511+633
Physical Target:
CW1: 3,238.00 Sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 131,276,000.00
CW1: P 126,681,340.00 (Construction of Road Slope Protection Structure)
EAO: P 4,594,660.00 |
July 9, 2021 |
FY 2021 GAA |
WIN1E02436 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
Jct. Davao - Cotabato Rd. (Matina Crossing Section) - Matina Aplaya Rd. - Jct. Tulip Drive (Davao -Cotabato Rd.) - Ecoland Drive - Jct. ABS-CBN Quimpo Blvd. Diversion Rd. (John Paul Section), Davao City
Physical Target:
CW1: 2.2752 Lane Km (Reconstruction to Concrete Pavement)
CW2: 1.48 Lane Km (Road Widening)
CW3: 1,588.183 Sq. m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: 13,105.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 28,081,500.00 (Reconstruction to Concrete Pavement)
CW2: P 31,169,500.00 (Road Widening)
CW3: P 13,124,000.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: P 72,375,000.00 (ROW Acquisition)
EAO: P 5,250,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
Jct. Davao - Cotabato Rd. (Matina Crossing Section) - Matina Aplaya Rd. - Jct. Tulip Drive (Davao -Cotabato Rd.) - Ecoland Drive - Jct. ABS-CBN Quimpo Blvd. Diversion Rd. (John Paul Section), Davao City
Physical Target:
CW1: 3.652 Lane Km (Reconstruction to Concrete Pavement)
CW2: 0.277 Lane Km (Road Widening)
CW3: 1,715.905 Sq. m. (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: 13,105.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 55,320,260.00 (Reconstruction to Concrete Pavement)
CW2: P 3,831,060.00 (Road Widening)
CW3: P 13,223,680.00 (Off-Carriageway Improvement: Shoulder Paving/Construction)
ROW: P 72,375,000.00 (ROW Acquisition)
EAO: P 5,250,000.00 |
July 9, 2021 |
FY 2021 GAA |
WIN1E02500 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1468+(-017) - K1468+491
Physical Target:
CW1: 2.032 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 22,508,000.00
CW1: P 10,855,236.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 450,160.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) -
K1468+(-017) - K1468+480, K1466+888 - K1467+504.748
Physical Target:
CW1: 3.233 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 22,508,000.00
CW1: P 10,855,236.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 450,160.00 |
July 9, 2021 |
FY 2021 GAA |
WIN1E02501 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1475+000 - K1475+356
Physical Target:
CW1: 2.848 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 28,314,000.00
CW1: P 27,747,720.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 566,280.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1478+035 - K1478+616
Physical Target:
CW1: 3.486 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 28,314,000.00
CW1: P 27,747,720.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 566,280.00 |
July 9, 2021 |
FY 2021 GAA |
WIN1E02469 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1477+619 - K1478+476
Physical Target:
CW1: 3.336 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 27,727,000.00
CW1: P 27,172,460.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 554,540.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1477+620 - K1478+035
Physical Target:
CW1: 2.352 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 27,727,000.00
CW1: P 27,172,460.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 554,540.00 |
July 9, 2021 |
FY 2021 GAA |
WIN1E02462 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads
Tagum-Panabo Circum Rd - K1503+597 - K1504+905
Physical Target:
CW1: 2.598 Lane Km (Road Widening)
Allocation:
TOTAL: P 43,144,000.00
CW1: P 42,281,120.00 (Road Widening)
EAO: P 862,880.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads Tagum-Panabo Circum Rd -
K1501+599 - K1502+001, K1502+597 - K1504+606
Physical Target:
CW1: 4.784 Lane Km (Road Widening)
Allocation:
TOTAL: P 43,144,000.00
CW1: P 42,281,120.00 (Road Widening)
EAO: P 862,880.00 |
July 9, 2021 |
FY 2021 GAA |
WIN1E02509 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads
Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1486+000 - K1488+000
Physical Target:
CW1: 4.00 Lane Km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Road Widening)
EAO: P 1,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads
Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1487+218.03 - K1488+092
Physical Target:
CW1: 1.748 Lane Km (Road Widening)
CW2: 1,747.94 lm (Construction of Drainage along Road)
ROW: 11,623.801 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 23,144,245.00 (Road Widening)
CW2: P 21,935,755.00 (Construction of Drainage along Road)
ROW: P 3,920,000.00 (ROW Acquisition)
EAO: P 1,000,000.00 |
July 9, 2021 |
FY 2021 GAA |
WIN1G02502 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Montevista-Compostela-Mati Bdry Rd - K1435+100 - K1435+237,
K1456+934 - K1457+146, K1459+000 - K1460+000,
K1473+000 - K1474+743, K1474+764 - K1475+485
Physical Target:
CW1: 1.015 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Montevista-Compostela-Mati Bdry Rd - K1435+100 - K1435+237,
K1456+934 - K1457+146, K1459+000 - K1460+000,
K1473+000 - K1474+743, K1474+764 - K1475+485
Physical Target:
CW1: 7.798 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00 |
July 9, 2021 |
FY 2021 GAA |
WIN1E02473 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Hijo River at Hijo Br.2 (Upstream) Brgy. Hijo, Maco, Davao de Oro (Sta. 2+220 - Sta. 3+000 LS)
Physical Target:
CW1: 373.450 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00
TO: OO2: Protect Lives and Properties - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Hijo River at Hijo Br.2 (Upstream) Brgy. Hijo, Maco, Davao de Oro (Sta. 1+980.413 - Sta. 2+353.863 LS)
Physical Target:
CW1: 373.450 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure)
EAO: P 1,000,000.00 |
July 9, 2021 |
FY 2021 GAA |
WIN1E02486 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of concrete road, Sta Emilia - New Bethlehem, Lubho, Laak Davao de Oro
Physical Target:
CW1: 1.748 Lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Concrete Road)
EAO: P 500,000.00
TO: Local Program - Local - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of concrete road, Sta Emilia - New Bethlehem, Lubho, Laak Davao de Oro
Physical Target:
CW1: 2.180 Lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Construction of Concrete Road)
EAO: P 500,000.00 |
July 9, 2021 |
FY 2021 GAA |
WIN1E02496 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Road, Barangay King-King, Pantukan, Davao de Oro
Physical Target:
CW1: 0.494 Lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Concrete Road)
EAO: P 50,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Road, Barangay King-King, Pantukan, Davao de Oro
Physical Target:
CW1: 0.626 Lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Concrete Road)
EAO: P 50,000.00 |
July 9, 2021 |
FY 2021 GAA |
WIN1E02460 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Convergence and Special Support - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Malabog-Paquibato Road leading to Megkawayan Peak Resort, Brgy. Malabog, Davao City
Physical Target:
CW1: 1.416 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 27,500,000.00
CW1: P 26,950,000.00 (Construction of Concrete Road)
EAO: P 550,000.00
TO: Convergence and Special Support Program - Convergence and Special Support - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
Malabog-Paquibato Road leading to Megkawayan Peak Resort, Brgy. Malabog, Davao City
Physical Target:
CW1: 2.00 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 27,500,000.00
CW1: P 26,950,000.00 (Construction of Concrete Road)
EAO: P 550,000.00 |
July 9, 2021 |
FY 2021 GAA |
WIN1E02485 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) -
K1584+(-155) - K1584+000, K1584+(-196) - K1584+(-155),
K1584+(-235) - K1584+(-196), K1589+739 - K1589+887,
K1594+000 - K1594+892, K1598+600 - K1598+853
Physical Target:
CW1: 5.803 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 51,625,000.00
CW1: P 49,818,125.00 (Reconstruction to Concrete Pavement)
EAO: P 1,806,875.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) -
K1584+(-155) - K1584+000, K1584+(-196) - K1584+(-155),
K1584+(-214) - K1584+(-196), K1589+739 - K1589+883,
K1594+000 - K1594+892, K1598+600 - K1598+853
Physical Target:
CW1: 3.006 Lane Km (Reconstruction to Concrete Pavement)
CW2: 1.503 Km (Road Safety: Street Lighting)
Allocation:
TOTAL: P 51,625,000.00
CW1: P 37,185,063.00 (Reconstruction to Concrete Pavement)
CW2: P 12,633,062.00 (Road Safety: Street Lighting)
EAO: P 1,806,875.00 |
July 8, 2021 |
2021 |
WIN1C04197 |
GAA 2021 |
June 30, 2021 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - (S04030LZ) Chainage 3185 - Chainage 4185;
Physical Target: CW1: 1 Lane Km;
Allocation= Php 20,000,000
To: Jct-Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - (S04030LZ) Chainage 4015 - Chainage 4685;
Physical Target: CW1: 1.34 Lane Km;
Allocation= Php 20,000,000
|
July 8, 2021 |
2021 |
WIN1C04166 |
GAA 2021 |
June 30, 2021 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Construction of Marat Flood Control, Sta. 119 + 420 – Sta. 119 + 520 (R.S.), Sta. 119 + 450 – Sta. 119 + 550 (L.S.), Sta. 119 + 630 – Sta. 119 + 748 (R.S.), Sta. 119 +748 – Sta. 119 + 848 (L.S.), Sta. 120 + 518 – Sta. 121 + 118 (R.S.), Paracelis, Mountain Province;
Physical Target: CW1: 702.52 Lineal meters;
Allocation= Php 87,327,000
To: Construction of Marat Flood Control, Sta. 119 + 470 - Sta. 119 + 520(R.S.), Sta. 119 + 623.5 - Sta. 119 + 666(R.S.), Sta. 119 + 672 - Sta. 119 + 880(R.S.), Sta. 119 + 470 - Sta. 119 +865(L.S.), Sta. 119 + 690 - Sta. 119 + 880(L.S.), Paracelis, Mountain Province;
Physical Target: CW1: 702.52 Lineal meters;
Allocation= Php 87,327,000
|
July 8, 2021 |
2021 |
WIN1C04188 |
GAA 2021 |
June 28, 2021 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Dantay-Sagada Rd - K0387 + 260 - K0387 + 303, K0391 + 1024 - K0392 + 000, K0391 + 630 - K0391 + 860, K0391 + 920 - K0391 + 955, K0392 + 000 - K0392 + 025;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 1.338 Lane Km;
Allocation= Php 21,560,000
To: Dantay-Sagada Rd - K0387 + 297 - K0387 + 303, K0391 + 1030 - K0392 + 000, K0391 + 630 - K0391 + 860, K0391 + 920 - K0391 + 955, K0392 + 000 - K0392 + 025;
Type of Work: CW1: Rehabiliation of Paved Road
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 0.626 Lane Km
CW2: 606.35 Square meters;
Allocation= Php 21,560,000
|
July 8, 2021 |
2021 |
WIN1C04172 |
GAA 2021 |
June 16, 2021 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0497 + 510 - K0498 + 344, K0499 + 915 - K0503 + 000;
Physical Target: CW1: 2,369.640 Square meters;
Allocation= Php 42,279,000
To: Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0497 + 510 - K0498 + 344, K0499 + 915 - K0503 + 000, K0505 + 000 - K0506 + 494, K0510 + 780 - K0511 + 939;
Physical Target: CW1: 3,950.64 Square meters;
Allocation= Php 42,279,000
|
July 8, 2021 |
2021 |
WIN1C04191 |
GAA 2021 |
June 16, 2021 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Construction of Flood Control in Anggacan Sur, Tanudan, Kalinga;
Physical Target: CW1: 55 Lineal meters;
Allocation= Php 1,000,000
To: Construction of Flood Control in Anggacan Sur, Tanudan, Kalinga;
Physical Target: CW1: 32 Lineal meters;
Allocation= Php 1,000,000
|
July 8, 2021 |
2021 |
WIN1C04199 |
GAA 2021 |
June 24, 2021 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Tabuk-Banawe via Tanudan-Barlig Rd - K0538 + 660 - K0538 + 740;
Type of Work: CW1: Construction of Road Slope Protection Structure;
Physical Target: CW1: 1,276.25 Square meters;
Allocation= Php 25,000,000
To: Tabuk-Banawe via Tanudan-Barlig Rd - K0510 + 095 - K0510 + 159, K0511 + 381 - K0511 + 402, K0511 + 605 - K0511 + 632, K0511 + 758 - K0511 + 772, K0523 + 000 - K0524 + 000, K0525 + 907 - K0525 + 960;
Type of Work: CW1: Construction of Road Slope Protection Structure
CW2: Preventive Maintenance of Road: Asphalt Overlay;
Physical Target: CW1: 1,399 Square meters
CW2: 2.056 Lane Km;
Allocation= Php 25,000,000
|
July 8, 2021 |
2021 |
WIN1C04201 |
GAA 2021 |
June 24, 2021 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Tabuk-Banawe via Tanudan-Barlig Rd - K0536 + 300 - K0536 + 385;
Type of Work: CW1: Construction of Road Slope Protection Structure;
Physical Target: CW1: 1,278.25 Square meters;
Allocation= Php 25,000,000
To: Tabuk-Banawe via Tanudan-Barlig Rd - K0516 + 723 – K0517 + 704, K0524 + 000 – K0524 + 050.5, K0537 +200 – K0537 + 260, K0543 +267.7 – K0543 + 297.7;
Type of Work: CW1: Construction of Road Slope Protection Structure
CW2: Preventive Maintenance of Road: Asphalt Overlay;
Physical Target: CW1: 1,440 Square meters
CW2: 2.041 Lane Km;
Allocation= Php 25,000,000
|
July 8, 2021 |
2021 |
WIN1F06448 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Guimaras District Engineering Office |
FROM:
LOCAL PROGRAM
Local – Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Napandong - So. Sambulawa -Tando Road, Sta. 0+520 - Sta. 0+960, Sta. 1+180 - Sta. 1+850, Sta. 2+100 - Sta. 2+300, Sta. 2+620 - Sta. 2+880, Sta. 2+990 - Sta. 3+020, Nueva Valencia, Guimaras
CW1- Construction of Concrete Road: 3.738 lane km - 31,046.40
EAO - 313.60
Total: 31,360.00
TO:
LOCAL PROGRAM
Local – Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Napandong - So. Sambulawa -Tando Road, Nueva Valencia, Guimaras, Sta. 0+000 - Sta. 0+009, Sta. 0+520 - Sta. 0+941, Sta. 1+171 - Sta. 2+281, Sta. 2+577 - Sta. 2+859, Sta. 2+962 - Sta. 3+007
CW1- Construction of Concrete Road: 3.738 lane km - 31,046.40
EAO - 313.60
Total: 31,360.00 |
July 8, 2021 |
2021 |
WIN1F06432 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Guimaras District Engineering Office |
FROM:
LOCAL PROGRAM
Local – Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Road (Pathway) in Dr. Catalino Gallego Nava Memorial High School, Barangay Constancia, San Lorenzo Guimaras
CW1- Construction of Concrete Road: 0.0893 lane km - 1,000.00
EAO - -
Total: 1,000.00
TO:
LOCAL PROGRAM
Local – Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Road (Pathway) in Dr. Catalino Gallego Nava Memorial High School, Barangay Constancia, San Lorenzo Guimaras
CW1- Construction of Concrete Road: 0.04 lane km - 1,000.00
EAO - -
Total: 1,000.00
|
July 8, 2021 |
2021 |
WIN1E02468 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. 310204101425000
Project ID: P00502170MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
FROM:
Butuan City-Agusan Del Norte Logistical Highway, Package 15, Butuan City
Type of Work/Physical Target:
CW1 - Construction of Gravel Road / 2.812 lane km.
Unit Cost: Php 37,748,933.14 / lane km.
Allocation: Php 106,150,000
EAO: Php 3,850,000
Total: Php 110,000,000
TO:
Butuan City-Agusan Del Norte Logistical Highway, Package 15, Butuan City
Type of Work/Physical Target:
CW1 - Construction of Gravel Road / 4.338 lane km.
CW2 - ROW- ROW Acquisition / 18,690.0 sq.m.
Unit Cost: CW1:Php 22,245,274.32 / lane km.
CW2:Php 516.32 / sq.m.
Estimated Cost: CW1: Php 96,500,000
CW2: Php 9,650,000
EAO: Php 3,850,000
Total: Php 110,000,000
|
July 8, 2021 |
2021 |
WIN1E02231 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. 300116203604000
Project ID: P00550741MN
Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Construction of Road, La Purisima to San Juan Road, Prosperidad, Agusan del Sur
Type of Work/Physical Target:
CW1 - Construction of Concrete Road / 11.684 lane km.
Unit Cost: Php 10,323,947.28 / lane km.
Allocation: Php 120,625,000.00
EAO: Php 4,375,000.00
Total: Php 125,000,000.00
TO:
Construction of Road, La Purisima to San Juan Road, Prosperidad and Bayugan City, Agusan del Sur
Type of Work/Physical Target:
CW1 - Construction of Gravel Road / 6.16 lane km.
Unit Cost: Php 19,581,980.52 / lane km.
Estimated Cost: Php 120,625,000.00
EAO: Php 4,375,000.00
Total: Php 125,000,000.00 |
July 8, 2021 |
2021 |
WIN1E02255 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. 300207100433000
Project ID: P00537274MN
Convergence and Special Support Program - Construction/ Improvement of Various Infrastructure in support of National Security
FROM:
Marihatag-Lianga Road, Marihatag, Surigao Del Sur
Type of Work/Physical Target:
CW1 - Construction of Concrete Road / 0.600 lane km.
CW2 - Construction of Gravel Road / 5.120 lane km.
Unit Cost: CW1 Php 16,720,541.67 / lane km.
CW2 Php 20,659,858.40 / lane km.
Allocation: CW1 Php 10,021,525.00
CW2 Php 105,778,475.00
EAO: Php 4,200,000.00
Total: Php 120,000,000.00
TO:
Marihatag-Lianga Road, Marihatag and Lianga, Surigao Del Sur
Type of Work/Physical Target:
CW1 - Construction of Concrete Road / 0.600 lane km.
CW2 - Construction of Gravel Road / 5.120 lane km.
Unit Cost: CW1 Php 16,351,098.28 / lane km.
CW2 Php 20,701,043.17 / lane km.
Estimated Cost: CW1 Php 9,810,658.97.00
CW2 Php 105,989,341.03
EAO: Php 4,200,000.00
Total: Php 120,000,000.00 |
July 8, 2021 |
2021 |
WIN1C04165 |
GAA 2021 |
June 30, 2021 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
From: Construction of Alimit-Magatawa Barangay Road, Alimit, Mayoyao, Ifugao;
Physical Target: CW1: 3.64 Lane Km;
Allocation= Php 25,000,000
To: Construction of Alimit-Magatawa Barangay Road, Alimit, Mayoyao, Ifugao;
Physical Target: CW1: 6.4 Lane Km;
Allocation= Php 25,000,000
|
July 8, 2021 |
2021 |
WIN1C04169 |
GAA 2021 |
June 30, 2021 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
From: Construction of Ayangan Barangay Road, Barangay Ayangan, Mayoyao, Ifugao;
Physical Target: CW1: 1.46 Lane Km;
Allocation= Php 10,000,000
To: Construction of Ayangan Barangay Road, Barangay Ayangan, Mayoyao, Ifugao;
Physical Target: CW1: 2.6 Lane Km;
Allocation= Php 10,000,000
|
July 8, 2021 |
2021 |
WIN1E02363 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. 320101106325000
Project ID: P00522126MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Flood Mitigation Structures along Agusan River (Tungao Section) Package 1, Butuan City, Agusan del Norte
Type of Work/Physical Target:
CW1 - Construction of Flood Mitigation Structure / 474.752 lm.
Unit Cost: Php 203,264.01 / lm.
Allocation: Php 96,500,000
EAO: Php 3,500,000
Total: Php 100,000,000
TO:
Construction of Flood Mitigation Structures along Agusan River (Tungao Section) Package 1, Butuan City, Agusan del Norte
Type of Work/Physical Target:
CW1 - Construction of Flood Mitigation Structure / 118 lm.
Unit Cost: Php 817,796.61 / lm.
Estimated Cost: Php 96,500,000
EAO: Php 3,500,000
Total: Php 100,000,000 |
July 8, 2021 |
2021 |
WIN1C04171 |
GAA 2021 |
June 30, 2021 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Construction of Taneg Flood Control Sta. 13+991 - Sta. 14+711 (R.S.), Mankayan, Benguet;
Physical Target: CW1: 615 Lineal meters;
Allocation= Php 30,000,000
To: Construction of Taneg Flood Control Sta. 13+995 - Sta. 14+319 (R.S.), Sta. 14+010 - Sta. 14+358 (L.S.), Mankayan, Benguet;
Physical Target: CW1: 615 Lineal meters;
Allocation= Php 30,000,000
|
July 8, 2021 |
2021 |
WIN1C04195 |
GAA 2021 |
June 21, 2021 |
Cordillera Administrative Region |
Baguio City District Engineering Office |
From: Gov Pack Rd - (S04724LZ) Chainage 027 - Chainage 270;
Physical Target: CW1: 3,303.54 Square meters;
Allocation= Php 45,000,000
To: Gov Pack Rd - (S00408LZ) Chainage 0 - Chainage 36, (S00521LZ) Chainage 0 - Chainage 100, (S04724LZ) Chainage 0 - Chainage 50, Chainage 176 - Chainage 276, (S00409LZ) Chainage 0 - Chainage 200;
Physical Target: CW1: 1,922.50 Square meters;
Allocation= Php 45,000,000
|
July 8, 2021 |
2021 |
WIN1C04164 |
GAA 2021 |
June 30, 2021 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
From: Construction/Improvement of Butao-Pulot Road, Calanasan, Apayao;
Type of Work: Construction of Concrete Road;
Physical Target: CW1: 1.12 Lane Km;
Allocation= Php 5,000,000
To: Construction/Improvement of Butao-Pulot Road, Calanasan, Apayao;
Type of Work: Construction of Gravel Road;
Physical Target: CW1: 1.12 Lane Km;
Allocation= Php 5,000,000
|
July 8, 2021 |
2021 |
WIN1E02441 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. 3102011001720000
Project ID: P00501597MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1355 + 276 - K1359 + 500
Type of Work/Physical Target:
CW1 - Road Widening / 5.448 lane km.
Unit Cost: Php 15,420,809.66 / lane km.
Allocation: Php 130,275,000
EAO: Php 4,725,000
Total: Php 135,000,000
TO:
Daang Maharlika (Agusan-Davao Sect) - K1355 + 276 - K1356 + 680
Type of Work/Physical Target:
CW1 - Road Widening / 2.808 lane km.
Unit Cost: Php 46,394,230.77 / lane km.
Estimated Cost: Php 130,275,000
EAO: Php 4,725,000
Total: Php 135,000,000
|
July 8, 2021 |
2021 |
WIN1C04170 |
GAA 2021 |
June 30, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Isit Flood Control Phase III, Sta. 0+200 - Sta. 0+700, Dolores, Abra;
Physical Target: CW1: 94.80 Lineal meters;
Allocation= Php 20,000,000
To: Construction of Isit Flood Control Phase III, Sta. 0+200 - Sta. 0+700, Dolores, Abra;
Physical Target: CW1: 270 Lineal meters;
Allocation= Php 20,000,000
|
July 8, 2021 |
2021 |
WIN1C04167 |
GAA 2021 |
June 11, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Rehabilitation/Construction of Sinalang - Peñarrubia Road Phase II, Peñarrubia, Abra;
Physical Target: CW1: 9.27 Lane Km;
Allocation= Php 50,000,000
To: Rehabilitation/Construction of Sinalang - Peñarrubia Road Phase II, Peñarrubia, Abra;
Physical Target: CW1: 8.2 Lane Km;
Allocation= Php 50,000,000
|
July 8, 2021 |
CY 2021 |
WIN1F06504 |
UACS NO. 310205100511000 |
May 20, 2021 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 310205100511000
Project ID.: P00506023LZ
OO1: Ensure Safe and Reliable National Road System
Network Development – Construction of Missing Links/ New Roads
Laguna Lake Highway Extension (Phase 1), Taguig City
Physical Target: CW1 = Construction Concrete Road 1080 Lane Km
Unit Cost (P’000) = P 10,722.22 / Lane Km.
Allocation (P’000) = P 115,800.00
EAO (P’000) = P 4,200.00
Total (P’000) = P 120,000.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Network Development – Construction of Missing Links/ New Roads
Laguna Lake Highway Extension (Phase 1), Taguig City
Physical Target: CW1 = Construction Concrete Road 2.06 Lane Km
CW2 = Construction of Concrete Bridge 124.20 sq.m.
RROW = 1,428.57 sq.m.
Unit Cost (P’000) = P 47,033.48 / Lane Km. P 94M/km
= P 71.75/ sq.m.
= P 7.00/ sq.m.
Allocation (P’000) = P 96,888.96
= P 8,911.04
= P10,000.00
EAO (P’000) = P 4,200.00
Total (P’000) = P 120,000.00
WIN1F06504
|
July 8, 2021 |
2021 |
WIN1E02378 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. 310201100721000
Project ID: P00501598MN
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1364 + 000 - K1367 + 000
Type of Work/Physical Target:
CW1 - Road Widening / 6.000 lane km.
Unit Cost: Php 16,887,500 / lane km.
Allocation: Php 101,325,000
EAO: Php 3,675,000
Total: Php 105,000,000
TO:
Daang Maharlika (Agusan-Davao Sect) - K1360 + 540 - K1361 + 000, K1364 + 000 - K1364 + 680
Type of Work/Physical Target:
CW1 - Road Widening / 2.280 lane km.
Unit Cost: Php 44,440,789.47 / lane km.
Estimated Cost: Php 101,325,000
EAO: Php 3,675,000
Total: Php 105,000,000
|
July 8, 2021 |
2021 |
WIN1C04187 |
GAA 2021 |
July 5, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Ilocos Norte Rd - K0430+180 - K0430 + 300;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 0.24 Lane Km;
Allocation= Php 100,000,000
To: Abra-Ilocos Norte Rd - K0450+000 - K0450 + 500;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 1 Lane Km
CW2: 3,782.34 Square meters;
Allocation= Php 100,000,000
|
July 8, 2021 |
CY 2021 |
WIN1F06429 |
UACS NO. 320101106449000 |
February 24, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106449000
Project ID.: P00525815LZ
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero dela Reina, Barangay 59, 52 Sta.0+944.90 to
Sta.0+982.30, Manila City
Physical Target: CW1 – Construction of Flood Mitigation Structure 92.50 l.m.
Unit Cost (P’000) = P 317.83 / l.m.
Allocation (P’000) = P 29,400.00
EAO (P’000) = P 600.00
Total (P’000) = P 30,000.00
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero dela Reina, Barangay 59, 52 (LS) Sta.0+903.00 to
Sta.0+949.00, (RS) Sta. 0+911.70 to Sta. 0+958.20, Manila City
Physical Target: CW1 – Construction of Flood Mitigation Structure 92.50 l.m.
Unit Cost (P’000) = P 317.83 / l.m.
Allocation (P’000) = P 29,400.00
EAO (P’000) = P 600.00
Total (P’000) = P 30,000.00
WIN1F06429
|
July 8, 2021 |
CY 2021 |
WIN1F06429 |
UACS NO. 320101106449000 |
February 24, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106449000
Project ID.: P00525815LZ
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero dela Reina, Barangay 59, 52 Sta.0+944.90 to
Sta.0+982.30, Manila City
Physical Target: CW1 – Construction of Flood Mitigation Structure 92.50 l.m.
Unit Cost (P’000) = P 317.83 / l.m.
Allocation (P’000) = P 29,400.00
EAO (P’000) = P 600.00
Total (P’000) = P 30,000.00
002: Protect Lives and Properties
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero dela Reina, Barangay 59, 52 (LS) Sta.0+903.00 to
Sta.0+949.00, (RS) Sta. 0+911.70 to Sta. 0+958.20, Manila City
Physical Target: CW1 – Construction of Flood Mitigation Structure 92.50 l.m.
Unit Cost (P’000) = P 317.83 / l.m.
Allocation (P’000) = P 29,400.00
EAO (P’000) = P 600.00
Total (P’000) = P 30,000.00
WIN1F06429
|
July 8, 2021 |
2021 |
WIN1E02376 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. 320102104204000
Project ID: P00522339MN
OO2: Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
FROM:
Rehabilitation of Flood Control Structure along Tago River(Package 2), San Miguel, Surigao del Sur
Type of Work/Physical Target:
CW1 - Rehabilitation / Major Repair of Flood Control Structure / 844.488 lm.
Unit Cost: Php 130,268.28 / lm.
Allocation: Php 110,010,000
EAO: Php 3,950,000
Total: Php 114,000,000
TO:
Rehabilitation of Flood Control Structure along Tago River(Package 2), San Miguel, Surigao del Sur
Type of Work/Physical Target:
CW1 - Major Repair of Flood Control Structure / 245 lm.
Unit Cost: Php 449,020.41 / lm.
Estimated Cost: Php 110,010,000
EAO: Php 3,950,000
Total: Php 114,000,000 |
July 8, 2021 |
2021 |
WIN1E02494 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. 300203101444000
Project ID: P00537633MN
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
FROM:
New Tubigon leading to Pinandagatan Falls,Sibagat, Agusan del Sur
Type of Work/Physical Target:
CW1 - Construction of Concrete Road / 5.0 lane km.
Unit Cost: Php 19,725,565.00 / lane km.
Allocation: Php 98,627,825
EAO: Php 3,577,175
Total: Php 102,205,000
TO:
New Tubigon leading to Pinandagatan Falls,Sibagat, Agusan del Sur
Type of Work/Physical Target:
CW1 - Construction of Concrete Road / 0.40 lane km.
CW2 - Construction of Gravel Road / 1.28 lane km.
Unit Cost: CW1 Php 16,432,724.75 / lane km.
CW2 Php 71,917,761.80 / lane km.
Estimated Cost: CW1 Php 6,573,089.90
CW2 Php 92,054,735.11
EAO: Php 3,577,175
Total: Php 102,205,000
|
July 7, 2021 |
CY 2021 |
WIN1F06468 |
UACS NO. 300209100009000 |
April 5, 2021 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 300209100009000
Project ID.: P00531637LZ
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Railway Stations
Road 20 leading to Tandang Sora Station, Quezon City
Physical Target: CW1 = Construction of Drainage Structure 1600 l.m.
CW2 = Shoulder Paving / Construction 3200 sq.m.
Unit Cost (P’000) = P 6.13 / l.m.
= P 2.03 / sq.m.
Allocation (P’000) = P 9,557.36
= P 6,307.24
EAO (P’000) = P 575.40
Total (P’000) = P 16,440.00
As Modified
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Railway Stations
Road 20 leading to Tandang Sora Station, Quezon City
Physical Target: CW1 = Shoulder Paving/Construction 2484 sq.m.
Unit Cost (P’000) = P 5.61 / sq.m.
Allocation (P’000) = P 13,946.84
EAO (P’000) = P 488.14
Total (P’000) = P 14,434.98
Excess (P’000) = P 2,005.02
WIN1F06468
|
July 7, 2021 |
2021 |
WIN1F06454 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
AS PER GAA/ORIGINAL:
Tacloban-Baybay South Rd -K0911+000 – K0911+185
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 4.900 M
along Road: 370 Lineal Meters
EAO P 0.100 M
Total P 5.00 M
AS MODIFIED:
Tacloban-Baybay South Rd K0911+000 – K0911+185
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 4.900 M
along Road: 185 Lineal Meters
EAO P 0.100 M
Total P 5.00 M
|
July 7, 2021 |
2021 |
WIN1F06452 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Burgos St – (S00031LT) Chainage 000 – Chainage 845
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 22.540 M
along Road: 1,690 Lineal Meters
EAO P 0.460 M
Total P 23.00 M
AS MODIFIED:
Burgos St – (S00031LT) Chainage 000 – Chainage 688
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 22.540 M
along Road: 688 Lineal Meters
EAO P 0.460 M
Total P 23.00 M
|
July 7, 2021 |
2021 |
WIN1F06342 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
AS PER GAA/ORIGINAL:
Sn Policarpo-Arteche-Lapinig Rd - K0851 + 050 - K0851 + 200, K0851 + 350 - K0851 + 841
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement: P 28.572880 M
1.282 Lane Km
EAO P 0.583120 M
Total P 29.156 M
AS MODIFIED:
Sn Policarpo-Arteche-Lapinig Rd - K0851 + 050 - K0851 + 200, K0851 + 350 - K0852 + 176
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement: P 28.572880 M
1.960 Lane Km
EAO P 0.583120 M
Total P 29.156 M
|
July 7, 2021 |
2021 |
WIN1F06451 |
GAA FY 2021 |
February 2, 2021 |
Region VIII |
Leyte 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
Kiling-Tanauan-Tabontabon-Julita Rd - K0934 + 906 - K0935 + 000, K0936 + 000 - K0937 + 000
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 10.29392 M
Concrete Reblocking: 2.188 Lane Km
EAO P 0.21008 M
Total P 10.504 M
AS MODIFIED:
Kiling-Tanauan-Tabontabon-Julita Rd - K0932 + (-638) - K0932 + 688, K0934 + 609 - K0935 + 000, K0936 + 000 - K0937 + 000
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 10.29392 M
Concrete Reblocking: 1.0935 Lane Km
EAO P 0.21008 M
Total P 10.504 M
|
July 7, 2021 |
2021 |
WIN1F06474 |
GAA FY 2021 |
February 2, 2021 |
Region VIII |
Leyte 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
La Paz-Javier-Bito Rd - K0066 + 000 - K0065 + 000
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 9.80 M
Concrete Reblocking: 2.122 Lane Km
EAO P 0.20 M
Total P 10.00 M
AS MODIFIED:
La Paz-Javier-Bito Rd - K0066 + 000 - K0065 + 000, K0952 + 000 - K0953 + 142
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 9.80 M
Concrete Reblocking: 1.0215 Lane Km
EAO P 0.20 M
Total P 10.00 M
|
July 7, 2021 |
2021 |
WIN1F06439 |
GAA FY 2021 |
February 2, 2021 |
Region VIII |
Leyte 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
Mayorga-La Paz Rd - K0946 + 550 - K0947 + 215
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 6.05738 M
Concrete Reblocking: 1.246 Lane Km
EAO P 0.12362 M
Total P 6.181 M
AS MODIFIED:
Mayorga-La Paz Rd - K0946 + (-026) - K0947 + 221.60
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 6.05738 M
Concrete Reblocking: 1.278 Lane Km
EAO P 0.12362 M
Total P 6.181 M
|
July 7, 2021 |
2021 |
WIN1F06354 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
AS PER GAA/ORIGINAL:
Sn Policarpo-Arteche-Lapinig Rd - K0866 + 000 - K0866 + 959
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 10.77216 M
Asphalt Overlay: 1.918 Lane Km
EAO P 0.21984 M
Total P 10.992 M
AS MODIFIED:
Sn Policarpo-Arteche-Lapinig Rd - K0866 + 000 - K0866 + 839
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 10.77216 M
Asphalt Overlay: 1.678 Lane Km
EAO P 0.21984 M
Total P 10.992 M
|
July 7, 2021 |
2021 |
WIN1C04137 |
FY 2021 GAA |
December 1, 2020 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Manila North Road - K0065+357 - K0065+562 |
July 7, 2021 |
2021 |
WIN1C04116 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads
Baliwag - Candaba - Sta. Ana Rd, K0075+220 - K0075+650 (Sta. Ana Section) |
July 7, 2021 |
2021 |
WIN1F06450 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
AS PER GAA/ORIGINAL:
Rizal Avenida Ext Rd – K0905+(-440) – K0905+(-182), K0905+(-836) - K0905+(-440)
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 14.700 M
Asphalt Overlay: 2.616 Lane Km
EAO P 0.300 M
Total P 15.00 M
AS MODIFIED:
Rizal Avenida Ext Rd – (S00016LT) - K0905+(-836) - K0905+(-248)
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 14.700 M
Asphalt Overlay: 2.352 Lane Km
EAO P 0.300 M
Total P 15.00 M
|
July 7, 2021 |
2021 |
WIN1C04114 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation - Preventive Maintenance - Primary Roads
Manila North Road , K0063+355 - K0063+800 |
July 7, 2021 |
2021 |
WIN1F06392 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
Burgos St – (S00008LT) Chainage 0 – Chainage 450
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 9.832340 M
Asphalt Overlay: 1.744 Lane Km
EAO P 0.200660 M
Total P 10.033 M
AS MODIFIED:
Burgos St – (S00008LT) Chainage 0 – Chainage 450
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 9.832340 M
Asphalt Overlay: 1.438 Lane Km
EAO P 0.200660 M
Total P 10.033 M
|
July 7, 2021 |
2021 |
WIN1F06391 |
GAA FY 2021 |
January 2, 2021 |
Region VIII |
Eastern Samar District Engineering Office |
OO2: Protect Lives and Properties
Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Balangiga Flood Control along Balangiga River, Balangiga, Eastern Samar
Physical Target: Allocation:
CW1-Construction of Flood Mitigation Structure: P 49.00 M
472.789 Lineal Meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Construction of Balangiga Flood Control along Balangiga River, Balangiga, Eastern Samar
Physical Target: Allocation:
CW1-Construction of Flood Mitigation Structure: P 49.00 M
127.00 Lineal Meters
EAO P 1.00 M
Total P 50.00 M
|
July 7, 2021 |
2021 |
WIN1F06462 |
SR2021-02-000134 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Ibajay Bypass Road, Aklan
CW1- Construction of Concrete Road: 2.600 lane km - 38,600.00
ROW Acquisition: 22,000 sq.m - 28,950.00
EAO - 2,450.00
Total: 70,000.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Ibajay Bypass Road, Aklan
CCW1- Construction of Concrete Road: 1.733 lane km - 39,200.00
ROW Acquisition: 22,000 sq.m - 28,350.00
EAO - 2,450.00
Total: 70,000.00
|
July 7, 2021 |
2021 |
WIN1F06326 |
GAA FY 2021 |
February 2, 2021 |
Region VIII |
Leyte 2nd District Engineering Office |
OO2: Protect Lives and Properties
Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Binahaan Flood Control Structure and Drainage system, Binahaan River Basin, K002+847 - K003+622 (Left Side River Bank), Pastrana, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 49.00 M
Structure: 663.25 Lineal Meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Construction of Binahaan Flood Control Structure and Drainage system, Binahaan River Basin, K000+850 - K001+513.25 (Right Side River Bank), Pastrana, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 49.00 M
Structure: 663.25 Lineal Meters
EAO P 1.00 M
Total P 50.00 M
|
July 7, 2021 |
2021 |
WIN1F06475 |
SR2021-02-000156 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Tangalan Bypass Road, Aklan
CW1- Construction of Concrete Road: 3.00 lane km - 43,425.00
ROW Acquisition: 5,000 sq.m - 24,125.00
EAO - 2,450.00
Total: 70,000.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Tangalan Bypass Road, Aklan
CW1- Construction of Concrete Road: 1.64 lane km - 44,100.00
ROW Acquisition: 5,000 sq.m - 23,450.00
EAO - 2,450.00
Total: 70,000.00
|
July 7, 2021 |
2021 |
WIN1F06475 |
SR2021-02-000156 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Tangalan Bypass Road, Aklan
CW1- Construction of Concrete Road: 3.00 lane km - 43,425.00
ROW Acquisition: 5,000 sq.m - 24,125.00
EAO - 2,450.00
Total: 70,000.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Tangalan Bypass Road, Aklan
CW1- Construction of Concrete Road: 1.64 lane km - 44,100.00
ROW Acquisition: 5,000 sq.m - 23,450.00
EAO - 2,450.00
Total: 70,000.00
|
July 7, 2021 |
FY 2021 GAA |
WIN1F06315 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 1st District Engineering Office |
UACS No. : 300117209138000
Project ID : P00564691LZ
LOCAL PROGRAM
Local roads and Bridges - Local Roads
Local Infrastructure Program
FROM :
Construction of Road from
Sitio Tibonbon to San Teodoro, Brgyu. Poblacion 5,
Coron, Palawan
Physical Target - CW1 - Construction of Concrete Road :
0.506 Lane Km
Allocation : Php 3.00 Million
TO :
Construction of Road in Brgy. Poblacion 5,
Coron, Palawan
Physical Target - CW1 - Construction of Concrete Road :
0.506 Lane Km
Allocation : Php 3.00 Million |
July 7, 2021 |
FY 2021 GAA |
WIN1F06218 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 310202100817000
Project ID : P00505134LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
PPSR Lct ( Abo-abo ) - Quezon Road,
K0129 + (-572) - K0129 + 975
Physical Target - CW1 - Road Widening : 3.094 Lane Km
Allocation : Php 32.394 Million
TO :
PPSr Jct ( Abo - abo) - Quezon Road,
K0129 + (-572) - K0129 + 544
Physical Target - CW1 - Road Widening : 2.232 Lane Km
Allocation : Php 32.394 Million |
July 7, 2021 |
2021 |
WIN1F06466 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
Local Program
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
AS PER GAA/ORIGINAL:
Concreting of Roads (Barangay Hampipila, Barangay Burubud-an, Barangay Mag-atubang), Abuyog, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road: P 1.485 M
0.130 Lane Km
EAO P 0.015 M
Total P 1.500 M
AS MODIFIED:
Concreting of Roads (Barangay Hampipila, Barangay Burubud-an, Barangay Mag-atubang), Abuyog, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road: P 1.485 M
0.694 Lane Km
EAO P 0.015 M
Total P 1.500 M
|
July 7, 2021 |
2021 |
WIN1F06471 |
SR2021-02-000141 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 650.77 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
TO:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 700.40 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
|
July 7, 2021 |
2021 |
WIN1F06471 |
SR2021-02-000141 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 650.77 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
TO:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 700.40 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
|
July 7, 2021 |
2021 |
WIN1F06471 |
SR2021-02-000141 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 650.77 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
TO:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 700.40 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
|
July 7, 2021 |
2021 |
WIN1F06471 |
SR2021-02-000141 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 650.77 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
TO:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 700.40 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
|
July 7, 2021 |
2021 |
WIN1F06471 |
SR2021-02-000141 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 650.77 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
TO:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 700.40 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
|
July 7, 2021 |
2021 |
WIN1F06471 |
SR2021-02-000141 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 650.77 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
TO:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 700.40 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
|
July 7, 2021 |
2021 |
WIN1F06465 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
Local Program
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
AS PER GAA/ORIGINAL:
Rehabilitation of Barangay Road, Barangay Hinabay, Inopacan, Leyte
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 1.00 M
0.00 Lane Km
Total P 1.00 M
AS MODIFIED:
Rehabilitation of Barangay Road, Barangay Hinabay, Inopacan, Leyte
Physical Target: Allocation:
CW1-Rehabilitation of Paved Road: P 1.00 M
0.306 Lane Km
Total P 1.00 M
|
July 7, 2021 |
2021 |
WIN1F06471 |
SR2021-02-000141 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 650.77 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
TO:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 700.40 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
|
July 7, 2021 |
2021 |
WIN1F06471 |
SR2021-02-000141 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 650.77 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
TO:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 700.40 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
|
July 7, 2021 |
2021 |
WIN1F06471 |
SR2021-02-000141 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 650.77 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
TO:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 700.40 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
|
July 7, 2021 |
2021 |
WIN1C04183 |
GAA 2021 |
June 30, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction/Improvement of Dada - Beyeng - Kayapa Road, Dada, Beyeng and Kayapa, Bakun, Benguet;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 100,000,000
To: Construction/Improvement of Dada - Beyeng - Kayapa Road, Dada, Beyeng and Kayapa, Bakun, Benguet;
Physical Target: CW1 : 5 Lane Km;
Allocation= Php 100,000,000
|
July 7, 2021 |
2021 |
WIN1F06471 |
SR2021-02-000141 |
February 4, 2021 |
Region VI |
Aklan District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 650.77 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
TO:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure (Revetment Wall) along Aklan River, Barangay Poblacion, Malinao, Aklan
CW1- Construction of Flood Mitigation Structure: 700.40 lineal meters - 96,500.00
EAO - 3,500.00
Total: 100,000.00
|
July 7, 2021 |
2021 |
WIN1F06425 |
GAA FY 2021 |
February 2, 2021 |
Region VIII |
Leyte 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K0935 + (-414) - K0936 + 086
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 29.40 M
Structure: 6,706.408 Square Meters
EAO P 0.60 M
Total P 30.00 M
AS MODIFIED:
Daang Maharlika (LT) - K0935 + (-604) - K0935 + (-508)
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 29.40 M
Structure: 2,188.00 Square Meters
EAO P 0.60 M
Total P 30.00 M
|
July 7, 2021 |
CY 2021 |
WINF106427 |
UACS NO. 300104219173000 |
April 26, 2021 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
Local – Buildings And As per GAA/Original
UACS No. 300104219173000
Project ID.: P00557343LZ
Local Program
Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building (Covered Court) Phase 2, Barangay Parada, Valenzuela City
Physical Target: CW1 = Construction of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost = P 4,950.0 / No. of Bldg.
Allocation (P’000) = P 4,950.00
EAO (P’000) = P 50.00
Total (P’000) = P 5,000.00
As Modified
Local Program
Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of Multi-Purpose Building (Covered Court) Phase 3, Barangay Parada, Valenzuela City
Physical Target: CW1 = Construction of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost = P 4,950.0 / No. of Bldg.
Allocation (P’000) = P 4,950.00
EAO (P’000) = P 50.00
Total (P’000) = P 5,000.00
WIN1F06427
|
July 7, 2021 |
2021 |
WIN1C04160 |
GAA 2021 |
June 30, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Mt Prov-Cagayan via Tabuk-Enrile Rd - K0417 + 400 - K0417 + 750;
Physical Target: CW1 : 3,835 Square meters;
Allocation= Php 100,000,000
To: Mt Prov-Cagayan via Tabuk-Enrile Rd - K0404 + 955 - K0405 + 060;
Physical Target: CW1 : 4,135.50 Square meters;
Allocation= Php 100,000,000
|
July 7, 2021 |
CY 2021 |
WIN1F06420 |
UACS NO. 310103100643000 |
March 4, 2021 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA/Original
UACS No. 310103100643000
Project ID.: P00505520LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Kamias Road Rd – K0010+153 – K0010+730
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=2.308 lane km
Unit Cost (P’000) = P 4,336.54/ lane km
Allocation (P’000) = P 10,008.74
EAO (P’000) = P 204.26
Total (P’000) = P 10,213.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Kamias Road Rd – K0010+153 – K0010+506
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay L=1.412 lane km
Unit Cost (P’000) = P 7,088.34/ lane km P14M/km
Allocation (P’000) = P 10,008.74
EAO (P’000) = P 204.26
Total (P’000) = P 10,213.00
WIN1F06420
|
July 7, 2021 |
2021 |
WIN1F06421 |
GAA FY 2021 |
February 2, 2021 |
Region VIII |
Leyte 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL:
Palo-Carigara-Ormoc Rd - K0972 + 760 - K0973 + 280
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 33.026 M
Structure: 2,807.048 square meters
EAO P 0.674 M
Total P 33.700 M
AS MODIFIED:
Palo-Carigara-Ormoc Rd - K0972 + 776.13 - K0973 + 041.13
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 33.026 M
Structure: 1,883.00 square meters
EAO P 0.674 M
Total P 33.700 M
|
July 6, 2021 |
2021 |
WIN1E02290 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. 300117210458000
Project ID: P00551467MN
FROM:
LOCAL PROGRAM - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction/Rehabilitation (Completion) of Local Road, Barangay Poblacion, Bacuag, Surigao Del Norte
Type of Work/Physical Target:
CW1 - Construction of Concrete Road / 0.187 lane km.
Unit Cost: Php 10,588,235.29 / lane km.
Allocation: Php 1,980,000.00
EAO: Php 20,000.00
Total: Php 2,000,000.00
TO:
LOCAL PROGRAM - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction/Rehabilitation (Completion) of Local Road, Barangay Poblacion, Bacuag, Surigao Del Norte
Type of Work/Physical Target:
CW1 - Construction of Concrete Road / 0.277 lane km.
Unit Cost: Php 7,148,014.44 / lane km.
Estimated Cost: Php 1,980,000.00
EAO: Php 20,000.00
Total: Php 2,000,000.00 |
July 6, 2021 |
FY 2021 GAA |
WIN1E02427 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, Jct. Davao - Bukidnon Road (Calinan Section) - Wangan - Subasta - Tagakpan - Tungkalan - Tagurano - Catigan - Baracatan - Sibulan - Tibolo - Kapatagan Road, (Package C), Davao City
Physical Target:
CW1: 1.628 Lane Km (Construction of Concrete Road)
CW2: 0.772 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 120,967,000.00
CW1: P 42,460,000.00 (Construction of Concrete Road)
CW2: P 74,273,155.00 (Reconstruction to Concrete Pavement)
EAO: P 4,233,845.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road, Jct. Davao - Bukidnon Road (Calinan Section) - Wangan - Subasta - Tagakpan - Tungkalan - Tagurano - Catigan - Baracatan - Sibulan - Tibolo - Kapatagan Road, (Package C), Davao City
Physical Target:
CW1: 0.828 Lane Km (Construction of Concrete Road)
CW2: 0.772 Lane Km (Reconstruction to Concrete Pavement)
CW3: 286.20 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 120,967,000.00
CW1: P 31,321,129.00 (Construction of Concrete Road)
CW2: P 55,966,686.00 (Reconstruction to Concrete Pavement)
CW3: P 29,445,340.00 (Construction of Concrete Bridge)
EAO: P 4,233,845.00 |
July 6, 2021 |
FY 2021 GAA |
WIN1E02431 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Davao-Cotabato Old Rd - K1520+029 - K1521+361
Physical Target:
CW1: 7.932 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 37,281,000.00
CW1: P 36,535,380.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 745,620.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Davao-Cotabato Old Rd - K1520+029 - K1520+683
Physical Target:
CW1: 2.616 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 37,281,000.00
CW1: P 36,535,380.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 745,620.00 |
July 6, 2021 |
FY 2021 GAA |
WIN1E02453 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way -
K1728+730.167 - K1728+ 823.101, K1728+849.473 - K1728+911.375,
K1729+267.105 - K1729+ 287.105, K1735+820.448 - K1735+850
Physical Target:
CW1: 6,786.50 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 130,000,000.00
CW1: P 125,450,000.00 (Construction of Road Slope Protection Structure)
EAO: P 4,550,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way - K1729+001 - K1729+104
K1729+445 - K1729+521, K1729+932 - K1730+016
Physical Target:
CW1: 3,398.41 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 130,000,000.00
CW1: P 125,450,000.00 (Construction of Road Slope Protection Structure)
EAO: P 4,550,000.00 |
July 6, 2021 |
FY 2021 GAA |
WIN1E02428 |
FY 2021 GAA RA 11518 |
January 1, 2020 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
5th Ave - K1510+(-822) - K1510+(-512)
Physical Target:
CW1: 1.800 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 13,618,000.00
CW1: P 13,345,640.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 272,360.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
5th Ave - K1510+475 - K1510+599
Physical Target:
CW1: 0.890 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 13,618,000.00
CW1: P 13,345,640.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 272,360.00 |
July 6, 2021 |
FY 2021 GAA |
WIN1E02429 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road at Cebole, Sitio Galacia, Brgy. Colosas, Paquibato District, Davao City
Physical Target:
CW1: 7.951 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 79,476,000.00
CW1: P 76,694,340.00 (Construction of Concrete Road)
EAO: P 2,781,660.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road at Cebole, Sitio Galacia, Brgy. Colosas, Paquibato District, Davao City
Physical Target:
CW1: 2.640 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 79,476,000.00
CW1: P 76,694,340.00 (Construction of Concrete Road)
EAO: P 2,781,660.00 |
July 6, 2021 |
FY 2021 GAA |
WIN1E02439 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Revetment along Hijo River at Barangay New Asturias, Mawab, Davao de Oro
Physical Target:
CW1: 140.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Flood Mitigation Structure)
EAO: P 400,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Revetment along Hijo River at Barangay New Asturias, Maco, Davao de Oro
Physical Target:
CW1: 140.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,600,000.00 (Construction of Flood Mitigation Structure)
EAO: P 400,000.00 |
July 6, 2021 |
FY 2021 GAA |
WIN1E02435 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Prosperidad, Montevista to Casoon, Monkayo, Davao de Oro
Physical Target:
CW1: 3.380 Lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,500,000.00 (Construction of Concrete Road)
EAO: P 500,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Prosperidad, Montevista to Casoon, Monkayo, Davao de Oro
Physical Target:
CW1: 4.691 Lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,500,000.00 (Construction of Concrete Road)
EAO: P 500,000.00 |
July 5, 2021 |
2021 |
WIN1C04109 |
GAA 2021 |
June 25, 2021 |
Cordillera Administrative Region |
CAR - Regional Office |
From: City Limit-Sto Tomas Rd - K0262 + 005 - K0262 + 150, K0263 + 250 - K0263 + 400;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1 : 0.59 Lane Km;
Allocation= Php 200,000,000
To: City Limit-Sto Tomas Rd - K0255 + 1085 - K0255 + 1098.50, K0255 + 1806.50 - K0255 + 1857, K0258 + 454 – K0258 + 478.50, K0258 + 801 - K0258 + 847, K0259 + 065.50 - K0259 + 097.50, K0259 + 277 - K0259 + 292, K0259 + 336.50 - K0259 + 492, K0259 + 606 - K0259 + 612.50, K0259 + 684.50 - K0259 + 785, K0259 + 813 - K0259 + 840, K0259 + 927 - K0259 + 1093, K0260 + 000 - K0260 + 077, K0261 + 064 - K0261 + 088, K0261 + 693 - K0261 + 715.50, K0262 + 000 - K0262 + 180, K0262 + 522 - K0262 + 636, K0263 + 416 - K0263 + 478;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1 : 1.244 Lane Km
CW2: 6,754 Square meters;
Allocation= Php 200,000,000
|