Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
August 4, 2021 FY 2021 GAA WIN1F06348 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Romblon District Engineering Office
UACS No. : 310102100692000
Project ID : P00505613LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

FROM :

Tablas Circumferential Road,
K0021 + 035 - K0021 + 591
Physical Target - CW1 - Preventive Maintenance of Road -
Concrete Reblocking : 1.112 Lane Km
Allocation : Php 5.359 Million

TO :

Tablas Circumferential Road,
K0021 + 035.60 - K0021 + 063.35 (L/S),
K0021 + 085.60 - K0021 + 438.00 (R/S)
Physical Target - CW1 - Preventive Maintenance of Road -
Concrete Reblocking : 0.43715 Lane Km
Allocation : Php 5.359 Million

August 4, 2021 FY 2021 GAA WIN1E02676 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Construction/Improvement of Various Infrastructures in Support of National Security (TIKAS)
Concreting of Camp General Manuel T Yan Sr road, Camp General Manuel T Yan Sr., Brgy. Tuboran, Mawab, Compostela Valley
Physical Target:
CW1: 4.009 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 57,500,000.00
CW1: P 55,487,500.00 (Construction of Concrete Road)
EAO: P 2,012,500.00

TO: Convergence and Special Support Program - Construction/Improvement of Various Infrastructures in Support of National Security (TIKAS)
Concreting of Camp General Manuel T Yan Sr road, Camp General Manuel T Yan Sr., Brgy. Tuboran, Mawab, Compostela Valley
Physical Target:
CW1: 3.987 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 57,500,000.00
CW1: P 55,487,500.00 (Construction of Concrete Road)
EAO: P 2,012,500.00
August 4, 2021 FY 2021 GAA WIN1F06358 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Romblon District Engineering Office
UACS No. : 310105100555000
Project ID : P00505614LZ

001: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads - Secondary Roads

FROM :

Tablas Circumferential Road,
K0030 + 934 - K0031 + 293
Physical Target - CW1 - Reconstruction to Concrete Pavement :
0.722 Lane Km
Allocation : Php 15.60 Million

TO :

Tablas Circumferential Road,
K0030 + 934 - K0031 + 242
Physical Target - CW1 - Reconstruction to Concrete Pavement :
0.620 Lane Km
Allocation : Php 15.60 Million
August 4, 2021 2021 WIN1C03927 FY 2021 GAA December 28, 2020 Region III Zambales 1st District Engineering Office
Network Development - Road Widening - Secondary Roads

Olongapo - Bugallon Road - K0182+823 - K0183+663.50

August 4, 2021 FY 2021 GAA WIN1E02677 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Montevista-Compostela-Mati Bdry Rd - K1429+923 - K1433+387,
K1434+000 - K1434+059.50, K1434+870 - K1435+100,
K1446+000 - K1448+146, K1448+266 - K1449+000
Physical Target:
CW1: 19.440 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 99,997,000.00
CW1: P 96,497,105.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,499,895.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Montevista-Compostela-Mati Bdry Rd - K1429+923 - K1433+367,
K1434+870 - K1435+100, K1435+237 - K1436+367,
K1446+479 - K1448+146, K1448+193 - K1448+826
Physical Target:
CW1: 14.396 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 99,997,000.00
CW1: P 96,497,105.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,499,895.000
August 4, 2021 2021 WIN1C04182 FY 2021 GAA December 28, 2020 Region III Pampanga 1st District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads

Manila North Road - Apalit Section - K0052+706 - K0053+639
August 4, 2021 FY 2021 GAA WIN1F06399 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Romblon District Engineering Office
UACS No. : 310105100556000
Project No. : P00505615LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads - Secondary Roads

FROM :

Tablas Circumferential Road,
K0117 + 180 - K0117 + 312
Physical Target - CW1 - Reconstruction to Concrete Pavement :
0.264 Lane Km
Allocation : Php 6.20 Million

TO :

Tablas Circumferential Road,
K0117 + 187.70 - K0117 + 388.70
Physical Target - CW1- Reconstruction to Concrete Pavement :
0.402 Lane Km
Allocation : Php 6.20 Million
August 4, 2021 FY 2021 GAA WIN1E02669 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1808+692 - K1809+735
Physical Target:
CW1: 2.060 lane km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Road Widening)
EAO: P 1,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1809+324 - K1810+895
Physical Target:
CW1: 3.100 lane km (Road Widening)
ROW: 31,000.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 44,000,000.00 (Road Widening)
ROW: P 5,000,000.00 (ROW Acquisition)
EAO: P 1,000,000.00
August 4, 2021 FY 2021 GAA WIN1E02670 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway -
K1588+400 - K1588+418, K1589+200 - K1589+230,
K1590+000 - K1590+200, K1590+800 - K1590+830,
K1591+600 - K1591+650, K1592+050 - K1592+250,
K1595+290 - K1595+340, K1595+500 - K1595+600
Physical Target:
CW1: 6,566.666 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 53,000,000.00
CW1: P 51,145,000.00 (Construction of Road Slope Protection Structure)
EAO: P 1,855,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1587+718 - K1587+778,
K1587+843 - K1587+882, K1589+970 - K1590+012,
K1590+000 - K1590+200, K1591+560 - K1591+600,
K1592+110 - K1592+220, K1595+306 - K1595+339
Physical Target:
CW1: 6,489.912 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 53,000,000.00
CW1: P 51,145,000.00 (Construction of Road Slope Protection Structure)
EAO: P 1,855,000.00
August 4, 2021 FY 2021 GAA WIN1E02668 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Daang Maharlika (MN) -
K1389+350 - K1389+430, K1403+500 - K1403+600
Physical Target:
CW1: 2,877.690 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 37,112,000.00
CW1: P 36,369,760.00 (Construction of Road Slope Protection Structure)
EAO: P 742,240.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Daang Maharlika (MN) - K1385+896 - K1386+104
Physical Target:
CW1: 2,707.32 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 37,112,000.00
CW1: P 36,369,760.00 (Construction of Road Slope Protection Structure)
EAO: P 742,240.00
August 3, 2021 2021 WIN1F06590 GAA FY 2021 January 1, 2021 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

AS PER GAA/ORIGINAL:

Picas-Sn Jose DZR Airport Rd – (S00258LT) Chainage 0 – Chainage 94

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement: P 4.188520 M
0.188 Lane Km
EAO P 0.085480 M

Total P 4.274.00 M

AS MODIFIED:

Picas-Sn Jose DZR Airport Rd - (S00258LT) Chainage 33 - Chainage 85, (S00257LT) K0910+-859-K0910+-813

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement: P 4.188520 M
0.196 Lane Km
EAO P 0.085480 M

Total P 4.274.00 M
August 3, 2021 2021 WIN1F06588 GAA FY 2021 January 1, 2021 Region VIII Northern Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0820 + 100 - K0820 + 494

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 72.375 M
Structure: 7,500 square meters
EAO P 2.625 M

Total P 75.00 M

AS MODIFIED:

Palapag-Mapanas-Gamay-Lapinig Rd - K0820 + 130 - K0820 + 460, K0820 + 820 - K0820 + 885

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 72.375 M
Structure: 1,975 square meters
EAO P 2.625 M

Total P 75.00 M
August 3, 2021 CY 2021 WIN1F06643 UACS No. 300209100002000 April 30, 2021 National Capital Region NCR - Regional Office
As per GAA/Original
UACS No. 300209100002000
Project ID.: P00531623LZ

Convergence and Special Support Program

Construction/ Improvement of Access Roads leading to Railway Stations
Bahay Toro Ave. leading to Tandang Sora Station, Quezon City
Physical Target: CW1 = Construction of Drainage Structure 1600 l.m.
CW2 = Shoulder Paving / Construction 3206 sq.m.
Unit Cost (P’000) = P 5.97 / l.m.
= P 1.97/ sq.m.
Allocation (P’000) = P 9,557.36
= P 6,319.79
EAO (P’000) = P 575.855
Total (P’000) = P 16,453.00

As Modified

Convergence and Special Support Program

Construction/ Improvement of Access Roads leading to Railway Stations
Bahay Toro Ave. leading to Tandang Sora Station, Quezon City
Physical Target: CW1 = Shoulder Paving/Construction 1330 sq.m.
Unit Cost (P’000) = P 8.58 / sq.m.
Allocation (P’000) = P 11,408.39
EAO (P’000) = P 399.29
Total (P’000) = P 11,807.68
Excess Amount (P’000) = P 4,645.32
WIN1F06643
August 3, 2021 CY 2021 WIN1F06644 UACS No. 300209100004000 May 17, 2021 National Capital Region NCR - Regional Office
As per GAA/Original
UACS No. 300209100004000
Project ID.: P00531627LZ

Convergence and Special Support Program

Construction/ Improvement of Access Roads leading to Railway Stations
Don Julio Gregorio St. leading to Quirino Highway Station, Quezon City
Physical Target: CW1 = Construction of Drainage Structure 1400 l.m.
CW2 = Shoulder Paving / Construction 2800 sq.m.
Unit Cost (P’000) = P 6.42 / l.m.
= P 2.12/ sq.m.
Allocation (P’000) = P 8,981.255
= P 5,927.995
EAO (P’000) = P 540.75
Total (P’000) = P 15,450.00

As Modified

Convergence and Special Support Program

Construction/ Improvement of Access Roads leading to Railway Stations
Don Julio Gregorio St. leading to Quirino Highway Station, Quezon City
Physical Target: CW1 = Shoulder Paving/ Construction 2846 sq.m.
Unit Cost (P’000) = P 5.24 / sq.m.
Allocation (P’000) = P 14,909.25
EAO (P’000) = P 540.75
Total (P’000) = P 15,450.00
WIN1F06644
August 3, 2021 CY 2021 WIN1F06297 UACS No. 320101106455000 April 28, 2021 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 320101106455000
Project ID.: P00525821LZ

OO2: Protect Lives and Properties

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Flood Control Structures and Facilities along Blumentritt, Sta. 0+000.00 to Sta. 0+297.20,
Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 214.40 l.m.
Unit Cost (P’000) = P 91.41/ l.m.
Allocation (P’000) = P 19,600.00
EAO (P’000) = P 400.00
Total (P’000) = P 20,000.00


As Modified

OO2: Protect Lives and Properties

Flood Management-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Flood Control Structures and Facilities along Blumentritt, Sta. 0+000.00 to Sta. 0+214.40,
Manila City
Physical Target: CW1 = Construction of Flood Mitigation Structure 214.40 l.m.
Unit Cost (P’000) = P 91.41/ l.m.
Allocation (P’000) = P 19,600.00
EAO (P’000) = P 400.00
Total (P’000) = P 20,000.00
WIN1F06297
August 2, 2021 2021 WIN1C04262 FY 2021 GAA December 28, 2020 Region III Aurora District Engineering Office
Asset Preservation - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Baler - Casiguran Rd (Baler - Dinadiawan) (S04735LZ), K0274+895 - K0275+000


August 2, 2021 2021 WIN1C04420 FY 2021 GAA December 28, 2020 Region III Regional Office III
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as R. A. 11239

Improvement of Signages along Various Intersections of Roman Expressway
August 2, 2021 2021 WIN1C04413 FY 2021 GAA December 28, 2020 Region III Regional Office III
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as R. A. 11239

Improvement of Signages along Various Intersections of Roman Expressway
August 2, 2021 2021 WINC04403 GAA 2021 July 28, 2021 Cordillera Administrative Region CAR - Regional Office
From: Mt Prov-Cagayan via Tabuk-Enrile Rd - K0417 + 750 - K0418 + 050; Physical Target: CW1 : 3,870 Square meters; Allocation= Php 100,000,000


To: Mt Prov-Cagayan via Tabuk-Enrile Rd - K0416 + 005 - K0416 + 090;
Physical Target: CW1 : 4,002.50 Square meters;
Allocation= Php 100,000,000
August 2, 2021 2021 WIN1C04404 GAA 2021 July 28, 2021 Cordillera Administrative Region CAR - Regional Office
From: Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Labey-Lacamen Provincial Road (Section 4B of BLISTT Outer Ring Circumferential Road), Package 7, Benguet;
Physical Target: CW1 : 9,523.62 Square meters;
Allocation= Php 200,000,000

To: Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Labey-Lacamen Provincial Road (Section 4B of BLISTT Outer Ring Circumferential Road), Package 7, Benguet;
Physical Target: CW1 : 9,917 Square meters;
Allocation= Php 200,000,000

August 2, 2021 2021 WIN1C04390 GAA 2021 July 28, 2021 Cordillera Administrative Region CAR - Regional Office
From: Mt Prov-Ilocos Sur via Tue Rd - K0389 + 350 - K0389 + 460, K0389 + 950 - K0390 + 120;
Physical Target: CW1 : 3,875 Square meters;
Allocation= Php 100,000,000

To: Mt Prov-Ilocos Sur via Tue Rd - K0389 + 380 - K0389 +736;
Physical Target: CW1 : 4,647 Square meters;
Allocation= Php 100,000,000

August 2, 2021 2021 WIN1C04391 GAA 2021 July 28, 2021 Cordillera Administrative Region CAR - Regional Office
From: Construction of Amburayan Flood Control, Kapangan, Benguet;
Physical Target: CW1 : 0 Lineal meters;
Allocation= Php 100,000,000

To: Construction of Amburayan Flood Control, Kapangan, Benguet;
Physical Target: CW1 : 914 Lineal meters;
Allocation= Php 100,000,000

August 2, 2021 2021 WIN1C04392 GAA 2021 July 28, 2021 Cordillera Administrative Region CAR - Regional Office
From: Road Opening of Bolok - Adaoay - Bajen - Batan Access Road, Batan and Anchokey, Kabayan, Benguet;
Physical Target: CW1 : 0 Lane Km;
Allocation= Php 100,000,000

To: Road Opening of Bolok - Adaoay - Bajen - Batan Access Road, Batan and Achokey, Kabayan, Benguet;
Physical Target: CW1 : 6.4 Lane Km;
Allocation= Php 100,000,000

August 2, 2021 2021 WIN1C04399 GAA 2021 July 28, 2021 Cordillera Administrative Region CAR - Regional Office
From: Construction of Road Slope Protection along Governor Dangwa National Road at Ambalideng, Poblacion, Kibungan, Benguet, K0315+750 - K0315+820;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 60,000,000

To: Construction of Road Slope Protection along Governor Dangwa National Road at Ambalideng, Poblacion, Kibungan, Benguet, K0315+120 - K0315+175, K0315+650 - K0315+695;
Physical Target: CW1 : 2,365 Square meters;
Allocation= Php 60,000,000

August 2, 2021 2021 WIN1C04398 GAA 2021 July 28, 2021 Cordillera Administrative Region CAR - Regional Office
From: Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Labey-Lacamen Provincial Road (Section 4B of BLISTT Outer Ring Circumferential Road), Package 6, Benguet;
Physical Target: CW1 : 10,993 Square meters;
Allocation= Php 255,000,000

To: Baguio-La Trinidad-Itogon-Sablan-Tuba and Tublay, Labey-Lacamen Provincial Road (Section 4B of BLISTT Outer Ring Circumferential Road), Package 6, Benguet;
Physical Target: CW1 : 11,267 Square meters;
Allocation= Php 255,000,000

August 2, 2021 2021 WIN1C04411 GAA 2021 July 28, 2021 Cordillera Administrative Region CAR - Regional Office
From: Gov. Bado Dangwa National Rd - K0345 + 520 - K0345 + 664, K345 + 831 - K0345 + 890;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 105,000,000

To: Gov. Bado Dangwa National Rd - K0345 + 520 - K0345 + 650;
Physical Target: CW1 : 4,165 Square meters;
Allocation= Php 105,000,000

August 2, 2021 2021 WIN1C04410 GAA 2021 July 28, 2021 Cordillera Administrative Region CAR - Regional Office
From: Mt Prov-Ilocos Sur via Tue Rd - K0389 + 600 - K0389 + 900;
Physical Target: CW1 : 3,870 Square meters;
Allocation= Php 100,000,000

To: Mt Prov-Ilocos Sur via Tue Rd - K0389 + 876 - K0390 + 000;
Physical Target: CW1 : 4,487.5 Square meters;
Allocation= Php 100,000,000

August 2, 2021 2021 WINC04409 GAA 2021 July 28, 2021 Cordillera Administrative Region CAR - Regional Office
From: Gov. Bado Dangwa National Rd - K0288 + 382 - K0288 + 535, K0298 + 130 - K0298 + 352, K0298 + 460 - K0298 + 572;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 160,000,000

To: Gov. Bado Dangwa National Rd - K0288 + 382 - K0288 + 535, K0298 + 130 - K0298 + 200;
Physical Target: CW1 : 8,742 Square meters;
Allocation= Php 160,000,000

August 2, 2021 2021 WIN1C04393 GAA 2021 July 28, 2021 Cordillera Administrative Region CAR - Regional Office
From: Banaue-Hungduan-Benguet Bdry Rd - K0407 + 546 - K0407 + 846, K0401 + 430 - K0401 + 630;
Physical Target: CW1 : 4,000 Square meters;
Allocation= Php 118,187,000

To: Banaue-Hungduan-Benguet Bdry Rd - K0407 + 480 - K0407 + 850;
Physical Target: CW1 : 5,291.2 Square meters;
Allocation= Php 118,187,000

August 2, 2021 2021 WIN1C04401 GAA 2021 July 28, 2021 Cordillera Administrative Region CAR - Regional Office
From: Mt Prov-Cagayan via Tabuk-Enrile Rd - K0418 + 300 - K0418 + 600;
Physical Target: CW1 : 3,870 Square meters;
Allocation= Php 100,000,000

To: Mt Prov-Cagayan via Tabuk-Enrile Rd - K0418 + 230 - K0418 + 380;
Physical Target: CW1 : 3,901 Square meters;
Allocation= Php 100,000,000

August 2, 2021 2021 WIN1C04402 GAA 2021 July 28, 2021 Cordillera Administrative Region CAR - Regional Office
From: Mt Prov-Cagayan via Tabuk-Enrile Rd - K0404 + 800 - K0404 + 950, K0404 + 960 - K0405 + 060;
Physical Target: CW1 : 3,895 Square meters;
Allocation= Php 100,000,000

To: Mt Prov-Cagayan via Tabuk-Enrile Rd - K0404 + 800 - K0404 + 935;
Physical Target: CW1 : 3,927 Square meters;
Allocation= Php 100,000,000

August 2, 2021 2021 WIN1C04356 GAA 2021 July 22, 2021 Cordillera Administrative Region CAR - Regional Office
From: Construction of Road Slope Protection Structure along Governor Bado Dangwa National Road at Ampusongan, Bakun, Benguet, K0339+574 - K0339+660;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 60,000,000

To: Construction of Road Slope Protection Structure along Governor Dangwa National Road at Ampusongan, Bakun, Benguet, K0338+970 - K0339+050;
Physical Target: CW1 : 2,413 Square meters;
Allocation= Php 60,000,000

August 2, 2021 2021 WIN1C04385 GAA 2021 July 23, 2021 Cordillera Administrative Region CAR - Regional Office
From: Benguet (Asphalt Overlay) - Nueva Vizcaya Road K0303 + 000 - K0319 + 726; Physical Target: CW1 : 33.846 Lane Km; Allocation= Php 300,000,000

To: Benguet - Nueva Vizcaya Road K0254 + (-372) - K0281 + 800;
Physical Target: CW1 : 56.632 Lane Km;
Allocation= Php 300,000,000
August 2, 2021 2021 WIN1C04387 GAA 2021 July 23, 2021 Cordillera Administrative Region CAR - Regional Office
From: Cong. Andres Acop Cosalan Rd - K0356 + 630 - K0356 + 830;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 222,000,000

To: Cong. Andres Acop Cosalan Rd - K0356 + 680 - K0356 + 830;
Physical Target: CW1 : 9,346 Square meters;
Allocation= Php 222,000,000

August 2, 2021 2021 WIN1C04388 GAA 2021 July 23, 2021 Cordillera Administrative Region CAR - Regional Office
From: Gov. Bado Dangwa National Rd - K0315 + 721 - K0315 + 826, K0316 + 000 - K0316 + 082;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 120,000,000

To: Gov. Bado Dangwa National Rd - K0315 + 721 - K0315 + 826, K0316 + 045 - K0316 + 082;
Physical Target: CW1 : 5,062 Square meters;
Allocation= Php 120,000,000

August 2, 2021 2021 WIN1C04386 GAA 2021 July 23, 2021 Cordillera Administrative Region CAR - Regional Office
From: Mt Prov-Cagayan via Tabuk-Enrile Rd - K0419 + 100 - K0419 + 450;
Physical Target: CW1 : 3,830 Square meters;
Allocation= Php 100,000,000

To: Mt Prov-Cagayan via Tabuk-Enrile Rd - K0418 + 460 - K0418 + 580;
Physical Target: CW1 : 3,990 Square meters;
Allocation= Php 100,000,000

August 2, 2021 2021 WIN1C04380 GAA 2021 July 22, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Kalinga Rd - K0457+000 - K0458 + 100;
Type of Work: CW1: Reconstruction to Concrete Pavement ; Physical Target: CW1: 2.136 Lane Km;
Allocation= Php 99,000,000

To: Abra-Kalinga Rd - K0456+600 - K0458 + 100;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 2.894 Lane Km
CW2: 3,403.26 Square meters;
Allocation= Php 99,000,000
August 2, 2021 2021 WIN1C04312 GAA 2021 July 16, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Kalinga Rd - K0420 + 654 - K0421 + 600;
Physical Target: CW1: 1.778 Lane Km;
Allocation= Php 20,000,000

To: Abra-Kalinga Rd - K0419 + 484 - K0421 + 600;
Physical Target: CW1: 4.120 Lane Km;
Allocation= Php 20,000,000

August 2, 2021 2021 WIN1C04311 GAA 2021 July 16, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Cervantes Rd - K0438 + 182 - K0443 + 323;
Physical Target: CW1: 10 Lane Km;
Allocation= Php 50,000,000

To: Abra-Cervantes Rd - K0438 + 182 - K0443 + 323;
Physical Target: CW1: 10.492 Lane Km;
Allocation= Php 50,000,000

August 2, 2021 2021 WIN1C04375 GAA 2021 July 22, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Ilocos Norte Rd - K0431 + 710 - K0431 + 800;
Physical Target: CW1: 10,000 Square meters;
Allocation= Php 100,000,000

To: Abra-Ilocos Norte Rd - K0430 + 488 - K0430 + 647;
Physical Target: CW1: 4,064.27 Square meters;
Allocation= Php 100,000,000

August 2, 2021 2021 WIN1C04358 GAA 2021 July 22, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Ilocos Norte Rd - K0434 + 700 - K0435 + 850;
Physical Target: CW1: 10,000 Square meters;
Allocation= Php 100,000,000

To: Abra-Ilocos Norte Rd - K0434 + 870 - K0435 + 000;
Physical Target: CW1: 4,061.78 Square meters;
Allocation= Php 100,000,000

August 2, 2021 2021 WIN1C04370 GAA 2021 July 22, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Gucab - Demet Flood Control, La Paz, Abra;
Physical Target: CW1: 445.594 Lineal meters;
Allocation= Php 50,000,000

To: Construction of Gucab - Demet Flood Control, La Paz, Abra;
Physical Target: CW1: 395.2 Lineal meters;
Allocation= Php 50,000,000

August 2, 2021 2021 WIN1C04378 GAA 2021 July 22, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Riang Flood Control Structure, Sta. 30+700 - Sta. 31+200, Peñarrubia, Abra;
Physical Target: CW1: 600 Lineal meters;
Allocation= Php 50,000,000

To: Construction of Riang Flood Control Structure, Sta. 30+700 - Sta. 31+200, Peñarrubia, Abra;
Physical Target: CW1: 470 Lineal meters;
Allocation= Php 50,000,000

August 2, 2021 2021 WIN1C04372 GAA 2021 July 22, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Rehabilitation of Bucay North Road with Road Opening, Pagala Section, Bucay, Abra;
Type of Work: CW1: Rehabilitation of Concrete Road;
Physical Target: CW1: 10.396 Lane Km;
Allocation= Php 100,000,000

To: Rehabilitation of Bucay North Road with Road Opening, Pagala Section, Bucay, Abra;
Type of Work: CW1: Rehabilitation of Concrete Road
CW2: Construction of Road Slope Protection Stucture;
Physical Target: CW1: 4.2584 Lane Km
CW2: 10,674 Square Meters;
Allocation= Php 100,000,000

August 2, 2021 2021 WIN1C04313 GAA 2021 July 16, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Rehabilitation of Peñarrubia Cawaw Road, Peñarrubia, Abra;
Physical Target: CW1: 3.72 Lane Km;
Allocation= Php 50,000,000

To: Rehabilitation of Peñarrubia Cawaw Road, Peñarrubia, Abra;
Physical Target: CW1: 5.066 Lane Km;
Allocation= Php 50,000,000

August 2, 2021 2021 WIN1C04400 GAA 2021 July 28, 2021 Cordillera Administrative Region Apayao 2nd District Engineering Office
From: Construction of Sta. Filomena Floodway / Flood Control Structure, Sta. Filomena, Calanasan, Apayao;
Physical Target: CW1: 100 Lineal meters;
Allocation= Php 10,000,000

To: Construction of Sta. Filomena Floodway / Flood Control Structure, Sta. Filomena, Calanasan, Apayao;
Physical Target: CW1: 45 Lineal meters;
Allocation= Php 10,000,000

August 2, 2021 2021 WIN1C04346 GAA 2021 July 19, 2021 Cordillera Administrative Region Baguio City District Engineering Office
From: South Drive- K0252+755;
Type of Work: Off-Carriageway Improvement: Flaring of Intersections / Improvement of Intersections;
Physical Target: CW1: 1 No. of Intersection;
Allocation= Php 5,000,000

To: South Drive- K0251+755 – K0252+595;
Type of Work: Off-Carriageway Improvement: Shoulder Paving/ Construction;
Physical Target: CW1: 1,260 Square meters;
Allocation= Php 5,000,000




August 2, 2021 2021 WIN1C04408 GAA 2021 July 28, 2021 Cordillera Administrative Region Baguio City District Engineering Office
From: Construction of Road, Iron Street Purok 6, Upper Quezon Hill, Baguio City;
Physical Target: CW1: 0.08 Lane Km;
Allocation= Php 3,000,000

To: Construction of Road, Iron Street Purok 7, Upper Quezon Hill, Baguio City;
Physical Target: CW1: 0.08 Lane Km;
Allocation= Php 3,000,000

August 2, 2021 2021 WIN1C04360 GAA 2021 July 22, 2021 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Road Slope Protection Project along Governor Bado Dangwa National Road, Mayus, Poblacion, Kibungan, Benguet, K0320 + 442 - K0320 + 542;
Physical Target: CW1: 1800 Square meter;
Allocation= Php 50,000,000

To: Road Slope Protection Project along Governor Bado Dangwa National Road, Mayus, Poblacion, Kibungan, Benguet, K0320 + 442 - K0320 + 592;
Physical Target: CW1: 2,493.55 Square meter;
Allocation= Php 50,000,000

August 2, 2021 2021 WIN1C04362 GAA 2021 July 22, 2021 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Construction of Guinaoang Flood Control Sta. 21+404 - Sta. 21+644 (R.S.), Mankayan, Benguet;
Physical Target: CW1: 240 Lineal meters;
Allocation= Php 10,000,000

To: Construction of Guinaoang Flood Control Sta. 21+404 - Sta. 21+527 (R.S.), Sta. 21+441 - Sta. 21+561 (L.S.), Mankayan, Benguet;
Physical Target: CW1: 240 Lineal meters;
Allocation= Php 10,000,000

August 2, 2021 2021 WIN1C04366 GAA 2021 July 22, 2021 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Construction of Balili Flood Control Sta. 1+429 - 2+149 (R.S.), Mankayan, Benguet;
Physical Target: CW1: 735 Lineal meters;
Allocation= Php 30,000,000

To: Construction of Balili Flood Control Sta. 1+429 - Sta. 1+698 (L.S.), Sta. 1+445 - Sta. 1+698 (R.S.), Sta. 1+711 - Sta. 1+849 (L.S.), Sta. 1+727 - Sta. 1+803(R.S.), Mankayan, Benguet;
Physical Target: CW1: 735 Lineal meters;
Allocation= Php 30,000,000

August 2, 2021 2021 WIN1C04369 GAA 2021 July 22, 2021 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Construction of Copias Flood Control Sta. 5+120 - Sta. 5+360 (L.S.),Kapangan, Benguet;
Physical Target: CW1: 240 Lineal meters;
Allocation= Php 10,000,000

To: Construction of Copias Flood Control Sta. 5+264 - Sta. 5+434 (R.S.),Kapangan, Benguet;
Physical Target: CW1: 185 Lineal meters;
Allocation= Php 10,000,000

August 2, 2021 2021 WIN1C04364 GAA 2021 July 22, 2021 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Construction of Palina Flood Control Sta. 3+238 - Sta. 3+358 (B.S.), Kibungan, Benguet;
Physical Target: CW1: 195 Lineal meters;
Allocation= Php 10,000,000

To: Construction of Palina Flood Control Sta. 3+322 - Sta. 3+437 (L.S.), Sta. 3+322 - Sta. 3+400 (R.S.), St. 4+126 - Sta. 4+166 (L.S.), Sta. 4+125 - Sta. 4+150 (R.S.), Kibungan, Benguet;
Physical Target: CW1: 195 Lineal meters;
Allocation= Php 10,000,000

August 2, 2021 2021 WIN1C04363 GAA 2021 July 22, 2021 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Construction of Mayus Flood Control Sta. 0+158 - Sta. 0+278 (B.S.), Kibungan, Benguet;
Physical Target: CW1: 220 Lineal meters;
Allocation= Php 10,000,000

To: Construction of Mayus Flood Control Sta. 0+158 - Sta. 0+278 (R.S.), Sta. 0+187 - Sta. 0+292 (L.S.), Kibungan, Benguet;
Physical Target: CW1: 220 Lineal meters;
Allocation= Php 10,000,000

August 2, 2021 2021 WIN1C04371 GAA 2021 July 23, 2021 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: National Road System along Kalinga-Abra Road(Balbalan Section), K0497+505-K0497+651, Balbalan, Kalinga;
Type of Work: CW1: Reconstruction to Concrete Pavement;
Physical Target: CW1: 0.292 Lane Km;
Allocation= Php 60,000,000

To: National Road System along Kalinga-Abra Road (Balbalan Section), K0487+1235-K0487+1260, K0487+1310-K0487+1381, K0489+081-K0489+211, K0489+286-K0489+500, K0489+1715-K0489+1755, K0494+055–K0494+201, K0497+440-K0497+618, Balbalan, Kalinga;
Type of Work: CW1: Reconstruction to Concrete Pavement
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 1.608 Lane Km
CW2: 2,065.65 Square meters;
Allocation= Php 60,000,000
August 2, 2021 2021 WIN1C04367 GAA 2021 July 22, 2021 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Construction of Saliok Flood Control, Sta. 129 + 695 – Sta. 129 + 835 (L.S.), Sta. 129 + 775 – Sta. 129 + 875 (R.S.), Natonin, Mountain Province;
Physical Target: CW1: 262 Lineal meters;
Allocation= Php 20,000,000

To: Construction of Saliok Flood Control, Sta. 129 + 875 - Sta. 130 + 137(R.S.), Natonin, Mountain Province;
Physical Target: CW1: 262 Lineal meters;
Allocation= Php 20,000,000

July 30, 2021 FY 2021 GAA WIN1F06382 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 300116204224000
Project ID : P00562485LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Concreting of Road at
Mansalay, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
6.50 Lane Km
Allocation : Php 39.00 Million

TO :

Concreting of Road at
Mansalay, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
7.3040 Lane Km
Allocation : Php 39.00 Million
July 30, 2021 FY 2021 GAA WIN1F06347 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 300116204225000
Project ID : P00562486LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Concreting of Road at
Roxas, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
6.00 Lane Km
Allocation : Php 36.00 Million

TO :

Concreting of Road at
Roxas, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
6.00 Lane Km
Allocation : Php 36.00 Million

TO :

Concreting of Road at
Roxas, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
6.0192 Lane Km
Allocation : Php 36.00 Million
July 30, 2021 CY 2021 WIN1F06599 UACS No. 310205100513000 June 28, 2021 National Capital Region NCR - Regional Office
As per GAA/Original
UACS No. 310205100513000
Project ID.: P00506024LZ

OO1: Ensure Safe and Reliable National Road System

Network Development – Construction of Missing Links / New Roads
Laguna Lake Highway Extension (Phase 2), Taguig City
Physical Target: CW1 = Construction of Concrete Road 10.80 lane Km
Unit Cost (P’000) = P 10,722.22 / l.m.
Allocation (P’000) = P 115,800.00
EAO (P’000) = P 4,200.00
Total (P’000) = P 120,000.00

As Modified

OO1: Ensure Safe and Reliable National Road System

Network Development – Construction of Missing Links / New Roads
Laguna Lake Highway Extension (Phase 2), Taguig City
Physical Target: CW1 = Construction of Concrete Road 1.52 lane Km
CW2 = RROW 1,428.57 sq.m
Unit Cost (P’000) = P 69,923.37 / lane km. 140 m/km
= P 7.00 / sq.m.
Allocation (P’000) = P 106,283.52
= P 10,000.00
EAO (P’000) = P 3,716.48
Total (P’000) = P 120,000.00
WIN1F06599
July 30, 2021 CY 2021 WIN1F06601 UACS No. 310205100510000 June 28, 2021 National Capital Region NCR - Regional Office
As per GAA/Original
UACS No. 310205100510000
Project ID.: P00506025LZ

OO1: Ensure Safe and Reliable National Road System

Network Development – Construction of Missing Links / New Roads
Laguna Lake Highway Extension (Phase 1), Muntinlupa City
Physical Target: CW1 = Construction of Concrete Road 10.80 lane Km
Unit Cost (P’000) = P 10,722.22 / l.m.
Allocation (P’000) = P 115,800.00
EAO (P’000) = P 4,200.00
Total (P’000) = P 120,000.00

As Modified

OO1: Ensure Safe and Reliable National Road System

Network Development – Construction of Missing Links / New Roads
Laguna Lake Highway Extension (Phase 2), Muntinlupa City
Physical Target: CW1 = Construction of Concrete Road 1.27 lane Km
CW2 = RROW 1,428.57 sq.m
Unit Cost (P’000) = P 83,686.15 / lane km. P166 m/km
= P 7.00 / sq.m.
Allocation (P’000) = P 106,281.41
= P 10,000.00
EAO (P’000) = P 3,718.59
Total (P’000) = P 120,000.00
WIN1F06601
July 30, 2021 CY 2021 WIN1F06600 UACS No. 31020510052000 June 28, 2021 National Capital Region NCR - Regional Office
As per GAA/Original
UACS No. 31020510052000
Project ID.: P00506026LZ

OO1: Ensure Safe and Reliable National Road System

Network Development – Construction of Missing Links / New Roads
Laguna Lake Highway Extension (Phase 2), Muntinlupa City
Physical Target: CW1 = Construction of Concrete Road 10.80 lane Km
Unit Cost (P’000) = P 10,722.22 / l.m.
Allocation (P’000) = P 115,800.00
EAO (P’000) = P 4,200.00
Total (P’000) = P 120,000.00

As Modified

OO1: Ensure Safe and Reliable National Road System

Network Development – Construction of Missing Links / New Roads
Laguna Lake Highway Extension (Phase 2), Muntinlupa City
Physical Target: CW1 = Construction of Concrete Road 1.27 lane Km
CW2 = RROW 1,428.57 sq.m
Unit Cost (P’000) = P 73,296.76 / lane km. P146 m/km
= P 7.00 / sq.m.
Allocation (P’000) = P 106,280.31
= P 10,000.00
EAO (P’000) = P 3,719.69
Total (P’000) = P 120,000.00
WIN1F06600
July 30, 2021 2021 WIN1F06469 FCR 2021 RA 11518 December 28, 2020 Region VI Regional Office VI
FROM:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction of Road Section Comprising Barangay Gov. Evelio B. Javier (Lanag) to
Bongbongan II, Hamtic, Antique

CW1- Construction of Concrete Road: 3.572 lane km - 39,600.00

EAO - 400.00

Total: 40,000.00


TO:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program

Construction of Road Section Comprising Barangay Gov. Evelio B. Javier (Lanag) to
Bongbongan II, Hamtic, Antique

CW1- Construction of Concrete Road: 3.572 lane km - 39,600.00

EAO - 400.00

Total: 40,000.00
July 30, 2021 2021 WIN1F06280 FCR 2021 RA 11518 December 28, 2020 Region VI Antique District Engineering Office
FROM:

OO1: Ensure Safe and Reliable National Road System

Bridge - Widening of Permanent Bridges

Igbawaran Br. (B00326PN) along Iloilo-Antique Rd

CW1- Widening of Bridge: 155.311 sq.m - 22,389.08

EAO - 456.92

Total: 22,846.00


TO:

OO1: Ensure Safe and Reliable National Road System

Bridge - Widening of Permanent Bridges

Igbawaran Br. (B00326PN) along Iloilo-Antique Rd


CW1- Widening of Bridge: 183.96 sq.m - 21,489.08

ROW Acquisition: 1,668 sq.m - 900.00

EAO - 456.92

Total: 22,846.00
July 30, 2021 2021 WIN1F06169 FCR 2021 RA 11518 December 28, 2020 Region VI Antique District Engineering Office
FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Iloilo-Antique Rd - K0151 + 681 - K0152 + 111

CW1- Reconstruction to Concrete Pavement:
0.87 lane km - 17,409.70

EAO - 355.30

Total: 17,765.00


TO:


OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Iloilo-Antique Rd - K0151+576 – K0152+380

CW1- Reconstruction to Concrete Pavement:
1.562 lane km - 17,409.70

EAO - 355.30

Total: 17,765.00
July 30, 2021 2021 WIN1F06125 FCR 2021 RA 11518 December 28, 2020 Region VI Antique District Engineering Office
FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Odiong-Sibalom-Sn Remigio-Leon Rd - K0124 + 440 - K0126 + 581

CW1- Construction of Road Slope Protection Structure:
2127.867 sq.m - 31,279.64

EAO - 638.36

Total: 31,918.00


TO:

OO1: Ensure Safe and Reliable National Road
System

Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Odiong-Sibalom-Sn Remgio-Leon Rd- K0124+440 – K0124+510, K0127+070 – K0127+093, K0127+218 – K0127+313, K0134+(-088) – K0134+(-065), K0134+033 –K0134+081.50, K0134+291 – K0134+340, K0134+554.80 -K0134+581


CW1- Construction of Road Slope Protection Structure:
1,759.40 sq.m - 31,279.64

EAO - 638.36

Total: 31,918.00
July 30, 2021 2021 WIN1F06125 FCR 2021 RA 11518 December 28, 2020 Region VI Antique District Engineering Office
FROM:

OO2: Protect Lives and Properties Against Major Floods

Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structures along Sibalom River, Barangay Igbonglo, San Jose, Antique

CW1- Construction of Flood Mitigation Structure:
244 lineal meters - 49,000.00

EAO - 1,000.00

Total: 50,000.00


TO:

OO2: Protect Lives and Properties Against Major Floods

Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structures along Sibalom River, Barangay San Pedro, San Jose, Antique

CW1- Construction of Flood Mitigation Structure:
244 lineal meters - 49,000.00

EAO - 1,000.00

Total: 50,000.00
July 30, 2021 2021 WIN1F06125 FCR 2021 RA 11518 December 28, 2020 Region VI Antique District Engineering Office
FROM:

OO2: Protect Lives and Properties Against Major Floods

Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structures along Sibalom River, Barangay Igbonglo, San Jose, Antique

CW1- Construction of Flood Mitigation Structure:
244 lineal meters - 49,000.00

EAO - 1,000.00

Total: 50,000.00


TO:

OO2: Protect Lives and Properties Against Major Floods

Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structures along Sibalom River, Barangay San Pedro, San Jose, Antique

CW1- Construction of Flood Mitigation Structure:
244 lineal meters - 49,000.00

EAO - 1,000.00

Total: 50,000.00
July 30, 2021 FY 2021 GAA WIN1F06387 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Palawan 1st District Engineering Office
UACS No. : 310203100466000
Project ID : P00505155LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Tertiary Roads

FROM :

Coron - Busuanga Road,
K0040 + 798 - K0042 + 000
Physical Target - CW1 - Road Widening : 2.400 Lane Km
Allocation : Php 35.285 Million

TO :

Coron - Busuanga Road,
K0040 + 798 - K0041 + 461.50
Physical Target - CW1 - Road Widening : 1.327 Lane Km
Allocation : Php 365.285 Million
July 30, 2021 2021 WIN1F06545 FCR 2021 RA 11518 December 28, 2020 Region VI Regional Office VI
FROM:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects

Construction of Concrete Bridge, Barangay Tamayoc, Municipality of Patnongon, Antique

CW1- Construction of Bridge: 712.50 sq.m - 29,400.00

EAO - 600.00

Total: 30,000.00


TO:


LOCAL PROGRAM

Local - Local Roads and Bridges - Local Bridges - Construction / Repair / Rehabilitation /
Improvement of Various Infrastructure including Local Projects

Construction of Concrete Bridge, Barangay Tamayoc, Municipality of Patnongon, Antique

CW1- Construction of Bridge: 715.50 sq.m - 29,400.00

EAO - 600.00

Total: 30,000.00
July 30, 2021 FY 2021 GAA WIN1F06381 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Palawan 1st District Engineering Office
UACS No. : 300117209127000
Project ID : P00564680LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM :

Upgrading of Lungsod - Lagariao FMR,
Cuyo, Palawan
Physical Target - CW1 - Rehabilitation of Concrete Road :
2.061 Lane Km
Allocation : Php 15.00 Million

TO :

Upgrading of Lungsod - Lagaoriao FMR,
Cuyo, Palawan
Physical Target - CW1 - Rehabilitation of Concrete Road :
2.246 Lane Km
Allocation : Php 15.00 Million
July 30, 2021 FY 2021 GAA WIN1F06331 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 310205100685000
Project ID : P00515600LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/New Roads

FROM :

Palawan Circumferential Road
( Latud - Canipaan Section )
Physical Target - CW1 - Construction of Concrete Road :
1.500 Lane Km
Allocation : Php 30.00 Million

TO :

Palawan Circumferential Road
( Latud - Canipaan Section )
Physical Target - CW1 - Construction of Concrete Road :
2.400 Lane Km
Allocation : Php 30.00 Million
July 30, 2021 FY 2021 GAA WIN1F06365 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Palawan 3rd District Engineering Office
UACS No. : 310105100554000
Project ID : P00505449LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads - Secondary Roads

FROM :

Puerto Princesa South Road,
K0010 + 543 - K0011 + 000
Physical Target - CW1 - Reconstruction to Concrete Pavement :
1.014 Lane Km
Allocation : Php 21.898 Million

TO :

Puerto Princesa South Road,
K0010 + 543 - K0010 + 707,
K0010 + 781 - K0011 + 000,
K0011 + 000 - K0011 + 555,
K0012 + 850 - K0013 + 000
Physical Target - CW1 - Reconstruction to Concrete Pavement :
2.355 Lane Km
Allocation : Php 21.898 Million
July 30, 2021 FY 2021 GAA WIN1F06313 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Palawan 3rd District Engineering Office
UACS No. : 310105100553000
Project ID : P00505612LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads - Secondary Roads

FROM :

Puerto Princesa Road,
K0001 + 393 - K0001 + 732.66
Physical Target - CW1 - Reconstruction to Concrete Pavement :
1.359 Lane Km
Allocation : Php 28.111 Million

TO :

Puerto Princesa South Road,
K0014 + 894 - K0015 + 820,
K0019 + 961 - K0020 + 151,
K0027 + 660 - K0028 + 037
Physical Target - CW1 - Reconstruction to Concrete Pavement :
2.986 Lane Km
Allocation : Php 28.111 Million
July 29, 2021 2021 WIN1F06077 SR2021-02-004551 February 15, 2021 Region VI Regional Office VI
FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development - Construction of By-Pass and Diversion Roads

Bacolod Negros Occidental Economic Highway (BANOCEH), Section 1, Package H, Negros Occidental

CW1- Road Widening: 4.847 lane km - 73,340.00

EAO - 2,660.00

Total: 76,000.00


TO:


OO1: Ensure Safe and Reliable National Road System

Network Development - Construction of By-Pass and Diversion Roads

Bacolod Negros Occidental Economic Highway (BANOCEH), Section 1, Package H, Negros Occidental

CW1- Road Widening: 3.956 lane km - 73,340.00

EAO - 2,660.00

Total: 76,000.00
July 29, 2021 2021 WIN1F06199 SR2021-02-002182 February 4, 2021 Region VI Regional Office VI
FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development- Road Widening - Primary Roads

Bacolod North Rd - K0118 + 531 - K0120 + 611

CW1- Road Widening: 4.146 lane km - 94,980.125

EAO - 3,444.875

Total: 98,425.00


TO:

OO1: Ensure Safe and Reliable National Road System

Network Development- Road Widening - Primary Roads

Bacolod North Rd - K0118 + 531 - K0119 + 714

CW1- Road Widening: 2.378 lane km - 84,466.45

ROW Acquisition: 11,890 square meters - 10,513.675

EAO - 3,444.875

Total: 98,425.00
July 29, 2021 2021 WIN1F06194 SR2021-02-002199 February 4, 2021 Region VI Regional Office VI
FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Tertiary Roads

Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd - K0094 + 788 - K0098 + 000


CW1- Road Widening: 6.532 lane km - 95,505.085

EAO - 3,463.915

Total: 98,969.00


TO:

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Tertiary Roads

Kabankalan Jct Salong-Tapi-Dacongcogon-Bantayan Rd - K0094 + 444 - K0097 + 403

CW1- Road Widening: 5.992 lane km - 87,447.335

ROW Acquisition: 29,960 square meters - 8,057.75

EAO - 3,463.915

Total: 98,969.00
July 29, 2021 2021 WIN1F06112 SR2021-02-002166 February 4, 2021 Region VI Regional Office VI
FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0073 + 300 - K0073 + 800

CW1- Construction of Road Slope Protection Structure:
4,218.75 sq.m - 72,375.00

EAO - 2,625.00

Total: 75,000.00


TO:

OO1: Ensure Safe and Reliable National Road System


Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0073 + 250 - K0073 + 800


CW1- Construction of Road Slope Protection Structure:
9,109.00 sq.m - 72,375.00

EAO - 2,625.00

Total: 75,000.00
July 29, 2021 FY 2021 GAA WIN1G02987 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Buhangin-Lapanday Flyover - (S01470MN) Chainage 000 - Chainage 294
Physical Target:
CW1: 0.588 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 3,229,000.00
CW1: P 3,164,420.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 64,580.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Buhangin-Lapanday Flyover - (S01470MN) Chainage 000 - Chainage 213
Physical Target:
CW1: 0.213 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 3,229,000.00
CW1: P 3,164,420.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 64,580.00
July 29, 2021 2021 WIN1F06084 SR2021-02-002155 February 4, 2021 Region VI Regional Office VI
FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

Kabankalan-Bais Rd - K0094 + 000 - K0094 + 529, K0095 + 500 - K0096 + 000, K0099 + 000 - K0100 + 000, K0101 + 000 - K0101 + 318

CW1- Preventive Maintenance of Road: Asphalt Overlay:
9.372 lane km - 49,436.95

EAO - 1,793.05

Total: 51,230.00


TO:

OO1: Ensure Safe and Reliable National Road System


Asset Preservation - Preventive Maintenance - Primary Roads

Kabankalan-Bais Rd - K0094 + 000 - K0094 + 529, K0099 + 000 - K0100 + 000, K0101 + 000 - K0102 + 000

CW1- Preventive Maintenance of Road: Asphalt Overlay:
10.028 lane km - 49,436.95

EAO - 1,793.05

Total: 51,230.00
July 29, 2021 FY 2021 GAA WIN1G02976 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Daang Maharlika (MN) - (S01460MN) Chainage 030 - Chainage 1015
Physical Target:
CW1: 3.940 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 800,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Daang Maharlika (MN) - (S01460MN) Chainage 030 - Chainage 760
Physical Target:
CW1: 2.190 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 800,000.00
July 29, 2021 2021 WIN1F06088 SR2021-02-002161 February 4, 2021 Region VI Regional Office VI
FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

Bacolod North Rd - K0143 + 623 - K0144 + 000, K0144 + 363 - K0144 + 805

CW1- Reconstruction to Concrete Pavement:
2.536 lane km - 51,281.065

EAO - 1,859.935

Total: 53,141.00


TO:

OO1: Ensure Safe and Reliable National Road System


Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads –
Primary Roads

Bacolod North Rd - K0143 + 623 - K0144 + 056, K0144 + 317- K0144 + 939

CW1- Reconstruction to Concrete Pavement:
2.904 lane km - 51,281.065

EAO - 1,859.935

Total: 53,141.00
July 29, 2021 FY 2021 GAA WIN1G02967 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Drainage System Leading to Dacudao Maindrain, Davao City
Physical Target:
CW1: 3,028.133 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 58,664,000.00
CW1: P 56,610,760.00 (Construction of Drainage Structure)
EAO: P 2,053,240.00

TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Drainage System Leading to Dacudao Maindrain, Davao City
Physical Target:
CW1: 1,500.000 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 58,664,000.00
CW1: P 56,610,760.00 (Construction of Drainage Structure)
EAO: P 2,053,240.00
July 29, 2021 FY 2021 GAA WIN1G02974 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
L Garcia St - K1508+(-205) - K1508+(-012)
Physical Target:
CW1: 0.772 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 4,239,000.00
CW1: P 4,154,220.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 84,780.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
L Garcia St - K1508+(-113) - K1508+(-012)
Physical Target:
CW1: 2.190 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 4,239,000.00
CW1: P 4,154,220.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 84,780.00
July 29, 2021 2021 WIN1F06098 SR2021-02-002249 February 4, 2021 Region VI Regional Office VI
FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/ New Roads

Candoni-Gatuslao-Basay Bdry Road, Negros Occidental

CW1- Construction of Concrete Road: 4.025 lane km - 101,325.00

EAO - 3,675.00

Total: 105,000.00


TO:

OO1: Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/ New Roads

Candoni-Gatuslao-Basay Bdry Road, Negros Occidental

CW1- Construction of Concrete Road: 4.960 lane km - 101,325.00

EAO - 3,675.00

Total: 105,000.00
July 29, 2021 2021 WIN1F06143 SR2021-02-002170 February 4, 2021 Region VI Regional Office VI
FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Candoni-Sipalay Rd - K0144 + 050 - K0144 + 100

CW1- Construction of Road Slope Protection Structure:
7,285.974 sq.m - 57,900.00

EAO - 2,100.00

Total: 60,000.00


TO:

OO1: Ensure Safe and Reliable National Road
System

Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Candoni-Sipalay Rd - K0144 + 126 - K0144 + 860, K0145 + 580 - K0146 + 126

CW1- Construction of Road Slope Protection Structure:
7,518.47 sq.m - 46,477.295

ROW Acquisition: 5,870 sq.m - 11,422.705

EAO - 2,100.00

Total: 60,000.00

July 29, 2021 2021 WIN1F06139 SR2021-02-002227 February 4, 2021 Region VI Regional Office VI
FROM:


OO1: Ensure Safe and Reliable National Road System

Network Development - Construction of By-Pass and Diversion Roads

Escalante City Circumferential Road, Negros Occidental

CW1- Construction of Concrete Road:
2.202 lane km - 39,362.35

ROW Acquisition: 67,540 sq.m - 28,187.65

EAO - 2,450.00

Total: 70,000.00

TO:


OO1: Ensure Safe and Reliable National Road System

Network Development - Construction of By-Pass and Diversion Roads

Escalante City Circumferential Road, Negros Occidental

CW1- Construction of Concrete Road:
2.67526 lane km - 38,340.00

ROW Acquisition:
67,540 sq.m - 29,210.00

EAO - 2,450.00

Total: 70,000.00
July 29, 2021 2021 WIN1F06360 SR2021-02-004546 February 15, 2021 Region VI Regional Office VI
FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

President Corazon C. Aquino Ave. - (S00558PN) Chainage 000 - Chainage 1233.5

CW1 - Construction of Drainage Structure along Road:
2,467 lineal meters - 8,685.00

EAO - 315.00

Total: 9,000.00


TO:


OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

President Corazon C. Aquino Ave. - (S00558PN) Chainage 549 - Chainage 1203

CW1 - Construction of Drainage Structure along Road:
654 lineal meters - 8,685.00

EAO - 315.00

Total: 9,000.00
July 29, 2021 2021 WIN1F06587 SR2021-02-002211 February 4, 2021 Region VI Regional Office VI
FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development - Construction of By-Pass and Diversion Roads

Bacolod Negros Occidental Economic Highway (BANOCEH), Section 1, Package I, Negros Occidental

CW1 - Construction of Drainage Structure along Road:
4,496 lineal meters - 86,850.00

CW2 - Widening of Bridge : 756 sq.m - 60,795.00


CW3 - Off-Carriageway Improvement: Construction of Bike Lanes : 6,253.41 sq.m - 42,055.665

EAO - 6,880.335

Total: 196,581.00

TO:

OO1: Ensure Safe and Reliable National Road System

Network Development - Construction of By-Pass and Diversion Roads

Bacolod Negros Occidental Economic Highway (BANOCEH), Section 1, Package I, Negros Occidental


CW1 - Off-Carriageway Improvement: Construction of Bike Lanes : 9,331.84 sq.m - 141,488.665

CW2 - Construction of Road Slope Protection Structure:
10,145 sq.m - 48,212.00

EAO - 6,880.335

Total: 196,581.00
July 29, 2021 2021 300211100066000 GAA FY 2021 January 25, 2021 Region II Cagayan 3rd District Engineering Office
Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239 - Installation of Road Safety Devices Along Cagayan Valley Road (K0484+800 - K0488+207)
July 29, 2021 FY 2021 GAA WIN1F06353 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310202100827000
Project ID : P00505153LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Calapan South Road,
K0106 + 000 - K0107 + 500
Physical Target - CW1 - Road Widening : 2.99 Lane Km
Allocation : Php 20.00 Million

TO :
Calapan South Road,
K0106 + 002.40 - K0106 + 880
Physical Target - CW1 - Road Widening : 1.755 Lane Km
Allocation : Php 20.00 Million
July 29, 2021 FY 2021 GAA WIN1F06259 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310102100694000
Project ID : P00505616LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

FROM :

Mindoro Oriental/Occidental East Coastal Road,
K0189 + 000 - K0189 + 482
Physical Target - CW1 - Preventive Maintenance : 0.964 Lane Km
Allocation : Php 9.298 Million

TO :

Mindoro Oriental/Occidental East Coastal Road,
K0189 + 000 - K0189 + 307
Physical Target - CW1 - Preventive Maintenance : 0.614 Lane Km
Allocation : Php 9.298 Million
July 29, 2021 2021 WIN1F06592 FCR 2021 RA 11518 December 28, 2020 Region VI Negros Occidental 4th District Engineering Office
FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads

Jct Bagonawa-La Castellana-Isabela Rd - K0043 + 239 - K0044 + 345

CW1- Construction of
Drainage Structure along Road: 2,214 lineal meters - 14,097.30

EAO - 287.70

Total: 14,385.00


TO:


OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads

Jct Bagonawa-La Castellana-Isabela Rd - K0043 + 239 - K0044 + 345

CW1- Construction of
Drainage Structure along Road: 1,592 lineal meters - 14,097.30

EAO - 287.70

Total: 14,385.00
July 29, 2021 FY 2021 GAA WIN1F06397 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 300116203389000
Project ID : P00561886LZ

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Concreting of Road,
Pinamalayan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
12.50 Lane Km
Allocation : Php 75.00 Million

TO :

Concreting of Road,
Pinamalayan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
11.281 Lane Km
Allocation : Php 75.00 Million


July 29, 2021 2021 310106100579000 GAA FY 2021 January 25, 2021 Region II Batanes District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Tertiary Roads - Sn Vicente - Savidug - Chavayan - Sumnanga - Nakanmuan Rd - K0007 + 312 - K0007 + 369, K0014 + (-005) - K0014 + 182
July 29, 2021 2021 310109100633000 GAA FY 2021 January 25, 2021 Region II Batanes District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Basco - Mahatao - Ivana - Uyugan - Imnajbu Rd - K0000 + 790 - K0000 + 850, K0000 + 912 - K0000 + 946
July 29, 2021 FY 2021 GAA WIN1F06350 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 300116204213000
Project ID : P00562474LZ

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Concreting of Road,
So. Ilaya, Brgy. San Miguel - Brgy. Uyao - Brgy. Libertad,
Roxas, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.90 Lane Km
Allocation : 20.00 Million

TO :

Concreting of Road,
So. Ilaya, Brgy. San miguel - Brgy. Uyao - Brgy. Libertad,
Roxas, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
3.304 Lane Km
Allocation : Php 20.00 Million
July 29, 2021 FY 2021 GAA WIN1F06349 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 300116204222000
Project ID : P00562483LZ

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Concreting of Road at
Bongabong, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
7.50 Lane Km
Allocation : Php 45.00 Million

TO :

Concreting of Road at
Bongabong, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
7.23 Lane Km
Allocation : Php 45.00 Million

July 29, 2021 2021 310106100578000 GAA FY 2021 January 25, 2021 Region II Batanes District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Sn Vicente - Savidug - Chavayan - Sumnanga - Nakanmuan Rd - K0023 + 003 - K0023 + 190.25
July 29, 2021 2021 WIN1F06547 SR2021-02-001643 February 4, 2021 Region VI Regional Office VI
FROM:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Rehabilitation/Improvement of Boracay Circumferential Road, Tambisaan Jetty Port Road and Boracay Jetty Port Road Junction to Cagban Jetty Port, Aklan

CW1- Rehabilitation of Concrete Road:
16.232 lane km - 135,100.00

EAO - 4,900.00

Total: 140,000.00

TO:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Rehabilitation/Improvement of Boracay Circumferential Road, Tambisaan Jetty Port Road and Boracay Jetty Port Road Junction to Cagban Jetty Port, Aklan

CW1- Rehabilitation of Concrete Road:
2.847 lane km - 135,100.00

EAO - 4,900.00

Total: 140,000.00
July 29, 2021 2021 WIN1F06547 SR2021-02-001643 February 4, 2021 Region VI Regional Office VI
FROM:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Rehabilitation/Improvement of Boracay Circumferential Road, Tambisaan Jetty Port Road and Boracay Jetty Port Road Junction to Cagban Jetty Port, Aklan

CW1- Rehabilitation of Concrete Road:
16.232 lane km - 135,100.00

EAO - 4,900.00

Total: 140,000.00

TO:

LOCAL PROGRAM

Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Rehabilitation/Improvement of Boracay Circumferential Road, Tambisaan Jetty Port Road and Boracay Jetty Port Road Junction to Cagban Jetty Port, Aklan

CW1- Rehabilitation of Concrete Road:
2.847 lane km - 135,100.00

EAO - 4,900.00

Total: 140,000.00