May 13, 2022 |
FY 2022 GAA |
WIN2G02867 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300203102049000
Project ID : P00635435LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Construction/Improvement of Access Roads leading to
Declared Tourism Destinations
(Tourism Road infrastructure Program - TRIP)
FROM :
Road from Poblacion to Capari Cove, Palawan
Physical Target - CW1 - Construction of Concrete Road :
1.333 Lane Km
Allocation - Php 20.00 Million
TO :
Road from Poblacion to Capari Cove, Palawan
Physical Target - CW1 - Construction of Concrete Road :
1.201 Lane Km
Allocation - Php 20.00 million |
May 13, 2022 |
FY 2022 GAA |
WIN2G02878 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300203101629000
Project ID : P00635469LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
FROM :
Construction/Improvement of Access Roads leading to
Declared Tourism Destinations
(Tourism Road Infrastructure Program - TRIP)
FROM :
Access Roads to Malampaya Sound, Mt. Capuas and
San Vicente Long Beach, San Vicente and Taytay, palawan
Physical Target - CW1 - Construction of Concrete Road :
2.403 Lane Km
Allocation - Php 36.046 Million
TO :
Access Road to Malampaya Sound, Mt. Capuas and
San Vicente Long Beach, San Vicente and Taytay, Palawan
Physical Target - CW1 - Construction of Concrete Road :
1.800 Lane Km
Allocation - Php 36.046 Million
|
May 13, 2022 |
FY 2022 GAA |
WIN2G02928 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215100240000
Project ID : P00636842LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the national Road/s
leading to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along TDC - Pagdanan Road, San Vicente, Palawan,
Sta. 10+458.00 - Sta. 10+612.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,246.61 square meter
Allocation - Php 100.254 Million
To :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along TDC - Pagdanan Road, San Vicente, Palawan
Sta. 10+458.00 - Sta. 10+624.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 4,302.70 square meter
Allocation - Php 100.254 Million |
May 13, 2022 |
2022 |
WIN2E02261 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
Installation of Road Safety Facilities - R Castillo St - (S01459MN) Chainage 0 - Chainage 3153, Davao City
Physical Target:
CW1: 12.219 Lane Km (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 15,200,000.00
CW1: P 14,896,000.00 (Road Safety: Pavement Markings)
EAO: P 304,000.00
TO: Convergence and Special Support Program
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
Installation of Road Safety Facilities - R Castillo St - (S01459MN) Chainage 0 - Chainage 2740, Davao City
Physical Target:
CW1: 2.740 Lane Km (Road Safety: Street Lighting)
Allocation:
TOTAL: P 15,200,000.00
CW1: P 14,896,000.00 (Road Safety: Street Lighting)
EAO: P 304,000.00 |
May 13, 2022 |
2022 |
WIN2E02075 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Matina River, Sta. 5+643 - Sta. 6+023, Matina Pangi Br. 1 Upstream, Matina Pangi Section, Left Bank, Davao City
Physical Target:
CW1: 380 lineal m. (Construction of Revetment:)
ROW: 1,140 sq. m. (ROW acquisition)
Allocation:
TOTAL: P 89,400,000.00
CW1: P 75,270,000.00 (Construction of Revetment)
ROW: P11,001,000 (ROW acquisition)
EAO: P 3,129,000.00
TO: OO2: Protect Lives and Properties Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Matina River, Sta. 6+207 - Sta. 6+440, Matina Pangi Br. 1 Upstream, Matina Pangi Section, Left Bank, Davao City
Physical Target:
CW1: 233 lineal m. (Construction of Revetment:)
ROW: 2,790.69 sq. m. (ROW acquisition)
Allocation:
TOTAL: P 89,400,000.00
CW1: P 75,270,000.00 (Construction of Revetment)
ROW: P11,001,000 (ROW acquisition)
EAO: P 3,129,000.00 |
May 13, 2022 |
FY 2022 GAA |
WIN2G02888 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215100244000
Project ID : P00636846LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildingd/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Sta. 9+180.00 - Sta. 9+440.00
Kemdeng, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,803.005 square meter
Allocation - Php 125.083 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Sta. 9+180.00 - Sta. 9+435.00
Kemdeng, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 5,384.78 square meter
Allocation - Php 125.083 Million
|
May 13, 2022 |
2022 |
WIN2E02094 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Davao River, Sta. 0+077 - Sta. 0+412, Generoso Bridge Downstream, Right Bank, Davao City
Physical Target:
CW1: 245 lineal m. (Construction of Revetment:)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Revetment)
EAO: P 3,500,000.00
TO: OO2: Protect Lives and Properties Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Davao River, Sta. 2+001 - Sta. 2+246, Generoso Bridge Downstream, Right Bank, Davao City
Physical Target:
CW1: 245 lineal m. (Construction of Revetment:)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Revetment)
EAO: P 3,500,000.00 |
May 13, 2022 |
2022 |
WIN2E02106 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Installation of Road Safety Devices – ABS-CBN-Quimpo Blvd Div. Rd - K1514 + 000 – K1515 + 343, Davao City
Physical Target:
CW1: 10.048 lane km. (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 12,500,000.00
CW1: P 12,250,000.00 (Road Safety: Pavement Markings)
EAO: P 250,000.00
TO: Convergence and Special Support Program - Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239:
Installation of Road Safety Devices – ABS-CBN-Quimpo Blvd Div. Rd - K1514 + 470 – K1515 + 320, Davao City
Physical Target:
CW1: 0.820 km. (Road Safety: Street Lighting)
Allocation:
TOTAL: P 12,500,000.00
CW1: P 12,250,000.00 (Road Safety: Street Lighting)
EAO: P 250,000.00 |
May 13, 2022 |
2022 |
320102104940000 |
GAA 2022 |
January 3, 2022 |
Region II |
Isabela 4th District Engineering Office |
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Rehabilitation of Cagayan River Flood Control Project, Sta. 0+000 - Sta. 0+202, Dammang West, Echague, Isabela |
May 13, 2022 |
2022 |
300219100613000 |
GAA 2022 |
January 3, 2022 |
Region II |
Isabela 4th District Engineering Office |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructure/Facilities
Construction of Brgy. Panang Flood Control Structure, Sta. 0 + 400 - Sta. 0 + 795, San Agustin, Isabela |
May 13, 2022 |
2022 |
300219100615000 |
GAA 2022 |
January 3, 2022 |
Region II |
Isabela 4th District Engineering Office |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructure/Facilities
Construction of Flood Control Structure, Sta. 0 + 385 - Sta. 0 + 855, Sinaoangan Sur, San Agustin, Isabela |
May 13, 2022 |
2022 |
300219100607000 |
GAA 2022 |
January 3, 2022 |
Region II |
Isabela 4th District Engineering Office |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructure/Facilities
Construction of Addalam Flood Control Structure, Jones, Isabela |
May 13, 2022 |
FY 2022 GAA |
WIN2G02939 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215101637000
Project ID : P00636969LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAMM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Port barton - Kemdeng Road, San Vicente, Palawan
Sta. 0+692.00 - Sta. 735.00
Physical Target - CW1- Construction of Road Slope Protection
Structure : 407.735 square meter
Allocation - ph 18.195 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Port Barton - Kemdeng Road, San Vicente, Palawan
Sta. 0+458.00 - Sta. 0+485.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 738.00 square meter
Allocation - Php 18.195 Million
|
May 13, 2022 |
FY 2022 GAA |
WIN2G02901 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215101646000
Project ID : P00636976LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the national Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Tabon Cave Road, Sta. 6+356.00 - Sta.06+436.00
Quezon, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 641.89 square meter
Allocation - Php 28.644 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Tabon Cave Road, Sta. 6+356.00 - Sta. 6+436.00
Quezon, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,296.72 square meter
Allocation - Php 28.644 Million |
May 13, 2022 |
FY 2022 GAA |
WIN2G02882 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215100248000
Project ID : P00636850LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Construction of PPSR Jct. - napsan - Apurawan Road
Sta. 35+634.00 - Sta. 35+765.00 Palawan
Physical Target - CW1 - Construction of Concrete Road ;
9.127 lane km
Allocation - Php 110.155 Million
TO :
Construction of PPSR Jct. - Napsan - Apurawan Road
Sta. 35+634.00 - Sta. 35+772.00
Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 4,922.74 square meter
Allocation - Php 110.155 Million |
May 13, 2022 |
2022 |
300219100044000 |
GAA 2022 |
January 3, 2022 |
Region II |
Isabela 4th District Engineering Office |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructure/Facilities
Construction of Flood Control Structure at Brgy. Calaocan Section 1, Santiago City, Isabela |
May 13, 2022 |
2022 |
300219100045000 |
GAA 2022 |
January 3, 2022 |
Region II |
Isabela 4th District Engineering Office |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructure/Facilities
Construction of Flood Control Structure at Brgy. Calaocan Section 2, Santiago City, Isabela |
May 13, 2022 |
2022 |
300219100612000 |
GAA 2022 |
January 3, 2022 |
Region II |
Isabela 4th District Engineering Office |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructure/Facilities
Construction of Brgy. Minuri Flood Control Structure, Sta. 0 + 400 - Sta. 0 + 915, Jones, Isabela |
May 13, 2022 |
FY 2022 GAA |
WIN2G02922 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215101647000
Project ID : P00636977LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Tabon Cave Road, Sta. 6+539.00 - Sta. 6+649.00
Quezon, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure ; 1,043.08 square meter
Allocation - Php 46.547 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along tabon Cave Road, Sta. 6+539.00 - Sta. 6+640.00
Quezon, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,019.35 square meter
Allocation - Php 46.547 Million |
May 13, 2022 |
2022 |
320101107353000 |
GAA 2022 |
January 3, 2022 |
Region II |
Isabela 4th District Engineering Office |
OO2: Protects Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage System
Construction of Villaflor Flood Control Structure, Sta. 0+000 - Sta. 0+595, San Isidro, Isabela |
May 13, 2022 |
FY 2022 GAA |
WIN2G02907 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215100406000
Project ID : P00638962LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the national Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Access Road Malbog jct. - Sta. Fe Gumbirayan Provincial
Road leading to San Jose Beaches, Sta. 8+360 - Sta. 8+520
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,577.05 square meter
Allocation - 115.00 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Access Road Malbog Jct. - Sta. Fe Gumbirayan Provincial
Road leading to San Jose Beaches, Sta. 7+953 - Sta. 8+154
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 4,954.40 square meter
Allocation - Php 115.00 Million
|
May 13, 2022 |
2022 |
WIN2E02197 |
FY 2022 GAA R.A.11639 |
January 1, 2022 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1560+ 890 - K1560 + 990
Physical Target:
CW1: 5,555.56.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1560 + 890 - K1560 + 990
Physical Target:
CW1: 3,600.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00 |
May 13, 2022 |
2022 |
WIN2E02188 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1570+ 035 - K1570 + 135
Physical Target:
CW1: 5,555.56.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1568 + 225 - K1568 + 247, K1570 + 000 – K1570 + 086
Physical Target:
CW1: 3,577.64 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00 |
May 13, 2022 |
2022 |
WIN2E02158 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties – Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Manat River (Downstream), Sta. 19+110 – Sta. 19+900 (LS), Sta. 19+500 – Sta. 21+500 (RS), Brgy. Mainit, Nabunturan, Davao de Oro
Physical Target:
CW1: 2,790 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction of Revetment)
EAO: P 2,450,000.00
TO: OO2: Protect Lives and Properties – Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Manat River (Downstream), Sta. 19+110 - Sta. 19+900 (LS), Sta. 20+115.73 - Sta. 21+007.73 (RS), Sta. 21+028.00 - Sta. 21+500.00 (RS), Brgy. Mainit, Nabunturan, Davao de Oro
Physical Target:
CW1: 2,150 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction of Revetment)
EAO: P 2,450,000.00 |
May 13, 2022 |
2022 |
WIN2E02133 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River, Sta. 1+000 – Sta. 2+000 (LS), Sta. 3+000 – Sta. 4+200 (LS), Brgy. Tandawan, New Bataan, Davao de Oro
Physical Target:
CW1: 2,200.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Revetment)
EAO: P 3,150,000.00
TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River, Sta. 4+400 – Sta. 7+340, Brgy. Tandawan, New Bataan, Davao de Oro
Physical Target:
CW1: 2,000.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Revetment)
EAO: P 3,150,000.00 |
May 13, 2022 |
2022 |
WIN2E02147 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River, Sta. 2+000 - Sta. 3+500 (LS), Brgy. Katipunan, Maragusan, Davao de Oro
Physical Target:
CW1: 1,500.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Revetment)
EAO: P 3,150,000.00
TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River, Sta. 2+000.000 – Sta. 2+512.382 (LS), Sta. 3+839.493 – Sta. 5+169.202 (LS), Sta. 5+546.574 – Sta. 5+822.483 (LS), Brgy. Katipunan, Maragusan, Davao de Oro
Physical Target:
CW1: 2,118.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Revetment)
EAO: P 3,150,000.00 |
May 13, 2022 |
2022 |
WIN2E02152 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River, Sta. 5+000 – Sta. 7+500 (RS), Brgy. Magsaysay, New Bataan, Davao de Oro
Physical Target:
CW1: 2,500.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Revetment)
EAO: P 3,150,000.00
TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River, Sta. 16+347 – Sta. 18+570 (RS), Brgy. Magsaysay, New Bataan, Davao de Oro
Physical Target:
CW1: 2,243.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Revetment)
EAO: P 3,150,000.00 |
May 13, 2022 |
2022 |
WIN2E02134 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Hijo River, Sta. 0+200 – Sta. 2+200 (RS), Brgy. Panibasan, Maco, Davao de Oro
Physical Target:
CW1: 2,000.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 80,000,000.00
CW1: P 77,200,000.00 (Construction of Revetment)
EAO: P 2,800,000.00
TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Hijo River, Sta. 3+400 - Sta. 6+000, Brgy. Panibasan, Maco, Davao de Oro
Physical Target:
CW1: 2,218.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 80,000,000.00
CW1: P 77,200,000.00 (Construction of Revetment)
EAO: P 2,800,000.00 |
May 13, 2022 |
2022 |
WIN2E02080 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Manat River (Up-stream and Down Stream) leading to Agusan River, Sta. 12+700 – Sta. 13+200 (LS), Bankeruhan Sur to Bankerohan Norte, Davao de Oro
Physical Target:
CW1: 500.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Revetment)
EAO: P 3,150,000.00
TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Manat River (Up-stream and Down Stream) leading to Agusan River, Sta. 12+793.671 – Sta. 13+057.781 (LS), Sta. 13+066.790 – Sta. 13+200 (LS), Bankeruhan Sur to Bankeruhan Norte, Davao de Oro
Physical Target:
CW1: 420.420 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Revetment)
EAO: P 3,150,000.00 |
May 13, 2022 |
2022 |
WIN2E02138 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River (Downstream), Sta. 2+400 – Sta. 3+900 (LS), Brgy. Cambagang, Maragusan, Davao de Oro
Physical Target:
CW1: 1,500.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00
TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River (Downstream), Sta. 2+400 – Sta. 2+419.318 (LS), Sta. 2+431.645 – Sta. 2+930.00 (LS), Sta. 3+098.557 – Sta. 3+246.896 (LS), Sta. 3+266.034 – Sta. 3+783.342 (LS), Brgy. Cambagang, Maragusan, Davao de Oro
Physical Target:
CW1: 1,300.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00 |
May 13, 2022 |
2022 |
WIN2E02144 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River (Upstream), Sta. 4+640 – Sta. 6+140 (LS), Brgy. Cambagang, Maragusan, Davao de Oro
Physical Target:
CW1: 1,500.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00
TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River (Upstream), Sta. 4+640 – Sta. 5+070 (LS), Sta. 5+070 – Sta. 5+909.00 (LS), Brgy. Cambagang, Maragusan, Davao de Oro
Physical Target:
CW1: 1,329.000 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00 |
May 13, 2022 |
2022 |
WIN2E02170 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Hijo River, Sta. 0+550.07 – Sta. 1+350.07 (RS), Sta. 1+547.93 – Sta. 1+747.93, Brgy. Elizalde, Maco, Davao de Oro
Physical Target:
CW1: 1,000.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00
TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Hijo River, Sta. 0+550.07 – Sta. 1+837.070 (RS), Sta. 1+547.93 – Sta. 1+870.930 (LS), Brgy. Elizalde, Maco, Davao de Oro
Physical Target:
CW1: 1,610.000 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00 |
May 13, 2022 |
2022 |
WIN2E02148 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Revetment along Hijo River, Barangay Dumlan, Maco, Davao de Oro
Physical Target:
CW1: 431.20 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction of Revetment)
EAO: P 2,450,000.00
TO: Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Revetment along Hijo River, Barangay Dumlan, Maco, Davao de Oro
Physical Target:
CW1: 453.53 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction of Revetment)
EAO: P 2,450,000.00 |
May 13, 2022 |
2022 |
WIN2E02136 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program – Basic Infrastructure Program (BIP) – Multi-Purpose Buildings/Facilities to support Social Services
Construction of Multi-purpose Building Kidaraan ES, Mabini, Davao de Oro
Physical Target:
CW1: 1 No. of Building (Construction of Multi Purpose Building)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Multi Purpose Building)
EAO: P 50,000.00
TO: Convergence and Special Support Program – Basic Infrastructure Program (BIP) – Multi-Purpose Buildings/Facilities to support Social Services
Construction of Multi-purpose Building Masicareg ES, Prk. Kidaraan, Mabini, Davao de Oro
Physical Target:
CW1: 1 No. of Building (Construction of Multi Purpose Building)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Multi Purpose Building)
EAO: P 50,000.00 |
May 13, 2022 |
2022 |
WIN2E02181 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Binuangan Creek leading to Maco River, Sta. 0+000 – Sta, 0+500 (LS), Sta. 0+000 – Sta. 1+000 (RS), Brgy. Binuangan, Maco, Davao de Oro
Physical Target:
CW1: 1,500.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00
TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Binuangan Creek leading to Maco River, Sta. 0+400 – Sta. 1+200, Brgy. Binuangan, Maco, Davao de Oro
Physical Target:
CW1: 1,300.000 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00 |
May 12, 2022 |
2022 |
WIN2E02030 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Dahican-Lawigan Rd - K1716+500 - K1716+653.10,
K1717+653 - K1720+000, K1720+000 - K1722+000
Physical Target:
CW1: 9.000 Lane Km (Road Widening)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Road Widening)
EAO: P 5,250,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Dahican-Lawigan Rd - K1716+653 - K1721+418
Physical Target:
CW1: 7.531 Lane Km (Road Widening)
ROW: 50,084.701 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 109,045,000.00 (Road Widening)
ROW: P 35,705,000.00 (ROW Acquisition)
EAO: P 5,250,000.00 |
May 12, 2022 |
2022 |
WIN2E02072 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry - Davao Or Coastal Rd - K1605 + 000 - K1608 + 826
Physical Target:
CW1: 7.648 Lane Km (Road Widening)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Road Widening)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry - Davao Or Coastal Rd - K1604 + 966 - K1608 + 799
Physical Target:
CW1: 7.662 Lane Km (Road Widening)
ROW: 50,952.30 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 88,500,000.00 (Road Widening)
ROW: P 8,000,000.00 (ROW Acquisition)
EAO: P 3,500,000.00 |
May 12, 2022 |
2022 |
WIN2E02089 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry - Davao Or Coastal Rd - K1536 + 850 - K1536 + 950
Physical Target:
CW1: 5,555.560 sq. m. (Construction of Road Slope Protection)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry - Davao Or Coastal Rd - K1536 + 680 – K1536 + 740,
K1536 + 780 - K1536 + 840
Physical Target:
CW1: 3,504.00 sq. m. (Construction of Road Slope Protection)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection)
EAO: P 3,500,000.00 |
May 12, 2022 |
2022 |
WIN2E02025 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1781+(-486) - K1785+000, K1792+298 - K1792+608,
K1793+356 - K1795+735, K1796+085 - K1799+000, K1802+000 - K1806+109
Physical Target:
CW1: 15.000 Lane Km (Road Widening)
Allocation:
TOTAL: P 250,000,000.00
CW1: P 241,250,000.00 (Road Widening)
EAO: P 8,750,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1795+185 - K1795+735,
K1796+085 - K1799+041, K1802+000 - K1804+334
Physical Target:
CW1: 11.548 Lane Km (Road Widening)
ROW: 115,480.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 250,000,000.00
CW1: P 176,112,500.00 (Road Widening)
ROW: P 65,137,500.00 (ROW Acquisition)
EAO: P 8,750,000.00 |
May 12, 2022 |
2022 |
WIN2E02027 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Mati-Maragusan Rd - K1527+593 - K1532+000
Physical Target:
CW1: 8.828 Lane Km (Road Widening)
Allocation:
TOTAL: P 131,159,000.00
CW1: P 126,568,435.00 (Road Widening)
EAO: P 4,590,565.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Mati-Maragusan Rd - K1527+593 - K1529+892
Physical Target:
CW1: 4.608 Lane Km (Road Widening)
ROW: 30,645.049 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 131,159,000.00
CW1: P 119,330,935.00 (Road Widening)
ROW: P 7,237,500.00 (ROW Acquisition)
EAO: P 4,590,565.00 |
May 12, 2022 |
2022 |
WIN2E02023 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
By-Pass Road at Jct. Davao City Diversion Road-Communal-Cabantian-Tigatto Road, Davao City
Physical Target:
CW1: 379.940 sq. m. (Construction of Concrete Bridge)
CW2: 0.068 Lane Km (Construction of Concrete Road)
CW3: 0.291 Lane Km (Construction of Concrete Road)
ROW: 1,475.406 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 96,742,000.00
CW1: P 83,129,925.00 (Construction of Concrete Bridge)
CW2: P 518,205.00 (Construction of Concrete Road)
CW3: P 2,219,500.00 (Construction of Concrete Road)
ROW: P 7,488,400.00 (ROW Acquisition)
EAO: P 3,385,970.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
By-Pass Road at Jct. Davao City Diversion Road-Communal-Cabantian-Tigatto Road, Davao City
Physical Target:
CW1: 0.340 Lane Km (Road Widening)
CW2: 0.398 Lane Km (Construction of Concrete Road)
CW3: 550.100 sq. m. (Off-Carriageway Improvement)
ROW: 4,550.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 96,742,000.00
CW1: P 10,085,989.12 (Road Widening)
CW2: P 7,307,288.54 (Construction of Concrete Road)
CW3: P 2,871,722.34 (Off-Carriageway Improvement)
ROW: P 20,265,000.00 (ROW Acquisition)
EAO: P 1,470,00.00
EXC: P 54,742,000.00 |
May 12, 2022 |
2022 |
WIN2E02028 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Davao-Bukidnon Rd - K1635+157 - K1635+660, K1638+818 - K1639+100,
K1643+018 - K1643+900, K1644+321 - K1646+000, K1669+564 - K1671+000
Physical Target:
CW1: 12.520 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 149,886,000.00
CW1: P 144,620,690.00 (Reconstruction to Concrete Pavement)
EAO: P 5,245,310.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Davao-Bukidnon Rd - K1644+321 - K1647+409, K1648+055 - K1648+560,
K1653+090 - K1654+713, K1660+094 - K1660+402, K1667+159 - K1667+238,
K1668+085 - K1668+409, K1668+499 - K1668+562, K1669+192 - K1669+516,
K1672+939 - K1673+220, K1681+350 - K1682+220
Physical Target:
CW1: 14.932 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 149,886,000.00
CW1: P 144,620,690.00 (Reconstruction to Concrete Pavement)
EAO: P 5,245,310.00 |
May 12, 2022 |
2022 |
WIN2E02026 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Tibanban-Lavigan Rd - K1744+436 - K1745+200, K1749+735 - K1753+000,
K1753+000 - K1755+000, K1755+000 - K1757+055, K1757+547 - K1759+902
Physical Target:
CW1: 21.032 Lane Km (Road Widening)
Allocation:
TOTAL: P 200,000,000.00
CW1: P 193,000,000.00 (Road Widening)
EAO: P 7,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Tibanban-Lavigan Rd - K1782+600 - K1784+506
Physical Target:
CW1: 3.534 Lane Km (Road Widening)
CW2: 673.180 sq. m. (Construction of Road Slope Protection Structure (Seawall))
CW3: 2,340.00 sq. m. (Construction of Road Slope Protection Structure (MSE Wall))
ROW: 23,501.10 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 200,000,000.00
CW1: P 80,655,296.01 (Road Widening)
CW2: P 37,450,252.66 (Construction of Road Slope Protection Structure (Seawall))
CW3: P 65,244,451.33 (Construction of Road Slope Protection Structure (MSE Wall))
ROW: P 9,650,000.00 (ROW Acquisition)
EAO: P 7,000,000.00 |
May 12, 2022 |
2022 |
WIN2E02090 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1632 + 200 - K1632 + 300
Physical Target:
CW1: 5,555.56 sq. m. (Construction of Road Slope Protection)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1692 + 580 - K1692 + 720
Physical Target:
CW1: 3,598.00 sq. m. (Construction of Road Slope Protection)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection)
EAO: P 3,500,000.00 |
May 12, 2022 |
2022 |
WIN2E02091 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry - Davao Or Coastal Rd - K1528 + 475 - K1529 + 286
Physical Target:
CW1: 1.560 Lane Km (Road Widening)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Road Widening)
EAO: P 600,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry - Davao Or Coastal Rd - K1528 + 336 - K1529 + 286
Physical Target:
CW1: 1.838 Lane Km (Road Widening)
ROW: 12,222.70 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 26,460,000.00 (Road Widening)
ROW: P 2,940,000.00 (ROW Acquisition)
EAO: P 600,000.00 |
May 12, 2022 |
2022 |
WIN2E02103 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd – K1596 + 685 - K1599 + 688
Physical Target:
CW1: 6.000 Lane Km (Road Widening)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Road Widening)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1597 + 915 - K1599 + 664, K1600 + 647 - K1601 + 901
Physical Target:
CW1: 6.000 Lane Km (Road Widening)
ROW: 39,900.000 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 89,500,000.00 (Road Widening)
ROW: P 7,000,000.00 (ROW Acquisition)
EAO: P 3,500,000.00 |
May 12, 2022 |
2022 |
WIN2E02041 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) -
(500062MN) K1482 + (-686) - K1482 + (-547),
(500063MN) K1480 + (-665) - K1480 + (-411),
(S00064MN) K1479 + (-145) - K1479 + 002,
(S00065MN) K1477 + (-037) - K1476 + 266,
K1477 + (-620) - K1477 + (-485)
Physical Target:
CW1: 2.934 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 50,128,000.00
CW1: P 48,373,520.00 (Asphalt Overlay)
EAO: P 1,754,480.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) -
(S00060MN) K1478 + 400 - K1478 + 833,
(S00064MN) K1479 + 179 - K1479 + 612
Physical Target:
CW1: 2.598 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 50,128,000.00
CW1: P 48,373,520.00 (Asphalt Overlay)
EAO: P 1,754,480.00
|
May 12, 2022 |
2022 |
WIN2E02130 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry - Davao Or Coastal Rd - K1522 + 1019 - K1523 + 487
Physical Target:
CW1: 1.000 Lane Km (Road Widening)
Allocation:
TOTAL: P 18,000,000.00
CW1: P 17,640,000.00 (Road Widening)
EAO: P 360,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry - Davao Or Coastal Rd - K1521 + 005.51 - K1521 + 232,
K1523 + 175 - K1523 + 358, K1526 + 929 - K1527 + 060
Physical Target:
CW1: 1.019 Lane Km (Road Widening)
ROW: 13,552.434 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 18,000,000.00
CW1: P 14,640,000.00 (Road Widening)
ROW: P 3,000,000.00 (ROW Acquisition)
EAO: P 360,000.00 |
May 12, 2022 |
2022 |
WIN2E02163 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1447 + 000 - K1447 + 219
Physical Target:
CW1: 1.314 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 15,710,000.00
CW1: P 15,395,800.00 (Asphalt Overlay)
EAO: P 314,200.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1451 + 983 - K1452 + 252
Physical Target:
CW1: 1.632 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 15,710,000.00
CW1: P 15,395,800.00 (Asphalt Overlay)
EAO: P 314,200.00
|
May 12, 2022 |
2022 |
WIN2E02128 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum – Panabo Circum Rd - K1510 + 935 - K1512 + 274
Physical Target:
CW1: 2.664 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 25,826,000.00
CW1: P 25,309,480.00 (Asphalt Overlay)
EAO: P 516,520.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum – Panabo Circum Rd - K1509 + 965 - K1510 + 588
Physical Target:
CW1: 2.552 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 25,826,000.00
CW1: P 25,309,480.00 (Asphalt Overlay)
EAO: P 516,520.00
|
May 12, 2022 |
2022 |
WIN2E02143 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1688 + 800 - K1688 + 900
Physical Target:
CW1: 5,555.56 sq. m. (Construction of Road Slope Protection)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1687 + 820 - K1687 + 960
Physical Target:
CW1: 3,605.00 sq. m. (Construction of Road Slope Protection)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection)
EAO: P 3,500,000.00 |
May 12, 2022 |
2022 |
WIN2E02260 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry - Davao Or Coastal Rd - K1515 + 105 - K1515 + 205
Physical Target:
CW1: 4,050.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1515 + 105 - K1515 + 205
Physical Target:
CW1: 3,600.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00 |
May 12, 2022 |
2022 |
WIN2E02264 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1568 + 900 - K1569 + 000
Physical Target:
CW1: 4,149.180 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1568 + 900 - K1569 + 000
Physical Target:
CW1: 3,558.88 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00 |
May 12, 2022 |
2022 |
WIN2E02030 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides – Primary Roads
Daang Maharlika (MN) – K1438 + 150 – K1438 + 190, K1442 + 400 – K1442 + 460,
K1444 + 700 – K1444 + 760, K1445 + 660 – K1445 + 683
Physical Target:
CW1: 5,716.07 Square Meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 68,400,000.00
CW1: P 66,006,000.00 (Construction of Road Slope Protection Structure)
EAO: P 2,394,000.00
TO: OO1 OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides – Primary Roads
Daang Maharlika (MN) – K1439 + 718 – K1439 + 756, K1439 + 763 – K1439 + 797,
K1439 + 927 – K1439 + 966
Physical Target:
CW1: 4,676.04 Square Meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 68,400,000.00
CW1: P 66,006,000.00 (Construction of Road Slope Protection Structure)
EAO: P 2,394,000.00 |
May 12, 2022 |
2022 |
WIN2E02127 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1522 + 400 - K1522 + 445.7, K1523 + 750 - K1523 + 780
Physical Target:
CW1: 3,333.33 Square Meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Road Slope Protection Structure)
EAO: P 1,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1493 + 314.50 - K1493 + 389, K1514 + 900 - K1514 + 980, K1515 + 950 - K1516 + 020, K1516 + 457 -K1516 + 520, K1518 + 013.50 - K1518 + 050, K1519 + 330 - K1519 + 380, K1523 + 830 - K1524 + 000, K1529 + 020 - K1529 + 100
Physical Target:
CW1: 9,325.00 Square Meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Road Slope Protection Structure)
EAO: P 1,000,000.00
|
May 12, 2022 |
2022 |
WIN2E02142 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) - K1476 + 195 - K1476 + 329
Physical Target:
CW1: 2,512.00 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 8,220,000.00
CW1: P 8,055,600.00 (Construction of Drainage Structure along Road)
EAO: P 164,400.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) - K1476 + 195 - K1476 + 323
Physical Target:
CW1: 256.00 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 8,220,000.00
CW1: P 8,055,600.00 (Construction of Drainage Structure along Road)
EAO: P 164,400.00
|
May 12, 2022 |
2022 |
WIN2C03532 |
GAA FY 2022 |
February 1, 2022 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Tigbao-Pulak-Sta Fe Rd - K0912 + 264 - K0912 + 853
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 2,777.78 Square meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Tigbao-Pulak-Sta Fe Rd - K0909 + 432 - K0909 + 502, K0910 + 387 – K0910 + 869, K0912 + 264 – K0912 + 680
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 2,777.78 Square meters
EAO P 1.00 M
Total P 50.00 M
|
May 12, 2022 |
2022 |
WIN2E02058 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties – Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Pagtulian River, Sta. 0+000 – Sta. 0+750 (BS), Bukal, Nabunturan, Davao de Oro
Physical Target:
CW1: 1,482.275 ln. m. (Construction of Revetment)
Allocation:
TOTAL: P 59,291,000.00
CW1: P 57,215,815.00 (Construction of Revetment)
EAO: P 2,075,185.00
TO: OO2: Protect Lives and Properties – Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Pagtulian River, Sta. 0+000 – Sta. 0+750 (BS), Bukal, Nabunturan, Davao de Oro
Physical Target:
CW1: 1,400.000 ln. m. (Construction of Revetment)
Allocation:
TOTAL: 59,291,000.00
CW1: P 57,215,815.00 (Construction of Revetment)
EAO: P 2,075,185.00 |
May 12, 2022 |
2022 |
WIN2E02057 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties – Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Pantud Creek, Sta. 11+300 – Sta. 12+200 (BS), Brgy. Poblacion – Brgy. Magsaysay, Nabunturan, Davao de Oro
Physical Target:
CW1: 1,482.275 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Revetment)
EAO: P 2,100,000.00
TO: OO2: Protect Lives and Properties – Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Pantud Creek, Sta. 10+100 – Sta. 12+100, Brgy. Poblacion – Brgy. Magsaysay, Nabunturan, Davao de Oro
Physical Target:
CW1: 2,370.00 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Revetment)
EAO: P 2,100,000.00 |
May 12, 2022 |
2022 |
WIN2C03534 |
SARO-BMB-A-22-0003175 |
March 21, 2022 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Tertiary Roads
AS PER GAA/ORIGINAL:
Tanauan-Dagami Rd - K0922 + 367 - K0924 + 000
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 29.911560 M
Asphalt Overlay: 5.226 Lane Km
EAO P 0.610440 M
Total P 30.522 M
AS MODIFIED:
Tanauan-Dagami Rd - K0922 + 367 - K0923 + 585
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 29.911560 M
Asphalt Overlay:4.80 Lane Km
EAO P 0.610440 M
Total P 30.522 M |
May 12, 2022 |
2022 |
WIN2E02149 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties – Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Tagbalaobao River up to Pindasan, Sta. 0+250 – Sta. 0+621 (LS), Sta. 0+250 – Sta. 0+621 (RS), Baybay Bucana, Davao de Oro
Physical Target:
CW1: 698.000 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction of Revetment)
EAO: P 2,450,000.00
TO: OO2: Protect Lives and Properties – Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Tagbalaobao River up to Pindasan, Sta. 0+220.496 – Sta. 0+405.293 (LS), Sta. 0+547.475 – Sta. 0+610.611 (LS), Sta. 0+634.698 – Sta. 0+718.698 (LS), Sta. 0+289.988 – Sta. 0+566.777 (RS), Baybay Bucana, Davao de Oro
Physical Target:
CW1: 698.000 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction of Revetment)
EAO: P 2,450,000.00 |
May 12, 2022 |
2022 |
WIN2E02073 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1468 + 1580 - K1468 + 1733
Physical Target:
CW1: 0.612 lane km (Asphalt Overlay)
Allocation:
TOTAL: P 7,242,000.00
CW1: P 7,097,160.00 (Asphalt Overlay)
EAO: P 144,840.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1465 + 658.462 - K1466 + 106
Physical Target:
CW1: 0.973 lane km (Asphalt Overlay)
Allocation:
TOTAL: P 7,242,000.00
CW1: P 7,097,160.00 (Asphalt Overlay)
EAO: P 144,840.00
|
May 12, 2022 |
2022 |
WIN2E02265 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1692 + 600 - K1692 + 700
Physical Target:
CW1: 5,555.56 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1556 + 500 - K1556 + 600,
K1556 + 640 – K1556 + 740
Physical Target:
CW1: 3,600.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00 |
May 12, 2022 |
2022 |
WIN2E02092 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Masara River leading to Hijo River, Sta. 0+280 - Sta. 0+630 (LS), Sta. 0+940 - Sta. 1+290 (LS), Sta. 1+040- Sta. 1+690 (RS), Sta. 1+780 - Sta. 2+180 (RS), Sta. 2+640 - Sta. 2+890 (RS), Brgy. Elizalde to Brgy. Tagbaros, Maco, Davao de Oro
Physical Target:
CW1: 2,000.000 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 80,000,000.00
CW1: P 77,200,000.00 (Construction of Revetment)
EAO: P 2,800,000.00
TO: OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Masara River leading to Hijo River, Sta. 0+400 - Sta. 2+940, Brgy. Elizalde to Brgy. Tagbaros, Maco, Davao de Oro
Physical Target:
CW1: 2,446.000 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 80,000,000.00
CW1: P 77,200,000.00 (Construction of Revetment)
EAO: P 2,800,000.00 |
May 12, 2022 |
2022 |
WIN2E02140 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road, Ampawid, Laak, Davao de Oro
Physical Target:
CW1: 2.080 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Concrete Road)
EAO: P 600,000.00
TO: Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road, Ampawid, Laak, Davao de Oro
Physical Target:
CW1: 2.160 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Concrete Road)
EAO: P 600,000.00 |
May 12, 2022 |
2022 |
WIN2E02068 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Primary Roads
Surigao-Davao Coastal Rd - K1789 + 266 - K1790 + 121
Physical Target:
CW1: 1.724 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 29,021,000.00
CW1: P 28,440,580.00 (Reconstruction to Concrete Pavement)
EAO: P 580,420.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Primary Roads
Surigao-Davao Coastal Rd - K1789 + 170 - K1790 + 020
Physical Target:
CW1: 3.105 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 29,021,000.00
CW1: P 28,440,580.00 (Reconstruction to Concrete Pavement)
EAO: P 580,420.00 |
May 12, 2022 |
2022 |
WIN2E02139 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads
Montevista – Compostela – Mati Bdry Road – K1460 + 290 – K1460 + 320
Physical Target:
CW1: 1,000.00 Square Meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Road Slope Protection Structure)
EAO: P 300,000.00
TO OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads
Montevista – Compostela – Mati Bdry Road – K1460 + 290 – K1460 + 320, K1469 + 220 – K1469 + 245
Physical Target:
CW1: 951.72 Square Meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Road Slope Protection Structure)
EAO: P 300,000.00 |
May 12, 2022 |
2022 |
WIN2E02169 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Primary Roads
Daang Maharlika (MN) – K1425 + 937 – K1426 + 018, K1428 + 150 – K1428 + 290
Physical Target:
CW1: 3,866.660 Square Meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 58,000,000.00
CW1: P 55,970,000.00 (Construction of Road Slope Protection Structure)
EAO: P 2,030,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Primary Roads
Daang Maharlika (MN) – K1425 + 1005 – K1426 + 016, K1442 + 975 – K1443 + 141
Physical Target:
CW1: 3,746.140 Square Meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 58,000,000.00
CW1: P 55,970,000.00 (Construction of Road Slope Protection Structure)
EAO: P 2,030,000.00 |
May 12, 2022 |
2022 |
WIN2E02069 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance -Secondary Roads
Tagum-Panabo Circum Rd - K1509 + 106 - K1510 + 935
Physical Target:
CW1: 3.688 lane km (Asphalt Overlay)
Allocation:
TOTAL: P 35,271,000.00
CW1: P 34,565,580.00 (Asphalt Overlay)
EAO: P 705,420.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1509 + 106 - K1509 + 965
Physical Target:
CW1: 3.436 lane km (Asphalt Overlay)
Allocation:
TOTAL: P 35,271,000.00
CW1: P 34,565,580.00 (Asphalt Overlay)
EAO: P 705,420.00
|
May 12, 2022 |
2022 |
WIN2E02071 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Off-Carriageway Improvement – Tertiary Roads
Montevista-Compostela-Mati Bdry Rd – K1472 + 695 – K1473 + 479
Physical Target:
CW1: 3,244.00 Square Meters (Off-Carriageway Improvement: Paving of Shoulders)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Off-Carriageway Improvement: Paving of Shoulders)
EAO: P 1,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Off-Carriageway Improvement – Tertiary Roads
Montevista-Compostela-Mati Bdry Rd - K1428 + 325 – K1431 + 795
Physical Target:
CW1: 3,443.00 Square Meters (Off-Carriageway Improvement: Construction of Median/Center Island)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Off-Carriageway Improvement: Construction of Median/Center Island)
EAO: P 1,000,000.00 |
May 12, 2022 |
2022 |
WIN2E02266 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1573 + 900 - K1574 + 000
Physical Target:
CW1: 4,345.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1573 + 900 - K1574 + 000
Physical Target:
CW1: 3,568.00 sq. m. (Construction of Road Slope Protection Structure)
ROW: 4,491.24 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 95,500,000.00 (Construction of Road Slope Protection Structure)
ROW: P 1,000,000.00 (ROW Acquisition)
EAO: P 3,500,000.00 |
May 12, 2022 |
2022 |
WIN2E02067 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program – Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) - K1460 + 590- K1461 + 192
Physical Target:
CW1: 1,286.000 Lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Drainage Structure along Road)
EAO: P 1,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program – Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) - K1460 + 590 - K1460 + 632, K1460 + 632 - K1461 + 080
Physical Target:
CW1: 573.000 Lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Drainage Structure along Road)
EAO: P 1,000,000.00
|
May 12, 2022 |
2022 |
WIN2C03547 |
SARO-BMB-A-22-0003175 |
March 21, 2022 |
Region VIII |
Leyte 1st District Engineering Office |
Convergence and Special Support Program
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Construction of Road, Brgy. Gov. Jaro, Babatngon, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road: P 9.90 M
: 1.680 Lane Km
EAO P 0.10 M
Total P 10.00 M
AS MODIFIED:
Construction of Road, Brgy. Gov. E. Jaro, Babatngon, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road: P 9.90 M
: 1.680 Lane Km
EAO P 0.10 M
Total P 10.00 M
|
May 12, 2022 |
2022 |
WIN2E02154 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System -Network Development - Road Widening - Tertiary Roads
Jct Manikling-Gov Generoso Rd - K1744 + 436 - K1745 + 200, K1749 + 735 - K1753 + 000, K1753 + 000 - K1755 + 000, K1755 + 000 - K1757 + 055, K1757 + 547 - K1759 + 902
Physical Target:
CW1: 20.890 Lane Km (Road Widening)
Allocation:
TOTAL: P 300,000,000.00
CW1: P 289,500,000.00 (Road Widening)
EAO: P 10,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Jct Manikling-Gov Generoso Rd - K1744 + 436 - K1745 + 200, K1749 + 735 - K1757 + 037
Physical Target:
CW1: 16.118 Lane Km (Road Widening)
ROW: 107,184.70 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 241,250,000.00 (Road Widening)
EAO: P 48,250,000.00 |
May 12, 2022 |
2022 |
WIN2E02277 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry - Davao Or Coastal Rd - K1525 + 716 - K1525 + 816
Physical Target:
CW1: 3,770.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1525 + 720 - K1525 + 860
Physical Target:
CW1: 3,598.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00 |
May 12, 2022 |
2022 |
WIN2E02081 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads
Nabunturan - Laak Road, Davao Del Oro
Physical Target:
CW1: 8.070 Lane Km (Road Concreting)
ROW: 59,670.000 sq.m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 134,961,040.00 (Road Concreting)
ROW: P 9,788,960.00
EAO: P 5,250,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads
Nabunturan - Laak Road, Davao Del Norte
Physical Target:
CW1: 8.070 Lane Km (Road Concreting)
ROW: 59,670.000 sq.m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 134,961,040.00 (Road Concreting)
ROW: P 9,788,960.00
EAO: P 5,250,000.00 |
May 12, 2022 |
2022 |
WIN2E02146 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System Network Development - Road Widening - Secondary Roads
Carmen-DAPECOL Cmpd Rd - K1479 + 870 - K1480 + 330, K1480 + 431 – K1481 + 235
Physical Target:
CW1: 2.442 Lane km (Road Widening)
Allocation:
TOTAL: P 61,050,000.00
CW1: P 58,913,250.00 (Road Widening)
EAO: P 2,136,750.00
TO: OO1: Ensure Safe and Reliable National Road System Network Development - Road Widening - Secondary Roads
Carmen-DAPECOL Cmpd Rd - K1472 + 850 - K1473 + 468
Physical Target:
CW1: 1.268 Lane km (Road Widening)
CW2: 1.268 Lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 61,050,000.00
CW1: P 38,466,792.00 (Road Widening)
CW2: P 20,446,458.00 (Reconstruction to Concrete Pavement)
EAO: P 2,136,750.00
|
May 12, 2022 |
2022 |
WIN2E02129 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
Daang Maharlika - K1485 + 988 - K1487 + 500 - K1488 + 024
Physical Target:
CW1: 13.597 Lane Km (Road Reconstruction)
Allocation:
TOTAL: P 115,000,000.00
CW1: P 110,975,000.00 (Road Reconstruction)
EAO: P 4,025,000.00
TO: OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
Daang Maharlika - K1486 + 100 - K1487 + 192, K1495 + 171 - K1496 + 897
Physical Target:
CW1: 11.168 Lane Km (Road Reconstruction)
Allocation:
TOTAL: P 115,000,000.00
CW1: P 110,975,000.00 (Road Reconstruction)
EAO: P 4,025,000.00 |
May 12, 2022 |
2022 |
WIN2E02115 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Primary Roads
Daang Maharlika (MN) – K1454 + 997 - K1455 + 356, K1456 + 010 - K1456 + 498
Physical Target:
CW1: 3.388 Lane Km (Road Reconstruction)
Allocation:
TOTAL: P 55,000,000.00
CW1: P 53,075,000.00 (Road Reconstruction)
EAO: P 1,925,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Primary Roads
Daang Maharlika (MN) – K1454 + 998 - K1455 + 338
Physical Target:
CW1: 1.560 Lane Km (Road Reconstruction)
Allocation:
TOTAL: P 55,000,000.00
CW1: P 35,306,719.10 (Road Reconstruction)
CW2: P 17,768,280.90 (Improvement of Intersections)
EAO: P 1,925,000.00 |
May 12, 2022 |
2022 |
WIN2E02084 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City 2nd District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Basic Infrastructure Program (BIP) – Multi-purpose Buildings/Facilities to support Social Services
Construction of Multi-Purpose Building (Davao City UP Sports Complex – Phase 7), Barangay Oshiro, Tugbok District, Davao City
Physical Target:
CW1: 1 Number of Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 99,000,000.00 (Construction of Multi-Purpose Building)
EAO: P 1,000,000.00
TO: Convergence and Special Support Program - Basic Infrastructure Program (BIP) – Multi-purpose Buildings/Facilities to support Social Services
Construction of Multi-Purpose Building (Davao City UP Sports Complex – Phase 9), Barangay Oshiro, Tugbok District, Davao City
Physical Target:
CW1: 1 Number of Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 99,000,000.00 (Construction of Multi-Purpose Building)
EAO: P 1,000,000.00
|
May 12, 2022 |
2022 |
WIN2E02087 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City 2nd District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Basic Infrastructure Program (BIP) – Multi-purpose Buildings/Facilities to support Social Services
Construction of Multi-Purpose Building (Davao City UP Sports Complex – Phase 8), Barangay Oshiro, Tugbok District, Davao City
Physical Target:
CW1: 1 Number of Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 99,000,000.00 (Construction of Multi-Purpose Building)
EAO: P 1,000,000.00
TO: Convergence and Special Support Program - Basic Infrastructure Program (BIP) – Multi-purpose Buildings/Facilities to support Social Services
Construction of Multi-Purpose Building (Davao City UP Sports Complex – Phase 10), Barangay Oshiro, Tugbok District, Davao City
Physical Target:
CW1: 1 Number of Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 99,000,000.00 (Construction of Multi-Purpose Building)
EAO: P 1,000,000.00
|
May 12, 2022 |
2022 |
WIN2E02159 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City 2nd District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Roads leading to Major/Strategic Public Buildings/Facilities
Construction of Road along Purok 4 to Boundary of Barangay Dominga, Barangay Dalagdag, Marilog District, Davao City
Physical Target:
CW1: 1.061 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
TO: Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Roads leading to Major/Strategic Public Buildings/Facilities
Construction of Road along Purok 4 to Boundary of Barangay Dominga, Barangay Dalagdag, Calinan District, Davao City
Physical Target:
CW1: 1.308 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
|
May 12, 2022 |
2022 |
WIN2E02049 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening - Secondary Roads
Pres. Diosdado P.Macapagal Natl Hi-way - K1703 + 447 - 1705 + 008
Physical Target:
CW1: 3.094 Lane Km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Road Widening)
EAO: P 1,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening - Secondary Roads
Pres. Diosdado P.Macapagal Natl Hi-way - K1703 + 447 - K1705 + 008,
K1708 + 000 - K1708 + 670
Physical Target:
CW1: 4.320 Lane Km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Road Widening)
EAO: P 1,000,000.00 |
May 12, 2022 |
2022 |
WIN2E02074 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties – Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Drainage Structure Along Poblacion Creek, Sta. 0+000 - Sta. 1+500,
Brgy. Poblacion, Lupon, Davao Oriental
Physical Target:
CW1: 881.611 Lineal Meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Drainage Structure)
EAO: P 1,000,000.00
TO: OO2: Protect Lives and Properties – Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Drainage Structure Along Poblacion Creek, Sta. 0+440 - Sta. 1+160,
Sta. 0+000 - Sta. 1+556.76, Brgy. Poblacion, Lupon, Davao Oriental
Physical Target:
CW1: 2,276.760 Lineal Meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Drainage Structure)
EAO: P 1,000,000.00 |
May 12, 2022 |
2022 |
WIN2E02086 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way – K1714 + 295 – K1716 + 388
Physical Target:
CW1: 4.180 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way – K1714 + 295 – K1715 + 025
Physical Target:
CW1: 2.872 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00 |
May 12, 2022 |
2022 |
WIN2E02088 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Pres. Diosdado P.Macapagal Natl Hi-way – K1727 + 240 – K1727 + 360
Physical Target:
CW1: 5,555.560 sq. m. (Construction of Road Slope Protection)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Pres. Diosdado P.Macapagal Natl Hi-way – K1774 + 396 – K1775 + 000
Physical Target:
CW1: 4,273.752 sq. m. (Construction of Road Slope Protection)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection)
EAO: P 3,500,000.00 |
May 12, 2022 |
2022 |
WIN2E02151 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd – K1497 + 353 – K1498 + 802
Physical Target:
CW1: 2.898 Lane Km (Road Widening)
Allocation:
TOTAL: P 49,999,000.00
CW1: P 48,999,020.00 (Road Widening)
EAO: P 999,980.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd – K1497 + 454 – K1498 + 950
Physical Target:
CW1: 3.036 Lane Km (Road Widening)
ROW Acquisition: 30,360.00 sq. m.
Allocation:
TOTAL: P 49,999,000.00
CW1: P 44,999,020.00 (Road Widening)
ROW Acquisition: P 4,000,000.00
EAO: P 999,980.00 |
May 12, 2022 |
2022 |
WIN2E02267 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads
Magsaysay Ave - K1510 + 757 - K1511 + 047,
(S01445MN) Chainage 000 - Chainage 171
Physical Target:
CW1: 1.124 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 11,834,000.00
CW1: P 11,597,320 .00 (Asphalt Overlay)
EAO: P 236,680 .00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads
Magsaysay Ave - K1510 + 704 - K1511 + 020, (S01445MN) Chainage 000 - Chainage 145
Physical Target:
CW1: 0.834 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 11,834,000.00
CW1: P 11,597,320 .00 (Asphalt Overlay)
EAO: P 236,680 .00 |
May 12, 2022 |
2022 |
WIN2E02263 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1487 + 708 - K1488 + 376, K1488 + 456 - K1488 + 600
Physical Target:
CW1: 4.307 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 54,946,000.00
CW1: P 53,022,890.00 (Asphalt Overlay)
EAO: P 1,923,110.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1487 + 708 - K1488 + 515
Physical Target:
CW1: 2.871 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 54,946,000.00
CW1: P 53,022,890.00 (Asphalt Overlay)
EAO: P 1,923,110.00 |
May 12, 2022 |
2022 |
WIN2E02262 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1513 + 208 - K1514 + 265, K1514 + 530 - K1514 + 709, (S01455MN) Chainage 3033 - Chainage 3100
Physical Target:
CW1: 1.320 Lane Km (Road Widening)
Allocation:
TOTAL: P 19,800,000.00
CW1: P 19,404,000.00 (Road Widening)
EAO: P 396,000 .00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1513 + 208 - K1513 + 249,
K1513 + 291 - K1513 + 320, K1513 + 350 - K1514 + 265,
K1514 + 700 - K1514 + 720, (S01455MN) Chainage 3033 - Chainage 3100
Physical Target:
CW1: 1.089 Lane Km (Road Widening)
ROW: 200.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 19,800,000.00
CW1: P 10,388,000.00 (Road Widening)
ROW: P 9,016,000.00 (ROW Acquisition)
EAO: P 396,000 .00 |
May 12, 2022 |
2022 |
WIN2E02278 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads
Davao-Bukidnon Rd - K1701 + 104 - K1701 + 153, K1701 + 159 - K1701 + 304
Physical Target:
CW1: 0.205 Lane Km (Road Widening)
Allocation:
TOTAL: P 4,580,000.00
CW1: P 4,488,400.00 (Road Widening)
EAO: P 91,600.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads
Davao-Bukidnon Rd – K1701 + 000 – K1701 + 232
Physical Target:
CW1: 0.200 Lane Km (Road Widening)
CW2: 0.096 Lane Km (Reconstruction)
Allocation:
TOTAL: P 4,580,000.00
CW1: P 3,398,081.55 (Road Widening)
CW2: P 1,090,318.45 (Reconstruction)
EAO: P 91,600.00 |
May 12, 2022 |
2022 |
WIN2E02280 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Secondary Roads
Ma-a Rd - K1510 + 468 - K1510 + 507, K1511 + 482 - K1511 + 516
Physical Target:
CW1: 87.600 sq. m. (Off-carriageway Improvement: Construction of Sidewalk)
ROW: 87.600 sq. m.
Allocation:
TOTAL: P 2,418,000.00
CW1: P 1,359,260 .00 (Off-carriageway Improvement: Construction of Sidewalk)
ROW: P 1,010,380.00
EAO: P 48,360.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Secondary Roads
Ma-a Rd - K1510 + 298 - K1510 + 318, K1510 + 468 - K1510 + 507,
K1511 + 482 - K1511 + 516, K1512 + 340 - K1512 + 483
Physical Target:
CW1: 459.910 sq. m. (Off-carriageway Improvement: Construction of Sidewalk)
ROW: 173.91 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 2,418,000.00
CW1: P 1,372,000.00 (Off-carriageway Improvement: Construction of Sidewalk)
ROW: P 997,640.00 (ROW Acquisition)
EAO: P 48,360.00 |
May 12, 2022 |
2022 |
WIN2E02279 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening – Secondary Roads
Buhangin-Lapanday - K1505 + 726 - K1505 + 791
Physical Target:
CW1: 0.130 Lane Km (Road Widening)
ROW: 725.580 sq. m.
Allocation:
TOTAL: P 25,000,000.00
CW1: P 14,700,000.00 (Road Widening)
ROW: P 9,800,000.00
EAO: P 500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening – Secondary Roads
Buhangin-Lapanday - K1505 + 500 - K1505 + 866
Physical Target:
CW1: 0.716 Lane Km (Road Widening)
ROW: 2,040.60 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 14,700,000.00 (Road Widening)
ROW: P 9,800,000.00 (ROW Acquisition)
EAO: P 500,000.00 |
May 12, 2022 |
2022 |
WIN2E02153 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd – K1502+506- K1S04+000
Physical Target:
CW1: 2.988 Lane Km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Road Widening)
EAO: P 1,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd – K1501+090 - K1502+803
Physical Target:
CW1: 3.426 Lane Km (Road Widening)
ROW Acquisition: 34,260.00 sq. m.
Allocation:
TOTAL: P 50,000,000.00
CW1: P 46,000,000.00 (Road Widening)
ROW Acquisition: P 3,000,000.00
EAO: P 1,000,000.00 |
May 12, 2022 |
2022 |
WIN2E02097 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (MN) – K1489 + 151 – K1489 + 857
Physical Target:
CW1: 4.236 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 56,166,000.00
CW1: P 54,200,190.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,965,810.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (MN) – K1488 + 909 – K1489 + 049, K1489 + 128 – K1489 + 830
Physical Target:
CW1: 3.272 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 56,166,000.00
CW1: P 54,200,190.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,965,810.00 |
May 12, 2022 |
2022 |
WIN2E02116 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Secondary Roads
Nabunturan-Maragusan Rd – K1436 + 774 – K1438 + 680
Physical Target:
CW1: 3.812 Lane Km (Road Widening)
Allocation:
TOTAL: P 61,227,000.00
CW1: P 59,084,055.00 (Road Widening)
EAO: P 2,142,945.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Secondary Roads
Nabunturan-Maragusan Rd – K1435 + 840 – K1438 + 946
Physical Target:
CW1: 6.120 Lane Km (Road Widening)
ROW Acquisition: 61,200.00 sq. m.
Allocation:
TOTAL: P 61,227,000.00
CW1: P 56,584,055.00 (Road Widening)
ROW Acquisition: P 2,500,000.00
EAO: P 2,142,945.00 |
May 12, 2022 |
2022 |
WIN2E02099 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (MN) – K1494 + 496 – K1494 + 824
Physical Target:
CW1: 2.130 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 25,489,000.00
CW1: P 24,979,220.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 509,780.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (MN) – K1494 + 469 – K1494 + 731
Physical Target:
CW1: 1.310 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 25,489,000.00
CW1: P 24,979,220.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 509,780.00 |
May 12, 2022 |
2022 |
WIN2E02062 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Construction of Bypass and Diversion Roads
Mapawa-Bahi-Langgawisan, Maragusan, Davao de Oro Bypass Road, Davao de Oro
Physical Target:
CW1: 12.400 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Construction of Bypass and Diversion Roads
Mapawa-Bahi-Langgawisan, Maragusan, Davao de Oro Bypass Road, Davao de Oro
Physical Target:
CW1: 12.400 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Gravel Road)
EAO: P 3,500,000.00 |
May 12, 2022 |
2022 |
WIN2E02093 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Davao City Div Rd - K1510 + 950 - K1511 + 101
Physical Target:
CW1: 5,555.560 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Davao City Div Rd - K1511 + 718 - K1511 + 741, K1511 + 770 – K1511 + 795
Physical Target:
CW1: 2,949.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00 |
May 12, 2022 |
2022 |
WIN2E02145 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Tertiary Roads
Montevista-C.Ompostela-Mati Bdry Rd – K1481 + 745 - K1481 + 955
Physical Target:
CW1: 0.420 Lane Km (Road Widening)
Allocation:
TOTAL: P 8,564,000.00
CW1: P 8,392,720.00 (Road Widening)
EAO: P 171,280.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Tertiary Roads
Montevista-Compostela-Mati Bdry Rd – K1481 + 645 - K1481 + 955
Physical Target:
CW1: 0.620 Lane Km (Road Widening)
Row Acquisition: 6,200.00 sq. m.
Allocation:
TOTAL: P 8,564,000.00
CW1: P 7,892,720.00 (Road Widening)
ROW Acquisition: P 500,000.00
EAO: P 171,280.00 |