April 7, 2022 |
FY 2022 |
WINC03514 |
UACS No. 300219100446000 |
February 24, 2022 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300219100446000
Project ID.: P00637045LZ
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Flood Mitigation Structures Protecting
Public Infrastructure/Facilities
Construction of Flood Control Wall along Bisi-Mabolo, Brgy. Mabolo, Valenzuela City
Physical Target: CW1 – Construction of Flood Mitigation Structure = 212.00 lane km
Unit Cost = P 69,339.62/lane km
Allocation = P 14,700,000
EAO = P 300,000
Total = P 15,000,000
As Modified
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Flood Mitigation Structures Protecting
Public Infrastructure/Facilities
Construction of Flood Control Wall along Bisig-Mabolo, Brgy. Mabolo, Valenzuela City
Physical Target: CW1 – Construction of Flood Mitigation Structure = 212.00 lane km
Unit Cost = P 69,339.62/lane km
Allocation = P 14,700,000
EAO = P 300,000
Total = P 15,000,000
WINC03514
|
April 7, 2022 |
FY 2022 |
WIN2C03504 |
UACS No. 310106100691000 |
February 10, 2022 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 310106100691000
Project ID.: P00603570LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction / Upgrading of Damaged Paved Roads – Tertiary Roads
Aurora Avenue – (S02355LZ) Chainage 832 – Chainage 895
Physical Target: CW1 – Reconstruction of Concrete Pavement=0.252 lane km
Unit Cost = P 38,888,889/lane km
Allocation = P 9,800,000
EAO = P 200,000
Total = P 10,000,000
As Modified
OO1: Ensure Safe and Reliable National Road, System
Asset Preservation – Rehabilitation/ Reconstruction / Upgrading of Damaged Paved Roads – Tertiary Roads
Aurora Avenue – (S02355LZ) Chainage 000.0 – Chainage 76.0, Chainage 832.0 – Chainage 895.0
Physical Target: CW1 – Reconstruction of Concrete Pavement=0.834 lane km
Unit Cost = P 11,750,560/lane km
Allocation = P 9,800,000
EAO = P 200,000
Total = P 10,000,000
WIN2C03504
|
April 7, 2022 |
FY 2022 |
WIN2C03513 |
UACS No. 300221100150000 |
February 8, 2022 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 300221100150000
Project ID.: P00631920LZ
Convergence and Special Support Program
Convergence and Special Support – Basic Infrastructure Program (BIP) – Access Roads and/or
Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation of Road, Zone 1-7, Barangay 100-190, Manila City
Physical Target: CW1 – Rehabilitation of Concrete Road=2.359 lane km
Unit Cost = P 14,688,427/lane km
Allocation = P 34,650,000
EAO = P 350,000
Total = P 35,000,000
As Modified
Convergence and Special Support Program
Convergence and Special Support – Basic Infrastructure Program (BIP) – Access Roads and/or
Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation of Road, Zone 1-7, Barangay 1-90, Manila City
Physical Target: CW1 – Rehabilitation of Concrete Road=2.359 lane km
Unit Cost = P 14,688,427/lane km
Allocation = P 34,650,000
EAO = P 350,000
Total = P 35,000,000
WIN2C03513
|
April 6, 2022 |
2022 |
WIN2F05892 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Concepcion - La Paz Rd - K0134+000 - K0134+345, K0135+366 - K0135+889
|
April 6, 2022 |
2022 |
WIN2F05893 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac 2nd District Engineering Office |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures / Facilities
Rehabilitation of Dike along Parua River, Sta. 6+675 to Sta. 7+119 (Brgy. San Francisco Section Left Bank), Concepcion, Tarlac
|
April 5, 2022 |
FY 2022 |
WIN2C03472 |
UACS No. 300226100254000 |
February 8, 2022 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 300226100254000
Project ID.: P00633123LZ
Convergence and Special Support Program
Convergence and Special Support – Basic Infrastructure Program (BIP) – Access Roads and/or
Bridges from National Road/s leading to Major/Strategic Public Buildings/ Facilities
Construction of Multi-Purpose Building, Zone 1-7, Barangay 100-190, Manila City
Physical Target: CW1 = Rehabilitation/ Major Repair Multi-Purpose Building 1.0 bldg.
Unit Cost = P 39,600,000/ bldg
Allocation = P 39,600,000
EAO = P 400,000
Total = P 40,000,000
As Modified
Convergence and Special Support Program
Convergence and Special Support – Basic Infrastructure Program (BIP) – Access Roads and/or
Bridges from National Road/s leading to Major/Strategic Public Buildings/ Facilities
Construction of Multi-Purpose Building, Zone 1-7, Barangay 1-90, Manila City
Physical Target: CW1 = Rehabilitation/ Major Repair Multi-Purpose Building 6.0 bldg.
Unit Cost = P 6,600,000/ bldg
Allocation = P 39,600,000
EAO = P 400,000
Total = P 40,000,000
WIN2C03472
|
April 5, 2022 |
FY 2022 |
WIN2C03472 |
UACS No. 300226100254000 |
February 8, 2022 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 300226100254000
Project ID.: P00633123LZ
Convergence and Special Support Program
Convergence and Special Support – Basic Infrastructure Program (BIP) – Access Roads and/or
Bridges from National Road/s leading to Major/Strategic Public Buildings/ Facilities
Construction of Multi-Purpose Building, Zone 1-7, Barangay 100-190, Manila City
Physical Target: CW1 = Rehabilitation/ Major Repair Multi-Purpose Building 1.0 bldg.
Unit Cost = P 39,600,000/ bldg
Allocation = P 39,600,000
EAO = P 400,000
Total = P 40,000,000
As Modified
Convergence and Special Support Program
Convergence and Special Support – Basic Infrastructure Program (BIP) – Access Roads and/or
Bridges from National Road/s leading to Major/Strategic Public Buildings/ Facilities
Construction of Multi-Purpose Building, Zone 1-7, Barangay 1-90, Manila City
Physical Target: CW1 = Rehabilitation/ Major Repair Multi-Purpose Building 6.0 bldg.
Unit Cost = P 6,600,000/ bldg
Allocation = P 39,600,000
EAO = P 400,000
Total = P 40,000,000
WIN2C03472
|
April 5, 2022 |
2022 |
310201100862000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Regional Office II |
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0373+(-387.25) - K0374+170 |
April 5, 2022 |
2022 |
3002191000043000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Regional Office II |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities - Construction of Catotoran Norte Flood Structure, Sta. 0+000 - Sta. 0+130, Sta. 0+000 - Sta. 0+057, Sta. 0+000 - Sta. 0+200, Camalaniugan, Cagayan |
April 5, 2022 |
2022 |
310101100545000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Cagayan 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads - Manila North Rd - K0615+000 - K0617+198 |
April 5, 2022 |
2022 |
310101100546000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Cagayan 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads - Manila North Rd - K0625+000 - K0628+061 |
April 5, 2022 |
2022 |
310101100547000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Cagayan 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads - Manila North Rd - K640+1007 - K0644+019 |
April 5, 2022 |
2022 |
310101100621000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Cagayan 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads - Manila North Rd - K0647+000 - K0648+565 |
April 5, 2022 |
2022 |
310101100622000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Cagayan 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads - Manila North Rd - K0664+020 - K0664+455 |
April 5, 2022 |
2022 |
310102100904000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Cagayan 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads - Calog-Pudtol Rd - K0666+065 - K0667+387 |
April 5, 2022 |
2022 |
310104100387000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Cagayan 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads - Manila North Rd - K0679+272 - K0679+762 |
April 5, 2022 |
2022 |
310107100370000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Cagayan 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads - Manila North Rd - K0600+560 - K0600+830 |
April 5, 2022 |
2022 |
310209100331000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Cagayan 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Tertiary Roads - Jct Logac-Lasam-Gagabutan Rd - K0717+027 - K0720+028 |
April 5, 2022 |
FY 2021 |
WIN2C03450 |
UACS No. 320101106435000 |
January 31, 2022 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 320101106435000
Project ID.: P00525801LZ
OO2: Protect Lives and Properties Against Major Flood
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement of Flood Control River Wall along Polo River, Tagalag, Valenzuela City
Physical Target: CW1 - Rehabilitation/ Major of Flood Control Structure – 0.000 Lineal Meters
Unit Cost = -
Allocation = P 14,700,000
EAO = P 300,000
Total = P 15,000,000
As Modified
OO2: Protect Lives and Properties Against Major Flood
Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement of Flood Control River Wall along Polo River, Tagalag, Valenzuela City
Physical Target: CW1 - Rehabilitation/ Major of Flood Control Structure – 70.000 Lineal Meters
Unit Cost = P 210,000.00/Lineal Meter
Allocation = P 14,700,000
EAO = P 300,000
Total = P 15,000,000
WIN2C03450
|
April 5, 2022 |
2022 |
310212100216000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Cagayan 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Tertiary Roads - Jct Logac-Lasam-Gagabutan Rd - (S00656LZ) Chainage 13758 - Chainage 14860, Chainage 14949 - Chainage 15159 |
April 5, 2022 |
FY 2022 |
WIN2C03495 |
UACS No. 300215100901000 |
March 9, 2022 |
National Capital Region |
South Manila District Engineering Office |
As per GAA/Original
UACS No. 300215100901000
Project ID.: P00630332LZ
Convergence and Special Support Program
Sustainable Infrastructure Projects alleviating Gaps (SIPAG) – Access Roads and/or Bridges from
the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road including Drainage Improvement of Zone 931, Pandacan, Manila
Physical Target: CW1 – Construction of Concrete Road – 2.810 lane km
Unit Cost = P 10,462,634/lane km
Allocation = P 29,400,000
EAO = P 600,000
Total = P 30,000,000
As Modified
Convergence and Special Support Program
Sustainable Infrastructure Projects alleviating Gaps (SIPAG) – Access Roads and/or Bridges from
the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road including Drainage Improvement of Zone 91, Pandacan, Manila
Physical Target: CW1 – Construction of Concrete Road – 2.810 lane km
Unit Cost = P 10,462,634/lane km
Allocation = P 29,400,000
EAO = P 600,000
Total = P 30,000,000
WIN2C03495
|
April 5, 2022 |
2022 |
310201100965000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Cagayan 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Manila North Rd - K0662+069 - K0663+000 |
April 5, 2022 |
2022 |
310201100966000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Cagayan 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Manila North Rd - K0650+927 - K0651+000, K0655+579 - K0655+728, K0655+751 - K0656+938, K0656+961 - K0657+000 |
April 5, 2022 |
2022 |
320102104913000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Cagayan 2nd District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation along Major River Basins and Principal Rivers - Construction of Pata Flood Control Structure along Pata River (Sta. 0+000 - Sta. 0+120), Pata, Claveria, Cagayan |
April 5, 2022 |
2022 |
320102104910000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Cagayan 2nd District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation along Major River Basins and Principal Rivers - Construction of Langgangan Flood Control along Langgangan River, Sta. 0+000 - Sta. 0+418 (Section 1), Sta. 0+000 - Sta. 0+025 (Section 2), Sta. 0+000 - Sta. 0+132 (Section 3), Sta. Praxedes, Cagayan |
April 5, 2022 |
2022 |
320102104522000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Cagayan 2nd District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation along Major River Basins and Principal Rivers - Construction of Canayun-Sirit-Dana-Ili Flood Control Along Abulug River (Sta. 13+300 - Sta. 13+580) Left Side, Abulug, Cagayan |
April 5, 2022 |
2022 |
320102104909000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Cagayan 2nd District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation along Major River Basins and Principal Rivers - Construction of Dugo Flood Control along Abulug River (Sta. 10+310 - Sta. 10+600 R/S), Abulug, Cagayan |
April 5, 2022 |
2022 |
320102104910000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Cagayan 2nd District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation along Major River Basins and Principal Rivers - Construction of Simayung Flood Control along Abulug River, Sta. 7+241 - Sta. 7+416 Section 1, Sta. 7+416 - Sta. 7+466 Section 2, Abulug, Cagayan |
April 5, 2022 |
2022 |
320102104912000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Cagayan 2nd District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation along Major River Basins and Principal Rivers - Construction of Masi Flood Control Structure along Pamplona River (Sta. 0+000 - Sta. 0+250), Pamplona, Cagayan |
April 5, 2022 |
2022 |
310212100217000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Cagayan 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development Program - Paving of Unpaved Roads - Tertiary Roads - (S00656LZ) Chainage 500 - Chainage 1865 |
April 2, 2022 |
2022 |
WIN2F05909 |
SR2022-02-000068 |
February 3, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Cong. Andres Acop Cosalan Rd - K0301 + (-905) - K0304 + 024, K0313 + 175 - K0317 + 533, K0319 + 000 - K0322 + 600, K0324 + 000 - K0327 + 000, K0328 + 700 - K0330 + 500, K0331 + 751 - K0333 + 1495, K0336 + 000 - K0342 + 222;
Physical Target: 50.530 Lane Km;
Allocation: Php 300,000,000
To: Cong. Andres Acop Cosalan Rd - K0301 + (-905) - K0304 + 024, K0313 + 175 - K0317 + 533, K0319 + 000 - K0322 + 600, K0324 + 000 - K0327 + 000, K0328 + 700 - K0330 + 500, K0331 + 751 - K0333 + 381;
Physical Target: 35.902 Lane Km;
Allocation: Php 300,000,000
|
April 2, 2022 |
2022 |
WIN2F05909 |
SR2022-02-000068 |
February 3, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Cong. Andres Acop Cosalan Rd - K0301 + (-905) - K0304 + 024, K0313 + 175 - K0317 + 533, K0319 + 000 - K0322 + 600, K0324 + 000 - K0327 + 000, K0328 + 700 - K0330 + 500, K0331 + 751 - K0333 + 1495, K0336 + 000 - K0342 + 222;
Physical Target: 50.530 Lane Km;
Allocation: Php 300,000,000
To: Cong. Andres Acop Cosalan Rd - K0301 + (-905) - K0304 + 024, K0313 + 175 - K0317 + 533, K0319 + 000 - K0322 + 600, K0324 + 000 - K0327 + 000, K0328 + 700 - K0330 + 500, K0331 + 751 - K0333 + 381;
Physical Target: 35.902 Lane Km;
Allocation: Php 300,000,000
|
April 2, 2022 |
2022 |
WIN2F05904 |
SR2022-03-007586 |
March 23, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Benguet-Nueva Vizcaya Rd - K0302 + 320 - K0302 + 415;
Physical Target: 6,666.670 Square meters;
Allocation: Php 120,000,000
To: Benguet-Nueva Vizcaya Rd - K0293+ 245 - K0293 + 308;
Physical Target: 4,774.000 Square meters;
Allocation: Php 120,000,000
|
April 2, 2022 |
2022 |
WIN2F05902 |
SR2022-02-001190 |
February 4, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Itogon-Dalupirip-Sn Manuel Bdry Rd - K0271 + 286 - K0271 + 413;
Physical Target: 8333.330 Square meters;
Allocation: Php 150,000,000
To: Itogon-Dalupirip-Sn Manuel Bdry Rd - K0271 + 216 - K0271 + 466;
Physical Target: 6,434.000 Square meters;
Allocation: Php 150,000,000
|
April 2, 2022 |
2022 |
WIN2F05898 |
SR2022-02-001197 |
February 4, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Itogon-Dalupirip-Sn Manuel Bdry Rd - K0271 + 889 - K0272 + 050, K0272 + 393 - K0272 + 458;
Physical Target: 8333.340 Square meters;
Allocation: Php 150,000,000
To: Itogon-Dalupirip-Sn Manuel Bdry Rd - K0271 + 875 - K0272 + 045, K0272 + 400 - K0272 + 455;
Physical Target: 6,341.000 Square meters;
Allocation: Php 150,000,000
|
April 2, 2022 |
2022 |
WIN2F05905 |
SR2022-02-001865 |
February 4, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Preventive Maintenance (Asphalt Overlay) along Baguio-Bontoc Rd - K0254 + (-586) - K0260 + 000;
Physical Target: 9.800 Lane Km;
Allocation: Php 130,000,000
To: Preventive Maintenance (Asphalt Overlay) along Baguio-Bontoc Rd - K0253 + (-586) - K0262 + 000;
Physical Target: 19.232 Lane Km;
Allocation: Php 130,000,000
|
April 2, 2022 |
2022 |
WIN2F05941 |
SR2022-02-001889 |
February 4, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Preventive Maintenance (Asphalt Overlay) along Baguio-Itogon Rd - K0254 + (-651) - K0258 + 595, K0261 + 000 - K0268 + 055;
Physical Target: 15.831 Lane Km;
Allocation: Php 210,000,000
To: Preventive Maintenance (Asphalt Overlay) along Baguio-Itogon Rd - K0254 + (-651) - K0258 + 595, K0261 + 000 - K0264+768;
Physical Target: 17.948 Lane Km;
Allocation: Php 210,000,000
|
April 2, 2022 |
2022 |
WIN2F05934 |
SR2022-02-001142 |
February 4, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Gov. Bado Dangwa National Rd - K0338 + 150 - K0338 + 300;
Physical Target: 8333.330 Square meters;
Allocation: Php 150,000,000
To: Gov. Bado Dangwa National Rd - K0338 + 038 - K0338 + 151, K0338 + 220 - K0338 + 250;
Physical Target: 6166.000 Square meters;
Allocation: Php 150,000,000
|
April 2, 2022 |
2022 |
WIN2F05913 |
SR2022-02-001927 |
February 4, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Preventive Maintenance along Baguio-Bontoc Rd - K0281 + 195 - K0288 + 827;
Type of Work: Preventive Maintenance of Road: Concrete Reblocking;
Physical Target: 11.308 Lane Km;
Allocation: Php 150,000,000.000
To: Preventive Maintenance along Baguio-Bontoc Rd - K0273 + 500 - K0281 + 438;
Type of Work: Preventive
Maintenance of Road: Asphalt Overlay;
Physical Target: 15.940 Lane Km;
Allocation: Php 150,000,000.000
|
April 2, 2022 |
2022 |
WIN2F05914 |
SR2022-02-001930 |
February 4, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Preventive Maintenance along Baguio-Bontoc Rd - K0288 + 827 - K0299 + 730, K0299 + 750 - K0300 + 636;
Physical Target: 16.584 Lane Km;
Allocation: Php 220,000,000
To: Preventive Maintenance along Baguio-Bontoc Rd - K0294 + 969 - K0299 + 760, K0299 + 820 - K0307 + 205;
Physical Target: 24.096 Lane Km;
Allocation: Php 220,000,000
|
April 2, 2022 |
2022 |
WIN2F05915 |
SR2022-02-001933 |
February 4, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Preventive Maintenance along Gov. Bado Dangwa National Rd - K0346 + 000 - K0351 + 256, K0328 + (-085) - K0335 + 000;
Physical Target: 16.584 Lane Km;
Allocation: Php 220,000,000
To: Preventive Maintenance along Gov. Bado Dangwa National Rd - (S00377LZ) K0328 + (-085) - K0329 + 420, (S00376LZ) K0320 + 100 - K0331 + 000;
Physical Target: 24.852 Lane Km;
Allocation: Php 220,000,000
|
March 30, 2022 |
2022 |
WIN2F05881 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac 2nd District Engineering Office |
Convergence and Special Support Program - Basic Infrastructure Program - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Rehabilitation of Existing Dike along Binabakod River, Paludpud Section, D/S of Check Gate, La Paz, Tarlac |
March 30, 2022 |
2022 |
WIN2F05880 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac 2nd District Engineering Office |
Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Rehabilitation of Dike along O'Donnell River (Brgy. Maruglu Section, Sta. 2+603 to Sta. 3+137 Right Bank), Capas, Tarlac |
March 30, 2022 |
2022 |
WIN2F05835 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac 2nd District Engineering Office |
Convergence and Special Support Program - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Rehabilitation of Existing Dike along O'Donnell River (Sta. Lucia Section, Right Bank), Sta. 10+820.00 to Sta. 11+102.80, Capas, Tarlac |
March 30, 2022 |
2022 |
WIN2F05873 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac 2nd District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads
Concepcion - La Paz Rd - K0120+915 - K0121+108, K0121+108 - K0121+570, K0122+710 - K0123+013, K0132+117 - K0132+363 |
March 30, 2022 |
2022 |
WIN2F05879 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac 2nd District Engineering Office |
Network Development Program - Off-Carriageway Improvement - Primary Roads
Tarlac - Sta. Rosa Rd - K0133+954 - K0134+340 |
March 30, 2022 |
2022 |
WIN2F05942 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Madella - Dinadiawan Rd - K0418+690 - K0418+750 |
March 29, 2022 |
FY 2022 |
WIN2C03467 |
UACS No. 310106100696000 |
February 11, 2022 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 310106100696000
Project ID.: P00603572LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads
North Antipolo St – K0007+000 – K0007+044, K0008+931 – K0007+000
Physical Target: CW1 = Rehabilitation of Paved Road 0.226 lane km
Unit Cost = P 21,681,416/lane km
Allocation = P 4,900,000
EAO = P 100,000
Total = P 5,000,000
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads
North Antipolo St – K0009+(-267.80) – K0009+(129.30)
Physical Target: CW1 = Rehabilitation of Paved Road 0.277 lane km
Unit Cost = P 17,689,531/lane km
Allocation = P 4,900,000
EAO = P 100,000
Total = P 5,000,000
WIN2C03467
|
March 29, 2022 |
FY 2022 |
WIN2C03469 |
UACS No. 310102100868000 |
February 10, 2022 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 310102100868000
Project ID.: P00603562LZ
OO1: Ensure and Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
J Rizal Ave – K0003+(-168.80)– K0003+000, K0003+(-170) – K0003+(-168.80), K0003+(195.10) – K0003+(-170), K0003+000 – K0003+529
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay = 1.448 lane km
Unit Cost = P 6,767,956/lane km
Allocation = P 9,800,000
EAO = P 200,000
Total = P 10,000,000
As Modified
OO1: Ensure and Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
J Rizal Ave –K0003+(-529) – K0003+(-195.1)
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay = 1.448 lane km
Unit Cost = P 5,871,779/lane km
Allocation = P 9,800,000
EAO = P 200,000
Total = P 10,000,000
WIN2C03469
|
March 29, 2022 |
FY 2022 |
WIN2C03477 |
UACS No. 3101022100872000 |
February 10, 2022 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 3101022100872000
Project ID.: P00603560LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Legarda St. – K0003+(-523)-K0003+(-320), K0003+(-603)-K0003+(-523), K0003+(-683)-
K0003+(-603), K0003+(-693)-K0003+(-683), K0003+(=752.70)-K0003+(-693)
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 0.865 lane km
Unit Cost = P 16,994,219 / lane km.
Allocation = P 14,700,000
EAO = P 300,000
Total = P 15,000,000
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Legarda St. – K0003+(-655.3)-K0003+(-210.6)
Physical Target: CW1 = Preventive Maintenance of Road: Asphalt Overlay 0.889 lane km
Unit Cost = P 16,535,433 / lane km.
Allocation = P 14,700,000
EAO = P 300,000
Total = P 15,000,000
WIN2C03477
|
March 29, 2022 |
2022 |
WIN2F05870 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads
Romulo H-way - K0160+390 - K0161+158 |
March 29, 2022 |
2022 |
WIN2F05821 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Manila North Rd - K0155+876 - K0156+210, K0159+721 - K0160+565 |
March 29, 2022 |
2022 |
WIN2F05830 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Manila North Rd - K0156+210 - K0156+350, K0157+081 - K0158+800
|
March 29, 2022 |
2022 |
WIN2F05837 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Tarlac - Sta. Rosa Rd - K0136+ (-404) - K0136+487, K0136+511 - K0137+093, K0137+384 - K0137+549
|
March 29, 2022 |
2022 |
WIN2F05832 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Romulo H-way - K0141+024 - K0141+361 |
March 29, 2022 |
2022 |
WIN2F05834 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Flood Control Structure along Tarlac River Control (Right Dike), Tagumbao - Dicolor Section (Package B), Sta. 0+000 - Sta. 0+313, Gerona, Tarlac |
March 29, 2022 |
2022 |
WIN2F05822 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Flood Control Structure along Camiling River (Left Bank), Libueg - Bacabac Section (Package D), Sta. 0+249 - Sta. 0+525, Camiling, Tarlac |
March 29, 2022 |
2022 |
WIN2F05833 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Flood Control Structure along Camiling River (Right Bank), Bilad Section (Package B), Sta. 0+000 - Sta. 0+194, Bilad, Camiling, Tarlac |
March 29, 2022 |
2022 |
WIN2F05824 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Flood Control Structure along Camiling River (Right Bank), Tambugan - Sawat Section (Package A), Sta. 0+567 - Sta. 0+863, Camiling, Tarlac |
March 29, 2022 |
2022 |
WIN2F05823 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Romulo H-way - K0140+361 - K0141+024, K0141+361 - K0141+810 |
March 29, 2022 |
2022 |
WIN2F05827 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Manila North Rd - K0131+605 - K0132+073 |
March 29, 2022 |
2022 |
WIN2F05831 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Manila North Rd - K0131+081 - K0131+605 |
March 29, 2022 |
2022 |
WIN2F05825 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Primary Roads
Romulo H-way - K0132+599 - K0134+410 |
March 29, 2022 |
2022 |
WIN2F05826 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Manila North Rd - K0133+674 - K0134+173 |
March 24, 2022 |
2022 |
WIN2E01980 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. : 300214100095000
Project ID: P00633706MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
FROM:
Preventive Maintenance along Daang Maharlika (Surigao-Agusan Sect) - K1125 + 050 - K1680 + 546.25
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 3.910 Lane Km
Allocation:
TOTAL: P 60,000,000
CW1: P 57,900,000
EAO: P 2,100,000
Unit Cost:
CW1: P 14,808,184.14/ Lane Km
TO:
Preventive Maintenance along Daang Maharlika (Surigao-Agusan Sect) - K1125 + 000.00 - K1126+954.10
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 3.910 Lane Km
Allocation:
TOTAL: P 60,000,000
CW1: P 57,900,000
EAO: P 2,100,000
Unit Cost:
CW1: P 14,808,184.14/ Lane Km
|
March 24, 2022 |
2022 |
WIN2F05829 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Bataan 1st District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction / Rehabilitation of Flood Control Project along Colo River, Sta. (-) 0+739.50 - Sta. (-) 1+111.41, Palihan Section Phase 2AGP, Hermosa, Bataan |
March 24, 2022 |
2022 |
WIN2F05839 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Bataan 1st District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Rehabilitation of Flood Control Project along Colo River, Sta. 0+441.43 - Sta. (-)0+596.40, Palihan Section Phase 1AGP, Hermosa, Bataan
|
March 24, 2022 |
2022 |
WIN2F05838 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Bataan 1st District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Rehabilitation of Flood Control Project along Colo River, Sta. 0+495.50 - Sta. 0+846.62, Layac Section Phase 2AGP, Dinalupihan, Bataan |
March 24, 2022 |
2022 |
WIN2F05828 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Bataan 1st District Engineering Office |
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Rehabilitation of Flood Control Project along Colo River, Sta. (-)0+159 - Sta. 0+495.50. Layac Section Phase 1AGP, Dinalupihan, Bataan |
March 22, 2022 |
FY 2021 GAA |
WIN1G02575 |
DPWH Infra Program FY 2021 |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No.: 300202100197000
Project ID : P00534413LZ
Convergence and Special Support Program
Construction/Improvement of Access Roads leading to Seaports
FROM :
Concreting of Access Road leading to San Vicente Port Barton Docking Area MIMAROPA/Palawan/San Vicente/Port Barton, Palawan
Physical Target : CW1 - Construction of Concrete Road :
3.2 Lane Km
Allocation : Php 40.00 Million
TO :
Concreting of Access Road leading to San Vicente Port Barton Docking Area MIMAROPA/Palawan/San Vicente/Port Barton,
Palawan
Physical Target : CW1 - Construction of Concrete Road :
1.52978 Lane Km
CW2 - Road Safety : Pavement Markings :
1,923.0 Lineal Meters
Allocation : Php 40.00 Million
|
March 21, 2022 |
FY 2021 GAA |
WIN2G02604 |
DPWH FY 2021 GAA |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300116204189000
Project ID : P00562450LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/repair/Rehabilitation /Improvement of
Various Infrastructure including Local Projects
FROM :
Construction of Road leadinng to San Vicente Port Barton, Palawan
Physical Target : CW1 - Construction of Concrete road : 0 Lane km
Allocation : Php 20.00 Million
TO:
Construction of Road leading to San Vicente Port Barton, Palawan
Physical Target : CW1 - Construction of Concrete Road :
1.30 Lane Km
Allocation : Php 20.00 Million
|
March 21, 2022 |
FY 2021 GAA |
WIN2G02603 |
DPWH Infra Program FY 2021 |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300116204190000
Project ID : P00562451LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Construction/Improvement of Taradungan - Antonio Road,
Roxas, Palawan
Physical Target : CW1 - Construction of Concrete Road :
0 Lane Km
Allocation : Php 25.00 Million
TO :
Construction/Improvement of Taradungan - Antonio Road,
Roxas, Palawan
Physical Target : CW1 - Construction of Concrete Road :
1.90 Lane Km
Allocation : Php 25.00 Million
|
March 17, 2022 |
2022 |
WIN2E01979 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. : 300215100616000
Project ID: P00630154MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road, Sitio Puyawon, Barangay Mahanub - Sitio Buya, Barangay Camam-onan, Gigaquit, Surigao del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 5.004 Lane Km
Allocation:
TOTAL: P 80,000,000
CW1: P 77,200,00
EAO: P 2,800,00
Unit Cost:
CW1: P 15,427,657.87/ Lane Km
TO:
Construction of Road, Sitio Puyawon, Sitio Buya, Barangay Camam-onan, Gigaquit, Surigao del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 5.004 Lane Km
Allocation:
TOTAL: P 80,000,000
CW1: P 77,200,00
EAO: P 2,800,00
Unit Cost:
CW1: P 15,427,657.87/ Lane Km |
March 17, 2022 |
2022 |
WIN2E01978 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. : 300215100617000
Project ID: P00630663MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road in Barangay Ferlda - Sitio Puyawon, Barangay Mahanub, Gigaquit, Surigao del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 4.020 Lane Km
Allocation:
TOTAL: P 80,000,000
CW1: P 77,200,00
EAO: P 2,800,00
Unit Cost:
CW1: P 19,203,024.73/ Lane Km
TO:
Construction of Road in Barangay Ferlda - Sitio Puyawon, Barangay Camam-onan, Gigaquit, Surigao del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 4.020 Lane Km
Allocation:
TOTAL: P 80,000,000
CW1: P 77,200,00
EAO: P 2,800,00
Unit Cost:
CW1: P 19,203,024.73/ Lane Km
|
December 27, 2021 |
2021 |
WIN1F06705 |
SR2021-11-014754 |
November 18, 2021 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Rehabilitation/Reconstruction of Road with Slips, Slope Collapse, and Lanslide – Kananga – Tunongan Hot Spring Rd – K0996+000 – K0996+450
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 72.375 M
Structure: 0.00 square meters
EAO P 2.625 M
Total P 75.00 M
AS MODIFIED:
Rehabilitation/Reconstruction of Road with Slips, Slope Collapse, and Lanslide – Kananga – Tunongan Hot Spring Rd – K0996+304 – K0996+430; K0996+474 – K0996+777
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 72.375 M
Structure: 3, 065 square meters
EAO P 2.625 M
Total P 75.00 M
|
December 27, 2021 |
2021 |
WIN1F06649 |
SR2021-11-014756 |
November 18, 2021 |
Region VIII |
Leyte 4th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Rehabilitation/Reconstruction of Road with Slips, Slope Collapse, and Landslide – Kananga – Tungonan Hot Spring Rd – K0997+400 – K0997+800
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 72.375 M
Structure: 0.00 square meters
EAO P 2.625 M
Total P 75.00 M
AS MODIFIED:
Rehabilitation/Reconstruction of Road with Slips, Slope Collapse, and Landslide – Kananga – Tungonan Hot Spring Rd – K0997+040 – K0997+370; K0998+140 – K0998+222
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 72.375 M
Structure: 2,880 square meters
EAO P 2.625 M
Total P 75.00 M
|
December 27, 2021 |
2021 |
WIN1F06204 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
Leyte-Samar Rd (via Guintigui-an) – K0899+048 – K0899+434, K0899+466 – K0899+555
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 10.62222 M
Asphalt Overlay: 1.891 Lane Km
EAO P 0.21678 M
Total P 10.839 M
AS MODIFIED:
Leyte-Samar Rd (via Guintigui-an) – K0899+048 – K0899+418, K0899+482 – K0899+547
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 10.62222 M
Asphalt Overlay: 1.740 Lane Km
EAO P 0.21678 M
Total P 10.839 M
|
December 27, 2021 |
2021 |
WIN1F06205 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
Convergence and Special Support Program
Convergence and Special Support - Construction/ Improvement of Access Roads leading to Airports
AS PER GAA/ORIGINAL:
Access Road from San Jose Road to the New Passenger Terminal Building, Daniel Z. Romualdez Airport, San Jose,Tacloban City
Physical Target: Allocation:
CW1-Construction of Concrete P 28.09366 M
Road: 2.668 Lane Km
EAO P 0.57334 M
Total P 28.667 M
AS MODIFIED:
(Kalsada Tungo sa Paliparan, Rules at Daungan Program – Katuparan) Access Road from San Jose Road to the New Passenger Terminal Building, Daniel Z. Romualdez Airport, San Jose, Tacloban City
Physical Target: Allocation:
CW1-Construction of Concrete P 28.09366 M
Road: 2.352 Lane Km
EAO P 0.57334 M
Total P 28.667 M
|
December 27, 2021 |
2021 |
WIN1F06183 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Northern Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0687 + 964 - K0688 + 000
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 18.669 M
Structure: 3,883.891 square meters
EAO P 0.381 M
Total P 19.050 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0688 + 000 - K0688 + 033
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 18.669 M
Structure: 1,156.46 square meters
EAO P 0.381 M
Total P 19.050 M |
December 20, 2021 |
2021 |
WIN1C03407 |
GAA 2021 |
October 29, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Rehabilitation of Bucay North Road with Road Opening, San Miguel-Bancagan Section, Bucay, Abra;
Type of Work: Rehabilitation of Concrete Road;
Physical Target: CW1: 10.396 Lane Km;
Allocation= Php 100,000,000
To: Rehabilitation of Bucay North Road with Road Opening, San Miguel-Bancagan Section, Bucay, Abra;
Type of Work: CW1: Rehabilitation of Concrete Road
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 1.542 Lane Km
CW2: 13,878 Square meters;
Allocation= Php 100,000,000
|
December 20, 2021 |
2021 |
WIN1C03402 |
GAA 2021 |
October 29, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Pakiling-Banglolao Flood Control, Barangay Pakiling, Bucay, Abra;
Type of Work: Construction of Flood Mitigation Structure;
Physical Target: CW1: 293.20 Lineal meters;
Allocation= Php 50,000,000
To: Construction of Pakiling-Banglolao Flood Control, Barangay Pakiling, Bucay, Abra;
Type of Work: Construction of Flood Mitigation Structure;
Physical Target: CW1: 241.60 Lineal meters;
Allocation= Php 50,000,000
|
December 20, 2021 |
2021 |
WINC03404 |
GAA 2021 |
October 29, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Soot Flood Control, Barangay Mudeng, La Paz, Abra;
Type of Work: Construction of Flood Mitigation Structure;
Physical Target: CW1: 445.594 Lineal meters;
Allocation= Php 50,000,000
To: Construction of Soot Flood Control, Barangay Mudeng, La Paz, Abra;
Type of Work: Construction of Flood Mitigation Structure;
Physical Target: CW1: 219.20 Lineal meters;
Allocation= Php 50,000,000
|
December 15, 2021 |
FY 2021 |
WIN1E01932 |
300117210088000 |
November 9, 2021 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 300117210088000
Project ID : P00551097MN
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program
Rehabilitation/Improvement of Sindangan Rotonda, Sindangan, Zamboanga del Norte
CW1 - Rehabilitation of Concrete Road : 0.982 lane km
Unit Cost : P 10,481,280.52 /lane km
CW2 - Construction of Drainage Structure: 235.190 ln. m.
Unit Cost : P 8,854.04 /ln.m
EAO : P 125,000.00
Allocation : P 12,500,000.00 |
December 14, 2021 |
FY2021 |
WIN1B01184 |
300117210006000 |
April 23, 2021 |
Region IX |
Regional Office IX |
Local - Local Roads and Bridges - Local Roads - Local Infrastructure Program - Concreting of Road at Sitio Ratag, Barangay Baligtang, Pandami, Sulu
CW1: Construction of Concrete Road
Physical Target: 0.880 Lane Km.
Unit Cost: Php 11,250,000.00/lane km.
EAO: Php 100,000.00
Total Allocation: Php 10,000,000.00 |
December 2, 2021 |
2021 |
WIN1F06105 |
SARO-BMB-A-21-0010265 |
October 25, 2021 |
Region VIII |
Leyte 1st District Engineering Office |
Local Program
Local - Buildings And Other Structures - Multipurpose / Facilities - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
AS PER GAA/ORIGINAL:
Construction of Covered Court-Regional Rehabilitation Center for Youth (RRCY) Brgy. Pawing, Palo, Leyte
Physical Target: Allocation:
CW1-Construction of Multi Purpose Building: P 9.800 M
1.00 Number of Building
EAO P 0.200 M
Total P 10.00 M
AS MODIFIED:
Construction of Covered Court-Regional Rehabilitation Center for Youth (RRCY) Brgy. Sto. Niño, Tanauan, Leyte
Physical Target: Allocation:
CW1-Construction of Multi Purpose Building: P 9.800 M
1.00 Number of Building
EAO P 0.200 M
Total P 10.00 M
|
December 2, 2021 |
2021 |
WIN1F06286 |
SARO-BMB-A-21-0010166 |
October 22, 2021 |
Region VIII |
Leyte 4th District Engineering Office |
Local Program
Local – Flood Control and Drainage – Drainage/Protection Works – Local Infrastructure Program
AS PER GAA/ORIGINAL:
Construction of Albuera Seawall, Albuera, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 49.00 M
Structure: 412.092 Lineal Meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Construction of Albuera Seawall, Albuera, Leyte
Physical Target: Allocation:
CW1-Construction of Flood Mitigation P 49.00 M
Structure: 400.00 Lineal Meters
EAO P 1.00 M
Total P 50.00 M
|
December 2, 2021 |
2021 |
WIN1F06276 |
SR2021-09-012555 |
September 14, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
AS PER GAA/ORIGINAL:
Asphalt Overlay along National Road: Ormoc-Baybay Southern Leyte Boundary Road K1116+000 - K1117+000, K1118+000 - K1119+000, K1120+000 - K1120+857, K1121+000 - K1122+000
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 38.60 M
Asphalt Overlay: 0.00 Lane Km
EAO P 1.40 M
Total P 40.00 M
AS MODIFIED:
Asphalt Overlay along National Road: Ormoc-Baybay Southern Leyte Boundary Road K1117+985 - K1119+000, K1120+000 - K1120+857, K1120+866 – K1121+672
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 38.60 M
Asphalt Overlay: 5.412 Lane Km
EAO P 1.40 M
Total P 40.00 M
|
December 2, 2021 |
2021 |
WIN1F06671 |
SARO-BMB-A-21-0010157 |
October 22, 2021 |
Region VIII |
Northern Samar 2nd District Engineering Office |
Local Program
Flood Control and Drainage - Drainage / Protection Works - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
AS PER GAA/ORIGINAL:
Construction/Upgrading/Rehabilitation of Drainage along National Roads (Arteche – Jipapad – Las Navas – Rawis) at Barangay Gibuangan and Barangay Sagudsuron, Catubig, Northern Samar
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 32.340 M
: 0.00 Lineal Meters
EAO P 0.660 M
Total P 33.00 M
AS MODIFIED:
Construction/Upgrading/Rehabilitation of Drainage along National Roads (Arteche – Jipapad – Las Navas – Rawis) at Barangay Gibuangan and Barangay Sagudsuron, Catubig, Northern Samar
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 12.22309 M
: 625.00 Lineal Meters
CW2-Road Widening: 2.504 Lane Km P 20.11691 M
EAO P 0.660 M
Total P 33.00 M
|
December 2, 2021 |
2021 |
WIN1F06233 |
SARO-BMB-A-21-0008585 |
September 22, 2021 |
Region VIII |
Samar 1st District Engineering Office |
Local Program
Local - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
AS PER GAA/ORIGINAL:
Concreting of Brgy. Talahid – Brgy. Rica Road, Costa, Almagro, Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 49.00 M
: 6.478 Lane Km
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Concreting of Brgy. Talahid – Brgy. Costa Rica Road, Almagro, Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 49.00 M
: 6.478 Lane Km
EAO P 1.00 M
Total P 50.00 M
|
December 2, 2021 |
2021 |
WIN1F06109 |
SARO-BMB-A-21-0007316 |
August 24, 2021 |
Region VIII |
Southern Leyte District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K1100 + 087 - K1100+177
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 0.00 Square Meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Daang Maharlika (LT) - K1006 + 801 - K1006+901
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 3000 Square Meters
EAO P 1.00 M
Total P 50.00 M
|
December 2, 2021 |
2021 |
WIN1E01921 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 310207100128000
Project ID: P00501573MN
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement - Primary Roads
FROM:
Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1233 + (-088) - K1234 + 124, K1235 + 335 - K1236 + 262
Type of Work:
CW1- Off-Carriageway Improvement: Shoulder Paving/Construction
Physical Target:
CW1- 10,501.920 Square meters
Allocation:
TOTAL: P 90,200,000
CW1: P 87,043,000
EAO: P 3,157,000
Unit Cost:
CW1: P 8,288.29/Square meters
TO:
Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1233 + (-088) - K1233 + 244, K1243 + 060 - K1243 + 083, K1243 + 200 – K1243 + 746, K1243 + 1002 – K1244 +257
Type of Work:
CW1- Off-Carriageway Improvement: Shoulder Paving/Construction
CW2- Construction of Drainage Structure along Road
Physical Target:
CW1- 9,669.340 Square meters
CW2- 481.00 Lineal meters
Allocation:
TOTAL: P 90,200,000
CW1: P 49,167,337.59
CW2: P 37,875,662.41
EAO: P 3,157,000
Unit Cost:
CW1: P 5,084.87/Square meters
CW2: P 78,743.58/Lineal meters
|
December 2, 2021 |
2021 |
WIN1F06674 |
SARO-BMB-A-21-0010271 |
October 25, 2021 |
Region VIII |
Tacloban City District Engineering Office |
Local Program
Local - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
AS PER GAA/ORIGINAL:
Gov. Benjamin "Kokoy" Romualdez Diversion Road (S00253LT) Chainage 0-205, (S00255LT) K0908+946-K0909+030, (S00254LT) Chainage 0-55, Picas San Jose DZR Airport Road (S00257LT) K0910+-926-K0910+-857, (S00258LT) Chainage 0-094, Tacloban City
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 4.900 M
along Road: 117 Lineal Meters
EAO P 0.100 M
Total P 5.00 M
AS MODIFIED:
Gov. Benjamin "Kokoy" Romualdez Diversion Road (S00255LT) K0908+950-K0909+026 Tacloban Baybay South Road (S00244LT) K0913+977-K0914+017
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 4.950 M
along Road: 117 Lineal Meters
EAO P 0.050 M
Total P 5.00 M
|
December 2, 2021 |
2021 |
WIN1F06163 |
SARO-BMB-A-21-0010294 |
October 25, 2021 |
Region VIII |
Tacloban City District Engineering Office |
Local Program
Local - National Roads and Bridges - National Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
AS PER GAA/ORIGINAL:
Gov. Benjamin “Kokoy” Romualdez Diversion Road (S00255LT) K0908+825-K0908+755, Tacloban City
Physical Target: Allocation:
CW1-Asphalt Overlay: 0.800 Lane Km P 4.900 M
EAO P 0.100 M
Total P 5.00 M
AS MODIFIED:
Gov. Benjamin “Kokoy” Romualdez Diversion Road (S00255LT) K0908+265-K0908+472, Tacloban City
Physical Target: Allocation:
CW1-Asphalt Overlay: 0.800 Lane Km P 4.950 M
EAO P 0.050 M
Total P 5.00 M
|
December 2, 2021 |
2021 |
WIN1F06678 |
GAA FY 2021 |
January 1, 2021 |
Region VIII |
Tacloban City District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads
AS PER GAA/ORIGINAL:
Leyte-Samar Rd (via Guintigui-an) – K0904 +467 – K0904 +603
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 4.900 M
Road: 272 Lineal Meters
EAO P 0.100 M
Total P 5.00 M
AS MODIFIED:
Leyte-Samar Rd (via Guintigui-an) – K0904 + 459 – K0904 + 663, K0904 + 513 – K0904 + 536
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 4.900 M
Road: 227 Lineal Meters
EAO P 0.100 M
Total P 5.00 M
|
December 2, 2021 |
2021 |
WIN1F06321 |
GAA FY 2021 |
January 4, 2021 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Ormoc-Baybay-Southern Leyte Bdry Rd - K1059 + 400 - K1059 + 610
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 1.6464 M
Road: 210.00 Lineal Meters
EAO P 0.0336 M
Total P 1.68 M
AS MODIFIED:
Ormoc-Baybay-Southern Leyte Bdry Rd - K1059 + 817 - K1060 + 019
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 1.6464 M
Road: 150.00 Lineal Meters
EAO P 0.0336 M
Total P 1.68 M
|
December 1, 2021 |
2021 |
WIN1C03417 |
GAA 2021 |
October 27, 2021 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Road - K0414 + 770 - K0414 +800, K0440 + 1020 - K0440 + 1080, K0441 + 810 - K0441 + 855, K0444 + 314 - K0444 + 344, K0446 + 036 - K0446 + 046, K0446 + 190 - K0446 + 220, K0446 + 240 - K0446 + 260;
Physical Target: CW1: 0 Square meters;
Allocation= Php 27,000,000
To: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Road - K0414 + 770 - K0414 +800, K0440 + 1020 - K0440 + 1080, K0441 + 810 - K0441 + 855, K0444 + 314 - K0444 + 344, K0446 + 036 - K0446 + 046, K0446 + 190 - K0446 + 220, K0446 + 240 - K0446 + 260;
Physical Target: CW1: 1,451 Square meters;
Allocation= Php 27,000,000
|
December 1, 2021 |
2021 |
WIN1C03419 |
GAA 2021 |
October 29, 2021 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Pagala Flood Control, Bucay, Abra;
Physical Target: CW1: 720 Lineal meters;
Allocation= Php 100,000,000
To: Construction of Pagala Flood Control, Bucay, Abra;
Physical Target: CW1: 536 Lineal meters;
Allocation= Php 100,000,000
|
November 23, 2021 |
FY 2021 GAA |
WIN1E01904 |
FY 2021 GAA RA 11518 |
January 1, 2021 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Local Program - Flood Control and Drainage - Drainage Protection Works -Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Seawall at NHA Bangkal Relocation, Davao City
Physical Target:
CW1: 913.372 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Flood Mitigation Structure)
EAO: P 3,500,000.00
TO: Local Program - Flood Control and Drainage - Drainage Protection Works -Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Projects
Construction of Seawall at NHA Bangkal Relocation, Davao City
Physical Target:
CW1: 240.000 lm (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Flood Mitigation Structure)
EAO: P 3,500,000.00 |
November 23, 2021 |
2021 |
WIN1E01922 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. : 320101106328000
Project ID: P00522129MN
OO2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Revetment along Agusan River Basin, Esperanza Section, Agusan del Sur
Type of Work:
CW1- Construction of Revetment
Physical Target:
CW1- 947.425 Lineal meters
Allocation:
TOTAL: P 120,000,000
CW1: P 115,800,000
EAO: P 4,200,000
Unit Cost:
CW1: P 122,226.03/Lineal meters
TO:
Construction of Revetment along Agusan River Basin, Esperanza Section, Agusan del Sur
Type of Work:
CW1- Construction of Revetment
Physical Target:
CW1- 258.2 Lineal meters
Allocation:
TOTAL: P 120,000,000
CW1: P 115,034,755
EAO: P 4,172,245
Excess: P 793,000
Unit Cost:
CW1: P 445,525.77/Lineal meters
|
November 18, 2021 |
2021 |
WIN1E01915 |
FY 2021 GAA RA 11518 |
January 25, 2021 |
Region XIII |
Regional Office XIII |
UACS No. : 300116203535000
Project ID: P00550699MN
Local Program - Local Roads and Bridges - Local Roads - Construction / Repair / Rehabilitation / Improvement of Various Infrastructure including Local Projects
FROM:
Construction of Circumferential Road along Agusan Marsh Road, Bunawan Section (Phase 4), Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 12.151 Lane Km
Allocation:
TOTAL: P 130,000,000
CW1: P 125,450,000
EAO: P 4,550,000
Unit Cost:
CW1: P 10,324,253.15/Lane Km
TO:
Construction of Circumferential Road along Agusan Marsh Road, Bunawan Section (Phase 4), Agusan del Sur
Type of Work:
CW1- Construction of Gravel Road
Physical Target:
CW1- 1.84 Lane Km
Allocation:
TOTAL: P 130,000,000
CW1: P 125,297,576.51
EAO: P 4,544,471.69
Excess: P 157,951.80
Unit Cost:
CW1: P 68,096,508.97/Lane Km
|