April 23, 2022 |
2022 |
WIN2F06324 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
From: Construction of Flood Control Structure, Sta. 27+000 - Sta. 27+490, Busilac, Alfonso Lista, Ifugao;
Physical Target: 150.000 Lineal Meters;
Allocation: Php 24,500,000.000
To: Construction of Flood Control Structure, Sta. 27+140 - Sta. 27+490, Busilac, Alfonso Lista, Ifugao;
Physical Target: 350.000 Lineal Meters;
Allocation: Php 24,500,000.000
|
April 23, 2022 |
2022 |
WIN2F06336 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
From: Construction of Mapacopaco Flood Control Structure, Sta. 41+000 - Sta. 41+670, Posnaan, Aguinaldo, Ifugao;
Physical Target: 150.000 Lineal Meters;
Allocation: Php 32,467,000.000
To: Construction of Mapacopaco Flood Control Structure, Sta. 41+000 - Sta. 41+510, Posnaan, Aguinaldo, Ifugao;
Physical Target: 510.000 Lineal Meters;
Allocation: Php 32,467,000.000
|
April 23, 2022 |
2022 |
WIN2F06341 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
From: Construction of Mapacopaco Flood Control Structure, Sta. 42+555 - Sta. 43+000, Posnaan, Aguinaldo, Ifugao;
Physical Target: 150.000 Lineal Meters;
Allocation: Php 21,217,000.000
To: Construction of Mapacopaco Flood Control Structure, Sta. 42+555 - Sta. 42+913.60, Posnaan, Aguinaldo, Ifugao;
Physical Target: 346.000 Lineal Meters;
Allocation: Php 21,217,000.000
|
April 23, 2022 |
2022 |
WIN2F06337 |
SARO-BMB-A-22-0002938 |
March 21, 2022 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
From: Construction of Flood Mitigation Structures along Magat River, Sta. 39 + 563 - Sta. 40 + 975, Sta. 41 + 668 - Sta. 41 + 706, San Juan and Calupaan, Alfonso Lista, Ifugao;
Physical Target: 512.000 Lineal Meters;
Allocation: Php 50,000,000.000
To: Construction of Flood Mitigation Structures along Magat River, Sta. 39 + 563 - Sta. 40 + 075, San Juan, Alfonso Lista, Ifugao;
Physical Target: 512.000 Lineal Meters;
Allocation: Php 50,000,000.000
|
April 23, 2022 |
2022 |
WIN2F06313 |
SARO-BMB-A-22-0002938 |
March 21, 2022 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
From: Construction of Namillangan Flood Control ta. 45+500- Sta. 48+100 (L/S) Namillangan, Alfonso Lista, Ifugao;
Physical Target: 491.500 Lineal Meters;
Allocation: Php 50,000,000.000
To: Construction of Namillangan Flood Control Sta. 43+700- Sta. 44+217.5 (R/S) Namillangan, Alfonso Lista, Ifugao;
Physical Target: 491.500 Lineal Meters;
Allocation: Php 50,000,000.000
|
April 22, 2022 |
2022 |
WIN2F06225 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
A Castañeda - Ma. Aurora - San Luis Rd - K0196+506 - K0196+533, K0198+530 - K0198+555, K0198+572 - K0198+580, K0198+950 - K0198+980, K0202+932 - K0202+950 |
April 22, 2022 |
2022 |
WIN2F06288 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Sn Antonio - Floridablanca Rd - K0081+134.30 - K0082+358.60, K0082+358.60 - K0082+760, K0088+09720 - K0089+057.71 |
April 22, 2022 |
2022 |
WIN2F06172 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Angeles - Porac - Floridablanca - Dinalupihan Rd - K0088+000 - K0089+000, K0089+1320 - K0090+000, K0090+000 - K0090+683.50 |
April 22, 2022 |
FY 2022 |
WIN2C03520 |
UACS No. 310103100844000 |
February 22, 2022 |
National Capital Region |
North Manila District Engineering Office |
As per GAA/Original
UACS No. 310103100844000
Project ID.: P00603558LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
G. Tuazon St – K0009+(-110) – K0009+000, K0009+(-237) – K0009+(-110),
K0009+(-434))+(-237), K0009+000-K0009+437
Physical Target: CW1- Preventive Maintenance of Road: Concrete Reblocking=0.871 lane Km
Unit Cost = P 3,375,431/lane km
Allocation = P 2,940,000
EAO = P 60,000
Total = P 3,000,000
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
G. Tuazon St – K0009+414.30-K0009+264.0
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay=0.301 lane Km
Unit Cost = P 9,767,442/lane km
Allocation = P 2,940,000
EAO = P 60,000
Total = P 3,000,000
WIN2C03520
|
April 22, 2022 |
2022 |
WIN2F06255 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Nueva Ecija 1st District Engineering Office |
Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructure /Facilities
Construction of Drainage Canal, Brgy. Poblacion, Guimba, Nueva Ecija
|
April 21, 2022 |
2022 |
WIN2F06284 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R. A. 11239
Repair/Rehabilitation/Improvement along Daang Maharlika (LZ) - K0084+380 - K0084+499, K0084+576 - K0084+613, K0087+780 - K0088+000, K0088+450 - K0088+491, K0088+540 - K0088+595, K0088+820 - K0089+020, K0090+543.3 - K0090+780, K0090+904.50 - K0091+006.30 |
April 21, 2022 |
2022 |
WIN2F06227 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Bulacan 2nd District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads
Meycauayan - Camalig - Bahay Pari Rd - K0023+000 - K0023+084
|
April 21, 2022 |
2022 |
WIN2F06230 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Roads leading to Major / Strategic Public Buildings / Facilities
Construction of Suguit - Punglo Road, Maria Aurora, Aurora |
April 21, 2022 |
2022 |
WIN2F06230 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Roads leading to Major / Strategic Public Buildings / Facilities
Construction of Suguit - Punglo Road, Maria Aurora, Aurora |
April 21, 2022 |
2022 |
WIN2F06253 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and / or Bridges from the National Road/s leading to Major / Strategic Public Buildings / Facilities
Construction of Road (Baler - San Luis - Dingalan), Baler, Aurora |
April 21, 2022 |
2022 |
WIN2F06223 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Madella-Dinadiawan Rd - K0409+150 - K0409+220, K0409+300 - K0409+348, K0409+550 - K0409+565, K0409+650 - K0409+665, K0409+750 - K0409+790, K0410+050 - K0410+096, K0410+150 - K0410+162, K0410+635 - K0410+670, K0411+100 - K0411+115, K0411+250 - K0411+260, K0411+810 - K0411+825, K0412+180 - K0412+195, K0418+920 - K0419+004, K0419+050 - K0419+080, K0419+100 - K0419+115, K0419+400 - K0419+472, K0419+500 - K0419+536 |
April 21, 2022 |
2022 |
WIN2F06224 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Network Development Program - Off-Carriageway Improvement - Secondary Roads
Baler - Casiguran Rd (Dinadiawan - Casiguran Sect) - K0339+275 - K0339+431, K0339+606 - K0340+023, K0340+845 - K0342+292 |
April 21, 2022 |
2022 |
WIN2F06250 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Nueva Ecija - Aurora Road - K0174+300 - K0174+312.56, K0174+900 - K0174+927, K0176+470 - K0176+497, K0176+610 - K0176+622.56, K0177+311 - K0177+323, K0177+450 - K0177+456, K0177+600 - K0177+612, K0177+760 - K0177+775, K0177+850 - K0177+862, K0178+450 - K0178+475, K0179+475 - K0179+661, K0185+300 - K0185+315, K0186+500 - K0186+512.56, K0187+600 - K0187+606, K0189+300 - K0189+312, K0192+100 - K0192+112, K0192+122 - K0192+131, K0192+200 - K0192+215.84, K0192+950 - K0192+962, K0198+450 - K0198+474, K0199+150 - K0199+237, K0210+965 - K0210+977.56, K0214+300 - K0214+312.56 |
April 21, 2022 |
2022 |
WIN2G02623 |
FY 2022 GAA RA 11639 |
January 3, 2022 |
Region VI |
Aklan District Engineering Office |
UACS No. 310202101157000
Project ID: P00604800VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Aklan East Rd - K0298 + 000 - K0299 + 000, K0309 + 369 - K0309 + 372, K0309 + 747 - K0309 + 791, K0316 + 677 - K0317 + 171, K0317 + 211 - K0317 + 890, K0322 + 737 - K0322 + 840
CW1 - Road Widening : 4.556 lane km - 45,820.88
EAO - 935.12
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Aklan East Rd - K0299 + 652 - K0301 + 000
CW1 - Road Widening : 2.696 lane km - 41,813.16
ROW Acquisition: 263.70 sq.m. - 4,007.72
EAO - 935.12
|
April 21, 2022 |
2022 |
WIN2G02624 |
SR2022-02-001265 |
February 4, 2022 |
Region VI |
Aklan District Engineering Office |
UACS No. 310208100393000
Project ID: P00604793VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Secondary Roads
Aklan East Rd - K0276 + 000 - K0276 + 061, K0278 + 000 - K0278 + 175, K0281 + 281 - K0282 + 726, K0284 + 539 - K0285 + 471, K0309 + 791 - K0311 + 854, K0311 + 923 - K0315 + 895, K0316 + 295 - K0316 + 677
CW1 - Off-Carriageway Improvement: Paving of Shoulders:
25,149.00 sq.m. - 63,097.490
CW2 - Off-Carriageway Improvement: Construction of Sidewalk: 109.50 sq.m. - 211.335
EAO - 2,296.175
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Secondary Roads
Aklan East Rd - K0277 + 720 - K0278 + 020, K0278 + 215 - K0280 + 070, K0279 + 700 - K0279 + 785, K0279 + 785 - K0280 + 820, K0280 + 070 -K0280 + 300, K0280 + 820 - K0282 + 000, K0281 + 170 - K0282 + 200, K0282 + 000 -K0282 + 980, K0282 + 440 - K0285 + 380, K0282 + 980 - K0283 + 070, K0283 + 215 -K0285 + 380, K0311 + 000 - K0311 + 775, K0312 + 410 - K0313 + 500, K0313 + 185 -K0315 + 250, K0313 + 185 - K0315 + 405, K0315 + 582 - K0315 + 875, K0315 + 670 - K0315 + 875, K0315 + 915 - K0316 + 290
CW1 - Off-Carriageway Improvement: Paving of Shoulders:
18,117.50 sq.m. - 61,889.825
CW2 - Off-Carriageway Improvement: Construction of Sidewalk:
2,706.00 sq.m. - 219.00
ROW Acquisition: 600.00 sq.m. - 1,200.00
EAO - 2,296.175
|
April 21, 2022 |
2022 |
WIN2G02622 |
SR2022-02-000179 |
February 3, 2022 |
Region VI |
Aklan District Engineering Office |
UACS No. 310102100830000
Project ID: P00603617VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Aklan East Rd (S00322PN) - K0278 + 237 - K0279 + 782, K0281 + 000 - K0282 + 000
CW1- Preventive Maintenance of Road: Asphalt Overlay:
9.952 lane km - 78,315.54
EAO - 2,840.46
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Aklan East Rd (S00322PN) - K0276 + 000 - K0278 + 082, K0286 + 045 - K0290 + 113
CW1- Preventive Maintenance of Road: Asphalt Overlay:
16.516 lane km - 78,315.54
EAO - 2,840.46
|
April 21, 2022 |
2022 |
WIN2G02625 |
FY 2022 GAA RA 11639 |
January 3, 2022 |
Region VI |
Aklan District Engineering Office |
UACS No. 310108101163000
Project ID: P00604062VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Aklan West Rd (Kalibo-Nabas) - K0264 + 450 - K0264 + 520, K0265 + 400 - K0265 + 430
CW1- Construction of Road Slope Protection Structure:
2,000.00 sq.m. - 19,600.00
EAO - 400.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Aklan West Rd (Kalibo-Nabas) - K0262 + 940 - K0262 + 990, K0264 + 450 - K0264 + 570, K0265 + 400 - K0265 + 460, K0266 + 000 -K0266 + 080
CW1- Construction of Road Slope Protection Structure:
1,360.00 sq.m. - 19,600.00
EAO - 400.00
|
April 21, 2022 |
2022 |
WIN2G02626 |
SR2022-02-001270 |
February 4, 2022 |
Region VI |
Aklan District Engineering Office |
UACS No. 310208100394000
Project ID: P00604794VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Secondary Roads
Aklan West Rd (Kalibo-Nabas) - K0234 + (-905) - K0234 + 579, K0234 + 856 - K0236 + 575, K0236 + 724 - K0237 + 430, K0238 + 704 - K0239 + 246, K0240 + 000 - K0240 + 086
CW1 - Off-Carriageway Improvement: Paving of Shoulders:
12,931.50 sq.m. - 81,131.41
EAO - 2,942.59
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Secondary Roads
Aklan West Rd (Kalibo-Nabas) - K0238 + 704 - K0239 + 150, K0238 + 704 - K0239 + 246, K0239 + 620-K0239 + 246, K0254 + 000 - K0254 + 300, K0254 + 000 -K0254 + 630, K0258 + 400 - K0259 + 380, K0265 + 600 -K0266 + 800, K0271 + 640 - K0272 + 020, K0272 + 145 - K0274 + 440, K0272 + 145 -K0273 + 640, K0274 + 440 - K0275 + 080, K0275 + 130 - K0275 + 360
CW1 - Off-Carriageway Improvement: Paving of Shoulders:
30,609.70 sq.m. - 81,131.41
EAO - 2,942.59
|
April 21, 2022 |
2022 |
WIN2G02629 |
SR2022-02-000274 |
February 3, 2022 |
Region VI |
Regional Office VI |
UACS No. 310109100880000
Project ID: P00604080VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Lambunao-INCA Rd - K0048 + 700 - K0048 + 920
CW1- Construction of Road Slope Protection Structure:
3,333.33 sq.m - 57,900.00
EAO - 2,100.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Lambunao-INCA Rd – K0059 + 405 – K0059 + 446.10
CW1- Construction of Road Slope Protection Structure:
2,599.257 sq.m - 57,900.00
EAO - 2,100.00
|
April 21, 2022 |
2022 |
WIN2G02627 |
SR2022-02-000249 |
February 3, 2022 |
Region VI |
Regional Office VI |
UACS No. 310109100874000
Project ID: P00604084VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Jct Bancal-Leon-Antique Bdry Rd - K0041 + 790 - K0041 + 820, K0049 + 000 - K0049 + 114
CW1- Construction of Road Slope Protection Structure:
3,888.89 sq.m - 67,550.00
EAO - 2,450.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Jct Bancal-Leon-Antique Bdry Rd - K0041 + 593 - K0041 + 623
CW1- Construction of Road Slope Protection Structure:
3,099.95 sq.m - 67,550.00
EAO - 2,450.00
|
April 21, 2022 |
2022 |
WIN2F06246 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Nueva Ecija - Aurora Rd - K0171+200 - K0171+305 |
April 21, 2022 |
2022 |
WIN2F06283 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Baler-Casiguran Rd (Baler-Dinadiawan) - K0242+327 - K0242+870, K0245+700 - K0245+877, K0252+444 - K0252+784.08
|
April 21, 2022 |
2022 |
WIN2F06231 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Baler-Casiguran Rd (Baler-Dinadiawan) - K0277+420 - K0277+435, K0278+400 - K0278+415, K0278+800 - K0278+815, K0279+700 - K0279+721, K0280+050-K0280+071 |
April 20, 2022 |
FY 2022 |
WIN2C03522 |
UACS No. 300220100188000 |
February 8, 2022 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA/Original
UACS No. 300220100188000
Project ID.: P00637105LZ
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of 6-Storey Multi-purpose Building (Government Center) Package 9, Brgy. St. Joseph,
San Juan City
Physical Target: CW1-Construction of Multi-Purpose Building = 1.0 No. of Building
Unit Cost = P 7,840,000/no. of bldg.
Allocation = P 7,840,000
EAO = P 160,000
Total = P 8,000,000
As Modified
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of 6-Storey Multi-purpose Building (Government Center) Package 10, Brgy. St. Joseph,
San Juan City
Physical Target: CW1-Construction of Multi-Purpose Building = 1.0 No. of Building
Unit Cost = P 7,840,000/no. of bldg.
Allocation = P 7,840,000
EAO = P 160,000
Total = P 8,000,000
WIN2C03522
|
April 20, 2022 |
2022 |
WIN2F05972 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 310103100965000
Project ID: P00603965LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Tertiary Roads - Jct Bato-Baras Rd – K0013+195 – K0014+000, K0022+300 – K0023+000
Physical Target: CW1 – Preventive Maintenance of Road: Concrete Reblocking – 2.908 Lane km.
Allocation: Php 12,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Tertiary Roads - Jct Bato-Baras Rd – K0013+195 – K0014+000, K0014+000 – K0015+000
Physical Target: CW1 - Preventive Maintenance of Road: Concrete Reblocking – 1.584 Lane km.
Estimated Cost: Php 12,000,000.00
|
April 20, 2022 |
2022 |
WIN2F06179 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Catanduanes District Engineering Office |
UACS No.: 310112100321000
Project ID: P00604141LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads - Baras-Gigmoto-Viga Rd – K0026+000 – K0026+742
Physical Target: CW1 - Construction of Drainage Structure along Road – 742 Lineal Meters.
Allocation: Php 22,274,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads - Baras-Gigmoto-Viga Rd – K0029+000 – K0030+00, K0050+791 – K0050+848, K0087+900 – K0088+000, K0090+100 – K0090+325
Physical Target: CW1 - Construction of Drainage Structure along Road – 1143 Lineal Meters.
Estimated Cost: Php 22,274,000.00
|
April 20, 2022 |
2022 |
WIN2F06305 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R. A. 11239
Installation of Reflective Pavement Studs A Castaneda - Ma. Aurora - San Luis Rd - K0193+(-307) - K0193+068, K0193+920 - K0206+712, Baler Airport Road - K0227+979 - K0229+657, Nueva Ecija - Aurora Rd - K0171+(-322) - K0184+621 |
April 20, 2022 |
2022 |
WIN2F05889 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Masbate 1st District Engineering Office |
UACS No.: 310106100776000
Project ID: P00603976LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Tertiary Roads - Sn Fernando-Talisay Rd – K0001+798 – K0002+116
Physical Target: CW1 – Reconstruction to Concrete Pavement – 0.596 Lane km.
Allocation: Php 9,855,000
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Tertiary Roads - Sn Fernando-Talisay Rd – K0011+765 – K0011+865, K0011+975 – K0012+058.50, K0012+252 – K0012+291
Physical Target: CW1 - Reconstruction to Concrete Pavement – 0.517 Lane km.
Estimated Cost: Php 9,855,000
|
April 20, 2022 |
2022 |
WIN2F05886 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Masbate 1st District Engineering Office |
UACS No.: 310111100436000
Project ID: P00604144LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Construction/ Upgrading Rehabilitation of Drainage along National Roads – Secondary Roads – Sn Fernando North Rd – K0012+871 – K0012+921, K0013+895 – K0014+213, K0024+843 – K0025+000
Physical Target: CW1 - Construction of Drainage Construction along Road – 521 Lineal Meters
Allocation: Php 7,850,000
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Construction/ Upgrading Rehabilitation of Drainage along National Roads – Secondary Roads – Sn Fernando North Rd – K0012+889 – K0012+921, K0012+980 – K0013+106, K0013+991 – K0014+213, K0024+846 – K0025+000
Physical Target: CW1 - Construction of Drainage Construction along Road – 521 Lineal Meters
Estimated Cost: Php 7,850,000
|
April 20, 2022 |
2022 |
WIN2F05883 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Masbate 1st District Engineering Office |
UACS No.: 310109101000000
Project ID: P00604432LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Tertiary Roads - Sn Fernando-Talisay Rd – K0002+741 – K0002+781
Physical Target: CW1 - Construction of Road Slope Protection Structure – 1666.67 Square Meters.
Allocation: Php 30,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Tertiary Roads - Sn Fernando-Talisay Rd – K0002+741 – K0002+781
Physical Target: CW1 - Construction of Road Slope Protection Structure – 1324.84 Square Meters.
Estimated Cost: Php 30,000,000.00
|
April 20, 2022 |
2022 |
WIN2F05885 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Masbate 1st District Engineering Office |
UACS No.: 310109100870000
Project ID: P00604433LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Tertiary Roads - Sn Fernando-Talisay Rd – K0003+000 – K0003+095
Physical Target: CW1 - Construction of Road Slope Protection Structure – 4444.44 Square Meters.
Allocation: Php 80,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Tertiary Roads - Sn Fernando-Talisay Rd – K0003+065 – K0003+209
Physical Target: CW1 - Construction of Road Slope Protection Structure – 3697.71 Square Meters.
Estimated Cost: Php 80,000,000.00
|
April 20, 2022 |
2022 |
WIN2F05884 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Masbate 1st District Engineering Office |
UACS No.: 310209100371000
Project ID: P00606440LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement – Tertiary Roads – Sn Pascual-Claveria Rd – K0012+000 – K0012+277, K0012+478 – K0012+850, K0017+041 – K0017+801
Physical Target: CW1 – Off-Carriageway Improvement: Paving of Shoulders – 4227 Square Meters.
Allocation: Php 30,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement – Tertiary Roads – Sn Pascual-Claveria Rd – K0012+478 – K0012+850, K0017+041 – K0018+ 042
Physical Target: CW1 - Off-Carriageway Improvement: Paving of Shoulders – 4227 Square Meters.
Estimated Cost: Php 30,000,000.00
|
April 20, 2022 |
2022 |
WIN2F05910 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310111100438000
Project ID: P00604143LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Construction/ Upgrading of Drainage along National Roads – Secondary Roads - Masbate-Milagros Rd – K0021+256 – K0021+577
Physical Target: CW1 - Construction of Drainage Structure along Road – 321 Lineal Meters
Allocation: Php 13,740,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Construction/ Upgrading of Drainage along National Roads – Secondary Roads - Masbate-Milagros Rd – K0023+045 – K0023+285
Physical Target: CW1 - Construction of Drainage Structure along Road – 240 Lineal Meters
Estimated Cost: Php 13,740,000.00
|
April 20, 2022 |
2022 |
WIN2F06091 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310102100825000
Project ID: P00610123LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Secondary Roads – Jct Crossing-Mandaon Rd – K0045+800 – K0049+250
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 6.858 Lane km.
Allocation: Php 128,500,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Secondary Roads – Jct Crossing-Mandaon Rd – K0046+(-358) – K0046+000, K0047+000 – K0048+620
Physical Target: CW1 - Preventive Maintenance of Road: Asphalt Overlay – 7.876 Lane km.
Estimated Cost: Php 128,500,000.00
|
April 20, 2022 |
2022 |
22-6801 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310102100826000
Project ID: P00610124LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads – Jct Milagros-Baleno-Lagta Rd – K0025+050 – K0033+380
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 30.14 Lane km.
Allocation: Php 295,300,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads – Jct Milagros-Baleno-Lagta Rd – K0025+(-115) – K0030+140
Physical Target: CW1 - Preventive Maintenance of Road: Asphalt Overlay – 19.686 Lane km.
Estimated Cost: Php 295,300,000.00
|
April 20, 2022 |
2022 |
WIN2F05982 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310102100827000
Project ID: P00610125LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads – Jct Milagros-Baleno-Lagta Rd – K0042+780 – K0047+200
Physical Target: CW1 – Preventive Maintenance of the Road: Asphalt Overlay – 16.861 Lane km.
Allocation: Php 180,350,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads – Jct Milagros-Baleno-Lagta Rd – K0042+682 – K0045+725
Physical Target: CW1 - Preventive Maintenance of the Road: Asphalt Overlay – 11.736 Lane km.
Estimated Cost: Php 180,350,000.00
|
April 20, 2022 |
2022 |
WIN2F0610 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310102100828000
Project ID: P00610126LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads – Jct Tawad-Balud Rd – K0027+300 – K0031+756
Physical Target: CW1 – Preventive Maintenance of Road: Concrete Reblocking – 8.848 Lane km.
Allocation: Php 165,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads – Jct Tawad-Balud Rd – K0027+(-360) – K0028+944, K0029+910 – K0031+390
Physical Target: CW1 - Preventive Maintenance of Road: Concrete Reblocking – 11.032 Lane km.
CW2 - Construction of Drainage Structure along Road – 1,729.450 Lineal meters
Estimated Cost: Php 165,000,000.00
|
April 20, 2022 |
2022 |
WIN2F06168 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310102100829000
Project ID: P00610127LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads – Masbate-Milagros Rd – K0024+000 – K0026+500
Physical Target: CW1 - Preventive Maintenance of Road: Concrete Reblocking – 4.682 Lane km.
Allocation: Php 85,000,000.00
AS MODIFIED:
OO1 : : Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads – Masbate-Milagros Rd – K0024+274 – K0025+610
Physical Target: CW1 - Preventive Maintenance of Road: Concrete Reblocking – 5.456 Lane km.
Estimated Cost: Php 85,000,000.00
|
April 20, 2022 |
2022 |
WIN2F05931 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 320101107540000
Project ID: P00620280LZ
AS PER GAA:
OO2 : Protect Lives and Properties – Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Calsuche Seawall, Milagros, Masbate
Physical Target: CW1 - Construction of Flood Mitigation Structure – 168 Lineal Meters
Allocation: Php 100,000,000.00
AS MODIFIED:
OO2 : Protect Lives and Properties – Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Calasuche Seawall, Milagros, Masbate
Physical Target: CW1 - Construction of Flood Mitigation Structure – 168 Lineal Meters
Estimated Cost: Php 100,000,000.00
|
April 20, 2022 |
2022 |
WIN2F05958 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Masbate 3rd District Engineering Office |
UACS No.: 310108100899000
Project ID: P00611363LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Secondary Roads - Masbate-Cataingan-Placer Rd – K0021+257 – K0021+507
Physical Target: CW1 – Road Slope Protection Structure – 5277.78 Square Meters.
Allocation: Php 95,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Secondary Roads - Masbate-Cataingan-Placer Rd – K0022+345 – K0022+595
Physical Target: CW1 - Road Slope Protection Structure – 5277.78 Square Meters.
Estimated Cost: Php 95,000,000.00
|
April 20, 2022 |
2022 |
WIN2F05959 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Masbate 3rd District Engineering Office |
UACS No.: 300105200775000
Project ID: P00655179LZ
AS PER GAA:
Local Program – Local – Buildings and Other Structures – Multipurpose/ Facilities – National Building Program – Construction of DPWH Masbate 3rd DEO Materials Testing Laboratory Building, Dimasalang, Masbate City
Physical Target: CW1 - Construction of Multipurpose Building - 1 number of building
Allocation: Php 7,000,000.00
AS MODIFIED:
Local Program – Local – Buildings and Other Structures – Multipurpose/ Facilities – National Building Program – Construction of DPWH Masbate 3rd DEO Materials Testing Laboratory Building, Dimasalang, Masbate
Physical Target: CW1 - Construction of Multipurpose Building - 1 number of building
Estimated Cost: Php 7,000,000.00
|
April 20, 2022 |
FY 2021 GAA |
WIN2G02781 |
DPWH Infra Program FY 2021 |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300106200716000
Project ID : P00561579LZ
LOCAL PROGRAM
Flood Control and Drainage - Flood Control Structures/Facilities -
Construction/Repair/Rehabilitation/Improvement of Various
Infrastructure including Local Projects
FROM :
Construction of Jao-asan Flooc Control,
Jao-asan, Magdiwang, Romblon
Physical Target - CW1 - Construction of Flood Control Mitigation :
0.00 Lineal Meter (lm)
Allocation - Php 50.00 million
TO :
Construction of Jao-asan Flood Control
Jao-asan, Magdiwang, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
248.00 Lineal Meter (lm)
Allocation - Php 50.00 Million |
April 20, 2022 |
FY 2021 GAA |
WIN2G02754 |
DPWH Infra Program FY 2021 |
December 28, 2020 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300116204208000
Project *ID : P00562469LZ
LOCAL PROGRAM
Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects
FROM :
Construction(Completion) of Kabaliwan - Boliganay Road
(Phase II), San Agustin and Odiongan, Romblon
Physical Target - CW1 - Construction of Concrete Road ; 0 lane Km
Allocation - Php 50.00 Milliojn
TO :
Construction(Completion) of Kabaliwan - Boliganay Road
(Phase II), San Agustin and Odiongan, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 3,182 Square meters
Allocation - Php 50.00 Million
|
April 20, 2022 |
2022 |
WIN2F05946 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Regional Office V |
UACS No.: 310201100872000
Project ID: P00605799LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening Primary Roads – Daang Maharlika (LZ) – K0415+515 – K0316+265, K0416+760 – K0417+049, K0420+080 – K0420+843, K0420+867.60 – K0421+337
Physical Target: CW1 – Road Widening – 4.605 Lane km.
Allocation: Php 115,120,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening Primary Roads – Daang Maharlika (LZ) – K0416+836 – K0417+049, K0420+080 – K0420+843, K0420+867.60 – K0421+337
Physical Target: CW1 - Road Widening – 2.9648 Lane km.
CW2 - Construction of Drainage Structure along Road – 2977.8 Lineal meters
ROW – ROW acquisition – 29648 Square Meters
Estimated Cost: Php 115,120,000.00
|
April 20, 2022 |
2022 |
WIN2F06007 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Regional Office V |
UACS No.: 310201100870000
Project ID: P00606446LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Primary Roads – Daang Maharlika (LZ) – K0399+243 – K0401+848
Physical Target: CW1 – Road Widening – 5.192 Lane km.
Allocation: Php 136,775,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Primary Roads – Daang Maharlika (LZ) – K0399+243 – K0400+614.45
Physical Target: CW1 - Road Widening – 2.7369 Lane km.
CW2 - Construction of Road Slope Protection Structure – 3086.03 Lineal meters
CW3 – Construction of Drainage Structure along Road – 2706.98 Lineal Meters
ROW Acquisition – 27369 Square Meters
Estimated Cost: Php 136,775,000.00
|
April 20, 2022 |
2022 |
WIN2F05998 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Regional Office V |
UACS No.: 310201100871000
Project ID: P00606447LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Primary Roads – Daang Maharlika (LZ) – K0413+415 – K0415+515
Physical Target: CW1 – Road Widening – 4.17 Lane km.
Allocation: Php 104,250,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Primary Roads – Daang Maharlika (LZ) – K0413+415 – K0414+385
Physical Target: CW1 - Road Widening – 1.924 Lane km.
CW2 - Construction of Rode Slope Protection Structure – 2311.07 Square Meters
CW3 – Construction of Drainage Structure along Roads – 1893.6 Lineal Meters
ROW – Row Acquisition - 19240 Square Meters
Estimated Cost: Php 104,250,000.00
|
April 20, 2022 |
2022 |
WIN2F06183 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Regional Office V |
UACS No.: 310109100871000
Project ID: P00609355LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Rehabilitation/ Reconstruction of Road with Slips/ Slope Collapse and Landslide – Tertiary Roads - Nabua-Balatan Rd – K0490+000 – K0490+232
Physical Target: CW1 - Construction of Road Slope Protection Structure – 6111.111 Square Meter
Allocation: Php 110,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Rehabilitation/ Reconstruction of Road with Slips/ Slope Collapse and Landslide – Tertiary Roads - Nabua-Balatan Rd – K0490+640 – K0490+990
Physical Target: CW1 Construction of Road Slope Protection Structure – 5274.36 Square Meter
Estimated Cost: Php 110,000,000.00
|
April 20, 2022 |
2022 |
WIN2F05962 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Regional Office V |
UACS No.: 320101107580000
Project ID: P00620320LZ
AS PER GAA:
OO2 : Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/ Improvement/ Rehabilitation of Cadac-an River Flood Mitigation Structure Sta. 12+219.2 – Sta. 12+972 Right Side, Sta. 12+219.2 – Sta. 13+125 Left Side, Juban, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1104 Lineal Meters
Allocation: Php 181,000,000.00
AS MODIFIED:
OO2 : Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/ Improvement/ Rehabilitation of Cadac-an River Flood Mitigation Structure Sta. 12+260 – Sta. 12+308 Right Side, Sta. 11+792 – Sta. 12+848 Left Side, Juban, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1104 Lineal Meters
Estimated Cost: Php 181,000,000.00
|
April 20, 2022 |
2022 |
WIN2F06008 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Regional Office V |
UACS No.: 320101107581000
Project ID: P00620321LZ
AS PER GAA:
OO2 : Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/ Improvement/ Rehabilitation of Cadac-an River Flood Mitigation Structure, Sta. 23+817.2 – Sta. 24+638 Left Side, Sta. 23+817.2 – Sta. 24+655 Right Side, Irosin, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1374.57 Lineal Meters.
Allocation: Php 180,849,000.00
AS MODIFIED:
OO2 : Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/ Improvement/ Rehabilitation of Cadac-an River Flood Mitigation Structure, Sta. 23+752 – Sta. 24+575.57 Left Side, Sta. 23+806.5 – Sta. 24+357.5 Right Side, Irosin, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1374.57 Lineal Meters.
Estimated Cost: Php 180,849,000.00
|
April 20, 2022 |
2022 |
WIN2F05947 |
FY 2022 GAA RA 11639 |
December 29, 2021 |
Region V |
Regional Office V |
UACS No.: 300105200333000
Project ID: P00655008LZ
AS PER GAA:
LOCAL PROGRAM : Buildings and Other Structures – Multipurpose/ Facilities – National Building Program – Construction of Bicol University Convention and Disaster Risk Reduction Management Center, Legazpi City (Phase III)
Physical Target: CW1 - Construction of Multipurpose Building– 1 number of building
Allocation: Php 75,000,000.00
AS MODIFIED:
LOCAL PROGRAM : Buildings and Other Structures – Multipurpose/ Facilities – National Building Program – Construction of Bicol University Convention and Disaster Risk Reduction Management Center, Legazpi City (Phase IV)
Physical Target: CW1 - Construction of Multipurpose Building– 1 number of building
Estimated Cost: Php 75,000,000.00
|
April 20, 2022 |
2022 |
WIN2F06047 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Regional Office V |
UACS No.: 310205100576000
Project ID: P00608292LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads – Bacon-Manito Rd, Package 1, Sorsogon
Physical Target: CW1 - Construction of Concrete Road – 3.291 Lane km.
CW2 – Construction of Drainage Structure along Road – 1650 Lineal Meters
CW3 – Construction of Road Slope Protection Structure – 4000 Square Meters
Allocation: Php 100,000,000.00
AS MODIFIED:
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads – Bacon-Manito Rd, Package 1, Sorsogon
Physical Target: CW1 - Construction of Concrete Road – 2.356 Lane km.
CW2 - Construction of Drainage Structure along Road – 1400 Lineal Meters
CW3 – Construction of Road Slope Protection Structure – 1210.6 Square Meters
Estimated Cost: Php 100,000,000.00
|
April 20, 2022 |
2022 |
WIN2F05997 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Regional Office V |
UACS No.: 310205100577000
Project ID: P00608293LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads – Bacon-Manito Rd, Package 2, Sorsogon
Physical Target: CW1 - Construction of Road Slope Protection Structure – 5050 Square Meters
Allocation: Php 100,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads – Bacon-Manito Rd, Package 2, Sorsogon
Physical Target: CW1 - Construction of Road Slope Protection Structure – 3563.84 Square Meters
Estimated Cost: Php 100,000,000.00
|
April 20, 2022 |
2022 |
WIN2E02109 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 310102100853000
Project ID: P00601289MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads
FROM:
Surigao-Davao Coastal Rd (S00300MN) - K1461 + 099 - K1463 + 112, K1471 + 566 - K1473 + 506.44
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 11.933 Lane Km
Allocation:
TOTAL: P 101,000,000
CW1: P 97,465,000
EAO: P 3,535,000
Unit Cost:
CW1: P 8,167,686.25/Lane Km
TO:
Surigao-Davao Coastal Rd (S00300MN) - K1461+099 - K1463+112, K1463+112 - K1463+481, K1471+566 - K1473+506.44
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 12.670 Lane Km
Allocation:
TOTAL: P 101,000,000
CW1: P 97,465,000
EAO: P 3,535,000
Unit Cost:
CW1: P 7,692,580.90/Lane Km |
April 20, 2022 |
2022 |
WIN2E02156 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 310203100535000
Project ID: P00602516MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System – Network Development Program - Road Widening - Tertiary Roads
FROM:
Butuan City-Malaybalay Rd - K1246 + 400 - K1247 + 525, K1250 + 878 - K1252 + 631
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 5.699 Lane Km
Allocation:
TOTAL: P 101,000,000
CW1: P 97,465,000
EAO: P 3,535,000
Unit Cost:
CW1: 17,102,123.17/Lane Km
TO:
Butuan City-Malaybalay Rd - K1246 + 428 - K1247 + 000, K1250 + 878 - K1252 + 640
Type of Work:
CW1- Road Widening
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 4.660 Lane Km
CW2- 1,577.10 Square meters
Allocation:
TOTAL: P 101,000,000
CW1: P 79,919,756
CW2: P 17,545,244
EAO: P 3,535,000
Unit Cost:
CW1: P 17,150,162.23/Lane Km
CW2: P 11,125.00/Square meters
|
April 20, 2022 |
2022 |
WIN2E02168 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 300214100093000
Project ID: P00633704MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
FROM:
Preventive Maintenance along Daang Maharlika (Agusan-Davao Sect) - K1248 + 550 - K1250 + 098, K1250 + 098 - K1251 + 000, K1251 + 542 - K1253 + 264, K1265 + 605 - K1266 + 622, K1266 + 622 - K1267 + 569, K1268 + 003 - K1270 + 110, K1273 + 043 - K1273 + 892, K1274 + 384 - K1276 + 000, K1276 + 000 - K1276 + 672, K1276 + 672 - K1276 + 994, K1277 + 678 - K1278 + 073, K1278 + 696 - K1278 + 862
Type of Work:
CW1- Preventive Maintenance of Road: Concrete Reblocking
Physical Target:
CW1- 7.649 Lane Km
Allocation:
TOTAL: P 140,000,000
CW1: P 135,100,000
EAO: P 4,900,00
Unit Cost:
CW1: P 17,662,440/Lane Km
TO:
Preventive Maintenance along Daang Maharlika (Agusan-Davao Sect) - K1248+550 - K1250+098, K1250+098 - K1251+000, K1251+542 - K1253+264, K1265+605 - K1266+622, K1266+622 - K1267+569, K1268+003 - K1268+613.50
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 17.847 Lane Km
Allocation:
TOTAL: P 140,000,000
CW1: P 135,100,000
EAO: P 4,900,00
Unit Cost:
CW1: P 7,569,899.70/Lane Km
|
April 20, 2022 |
2022 |
WIN2E02167 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 310101100595000
Project ID: P00601290MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
FROM:
Jct Lingig-Trento Rd (S00312MN) - K1472 + (-647) - K1474 + 542.18
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 12.533 Lane Km
Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000
Unit Cost:
CW1: P 8,084,656.51/Lane Km
TO:
Jct Lingig-Trento Rd (S00312MN) - K1472 + (-647) - K1474 + 815.55
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 13.850 Lane Km
Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000
Unit Cost:
CW1: P 7,315,884.48/Lane Km |
April 19, 2022 |
2022 |
WIN2F06099 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Albay 1st Engineering Office |
UACS No.: 300217100033000
Project ID: P00636994LZ
AS PER GAA:
CSSP : Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jursidictions) – Construction of Road, Salvacion – Santicon – Sulong – Napao, Polangui, Albay
Physical Target: CW1 - Construction of Concrete Road – 10.03 Lane km.
Allocation: Php 99,000.00
AS MODIFIED:
OO1 : Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jursidictions) – Construction of Road, Salvacion – Santicon – Sulong – Napao, Bacacay, Albay
Physical Target: CW1 - Reconstruction of Concrete Pavement – 10.03 Lane Km
Allocation: Php 99,000.00
Estimated Cost: Php 20,057,000.00
|
April 19, 2022 |
2022 |
WIN2F06160 |
SR2022-02-000858 |
February 3, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Cong. Andres Acop Cosalan Rd - K0315 + 736 - K0315 + 918;
Physical Target: 8,333.330 Square meters;
Allocation: Php 150,000,000.000
To: Cong. Andres Acop Cosalan Rd - K0315 + 693 - K0315 + 930;
Physical Target: 6,188.000 Square meters;
Allocation: Php 150,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06050 |
SR2022-02-001173 |
February 4, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Gov. Bado Dangwa National Rd - K0338 + 700 - K0338 + 900;
Physical Target: 8333.340 Square meters;
Allocation: Php 150,000,000.000
To: Gov. Bado Dangwa National Rd - K0338 + 753 - K0338 + 914;
Physical Target: 6,124.700 Square meters;
Allocation: Php 150,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06011 |
SR2022-02-001178 |
February 4, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Gov. Bado Dangwa National Rd - K0339 + 334 - K0339 + 500;
Physical Target: 8333.340 Square meters;
Allocation: Php 150,000,000.000
To: Gov. Bado Dangwa National Rd - K0339 + 323 - K0339 + 548;
Physical Target: 6,247.200 Square meters;
Allocation: Php 150,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06018 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 310104100408000
Project ID: P00603937LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System Asset Preservation – Rehabilitiation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads- Daang Maharlika (LZ) – K0533+000 – K0533+600
Physical Target: CW1 – Reconstruction to Concrete Pavement – 1.2 Lane km.
Allocation: Php 20,057,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System Asset Preservation – Rehabilitiation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads- Daang Maharlika (LZ) – K0527+405 – K0527+647, K0532+624 – K0532+880, K0533+000 – K0533+600
Physical Target: CW1 - Reconstruction to Concrete Pavement – 2.196 Lane Km
Allocation: Php 20,057,000.00
|
April 19, 2022 |
2022 |
WIN2F06079 |
SR2022-02-000899 |
February 3, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Banaue-Hungduan-Benguet Bdry Rd - K0366 + 000 - K0366 + 150;
Physical Target: 7,200.000 Square meters;
Allocation: Php 60,000,000.000
To: Banaue-Hungduan-Benguet Bdry Rd - K0366 + 000 - K0366 + 070;
Physical Target: 2,280.000 Square meters;
Allocation: Php 60,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06018 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 310104100353000
Project ID: P00603938LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads - Daang Maharlika (LZ) – K0536+000 – K0537+840
Physical Target: CW1 – Reconstruction to Concrete Pavement – 3.774 Lane km.
Allocation: Php 63,079,235.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads - Daang Maharlika (LZ) – K0527+647 – K0528+460, K0530+000 – K0532+000
Physical Target: CW1 - Reconstruction to Concrete Pavement – 5.626 Lane km.
Estimated Cost: Php 63,079,235.00
|
April 19, 2022 |
2022 |
WIN2F06127 |
SR2022-03-006711 |
March 21, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Preventive Maintenance (Asphalt Overlay) along Baguio-Bontoc Rd - K0329 + 394 - K0330 + 600, K0330 + 850 - K0336 + 400;
Physical Target: 7.538 Lane Km;
Allocation: Php 100,000,000.000
To: Preventive Maintenance (Asphalt Overlay) along Baguio-Bontoc Rd - K0312 + 600 - K0320 + 600;
Physical Target: 15.860 Lane Km;
Allocation: Php 100,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06188 |
SR2022-02-001910 |
February 4, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Preventive Maintenance (Asphalt Overlay) along Gov. Bado Dangwa National Rd - K0308 + 500 - K0318 + 167;
Physical Target: 15.077 Lane Km;
Allocation: Php 200,000,000.000
To: Preventive Maintenance (Asphalt Overlay) along Gov. Bado Dangwa National Rd - K0308 + 500 - K0318 + 167, K0319 + (-840) - K0320 + 100;
Physical Target: 23.028 Lane Km;
Allocation: Php 200,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06222 |
SR2022-03-007782 |
March 23, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Preventive Maintenance along Itogon-Dalupirip-San Manuel Bdry ;
Type of Work: Preventive Maintenance of Road: Concrete Reblocking;
Physical Target: 10.790 Lane Km;
Allocation: Php 90,000,000.000
To: Preventive Maintenance along Itogon-Dalupirip-San Manuel Bdry ;
Type of Work: Preventive Maintenance of Road: Asphalt Overlay;
Physical Target: 10.790 Lane Km;
Allocation: Php 90,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06184 |
SR2022-03-007619 |
March 23, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Kalinga Rd - K0449 + 100 - K0449 + 250;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000
To: Abra-Kalinga Rd - K0449 + 100 - K0449 + 250;
Physical Target: 3,404.880 Square meters;
Allocation: Php 100,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06210 |
SR2022-03-007623 |
March 23, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Kalinga Rd - K0450 + 100 - K0450 + 200;
Physical Target: 3,055.560 Square meters;
Allocation: Php 55,000,000.000
To: Abra-Kalinga Rd - K0450 + 100 - K0450 + 200;
Physical Target: 1,830.500 Square meters;
Allocation: Php 55,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06211 |
SR2022-03-007625 |
March 23, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Kalinga Rd - K0450 + 700 - K0450 + 810;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000
To: Abra-Kalinga Rd - K0450 + 700 - K0450 + 810;
Physical Target: 3,404.000 Square meters;
Allocation: Php 100,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06155 |
SR2022-03-007628 |
March 23, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Kalinga Rd - K0451 + 000 - K0451 + 150;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000
To: Abra-Kalinga Rd - K0451 + 000 - K0451 + 150;
Physical Target: 3,404.720 Square meters;
Allocation: Php 100,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06216 |
SR2022-03-007630 |
March 23, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Kalinga Rd - K0451 + 450 - K0451 + 600;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06098 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Albay 2nd Engineering Office |
UACS No.: 310111100431000
Project ID: P00604133LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation- Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Secondary Roads – Legazpi City-Punta de Jesus Rd – K0532+000 – K0532+700, K0536+800 – K0537+607
Physical Target: CW1 – Construction of Drainage Structure along Road – 3014 Lineal Meter.
Allocation: Php 50,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation- Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Secondary Roads – Legazpi City-Punta de Jesus Rd – K0532+000 – K0532+700, K0536+800 – K0537+607, K0566+050 – K0566+280
Physical Target: CW1 - Construction of Drainage Structure along Road – 1699 Lineal Meter.
Estimated Cost: Php 50,000,000.00
|
April 19, 2022 |
2022 |
WIN2F05990 |
FY 2022 GAA RA 11639 |
December 30, 2022 |
Region V |
Camarines Norte District Engineering Office |
UACS No.: 300221101271000
Project ID: P00640381LZ
AS PER GAA:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s Leading to Major/ Strategic Public Buildings/ Facilities – Construction of Road, Barangay Pinagbitayan Maliit, Paracale, Camarines Norte
Physical Target: CW1 - Construction of Concrete Road – 1.332 Lane km.
CW2 – Construction of Road Slope Protection Structure – 1904.06 Square Meters
Allocation: Php 25,000,000.00
AS MODIFIED:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s Leading to Major/ Strategic Public Buildings/ Facilities – Construction of Road, Barangay Pinagbirayan Munti, Paracale, Camarines Norte
Physical Target: CW1 - Construction of Concrete Road – 1.332 Lane km.
CW2 – Construction of Road Slope Protection Structure – 1904.06 Square Meters
Estimated Cost: Php 25,000,000.00
|
April 19, 2022 |
2022 |
WIN2F06078 |
SR2022-03-007635 |
March 23, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Kalinga Rd - K0454 + 700 - K0454 + 820;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000
To: Abra-Kalinga Rd - K0454 + 700 - K0454 + 820;
Physical Target: 3,404.880 Square meters;
Allocation: Php 100,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06187 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310102100958000
Project ID: P00603952LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Preventive Maintenance – Secondary Roads - Pili-Tigaon-Albay Bdry Rd – K0465+168 – K0468+310
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 6.258 Lane km.
Allocation: Php 40,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Preventive Maintenance – Secondary Roads - Pili-Tigaon-Albay Bdry Rd – K0465+168 – K0467+476.20
Physical Target: CW1 - Preventive Maintenance of Road: Asphalt Overlay – 4.6504 Lane km.
Estimated Cost: Php 40,000,000.00
|
April 19, 2022 |
2022 |
WIN2F06173 |
SR2022-03-007638 |
March 23, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Abra-Kalinga Rd - K0455 + 280 - K0455 + 400;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000
To: Abra-Kalinga Rd - K0455 + 280 - K0455 + 400;
Physical Target: 3,404.880 Square meters;
Allocation: Php 100,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06165 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310103100964000
Project ID: P00603955LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Preventive Maintenance – Tertiary Roads – Naga City Bdry-Calabanga-Balongay Rd – K0449+000 – K0451+000
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 4.198 Lane km.
Allocation: Php 27,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Preventive Maintenance – Tertiary Roads – Naga City Bdry-Calabanga-Balongay Rd – K0448+986.90 – K0450+714.50
Physical Target: CW1 - Preventive Maintenance of Road: Asphalt Overlay – 3.4892 Lane km.
Estimated Cost: Php 27,000,000.00
|
April 19, 2022 |
2022 |
WIN2F05950 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310112100320000
Project ID: P00604140LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads – Naga-Carolina-Panicuason Rd – K0441+000 – K0442+690
Physical Target: CW1 – Construction of Drainage Structure along Road – 3370 Lineal Meters.
Allocation: Php 37,657,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads – Naga-Carolina-Panicuason Rd – K0441+000 – K0441+748
Physical Target: CW1 - Construction of Drainage Structure along Road – 1496 Lineal Meters.
Estimated Cost: Php 37,657,000.00
|
April 19, 2022 |
2022 |
WIN2F06147 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310209100368000
Project ID: P00606415LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement – Tertiary Roads – Naga-Carolina-Panicuason Rd – K0438+(-235) – K0438+600
Physical Target: CW1 – Off-Carriageway Improvement: Paving of Shoulders – 3340 Square Meters.
Allocation: Php 25,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement – Tertiary Roads – Naga-Carolina-Panicuason Rd – K0438+(-015) – K0438+583
Physical Target: CW1 - Off-Carriageway Improvement: Paving of Shoulders – 2392 Square Meters.
Estimated Cost: Php 25,000,000.00
|
April 19, 2022 |
2022 |
WIN2F06175 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Abang Flood Control Structure (Phase 2), Barangay Abang, Bucay, Abra;
Physical Target: 264.000 Lineal meters;
Allocation: Php 50,000,000.000
To: Construction of Abang Flood Control Structure (Phase 2), Barangay Abang, Bucay, Abra;
Physical Target: 167.600 Lineal meters;
Allocation: Php 50,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06129 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Abang Flood Control, Barangay Abang, Bucay, Abra;
Physical Target: 430.000 Lineal meters;
Allocation: Php 50,000,000.000
To: Construction of Abang Flood Control, Barangay Abang, Bucay, Abra;
Physical Target: 172.400 Lineal meters;
Allocation: Php 50,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06088 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Bangcagan Flood Control Structure, Barangay Bangcagan, Bucay, Abra;
Physical Target: 442.321 Lineal meters;
Allocation: Php 50,000,000.000
To: Construction of Bangcagan Flood Control Structure, Barangay Bangcagan, Bucay, Abra;
Physical Target: 612.000 Lineal meters;
Allocation: Php 50,000,000.000
|
April 19, 2022 |
2022 |
WIN2F05987 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 310103100807000
Project ID: P00610156LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Preventive Maintenance – Tertiary Roads - Hanawan-Consocep Rd – K0470+(-594) – K0474+679
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 11.732 Lane km.
Allocation: Php 98,950,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Preventive Maintenance – Tertiary Roads - Hanawan-Consocep Rd – K0470+(-594) – K0473+615
Physical Target: CW1 - Preventive Maintenance of Road: Asphalt Overlay – 8.7289 Lane km.
CW2 - Construction of Drainage Structure along Road – 1,729.450 Lineal meters
Estimated Cost: Php 98,950,000.00
|
April 19, 2022 |
2022 |
WIN2F06174 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Deet - Balingasa Flood Control, Barangay Deet, Tayum, Abra;
Physical Target: 442.321 Lineal meters;
Allocation: Php 50,000,000.000
To: Construction of Deet - Balingasa Flood Control, Barangay Deet, Tayum, Abra;
Physical Target: 458.310 Lineal meters;
Allocation: Php 50,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06093 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 320101107527000
Project ID: P00621520LZ
AS PER GAA:
OO2 : Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainages Systems – Construction/ Rehabilitation/ Improvement of Flood Mitigation Structure, Bicol River Flood Control, Brgy. Fundado (Fundado Section – Left Side), Magarao, Camarines Sur
Physical Target: CW1 – Construction of Flood Mitigation Structure – 391 Lineal Meters
Allocation: Php 70,000,000.00
AS MODIFIED:
OO2 : Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainages Systems – Construction/ Rehabilitation/ Improvement of Flood Mitigation Structure, Bicol River Flood Control, Brgy. Barobaybay (Barobaybay Section – Left Side), Magarao, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 391 Lineal Meters
Estimated Cost: Php 70,000,000.00
|
April 19, 2022 |
2022 |
WIN2F06219 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Malanas Flood Control, Malanas, San Juan, Abra;
Physical Target: 442.321 Lineal meters;
Allocation: Php 50,000,000.000
To: Construction of Malanas Flood Control, Malanas, San Juan, Abra;
Physical Target: 414.000 Lineal meters;
Allocation: Php 50,000,000.000
|
April 19, 2022 |
2022 |
WIN2F05973 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 300225100473000
Project ID: P00632964LZ
AS PER GAA:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Flood Mitigation Structures Protecting Public Infrastructures/Facilities – Construction of Flood Mitigation Structure of San Jose to Caditaan Creek, Barangay Pawili, Pili, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 93.6 Lineal Meters.
Allocation: Php 5,000,000.00
AS MODIFIED:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Flood Mitigation Structures Protecting Public Infrastructures/Facilities – Construction of Flood Mitigation Structure of San Jose Creek, Barangay San Jose, Pili, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 93.6 Lineal Meters.
Estimated Cost: Php 5,000,000.00
|
April 19, 2022 |
2022 |
WIN2F06161 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Construction of Pagala Flood Control Structure (Phase 2), Barangay Pagala, Bucay, Abra;
Physical Target: 442.321 Lineal meters;
Allocation: Php 50,000,000.000
To: Construction of Pagala Flood Control Structure (Phase 2), Barangay Pagala, Bucay, Abra;
Physical Target: 470.000 Lineal meters;
Allocation: Php 50,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06162 |
FY 2022 GAA RA 11639 |
December 30, 2021 |
Region V |
Camarines Sur 3rd District Engineering Office |
UACS No.: 300225100476000
Project ID: P00640581LZ
AS PER GAA:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Flood Mitigation Structures Protecting Public Infrastructures/ Facilities – Construction of Slope Protection (Riprapping), Brgy. Carangcay, Magarao, Camarines Sur
Physical Target: CW1 - Construction of Slope Protection Structure – 1550 Square Meters.
Allocation: Php 30,000,000.00
AS MODIFIED:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Flood Mitigation Structures Protecting Public Infrastructures/ Facilities – Construction of Slope Protection (Riprapping), Brgy. Carangcang, Magarao, Camarines Sur
Physical Target: CW1 - Construction of Slope Protection Structure – 1550 Square Meters.
Estimated Cost: Php 30,000,000.00
|
April 19, 2022 |
2022 |
WIN2F06182 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
From: Construction of Sta. Filomena Flood Control Structure, Sta. 0 + 810 - Sta. 1 + 310, Calanasan, Apayao;
Physical Target: 500.000 Lineal meters;
Allocation: Php 50,000,000.000
To: Construction of Sta. Filomena Flood Control Structure, Sta. 0+ 440 - Sta. 1+ 400, Calanasan, Apayao;
Physical Target: 960.000 Lineal meters;
Allocation: Php 50,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06077 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Baguio City District Engineering Office |
From: Sto Tomas-Mt Cabuyo Rd – K0252 + 291 – K0253 + 049;
Physical Target: 491.000 Lineal meters;
Allocation: Php 25,000,000.000
To: Sto Tomas-Mt Cabuyo Rd – K0252 + 160 – K0253 + 049;
Physical Target: 622.000 Lineal meters;
Allocation: Php 25,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06070 |
SARO-BMB-A-22-0002928 |
March 21, 2022 |
Cordillera Administrative Region |
Baguio City District Engineering Office |
From: Construction of Road located at Purok 4, Monticello, Barangay Camp 7,Baguio City;
Physical Target: 0.500 Lane Km;
Allocation: Php 5,000,000.000
To: Construction of Road located at Purok 2, Monticello, Barangay Camp 7;
Physical Target: 0.275 Lane Km;
Allocation: Php 5,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06012 |
SR2022-03-007744 |
March 23, 2022 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: Shilan-Beckel Rd - K0261+892 - K0262+890, K0264+908 - K0265+943;
Physical Target: 3.878 Lane Km;
Allocation: Php 66,000,000.000
To: Shilan-Beckel Rd - K0262+056 - K0262+284.5, K0262+355.5 - K0262+780, K0264+925 - K0265+943;
Physical Target: 3.326 Lane Km;
Allocation: Php 66,000,000.000
|
April 19, 2022 |
2022 |
WIN2F06051 |
SR2022-03-007745 |
March 23, 2022 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: Baguio-Itogon Rd – K0259+050 - K0259+150, K0259+204 - K0259+480, K0259+534 - K0261+000;
Physical Target: 3.520 Lane Km;
Allocation: Php 93,400,000.000
To: Baguio-Itogon Rd – K0259+050 - K0259+150, K0259+204 - K0259+480, K0259+534 - K0260+690, K0260+735 - K0261+000;
Physical Target: 3.430 Lane Km;
Allocation: Php 93,400,000.000
|
April 19, 2022 |
2022 |
WIN2F06132 |
SARO-BMB-A-22-0002929 |
March 21, 2022 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: Baguio-Bauang Rd - K0284+500 - K0284+507, K0290+410 - K0290+420, K0291+170 - K0291+270;
Physical Target: 766.800 Square Meters;
Allocation: Php 14,100,000.000
To: Baguio-Bauang Rd - K0291+164 - K0291+290;
Physical Target: 1,044.000 Square Meters;
Allocation: Php 14,100,000.000
|