May 20, 2022 |
2022 |
WIN2E02349 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. : 300215100607000
Project ID: P00630145MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road, Barangay Camp Eduard, Alegria, Surigao del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 7.864 Lane Km
Allocation:
TOTAL: P 80,000,000
CW1: P 77,200,000
EAO: P 2,800,000
Unit Cost:
CW1: P 9,816,887.08/ Lane Km
TO:
Construction of Road, Barangay Camp Eduard, Alegria, Surigao del Norte
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Drainage Structure along Road
Physical Target:
CW1- 4.2536 Lane Km
CW2- 3,034.38 Lineal meters
Allocation:
TOTAL: P 80,000,000
CW1: P 62,067,108.74
CW2: P 15,132,891.26
EAO: P 2,800,000
Unit Cost:
CW1: P 14,591,665.59/ Lane Km
CW2: P 4,987.14/ Lineal meters |
May 20, 2022 |
2022 |
WIN2E02199 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
UACS No. : 300219100392000
Project ID: P00632322MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
FROM:
Rehabilitation and Road Slope Protection Structures along Bislig-Trento Road, K1445+100 -K1445+300
Type of Work:
CW1- Rehabilitation / Major Repair of Slope Protection Structure
Physical Target:
CW1- 4,295.082 Square meters
Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000
Unit Cost:
CW1: P 22,467.56/ Square meters
TO:
Rehabilitation and Road Slope Protection Structures along Bislig-Trento Road, K1508+510 - K1508+750
Type of Work:
CW1- Rehabilitation / Major Repair of Slope Protection Structure
Physical Target:
CW1- 10,393.78 Square meters
Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000
Unit Cost:
CW1: P 9,824.39/ Square meters |
May 20, 2022 |
FY 2022 GAA |
WIN2G02910 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 320101108185000
Project ID : P00620663LZ
002 : Protect Lives and Properties Against Major Floods
Flood Management - Construction/maintenance of Flood
Mitigation Structures and Drainage Systems
FROM :
Construction of Ransang River Flood Control Structure
Sta. 0+000 - Sta. 0+300,
Rizal, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structures
233.50 LM
Allocation - Php 20.00 Million
TO :
Construction of Ransang Flood Control Structure
Left Bank Sta. 0+000 - Sta. 0+083 Downstream,
Sta. 0+102.20 - Sta. 0+253 Upstream,
Rizal, Palawan\
Physical Target - CW1 - Construction of Flood Mitigation Structure
233.50 LM
Allocation - Php 20.00 Million
|
May 20, 2022 |
FY 2022 GAA |
WIN2G02824 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 320101108186000
Project ID : P00620664LZ
002 : Protect Lives and Properties Against Major Floods
Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage System
FROM :
Construction of Salogon River Flood Control Structure
Sta. 0+000 - Sta. 0+450
Brooke's Point, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
640.00 LM
Allocation - Php 40.00 Million
TO :
Construction of Salogon River Flood Control Structure,
Sta. 0+000 - Sta. 0+520 Right Bank,
Sta. 0+360 - Sta. 0+480 Left Bank,
Brooke's Point, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
640 LM
Allocation - Php 40.00 Million |
May 20, 2022 |
FY 2022 GAA |
WIN2G06274 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 320101108188000
Project ID : P00620666LZ
002 : Protect Lives and Properties Against Major Floods
Flood management - Construction/Maintenance of Flood
Mitigation Structures and Drainage Systems
FROM :
Construction of Tagusao River Flood Control Structure,
Sta. 0+100 - Sta. 0+400,
Quezon, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
550.0 LM
Allocation - Php 30.00 Million
TO :
Construction of Tagusao River Flood Control Structure,
Sta. 0+070 - Sta. 0+620 Right Riverbank,
Quezon Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
550.0 LM
Allocation - Php 30.00 Million |
May 20, 2022 |
FY 2022 GAA |
WIN2G02932 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 320102104996000
Project ID : P00621114LZ
002: Protect Lives and Properties against Major Floods
Flood Management - Construction/Rehabilitation of Flood Mitigation
Facilities along Major River Basins and Principal Rivers
FROM :
Construction of Culasian River Flood Control Structure,
Sta. 0+000 - Sta. 0+152
Rizal, Palawan, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
82.0 LM
Allocation - Php 10.00 Million
TO:
Construction of Culasian River Flood Control Structure,
Sat. 0+000 - Sta. 0+082
Rizal, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
82.0 LM
Allocation - Php 10.00 Million |
May 20, 2022 |
FY 2022 GAA |
WIN2G02933 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 320102104997000
Project ID : P00621115LZ
002 : Protect Lives and Properties Against Major Floods
Flood Management - Construction/Rehabilitation of Flood Mitigation
Facilities along Major River Basins and Principal Rivers
FROM :
Construction of Panitian River Flood Control Structure,
Sta. 0+000 - Sta. 0+250
Quezon, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
262.0 LM
Allocation - Php 20.00 Million
TO :
Construction of Panitian River Flood Control Structure
Sta. 0+000 - Sta. 0+131,
Quezon, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
262.0 LM
Allocation - Php 20.00 Million |
May 20, 2022 |
FY 2022 GAA |
WIN2Go2903 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 300214100243000
Project ID : P00635991LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Special Road Fund - Motor Vehicle Users Charge (MVUC)
as per R.A. 11239
FROM :
Preventive Maintenance (Asphalt Overlay) along
Quezon - Aramaywan Rd
K0160+000 - K0160+859,
K0166+000 - K0167+000,
K0172+229 - K0172+548
Physical Target - CW1 - Preventive maintenance of Road :
Asphlat Overlay : 4.478 Lane Km
Allocation - Php 43.687 Million
TO :
Preventive Maintenance (Asphalt Overlay) along
Quezon - Aramaywan Rd\
K0156+504 - K0158+662
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay : 4.478Lane Km
Allocation - Php 43.687 Million |
May 19, 2022 |
FY 2022 |
WIN2E02312 |
310204101141000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 310204101141000
Project ID: P00604246MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Airport - Turno - Sinaman Bypass Road, Zamboanga del Norte
CW1- Road Widening
Physical Target: 4.91 Lane Km
Unit Cost: ₱ 20,061,099.80/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 20,000.00 sq.m.
Unit Cost: ₱ 382.50/sq.m.
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00 |
May 19, 2022 |
FY 2022 |
WIN2E02318 |
320101107683000 |
March 22, 2022 |
Region IX |
Regional Office IX |
UACS No. 320101107683000
Project ID: P00620007MN
OO2: Protect Lives and Properties - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Panganuran River, Gutalac, Zamboanga del Norte (at Panganuran Br. Section along Liloy - Siocon Road (S01146MN))
CW1- Construction of Flood Mitigation Structure
Physical Target: 567.610 Lineal Meters
Unit Cost: ₱ 171,425.73/Lineal Meters
EAO: ₱ 3,535,000.00
Excess: ₱ 162,042.35
Allocation: ₱ 101,000,000.00 |
May 19, 2022 |
FY 2022 GAA |
WIN2G02660 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No. : 320102104987000
Project ID : P00621103LZ
Construction/Rehabilitation of Flood Mitigation Facilities
within major River basins and principal Rivers
Construction of Flood Control Structure
FROM :
Construction of Flood Control Structure along
Anahawin River, Sta. 0+000 - Sta. 0+473,
Brgy. Poblacion, Calintaan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
315.0 lineal meter
Allocation - Php 45.00 Million
TO :
Construction of Flood Control Structure along
Anahawin River, Sta. 0+000 - Sta. 0+315,
Brgy. Poblacion, Calintaan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
315.00 lineal meter
Allocation - Php 45.00 Million
|
May 19, 2022 |
FY 2022 |
WIN2E02333 |
310103100817000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 310103100817000
Project ID: P00601163MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Imelda-Bayog-Kumalarang - Lapuyan-Margosatubig Rd - K1763 + (-656) - K1763 + (-276), K1763 + (-276) - K1763 + 000, K1763 + 000 - K1764 + 316.49, K1765 + 000 - K1767 + 610.51
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target: 9.17 Lane Km
Unit Cost: ₱ 10,687,966.19/Lane Km
EAO: ₱ 3,610,845.00
Excess: ₱ 1,547,505.00
Allocation: ₱ 103,167,000.00 |
May 19, 2022 |
FY 2022 GAA |
WIN2G02753 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No. : 320102104988000
Project ID : P00621104LZ
Construction of Flood Control Structure
FROM :
Construction of Flood Control Structure -
Mompong River, Malisbong Section,
Sta. 0+000 - Sta. 0+474,
Sablayan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
377.00 lineal meter
Allocation - Php 45.00 Million
TO :
Construction of Flood Control Structure -
Mompong River, Malisbong Section,
Sta. 0+000 - Sta. 0+377
Sablayan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
377.00 lineal meter
Allocation - Php 45.00 Million |
May 19, 2022 |
FY 2022 |
WIN2E02327 |
310204101148000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 310204101148000
Project ID: P00604243MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
NRJ Lapakan – Lamisahan - Victoria By-Pass Road, Zamboanga City
CW1- Construction of Concrete Road
Physical Target: 1.76 Lane Km
Unit Cost: ₱ 54,882,011.25/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 33,333.33 sq.m.
Unit Cost: ₱ 286.7298/sq.m.
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00 |
May 19, 2022 |
FY 2022 |
WIN2E02328 |
310101100578000 |
March 22, 2022 |
Region IX |
Regional Office IX |
UACS No. 310101100578000
Project ID: P00604683MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Pagadian City-Zamboanga City Rd – K1697+400.00 – K1699+000.00, K1719+000.00 – K1719+294.00, K1719+314.00 – K1720+000.00, K1721+200.00 – K1721+420.00, K1704 + 370 - K1704 + 420
CW1- Preventive Maintenance of Road: Concrete Reblocking
Physical Target: 5.60 Lane km
Unit Cost: ₱ 16,820,495.08/Lane km
CW2- Construction of Road Slope Protection Structure
Physical Target: 8,678.50 sq.m.
Unit Cost: ₱ 507.60/sq.m.
EAO: ₱ 3,605,000.00
Excess: ₱ 795,000.00
Allocation: ₱ 103,000,000.00 |
May 19, 2022 |
FY 2022 |
WIN2E02331 |
310305101537000 |
March 22, 2022 |
Region IX |
Regional Office IX |
UACS No. 310305101537000
Project ID: P00602123MN
OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges
Opao Br. (B01784MN) along Dipolog-Oroquieta National Rd
CW1- Widening of Bridge
Physical Target: 867.186 sq.m.
Unit Cost: ₱ 115,027.23/Sq.m.
EAO: ₱ 3,675,000.00
Excess: ₱ 1,575,000.00
Allocation: ₱ 105,000,000.00 |
May 19, 2022 |
FY 2022 GAA |
WIN2G02975 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No. : 320102104991000
Project ID : P00621623LZ
002 : Protect Lives and Properties Against Major Flood
Construction/Rehabilitation of Flood Mitigation Facilities
within Major River basins and Principal Rivers
FROM :
Construction of River Protection Structures along
Calawagan River,
Sta. 0+000.00 - Sta. 0+722.89,
Paluan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
662.00 lineal meter
Allocation - Php 50.00 Million
TO :
Construction of River Protection Structure
along Calawagan River
Sta. 0+000 - Sta. 0+322,
Sta. 0+492 - Sta. 0+772,
Paluan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
662.00 lineal meter
Allocation -Php 50.00 |
May 19, 2022 |
FY 2022 |
WIN2E02332 |
310204101585000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 310204101585000
Project ID: P00604236MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
NRJ Baluno - La Paz (Sitio Pole) Diversion Road, (Phase II), Zamboanga City
CW1- Construction of Concrete Road
Physical Target: 2.00 Lane Km
Unit Cost: ₱ 48,177,832.77/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 32,647.78 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00 |
May 19, 2022 |
FY 2022 |
WIN2E02326 |
310204101581000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 310204101581000
Project ID: P00604256MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Ipil Circumferential Road, Veterans-Tiayon-Don Andres Section, Package II, Zamboanga Sibugay
CW1- Road Widening
Physical Target: 6.89 Lane Km
Unit Cost: ₱ 12,612,481.86/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 38,433.33 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 3,570,000.00
Allocation : ₱ 102,000,000.00 |
May 19, 2022 |
FY 2022 |
WIN2E02330 |
310201100904000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 310201100904000
Project ID: P00602316MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Liloy-Ipil Rd - K1985 + 081.41 - K1985 + 794.28, K1985 + 981.19 - K1987 + 960.00
CW1- Road Widening
Physical Target: 5.383 Lane Km
Unit Cost: ₱ 15,455,469.15/Lane Km
ROW- Right-Of-Way Acquisition
Physical Target: 27,509.66 sq.m.
Unit Cost: ₱ 500.00/Sq.m.
EAO : ₱ 3,516,380.00
Allocation: ₱ 100,468,000.00 |
May 19, 2022 |
FY 2022 |
WIN2E02329 |
310108100969000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 310108100969000
Project ID: P00601386MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Zamboanga West Coastal Rd (Limpapa-Sibuco Sect) - K1991 + 276.00 - K1991 + 385.00, K1993 + 100.39 - K1995 + 413.38
CW1- Construction of Road Slope Protection Structure
Physical Target: 3,978.50 sq.m.
Unit Cost: ₱ 25,493.70/sq.m.
ROW- Right-Of-Way Acquisition
Physical Target: 6,136.22 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 3,745,455.00
Allocation: ₱ 107,013,000.00 |
May 19, 2022 |
FY 2022 GAA |
WIN2G02769 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No. : 320102104992000
Project ID : P00621624LZ
002 ; Protect Lives and Properties Against Major Flood
Flood management Program -
Construction/Rehabilitation of Flood Mitigation Facilities
within Major River Basins and principal Rivers
FROM :
Construction of River Protection Structures along
Katanlawan River,
Sta. 0+000 - Sta. 0+679.42
Paluan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
1000.00 Lineal Meter
Allocation - Php 47.00 Million
TO :
Construction of River Protection Structure
along Katanlawan River,
Sta. 0+000 - Sta. 0+840(L/S),
Sta. 0+200 - Sta.0+360(R/S),
Paluan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
1000.00 Lineal Meter
Allocation - 47.00 Million
|
May 19, 2022 |
FY 2022 |
WIN2E02357 |
310211100090000 |
April 5, 2022 |
Region IX |
Zamboanga del Norte 2nd District Engineering Office |
UACS No. 310211100090000
Project ID : P00604483MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Secondary Roads
Zamboanga West Coastal Road (Sibuco - Sirawai Section) S01166MN
Chainage 12494 - Chainage 14094
CW1 - Paving of Unpaved Roads: 3.200 Lane km
Unit Cost : P 15,312.50/Lane km
EAO : P 1,000,000.00
Allocation : P 50,000,000.00 |
May 19, 2022 |
FY 2022 GAA |
WIN2G02931 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Occidental District Engineering Office |
UACS No. : 300105200731000
Project ID : P00655135LZ
LOCAL PROGRAM
National Building Program - Buildings and other Structures
FROM :
Construction(Completion) of Four Storey Hostel Building,
DPWH Mindoro Occidental District Engineering Office
Mamburao, Occidental Mindoro
Physical Target - CW1 - Construction of Multi Purpose Building :
1 number of Building
Allocation - 22.230 Million
TO :
Construction of 2 Storey Hostel Building
DPWH Mindoro Occidental District Engineering Office
Mamburao, Occidental Mindoro
Physical Target - CW1 - Construction of Multi Purpose Building :
1 number of Building
Allocation - Php 22.230 Million |
May 19, 2022 |
2022 |
WIN2E02365 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System Network Development – Asset Preservation Program – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1519 + 250 - K1519 + 310
Physical Target:
CW1: 3,333.33 Square Meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Road Slope Protection Structure)
EAO: P 1,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System Network Development – Asset Preservation Program – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1522 + 340 - K1522 + 403, K1528 + 180 – K1528 + 300
Physical Target:
CW1: 1,916.34 Square Meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Road Slope Protection Structure)
EAO: P 1,000,000.00
|
May 19, 2022 |
2022 |
WIN2E02366 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao del Norte District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Jct. Tagum-Panabo Circumferential Road, Brgy. New Bantayan – Brgy. Magatos, Asuncion, Davao del Norte
Physical Target:
CW1: 5.660 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00
TO: Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Jct. Tagum-Panabo Circumferential Road, Brgy. New Bantayan – Brgy. Magatos, Asuncion, Davao del Norte
Physical Target:
CW1: 1.360 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00
|
May 19, 2022 |
FY 2022 |
WIN2E02343 |
300204101215000 |
March 23, 2022 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 300204101215000
Project ID : P00632755MN
Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones
Access Road at Sitio Anuling, Pamucutan to Sta. Rita in Support of High Value Crops (Abaca, Cacao, Rubber and Coffee), Upper La Paz, Zamboanga City
CW1 - Construction of Concrete Road : 1.17 Lane km
Unit Cost : P 41,381,945.56/Lane km
EAO : P 1,000,000.00
Excess: P 583,123.70
Allocation : P 50,000,000.00 |
May 19, 2022 |
FY 2022 GAA |
WIN2G02846 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 320101108178000
Project ID : P00620656LZ
002: Protect Lives and Properties against Major Floods
Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage System
FROM :
Construction of Barong-barong Flood Control Structure,
Sta. 0+500 - Sta. 0+700,
Brooke's Point, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
245 LM
Allocation - Php 20.00 Million
TO :
Construction of B0arong-barong Flood Control Structure,
Sta. 0+500 - Sta. 0+745,
Brooke's Point, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
245 LM
Allocation - Php 20.00 Million
|
May 19, 2022 |
FY 2022 |
WIN2E02347 |
310102101054000 |
March 23, 2022 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310102101054000
Project ID : P00604475MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Old Rd (Ayala-Talisayan) - K1956 + (-597) - K1956 + 000
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target: 1.194 Lane km
Unit Cost : P 7,368,347.11/Lane km
EAO : P 180,000.00
Physical Reserved: P 22,193.55
Allocation : P 9,000,000.00 |
May 19, 2022 |
FY 2022 |
WIN2E02342 |
310111100474000 |
March 23, 2022 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310111100474000
Project ID: P00601323MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Zamboanga City-Labuan-Limpapa Rd - K1944 + 747 - K1945 + 599.30
CW1 - Rehabilitation /Major Repair of Drainage Structure along Road
Physical Target: 852.30 Ln.m.
Unit Cost: P 16,766.9386/Ln.m.
EAO: P 299,960.00
Excess: P 407,578.23
Allocation: P 14,998,000.00 |
May 19, 2022 |
FY 2022 |
WIN2E02344 |
310101100739000 |
March 23, 2022 |
Region IX |
Zamboanga City 2nd District Engineering Office |
UACS No. 310101100739000
Project ID : P00601144MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Pagadian City-Zamboanga City Rd K1900 + 911 - K1901 + 000, K1901 + 829 - K1902 + 318
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target: 1.228 Lane km
Unit Cost : P 7,955,629.28/Lane km
EAO : P 200,000.00
Excess: P 30,487.25
Allocation : P 10,000,000.00 |
May 19, 2022 |
2022 |
WIN2E02348 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1566+ 935 - K1567 + 035
Physical Target:
CW1: 5,555.56.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1566 + 640 - K1566 + 817
Physical Target:
CW1: 3,540.00 sq. m. (Construction of Road Slope Protection Structure)
ROW: 7,434.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 95,000,000.00 (Construction of Road Slope Protection Structure)
ROW: P 1,500,000.00 (ROW Acquisition)
EAO: P 3,500,000.00 |
May 19, 2022 |
2022 |
WIN2E02378 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way – K1764 + 184 – K1764 + 632
Physical Target:
CW1: 0.896 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 10,699,000.00
CW1: P 10,485,020.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 213,980.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way – K1759 + 889.129 – K1759 + 976.871
Physical Target:
CW1: 0.526 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 10,669,000.00
CW1: P 10,485,020.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 213,980.00 |
May 19, 2022 |
2022 |
WIN2E02376 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
Mati-Maragusan – K1523 + 953 – K1524 + 228
Physical Target:
CW1: 1.540 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Reconstruction to Concrete Pavement)
EAO: P 500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
Mati-Maragusan – K1524 + 083 – K1524 + 228
Physical Target:
CW1: 0.045 Lane Km (Reconstruction to Concrete Pavement)
CW2: 540 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 14,655,690.00 (Reconstruction to Concrete Pavement)
CW2: P 9,844,310.00 (Construction of Road Slope Protection Structure)
EAO: P 500,000.00 |
May 19, 2022 |
2022 |
WIN2E02380 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties – Flood Management – Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Flood Mitigation Structure along Bitanagan River,
Sta. 0+000 - Sta. 0+500, Mati City, Davao Oriental
Physical Target:
CW1: 500.00 Lineal Meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Drainage Structure)
EAO: P 600,000.00
TO: OO2: Protect Lives and Properties – Flood Management – Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Flood Mitigation Structure along Bitanagan River, Sta. 0+054 – Sta. 0+136,
Sta. 0+057 – Sta. 0+232, Mati City, Davao Oriental
Physical Target:
CW1: 261.00 Lineal Meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Drainage Structure)
EAO: P 600,000.00 |
May 19, 2022 |
2022 |
WIN2E02379 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program – Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program – ROLL-IT)
Road from Junction Brgy. Sainz connecting to Sitio Licop in support of Cacao, Coffee, Corn,
and Mango Industries, Mati City, Davao Oriental
Physical Target:
CW1: 0.654 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 14,726,000.00
CW1: P 14,431,480.00 (Construction of Concrete Road)
EAO: P 294,520.00
TO: Convergence and Special Support Program – Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program – ROLL-IT)
Road from Junction Brgy. Sainz connecting to Sitio Licop in support of Cacao, Coffee, Corn,
and Mango Industries, Mati City, Davao Oriental
Physical Target:
CW1: 0.300 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 14,726,000.00
CW1: P 14,431,480.00 (Construction of Concrete Road)
EAO: P 294,520.00 |
May 19, 2022 |
FY 2022 GAA |
WIN2G02864 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 320101108179000
Project ID : P00620657LZ
002 : Protect Lives and Properties Against major Floods
Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage System
FROM :
Construction of Lanadio Flood Control Structure,
Sta. 0+000 - Sta. 0+150,
Brooke's Point, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
760 LM
Allocation - Php 30.00 Million
TO :
Construction of Lanadio Flood Control Structure,
Sta. 0+000 - Sta. 0+760
Brooke's Point, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
760 LM
Allocation - Php 30.00 Million |
May 19, 2022 |
FY 2022 GAA |
WIN2G02847 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 320101108180000
Project ID : P00620658LZ
002 : Protect Lives and Properties Against Major Floods
Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage System
FROM :
Construction of Malatgao River Flood Control Structure,
Sta. 0+000 - Sta. 0+150,
Quezon, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
168 LM
Allocation - Php 10.00 Million
TO :
Construction of Malatgao River Flood Control Structure,
Sta. 0+000 - Sta. 0+094 Left Riverbank,
Sta. 0+020 - Sta. 0+094 Right Riverbank,
Quezon, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
168 LM
Allocation - Php 10.00 Million
|
May 19, 2022 |
FY 2022 GAA |
WIn2G02809 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 320101108181000
Project ID : P00620659LZ
002: Protect Lives and Properties Against Major Floods
Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage System\
FROM :
Construction of Malinao River Flood Control Structure,
Sta. 0+000 - Sta. 0+125,
Narra, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
434 LM
Allocation - Php 30.00 Million
TO :
Construction of Malinao River Flood Control Structure
Sta. 0+000 - Sta. 0+234 Right Bank,
Sta. 0+040 - Sta. 0+240 Left Bank,
Narra, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
434 LM
Allocation - Php 30.00 Million
|
May 19, 2022 |
2022 |
WIN2E02361 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (MN) – (S01460MN) Chainage 760 – Chainage 1204
Physical Target:
CW1: 1.332 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 16,048,000.00
CW1: P 15,727,040.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 320,960.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (MN) – K1499 + 015 – K1499 + 325, K1499 + 344 – K1499 + 386, K1499 + 971 – K1500+000
Physical Target:
CW1: 0.782 lane km (Off Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 16,048,000.00
CW1: P 15,727,040.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 320,960.00 |
May 19, 2022 |
2022 |
WIN2E02353 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Davao City Div Rd - K1511 + 360 - K1511 + 420
Physical Target:
CW1: 3,208.440 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 57,752,000.00
CW1: P 55,730,680.00 (Construction of Road Slope Protection Structure)
EAO: P 2,021,320.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Davao City Div Rd – K1511 + 810 – K1511 + 837
Physical Target:
CW1: 1,702.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 57,752,000.00
CW1: P 55,730,680.00 (Construction of Road Slope Protection Structure)
EAO: P 2,021,320.00 |
May 19, 2022 |
2022 |
WIN2E02354 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Davao City Div Rd – K1511 + 848 – K1511 + 956
Physical Target:
CW1: 5,310.000 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 79,650,000.00
CW1: P 76,862,250.00 (Construction of Road Slope Protection Structure)
EAO: P 2,787,750.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Davao City Div Rd – K1511 + 837 – K1511 + 890
Physical Target
CW1: 2,277.000 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 79,650,000.00
CW1: P 76,862,250.00 (Construction of Road Slope Protection Structure)
EAO: P 2,787,750.00 |
May 19, 2022 |
2022 |
WIN2E02358 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads
Davao-Bukidnon Rd - K1698 + 541 - K1698 + 552, K1698 + 624 - K1698 + 649, K1698 + 918 - K1699 + 020, K1701 + 000 - K1701 + 029, K1701 + 093 - K1701 + 104
Physical Target:
CW1: 0.148 Lane Km (Road Widening)
Allocation:
TOTAL: P 4,908,000.00
CW1: P 4,809,840.00 (Road Widening)
EAO: P 98,160.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads
Davao–Bukidnon Rd – K1698 + 541 – K1698 + 552, K1698 + 624 – K1698 + 649, K1698 + 918 – K1699 + 020
Physical Target:
CW1: 0.108 Lane Km (Road Widening)
Allocation:
TOTAL: P 4,908,000.00
CW1: P 4,809,840.00 (Road Widening)
EAO: P 98,160.00 |
May 19, 2022 |
2022 |
WIN2E02367 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Secondary Roads
ABS-CBN-Quimpo Blvd Div. Rd - K1512 + 145 - K1512 + 444
Physical Target:
CW1: 0.598 lane km (Road Widening)
ROW Acquisition: 2,098.98 square meters
Allocation:
TOTAL: P 135,729,000.00
CW1: P 75,976,380.00 (Road Widening)
ROW Acquisition: P 55,002,105.00
EAO: P 4,750,515.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Secondary Roads
ABS-CBN-Quimpo Blvd Div. Rd - K1512 + 120 - K1512 + 220, K1512 + 280 - K1512 + 442, K1512 + 600 - K1513 + 630, K1515 + 291- K1515 + 343
Physical Target:
CW1: 1.876 lane km (Road Widening)
ROW Acquisition: 1,067.386 square meters
Allocation:
TOTAL: P 135,729,000.00
CW1: P 73,949,880.00 (Road Widening)
ROW Acquisition: P 57,028,605.00
EAO: P 4,750,515.00 |
May 19, 2022 |
2022 |
WIN2E02359 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Off-Carriageway Improvement – Secondary Roads
Davao City Div Rd – K1509 + 000 - K1509 + 320, K1509 + 575 - K1509 + 940, K1511 + 045 - K1511 + 445, K1511 + 961 - K1511 + 983, K1512 + 172 - K1512 + 294, K1512 + 350 - K1512 + 408, K1514 + 893 - K1514 + 901, K1515 + 015 - K1515 + 030
Physical Target:
CW1: 1,140.00 square meters (Off-Carriageway Improvement: Construction of Traffic Island)
CW2: 432.00 square meters (Off-Carriageway Improvement: Construction of Sidewalk)
ROW Acquisition: 189.60 square meters
Allocation:
TOTAL: P 23,858,000.00
CW1: P 13,918,940.00 (Off-Carriageway Improvement: Construction of Traffic Island)
CW2: P 7,600,880.00 (Off-Carriageway Improvement: Construction of Sidewalk)
ROW Acquisition: P 1,861,020.00
EAO: P 477,160.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Off-Carriageway Improvement – Secondary Roads
Davao City Div Rd – K1507 + 311 – K1507 + 352, K1510 + 470 – K1510 + 850, K1512 + 528 – K1512 + 565, K1512 + 572 – K1512 + 595, K1512 + 820 – K1512 + 860, K1514 + 581 – K1514 + 646, K1514 + 992 – K1515 + 012
Physical Target:
CW1: 384.00 square meters (Construction of Road Slope Protection Structure)
CW2: 1,247.04 square meters (Off-Carriageway Improvement: Construction of Sidewalk)
ROW Acquisition: 395.431 square meters
Allocation:
TOTAL: P 23,858,000.00
CW1: P 4,932,798.91 (Construction of Road Slope Protection Structure)
CW2: P 14,185,531.09 (Off-Carriageway Improvement: Construction of Sidewalk)
ROW Acquisition: P 4,262,510.00
EAO: P 477,160.00 |
May 19, 2022 |
2022 |
WIN2E02362 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Quezon Blvd (MN) - K1509+ (-214) - K1510 + 799
Physical Target:
CW1: 4.010 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 40,100,000.00
CW1: P 39,298,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 802,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Quezon Blvd (MN) - K1509+ 819 - K1510 + 711
Physical Target:
CW1: 1.768 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 40,100,000.00
CW1: P 39,298,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 802,000.00 |
May 19, 2022 |
2022 |
WIN2E02364 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Davao City Div Rd - K1509 + 360 - K1509 + 400
Physical Target:
CW1: 5,555.56 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Davao City Div Rd – K1509 + 340 – K1509 + 440
Physical Target:
CW1: 1,410.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00 |
May 19, 2022 |
2022 |
WIN2E02360 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program – Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Installation of Road Safety Facilities - ABS-CBN-Quimpo Blvd Div. Rd - K1514 + 000 - K1515 + 343, Davao City
Physical Target:
CW1: 10.048 Lane Km (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 12,500,000.00
CW1: P 12,250,000.00 (Road Safety: Pavement Markings)
EAO: P 250,000.00
TO: Convergence and Special Support Program – Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Installation of Road Safety Facilities - ABS-CBN-Quimpo Blvd Div. Rd - K1513 + 620 - K1514 + 470, Davao City
Physical Target:
CW1: 0.871 Km (Road Safety: Street Lighting)
Allocation:
TOTAL: P 12,500,000.00
CW1: P 12,250,000.00 (Road Safety: Street Lighting)
EAO: P 250,000.00 |
May 19, 2022 |
2022 |
WIN2E02363 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program – Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Installation of Road Safety Facilities – Davao-Cotabato Rd (Davao City – Jct Digos Sect), K1516 + 000 – K1517 + 000
Physical Target:
CW1: 8.039 Lane Km (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Road Safety: Pavement Markings)
EAO: P 200,000.00
TO: Convergence and Special Support Program – Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Installation of Road Safety Facilities – Davao-Cotabato Rd (Davao City – Jct Digos Sect), K1516 + 000 – K1517 + 000
Physical Target:
CW1: 0.975 km (Road Safety: Street Lighting)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Road Safety: Street Lighting)
EAO: P 200,000.00 |
May 19, 2022 |
2022 |
WIN2E02368 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads
Montevista – Compostela – Mati Bdry Rd - K1455 + 800 – K1455 + 920, K1456 + 300 – K1456 + 400, K1468 + 000 – K1468 + 060
Physical Target:
CW1: 3,100.000 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 15,400,000.00
CW1: P 15,092,000.00 (Construction of Road Slope Protection Structure)
EAO: P 308,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads
Montevista – Compostela – Mati Bdry Rd - K1460 + 320 – K1460 + 395
Physical Target:
CW1: 450.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 15,400,000.00
CW1: P 15,092,000.00 (Construction of Road Slope Protection Structure)
EAO: P 308,000.00 |
May 19, 2022 |
2022 |
WIN2E02377 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of By-Pass and Diversion Roads
Matina Crossing Road (Jct. Davao - Cotabato Road - Jct. Davao City Diversion Road), Davao City
Physical Target:
CW1: 0.674 Lane Km (Construction of Concrete Road)
CW2: 1.051 Lane Km (Construction of Concrete Road)
CW3: 2,899.038 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 159,235,000.00
CW1: P 17,823,550.00 (Construction of Concrete Road)
CW2: P 59,007,820.00 (Construction of Concrete Road)
CW3: P 76,830,405.00 (Construction of Concrete Bridge)
EAO: P 5,573,225.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of By-Pass and Diversion Roads
Matina Crossing Road (Jct. Davao - Cotabato Road - Jct. Davao City Diversion Road), Davao City
Physical Target:
CW1: 0.916 Lane Km (Reconstruction to Concrete Pavement)
CW2: 139.000 ln. m. (Construction of Drainage Structure along Road)
ROW Acquisition: 2,899.038 sq. m.
Allocation:
TOTAL: P 159,235,000.00
CW1: P 35,119,482.83 (Reconstruction to Concrete Pavement)
CW2: P 22,298,017.17 (Construction of Drainage Structure along Road)
ROW Acquisition: P 57,417,500.00
EAO: P 4,165,000.00
EXCESS: P 40,235,000.00 |
May 18, 2022 |
FY 2022 GAA |
WIN2G02965 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300214100067000
Project ID : P00635854LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Special Road Fund - Motor Vehicle Motor's Charge (MVUC)
as per R.A. 11239
FROM :
Preventive Maintenance (Asphalt Overlay) along
Sn Jose - Caminawit Port Road
K0237+(-663) - K0240+209
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 5.187 Lane Km
Allocation - Php 75.549 Million
TO :
Preventive Maintenance (Asphalt Overlay) along
Sn Jose - Caminawit Port Road
K0237+(-663) - K0239+522
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 6.366 Lane Km
Allocation - Php 75.549 Million
|
May 18, 2022 |
FY 2022 GAA |
WIN2G02947 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215100243000
Project ID : P00636845LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s
leading to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Sta. 7+163.00 - Sta. 7+571.00,
Kemdeng, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 7,672.202 Square Meter
Allocation - Php 342.369 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Sta. 7+163.00 - Sta. 7+646.00,
Kemdeng, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 15,785.230 Square Meter
Allocation - Php 342.369 Million |
May 18, 2022 |
FY 2022 GAA |
WIN2G02944 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 3002151016360000
Project ID : P00636958LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s
leading to Major/Strategic public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Port barton - Kemdeng Road,
San Vicente, Palawan
Sta. 0+373.00 - Sta. 0+443.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 723.35 Square Meter
Allocation - Php 32.279 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Port Barton - Kemdeng Road
Sta. 0+218.00 - Sta. 0+250.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1,346.93 Square Meter
Allocation - Php 32.279 Million
|
May 18, 2022 |
FY 2022 GAA |
WIn2G02945 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215101641000
Project ID : P00636973LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation Road with Slips, Slope Collapse, and Landslide
Port Barton - Kemdeng Road
San Vicente, Palawan
Sta. 1+527.00 - Sta. 1+573.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 503.31 Square Meter
Allocation - Php 22.460 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Port Barton - Kemdeng Road,
San Vicente, Palawan
Sta. 1+070.00 - Sta. 0+105.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 913.12 Square Meter
Allocation - Php 22.460 Million |
May 18, 2022 |
FY 2022 GAA |
WIN2G02817 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215101609000
Project ID : P00639228LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vicente, Palawan
Sta. 171+039.00 - Sta. 171+062.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 272.11 Square Meter
Allocation - Php 12.143 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vicente, Palawan
Sta. 171+0.9.00 - Sta. 171+062.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 527.03 Square Meter
Allocation - Php 12.143 Million
|
May 18, 2022 |
FY 2022 GAA |
WIN2G02884 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300219100142000
Project ID : P00639383LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Flood Mitigation Structures protecting
Public Infrastructures/Facilities
FROM :
Construction (Completion) of River Control Structure and
Drainage System,
Bangon River Control, Tablas Island, Romblon
Physical Target - CW1 - Construction of Flood mitigation Structure :
915.165 Lineal Meter
Allocation - 110.000 million
TO :
Construction (Completion) of River Control Structure
and Drainage System,
Bangon River Control, Tablas Island, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
542.65 Lineal Meter
Allocation - Php 110.00 Million |
May 18, 2022 |
2022 |
WIN2F06359 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Network Development Program - Construction of By-Pass and Diversion Roads
Concepcion - Mabalacat Bypass Road |
May 18, 2022 |
2022 |
WIN2F06354 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Network Development Program - Construction of By-Pass and Diversion Roads
Lubao - Guagua - Minalin - Sto. Tomas Road (Sto. Tomas - Minalin Section), Package 2, Pampanga |
May 18, 2022 |
2022 |
WIN2F06358 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Regional Office III |
Network Development Program - Construction of By-Pass and Diversion Roads
Lubao - Guagua - Minalin - Sto. Tomas Road (Sto. Tomas - Minalin Section) Package 1, Pampanga |
May 18, 2022 |
2022 |
WIN2E02324 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 310101100598000
Project ID: P00604689MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
FROM:
Daang Maharlika (Surigao-Agusan Section) - K1199 + 435 - K1203 + 571, K1208 + 328 - K1210 + 404
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 22.827 Lane Km
Allocation:
TOTAL: P 150,000,000
CW1: P 144,750,000
EAO: P 5,250,000
Unit Cost:
CW1: P 6,341,174.9244/ Lane Km
TO:
Daang Maharlika (Surigao-Agusan Section) - K1182+812 - K1183+780, K1183+820-K1184+892, K1199+435-K1199+709, K1200+291-K1200+318, K1200+318-K1200+683, K1202+627-K1203+000, K1203+231-K1203+249.50 ,K1203+249.50 -K1203+258.5, K1203+258.5-K1203+328, K1204+912-K1205+089, K1208+121-K1208+130
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 9.118 Lane Km
Allocation:
TOTAL: P 150,000,000
CW1: P 144,750,000
EAO: P 5,250,000
Unit Cost:
CW1: P 15,875,191.928/ Lane Km |
May 18, 2022 |
2022 |
WIN2E02323 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 320101107783000
Project ID: P00620100MN
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Dike Revetment along Hubo River Basin Protecting Hubo Bridge Abutment "A" Upstream, Brgy. Buhisan, Sta. 0+000.00 - Sta. 0+346.00, San Agustin, Surigao del Sur
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 819.920 Lineal meters
Allocation:
TOTAL: P 104,000,000
CW1: P 100,360,000
EAO: P 3,640,000
Unit Cost:
CW1: P 122,402.186/ Lineal meters
TO:
Construction of Dike Revetment along Hubo River Basin Protecting Hubo Bridge Abutment "A" Upstream, Brgy. Buhisan, Sta. 0+000.00 - Sta. 0+305.098, San Agustin, Surigao del Sur
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 305.098 Lineal meters
Allocation:
TOTAL: P 104,000,000
CW1: P 100,360,000
EAO: P 3,640,000
Unit Cost:
CW1: P 328,943.487/ Lineal meters |
May 18, 2022 |
2022 |
WIN2E02325 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 320102104750000
Project ID: P00620257MN
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
FROM:
Construction of Flood Mitigation Structure, Agusan River Basin (Bit-os Section), Sta. 0+000.00 - Sta. 0+157.00, Butuan City, Agusan del Norte
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 465.116 Lineal meters
Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000
Unit Cost:
CW1: P 207,475.12/ Lineal meters
TO:
Construction of Flood Mitigation Structure, Agusan River Basin (Bit-os Section), Sta. 0+124.935 - Sta. 0+244.00, Butuan City, Agusan del Norte
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 119.065 Lineal meters
Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000
Unit Cost:
CW1: P 810,481.67/ Lineal meters
|
May 18, 2022 |
2022 |
WIN2E02321 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 310205100950000
Project ID: P00603819MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads
FROM:
Bdry. Bukidnon/Agusan del Norte, Lawan-Lawan Section, Package I, Las Nieves, Butuan City
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 2.800 Lane Km
Allocation:
TOTAL: P 98,000,000
CW1: P 94,570,000
EAO: P 3,430,000
Unit Cost:
CW1: P 33,775,000/ Lane Km
TO:
Bdry. Bukidnon/Agusan del Norte, Lawan-Lawan Section, Package I, Las Nieves, Butuan City
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 2.760 Lane Km
Allocation:
TOTAL: P 98,000,000
CW1: P 94,570,000
EAO: P 3,430,000
Unit Cost:
CW1: P 34,264,492.75/ Lane Km
|
May 18, 2022 |
2022 |
WIN2E02321 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 310205100950000
Project ID: P00603819MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads
FROM:
Bdry. Bukidnon/Agusan del Norte, Lawan-Lawan Section, Package I, Las Nieves, Butuan City
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 2.800 Lane Km
Allocation:
TOTAL: P 98,000,000
CW1: P 94,570,000
EAO: P 3,430,000
Unit Cost:
CW1: P 33,775,000/ Lane Km
TO:
Bdry. Bukidnon/Agusan del Norte, Lawan-Lawan Section, Package I, Las Nieves, Butuan City
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 2.760 Lane Km
Allocation:
TOTAL: P 98,000,000
CW1: P 94,570,000
EAO: P 3,430,000
Unit Cost:
CW1: P 34,264,492.75/ Lane Km
|
May 18, 2022 |
2022 |
WIN2E02320 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 310205100951000
Project ID: P00603820MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads
FROM:
Bdry. Bukidnon/Agusan del Norte, Lawan-Lawan Section, Package J, Las Nieves, Butuan City
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 4,679.560 Square meters
Allocation:
TOTAL: P 68,000,000
CW1: P 65,620,000
EAO: P 2,380,000
Unit Cost:
CW1: P 14,022.69/ Square meters
TO:
Bdry. Bukidnon/Agusan del Norte, Lawan-Lawan Section, Package J, Las Nieves, Butuan City
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 4,559.925 Square meters
Allocation:
TOTAL: P 68,000,000
CW1: P 65,620,000
EAO: P 2,380,000
Unit Cost:
CW1: P 14,390.59/ Square meters
|
May 18, 2022 |
2022 |
WIN2E02291 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 310104100453000
Project ID: P00601313MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1250 + 098 - K1250 + 960
Type of Work:
CW1- Reconstruction to Concrete Pavement
Physical Target:
CW1- 1.528 Lane Km
Allocation:
TOTAL: P 14,297,000
CW1: P 14,011,060
EAO: P 285,940
Unit Cost:
CW1: P 9,169,541.88/ Lane Km
TO:
Daang Maharlika (Agusan-Davao Sect) - K1244 + 671.00 - K1244 + 684.50, K1246 + 980.00 - K1247 + 030.00, K1247 + 260.00 - K1247 + 570.00, K1248 + 196.00 - K1248 + 256.00, K1248 + 378.00 - K1248 + 550.00
Type of Work:
CW1- Reconstruction to Concrete Pavement
Physical Target:
CW1- 1.225 Lane Km
Allocation:
TOTAL: P 14,297,000
CW1: P 14,011,060
EAO: P 285,940
Unit Cost:
CW1: P 11,437,600/ Lane Km
|
May 18, 2022 |
FY 2022 |
WIN2E02341 |
310102101055000 |
March 31, 2022 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
UACS No. 310102101055000
Project ID : P00601154MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Jct. Polo-Dapitan Park Natl Rd - K1826+920 - K1827+021.10, K1827+371.43 - K1827+672.30
CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target: 1.58674 Lane km
Unit Cost : P 9,264,277.70/Lane km
EAO : P 300,000.00
Allocation : P 15,000,000.00 |
May 18, 2022 |
FY 2022 |
WIN2E02299 |
310204101580000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 310204101580000
Project ID: P00604255MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Ipil Circumferential Road, Veterans-Tiayon-Don Andres Section, Package I, including Bridge, Zamboanga Sibugay
CW1- Road Widening
Physical Target: 5.976 Lane Km
Unit Cost: ₱ 11,971,473.07/Lane km
CW2- Widening of Bridge
Physical Target: 294.214 sq.m
Unit Cost: ₱ 52,201.72/sq.m.
ROW- Right-Of-Way Acquisition
Physical Target: 33,333.33 sq.m.
Unit Cost: ₱ 345.90/sq.m.
EAO: ₱ 3,570,000.00
Allocation: ₱ 102,000,000.00 |
May 18, 2022 |
FY 2022 |
WIN2E02297 |
310204101598000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 310204101598000
Project ID: P00604240MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Zamboanga City Diversion Road, Package 3, Zamboanga City
CW1- Construction of Concrete Bridge
Physical Target: 1,734.372 sq.m.
Unit Cost: ₱ 54,630.73/sq.m.
ROW- Right-Of-Way Acquisition
Physical Target: 16,666.67 sq.m.
Unit Cost: ₱ 394.50/sq.m.
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00 |
May 18, 2022 |
FY 2022 |
WIN2E02303 |
10204101592000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 310204101592000
Project ID: P00604242MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Vitali - Sibulao - Bypass Road Project (Alternate Road of N1), Package 2, Zamboanga City
CW1- Construction of Concrete Road
Physical Target: 5.95 Lane Km
Unit Cost: ₱ 15,882,352.94/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 33,333.33 sq.m.
Unit Cost: ₱ 349.50/sq.m.
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00 |
May 18, 2022 |
FY 2022 |
WIN2E02310 |
320101107695000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 320101107695000
Project ID: P00620019MN
OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure including Pumping Station (Package 1 & 2), Zamboanga City
CW1- Construction of Flood Mitigation Structure
Physical Target: 1,193.00 Lineal Meters
Unit Cost: ₱ 95,557.41/ Lineal Meters
EAO: ₱ 4,200,000.00
Excess: ₱ 1,800,000.00
Allocation: ₱ 120,000,000.00 |
May 18, 2022 |
FY 2022 |
WIN2E02298 |
310204101593000 |
March 22, 2022 |
Region IX |
Regional Office IX |
UACS No. 310204101593000
Project ID: P00604233MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Zamboanga City By-Pass Road, (West Coast Section), Phase I, Zamboanga City
CW1- Construction of Concrete Road
Physical Target: 6.097 Lane Km
Unit Cost: ₱ 15,499,425.96/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 33,333.33 sq.m.
Unit Cost: ₱ 349.50/sq.m.
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00 |
May 18, 2022 |
FY 2022 |
WIN2E02308 |
310204101586000 |
March 22, 2022 |
Region IX |
Regional Office IX |
UACS No. 310204101586000
Project ID: P00604247MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
NRJ Biasong - Minaog Bypass Road, Zamboanga del Norte
CW1- Construction of Concrete Bridge
Physical Target: 1,156.248 sq.m
Unit Cost: ₱ 85,660.40/sq.m.
ROW- Right-Of-Way Acquisition
Physical Target: 33,333,330 sq.m.
Unit Cost: ₱ 357.91/sq.m
EAO: ₱ 4,025,000.00
Allocation: ₱ 115,000,000.00 |
May 18, 2022 |
FY 2022 |
WIN2E02311 |
310104100359000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 310104100359000
Project ID: P00601148MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
Dipolog-Sindangan-Liloy Rd - K1850 + 000.00 – K1851 + 000.00, K1851 + 000.00 – K1852 + 985.68, K1853 + 002.34 – K1853 + 236.00, K1853 + 267.58 – K1854 + 299.16, K1854 + 369.40 – K1855 + 103.45, K1855 + 199.00 – K1855 + 342.00, K1859 + 968.00 – K1861 + 633.00
CW1- Reconstruction to Concrete Pavement
Physical target: 13.739 Lane Km
Unit Cost: ₱ 7,467,439.06/Lane Km
EAO: ₱ 3,731,000.00
Excess: ₱ 273,854.73
Allocation: ₱ 106,600,000.00 |
May 17, 2022 |
FY 2022 GAA |
WIN2G02967 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 320102104986000
Project ID : P00621622LZ
002 : Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/Rehabilitation of
Flood mitigation facilities within Major River Basins and
Principal Rivers
FROM ;
Construction of Tiguion River Flood Control,
Gasan, Marinduque (Package 1)
Physical Target - CW1 - Construction of Flood Mitigation
Structure : 166.39 lineal meter
Allocation - Php 20.00 Million
TO :
Construction of Tiguion River Flood Control,
Gasan, Marinduque (Package1)
Physical Target - CW1 - Construction of Flood Mitigation
Structure ; 140.60 Lineal Meter
Allocation - Php 20.00 Million |
May 17, 2022 |
FY 2022 GAA |
WIn2G02968 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No : 300215100241000
Project ID : P00636843LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s
leading to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along TDC - Pagdanan Road, San Vicente, Palawan
Sta. 14+747 - Sta. 14+896
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,358.533 square meter
Allocation - Php 60.624 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along TDC - Pagdanan Road, San Vicente, Palawan
Sta. 14+747 - Sta. 14+896
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,489.53 square meter
Allocation - Php 60.624 Million |
May 17, 2022 |
FY 2022 GAA |
WIN2G02955 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. :300215101648000
Project ID : P00636978LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the national Road/s
leading to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Tabon Cave Road,
Sta. 7+100 - Sta. 7+154
Quezon, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 402.56 Square Meter
Allocation - Php 17.64 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Tabon Cave Road
Sta. 7+100 - Sta. 7+154
Quezon, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 813.27 Square Meter
Allocation - Php 17.964 Million
|
May 17, 2022 |
FY 2022 GAA |
WIN2G02911 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215100234000
Project ID : P00630102LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s
leading to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
San Jose - Port Barton Road,
Sta. 13+000 - Sta 13+060,
Sta. 13+129 - Sta. 13+140,
Sta. 13+210 - Sta. 13+250,
Sta. 13+393 - Sta. 13+573
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,352.96 Square Meter
Allocation - Php 105.00 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
San jose - Port Barton Road,
Sta. 13+000 - Sta. 13+060,
Sta. 13+129 - Sta. 13+140,
Sta. 13+210 - Sta. 13+250,
Sta. 13+393 - Sta. 13+465.40
Physical Target - CW1 - Construction of Road Slope Protection
Structure ; 4,934.80 Square Meter
Allocation - Php 105.00 Million
|
May 17, 2022 |
FY 2022 GAA |
WIN2G02962 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215100231000
Project ID : P00630099LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from National Road/s leading to
Major/Strategic Public Buildings/Facilities
FROM :
Construction of Road,
Barangay Poblacion, Narra, Palawan
Physical Target - CW1 - Construction of Concrete Road :
4.958 Lane Km
Allocation - Php 55.00 Million
TO :
Construction of Road,
Barangay Poblacion, Narra, Palawan
Physical Target - CW1 - Construction of Concrete Road :
5.906 Lane Km
Allocation - 55.00 Million
|
May 17, 2022 |
FY 2022 |
WIN2C03529 |
UACS No. 300214100105000 |
March 1, 2022 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA/Original
UACS No. 300214100105000
Project ID.: P00635866LZ
Convergence and Special Support Program
Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Preventive Maintenance along Fairview Ave – K0023+638 – K0021+000
Physical Target: CW1- Preventive Maintenance of Road: Concrete Re-blocking - 3.02 lane km
Unit Cost = P 9,735.10/lane km
Allocation = P 29,400,000
EAO = P 600,000
Total = P 30,000,000
As Modified
Convergence and Special Support Program
Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Preventive Maintenance along Fairview Ave – K0023+638 – K0024+620
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay – 3.387 lane km
Unit Cost = P 8,680.25/lane km
Allocation = P 29,400,000
EAO = P 600,000
Total = P 30,000,000
WIN2C03529
|
May 17, 2022 |
FY 2022 GAA |
WIN2G02960 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300203102047000
Project ID : P00635433LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Construction/Improvement of Access Roads leading to Declared
Tourism Destinations
(Tourism Road infrastructure Program - TRIP)
FROM :
New Agutaya Tourism Road leading to San Vicente Long Beach,
San Vicente, Palawan
Physical Target - CW1 - Construction of Concrete Road :
1.660 Lane Km
Allocation - php 24.900 Million
TO :
New Agutaya Tourism Road leading to San Vicente Long beach,
San Vicente, Palawan
Physical Target - CW1 - Construction of Concrete Road :
2.842 Lane Km
Allocation - php 24.900 Million
|
May 16, 2022 |
2022 |
WIN2F06299 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Bataan Technical Park Inc Rd (BTPI) - K0175+(-506) - K0175+506 |
May 16, 2022 |
2022 |
WIN2F06169 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads
Calaguiman Vicinal Rd - K0127+260 - K0127+460.20, K0127+517 - K0127+997, K0128+041 - K0128+176.40 |
May 16, 2022 |
2022 |
WIN2F06150 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads
Roman Expressway - K0101+(-158) - K0101+100, K0101+230 - K0101+849 |
May 16, 2022 |
2022 |
WIN2F06298 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads
Gov JJ Linao Rd - K0166+300 - K0166+501 |
May 16, 2022 |
2022 |
WIN2F06228 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Jose Abad Santos Ave (JASA) - K0109+455 - K0109+514, K0110+445 - K0110+489, K0112+846.50 - K0112+970 |
May 16, 2022 |
FY 2022 GAA |
WIN2G02953 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310202100964000
Project ID : P00606196LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
El Nido - Jct New Ibahay Road
K0277+000 - K0280+000
Physical Target - CW1 - Road Widening : 5.808 Lane Km
Allocation - Php 87.120 Million
TO :
El Nido - Jct New Ibahay Road
K0277+000 - K0279+767
Physical Target - CW1 - Road Widening : 5.416 Lane Km
Allocation - Php 87.120 Million
|
May 16, 2022 |
2022 |
WIN2F06312 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Nuclear Power Plant Rd - K0166+101 - K0166+414 |
May 16, 2022 |
2022 |
WIN2F06322 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Calaguiman Vicinal Rd - K0124+320 - K0124+826.30 |
May 16, 2022 |
2022 |
WIN2F06311 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Gov JJ Linao Rd - K0166+072 - K0166+300, K0168+000 - K0168+515 |
May 16, 2022 |
2022 |
WIN2F06189 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Tabacan Poblacion Rd - K0102+593 - K0102+930 |
May 16, 2022 |
FY 2022 GAA |
WIN2G02969 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310202100965000
Project ID : P00606197LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
El Nido - Jct New Ibahay Road
K0280+000 - K0283+000
Physical Target - CW1 - Road Widening : 5.644 Lane Km
Allocation - Php 84.660 Million
TO :
El Nido - Jct Ibahay Road
K0279+767 - K0283+000
Physical Target - CW1 - Road Widening : 6.036 Lane Km
- CW2 - Road Safety : Pavement Markings :
6.036 Lane Km
Allocation - php 84.660 Million |
May 16, 2022 |
FY 2022 GAA |
Win2G02964 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310205100813000
Project ID : P00608163LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/New Roads
FROM :
Sofronio Espanola - Quezon Cross Country Road
(Pulot Interior - Tagusao Section), Package D
Palawan
Physical Target - CW1 - Construction of Concrete Road :
5.102 Lane Km
Allocation - Php 50.00 Million
TO :
Sofronio Espanola - Quezon Cross Country Road
(Pulot Interior - Tagusao Section), Package D
Palawan
Physical Target - CW1 - Construction of Concrete Road :
5.370 Lane Km
Allocation - Php 50.00 Million
|
May 16, 2022 |
FY 2022 GAA |
WIN2G02961 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310102100819000
Project ID : P00609336LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
FROM :
Puerto Princesa North Road
K0227+000 - K0232+385
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 10.850 Lane Km
Allocation - Php 105.851 Million
TO :
Puerto Princesa North Road
K0227+000 - K0231+698
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt overlay - 9.464 Lane Km
- CW2 - Road Safety : Pavement Markings :
9.464 Lane Km
Allocation - Php 105.851 Million |
May 16, 2022 |
FY 2022 GAA |
WIN2G02970 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310108100882000
Project ID : P00611358LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse, and Landslide - Secondary Roads
FROM :
PPSR Jct - napsan - Apurawan Road (S00033PW)
K0036+825 - K0036+976
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 3,154.72 square meter
Allocation - Php 56.785 Million
TO :
PPSr Jct - Napsan - Apurawan Road
K0036+825 - K0036+976,
K0037+469 - K0037+490
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 2,439.40 square meter
Allocation - Php 56.785 Million
|
May 16, 2022 |
FY 2022 GAA |
WIn2G02943 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 32010204626000
Project ID : P00621107LZ
002 : Protect Lives and Properties Against major Floods
Construction/Rehabilitation of Flood Mitigation Facilities
within Major River Basins and Principal Rivers
FROM :
Construction of Flood Control Structure,
Amnay River
Sta. 0+000 - Sta. 0+456,
Claudio Salgado Section
Sablayan Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
444 lineal meter
Allocation - php 45.00 Million
TO :
Construction of Flood Control Structure
Amnay River
Sta. 0+320 - Sta. 0+603,
Claudio Salgado Section,
Sablayan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
283 lineal meter
Allocation - Php 45.00 Million |
May 16, 2022 |
FY 2022 GAA |
WIn2G02942 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 320102104628000
Project ID : P00621109LZ
002 ; Protect Lives and Properties Against Major Floods
Construction/Rehabilitation of Flood Mitigation Facilities
within Major River basins and Principal Rivers
FROM :
Construction of Flood Control Structure,
Amnay River,
Sta. 0+000 - Sta. 0+462,
Guitong Section,
Sablayan, occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
462 lineal meter
Allocation - Php 45.00 Million
TO :
Construction of Flood Control Structure
Amnay River,
Sta. 1+303 - Sta. 1+680,
Guitong Section,
Sablayan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood mitigation Structure :
377 lineal meter
Allocation - Php 45.00 Million |
May 13, 2022 |
FY 2022 GAA |
WIN2G02868 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300203101636000
Project ID : P00635431LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Construction/Improvement of Access Roads leading to
Declared Tourism Destinations
(Tourism Road Infrastructure Program - TRIP)
FROM :
New Agutaya - Alimanguan Tourism Road leading to
San Vicente Long Beach, San Vicente, Palawan
Physical Target - CW1 - Construction of Concrete Road :
1.333 lane Km
Allocation - 20.00 Million
TO :
New Agutaya - Alimanguan Tourism Road leading to
San Vicente Long Beach, San Vicente, Palawan
Physical Target - CW1 - Construction of Concrete Road :
1.280 Lane Km
Allocation - Php 20.00 Million |
May 13, 2022 |
FY 2022 GAA |
WIN2G02887 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300203102048000
Project ID : P00635434LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Construction/Improvement of Access Roads leading to
Declared Tourism Destinations
(Tourism Road Infrastructure Program - TRIP)
FROM :
Purok 4 Sto. Nino Road leading to Ombo Falls via
Bato Ningning Site, Palawan
Physical Target - CW1 - Construction of Concrete Road :
1.142 Lane Km
Allocation - Php 20.00 Million
TO :
Purok 4, Sto. Nino leading to Ombo Falls via
Bato Ningning Site, Palawan
Physical Target - CW1 - Construction of Concrete Road :
0.850 Lane Km
Allocation - Php 20.00 Million
|