Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
April 23, 2022 2022 WIN2F06324 GAA 2022 January 2, 2022 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From: Construction of Flood Control Structure, Sta. 27+000 - Sta. 27+490, Busilac, Alfonso Lista, Ifugao;
Physical Target: 150.000 Lineal Meters;
Allocation: Php 24,500,000.000

To: Construction of Flood Control Structure, Sta. 27+140 - Sta. 27+490, Busilac, Alfonso Lista, Ifugao;
Physical Target: 350.000 Lineal Meters;
Allocation: Php 24,500,000.000

April 23, 2022 2022 WIN2F06336 GAA 2022 January 2, 2022 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From: Construction of Mapacopaco Flood Control Structure, Sta. 41+000 - Sta. 41+670, Posnaan, Aguinaldo, Ifugao;
Physical Target: 150.000 Lineal Meters;
Allocation: Php 32,467,000.000

To: Construction of Mapacopaco Flood Control Structure, Sta. 41+000 - Sta. 41+510, Posnaan, Aguinaldo, Ifugao;
Physical Target: 510.000 Lineal Meters;
Allocation: Php 32,467,000.000

April 23, 2022 2022 WIN2F06341 GAA 2022 January 2, 2022 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From: Construction of Mapacopaco Flood Control Structure, Sta. 42+555 - Sta. 43+000, Posnaan, Aguinaldo, Ifugao;
Physical Target: 150.000 Lineal Meters;
Allocation: Php 21,217,000.000

To: Construction of Mapacopaco Flood Control Structure, Sta. 42+555 - Sta. 42+913.60, Posnaan, Aguinaldo, Ifugao;
Physical Target: 346.000 Lineal Meters;
Allocation: Php 21,217,000.000

April 23, 2022 2022 WIN2F06337 SARO-BMB-A-22-0002938 March 21, 2022 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From: Construction of Flood Mitigation Structures along Magat River, Sta. 39 + 563 - Sta. 40 + 975, Sta. 41 + 668 - Sta. 41 + 706, San Juan and Calupaan, Alfonso Lista, Ifugao;
Physical Target: 512.000 Lineal Meters;
Allocation: Php 50,000,000.000

To: Construction of Flood Mitigation Structures along Magat River, Sta. 39 + 563 - Sta. 40 + 075, San Juan, Alfonso Lista, Ifugao;
Physical Target: 512.000 Lineal Meters;
Allocation: Php 50,000,000.000

April 23, 2022 2022 WIN2F06313 SARO-BMB-A-22-0002938 March 21, 2022 Cordillera Administrative Region Ifugao 2nd District Engineering Office
From: Construction of Namillangan Flood Control ta. 45+500- Sta. 48+100 (L/S) Namillangan, Alfonso Lista, Ifugao;
Physical Target: 491.500 Lineal Meters;
Allocation: Php 50,000,000.000

To: Construction of Namillangan Flood Control Sta. 43+700- Sta. 44+217.5 (R/S) Namillangan, Alfonso Lista, Ifugao;
Physical Target: 491.500 Lineal Meters;
Allocation: Php 50,000,000.000

April 22, 2022 2022 WIN2F06225 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

A Castañeda - Ma. Aurora - San Luis Rd - K0196+506 - K0196+533, K0198+530 - K0198+555, K0198+572 - K0198+580, K0198+950 - K0198+980, K0202+932 - K0202+950
April 22, 2022 2022 WIN2F06288 FY 2022 GAA December 30, 2021 Region III Pampanga 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Sn Antonio - Floridablanca Rd - K0081+134.30 - K0082+358.60, K0082+358.60 - K0082+760, K0088+09720 - K0089+057.71
April 22, 2022 2022 WIN2F06172 FY 2022 GAA December 30, 2021 Region III Pampanga 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Angeles - Porac - Floridablanca - Dinalupihan Rd - K0088+000 - K0089+000, K0089+1320 - K0090+000, K0090+000 - K0090+683.50
April 22, 2022 FY 2022 WIN2C03520 UACS No. 310103100844000 February 22, 2022 National Capital Region North Manila District Engineering Office
As per GAA/Original
UACS No. 310103100844000
Project ID.: P00603558LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
G. Tuazon St – K0009+(-110) – K0009+000, K0009+(-237) – K0009+(-110),
K0009+(-434))+(-237), K0009+000-K0009+437
Physical Target: CW1- Preventive Maintenance of Road: Concrete Reblocking=0.871 lane Km
Unit Cost = P 3,375,431/lane km
Allocation = P 2,940,000
EAO = P 60,000
Total = P 3,000,000

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
G. Tuazon St – K0009+414.30-K0009+264.0
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay=0.301 lane Km
Unit Cost = P 9,767,442/lane km
Allocation = P 2,940,000
EAO = P 60,000
Total = P 3,000,000
WIN2C03520
April 22, 2022 2022 WIN2F06255 FY 2022 GAA December 30, 2021 Region III Nueva Ecija 1st District Engineering Office
Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructure /Facilities

Construction of Drainage Canal, Brgy. Poblacion, Guimba, Nueva Ecija

April 21, 2022 2022 WIN2F06284 FY 2022 GAA December 30, 2021 Region III Nueva Ecija 2nd District Engineering Office
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R. A. 11239

Repair/Rehabilitation/Improvement along Daang Maharlika (LZ) - K0084+380 - K0084+499, K0084+576 - K0084+613, K0087+780 - K0088+000, K0088+450 - K0088+491, K0088+540 - K0088+595, K0088+820 - K0089+020, K0090+543.3 - K0090+780, K0090+904.50 - K0091+006.30
April 21, 2022 2022 WIN2F06227 FY 2022 GAA December 30, 2021 Region III Bulacan 2nd District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Meycauayan - Camalig - Bahay Pari Rd - K0023+000 - K0023+084
April 21, 2022 2022 WIN2F06230 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Roads leading to Major / Strategic Public Buildings / Facilities

Construction of Suguit - Punglo Road, Maria Aurora, Aurora
April 21, 2022 2022 WIN2F06230 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Roads leading to Major / Strategic Public Buildings / Facilities

Construction of Suguit - Punglo Road, Maria Aurora, Aurora
April 21, 2022 2022 WIN2F06253 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and / or Bridges from the National Road/s leading to Major / Strategic Public Buildings / Facilities

Construction of Road (Baler - San Luis - Dingalan), Baler, Aurora
April 21, 2022 2022 WIN2F06223 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Madella-Dinadiawan Rd - K0409+150 - K0409+220, K0409+300 - K0409+348, K0409+550 - K0409+565, K0409+650 - K0409+665, K0409+750 - K0409+790, K0410+050 - K0410+096, K0410+150 - K0410+162, K0410+635 - K0410+670, K0411+100 - K0411+115, K0411+250 - K0411+260, K0411+810 - K0411+825, K0412+180 - K0412+195, K0418+920 - K0419+004, K0419+050 - K0419+080, K0419+100 - K0419+115, K0419+400 - K0419+472, K0419+500 - K0419+536
April 21, 2022 2022 WIN2F06224 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Network Development Program - Off-Carriageway Improvement - Secondary Roads

Baler - Casiguran Rd (Dinadiawan - Casiguran Sect) - K0339+275 - K0339+431, K0339+606 - K0340+023, K0340+845 - K0342+292
April 21, 2022 2022 WIN2F06250 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Nueva Ecija - Aurora Road - K0174+300 - K0174+312.56, K0174+900 - K0174+927, K0176+470 - K0176+497, K0176+610 - K0176+622.56, K0177+311 - K0177+323, K0177+450 - K0177+456, K0177+600 - K0177+612, K0177+760 - K0177+775, K0177+850 - K0177+862, K0178+450 - K0178+475, K0179+475 - K0179+661, K0185+300 - K0185+315, K0186+500 - K0186+512.56, K0187+600 - K0187+606, K0189+300 - K0189+312, K0192+100 - K0192+112, K0192+122 - K0192+131, K0192+200 - K0192+215.84, K0192+950 - K0192+962, K0198+450 - K0198+474, K0199+150 - K0199+237, K0210+965 - K0210+977.56, K0214+300 - K0214+312.56
April 21, 2022 2022 WIN2G02623 FY 2022 GAA RA 11639 January 3, 2022 Region VI Aklan District Engineering Office
UACS No. 310202101157000
Project ID: P00604800VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

Aklan East Rd - K0298 + 000 - K0299 + 000, K0309 + 369 - K0309 + 372, K0309 + 747 - K0309 + 791, K0316 + 677 - K0317 + 171, K0317 + 211 - K0317 + 890, K0322 + 737 - K0322 + 840

CW1 - Road Widening : 4.556 lane km - 45,820.88
EAO - 935.12


TO:

OO1: Ensure Safe and Reliable National Road System


Network Development - Road Widening - Secondary Roads

Aklan East Rd - K0299 + 652 - K0301 + 000

CW1 - Road Widening : 2.696 lane km - 41,813.16
ROW Acquisition: 263.70 sq.m. - 4,007.72
EAO - 935.12

April 21, 2022 2022 WIN2G02624 SR2022-02-001265 February 4, 2022 Region VI Aklan District Engineering Office
UACS No. 310208100393000
Project ID: P00604793VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement - Secondary Roads

Aklan East Rd - K0276 + 000 - K0276 + 061, K0278 + 000 - K0278 + 175, K0281 + 281 - K0282 + 726, K0284 + 539 - K0285 + 471, K0309 + 791 - K0311 + 854, K0311 + 923 - K0315 + 895, K0316 + 295 - K0316 + 677

CW1 - Off-Carriageway Improvement: Paving of Shoulders:
25,149.00 sq.m. - 63,097.490

CW2 - Off-Carriageway Improvement: Construction of Sidewalk: 109.50 sq.m. - 211.335

EAO - 2,296.175

TO:

OO1: Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement - Secondary Roads

Aklan East Rd - K0277 + 720 - K0278 + 020, K0278 + 215 - K0280 + 070, K0279 + 700 - K0279 + 785, K0279 + 785 - K0280 + 820, K0280 + 070 -K0280 + 300, K0280 + 820 - K0282 + 000, K0281 + 170 - K0282 + 200, K0282 + 000 -K0282 + 980, K0282 + 440 - K0285 + 380, K0282 + 980 - K0283 + 070, K0283 + 215 -K0285 + 380, K0311 + 000 - K0311 + 775, K0312 + 410 - K0313 + 500, K0313 + 185 -K0315 + 250, K0313 + 185 - K0315 + 405, K0315 + 582 - K0315 + 875, K0315 + 670 - K0315 + 875, K0315 + 915 - K0316 + 290

CW1 - Off-Carriageway Improvement: Paving of Shoulders:
18,117.50 sq.m. - 61,889.825

CW2 - Off-Carriageway Improvement: Construction of Sidewalk:
2,706.00 sq.m. - 219.00

ROW Acquisition: 600.00 sq.m. - 1,200.00

EAO - 2,296.175



April 21, 2022 2022 WIN2G02622 SR2022-02-000179 February 3, 2022 Region VI Aklan District Engineering Office
UACS No. 310102100830000
Project ID: P00603617VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

Aklan East Rd (S00322PN) - K0278 + 237 - K0279 + 782, K0281 + 000 - K0282 + 000

CW1- Preventive Maintenance of Road: Asphalt Overlay:
9.952 lane km - 78,315.54

EAO - 2,840.46

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

Aklan East Rd (S00322PN) - K0276 + 000 - K0278 + 082, K0286 + 045 - K0290 + 113

CW1- Preventive Maintenance of Road: Asphalt Overlay:
16.516 lane km - 78,315.54

EAO - 2,840.46
April 21, 2022 2022 WIN2G02625 FY 2022 GAA RA 11639 January 3, 2022 Region VI Aklan District Engineering Office
UACS No. 310108101163000
Project ID: P00604062VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Aklan West Rd (Kalibo-Nabas) - K0264 + 450 - K0264 + 520, K0265 + 400 - K0265 + 430

CW1- Construction of Road Slope Protection Structure:
2,000.00 sq.m. - 19,600.00

EAO - 400.00

TO:

OO1: Ensure Safe and Reliable National Road System


Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Aklan West Rd (Kalibo-Nabas) - K0262 + 940 - K0262 + 990, K0264 + 450 - K0264 + 570, K0265 + 400 - K0265 + 460, K0266 + 000 -K0266 + 080


CW1- Construction of Road Slope Protection Structure:
1,360.00 sq.m. - 19,600.00

EAO - 400.00

April 21, 2022 2022 WIN2G02626 SR2022-02-001270 February 4, 2022 Region VI Aklan District Engineering Office
UACS No. 310208100394000
Project ID: P00604794VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement - Secondary Roads

Aklan West Rd (Kalibo-Nabas) - K0234 + (-905) - K0234 + 579, K0234 + 856 - K0236 + 575, K0236 + 724 - K0237 + 430, K0238 + 704 - K0239 + 246, K0240 + 000 - K0240 + 086

CW1 - Off-Carriageway Improvement: Paving of Shoulders:
12,931.50 sq.m. - 81,131.41

EAO - 2,942.59

TO:

OO1: Ensure Safe and Reliable National Road System

Network Development - Off-Carriageway Improvement - Secondary Roads

Aklan West Rd (Kalibo-Nabas) - K0238 + 704 - K0239 + 150, K0238 + 704 - K0239 + 246, K0239 + 620-K0239 + 246, K0254 + 000 - K0254 + 300, K0254 + 000 -K0254 + 630, K0258 + 400 - K0259 + 380, K0265 + 600 -K0266 + 800, K0271 + 640 - K0272 + 020, K0272 + 145 - K0274 + 440, K0272 + 145 -K0273 + 640, K0274 + 440 - K0275 + 080, K0275 + 130 - K0275 + 360

CW1 - Off-Carriageway Improvement: Paving of Shoulders:
30,609.70 sq.m. - 81,131.41

EAO - 2,942.59
April 21, 2022 2022 WIN2G02629 SR2022-02-000274 February 3, 2022 Region VI Regional Office VI
UACS No. 310109100880000
Project ID: P00604080VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Lambunao-INCA Rd - K0048 + 700 - K0048 + 920

CW1- Construction of Road Slope Protection Structure:
3,333.33 sq.m - 57,900.00

EAO - 2,100.00

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Lambunao-INCA Rd – K0059 + 405 – K0059 + 446.10

CW1- Construction of Road Slope Protection Structure:
2,599.257 sq.m - 57,900.00

EAO - 2,100.00

April 21, 2022 2022 WIN2G02627 SR2022-02-000249 February 3, 2022 Region VI Regional Office VI
UACS No. 310109100874000
Project ID: P00604084VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Jct Bancal-Leon-Antique Bdry Rd - K0041 + 790 - K0041 + 820, K0049 + 000 - K0049 + 114

CW1- Construction of Road Slope Protection Structure:
3,888.89 sq.m - 67,550.00

EAO - 2,450.00

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Jct Bancal-Leon-Antique Bdry Rd - K0041 + 593 - K0041 + 623

CW1- Construction of Road Slope Protection Structure:
3,099.95 sq.m - 67,550.00

EAO - 2,450.00

April 21, 2022 2022 WIN2F06246 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Nueva Ecija - Aurora Rd - K0171+200 - K0171+305
April 21, 2022 2022 WIN2F06283 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads

Baler-Casiguran Rd (Baler-Dinadiawan) - K0242+327 - K0242+870, K0245+700 - K0245+877, K0252+444 - K0252+784.08
April 21, 2022 2022 WIN2F06231 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Baler-Casiguran Rd (Baler-Dinadiawan) - K0277+420 - K0277+435, K0278+400 - K0278+415, K0278+800 - K0278+815, K0279+700 - K0279+721, K0280+050-K0280+071
April 20, 2022 FY 2022 WIN2C03522 UACS No. 300220100188000 February 8, 2022 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 300220100188000
Project ID.: P00637105LZ
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of 6-Storey Multi-purpose Building (Government Center) Package 9, Brgy. St. Joseph,
San Juan City
Physical Target: CW1-Construction of Multi-Purpose Building = 1.0 No. of Building
Unit Cost = P 7,840,000/no. of bldg.
Allocation = P 7,840,000
EAO = P 160,000
Total = P 8,000,000

As Modified
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of 6-Storey Multi-purpose Building (Government Center) Package 10, Brgy. St. Joseph,
San Juan City
Physical Target: CW1-Construction of Multi-Purpose Building = 1.0 No. of Building
Unit Cost = P 7,840,000/no. of bldg.
Allocation = P 7,840,000
EAO = P 160,000
Total = P 8,000,000
WIN2C03522
April 20, 2022 2022 WIN2F05972 FY 2022 GAA RA 11639 December 30, 2021 Region V Catanduanes District Engineering Office
UACS No.: 310103100965000
Project ID: P00603965LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Tertiary Roads - Jct Bato-Baras Rd – K0013+195 – K0014+000, K0022+300 – K0023+000
Physical Target: CW1 – Preventive Maintenance of Road: Concrete Reblocking – 2.908 Lane km.
Allocation: Php 12,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Tertiary Roads - Jct Bato-Baras Rd – K0013+195 – K0014+000, K0014+000 – K0015+000
Physical Target: CW1 - Preventive Maintenance of Road: Concrete Reblocking – 1.584 Lane km.
Estimated Cost: Php 12,000,000.00
April 20, 2022 2022 WIN2F06179 FY 2022 GAA RA 11639 December 30, 2021 Region V Catanduanes District Engineering Office
UACS No.: 310112100321000
Project ID: P00604141LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads - Baras-Gigmoto-Viga Rd – K0026+000 – K0026+742
Physical Target: CW1 - Construction of Drainage Structure along Road – 742 Lineal Meters.
Allocation: Php 22,274,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads - Baras-Gigmoto-Viga Rd – K0029+000 – K0030+00, K0050+791 – K0050+848, K0087+900 – K0088+000, K0090+100 – K0090+325
Physical Target: CW1 - Construction of Drainage Structure along Road – 1143 Lineal Meters.
Estimated Cost: Php 22,274,000.00
April 20, 2022 2022 WIN2F06305 FY 2022 GAA December 30, 2021 Region III Regional Office III
Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R. A. 11239

Installation of Reflective Pavement Studs A Castaneda - Ma. Aurora - San Luis Rd - K0193+(-307) - K0193+068, K0193+920 - K0206+712, Baler Airport Road - K0227+979 - K0229+657, Nueva Ecija - Aurora Rd - K0171+(-322) - K0184+621
April 20, 2022 2022 WIN2F05889 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 1st District Engineering Office
UACS No.: 310106100776000
Project ID: P00603976LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Tertiary Roads - Sn Fernando-Talisay Rd – K0001+798 – K0002+116
Physical Target: CW1 – Reconstruction to Concrete Pavement – 0.596 Lane km.
Allocation: Php 9,855,000

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Tertiary Roads - Sn Fernando-Talisay Rd – K0011+765 – K0011+865, K0011+975 – K0012+058.50, K0012+252 – K0012+291
Physical Target: CW1 - Reconstruction to Concrete Pavement – 0.517 Lane km.
Estimated Cost: Php 9,855,000
April 20, 2022 2022 WIN2F05886 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 1st District Engineering Office
UACS No.: 310111100436000
Project ID: P00604144LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Construction/ Upgrading Rehabilitation of Drainage along National Roads – Secondary Roads – Sn Fernando North Rd – K0012+871 – K0012+921, K0013+895 – K0014+213, K0024+843 – K0025+000
Physical Target: CW1 - Construction of Drainage Construction along Road – 521 Lineal Meters
Allocation: Php 7,850,000

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Construction/ Upgrading Rehabilitation of Drainage along National Roads – Secondary Roads – Sn Fernando North Rd – K0012+889 – K0012+921, K0012+980 – K0013+106, K0013+991 – K0014+213, K0024+846 – K0025+000
Physical Target: CW1 - Construction of Drainage Construction along Road – 521 Lineal Meters
Estimated Cost: Php 7,850,000
April 20, 2022 2022 WIN2F05883 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 1st District Engineering Office
UACS No.: 310109101000000
Project ID: P00604432LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Tertiary Roads - Sn Fernando-Talisay Rd – K0002+741 – K0002+781
Physical Target: CW1 - Construction of Road Slope Protection Structure – 1666.67 Square Meters.
Allocation: Php 30,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Tertiary Roads - Sn Fernando-Talisay Rd – K0002+741 – K0002+781
Physical Target: CW1 - Construction of Road Slope Protection Structure – 1324.84 Square Meters.

Estimated Cost: Php 30,000,000.00
April 20, 2022 2022 WIN2F05885 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 1st District Engineering Office
UACS No.: 310109100870000
Project ID: P00604433LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Tertiary Roads - Sn Fernando-Talisay Rd – K0003+000 – K0003+095
Physical Target: CW1 - Construction of Road Slope Protection Structure – 4444.44 Square Meters.
Allocation: Php 80,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide – Tertiary Roads - Sn Fernando-Talisay Rd – K0003+065 – K0003+209
Physical Target: CW1 - Construction of Road Slope Protection Structure – 3697.71 Square Meters.

Estimated Cost: Php 80,000,000.00
April 20, 2022 2022 WIN2F05884 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 1st District Engineering Office
UACS No.: 310209100371000
Project ID: P00606440LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement – Tertiary Roads – Sn Pascual-Claveria Rd – K0012+000 – K0012+277, K0012+478 – K0012+850, K0017+041 – K0017+801
Physical Target: CW1 – Off-Carriageway Improvement: Paving of Shoulders – 4227 Square Meters.
Allocation: Php 30,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement – Tertiary Roads – Sn Pascual-Claveria Rd – K0012+478 – K0012+850, K0017+041 – K0018+ 042
Physical Target: CW1 - Off-Carriageway Improvement: Paving of Shoulders – 4227 Square Meters.
Estimated Cost: Php 30,000,000.00
April 20, 2022 2022 WIN2F05910 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 310111100438000
Project ID: P00604143LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Construction/ Upgrading of Drainage along National Roads – Secondary Roads - Masbate-Milagros Rd – K0021+256 – K0021+577
Physical Target: CW1 - Construction of Drainage Structure along Road – 321 Lineal Meters
Allocation: Php 13,740,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Construction/ Upgrading of Drainage along National Roads – Secondary Roads - Masbate-Milagros Rd – K0023+045 – K0023+285
Physical Target: CW1 - Construction of Drainage Structure along Road – 240 Lineal Meters
Estimated Cost: Php 13,740,000.00
April 20, 2022 2022 WIN2F06091 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 310102100825000
Project ID: P00610123LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Secondary Roads – Jct Crossing-Mandaon Rd – K0045+800 – K0049+250
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 6.858 Lane km.
Allocation: Php 128,500,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Secondary Roads – Jct Crossing-Mandaon Rd – K0046+(-358) – K0046+000, K0047+000 – K0048+620
Physical Target: CW1 - Preventive Maintenance of Road: Asphalt Overlay – 7.876 Lane km.
Estimated Cost: Php 128,500,000.00
April 20, 2022 2022 22-6801 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 310102100826000
Project ID: P00610124LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads – Jct Milagros-Baleno-Lagta Rd – K0025+050 – K0033+380
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 30.14 Lane km.
Allocation: Php 295,300,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads – Jct Milagros-Baleno-Lagta Rd – K0025+(-115) – K0030+140
Physical Target: CW1 - Preventive Maintenance of Road: Asphalt Overlay – 19.686 Lane km.
Estimated Cost: Php 295,300,000.00
April 20, 2022 2022 WIN2F05982 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 310102100827000
Project ID: P00610125LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads – Jct Milagros-Baleno-Lagta Rd – K0042+780 – K0047+200
Physical Target: CW1 – Preventive Maintenance of the Road: Asphalt Overlay – 16.861 Lane km.
Allocation: Php 180,350,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads – Jct Milagros-Baleno-Lagta Rd – K0042+682 – K0045+725
Physical Target: CW1 - Preventive Maintenance of the Road: Asphalt Overlay – 11.736 Lane km.
Estimated Cost: Php 180,350,000.00
April 20, 2022 2022 WIN2F0610 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 310102100828000
Project ID: P00610126LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads – Jct Tawad-Balud Rd – K0027+300 – K0031+756
Physical Target: CW1 – Preventive Maintenance of Road: Concrete Reblocking – 8.848 Lane km.
Allocation: Php 165,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads – Jct Tawad-Balud Rd – K0027+(-360) – K0028+944, K0029+910 – K0031+390
Physical Target: CW1 - Preventive Maintenance of Road: Concrete Reblocking – 11.032 Lane km.
CW2 - Construction of Drainage Structure along Road – 1,729.450 Lineal meters
Estimated Cost: Php 165,000,000.00
April 20, 2022 2022 WIN2F06168 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 310102100829000
Project ID: P00610127LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads – Masbate-Milagros Rd – K0024+000 – K0026+500
Physical Target: CW1 - Preventive Maintenance of Road: Concrete Reblocking – 4.682 Lane km.
Allocation: Php 85,000,000.00

AS MODIFIED:
OO1 : : Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads – Masbate-Milagros Rd – K0024+274 – K0025+610
Physical Target: CW1 - Preventive Maintenance of Road: Concrete Reblocking – 5.456 Lane km.
Estimated Cost: Php 85,000,000.00
April 20, 2022 2022 WIN2F05931 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 320101107540000
Project ID: P00620280LZ
AS PER GAA:
OO2 : Protect Lives and Properties – Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Calsuche Seawall, Milagros, Masbate
Physical Target: CW1 - Construction of Flood Mitigation Structure – 168 Lineal Meters
Allocation: Php 100,000,000.00

AS MODIFIED:
OO2 : Protect Lives and Properties – Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Calasuche Seawall, Milagros, Masbate
Physical Target: CW1 - Construction of Flood Mitigation Structure – 168 Lineal Meters
Estimated Cost: Php 100,000,000.00
April 20, 2022 2022 WIN2F05958 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 3rd District Engineering Office
UACS No.: 310108100899000
Project ID: P00611363LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Secondary Roads - Masbate-Cataingan-Placer Rd – K0021+257 – K0021+507
Physical Target: CW1 – Road Slope Protection Structure – 5277.78 Square Meters.
Allocation: Php 95,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Secondary Roads - Masbate-Cataingan-Placer Rd – K0022+345 – K0022+595
Physical Target: CW1 - Road Slope Protection Structure – 5277.78 Square Meters.
Estimated Cost: Php 95,000,000.00
April 20, 2022 2022 WIN2F05959 FY 2022 GAA RA 11639 December 30, 2021 Region V Masbate 3rd District Engineering Office
UACS No.: 300105200775000
Project ID: P00655179LZ
AS PER GAA:
Local Program – Local – Buildings and Other Structures – Multipurpose/ Facilities – National Building Program – Construction of DPWH Masbate 3rd DEO Materials Testing Laboratory Building, Dimasalang, Masbate City
Physical Target: CW1 - Construction of Multipurpose Building - 1 number of building
Allocation: Php 7,000,000.00

AS MODIFIED:
Local Program – Local – Buildings and Other Structures – Multipurpose/ Facilities – National Building Program – Construction of DPWH Masbate 3rd DEO Materials Testing Laboratory Building, Dimasalang, Masbate
Physical Target: CW1 - Construction of Multipurpose Building - 1 number of building
Estimated Cost: Php 7,000,000.00
April 20, 2022 FY 2021 GAA WIN2G02781 DPWH Infra Program FY 2021 December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 300106200716000
Project ID : P00561579LZ

LOCAL PROGRAM

Flood Control and Drainage - Flood Control Structures/Facilities -
Construction/Repair/Rehabilitation/Improvement of Various
Infrastructure including Local Projects

FROM :

Construction of Jao-asan Flooc Control,
Jao-asan, Magdiwang, Romblon
Physical Target - CW1 - Construction of Flood Control Mitigation :
0.00 Lineal Meter (lm)
Allocation - Php 50.00 million

TO :

Construction of Jao-asan Flood Control
Jao-asan, Magdiwang, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
248.00 Lineal Meter (lm)
Allocation - Php 50.00 Million
April 20, 2022 FY 2021 GAA WIN2G02754 DPWH Infra Program FY 2021 December 28, 2020 Region IV-B Regional Office IV-B
UACS No. : 300116204208000
Project *ID : P00562469LZ

LOCAL PROGRAM

Local Roads and Bridges - Local Roads -
Construction/Repair/Rehabilitation/Improvement of
Various Infrastructure including Local Projects

FROM :

Construction(Completion) of Kabaliwan - Boliganay Road
(Phase II), San Agustin and Odiongan, Romblon
Physical Target - CW1 - Construction of Concrete Road ; 0 lane Km
Allocation - Php 50.00 Milliojn

TO :

Construction(Completion) of Kabaliwan - Boliganay Road
(Phase II), San Agustin and Odiongan, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 3,182 Square meters
Allocation - Php 50.00 Million
April 20, 2022 2022 WIN2F05946 FY 2022 GAA RA 11639 December 30, 2021 Region V Regional Office V
UACS No.: 310201100872000
Project ID: P00605799LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening Primary Roads – Daang Maharlika (LZ) – K0415+515 – K0316+265, K0416+760 – K0417+049, K0420+080 – K0420+843, K0420+867.60 – K0421+337
Physical Target: CW1 – Road Widening – 4.605 Lane km.
Allocation: Php 115,120,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening Primary Roads – Daang Maharlika (LZ) – K0416+836 – K0417+049, K0420+080 – K0420+843, K0420+867.60 – K0421+337
Physical Target: CW1 - Road Widening – 2.9648 Lane km.
CW2 - Construction of Drainage Structure along Road – 2977.8 Lineal meters
ROW – ROW acquisition – 29648 Square Meters
Estimated Cost: Php 115,120,000.00
April 20, 2022 2022 WIN2F06007 FY 2022 GAA RA 11639 December 30, 2021 Region V Regional Office V
UACS No.: 310201100870000
Project ID: P00606446LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Primary Roads – Daang Maharlika (LZ) – K0399+243 – K0401+848
Physical Target: CW1 – Road Widening – 5.192 Lane km.
Allocation: Php 136,775,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Primary Roads – Daang Maharlika (LZ) – K0399+243 – K0400+614.45
Physical Target: CW1 - Road Widening – 2.7369 Lane km.
CW2 - Construction of Road Slope Protection Structure – 3086.03 Lineal meters
CW3 – Construction of Drainage Structure along Road – 2706.98 Lineal Meters
ROW Acquisition – 27369 Square Meters
Estimated Cost: Php 136,775,000.00
April 20, 2022 2022 WIN2F05998 FY 2022 GAA RA 11639 December 30, 2021 Region V Regional Office V
UACS No.: 310201100871000
Project ID: P00606447LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Primary Roads – Daang Maharlika (LZ) – K0413+415 – K0415+515
Physical Target: CW1 – Road Widening – 4.17 Lane km.
Allocation: Php 104,250,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Primary Roads – Daang Maharlika (LZ) – K0413+415 – K0414+385
Physical Target: CW1 - Road Widening – 1.924 Lane km.
CW2 - Construction of Rode Slope Protection Structure – 2311.07 Square Meters
CW3 – Construction of Drainage Structure along Roads – 1893.6 Lineal Meters
ROW – Row Acquisition - 19240 Square Meters
Estimated Cost: Php 104,250,000.00
April 20, 2022 2022 WIN2F06183 FY 2022 GAA RA 11639 December 30, 2021 Region V Regional Office V
UACS No.: 310109100871000
Project ID: P00609355LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Rehabilitation/ Reconstruction of Road with Slips/ Slope Collapse and Landslide – Tertiary Roads - Nabua-Balatan Rd – K0490+000 – K0490+232
Physical Target: CW1 - Construction of Road Slope Protection Structure – 6111.111 Square Meter
Allocation: Php 110,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Rehabilitation/ Reconstruction of Road with Slips/ Slope Collapse and Landslide – Tertiary Roads - Nabua-Balatan Rd – K0490+640 – K0490+990
Physical Target: CW1 Construction of Road Slope Protection Structure – 5274.36 Square Meter
Estimated Cost: Php 110,000,000.00
April 20, 2022 2022 WIN2F05962 FY 2022 GAA RA 11639 December 30, 2021 Region V Regional Office V
UACS No.: 320101107580000
Project ID: P00620320LZ
AS PER GAA:
OO2 : Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/ Improvement/ Rehabilitation of Cadac-an River Flood Mitigation Structure Sta. 12+219.2 – Sta. 12+972 Right Side, Sta. 12+219.2 – Sta. 13+125 Left Side, Juban, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1104 Lineal Meters
Allocation: Php 181,000,000.00

AS MODIFIED:
OO2 : Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/ Improvement/ Rehabilitation of Cadac-an River Flood Mitigation Structure Sta. 12+260 – Sta. 12+308 Right Side, Sta. 11+792 – Sta. 12+848 Left Side, Juban, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1104 Lineal Meters
Estimated Cost: Php 181,000,000.00
April 20, 2022 2022 WIN2F06008 FY 2022 GAA RA 11639 December 30, 2021 Region V Regional Office V
UACS No.: 320101107581000
Project ID: P00620321LZ
AS PER GAA:
OO2 : Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/ Improvement/ Rehabilitation of Cadac-an River Flood Mitigation Structure, Sta. 23+817.2 – Sta. 24+638 Left Side, Sta. 23+817.2 – Sta. 24+655 Right Side, Irosin, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1374.57 Lineal Meters.
Allocation: Php 180,849,000.00

AS MODIFIED:
OO2 : Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction/ Improvement/ Rehabilitation of Cadac-an River Flood Mitigation Structure, Sta. 23+752 – Sta. 24+575.57 Left Side, Sta. 23+806.5 – Sta. 24+357.5 Right Side, Irosin, Sorsogon
Physical Target: CW1 - Construction of Flood Mitigation Structure – 1374.57 Lineal Meters.
Estimated Cost: Php 180,849,000.00
April 20, 2022 2022 WIN2F05947 FY 2022 GAA RA 11639 December 29, 2021 Region V Regional Office V
UACS No.: 300105200333000
Project ID: P00655008LZ
AS PER GAA:
LOCAL PROGRAM : Buildings and Other Structures – Multipurpose/ Facilities – National Building Program – Construction of Bicol University Convention and Disaster Risk Reduction Management Center, Legazpi City (Phase III)
Physical Target: CW1 - Construction of Multipurpose Building– 1 number of building
Allocation: Php 75,000,000.00

AS MODIFIED:
LOCAL PROGRAM : Buildings and Other Structures – Multipurpose/ Facilities – National Building Program – Construction of Bicol University Convention and Disaster Risk Reduction Management Center, Legazpi City (Phase IV)
Physical Target: CW1 - Construction of Multipurpose Building– 1 number of building
Estimated Cost: Php 75,000,000.00
April 20, 2022 2022 WIN2F06047 FY 2022 GAA RA 11639 December 30, 2021 Region V Regional Office V
UACS No.: 310205100576000
Project ID: P00608292LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads – Bacon-Manito Rd, Package 1, Sorsogon
Physical Target: CW1 - Construction of Concrete Road – 3.291 Lane km.
CW2 – Construction of Drainage Structure along Road – 1650 Lineal Meters
CW3 – Construction of Road Slope Protection Structure – 4000 Square Meters
Allocation: Php 100,000,000.00

AS MODIFIED:
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads – Bacon-Manito Rd, Package 1, Sorsogon
Physical Target: CW1 - Construction of Concrete Road – 2.356 Lane km.
CW2 - Construction of Drainage Structure along Road – 1400 Lineal Meters
CW3 – Construction of Road Slope Protection Structure – 1210.6 Square Meters

Estimated Cost: Php 100,000,000.00
April 20, 2022 2022 WIN2F05997 FY 2022 GAA RA 11639 December 30, 2021 Region V Regional Office V
UACS No.: 310205100577000
Project ID: P00608293LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads – Bacon-Manito Rd, Package 2, Sorsogon
Physical Target: CW1 - Construction of Road Slope Protection Structure – 5050 Square Meters
Allocation: Php 100,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads – Bacon-Manito Rd, Package 2, Sorsogon
Physical Target: CW1 - Construction of Road Slope Protection Structure – 3563.84 Square Meters
Estimated Cost: Php 100,000,000.00
April 20, 2022 2022 WIN2E02109 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 310102100853000
Project ID: P00601289MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads

FROM:

Surigao-Davao Coastal Rd (S00300MN) - K1461 + 099 - K1463 + 112, K1471 + 566 - K1473 + 506.44

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 11.933 Lane Km

Allocation:
TOTAL: P 101,000,000
CW1: P 97,465,000
EAO: P 3,535,000

Unit Cost:
CW1: P 8,167,686.25/Lane Km

TO:

Surigao-Davao Coastal Rd (S00300MN) - K1461+099 - K1463+112, K1463+112 - K1463+481, K1471+566 - K1473+506.44

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 12.670 Lane Km

Allocation:
TOTAL: P 101,000,000
CW1: P 97,465,000
EAO: P 3,535,000

Unit Cost:
CW1: P 7,692,580.90/Lane Km
April 20, 2022 2022 WIN2E02156 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 310203100535000
Project ID: P00602516MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System – Network Development Program - Road Widening - Tertiary Roads

FROM:

Butuan City-Malaybalay Rd - K1246 + 400 - K1247 + 525, K1250 + 878 - K1252 + 631

Type of Work:
CW1- Road Widening

Physical Target:
CW1- 5.699 Lane Km

Allocation:
TOTAL: P 101,000,000
CW1: P 97,465,000
EAO: P 3,535,000

Unit Cost:
CW1: 17,102,123.17/Lane Km

TO:

Butuan City-Malaybalay Rd - K1246 + 428 - K1247 + 000, K1250 + 878 - K1252 + 640

Type of Work:
CW1- Road Widening
CW2- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4.660 Lane Km
CW2- 1,577.10 Square meters

Allocation:
TOTAL: P 101,000,000
CW1: P 79,919,756
CW2: P 17,545,244
EAO: P 3,535,000

Unit Cost:
CW1: P 17,150,162.23/Lane Km
CW2: P 11,125.00/Square meters
April 20, 2022 2022 WIN2E02168 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 300214100093000
Project ID: P00633704MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

FROM:

Preventive Maintenance along Daang Maharlika (Agusan-Davao Sect) - K1248 + 550 - K1250 + 098, K1250 + 098 - K1251 + 000, K1251 + 542 - K1253 + 264, K1265 + 605 - K1266 + 622, K1266 + 622 - K1267 + 569, K1268 + 003 - K1270 + 110, K1273 + 043 - K1273 + 892, K1274 + 384 - K1276 + 000, K1276 + 000 - K1276 + 672, K1276 + 672 - K1276 + 994, K1277 + 678 - K1278 + 073, K1278 + 696 - K1278 + 862

Type of Work:
CW1- Preventive Maintenance of Road: Concrete Reblocking

Physical Target:
CW1- 7.649 Lane Km

Allocation:
TOTAL: P 140,000,000
CW1: P 135,100,000
EAO: P 4,900,00

Unit Cost:
CW1: P 17,662,440/Lane Km

TO:

Preventive Maintenance along Daang Maharlika (Agusan-Davao Sect) - K1248+550 - K1250+098, K1250+098 - K1251+000, K1251+542 - K1253+264, K1265+605 - K1266+622, K1266+622 - K1267+569, K1268+003 - K1268+613.50

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 17.847 Lane Km

Allocation:
TOTAL: P 140,000,000
CW1: P 135,100,000
EAO: P 4,900,00

Unit Cost:
CW1: P 7,569,899.70/Lane Km
April 20, 2022 2022 WIN2E02167 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 310101100595000
Project ID: P00601290MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads

FROM:

Jct Lingig-Trento Rd (S00312MN) - K1472 + (-647) - K1474 + 542.18

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 12.533 Lane Km

Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000

Unit Cost:
CW1: P 8,084,656.51/Lane Km

TO:

Jct Lingig-Trento Rd (S00312MN) - K1472 + (-647) - K1474 + 815.55

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 13.850 Lane Km

Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000

Unit Cost:
CW1: P 7,315,884.48/Lane Km
April 19, 2022 2022 WIN2F06099 FY 2022 GAA RA 11639 December 30, 2021 Region V Albay 1st Engineering Office
UACS No.: 300217100033000
Project ID: P00636994LZ
AS PER GAA:
CSSP : Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jursidictions) – Construction of Road, Salvacion – Santicon – Sulong – Napao, Polangui, Albay
Physical Target: CW1 - Construction of Concrete Road – 10.03 Lane km.
Allocation: Php 99,000.00

AS MODIFIED:
OO1 : Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jursidictions) – Construction of Road, Salvacion – Santicon – Sulong – Napao, Bacacay, Albay
Physical Target: CW1 - Reconstruction of Concrete Pavement – 10.03 Lane Km
Allocation: Php 99,000.00

Estimated Cost: Php 20,057,000.00
April 19, 2022 2022 WIN2F06160 SR2022-02-000858 February 3, 2022 Cordillera Administrative Region CAR - Regional Office
From: Cong. Andres Acop Cosalan Rd - K0315 + 736 - K0315 + 918;
Physical Target: 8,333.330 Square meters;
Allocation: Php 150,000,000.000

To: Cong. Andres Acop Cosalan Rd - K0315 + 693 - K0315 + 930;
Physical Target: 6,188.000 Square meters;
Allocation: Php 150,000,000.000

April 19, 2022 2022 WIN2F06050 SR2022-02-001173 February 4, 2022 Cordillera Administrative Region CAR - Regional Office
From: Gov. Bado Dangwa National Rd - K0338 + 700 - K0338 + 900;
Physical Target: 8333.340 Square meters;
Allocation: Php 150,000,000.000

To: Gov. Bado Dangwa National Rd - K0338 + 753 - K0338 + 914;
Physical Target: 6,124.700 Square meters;
Allocation: Php 150,000,000.000
April 19, 2022 2022 WIN2F06011 SR2022-02-001178 February 4, 2022 Cordillera Administrative Region CAR - Regional Office
From: Gov. Bado Dangwa National Rd - K0339 + 334 - K0339 + 500;
Physical Target: 8333.340 Square meters;
Allocation: Php 150,000,000.000

To: Gov. Bado Dangwa National Rd - K0339 + 323 - K0339 + 548;
Physical Target: 6,247.200 Square meters;
Allocation: Php 150,000,000.000

April 19, 2022 2022 WIN2F06018 FY 2022 GAA RA 11639 December 30, 2021 Region V Albay 2nd Engineering Office
UACS No.: 310104100408000
Project ID: P00603937LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System Asset Preservation – Rehabilitiation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads- Daang Maharlika (LZ) – K0533+000 – K0533+600
Physical Target: CW1 – Reconstruction to Concrete Pavement – 1.2 Lane km.
Allocation: Php 20,057,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System Asset Preservation – Rehabilitiation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads- Daang Maharlika (LZ) – K0527+405 – K0527+647, K0532+624 – K0532+880, K0533+000 – K0533+600
Physical Target: CW1 - Reconstruction to Concrete Pavement – 2.196 Lane Km
Allocation: Php 20,057,000.00
April 19, 2022 2022 WIN2F06079 SR2022-02-000899 February 3, 2022 Cordillera Administrative Region CAR - Regional Office
From: Banaue-Hungduan-Benguet Bdry Rd - K0366 + 000 - K0366 + 150;
Physical Target: 7,200.000 Square meters;
Allocation: Php 60,000,000.000

To: Banaue-Hungduan-Benguet Bdry Rd - K0366 + 000 - K0366 + 070;
Physical Target: 2,280.000 Square meters;
Allocation: Php 60,000,000.000

April 19, 2022 2022 WIN2F06018 FY 2022 GAA RA 11639 December 30, 2021 Region V Albay 2nd Engineering Office
UACS No.: 310104100353000
Project ID: P00603938LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads - Daang Maharlika (LZ) – K0536+000 – K0537+840
Physical Target: CW1 – Reconstruction to Concrete Pavement – 3.774 Lane km.
Allocation: Php 63,079,235.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads - Daang Maharlika (LZ) – K0527+647 – K0528+460, K0530+000 – K0532+000
Physical Target: CW1 - Reconstruction to Concrete Pavement – 5.626 Lane km.
Estimated Cost: Php 63,079,235.00
April 19, 2022 2022 WIN2F06127 SR2022-03-006711 March 21, 2022 Cordillera Administrative Region CAR - Regional Office
From: Preventive Maintenance (Asphalt Overlay) along Baguio-Bontoc Rd - K0329 + 394 - K0330 + 600, K0330 + 850 - K0336 + 400;
Physical Target: 7.538 Lane Km;
Allocation: Php 100,000,000.000

To: Preventive Maintenance (Asphalt Overlay) along Baguio-Bontoc Rd - K0312 + 600 - K0320 + 600;
Physical Target: 15.860 Lane Km;
Allocation: Php 100,000,000.000

April 19, 2022 2022 WIN2F06188 SR2022-02-001910 February 4, 2022 Cordillera Administrative Region CAR - Regional Office
From: Preventive Maintenance (Asphalt Overlay) along Gov. Bado Dangwa National Rd - K0308 + 500 - K0318 + 167;
Physical Target: 15.077 Lane Km;
Allocation: Php 200,000,000.000

To: Preventive Maintenance (Asphalt Overlay) along Gov. Bado Dangwa National Rd - K0308 + 500 - K0318 + 167, K0319 + (-840) - K0320 + 100;
Physical Target: 23.028 Lane Km;
Allocation: Php 200,000,000.000

April 19, 2022 2022 WIN2F06222 SR2022-03-007782 March 23, 2022 Cordillera Administrative Region CAR - Regional Office
From: Preventive Maintenance along Itogon-Dalupirip-San Manuel Bdry ;
Type of Work: Preventive Maintenance of Road: Concrete Reblocking;
Physical Target: 10.790 Lane Km;
Allocation: Php 90,000,000.000

To: Preventive Maintenance along Itogon-Dalupirip-San Manuel Bdry ;
Type of Work: Preventive Maintenance of Road: Asphalt Overlay;
Physical Target: 10.790 Lane Km;
Allocation: Php 90,000,000.000

April 19, 2022 2022 WIN2F06184 SR2022-03-007619 March 23, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Kalinga Rd - K0449 + 100 - K0449 + 250;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000

To: Abra-Kalinga Rd - K0449 + 100 - K0449 + 250;
Physical Target: 3,404.880 Square meters;
Allocation: Php 100,000,000.000

April 19, 2022 2022 WIN2F06210 SR2022-03-007623 March 23, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Kalinga Rd - K0450 + 100 - K0450 + 200;
Physical Target: 3,055.560 Square meters;
Allocation: Php 55,000,000.000

To: Abra-Kalinga Rd - K0450 + 100 - K0450 + 200;
Physical Target: 1,830.500 Square meters;
Allocation: Php 55,000,000.000

April 19, 2022 2022 WIN2F06211 SR2022-03-007625 March 23, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Kalinga Rd - K0450 + 700 - K0450 + 810;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000

To: Abra-Kalinga Rd - K0450 + 700 - K0450 + 810;
Physical Target: 3,404.000 Square meters;
Allocation: Php 100,000,000.000

April 19, 2022 2022 WIN2F06155 SR2022-03-007628 March 23, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Kalinga Rd - K0451 + 000 - K0451 + 150;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000

To: Abra-Kalinga Rd - K0451 + 000 - K0451 + 150;
Physical Target: 3,404.720 Square meters;
Allocation: Php 100,000,000.000


April 19, 2022 2022 WIN2F06216 SR2022-03-007630 March 23, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Kalinga Rd - K0451 + 450 - K0451 + 600;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000


April 19, 2022 2022 WIN2F06098 FY 2022 GAA RA 11639 December 30, 2021 Region V Albay 2nd Engineering Office
UACS No.: 310111100431000
Project ID: P00604133LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation- Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Secondary Roads – Legazpi City-Punta de Jesus Rd – K0532+000 – K0532+700, K0536+800 – K0537+607
Physical Target: CW1 – Construction of Drainage Structure along Road – 3014 Lineal Meter.
Allocation: Php 50,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation- Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Secondary Roads – Legazpi City-Punta de Jesus Rd – K0532+000 – K0532+700, K0536+800 – K0537+607, K0566+050 – K0566+280

Physical Target: CW1 - Construction of Drainage Structure along Road – 1699 Lineal Meter.
Estimated Cost: Php 50,000,000.00
April 19, 2022 2022 WIN2F05990 FY 2022 GAA RA 11639 December 30, 2022 Region V Camarines Norte District Engineering Office
UACS No.: 300221101271000
Project ID: P00640381LZ
AS PER GAA:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s Leading to Major/ Strategic Public Buildings/ Facilities – Construction of Road, Barangay Pinagbitayan Maliit, Paracale, Camarines Norte
Physical Target: CW1 - Construction of Concrete Road – 1.332 Lane km.
CW2 – Construction of Road Slope Protection Structure – 1904.06 Square Meters
Allocation: Php 25,000,000.00

AS MODIFIED:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s Leading to Major/ Strategic Public Buildings/ Facilities – Construction of Road, Barangay Pinagbirayan Munti, Paracale, Camarines Norte
Physical Target: CW1 - Construction of Concrete Road – 1.332 Lane km.
CW2 – Construction of Road Slope Protection Structure – 1904.06 Square Meters
Estimated Cost: Php 25,000,000.00
April 19, 2022 2022 WIN2F06078 SR2022-03-007635 March 23, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Kalinga Rd - K0454 + 700 - K0454 + 820;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000

To: Abra-Kalinga Rd - K0454 + 700 - K0454 + 820;
Physical Target: 3,404.880 Square meters;
Allocation: Php 100,000,000.000

April 19, 2022 2022 WIN2F06187 FY 2022 GAA RA 11639 December 30, 2021 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 310102100958000
Project ID: P00603952LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Preventive Maintenance – Secondary Roads - Pili-Tigaon-Albay Bdry Rd – K0465+168 – K0468+310
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 6.258 Lane km.
Allocation: Php 40,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Preventive Maintenance – Secondary Roads - Pili-Tigaon-Albay Bdry Rd – K0465+168 – K0467+476.20
Physical Target: CW1 - Preventive Maintenance of Road: Asphalt Overlay – 4.6504 Lane km.
Estimated Cost: Php 40,000,000.00
April 19, 2022 2022 WIN2F06173 SR2022-03-007638 March 23, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Kalinga Rd - K0455 + 280 - K0455 + 400;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000

To: Abra-Kalinga Rd - K0455 + 280 - K0455 + 400;
Physical Target: 3,404.880 Square meters;
Allocation: Php 100,000,000.000

April 19, 2022 2022 WIN2F06165 FY 2022 GAA RA 11639 December 30, 2021 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 310103100964000
Project ID: P00603955LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Preventive Maintenance – Tertiary Roads – Naga City Bdry-Calabanga-Balongay Rd – K0449+000 – K0451+000
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 4.198 Lane km.
Allocation: Php 27,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Preventive Maintenance – Tertiary Roads – Naga City Bdry-Calabanga-Balongay Rd – K0448+986.90 – K0450+714.50
Physical Target: CW1 - Preventive Maintenance of Road: Asphalt Overlay – 3.4892 Lane km.
Estimated Cost: Php 27,000,000.00
April 19, 2022 2022 WIN2F05950 FY 2022 GAA RA 11639 December 30, 2021 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 310112100320000
Project ID: P00604140LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads – Naga-Carolina-Panicuason Rd – K0441+000 – K0442+690
Physical Target: CW1 – Construction of Drainage Structure along Road – 3370 Lineal Meters.
Allocation: Php 37,657,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Tertiary Roads – Naga-Carolina-Panicuason Rd – K0441+000 – K0441+748
Physical Target: CW1 - Construction of Drainage Structure along Road – 1496 Lineal Meters.
Estimated Cost: Php 37,657,000.00
April 19, 2022 2022 WIN2F06147 FY 2022 GAA RA 11639 December 30, 2021 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 310209100368000
Project ID: P00606415LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement – Tertiary Roads – Naga-Carolina-Panicuason Rd – K0438+(-235) – K0438+600
Physical Target: CW1 – Off-Carriageway Improvement: Paving of Shoulders – 3340 Square Meters.
Allocation: Php 25,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Off-Carriageway Improvement – Tertiary Roads – Naga-Carolina-Panicuason Rd – K0438+(-015) – K0438+583
Physical Target: CW1 - Off-Carriageway Improvement: Paving of Shoulders – 2392 Square Meters.
Estimated Cost: Php 25,000,000.00
April 19, 2022 2022 WIN2F06175 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Abang Flood Control Structure (Phase 2), Barangay Abang, Bucay, Abra;
Physical Target: 264.000 Lineal meters;
Allocation: Php 50,000,000.000

To: Construction of Abang Flood Control Structure (Phase 2), Barangay Abang, Bucay, Abra;
Physical Target: 167.600 Lineal meters;
Allocation: Php 50,000,000.000

April 19, 2022 2022 WIN2F06129 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Abang Flood Control, Barangay Abang, Bucay, Abra;
Physical Target: 430.000 Lineal meters;
Allocation: Php 50,000,000.000

To: Construction of Abang Flood Control, Barangay Abang, Bucay, Abra;
Physical Target: 172.400 Lineal meters;
Allocation: Php 50,000,000.000

April 19, 2022 2022 WIN2F06088 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Bangcagan Flood Control Structure, Barangay Bangcagan, Bucay, Abra;
Physical Target: 442.321 Lineal meters;
Allocation: Php 50,000,000.000

To: Construction of Bangcagan Flood Control Structure, Barangay Bangcagan, Bucay, Abra;
Physical Target: 612.000 Lineal meters;
Allocation: Php 50,000,000.000

April 19, 2022 2022 WIN2F05987 FY 2022 GAA RA 11639 December 30, 2021 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 310103100807000
Project ID: P00610156LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Preventive Maintenance – Tertiary Roads - Hanawan-Consocep Rd – K0470+(-594) – K0474+679
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 11.732 Lane km.
Allocation: Php 98,950,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System – Asset Preservation Program – Preventive Maintenance – Tertiary Roads - Hanawan-Consocep Rd – K0470+(-594) – K0473+615
Physical Target: CW1 - Preventive Maintenance of Road: Asphalt Overlay – 8.7289 Lane km.
CW2 - Construction of Drainage Structure along Road – 1,729.450 Lineal meters
Estimated Cost: Php 98,950,000.00
April 19, 2022 2022 WIN2F06174 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Deet - Balingasa Flood Control, Barangay Deet, Tayum, Abra;
Physical Target: 442.321 Lineal meters;
Allocation: Php 50,000,000.000

To: Construction of Deet - Balingasa Flood Control, Barangay Deet, Tayum, Abra;
Physical Target: 458.310 Lineal meters;
Allocation: Php 50,000,000.000

April 19, 2022 2022 WIN2F06093 FY 2022 GAA RA 11639 December 30, 2021 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 320101107527000
Project ID: P00621520LZ
AS PER GAA:
OO2 : Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainages Systems – Construction/ Rehabilitation/ Improvement of Flood Mitigation Structure, Bicol River Flood Control, Brgy. Fundado (Fundado Section – Left Side), Magarao, Camarines Sur
Physical Target: CW1 – Construction of Flood Mitigation Structure – 391 Lineal Meters
Allocation: Php 70,000,000.00

AS MODIFIED:
OO2 : Protect Lives and Properties Against Major Floods – Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainages Systems – Construction/ Rehabilitation/ Improvement of Flood Mitigation Structure, Bicol River Flood Control, Brgy. Barobaybay (Barobaybay Section – Left Side), Magarao, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 391 Lineal Meters
Estimated Cost: Php 70,000,000.00
April 19, 2022 2022 WIN2F06219 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Malanas Flood Control, Malanas, San Juan, Abra;
Physical Target: 442.321 Lineal meters;
Allocation: Php 50,000,000.000

To: Construction of Malanas Flood Control, Malanas, San Juan, Abra;
Physical Target: 414.000 Lineal meters;
Allocation: Php 50,000,000.000

April 19, 2022 2022 WIN2F05973 FY 2022 GAA RA 11639 December 30, 2021 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 300225100473000
Project ID: P00632964LZ
AS PER GAA:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Flood Mitigation Structures Protecting Public Infrastructures/Facilities – Construction of Flood Mitigation Structure of San Jose to Caditaan Creek, Barangay Pawili, Pili, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 93.6 Lineal Meters.
Allocation: Php 5,000,000.00

AS MODIFIED:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Flood Mitigation Structures Protecting Public Infrastructures/Facilities – Construction of Flood Mitigation Structure of San Jose Creek, Barangay San Jose, Pili, Camarines Sur
Physical Target: CW1 - Construction of Flood Mitigation Structure – 93.6 Lineal Meters.
Estimated Cost: Php 5,000,000.00
April 19, 2022 2022 WIN2F06161 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Pagala Flood Control Structure (Phase 2), Barangay Pagala, Bucay, Abra;
Physical Target: 442.321 Lineal meters;
Allocation: Php 50,000,000.000

To: Construction of Pagala Flood Control Structure (Phase 2), Barangay Pagala, Bucay, Abra;
Physical Target: 470.000 Lineal meters;
Allocation: Php 50,000,000.000

April 19, 2022 2022 WIN2F06162 FY 2022 GAA RA 11639 December 30, 2021 Region V Camarines Sur 3rd District Engineering Office
UACS No.: 300225100476000
Project ID: P00640581LZ
AS PER GAA:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Flood Mitigation Structures Protecting Public Infrastructures/ Facilities – Construction of Slope Protection (Riprapping), Brgy. Carangcay, Magarao, Camarines Sur
Physical Target: CW1 - Construction of Slope Protection Structure – 1550 Square Meters.
Allocation: Php 30,000,000.00

AS MODIFIED:
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - Flood Mitigation Structures Protecting Public Infrastructures/ Facilities – Construction of Slope Protection (Riprapping), Brgy. Carangcang, Magarao, Camarines Sur
Physical Target: CW1 - Construction of Slope Protection Structure – 1550 Square Meters.
Estimated Cost: Php 30,000,000.00
April 19, 2022 2022 WIN2F06182 GAA 2022 January 2, 2022 Cordillera Administrative Region Apayao 2nd District Engineering Office
From: Construction of Sta. Filomena Flood Control Structure, Sta. 0 + 810 - Sta. 1 + 310, Calanasan, Apayao;
Physical Target: 500.000 Lineal meters;
Allocation: Php 50,000,000.000

To: Construction of Sta. Filomena Flood Control Structure, Sta. 0+ 440 - Sta. 1+ 400, Calanasan, Apayao;
Physical Target: 960.000 Lineal meters;
Allocation: Php 50,000,000.000

April 19, 2022 2022 WIN2F06077 GAA 2022 January 2, 2022 Cordillera Administrative Region Baguio City District Engineering Office
From: Sto Tomas-Mt Cabuyo Rd – K0252 + 291 – K0253 + 049;
Physical Target: 491.000 Lineal meters;
Allocation: Php 25,000,000.000

To: Sto Tomas-Mt Cabuyo Rd – K0252 + 160 – K0253 + 049;
Physical Target: 622.000 Lineal meters;
Allocation: Php 25,000,000.000

April 19, 2022 2022 WIN2F06070 SARO-BMB-A-22-0002928 March 21, 2022 Cordillera Administrative Region Baguio City District Engineering Office
From: Construction of Road located at Purok 4, Monticello, Barangay Camp 7,Baguio City;
Physical Target: 0.500 Lane Km;
Allocation: Php 5,000,000.000

To: Construction of Road located at Purok 2, Monticello, Barangay Camp 7;
Physical Target: 0.275 Lane Km;
Allocation: Php 5,000,000.000

April 19, 2022 2022 WIN2F06012 SR2022-03-007744 March 23, 2022 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Shilan-Beckel Rd - K0261+892 - K0262+890, K0264+908 - K0265+943;
Physical Target: 3.878 Lane Km;
Allocation: Php 66,000,000.000

To: Shilan-Beckel Rd - K0262+056 - K0262+284.5, K0262+355.5 - K0262+780, K0264+925 - K0265+943;
Physical Target: 3.326 Lane Km;
Allocation: Php 66,000,000.000


April 19, 2022 2022 WIN2F06051 SR2022-03-007745 March 23, 2022 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Baguio-Itogon Rd – K0259+050 - K0259+150, K0259+204 - K0259+480, K0259+534 - K0261+000;
Physical Target: 3.520 Lane Km;
Allocation: Php 93,400,000.000

To: Baguio-Itogon Rd – K0259+050 - K0259+150, K0259+204 - K0259+480, K0259+534 - K0260+690, K0260+735 - K0261+000;
Physical Target: 3.430 Lane Km;
Allocation: Php 93,400,000.000

April 19, 2022 2022 WIN2F06132 SARO-BMB-A-22-0002929 March 21, 2022 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Baguio-Bauang Rd - K0284+500 - K0284+507, K0290+410 - K0290+420, K0291+170 - K0291+270;
Physical Target: 766.800 Square Meters;
Allocation: Php 14,100,000.000

To: Baguio-Bauang Rd - K0291+164 - K0291+290;
Physical Target: 1,044.000 Square Meters;
Allocation: Php 14,100,000.000

Pages