July 29, 2021 |
2021 |
WIN1F06296 |
SR2021-02-004552 |
February 15, 2021 |
Region VI |
Regional Office VI |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Bacolod Negros Occidental Economic Highway (BANOCEH), Section 2, Segment 3, Package B,
Negros Occidental
CW1- Construction of Concrete Road: 1.968 lane km - 58,865.00
ROW Acquisition: 67,500 sq.m - 13,510.00
EAO - 2,625.00
Total: 75,000.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Bacolod Negros Occidental Economic Highway (BANOCEH), Section 2, Segment 3, Package B,
Negros Occidental
CW1- Construction of Concrete Road:
0.71852 lane km - 16,813.372
CW2- Construction of Concrete Bridge: 1,010.286 sq.m - 55,561.628
EAO - 2,625.00
Total: 75,000.00
|
July 29, 2021 |
2021 |
WIN1C04077 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Bulacan 1st District Engineering Office |
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure, Sta. 0+000 - Sta. 0+456.00 along Babatnin, Malolos, Bulacan
|
July 29, 2021 |
2021 |
WIN1C04249 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Pampanga 2nd District Engineering Office |
Network Development - Road Widening - Secondary Roads
Angeles - Porac - Floridablanca - Dinalupihan Rd, K0104+205 - K0106+000 |
July 28, 2021 |
FY 2021 GAA |
WIN1F06383 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204168000
Project ID : P00562429LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road,
Brgy. Pahilahan - Brgy. Matulatula Road,
Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
3.978 Lane Km
Allocation : Php 25.00 Million
TO :
Concreting of Road,
Brgy. Pahilahan - Brgy. Matulatula Road,
Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.212 Lane Km
Allocation : Php 25.00 Million |
July 28, 2021 |
FY 2021 GAA |
WIN1F06386 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204175000
Project ID : P00562436LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road,
Sitio Buena Vista, Brgy. Loyal,
Victoria, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road ;
4.740 Lane Km
Allocation : 25.00 Million
TO :
Concreting of Road,
Sitio Buena Vista, Brgy. Loyal,
Victoria, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
3.088 Lane Km
Allocation : Php 25.00 Million |
July 28, 2021 |
FY 2021 GAA |
WIN1G02970 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) - K1479+500 - K1480+761
Physical Target:
CW1: 2,200 ln. m. (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 55,000,000.00
CW1: P 53,075,000.00 (Construction of Drainage Structure along Road)
EAO: P 1,925,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) - K1478+392
Physical Target:
CW1: 718 ln. m. (Construction of Drainage Structure along Road)
ROW: 2,872.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 55,000,000.00
CW1: P 47,767,500.00 (Construction of Drainage Structure along Road)
ROW: P 5,307,500.00 (ROW Acquisition)
EAO: P 1,925,000.00 |
July 28, 2021 |
CY 2021 |
WIN1F06594 |
UACS No. 300209100003000 |
April 30, 2021 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 300209100003000
Project ID.: P00531625LZ
Convergence and Special Support Program
Construction / Improvement of Access Roads leading to Railways Stations
Candido St. leading to Quirino Highway
Physical Target: CW1 = Construction of Drainage Structure 800 l.m.
CW2 = Shoulder Paving / Construction 1600 sq.m.
Unit Cost (P’000) = P 9.73 / l.m.
= P 3.21 / sq.m.
Allocation (P’000) = P 7,784.66
= P 5,136.70
EAO (P’000) = P 468.65
Total (P’000) = P 13,390.00
As Modified
Convergence and Special Support Program
Construction / Improvement of Access Roads leading to Railways Stations
Candido St. leading to Quirino Highway
Physical Target: CW1 = Shoulder Paving/Construction 767 sq.m.
Unit Cost (P’000) = P 11.53 / sq.m.
Allocation (P’000) = P 8,845.87
EAO (P’000) = P 309.61
Total (P’000) = P 9,155.48
Excess Amount = P 4,234.52
WIN1F06594
|
July 28, 2021 |
FY 2021 GAA |
WIN1G02992 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance (Asphalt Overlay) - Monteverde St. (Jct. Magsaysay Avenue - Jct. Guerrero St.), Davao City
Physical Target:
CW1: 3.339 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 38,600,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,400,000.00
TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Preventive Maintenance (Asphalt Overlay) - Monteverde St. (Jct. Magsaysay Avenue - Jct. Guerrero St.), Davao City
Physical Target:
CW1: 1.934 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 38,600,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,400,000.00 |
July 28, 2021 |
FY 2021 GAA |
WIN1G02985 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Rehabilitation of Drainage, Sto. Rosario Creek, Barangay Buhangin Proper, Davao City
Physical Target:
CW1: 300 Lineal Meters (Rehabilitation of Major Repair of Drainage Structure)
Allocation:
TOTAL: P 2,500,000.00
CW1: P 2,475,000.00 (Rehabilitation of Major Repair of Drainage Structure)
EAO: P 25,000.00
TO: Local Program - Flood Control and Drainage - Drainage/Protection Works - Local Infrastructure Program
Rehabilitation of Drainage, Sto. Rosario Creek, Barangay Buhangin Proper, Davao City
Physical Target:
CW1: 505 Lineal Meters (Rehabilitation of Major Repair of Drainage Structure)
Allocation:
TOTAL: P 2,500,000.00
CW1: P 2,475,000.00 (Rehabilitation of Major Repair of Drainage Structure)
EAO: P 25,000.00 |
July 28, 2021 |
FY 2021 GAA |
WIN1G02986 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Nabunturan-Maragusan Rd - K1471+000 - K1472+893
Physical Target:
CW1: 3.786 lane km (Road Widening)
Allocation:
TOTAL: P 61,789,000.00
CW1: P 59,626,385.00 (Road Widening)
EAO: P 2,162,615.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Nabunturan-Maragusan Rd - K1471+265 - K1472+925
Physical Target:
CW1: 3.320 lane km (Road Widening)
ROW: 33,320.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 61,789,000.00
CW1: P 54,626,385.00 (Road Widening)
ROW: P 5,000,000.00 (ROW Acquisition)
EAO: P 2,162,615.00 |
July 28, 2021 |
FY 2021 GAA |
WIN1F06363 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204182000
Project ID : P00562443LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concretinbg of Various Roads,
Calapan City, Oriental Mindoro
Physical Target - CW1- Construction of Concrete Road :
0.312 Lane Km
CW2 - Construction of Concrete Road :
0.312 Lane Km
CW3 - Construction of Concrete Road :
0.312 Lane Km
CW4 - Construction of Concrete Road :
0.312 Lane Km
CW5 - Construction of Concrete Road :
0.312 Lane Km
Allocation : Php 10.00 Million
TO :
Concreting of various Road,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.470 Lane Km
CW2 - Construction of Concrete Road :
0.197 lane Km
CW3 - Construction of Concrete Road :
0.343 Lane Km
CW4 - Construction of Concrete Road :
0.286 Lane Km
CW5 - Construction of Concrete Road :
0.452 Lane Km
Allocation : Php 10.00 million |
July 28, 2021 |
FY 2021 GAA |
WIN1F06368 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204186000
Project ID : P00562447LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Various Roads,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.906 Lane Km
CW2 - Construction of Concrete Road :
0.906 Lane Km
Allocation : Php 10.00 Million
TO :
Concreting of Various Road,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.649 Lane Km
CW2 - Construction of Concrete Road :
0.614 Lane Km
Allocation : Php 10.00 Million
|
July 28, 2021 |
FY 2021 GAA |
WIN1F06385 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No. : 310105100550000
Project ID : P00505595LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads - Secondary Roads
FROM :
Mindoro West Coastal Road,
K0402 + 990 - K0403 + 409
Physical Target - CW1 - Reconstruction of Concrete Pavement :
1.064 Lane Km
Allocation : Php 22.990 Million
TO :
Mindoro West Coastal Road,
K0402 + 990 - K0403 + 738
Physical Target - CW1 - 1.722 Lane Km
Allocation : Php 22.990 Million
|
July 28, 2021 |
FY 2021 GAA |
WIN1G02989 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of Multi-Purpose Building, Barangay Tubod, Panabo City, Davao del Norte
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 2,000,000.00
CW1: P 1,980,000.00 (Construction of Multi-Purpose Building)
EAO: P 20,000.00
TO: Local Program - Buildings And Other Structures - Multipurpose/ Facilities - Local Infrastructure Program
Construction of Multi-Purpose Building, Barangay Tubod, Carmen, Davao del Norte
Physical Target:
CW1: 1 building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 2,000,000.00
CW1: P 1,980,000.00 (Construction of Multi-Purpose Building)
EAO: P 20,000.00 |
July 28, 2021 |
FY 2021 GAA |
WIN1G02973 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Digos Div Rd -
K1562+(-444) - K1562+120, K1565+256 - K1566+210
Physical Target:
CW1: 2.990 Lane Km (Road Widening)
Allocation:
TOTAL: P 79,503,000.00
CW1: P 76,720,395.00 (Road Widening)
EAO: P 2,782,605.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Digos Div Rd - K1565+256 - K1566+198
Physical Target:
CW1: 1.838 Lane Km (Road Widening)
ROW: 15,796.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 79,503,000.00
CW1: P 38,488,395.00 (Road Widening)
ROW: P 38,232,000.00 (ROW Acquisition)
EAO: P 2,782,605.00 |
July 28, 2021 |
FY 2021 GAA |
WIN1F06373 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 310202100825000
Project ID : P00505143LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Bongabong - Sagana - Roxas - San Aquilino Road,
K0128 + 809 - K0129 + 126
Physical Target - CW1 - Road Widening : 0.60 Lane Km
Allocation : Php 9.00 Million
TO :
Bongabong - Sagana - Roxas - San Aquilino Road,
K0128 + 808 - K0129 + 059
Physical Target - CW1 - Road Widening : 0.468 Lane Km
Allocation : Php 9.00 Million
|
July 28, 2021 |
2021 |
WIN1C04368 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Rehabilitation/Improvement of Pampanga River Flood Control Structure, Sta. 3+533.72 - Sta. 4+139.72, Julo, San Antonio, Nueva Ecija |
July 28, 2021 |
FY 2021 GAA |
WIN1F06356 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 310208100351000
Project ID : P00505150LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement -
Secondary Roads
FROM :
Mindoro Oriental/Occidental East Coastal Road,
K0195 + 000 - K0195 + 545
Physical Target - CW1 - Shoulder Paving/Construction :
2,180.0 sq.m.
Allocation : Php 6.00 Million
TO :
Mindoro oriental/Occidental east Coastal road,
K0195 + 000 - K0195 + 258
Physical Target - CW1 - Shoulder Paving/Construction :
1,617.10 sq.m.
Allocation : Php 6.00 Million
|
July 28, 2021 |
2021 |
WIN1C04204 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Flood Management - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Rehabilitation/Improvement of Pampanga River Flood Control Structure, Sta. 4+489.72 - Sta. 4+820.52, Julo, San Antonio, Nueva Ecija |
July 28, 2021 |
FY 2021 GAA |
WIN1G02975 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Pakiputan Wharf - K1501+(-032) - K1501+474
Physical Target:
CW1: 3.036 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 22,228,000.00
CW1: P 21,783,440.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 444,560.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Pakiputan Wharf - K1501+(-032) - K1501+296
Physical Target:
CW1: 1.312 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 22,228,000.00
CW1: P 21,783,440.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 444,560.00 |
July 28, 2021 |
2021 |
WIN1C04361 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads
Jose Abad Santos Ave (JASA) - K0100+636.60 - K0100+652.00, K0100+655 - K0100+963.40, K0099+886.60 - K0099+948.10, K0100+272.30 - K0100+453 |
July 28, 2021 |
2021 |
WIN1C04175 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (LZ) - K0101+020 - K0101+314
|
July 28, 2021 |
FY 2021 GAA |
WIN1G02969 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Dacudao Rd - K1509+(-760) - K1509+813
Physical Target:
CW1: 3.146 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 34,550,000.00
CW1: P 33,859,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 691,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Dacudao Rd - K1509+(-760) - K1509+(-184)
Physical Target:
CW1: 1.856 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 34,550,000.00
CW1: P 33,859,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 691,000.00 |
July 28, 2021 |
FY 2021 GAA |
WIN1G02968 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Drainage and Protection Works - Local Infrastructure Program
Improvement of Drainage Structure, Barangay 38-D, Davao City
Physical Target:
CW1: 360.00 Lineal meters (Rehabilitation/Major Repair of Drainage Structure)
Allocation:
TOTAL: P 3,500,000.00
CW1: P 3,465,000.00 (Rehabilitation/Major Repair of Drainage Structure)
EAO: P 35,000.00
TO: Local Program - Flood Control and Drainage - Drainage and Protection Works - Local Infrastructure Program
Improvement of Drainage Structure, Barangay 38-D, Davao City
Physical Target:
CW1: 260.00 Lineal meters (Rehabilitation/Major Repair of Drainage Structure)
Allocation:
TOTAL: P 3,500,000.00
CW1: P 3,465,000.00 (Rehabilitation/Major Repair of Drainage Structure)
EAO: P 35,000.00 |
July 28, 2021 |
2021 |
WIN1G02988 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. : 310305101269000
Project ID: P00502481MN
OO1: Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges
FROM:
Carac-an Parallel Br. along Surigao-Davao Coastal Rd
Type of Work:
CW1- Construction of Parallel Bridge
Physical Target:
CW1- 5564.16 Square meters
Allocation:
TOTAL: P 134,760,000
CW1: P 130,043,400
EAO: P 4,716,600
Unit Cost:
CW1: P 23,371.61/ Square meters
TO:
Carac-an Parallel Br. along Surigao-Davao Coastal Rd
Type of Work:
CW1- Construction of Parallel Bridge
Physical Target:
CW1- 5,301.62 Square meters
Allocation:
TOTAL: P 134,760,000
CW1: P 130,043,400
EAO: P 4,716,600
Unit Cost:
CW1: P 24,528.99/ Square meters |
July 28, 2021 |
2021 |
WIN1E02626 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. : 320102104198000
Project ID: P00522333MN
OO2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
FROM:
Construction of Bank Protection along Wawa River Protecting the National Road, along Bayugan - Esperanza Road (Crossing Luna Section), Agusan del Sur, Package 1
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 0.000 Lineal meters
Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000
Unit Cost:
CW1: P 0/ Lineal meters
TO:
Construction of Bank Protection along Wawa River Protecting the National Road, along Bayugan - Esperanza Road (Crossing Luna Section), Agusan del Sur, Package 1
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 365 Lineal meters
Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000
Unit Cost:
CW1: P 277,602.74/ Lineal meters |
July 28, 2021 |
2021 |
WIN1E02625 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. : 300108200274000
Project ID: P00550439MN
Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Construction of Bank Protection Protecting the National Road, Butuan City-Esperanza-San Luis, Talacogon, Agusan del Sur, Package 2
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 1,144.806 Lineal meters
Allocation:
TOTAL: P 145,000,000
CW1: P 139,925,000
EAO: P 5,075,000
Unit Cost:
CW1: P 122,225.95/ Lineal meters
TO:
Construction of Bank Protection Protecting the National Road, Butuan City-Esperanza-San Luis, Talacogon, Agusan del Sur, Package 2
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 387.953 Lineal meters
Allocation:
TOTAL: P 145,000,000
CW1: P 139,925,000
EAO: P 5,075,000
Unit Cost:
CW1: P 360,675.13/ Lineal meters
|
July 28, 2021 |
2021 |
WIN1E02495 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
UACS No. : 310202100750000
Project ID: P00501365MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
FROM:
NRJ Barobo-Agusan Del Sur Bdry Rd - K1404 + 000 - K1407 + 163
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 6.326 Lane Km
Allocation:
TOTAL: P 95,000,000
CW1: P 91,675,000
EAO: P 3,325,000
Unit Cost:
CW1: P 14,491,779.96/Lane Km
TO:
NRJ Barobo-Agusan Del Sur Bdry Rd - K1403 + 181 - K1405 + 761
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 5.160 Lane Km
Allocation:
TOTAL: P 95,000,000
CW1: P 91,675,000
EAO: P 3,325,000
Unit Cost:
CW1: P 17,766,472.89/Lane Km
|
July 28, 2021 |
2021 |
WIN1E02624 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
UACS No. : 320101106332000
Project ID: P00522133MN
OO2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems .
FROM:
Construction of Tandag Flood Control, Brgy. Dagocdoc, Tandag City, Surigao Del Sur
Type of Work:
CW1- Construction of Revetment
Physical Target:
CW1- 364.192 Lineal meters
Allocation:
TOTAL: P 76,712,000
CW1: P 74,027,080
EAO: P 2,684,920
Unit Cost:
CW1: P 203,263.88/ Lineal meters
TO:
Construction of Tandag Flood Control, Brgy. Dagocdoc, Tandag City, Surigao Del Sur
Type of Work:
CW1- Construction of Revetment
Physical Target:
CW1- 256.80 Lineal meters
Allocation:
TOTAL: P 76,712,000
CW1: P 74,027,080
EAO: P 2,684,920
Unit Cost:
CW1: P 288,267.45/ Lineal meters
|
July 28, 2021 |
2021 |
WIN1E02639 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 310103100774000
Project ID: P00501879MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Tertiary Roads
FROM:
Butuan City-Pianing-Tandag Rd - K1232 + (-1016) - K1232 + (-298)
Type of Work:
CW1- Preventive Maintenance of Road: Concrete Reblocking
Physical Target:
CW1- 1.436 Lane Km
Allocation:
TOTAL: P 6,478,000
CW1: P 6,348,440
EAO: P 129,560
Unit Cost:
CW1: P 4,420,919.22/Lane Km
TO:
Butuan City-Pianing-Tandag Rd - K1232 + (-1008.50) - K1232 + (-626)
Type of Work:
CW1- Preventive Maintenance of Road: Concrete Reblocking
Physical Target:
CW1- 0.765 Lane Km
Allocation:
TOTAL: P 6,478,000
CW1: P 6,348,440
EAO: P 129,560
Unit Cost:
CW1: P 8,298,614.38/Lane Km
|
July 28, 2021 |
2021 |
WIN1E02632 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. : 310112100274000
Project ID: P00501692MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads
FROM:
Surigao City-Sn Juan Coastal Rd - K1119 + 221 - K1119 + 479
Type of Work:
CW1- Rehabilitation /Major Repair of Drainage Structure along Road
Physical Target:
CW1- 258.00 Lineal meters
Allocation:
TOTAL: P 3,000,000
CW1: P 2,940,000
EAO: P 60,000
Unit Cost:
CW1: P 11,395.35/ Lineal meters
TO:
Surigao City-Sn Juan Coastal Rd - K1119 + 221 - K1119 + 466
Type of Work:
CW1- Rehabilitation /Major Repair of Drainage Structure along Road
Physical Target:
CW1- 281.00 Lineal meters
Allocation:
TOTAL: P 3,000,000
CW1: P 2,940,000
EAO: P 60,000
Unit Cost:
CW1: P 10,462.63/ Lineal meters
|
July 27, 2021 |
2021 |
WIN1C04350 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Regional Office III |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Baler Bypass Road, Baler, Aurora |
July 27, 2021 |
2021 |
WIN1C04359 |
FY 2021 GAA |
December 27, 2020 |
Region III |
Regional Office III |
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Repair / Rehabilitation / Improvement, Overlay with Pavement Markings along Jose Abad Santos Avenue (JASA), K0109+015 - K0109+400, K0111+000 - K0111+502.15 Phase 1 |
July 27, 2021 |
2021 |
WIN1C04354 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Regional Office III |
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Road (Phase 1), Barangay Quinawan, Bagac, Bataan |
July 27, 2021 |
2021 |
WIN1F06562 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
AS PER GAA/ORIGINAL:
Tigbao-Sta Fe-Sn Miguel Rd – K0903+641-K0904+195, K0907+209-K0907+581
Physical Target: Allocation:
CW1-Road Widening: 1.872 Lane Km P 26.83828 M
EAO P 0.547720 M
Total P 27.386 M
AS MODIFIED:
Tigbao-Sta Fe-Sn Miguel Rd – K0903+641-K0904+195
Physical Target: Allocation:
CW1-Road Widening: 1.128 Lane Km P 26.83828 M
EAO P 0.547720 M
Total P 27.386 M
|
July 27, 2021 |
2021 |
WIN1E02633 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. : 320102104445000
Project ID: P00522383MN
OO2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
FROM:
Rehabilitation of Adlayan River Bank, Sta.0+000.00 - Sta. 0+120.00, San Francisco, Agusan del Sur
Type of Work:
CW1- Rehabilitation / Major Repair of Flood Control Structure
Physical Target:
CW1- 28.000 Lineal meters
Allocation:
TOTAL: P 5,000,000
CW1: P 4,900,000
EAO: P 100,000
Unit Cost:
CW1: P 175,000.00/Lineal meters
TO:
Rehabilitation of Adlayan River Bank, Sta.0+000.00 - Sta. 0+028.00, San Francisco, Agusan del Sur
Type of Work:
CW1- Rehabilitation / Major Repair of Flood Control Structure
Physical Target:
CW1- 28.000 Lineal meters
Allocation:
TOTAL: P 5,000,000
CW1: P 4,900,000
EAO: P 100,000
Unit Cost:
CW1: P 175,000.00/Lineal meters
|
July 26, 2021 |
FY 2021 GAA |
WIN1E02654 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road with drainage Taglawig, Maco, Davao de Oro
Physical Target:
CW1: 1.568 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Concrete Road)
EAO: P 300,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Road with drainage Taglawig, Maco, Davao de Oro
Physical Target:
CW1: 2.100 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Concrete Road)
EAO: P 300,000.00 |
July 26, 2021 |
2021 |
WIN1F06261 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Iloilo City District Engineering Office |
FROM:
LOCAL PROGRAM
Local - Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure Program
Construction/Rehabilitation of Multi-Purpose Building in Barangay San Raphael, Mandurriao,
Iloilo City
CW1- Construction of Multi Purpose Building: 1.00 Building - 4,950.00
EAO - 50.00
Total: 5,000.00
TO:
LOCAL PROGRAM
Local - Buildings and Other Structures - Multipurpose / Facilities - Local Infrastructure Program
Construction/Rehabilitation of Multi-Purpose Building in Barangay San Rafael, Mandurriao,
Iloilo City
CW1- Construction of Multi Purpose Building: 1.00 Building - 4,950.00
EAO - 50.00
Total: 5,000.00
|
July 26, 2021 |
2021 |
WIN1F06070 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Guimaras District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Guimaras Circumferential Rd - K0054 + 000 - K0055 + 000
CW1- Road Widening: 2.004 lane km - 37,903.46
EAO - 773.54
Total: 38,677.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Guimaras Circumferential Rd - K0054 + 000 - K0054 + 815
CW1- Road Widening: 1.630 lane km - 36,406.02
ROW Acquisition: 4,075 sq.m - 1,497.44
EAO - 773.54
Total: 38,677.00
|
July 26, 2021 |
2021 |
WIN1F06070 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Guimaras District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Guimaras Circumferential Rd - K0054 + 000 - K0055 + 000
CW1- Road Widening: 2.004 lane km - 37,903.46
EAO - 773.54
Total: 38,677.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Guimaras Circumferential Rd - K0054 + 000 - K0054 + 815
CW1- Road Widening: 1.630 lane km - 36,406.02
ROW Acquisition: 4,075 sq.m - 1,497.44
EAO - 773.54
Total: 38,677.00
|
July 26, 2021 |
FY 2021 GAA |
WIN1E02646 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Ma-a Rd - K1511+827 - K1513+000
Physical Target:
CW1: 4.616 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 26,455,000.00
CW1: P 25,925,900.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 529,100.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Ma-a Rd - K1511+827 - K1513+000
Physical Target:
CW1: 1.520 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 26,455,000.00
CW1: P 25,925,900.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 529,100.00 |
July 26, 2021 |
2021 |
WIN1F06060 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Guimaras District Engineering Office |
FROM:
LOCAL PROGRAM
Local – Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Brgy. Alaguisoc to Brgy. Bugnay, Sta. 0+000 - Sta. 2+100, Jordan, Guimaras
CW1- Construction of Concrete Road: 4.409 lane km -
40,748.40
EAO - 411.60
Total: 41,160.00
TO:
LOCAL PROGRAM
Local – Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Road, Brgy. Alaguisoc to Brgy. Bugnay, Jordan, Guimaras, Sta. 0+100- Sta. 0+145, Sta. 0+244 - Sta. 0+515, Sta. 3+200- Sta. 5+088.50
CW1- Construction of Concrete Road: 4.409 lane km -
40,748.40
EAO - 411.60
Total: 41,160.00 |
July 26, 2021 |
2021 |
WIN1F06413 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Guimaras District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Central Rd (Sn Miguel-Constancia-Cabano-Igcawayan) - K0061 + 000 - K0061 + 800
CW1- Road Widening: 1.60 lane km - 45,691.52
EAO - 932.48
Total: 46,624.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Central Rd (Sn Miguel-Constancia-Cabano-Igcawayan) - K0061 + 000 - K0062 + 000
CW1- Road Widening: 2.01 lane km - 44,495.92
ROW Acquisition:5,030 sq.m - 1,195.60
EAO - 932.48
Total: 46,624.00
|
July 26, 2021 |
2021 |
WIN1F06278 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Guimaras District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Bridge - Widening of Permanent Bridges
Atgang Br. (B00011GR) along Guimaras Circumferential Rd
CW1- Widening of Bridge: 190.10 sq.m - 30,375.835
ROW Acquisition: 500.00 sq.m - 592.165
EAO - 632.00
Total: 31,600.00
TO:
OO1: Ensure Safe and Reliable National Road System
Bridge - Widening of Permanent Bridges
Atgang Br. (B00011GR) along Guimaras Circumferential Rd
CW1- Widening of Bridge: 381.60 sq.m - 30,363.75
ROW Acquisition: 500.00 sq.m - 604.25
EAO - 632.00
Total: 31,600.00
|
July 26, 2021 |
2021 |
WIN1F06351 |
SR2021-02-001528 |
February 12, 2021 |
Region VI |
Guimaras District Engineering Office |
FROM:
LOCAL PROGRAM
Local – Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Salvacion-Lanipe-Oracon Road, Sta. 0+000 - Sta. 1+900, Sta. 3+710 - Sta. 3+805, Sta. 3+850 - Sta. 5+425, Sta. 5+650 - Sta. 5+670, Nueva Valencia, Guimaras
CW1- Construction of Concrete Road:
9.339 lane km - 99,000.00
EAO - 1,000.00
Total: 100,000.00
TO:
LOCAL PROGRAM
Local – Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Salvacion-Lanipe-Oracon Road, Sta. 0+000 - Sta. 1+080, Sta. 1+285 - Sta. 3+191, Sta. 3+710 - Sta. 3+803, Sta. 3+850 - Sta. 5+430, Sta. 5+650 - Sta. 5+666, Nueva Valencia, Guimaras
CW1- Construction of Concrete Road:
9.339 lane km - 99,000.00
EAO - 1,000.00
Total: 100,000.00
|
July 26, 2021 |
2021 |
WIN1F06345 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Guimaras District Engineering Office |
FROM:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Convergence and Special Support - Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Sitio Calog/Bubog, Cabano to Sitio Bantayan, Aguilar Road leading to San Lorenzo Wind Farm,
San Lorenzo, Guimaras
CW1- Construction of Concrete Road:
0.989 lane km - 41,022.80
- - -
EAO - 837.20
Total: 41,860.00
TO:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Convergence and Special Support - Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Sitio Calog/Bubog, Cabano to Sitio Bantayan, Aguilar Road leading to San Lorenzo Wind Farm,
San Lorenzo, Guimaras
CW1- Construction of Concrete Road:
0.553 lane km - 19,510.05
CW2- Construction of Concrete Bridge:
286.20 sq.m - 21,512.75
EAO - 837.20
Total: 41,860.00
|
July 26, 2021 |
2021 |
WIN1F06345 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Guimaras District Engineering Office |
FROM:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Convergence and Special Support - Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Sitio Calog/Bubog, Cabano to Sitio Bantayan, Aguilar Road leading to San Lorenzo Wind Farm,
San Lorenzo, Guimaras
CW1- Construction of Concrete Road:
0.989 lane km - 41,022.80
- - -
EAO - 837.20
Total: 41,860.00
TO:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Convergence and Special Support - Construction/Improvement of Access Roads leading to Trades, Industries and Economic Zones
Sitio Calog/Bubog, Cabano to Sitio Bantayan, Aguilar Road leading to San Lorenzo Wind Farm,
San Lorenzo, Guimaras
CW1- Construction of Concrete Road:
0.553 lane km - 19,510.05
CW2- Construction of Concrete Bridge:
286.20 sq.m - 21,512.75
EAO - 837.20
Total: 41,860.00
|
July 26, 2021 |
FY 2021 GAA |
WIN1E02642 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1490+000 - K1490+599
Physical Target:
CW1: 3.594 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 800,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1490+000 - K1490+551
Physical Target:
CW1: 2.204 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 800,000.00 |
July 26, 2021 |
FY 2021 GAA |
WIN1E02653 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Opening/Rehab. of road, crossing Benguet Sitio Pagara to Biasong, Pantukan, Davao de Oro
Physical Target:
CW1: 1.838 lane km (Rehabilitation of Concrete Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Rehabilitation of Concrete Road)
EAO: P 600,000.00
TO: Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Opening/Rehab. of road, crossing Benguet Sitio Pagara to Biasong, Pantukan, Davao de Oro
Physical Target:
CW1: 3.360 lane km (Construction of Gravel Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Gravel Road)
EAO: P 600,000.00 |
July 26, 2021 |
2021 |
WIN1C03964 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads
Jose Abad Santos Ave (JASA) - K0100+966.40 - K0100+986.70, K0101+000 - K0101+227.70, K0099+204.35 - K0099+829.60
|
July 26, 2021 |
2021 |
WIN1F06519 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Negros Occidental 4th District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Secondary Roads
Jct Bagonawa-La Castellana-Isabela Rd - K0043 + 575 - K0044 + 345
CW1- Off-Carriageway Improvement: Shoulder Paving /
Construction: 1,542.00 sq.m - 4,533.48
EAO - 92.52
Total: 4,626.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Secondary Roads
Jct. Bagonawa- La Castellana- Isabela Rd- K0043 + 575 - K0044 + 320
CW1- Off-Carriageway Improvement:
Shoulder Paving / Construction: 1,775.44 sq.m - 4,533.48
EAO - 92.52
Total: 4,626.00
|
July 26, 2021 |
2021 |
WIN1C04288 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Network Development - Road Widening - Primary Roads
Daang Maharlika (LZ) - K0094+272.10 - K0094+842.60, K0094+866.60 - K0095+400.00 |
July 26, 2021 |
2021 |
WIN1C03965 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads
Gapan - Fort Magsaysay Rd - K0112+026.28 - K0113+000.00
|
July 26, 2021 |
2021 |
WIN1C03972 |
FY 2021 GAA |
December 28, 2020 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (LZ) - K0101+314.00 - K0102+483.70
|
July 23, 2021 |
FY 2021 GAA |
WIN1F06435 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310202100703000
Project ID : P00515587LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Marinduque Circumferential Road,
K0021 + 000 - K0024 + 000,
K0032 + 000 - K0034 + 000
Physical Target - CW1 - Road Widening : 10.33 Lane Km
Allocation : Php 255.300 Million
TO :
Marinduque Circumferential Road,
K0018 + 351 - K0020 + 619,
K0020 + 644 - K0020 + 664,
k0020 + 704 - K0021 + 378,
K0021 + 398 - K0022 + 137
Physical Target - CW1 - Road Widening : 7.424 Lane Km
Allocation : Php 255.300 Million |
July 23, 2021 |
CY 2021 |
WIN1F06544 |
UACS NO. 320101106439000 |
February 24, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106439000
Project ID.: P0052580LZ
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Binondo, Barangay 281, Sta. 0+410.00 to
Sta. 0+568.40, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 149.50 l.m.
Unit Cost (P’000) = P 327.75/ l.m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
As Modified
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Binondo, Barangay 281, Sta. 0+410.00 to
Sta. 0+559.50, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 149.50 l.m.
Unit Cost (P’000) = P 327.75/ l.m.m P327,750/LM
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
WIN1F06544
|
July 23, 2021 |
2021 |
WIN1F06123 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 1st District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Iloilo-Capiz Rd (New Route) - K0108 + 674 - K0109 + 198, K0109 + 700 - K0110 + 925
CW1- Preventive Maintenance of Road: Asphalt Overlay:
7.052 lane km - 37,775.08
EAO - 770.92
Total: 38,546.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Iloilo-Capiz Rd (New Route) - K0108 + 674 –
K0110 + 775
CW1- Preventive Maintenance of Road: Asphalt Overlay:
8.46 lane km - 37,775.08
EAO - 770.92
Total: 38,546.00
|
July 23, 2021 |
CY 2021 |
WIN1F06555 |
UACS NO. 310204100982000 |
May 4, 2021 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 310204100982000
Project ID.: P00515589LZ
OO1: Ensure Safe and Reliable National Road System
Network Development – Construction of Bypass and Diversion Roads
Alabang = Zapote Diversion Road, La Piñas City
Physical Target: CW1 = Construction Concrete Road 7.25 Lane Km
Unit Cost (P’000) = P 19,300.00 / Lane Km.
Allocation (P’000) = P 139,925.00
EAO (P’000) = P 5,075.00
Total (P’000) = P 145,000.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Network Development – Construction of Bypass and Diversion Roads
Alabang = Zapote Diversion Road, La Piñas City
Physical Target: CW1 = Construction Concrete Road 3,100 sq.m.
CW2 = Construction of Concrete Bridge 1,200 sq.m.
Unit Cost (P’000) = P 28.38 sq.m
= P 43.29 sq.m.
Allocation (P’000) = P 87,973.00
= P 51,952.00
EAO (P’000) = P 5,075.00
Total (P’000) = P 145,000.00
WIN1F06555
|
July 23, 2021 |
FY 2021 GAA |
WIN1F06430 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310107100211000
Project No.: P00516151LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse, and Landslide -
Primary Roads
FROM :
Itabiak - San Vicente Road, Palawan
K0166 + 508 - K0166 + 673
Physical Target - CW1 - Construction of Road Slope Protection :
9,500.00 squre meter
Allocation : Php 95.00 Million
TO :
Itabiak - San Vicente Road, Palawan
K0166 + 480 - K0166 + 735
Physical Target - CW1 - Construction of Road Slope Protection :
4,432.00 square meter
Allocation : Php 95.00 Million
|
July 23, 2021 |
2021 |
WIN1F06124 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 1st District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Capiz Rd - K0120 + 500 - K0120 + 921
CW1- Reconstruction to Concrete Pavement:
1.51 lane km - 30,973.88
EAO - 632.12
Total: 31,606.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Capiz Rd - K0120 + 500 - K0121 + 637, K0121 + 796 - K0122 + 240, K0147 + 805.5 - K0148 + 244.5
CW1- Reconstruction to Concrete Pavement:
4.086 lane km - 30,973.88
EAO - 632.12
Total: 31,606.00
|
July 23, 2021 |
2021 |
WIN1F06086 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 1st District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Maayon-Jct Bailan Rd - K0125 + 713 - K0127 + 000
CW1- Road Widening: 2.606 lane km - 49,000.00
EAO - 1,000.00
Total: 50,000.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Maayon-Jct Bailan Rd – K0121 + 274 - K0121 + 738, K0125 + 351 - K0127 + 000
CW1- Road Widening: 4.258 lane km - 49,000.00
EAO - 1,000.00
Total: 50,000.00
|
July 23, 2021 |
2021 |
WIN1F06081 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 1st District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Iloilo-Capiz Rd (New Route) - K0110 + 995 - K0111 + 556
CW1- Preventive Maintenance of Road: Asphalt Overlay: 2.272 lane km - 12,163.76
EAO - 248.24
Total: 12,412.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Iloilo-Capiz Rd (New Route) - K0110 + 995 - K0111 + 665
CW1- Preventive Maintenance of Road: Asphalt Overlay: 2.71 lane km - 12,163.76
EAO - 248.24
Total: 12,412.00
|
July 23, 2021 |
2021 |
WIN1F06080 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 1st District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Iloilo-Capiz Rd (New Route) - K0106 + (-134) - K0106 + 020, K0106 + (-543) - K0106 + (-134), K0112 + 000 - K0113 + 632
CW1- Preventive Maintenance of Road: Asphalt Overlay:
8.027 lane km - 42,998.48
EAO - 877.52
Total: 43,876.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Iloilo-Capiz Rd (New Route) - K0106 + (-543) - K0106 + 179, K0111 + 665 - K0113 + 504
CW1- Preventive Maintenance of Road: Asphalt Overlay:
9.615 lane km - 42,998.48
EAO - 877.52
Total: 43,876.00
|
July 23, 2021 |
FY 2021 GAA |
WINF06423 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310108100522000
Project ID : P00505926LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse, and Landslide -
Secondary Roads
FROM :
Sibuyan Circumferential Road,
K0005 + 250 - K0005 + 446
Physical Target - CW1 - Construction of Road Slope Protection :
3,875.00 Square meter
Allocation : Php 70.00 Million
TO :
Sibuyan Circumferential Road,
K0005 + 170 - K0005 + 234
Physical Target - CW1 - Construction of Road Slope Protection :
3,251.00 Square meter
Allocation P Php 70.00 Million |
July 23, 2021 |
2021 |
WIN1F06157 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 1st District Engineering Office |
FROM:
LOCAL PROGRAM
Local – Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Local Roads, Barangay Intampilan, President Roxas, Capiz
CW1- Construction of Concrete Road:
0.336 lane km - 2,970.00
EAO - 30.00
Total: 3,000.00
TO:
LOCAL PROGRAM
Local – Local Roads and Bridges - Local Roads - Local Infrastructure Program
Concreting of Local Roads, Barangay Intampilan, Panitan, Capiz
CW1- Construction of Concrete Road:
0.336 lane km - 2,970.00
EAO - 30.00
Total: 3,000.00 |
July 23, 2021 |
2021 |
WIN1F06160 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 1st District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Jct Natl Rd Cuartero-Tapulang-Maayon Rd - K0117 + 326 - K0119 + 146
CW1- Road Widening: 3.616 lane km - 49,000.00
EAO - 1,000.00
Total: 50,000.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Jct Natl Rd Cuartero-Tapulang-Maayon Rd – K0117 + 286.11 - K0119 + 630.11
CW1- Road Widening: 4.664 lane km - 49,000.00
EAO - 1,000.00
Total: 50,000.00
|
July 23, 2021 |
2021 |
WIN1F06154 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 1st District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Capiz Rd - K0130 + 802 - K0131 + 117
CW1- Reconstruction to Concrete Pavement: 1.216 lane km - 24,953.74
EAO - 509.26
Total: 25,463.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Capiz Rd - K0130 + 802 - K0131 + 299, K0134 + 195.5 - K0134 + 453.5, K0134 + 741 - K0135 + 490
CW1- Reconstruction to Concrete Pavement:
2.964 lane km - 24,953.74
EAO - 509.26
Total: 25,463.00
|
July 23, 2021 |
2021 |
WIN1F06087 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Negros Occidental 1st District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Bacolod North Rd - K0032 + 639 - K0032 + 992
CW1- Reconstruction to Concrete Pavement:
1.412 lane km - 28,989.38
EAO - 591.62
Total: 29,581.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Bacolod North Rd - K0013 + 843 - K0014 + 454, K0032 + 639 - K0032 + 992, K0032 + 992 - K0033 + 000, K0035 + 607 - K0035 + 841
CW1- Reconstruction to Concrete Pavement:
2.418 lane km - 28,989.38
EAO - 591.62
Total: 29,581.00
|
July 23, 2021 |
2021 |
WIN1F06110 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Negros Occidental 1st District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Bacolod North Rd - K0013 + 402 - K0013 + 843, K0014 + 462 - K0014 + 680, K0014 + 927 - K0015 + 008
CW1- Preventive Maintenance of Road: Asphalt Overlay:
2.972 lane km - 24,691.10
EAO - 503.90
Total: 25,195.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Bacolod North Rd - K0013 + 402 - K0013 + 843, K0014 + 454 - K0014 + 680, K0014 + 927 - K0015 + 071
CW1- Preventive Maintenance of Road: Asphalt Overlay:
3.027 lane km - 24,691.10
EAO - 503.90
Total: 25,195.00 |
July 23, 2021 |
CY 2021 |
WIN1F06558 |
UACS NO. 320101106440000 |
February 24, 2021 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 320101106440000
Project ID.: P00525806LZ
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Quiapo, Brgy. 394 (Phase I), Sta. 0+434.00 to
Sta. 470.00, Sta. 0+500.00 to 0+623.00, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 152.80 l.m.
Unit Cost (P’000) = P 320.68/ l.m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
As Modified
OO2: Protect Lives and Properties
Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Bank Improvement (Steel Sheet Pile) along Estero de Quiapo, Brgy. 394 (Phase I), Sta. 0+434.00 to
Sta. 470.00, Sta. 0+500.00 to 0+616.80, Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 152.80 l.m.
Unit Cost (P’000) = P 320.68/ l.m.
Allocation (P’000) = P 49,000.00
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
WIN1F06558
|
July 23, 2021 |
2021 |
WIN1F06120 |
SR2021-02-001866 |
February 4, 2021 |
Region VI |
Negros Occidental 1st District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Vito Port Rd - K0092 + 000 - K0093 + 234, K0094 + 472 - K0096 + 000, K0097 + 000 - K0098 + 786
CW1- Preventive Maintenance of Road: Asphalt Overlay:
11.36 lane km - 59,918.78
EAO - 2,173.22
Total: 62,092.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Vito Port Rd - K0092 + (-173) - K0093 + 234, K0094 + 472 - K0096 + 000, K0097 + 000 - K0098 +786
CW1- Preventive Maintenance of Road: Asphalt Overlay:
9.274 lane km - 59,918.78
EAO - 2,173.22
Total: 62,092.00
|
July 23, 2021 |
2021 |
WIN1F06113 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Negros Occidental 1st District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Secondary Roads
Bacolod Silay Airport Access Rd - K0008 + (-774) - K0012 + 685
CW1- Off-Carriageway Improvement: Construction of Bike Lanes: 13,682.50 sq.m - 37,549.68
EAO - 766.32
Total: 38,316.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Secondary Roads
Bacolod Silay Airport Access Rd - K0008 + (-774) - K0010 + 134
CW1- Off-Carriageway Improvement: Construction of Bike Lanes: 6,229.32 sq.m - 37,549.68
EAO - 766.32
Total: 38,316.00
|
July 23, 2021 |
2021 |
WIN1F06174 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Iloilo 1st District Engineering Office |
FROM:
LOCAL PROGRAM
Local – Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Lanag Norte-Sitio Parapada Road Tubungan, Oton, Iloilo
CW1- Construction of Concrete Road: 0.250 lane km - 1,980.00
EAO - 20.00
Total: 2,000.00
TO:
LOCAL PROGRAM
Local – Local Roads and Bridges - Local Roads - Local Infrastructure Program
Construction of Lanag Norte-Sitio Parapada Road, Tubungan, Iloilo
CW1- Construction of Concrete Road: 0.250 lane km - 1,980.00
EAO - 20.00
Total: 2,000.00 |
July 23, 2021 |
2021 |
WIN1F06263 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Iloilo 1st District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Tiolas-Sinugbuhan Rd - K0061 + 020 - K0061 + 324, K0061 + 581 - K0061 + 786, K0064 + 000 - K0064 + 560, K0065 + 300 - K0065 + 540
CW1- Construction of Drainage Structure along Road:
1,309 lineal meters - 6,414.10
EAO - 130.90
Total: 6,545.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Tiolas-Sinugbuhan Rd – K0061 + 020 – K0061 + 310, K0061 + 581 – K0061 + 698, K0064 + 000 – K0064 + 560
CW1- Construction of Drainage Structure along Road:
967 lineal meters - 6,414.10
EAO - 130.90
Total: 6,545.00 |
July 23, 2021 |
2021 |
WIN1F06158 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Iloilo 1st District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Guimbal-Tubungan Rd - K0035 + 353 - K0035 + 653, K0036 + 367 - K0036 + 959
CW1- Reconstruction to Concrete Pavement:
1.784 lane km - 35,752.36
EAO - 729.64
Total: 36,482.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Guimbal-Tubungan Rd - K0035 + 353 - K0035 + 653, K0036 + 367 - K0036 + 959, K0038 + 488 -K0039 + 000
CW1- Reconstruction to Concrete Pavement:
2.806 lane km - 35,752.36
EAO - 729.64
Total: 36,482.00
|
July 23, 2021 |
2021 |
WIN1F06239 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Iloilo 2nd District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Pave Roads - Secondary Roads
Passi-Calinog Rd - K0060 + 200 - K0061 + 132
CW1- Reconstruction to Concrete Pavement:
1.538 lane km - 31,562.86
EAO - 644.14
Total: 32,207.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Pave Roads - Secondary
Roads
Passi-Calinog Rd - K0055 + 800 - K0056 + 300, K0057 + 000 - K0057 + 400, K0060 + 200 - K0061 + 132
CW1- Reconstruction to Concrete Pavement:
1.004 lane km - 12,512.36
CW2- Road Widening:
1.004 lane km - 11,559.31
CW3- Preventive Maintenance of Road: Concrete Reblocking: 0.792 lane km - 5,531.19
ROW Acquisition: 2,000 sq.m - 1,960.00
EAO - 644.14
Total: 32,207.00
|
July 23, 2021 |
2021 |
WIN1F06092 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Iloilo 2nd District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Iloilo-Capiz (New Route) - K0049 + 266 - K0049 + 666, K0050 + 900 - K0051 + 097
CW1- Preventive Maintenance of Road: Asphalt Overlay: 2.408 lane km - 12,905.62
EAO - 263.38
Total: 13,169.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Iloilo-Capiz (New Route) – K0036 + 443 - K0039 + 359
CW1- Preventive Maintenance of Road: Concrete Reblocking: 1.78832 lane km - 12,905.62
EAO - 263.38
Total: 13,169.00
|
July 23, 2021 |
2021 |
WIN1F06091 |
SR2021-02-001780 |
February 4, 2021 |
Region VI |
Iloilo 3rd District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Project, Barotac Viejo River Control, Barangay Natividad, Barotac Viejo, Iloilo, Sta. 3 + 630 - Sta. 2 + 839.07
CW1- Construction of Flood Mitigation Structure:
675.03 lineal meters - 71,275.865
EAO - 2,585.135
Total: 73,861.00
TO:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Project, Barotac Viejo River Control, Barangay Natividad, Barotac Viejo, Iloilo, Sta. 3 + 514.10 - Sta 2 + 839.07
CW1- Construction of Flood Mitigation Structure:
675.03 lineal meters - 71,275.865
EAO - 2,585.135
Total: 73,861.00 |
July 23, 2021 |
2021 |
WIN1F06059 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Iloilo 3rd District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Iloilo East Coast-Estancia Wharf Rd - K0178 + (-242) - K0179 + 603, K0178 + (-556) - K0178 + (-264)
CW1- Construction of Drainage Structure along Road:
4,280 lineal meters - 46,138.40
EAO - 941.60
Total: 47,080.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Iloilo East Coast - Estancia Wharf Rd - K0178 + (-554) - K0179 + 759
CW1- Construction of Drainage Structure along Road:
4,626 lineal meters - 46,138.40
EAO - 941.60
Total: 47,080.00
|
July 23, 2021 |
2021 |
WIN1F06074 |
SR2021-02-001770 |
February 4, 2021 |
Region VI |
Iloilo 3rd District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Secondary Roads
Iloilo East Coast-Capiz Rd - K0177 + 290 - K0178 + 688, K0178 + 931 - K0182 + 469
CW1- Off-Carriageway Improvement: Shoulder Paving / Construction: 14,919 sq.m - 86,381.01
EAO - 3,132.99
Total: 89,514.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Secondary Roads
Iloilo East Coast-Capiz Rd - K0177 + 290 - K0178 + 688, K0178 + 931 - K0182 + 180
CW1- Off-Carriageway Improvement: Shoulder Paving / Construction: 14,052 sq.m - 86,381.01
EAO - 3,132.99
Total: 89,514.00 |
July 23, 2021 |
FY 2021 GAA |
WIN1F06343 |
FY 2021 GAA DPWH Infra Projects |
December 28, 2020 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300116204165000
Project ID : P00562426LZ
LOCAL PROGRAM
Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Concreting of Road,
Brgy. Calubasanhon, Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.778 Lane Km
Allocation : Php 4.00 million
TO :
Concreting of Road,
Brgy. Calubasanhon, Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.772 Lane Km
Allocation : Php 4.00 Million |
July 23, 2021 |
2021 |
WIN1F06069 |
SR2021-02-001743 |
February 4, 2021 |
Region VI |
Iloilo 3rd District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Capiz Rd - K0204 + 454 - K0205 + 088
CW1- Reconstruction to Concrete Pavement: 2.404 lane km - 48,549.15
EAO - 1,760.85
Total: 50,310.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Capiz Rd - K0204 + 230 - K0205 + 292, K0249 + 065-K0250 + 427
CW1- Reconstruction to Concrete Pavement:
4.840 lane km - 48,549.15
EAO - 1,760.85
Total: 50,310.00
|
July 23, 2021 |
2021 |
WIN1F06070 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Iloilo 3rd District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Balasan-Carles Rd - K0179 + 874 - K0180 + 508
CW1- Reconstruction to Concrete Pavement:
1.268 lane km - 25,400.62
EAO - 518.38
Total: 25,919.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Balasan-Carles Rd - K0179 + 560 - K0180 + 508, K0184 + 750 - K0185 + 251
CW1- Reconstruction to Concrete Pavement:
2.902 lane km - 25,400.62
EAO - 518.38
Total: 25,919.00 |
July 23, 2021 |
2021 |
WIN1F06141 |
SR2021-02-001777 |
February 4, 2021 |
Region VI |
Iloilo 3rd District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Barotac Viejo River Control, Barangay Poblacion Ilawod, Barotac Viejo, Iloilo, Sta. 3 + 598 - Sta. 2 + 948.46
CW1- Construction of Flood Mitigation Structure:
356.796 lineal meters - 77,200.00
EAO - 2,800.00
Total: 80,000.00
TO:
ORGANIZATIONAL OUTCOME 2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Barotac Viejo River Control, Barangay Poblacion Ilawod, Barotac Viejo, Iloilo, Sta. 3 + 528.6 - Sta. 2 + 881.44
CW1- Construction of Flood Mitigation Structure:
647.16 lineal meters - 77,200.00
EAO - 2,800.00
Total: 80,000.00
|
July 23, 2021 |
2021 |
WIN1F06134 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Iloilo 3rd District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Passi-Sn Rafael-Lemery-Sara Rd - K0088 + 813 - K0089 + 207
CW1- Road Widening: 0.804 lane km - 13,788.60
EAO - 281.40
Total: 14,070.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Passi-Sn Rafael-Lemery-Sara Rd – K0086 + 971-K0087 + 304
CW1- Road Widening: 0.678 lane km - 11,338.60
ROW Acquisition: 3,390 sq.m - 2,450.00
EAO - 281.40
Total: 14,070.00
|
July 23, 2021 |
2021 |
WIN1F06361 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Iloilo 3rd District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Balasan-Carles Rd - K0179 + 874 - K0180 + 508
CW1- Reconstruction to Concrete Pavement:
1.268 lane km - 25,400.62
EAO - 518.38
Total: 25,919.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Balasan-Carles Rd - K0179 + 560 - K0180 + 508, K0184 + 750 - K0185 + 251
CW1- Reconstruction to Concrete Pavement:
2.902 lane km - 25,400.62
EAO - 518.38
Total: 25,919.00
|
July 23, 2021 |
2021 |
WIN1F06312 |
SR2021-02-001773 |
February 4, 2021 |
Region VI |
Iloilo 3rd District Engineering Office |
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Secondary Roads
Passi-Sn Rafael-Lemery-Sara Rd - K0069 + 714 - K0070 + 593, K0074 + 531 - K0076 + 034, K0076 + 256 - K0076 + 776, K0092 + 095 - K0092 + 531
CW1- Off-Carriageway Improvement: Shoulder Paving / Construction: 10,107 sq.m - 51,734.615
EAO - 1,876.385
Total: 53,611.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Secondary Roads
Passi-Sn Rafael-Lemery-Sara Rd - K0069 + 095 - K0069 + 531, K0069 + 701 - K0070 + 593, K0074 + 493 - K0076 + 034, K0076 + 360 - K0076 + 784
CW1- Off-Carriageway Improvement: Shoulder Paving / Construction: 8,319 sq.m - 51,734.615
EAO - 1,876.385
Total: 53,611.00
|
July 23, 2021 |
2021 |
WIN1F06126 |
SR2021-02-004157 |
February 11, 2021 |
Region VI |
Iloilo 4th District Engineering Office |
FROM:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
Preventive Maintenance of Benigno S. Aquino Jr. Ave, K00131PN-K0007+000-K0008+500, K009+236-K0012+000 and K00477PN-K0015+(-504)-K0015+506, Iloilo
CW1 - Preventive Maintenance of Road: Asphalt Overlay:
16.317 lane km - 72,375.00
EAO - 2,625.00
Total: 75,000.00
TO:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
Preventive Maintenance of Sen. Benigno S. Aquino Jr. Ave, S00131PN-K0007+000-K0008+500, K0009+236-K0012+123 and S00477PN-K0015+(-504)-K0015+506, Iloilo
CW1 - Preventive Maintenance of Road: Asphalt Overlay:
16.317 lane km - 72,375.00
EAO - 2,625.00
Total: 75,000.00
|
July 23, 2021 |
CY 2021 |
WIN1F06576 |
UACS NO. 310206100029000 |
May 5, 2021 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 310206100029000
Project ID.: P00402135LZ
OO1: Ensure Safe and Reliable National Road System
Network Development – Construction of Flyovers/Interchanges/Undepasses/Long Span Bridges
C-5 – Quirino Flyover, Parañaque City
Physical Target: CW1 = Construction of Flyover 4900 sq.m.
Unit Cost (P’000) = P 14.07 / Lane Km.
Allocation (P’000) = P 60,928.02
EAO (P’000) = P 2,499.98
Total (P’000) = P 71,428.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Network Development – Construction of Flyovers/Interchanges/Undepasses/Long Span Bridges
C-5 – Quirino Flyover, Parañaque City
Physical Target: CW1 = Construction of Flyover 4900 sq.m.
Unit Cost (P’000) = P 14.07 / Lane Km.
Allocation (P’000) = P 60,928.02
EAO (P’000) = P 2,499.98
Total (P’000) = P 71,428.00
WIN1F06576
|
July 23, 2021 |
2021 |
WIN1E02356 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. : 300202100222000
Project ID: P00537670MN
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Seaports
FROM:
NRJ Cagniog-Cayutan-Canlanipa Port Road leading to Surigao City Port, Surigao City, Surigao del Norte
Type of Work:
CW1- Off-Carriageway Improvement: Shoulder Paving / Construction
Physical Target:
CW1- 2,500.00 Square meters
Allocation:
TOTAL: P 15,000,000
CW1: P 14,700,000
EAO: P 300,000
Unit Cost:
CW1: P 5,880.00/ Square meters
TO:
NRJ Cagniog-Cayutan-Canlanipa Port Road leading to Surigao City Port, Surigao City, Surigao del Norte
Type of Work:
CW1- Off-Carriageway Improvement: Shoulder Paving / Construction
Physical Target:
CW1- 5,662.40 Square meters
Allocation:
TOTAL: P 15,000,000
CW1: P 14,700,000
EAO: P 300,000
Unit Cost:
CW1: P 2,596.07/ Square meters
|
July 23, 2021 |
2021 |
WIN1E02370 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. : 300116204629000
Project ID: P00550979MN
Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation /Improvement of Various Infrastructure including Local Projects
FROM:
Concreting of Road, Barangay Mayag, Sison, Surigao del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.748 Lane Km
Allocation:
TOTAL: P 8,000,000
CW1: P 7,840,000
EAO: P 160,000
Unit Cost:
CW1: P 10,481,283.42/ Lane Km
TO:
Concreting of Road, Barangay Mayag, Sison, Surigao del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 1.121 Lane Km
Allocation:
TOTAL: P 8,000,000
CW1: P 7,840,000
EAO: P 160,000
Unit Cost:
CW1: P 6,993,755.58/ Lane Km |
July 23, 2021 |
2021 |
WIN1F06111 |
SR2021-04-008112 |
April 23, 2021 |
Region VI |
Negros Occidental 5th District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Bacolod North Rd - K0101 + 000 - K0101 + 380
CW1- Preventive Maintenance of Road: Asphalt Overlay:
1.236 lane km - 10,108.375
EAO - 366.625
Total: 10,475.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Bacolod North Rd - K0101 + 000 - K0101 + 504
CW1- Preventive Maintenance of Road: Asphalt Overlay:
1.008 lane km - 10,108.375
EAO - 366.625
Total: 10,475.00
|
July 23, 2021 |
2021 |
WIN1F06114 |
SR2021-02-001932 |
February 4, 2021 |
Region VI |
Negros Occidental 5th District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Jct DS Benedicto-Spur 16-Calatrava Rd - K0055 + 300 - K0055 + 318, K0055 + 500 - K0055 + 520, K0055 + 600 - K0055 + 610, K0057 + 700 - K0057 + 715
CW1- Construction of Road Slope Protection Structure:
2,685 sq.m - 25,910.25
EAO - 939.75
Total: 26,850.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Jct DS Benedicto-Spur 16-Calatrava Rd - K0055 + 300 - K0055 + 380, K0055 + 500 - K0055 + 520, K0055 + 600 - K0055 + 610, K0057 + 640 - K0057 + 658
CW1- Construction of Road Slope Protection Structure:
1,480 sq.m - 25,910.25
EAO - 939.75
Total: 26,850.00
|
July 23, 2021 |
2021 |
WIN1F06119 |
SR2021-02-001937 |
February 4, 2021 |
Region VI |
Negros Occidental 5th District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Jct DS Benedicto-Spur 16-Calatrava Rd - K0077 + 863 - K0078 + 000, K0078 + 300 - K0078 + 400, K0083 + 000 - K0083 + 005
CW1- Construction of Road Slope Protection Structure:
335.305 sq.m - 5,790.00
EAO - 210.00
Total: 6,000.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Jct DS Benedicto-Spur 16-Calatrava Rd - K0077 + 863 - K0078 + 000, K0078 + 227 - K0078 + 300, K0083 + 000 - K0083 + 042
CW1- Construction of Road Slope Protection Structure:
983.58 sq.m - 5,790.00
EAO - 210.00
Total: 6,000.00
|
July 23, 2021 |
2021 |
WIN1F06150 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Negros Occidental 3rd District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod South Rd - K0085 + 070 - K0085 + 217, K0085 + 608 - K0086 + 000
CW1- Preventive Maintenance of Road: Asphalt
Overlay: 2.168 lane km - 11,613.00
EAO - 237.00
Total: 11,850.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod South Rd - K0085 + 070 – K0085 + 608, K0087 + 608 – K0087 + 718
CW1- Preventive Maintenance of Road: Asphalt
Overlay: 2.592 lane km - 11,613.00
EAO - 237.00
Total: 11,850.00 |
July 23, 2021 |
2021 |
WIN1F06344 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 2nd District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Primary Roads
Iloilo-Capiz Rd (New Route) - K0079 + 000 - K0079 + 855
CW1- Road Widening: 1.312 lane km - 23,398.48
EAO - 477.52
Total: 23,876.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Primary Roads
Iloilo-Capiz Rd (New Route) – K0079 + 981 - K0080 + 219
CW1- Road Widening: 0.478 lane km - 12,153.48
CW2- Construction of Road Slope Protection Structure: 1,250.83 sq.m - 8,500.00
ROW Acquisition: 498.79 sq.m - 2,745.00
EAO - 477.52
Total: 23,876.00
|
July 23, 2021 |
FY 2021 GAA |
WIN1E02638 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Bridge Program - Widening of Permanent Bridges
Pilan Br. (B00130MN) along Davao-Cotabato Rd (Davao City-Jct Digos Sect)
Physical Target:
CW1: 200.340 sq. m. (Widening of Bridge)
Allocation:
TOTAL: P 99,500,000.00
CW1: P 96,017,500.00 (Widening of Bridge)
EAO: P 3,482,500.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Bridge Program - Widening of Permanent Bridges
Pilan Br. (B01996MN) along Davao-Cotabato Rd (Davao City-Jct Digos Sect)
Physical Target:
CW1: 96.831 sq. m. (Widening of Bridge)
ROW: 3,195.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 99,500,000.00
CW1: P 17,716,600.00 (Widening of Bridge)
ROW: P 6,504,900.00 (ROW Acquisition)
EAO: P 878,500.00
EXC: P 74,400,000.00 |
July 23, 2021 |
2021 |
WIN1F06078 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 2nd District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Sigma-Mambusao-Jamindan Rd - K0090 + 837 - K0090 + 984, K0091 + 842 - K0092 + 139.50
CW1- Reconstruction to Concrete Pavement: 1.187 lane km - 24,358.88
EAO - 497.12
Total: 24,856.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Sigma-Mambusao-Jamindan Rd - K0090 + 837 - K0090 + 988, K0091 + 194 - K0091+248, K0091 + 779 - K0092 + 351, K0102 + 000 - K0102 + 160
CW1- Reconstruction to Concrete Pavement: 1.878 lane km - 24,358.88
EAO - 497.12
Total: 24,856.00 |
July 23, 2021 |
FY 2021 GAA |
WIN1E02575 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure along Bitaogan River, Lupon, Davao Oriental
Physical Target:
CW1: 337.00 ln. m. (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 10,00,000.00
CW1: P 9,800,000.00 (Construction of Flood Mitigation Structure)
EAO: P 200,000.00
TO: OO2: Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Mitigation Structure along Bitaogan River, San Isidro, Davao Oriental
Physical Target:
CW1: 337.00 ln. m. (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 10,00,000.00
CW1: P 9,800,000.00 (Construction of Flood Mitigation Structure)
EAO: P 200,000.00 |
July 23, 2021 |
2021 |
WIN1F06118 |
FCR 2021 RA 11518 |
December 28, 2020 |
Region VI |
Capiz 2nd District Engineering Office |
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Capiz-Aklan Rd - K0338 + 972 - K0339 + 765
CW1- Reconstruction to Concrete Pavement:
1.598 lane km - 32,778.06
EAO - 668.94
Total: 33,447.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Capiz-Aklan Rd - K0338 + 972 - K0339 + 888
CW1- Reconstruction to Concrete Pavement:
1.838 lane km - 32,778.06
EAO - 668.94
Total: 33,447.00
|