Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
May 3, 2022 2022 WIN2F06301 SR2022-03-007639 March 23, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Abra-Kalinga Rd - K0456 + 100 - K0456 + 200;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000

To: Abra-Kalinga Rd - K0456 + 100 - K0456 + 200;
Physical Target: 3,404.880 Square meters;
Allocation: Php 100,000,000.000

May 3, 2022 2022 WIN2F06287 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Construction of Sinalang Flood Control, Barangays Namarabar & Riang, Peñarrubia, Abra;
Physical Target: 442.321 Lineal meters;
Allocation: Php 50,000,000.000

To: Construction of Sinalang Flood Control, Barangays Namarabar & Riang, Peñarrubia, Abra;
Physical Target: 404.000 Lineal meters;
Allocation: Php 50,000,000.000

May 3, 2022 2022 WIN2F06348 SR2022-03-007578 March 23, 2022 Cordillera Administrative Region Apayao 2nd District Engineering Office
From: Sub-Program: Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads;
Project Description: along Claveria - Calanasan Road KO663+275 - KO663+376;
Physical Target: 3,888.890 Square meters;
Allocation: Php 70,000,000.000

To: Sub-Program: Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads;
Project Desciption: Claveria-Calanasan-Kabugao Road - K0663+275 - K0663+376;
Physical Target: 3,599.500 Square meters;
Allocation: Php 70,000,000.000

May 3, 2022 2022 WIN2F06318 SR2022-03-007580 March 23, 2022 Cordillera Administrative Region Apayao 2nd District Engineering Office
From: Sub-Program: Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads;
Project Description: along Claveria - Calanasan Road KO662+423 - KO662+667;
Physical Target: 3,333.330 Square meters;
Allocation: Php 60,000,000.000

To: Sub-Program: Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads;
Project Desciption: Claveria-Calanasan-Kabugao Road - K0662+423 - K0662+667;
Physical Target: 3,212.500 Square meters;
Allocation: Php 60,000,000.000
May 3, 2022 2022 WIN2F06233 SARO-BMB-A-22-0002929 March 21, 2022 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Tawang-Ambiong Rd - K0260+(-193), K0260+018, K0260+250, K0260+497, K0260+518, K0260+918, K0261+042, K0261+409, K0261+958, K0262+710, K0262+900, K0263+090, K0264+250, K0264+620;
Physical Target: 2,800.000 Lineal Meters;
Allocation: Php 20,000,000.000

To: Tawang-Ambiong Rd - K0260+(-193), K0260+018, K0260+250, K0260+497, K0260+518, K0260+918, K0261+042, K0261+409, K0261+958, K0262+900, K0263+090, K0264+170 - K0264+280, K0264+552;
Physical Target: 1,631.000 Lineal Meters;
Allocation: Php 20,000,000.000

May 3, 2022 2022 WIN2F06339 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Baguio - Bontoc Rd - K0336 + 400 - K0339+200;
Physical Target: 5.584 Lane Km;
Allocation: Php 35,000,000.000

To: Baguio - Bontoc Rd - K0336 + 400 - K0339+285;
Physical Target: 5.754 Lane Km;
Allocation: Php 35,000,000.000


May 3, 2022 2022 WIN2F06236 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Gov. Bado Dangwa National Rd - K0338+600 - K0338+731;
Type of Work: CW1: Preventive Maintenance of Road: Asphalt Overlay
CW2: Construction of Road Slope Protection Structure;
Physical Target: CW1: 0.131 Lane Km
CW2: 242 Square meters;
Allocation: Php 6,000,000.000

To: Gov. Bado Dangwa National Rd - K0343+498 - K0344+000;
Type of Work: Preventive Maintenance of Road: Asphalt Overlay;
Physical Target: 1.048 Lane Km;
Allocation: Php 6,000,000.000

May 3, 2022 2022 WIN2F06238 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Baguio-Bontoc Rd - K0297+144 - K0297+163, K0298+902 - K0298+908, K0298+924 - K0298+952;
Physical Target: 272.000 Square meters;
Allocation: Php 2,700,000.000

To: Baguio-Bontoc Rd - K0297+144 - K0297+200, K0298+924 - K0298+952;
Physical Target: 325 Square meters;
Allocation: Php 2,700,000.000

May 3, 2022 2022 WIN2F06340 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Baguio-Bontoc Rd - K0313+625 - K0313+649, K0315+605 - K0315+710, K0315+900 - K0315+927, K0320+780 - K0320+815, K0322+285 - K0322+300, K0328+900 - K0328+915;
Physical Target: 2,755.000 Square meters;
Allocation: Php 16,000,000.000

To: Baguio-Bontoc Rd - K0313+589 - K0313+649, K0315+661 - K0315+710, K0315+900 - K0315+933, K0320+780 - K0320+830, K0322+270 - K0322+305, K0328+900 - K0328+921;
Physical Target: 1456 Square meters;
Allocation: Php 16,000,000.000

May 3, 2022 2022 WIN2F06292 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Gov. Bado Dangwa National Rd - K0279+659 - K0279+674, K0280+275 - K0280+310, K0292+141 - K0292+156, K0292+466 - K0292+511, K0293+074 - K0293+109, K0299+454 - K0299+489, K0300+824 - K0300+859, K0304+027 - K0304+067;
Physical Target: 1,630.000 Square meters;
Allocation: Php 19,000,000.000

To: Gov. Bado Dangwa National Rd - K0299+454 - K0299+489, K0304+027 - K0304+067;
Physical Target: 789 Square meters;
Allocation: Php 19,000,000.000

May 3, 2022 2022 WIN2F06234 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Cong. Andres Acop Cosalan Rd - K0354+580 - K0354+581, K0355+400 - K0355+401,K0362+230 - K0362+233;
Physical Target: 660.000 Lineal meters;
Allocation: Php 8,000,000.000

To: Cong. Andres Acop Cosalan Rd - K0355+400 - K0355+401,K0362+230 - K0362+233;
Physical Target: 475 Lineal meters;
Allocation: Php 8,000,000.000

May 3, 2022 2022 WIN2F06251 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Baguio-Bontoc Rd - K0309+800 - K0313+000;
Type of Work: Rehabilitation / Major Repair of Drainage Structure along Road;
Physical Target: 3,960.000 Lineal meters;
Allocation: Php 40,000,000.000

To: Baguio-Bontoc Rd - K0309+088 - K0309+500, K0309+800 - K0311+350, K0312+040 - K0312+855, K0313+015 - K0313+780, K0314+180 - K0315+030, K0315+146 - K0315+958, K0316+292 - K0316+661 , K0317+560 - K0317+609;
Type of Work: Construction of Drainage Structure along Road;
Physical Target: 2828 Lineal meters;
Allocation: Php 40,000,000.000

May 3, 2022 2022 WIN2F06237 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Cong. Andres Acop Cosalan Rd - K0364+000 - K0365+865;
Physical Target: 1,900.000 Square meters;
Allocation: Php 15,000,000.000

To: Cong. Andres Acop Cosalan Rd - K0365+000 - K0365+679;
Physical Target: 1697.500 Square meters;
Allocation: Php 15,000,000.000

May 3, 2022 2022 WIN2F06249 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Construction of Multi-Purpose Building at Toludan Elementary School, Barangay Cattubo, Atok, Benguet;
Physical Target: 1.000 Number of Building;
Allocation: Php 7,000,000.000

To: Construction of Multi-Purpose Building at Rufino Alawas Elementary School, Barangay Cattubo, Atok, Benguet;
Physical Target: 1.000 Number of Building;
Allocation: Php 7,000,000.000


May 3, 2022 2022 WIN2F06256 SARO-BMB-A-22-0002930 March 21, 2022 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Construction of Lam-Ayan - Dengao - Dekkan - Balintag Road, Baculongan Sur, Buguias, Benguet;
Physical Target: 0.989 Lane Km;
Allocation: Php 10,000,000.000

To: Construction of Lam-Ayan - Dengao - Dekkan - Balintag Road, Baculongan Norte, Buguias, Benguet;
Physical Target: 0.989 Lane Km;
Allocation: Php 10,000,000.000

May 3, 2022 2022 WIN2F06232 GAA 2022 January 2, 2022 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Balbalan-Pinukpuk Rd - K0517 + 274 - K0517 + 308, K0522 + 830 - K0522 + 862 ;
Physical Target: 650.000 Square meters;
Allocation: Php 9,500,000.000

To: Balbalan-Pinukpuk Rd - K0522 + 830 - K0522 + 866 ;
Physical Target: 559.800 Square meters;
Allocation: Php 9,500,000.000

May 3, 2022 2022 WIN2F06266 GAA 2022 January 2, 2022 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0496 + 591 - K0496 + 668,K0515 + 233 - K0515 + 280 ;
Physical Target: 449.000 Square meters;
Allocation: Php 5,500,000.000

To: Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0496 + 591 - K0496 + 668, K0502 + 752 - K0502 + 763, K0513 + 172 - K0513 + 211;
Physical Target: 597.000 Square meters;
Allocation: Php 5,500,000.000

May 3, 2022 2022 WIN2F06297 GAA 2022 January 2, 2022 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Tabuk-Banawe via Tanudan-Barlig Rd - K0512 + 461 - K0512 + 472, K0514 + 169 - K0514 + 207, K0518 + 645 - K0518 + 695, K0536 + 808 - K0536 + 833, K0542 + 621 - K0542 + 658;
Physical Target: 1,385.000 Square meters;
Allocation: Php 16,500,000.000

To: Tabuk-Banawe via Tanudan-Barlig Rd - K0512 + 333 - K0512 + 408, K0527 + 254 - K0527 + 274, K0532 + 637 - K0532 + 687, K0532 + 795 - K0532 + 840;
Physical Target: 1,220.000 Square meters;
Allocation: Php 16,500,000.000

May 3, 2022 2022 WIN2F06243 SR2022-02-001457 DTD February 4, 2022 Cordillera Administrative Region Lower Kalinga District Engineering Office
From: Construction of Mega Dike Project along Chico River (Left Bank), Tabuk City, Kalinga ;
Physical Target: 866.617 Lineal meters;
Allocation: Php 60,000,000.000

To: Construction of Mega Dike Project along Chico River Sta. 92 + 230 - Sta. 92 + 830 (Right Bank), Tabuk City, Kalinga ;
Physical Target: 600.000 Lineal meters;
Allocation: Php 60,000,000.000

May 3, 2022 2022 WIN2F06269 GAA 2022 January 2, 2022 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0395 + 935 - K0396 + 574;
Physical Target: 1.324 Lane Km;
Allocation: Php 22,255,000.000

To: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0396 + 223 - K0396 + 800;
Physical Target: 1.154 Lane Km;
Allocation: Php 22,255,000.000

May 3, 2022 2022 WIN2F06242 GAA 2022 January 2, 2022 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - (S04030LZ) Chainage 1830 - Chainage 2265;
Physical Target: 0.435 Lane Km;
Allocation: Php 9,570,000.000

To: Jct-Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - (S04030LZ) Chainage 1340 - Chainage 1640;
Physical Target: 0.600 Lane Km;
Allocation: Php 9,570,000.000

May 3, 2022 2022 WIN2F06260 GAA 2022 January 2, 2022 Cordillera Administrative Region Mountain Province 1st District Engineering Office
From: Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - (S04030LZ) Chainage 3015 - Chainage 4015;
Physical Target: 1.000 Lane Km;
Allocation: Php 22,000,000.000

To: Jct-Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - (S04030LZ) Chainage 3415 - Chainage 4015;
Physical Target: 1.200 Lane Km;
Allocation: Php 22,000,000.000

April 29, 2022 FY 2022 WIN2E02244 310201100901000 March 23, 2022 Region IX Regional Office IX
UACS No. 310201100901000
Project ID: P00602313MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Dipolog-Sindangan-Liloy Rd - K1900 + 583 - K1902 + 820, K1902 + 990.00 - K1903 + 736.00
CW1- Road Widening
Physical Target: 5.966 Lane Km
Unit Cost: ₱ 16,568,172.54/Lane Km
ROW- Right-Of-Way Acquisition
Physical Target: 24,347.61 sq.m.
Unit Cost: ₱ 300.00/Sq.m.
EAO: ₱ 3,850,000.00
Total Allocation: ₱ 110,000,000.00
April 29, 2022 FY 2022 WIN2E02250 310201100910000 March 23, 2022 Region IX Regional Office IX
UACS No. 310201100910000
Project ID: P00602314MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Sindangan-Liloy Rd - K1935 + 000 - K1935 + 240, K1935 + 500 - K1937 + 611.90, K1938 + 393.00 - K1938 + 895.65, K1942+500.00 - K1942+860.00
CW1- Road Widening
Physical Target: 6.429 Lane Km
Unit Cost: ₱ 15,411,171.91/Lane Km
ROW- Right-Of-Way Acquisition
Physical Target: 7,372.786 sq.m.
Unit Cost: ₱ 300.00/Sq.m.
EAO: ₱ 3,673,740.00
Total Allocation: ₱ 104,964,000.00
April 29, 2022 FY 2022 WIN2E02246 310211100086000 March 23, 2022 Region IX Regional Office IX
UACS No. 310211100086000
Project ID: P00602318MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Secondary Roads

Liloy-Siocon Rd - K2034 + 005.00 - K2034 + 779.68, K2035 + 218.50 - K2037 + 020.00
CW1- Paving of Unpaved Roads
Physical Target: 5.152 Lane Km
Unit Cost: ₱ 19,054,013.63/Lane Km
EAO: ₱ 3,570,000.00
Excess: ₱ 263,721.76
Total Allocation: ₱ 102,000,000.00
April 29, 2022 FY 2022 WIN2E02182 310201100898000 March 23, 2022 Region IX Regional Office IX
UACS No. 310201100898000
Project ID: P00602320MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1879 + 000 - K1882 + 000
CW1- Road Widening
Physical Target: 6.000 Lane Km
Unit Cost: ₱ 13,866,245.97/Lane Km
ROW- Right-Of-Way Acquisition
Physical Target: 60,425.08 sq.m.
Unit Cost: ₱ 300.00/Sq.m.
EAO: ₱ 3,675,000.00
Total Allocation: ₱ 105,000,000.00
April 29, 2022 FY 2022 WIN2E02202 310202101024000 March 23, 2022 Region IX Regional Office IX
UACS No. 310202101024000
Project ID: P00602322MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads

Rizal-Dakak-Dapitan Coastal Loop Rd - K1864 + 000 - K1866 + 800
CW1- Road Widening
Physical Target: 5.600 Lane Km
Unit Cost: ₱ 16,297,413.70/Lane Km
ROW- Right-Of-Way Acquisition
Physical Target: 33,333.333 sq.m.
Unit Cost: ₱ 300.00/Sq.m.
EAO: ₱ 3,675,000.00
Excess: ₱ 59,483.26
Total Allocation: ₱ 105,000,000.00
April 29, 2022 FY 2022 WIN2E02176 310201100905000 March 23, 2022 Region IX Regional Office IX
UACS No. 310201100905000
Project ID: P00602324MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Pagadian City-Zamboanga City Rd - K1710 + 100.00 - K1712 + 960.00
CW1- Road Widening
Physical Target: 5.72 Lane Km
Unit Cost: ₱ 15,450,405.45/Lane Km
ROW- Right-Of-Way Acquisition
Physical Target: 33,333.333 sq.m.
Unit Cost: ₱ 300.00/Sq.m.
EAO: ₱ 3,570,000.00
Excess: ₱ 53,680.84
Total Allocation: ₱ 102,000,000.00
April 29, 2022 FY 2022 WIN2E02213 310212100201000 March 22, 2022 Region IX Regional Office IX
UACS No. 310212100201000
Project ID: P00602331MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Tertiary Roads

Zamboanga del Sur Coastal Rd - (S01186MN) Chainage 10653.00 - Chainage 13640.00
CW1- Paving of Unpaved Roads
Physical Target: 5.97 Lane Km
Unit Cost: ₱ 15,393,634.84/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 16,666.67 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 3,570,000.00
Excess: ₱ 1,530,000.00
Total Allocation: ₱ 102,000,000.00
April 29, 2022 FY 2022 WIN2E02218 310201100903000 March 23, 2022 Region IX Regional Office IX
UACS No. 310201100903000
Project ID: P00602333MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Lanao-Pagadian-Zamboanga City Rd - K1789 + 738 - K1790 + 500.00, K1790 + 720.00 - K1791 + 864.00, K1793 + 100.00 - K1793 + 870.00, K1794 + 215.00 - K1795 + 240.00, K1795 + 500.00 - K1795 + 800.00
CW1- Road Widening
Physical Target: 8.00 Lane Km
Unit Cost: ₱ 11,468,101.76/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 21,666.667 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 3,570,000.00
Excess: ₱ 185,185.96
Total Allocation: ₱ 102,000,000.00
April 29, 2022 FY 2022 WIN2E02238 310205100731000 March 22, 2022 Region IX Regional Office IX
UACS No. 310205100731000
Project ID: P00603740MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Missing Links/ New Roads

Sindangan - Bayog - Lakewood Road, Package 1, Zamboanga Del Norte
CW1- Construction of Concrete Road
Physical Target: 2.34 Lane Km
Unit Cost: ₱ 27,500,000.00/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 16,666.667 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 2,555,000.00
Excess: ₱ 1,095,000.00
Total Allocation: ₱ 73,000,000.00
April 29, 2022 FY 2022 WIN2E02222 310204101595000 March 22, 2022 Region IX Regional Office IX
UACS No. 310204101595000
Project ID: P00604237MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Zamboanga City By-pass Road, (Widening of San Ramon Bridge including approaches), Zamboanga City
CW1- Widening of Bridge
Physical Target: 437.886 sq.m.
Unit Cost: ₱ 219,006.77/sq.m.
ROW- Right-Of-Way Acquisition
Physical Target: 3,333.333 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 3,570,000.00
Excess: ₱ 1,530,000.00
Total Allocation: ₱ 102,000,000.00
April 29, 2022 FY 2022 WIN2E02224 320101107686000 March 22, 2022 Region IX Regional Office IX
UACS No. 320101107686000
Project ID: P00620010MN

OO2: Protect Lives and Properties - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure at Bogayo River, Kumalarang Br. 1 Section (B00549MN) (Downstream Rightside) along Pagadian City - Zamboanga City Road (S01453MN), Brgy. Bogayo, Kumalarang, Zamboanga del Sur
CW1- Construction of Flood Mitigation Structure
Physical Target: 448.00 Lineal Meters
Unit Cost: ₱ 216,294.65/Lineal Meters
EAO: ₱ 3,570,000.00
Excess: ₱ 1,530,000.00
Total Allocation: ₱ 102,000,000.00
April 29, 2022 FY 2022 WIN2E02249 320101107689000 March 23, 2022 Region IX Regional Office IX
UACS No. 320101107689000
Project ID: P00620013MN

OO2: Protect Lives and Properties - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure at Rebokon River, Rebokon Bridge Section along Zamboanga del Sur Coastal National Road (S01101MN), Brgy. Rebokon, Dumalinao, Zamboanga del Sur
CW1- Construction of Flood Mitigation Structure
Physical Target: 267.50 Lineal Meters
Unit Cost: ₱ 254,828.54/Lineal Meters
EAO: ₱ 2,472,365.00
Total Allocation: ₱ 70,639,000.00
April 29, 2022 FY 2022 WIN2E02207 320101107693000 March 22, 2022 Region IX Regional Office IX
UACS No. 320101107693000
Project ID: P00620017MN

OO2: Protect Lives and Properties - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure at Tukuran River, Militar Br. Section (B00470MN) (Upstream - Right Side), along Jct. Tukuran - Jct. Karomatan Road (S01103MN), Zamboanga del Sur
CW1- Construction of Flood Mitigation Structure
Physical Target: 610.00 Lineal Meters
Unit Cost: ₱ 163,524.59/Lineal Meters
EAO: ₱ 3,675,000.00
Excess: ₱ 1,575,000.00
Total Allocation: ₱ 105,000,000.00
April 29, 2022 FY 2022 WIN2E02225 320101106250000 March 22, 2022 Region IX Regional Office IX
UACS No. 320101106250000
Project ID: P00620022MN

OO2: Protect Lives and Properties - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction/Extension of Flood Control Structure along Siocon River (Upstream), Siocon, Zamboanga del Norte
CW1- Construction of Flood Mitigation Structure
Physical Target: 470.00 Lineal Meters
Unit Cost: ₱ 204,058.70/Lineal Meters
ROW- Right-Of-Way Acquisition
Physical Target: 141.368 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 3,535,000.00
Excess: ₱ 1,515,000.00
Total Allocation: ₱ 101,000,000.00
April 29, 2022 FY 2022 WIN2E02192 310108100968000 March 23, 2022 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310108100968000
Project ID No.: P00601378MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Zamboanga City - Labuan - Limpapa Rd - K1973 + 218.74 - K1973 + 282.45, K1973 + 940 - K1974 + 030, K1974 + 535 - K1974 + 580.53, K1974 + 740 - K1974 + 784.13
CW1- Construction of Road Slope Protection Structure
Physical Target: 2,236.76 sq.m.
Unit Cost: ₱ 23,519.66479/Sq.m.
EAO: ₱ 2,100,000.00
Excess: ₱ 5,292,154.59
Total Allocation: ₱ 60,000,000.00
April 29, 2022 FY 2022 WIN2E02242 310204101786000 March 23, 2022 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310204101786000
Project ID: P00604480MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

NRJ Lapakan - Lamisahan - Victoria By-Pass Road Package 2, Zamboanga City
CW1- Construction of Concrete Road
Physical Target: 2 Lane km
Unit Cost: ₱ 20,895,198.33/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 5,000 sq.m.
Unit Cost: ₱ 1,440.00/sq.m.
EAO: ₱ 1,000,000.00
Excess: ₱ 9,603.36
Total Allocation: ₱ 50,000,000.00
April 29, 2022 FY 2022 WIN2E02211 310204101787000 March 23, 2022 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310204101787000
Project ID: P00604481MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

NRJ Lapakan - Lamisahan - Victoria By-Pass Road Package 3, Zamboanga City
CW1- Construction of Concrete Road
Physical Target: 2 Lane km
Unit Cost: ₱ 20,137,042.27/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 6,055 sq.m.
Unit Cost: ₱ 1,440.00/sq.m.
EAO: ₱ 1,000,000.00
Excess: ₱ 5,915.45
Total Allocation: ₱ 50,000,000.00
April 29, 2022 FY 2022 WIN2E02195 310110100330000 March 21, 2022 Region IX Zamboanga del Norte 1st District Engineering Office
UACS No. 310110100330000
Project ID: P00601320MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

Dipolog - Oroquieta National Rd - K1831 + 440 - K1831 + 967.7

CW1 - Construction of Drainage Structure along Road: 519.56 l.m.
Unit Cost: P 13,664.21/l.m.
ROW: 1,714.55 sq.m.
Unit Cost: P 1,608.95/sq.m
EAO: P 141,987.57
Allocation: P 10,000,000.00
April 29, 2022 FY 2022 WIN2E02107 310110100331000 March 21, 2022 Region IX Zamboanga del Norte 1st District Engineering Office
UACS No. 310110100331000
Project ID: P00601321MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

Dipolog - Oroquieta National Rd - K1834 + 190.09 - K1834 + 807.72

CW1 - Construction of Drainage Structure along Road: 883.17 l.m.
Unit Cost: P 11,509.88/l.m.
ROW: 1,478.40 sq.m.
Unit Cost: P 1,748.00/sq.m
EAO: P 203,303.61
Allocation: P 12,953,000.00
April 29, 2022 FY 2022 WIN2E02051 310109100907000 March 21, 2022 Region IX Zamboanga del Norte 1st District Engineering Office
UACS No. 310109100907000
Project ID: P00601382MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Sindangan - Bayog - Lakewood Rd (S01059MN)
Chainage 10542.2 - Chainage 10650,
Chainage 11244.8 - Chainage 11347

CW1- Construction of Slope Protection Structure
Physical Target: 11,483.13 sq.m.
Unit Cost: ₱ 5,126.22/Sq.m.
EAO: ₱ 2,135,000.00
Total Allocation: ₱ 61,000,000.00
April 29, 2022 FY 2022 WIN2E02200 310203100523000 March 30, 2022 Region IX Zamboanga del Sur 2nd District Engineering Office
UACS No. 310203100523000
Project ID: P00602301MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads

Sindangan - Bayog - Lakewood Rd - K1734 + 422 - K1735 + 000, K1735 + 362 - K1736 + 000, K1736 + 559 - K1737 + 288

CW1- Road Widening
Physical Target: 3.89 Lane Km
Unit Cost: ₱ 15,075,334.19/Lane km
EAO: ₱ 2,126,950.00
Total Allocation: ₱ 60,770,000.00
April 29, 2022 FY 2022 WIN2E02251 300217100042000 March 22, 2022 Region IX Zamboanga Sibugay 1st District Engineering Office
UACS No. 300217100042000
Project ID: P00633884MN

CSSP: Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)

Preventive Maintenance along Imelda-Bayog-Kumalarang-Margosatubig Rd. K1751 + (-602) - K1752 + 430.5

CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target: 4.065 lane-km
Unit Cost : P 16,617,466.17/lane-km
EAO : P 2,450,000.00
Allocation : P 70,000,000.00
April 29, 2022 FY 2022 WIN2E02187 310106100824000 March 23, 2022 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 310106100824000
Project ID: P00601164MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Crossing Sta. Clara - Sandayong Rd - K1796 + 050 - K1796 + 098

CW1 : Reconstruction to Concrete Pavement
Physical Target: 0.096 lane-km
Unit Cost : P 20,416,666.67/lane-km
EAO : P 40,000.00
Allocation : P 2,000,000.00
April 29, 2022 FY 2022 WIN2E02228 310201101020000 March 23, 2022 Region IX Zamboanga Sibugay 2nd District Engineering Office
UACS No. 310201101020000
Project ID: P00602337MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Lanao-Pagadian-Zamboanga City Rd - K1791 + 864 - K1792 + 520

CW1- Road Widening
Physical Target: 1.306 Lane Km
Unit Cost: ₱ 16,406,814.70/Lane km
ROW: 3,333.33 sq.m.
Unit Cost: P 300.00/sq.m
EAO: ₱ 457,700.00
Total Allocation: ₱ 22,885,000.00
April 29, 2022 FY 2022 WIN2E02259 310101100577000 March 31, 2022 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 310101100577000
Project ID : P00601153MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads

Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1857+(-1123) - K1857+251, K1858+000 - K1858+895, K1859+000 - K1861+645

CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target: 9.796 Lane km
Unit Cost : P 8,373,315.64/Lane km
EAO : P 2,975,000.00
Allocation : P 85,000,000.00
April 29, 2022 FY 2022 WIN2E02208 310104100358000 March 31, 2022 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 310104100358000
Project ID: P00601157MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

Dipolog-Oroquieta National Rd - K1818+535 - K1818+672, K1819+000 - K1819+330, K1819+345 - K1820+144, K1823+000 - K1824+000, K1826+485 - K1826+531, K1826+592 - K1826+695, K1826+1000 - K1827+064, K1828+000 - K1828+967.50

CW1 : Reconstruction to Concrete Pavement
Physical Target: 6.943 Lane km
Unit Cost : P 7,505,401.12/Lane km
EAO : P 1,890,000.00
Allocation : P 54,000,000.00
April 29, 2022 FY 2022 WIN2E02171 310105100638000 March 23, 2022 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 310105100638000
Project ID: P00601158MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Rizal-Dakak-Dapitan Coastal Loop Rd - K1799+030 - K1799+633, K1819+766 - K1820+009, K1846+270- K1846+390, K1849+540 - K1849+601, K1859+430 - K1860+254

CW1 : Reconstruction to Concrete Pavement
Physical Target: 3.702 Lane km
Unit Cost : P 20,246,484.33/Lane km
ROW - Right-of-Way Acquisition
Physical Target: P 1,710 sq.m.
Unit Cost: P 1,500.00/sq.m.
EAO : P 2,811,515.00
Allocation : P 80,329,000.00
April 29, 2022 FY 2022 WIN2G02886 310106100822000 March 23, 2022 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 310106100822000
Project ID: P00601159MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Piñan-Mutia Rd - K1816+(-878.50) - K1816+(-816), K1818+000 - K1818+100, K1823+194.60 - K1823+541, (S01035MN) Chainage 0 - Chainage 548

CW1 : Reconstruction to Concrete Pavement
Physical Target: 2.1138 Lane km
Unit Cost : P 10,513,047.59/Lane km
EAO : P 453,520.00
Allocation : P 22,676,000.00
April 29, 2022 FY 2022 WIN2E02175 310108100966000 March 23, 2022 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 310108100966000
Project ID No.: P00601388MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Jct Pulauan Port Rd - K1827+588 - K1827+782.60

CW1- Construction of Road Slope Protection Structure
Physical Target: 4,574.65 sq.m.
Unit Cost: ₱ 16,525.85/Sq.m.
ROW - Right-of-Way Acquisition
Physical Target: P 1,066.66 sq.m.
Unit Cost: P 1,500.01/sq.m.
EAO: ₱ 2,800,000.00
Total Allocation: ₱ 80,000,000.00
April 29, 2022 FY 2022 WIN2E02179 310108101228000 March 31, 2022 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 310108101228000
Project ID No.: P00601389MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Rizal-Dakak-Dapitan Coastal Loop Rd - K1828+840 - K1829+028, K1829+136 - K1829+145.40, K1836+825 - K1836+960, K1859+225 - K1859+425

CW1- Construction of Road Slope Protection Structure
Physical Target: 8,039.81 sq.m.
Unit Cost: ₱ 3,656.80/Sq.m.
EAO: ₱ 600,000.00
Total Allocation: ₱ 30,000,000.00
April 29, 2022 FY 2022 WIN2E02191 310101100742000 March 23, 2022 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 310101100742000
Project ID : P00604478MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads

Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd - K1861+645 - K1862+631.50, K1862+810.60 - K1863+000, K1866+698 - K1867+917.80

CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target: 4.6194 Lane km
Unit Cost : P 8,485,950.56/Lane km
EAO : P 800,000.00
Allocation : P 40,000,000.00
April 29, 2022 FY 2022 WIN2E02177 310102101056000 March 31, 2022 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 310102101056000
Project ID : P00604479MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads

Rizal-Dakak-Dapitan Coastal Loop Rd - K1860+254 - K1862+427, K1868+369.80 - K1868+833

CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target: 5.2724 Lane km
Unit Cost : P 7,434,944.24/Lane km
EAO : P 800,000.00
Allocation : P 40,000,000.00
April 29, 2022 FY 2022 WIN2E02174 300225100636000 March 31, 2022 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 300225100636000
Project ID : P00631083MN

CSSP: Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities


Construction of Flood Mitigation Structure, Sinaad-San Francisco, Sergio Osmeña, Zamboanga del Norte

CW1 - Construction of Flood Mitigation Structure
Physical Target: 10.070 Lineal meters
Unit Cost : P 491,559.09/Lineal meters
EAO : P 50,000.00
Allocation : P 5,000,000.00
April 29, 2022 FY 2022 WIN2E02048 300225100638000 March 31, 2022 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 300225100638000
Project ID : P00634997MN

CSSP: Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities

Construction of Box Culvert Bridge, San Pedro, Dapitan City, Zamboanga Del Norte

CW1 - Construction of Flood Mitigation Structure
Physical Target: 12.10 Lineal meters
Unit Cost : P 409,090.91/Lineal meters
EAO : P 50,000.00
Allocation : P 5,000,000.00
April 28, 2022 FY 2022 GAA WIN2G02926 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310108100883000
Project ID : P00611359LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM :

PPSR Jct - Napsan - Apurawan Road
K0038+578 - K0038+659
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,864.06 square meter
Allocation - Php 51.553 Million

TO ;

PPSr Jct - Napsan - Apurawan Road
K0038+578 - K0038+656
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,122.50 square meter
Allocation - Php 51.553 Million
April 28, 2022 2022 WIN2E02276 FY 2022 GAA RA 11639 January 22, 2022 Region XIII Regional Office XIII
UACS No. : 310101100596000
Project ID: P00604687MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads

FROM:

Butuan City-Malaybalay Rd - K1241 + 500 - K1247 + 900

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 16.371 Lane Km

Allocation:
TOTAL: P 130,000,000
CW1: P 125,450,000
EAO: P 4,550,000

Unit Cost:
CW1: P 7,662,940.566/Lane Km

TO:

Butuan City-Malaybalay Rd - K1241+500 - K1247+775

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 16.887 Lane Km

Allocation:
TOTAL: P 130,000,000
CW1: P 125,450,000
EAO: P 4,550,000

Unit Cost:
CW1: P 7,428,791.378/Lane Km
April 28, 2022 2022 WIN2E02274 FY 2022 GAA RA 11639 January 20, 2022 Region XII Regional Office XII
UACS No. : 310110100273000
Project ID: P00601369MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

FROM:

Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1246 + 000 - K1247 + 219

Type of Work:
CW1- Construction of Drainage Structure along Road

Physical Target:
CW1- 1,200 Lineal meters

Allocation:
TOTAL: P 108,536,000
CW1: P 104,737,240
EAO: P 3,798,760

Unit Cost:
CW1: P 87,281.03/ Lineal meters

TO:

Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1246 + 362 - K1246 + 633

Type of Work:
CW1- Construction of Drainage Structure along Road

Physical Target:
CW1- 853 Lineal meters

Allocation:
TOTAL: P 108,536,000
CW1: P 104,737,240
EAO: P 3,798,760

Unit Cost:
CW1: P 122,786.92/ Lineal meters
April 28, 2022 2022 WIN2E02234 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 300214100094000
Project ID: P00633705MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

FROM:

Preventive Maintenance along Daang Maharlika (Agusan-Davao Sect) - K1278 + 862 - K1280 + 777, K1280 + 883 - K1281 + 565, K1287 + 910 - K1288 + 964, K1290 + 846 - K1294 + 035, K1294 + 245 - K1295 + 633, K1297 + 125 - K1297 + 959, K1302 + 858 - K1303 + 600

Type of Work:
CW1- Preventive Maintenance of Road: Concrete Reblocking

Physical Target:
CW1- 6.010 Lane Km

Allocation:
TOTAL: P 110,000,000
CW1: P 106,150,000
EAO: P 3,850,000

Unit Cost:
CW1: P 17,662,229.62/ Lane Km

TO:

Preventive Maintenance along Daang Maharlika (Agusan-Davao Sect) - K1278+862.00 - K1280+777.00, K1280+883.00 - K1281+565.00, K1287+910.00 -K1288+964.00, K1290+846.00 - K1291+666.00

Type of Work:
CW1- Preventive Maintenance of Road: Concrete Reblocking

Physical Target:
CW1- 14.366 Lane Km

Allocation:
TOTAL: P 110,000,000
CW1: P 106,150,000
EAO: P 3,850,000

Unit Cost:
CW1: P 7,388,973.97/ Lane Km
April 28, 2022 2022 WIN2E02217 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 310205100954000
Project ID: P00603827MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads

FROM:

East-West lateral road connecting Agusan Del Sur to Bukidnon, San Miguel Proper (Surigao del Sur) - Calaitan (Bayugan), Package 11, Surigao del Sur

Type of Work:
CW1- Construction of Gravel Road

Physical Target:
CW1- 1.218 Lane Km

Allocation:
TOTAL: P 67,000,000
CW1: P 64,655,000
EAO: P 2,345,000

Unit Cost:
CW1: P 53,082,922.82/ Lane Km

TO:

East-West lateral road connecting Agusan Del Sur to Bukidnon, San Miguel Proper (Surigao del Sur) - Calaitan (Bayugan), Package 11, Surigao del Sur

Type of Work:
CW1- Construction of Gravel Road

Physical Target:
CW1- 0.840 Lane Km

Allocation:
TOTAL: P 67,000,000
CW1: P 64,655,000
EAO: P 2,345,000

Unit Cost:
CW1: P 76,970,238.1/ Lane Km
April 28, 2022 FY 2022 GAA WIN2G02883 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300219100141000
Project ID : P00630954LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
- Flood Mitigation Structures protecting Public
Infrastructures/Facilities

FROM :

Construction of cagancan River Control, barangay Don Pedro,
Mansalay, Oriental mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure:
1,247.95 lineal meter
Allocation - Php 150.00 Million

TO :

Construction of Cagancan River Control, barangay Don Pedro,
Mansalay, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure:
1,467.00 lineal meter
Allocation - Php 150.00 Million

April 28, 2022 FY 2022 GAA WIN2G02912 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300203101637000
Project ID : P00635432LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Construction/Improvement of Access Roads leading to
Declared Tourism Destinations
(Tourism Road Infrastructure Program - TRIP)

FROM :

San Jose - Port Barton Road leading to Various resorts in
Port Barton, San Vicente, Palawan
Physical Target - CW1 - Construction of Concrete Road :
6.662 lane km
Allocation - Php 9.930 Million

TO :

San Jose - Port Barton Road leading to various resorts in
Port Barton, San Vicente, Palawan
Physical Target - CW1 - Construction of Concrete Road ;
0.717 lane km
Allocation - Php 9.930 Million
April 28, 2022 FY 2022 GAA WIN2G02900 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100242000
Project ID : P00636844LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating GAPS (SIPAG)
- Access Roads and/or Bridges from the national Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and landslide along TDC - Pagdanan Road, San Vicente, Palawan
Sta. 14+973.00 to Sta. 15+167.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,547.14 square meter
Allocation - Php 113.665 MIllion

TO :

Rehabilitation of Road with Slips, Slope Collapse, and landslide along TDC - Pagdanan Road, San Vicente, Palawan
Sta. 14+973.00 to Sta. 15+167.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 4,888.49 square meter
Allocation - Php 113.665 Million

April 28, 2022 2022 WIN2E02281 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Butuan City District Engineering Office
UACS No. : 310201101058000
Project ID: P00602515MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads

FROM:

Daang Maharlika (Surigao-Agusan Sect) - K1232 + 791 - K1232 + 851, K1240 + 305 - K1240 + 474

Type of Work:
CW1- Road Widening

Physical Target:
CW1- 0.398 Lane Km

Allocation:
TOTAL: P 20,000,000
CW1: P 19,600,000
EAO: P 400,000

Unit Cost:
CW1: P 49,246,231.16/ Lane Km

TO:

Daang Maharlika (Surigao-Agusan Sect) - K1232 + 860 - K1233 + 128, K1240 + 694 - K1240 + 863

Type of Work:
CW1- Road Widening

Physical Target:
CW1- 1.022 Lane Km

Allocation:
TOTAL: P 20,000,000
CW1: P 19,600,000
EAO: P 400,000

Unit Cost:
CW1: P 19,178,082.19/ Lane Km
April 28, 2022 FY 2022 GAA WIN2G02898 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100245000
Project ID : P00636847LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
- Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide,
Port Barton - Kemdeng Road,
Sta. 0+052.00 - Sta. 0+300.00
San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 3,256.118 square meter
Allocation - Php 145.303 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse and, Landslide,
Port Barton - Kemdeng Road,
Sta. 0+000.00 - Sta 0+218.00
San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 5,845.99 square meter
Allocation - Php 145.303 Million
April 28, 2022 FY 2022 GAA WIN2G02927 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100247000
Project ID : P00636849LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
- Access Roads and/or Bridges from the National Road/s leading to
Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide,
Port Barton - Kemdeng Road,
San Vicente, Palawan
Sta. 0+767.00 - Sta. 0+887.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,342.13 square meter
Allocation - Php 59.892 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide,
Port barton - kemdeng Road,
San Vicente, Palawan
Sta. 0+485.00 - Sta. 0+573.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,434.80 square meter
Allocation - Php 59.892 Million
.
April 28, 2022 FY 2022 GAA WIn2G02815 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300219100143000
Project ID : P00639384LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Program Alleviating Gaps(SIPAG)
- Flood mitigation Structures protecting Public
Infrastructure/Facilities

FFROM :

Construction of River Control Structure and Drainage System,
Cambajao River Control, Sibuyan Island, Romblon (Phase 2)
Physical Target - CW1 - Construction of Flood Mitigation Structure:
915.165 lineal meter
Allocation - Php 110.00 million

TO :

Construction of River Control Structure and Drainage System,
Cambajao River Control, Sibuyan island, Romblon (Phase 2)
Physical Target - CW1 - Construction of Flood Mitigation Structure:
560.050 lineal meter
Allocation - Php 110.00 Million
April 28, 2022 2022 WIN2C03492 GAA FY 2022 January 1, 2022 Region VIII Northern Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Tertiary Roads

AS PER GAA/ORIGINAL:

Rawis-Catubig Rd-K0798+000 - K0799+230, K0801+877 - K0802+855

Physical Target: Allocation:

CW1-Road Widening: 4.398 Lane Km P 39.20 M

EAO P 0.80 M

Total P 40.00 M

AS MODIFIED:

Rawis-Catubig Rd-K0798+020 - K0799+214.50, K0801+877 - K0802+848

Physical Target: Allocation:

CW1-Road Widening: 4.313 Lane Km P 39.20 M

EAO P 0.80 M

Total P 40.00 M
April 28, 2022 2022 WIN2C03505 SR2022-03-008081 March 23, 2022 Region VIII Northern Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Sn Policarpo-Arteche-Lapinig Rd, K0861+500 - K0861+550, K0861+800 - K0861+920

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 94.4928 M
Structure: 5,440 Square meters

EAO P 3.4272 M

Total P 97.92 M

AS MODIFIED:

Sn Policarpo-Arteche-Lapinig Rd, K0861+212 - K0862+060

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 94.4928 M
Structure: 6,176 Square meters

EAO P 3.4272 M

Total P 97.92 M
April 28, 2022 2022 WIN2C03493 SR2022-03-008092 March 23, 2022 Region VIII Northern Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Sn Policarpo-Arteche-Lapinig Rd- K0862+550 - K0862+722

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 93.67448 M
Structure: 5,392.89 Square meters
EAO P 3.39752 M

Total P 97.072 M

AS MODIFIED:

Sn Policarpo-Arteche-Lapinig Rd-K0862+747 - K0863+085

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 93.67448 M
Structure: 5,967 Square meters
EAO P 3.39752 M

Total P 97.072 M
April 28, 2022 2022 WIN2C03515 SR2022-03-007863 March 23, 2022 Region VIII Northern Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd-K0814+661 - K0814+808

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 51.145 M
Structure: 2,944.44 Square meters

EAO P 1.855 M

Total P 53.00 M

AS MODIFIED:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd-K0812+460 - K0812+533, K0813+320 - K0813+458, K0814+661 - K0814+808

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 51.145 M
Structure: 3,330 Square meters

EAO P 1.855 M

Total P 53.00 M
April 28, 2022 2022 WIN2C03483 SR2022-03-007872 March 23, 2022 Region VIII Northern Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Rawis-Catubig Rd-K0805+450 - K0805+600

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 93.725625 M
Structure: 5,395.83 Square meters

EAO P 3.399375 M

Total P 97.125 M

AS MODIFIED:

Rawis-Catubig Rd-K0789+762.60 - K0791+000, K0793+950 - K0794+396

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 93.725625 M
Structure: 5,620.30 Square meters

EAO P 3.399375 M

Total P 97.125 M
April 28, 2022 2022 WIN2C03490 SARO-BMB-A-22-0003144 March 21, 2022 Region VIII Northern Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd-K0820+700 - K0820+750

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 29.792 M
Structure: 1,688.89 Square meters

EAO P 0.608 M

Total P 30.40 M

AS MODIFIED:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd-K0820+572 - K0820+756

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 29.792 M
Structure: 3,120 Square meters

EAO P 0.608 M

Total P 30.40 M
April 28, 2022 2022 WIN2C03491 SARO-BMB-A-22-0003144 March 21, 2022 Region VIII Northern Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd-K0831+423 - K0831+640

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 44.10 M
Structure: 2,500 Square meters

EAO P 0.90 M

Total P 45.00 M

AS MODIFIED:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd-K0831+440 - K0831+640

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 44.10 M
Structure: 2,500 Square meters

EAO P 0.90 M

Total P 45.00 M
April 28, 2022 2022 WIN2E02150 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Surigao del Sur 1st District Engineering Office
UACS No. : 300219101256000
Project ID: P00630654MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
FROM:

Construction of River Control Structure at Daniog River, Barangay Gamuton, Lanuza, Surigao del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 236.515 Lineal meters

Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000

Unit Cost:
CW1: P 124,305.01/Lineal meters

TO:

Construction of River Control Structure at Daniog River, Barangay Gamuton, Lanuza, Surigao del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 415.600 Lineal meters

Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000

Unit Cost:
CW1: P 70,741.10/Lineal meters
April 28, 2022 2022 WIN2E02164 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Surigao del Sur 1st District Engineering Office
UACS No. : 300225100707000
Project ID: P00634154MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities

FROM:

Construction of Flood Control and Drainage System at Barangay Rosario, Tandag City, Surigao del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 118.258 Lineal meters

Allocation:
TOTAL: P 15,000,000
CW1: P 14,850,000
EAO: P 150,000

Unit Cost:
CW1: P 125,572.90/Lineal meters

TO:

Construction of Flood Control and Drainage System at Barangay Rosario, Tandag City, Surigao del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 931.00 Lineal meters

Allocation:
TOTAL: P 15,000,000
CW1: P 14,850,000
EAO: P 150,000

Unit Cost:
CW1: P 15,950.59/Lineal meters
April 28, 2022 FY 2022 WIN2E02219 310102100846000 March 23, 2022 Region IX Regional Office IX
UACS No. 310102100846000
Project ID: P00601155MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads

Rizal-Dakak-Dapitan Coastal Loop Rd - K1805 + 000 - K1807 + 000, K1808 + 000 - K1811 + 000, K1813 + 000 - K1814 + 000.00

CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target: 12.00 Lane Km
Unit cost: ₱ 9,515,382.50/Lane km
EAO: ₱ 4,141,410.00
Total Allocation: ₱ 118,326,000.00

April 28, 2022 FY 2022 WIN2E02237 310108100967000 March 23, 2022 Region IX Regional Office IX
UACS No. 310108100967000
Project ID: P00601377MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Zamboanga City-Labuan-Limpapa Rd - K1971 + 740.00 - K1971 + 880.00, K1971 + 960.00 - K1972 + 140.00, K1973 + 140.00 - K1973 + 200.00

CW1- Construction of Road Slope Protection Structure
Physical Target: 4,997.50 sq.m.
Unit Cost: ₱ 20,169.67/Sq.m.
ROW- Right-Of-Way Acquisition
Physical Target: 1,756.95 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 3,675,000.00
Total Allocation: ₱ 105,000,000.00

April 28, 2022 FY 2022 WIN2E02193 310305101539000 March 23, 2022 Region IX Regional Office IX
UACS No. 310305101539000
Project ID: P00602121MN

OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges

Sindangan Br. (B00455MN) along Dipolog-Sindangan-Liloy Rd (Phase II)
CW1- Widening of Bridge
Physical Target: 4,335.93 sq.m.
Unit Cost: ₱ 50,543.95/Sq.m.
ROW- Right-Of-Way Acquisition
Physical Target: 61,149.95 sq.m.
Unit Cost: ₱ 300.00/Sq.m.
EAO: ₱ 8,750,000.00
Excess: ₱ 3,750,000.00
Total Allocation: ₱ 250,000,000.00
April 28, 2022 FY 2022 WIN2E02212 310305101538000 March 23, 2022 Region IX Regional Office IX
UACS No. 310305101538000
Project ID: P00602122MN

OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges

Piao Br. (B00454MN) along Dipolog-Sindangan-Liloy Rd (Phase II)
CW1- Widening of Bridge
Physical Target: 2,023.434 sq.m.
Unit Cost: ₱ 27,227.31/Sq.m.
ROW- Right-Of-Way Acquisition
Physical Target: 6,357.77 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 2,100,000.00
Excess: ₱ 900,000.00
Total Allocation: ₱ 60,000,000.00


April 28, 2022 FY 2022 WIN2E02209 310305101533000 March 22, 2022 Region IX Regional Office IX
UACS No. 310305101533000
Project ID: P00602124MN

OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges

De Venta Perla Br. (B01606MN) along Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd
CW1- Widening of Bridge
Physical Target: 1,445.31 sq.m.
Unit Cost: ₱ 72,220.66/Sq.m.
ROW- Right-Of-Way Acquisition
Physical Target: 395.838 sq.m.
Unit Cost: ₱ 300.00/sq.m
EAO: ₱ 3,850,000.00
Excess: ₱ 1,650,000.00
Total Allocation: ₱ 110,000,000.00
April 28, 2022 FY 2022 WIN2E02284 310305101536000 March 22, 2022 Region IX Regional Office IX
UACS No. 310305101536000
Project ID: P00602125MN

OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges

Layawan Br. (B00422MN) along Dipolog-Punta-Dansullan-S Osmeña-Zamboanga del Norte/Sur Bdry Rd
CW1- Widening of Bridge
Physical Target: 724.086 sq.m.
Unit Cost: ₱ 144,319.87/Sq.m.
EAO: ₱ 3,850,000.00
Excess: ₱ 1,650,000.00
Total Allocation: ₱ 110,000,000.00
April 28, 2022 FY 2022 WIN2E02190 310201100907000 March 23, 2022 Region IX Regional Office IX
UACS No. 310201100907000
Project ID: P00602310MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Pagadian City-Zamboanga City Rd - K1858 + 978.00 - K1861 + 336.00, K1864+235.00 - K1864 + 700.00
CW1- Road Widening
Physical Target: 5.646 Lane Km
Unit Cost: ₱ 15,604,598.60/Lane km
ROW- Right-Of-Way Acquisition/
Physical Target: 44,071.45 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 3,675,000.00
Total Allocation: ₱ 105,000,000.00
April 28, 2022 FY 2022 WIN2E02189 310201100909000 March 23, 2022 Region IX Regional Office IX
UACS No. 310201100909000
Project ID: P00602311MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Pagadian City-Zamboanga City Rd - K1883 + 794.00 - K1885 + 000.00, K1886 + 188.00 - K1887 + 148.00, K1887 + 257.00 - K1887 + 277.00, K1887 + 317.00 - K1888 + 240.00
CW1- Road Widening
Physical Target: 6.218 Lane Km
Unit Cost: ₱ 14,590,447.46/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 35,338.66 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 3,675,000.00
Total Allocation: ₱ 105,000,000.00
April 27, 2022 FY 2022 WIN2C03523 UACS No. 310106100685000 January 24, 2022 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 310106100685000
Project ID.: P00603547LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Gov I Santiago St. – K0015+(-197) + K0015+006, K0015+(-664) – K0015+(-197), K0015+006 – K0015+012
Physical Target: CW1- Reconstruction of Concrete Pavement = 1.312 lane km
Unit Cost = P 14,939,024/lane km
Allocation = P 19,600,000
EAO = P 400,000
Total = P 20,000,000

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Gov I Santiago St. – K0015+(-541) + K0015+(-238)
Physical Target: CW1- Reconstruction of Concrete Pavement = 0.606 lane km
Unit Cost = P 32,343,234/lane km
Allocation = P 19,600,000
EAO = P 400,000
Total = P 20,000,000
WIN2C03523
April 27, 2022 2022 320102104918000 GAA 2022 January 3, 2022 Region II Cagayan 3rd District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Drainage System along Tuguegarao Diversion Road 2 K0482+471 - K0488+071, Tuguegarao City
April 27, 2022 2022 310109100807000 GAA 2022 January 3, 2022 Region II Cagayan 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Peñablanca-Callao Cave Rd - Package 1
April 27, 2022 2022 320102104523000 GAA 2022 January 3, 2022 Region II Cagayan 3rd District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Drainage System along Caritan- Balzain Creek Sta 0+(-280) - Sta 0+(-689.20), Caritan, Tuguegarao City, Cagayan
April 27, 2022 2022 WIN2F06031 FY 2022 GAA December 30, 2021 Region III Bataan 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Gov JJ Linao Rd - K0140+047 - K0140+407
April 27, 2022 2022 320102104513000 GAA 2022 January 3, 2022 Region II Cagayan 3rd District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Cagayan River Flood Management Projects, Anquiray (Sta 0+480 - Sta 0+780), Amulung, Cagayan (Downstream)
April 27, 2022 2022 WIN2F06069 FY 2022 GAA December 30, 2021 Region III Bataan 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Jct Layac - Balanga - Mariveles Port Rd - K0153+(-738) - K0153+(-100), K0153+265, K0153+287 - K0153+603
April 27, 2022 2022 300215101133000 GAA 2022 January 3, 2022 Region II Cagayan 3rd District Engineering Office
Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities

Construction of Road at Barangay 4, Enrile, Cagayan
April 27, 2022 2022 WIN2F06028 FY 2022 GAA December 30, 2021 Region III Bataan 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Visayas Ave (R01124LZ) - K0164+(-213) - K0164+520
April 27, 2022 2022 310107100373000 GAA 2022 January 3, 2022 Region II Cagayan 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse and Landslide - Primary Roads

Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0441 + 772 - K0441 + 960
April 27, 2022 2022 310109100808000 GAA 2022 January 3, 2022 Region II Cagayan 3rd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Peñablanca-Callao Cave Rd - Package 2
April 27, 2022 2022 WIN2F06027 FY 2022 GAA December 30, 2021 Region III Bataan 2nd District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Jct Layac - Balanga - Mariveles Port Rd - K0158+300 - K0158+390
April 27, 2022 2022 320102104515000 GAA 2022 January 3, 2022 Region II Cagayan 3rd District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Cagayan River Flood Management Projects, Minanga Sur (Sta. 0+000 - Sta. 0+250), Iguig, Cagayan
April 27, 2022 2022 WIN2F06040 FY 2022 GAA December 30, 2021 Region III Bataan 2nd District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Bagac - Mariveles Rd - K0164+320 - K0165+018, K0165+030 - K0165+450
April 27, 2022 2022 320102104530000 GAA 2022 January 3, 2022 Region II Cagayan 3rd District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control System along Cagayan River Basin, Brgy. Alibago, Enrile, Cagayan, Sta. 0+770-Sta. 1+170 (Downstream)

Pages