Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
May 12, 2022 2022 310106100727000 GAA 2022 January 3, 2022 Region II Batanes District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads - Tertiary Roads

San Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K0005 + 699.50 - K0005 + 759.30
May 12, 2022 2022 WIN2E02095 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Davao City Div Rd - K1511 + 909 - K1511 + 1003
Physical Target:
CW1: 5,026.720 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 90,481,000.00
CW1: P 87,314,165.00 (Construction of Road Slope Protection Structure)
EAO: P 3,166,835.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Davao City Div Rd - K1511 + 907 - K1511 + 980
Physical Target:
CW1: 2,564.00 sq. m. (Construction of Road Slope Protection Structure)

Allocation:
TOTAL: P 90,481,000.00
CW1: P 87,314,165.00 (Construction of Road Slope Protection Structure)
EAO: P 3,166,835.00
May 12, 2022 2022 WIN2E02141 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Fatima-Malabog Rd - K1502 + 072 - K1502 + 122, K1502 + 135 - K1502 + 158, K1502 + 212 - K1502 + 275
Physical Target:
CW1: 3,849.99 sq. m. (Construction of Road Slope Protection Structure)

Allocation:
TOTAL: P 57,750,000.00
CW1: P 55,728,750.00 (Construction of Road Slope Protection Structure)
EAO: P 2,021,250.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Fatima-Malabog Rd - K1511 + 690 - K1511 + 710, K1511 + 755 - K1511 + 775, K1512 + 270 - K1512 + 350
Physical Target:
CW1: 1,365.60 sq. m. (Construction of Road Slope Protection Structure)

Allocation:
TOTAL: P 57,750,000.00
CW1: P 55,728,750.00 (Construction of Road Slope Protection Structure)
EAO: P 2,021,250.00
May 12, 2022 2022 WIN2E02096 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Fatima-Malabog Rd - K1501 + 200 - K1501 + 500, K1502 + 200 - K1505 + 400
Physical Target:
CW1: 6.924lane km. (Road Widening)
Allocation:
TOTAL: P 68,774,000.00
CW1: P 66,366,910.00 (Road Widening)
EAO: P 2,407,090.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads

Fatima-Malabog Rd - K1501 + 200 - K1501 + 500, K1502 + 200 - K1504 + 470
Physical Target:
CW1: 5.094 lane km. (Road Widening)

Allocation:
TOTAL: P 68,774,000.00
CW1: P 66,366,910.00 (Road Widening)
EAO: P 2,407,090.00
May 12, 2022 2022 WIN2E02052 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Fatima-Malabog Rd - K1509 + 302 - K1511 + 341
Physical Target:
CW1: 3.752 lane km. (Road Widening)
Allocation:
TOTAL: P 37,520,000.00
CW1: P 36,769,600.00 (Road Widening)
EAO: P 750,400.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads

Fatima-Malabog Rd - K1509 + 302 - K1511 + 360
Physical Target:
CW1: 3.790 lane km. (Road Widening)

Allocation:
TOTAL: P 37,520,000.00
CW1: P 36,769,600.00 (Road Widening)
EAO: P 750,400.00
May 12, 2022 2022 310106100726000 GAA 2022 January 3, 2022 Region II Batanes District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads - Tertiary Roads

Sn Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd - K0005 +480 - K0005 + 503.06, K0005 + 504.56 - K0005 + 6999.50
May 12, 2022 2022 WIN2E02098 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program: Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Mitigation Structure along Bunawan River, Sta. 5 + 482 to Sta. 5 + 942, Davao City
Physical Target:
CW1: 420.00 Lineal Meters. (Construction of Flood Mitigation Structure:)

Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure:)
EAO: P 1,000,000.00

TO: Convergence and Special Support Program: Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities

Construction of Flood Mitigation Structure along Bunawan River, Sta. 2 + 020 to Sta. 2 + 440, Davao City
Physical Target:
CW1: 420.00 Lineal Meters. (Construction of Flood Mitigation Structure:))

Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Flood Mitigation Structure:)
EAO: P 1,000,000.00
May 12, 2022 2022 WIN2E02100 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (MN) – K1484 + (-330) – K1484 + 331, K1484 + (-844) – K1484 + (-330), K1484 + (-979) – K1484 + (-844)
Physical Target:
CW1: 5.240 lane km. (Preventive Maintenance of Road: Asphalt Overlay)

Allocation:
TOTAL: P 64,855,000.00
CW1: P 62,585,075.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,269,925.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (MN) – K1484 + (-979) – K1484 + (-356)
Physical Target:
CW1: 3.738 lane km. (Preventive Maintenance of Road: Asphalt Overlay)

Allocation:
TOTAL: P 64,855,000.00
CW1: P 62,585,075.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,269,925.00
May 12, 2022 2022 WIN2E02076 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (MN) - K1493 + 316 - K1494 + 272
Physical Target:
CW1: 5.706 lane km. (Preventive Maintenance of Road: Asphalt Overlay)

Allocation:
TOTAL: P 69,028,000.00
CW1: P 66,612,020.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,415,980.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (MN) - K1493 + 287 - K1494 + 410
Physical Target:
CW1: 6.654 lane km. (Preventive Maintenance of Road: Asphalt Overlay)

Allocation:
TOTAL: P 69,028,000.00
CW1: P 66,612,020.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,415,980.00
May 12, 2022 2022 WIN2E02102 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (MN) - K1488 + 689 - K1489 + 151
Physical Target:
CW1: 2.699 lane km. (Preventive Maintenance of Road: Asphalt Overlay)

Allocation:
TOTAL: P 32,096,000.00
CW1: P 31,454,080.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 641,920.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (MN) - K1488 + 515 - K1488 + 909
Physical Target:
CW1: 1.718 lane km. (Preventive Maintenance of Road: Asphalt Overlay)

Allocation:
TOTAL: P 32,096,000.00
CW1: P 31,454,080.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 641,920.00
May 12, 2022 2022 WIN2E02196 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Secondary Roads
ABS-CBN-Quimpo Blvd Div. Rd - K1511 + (-108) - K1511 + 154
Physical Target:
CW1: 314.400 sq. m. (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: 314.400 sq. m. (ROW acquisition)

Allocation:
TOTAL: P 23,435,000.00
CW1: P 13,818,980.00 (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: P 9,147,320.00 (ROW acquisition)
EAO: P 468,700.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Secondary Roads
ABS-CBN-Quimpo Blvd Div. Rd - K1511 + (-123) - K1511 + 154, K1512 + 013 – K1512 + 120
Physical Target:
CW1: 860.260 sq. m. (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: 198.258 sq. m. (ROW acquisition)

Allocation:
TOTAL: P 23,435,000.00
CW1: P 13,818,980.00 (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: P 9,147,320.00 (ROW acquisition)
EAO: P 468,700.00
May 12, 2022 2022 WIN2E02194 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Davao Bukidnon Rd – K1698+448 - K1698+541, K1698+552 – K1698+624, K1698+915 – K1698+918, K1699+020 – K1699+357, K1699+843 – K1699+853, K1699+937 – K1699+954, K1699+980 – K1699+1010, K1700+132 – K1700+254, K1700+490 – K1700+532, K1700+795 – K1701+000, K1701+029 – K1701+076
Physical Target:
CW1: 1,229.10 sq. m. (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: 1,229.10 sq. m. (ROW acquisition)

Allocation:
TOTAL: P 30,000,000.00
CW1: P 19,123,720.00 (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: P 10,276,280.00 (ROW acquisition)
EAO: P 600,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Davao Bukidnon Rd – K1698+435 – K1698+512, K1698+526 – K1698+544, K1698+557 – K1698+611, K1698+632 – K1698+661, K1698+902 – K1698+904, K1698+936 – K1699+295, K1699+365 – K1699+374, K1699+599 – K1699+642, K1699+666 – K1699+720, K1699+740 – K1699+760, K1699+787 – K1699+806, K1699+820 – K1699+840, K1699+879 – K1699+902, K1699+920 – K1699+980, K1700+121 – K1700+300
Physical Target:
CW1: 1,686.00 sq. m. (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: 1,229.10 sq. m. (ROW acquisition)

Allocation:
TOTAL: P 30,000,000.00
CW1: P 19,123,720.00 (Off-Carriageway Improvement: Construction of Sidewalk)
ROW: P 10,276,280.00 (ROW acquisition)
EAO: P 600,000.00
May 11, 2022 FY 2022 GAA WIN2G02863 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310102100820000
Project ID : P00609337LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Preventive maintenance - Secondary Roads

FROM :

Puerto Princesa North Road
K0246+000 - K0250+219
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 8.452 Lane Km
Allocation - Php 82.456 Million

To :

Puerto Princesa North Road
K0246+000 - K0249+703
Physical Target - CW1 - Preventive Maintenance of Road ;
Asphalt Overlay - 7.410 lane Km
- CW2 - Road Safety : Pavement Markings
( including Solar Studs) - 7.410 Lane Km
Allocation - Php 82.456 Million
May 11, 2022 FY 2022 GAA WIN2G02816 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310102100821000
Project ID : P00609338LZ

001 : Ensure Safe and Reliable National Road Safety

Asset Preservation - Preventive maintenance - Secondary Roads

FROM :

Princesa North Road
K0232+531 - K0237+111
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 9.202 Lane Km
Allocation - Php 89.773 Million

TO :

Puerto Princesa North Road
K0232+531 - K0236+460
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 7.888 Lane Km
- CW2 - Road Safety : Pavement Markings
(including Solar Studs) - 7.888 Lane Km
Allocation - Php 89.773 Million
May 11, 2022 FY 2022 GAA WIN2G02861 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310102100824000
Project ID : P00603339LZ

001 : Ensure Safe and Reliable National Road Safety

Asset Preservation - Preventive Maintenance - Secondary Roads

FROM :

Princesa North Road
K0028+525 - K0033+629
Physical Target - CW1 - Preventive Maintenance of Road:
Asphalt Overlay - 10.256 Lane Km
Allocation - Php 100.056 Million

TO :
Puerto Princesa North Road
K0028+525 - K0033+001
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 9.000 Lane Km
- CW2 - Road Safety : Pavement Markings
(including Solar Studs) - 9.000 Lane Km
Allocation - Php 100.056 Million
May 11, 2022 FY 2022 GAA WIN2G02921 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310102100822000
Project ID : P00610121LZ

001: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

FROM :

Calapan South Road
K0064+000 - K0071+000
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 28.164 Lane Km
Allocation - Php 290.00 Million

TO :

Calapan South Road
K0064+000 - K0069+180
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 20.844 Lane Km
Allocation - Php 290.00 Million
May 11, 2022 FY 2022 GAA WIN2G02924 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310102100823000
Project ID : P00610122LZ

001: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

FROM :

Calapan South Road
K0071+867 - K0075+036,
K0075+850 - K0079+238,
K0081+904 - K0082+830
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 29.952 Lane Km
Allocation - Php 309.000 Million

TO :

Calapan South Road
K0071+867 - K0075+036,
K0075+850 - K0078+475
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 23.22 Lane Km
Allocation - Php 309.00 million
May 11, 2022 FY 2022 GAA WIn2G02896 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310108100884000
Project ID : P00611360LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of Roads with
Slips, Slope Collapse, and Landslide - Secondary Roads

FROM :

Sibuyan Circumferential Road
K0038+900 - K0069+420
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 11,111.11 square meter
Allocation - Php 200.00 million

TO :

Sibuyan Circumferential Road
K0038+900 - K0039+312
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 8,842.36 square meter
Allocation - Php 200.00 Million
May 11, 2022 FY 2022 GAA WIN2G02881 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310108100885000
Project ID : P00611361LZ

001 : Ensure Safe and Reliable National Road System

Asset preservation - Rehabilitation/Reconstruction of Roads with
Slips, Slope Collapse, and Landslide - Secondary Roads

FROM :

Tablas Circumferential Road
K0028+000 - K0028+272
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 11,111.11 qsuare meter
Allocation - Php 200.00 Million


TO :

Tablas Circumferential Road
K0028+000 - K0028+144
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 9,117.50 square meter
Allocation - Php 200.00 Million
May 11, 2022 FY 2022 WIN2C03538 UACS No. 320102104456000 March 2, 2022 National Capital Region Metro Manila 1st District Engineering Office
As per GAA/Original
UACS No. 320102104456000
Project ID.: P00620768LZ
OO2: Protect Live and Properties Against Major Floods
Flood Management – Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and
Principal Rivers
Rehabilitation of Pasig-Marikina River Channel, Sta. 1+500 – Sta. 3+1000, Pasig City
Physical Target: CW1- Channelization = 63,449.333 cubic meters
Unit Cost = P 1,447.50/cu.m.
Allocation = P 91,842,910
EAO = P 3,331,090
Total = P 95,174,000

As Modified
OO2: Protect Live and Properties Against Major Floods
Flood Management – Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and
Principal Rivers
Rehabilitation of Pasig-Marikina River Channel, Sta. 1+500 – Sta. 3+000, Pasig City
Physical Target: CW1- Channelization = 50,723.50 cubic meters
Unit Cost = P 1,810.66/cu.m.
Allocation = P 91,842,910
EAO = P 3,331,090
Total = P 95,174,000
WIN2C03538
May 11, 2022 2022 WIN2C03546 SARO-BMB-A-22-0003144 March 21, 2022 Region VIII Northern Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0809 + 978 - K0819 + 085

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 26.46 M
Structure: 1,500 Square meters

EAO P 0.54 M

Total P 27.00 M

AS MODIFIED:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0809 + 978 - K0810 + 085

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 26.46 M
Structure: 1,225 Square meters

EAO P 0.54 M

Total P 27.00 M
May 11, 2022 FY 2022 GAA WIN2G02892 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310109100868000
Project No.: P00611434LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of Roads with
Slips, Slope Collapse, and Landslide - Tertiary Roads

FROM :

Odionga - East - West Road
K0009+220 - K0009+392
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 13,055.56 square meter
Allocation - php 235.00 million

TO :

Odiongan - East - West Road
Sta. 8+840 - Sta. 8+940,
Sta. 9+158 - Sta. 9+392
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 10,391.11 square meter
Allocation - Php 235.00 Million
May 11, 2022 FY 2022 GAA WIN2G02891 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. ; 320101107513000
Project ID : P00620654LZ

002: Protect Lives and Properties Against major Floods

Construction/Maintenance of Flood Mitigation Structures
and Drainage Systems

FROM :

Construction of Patrick Flood Control (Kambingan Section),
Sta. 0+000 - Sta. 0+507
Sablayan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
507 lineal meter
Allocation - Php 50.00 Million

TO :

Construction of Patrick Flood Control (Kambingan Section),
Sta. 0+000 - Sta. 0+070.00 (RS),
Sta. 0+140 - Sta. 0+477.25 (RS)
Sablayan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
407.25 lineal meter
Allocation - Php 50.00 Million
May 11, 2022 FY 2022 GAA WIn2G02890 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 320101107518000
Project ID : P00620672LZ

002 : Protect Lives and Properties Against Major Floods

Construction/Maintenance of Flood Mitigation Structures
and Drainage Systems

FROM :

Construction of Tuguis Flood Control Structures along
Looc (Cogon Tulay) - Odiongan Road,
Barangay Progreso Este, Odiongan, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
433 lineal meter
Allocation - Php 50.00 Million

TO :

Constuction of Tuguis Flood Control Structure along
Looc (Cogon Tulay) - Odiongan Road,
Barangay Progreso Este, Odiongan, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
296.4 lineal meter
Allocation - Php 50.00 Million

May 11, 2022 2022 WIN2C03537 SR2022-03-007854 March 23, 2022 Region VIII Northern Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0812 + 150 - K0812 + 323

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 95.158650 M
Structure: 5,478.330 Square meters

EAO P 3.451350 M

Total P 98.610 M

AS MODIFIED:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd - K0809 + 415 - K0809 + 655, K0810 + 500 - K0810 + 750, K0812 + 150 - K0812 + 500

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 95.158650 M
Structure: 5,040 Square meters

EAO P 3.451350 M

Total P 98.610 M
May 11, 2022 2022 WIN2C03544 SARO-BMB-A-22-0003185 March 21, 2022 Region VIII Southern Leyte District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K1011 + 600 - K1011 + 800

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 49.00 M
Structure: 3,666.67 Square meters

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Daang Maharlika (LT) - K1030 + 000 - K1030 + 410

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 49.00 M
Structure: 3,666.67 Square meters

EAO P 1.00 M

Total P 50.00 M
May 11, 2022 2022 WIN2C03535 SR2022-03-008067 March 23, 2022 Region VIII Southern Leyte District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Bdry Southern Leyte-Maasin-Macrohon-Sogod-Jct Daang Maharlika

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 96.500 M
Structure: 5,555.560 Square meters

EAO P 3.500 M

Total P 100.00 M

AS MODIFIED:

Bdry Southern Leyte-Maasin-Macrohon-Sogod-Jct Daang Maharlika, K1194 + 387 – K1194 + 553

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 96.500 M
Structure: 4,500 Square meters

EAO P 3.500 M

Total P 100.00 M
May 11, 2022 2022 WIN2C03539 SR2022-03-008319 March 23, 2022 Region VIII Southern Leyte District Engineering Office
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Multi-Purpose Buildings/ Facilities to support Social Services


AS PER GAA/ORIGINAL:

Construction/Improvement of Guadalupe Port, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Multi Purpose Building P 96.500 M
: 1.00 Number of Buildings

EAO P 3.500 M

Total P 100.00 M

AS MODIFIED:

Construction/Improvement of Guadalupe Port, Southern Leyte

Physical Target: Allocation:

CW1-Construction of Other Facilities P 96.500 M
: 1.00 Number of Facilities

EAO P 3.500 M

Total P 100.00 M
May 11, 2022 2022 WIN2C03536 GAA FY 2022 January 10, 2022 Region VIII Southern Leyte District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation- Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

AS PER GAA/ORIGINAL:

Jct Himay-angan-Silago-Abuyog Bdry Rd - K1050 + (-319) - K1050 + (-307)

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 1.960 M
Road: 12 Lineal meters

EAO P 0.04 M

Total P 2.00 M

AS MODIFIED:

Jct Himay-angan-Silago-Abuyog Bdry Rd - K1064 + 914

Physical Target: Allocation:

CW1-Construction of Drainage Structure along P 1.960 M
Road: 15 Lineal meters

EAO P 0.04 M

Total P 2.00 M
May 11, 2022 FY 2022 GAA WIN2G02902 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100233000
Project ID : P00630101LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Port Barton - TDC Road,
Sta. 17+477 - Sta. 17+761,
Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,500.472 square meter
Allocation - Php 66.958 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Port Barton - TDC Road,
Sta. 17+477 - Sta. 17+644
Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,820.10 square meter
Allocation - Php 66.958 Million

May 11, 2022 2022 WIN2C03542 GAA FY 2022 January 10, 2022 Region VIII Leyte 3rd District Engineering Office
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)-Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of Campokpok - Layog - Butason - Cota Rd., San Isidro, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road P 49.00 M
: 1.904 Lane Km

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Construction of Campokpok - Layog - Butason - Cota Rd., Tabango, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road P 49.00 M
: 1.904 Lane Km

EAO P 1.00 M

Total P 50.00 M
May 11, 2022 2022 WIN2C03545 SR2022-02-000238 February 3, 2022 Region VIII Leyte 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0908 + 350 - K0908 + 946

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 62.725 M
Structure: 3,611.11 Square meters

EAO P 2.275 M

Total P 65.00 M

AS MODIFIED:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0908 + 350 - K0909 + 350

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 62.725 M
Structure: 3,611.11 Square meters

EAO P 2.275 M

Total P 65.00 M
May 11, 2022 FY 2022 GAA WIN2G02899 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300219100147000
Project ID : P00630957LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Flood Mitigation Structures protecting Public Infrastructure/Facilities

FROM :

Construction of Tuguis Flood Control Structure (Phase 2) along
Looc - Cogon - Tulay Odiongan Road,
Barangay Progreso Este, Odiongan, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
457.58 lineal meter
Allocation - Php 55.00 Million

TO :

Construction of Tuguis Flood Control Structure (Phase 2) along
Looc - Cogon - Tulay Odiongan Road,
Barangay Progreso Este, Odiongan, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
315.50 lineal meter
Allocation - Php 55.00 Million
May 11, 2022 FY 2022 GAA WIn2G02937 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 3002011000083000
Project ID : P00634955LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Construction/Improvement of Access Roads leading to Airports
( Kalsada Tungo sa Paliparan, Riles at Daungan Program -
KATUPARAN )

FROM :

Bantulan - Sandoval Airport Access Road,
Taytay, Palawan
Physical Target - CW1 - Construction of Concrete Road :
8.13 Lane Km
Allocation - Php 121.924 Million

TO :

Bantulan - Sandoval Airport Access Road
Taytay, Palawan
Physical Target - CW1 - Construction of Concrete Road :
7.53 Lane Km
Allocation - Php 121.924 Million
May 11, 2022 2022 WIN2C03548 SR2022-02-000251 February 3, 2022 Region VIII Leyte 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0915 + 584 - K0915 + 610

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 67.550 M
Structure: 3,888.89 Square meters
EAO P 2.450 M

Total P 70.00 M

AS MODIFIED:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0915 + 584 - K0915 + 610, K0918 + 050 – K0918 + 650

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 67.550 M
Structure: 3,888.89 Square meters
EAO P 2.450 M

Total P 70.00 M
May 11, 2022 2022 320102104947000 GAA 2022 January 3, 2022 Region II Nueva Vizcaya District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Sto. Domingo Flood Control, Sto. Domingo, Bambang, Nueva Vizcaya
May 11, 2022 2022 WIN2C03549 GAA FY 2022 February 1, 2022 Region VIII Leyte 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0916 + 581 - K0916 + 681

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 49.00 M
Structure: 2,777.78 Square meters

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0916 + 000 - K0916 + 681

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 49.00 M
Structure: 2,777.78 Square meters

EAO P 1.00 M

Total P 50.00 M
May 11, 2022 2022 320102104536000 GAA 2022 January 3, 2022 Region II Isabela 2nd District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Rehabilitation of Siffu River Flood Control Structure (Suerte Section Phase II), Sta. 0+ 000 - Sta. 0+730, Brgy. Suerte, Quirino, Isabela
May 11, 2022 2022 WIN2C03526 GAA FY 2022 February 1, 2022 Region VIII Leyte 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Leyte-Samar Inter-Provl Rd - K0911 + 838 - K0912 + 331

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 49.00 M
Structure: 2,777.78 Square meters

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Leyte-Samar Inter-Provl Rd - K0911 + 752 - K0912 + 331

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 49.00 M
Structure: 2,777.78 Square meters

EAO P 1.00 M

Total P 50.00 M
May 10, 2022 FY 2022 GAA WIN2G02908 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310205100815000
Project ID : P00608165LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/New Roads

FROM :

Sofrinio Espanola - Quezon Cross Country Road
(Pulot Interior - Tagusao Section), Package F, Palawan
Physical Target - CW1 - Construction of Gravel Road :
5.102 Lane Km
Allocation - Php 50.00 Million

TO :

Sofronio Espanola - Quezon Country Cross Road
(Pulot Interior-Tagusao Section), Package F, Palawan
Physical Target - CW1 - Construction of Gravel Road :
7.858 Lane Km
Allocation - Php 50.00 Million
May 10, 2022 FY 2022 GAA WIN2G02904 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310204101536000
Project ID : P00608633LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/New Roads

FROM :

Boac - Mogpog By-Pass Road, Package 1, Marinduque
Physical Target - CW1 - Construction of Concrete Road :
2.000 Lane Km
Allocation - Php 150.00 Million

TO :

Boac - Mogpog By-Pass Road, Package1, Marinduque
Physical Target - CW1 - Construction of Concrete Road :
4.414 Lane Km
- CW2 - Road Safety Pavement Markings :
4.414 Lane Km
Allocation - Php 150.00 Million

May 10, 2022 FY 2022 GAA WIN2G02936 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. ; 310102100812000
Project ID : P00609329LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

FROM :

Preventive Maintenance of Road : Asphalt Overlay -
Puerto Princesa North Road (S00025PW)
K0067+298 - K0074+313
Physical Target - CW1 - Preventive Maintenance of Road -
Asphalt Overlay : 14.00 Lane Km
Allocation - 136.582 Million

TO :
Preventive maintenance of Road : Asphalt Overlay -
Puerto Princesa North Road (S00025PW)
K0067+298 - K0074+036
Allocation - Php 136.582 Million
May 10, 2022 FY 2022 GAA WIN2G02934 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310102100813000
Project ID : P009330LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

FROM :

Puerto Princesa North Road
K0168+000 - K0173+409
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 10.88 Lane Km
Allocation - Php 106.143 Million

TO :

Puerto Princesa North Road
K0168+000 - K0172+721
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 9.486 Lane Km
Allocation - Php 106.143 Million

May 10, 2022 FY 2022 GAA WIN2G02862 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310102100815000
Project ID : P00609332LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

FROM :

Princesa North Road
K0189+681 - K0194+591
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - .248 Lane Km
Allocation - Php 99.978 Million

TO :

Puerto Princesa North Road
K0189+681 - K0194+358
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 9.782 Lane Km
- CW2 - Road Safety : Pavement Markings -
( including Solar Studs) - 9.782 Lane Km
Allocation - Php 99.978 Million

May 10, 2022 FY 2022 GAA WIN2G02870 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310102100817000
Project ID : P00609334LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

FROM :

Puerto Princesa North Road
K0216+000 - K0221+304
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 10.628 Lane Km
Allocation - Php 148.250 Million

TO :

Puerto Princesa North Road
K0216+000 - K0220+952
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 9.930 Lane Km
Allocation - Php 148.250 Million
May 10, 2022 FY 2022 GAA WIN2G02821 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310102100818000
Project ID : P00609335LZ

001 : Asset Preservation - Preventive Maintenance

FROM :

Puerto Princesa North Road
K0257+000 - K0262+546
Physical Target - CW1 - Preventive maintenance of Road :
Asphalt Overlay - 11.07 Lane Km
Allocation - Php 108.017 Million

TO :

Puerto Princesa North Road
K0257+000 - K0261+812
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 9.60 Lane Km
Allocation - Php 108.017 Million
May 6, 2022 2022 WIN2C03540 GAA FY 2022 January 3, 2022 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0997 + 814 - K0998 + 400

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 14.700 M
: 1.156 Lane Km

EAO P 0.300 M

Total P 15.00 M

AS MODIFIED:

Daang Maharlika (LT) - K0997 + 814 - K0999 + 000

Physical Target: Allocation:

CW1-Reconstruction to Concrete Pavement P 14.700 M
: 1.575 Lane Km

EAO P 0.300 M

Total P 15.00 M
May 6, 2022 2022 WIN2C03543 GAA FY 2022 January 3, 2022 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Ormoc-Baybay-Southern Leyte Bdry Rd - K1040 + 485 - K1040 + 935

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 3.920 M
along Road: 450 Lineal meters

EAO P 0.080 M

Total P 4.00 M

AS MODIFIED:

Ormoc-Baybay-Southern Leyte Bdry Rd - K1040 + 488 - K1040 + 578, K1041 + 924 – K1042 + 085, K042 + 843 – K1043 + 115

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 3.920 M
along Road: 437 Lineal meters

EAO P 0.080 M

Total P 4.00 M
May 6, 2022 2022 WIN2C03531 GAA FY 2022 January 3, 2022 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Primary Roads

AS PER GAA/ORIGINAL:

Ormoc-Baybay-Southern Leyte Bdry Rd - K1055 + 757.17 - K1056 + 115, K1058 + 000 - K1058 + 167

Physical Target: Allocation:

CW1-Road Widening: 0.976 Lane Km P 12.7155 M

EAO P 0.2595 M

Total P 12.975 M

AS MODIFIED:

Ormoc-Baybay-Southern Leyte Bdry Rd - K1049 + 729 - K1049 + 927, K1054 + 836 - K1055 + 080

Physical Target: Allocation:

CW1-Road Widening: 0.796 Lane Km P 8.5709796 M

CW2-Construction of Road Slope Protection P 4.1445204 M
Structure: 1,121 Square meters

EAO P 0.2595 M

Total P 12.975 M
May 6, 2022 2022 WIN2C03530 SARO-BMB-A-22-0003177 March 21, 2022 Region VIII Leyte 5th District Engineering Office
Convergence and Special Support Program

Construction/ Rehabilitation of Water Supply/ Septage and Sewerage/ Rainwater Collector System - Water Supply

AS PER GAA/ORIGINAL:

Construction of Level III Water Supply System, Baybay City, Leyte

Physical Target: Allocation:

CW1-Construction of Water Supply Systems P 49.00 M
: 1.00 Number of Water Supply Systems

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Construction of Level III Water Supply System, Baybay City, Leyte

Physical Target: Allocation:

CW1-Construction of Water Supply Systems P 49.00 M
: 6.00 Number of Water Supply Systems

EAO P 1.00 M

Total P 50.00 M
May 6, 2022 2022 WIN2C03533 SARO-BMB-A-22-0003177 March 21, 2022 Region VIII Leyte 5th District Engineering Office
Convergence and Special Support Program

Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

AS PER GAA/ORIGINAL:

Preventive Maintenance (Asphalt Overlay) along Ormoc-Baybay-Southern Leyte Bdry Rd - K1053 + 151 - K1053 + 315, K1053 + 887 - K1055 + 711, K1056 + 000 - K1056 + 070

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 23.520 M
Asphalt Overlay: 4.409 Lane Km

EAO P 0.480 M

Total P 24.00 M

AS MODIFIED:

Preventive Maintenance (Asphalt Overlay) along Ormoc-Baybay-Southern Leyte Bdry Rd - K1053 + 151 - K1053 + 305, K1053 + 382 - K1053 + 829, K1054 + 000 - K1055 + 019

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 23.520 M
Asphalt Overlay: 3.152 Lane Km

EAO P 0.480 M

Total P 24.00 M
May 6, 2022 2022 WIN2C03541 SARO-BMB-A-22-0003177 March 21, 2022 Region VIII Leyte 5th District Engineering Office
Convergence and Special Support Program

Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services


AS PER GAA/ORIGINAL:

Construction of Multi-Purpose Building , Bato, Leyte

Physical Target: Allocation:

CW1-Construction of Multi Purpose Building P 7.920 M
: 1.00 Number of Buildings

EAO P 0.080 M

Total P 8.00 M

AS MODIFIED:

Construction of Multi-Purpose Building , Bato, Leyte

Physical Target: Allocation:

CW1-Construction of Multi Purpose Building P 7.920 M
: 2.00 Number of Buildings

EAO P 0.080 M

Total P 8.00 M
May 6, 2022 FY 2022 GAA WIN2G2893 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310108100878000
Project ID : P00604386LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM :

Construction of Road Slope Protection Structure -
Calapan North Road
K0042+720 - K0042+820,
K0042+880 - K0043+100
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 16,050 square meter
Allocation - Php 160.500 Million

TO :

Construction of Road Slope Protection Structure -
Calapan North Road
K0042+740 - K0042+1008,
K0043+060 - K0043+170
Physical Target - CW1 - Construction of Road Slope protection
Structure : 7,612 square meter
Allocation - Php 160.500 Millionn
May 6, 2022 FY 2022 GAA WIN2G02866 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310202100985000
Project ID : P00606202LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Puerto Princesa South Road
K0012+180 - K0014+000
Physical Target - CW1 - Road Widening : 3.854 Lane Km
Allocation - Php 80.00 Million

TO :

Puerto Princesa South Road
K0012+180 - K0013+780
Physical Target - CW1 - Road Widening : 3.408 Lane Km
Allocation - Php 80.00 Million
May 6, 2022 FY 2022 GAA WIN2G02820 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310202101129000
Project ID : P00606203LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Puerto Princesa South Road
K0014+000 - K0014+853
Physical Target - CW1 - Road Widening : 1.706 Lane Km
Allocation - Php 35.00 Million

TO :

Puerto Princesa South Road
K0013+967 - K0014+740
Physical Target - CW1 - Road Widening : 1.552 Lane Km
Allocation - Php 35.00 Million
May 6, 2022 FY 2022 GAA WIN2G02915 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. :310202100966000
Project ID : P00606270LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Marinduque Circumferential Road
K0039+633 - K0042+000
Physical Target - CW1 - Road Widening : 4.630 Lane Km
Allocation - Php 105.00 Million

TO :

Marinduque Circumferential Road
K0039+000 - K0041+359
Physical Target - CW1 - Road Widening : 4.718 Lane km
- CW2 - Road Safety - Pavement Markings :
4.718 Lane Km
Allocation - Php 105.00 Million

May 6, 2022 FY 2022 GAA WIN2G02849 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. :310202100978000
Project ID : p00606273LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Puerto Princesa North Road
K0128+000 - K0131+870
Physical Target - CW1 - Road Widening : 7.766 Lane Km
Allocation - Php 116.490 million

TO :

Puerto Princesa North Road
K0128+000 - K0131+150
Physical Target - CW1 - Road Widening : 6.326 Lane Km
Allocation - Php 116.490 Million
May 6, 2022 FY 2022 GAA WIN2G02838 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310202100980000
Project ID : P00606275LZ

001: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Puerto Princesa North Road
K0142+841 - K0147+000
Physical Target - CW1 - Road Widening : 8.342 Lane Km
Allocation - Php 125.130 million

TO :

Puerto Princesa North Road
K0142+961 - K0146+065
Physical Target - CW1 - Road Widening ; 6.236 Lane Km
Allocation - Php 125.130 Million
May 6, 2022 FY 2022 GAA WIN2G02830 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310202100982000
Project ID : P00606280LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Puerto Princesa North Road,
K0166+000 - K0166+097,
K0166+108 - K0166+509,
K0166+1306 - K0168+087,
K0166+534 - K0166+1295,
K0168+109 - K0168+666,
K0168+681 - K0170+000
Physical Target - CW1 - Road Widening ; 7.920 lane Km
Allocation - Php 118.800 Million

To :

Puerto Princesa North Road

K0166+000 - K0166+084,
K0166+152 - K0166+496,
K0166+632 - K0166+1274,
K0166+1335 - K2168+065,
K0168+137 - K0168+544,
K0168+799 - K0169+563
Physical Target - CW1 - Road Widening : 6.002 Lane km
Allocation - Php 118.800 million
May 6, 2022 2022 WIN2C03554 GAA FY 2022 January 3, 2022 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0966 + 100 - K0967 + 193, K0967 + 209 - K0969 + 000

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 55.9314 M
Asphalt Overlay: 11.592 Lane Km

EAO P 2.0286 M

Total P 57.960 M

AS MODIFIED:

Daang Maharlika (LT) - K0966 + 100 - K0967 + 188, K0967 + 217 - K0967 + 980

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 55.9314 M
Asphalt Overlay: 7.412 Lane Km

EAO P 2.0286 M

Total P 57.960 M
May 6, 2022 2022 WIN2C03552 SR2022-03-007313 March 23, 2022 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0978 + 200 - K0978 + 400, K0979 + 300 - K0979 + 500, K1001 + 850 -K1002 + 100, K1002 + 800 - K1002 + 939

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 96.500 M
Structure: 5,555.560 Square meters
EAO P 3.500 M

Total P 100.00 M

AS MODIFIED:

Daang Maharlika (LT) – K1000 + 888 – K1000 + 920, K1002 + 810 – K1002 + 939

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 96.500 M
Structure: 2,044.70 Square meters
EAO P 3.500 M

Total P 100.00 M
May 6, 2022 2022 WIN2C03553 GAA FY 2022 January 3, 2022 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Tacloban-Baybay South Rd - K0985 + 160 - K0985 + 260

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 29.400 M
Structure: 1,686 Square meters

EAO P 0.600 M

Total P 30.00 M

AS MODIFIED:

Tacloban-Baybay South Rd - K0985 + 160 - K0985 + 260

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 29.400 M
Structure: 600 Square meters

EAO P 0.600 M

Total P 30.00 M
May 6, 2022 FY 2022 GAA P00608155LZ DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310205100569000
Project ID : P00608155LZ

001: Ensure Safe and Reliable National Road System

Network Development - Construction of missing Links/New Roads

FROM :

Bulalacao - San Jose Road (Bulalacao Section),
Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
5.73 Lane Km
Allocation - Php 86.00 Million

TO :

Bulalacao - San Jose Road (Bulalacao Section),
Oriental Mindoro
Physical Target - CW1 - Construction of Gravel Road :
3.72 Lane Km
- CW2 - Construction of New Bridge :
286.20 sq.m.
- CW3 - Construction of New Bridge :
238.50 sq.m.
Allocation - Php 86.00 Million


May 6, 2022 FY 2022 GAA WIN2G02935 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310205100816000
Project ID : P00608161LZ

001: Ensure Safe and Reliable national Road System

Network Development - Construction of Missing Links/New Roads

FROM :

Victoria Sablayan (Mindoro Cross Island Road), Package I,
Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.392 Lane Km
- CW2 - Construction of Concrete Bridge :
678.771 square meter
Allocation - Php 150.00 Million

TO :

Victoria Sablayan ( Mindoro Cross Island Road ), Package I,
Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.202 Lane Km
- CW2 - Construction of Concrete Bridge :
1,863.456 square meter
Allocation - Php 150.00 Million
May 6, 2022 FY 2022 GAA WIn2G02938 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No, ; 310205100814000
Project ID : P00608164LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/New Roads

FROM :

Sofronio Espanola - Quezon Cross Country Road
(Pulot Interior - Tagusao Section), Package E, Palawan
Physical Target - CW1 - Construction of gravel Road :
5.102 lane Km
Allocation - 50.00 Million

To :

Sofronio Espanola -Quezon Cross Country Road
(Pulot Interior - Tagusao Section), Package E, Palawan
Physical Target - CW1 - Construction of gravel Road :
7.730 Lane Km
Allocation - Php 50.00 Million
May 6, 2022 2022 WIN2F06310 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

A Castañeda - Ma Aurora - San Luis Rd - K0207+658 - K0208+000
May 6, 2022 2022 WIN2F06315 FY 2022 GAA December 30, 2021 Region III Aurora District Engineering Office
Network Development Program - Off-Carriageway Improvement - Secondary Roads

Baler - Casiguran Rd (Baler - Dinadiawan) - K0276+168.70 - K0276+241.00 , K0276+253.00 - K0276.+298.20, K0276+529.10 - K0276+580.00, K0276+623.20 - K0276+872.90, K0277+174.50 - K0277+220.00, K0277+325.90 - K0277+348.50, K0277+943.00 - K0277+954.00, K0278+474.20 - K0278+508.30, K0278+607.40 - K0278+689.00, K0278+708.15 - K0278+75810, K0278+902.80 - K0278+946.50, K0279+208.5 - K0279+450.20, K0279+842.50 - K0280+000.00, K0280+000.00 - K0280+150.00, K0280+272.80 - K0280+340.80 (Left Side)
K0276+000.00 - K0276+241.00, K0276+253.00 - K0276+740.00, K0276+800.00 - K0277+300.00, K0277+375.70 - K0277+511.70, K0277+529.30 - K0277+562.40, K0277+574.20 - K0277+742.10, K0277+746.00 - K0277+911.90, K0277+942.90 - K0277+954.00, K0278+000.00 - K0278+246.30, K0278+260.00 - K0278+265.50, K0278+300.00 - K0278+688.00, K0278+708.40 - K0278+775.00, K0278+792.00 - K0278+811.90, K0278+834.20 - K0278+845.30, K0278+854.60 - K0278+882.20, K0278+940.00 - K0279+000.00, K0279+000.00 - K0279+029.90, K0279+058.90 - K0279+171.20, K0279+188.10 - K0279+226.20, K0279+258.20 - K0279+310.00, K0279+320.60 - K0279+809.50, K0279+840.50 - K0279+910.70, K0279+921.10 - K0280+000.00, K0280+000.00 - K0280+075.90, K0280+097.40 - K0280+101.50, K0280+114.90 - K0280.324.70, K0280+336.90 - K0280+437.00 (Right Side)
00
May 5, 2022 FY 2022 GAA WIN2G02677 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 3rd District Engineering Office
UACS No.: 310202101131000
Project ID : P00606206LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Puerto Princesa South Road
K0039+698 - K0040+000\
K0044+846 - K0045+108
Physical Target - CW1 - Road Widening : 1.136 lane km
Allocation - Php 20.00 million

TO :

Puerto Princesa South Road
K0039+698 - K0040+000
K0045+700 - K0046+000
Physical Target - CW1 - Road Widening : 1.204 lane km
Allocation - Php 20.00 million
May 5, 2022 FY 2022 GAA WIN2G02819 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 3rd District Engineering Office
UACS No. : 310202100987000
Project ID : P00606207LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Puerto Princesa South Road
K0046+000 - K0047+364
Physical Target - CW1 - Road Widening - 2.638 Lane Km
Allocation - Php 55.00 Million

TO :

Puerto Princesa South Road
K0046+000 - K0047+300
K0047+440 - K0047+522
Physical Target - CW1 - Road Widening : 20674 Lane Km
Allocation - Php 55.00 Million
May 5, 2022 FY 2022 GAA WIN2G02755 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 3rd District Engineering Office
UACS No. : 320102104630000
Project ID : P00620901LZ

002 : Protect Lives and Properties

Flood Management - Construction/Maintenance of Mitigation Structures and Drainage

FROM :

Construction of Flood Mitagation Structure -
Iraan River Waterways Phase 3,
Sta. 0+000 - Sta. 0+642
Aborlan, Palawan
Physical Target - CW1 - Flood Management : 751 lineal meters
Allocation - Php 100.00 Million

TO :

Construction of Flood Mitigation Structure,
Iraan River Waterways Phase 3,
Left Bank, Sta. 0+000 - Sta. 0+380,
Right Bank, Sta. 0+107 - Sta. 0+364,
Upper Left Bank Sta. 0+389 - Sta. 0+503
Aborlan, Quezon
May 5, 2022 2022 WIN2E02294 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 300215100603000
Project ID: P00630140MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of NRJ Tagbalili-Dumaganas Road, Esperanza, Agusan del Sur

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 2.400 Lane Km

Allocation:
TOTAL: P 115,000,000
CW1: P 110,975,000
EAO: P 4,025,000

Unit Cost:
CW1: P 46,239,583.33/ Lane Km

TO:

Construction of NRJ Tagbalili-Dumaganas Road, Esperanza, Agusan del Sur

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 4.800 Lane Km

Allocation:
TOTAL: P 115,000,000
CW1: P 110,975,000
EAO: P 4,025,000

Unit Cost:
CW1: P 23,119,791.67/ Lane Km
May 5, 2022 FY 2022 WIN2E02290 310104100361000 March 23, 2022 Region IX Regional Office IX
UACS No. 310104100361000
Project ID: P00601146MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads

Pagadian City-Zamboanga City Rd - K1860 + 000 - K1860 + 996.62, K1862 + 041.88 - K1863 + 044.99, K1872 + 980.21 - K1878 + 100
CW1- Reconstruction to Concrete Pavement
Physical Reserved: 14.24 Lane Km
Unit Cost: ₱ 7,454,353.93
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00
May 5, 2022 FY 2022 WIN2E02295 310204101594000 March 23, 2022 Region IX Regional Office IX
UACS No. 310204101594000
Project ID: P00604234MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Zamboanga City By-Pass Road, (West Coast Section), Phase II, Zamboanga City
CW1- Construction of Concrete Road
Physical Reserved: 5.159 Lane Km
Unit Cost: ₱ 18,317,503.39
ROW- Right-Of-Way Acquisition
Physical Reserved: 33,333.33 sq.m.
Unit Cost: ₱ 300.00
EAO: ₱ 3,850,000.00
Excess: ₱ 1,650,000.00
Total Allocation: ₱ 110,000,000.00
May 5, 2022 FY 2022 GAA WIN2G02715 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 310105100701000
Project ID : P00603928LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads - Secondary Roads

FROM :

Tablas Circumferential Road
K0114+652 - K0114+850
Physical Target - CW1 - Reconstruction of Concrete
Pavement : 0.396 Lane Km
Allocation - Php 5.950 Million

TO :

Tablas Circumferential Road
K0114+652 - K0114+786.50
Physical Target - CW1 - Reconstruction to Concrete
Pavement : 0.269 Lane Km
Allocation - Php 5.950 Million
May 5, 2022 FY 2022 WIN2E02289 310204101578000 March 23, 2022 Region IX Regional Office IX
UACS No. 310204101578000
Project ID: P00604241MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Buenavista - Bolong By-Pass Road, Zamboanga City Package 3, Zamboanga City
CW1- Construction of Concrete Road
Physical Reserved: 0.958 Lane km
Unit Cost: ₱ 77,770,116.63
CW2- Construction of Concrete Bridge
Physical Reserved: 198.81 sq.m.
Unit Cost: ₱ 100,579.59
ROW- Right-Of-Way Acquisition
Physical Reserved: 33,333.33 sq.m.
Unit Cost: ₱ 300.00
EAO: ₱ 3,850,000.00
Excess: ₱ 1,650,000.00
Allocation: ₱ 110,000,000.00
May 5, 2022 FY 2022 WIN2E02292 310204101582000 March 22, 2022 Region IX Regional Office IX
UACS No. 310204101582000
Project ID: P00604248MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Labangan - Pagadian City - Dumalinao By-Pass Road, Zamboanga Del Sur
CW1- Construction of Concrete Road
Physical Reserved: 7.44 Lane Km
Unit Cost: ₱ 12,352,150.54
ROW- Right-Of-Way Acquisition
Physical Reserved: 16,666.666 sq.m.
Unit Cost: ₱ 300.00
EAO: ₱ 3,570,000.00
Excess: ₱ 1,530,000.00
Total Allocation: ₱ 102,000,000.00
May 5, 2022 FY 2022 GAA WIN2G02717 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 310105100702000
Project ID : P00603929LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads - Secondary Roads

FROM :

Tablas Circumferential Road
K0124+884 - K0125+000
K0125+300 - K0126+521
Physical Target - CW1 - Reconstruction to Concrete Pavement :
2.688 Lane Km
Allocation - Php 48.810 Million

To :

Tablas Circumferential Road
K0124+884.00 - K0125+000
K0125+860.73 - K0126+716
K0126+818.86 - K0126+900
Physical Target - CW1 - Reconstruction to Concrete Pavement :
2.12082 Lane Km
Allocation - Php 48.810 Million
May 5, 2022 FY 2022 GAA WIN2G02837 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. ; 310105100699000
Project ID : P00603930LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads - Secondary Roads

FROM :

Sibuyan Circumferential Road
K0091+427 - K0092+033
Physical Target - CW1 - Reconstruction to Concrete Pavement :
1.242 Lane Km
Allocation - Php 22.530 Million

TO :

Sibuyan Circumferential Road
K0091+427 - K0092+151
Physical Target - CW1 - Reconstruction to Concrete Pavement :
1.478 Lane Km
Allocation - 22.530 Million
May 5, 2022 FY 2022 GAA WIN2G02763 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 310111100427000
Project ID : P00604075LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Construction/Upgrading/Rehabilitation of
Drainage along National Roads - Secondary Roads

FROM :

Tablas Circumferential Road
K0013+093 - K0013+693
Physical Target - CW1 - Construction of Drainage Structure
along Road : 600.00 lineal meters
Allocation - Php 5.00 Million

TO :

Tablas Circumferential Road
K0013+154 - K0013+484,
K0013+570 - K0013+693
Physical Target - CW1 - Construction of Drainage Structure
along Road : 453.00 lineal meters
Allocation - Php 5.00 Million

May 5, 2022 FY 2022 GAA WIN2G02758 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 320101107509000
Project ID : P00620263LZ

002 : Protect Lives and Properties

Flood management - Construction/Maintenance of Flood
Mitigation Structures and Drainage Systems

FROM :

Construction of Agbunyog Flood Control along
Tablas Circumferential Road (B/S),
Sta. 0+000 - Sta. 0+363.50
Sta. Maria Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
642.00 lineal meters
Allocation - Php 99.50 Million

TO :

Construction of Agbunyog Flood Control along
Tablas Circumferential Road (B/S),
Sta. 0+271 - Sta. 0+698 (R/S),
Sta. 0+470 - Sta. 0+510(L/S),
Sta. 0+525 - Sta. 0+700(L/S),
Sta. Maria, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
642.00 lineal meters
Allocation - Php 99.50 Million

May 5, 2022 FY 2022 GAA WIN2G02767 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300214100247000
Project ID : P00635995LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Special Road Fund - Motor Vehicle User's Charge (MVUC)
as per R.A. 11239

Repair/Rehabilitation/Reconstruction of National Road with
Slips, Slope Collapse, and Landslide along
Romblon - Cogon - Sablayan Road
K0001+350 - K0001+365
Physical Target - CW1 - Rehabilitation of Concrete Road :
1.974 lane km
Allocation - Php 22.00 Million

TO :

Repair/Rehabilitation/Reconstruction of National Road with
Slips, Slope Collapse, and Landslide along
Romblon - Cogon - Sablayan Road
K0005+938.90 - K0005+980.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 328.22 square meters
Allocation - Php 22.00 Million
May 5, 2022 FY 2022 GAA WIN2G02835 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 310111100426000
Project ID : P00604076LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Construction/Upgrading/Rehabilitation of
Drainage along National Roads

FROM :

Tablas Circumferential Road
K0002+991 - K0003+792,
K0005+309.50 - K0005+835,
K0006+919 - K0007+054,
K0008+703 - K0009+103.50,
K0009+117 - K000-+324
Physical Target - CW1 - Construction of Drainage Structure
along Road ; 2,053.00 lineal meters
Allocation - Php 9.996 million

To :

Tablas Circumferential Road
K0002+997 - K0003+799,
K0006+919 - K0007+053,
K0008+703 - K0009+121
Physical Target - CW1 - Construction of Drainage Structure
along Road : 1,358.00 lineal meters
Allocation - Php 9.996 Million
May 5, 2022 FY 2022 GAA WIN2G02712 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Occidental District Engineering Office
UACS No. : 310105100694000
Project ID : P00603919LZ

001 : Ensure Safe and Reliable national Road System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading of
Damaged Paved Roads

FROM ;

Jct, MWCR - San Jose Airport - Jct. Bubog Road
K0238+000 - K0238+216
Physical Target - CW1 - Reconstruction to Concrete Pavement :
0.432 Lane Km
Allocation - Php 7.396 Million

TO :

Jct. MWCR - San Jose Airport - Jct. Bubog Road
K0238+(-226) - K0238+289
Physical Target - CW1 - Reconstruction to Concrete Pavement :
1.030 Lane Km
Allocation - Php 7.396 Million
May 5, 2022 FY 2022 GAA WIN2G02757 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Occidental District Engineering Office
UACS No. : 320101108176000
Project ID : P00620653LZ

002 : Construction/Rehabilitation of Flood Mitigation Facilities
within Major River Basins and Principal Rivers -
Construction of Flood Control Structure

FROM :

Construction of Flood Control Structure -
Patrick River, Lagnas Section,
Sta. 0+000 - Sta. 0+471,
Sablayan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation
Structure : 390 l.m
Allocation - Php 50.00 million

TO :

Construction of Flood Control Structure -
Patrick River, Lagnas Section
Sta. 0+000 - Sta. 0+390
Sablayan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation
Structure : 390 l.m.
Allocation - Php 50.00 Million

May 5, 2022 2022 WIN2E02239 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 320102105117000
Project ID: P00620293MN

ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

FROM:

Construction of Azpetia River Bank Protection, Sta. 0+000.00 - Sta. 0+010.00 R/S, Brgy. Azpetia, Prosperidad, Agusan del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 620.000 Lineal meters

Allocation:
TOTAL: P 46,000,000
CW1: P 45,080,000
EAO: P 920,000

Unit Cost:
CW1: P 72,710.00/Lineal meters

TO:

Construction of Azpetia River Bank Protection, Sta. 0+000.00 - Sta. 0+540.00 R/S, Sta. 0+000.00 – Sta. 0+080.00 L/S, Brgy. Azpetia, Prosperidad, Agusan del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 620.000 Lineal meters

Allocation:
TOTAL: P 46,000,000
CW1: P 45,080,000
EAO: P 920,000

Unit Cost:
CW1: P 72,710.00/Lineal meters
May 5, 2022 2022 WIN2E02252 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 320102105119000
Project ID: P00620295MN

ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

FROM:

Construction of Bank Protection of Sianib River along Daang Maharlika (Agusan-Davao Section), Sta. 0+000.00 - Sta. 0+160.00, Prosperidad, Agusan del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 416.400 Lineal meters

Allocation:
TOTAL: P 46,000,000
CW1: P 45,080,000
EAO: P 920,000

Unit Cost:
CW1: P 108,261.29/Lineal meters

TO:

Construction of Bank Protection of Sianib River along Daang Maharlika (Agusan-Davao Section), Sta. 0+000.00 - Sta. 0+350 Upstream, Sta. 0+000.00 - Sta. 0+066.40 Downstream, Prosperidad, Agusan del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 416.400 Lineal meters

Allocation:
TOTAL: P 46,000,000
CW1: P 45,080,000
EAO: P 920,000

Unit Cost:
CW1: P 108,261.29/Lineal meters
May 4, 2022 FY 2022 GAA WIN2G02631 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Marinduque District Engineering Office
UACS No. : 310202100968000
Project ID : P00606271LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Road Widening - Marinduque Circumferential Road
K0050+000 - K0050+240,
K0050+660 - K0051+329
Physical Target - CW1 - Road Widening : 1.852 Lane Km
Allocation - Php 60.00 Million

TO :

Road Widening - Marinduque Circumferential Road
K0046+704 - K0047+589,
K0050+000 - K0050+240,
K0050+660 - K0051+329
Physical Target - CW1 - Road Widening : 3.644 Lane Km
Allocation - Php 60.00 Million
May 4, 2022 FY 2022 GAA Win2G02718 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Marinduque District Engineering Office
UACS No. : 310205100808000
Project ID : P00611462LZ

001 ; Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/New Roads -


FROM :

Construction of Missing Links/New Roads
- Dr. Damian Reyes Memorial Road,
Sta. 32+150 - Sta. 33+150
Physical Target - CW1 - Construction of Concrete Road :
1.122 lane km
Allocation - Php 97.80 million

TO :

Construction of Missing Links/New Roads
Dr. Damian Reyes Memorial Road
Sta. 35+940 - Sta. 36+890
Physical Target - CW1 - Construction of Gravel Road :
1.900 Lane Km
Allocation - Php 97.80 Million



May 4, 2022 FY 2022 GAA WIN2G02793 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Marinduque District Engineering Office
UACS No. : 310205100809000
Project ID : P00611463LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/New Roads

FROM :

Construction of Missing Links/New Roads -
Dr. Damian Reyes memorial Road
Sta. 33+150 - Sta. 34+150
Physical Target - CW1 - Construction of Concrete Road :
1.141 lane km
Allocation - Php 99.50 Million

TO :

Construction of Missing Links/New Roads -
Dr. Damian Reyes Memorial Road,
Sta. 36+890 - Sta. 37+860
Physical Target - CW1 - Construction of Gravel Road :
1.940 lane km
Allocation - Php 99.50 Million
May 4, 2022 FY 2022 GAA WIN2G02750 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Marinduque District Engineering Office
UACS No. : 310205100810000
Project ID : P00611464LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/New Roads

FROM :

Construction of Missing links/New Roads -
Dr. Damian Reyes memorial Road
Sta. 34+150 - Sta. 35+150
Physical Target - CW1 - Construction of Concrete Road ;
1.141 lane km
Allocation - Php 99.50 Million

TO :

Construction of Missing Links/New Roads -
Dr. Damian Reyes Memorial Road
Sta. 37+860 - Sta. 38+830
Physical Target - Construction of Gravel Road :
1.940 lane km
Allocation - Php 99.50 Million

May 4, 2022 FY 2022 GAA WIN2G02632 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Marinduque District Engineering Office
UACS No. : 300215100229000
Project ID : P00630097LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities

FROM ::

Construction of Dampulan - Malibago Road,
Sta. Cruz, Marinduque
Physical Target - CW1 - Construction of Concrete Road :
5.04 lane km
Allocation - Php 70.00 Million

TO :

Construction of Dampulan - Malibago Road
Torrijos, Marinduque
Physical Target - CW1 - Construction of Concrete Road :
5.04 lane km
Allocation - Php 70.00 Million
May 4, 2022 FY 2022 GAA WIN2G02746 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Marinduque District Engineering Office
UACS No. : 310205100811000
Project ID : P00611465LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/New Roads

FROM :

Construction of Missing Links/New Roads -
Dr. Damian Reyes Memorial Road
Sta. 35+150 - Sta. 36+150
Physical Target - CW1 - Construction of Concrete Road :
1.141 lane km
Allocation - 99.50 Million

TO :

Construction of Missing Links/New Roads
Dr. Damian Reyes Memorial Road
Sta. 38+830 - Sta. 39+800
Physical Target - Construction of gravel Road :
1.940 lane km
Allocation - Php 99.50 Million

May 4, 2022 FY 2022 GAA WIN2G02843 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 1st District Engineering Office
UACS No. : 310203100511000
Project ID : P00606199LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Tertiary Roads

FROM :

Road Widening - Coron - Busuanga Road
K0049+000 - K0050+000
Busuanga, Palawan
Physical Target - CW1 - Road Widening : 2.014 lane km
Allocation - Php 34.50 Million

TO :

Road Widening - Coron-Busuanga Road
K0041+461.50 - K0042+000.00
K0047+383.00 - K0047+585.00
Busuanga, Palawan
Physical Target - CW1 - Road Widening : 1.427 lane km
Allocation - Php 34.50 Million
May 4, 2022 FY 2022 GAA WIN2G02855 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 1st District Engineering Office
UACS No. : 310203100512000
Project ID : P00606284LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Tertiary Roads

FROM :

Road Widening - Coron - Busiuanga Road
K0059+458 - K0059+823
Busuanga, Palawan
Physical Target - CW1 - Road Widening : 0.730 lane km
Allocation - Physical Target - 8.934 Million

TO :

Road Widening - Coron - Busuanga Road
K0059+458.00 - K0059+707.00
Physical Target - CW1 - Road Widening : 0.498 lane km
Allocation - Php 8.934 Million
May 4, 2022 FY 2022 GAA WIN2G02818 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 3rd District Engineering Office
UACS No. : 310108100888000
Project ID : P00604399LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, slope Collapse, and Landslide
- Secondary Roads


FROM :

PPSR Jct -Napsan - Apurawan Road,
K0048+005 - K0048+175
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 4,250 square meters
Allocation - Php 85.00 Million

TO :

PPSR Jct - napsan - Apurawan Road
K0048+005 - K0048+335
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 3,701 square meters
Allocation - Php 85.00 Million
May 4, 2022 FY 2022 GAA WIN2G02782 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 3rd District Engineering Office
UACS No. : 310202100986000
Project ID : P00606205LZ

001 : Ensure Safe and Reliable national Road System

Network Development - Road Widening - Secondary Roads

FROM :

Road Widening - Puerto Princesa South Road
K0036+529 - K0038+000
Physical Target - CW1 - Road Widening : 2.948 lane km
Allocation - Php 60.00 Million

To :

Road Widening - Puerto Princesa South Road
K0036+529 - K0037+498
Physical Target - CW1 - Road Widening : 1.938 lane km
Allocation - Php 60.00 Million
May 4, 2022 2022 310109100967000 GAA 2022 January 3, 2022 Region II Cagayan 1st District Engineering Office
OO1: Ensure and Safe Reliable National Road System - Rehabilitation /Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads

Construction od Road Slope Protection Structure - Port Irene Access Road - K0263+157 - K0623+457
May 3, 2022 2022 WIN2F06316 SR2022-02-000120 February 3, 2022 Cordillera Administrative Region CAR - Regional Office
From: Gov. Bado Dangwa National Rd - K0275 + 229 - K0276 + 636, K0277 + (-367) - K0292 + 880, K0292 + 961 - K0297 + 000;
Physical Target: 45.332 Lane Km;
Allocation: Php 250,000,000.000

To: Gov. Bado Dangwa National Rd - K0275 + 229 - K0276 + 636, K0277 + (-367) - K0288 + 980;
Physical Target: 27.664 Lane Km;
Allocation: Php 250,000,000.000

May 3, 2022 2022 WIN2F06291 SR2022-03-007584 March 23, 2022 Cordillera Administrative Region CAR - Regional Office
From: Benguet-Nueva Vizcaya Rd - K0293 + 020 - K0293 + 300;
Physical Target: 15,000.000 Square meters;
Allocation: Php 270,000,000.000

To: Benguet-Nueva Vizcaya Rd - K0293 + 010 - K0293 + 245;
Physical Target: 10,950.000 Square meters;
Allocation: Php 270,000,000.000

May 3, 2022 2022 WIN2F06252 SR2022-02-001726 February 4, 2022 Cordillera Administrative Region CAR - Regional Office
From: Installation of Road Safety Devices along Asin (Km 8)-Nangalisan-Sn Pascual, Tuba Rd - K0258 + 100 - K0264 + 370, K0265 + 200 - K0281 + 920;
Type of Work: Road Safety: Pavement Markings;
Physical Target: 64.309 Lane Km;
Allocation: Php 80,000,000.000

To: Installation of Road Safety Devices along Asin (Km 8)-Nangalisan-Sn Pascual, Tuba Rd - K0258 + 100 - K0268 + 000, K0269 + 000 - K0277 + 780;
Type of Work: Road Safety: Street Lighting;
Physical Target: 17.616 Km;
Allocation: Php 80,000,000.000