Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
May 13, 2022 FY 2022 GAA WIN2G02867 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300203102049000
Project ID : P00635435LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Construction/Improvement of Access Roads leading to
Declared Tourism Destinations
(Tourism Road infrastructure Program - TRIP)

FROM :

Road from Poblacion to Capari Cove, Palawan
Physical Target - CW1 - Construction of Concrete Road :
1.333 Lane Km
Allocation - Php 20.00 Million

TO :

Road from Poblacion to Capari Cove, Palawan
Physical Target - CW1 - Construction of Concrete Road :
1.201 Lane Km
Allocation - Php 20.00 million
May 13, 2022 FY 2022 GAA WIN2G02878 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300203101629000
Project ID : P00635469LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

FROM :

Construction/Improvement of Access Roads leading to
Declared Tourism Destinations
(Tourism Road Infrastructure Program - TRIP)

FROM :

Access Roads to Malampaya Sound, Mt. Capuas and
San Vicente Long Beach, San Vicente and Taytay, palawan
Physical Target - CW1 - Construction of Concrete Road :
2.403 Lane Km
Allocation - Php 36.046 Million

TO :

Access Road to Malampaya Sound, Mt. Capuas and
San Vicente Long Beach, San Vicente and Taytay, Palawan
Physical Target - CW1 - Construction of Concrete Road :
1.800 Lane Km
Allocation - Php 36.046 Million
May 13, 2022 FY 2022 GAA WIN2G02928 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100240000
Project ID : P00636842LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the national Road/s
leading to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along TDC - Pagdanan Road, San Vicente, Palawan,
Sta. 10+458.00 - Sta. 10+612.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,246.61 square meter
Allocation - Php 100.254 Million

To :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along TDC - Pagdanan Road, San Vicente, Palawan
Sta. 10+458.00 - Sta. 10+624.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 4,302.70 square meter
Allocation - Php 100.254 Million
May 13, 2022 2022 WIN2E02261 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
Installation of Road Safety Facilities - R Castillo St - (S01459MN) Chainage 0 - Chainage 3153, Davao City
Physical Target:
CW1: 12.219 Lane Km (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 15,200,000.00
CW1: P 14,896,000.00 (Road Safety: Pavement Markings)
EAO: P 304,000.00

TO: Convergence and Special Support Program
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
Installation of Road Safety Facilities - R Castillo St - (S01459MN) Chainage 0 - Chainage 2740, Davao City
Physical Target:
CW1: 2.740 Lane Km (Road Safety: Street Lighting)
Allocation:
TOTAL: P 15,200,000.00
CW1: P 14,896,000.00 (Road Safety: Street Lighting)
EAO: P 304,000.00
May 13, 2022 2022 WIN2E02075 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Matina River, Sta. 5+643 - Sta. 6+023, Matina Pangi Br. 1 Upstream, Matina Pangi Section, Left Bank, Davao City
Physical Target:
CW1: 380 lineal m. (Construction of Revetment:)
ROW: 1,140 sq. m. (ROW acquisition)

Allocation:
TOTAL: P 89,400,000.00
CW1: P 75,270,000.00 (Construction of Revetment)
ROW: P11,001,000 (ROW acquisition)
EAO: P 3,129,000.00

TO: OO2: Protect Lives and Properties Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Matina River, Sta. 6+207 - Sta. 6+440, Matina Pangi Br. 1 Upstream, Matina Pangi Section, Left Bank, Davao City
Physical Target:
CW1: 233 lineal m. (Construction of Revetment:)
ROW: 2,790.69 sq. m. (ROW acquisition)

Allocation:
TOTAL: P 89,400,000.00
CW1: P 75,270,000.00 (Construction of Revetment)
ROW: P11,001,000 (ROW acquisition)
EAO: P 3,129,000.00
May 13, 2022 FY 2022 GAA WIN2G02888 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100244000
Project ID : P00636846LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildingd/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Sta. 9+180.00 - Sta. 9+440.00
Kemdeng, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,803.005 square meter
Allocation - Php 125.083 Million

TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Sta. 9+180.00 - Sta. 9+435.00
Kemdeng, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 5,384.78 square meter
Allocation - Php 125.083 Million

May 13, 2022 2022 WIN2E02094 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Davao River, Sta. 0+077 - Sta. 0+412, Generoso Bridge Downstream, Right Bank, Davao City
Physical Target:
CW1: 245 lineal m. (Construction of Revetment:)

Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Revetment)
EAO: P 3,500,000.00

TO: OO2: Protect Lives and Properties Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Davao River, Sta. 2+001 - Sta. 2+246, Generoso Bridge Downstream, Right Bank, Davao City
Physical Target:
CW1: 245 lineal m. (Construction of Revetment:)

Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Revetment)
EAO: P 3,500,000.00
May 13, 2022 2022 WIN2E02106 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Installation of Road Safety Devices – ABS-CBN-Quimpo Blvd Div. Rd - K1514 + 000 – K1515 + 343, Davao City
Physical Target:
CW1: 10.048 lane km. (Road Safety: Pavement Markings)

Allocation:
TOTAL: P 12,500,000.00
CW1: P 12,250,000.00 (Road Safety: Pavement Markings)
EAO: P 250,000.00

TO: Convergence and Special Support Program - Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239:
Installation of Road Safety Devices – ABS-CBN-Quimpo Blvd Div. Rd - K1514 + 470 – K1515 + 320, Davao City
Physical Target:
CW1: 0.820 km. (Road Safety: Street Lighting)

Allocation:
TOTAL: P 12,500,000.00
CW1: P 12,250,000.00 (Road Safety: Street Lighting)
EAO: P 250,000.00
May 13, 2022 2022 320102104940000 GAA 2022 January 3, 2022 Region II Isabela 4th District Engineering Office
OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Rehabilitation of Cagayan River Flood Control Project, Sta. 0+000 - Sta. 0+202, Dammang West, Echague, Isabela
May 13, 2022 2022 300219100613000 GAA 2022 January 3, 2022 Region II Isabela 4th District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructure/Facilities

Construction of Brgy. Panang Flood Control Structure, Sta. 0 + 400 - Sta. 0 + 795, San Agustin, Isabela
May 13, 2022 2022 300219100615000 GAA 2022 January 3, 2022 Region II Isabela 4th District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructure/Facilities

Construction of Flood Control Structure, Sta. 0 + 385 - Sta. 0 + 855, Sinaoangan Sur, San Agustin, Isabela
May 13, 2022 2022 300219100607000 GAA 2022 January 3, 2022 Region II Isabela 4th District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructure/Facilities

Construction of Addalam Flood Control Structure, Jones, Isabela
May 13, 2022 FY 2022 GAA WIN2G02939 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215101637000
Project ID : P00636969LZ


CONVERGENCE AND SPECIAL SUPPORT PROGRAMM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Port barton - Kemdeng Road, San Vicente, Palawan
Sta. 0+692.00 - Sta. 735.00
Physical Target - CW1- Construction of Road Slope Protection
Structure : 407.735 square meter
Allocation - ph 18.195 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Port Barton - Kemdeng Road, San Vicente, Palawan
Sta. 0+458.00 - Sta. 0+485.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 738.00 square meter
Allocation - Php 18.195 Million

May 13, 2022 FY 2022 GAA WIN2G02901 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215101646000
Project ID : P00636976LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the national Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Tabon Cave Road, Sta. 6+356.00 - Sta.06+436.00
Quezon, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 641.89 square meter
Allocation - Php 28.644 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Tabon Cave Road, Sta. 6+356.00 - Sta. 6+436.00
Quezon, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,296.72 square meter
Allocation - Php 28.644 Million
May 13, 2022 FY 2022 GAA WIN2G02882 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100248000
Project ID : P00636850LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Construction of PPSR Jct. - napsan - Apurawan Road
Sta. 35+634.00 - Sta. 35+765.00 Palawan
Physical Target - CW1 - Construction of Concrete Road ;
9.127 lane km
Allocation - Php 110.155 Million

TO :

Construction of PPSR Jct. - Napsan - Apurawan Road
Sta. 35+634.00 - Sta. 35+772.00
Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 4,922.74 square meter
Allocation - Php 110.155 Million
May 13, 2022 2022 300219100044000 GAA 2022 January 3, 2022 Region II Isabela 4th District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructure/Facilities

Construction of Flood Control Structure at Brgy. Calaocan Section 1, Santiago City, Isabela
May 13, 2022 2022 300219100045000 GAA 2022 January 3, 2022 Region II Isabela 4th District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructure/Facilities

Construction of Flood Control Structure at Brgy. Calaocan Section 2, Santiago City, Isabela
May 13, 2022 2022 300219100612000 GAA 2022 January 3, 2022 Region II Isabela 4th District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures Protecting Public Infrastructure/Facilities

Construction of Brgy. Minuri Flood Control Structure, Sta. 0 + 400 - Sta. 0 + 915, Jones, Isabela
May 13, 2022 FY 2022 GAA WIN2G02922 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215101647000
Project ID : P00636977LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Tabon Cave Road, Sta. 6+539.00 - Sta. 6+649.00
Quezon, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure ; 1,043.08 square meter
Allocation - Php 46.547 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along tabon Cave Road, Sta. 6+539.00 - Sta. 6+640.00
Quezon, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,019.35 square meter
Allocation - Php 46.547 Million
May 13, 2022 2022 320101107353000 GAA 2022 January 3, 2022 Region II Isabela 4th District Engineering Office
OO2: Protects Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage System

Construction of Villaflor Flood Control Structure, Sta. 0+000 - Sta. 0+595, San Isidro, Isabela
May 13, 2022 FY 2022 GAA WIN2G02907 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100406000
Project ID : P00638962LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the national Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Access Road Malbog jct. - Sta. Fe Gumbirayan Provincial
Road leading to San Jose Beaches, Sta. 8+360 - Sta. 8+520
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,577.05 square meter
Allocation - 115.00 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Access Road Malbog Jct. - Sta. Fe Gumbirayan Provincial
Road leading to San Jose Beaches, Sta. 7+953 - Sta. 8+154
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 4,954.40 square meter
Allocation - Php 115.00 Million



May 13, 2022 2022 WIN2E02197 FY 2022 GAA R.A.11639 January 1, 2022 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1560+ 890 - K1560 + 990
Physical Target:
CW1: 5,555.56.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1560 + 890 - K1560 + 990
Physical Target:
CW1: 3,600.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
May 13, 2022 2022 WIN2E02188 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1570+ 035 - K1570 + 135
Physical Target:
CW1: 5,555.56.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1568 + 225 - K1568 + 247, K1570 + 000 – K1570 + 086
Physical Target:
CW1: 3,577.64 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
May 13, 2022 2022 WIN2E02158 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Manat River (Downstream), Sta. 19+110 – Sta. 19+900 (LS), Sta. 19+500 – Sta. 21+500 (RS), Brgy. Mainit, Nabunturan, Davao de Oro
Physical Target:
CW1: 2,790 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction of Revetment)
EAO: P 2,450,000.00

TO: OO2: Protect Lives and Properties – Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Manat River (Downstream), Sta. 19+110 - Sta. 19+900 (LS), Sta. 20+115.73 - Sta. 21+007.73 (RS), Sta. 21+028.00 - Sta. 21+500.00 (RS), Brgy. Mainit, Nabunturan, Davao de Oro
Physical Target:
CW1: 2,150 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction of Revetment)
EAO: P 2,450,000.00
May 13, 2022 2022 WIN2E02133 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River, Sta. 1+000 – Sta. 2+000 (LS), Sta. 3+000 – Sta. 4+200 (LS), Brgy. Tandawan, New Bataan, Davao de Oro
Physical Target:
CW1: 2,200.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Revetment)
EAO: P 3,150,000.00

TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River, Sta. 4+400 – Sta. 7+340, Brgy. Tandawan, New Bataan, Davao de Oro
Physical Target:
CW1: 2,000.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Revetment)
EAO: P 3,150,000.00
May 13, 2022 2022 WIN2E02147 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River, Sta. 2+000 - Sta. 3+500 (LS), Brgy. Katipunan, Maragusan, Davao de Oro
Physical Target:
CW1: 1,500.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Revetment)
EAO: P 3,150,000.00

TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River, Sta. 2+000.000 – Sta. 2+512.382 (LS), Sta. 3+839.493 – Sta. 5+169.202 (LS), Sta. 5+546.574 – Sta. 5+822.483 (LS), Brgy. Katipunan, Maragusan, Davao de Oro
Physical Target:
CW1: 2,118.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Revetment)
EAO: P 3,150,000.00
May 13, 2022 2022 WIN2E02152 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River, Sta. 5+000 – Sta. 7+500 (RS), Brgy. Magsaysay, New Bataan, Davao de Oro
Physical Target:
CW1: 2,500.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Revetment)
EAO: P 3,150,000.00

TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River, Sta. 16+347 – Sta. 18+570 (RS), Brgy. Magsaysay, New Bataan, Davao de Oro
Physical Target:
CW1: 2,243.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Revetment)
EAO: P 3,150,000.00
May 13, 2022 2022 WIN2E02134 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Hijo River, Sta. 0+200 – Sta. 2+200 (RS), Brgy. Panibasan, Maco, Davao de Oro
Physical Target:
CW1: 2,000.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 80,000,000.00
CW1: P 77,200,000.00 (Construction of Revetment)
EAO: P 2,800,000.00

TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Hijo River, Sta. 3+400 - Sta. 6+000, Brgy. Panibasan, Maco, Davao de Oro
Physical Target:
CW1: 2,218.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 80,000,000.00
CW1: P 77,200,000.00 (Construction of Revetment)
EAO: P 2,800,000.00
May 13, 2022 2022 WIN2E02080 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Manat River (Up-stream and Down Stream) leading to Agusan River, Sta. 12+700 – Sta. 13+200 (LS), Bankeruhan Sur to Bankerohan Norte, Davao de Oro
Physical Target:
CW1: 500.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Revetment)
EAO: P 3,150,000.00

TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Manat River (Up-stream and Down Stream) leading to Agusan River, Sta. 12+793.671 – Sta. 13+057.781 (LS), Sta. 13+066.790 – Sta. 13+200 (LS), Bankeruhan Sur to Bankeruhan Norte, Davao de Oro
Physical Target:
CW1: 420.420 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Revetment)
EAO: P 3,150,000.00
May 13, 2022 2022 WIN2E02138 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River (Downstream), Sta. 2+400 – Sta. 3+900 (LS), Brgy. Cambagang, Maragusan, Davao de Oro
Physical Target:
CW1: 1,500.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00

TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River (Downstream), Sta. 2+400 – Sta. 2+419.318 (LS), Sta. 2+431.645 – Sta. 2+930.00 (LS), Sta. 3+098.557 – Sta. 3+246.896 (LS), Sta. 3+266.034 – Sta. 3+783.342 (LS), Brgy. Cambagang, Maragusan, Davao de Oro
Physical Target:
CW1: 1,300.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00
May 13, 2022 2022 WIN2E02144 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River (Upstream), Sta. 4+640 – Sta. 6+140 (LS), Brgy. Cambagang, Maragusan, Davao de Oro
Physical Target:
CW1: 1,500.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00

TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Agusan River (Upstream), Sta. 4+640 – Sta. 5+070 (LS), Sta. 5+070 – Sta. 5+909.00 (LS), Brgy. Cambagang, Maragusan, Davao de Oro
Physical Target:
CW1: 1,329.000 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00
May 13, 2022 2022 WIN2E02170 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Hijo River, Sta. 0+550.07 – Sta. 1+350.07 (RS), Sta. 1+547.93 – Sta. 1+747.93, Brgy. Elizalde, Maco, Davao de Oro
Physical Target:
CW1: 1,000.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00

TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Hijo River, Sta. 0+550.07 – Sta. 1+837.070 (RS), Sta. 1+547.93 – Sta. 1+870.930 (LS), Brgy. Elizalde, Maco, Davao de Oro
Physical Target:
CW1: 1,610.000 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00
May 13, 2022 2022 WIN2E02148 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Revetment along Hijo River, Barangay Dumlan, Maco, Davao de Oro
Physical Target:
CW1: 431.20 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction of Revetment)
EAO: P 2,450,000.00

TO: Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Revetment along Hijo River, Barangay Dumlan, Maco, Davao de Oro
Physical Target:
CW1: 453.53 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction of Revetment)
EAO: P 2,450,000.00
May 13, 2022 2022 WIN2E02136 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program – Basic Infrastructure Program (BIP) – Multi-Purpose Buildings/Facilities to support Social Services
Construction of Multi-purpose Building Kidaraan ES, Mabini, Davao de Oro
Physical Target:
CW1: 1 No. of Building (Construction of Multi Purpose Building)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Multi Purpose Building)
EAO: P 50,000.00

TO: Convergence and Special Support Program – Basic Infrastructure Program (BIP) – Multi-Purpose Buildings/Facilities to support Social Services
Construction of Multi-purpose Building Masicareg ES, Prk. Kidaraan, Mabini, Davao de Oro
Physical Target:
CW1: 1 No. of Building (Construction of Multi Purpose Building)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,950,000.00 (Construction of Multi Purpose Building)
EAO: P 50,000.00
May 13, 2022 2022 WIN2E02181 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Binuangan Creek leading to Maco River, Sta. 0+000 – Sta, 0+500 (LS), Sta. 0+000 – Sta. 1+000 (RS), Brgy. Binuangan, Maco, Davao de Oro
Physical Target:
CW1: 1,500.00 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00

TO: OO2: Protect Lives and Properties – Flood Management Program – Construction/Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Binuangan Creek leading to Maco River, Sta. 0+400 – Sta. 1+200, Brgy. Binuangan, Maco, Davao de Oro
Physical Target:
CW1: 1,300.000 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Revetment)
EAO: P 1,000,000.00
May 12, 2022 2022 WIN2E02030 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Dahican-Lawigan Rd - K1716+500 - K1716+653.10,
K1717+653 - K1720+000, K1720+000 - K1722+000
Physical Target:
CW1: 9.000 Lane Km (Road Widening)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Road Widening)
EAO: P 5,250,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Dahican-Lawigan Rd - K1716+653 - K1721+418
Physical Target:
CW1: 7.531 Lane Km (Road Widening)
ROW: 50,084.701 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 109,045,000.00 (Road Widening)
ROW: P 35,705,000.00 (ROW Acquisition)
EAO: P 5,250,000.00
May 12, 2022 2022 WIN2E02072 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry - Davao Or Coastal Rd - K1605 + 000 - K1608 + 826
Physical Target:
CW1: 7.648 Lane Km (Road Widening)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Road Widening)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry - Davao Or Coastal Rd - K1604 + 966 - K1608 + 799
Physical Target:
CW1: 7.662 Lane Km (Road Widening)
ROW: 50,952.30 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 88,500,000.00 (Road Widening)
ROW: P 8,000,000.00 (ROW Acquisition)
EAO: P 3,500,000.00
May 12, 2022 2022 WIN2E02089 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry - Davao Or Coastal Rd - K1536 + 850 - K1536 + 950
Physical Target:
CW1: 5,555.560 sq. m. (Construction of Road Slope Protection)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry - Davao Or Coastal Rd - K1536 + 680 – K1536 + 740,
K1536 + 780 - K1536 + 840
Physical Target:
CW1: 3,504.00 sq. m. (Construction of Road Slope Protection)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection)
EAO: P 3,500,000.00
May 12, 2022 2022 WIN2E02025 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1781+(-486) - K1785+000, K1792+298 - K1792+608,
K1793+356 - K1795+735, K1796+085 - K1799+000, K1802+000 - K1806+109
Physical Target:
CW1: 15.000 Lane Km (Road Widening)
Allocation:
TOTAL: P 250,000,000.00
CW1: P 241,250,000.00 (Road Widening)
EAO: P 8,750,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Surigao-Davao Coastal Rd - K1795+185 - K1795+735,
K1796+085 - K1799+041, K1802+000 - K1804+334
Physical Target:
CW1: 11.548 Lane Km (Road Widening)
ROW: 115,480.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 250,000,000.00
CW1: P 176,112,500.00 (Road Widening)
ROW: P 65,137,500.00 (ROW Acquisition)
EAO: P 8,750,000.00
May 12, 2022 2022 WIN2E02027 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Mati-Maragusan Rd - K1527+593 - K1532+000
Physical Target:
CW1: 8.828 Lane Km (Road Widening)
Allocation:
TOTAL: P 131,159,000.00
CW1: P 126,568,435.00 (Road Widening)
EAO: P 4,590,565.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Mati-Maragusan Rd - K1527+593 - K1529+892
Physical Target:
CW1: 4.608 Lane Km (Road Widening)
ROW: 30,645.049 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 131,159,000.00
CW1: P 119,330,935.00 (Road Widening)
ROW: P 7,237,500.00 (ROW Acquisition)
EAO: P 4,590,565.00
May 12, 2022 2022 WIN2E02023 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
By-Pass Road at Jct. Davao City Diversion Road-Communal-Cabantian-Tigatto Road, Davao City
Physical Target:
CW1: 379.940 sq. m. (Construction of Concrete Bridge)
CW2: 0.068 Lane Km (Construction of Concrete Road)
CW3: 0.291 Lane Km (Construction of Concrete Road)
ROW: 1,475.406 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 96,742,000.00
CW1: P 83,129,925.00 (Construction of Concrete Bridge)
CW2: P 518,205.00 (Construction of Concrete Road)
CW3: P 2,219,500.00 (Construction of Concrete Road)
ROW: P 7,488,400.00 (ROW Acquisition)
EAO: P 3,385,970.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads
By-Pass Road at Jct. Davao City Diversion Road-Communal-Cabantian-Tigatto Road, Davao City
Physical Target:
CW1: 0.340 Lane Km (Road Widening)
CW2: 0.398 Lane Km (Construction of Concrete Road)
CW3: 550.100 sq. m. (Off-Carriageway Improvement)
ROW: 4,550.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 96,742,000.00
CW1: P 10,085,989.12 (Road Widening)
CW2: P 7,307,288.54 (Construction of Concrete Road)
CW3: P 2,871,722.34 (Off-Carriageway Improvement)
ROW: P 20,265,000.00 (ROW Acquisition)
EAO: P 1,470,00.00
EXC: P 54,742,000.00
May 12, 2022 2022 WIN2E02028 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Davao-Bukidnon Rd - K1635+157 - K1635+660, K1638+818 - K1639+100,
K1643+018 - K1643+900, K1644+321 - K1646+000, K1669+564 - K1671+000
Physical Target:
CW1: 12.520 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 149,886,000.00
CW1: P 144,620,690.00 (Reconstruction to Concrete Pavement)
EAO: P 5,245,310.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Davao-Bukidnon Rd - K1644+321 - K1647+409, K1648+055 - K1648+560,
K1653+090 - K1654+713, K1660+094 - K1660+402, K1667+159 - K1667+238,
K1668+085 - K1668+409, K1668+499 - K1668+562, K1669+192 - K1669+516,
K1672+939 - K1673+220, K1681+350 - K1682+220
Physical Target:
CW1: 14.932 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 149,886,000.00
CW1: P 144,620,690.00 (Reconstruction to Concrete Pavement)
EAO: P 5,245,310.00
May 12, 2022 2022 WIN2E02026 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Tibanban-Lavigan Rd - K1744+436 - K1745+200, K1749+735 - K1753+000,
K1753+000 - K1755+000, K1755+000 - K1757+055, K1757+547 - K1759+902
Physical Target:
CW1: 21.032 Lane Km (Road Widening)
Allocation:
TOTAL: P 200,000,000.00
CW1: P 193,000,000.00 (Road Widening)
EAO: P 7,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Tibanban-Lavigan Rd - K1782+600 - K1784+506
Physical Target:
CW1: 3.534 Lane Km (Road Widening)
CW2: 673.180 sq. m. (Construction of Road Slope Protection Structure (Seawall))
CW3: 2,340.00 sq. m. (Construction of Road Slope Protection Structure (MSE Wall))
ROW: 23,501.10 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 200,000,000.00
CW1: P 80,655,296.01 (Road Widening)
CW2: P 37,450,252.66 (Construction of Road Slope Protection Structure (Seawall))
CW3: P 65,244,451.33 (Construction of Road Slope Protection Structure (MSE Wall))
ROW: P 9,650,000.00 (ROW Acquisition)
EAO: P 7,000,000.00
May 12, 2022 2022 WIN2E02090 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1632 + 200 - K1632 + 300
Physical Target:
CW1: 5,555.56 sq. m. (Construction of Road Slope Protection)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1692 + 580 - K1692 + 720
Physical Target:
CW1: 3,598.00 sq. m. (Construction of Road Slope Protection)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection)
EAO: P 3,500,000.00
May 12, 2022 2022 WIN2E02091 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry - Davao Or Coastal Rd - K1528 + 475 - K1529 + 286
Physical Target:
CW1: 1.560 Lane Km (Road Widening)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Road Widening)
EAO: P 600,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry - Davao Or Coastal Rd - K1528 + 336 - K1529 + 286
Physical Target:
CW1: 1.838 Lane Km (Road Widening)
ROW: 12,222.70 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 26,460,000.00 (Road Widening)
ROW: P 2,940,000.00 (ROW Acquisition)
EAO: P 600,000.00
May 12, 2022 2022 WIN2E02103 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd – K1596 + 685 - K1599 + 688
Physical Target:
CW1: 6.000 Lane Km (Road Widening)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Road Widening)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1597 + 915 - K1599 + 664, K1600 + 647 - K1601 + 901
Physical Target:
CW1: 6.000 Lane Km (Road Widening)
ROW: 39,900.000 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 89,500,000.00 (Road Widening)
ROW: P 7,000,000.00 (ROW Acquisition)
EAO: P 3,500,000.00
May 12, 2022 2022 WIN2E02041 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) -
(500062MN) K1482 + (-686) - K1482 + (-547),
(500063MN) K1480 + (-665) - K1480 + (-411),
(S00064MN) K1479 + (-145) - K1479 + 002,
(S00065MN) K1477 + (-037) - K1476 + 266,
K1477 + (-620) - K1477 + (-485)
Physical Target:
CW1: 2.934 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 50,128,000.00
CW1: P 48,373,520.00 (Asphalt Overlay)
EAO: P 1,754,480.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) -
(S00060MN) K1478 + 400 - K1478 + 833,
(S00064MN) K1479 + 179 - K1479 + 612
Physical Target:
CW1: 2.598 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 50,128,000.00
CW1: P 48,373,520.00 (Asphalt Overlay)
EAO: P 1,754,480.00
May 12, 2022 2022 WIN2E02130 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry - Davao Or Coastal Rd - K1522 + 1019 - K1523 + 487
Physical Target:
CW1: 1.000 Lane Km (Road Widening)
Allocation:
TOTAL: P 18,000,000.00
CW1: P 17,640,000.00 (Road Widening)
EAO: P 360,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Surigao del Sur Bdry - Davao Or Coastal Rd - K1521 + 005.51 - K1521 + 232,
K1523 + 175 - K1523 + 358, K1526 + 929 - K1527 + 060
Physical Target:
CW1: 1.019 Lane Km (Road Widening)
ROW: 13,552.434 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 18,000,000.00
CW1: P 14,640,000.00 (Road Widening)
ROW: P 3,000,000.00 (ROW Acquisition)
EAO: P 360,000.00
May 12, 2022 2022 WIN2E02163 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1447 + 000 - K1447 + 219
Physical Target:
CW1: 1.314 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 15,710,000.00
CW1: P 15,395,800.00 (Asphalt Overlay)
EAO: P 314,200.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1451 + 983 - K1452 + 252
Physical Target:
CW1: 1.632 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 15,710,000.00
CW1: P 15,395,800.00 (Asphalt Overlay)
EAO: P 314,200.00
May 12, 2022 2022 WIN2E02128 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum – Panabo Circum Rd - K1510 + 935 - K1512 + 274
Physical Target:
CW1: 2.664 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 25,826,000.00
CW1: P 25,309,480.00 (Asphalt Overlay)
EAO: P 516,520.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum – Panabo Circum Rd - K1509 + 965 - K1510 + 588
Physical Target:
CW1: 2.552 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 25,826,000.00
CW1: P 25,309,480.00 (Asphalt Overlay)
EAO: P 516,520.00
May 12, 2022 2022 WIN2E02143 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1688 + 800 - K1688 + 900
Physical Target:
CW1: 5,555.56 sq. m. (Construction of Road Slope Protection)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1687 + 820 - K1687 + 960
Physical Target:
CW1: 3,605.00 sq. m. (Construction of Road Slope Protection)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection)
EAO: P 3,500,000.00
May 12, 2022 2022 WIN2E02260 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry - Davao Or Coastal Rd - K1515 + 105 - K1515 + 205
Physical Target:
CW1: 4,050.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1515 + 105 - K1515 + 205
Physical Target:
CW1: 3,600.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
May 12, 2022 2022 WIN2E02264 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1568 + 900 - K1569 + 000
Physical Target:
CW1: 4,149.180 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1568 + 900 - K1569 + 000
Physical Target:
CW1: 3,558.88 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
May 12, 2022 2022 WIN2E02030 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides – Primary Roads
Daang Maharlika (MN) – K1438 + 150 – K1438 + 190, K1442 + 400 – K1442 + 460,
K1444 + 700 – K1444 + 760, K1445 + 660 – K1445 + 683
Physical Target:
CW1: 5,716.07 Square Meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 68,400,000.00
CW1: P 66,006,000.00 (Construction of Road Slope Protection Structure)
EAO: P 2,394,000.00

TO: OO1 OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides – Primary Roads
Daang Maharlika (MN) – K1439 + 718 – K1439 + 756, K1439 + 763 – K1439 + 797,
K1439 + 927 – K1439 + 966
Physical Target:
CW1: 4,676.04 Square Meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 68,400,000.00
CW1: P 66,006,000.00 (Construction of Road Slope Protection Structure)
EAO: P 2,394,000.00
May 12, 2022 2022 WIN2E02127 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1522 + 400 - K1522 + 445.7, K1523 + 750 - K1523 + 780
Physical Target:
CW1: 3,333.33 Square Meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Road Slope Protection Structure)
EAO: P 1,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1493 + 314.50 - K1493 + 389, K1514 + 900 - K1514 + 980, K1515 + 950 - K1516 + 020, K1516 + 457 -K1516 + 520, K1518 + 013.50 - K1518 + 050, K1519 + 330 - K1519 + 380, K1523 + 830 - K1524 + 000, K1529 + 020 - K1529 + 100
Physical Target:
CW1: 9,325.00 Square Meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Road Slope Protection Structure)
EAO: P 1,000,000.00
May 12, 2022 2022 WIN2E02142 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) - K1476 + 195 - K1476 + 329
Physical Target:
CW1: 2,512.00 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 8,220,000.00
CW1: P 8,055,600.00 (Construction of Drainage Structure along Road)
EAO: P 164,400.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) - K1476 + 195 - K1476 + 323
Physical Target:
CW1: 256.00 lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 8,220,000.00
CW1: P 8,055,600.00 (Construction of Drainage Structure along Road)
EAO: P 164,400.00
May 12, 2022 2022 WIN2C03532 GAA FY 2022 February 1, 2022 Region VIII Leyte 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Tigbao-Pulak-Sta Fe Rd - K0912 + 264 - K0912 + 853

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 49.00 M
Structure: 2,777.78 Square meters

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Tigbao-Pulak-Sta Fe Rd - K0909 + 432 - K0909 + 502, K0910 + 387 – K0910 + 869, K0912 + 264 – K0912 + 680

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 49.00 M
Structure: 2,777.78 Square meters

EAO P 1.00 M

Total P 50.00 M
May 12, 2022 2022 WIN2E02058 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Pagtulian River, Sta. 0+000 – Sta. 0+750 (BS), Bukal, Nabunturan, Davao de Oro
Physical Target:
CW1: 1,482.275 ln. m. (Construction of Revetment)
Allocation:
TOTAL: P 59,291,000.00
CW1: P 57,215,815.00 (Construction of Revetment)
EAO: P 2,075,185.00

TO: OO2: Protect Lives and Properties – Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Pagtulian River, Sta. 0+000 – Sta. 0+750 (BS), Bukal, Nabunturan, Davao de Oro
Physical Target:
CW1: 1,400.000 ln. m. (Construction of Revetment)
Allocation:
TOTAL: 59,291,000.00
CW1: P 57,215,815.00 (Construction of Revetment)
EAO: P 2,075,185.00
May 12, 2022 2022 WIN2E02057 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Pantud Creek, Sta. 11+300 – Sta. 12+200 (BS), Brgy. Poblacion – Brgy. Magsaysay, Nabunturan, Davao de Oro
Physical Target:
CW1: 1,482.275 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Revetment)
EAO: P 2,100,000.00

TO: OO2: Protect Lives and Properties – Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Pantud Creek, Sta. 10+100 – Sta. 12+100, Brgy. Poblacion – Brgy. Magsaysay, Nabunturan, Davao de Oro
Physical Target:
CW1: 2,370.00 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 60,000,000.00
CW1: P 57,900,000.00 (Construction of Revetment)
EAO: P 2,100,000.00
May 12, 2022 2022 WIN2C03534 SARO-BMB-A-22-0003175 March 21, 2022 Region VIII Leyte 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Tertiary Roads

AS PER GAA/ORIGINAL:

Tanauan-Dagami Rd - K0922 + 367 - K0924 + 000

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 29.911560 M
Asphalt Overlay: 5.226 Lane Km

EAO P 0.610440 M

Total P 30.522 M

AS MODIFIED:

Tanauan-Dagami Rd - K0922 + 367 - K0923 + 585

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 29.911560 M
Asphalt Overlay:4.80 Lane Km

EAO P 0.610440 M

Total P 30.522 M
May 12, 2022 2022 WIN2E02149 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Tagbalaobao River up to Pindasan, Sta. 0+250 – Sta. 0+621 (LS), Sta. 0+250 – Sta. 0+621 (RS), Baybay Bucana, Davao de Oro
Physical Target:
CW1: 698.000 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction of Revetment)
EAO: P 2,450,000.00

TO: OO2: Protect Lives and Properties – Flood Management – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment along Tagbalaobao River up to Pindasan, Sta. 0+220.496 – Sta. 0+405.293 (LS), Sta. 0+547.475 – Sta. 0+610.611 (LS), Sta. 0+634.698 – Sta. 0+718.698 (LS), Sta. 0+289.988 – Sta. 0+566.777 (RS), Baybay Bucana, Davao de Oro
Physical Target:
CW1: 698.000 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 70,000,000.00
CW1: P 67,550,000.00 (Construction of Revetment)
EAO: P 2,450,000.00
May 12, 2022 2022 WIN2E02073 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1468 + 1580 - K1468 + 1733
Physical Target:
CW1: 0.612 lane km (Asphalt Overlay)
Allocation:
TOTAL: P 7,242,000.00
CW1: P 7,097,160.00 (Asphalt Overlay)
EAO: P 144,840.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1465 + 658.462 - K1466 + 106
Physical Target:
CW1: 0.973 lane km (Asphalt Overlay)
Allocation:
TOTAL: P 7,242,000.00
CW1: P 7,097,160.00 (Asphalt Overlay)
EAO: P 144,840.00
May 12, 2022 2022 WIN2E02265 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1692 + 600 - K1692 + 700
Physical Target:
CW1: 5,555.56 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1556 + 500 - K1556 + 600,
K1556 + 640 – K1556 + 740
Physical Target:
CW1: 3,600.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
May 12, 2022 2022 WIN2E02092 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Masara River leading to Hijo River, Sta. 0+280 - Sta. 0+630 (LS), Sta. 0+940 - Sta. 1+290 (LS), Sta. 1+040- Sta. 1+690 (RS), Sta. 1+780 - Sta. 2+180 (RS), Sta. 2+640 - Sta. 2+890 (RS), Brgy. Elizalde to Brgy. Tagbaros, Maco, Davao de Oro
Physical Target:
CW1: 2,000.000 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 80,000,000.00
CW1: P 77,200,000.00 (Construction of Revetment)
EAO: P 2,800,000.00

TO: OO2: Protect Lives and Properties Against Major Floods – Flood Management Program – Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Revetment along Masara River leading to Hijo River, Sta. 0+400 - Sta. 2+940, Brgy. Elizalde to Brgy. Tagbaros, Maco, Davao de Oro
Physical Target:
CW1: 2,446.000 Lineal Meters (Construction of Revetment)
Allocation:
TOTAL: P 80,000,000.00
CW1: P 77,200,000.00 (Construction of Revetment)
EAO: P 2,800,000.00
May 12, 2022 2022 WIN2E02140 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road, Ampawid, Laak, Davao de Oro
Physical Target:
CW1: 2.080 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Concrete Road)
EAO: P 600,000.00

TO: Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Road, Ampawid, Laak, Davao de Oro
Physical Target:
CW1: 2.160 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Concrete Road)
EAO: P 600,000.00
May 12, 2022 2022 WIN2E02068 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Primary Roads
Surigao-Davao Coastal Rd - K1789 + 266 - K1790 + 121
Physical Target:
CW1: 1.724 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 29,021,000.00
CW1: P 28,440,580.00 (Reconstruction to Concrete Pavement)
EAO: P 580,420.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Primary Roads
Surigao-Davao Coastal Rd - K1789 + 170 - K1790 + 020
Physical Target:
CW1: 3.105 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 29,021,000.00
CW1: P 28,440,580.00 (Reconstruction to Concrete Pavement)
EAO: P 580,420.00
May 12, 2022 2022 WIN2E02139 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads
Montevista – Compostela – Mati Bdry Road – K1460 + 290 – K1460 + 320
Physical Target:
CW1: 1,000.00 Square Meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Road Slope Protection Structure)
EAO: P 300,000.00

TO OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads
Montevista – Compostela – Mati Bdry Road – K1460 + 290 – K1460 + 320, K1469 + 220 – K1469 + 245
Physical Target:
CW1: 951.72 Square Meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Construction of Road Slope Protection Structure)
EAO: P 300,000.00
May 12, 2022 2022 WIN2E02169 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Primary Roads
Daang Maharlika (MN) – K1425 + 937 – K1426 + 018, K1428 + 150 – K1428 + 290
Physical Target:
CW1: 3,866.660 Square Meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 58,000,000.00
CW1: P 55,970,000.00 (Construction of Road Slope Protection Structure)
EAO: P 2,030,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Primary Roads
Daang Maharlika (MN) – K1425 + 1005 – K1426 + 016, K1442 + 975 – K1443 + 141
Physical Target:
CW1: 3,746.140 Square Meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 58,000,000.00
CW1: P 55,970,000.00 (Construction of Road Slope Protection Structure)
EAO: P 2,030,000.00
May 12, 2022 2022 WIN2E02069 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance -Secondary Roads
Tagum-Panabo Circum Rd - K1509 + 106 - K1510 + 935
Physical Target:
CW1: 3.688 lane km (Asphalt Overlay)
Allocation:
TOTAL: P 35,271,000.00
CW1: P 34,565,580.00 (Asphalt Overlay)
EAO: P 705,420.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1509 + 106 - K1509 + 965
Physical Target:
CW1: 3.436 lane km (Asphalt Overlay)
Allocation:
TOTAL: P 35,271,000.00
CW1: P 34,565,580.00 (Asphalt Overlay)
EAO: P 705,420.00
May 12, 2022 2022 WIN2E02071 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Off-Carriageway Improvement – Tertiary Roads
Montevista-Compostela-Mati Bdry Rd – K1472 + 695 – K1473 + 479
Physical Target:
CW1: 3,244.00 Square Meters (Off-Carriageway Improvement: Paving of Shoulders)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Off-Carriageway Improvement: Paving of Shoulders)
EAO: P 1,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Off-Carriageway Improvement – Tertiary Roads
Montevista-Compostela-Mati Bdry Rd - K1428 + 325 – K1431 + 795
Physical Target:
CW1: 3,443.00 Square Meters (Off-Carriageway Improvement: Construction of Median/Center Island)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Off-Carriageway Improvement: Construction of Median/Center Island)
EAO: P 1,000,000.00
May 12, 2022 2022 WIN2E02266 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1573 + 900 - K1574 + 000
Physical Target:
CW1: 4,345.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1573 + 900 - K1574 + 000
Physical Target:
CW1: 3,568.00 sq. m. (Construction of Road Slope Protection Structure)
ROW: 4,491.24 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 95,500,000.00 (Construction of Road Slope Protection Structure)
ROW: P 1,000,000.00 (ROW Acquisition)
EAO: P 3,500,000.00
May 12, 2022 2022 WIN2E02067 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program – Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) - K1460 + 590- K1461 + 192
Physical Target:
CW1: 1,286.000 Lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Drainage Structure along Road)
EAO: P 1,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program – Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (MN) - K1460 + 590 - K1460 + 632, K1460 + 632 - K1461 + 080
Physical Target:
CW1: 573.000 Lineal meters (Construction of Drainage Structure along Road)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Drainage Structure along Road)
EAO: P 1,000,000.00
May 12, 2022 2022 WIN2C03547 SARO-BMB-A-22-0003175 March 21, 2022 Region VIII Leyte 1st District Engineering Office
Convergence and Special Support Program

Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of Road, Brgy. Gov. Jaro, Babatngon, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road: P 9.90 M
: 1.680 Lane Km

EAO P 0.10 M

Total P 10.00 M

AS MODIFIED:

Construction of Road, Brgy. Gov. E. Jaro, Babatngon, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road: P 9.90 M
: 1.680 Lane Km

EAO P 0.10 M

Total P 10.00 M
May 12, 2022 2022 WIN2E02154 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System -Network Development - Road Widening - Tertiary Roads
Jct Manikling-Gov Generoso Rd - K1744 + 436 - K1745 + 200, K1749 + 735 - K1753 + 000, K1753 + 000 - K1755 + 000, K1755 + 000 - K1757 + 055, K1757 + 547 - K1759 + 902
Physical Target:
CW1: 20.890 Lane Km (Road Widening)
Allocation:
TOTAL: P 300,000,000.00
CW1: P 289,500,000.00 (Road Widening)
EAO: P 10,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Tertiary Roads
Jct Manikling-Gov Generoso Rd - K1744 + 436 - K1745 + 200, K1749 + 735 - K1757 + 037
Physical Target:
CW1: 16.118 Lane Km (Road Widening)
ROW: 107,184.70 sq.m.
Allocation:
TOTAL: P 300,000,000.00
CW1: P 241,250,000.00 (Road Widening)
EAO: P 48,250,000.00
May 12, 2022 2022 WIN2E02277 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Surigao del Sur Bdry - Davao Or Coastal Rd - K1525 + 716 - K1525 + 816
Physical Target:
CW1: 3,770.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1525 + 720 - K1525 + 860
Physical Target:
CW1: 3,598.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
May 12, 2022 2022 WIN2E02081 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads
Nabunturan - Laak Road, Davao Del Oro
Physical Target:
CW1: 8.070 Lane Km (Road Concreting)
ROW: 59,670.000 sq.m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 134,961,040.00 (Road Concreting)
ROW: P 9,788,960.00
EAO: P 5,250,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads
Nabunturan - Laak Road, Davao Del Norte
Physical Target:
CW1: 8.070 Lane Km (Road Concreting)
ROW: 59,670.000 sq.m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 134,961,040.00 (Road Concreting)
ROW: P 9,788,960.00
EAO: P 5,250,000.00
May 12, 2022 2022 WIN2E02146 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System Network Development - Road Widening - Secondary Roads
Carmen-DAPECOL Cmpd Rd - K1479 + 870 - K1480 + 330, K1480 + 431 – K1481 + 235
Physical Target:
CW1: 2.442 Lane km (Road Widening)
Allocation:
TOTAL: P 61,050,000.00
CW1: P 58,913,250.00 (Road Widening)
EAO: P 2,136,750.00

TO: OO1: Ensure Safe and Reliable National Road System Network Development - Road Widening - Secondary Roads
Carmen-DAPECOL Cmpd Rd - K1472 + 850 - K1473 + 468
Physical Target:
CW1: 1.268 Lane km (Road Widening)
CW2: 1.268 Lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 61,050,000.00
CW1: P 38,466,792.00 (Road Widening)
CW2: P 20,446,458.00 (Reconstruction to Concrete Pavement)
EAO: P 2,136,750.00
May 12, 2022 2022 WIN2E02129 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
Daang Maharlika - K1485 + 988 - K1487 + 500 - K1488 + 024
Physical Target:
CW1: 13.597 Lane Km (Road Reconstruction)
Allocation:
TOTAL: P 115,000,000.00
CW1: P 110,975,000.00 (Road Reconstruction)
EAO: P 4,025,000.00

TO: OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
Daang Maharlika - K1486 + 100 - K1487 + 192, K1495 + 171 - K1496 + 897
Physical Target:
CW1: 11.168 Lane Km (Road Reconstruction)
Allocation:
TOTAL: P 115,000,000.00
CW1: P 110,975,000.00 (Road Reconstruction)
EAO: P 4,025,000.00
May 12, 2022 2022 WIN2E02115 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Primary Roads
Daang Maharlika (MN) – K1454 + 997 - K1455 + 356, K1456 + 010 - K1456 + 498
Physical Target:
CW1: 3.388 Lane Km (Road Reconstruction)
Allocation:
TOTAL: P 55,000,000.00
CW1: P 53,075,000.00 (Road Reconstruction)
EAO: P 1,925,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads – Primary Roads
Daang Maharlika (MN) – K1454 + 998 - K1455 + 338
Physical Target:
CW1: 1.560 Lane Km (Road Reconstruction)
Allocation:
TOTAL: P 55,000,000.00
CW1: P 35,306,719.10 (Road Reconstruction)
CW2: P 17,768,280.90 (Improvement of Intersections)
EAO: P 1,925,000.00
May 12, 2022 2022 WIN2E02084 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City 2nd District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Basic Infrastructure Program (BIP) – Multi-purpose Buildings/Facilities to support Social Services
Construction of Multi-Purpose Building (Davao City UP Sports Complex – Phase 7), Barangay Oshiro, Tugbok District, Davao City
Physical Target:
CW1: 1 Number of Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 99,000,000.00 (Construction of Multi-Purpose Building)
EAO: P 1,000,000.00

TO: Convergence and Special Support Program - Basic Infrastructure Program (BIP) – Multi-purpose Buildings/Facilities to support Social Services
Construction of Multi-Purpose Building (Davao City UP Sports Complex – Phase 9), Barangay Oshiro, Tugbok District, Davao City
Physical Target:
CW1: 1 Number of Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 99,000,000.00 (Construction of Multi-Purpose Building)
EAO: P 1,000,000.00
May 12, 2022 2022 WIN2E02087 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City 2nd District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Basic Infrastructure Program (BIP) – Multi-purpose Buildings/Facilities to support Social Services
Construction of Multi-Purpose Building (Davao City UP Sports Complex – Phase 8), Barangay Oshiro, Tugbok District, Davao City
Physical Target:
CW1: 1 Number of Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 99,000,000.00 (Construction of Multi-Purpose Building)
EAO: P 1,000,000.00

TO: Convergence and Special Support Program - Basic Infrastructure Program (BIP) – Multi-purpose Buildings/Facilities to support Social Services
Construction of Multi-Purpose Building (Davao City UP Sports Complex – Phase 10), Barangay Oshiro, Tugbok District, Davao City
Physical Target:
CW1: 1 Number of Building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 99,000,000.00 (Construction of Multi-Purpose Building)
EAO: P 1,000,000.00
May 12, 2022 2022 WIN2E02159 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City 2nd District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Roads leading to Major/Strategic Public Buildings/Facilities
Construction of Road along Purok 4 to Boundary of Barangay Dominga, Barangay Dalagdag, Marilog District, Davao City
Physical Target:
CW1: 1.061 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00

TO: Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Roads leading to Major/Strategic Public Buildings/Facilities
Construction of Road along Purok 4 to Boundary of Barangay Dominga, Barangay Dalagdag, Calinan District, Davao City
Physical Target:
CW1: 1.308 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Construction of Concrete Road)
EAO: P 200,000.00
May 12, 2022 2022 WIN2E02049 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening - Secondary Roads
Pres. Diosdado P.Macapagal Natl Hi-way - K1703 + 447 - 1705 + 008
Physical Target:
CW1: 3.094 Lane Km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Road Widening)
EAO: P 1,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening - Secondary Roads
Pres. Diosdado P.Macapagal Natl Hi-way - K1703 + 447 - K1705 + 008,
K1708 + 000 - K1708 + 670
Physical Target:
CW1: 4.320 Lane Km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Road Widening)
EAO: P 1,000,000.00
May 12, 2022 2022 WIN2E02074 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Drainage Structure Along Poblacion Creek, Sta. 0+000 - Sta. 1+500,
Brgy. Poblacion, Lupon, Davao Oriental
Physical Target:
CW1: 881.611 Lineal Meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Drainage Structure)
EAO: P 1,000,000.00

TO: OO2: Protect Lives and Properties – Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Drainage Structure Along Poblacion Creek, Sta. 0+440 - Sta. 1+160,
Sta. 0+000 - Sta. 1+556.76, Brgy. Poblacion, Lupon, Davao Oriental
Physical Target:
CW1: 2,276.760 Lineal Meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Drainage Structure)
EAO: P 1,000,000.00
May 12, 2022 2022 WIN2E02086 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way – K1714 + 295 – K1716 + 388
Physical Target:
CW1: 4.180 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way – K1714 + 295 – K1715 + 025
Physical Target:
CW1: 2.872 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00
May 12, 2022 2022 WIN2E02088 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Pres. Diosdado P.Macapagal Natl Hi-way – K1727 + 240 – K1727 + 360
Physical Target:
CW1: 5,555.560 sq. m. (Construction of Road Slope Protection)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation Program – Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Pres. Diosdado P.Macapagal Natl Hi-way – K1774 + 396 – K1775 + 000
Physical Target:
CW1: 4,273.752 sq. m. (Construction of Road Slope Protection)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection)
EAO: P 3,500,000.00
May 12, 2022 2022 WIN2E02151 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd – K1497 + 353 – K1498 + 802
Physical Target:
CW1: 2.898 Lane Km (Road Widening)
Allocation:
TOTAL: P 49,999,000.00
CW1: P 48,999,020.00 (Road Widening)
EAO: P 999,980.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd – K1497 + 454 – K1498 + 950
Physical Target:
CW1: 3.036 Lane Km (Road Widening)
ROW Acquisition: 30,360.00 sq. m.
Allocation:
TOTAL: P 49,999,000.00
CW1: P 44,999,020.00 (Road Widening)
ROW Acquisition: P 4,000,000.00
EAO: P 999,980.00
May 12, 2022 2022 WIN2E02267 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads
Magsaysay Ave - K1510 + 757 - K1511 + 047,
(S01445MN) Chainage 000 - Chainage 171
Physical Target:
CW1: 1.124 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 11,834,000.00
CW1: P 11,597,320 .00 (Asphalt Overlay)
EAO: P 236,680 .00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Secondary Roads
Magsaysay Ave - K1510 + 704 - K1511 + 020, (S01445MN) Chainage 000 - Chainage 145
Physical Target:
CW1: 0.834 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 11,834,000.00
CW1: P 11,597,320 .00 (Asphalt Overlay)
EAO: P 236,680 .00
May 12, 2022 2022 WIN2E02263 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1487 + 708 - K1488 + 376, K1488 + 456 - K1488 + 600
Physical Target:
CW1: 4.307 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 54,946,000.00
CW1: P 53,022,890.00 (Asphalt Overlay)
EAO: P 1,923,110.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1487 + 708 - K1488 + 515
Physical Target:
CW1: 2.871 Lane Km (Asphalt Overlay)
Allocation:
TOTAL: P 54,946,000.00
CW1: P 53,022,890.00 (Asphalt Overlay)
EAO: P 1,923,110.00
May 12, 2022 2022 WIN2E02262 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1513 + 208 - K1514 + 265, K1514 + 530 - K1514 + 709, (S01455MN) Chainage 3033 - Chainage 3100
Physical Target:
CW1: 1.320 Lane Km (Road Widening)
Allocation:
TOTAL: P 19,800,000.00
CW1: P 19,404,000.00 (Road Widening)
EAO: P 396,000 .00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Davao-Cotabato Rd (Davao City-Jct Digos Sect) - K1513 + 208 - K1513 + 249,
K1513 + 291 - K1513 + 320, K1513 + 350 - K1514 + 265,
K1514 + 700 - K1514 + 720, (S01455MN) Chainage 3033 - Chainage 3100
Physical Target:
CW1: 1.089 Lane Km (Road Widening)
ROW: 200.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 19,800,000.00
CW1: P 10,388,000.00 (Road Widening)
ROW: P 9,016,000.00 (ROW Acquisition)
EAO: P 396,000 .00
May 12, 2022 2022 WIN2E02278 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads
Davao-Bukidnon Rd - K1701 + 104 - K1701 + 153, K1701 + 159 - K1701 + 304
Physical Target:
CW1: 0.205 Lane Km (Road Widening)
Allocation:
TOTAL: P 4,580,000.00
CW1: P 4,488,400.00 (Road Widening)
EAO: P 91,600.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads
Davao-Bukidnon Rd – K1701 + 000 – K1701 + 232
Physical Target:
CW1: 0.200 Lane Km (Road Widening)
CW2: 0.096 Lane Km (Reconstruction)
Allocation:
TOTAL: P 4,580,000.00
CW1: P 3,398,081.55 (Road Widening)
CW2: P 1,090,318.45 (Reconstruction)
EAO: P 91,600.00
May 12, 2022 2022 WIN2E02280 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Secondary Roads
Ma-a Rd - K1510 + 468 - K1510 + 507, K1511 + 482 - K1511 + 516
Physical Target:
CW1: 87.600 sq. m. (Off-carriageway Improvement: Construction of Sidewalk)
ROW: 87.600 sq. m.
Allocation:
TOTAL: P 2,418,000.00
CW1: P 1,359,260 .00 (Off-carriageway Improvement: Construction of Sidewalk)
ROW: P 1,010,380.00
EAO: P 48,360.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Secondary Roads
Ma-a Rd - K1510 + 298 - K1510 + 318, K1510 + 468 - K1510 + 507,
K1511 + 482 - K1511 + 516, K1512 + 340 - K1512 + 483
Physical Target:
CW1: 459.910 sq. m. (Off-carriageway Improvement: Construction of Sidewalk)
ROW: 173.91 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 2,418,000.00
CW1: P 1,372,000.00 (Off-carriageway Improvement: Construction of Sidewalk)
ROW: P 997,640.00 (ROW Acquisition)
EAO: P 48,360.00
May 12, 2022 2022 WIN2E02279 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening – Secondary Roads
Buhangin-Lapanday - K1505 + 726 - K1505 + 791
Physical Target:
CW1: 0.130 Lane Km (Road Widening)
ROW: 725.580 sq. m.
Allocation:
TOTAL: P 25,000,000.00
CW1: P 14,700,000.00 (Road Widening)
ROW: P 9,800,000.00
EAO: P 500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening – Secondary Roads
Buhangin-Lapanday - K1505 + 500 - K1505 + 866
Physical Target:
CW1: 0.716 Lane Km (Road Widening)
ROW: 2,040.60 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 14,700,000.00 (Road Widening)
ROW: P 9,800,000.00 (ROW Acquisition)
EAO: P 500,000.00
May 12, 2022 2022 WIN2E02153 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd – K1502+506- K1S04+000
Physical Target:
CW1: 2.988 Lane Km (Road Widening)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Road Widening)
EAO: P 1,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd – K1501+090 - K1502+803
Physical Target:
CW1: 3.426 Lane Km (Road Widening)
ROW Acquisition: 34,260.00 sq. m.
Allocation:
TOTAL: P 50,000,000.00
CW1: P 46,000,000.00 (Road Widening)
ROW Acquisition: P 3,000,000.00
EAO: P 1,000,000.00
May 12, 2022 2022 WIN2E02097 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (MN) – K1489 + 151 – K1489 + 857
Physical Target:
CW1: 4.236 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 56,166,000.00
CW1: P 54,200,190.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,965,810.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (MN) – K1488 + 909 – K1489 + 049, K1489 + 128 – K1489 + 830
Physical Target:
CW1: 3.272 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)

Allocation:
TOTAL: P 56,166,000.00
CW1: P 54,200,190.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,965,810.00
May 12, 2022 2022 WIN2E02116 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Secondary Roads
Nabunturan-Maragusan Rd – K1436 + 774 – K1438 + 680
Physical Target:
CW1: 3.812 Lane Km (Road Widening)
Allocation:
TOTAL: P 61,227,000.00
CW1: P 59,084,055.00 (Road Widening)
EAO: P 2,142,945.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Secondary Roads
Nabunturan-Maragusan Rd – K1435 + 840 – K1438 + 946
Physical Target:
CW1: 6.120 Lane Km (Road Widening)
ROW Acquisition: 61,200.00 sq. m.
Allocation:
TOTAL: P 61,227,000.00
CW1: P 56,584,055.00 (Road Widening)
ROW Acquisition: P 2,500,000.00
EAO: P 2,142,945.00
May 12, 2022 2022 WIN2E02099 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (MN) – K1494 + 496 – K1494 + 824
Physical Target:
CW1: 2.130 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 25,489,000.00
CW1: P 24,979,220.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 509,780.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (MN) – K1494 + 469 – K1494 + 731
Physical Target:
CW1: 1.310 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)

Allocation:
TOTAL: P 25,489,000.00
CW1: P 24,979,220.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 509,780.00
May 12, 2022 2022 WIN2E02062 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Construction of Bypass and Diversion Roads
Mapawa-Bahi-Langgawisan, Maragusan, Davao de Oro Bypass Road, Davao de Oro
Physical Target:
CW1: 12.400 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Construction of Bypass and Diversion Roads
Mapawa-Bahi-Langgawisan, Maragusan, Davao de Oro Bypass Road, Davao de Oro
Physical Target:
CW1: 12.400 Lane Km (Construction of Gravel Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Gravel Road)
EAO: P 3,500,000.00
May 12, 2022 2022 WIN2E02093 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Davao City Div Rd - K1510 + 950 - K1511 + 101
Physical Target:
CW1: 5,555.560 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Davao City Div Rd - K1511 + 718 - K1511 + 741, K1511 + 770 – K1511 + 795
Physical Target:
CW1: 2,949.00 sq. m. (Construction of Road Slope Protection Structure)

Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
May 12, 2022 2022 WIN2E02145 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Tertiary Roads
Montevista-C.Ompostela-Mati Bdry Rd – K1481 + 745 - K1481 + 955
Physical Target:
CW1: 0.420 Lane Km (Road Widening)
Allocation:
TOTAL: P 8,564,000.00
CW1: P 8,392,720.00 (Road Widening)
EAO: P 171,280.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Tertiary Roads
Montevista-Compostela-Mati Bdry Rd – K1481 + 645 - K1481 + 955
Physical Target:
CW1: 0.620 Lane Km (Road Widening)
Row Acquisition: 6,200.00 sq. m.
Allocation:
TOTAL: P 8,564,000.00
CW1: P 7,892,720.00 (Road Widening)
ROW Acquisition: P 500,000.00
EAO: P 171,280.00