August 5, 2024 |
2024 |
WIN4F08059 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Bocaue - Sn Jose Rd - K0037+825 - K0038+173 |
August 5, 2024 |
2024 |
WIN4F08081 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Pampanga 2nd District Engineering Office |
Network Development Program - Road Widening - Tertiary Roads
Sn Fernando-Lubao Rd - K0075+254 - K0075+538.64, K0081+531 - K0081+562, K0082+911 - K0083+106.51, K0085+029 - K0085+098.60, K0085+351.60 -K0085+458.75 |
August 5, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Regional Office III |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Jose Abad Santos Ave (JASA) - K0084+391 - K0084+540, K0084+540 - K0085+000, K0085+000 - K0085+088.50 |
August 5, 2024 |
2024 |
WIN4F08070 |
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
AS PER GAA/ORIGINAL:
Govt Ctr Rd Network - K0913 + (-029.36) - K0913 + 000, K0913 + (-157) - K0913 + (-029.36), K0913 + 000 - K0913 + 730
Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 22.09312 M
Asphalt Overlay: 3.548 Lane Km
EAO P 0.45088 M
Total P 22.544 M
AS MODIFIED:
Govt Ctr Rd Network - K0913 + (-157) - K0913 + 395
Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 22.09312 M
Asphalt Overlay: 2.208 Lane Km
EAO P 0.45088 M
Total P 22.544 M
|
August 2, 2024 |
CY 2024 |
WIN4XY00341 |
UACS No. 300226110827000 |
June 11, 2024 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 300226110827000
Project ID.: P00846706LZ
Convergence and Special Support Program
Basic Infrastructure Program (BIP) – Multi-Purpose Buildings/ Facilities to support Social Services
Rehabilitation of Multi-Purpose Buildingm (College of Economics) at U.P. Diliman, Quezon City
Physical Target: CW1 = Rehabilitation/ Major Repair of Multi-Purpose Building – 1 bldg.
Unit Cost (P’000) = P 29,700.00/no. of bldgs..
Allocation (P’000)= P 29,700.00
EAO (P’000) = P 300.00
Total (P’000)= P 30,000.00
As Modified
Convergence and Special Support Program
Basic Infrastructure Program (BIP) – Multi-Purpose Buildings/ Facilities to support Social Services
Rehabilitation of Multi-Purpose Buildingm (School of Economics) at U.P. Diliman, Quezon City
Physical Target: CW1 = Rehabilitation/ Major Repair of Multi-Purpose Building – 1 bldg.
Unit Cost (P’000) = P 29,700.00/no. of bldgs..
Allocation (P’000)= P 29,700.00
EAO (P’000) = P 300.00
Total (P’000)= P 30,000.00
Bar Code #WIN4XY00341
|
August 2, 2024 |
FY 2024 |
P00820198MN |
GAA 2024 |
January 1, 2024 |
Region XII |
Saranggani District Engineering Office |
Construction of Bagacay Flood Mitigation Structure, Alabel, Sarangani
Construction of Flood Mitigation Structure
Amount: ₱ 47,254,000.00 |
August 2, 2024 |
FY 2024 |
P00800499MN |
SR2024-01-002300 |
January 27, 2024 |
Region XII |
Saranggani District Engineering Office |
From: Sarangani-Davao Del Sur Coastal Rd - K1749 + 100 - K1749 + 300
To: Rehabilitatio/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide along Sarangani- Davao del Sur Coastal Rd- K1696+915- K1697+012, K1697+135- K1697+290, K1749+110-K1749+300
Amount: ₱ 75,000,000.00 |
August 2, 2024 |
2024 |
P00803766MN |
SR2024-01-001925 |
January 27, 2024 |
Region X |
Regional Office X |
P00803766MN
310101101342000
OO1:Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
FROM:
Sayre Highway K1525 + 274 - K1527 + 520, K1538 + 1014 - K1539 + 683
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-6.218 Lane Km
Allocation:
Total: Php 122,720,000.00
CW1: Php 118,424,800.00
EAO: Php 4,925,200.00
TO:
Sayre Highway K1526 + (-726) - K1527 + 000, K1539 + 000 - K1539 + 681
Type of Work:
CW1-Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1-9.748 Lane Km
Allocation:
Total: Php 122,720,000.00
CW1: Php 118,424,800.00
EAO: Php 4,925,200.00 |
August 2, 2024 |
2024 |
P00800006MN |
SR2024-01-003092 |
January 27, 2024 |
Region X |
Regional Office X |
P00800006MN
310203100788000
OO1:Ensure Safe and Reliable National Road System - Network Development- Road Widening - Tertiary Roads
FROM:
Mulondo-Wao Rd - (S01604MN) Chainage 9300 - Chainage 11300
Type of Work:
CW1- Road Widening
Physical Target:
CW1-4.000 Lane Km
Allocation:
Total: Php 50,000,000.00
CW1: Php 48,250,000.00
EAO: Php 1,750,000.00
TO:
Mulondo-Wao Rd - (S01604MN) Chainage 40 - Chainage 2040
Type of Work:
CW1-Road Widening
Physical Target:
CW1-4.000 Lane Km
Allocation:
Total: Php 50,000,000.00
CW1: Php 48,250,000.00
EAO: Php 1,750,000.00 |
August 2, 2024 |
2024 |
P00834899MN |
SR2024-07-01803 |
July 22, 2024 |
Region X |
Regional Office X |
P00834899MN
300215104074000
CSSP:Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road, Jct. Bukidnon Davao City Road-Palacapao-East Dalurong-West Dalurong-Sinaysayan Road (East Dalurong Section and West Dalurong Section), Kitaotao,Bukidnon (Package 1)
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1-9.200 Lane Km
Allocation:
Total: Php 140,000,000.00
CW1: Php 135,100,000.00
EAO: Php 4,900,000.00
TO:
Construction of Road, Jct. Bukidnon Davao City Road-Palacapao-East Dalurong-West Dalurong-Sinaysayan Road (East Dalurong Section and West Dalurong Section), Kitaotao,Bukidnon (Package 1)
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1-5.200 Lane Km
CW2-4,940.00 Square meters
Allocation:
Total: Php 140,000,000.00
CW1: Php 108,376,592.01
CW2: Php 26,723,407.99
EAO: Php 4,900,000.00 |
August 2, 2024 |
2024 |
P00834902MN |
SR2024-07-018042 |
July 22, 2024 |
Region X |
Regional Office X |
P00834902MN
300215104077000
CSSP:Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road (Jct. Bukidnon-Davao City Road, Brgy. Tawas- Sitio Balakbakan-Sitio Sumalil Road, Kitaotao, Bukidnon
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1-6.000 Lane Km
Allocation:
Total: Php 100,000,000.00
CW1: Php 96,500,000.00
EAO: Php 3,500,000.00
TO:
Construction of Road (Jct. Bukidnon-Davao City Road, Brgy. Tawas- Sitio Balakbakan-Sitio Sumalil Road, Kitaotao, Bukidnon
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1-4.040 Lane Km
Allocation:
Total: Php 100,000,000.00
CW1: Php 96,500,000.00
EAO: Php 3,500,000.00 |
July 31, 2024 |
2024 |
310109101450000 |
GAA 2024 |
January 3, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Peñablanca- Callao Cave Rd- K0477+(-158)- K0477+(-258)
|
July 31, 2024 |
2024 |
310201101389000 |
GAA 2024 |
January 3, 2024 |
Region II |
Isabela 2nd District Engineering Office |
FROM:
Network Development - Road Widening - Primary Roads - Santiago-Tuguegarao Rd - K0388 + 1075.62 - K0390 + 000
TO:
Network Development - Road Widening - Primary Roads - Santiago-Tuguegarao Rd - K0389 + 240 - K0389 + 776 |
July 31, 2024 |
2024 |
310103101374000 |
GAA 2024 |
January 3, 2024 |
Region II |
Isabela 4th District Engineering Office |
FROM:
Asset Preservation - Preventive Maintenance - Tertiary Roads - Jct Ipil-Quirino Bdry Rd - K0365 + 500 - K0376 + 500 - K0376 + 211
TO:
Asset Preservation - Preventive Maintenance - Tertiary Roads - Jct Ipil-Quirino Bdry Rd - K0365 + 974 - K0373 + 763 |
July 31, 2024 |
2024 |
310105101009000 |
GAA 2024 |
January 3, 2024 |
Region II |
Nueva Vizcaya District Engineering Office |
FROM:
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Nueva Vizcaya-Ifugao Rd - K0283 + (-463) - K0289 + 010
TO:
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads - Nueva Vizcaya-Ifugao Rd - K0283 + (-463) - K0283 + 073, K0284 + 365 - K0289 + 010 |
July 31, 2024 |
2024 |
310204102443000 |
GAA 2024 |
January 3, 2024 |
Region II |
Regional Office II |
Network Development - Construction of By-Pass and Diversion Roads - Tuguegarao West Diversion Road (Jct. Carig-Linao-Atuluyan-Bagay-Buntun), Package 1, Cagayan |
July 31, 2024 |
2024 |
300215104461000 |
GAA 2024 |
January 3, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road , Brgy. Maddarulug Sur, Enrile, Cagayan |
July 31, 2024 |
2024 |
300215104464000 |
GAA 2024 |
January 3, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Bridge and Approaches, Brgy. Dassun, Solana, Cagayan |
July 31, 2024 |
2024 |
300216100032000 |
GAA 2024 |
January 3, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities - Construction of Access Road, Leading to Indigenous People of Peñablanca, Cagayan |
July 31, 2024 |
2024 |
300215104480000 |
GAA 2024 |
January 3, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or ridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities - Construction of Nattallag Bridges & Approaches, Brgy. Mangga, Peñablanca, Cagayan, Phase II |
July 31, 2024 |
2024 |
310201101247000 |
GAA 2024 |
January 3, 2024 |
Region II |
Regional Office II |
FROM:
Network Development - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0271 + 000 - K0272 + 379, K0273 + 392 - K0276 + 000, K0277 + 580 - K0279 + 000
TO:
Network Development - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0271 + 940 - K0272 + 376.30, K0273 + 408.70 - K0275 + 158.10 |
July 30, 2024 |
2024 |
WIN4F08073 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800214LZ
UACS No: 310108101265000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0414 + 385 - K0416 + 000, K0416 + 760 - K0416 + 836, K0423 + 970 - K0424 + 757, K0425 + 131 - K0426 + 722, K0429 + 597 - K0429 + 893, K0432 + 527 - K0432 + 528
Physical Target :
CW1 - Road Widening - 8.738 Lane Km
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0414 + 385 - K0415 + 360, K0423 + 970 - K0424 + 757, K0425 + 131 - K0426 + 722, K0429 + 632 - K0429 + 893
Physical Target :
CW1 - Road Widening - 7.21 Lane Km
ROW - ROW Acquisition - 18025 Square meter |
July 30, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800901LZ
UACS No: 310108101873000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Road with Slips, Slope Collapse, and Landslide - Secondary Roads - Catanduanes Cir Rd - K0168 + 650 - K0168 + 675
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 575 Square meters
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Road with Slips, Slope Collapse, and Landslide - Secondary Roads - Catanduanes Cir Rd - K0168 + 620 - K0168 + 705
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 681 Square meters |
July 30, 2024 |
2024 |
WIN4X700328 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800218LZ
UACS No: 310201101279000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - Daang Maharlika (LZ) - K0580 + 939 - K0580 + 968, K0580 + 994 - K0581 + 000, K0581 + 024 - K0581 + 269, K0581 + 269 - K0581 + 279, K0581 + 279 - K0581 + 375, K0581 + 432 - K0581 + 444, K0581 + 528 - K0581 + 571, K0581 + 707 - K0581 + 761
Physical Target :
CW1 - Road Widening - 0.381 Lane Km
CW2 - Construction of Drainage Structure along Road - 386 Lineal meters
ROW - ROW Acquisition - 24.27 Square meters
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0585 + 757 - K0586 + 322
Physical Target :
CW1 - Road Widening - 0.852 Lane Km
CW2 - Construction of Slope Protection Structure - 2191.34 Square meters |
July 30, 2024 |
2024 |
WIN4F08047 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800225LZ
UACS No: 310201101259000
FROM :
Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0267 + 145 - K0270 + 089
Physical Target :
CW1 - Road Widening - 5.912 Lane Km
ROW - ROW Acquisition - 59,120 Square meters
TO :
Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0267 + 145 - K0270 + 089
Physical Target :
CW1 - Road Widening - 5.077 Lane Km
CW2 - Construction of Road Slope Protection Structure - 4,199.92 Square Meters |
July 30, 2024 |
2024 |
WIN4F08045 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00802127LZ
UACS No: 310101101263000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0443 + (-420) - K0448 + 565 Phase II
Physical Target :
CW1 - Preventive Maintenance of Road Asphalt Overlay - 22.812 Lane Km
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0444 + 159 - K0447 + 152.50
Physical Target :
CW1 - Preventive Maintenance of Road Asphalt Overlay - 11.822 Lane Km |
July 30, 2024 |
2024 |
WIN4XY00327 |
2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800890LZ
UACS No: 310107100614000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Daang Maharlika (LZ) - K0526 + 041 - K0526 + 057
Physical Target :
CW1 - Construction of Road Slope Protection Structure
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Daang Maharlika (LZ) - K0520 + 744.16 - K0520 + 767.80, K0526 + 041.00 - K0526 + 057.00
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 210.980 Square meters |
July 30, 2024 |
2024 |
WIN4XY00318 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800913LZ
UACS No: 310107100612000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Daang Maharlika (LZ) - K0367 + 825 - K0367 + 875
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 1108 Square meters
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Daang Maharlika (LZ) - K0338 + 475 - K0338 + 560
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 570.18 Square meters |
July 30, 2024 |
2024 |
WIN4XY00319 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800911LZ
UACS No: 310107100610000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Daang Maharlika (LZ) K0354 + 878 - K0355 + 000
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 4000 Square meters
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Daang Maharlika (LZ) - K0358 + 860 - K0358 + 950, K0359 + 915 - K0359 + 975
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 1866.06 Square meters |
July 30, 2024 |
2024 |
WIN4XY00317 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800912LZ
UACS No: 310107100611000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Daang Maharlika (LZ) - K0365 + 100 - K0365 + 130
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 1560 Square meter
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Daang Maharlika (LZ) - K0365 + 100 - K0365 + 130, K0367 + 825 - K0367 + 875
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 676.39 Square meters |
July 30, 2024 |
2024 |
WIN4XY00289 |
GAA 2024 |
December 19, 2024 |
Region V |
Regional Office V |
Project ID : P00800542LZ
UACS No: 310205101228000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads - Pasacao - Balatan Tourism Coastal Highway (Pasacao - Minalabac Section), Camarines Sur
Physical Target :
CW1 - Construction of Concrete Road - 10.477 Lane Km
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads - Pasacao - Balatan Tourism Coastal Highway (Pasacao - Minalabac Section), Camarines Sur
Physical Target :
CW1 - Construction of Concrete Road - 4.769 Lane Km
CW2 - Construction of Road Slope Protection Structure - 3651.7 Square |
July 30, 2024 |
2024 |
WIN4F08046 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00837427LZ
UACS No: 300214100758000
FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0515 + 659 -K0516 + 005, K0516 + 596 - K0518 + 706, K0521 + 128 - 522 + 434, K0522 + 800 - K0522 + 922, K0524 + 046 - K0524 + 480, K0527 + 627 - K0528 + 432
Physical Target :
CW1 - Rehabilitation of Paved Road - 9.418 Lane Km
CW2 - Preventive Maintenance of Road Asphalt Overlay
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0516 + 596 - K0518 + 809, K0521 + 128 - 522 + 434 |
July 30, 2024 |
2024 |
WIN4XY00292 |
GAA 2024 |
January 19, 2024 |
Region V |
Sorsogon 2nd District Engineering Office |
Project ID : P00848321LZ
UACS No: 300226113671000
FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - Multipurpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building, Brgy. Bulawan, Sta. Magdalena, Sorsogon
Physical Target :
CW1 - Construction of Multi-Purpose Building - 1 No. of Building
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - Multipurpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building, Brgy. Bulawan, Prieto Diaz, Sorsogon
Physical Target :
CW1 - Construction of Multi-Purpose Building - 1 No. of Building |
July 30, 2024 |
2024 |
WIN4XY00283 |
GAA 2024 |
January 19, 2024 |
Region V |
Camarines Norte Sub-District Engineering Office |
Project ID : P00846365LZ
UACS No: 300226109838000
FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program(BIP) - BIP - Multi-Purpose Buildings/ Facilities to support Social Services - Completion of Multi-Purpose Buildings Mangamagong Elementary School Barangay Mangamagong Phase 2 Daet, Camarines Norte
Physical Target :
CW1 - Construction of Multi Purpose Building - 1 Number of Buildings
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program(BIP) - BIP - Multi-Purpose Buildings/ Facilities to support Social Services - Completion of Multi-Purpose Buildings Mangcamagong Elementary School (Phase 2), Barangay Mangcamagong, Basud, Camarines Norte
Physical Target :
CW1 - Construction of Multi Purpose Building - 1 Number of Buildings |
July 30, 2024 |
2024 |
WIN4XY00251 |
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00844598LZ
UACS : 300219102533000
FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps(SIPAG) - SIPAG - Flood Mitigation Structure protecting Major/ Strategic Public Buildings/ Facilities - Construction of Sagñay River Flood Mitigation Structure along Barangay Tarague and Barangay Minangdongjol Sagñay, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 551 lineal meters
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps(SIPAG) - SIPAG - Flood Mitigation Structure protecting Major/ Strategic Public Buildings/ Facilities - Construction of Sagñay River Flood Mitigation Structure along Barangay Tarague and Barangay Minadongjol Sagñay, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 551 lineal meters |
July 30, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00805178LZ
UACS : 310104100661000
FROM :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Daang Maharlika (LZ) - K0554 + 630 - K0555 + 074
Physical Target :
CW1 - Rehabilitation of Paved Roads - 0.888 Lane Km
TO :
ORGANIZATIONAL OUTCOME 1 - Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Daang Maharlika (LZ) - K0554 + 630 - K0554 + 900, K0557 + 625 - K0557 + 940, K0562 + 143 - K0562 + 465
Physical Target :
Rehabilitation of Paved Road - 1.177 Lane Km |
July 30, 2024 |
2024 |
|
GAA 2024 |
January 19, 2024 |
Region V |
Regional Office V |
Project ID : P00837978LZ
UACS : 300215103870000
FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/ or Bridges from National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Ridge Road, Tinocawan - Maninila - Caracan, Rapu-Rapui, Albay
Physical Target :
CW1 - Construction of Gravel Road - 4.498 Lane km
TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/ or Bridges from National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Ridge Road, Tinocawan - Manila - Caracan, Rapu-Rapui, Albay
Physical Target :
CW1 - Construction of Gravel Road - 4.241 Lane Km
Cw2 - Construction of Road Slope Protection Structure - 5,788 Square meters |
July 29, 2024 |
2024 |
|
SR2024-01-008087 |
January 31, 2024 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) – K0939 + 000 - K0941 + 000
Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 132.74926 M
Asphalt Overlay: 8.092 Lane Km
EAO P 4.81474 M
Total P 137.564 M
AS MODIFIED:
Daang Maharlika (LT) – K0939 + 770 – K0941 + 000, K0946 + 000 – K0947 + 000
Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 132.74926 M
Asphalt Overlay: 9.088 Lane Km
EAO P 4.81474 M
Total P 137.564 M
|
July 26, 2024 |
FY 2024 |
P00833593MN |
GAA 2024 |
January 1, 2024 |
Region XII |
Cotabato 1st District Engineering Office |
Basic
Infrastructure Program (BIP) - Flood Mitigation Structures
protecting Public Infrastructures/Facilities
Construction of Drainage Canal along Kitao Creek, Central
Katingawan, Midsayap, Cotabato
Basic
₱ 5,000,000.00
|
July 26, 2024 |
FY 2024 |
P00800498MN |
GAA 2024 |
January 1, 2024 |
Region XII |
Cotabato 2nd District Engineering Office |
From:Paco-Roxas-Arakan Valley - Jct Davao - Bukidnon Rd –
K1683 + 808 - K1683 + 929
To: Paco-Roxas-Arakan Valley - Jct Davao - Bukidnon Rd –
K1684 + 820 - K1684 + 892
Amount: ₱100,000,000.00 |
July 25, 2024 |
2024 |
WIN4E03573 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310201101368000
Project ID: P00800223MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads
FROM:
Daang Maharlika (Surigao-Agusan Sect) - K1168 + (-823) - K1168 + 009, K1168 + 368 - K1169 + 000, K1171 + 000 - K1174 + 701, K1175 + 133 - K1175 + 240, K1175 + 270 - K1175 + 642
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 11.284 Lane Km
Allocation:
TOTAL: P 216,616,000
CW1: P 209,034,440
EAO: P 7,581,560
Unit Cost:
CW1: P 18,524,852.89/Lane Km
TO:
Daang Maharlika (Surigao-Agusan Sect) - K1168 + (-823) - K1168 + (-036.09), K1168 + 380 - K1169 + 006.33, K1171 + 000 - K1171 + 640, K1171 + 860 - K1172 + 120, K1172 + 480 - K1172 + 625
Type of Work:
CW1- Road Widening
CW2- ROW Acquisition
Physical Target:
CW1- 4.916 Lane Km
CW2- 45,000 Square meters
Allocation:
TOTAL: P 216,616,000
CW1: P 199,384,440
CW2: P 9,650,000
EAO: P 7,581,560
Unit Cost:
CW1: P 40,558,266.88/Lane Km
CW2: P 214,.44/Square meters
|
July 25, 2024 |
2024 |
WIN4E03572 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 300215104139000
Project ID: P00834947MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road, Salaysayon - Jagimitan Road, (Sta K1+570 - K6+070) Package 2, Nasipit, Agusan Del Nore
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 17.604 Lane Km
Allocation:
TOTAL: P 200,000,000
CW1: P 193,000,000
EAO: P 7,000,000
Unit Cost:
CW1: P 52,445,652.17/Lane Km
TO:
Construction of Road, Salaysayon - Jaguimitan Road, (Sta K1+570 - K3+410) Package 2, Nasipit, Agusan Del Norte
Type of Work:
CW1- Construction of Gravel Road
Physical Target:
CW1- 3.68 Lane Km
Allocation:
TOTAL: P 200,000,000
CW1: P 193,000,000
EAO: P 7,000,000
Unit Cost:
CW1: P 52,445,652.17/Lane Km
|
July 25, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 300219102729000
Project ID: P00835851MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Jiabong-San Isidro River Control Project, Kitcharao, Agusan del Norte
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 900.00 Lineal meters
Allocation:
TOTAL: P 250,000,000
CW1: P 241,250,000
EAO: P 8,750,000
Unit Cost:
CW1: P 268,055.55/Lineal meters
TO:
Construction of Jaliobong-San Isidro River Control Project, Kitcharao, Agusan del Norte
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 900.00 Lineal meters
Allocation:
TOTAL: P 250,000,000
CW1: P 241,250,000
EAO: P 8,750,000
Unit Cost:
CW1: P 268,055.55/Lineal meters
|
July 25, 2024 |
2024 |
WIN4E03571 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310101101426000
Project ID: P00801114MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
FROM:
Daang Maharlika (Bayugan Rotunda) - Chainage 0 - Chainage 220
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 0.66 Lane Km
Allocation:
TOTAL: P 5,665,000
CW1: P 5,466,725
EAO: P 198,275
Unit Cost:
CW1: P 8,282,920/Lane Km
TO:
Daang Maharlika (Bayugan Rotunda) - Chainage 0 - Chainage 99
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 0.297 Lane Km
Allocation:
TOTAL: P 5,665,000
CW1: P 5,466,725
EAO: P 198,275
Unit Cost:
CW1: P 18,406,481/Lane Km
|
July 25, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310205101288000
Project ID: P00803885MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads
FROM:
East-West Lateral Road connecting Agusan del Sur/Bukidnon Agusan-Malaybalay Road, Package 8, Agusan Del Sur
Type of Work:
CW1- Construction of Gravel Road
Physical Target:
CW1- 6.6 Lane Km
Allocation:
TOTAL: P 200,000,000
CW1: P 193,000,000
EAO: P 7,000,000
Unit Cost:
CW1: P 29,242,424.24/Lane Km
TO:
East-West Lateral Road connecting Agusan del Sur/Bukidnon Agusan-Malaybalay Road, Package 10, Agusan Del Sur
Type of Work:
CW1- Construction of Gravel Road
Physical Target:
CW1- 6.6 Lane Km
Allocation:
TOTAL: P 200,000,000
CW1: P 193,000,000
EAO: P 7,000,000
Unit Cost:
CW1: P 29,242,424.24/Lane Km
|
July 25, 2024 |
2024 |
WIN4E03570 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310101101428000
Project ID: P00801130MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1336 + 234 - K1336 + 700
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 1.864 Lane Km
Allocation:
TOTAL: P 16,000,000
CW1: P 15,440,000
EAO: P 560,000
Unit Cost:
CW1: P 8,283,261.8/Lane Km
TO:
Daang Maharlika (Agusan-Davao Sect) - K1336 + 200 - K1336 + 455
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 1.02 Lane Km
Allocation:
TOTAL: P 16,000,000
CW1: P 15,440,000
EAO: P 560,000
Unit Cost:
CW1: P 15,137,254.9/Lane Km
|
July 25, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310104100707000
Project ID: P00801252MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads
- Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1320 + 666 - K1321 + 522, K1326 + 000 - K1326 + 300, K1328 + 400 - K1329 + 000, K1330 + 669 - K1330 + 802, K1330 + 989 - K1331 + 075, K1334 + 058 - K1334 + 135, K1335 + 000 - K1335 + 102, K1335 + 300 - K1336 + 200, K1337 + 218 - K1337 + 785, K1351 + 900 - K1351 + 961
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 7.364 Lane Km
Allocation:
TOTAL: P 220,920,000
CW1: P 213,187,800
EAO: P 7,732,200
Unit Cost:
CW1: P 28,950,000/Lane Km
TO:
Daang Maharlika (Agusan-Davao Sect) - K1320 + 666 - K1320 +932, K1321 + 015.946 - K1321 + 522, K1326 + 000 - K1326 + 300, K1328 + 400 - K1329 + 000, K1335 + 000 - K1335 + 102, K1335 + 300 - K1336 + 200, K1337 + 218 - K1337 + 785, K1351 + 900 - K1351 + 961
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 7.032 Lane Km
Allocation:
TOTAL: P 220,920,000
CW1: P 213,187,800
EAO: P 7,732,200
Unit Cost:
CW1: P 30,316,808.87/Lane Km
|
July 25, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310204102791000
Project ID: P00803871MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads
FROM:
Construction of Lake Mainit Circumferential Road Bypass Road to Wind Power Butuan City Surigao Norte
Type of Work:
CW1- Construction of Gravel Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 0.374 Lane Km
CW2- 3,692.4 Square meters
Allocation:
TOTAL: P 50,000,000
CW1: P 19,669,595
CW2: P 28,580,405
EAO: P 1,750,000
Unit Cost:
CW1: P 52,592,500/Lane Km
CW2: P 7,740.33/Square meters
TO:
Construction of Lake Mainit Circumferential Road Bypass Road to Wind Power, Surigao del Norte
Type of Work:
CW1- Construction of Gravel Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 0.374 Lane Km
CW2- 3,692.4 Square meters
Allocation:
TOTAL: P 50,000,000
CW1: P 19,669,595
CW2: P 28,580,405
EAO: P 1,750,000
Unit Cost:
CW1: P 52,592,500/Lane Km
CW2: P 7,740.33/Square meters
|
July 25, 2024 |
FY 2024 |
WIN4E03589 |
320101111308000 |
May 23, 2024 |
Region IX |
Regional Office IX |
UACS No. 320101111308000
Project ID: P00820889MN
OO2: Protect Lives and Properties Against Major Floods – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Puliran River, Puliran Br. Section Package 2, Sibuco, Zamboanga del Norte
CW1- Construction of Flood Mitigation Structure: 520 Lineal meters
Unit Cost: ₱ 315,369.11/ Lineal meters
EAO: ₱ 5,950,000.00 Excess: ₱ 58,059.63
Allocation: ₱ 170,000,000.00 |
July 25, 2024 |
FY 2024 |
WIN4E03594 |
310204102625000 |
May 23, 2024 |
Region IX |
Regional Office IX |
UACS No. 310204102625000
Project ID: P00800804MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Airport-Turno-Sinaman Bypass Road, Zamboanga del Norte
CW1- Road Widening: 1.76 Lane Km
Unit Cost: ₱ 15,785,191.55/ Lane Km CW2- Construction of Road Slope Protection Structure: 5,123.79 sq.m. Unit Cost: ₱ 3,018.87/ sq.m. ROW Acquisition: 4,145.07 sq.m. Unit Cost: ₱ 1,206.25/ sq.m.
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00 |
July 25, 2024 |
FY 2024 |
WIN4E03591 |
310204102640000 |
June 13, 2024 |
Region IX |
Regional Office IX |
UACS No. 310204102640000
Project ID: P00800792MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Sumagdang-Menzi Bypass Road, Zamboanga del Norte
CW1- Road Widening: 0.706 Lane Km
Unit Cost: ₱ 18,161,122.03/ Lane Km CW2- Construction of Concrete Road: 0.726 Lane Km Unit Cost: ₱ 21,203,812.19/ Lane Km CW3- Construction of Road Slope Protection Structure: 1,960.20 sq.m. Unit Cost: ₱ 10,301.15/ sq.m. CW4- Off-Carriageway Improvement/Construction of Bike Lanes: 9,700.00 sq. m. Unit Cost: ₱ 2,452.78/ sq.m. ROW Acquisition: 62,204.00 sq.m. Unit Cost: ₱ 80.38/ sq.m.
EAO: ₱ 2,800,000.00
Allocation: ₱ 80,000,000.00 |
July 25, 2024 |
FY 2024 |
WIN4E03555 |
310201101314000 |
May 23, 2024 |
Region IX |
Regional Office IX |
UACS No. 310201101314000
Project ID: P00800213MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Pagadian City-Zamboanga City Rd - K1935+900 - K1935+984.31, K1935+900 - K1935+930, K1935+520 - K1935+594.32
CW1- Road Widening: 0.263 Lane Km
Unit Cost: ₱ 17,407,510.30/ Lane Km CW2- Construction of Drainage Structure along Road: 166.0 Lineal meters Unit Cost: ₱10,758.59/ sq.m. ROW Acquisition: 330.55 sq.m. Unit Cost: ₱ 16,655.26/ sq.m.
EAO: ₱ 430,500.00
Allocation: ₱ 12,300,000.00 |
July 25, 2024 |
FY 2024 |
WIN4E03554 |
310201101311000 |
May 23, 2024 |
Region IX |
Regional Office IX |
UACS No. 310201101311000
Project ID: P00800021MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Lanao-Pagadian-Zamboanga City Rd - K1784+900 - k1785+256
CW1- Road Widening: 0.712 Lane Km
Unit Cost: ₱ 18,455,955.52/ Lane Km ROW Acquisition: 2,000.00 sq.m. Unit Cost: ₱ 500.0/ sq.m.
EAO: ₱ 514,150.00 Excess: ₱ 42,329.67
Allocation: ₱ 14,690,000.00 |
July 25, 2024 |
FY 2024 |
WIN4E03551 |
320101111321000 |
May 23, 2024 |
Region IX |
Regional Office IX |
UACS No. 320101111321000
Project ID: P00820895MN
OO2: Protect Lives and Properties Against Major Floods – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Tumaga River (Guiwan Section), Zamboanga City Package 1
CW1- Construction of Flood Mitigation Structure: 283.00 Lineal meters
Unit Cost: ₱ 340,897.41/ Lineal meters
EAO: ₱ 3,500,000.00 Excess: ₱ 26,032.91
Allocation: ₱ 100,000,000.00 |
July 25, 2024 |
FY 2024 |
|
300214100814000 |
June 18, 2024 |
Region IX |
Regional Office IX |
UACS No. 300214100814000 Project ID: P00833110MN Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, and Pedestrian Fencing along Pagadian City-Zamboanga City Rd- K1676+800 - K1677+800, Camanga, Dumalinao, Zamboanga del Sur
CW1 - Road Safety/Pavement Markings: 926.00 Lineal Meters
Unit Cost: ₱ 884.28/ Lineal Meters
Allocation: ₱ 810,000.00 |
July 25, 2024 |
FY 2024 |
WIN4E03563 |
310201101313000 |
May 23, 2024 |
Region IX |
Regional Office IX |
UACS No. 310201101313000
Project ID: P00802689MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Lanao-Pagadian-Zamboanga City Rd - K1648+(-273) - K1649+260
CW1- Road Widening: 3.044 Lane Km
Unit Cost: ₱ 36,298,153.48/ Lane Km ROW Acquisition: 1,425.00 sq.m. Unit Cost: ₱ 7,017.54/ sq.m.
EAO: ₱ 4,375,000.00 Excess: ₱ 133,420.81
Allocation: ₱ 125,000,000.00 |
July 25, 2024 |
FY 2024 |
WIN4E03597 |
310107100642000 |
May 23, 2024 |
Region IX |
Regional Office IX |
UACS No. 310107100642000
Project ID: P00800404MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Pagadian City-Zamboanga City Rd - K1703+790 - K1703+990, K1704+060 - K1704+161, K1721+200 - K1721+596.69
CW1- Construction of Road Slope Protection Structure: 5,390.00 sq.m.
Unit Cost: ₱ 20,307.014/sq.m. ROW Acquisition: 68.5788 sq.m.
EAO: ₱ 3,982,300.00
Allocation: ₱ 113,780,000.00 |
July 23, 2024 |
FY 2024 |
P00833081MN |
SR2024-01-000917 |
January 26, 2024 |
Region XII |
Regional Office XII |
Contract ID: 24M00027
Project Cost: P58,677,000
From:
Project Name: Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Marbel-Allah Valley-Cotabato Rd - K1810 + 1500 - K1812 + 900
Physical Target: 2.818 lane-km
To:
Project Name: Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Marbel-Allah Valley-Cotabato Rd - K1809 + 972 - K1813 + 423.50
Physical Target: 6.903 lane-km |
July 22, 2024 |
CY 2024 |
WIN4F08064 |
UACS No. 310101101446000 |
April 23, 2024 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 310101101446000
Project ID.: P00802172LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program – Preventive Maintenance – Primary Roads
MacArthur H-way – K0017+216 – K0017+388
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay – 1.032 lane km
Unit Cost (P’000) = P 15,098.84/lane km
Allocation = P 15,582,000.00
EAO = P 318,000.00
Total = P 15,900,000.00
As Modified
As per GAA/Original
UACS No. 310101101446000
Project ID.: P00802172LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program – Preventive Maintenance – Primary Roads
MacArthur H-way – K0017+249 – K0017+388
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay – 0.556 lane km
Unit Cost (P’000) = P 26,502.71/lane km
Allocation = P 14,735,500.00
EAO = P 318,000.00
Excess = P 846,500.00
Total = P 15,900,000.00
Bar Code #WIN4F08064
|
July 22, 2024 |
2024 |
WIN4E03543 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 300221106980000
Project ID: P00837269MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road along Don Pedro, San Luis, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 1.320 Lane Km
Allocation:
TOTAL: P 15,000,000
CW1: P 14,850,000
EAO: P 150,000,000
Unit Cost:
CW1: P 11,250,000/Lane Km
TO:
Construction of Road along Don Pedro, San Luis, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 0.95 Lane Km
CW2- 462.5 Square meters
Allocation:
TOTAL: P 15,000,000
CW1: P 11,680,457
CW2: P 3,169,543
EAO: P 150,000,000
Unit Cost:
CW1: P 12,295,218/Lane Km
CW2: P 6,853/Square meters
|
July 22, 2024 |
2024 |
WIN4F08072 |
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
AS PER GAA/ORIGINAL:
Tacloban-Baybay South Rd - K0917 + (-088.50) - K0917 + 000, K0917 + (-247) - K0917 + (-088.50), K0917 + (-263) - K0917 + (-247), K0917 + 000 - K0917 + 430
Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 17.26074 M
Asphalt Overlay: 2.772 Lane Km
EAO P 0.35226 M
Total P 17.613 M
AS MODIFIED:
Tacloban-Baybay South Rd - K0917 + (-263) - K0917 + 165
Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 17.26074 M
Asphalt Overlay: 1.712 Lane Km
EAO P 0.35226 M
Total P 17.613 M
|
July 22, 2024 |
2024 |
|
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads
AS PER GAA/ORIGINAL:
Sn Jose-Manlurip-MacArthur Park Rd - K0913 + 726 - K0914 + 761
Physical Target: Allocation:
CW1- Construction of Drainage Structure P 52.772955 M
along Road: 2,056.00 Lineal Meters
EAO P 1.914045 M
Total P 54.687 M
AS MODIFIED:
Sn Jose-Manlurip-MacArthur Park Rd - K0913 + 726 - K0914 + 074, K0914+149 - K0914+761
Physical Target: Allocation:
CW1- Construction of Drainage Structure P 52.772955 M
along Road: 1,906.00 Lineal Meters
EAO P 1.914045 M
Total P 54.687 M
|
July 22, 2024 |
2024 |
|
GAA FY 2024 |
March 21, 2024 |
Region VIII |
Eastern Samar District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
AS PER GAA/ORIGINAL:
Jct Taft-Oras-Sn Policarpo-Arteche Rd - K0943 + 542 - K0943 + 893
Physical Target: Allocation:
CW1- Reconstruction to Concrete Pavement: P 7.69202 M
0.702 Lane Km
EAO P 0.15698 M
Total P 7.849 M
AS MODIFIED:
Jct Taft-Oras-Sn Policarpo-Arteche Rd - K0943+542 - K0943+634, K0943+799 - K0943+808, K0943+825 - K0943+880, K0944+144 - K0944+153, K0944+348 - K0944+371, K0944+748 - K0944+781, K0945+909 - K0946+029, K0946+177 - K0946+187, K0946+221 - K0946+261, K0953+923 - K0953+946, K0954+012 - K0954+039, K0954+302 - K0954+344, K0955+400 - K0955+424, K0955+632 - K0955+660, K0957+344 - K0957+353, K0957+466 - K0957+484
Physical Target: Allocation:
CW1- Reconstruction to Concrete Pavement: P 7.69202 M
0.680 Lane Km
EAO P 0.15698 M
Total P 7.849 M
|
July 22, 2024 |
2024 |
|
GAA FY 2024 |
March 21, 2024 |
Region VIII |
Eastern Samar District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
AS PER GAA/ORIGINAL:
Wright-Taft-Borongan Rd - K0908 + 852 - K0909 + 000, K0909 + 759 - K0909 + 862, K0912 + 728 - K0912 + 828, K0916 + 320 - K0916 + 370, K0916 + 416 - K0916 + 466
Physical Target: Allocation:
CW1- Reconstruction to Concrete Pavement: P 9.92642 M
0.906 Lane Km
EAO P 0.20258 M
Total P 10.129 M
AS MODIFIED:
Wright-Taft-Borongan Rd – K0898 + 266 - K0898 + 338, K0901 + 475 - K0901 + 497, K0901 + 515 - K0901 + 529, K0905 + 525 - K0905 + 695, K0908 + 857 - K0908 + 875, K0908 + 884 - K0908 + 898, K0908 + 937 - K0908 + 944, K0908 + 957 - K0908 + 980, K0908 + 985 - K0908 + 998, K0909 + 805 - K0909 + 861, K0912 + 746 - K0912 + 798, K0916 + 320 - K0916 + 370, K0916 + 416 - K0916 + 466
Physical Target: Allocation:
CW1- Reconstruction to Concrete Pavement: P 9.92642 M
0.793 Lane Km
EAO P 0.20258 M
Total P 10.129 M
|
July 22, 2024 |
2024 |
|
GAA FY 2024 |
January 31, 2024 |
Region VIII |
Samar 1st District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods
Flood Management – Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
AS PER GAA/ORIGINAL:
Construction of Flood Control Structure along Gandara River, Barangay Mabuligon, Matuguinao, Samar
Physical Target: Allocation:
CW1- Construction of Food Mitigation Structure: P 49.00 M
175.00 Lineal Meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Construction of Flood Control Structure along Gandara River, Barangay Mabuligon, Matuguinao, Samar
Physical Target: Allocation:
CW1- Construction of Food Mitigation Structure: P 49.00 M
159.00 Lineal Meters
EAO P 1.00 M
Total P 50.00 M
|
July 22, 2024 |
2024 |
|
GAA FY 2024 |
January 31, 2024 |
Region VIII |
Samar 1st District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
AS PER GAA/ORIGINAL:
Construction of Danao CIS Protection Works along the Dam, Calbayog City, Samar
Physical Target: Allocation:
CW1- Construction of Food Mitigation Structure: P 9.8 M
40.00 Lineal Meters
EAO P 0.20 M
Total P 10.00 M
AS MODIFIED:
Construction of Danao CIS Protection Works along the Dam, Calbayog City, Samar
Physical Target: Allocation:
CW1- Construction of Food Mitigation Structure: P 9.8 M
37.40 Lineal Meters
EAO P 0.20 M
Total P 10.00 M
|
July 22, 2024 |
2024 |
WIN4F08083 |
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Tertiary Roads
AS PER GAA/ORIGINAL:
Kiling-Tanauan-Tabontabon-Julita Rd – K0931 + 317 – K0931 + 363
Physical Target: Allocation:
CW1- Reconstruction to Concrete Pavement: P 4.9 M
0.230 Lane Km
EAO P 0.10 M
Total P 5.00 M
AS MODIFIED:
Kiling-Tanauan-Tabontabon-Julita Rd – K0931 + 304 – K0931 + 363
Physical Target: Allocation:
CW1- Reconstruction to Concrete Pavement: P 4.9 M
0.118 Lane Km
EAO P 0.10 M
Total P 5.00 M
|
July 22, 2024 |
2024 |
WIN4XY00323 |
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Tacloban City District Engineering Office |
Convergence and Special Support Program
Basic Infrastructure Program (BIP) – Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Rehabilitation of Road with Drainage, Tacloban North Resettlement, Salvacion Heights, Tacloban City, Leyte
Physical Target: Allocation:
CW1- Rehabilitation of Paved Road: P 49.50 M
3.75 Lane Km
EAO P 0.50 M
Total P 50.00 M
AS MODIFIED:
Rehabilitation of Road with Drainage, Tacloban North Resettlement, Salvacion Heights, Tacloban City, Leyte
Physical Target: Allocation:
CW1- Rehabilitation of Paved Road : P 12.5832082 M
1.638 Lane Km
CW2 – Construction of Drainage Structure: P 36.9167918 M
2,212.00 Lineal Meters
EAO P 0.50 M
Total P 50.00 M
|
July 22, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Nueva Ecija 1st District Engineering Office |
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings / Facilities to Support Social Services
Rehabilitation of Multipurpose Building (Senior Citizens Center), Barangay Poblacion East II, Municipality of Aliaga, Nueva Ecija |
July 22, 2024 |
2024 |
WIN4F08053 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
NCR/Bulacan Bdry-Bigte-Ipo Dam Rd - K0034+081 - K0034+313 |
July 22, 2024 |
2024 |
WIN4F08055 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Bocaue - Sn Jose Rd - K0040+186 - K0040+430 |
July 22, 2024 |
2024 |
WIN4F08056 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Bocaue - Sn Jose Rd - K0041+000 - K0041+396 |
July 22, 2024 |
2024 |
|
GAA FY 2024 |
March 21, 2024 |
Region VIII |
Eastern Samar District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development – Road Widening – Secondary Roads
AS PER GAA/ORIGINAL:
Jct Taft-Oras-Sn Policarpo-Arteche Rd - K0891 + (-501) - K0891 + 000, K0892 + 613 - K0894 + 100, K0895 + 200 - K0896 + 350, K0896 + 876 - K0897 + 014
Physical Target: Allocation:
CW1- Road Widening: P 48.82654 M
2.674 Lane Km
EAO P 0.99646 M
Total P 49.823 M
AS MODIFIED:
Jct Taft-Oras-Sn Policarpo-Arteche Rd - K0891 + (-501) - K0891 + 000, K0892 + 613 - K0893 + 618
Physical Target: Allocation:
CW1- Road Widening: P 48.82654 M
2.674 Lane Km
EAO P 0.99646 M
Total P 49.823 M
|
July 22, 2024 |
2024 |
WIN4F08057 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Muzon-Tungkong Manga Rd - K0041+(-575) - K0041+(-205)
|
July 22, 2024 |
2024 |
WIN4F08058 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Muzon-Tungkong Manga Rd - K0041+649 - K0041+872
|
July 22, 2024 |
2024 |
WIN4F08065 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
NCR/Bulacan Bdry-Bigte-Ipo Dam Rd - K0036+890 - K0037+100, K0037+400 - K0037+670 |
July 22, 2024 |
2024 |
WIN4F08066 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
NCR/Bulacan Bdry-Bigte-Ipo Dam Rd - K0034+313 - K0034+536
|
July 20, 2024 |
2024 |
WIN4F08069 |
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
AS PER GAA/ORIGINAL:
Leyte-Samar Inter-Provl Rd - K0906 + 005 - K0906 + 760
Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 18.80424 M
Asphalt Overlay: 3.020 Lane Km
EAO P 0.38376 M
Total P 19.188 M
AS MODIFIED:
Leyte-Samar Inter-Provl Rd - K0906 + 005 - K0906 + 435
Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 18.80424 M
Asphalt Overlay: 1.720 Lane Km
EAO P 0.38376 M
Total P 19.188 M
|
July 20, 2024 |
2024 |
WIN4F08071 |
GAA FY 2024 |
January 1, 2024 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
AS PER GAA/ORIGINAL:
Palo-Carigara-Ormoc Rd - K0918 + 006 - K0919 + 205
Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 29.23928 M
Asphalt Overlay: 4.696 Lane Km
EAO P 0.59672 M
Total P 29.836 M
AS MODIFIED:
Palo-Carigara-Ormoc Rd - K0918 + 006 - K0918 + 743
Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 29.23928 M
Asphalt Overlay: 2.948 Lane Km
EAO P 0.59672 M
Total P 29.836 M
|
July 19, 2024 |
2024 |
320102106171000 |
GAA 2024 |
January 3, 2024 |
Region II |
Isabela 3rd District Engineering Office |
FROM:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Pinacanauan River Flood Control Project, Barangay Yeban, Sta.0+329 - Sta. 0+987, Benito Soliven, Isabela
TO:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Pinacanauan River Flood Control Project, Barangay Yeban, (Sta. 0+000 - Sta. 0+690, Sta. 0+875 - Sta. 0+906, Benito Soliven, Isabela
|
July 19, 2024 |
2024 |
320102106199000 |
GAA 2024 |
January 3, 2024 |
Region II |
Isabela 3rd District Engineering Office |
FROM:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Cagayan River Flood Control Project, Brgy. Upi (Sta. 0+000 - Sta. 0+490), Gamu, Isabela
TO:
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Cagayan River Flood Control Project, Brgy. Upi (Sta. 0+000 - Sta. 0+426.70), Gamu, Isabela |
July 18, 2024 |
2024 |
WIN4XY00296 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Regional Office III |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Manila North Road - K0069+045 - K0069+410.64, K0071+614 - K0072+500, K0072+500 - K0072+590, K0072+590 - K0072+790, K0072+790 - K0074+351 |
July 18, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Nueva Ecija 1st District Engineering Office |
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Control Structure along Rio Chico River, Sta. 5+938.10 - Sta. 5+978.10, Brgy. Sto. Rosario Young, Zaragoza, Nueva Ecija |
July 18, 2024 |
2024 |
WIN4XY00304 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Tarlac 2nd District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Existing Dike along Bangut River Upstream of Bangot Bridge, Right Side, Package A, Capas, Tarlac, Sta. 0+000 - Sta. 0+382.80 |
July 18, 2024 |
2024 |
WIN4XY00312 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Tarlac 2nd District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Existing Dike along Bangut River Upstream of Bangot Bridge, Right Side, Package C, Sta. 0+736.80 to Sta. 1+104.00 |
July 18, 2024 |
2024 |
WIN4XY00306 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Tarlac 2nd District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Existing Dike along Bangut River Upstream of Bangot Bridge, Right Side, Package D, Sta. 2+350.00 to Sta. 2+704.40
|
July 18, 2024 |
2024 |
WIN4XY00309 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Tarlac 2nd District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Existing Dike along Bangut River Upstream of Bangot Bridge, Right Side, Package E, Capas, Tarlac, Sta. 2+704.40 to Sta. 3+058.80
|
July 18, 2024 |
2024 |
WIN4XY00310 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Tarlac 2nd District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Existing Dike along Bangut River Upstream of Bangot Bridge, Right Side, Package F, Capas, Tarlac, Sta. 3+058.80 to Sta. 3+412.40
|
July 18, 2024 |
2024 |
WIN4XY00311 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Tarlac 2nd District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Existing Dike along Bangut River Upstream of Bangot Bridge, Right Side, Package G, Capas, Tarlac, Sta. 3+412.40 to Sta. 3+773.40
|
July 18, 2024 |
FY 2024 GAA |
P00834653MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of Road Safety: Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1534 + (-983) - K1561 + 288
Physical Target:
CW1: 28,541.00 lineal meters (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Road Safety: Pavement Markings)
EAO: P 1,750,000.00
TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of Road Safety: Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1538 + 280 - K1538 + 507, K1538 + 527 - K1538 + 675,
K1538 + 983 - K1539 + 078, K1539 + 094 - K1539 + 714, K1539 + 734 - K1539 + 973, K1540 + 427 - K1540 + 594,
K1540 + 619 - K1540 + 815, K1540 + 834 - K1540 + 882, K1541 + 741 - K1541 + 812, K1541 + 822 - K1542 + 236,
K1542 + 259 - K1542 + 310, K1543 + 388 - K1543 + 435, K1543 + 443 - K1543 + 656, K1543 + 701 - K1543 + 792,
Davao del Sur
Physical Target:
CW1: 2,494.006 lineal meters (Road Safety: Pavement Markings)
CW2: 275.00 number of units (Road Safety: Roadway Lighting)
CW3: 2,992.807 square meters (Off-Carriageway Improvement: Construction of Traffic Island)
Allocation:
TOTAL: P 10,455,000.00
CW1: P 5,052,401.00 (Road Safety: Pavement Markings)
CW2: P 25,606,330.00 (Road Safety: Roadway Lighting)
CW2: P 17,591,269.00 (Off-Carriageway Improvement: Construction of Traffic Island)
EAO: P 1,750,000.00 |
July 18, 2024 |
FY 2024 GAA |
P00803779MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Digos-Makar Rd - K1588 + 462 - K1591 + 160
Physical Target:
CW1: 5.858 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Digos-Makar Rd - K1568 + 687 - K1569 + 240,
K1570 + 263 - K1570 + 893, K1587 + 920 - K1587 + 960
Physical Target:
CW1: 5.063 lane km (Preventive Maintenance of Road: Asphalt Overlay)
CW2: 300.000 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 76,664,187.00 (Preventive Maintenance of Road: Asphalt Overlay)
CW2: P 19,835,813.00
EAO: P 3,500,000.00 |
July 17, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 23, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 300203102325000
Project ID: P00830089MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
FROM:
NRJ Daang Maharlika Bunawan Brook - Tagbayangbang Road leading to Bulongbulungan Water Falls, Brgy. Bunawan Brook, Bunawan, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 1.4 Lane Km
Allocation:
TOTAL: P 21,000,000
CW1: P 20,265,000
EAO: P 735,000
Unit Cost:
CW1: P 14,475,000/Lane Km
TO:
NRJ Daang Maharlika Bunawan Brook - Tagbayangbang Road leading to Bulongbulungan Water Falls, Brgy. Bunawan Brook, Bunawan, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Gravel Road
CW3- Construction of Road Slope Protection Structure
Physical Target:
CW1- 0.79 Lane Km
CW2- 0.97 Lane Km
CW3- 2449.4 Square meters
Allocation:
TOTAL: P 21,000,000
CW1: P 10,975,910
CW2: P 5,140,555
CW3: P 4,148,535
EAO: P 735,000
Unit Cost:
CW1: P 14,254,428.57/Lane Km
CW2: P 5,192,479.8/Lane Km
CW3: P 1,693.69/Square meters
|
July 17, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 23, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 300214101343000
Project ID: P00833162MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
FROM:
Installation/Application/Construction of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, Median Island, and Paved Shoulder along Daang Maharlika (Agusan-Davao Sect), (S00439MN) - K1327 + 260 - K1328 + 260, Barangay Sta Cruz, Rosario, Agusan del Sur
Type of Work:
CW1- Road Safety: Pavement Markings
Physical Target:
CW1- 1000 Lineal meters
Allocation:
TOTAL: P 9,720,000
CW1: P 9,525,600
EAO: P 194,400
Unit Cost:
CW1: P 9,525.6/Lineal meters
TO:
Installation/Application/Construction of Signage-Warning, Advisory and Regulatory Signs, Pavement Markings, Median Island, and Paved Shoulder along Daang Maharlika (Agusan-Davao Sect), (S00439MN) - K1327 + 090 - K1328 + 392, Barangay Sta Cruz, Rosario, Agusan del Sur
Type of Work:
CW1- Off-Carriageway Improvement: Construction of Median/Center Island
Physical Target:
CW1- 1480.27 Square meters
Allocation:
TOTAL: P 9,720,000
CW1: P 9,379,800
EAO: P 340,200
Unit Cost:
CW1: P 6,336.54/Square meters
|
July 17, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 23, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310101101430000
Project ID: P00803788MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
FROM:
Asphalt Overlay along Daang Maharlika (Surigao-Agusan Section) K1227+400 - K1230+041, K1230+279.7 - K1231+370.40
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 7.483 Lane Km
Allocation:
TOTAL: P 200,000,000
CW1: P 193,000,000
EAO: P 7,000,000
Unit Cost:
CW1: P 25,791,794.73/Lane Km
TO:
Asphalt Overlay along Daang Maharlika (Surigao-Agusan Section) K12225+650 - K1229+650, K1229+780 - K1230+000, K1230+200 - K1231+435, K1232+910 - K1233+210, K1234+583 - K1236+760, K1240+694 - K1240+863
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 17.227 Lane Km
Allocation:
TOTAL: P 200,000,000
CW1: P 193,000,000
EAO: P 7,000,000
Unit Cost:
CW1: P 11,203,343.59/Lane Km
|
July 17, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 300204101507000
Project ID: P00832747MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT)
FROM:
NRJ BCIR- Capitol-Bonbon Road in support of proposed Butuan City IT Park and Public Utility Transport Terminal, Butuan City, Agusan del Norte
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 0.804 Lane Km
Allocation:
TOTAL: P 15,300,000
CW1: P 14,764,500
EAO: P 535,500
Unit Cost:
CW1: P 18,363,805.97/Lane Km
TO:
NRJ BCIR- Capitol-Bonbon Road in support of proposed Butuan City IT Park and Public Utility Transport Terminal, Butuan City, Agusan del Norte
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 0.963 Lane Km
Allocation:
TOTAL: P 15,300,000
CW1: P 14,764,500
EAO: P 535,500
Unit Cost:
CW1: P 15,331,775.7/Lane Km
|
July 17, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 300221104922000
Project ID: P00835945MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Circumferential Road along Agusan Marsh Road, Brgy. San Gabriel and Brgy. Nueva Gracia, Loreto, Agusan Del Sur (Package 13)
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 26.406 Lane Km
Allocation:
TOTAL: P 300,000,000
CW1: P 297,000,000
EAO: P 3,000,000
Unit Cost:
CW1: P 11,247,443.76/Lane Km
TO:
Construction of Circumferential Road along Agusan Marsh Road, Brgy. San Gabriel and Brgy. Nueva Gracia, Loreto, Agusan Del Sur (Package 13)
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Bridge
CW3- Construction of Road Slope Protection Structure
Physical Target:
CW1- 4.746 Lane Km
CW2- 1908 Square meters
CW3- 41124 Square meters
Allocation:
TOTAL: P 300,000,000
CW1: P 76,978,440
CW2: P 137,146,680
CW3: P 82,874,880
EAO: P 3,000,000
Unit Cost:
CW1: P 16,219,646.02/Lane Km
CW2: P 71,879.81/Square meters
CW3: P 2,015.24/Square meters
|
July 17, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 310103101713000
Project ID: P00801068MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Tertiary Roads
FROM:
Butuan City-Malaybalay Rd - K1241 + 384 - K1241 + 500
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 0.348 Lane Km
Allocation:
TOTAL: P 2,988,000
CW1: P 2,928,240
EAO: P 59,760
Unit Cost:
CW1: P 8,414,482.76/Lane Km
TO:
Butuan City-Malaybalay Rd - K1247 + 078.00 – K1247 + 163.5
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 0.3195 Lane Km
Allocation:
TOTAL: P 2,988,000
CW1: P 2,928,240
EAO: P 59,760
Unit Cost:
CW1: P 9,165,070.42/Lane Km
|
July 17, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 300203102547000
Project ID: P00832596MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
FROM:
NRJ leading to Mt. Mayapay (Delta Discovery Park), Bit-os Section, Butuan City, Agusan del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 2.65 Lane Km
Allocation:
TOTAL: P 18,126,000
CW1: P 17,491,590
EAO: P 634,410
Unit Cost:
CW1: P 6,600,600/Lane Km
TO:
NRJ leading to Mt. Mayapay (Delta Discovery Park), Bit-os Section, Butuan City, Agusan del Norte
Type of Work:
CW1- Construction of Concrete Bridge
Physical Target:
CW1- 126.62 Square meters
Allocation:
TOTAL: P 18,126,000
CW1: P 17,491,590
EAO: P 634,410
Unit Cost:
CW1: P 138,142.39/Square meters
|
July 17, 2024 |
2024 |
310202101516000 |
GAA 2024 |
January 3, 2024 |
Region II |
Quirino District Engineering Office |
FROM:
Network Development - Road Widening - Secondary Roads - Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0324 + 430 - K0324 + 501, K0324 + 541 - K0325+725
TO:
Network Development - Road Widening - Secondary Roads - Cordon-Aurora Bdry Rd (Isabela Bdry-Jct Dumabato) - K0323 + 781 - K0324 + 501, K0324 + 541 - K0325+325 |
July 16, 2024 |
CY 2024 |
WIN4XY00322 |
UACS No. 310101101148000 |
April 23, 2024 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 310101101148000
Project ID.: P00802169LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program – Preventive Maintenance – Primary Roads
Bonifacio Monument Circle-K0009+097 – K0009+209
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay – 0.448 lane km
Unit Cost (P’000) = P 8,204.65/lane km
Allocation = P 3,675,685.00
EAO = P 133,315.00
Total = P 3,809,000.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program – Preventive Maintenance – Primary Roads
Bonifacio Monument Circle-K0009+(-014) – K0009+011.50, K0009+047-K0009+153, K0009+194 – K0009+209
Physical Target: CW1 = Preventive Maintenance of Road: Concrete Reblocking– 0.187 lane km
Unit Cost (P’000) = P 18,836.95/lane km
Allocation = P 3,522,509.00
EAO = P 133,315.00
Total = P 3,809,000.00
Bar Code #WIN4XY00322
|