Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
September 24, 2021 2021 WIN1C04510 FY 2021 GAA December 28, 2020 Region III Tarlac District Engineering Office
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation of Slope Protection along Tarlac River Control Right Dike, San Nicolas Section, San Nicolas, Tarlac City, Tarlac
September 24, 2021 2021 WIN1C04511 FY 2021 GAA December 28, 2020 Region III Tarlac District Engineering Office
Flood Management - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structures within Agno River Basin System along Camiling River Right Bank, Surgui 1st - Cacamilingan Sur Section (Package E), Camiling, Tarlac

September 23, 2021 2021 WIN1F06515 GAA FY 2021 January 4, 2021 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Bato-Bontoc Rd - K1113+830 - K1114+225, K1116+700 - K1116+910, K1117+270 - K1117+640, K1117+880 - K1117+970

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 15.582 M
Structure: 3,600 Square Meters
EAO P 0.318 M

Total P 15.900 M

AS MODIFIED:

Bato-Bontoc Rd - K1113+830 - K1114+225, K1116+700 - K1116+800, K1117+270 - K1117+440

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 15.582 M
Structure: 1,826.60 Square Meters
EAO P 0.318 M

Total P 15.900 M
September 23, 2021 2021 WIN1F06717 GAA FY 2021 January 1, 2021 Region VIII Biliran District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

AS PER GAA/ORIGINAL:

Biliran Circumferential Rd - K1052 + 867 - K1053 + 356

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 10.550 M
Asphalt Overlay : 0.984 Lane Km

EAO P 0.215 M

Total P 10.765 M

AS MODIFIED:

Biliran Circumferential Rd - K1052 + 867 - K1053 + 236

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 10.550 M
Asphalt Overlay : 0.744 Lane Km

EAO P 0.215 M

Total P 10.765 M
September 22, 2021 2021 WIN1E02833 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Regional Office XIII
UACS No. : 310110100203000
Project ID: P00501690MN

OO1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

FROM:

Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1240 + 307 - K1240 + 835

Type of Work:
CW1- Construction of Drainage Structure along Road

Physical Target:
CW1- 528 Lineal meters

Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000

Unit Cost:
CW1: P 191,903.41/Lineal meters

TO:

Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1240 + 306 - K1240 + 819, K1240 + 854 - K1241 + 210

Type of Work:
CW1- Construction of Drainage Structure along Road

Physical Target:
CW1- 932 Lineal meters

Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000

Unit Cost:
CW1: P 108,717.81/Lineal meters
September 22, 2021 2021 WIN1C04493 FY 2021 GAA December 28, 2020 Region III Regional Office III
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Rehabilitation / Improvement (Upgrading and Widening to 4 lanes with Concrete Slope Protection) of San Matias - Sto. Rosario Pau Road, Sto. Tomas, Pampanga

September 20, 2021 2021 WIN1C04496 FY 2021 GAA December 28, 2020 Region III Regional Office III
Network Development Program - Construction of By-Pass and Diversion Roads

Lubao - Guagua - Minalin - Sto. Tomas Road (Sto. Tomas - Minalin Section) Package 5, Pampanga
September 20, 2021 2021 WIN1C04516 FY 2021 GAA December 28, 2020 Region III Pampanga 1st District Engineering Office
Network Development - Road Widening - Tertiary Roads

Baliwag - Candaba - Sta. Ana Road, K0060+005 - K0061+054, K0064+800 - K0065+020, K0068+450 - K0068+819, K0071+615 - K0072+070 (Sta. Ana - Candaba Section)
September 20, 2021 2021 WIN1C04513 FY 2021 GAA December 28, 2020 Region III Pampanga 1st District Engineering Office
Network Development Program - Road Widening - Tertiary Roads

Baliwag - Candaba - Sta. Ana Road, K0073+445 - K0075+360 (Sta. Ana Section)


September 20, 2021 2021 WIN1E02841 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Sur 2nd District Engineering Office
UACS No. : 300111200356000
Project ID: P00550594MN

Local Program - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Bislig City Coastal Protection along Surigao-Davao Coastal Rd, Surigao del Sur

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 5.474 Lane Km

Allocation:
TOTAL: P 80,000,000
CW1: P 77,200,000
EAO: P 2,800,000

Unit Cost:
CW1: P 14,103,032.52/Lane Km

TO:

Construction of Bislig City Coastal Protection along Surigao-Davao Coastal Rd, Surigao del Sur

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Slope Protection Structure

Physical Target:
CW1- 0.480 Lane Km
CW2- 2,353.37 Square meters

Allocation:
TOTAL: P 80,000,000
CW1: P 43,722,708.75
CW2: P 32,787,739.18
EAO: P 2,775,552.07
Excess: P 714,000

Unit Cost:
CW1: P 91,088,976.56/Lane Km
CW2: P 13,932.25/Square meters
September 18, 2021 CY 2021 WIN1F06723 UACS No. 300103203173000 July 12, 2021 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300103203173000
Project ID.: P00556800LZ

Local Program

Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of Multi-Purpose / Facilities – Construction / Repair / Rehabilitation / Improvement of
Various Infrastructure including Local Projects
Construction of Multi-Purpose Building (Phase 2), Barangay Paso de Blas, Valenzuela City
Physical Target: CW1 = Construction of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost = P 9,800.00 / No. of Bldg.
Allocation (P’000) = P 9,800.00
EAO (P’000) = P 200.00
Total (P’000) = P 10,000.00

As Modified

Local Program

Local – Buildings And Other Structures – Multipurpose/Facilities – Local Infrastructure Program
Construction of Multi-Purpose / Facilities – Construction / Repair / Rehabilitation / Improvement of
Various Infrastructure including Local Projects
Construction of Multi-Purpose Building, Barangay Paso de Blas, Valenzuela City
Physical Target: CW1 = Construction of Multi-Purpose Building 1.00 No. of Bldg.
Unit Cost = P 9,800.00 / No. of Bldg.
Allocation (P’000) = P 9,800.00
EAO (P’000) = P 200.00
Total (P’000) = P 10,000.00
WIN1F06723
September 16, 2021 2021 WIN1C04515 GAA 2021 September 7, 2021 Cordillera Administrative Region CAR - Regional Office
From: Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Benguet-Nueva Vizcaya Rd - K0283 + 280 - K0283 + 380, K0284 + 000 - K0284 + 100;
Physical Target: CW1 : 9,751 Square meters;
Allocation= Php 222,000,000

To: Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Benguet-Nueva Vizcaya Rd - K0283 + 280 - K0283 + 380, K0284 + 000 - K0284 + 100;
Physical Target: CW1 : 9,088 Square meters;
Allocation= Php 222,000,000

September 16, 2021 2021 WIN1C04518 GAA 2021 September 7, 2021 Cordillera Administrative Region CAR - Regional Office
From: Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Marcos Hi-way - K0272 + 800 - K0272 + 960;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 125,000,000

To: Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Marcos Hi-way - K0272 + 800 - K0272 + 909;
Physical Target: CW1 : 5,076 Square meters;
Allocation= Php 125,000,000


September 16, 2021 2021 WIN1C04519 GAA 2021 September 7, 2021 Cordillera Administrative Region CAR - Regional Office
From: Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Benguet-Nueva Vizcaya Rd - K0254 + 270 - K0254 + 360;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 110,000,000

To: Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Benguet-Nueva Vizcaya Rd - K0254 + 270 - K0254 + 380;
Physical Target: CW1 : 4,382.2 Square meters;
Allocation= Php 110,000,000

September 16, 2021 2021 WIN1C04514 GAA 2021 September 7, 2021 Cordillera Administrative Region CAR - Regional Office
From: Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Cong. Andres Acop Cosalan Rd - K0334 + 140 - K0334 + 400;
Physical Target: CW1 : 5838.1 Square meters;
Allocation= Php 148,000,000

To: Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Cong. Andres Acop Cosalan Rd - K0333 + 1188 - K0333 + 1448;
Physical Target: CW1 : 5838.1 Square meters;
Allocation= Php 148,000,000
September 16, 2021 2021 WIN1C04508 GAA 2021 September 2, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Mausoc - Labaan Flood Control Structure, Sta. 0+000 - Sta. 0+500, San Quintin, Abra;
Physical Target: CW1: 500 Lineal meters;
Allocation= Php 50,000,000

To: Construction of Mausoc - Labaan Flood Control Structure, Sta. 0+000 - Sta. 0+500, San Quintin, Abra;
Physical Target: CW1: 420 Lineal meters;
Allocation= Php 50,000,000

September 16, 2021 2021 WIN1C04517 GAA 2021 September 14, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Gomonot Flood Control, Barangay Patiao, Peñarrubia, Abra;
Physical Target: CW1: 612 Lineal meters;
Allocation= Php 50,000,000

To: Construction of Gomonot Flood Control, Barangay Patiao, Peñarrubia, Abra;
Physical Target: CW1: 522 Lineal meters;
Allocation= Php 50,000,000

September 16, 2021 FY 2021 WIN1C04308 FY 2021 GAA RA 11518 March 27, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 310202100834000
Project ID: P00505300LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads – Jct Crossing-Mandaon Rd – K0052 + 500 – K0053 + 007
Physical Target: CW1- Road Widening – 1.0 Lane km.
Allocation: Php 10,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads – Jct Crossing-Mandaon Rd – K0052 + 500 – K0052 + 624
Physical Target: CW1- Road Widening – 0.248 Lane km.
Allocation: Php 10,000,000.00
September 16, 2021 FY 2021 WIN1C04079 FY 2021 GAA RA 11518 March 27, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 310202100835000
Project ID: P00505301LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads – Jct Tawad - Balud Rd – K0028 + 944 – K029 + 270
Physical Target: CW1- Road Widening – 0.64 Lane km.
Allocation: Php 10,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads – Jct Tawad - Balud Rd – K0028 + 944 – K029 + 064
Physical Target: CW1- Road Widening – 0.228 Lane km.
Allocation: Php 10,000,000.00
September 16, 2021 FY 2021 WIN1C04014 FY 2021 GAA RA 11518 March 27, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 310202100837000
Project ID: P00505302LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads – Masbate -Milagros Rd – K0005 + 719 – K0006 + 365
Physical Target: CW1- Road Widening – 1.304 Lane km.
Allocation: Php 10,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads – Masbate -Milagros Rd – K0005 + 719 – K0005 + 840
Physical Target: CW1- Road Widening – 0.242 Lane km.
Allocation: Php 10,000,000.00
September 15, 2021 FY 2021 GAA WIN1E02842 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Revetment Along Manat River (Up- stream and Down Stream) leading to Agusan River at Purok 7 Tapia, Montevista, Davao De Oro (Sta. 11+500 - Sta. 12+600 LS)
Physical Target:
CW1: 374.99 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,450,000.00

TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Revetment Along Manat River (Up- stream and Down Stream) leading to Agusan River at Purok 7 Tapia, Montevista, Davao De Oro (Sta. 7+820.139 - Sta. 7+894.829 LS, Sta. 8+040.000 - Sta. 8+289.480 LS)
Physical Target:
CW1: 374.99 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,450,000.00
September 13, 2021 FY 2021 GAA WIN1F06584 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 310107100213000
Project ID : P00516153LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and Landslide - Primary Roads

FROM :

Itabiak - San Vicente Road, Palawan
K0169 + 413 - K0169 + 538
Physical Target - CW1 - Construction of Road Slope Protection :
7,800.00 Square Meter
Allocation - Php 78.00 Million

TO :

Itabiak - San Vicente Road, Palawan
K0169 + 403 - K0169 + 592
Physical Target - CW1 - Construction of Road Slope Protection :
3,522.00 Square Meter
Allocation - Php 78.00 Million
September 13, 2021 FY 2021 GAA WIN1F06585 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 310107100214000
Project ID : P00516154LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and Landslide - Primary Roads

FROM :

Itabiak - San Vicente Road, Palawan
K0170 + 173 - K0170 + 233
Physical Target - CW1 - Construction of Road Slope Protection :
5,096.00 Square Meter
Allocation - Php 50.96 Million

TO :

Itabiak - San Vicente Road, Palawan
K0170 + 158.50 - K0170 + 260
Physical Target - CW1 - Construction of Road Slope Protection :
2,106.00 Square Meter
Allocation - Php 50.96 Million
September 13, 2021 FY 2021 GAA WIn1F06583 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 300117209166000
Project ID : P00564719LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Local Infrastructure Program

FROM :

Construction of Road Slope Protection along
Calapan Couth Road,
Brgy. Hagan, Bongabong, Oriental Mindoro
K0119 + 106 - K0119 + 283.50,
Bongabong, Oriental Mindoro
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 0 Square Meter
Allocation - Php 50.00 Million

TO :

Construction of Road Slope Protection along
Calapan South Road,
Brgy. Hagan,
K0119 + 130 - K0119 + 190,
Bongabong, Oriental Mindoro
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,196.06 Square Meter
Allocation - Php 50.00 Million
September 13, 2021 FY 2021 GAA WIN1F06560 FY 2021 GAA DPWH Infra Projects December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 300117209167000
Project ID : P00564720LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Local infrastructure Program

FROM :

Construction of Slope Protection along
Calapan South Road
K0127 + 803 - K0127 + 974050
Bongabong, Oriental Mindoro
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 0 Square Meter
Allocation - Php 50.00 Million

TO :

Construction of Slope Protection along
Calapan South Road
K0118 + 353 - K0118 + 460
Bongabong, Oriental Mindoro
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,285.18 Square Meter
Allocation - Php 50.00 Million
September 9, 2021 2021 WIN1E02832 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Dinagat Islands District Engineering Office
UACS No. : 310108100752000
Project ID: P00509858MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM:

Dinagat-Loreto Rd - K0072 + 530 - K0072 + 720

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000

Unit Cost:
CW1: P 0 / Square meter

TO:

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Dinagat-Loreto Rd - K0072 + 530 - K0072 + 720

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 1,810.00 Square meter

Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000

Unit Cost:
CW1: P 27,071.82 / Square meter
September 9, 2021 2021 WIN1E02801 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300108200281000
Project ID: P00550443MN

Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 19+090 - Sta. 19+233, San Francisco, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 70,000,000
CW1: P 67,550,000
EAO: P 2,450,000

Unit Cost:
CW1: P 0 / Square meter

TO:

Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 19+100 - Sta. 19+213.92, San Francisco, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 2,827.13 Square meter

Allocation:
TOTAL: P 70,000,000
CW1: P 67,550,000
EAO: P 2,450,000

Unit Cost:
CW1: P 23,893.49 / Square meter
September 8, 2021 FY 2021 GAA WIN1E02812 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Davao City Div Rd - K1511+524 - K1511+604 (L/S)
Physical Target:
CW1: 0.000 Sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Davao City Div Rd - K1511+633 - K1511+687 (L/S)
Physical Target:
CW1: 1,947.00 Sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
September 8, 2021 FY 2021 GAA WIN1E02813 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Flood Control and Drainage - Drainage Protection Works -Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Matina Pangi Bridge-I Upstream, Matina Pangi Section, Left Bank, Davao City Physical Target:
CW1: 400.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 88,400,000.00
CW1: P 85,306,000.00 (Construction of Revetment)
EAO: P 3,094,000.00

TO: Local - Flood Control and Drainage - Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Matina Pangi Bridge-I Upstream, Matina Pangi Section, Left Bank, Davao City Physical Target:
CW1: 285.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 88,400,000.00
CW1: P 85,306,000.00 (Construction of Revetment)
EAO: P 3,094,000.00
September 8, 2021 FY 2021 GAA WIN1E02807 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Davao City Div Rd - K1512+428 - K1512+474
Physical Target:
CW1: 0.000 Sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 40,316,000.00
CW1: P 39,509,680.00 (Construction of Road Slope Protection Structure)
EAO: P 806,320.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Davao City Div Rd - K1512+428 - K1512+450
Physical Target:
CW1: 789.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 40,316,000.00
CW1: P 39,509,680.00 (Construction of Road Slope Protection Structure)
EAO: P 806,320.00
September 8, 2021 FY 2021 GAA WIN1E02811 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Rehabilitation of Drainage Structure at Sasa Creek, Davao City
Physical Target:
CW1: 300.000 lm (Rehabilitation/Major Repair of Drainage Structure)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Rehabilitation/Major Repair of Drainage Structure)
EAO: P 2,100,000.00

TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Rehabilitation of Drainage Structure at Sasa Creek, Davao City
Physical Target:
CW1: 210.00 lm (Rehabilitation/Major Repair of Drainage Structure)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Rehabilitation/Major Repair of Drainage Structure)
EAO: P 2,100,000.00
September 8, 2021 FY 2021 GAA WIN1E02805 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Drainage Structure, Eagle Street, Phase 2, Barangay Bucana, Davao City
Physical Target:
CW1: 500.000 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Drainage Structure)
EAO: P 200,000.00

TO: Local - Flood Control and Drainage - Flood Control Structures / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
Construction of Drainage Structure, Eagle Street, Phase 2, Barangay Bucana, Davao City
Physical Target:
CW1: 327.00 lm (Construction of Drainage Structure)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Drainage Structure)
EAO: P 200,000.00
September 8, 2021 FY 2021 GAA WIN1E02810 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Secondary Roads
Davao City Div Rd - K1501+860
Physical Target:
CW1: 1,555.000 lm (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 105,000,000.00
CW1: P 101,325,000.00 (Construction of Drainage Structure along Road)
EAO: P 3,675,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Davao City Div Rd - K1501+860
Physical Target:
CW1: 188.00 lm (Construction of Drainage Structure along Road)
ROW: 1,000.000 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 105,000,000.00
CW1: P 77,200,000.00 (Construction of Drainage Structure along Road)
ROW: P 24,125,000.00 (ROW Acquisition)
EAO: P 3,675,000.00
September 8, 2021 FY 2021 GAA WIN1E02806 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Outfall Section, Sta. 0+241 to Sta. 0+671, Left Bank, Davao City
Physical Target:
CW1: 452.000 lm (Construction of Revetment)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Revetment)
EAO: P 3,500,000.00

TO: Local Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction/Repair/Rehabilitation/ Improvement of Various Infrastructure including Local Projects
Construction of Revetment along Matina River, Outfall Section, Sta. 0+115 to Sta. 0+465, Left Bank, Davao City Physical Target:
CW1: 328.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Revetment)
EAO: P 3,500,000.00
September 8, 2021 FY 2021 GAA WIN1E02836 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Revetment Along Manat River (Up- stream and Down Stream) leading to Agusan River at Bankeruhan Sur to Bankeruhan Norte, Montevista, Davao de Oro (Sta. 12+700 - Sta. 13+900 LS)
Physical Target:
CW1: 481.250 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Flood Mitigation Structure)
EAO: P 3,150,000.00

TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Revetment Along Manat River (Up- stream and Down Stream) leading to Agusan River at Bankeruhan Sur to Bankeruhan Norte, Montevista, Davao de Oro (Sta. 11 + 561.000 - Sta. 11 + 612.660 LS, Sta. 11 + 612. 660 - Sta. 12 + 042.250 LS)
Physical Target:
CW1: 481.250 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Flood Mitigation Structure)
EAO: P 3,150,000.00
September 8, 2021 FY 2021 GAA WIN1E02838 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basin and Principal Rivers
Construction of Revetment along Talomo River, Davao City
Physical Target:
CW1: 530.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Revetment)
EAO: P 2,100,000.00

TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basin and Principal Rivers
Construction of Revetment along Talomo River, Davao City
Physical Target:
CW1: 188.00 lm (Construction of Revetment)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Revetment)
EAO: P 2,100,000.00
September 8, 2021 FY 2021 GAA WIN1E02834 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basin and Principal Rivers
Construction of Esplanade at Davao River, Right Bank, Bolton Bridge Downstream Section, Davao City
Physical Target:
CW1: 309.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 74,400,000.00
CW1: P 71,796,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,604,000.00

TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basin and Principal Rivers
Construction of Esplanade at Davao River, Right Bank, Bolton Bridge Downstream Section, Davao City
Physical Target:
CW1: 3559.00 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 74,400,000.00
CW1: P 71,796,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,604,000.00
September 8, 2021 FY 2021 GAA WIN1E02837 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Rehabilitation / Major Repair of Flood Control Structure along Davao River, Bolton Bridge Upstream, Left Bank, Davao City (Sta. 1+570 - Sta. 1+843)
Physical Target:
CW1: 872.012 lm (Rehabilitation/Major Repair of Flood Control Structure)
Allocation:
TOTAL: P 80,000,000.00
CW1: P 77,200,000.00 (Rehabilitation/Major Repair of Flood Control Structure)
EAO: P 2,800,000.00

TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Maintenance of Flood Mitigations Structures and Drainage Systems
Rehabilitation / Major Repair of Flood Control Structure along Davao River, Bolton Bridge Upstream, Left Bank, Davao City (Sta. 1+614 - Sta. 2+173)
Physical Target:
CW1: 572.000 lm (Rehabilitation/Major Repair of Flood Control Structure)
Allocation:
TOTAL: P 80,000,000.00
CW1: P 77,200,000.00 (Rehabilitation/Major Repair of Flood Control Structure)
EAO: P 2,800,000.00
September 8, 2021 FY 2021 GAA WIN1E02835 FY 2021 GAA RA 11518 January 1, 2021 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Davao City Div Rd - K1511+604 - K1511+684 (L/S)
Physical Target:
CW1: 0.000 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Davao City Div Rd - K1511+687 - K1511+741
Physical Target:
CW1: 1,905.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
September 8, 2021 2021 WIN1E02827 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300108200278000
Project ID: P00550440MN

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Road Slope Protection Structure along Capalayan-Placer Road Sta 6+259 - Sta. 6+395, Tagana-an, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 98,000,000
CW1: P 94,570,000
EAO: P 3,430,000

Unit Cost:
CW1: P 0 / Square meter

TO:

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Road Slope Protection Structure along Capalayan-Placer Road Sta 6+259 - Sta. 6+395, Tagana-an, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 3,960.48 Square meter

Allocation:
TOTAL: P 98,000,000
CW1: P 94,570,000
EAO: P 3,430,000

Unit Cost:
CW1: P 23,878.42 / Square meter
September 8, 2021 2021 WIN1E02831 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300108200279000
Project ID: P00550441MN

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Road Slope Protection Structure along Capalayan-Placer Road Sta. 6+840 - Sta. 7+070, Tagana-an, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 0 / Square meter

TO:

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Road Slope Protection Structure along Capalayan-Placer Road Sta. 6+840 - Sta. 6+995, Tagana-an, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4,039.87 Square meter

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 23,885.25 / Square meter
September 8, 2021 2021 WIN1E02822 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300108200280000
Project ID: P00550442MN

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Road Slope Protection Structure along Capalayan-Placer Road Sta. 7+090 - Sta. 7+190, Placer, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 90,000,000
CW1: P 86,850,000
EAO: P 3,150,000

Unit Cost:
CW1: P 0 / Square meter

TO:

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Road Slope Protection Structure along Capalayan-Placer Road Sta. 7+090 - Sta. 7+190, Placer, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 3,636.78 Square meter

Allocation:
TOTAL: P 90,000,000
CW1: P 86,850,000
EAO: P 3,150,000

Unit Cost:
CW1: P 23,881.02 / Square meter
September 8, 2021 2021 WIN1E02821 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300108200282000
Project ID: P00550444MN

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 28+922 - Sta. 29+022, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 85,000,000
CW1: P 82,025,000
EAO: P 2,975,000

Unit Cost:
CW1: P 0 / Square meter

TO:

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 19+547.54 - Sta. 19+590, Sta. 28+930 - Sta. 29+020, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 3,432.89 Square meter

Allocation:
TOTAL: P 85,000,000
CW1: P 82,025,000
EAO: P 2,975,000

Unit Cost:
CW1: P 23,893.86 / Square meter
September 8, 2021 2021 WIN1E02830 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300108200283000
Project ID: P00550445MN

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 35+485 - Sta. 35+855, Malimono, Surigao del Norte


Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 0 / Square meter

TO:

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 35+570 - Sta. 35+781.28, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4,039.58 Square meter

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 23,888.62 / Square meter

September 8, 2021 2021 WIN1E02828 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300108200284000
Project ID: P00550446MN

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 39+467 - Sta. 39+735, Malimono, Surigao del Norte


Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 98,000,000
CW1: P 94,570,000
EAO: P 3,430,000

Unit Cost:
CW1: P 0 / Square meter

TO:

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 39+550 - Sta. 39+696.49, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 3,958.60 Square meter

Allocation:
TOTAL: P 98,000,000
CW1: P 94,570,000
EAO: P 3,430,000

Unit Cost:
CW1: P 23,889.76 / Square meter
September 8, 2021 2021 WIN1E02818 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300108200285000
Project ID: P00550447MN

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 39+773 - Sta. 39+953, Malimono, Surigao del Norte


Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 95,000,000
CW1: P 91,675,000
EAO: P 3,325,000

Unit Cost:
CW1: P 0 / Square meter

TO:

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 39+780 - Sta. 39+904.38, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 3,838.46 Square meter

Allocation:
TOTAL: P 95,000,000
CW1: P 91,675,000
EAO: P 3,325,000

Unit Cost:
CW1: P 23,883.28 / Square meter
September 8, 2021 2021 WIN1E02819 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300108200286000
Project ID: P00550448MN

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 40+368 - Sta. 40+505, Malimono, Surigao del Norte


Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 95,000,000
CW1: P 91,675,000
EAO: P 3,325,000

Unit Cost:
CW1: P 0 / Square meter

TO:

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 40+368 - Sta. 40+502.82, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 3,837.87 Square meter

Allocation:
TOTAL: P 95,000,000
CW1: P 91,675,000
EAO: P 3,325,000

Unit Cost:
CW1: P 23,886.95 / Square meter
September 8, 2021 2021 WIN1E02816 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300108200288000
Project ID: P00550450MN

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road Sta. 36+430 - Sta. 36+748, Malimono, Surigao del Norte


Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 0 / Square meter

TO:

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road Sta. 36+430 - Sta. 36+685.8, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4,040.11 Square meter

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 23,885.49 / Square meter
September 8, 2021 2021 WIN1E02826 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300108200289000
Project ID: P00550451MN

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road Sta. 42+200 - Sta. 42+320, Malimono, Surigao del Norte


Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 0 / Square meter

TO:

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road Sta. 42+200 - Sta. 42+320, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4,040.11 Square meter

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 23,885.55 / Square meter
September 8, 2021 2021 WIN1E02815 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300108200292000
Project ID: P00550454MN

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road Sta. 44+820 - Sta. 44+970, Malimono, Surigao del Norte


Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 0 / Square meter

TO:

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road Sta. 29+072 - Sta. 29+222.68, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4,040.14 Square meter

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 23,885.31 / Square meter
September 8, 2021 2021 WIN1E02814 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 310109100732000
Project ID: P00502023MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

FROM:

Quezon-Mapawa-Capalayan-Espina-Navarro Rd - K1133 + 360 - K1133 + 428


Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 2,250.00 Square meter

Allocation:
TOTAL: P 45,000,000
CW1: P 44,100,000
EAO: P 900,000

Unit Cost:
CW1: P 19,600 / Square meter

TO:

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Quezon-Mapawa-Capalayan-Espina-Navarro Rd - K1133 + 360 - K1133 + 406.38

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 1,814.32 Square meter

Allocation:
TOTAL: P 45,000,000
CW1: P 44,100,000
EAO: P 900,000

Unit Cost:
CW1: P 24,306.63 / Square meter
September 8, 2021 2021 WIN1E02825 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 310108100757000
Project ID: P00502025MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM:

Surigao-Davao Coastal Rd - K1189 + 750 - K1189 + 900


Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 2,571.429 Square meter

Allocation:
TOTAL: P 40,000,000
CW1: P 39,200,000
EAO: P 800,000

Unit Cost:
CW1: P 15,244.44 / Square meter

TO:

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Surigao-Davao Coastal Rd - K1189 + 750 - K1189 + 819.51

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 1,601.53 Square meter

Allocation:
TOTAL: P 40,000,000
CW1: P 39,200,000
EAO: P 800,000

Unit Cost:
CW1: P 24,476.59 / Square meter
September 8, 2021 2021 WIN1E02817 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 310109100578000
Project ID: P00509859MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

FROM:

Quezon-Mapawa-Capalayan-Espina-Navarro Rd - K1134 + 705 - K1134 + 770

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 75,000,000
CW1: P 72,375,000
EAO: P 2,625,000

Unit Cost:
CW1: P 0 / Square meter

TO:

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Quezon-Mapawa-Capalayan-Espina-Navarro Rd - K1133 + 345.58 - K1133 + 360, K1134 + 705 - K1134 + 770

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 3,029.26 Square meter

Allocation:
TOTAL: P 75,000,000
CW1: P 72,375,000
EAO: P 2,625,000

Unit Cost:
CW1: P 23,891.97 / Square meter
September 8, 2021 2021 WIN1E02829 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 310109100579000
Project ID: P00509860MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

FROM:

Surigao-Davao Coastal Rd - K1149 + 000 - K1149 + 248

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 85,000,000
CW1: P 82,025,000
EAO: P 2,975,000

Unit Cost:
CW1: P 0 / Square meter

TO:

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Surigao-Davao Coastal Rd - K1149 + 067 - K1149 + 146.83

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 3,430.19 Square meter

Allocation:
TOTAL: P 85,000,000
CW1: P 82,025,000
EAO: P 2,975,000

Unit Cost:
CW1: P 23,912.67 / Square meter
September 8, 2021 2021 WIN1E02820 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 310109100580000
Project ID: P00509861MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

FROM:

Surigao-Davao Coastal Rd - K1149 + 818 - K1149 + 930

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 80,000,000
CW1: P 77,200,000
EAO: P 2,800,000

Unit Cost:
CW1: P 0 / Square meter

TO:

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Surigao-Davao Coastal Rd - K1149 + 150 - K1149 + 203.17

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 3,223.68 Square meter

Allocation:
TOTAL: P 80,000,000
CW1: P 77,200,000
EAO: P 2,800,000

Unit Cost:
CW1: P 23,947.79 / Square meter
September 8, 2021 2021 WIN1E02824 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 310109100581000
Project ID: P00509862MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

FROM:

Surigao-Davao Coastal Rd - K1174 + 705 - K1174 + 850

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 85,000,000
CW1: P 82,025,000
EAO: P 2,975,000

Unit Cost:
CW1: P 0 / Square meter

TO:

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Surigao-Davao Coastal Rd - K1174 + 705 - K1174 + 821.89

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 3,430 Square meter

Allocation:
TOTAL: P 85,000,000
CW1: P 82,025,000
EAO: P 2,975,000

Unit Cost:
CW1: P 23,913.99 / Square meter
September 8, 2021 2021 WIN1E02823 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Dinagat Islands District Engineering Office
UACS No. : 300111200350000
Project ID: P00550589MN

Local Program - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Rehabilitation / Reconstruction of National Roads with Slips Slope Collapse and Landslide Dinagat - Loreto Road, Dinagat Islands

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 250,000,000
CW1: P 241,250,000
EAO: P 8,750,000

Unit Cost:
CW1: P 0 / Square meter

TO:

Local Program - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Rehabilitation / Reconstruction of National Roads with Slips Slope Collapse and Landslide Dinagat - Loreto Road, Dinagat Islands

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 12,418.71 Square meter

Allocation:
TOTAL: P 250,000,000
CW1: P 241,250,000
EAO: P 8,750,000

Unit Cost:
CW1: P 19,426.33 / Square meter
September 6, 2021 FY2021 WIN1E02641 300204100716000 April 12, 2021 Region IX Regional Office IX
CSSP: Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones

Access Road at Sitio Anuling, Pamucutan to Sta. Rita in support of High Value Crops (Abaca, Cacao, Rubber and Coffee), Upper La Paz, Zamboanga City, Package III

CW1: Construction of Concrete Road
Physical Target (Road): 0.86 Lane Km.
Unit Cost (Road): Php 90,895,516.15/lane km.
CW2: Construction of Slope Protection Structure
Physical Target (Slope Protection: 2,085.50 Sq. M.
Unit Cost (Slope Protection): Php 16,127.87/sq.m.
EAO: Php 3,913,169.08
Total Allocation: Php 115,718,000.00
September 6, 2021 FY2021 WIN1E02311 300204100717000 April 20, 2021 Region IX Regional Office IX
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones

Barangay San Juan-Dampalan-San Isidro Road connecting National Road and Marapong in support of Rubber, Coconut and Abaca Industries, Sergio Osmeña, Zamboanga del Norte, Package II

CW1: Construction of Concrete Bridge
Physical Target: 1,156.248 Sq. M.
Unit Cost: Php 84,947.498/sq. m.
EAO: Php 3,570,000.00
Excess: Php 209,625.40
Total Allocation: Php 102,000,000.00
September 6, 2021 FY2021 WIN1E02665 300111200357000 May 31, 2021 Region IX Regional Office IX
Local Program - National Roads and Bridges - National Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects

Jct. Blancia-Molave-Josefina Road, K1673+000 - K1676+057.57

CW1: Road Widening
Physical Target: 6.115 Lane Km.
Unit Cost: Php 14,790,238.35/lane km.
ROW Acquisition: 20,000.00 Sq. M. (Php 6,000,000.00)
EAO: Php 3,500,000.00
Excess: Php 57,692.49
Total Allocation: Php 100,000,000.00
September 6, 2021 FY2021 WIN1E02688 300116203724000 June 17, 2021 Region IX Regional Office IX
Local Program - Local Roads and Bridges - Local Roads - Construction/ Repair/ Rehabilitation/ Improvement of Various Infrastructure including Local Projects

Labangan-Midsalip Road, Sta. 17+540 - Sta. 20+200, (Package 2), Zamboanga del Sur

CW1: Construction of Concrete Road
Physical Target: 5.320 Lane Km.
Unit Cost: Php 17,770,169.33/Lane Km.
ROW Acquisition: 6,542.330467 Sq. M. (Php 1,962,699.14)
EAO: Php 3,500,000.00
Total Allocation: Php 100,000,000.00
September 3, 2021 FY2021 WIN1E02600 310204101151000 April 13, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Conctruction of Bypass and Diversion Roads

Sominot - Mahayag Road, Zamboanga del Sur

CW1: Construction of Concrete Road
Physical Target: 2.020 Lane Km.
Unit Cost: Php 48,679,016.20/lane km.
EAO: Php 3,441,606.45
Excess: Php 226,780.83
Total Allocation: Php 102,000,000.00
September 3, 2021 FY2021 WIN1E02385 310204101142000 April 19, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Balucot - Lower Usugan - Tungawan Bypass Road, Zamboanga del Sur

CW1: Construction of Concrete Road
Physical Target: 2.80 Lane Km.
Unit Cost: Php 35,153,571.43/lane km.
EAO: Php 3,570,000.00
Total Allocation: Php 102,000,000.00
September 3, 2021 FY2021 WIN1E02315 310205100732000 April 19, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/New Roads

Sindangan - Bayog - Lakewood Road, Package 1, Zamboanga del Sur

CW1: Construction of Concrete Road
Physical Target: 3.706 Lane Km.
Unit Cost: Php 21,909,667.14/lane km.
EAO: Php 2,947,000.00
Excess: Php 55,773.59
Total Allocation: Php 84,200,000.00
September 3, 2021 FY2021 WIN1E02402 310205100734000 April 19, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/New Roads

Sindangan - Bayog - Lakewood Road, Package 2, Zamboanga del Sur

CW1: Construction of Concrete Road
Physical Target: 3.60 Lane Km.
Unit Cost: Php 22,560,441.24/lane km.
EAO: Php 2,947,000.00
Excess: Php 35,411.54
Total Allocation: Php 84,200,000.00
September 3, 2021 FY2021 WIN1E02444 310205100735000 April 19, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/New Roads

Sindangan - Bayog - Lakewood Road, Package 3, Zamboanga del Sur

CW1: Construction of Concrete Road
Physical Target: 2.20 Lane Km.
Unit Cost: Php 36,900,876.44/lane km.
EAO: Php 2,947,000.00
Excess: Php 71,071.83
Total Allocation: Php 84,200,000.00
September 3, 2021 FY2021 WIN1G02990 310204101145000 May 31, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Ipil Circumferential Road, Zamboanga Sibugay, Phase III

CW1: Construction of Concrete Road
Physical Target: 1.62 Lane Km.
Unit Cost: Php 44,687,590.48/lane km.
ROW Acquisition: 88,333.0 Sq. M. (Php 25,572,500.00)
EAO: Php 3,570,000.00
Excess: Php 463,603.42
Total Allocation: Php 102,000,000.00
September 3, 2021 FY2021 WIN1E02561 310204101143000 May 31, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Buenavista - Bolong By-pass Road, Package 3, Zamboanga City

CW1: Construction of Concrete Road
Physical Target: 1.50 Lane Km.
Unit Cost: Php 62,286,666.67/lane km.
ROW Acquisition: 16,666.67 Sq. M. (Php 5,000,000.00)
EAO: Php 3,570,000.00
Total Allocation: Php 102,000,000.00
September 3, 2021 FY2021 WIN1E02416 310204101148000 April 20, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

NRJ Lapakan - Lamisahan - Victoria By-pass Road, Zamboanga City

CW1: Construction of Concrete Road
Physical Target: 5.74 Lane Km.
Unit Cost: Php 17,148,083.62/lane km
EAO: Php 3,570,000.00
Total Allocation: Php 102,000,000.00
September 3, 2021 FY2021 WIN1G02982 310306100188000 May 24, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Bridges - Construction of New Bridges

Liba Br. along Sindangan - Bayog - Lakewood Rd

CW1: Construction of Concrete Road
Physical Target: 867.186 Sq. M.
Unit Cost: Php 155,590.535/sq.m.
EAO: Php 4,900,000.00
Excess: Php 174,066.03
Total Allocation: Php 140,000,000.00
September 3, 2021 FY2021 WIN1E02394 310305101245000 April 19, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges

Limpapa Parallel Br. along Zamboannga City-Labuan-Limpapa Road

CW1: Construction of Parallel Bridge
Physical Target: 867.186 Sq. M.
Unit Cost: Php 166,919.2076/sq. m.
EAO: Php 5,250,000.00
Total Allocation: Php 150,000,000.00
September 3, 2021 FY2021 WIN1E02474 320101106238000 April 13, 2021 Region IX Regional Office IX
OO2: Protect Lives and Properties - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure at Baybay River, along Sindangan-Liloy Road, K1964+000, Brgy, Baybay, Liloy, Zamboanga del Norte

CW1: Construction of Flood Mitigation Structure
Physical Target: 510.0 Ln. M.
Unit Cost: Php 98,878.10/ln.m.
ROW Acquisition: 2,273.983 Sq. M. (Php 682,194.87)
EAO: Php 1,764,974.09
Total Allocation: Php 52,875,000.00
September 3, 2021 2021 WIN1C04455 GAA 2021 August 11, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Rehabilitation/Improvement of Villaviciosa Road Phase 2, Villaviciosa, Abra;
Type of Work: Rehabilitation of Concrete Road;
Physical Target: CW1: 12 Lane Km;
Allocation= Php 50,000,000

To: Rehabilitation/Improvement of Villaviciosa Road Phase 2, Villaviciosa, Abra;
Type of Work: CW1: Rehabilitation of Concrete Road
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 7 Lane Km
CW2: 870 Square meters;
Allocation= Php 50,000,000



September 3, 2021 2021 WIN1C04479 GAA 2021 August 16, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Patiao Flood Control, Sta. 67+300 - 67+800, Peñarrubia, Abra;
Physical Target: CW1: 354 Lineal meters;
Allocation= Php 30,000,000

To: Construction of Patiao Flood Control, Sta. 67+300 - 67+800, Peñarrubia, Abra;
Physical Target: CW1: 292 Lineal meters;
Allocation= Php 30,000,000

September 3, 2021 2021 WIN1C04476 GAA 2021 August 11, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Sinalang Flood Control, Peñarrubia, Abra;
Physical Target: CW1: 611.20 Lineal meters;
Allocation= Php 100,000,000

To: Construction of Sinalang Flood Control, Peñarrubia, Abra;
Physical Target: CW1: 663.20 Lineal meters;
Allocation= Php 100,000,000
September 3, 2021 2021 WIN1C04480 GAA 2021 August 16, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Pawa Flood Control, Lagangilang, Abra;
Physical Target: CW1: 445.594 Lineal meters;
Allocation= Php 50,000,000

To: Construction of Pawa Flood Control, Lagangilang, Abra;
Physical Target: CW1: 534 Lineal meters;
Allocation= Php 50,000,000
September 3, 2021 2021 WIN1C04478 GAA 2021 August 11, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Demet Flood Control, La Paz, Abra;
Physical Target: CW1: 891.189 Lineal meters;
Allocation= Php 100,000,000


To: Construction of Demet Flood Control, La Paz, Abra;
Physical Target: CW1: 768.80 Lineal meters;
Allocation= Php 100,000,000
September 3, 2021 2021 WIN1C04481 GAA 2021 August 16, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Botnong Flood Control, Tineg, Abra;
Physical Target: CW1: 522 Lineal meters;
Allocation= Php 50,000,000

To: Construction of Botnong Flood Control, Tineg, Abra;
Physical Target: CW1: 440 Lineal meters;
Allocation= Php 50,000,000

September 3, 2021 2021 WIN1C04450 GAA 2021 August 11, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Badas-Lam-ag Flood Control, San Juan, Abra;
Physical Target: CW1: 891.189 Lineal meters;
Allocation= Php 100,000,000

To: Construction of Badas-Lam-ag Flood Control, San Juan, Abra;
Physical Target: CW1: 432.80 Lineal meters;
Allocation= Php 100,000,000

September 3, 2021 2021 WIN1C04458 GAA 2021 August 11, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Ilocos Norte Rd - K0434 + 650 - K0434 + 750;
Physical Target: CW1: 10,000 Square meters;
Allocation= Php 100,000,000

To: Abra-Ilocos Norte Rd - K0434 + 300 - K0434 + 450;
Physical Target: CW1: 4,063.5 Square meters;
Allocation= Php 100,000,000


September 3, 2021 2021 WIN1C04446 GAA 2021 August 11, 2021 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Ilocos Norte Rd - K0431 + 850 - K0431 + 920;
Physical Target: CW1: 10,000 Square meters;
Allocation= Php 100,000,000

To: Abra-Ilocos Norte Rd - K0432 + 080 - K0432 + 480;
Physical Target: CW1: 4,064 Square meters;
Allocation= Php 100,000,000

September 3, 2021 2021 WIN1C04485 GAA 2021 August 16, 2021 Cordillera Administrative Region CAR - Regional Office
From: Construction of Carumsing Bridge, Carumsing, Dangtalan, Pasil, Kalinga;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 102,000,000

To: Construction of Carumsing Bridge, Carumsing, Dangtalan, Pasil, Kalinga;
Physical Target: CW1 : 1,159.11 Square meters;
Allocation= Php 102,000,000

September 3, 2021 2021 WIN1C04495 GAA 2021 August 19, 2021 Cordillera Administrative Region CAR - Regional Office
From: Gov. Bado Dangwa National Rd - K0348 + 760 - K0349 + 068;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 110,000,000

To: Gov. Bado Dangwa National Rd - K0348 + 760 - K0348 + 908;
Physical Target: CW1 : 4898.40 Square meters;
Allocation= Php 110,000,000

September 3, 2021 2021 WIN1C04459 GAA 2021 August 10, 2021 Cordillera Administrative Region CAR - Regional Office
From: Itogon-Dalupirip-Sn Manuel Bdry Rd - K0275 + 350 - K0275 + 456, K0275 + 509 - K0275 + 635, K0275 + 690 - K0275 + 848;
Physical Target: CW1 : 0 Square meters;
Allocation= Php 290,000,000

To: Itogon-Dalupirip-Sn Manuel Bdry Rd - K0275 + 510 - K0275 + 635, K0275 + 690 - K0275 + 810;
Physical Target: CW1 : 11,945 Square meters;
Allocation= Php 290,000,000

September 3, 2021 2021 WIN1C04447 GAA 2021 August 10, 2021 Cordillera Administrative Region CAR - Regional Office
From: Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0362 + 560 - K0362 + 720, K0372 + 210 - K0372 + 310;
Physical Target: CW1 : 5,200 Square meters;
Allocation= Php 102,762,000

To: Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0362 + 560 - K0362 + 675, K0372 + 210 - K0372 + 310;
Physical Target: CW1 : 4,874.23 Square meters;
Allocation= Php 102,762,000

September 3, 2021 FY2021 WIN1E02650 320101106239000 April 12, 2021 Region IX Regional Office IX
OO2: Protect Lives and Properties - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure at Kumalarang, Zamboanga del Sur

CW1: Construction of Flood Mitigation Structure
Physical Target: 550.50 Ln. M.
Unit Cost: Php 184,285.6955/ln. m.
EAO: Php 3,550,724.64
Total Allocation: Php 105,000,000.00
September 3, 2021 FY2021 WIN1E02705 320101106242000 April 12, 2021 Region IX Regional Office IX
OO2: Protect Lives and Properties - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structures with Esplanade at Limpapa River, Zamboanga City-Labuan-Limpapa Road (Limpapa Br. Section)

CW1: Construction of Flood Mitigation Structure
Physical Target: 259.79 Ln. M.
Unit Cost: Php 371,909.4557/ln.m.
EAO: Php 3,381,642.51
Total Allocation: Php 100,000,000.00
September 3, 2021 FY2021 WIN1G02954 320101106243000 April 12, 2021 Region IX Regional Office IX
OO2: Protect Lives and Properties - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Labason Flood Control at Antonino, Labason, Zamboanga del Norte (Upstream) Package 1

CW1: Construction of Flood Mitigation Structures
Physical Target: 557.0 Ln. M.
Unit Cost: Php 181,398.69/ln. m.
ROW Acquisition: 953.1065 Sq. M. (Php 285,931.96)
EAO: Php 3,675,000.00
Total Allocation: Php 105,000,000.00
September 3, 2021 FY2021 WIN1G02958 320101106244000 April 12, 2021 Region IX Regional Office IX
OO2: Protect Lives and Properties - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Labason Flood Control at Antonino, Labason, Zamboanga del Norte (Upstream) Package 2

CW1: Construction of Flood Mitigation Structure
Physical Target: 440.0 Ln. M.
Unit Cost: 225,854.55/ln.m.
ROW Acquisition: 830.0003 Sq. M. (Php 249,000.09)
EAO: Php 3,675,000.00
Excess: Php 1,700,000.00
Total Allocation: Php 105,000,000.00
September 3, 2021 FY2021 WIN1E02327 320101106246000 April 13, 2021 Region IX Regional Office IX
OO2: Protect Lives and Properties - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Revetment, Kumalarang River, Isabela City

CW1: Construction of Flood Mitigation Structure
Physical Target: 888.40 Ln. M.
Unit Cost: Php 162,716.5296/ln.m.
ROW Acquisition: 1,277.09 Sq. M. (Php 383,127.29)
EAO: Php 5,059,507.77
Total Allocation: 150,000,000.00
September 3, 2021 2021 WIN1E02803 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300108200287000
Project ID: P00550449MN

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 40+576 - Sta. 40+830, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 0 / Square meter

TO:

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 40+596 - Sta. 40+712.56, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4,040.15 Square meters

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 23,885.25 / Square meter
September 3, 2021 FY2021 WIN1E02475 320101106247000 April 12, 2021 Region IX Regional Office IX
OO2: Protect Lives and Properties - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Upper Tungawan Flood Control Structure along Tungawan River (Phase III), Tungawan, Zamboanga Sibugay

CW1: Construction of Flood Mitigation Structure
Physical Target: 641.0 Ln. M.
Unit Cost: Php 165,319.75/ln.m.
ROW Acquisition: 600.1378 Sq. M. (Php 180,041.34)
EAO: Php 3,850,000.00
Total Allocation: Php 110,000,000.00
September 3, 2021 2021 WIN1E02797 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300108200290000
Project ID: P00550452MN

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road Sta. 44+107 - Sta. 44+300, Malimono, Surigao del Norte


Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 0 / Square meter

TO:

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects


Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 44+170 - Sta. 44+262.92, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4,040.16 Square meters

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 23,885.19 / Square meter
September 3, 2021 2021 WIN1E02798 FY 2021 GAA RA 11518 January 25, 2021 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300108200291000
Project ID: P00550453MN

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

FROM:

Construction of Road Slope Protection Structure along Surigao-Agusan West Coastal Road Sta. 44+360 - Sta. 44+590, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0 Square meter

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 0 / Square meter

TO:

Local Program - Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects

Construction of Road Slope Protection Structure along Surigao - Agusan West Coastal Road Sta. 44+360 - Sta. 44+468.5, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4,040.15 Square meters

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 23,885.25 / Square meter
September 3, 2021 FY2021 WIN1E02530 300211100199000 April 12, 2021 Region IX Regional Office IX
CSSP: Convergence and Special Support Program - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

Repair/Maintenance National Roads and Bridges, Painting/Repainting of Centerline and Edge Line along: Dipolog-Orquieta Rd (K1795+(-437)-K1829+543 Intermittent Section);
Dipolog-Punta-Dansullan Sergio Osmena Road (K1857+(-1123)-K1893+775 Intermittent Section); Rizal-Dakak-Dapitan Coastal Loop Road (K1798+(-893)-K1868+881 Intermittent Section); Dipolog-Polanco-Pinan Jct Oroq Road (K1810+(-471)-K1828+800 Intermittent Section); Pinan-Mutia Rd (K1817+000-K1830+000); Jct. Polo-Dapitan Park Road (K1825+(-305) - K1829+000 Intermittent Section); Dipolog-Polanco-Macleodes Rd. (K1828+(-220)-K1848+952 Intermittent Section); Jct. Polo-Pulauan Port Road (K1827+(-320)-K1828+438 Intermittent Section)

CW1: Road Safety: Pavement Markings
Physical Target: 408.316 Lane Km.
Unit Cost: Php 108,775.0916/lane km.
EAO: Php 1,554,511.36
Excess: Php 30,878.32
Total Allocation: Php 46,000,000.00
September 3, 2021 FY2021 WIN1E02278 310201100683000 April 12, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Lanao-Pagadian-Zamboanga City Rd - K1777+980.00 - K1778+580.00, K1778+660.00 - K1782+580.00

CW1: Road Widening
Physical Target: 9.040 Lane Km.
Unit Cost: Php 10,481,823.98/lane km.
ROW Acquisition: 13,092.874 Sq. M. (Php 3,927,862.10)
EAO: Php 3,316,449.10
Total Allocation: Php 102,000,000.00
September 3, 2021 FY2021 WIN1G02899 310201100684000 April 12, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Liloy-Ipil Road - K1981+373 - K1984+460, K1984+497.65 - K1984+800.00

CW1: Road Widening
Physical Target: 6.779 Lane Km.
Unit Cost: Php 15,288,220.27/lane km.
ROW Acquisition: 9,112.651 Sq. M. (Php 2,733,795.20)
EAO: Php 3,627,359.58
Total Allocation: Php 110,000,000.00
September 2, 2021 FY2021 WIN1G02961 310202100720000 April 20, 2021 Region IX Regional Office IX
OO1:Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads

Basilan Circumferential Rd - K0006+635.45 - K0007+585.50, K0008+544.96 - K0009+380.00, K0009+640.00 - K0011+049.95

CW1: Road Widening
Physical Target: 6.39 Lane Km.
Unit Cost: Php 17,793,077.81/lane km.
ROW Acquisition: 39,174.1093 Sq. M. (Php 11,752,232.79)
EAO: Php 4,550,000.00
Total Allocation: Php 130,000,000.00
September 2, 2021 FY2021 WIN1E02379 310212100171000 April 19, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Tertiary Roads

Zamboanga del Sur Coastal Road - (S01167MN) Chainage 16134 - Chainage 16791, (S01167MN) Chainage 18571 - Chainage 20180, (S01168MN) Chainage 10160 - Chainage 11160

CW1: Paving of Unpaved Roads
Physical Target: 6.532 Lane Km.
Unit Cost: Php 15,087,373.64/lane km.
EAO: Php 3,449,275.37
Total Allocation: Php 102,000,000.00
September 2, 2021 FY2021 WIN1E02450 310108100567000 April 13, 2021 Region IX Regional Office IX
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary Roads

Zamboanga City - Labuan - Limpapa Road - K1976+300 - K1977+063.04

CW1:Construction of Slope Protection Structure
Physical Target: 8,059.39 Lane Km.
Unit Cost: Php 17,957.90061/Square Meter
EAO: Php 5,065,540.36
Total Allocation: Php 150,000,000.00