May 12, 2022 |
2022 |
310106100727000 |
GAA 2022 |
January 3, 2022 |
Region II |
Batanes District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads - Tertiary Roads
San Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K0005 + 699.50 - K0005 + 759.30 |
May 12, 2022 |
2022 |
WIN2E02095 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Davao City Div Rd - K1511 + 909 - K1511 + 1003
Physical Target:
CW1: 5,026.720 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 90,481,000.00
CW1: P 87,314,165.00 (Construction of Road Slope Protection Structure)
EAO: P 3,166,835.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Davao City Div Rd - K1511 + 907 - K1511 + 980
Physical Target:
CW1: 2,564.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 90,481,000.00
CW1: P 87,314,165.00 (Construction of Road Slope Protection Structure)
EAO: P 3,166,835.00 |
May 12, 2022 |
2022 |
WIN2E02141 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Fatima-Malabog Rd - K1502 + 072 - K1502 + 122, K1502 + 135 - K1502 + 158, K1502 + 212 - K1502 + 275
Physical Target:
CW1: 3,849.99 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 57,750,000.00
CW1: P 55,728,750.00 (Construction of Road Slope Protection Structure)
EAO: P 2,021,250.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Fatima-Malabog Rd - K1511 + 690 - K1511 + 710, K1511 + 755 - K1511 + 775, K1512 + 270 - K1512 + 350
Physical Target:
CW1: 1,365.60 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 57,750,000.00
CW1: P 55,728,750.00 (Construction of Road Slope Protection Structure)
EAO: P 2,021,250.00 |
May 12, 2022 |
2022 |
WIN2E02096 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Fatima-Malabog Rd - K1501 + 200 - K1501 + 500, K1502 + 200 - K1505 + 400
Physical Target:
CW1: 6.924lane km. (Road Widening)
Allocation:
TOTAL: P 68,774,000.00
CW1: P 66,366,910.00 (Road Widening)
EAO: P 2,407,090.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Fatima-Malabog Rd - K1501 + 200 - K1501 + 500, K1502 + 200 - K1504 + 470
Physical Target:
CW1: 5.094 lane km. (Road Widening)
Allocation:
TOTAL: P 68,774,000.00
CW1: P 66,366,910.00 (Road Widening)
EAO: P 2,407,090.00 |
May 12, 2022 |
2022 |
WIN2E02052 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Fatima-Malabog Rd - K1509 + 302 - K1511 + 341
Physical Target:
CW1: 3.752 lane km. (Road Widening)
Allocation:
TOTAL: P 37,520,000.00
CW1: P 36,769,600.00 (Road Widening)
EAO: P 750,400.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Fatima-Malabog Rd - K1509 + 302 - K1511 + 360
Physical Target:
CW1: 3.790 lane km. (Road Widening)
Allocation:
TOTAL: P 37,520,000.00
CW1: P 36,769,600.00 (Road Widening)
EAO: P 750,400.00 |
May 12, 2022 |
2022 |
310106100726000 |
GAA 2022 |
January 3, 2022 |
Region II |
Batanes District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads - Tertiary Roads
Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K0005 +480 - K0005 + 503.06, K0005 + 504.56 - K0005 + 6999.50 |
May 12, 2022 |
2022 |
WIN2E02098 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program: Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Mitigation Structure along Bunawan River, Sta. 5 + 482 to Sta. 5 + 942, Davao City
Physical Target:
CW1: 420.00 Lineal Meters. (Construction of Flood Mitigation Structure:)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure:)
EAO: P 1,000,000.00
TO: Convergence and Special Support Program: Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Mitigation Structure along Bunawan River, Sta. 2 + 020 to Sta. 2 + 440, Davao City
Physical Target:
CW1: 420.00 Lineal Meters. (Construction of Flood Mitigation Structure:))
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure:)
EAO: P 1,000,000.00 |
May 12, 2022 |
2022 |
WIN2E02100 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (MN) – K1484 + (-330) – K1484 + 331, K1484 + (-844) – K1484 + (-330), K1484 + (-979) – K1484 + (-844)
Physical Target:
CW1: 5.240 lane km. (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 64,855,000.00
CW1: P 62,585,075.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,269,925.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (MN) – K1484 + (-979) – K1484 + (-356)
Physical Target:
CW1: 3.738 lane km. (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 64,855,000.00
CW1: P 62,585,075.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,269,925.00 |
May 12, 2022 |
2022 |
WIN2E02076 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (MN) - K1493 + 316 - K1494 + 272
Physical Target:
CW1: 5.706 lane km. (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 69,028,000.00
CW1: P 66,612,020.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,415,980.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (MN) - K1493 + 287 - K1494 + 410
Physical Target:
CW1: 6.654 lane km. (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 69,028,000.00
CW1: P 66,612,020.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,415,980.00 |
May 12, 2022 |
2022 |
WIN2E02102 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (MN) - K1488 + 689 - K1489 + 151
Physical Target:
CW1: 2.699 lane km. (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 32,096,000.00
CW1: P 31,454,080.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 641,920.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (MN) - K1488 + 515 - K1488 + 909
Physical Target:
CW1: 1.718 lane km. (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 32,096,000.00
CW1: P 31,454,080.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 641,920.00 |
May 12, 2022 |
2022 |
WIN2E02196 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Secondary Roads
ABS-CBN-Quimpo Blvd Div. Rd - K1511 + (-108) - K1511 + 154
Physical Target:
CW1: 314.400 sq. m. (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: 314.400 sq. m. (ROW acquisition)
Allocation:
TOTAL: P 23,435,000.00
CW1: P 13,818,980.00 (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: P 9,147,320.00 (ROW acquisition)
EAO: P 468,700.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Secondary Roads
ABS-CBN-Quimpo Blvd Div. Rd - K1511 + (-123) - K1511 + 154, K1512 + 013 – K1512 + 120
Physical Target:
CW1: 860.260 sq. m. (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: 198.258 sq. m. (ROW acquisition)
Allocation:
TOTAL: P 23,435,000.00
CW1: P 13,818,980.00 (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: P 9,147,320.00 (ROW acquisition)
EAO: P 468,700.00 |
May 12, 2022 |
2022 |
WIN2E02194 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Davao Bukidnon Rd – K1698+448 - K1698+541, K1698+552 – K1698+624, K1698+915 – K1698+918, K1699+020 – K1699+357, K1699+843 – K1699+853, K1699+937 – K1699+954, K1699+980 – K1699+1010, K1700+132 – K1700+254, K1700+490 – K1700+532, K1700+795 – K1701+000, K1701+029 – K1701+076
Physical Target:
CW1: 1,229.10 sq. m. (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: 1,229.10 sq. m. (ROW acquisition)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 19,123,720.00 (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: P 10,276,280.00 (ROW acquisition)
EAO: P 600,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Davao Bukidnon Rd – K1698+435 – K1698+512, K1698+526 – K1698+544, K1698+557 – K1698+611, K1698+632 – K1698+661, K1698+902 – K1698+904, K1698+936 – K1699+295, K1699+365 – K1699+374, K1699+599 – K1699+642, K1699+666 – K1699+720, K1699+740 – K1699+760, K1699+787 – K1699+806, K1699+820 – K1699+840, K1699+879 – K1699+902, K1699+920 – K1699+980, K1700+121 – K1700+300
Physical Target:
CW1: 1,686.00 sq. m. (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: 1,229.10 sq. m. (ROW acquisition)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 19,123,720.00 (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: P 10,276,280.00 (ROW acquisition)
EAO: P 600,000.00 |
May 11, 2022 |
FY 2022 GAA |
WIN2G02863 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310102100820000
Project ID : P00609337LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Preventive maintenance - Secondary Roads
FROM :
Puerto Princesa North Road
K0246+000 - K0250+219
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 8.452 Lane Km
Allocation - Php 82.456 Million
To :
Puerto Princesa North Road
K0246+000 - K0249+703
Physical Target - CW1 - Preventive Maintenance of Road ;
Asphalt Overlay - 7.410 lane Km
- CW2 - Road Safety : Pavement Markings
( including Solar Studs) - 7.410 Lane Km
Allocation - Php 82.456 Million |
May 11, 2022 |
FY 2022 GAA |
WIN2G02816 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310102100821000
Project ID : P00609338LZ
001 : Ensure Safe and Reliable National Road Safety
Asset Preservation - Preventive maintenance - Secondary Roads
FROM :
Princesa North Road
K0232+531 - K0237+111
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 9.202 Lane Km
Allocation - Php 89.773 Million
TO :
Puerto Princesa North Road
K0232+531 - K0236+460
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 7.888 Lane Km
- CW2 - Road Safety : Pavement Markings
(including Solar Studs) - 7.888 Lane Km
Allocation - Php 89.773 Million
|
May 11, 2022 |
FY 2022 GAA |
WIN2G02861 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310102100824000
Project ID : P00603339LZ
001 : Ensure Safe and Reliable National Road Safety
Asset Preservation - Preventive Maintenance - Secondary Roads
FROM :
Princesa North Road
K0028+525 - K0033+629
Physical Target - CW1 - Preventive Maintenance of Road:
Asphalt Overlay - 10.256 Lane Km
Allocation - Php 100.056 Million
TO :
Puerto Princesa North Road
K0028+525 - K0033+001
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 9.000 Lane Km
- CW2 - Road Safety : Pavement Markings
(including Solar Studs) - 9.000 Lane Km
Allocation - Php 100.056 Million
|
May 11, 2022 |
FY 2022 GAA |
WIN2G02921 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310102100822000
Project ID : P00610121LZ
001: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
FROM :
Calapan South Road
K0064+000 - K0071+000
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 28.164 Lane Km
Allocation - Php 290.00 Million
TO :
Calapan South Road
K0064+000 - K0069+180
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 20.844 Lane Km
Allocation - Php 290.00 Million |
May 11, 2022 |
FY 2022 GAA |
WIN2G02924 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310102100823000
Project ID : P00610122LZ
001: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
FROM :
Calapan South Road
K0071+867 - K0075+036,
K0075+850 - K0079+238,
K0081+904 - K0082+830
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 29.952 Lane Km
Allocation - Php 309.000 Million
TO :
Calapan South Road
K0071+867 - K0075+036,
K0075+850 - K0078+475
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 23.22 Lane Km
Allocation - Php 309.00 million
|
May 11, 2022 |
FY 2022 GAA |
WIn2G02896 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310108100884000
Project ID : P00611360LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of Roads with
Slips, Slope Collapse, and Landslide - Secondary Roads
FROM :
Sibuyan Circumferential Road
K0038+900 - K0069+420
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 11,111.11 square meter
Allocation - Php 200.00 million
TO :
Sibuyan Circumferential Road
K0038+900 - K0039+312
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 8,842.36 square meter
Allocation - Php 200.00 Million |
May 11, 2022 |
FY 2022 GAA |
WIN2G02881 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310108100885000
Project ID : P00611361LZ
001 : Ensure Safe and Reliable National Road System
Asset preservation - Rehabilitation/Reconstruction of Roads with
Slips, Slope Collapse, and Landslide - Secondary Roads
FROM :
Tablas Circumferential Road
K0028+000 - K0028+272
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 11,111.11 qsuare meter
Allocation - Php 200.00 Million
TO :
Tablas Circumferential Road
K0028+000 - K0028+144
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 9,117.50 square meter
Allocation - Php 200.00 Million
|
May 11, 2022 |
FY 2022 |
WIN2C03538 |
UACS No. 320102104456000 |
March 2, 2022 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA/Original
UACS No. 320102104456000
Project ID.: P00620768LZ
OO2: Protect Live and Properties Against Major Floods
Flood Management – Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and
Principal Rivers
Rehabilitation of Pasig-Marikina River Channel, Sta. 1+500 – Sta. 3+1000, Pasig City
Physical Target: CW1- Channelization = 63,449.333 cubic meters
Unit Cost = P 1,447.50/cu.m.
Allocation = P 91,842,910
EAO = P 3,331,090
Total = P 95,174,000
As Modified
OO2: Protect Live and Properties Against Major Floods
Flood Management – Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and
Principal Rivers
Rehabilitation of Pasig-Marikina River Channel, Sta. 1+500 – Sta. 3+000, Pasig City
Physical Target: CW1- Channelization = 50,723.50 cubic meters
Unit Cost = P 1,810.66/cu.m.
Allocation = P 91,842,910
EAO = P 3,331,090
Total = P 95,174,000
WIN2C03538
|
May 11, 2022 |
2022 |
WIN2C03546 |
SARO-BMB-A-22-0003144 |
March 21, 2022 |
Region VIII |
Northern Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0809 + 978 - K0819 + 085
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 26.46 M
Structure: 1,500 Square meters
EAO P 0.54 M
Total P 27.00 M
AS MODIFIED:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0809 + 978 - K0810 + 085
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 26.46 M
Structure: 1,225 Square meters
EAO P 0.54 M
Total P 27.00 M |
May 11, 2022 |
FY 2022 GAA |
WIN2G02892 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310109100868000
Project No.: P00611434LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of Roads with
Slips, Slope Collapse, and Landslide - Tertiary Roads
FROM :
Odionga - East - West Road
K0009+220 - K0009+392
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 13,055.56 square meter
Allocation - php 235.00 million
TO :
Odiongan - East - West Road
Sta. 8+840 - Sta. 8+940,
Sta. 9+158 - Sta. 9+392
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 10,391.11 square meter
Allocation - Php 235.00 Million
|
May 11, 2022 |
FY 2022 GAA |
WIN2G02891 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. ; 320101107513000
Project ID : P00620654LZ
002: Protect Lives and Properties Against major Floods
Construction/Maintenance of Flood Mitigation Structures
and Drainage Systems
FROM :
Construction of Patrick Flood Control (Kambingan Section),
Sta. 0+000 - Sta. 0+507
Sablayan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
507 lineal meter
Allocation - Php 50.00 Million
TO :
Construction of Patrick Flood Control (Kambingan Section),
Sta. 0+000 - Sta. 0+070.00 (RS),
Sta. 0+140 - Sta. 0+477.25 (RS)
Sablayan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
407.25 lineal meter
Allocation - Php 50.00 Million |
May 11, 2022 |
FY 2022 GAA |
WIn2G02890 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 320101107518000
Project ID : P00620672LZ
002 : Protect Lives and Properties Against Major Floods
Construction/Maintenance of Flood Mitigation Structures
and Drainage Systems
FROM :
Construction of Tuguis Flood Control Structures along
Looc (Cogon Tulay) - Odiongan Road,
Barangay Progreso Este, Odiongan, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
433 lineal meter
Allocation - Php 50.00 Million
TO :
Constuction of Tuguis Flood Control Structure along
Looc (Cogon Tulay) - Odiongan Road,
Barangay Progreso Este, Odiongan, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
296.4 lineal meter
Allocation - Php 50.00 Million
|
May 11, 2022 |
2022 |
WIN2C03537 |
SR2022-03-007854 |
March 23, 2022 |
Region VIII |
Northern Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0812 + 150 - K0812 + 323
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 95.158650 M
Structure: 5,478.330 Square meters
EAO P 3.451350 M
Total P 98.610 M
AS MODIFIED:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0809 + 415 - K0809 + 655, K0810 + 500 - K0810 + 750, K0812 + 150 - K0812 + 500
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 95.158650 M
Structure: 5,040 Square meters
EAO P 3.451350 M
Total P 98.610 M |
May 11, 2022 |
2022 |
WIN2C03544 |
SARO-BMB-A-22-0003185 |
March 21, 2022 |
Region VIII |
Southern Leyte District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K1011 + 600 - K1011 + 800
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 3,666.67 Square meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Daang Maharlika (LT) - K1030 + 000 - K1030 + 410
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 3,666.67 Square meters
EAO P 1.00 M
Total P 50.00 M
|
May 11, 2022 |
2022 |
WIN2C03535 |
SR2022-03-008067 |
March 23, 2022 |
Region VIII |
Southern Leyte District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Bdry Southern Leyte-Maasin-Macrohon-Sogod-Jct Daang Maharlika
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 96.500 M
Structure: 5,555.560 Square meters
EAO P 3.500 M
Total P 100.00 M
AS MODIFIED:
Bdry Southern Leyte-Maasin-Macrohon-Sogod-Jct Daang Maharlika, K1194 + 387 – K1194 + 553
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 96.500 M
Structure: 4,500 Square meters
EAO P 3.500 M
Total P 100.00 M |
May 11, 2022 |
2022 |
WIN2C03539 |
SR2022-03-008319 |
March 23, 2022 |
Region VIII |
Southern Leyte District Engineering Office |
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Multi-Purpose Buildings/ Facilities to support Social Services
AS PER GAA/ORIGINAL:
Construction/Improvement of Guadalupe Port, Southern Leyte
Physical Target: Allocation:
CW1-Construction of Multi Purpose Building P 96.500 M
: 1.00 Number of Buildings
EAO P 3.500 M
Total P 100.00 M
AS MODIFIED:
Construction/Improvement of Guadalupe Port, Southern Leyte
Physical Target: Allocation:
CW1-Construction of Other Facilities P 96.500 M
: 1.00 Number of Facilities
EAO P 3.500 M
Total P 100.00 M |
May 11, 2022 |
2022 |
WIN2C03536 |
GAA FY 2022 |
January 10, 2022 |
Region VIII |
Southern Leyte District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation- Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
AS PER GAA/ORIGINAL:
Jct Himay-angan-Silago-Abuyog Bdry Rd - K1050 + (-319) - K1050 + (-307)
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 1.960 M
Road: 12 Lineal meters
EAO P 0.04 M
Total P 2.00 M
AS MODIFIED:
Jct Himay-angan-Silago-Abuyog Bdry Rd - K1064 + 914
Physical Target: Allocation:
CW1-Construction of Drainage Structure along P 1.960 M
Road: 15 Lineal meters
EAO P 0.04 M
Total P 2.00 M
|
May 11, 2022 |
FY 2022 GAA |
WIN2G02902 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215100233000
Project ID : P00630101LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Port Barton - TDC Road,
Sta. 17+477 - Sta. 17+761,
Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,500.472 square meter
Allocation - Php 66.958 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Port Barton - TDC Road,
Sta. 17+477 - Sta. 17+644
Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,820.10 square meter
Allocation - Php 66.958 Million
|
May 11, 2022 |
2022 |
WIN2C03542 |
GAA FY 2022 |
January 10, 2022 |
Region VIII |
Leyte 3rd District Engineering Office |
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)-Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Construction of Campokpok - Layog - Butason - Cota Rd., San Isidro, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road P 49.00 M
: 1.904 Lane Km
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Construction of Campokpok - Layog - Butason - Cota Rd., Tabango, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road P 49.00 M
: 1.904 Lane Km
EAO P 1.00 M
Total P 50.00 M
|
May 11, 2022 |
2022 |
WIN2C03545 |
SR2022-02-000238 |
February 3, 2022 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0908 + 350 - K0908 + 946
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 62.725 M
Structure: 3,611.11 Square meters
EAO P 2.275 M
Total P 65.00 M
AS MODIFIED:
Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0908 + 350 - K0909 + 350
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 62.725 M
Structure: 3,611.11 Square meters
EAO P 2.275 M
Total P 65.00 M |
May 11, 2022 |
FY 2022 GAA |
WIN2G02899 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300219100147000
Project ID : P00630957LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Flood Mitigation Structures protecting Public Infrastructure/Facilities
FROM :
Construction of Tuguis Flood Control Structure (Phase 2) along
Looc - Cogon - Tulay Odiongan Road,
Barangay Progreso Este, Odiongan, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
457.58 lineal meter
Allocation - Php 55.00 Million
TO :
Construction of Tuguis Flood Control Structure (Phase 2) along
Looc - Cogon - Tulay Odiongan Road,
Barangay Progreso Este, Odiongan, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
315.50 lineal meter
Allocation - Php 55.00 Million
|
May 11, 2022 |
FY 2022 GAA |
WIn2G02937 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 3002011000083000
Project ID : P00634955LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Construction/Improvement of Access Roads leading to Airports
( Kalsada Tungo sa Paliparan, Riles at Daungan Program -
KATUPARAN )
FROM :
Bantulan - Sandoval Airport Access Road,
Taytay, Palawan
Physical Target - CW1 - Construction of Concrete Road :
8.13 Lane Km
Allocation - Php 121.924 Million
TO :
Bantulan - Sandoval Airport Access Road
Taytay, Palawan
Physical Target - CW1 - Construction of Concrete Road :
7.53 Lane Km
Allocation - Php 121.924 Million |
May 11, 2022 |
2022 |
WIN2C03548 |
SR2022-02-000251 |
February 3, 2022 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0915 + 584 - K0915 + 610
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 67.550 M
Structure: 3,888.89 Square meters
EAO P 2.450 M
Total P 70.00 M
AS MODIFIED:
Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0915 + 584 - K0915 + 610, K0918 + 050 – K0918 + 650
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 67.550 M
Structure: 3,888.89 Square meters
EAO P 2.450 M
Total P 70.00 M |
May 11, 2022 |
2022 |
320102104947000 |
GAA 2022 |
January 3, 2022 |
Region II |
Nueva Vizcaya District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Sto. Domingo Flood Control, Sto. Domingo, Bambang, Nueva Vizcaya |
May 11, 2022 |
2022 |
WIN2C03549 |
GAA FY 2022 |
February 1, 2022 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0916 + 581 - K0916 + 681
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 2,777.78 Square meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0916 + 000 - K0916 + 681
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 2,777.78 Square meters
EAO P 1.00 M
Total P 50.00 M
|
May 11, 2022 |
2022 |
320102104536000 |
GAA 2022 |
January 3, 2022 |
Region II |
Isabela 2nd District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Rehabilitation of Siffu River Flood Control Structure (Suerte Section Phase II), Sta. 0+ 000 - Sta. 0+730, Brgy. Suerte, Quirino, Isabela |
May 11, 2022 |
2022 |
WIN2C03526 |
GAA FY 2022 |
February 1, 2022 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Leyte-Samar Inter-Provl Rd - K0911 + 838 - K0912 + 331
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 2,777.78 Square meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Leyte-Samar Inter-Provl Rd - K0911 + 752 - K0912 + 331
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 2,777.78 Square meters
EAO P 1.00 M
Total P 50.00 M |
May 10, 2022 |
FY 2022 GAA |
WIN2G02908 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310205100815000
Project ID : P00608165LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/New Roads
FROM :
Sofrinio Espanola - Quezon Cross Country Road
(Pulot Interior - Tagusao Section), Package F, Palawan
Physical Target - CW1 - Construction of Gravel Road :
5.102 Lane Km
Allocation - Php 50.00 Million
TO :
Sofronio Espanola - Quezon Country Cross Road
(Pulot Interior-Tagusao Section), Package F, Palawan
Physical Target - CW1 - Construction of Gravel Road :
7.858 Lane Km
Allocation - Php 50.00 Million
|
May 10, 2022 |
FY 2022 GAA |
WIN2G02904 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310204101536000
Project ID : P00608633LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/New Roads
FROM :
Boac - Mogpog By-Pass Road, Package 1, Marinduque
Physical Target - CW1 - Construction of Concrete Road :
2.000 Lane Km
Allocation - Php 150.00 Million
TO :
Boac - Mogpog By-Pass Road, Package1, Marinduque
Physical Target - CW1 - Construction of Concrete Road :
4.414 Lane Km
- CW2 - Road Safety Pavement Markings :
4.414 Lane Km
Allocation - Php 150.00 Million
|
May 10, 2022 |
FY 2022 GAA |
WIN2G02936 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. ; 310102100812000
Project ID : P00609329LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
FROM :
Preventive Maintenance of Road : Asphalt Overlay -
Puerto Princesa North Road (S00025PW)
K0067+298 - K0074+313
Physical Target - CW1 - Preventive Maintenance of Road -
Asphalt Overlay : 14.00 Lane Km
Allocation - 136.582 Million
TO :
Preventive maintenance of Road : Asphalt Overlay -
Puerto Princesa North Road (S00025PW)
K0067+298 - K0074+036
Allocation - Php 136.582 Million |
May 10, 2022 |
FY 2022 GAA |
WIN2G02934 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310102100813000
Project ID : P009330LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
FROM :
Puerto Princesa North Road
K0168+000 - K0173+409
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 10.88 Lane Km
Allocation - Php 106.143 Million
TO :
Puerto Princesa North Road
K0168+000 - K0172+721
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 9.486 Lane Km
Allocation - Php 106.143 Million
|
May 10, 2022 |
FY 2022 GAA |
WIN2G02862 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310102100815000
Project ID : P00609332LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
FROM :
Princesa North Road
K0189+681 - K0194+591
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - .248 Lane Km
Allocation - Php 99.978 Million
TO :
Puerto Princesa North Road
K0189+681 - K0194+358
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 9.782 Lane Km
- CW2 - Road Safety : Pavement Markings -
( including Solar Studs) - 9.782 Lane Km
Allocation - Php 99.978 Million
|
May 10, 2022 |
FY 2022 GAA |
WIN2G02870 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310102100817000
Project ID : P00609334LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
FROM :
Puerto Princesa North Road
K0216+000 - K0221+304
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 10.628 Lane Km
Allocation - Php 148.250 Million
TO :
Puerto Princesa North Road
K0216+000 - K0220+952
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 9.930 Lane Km
Allocation - Php 148.250 Million
|
May 10, 2022 |
FY 2022 GAA |
WIN2G02821 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310102100818000
Project ID : P00609335LZ
001 : Asset Preservation - Preventive Maintenance
FROM :
Puerto Princesa North Road
K0257+000 - K0262+546
Physical Target - CW1 - Preventive maintenance of Road :
Asphalt Overlay - 11.07 Lane Km
Allocation - Php 108.017 Million
TO :
Puerto Princesa North Road
K0257+000 - K0261+812
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 9.60 Lane Km
Allocation - Php 108.017 Million
|
May 6, 2022 |
2022 |
WIN2C03540 |
GAA FY 2022 |
January 3, 2022 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K0997 + 814 - K0998 + 400
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 14.700 M
: 1.156 Lane Km
EAO P 0.300 M
Total P 15.00 M
AS MODIFIED:
Daang Maharlika (LT) - K0997 + 814 - K0999 + 000
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 14.700 M
: 1.575 Lane Km
EAO P 0.300 M
Total P 15.00 M
|
May 6, 2022 |
2022 |
WIN2C03543 |
GAA FY 2022 |
January 3, 2022 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Ormoc-Baybay-Southern Leyte Bdry Rd - K1040 + 485 - K1040 + 935
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 3.920 M
along Road: 450 Lineal meters
EAO P 0.080 M
Total P 4.00 M
AS MODIFIED:
Ormoc-Baybay-Southern Leyte Bdry Rd - K1040 + 488 - K1040 + 578, K1041 + 924 – K1042 + 085, K042 + 843 – K1043 + 115
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 3.920 M
along Road: 437 Lineal meters
EAO P 0.080 M
Total P 4.00 M
|
May 6, 2022 |
2022 |
WIN2C03531 |
GAA FY 2022 |
January 3, 2022 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
AS PER GAA/ORIGINAL:
Ormoc-Baybay-Southern Leyte Bdry Rd - K1055 + 757.17 - K1056 + 115, K1058 + 000 - K1058 + 167
Physical Target: Allocation:
CW1-Road Widening: 0.976 Lane Km P 12.7155 M
EAO P 0.2595 M
Total P 12.975 M
AS MODIFIED:
Ormoc-Baybay-Southern Leyte Bdry Rd - K1049 + 729 - K1049 + 927, K1054 + 836 - K1055 + 080
Physical Target: Allocation:
CW1-Road Widening: 0.796 Lane Km P 8.5709796 M
CW2-Construction of Road Slope Protection P 4.1445204 M
Structure: 1,121 Square meters
EAO P 0.2595 M
Total P 12.975 M
|
May 6, 2022 |
2022 |
WIN2C03530 |
SARO-BMB-A-22-0003177 |
March 21, 2022 |
Region VIII |
Leyte 5th District Engineering Office |
Convergence and Special Support Program
Construction/ Rehabilitation of Water Supply/ Septage and Sewerage/ Rainwater Collector System - Water Supply
AS PER GAA/ORIGINAL:
Construction of Level III Water Supply System, Baybay City, Leyte
Physical Target: Allocation:
CW1-Construction of Water Supply Systems P 49.00 M
: 1.00 Number of Water Supply Systems
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Construction of Level III Water Supply System, Baybay City, Leyte
Physical Target: Allocation:
CW1-Construction of Water Supply Systems P 49.00 M
: 6.00 Number of Water Supply Systems
EAO P 1.00 M
Total P 50.00 M
|
May 6, 2022 |
2022 |
WIN2C03533 |
SARO-BMB-A-22-0003177 |
March 21, 2022 |
Region VIII |
Leyte 5th District Engineering Office |
Convergence and Special Support Program
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
AS PER GAA/ORIGINAL:
Preventive Maintenance (Asphalt Overlay) along Ormoc-Baybay-Southern Leyte Bdry Rd - K1053 + 151 - K1053 + 315, K1053 + 887 - K1055 + 711, K1056 + 000 - K1056 + 070
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 23.520 M
Asphalt Overlay: 4.409 Lane Km
EAO P 0.480 M
Total P 24.00 M
AS MODIFIED:
Preventive Maintenance (Asphalt Overlay) along Ormoc-Baybay-Southern Leyte Bdry Rd - K1053 + 151 - K1053 + 305, K1053 + 382 - K1053 + 829, K1054 + 000 - K1055 + 019
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 23.520 M
Asphalt Overlay: 3.152 Lane Km
EAO P 0.480 M
Total P 24.00 M |
May 6, 2022 |
2022 |
WIN2C03541 |
SARO-BMB-A-22-0003177 |
March 21, 2022 |
Region VIII |
Leyte 5th District Engineering Office |
Convergence and Special Support Program
Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services
AS PER GAA/ORIGINAL:
Construction of Multi-Purpose Building , Bato, Leyte
Physical Target: Allocation:
CW1-Construction of Multi Purpose Building P 7.920 M
: 1.00 Number of Buildings
EAO P 0.080 M
Total P 8.00 M
AS MODIFIED:
Construction of Multi-Purpose Building , Bato, Leyte
Physical Target: Allocation:
CW1-Construction of Multi Purpose Building P 7.920 M
: 2.00 Number of Buildings
EAO P 0.080 M
Total P 8.00 M |
May 6, 2022 |
FY 2022 GAA |
WIN2G2893 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310108100878000
Project ID : P00604386LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse, and Landslide - Secondary Roads
FROM :
Construction of Road Slope Protection Structure -
Calapan North Road
K0042+720 - K0042+820,
K0042+880 - K0043+100
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 16,050 square meter
Allocation - Php 160.500 Million
TO :
Construction of Road Slope Protection Structure -
Calapan North Road
K0042+740 - K0042+1008,
K0043+060 - K0043+170
Physical Target - CW1 - Construction of Road Slope protection
Structure : 7,612 square meter
Allocation - Php 160.500 Millionn
|
May 6, 2022 |
FY 2022 GAA |
WIN2G02866 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310202100985000
Project ID : P00606202LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Puerto Princesa South Road
K0012+180 - K0014+000
Physical Target - CW1 - Road Widening : 3.854 Lane Km
Allocation - Php 80.00 Million
TO :
Puerto Princesa South Road
K0012+180 - K0013+780
Physical Target - CW1 - Road Widening : 3.408 Lane Km
Allocation - Php 80.00 Million |
May 6, 2022 |
FY 2022 GAA |
WIN2G02820 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310202101129000
Project ID : P00606203LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Puerto Princesa South Road
K0014+000 - K0014+853
Physical Target - CW1 - Road Widening : 1.706 Lane Km
Allocation - Php 35.00 Million
TO :
Puerto Princesa South Road
K0013+967 - K0014+740
Physical Target - CW1 - Road Widening : 1.552 Lane Km
Allocation - Php 35.00 Million
|
May 6, 2022 |
FY 2022 GAA |
WIN2G02915 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. :310202100966000
Project ID : P00606270LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Marinduque Circumferential Road
K0039+633 - K0042+000
Physical Target - CW1 - Road Widening : 4.630 Lane Km
Allocation - Php 105.00 Million
TO :
Marinduque Circumferential Road
K0039+000 - K0041+359
Physical Target - CW1 - Road Widening : 4.718 Lane km
- CW2 - Road Safety - Pavement Markings :
4.718 Lane Km
Allocation - Php 105.00 Million
|
May 6, 2022 |
FY 2022 GAA |
WIN2G02849 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. :310202100978000
Project ID : p00606273LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Puerto Princesa North Road
K0128+000 - K0131+870
Physical Target - CW1 - Road Widening : 7.766 Lane Km
Allocation - Php 116.490 million
TO :
Puerto Princesa North Road
K0128+000 - K0131+150
Physical Target - CW1 - Road Widening : 6.326 Lane Km
Allocation - Php 116.490 Million |
May 6, 2022 |
FY 2022 GAA |
WIN2G02838 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310202100980000
Project ID : P00606275LZ
001: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Puerto Princesa North Road
K0142+841 - K0147+000
Physical Target - CW1 - Road Widening : 8.342 Lane Km
Allocation - Php 125.130 million
TO :
Puerto Princesa North Road
K0142+961 - K0146+065
Physical Target - CW1 - Road Widening ; 6.236 Lane Km
Allocation - Php 125.130 Million
|
May 6, 2022 |
FY 2022 GAA |
WIN2G02830 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310202100982000
Project ID : P00606280LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Puerto Princesa North Road,
K0166+000 - K0166+097,
K0166+108 - K0166+509,
K0166+1306 - K0168+087,
K0166+534 - K0166+1295,
K0168+109 - K0168+666,
K0168+681 - K0170+000
Physical Target - CW1 - Road Widening ; 7.920 lane Km
Allocation - Php 118.800 Million
To :
Puerto Princesa North Road
K0166+000 - K0166+084,
K0166+152 - K0166+496,
K0166+632 - K0166+1274,
K0166+1335 - K2168+065,
K0168+137 - K0168+544,
K0168+799 - K0169+563
Physical Target - CW1 - Road Widening : 6.002 Lane km
Allocation - Php 118.800 million |
May 6, 2022 |
2022 |
WIN2C03554 |
GAA FY 2022 |
January 3, 2022 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K0966 + 100 - K0967 + 193, K0967 + 209 - K0969 + 000
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 55.9314 M
Asphalt Overlay: 11.592 Lane Km
EAO P 2.0286 M
Total P 57.960 M
AS MODIFIED:
Daang Maharlika (LT) - K0966 + 100 - K0967 + 188, K0967 + 217 - K0967 + 980
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 55.9314 M
Asphalt Overlay: 7.412 Lane Km
EAO P 2.0286 M
Total P 57.960 M |
May 6, 2022 |
2022 |
WIN2C03552 |
SR2022-03-007313 |
March 23, 2022 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K0978 + 200 - K0978 + 400, K0979 + 300 - K0979 + 500, K1001 + 850 -K1002 + 100, K1002 + 800 - K1002 + 939
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 96.500 M
Structure: 5,555.560 Square meters
EAO P 3.500 M
Total P 100.00 M
AS MODIFIED:
Daang Maharlika (LT) – K1000 + 888 – K1000 + 920, K1002 + 810 – K1002 + 939
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 96.500 M
Structure: 2,044.70 Square meters
EAO P 3.500 M
Total P 100.00 M |
May 6, 2022 |
2022 |
WIN2C03553 |
GAA FY 2022 |
January 3, 2022 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL:
Tacloban-Baybay South Rd - K0985 + 160 - K0985 + 260
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 29.400 M
Structure: 1,686 Square meters
EAO P 0.600 M
Total P 30.00 M
AS MODIFIED:
Tacloban-Baybay South Rd - K0985 + 160 - K0985 + 260
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 29.400 M
Structure: 600 Square meters
EAO P 0.600 M
Total P 30.00 M
|
May 6, 2022 |
FY 2022 GAA |
P00608155LZ |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310205100569000
Project ID : P00608155LZ
001: Ensure Safe and Reliable National Road System
Network Development - Construction of missing Links/New Roads
FROM :
Bulalacao - San Jose Road (Bulalacao Section),
Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
5.73 Lane Km
Allocation - Php 86.00 Million
TO :
Bulalacao - San Jose Road (Bulalacao Section),
Oriental Mindoro
Physical Target - CW1 - Construction of Gravel Road :
3.72 Lane Km
- CW2 - Construction of New Bridge :
286.20 sq.m.
- CW3 - Construction of New Bridge :
238.50 sq.m.
Allocation - Php 86.00 Million
|
May 6, 2022 |
FY 2022 GAA |
WIN2G02935 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310205100816000
Project ID : P00608161LZ
001: Ensure Safe and Reliable national Road System
Network Development - Construction of Missing Links/New Roads
FROM :
Victoria Sablayan (Mindoro Cross Island Road), Package I,
Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.392 Lane Km
- CW2 - Construction of Concrete Bridge :
678.771 square meter
Allocation - Php 150.00 Million
TO :
Victoria Sablayan ( Mindoro Cross Island Road ), Package I,
Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.202 Lane Km
- CW2 - Construction of Concrete Bridge :
1,863.456 square meter
Allocation - Php 150.00 Million |
May 6, 2022 |
FY 2022 GAA |
WIn2G02938 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No, ; 310205100814000
Project ID : P00608164LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/New Roads
FROM :
Sofronio Espanola - Quezon Cross Country Road
(Pulot Interior - Tagusao Section), Package E, Palawan
Physical Target - CW1 - Construction of gravel Road :
5.102 lane Km
Allocation - 50.00 Million
To :
Sofronio Espanola -Quezon Cross Country Road
(Pulot Interior - Tagusao Section), Package E, Palawan
Physical Target - CW1 - Construction of gravel Road :
7.730 Lane Km
Allocation - Php 50.00 Million
|
May 6, 2022 |
2022 |
WIN2F06310 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
A Castañeda - Ma Aurora - San Luis Rd - K0207+658 - K0208+000 |
May 6, 2022 |
2022 |
WIN2F06315 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Aurora District Engineering Office |
Network Development Program - Off-Carriageway Improvement - Secondary Roads
Baler - Casiguran Rd (Baler - Dinadiawan) - K0276+168.70 - K0276+241.00 , K0276+253.00 - K0276.+298.20, K0276+529.10 - K0276+580.00, K0276+623.20 - K0276+872.90, K0277+174.50 - K0277+220.00, K0277+325.90 - K0277+348.50, K0277+943.00 - K0277+954.00, K0278+474.20 - K0278+508.30, K0278+607.40 - K0278+689.00, K0278+708.15 - K0278+75810, K0278+902.80 - K0278+946.50, K0279+208.5 - K0279+450.20, K0279+842.50 - K0280+000.00, K0280+000.00 - K0280+150.00, K0280+272.80 - K0280+340.80 (Left Side)
K0276+000.00 - K0276+241.00, K0276+253.00 - K0276+740.00, K0276+800.00 - K0277+300.00, K0277+375.70 - K0277+511.70, K0277+529.30 - K0277+562.40, K0277+574.20 - K0277+742.10, K0277+746.00 - K0277+911.90, K0277+942.90 - K0277+954.00, K0278+000.00 - K0278+246.30, K0278+260.00 - K0278+265.50, K0278+300.00 - K0278+688.00, K0278+708.40 - K0278+775.00, K0278+792.00 - K0278+811.90, K0278+834.20 - K0278+845.30, K0278+854.60 - K0278+882.20, K0278+940.00 - K0279+000.00, K0279+000.00 - K0279+029.90, K0279+058.90 - K0279+171.20, K0279+188.10 - K0279+226.20, K0279+258.20 - K0279+310.00, K0279+320.60 - K0279+809.50, K0279+840.50 - K0279+910.70, K0279+921.10 - K0280+000.00, K0280+000.00 - K0280+075.90, K0280+097.40 - K0280+101.50, K0280+114.90 - K0280.324.70, K0280+336.90 - K0280+437.00 (Right Side)
00
|
May 5, 2022 |
FY 2022 GAA |
WIN2G02677 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Palawan 3rd District Engineering Office |
UACS No.: 310202101131000
Project ID : P00606206LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Puerto Princesa South Road
K0039+698 - K0040+000\
K0044+846 - K0045+108
Physical Target - CW1 - Road Widening : 1.136 lane km
Allocation - Php 20.00 million
TO :
Puerto Princesa South Road
K0039+698 - K0040+000
K0045+700 - K0046+000
Physical Target - CW1 - Road Widening : 1.204 lane km
Allocation - Php 20.00 million
|
May 5, 2022 |
FY 2022 GAA |
WIN2G02819 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Palawan 3rd District Engineering Office |
UACS No. : 310202100987000
Project ID : P00606207LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Puerto Princesa South Road
K0046+000 - K0047+364
Physical Target - CW1 - Road Widening - 2.638 Lane Km
Allocation - Php 55.00 Million
TO :
Puerto Princesa South Road
K0046+000 - K0047+300
K0047+440 - K0047+522
Physical Target - CW1 - Road Widening : 20674 Lane Km
Allocation - Php 55.00 Million |
May 5, 2022 |
FY 2022 GAA |
WIN2G02755 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Palawan 3rd District Engineering Office |
UACS No. : 320102104630000
Project ID : P00620901LZ
002 : Protect Lives and Properties
Flood Management - Construction/Maintenance of Mitigation Structures and Drainage
FROM :
Construction of Flood Mitagation Structure -
Iraan River Waterways Phase 3,
Sta. 0+000 - Sta. 0+642
Aborlan, Palawan
Physical Target - CW1 - Flood Management : 751 lineal meters
Allocation - Php 100.00 Million
TO :
Construction of Flood Mitigation Structure,
Iraan River Waterways Phase 3,
Left Bank, Sta. 0+000 - Sta. 0+380,
Right Bank, Sta. 0+107 - Sta. 0+364,
Upper Left Bank Sta. 0+389 - Sta. 0+503
Aborlan, Quezon |
May 5, 2022 |
2022 |
WIN2E02294 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 300215100603000
Project ID: P00630140MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of NRJ Tagbalili-Dumaganas Road, Esperanza, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 2.400 Lane Km
Allocation:
TOTAL: P 115,000,000
CW1: P 110,975,000
EAO: P 4,025,000
Unit Cost:
CW1: P 46,239,583.33/ Lane Km
TO:
Construction of NRJ Tagbalili-Dumaganas Road, Esperanza, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 4.800 Lane Km
Allocation:
TOTAL: P 115,000,000
CW1: P 110,975,000
EAO: P 4,025,000
Unit Cost:
CW1: P 23,119,791.67/ Lane Km |
May 5, 2022 |
FY 2022 |
WIN2E02290 |
310104100361000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 310104100361000
Project ID: P00601146MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
Pagadian City-Zamboanga City Rd - K1860 + 000 - K1860 + 996.62, K1862 + 041.88 - K1863 + 044.99, K1872 + 980.21 - K1878 + 100
CW1- Reconstruction to Concrete Pavement
Physical Reserved: 14.24 Lane Km
Unit Cost: ₱ 7,454,353.93
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00
|
May 5, 2022 |
FY 2022 |
WIN2E02295 |
310204101594000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 310204101594000
Project ID: P00604234MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Zamboanga City By-Pass Road, (West Coast Section), Phase II, Zamboanga City
CW1- Construction of Concrete Road
Physical Reserved: 5.159 Lane Km
Unit Cost: ₱ 18,317,503.39
ROW- Right-Of-Way Acquisition
Physical Reserved: 33,333.33 sq.m.
Unit Cost: ₱ 300.00
EAO: ₱ 3,850,000.00
Excess: ₱ 1,650,000.00
Total Allocation: ₱ 110,000,000.00 |
May 5, 2022 |
FY 2022 GAA |
WIN2G02715 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 310105100701000
Project ID : P00603928LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads - Secondary Roads
FROM :
Tablas Circumferential Road
K0114+652 - K0114+850
Physical Target - CW1 - Reconstruction of Concrete
Pavement : 0.396 Lane Km
Allocation - Php 5.950 Million
TO :
Tablas Circumferential Road
K0114+652 - K0114+786.50
Physical Target - CW1 - Reconstruction to Concrete
Pavement : 0.269 Lane Km
Allocation - Php 5.950 Million |
May 5, 2022 |
FY 2022 |
WIN2E02289 |
310204101578000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 310204101578000
Project ID: P00604241MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Buenavista - Bolong By-Pass Road, Zamboanga City Package 3, Zamboanga City
CW1- Construction of Concrete Road
Physical Reserved: 0.958 Lane km
Unit Cost: ₱ 77,770,116.63
CW2- Construction of Concrete Bridge
Physical Reserved: 198.81 sq.m.
Unit Cost: ₱ 100,579.59
ROW- Right-Of-Way Acquisition
Physical Reserved: 33,333.33 sq.m.
Unit Cost: ₱ 300.00
EAO: ₱ 3,850,000.00
Excess: ₱ 1,650,000.00
Allocation: ₱ 110,000,000.00 |
May 5, 2022 |
FY 2022 |
WIN2E02292 |
310204101582000 |
March 22, 2022 |
Region IX |
Regional Office IX |
UACS No. 310204101582000
Project ID: P00604248MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Labangan - Pagadian City - Dumalinao By-Pass Road, Zamboanga Del Sur
CW1- Construction of Concrete Road
Physical Reserved: 7.44 Lane Km
Unit Cost: ₱ 12,352,150.54
ROW- Right-Of-Way Acquisition
Physical Reserved: 16,666.666 sq.m.
Unit Cost: ₱ 300.00
EAO: ₱ 3,570,000.00
Excess: ₱ 1,530,000.00
Total Allocation: ₱ 102,000,000.00 |
May 5, 2022 |
FY 2022 GAA |
WIN2G02717 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 310105100702000
Project ID : P00603929LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads - Secondary Roads
FROM :
Tablas Circumferential Road
K0124+884 - K0125+000
K0125+300 - K0126+521
Physical Target - CW1 - Reconstruction to Concrete Pavement :
2.688 Lane Km
Allocation - Php 48.810 Million
To :
Tablas Circumferential Road
K0124+884.00 - K0125+000
K0125+860.73 - K0126+716
K0126+818.86 - K0126+900
Physical Target - CW1 - Reconstruction to Concrete Pavement :
2.12082 Lane Km
Allocation - Php 48.810 Million |
May 5, 2022 |
FY 2022 GAA |
WIN2G02837 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. ; 310105100699000
Project ID : P00603930LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads - Secondary Roads
FROM :
Sibuyan Circumferential Road
K0091+427 - K0092+033
Physical Target - CW1 - Reconstruction to Concrete Pavement :
1.242 Lane Km
Allocation - Php 22.530 Million
TO :
Sibuyan Circumferential Road
K0091+427 - K0092+151
Physical Target - CW1 - Reconstruction to Concrete Pavement :
1.478 Lane Km
Allocation - 22.530 Million |
May 5, 2022 |
FY 2022 GAA |
WIN2G02763 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 310111100427000
Project ID : P00604075LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Construction/Upgrading/Rehabilitation of
Drainage along National Roads - Secondary Roads
FROM :
Tablas Circumferential Road
K0013+093 - K0013+693
Physical Target - CW1 - Construction of Drainage Structure
along Road : 600.00 lineal meters
Allocation - Php 5.00 Million
TO :
Tablas Circumferential Road
K0013+154 - K0013+484,
K0013+570 - K0013+693
Physical Target - CW1 - Construction of Drainage Structure
along Road : 453.00 lineal meters
Allocation - Php 5.00 Million
|
May 5, 2022 |
FY 2022 GAA |
WIN2G02758 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 320101107509000
Project ID : P00620263LZ
002 : Protect Lives and Properties
Flood management - Construction/Maintenance of Flood
Mitigation Structures and Drainage Systems
FROM :
Construction of Agbunyog Flood Control along
Tablas Circumferential Road (B/S),
Sta. 0+000 - Sta. 0+363.50
Sta. Maria Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
642.00 lineal meters
Allocation - Php 99.50 Million
TO :
Construction of Agbunyog Flood Control along
Tablas Circumferential Road (B/S),
Sta. 0+271 - Sta. 0+698 (R/S),
Sta. 0+470 - Sta. 0+510(L/S),
Sta. 0+525 - Sta. 0+700(L/S),
Sta. Maria, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
642.00 lineal meters
Allocation - Php 99.50 Million
|
May 5, 2022 |
FY 2022 GAA |
WIN2G02767 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300214100247000
Project ID : P00635995LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Special Road Fund - Motor Vehicle User's Charge (MVUC)
as per R.A. 11239
Repair/Rehabilitation/Reconstruction of National Road with
Slips, Slope Collapse, and Landslide along
Romblon - Cogon - Sablayan Road
K0001+350 - K0001+365
Physical Target - CW1 - Rehabilitation of Concrete Road :
1.974 lane km
Allocation - Php 22.00 Million
TO :
Repair/Rehabilitation/Reconstruction of National Road with
Slips, Slope Collapse, and Landslide along
Romblon - Cogon - Sablayan Road
K0005+938.90 - K0005+980.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 328.22 square meters
Allocation - Php 22.00 Million |
May 5, 2022 |
FY 2022 GAA |
WIN2G02835 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 310111100426000
Project ID : P00604076LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Construction/Upgrading/Rehabilitation of
Drainage along National Roads
FROM :
Tablas Circumferential Road
K0002+991 - K0003+792,
K0005+309.50 - K0005+835,
K0006+919 - K0007+054,
K0008+703 - K0009+103.50,
K0009+117 - K000-+324
Physical Target - CW1 - Construction of Drainage Structure
along Road ; 2,053.00 lineal meters
Allocation - Php 9.996 million
To :
Tablas Circumferential Road
K0002+997 - K0003+799,
K0006+919 - K0007+053,
K0008+703 - K0009+121
Physical Target - CW1 - Construction of Drainage Structure
along Road : 1,358.00 lineal meters
Allocation - Php 9.996 Million
|
May 5, 2022 |
FY 2022 GAA |
WIN2G02712 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No. : 310105100694000
Project ID : P00603919LZ
001 : Ensure Safe and Reliable national Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads
FROM ;
Jct, MWCR - San Jose Airport - Jct. Bubog Road
K0238+000 - K0238+216
Physical Target - CW1 - Reconstruction to Concrete Pavement :
0.432 Lane Km
Allocation - Php 7.396 Million
TO :
Jct. MWCR - San Jose Airport - Jct. Bubog Road
K0238+(-226) - K0238+289
Physical Target - CW1 - Reconstruction to Concrete Pavement :
1.030 Lane Km
Allocation - Php 7.396 Million |
May 5, 2022 |
FY 2022 GAA |
WIN2G02757 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No. : 320101108176000
Project ID : P00620653LZ
002 : Construction/Rehabilitation of Flood Mitigation Facilities
within Major River Basins and Principal Rivers -
Construction of Flood Control Structure
FROM :
Construction of Flood Control Structure -
Patrick River, Lagnas Section,
Sta. 0+000 - Sta. 0+471,
Sablayan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation
Structure : 390 l.m
Allocation - Php 50.00 million
TO :
Construction of Flood Control Structure -
Patrick River, Lagnas Section
Sta. 0+000 - Sta. 0+390
Sablayan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation
Structure : 390 l.m.
Allocation - Php 50.00 Million
|
May 5, 2022 |
2022 |
WIN2E02239 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 320102105117000
Project ID: P00620293MN
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
FROM:
Construction of Azpetia River Bank Protection, Sta. 0+000.00 - Sta. 0+010.00 R/S, Brgy. Azpetia, Prosperidad, Agusan del Sur
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 620.000 Lineal meters
Allocation:
TOTAL: P 46,000,000
CW1: P 45,080,000
EAO: P 920,000
Unit Cost:
CW1: P 72,710.00/Lineal meters
TO:
Construction of Azpetia River Bank Protection, Sta. 0+000.00 - Sta. 0+540.00 R/S, Sta. 0+000.00 – Sta. 0+080.00 L/S, Brgy. Azpetia, Prosperidad, Agusan del Sur
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 620.000 Lineal meters
Allocation:
TOTAL: P 46,000,000
CW1: P 45,080,000
EAO: P 920,000
Unit Cost:
CW1: P 72,710.00/Lineal meters |
May 5, 2022 |
2022 |
WIN2E02252 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 320102105119000
Project ID: P00620295MN
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
FROM:
Construction of Bank Protection of Sianib River along Daang Maharlika (Agusan-Davao Section), Sta. 0+000.00 - Sta. 0+160.00, Prosperidad, Agusan del Sur
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 416.400 Lineal meters
Allocation:
TOTAL: P 46,000,000
CW1: P 45,080,000
EAO: P 920,000
Unit Cost:
CW1: P 108,261.29/Lineal meters
TO:
Construction of Bank Protection of Sianib River along Daang Maharlika (Agusan-Davao Section), Sta. 0+000.00 - Sta. 0+350 Upstream, Sta. 0+000.00 - Sta. 0+066.40 Downstream, Prosperidad, Agusan del Sur
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 416.400 Lineal meters
Allocation:
TOTAL: P 46,000,000
CW1: P 45,080,000
EAO: P 920,000
Unit Cost:
CW1: P 108,261.29/Lineal meters |
May 4, 2022 |
FY 2022 GAA |
WIN2G02631 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Marinduque District Engineering Office |
UACS No. : 310202100968000
Project ID : P00606271LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Road Widening - Marinduque Circumferential Road
K0050+000 - K0050+240,
K0050+660 - K0051+329
Physical Target - CW1 - Road Widening : 1.852 Lane Km
Allocation - Php 60.00 Million
TO :
Road Widening - Marinduque Circumferential Road
K0046+704 - K0047+589,
K0050+000 - K0050+240,
K0050+660 - K0051+329
Physical Target - CW1 - Road Widening : 3.644 Lane Km
Allocation - Php 60.00 Million
|
May 4, 2022 |
FY 2022 GAA |
Win2G02718 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Marinduque District Engineering Office |
UACS No. : 310205100808000
Project ID : P00611462LZ
001 ; Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/New Roads -
FROM :
Construction of Missing Links/New Roads
- Dr. Damian Reyes Memorial Road,
Sta. 32+150 - Sta. 33+150
Physical Target - CW1 - Construction of Concrete Road :
1.122 lane km
Allocation - Php 97.80 million
TO :
Construction of Missing Links/New Roads
Dr. Damian Reyes Memorial Road
Sta. 35+940 - Sta. 36+890
Physical Target - CW1 - Construction of Gravel Road :
1.900 Lane Km
Allocation - Php 97.80 Million
|
May 4, 2022 |
FY 2022 GAA |
WIN2G02793 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Marinduque District Engineering Office |
UACS No. : 310205100809000
Project ID : P00611463LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/New Roads
FROM :
Construction of Missing Links/New Roads -
Dr. Damian Reyes memorial Road
Sta. 33+150 - Sta. 34+150
Physical Target - CW1 - Construction of Concrete Road :
1.141 lane km
Allocation - Php 99.50 Million
TO :
Construction of Missing Links/New Roads -
Dr. Damian Reyes Memorial Road,
Sta. 36+890 - Sta. 37+860
Physical Target - CW1 - Construction of Gravel Road :
1.940 lane km
Allocation - Php 99.50 Million
|
May 4, 2022 |
FY 2022 GAA |
WIN2G02750 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Marinduque District Engineering Office |
UACS No. : 310205100810000
Project ID : P00611464LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/New Roads
FROM :
Construction of Missing links/New Roads -
Dr. Damian Reyes memorial Road
Sta. 34+150 - Sta. 35+150
Physical Target - CW1 - Construction of Concrete Road ;
1.141 lane km
Allocation - Php 99.50 Million
TO :
Construction of Missing Links/New Roads -
Dr. Damian Reyes Memorial Road
Sta. 37+860 - Sta. 38+830
Physical Target - Construction of Gravel Road :
1.940 lane km
Allocation - Php 99.50 Million
|
May 4, 2022 |
FY 2022 GAA |
WIN2G02632 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Marinduque District Engineering Office |
UACS No. : 300215100229000
Project ID : P00630097LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
FROM ::
Construction of Dampulan - Malibago Road,
Sta. Cruz, Marinduque
Physical Target - CW1 - Construction of Concrete Road :
5.04 lane km
Allocation - Php 70.00 Million
TO :
Construction of Dampulan - Malibago Road
Torrijos, Marinduque
Physical Target - CW1 - Construction of Concrete Road :
5.04 lane km
Allocation - Php 70.00 Million |
May 4, 2022 |
FY 2022 GAA |
WIN2G02746 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Marinduque District Engineering Office |
UACS No. : 310205100811000
Project ID : P00611465LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/New Roads
FROM :
Construction of Missing Links/New Roads -
Dr. Damian Reyes Memorial Road
Sta. 35+150 - Sta. 36+150
Physical Target - CW1 - Construction of Concrete Road :
1.141 lane km
Allocation - 99.50 Million
TO :
Construction of Missing Links/New Roads
Dr. Damian Reyes Memorial Road
Sta. 38+830 - Sta. 39+800
Physical Target - Construction of gravel Road :
1.940 lane km
Allocation - Php 99.50 Million
|
May 4, 2022 |
FY 2022 GAA |
WIN2G02843 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Palawan 1st District Engineering Office |
UACS No. : 310203100511000
Project ID : P00606199LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
FROM :
Road Widening - Coron - Busuanga Road
K0049+000 - K0050+000
Busuanga, Palawan
Physical Target - CW1 - Road Widening : 2.014 lane km
Allocation - Php 34.50 Million
TO :
Road Widening - Coron-Busuanga Road
K0041+461.50 - K0042+000.00
K0047+383.00 - K0047+585.00
Busuanga, Palawan
Physical Target - CW1 - Road Widening : 1.427 lane km
Allocation - Php 34.50 Million
|
May 4, 2022 |
FY 2022 GAA |
WIN2G02855 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Palawan 1st District Engineering Office |
UACS No. : 310203100512000
Project ID : P00606284LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
FROM :
Road Widening - Coron - Busiuanga Road
K0059+458 - K0059+823
Busuanga, Palawan
Physical Target - CW1 - Road Widening : 0.730 lane km
Allocation - Physical Target - 8.934 Million
TO :
Road Widening - Coron - Busuanga Road
K0059+458.00 - K0059+707.00
Physical Target - CW1 - Road Widening : 0.498 lane km
Allocation - Php 8.934 Million
|
May 4, 2022 |
FY 2022 GAA |
WIN2G02818 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Palawan 3rd District Engineering Office |
UACS No. : 310108100888000
Project ID : P00604399LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, slope Collapse, and Landslide
- Secondary Roads
FROM :
PPSR Jct -Napsan - Apurawan Road,
K0048+005 - K0048+175
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 4,250 square meters
Allocation - Php 85.00 Million
TO :
PPSR Jct - napsan - Apurawan Road
K0048+005 - K0048+335
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 3,701 square meters
Allocation - Php 85.00 Million
|
May 4, 2022 |
FY 2022 GAA |
WIN2G02782 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Palawan 3rd District Engineering Office |
UACS No. : 310202100986000
Project ID : P00606205LZ
001 : Ensure Safe and Reliable national Road System
Network Development - Road Widening - Secondary Roads
FROM :
Road Widening - Puerto Princesa South Road
K0036+529 - K0038+000
Physical Target - CW1 - Road Widening : 2.948 lane km
Allocation - Php 60.00 Million
To :
Road Widening - Puerto Princesa South Road
K0036+529 - K0037+498
Physical Target - CW1 - Road Widening : 1.938 lane km
Allocation - Php 60.00 Million
|
May 4, 2022 |
2022 |
310109100967000 |
GAA 2022 |
January 3, 2022 |
Region II |
Cagayan 1st District Engineering Office |
OO1: Ensure and Safe Reliable National Road System - Rehabilitation /Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads
Construction od Road Slope Protection Structure - Port Irene Access Road - K0263+157 - K0623+457 |
May 3, 2022 |
2022 |
WIN2F06316 |
SR2022-02-000120 |
February 3, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Gov. Bado Dangwa National Rd - K0275 + 229 - K0276 + 636, K0277 + (-367) - K0292 + 880, K0292 + 961 - K0297 + 000;
Physical Target: 45.332 Lane Km;
Allocation: Php 250,000,000.000
To: Gov. Bado Dangwa National Rd - K0275 + 229 - K0276 + 636, K0277 + (-367) - K0288 + 980;
Physical Target: 27.664 Lane Km;
Allocation: Php 250,000,000.000
|
May 3, 2022 |
2022 |
WIN2F06291 |
SR2022-03-007584 |
March 23, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Benguet-Nueva Vizcaya Rd - K0293 + 020 - K0293 + 300;
Physical Target: 15,000.000 Square meters;
Allocation: Php 270,000,000.000
To: Benguet-Nueva Vizcaya Rd - K0293 + 010 - K0293 + 245;
Physical Target: 10,950.000 Square meters;
Allocation: Php 270,000,000.000
|
May 3, 2022 |
2022 |
WIN2F06252 |
SR2022-02-001726 |
February 4, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Installation of Road Safety Devices along Asin (Km 8)-Nangalisan-Sn Pascual, Tuba Rd - K0258 + 100 - K0264 + 370, K0265 + 200 - K0281 + 920;
Type of Work: Road Safety: Pavement Markings;
Physical Target: 64.309 Lane Km;
Allocation: Php 80,000,000.000
To: Installation of Road Safety Devices along Asin (Km 8)-Nangalisan-Sn Pascual, Tuba Rd - K0258 + 100 - K0268 + 000, K0269 + 000 - K0277 + 780;
Type of Work: Road Safety: Street Lighting;
Physical Target: 17.616 Km;
Allocation: Php 80,000,000.000
|