Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
May 20, 2022 2022 WIN2E02349 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300215100607000
Project ID: P00630145MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of Road, Barangay Camp Eduard, Alegria, Surigao del Norte

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 7.864 Lane Km

Allocation:
TOTAL: P 80,000,000
CW1: P 77,200,000
EAO: P 2,800,000

Unit Cost:
CW1: P 9,816,887.08/ Lane Km

TO:

Construction of Road, Barangay Camp Eduard, Alegria, Surigao del Norte

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Drainage Structure along Road

Physical Target:
CW1- 4.2536 Lane Km
CW2- 3,034.38 Lineal meters

Allocation:
TOTAL: P 80,000,000
CW1: P 62,067,108.74
CW2: P 15,132,891.26
EAO: P 2,800,000

Unit Cost:
CW1: P 14,591,665.59/ Lane Km
CW2: P 4,987.14/ Lineal meters
May 20, 2022 2022 WIN2E02199 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Surigao del Sur 2nd District Engineering Office
UACS No. : 300219100392000
Project ID: P00632322MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities

FROM:

Rehabilitation and Road Slope Protection Structures along Bislig-Trento Road, K1445+100 -K1445+300

Type of Work:
CW1- Rehabilitation / Major Repair of Slope Protection Structure

Physical Target:
CW1- 4,295.082 Square meters

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 22,467.56/ Square meters

TO:

Rehabilitation and Road Slope Protection Structures along Bislig-Trento Road, K1508+510 - K1508+750

Type of Work:
CW1- Rehabilitation / Major Repair of Slope Protection Structure

Physical Target:
CW1- 10,393.78 Square meters

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 9,824.39/ Square meters
May 20, 2022 FY 2022 GAA WIN2G02910 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 320101108185000
Project ID : P00620663LZ

002 : Protect Lives and Properties Against Major Floods

Flood Management - Construction/maintenance of Flood
Mitigation Structures and Drainage Systems

FROM :

Construction of Ransang River Flood Control Structure
Sta. 0+000 - Sta. 0+300,
Rizal, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structures
233.50 LM
Allocation - Php 20.00 Million

TO :

Construction of Ransang Flood Control Structure
Left Bank Sta. 0+000 - Sta. 0+083 Downstream,
Sta. 0+102.20 - Sta. 0+253 Upstream,
Rizal, Palawan\
Physical Target - CW1 - Construction of Flood Mitigation Structure
233.50 LM
Allocation - Php 20.00 Million
May 20, 2022 FY 2022 GAA WIN2G02824 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 320101108186000
Project ID : P00620664LZ

002 : Protect Lives and Properties Against Major Floods

Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage System

FROM :

Construction of Salogon River Flood Control Structure
Sta. 0+000 - Sta. 0+450
Brooke's Point, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
640.00 LM
Allocation - Php 40.00 Million

TO :

Construction of Salogon River Flood Control Structure,
Sta. 0+000 - Sta. 0+520 Right Bank,
Sta. 0+360 - Sta. 0+480 Left Bank,
Brooke's Point, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
640 LM
Allocation - Php 40.00 Million
May 20, 2022 FY 2022 GAA WIN2G06274 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 320101108188000
Project ID : P00620666LZ

002 : Protect Lives and Properties Against Major Floods

Flood management - Construction/Maintenance of Flood
Mitigation Structures and Drainage Systems

FROM :

Construction of Tagusao River Flood Control Structure,
Sta. 0+100 - Sta. 0+400,
Quezon, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
550.0 LM
Allocation - Php 30.00 Million

TO :

Construction of Tagusao River Flood Control Structure,
Sta. 0+070 - Sta. 0+620 Right Riverbank,
Quezon Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
550.0 LM
Allocation - Php 30.00 Million
May 20, 2022 FY 2022 GAA WIN2G02932 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 320102104996000
Project ID : P00621114LZ

002: Protect Lives and Properties against Major Floods

Flood Management - Construction/Rehabilitation of Flood Mitigation
Facilities along Major River Basins and Principal Rivers

FROM :

Construction of Culasian River Flood Control Structure,
Sta. 0+000 - Sta. 0+152
Rizal, Palawan, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
82.0 LM
Allocation - Php 10.00 Million

TO:

Construction of Culasian River Flood Control Structure,
Sat. 0+000 - Sta. 0+082
Rizal, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
82.0 LM
Allocation - Php 10.00 Million
May 20, 2022 FY 2022 GAA WIN2G02933 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 320102104997000
Project ID : P00621115LZ

002 : Protect Lives and Properties Against Major Floods

Flood Management - Construction/Rehabilitation of Flood Mitigation
Facilities along Major River Basins and Principal Rivers

FROM :

Construction of Panitian River Flood Control Structure,
Sta. 0+000 - Sta. 0+250
Quezon, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
262.0 LM
Allocation - Php 20.00 Million

TO :

Construction of Panitian River Flood Control Structure
Sta. 0+000 - Sta. 0+131,
Quezon, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
262.0 LM
Allocation - Php 20.00 Million
May 20, 2022 FY 2022 GAA WIN2Go2903 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 300214100243000
Project ID : P00635991LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Special Road Fund - Motor Vehicle Users Charge (MVUC)
as per R.A. 11239

FROM :

Preventive Maintenance (Asphalt Overlay) along
Quezon - Aramaywan Rd
K0160+000 - K0160+859,
K0166+000 - K0167+000,
K0172+229 - K0172+548
Physical Target - CW1 - Preventive maintenance of Road :
Asphlat Overlay : 4.478 Lane Km
Allocation - Php 43.687 Million

TO :

Preventive Maintenance (Asphalt Overlay) along
Quezon - Aramaywan Rd\
K0156+504 - K0158+662
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay : 4.478Lane Km
Allocation - Php 43.687 Million
May 19, 2022 FY 2022 WIN2E02312 310204101141000 March 23, 2022 Region IX Regional Office IX
UACS No. 310204101141000
Project ID: P00604246MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Airport - Turno - Sinaman Bypass Road, Zamboanga del Norte

CW1- Road Widening
Physical Target: 4.91 Lane Km
Unit Cost: ₱ 20,061,099.80/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 20,000.00 sq.m.
Unit Cost: ₱ 382.50/sq.m.
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00
May 19, 2022 FY 2022 WIN2E02318 320101107683000 March 22, 2022 Region IX Regional Office IX
UACS No. 320101107683000
Project ID: P00620007MN

OO2: Protect Lives and Properties - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure along Panganuran River, Gutalac, Zamboanga del Norte (at Panganuran Br. Section along Liloy - Siocon Road (S01146MN))

CW1- Construction of Flood Mitigation Structure
Physical Target: 567.610 Lineal Meters
Unit Cost: ₱ 171,425.73/Lineal Meters
EAO: ₱ 3,535,000.00
Excess: ₱ 162,042.35
Allocation: ₱ 101,000,000.00
May 19, 2022 FY 2022 GAA WIN2G02660 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Occidental District Engineering Office
UACS No. : 320102104987000
Project ID : P00621103LZ

Construction/Rehabilitation of Flood Mitigation Facilities
within major River basins and principal Rivers

Construction of Flood Control Structure

FROM :

Construction of Flood Control Structure along
Anahawin River, Sta. 0+000 - Sta. 0+473,
Brgy. Poblacion, Calintaan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
315.0 lineal meter
Allocation - Php 45.00 Million

TO :

Construction of Flood Control Structure along
Anahawin River, Sta. 0+000 - Sta. 0+315,
Brgy. Poblacion, Calintaan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
315.00 lineal meter
Allocation - Php 45.00 Million

May 19, 2022 FY 2022 WIN2E02333 310103100817000 March 23, 2022 Region IX Regional Office IX
UACS No. 310103100817000
Project ID: P00601163MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads


Imelda-Bayog-Kumalarang - Lapuyan-Margosatubig Rd - K1763 + (-656) - K1763 + (-276), K1763 + (-276) - K1763 + 000, K1763 + 000 - K1764 + 316.49, K1765 + 000 - K1767 + 610.51

CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target: 9.17 Lane Km
Unit Cost: ₱ 10,687,966.19/Lane Km
EAO: ₱ 3,610,845.00
Excess: ₱ 1,547,505.00
Allocation: ₱ 103,167,000.00
May 19, 2022 FY 2022 GAA WIN2G02753 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Occidental District Engineering Office
UACS No. : 320102104988000
Project ID : P00621104LZ

Construction of Flood Control Structure

FROM :

Construction of Flood Control Structure -
Mompong River, Malisbong Section,
Sta. 0+000 - Sta. 0+474,
Sablayan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
377.00 lineal meter
Allocation - Php 45.00 Million

TO :

Construction of Flood Control Structure -
Mompong River, Malisbong Section,
Sta. 0+000 - Sta. 0+377
Sablayan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
377.00 lineal meter
Allocation - Php 45.00 Million
May 19, 2022 FY 2022 WIN2E02327 310204101148000 March 23, 2022 Region IX Regional Office IX
UACS No. 310204101148000
Project ID: P00604243MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

NRJ Lapakan – Lamisahan - Victoria By-Pass Road, Zamboanga City

CW1- Construction of Concrete Road
Physical Target: 1.76 Lane Km
Unit Cost: ₱ 54,882,011.25/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 33,333.33 sq.m.
Unit Cost: ₱ 286.7298/sq.m.
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00
May 19, 2022 FY 2022 WIN2E02328 310101100578000 March 22, 2022 Region IX Regional Office IX
UACS No. 310101100578000
Project ID: P00604683MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads

Pagadian City-Zamboanga City Rd – K1697+400.00 – K1699+000.00, K1719+000.00 – K1719+294.00, K1719+314.00 – K1720+000.00, K1721+200.00 – K1721+420.00, K1704 + 370 - K1704 + 420

CW1- Preventive Maintenance of Road: Concrete Reblocking
Physical Target: 5.60 Lane km
Unit Cost: ₱ 16,820,495.08/Lane km
CW2- Construction of Road Slope Protection Structure
Physical Target: 8,678.50 sq.m.
Unit Cost: ₱ 507.60/sq.m.
EAO: ₱ 3,605,000.00
Excess: ₱ 795,000.00
Allocation: ₱ 103,000,000.00
May 19, 2022 FY 2022 WIN2E02331 310305101537000 March 22, 2022 Region IX Regional Office IX
UACS No. 310305101537000
Project ID: P00602123MN

OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges

Opao Br. (B01784MN) along Dipolog-Oroquieta National Rd

CW1- Widening of Bridge
Physical Target: 867.186 sq.m.
Unit Cost: ₱ 115,027.23/Sq.m.
EAO: ₱ 3,675,000.00
Excess: ₱ 1,575,000.00
Allocation: ₱ 105,000,000.00
May 19, 2022 FY 2022 GAA WIN2G02975 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Occidental District Engineering Office
UACS No. : 320102104991000
Project ID : P00621623LZ

002 : Protect Lives and Properties Against Major Flood

Construction/Rehabilitation of Flood Mitigation Facilities
within Major River basins and Principal Rivers

FROM :

Construction of River Protection Structures along
Calawagan River,
Sta. 0+000.00 - Sta. 0+722.89,
Paluan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
662.00 lineal meter
Allocation - Php 50.00 Million

TO :

Construction of River Protection Structure
along Calawagan River
Sta. 0+000 - Sta. 0+322,
Sta. 0+492 - Sta. 0+772,
Paluan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
662.00 lineal meter
Allocation -Php 50.00
May 19, 2022 FY 2022 WIN2E02332 310204101585000 March 23, 2022 Region IX Regional Office IX
UACS No. 310204101585000
Project ID: P00604236MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

NRJ Baluno - La Paz (Sitio Pole) Diversion Road, (Phase II), Zamboanga City

CW1- Construction of Concrete Road
Physical Target: 2.00 Lane Km
Unit Cost: ₱ 48,177,832.77/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 32,647.78 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00
May 19, 2022 FY 2022 WIN2E02326 310204101581000 March 23, 2022 Region IX Regional Office IX
UACS No. 310204101581000
Project ID: P00604256MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Ipil Circumferential Road, Veterans-Tiayon-Don Andres Section, Package II, Zamboanga Sibugay

CW1- Road Widening
Physical Target: 6.89 Lane Km
Unit Cost: ₱ 12,612,481.86/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 38,433.33 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 3,570,000.00
Allocation : ₱ 102,000,000.00
May 19, 2022 FY 2022 WIN2E02330 310201100904000 March 23, 2022 Region IX Regional Office IX
UACS No. 310201100904000
Project ID: P00602316MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Liloy-Ipil Rd - K1985 + 081.41 - K1985 + 794.28, K1985 + 981.19 - K1987 + 960.00

CW1- Road Widening
Physical Target: 5.383 Lane Km
Unit Cost: ₱ 15,455,469.15/Lane Km
ROW- Right-Of-Way Acquisition
Physical Target: 27,509.66 sq.m.
Unit Cost: ₱ 500.00/Sq.m.
EAO : ₱ 3,516,380.00
Allocation: ₱ 100,468,000.00
May 19, 2022 FY 2022 WIN2E02329 310108100969000 March 23, 2022 Region IX Regional Office IX
UACS No. 310108100969000
Project ID: P00601386MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads


Zamboanga West Coastal Rd (Limpapa-Sibuco Sect) - K1991 + 276.00 - K1991 + 385.00, K1993 + 100.39 - K1995 + 413.38

CW1- Construction of Road Slope Protection Structure
Physical Target: 3,978.50 sq.m.
Unit Cost: ₱ 25,493.70/sq.m.
ROW- Right-Of-Way Acquisition
Physical Target: 6,136.22 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 3,745,455.00
Allocation: ₱ 107,013,000.00
May 19, 2022 FY 2022 GAA WIN2G02769 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Occidental District Engineering Office
UACS No. : 320102104992000
Project ID : P00621624LZ

002 ; Protect Lives and Properties Against Major Flood

Flood management Program -
Construction/Rehabilitation of Flood Mitigation Facilities
within Major River Basins and principal Rivers

FROM :

Construction of River Protection Structures along
Katanlawan River,
Sta. 0+000 - Sta. 0+679.42
Paluan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
1000.00 Lineal Meter
Allocation - Php 47.00 Million

TO :

Construction of River Protection Structure
along Katanlawan River,
Sta. 0+000 - Sta. 0+840(L/S),
Sta. 0+200 - Sta.0+360(R/S),
Paluan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
1000.00 Lineal Meter
Allocation - 47.00 Million


May 19, 2022 FY 2022 WIN2E02357 310211100090000 April 5, 2022 Region IX Zamboanga del Norte 2nd District Engineering Office
UACS No. 310211100090000
Project ID : P00604483MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Paving of Unpaved Roads - Secondary Roads

Zamboanga West Coastal Road (Sibuco - Sirawai Section) S01166MN
Chainage 12494 - Chainage 14094

CW1 - Paving of Unpaved Roads: 3.200 Lane km
Unit Cost : P 15,312.50/Lane km
EAO : P 1,000,000.00
Allocation : P 50,000,000.00
May 19, 2022 FY 2022 GAA WIN2G02931 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Mindoro Occidental District Engineering Office
UACS No. : 300105200731000
Project ID : P00655135LZ

LOCAL PROGRAM

National Building Program - Buildings and other Structures

FROM :

Construction(Completion) of Four Storey Hostel Building,
DPWH Mindoro Occidental District Engineering Office
Mamburao, Occidental Mindoro
Physical Target - CW1 - Construction of Multi Purpose Building :
1 number of Building
Allocation - 22.230 Million

TO :

Construction of 2 Storey Hostel Building
DPWH Mindoro Occidental District Engineering Office
Mamburao, Occidental Mindoro
Physical Target - CW1 - Construction of Multi Purpose Building :
1 number of Building
Allocation - Php 22.230 Million
May 19, 2022 2022 WIN2E02365 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System Network Development – Asset Preservation Program – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1519 + 250 - K1519 + 310
Physical Target:
CW1: 3,333.33 Square Meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Road Slope Protection Structure)
EAO: P 1,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System Network Development – Asset Preservation Program – Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Kapalong-Talaingod-Valencia (Bukidnon) Rd - K1522 + 340 - K1522 + 403, K1528 + 180 – K1528 + 300
Physical Target:
CW1: 1,916.34 Square Meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Road Slope Protection Structure)
EAO: P 1,000,000.00
May 19, 2022 2022 WIN2E02366 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao del Norte District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Jct. Tagum-Panabo Circumferential Road, Brgy. New Bantayan – Brgy. Magatos, Asuncion, Davao del Norte
Physical Target:
CW1: 5.660 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00

TO: Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Jct. Tagum-Panabo Circumferential Road, Brgy. New Bantayan – Brgy. Magatos, Asuncion, Davao del Norte
Physical Target:
CW1: 1.360 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00
May 19, 2022 FY 2022 WIN2E02343 300204101215000 March 23, 2022 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 300204101215000
Project ID : P00632755MN

Convergence and Special Support Program - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones

Access Road at Sitio Anuling, Pamucutan to Sta. Rita in Support of High Value Crops (Abaca, Cacao, Rubber and Coffee), Upper La Paz, Zamboanga City

CW1 - Construction of Concrete Road : 1.17 Lane km
Unit Cost : P 41,381,945.56/Lane km
EAO : P 1,000,000.00
Excess: P 583,123.70
Allocation : P 50,000,000.00
May 19, 2022 FY 2022 GAA WIN2G02846 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 320101108178000
Project ID : P00620656LZ

002: Protect Lives and Properties against Major Floods

Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage System

FROM :

Construction of Barong-barong Flood Control Structure,
Sta. 0+500 - Sta. 0+700,
Brooke's Point, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
245 LM
Allocation - Php 20.00 Million

TO :

Construction of B0arong-barong Flood Control Structure,
Sta. 0+500 - Sta. 0+745,
Brooke's Point, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
245 LM
Allocation - Php 20.00 Million
May 19, 2022 FY 2022 WIN2E02347 310102101054000 March 23, 2022 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310102101054000
Project ID : P00604475MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads

Old Rd (Ayala-Talisayan) - K1956 + (-597) - K1956 + 000

CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target: 1.194 Lane km
Unit Cost : P 7,368,347.11/Lane km
EAO : P 180,000.00
Physical Reserved: P 22,193.55
Allocation : P 9,000,000.00
May 19, 2022 FY 2022 WIN2E02342 310111100474000 March 23, 2022 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310111100474000
Project ID: P00601323MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

Zamboanga City-Labuan-Limpapa Rd - K1944 + 747 - K1945 + 599.30

CW1 - Rehabilitation /Major Repair of Drainage Structure along Road
Physical Target: 852.30 Ln.m.
Unit Cost: P 16,766.9386/Ln.m.
EAO: P 299,960.00
Excess: P 407,578.23
Allocation: P 14,998,000.00
May 19, 2022 FY 2022 WIN2E02344 310101100739000 March 23, 2022 Region IX Zamboanga City 2nd District Engineering Office
UACS No. 310101100739000
Project ID : P00601144MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads

Pagadian City-Zamboanga City Rd K1900 + 911 - K1901 + 000, K1901 + 829 - K1902 + 318

CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target: 1.228 Lane km
Unit Cost : P 7,955,629.28/Lane km
EAO : P 200,000.00
Excess: P 30,487.25
Allocation : P 10,000,000.00
May 19, 2022 2022 WIN2E02348 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1566+ 935 - K1567 + 035
Physical Target:
CW1: 5,555.56.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1566 + 640 - K1566 + 817
Physical Target:
CW1: 3,540.00 sq. m. (Construction of Road Slope Protection Structure)
ROW: 7,434.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 95,000,000.00 (Construction of Road Slope Protection Structure)
ROW: P 1,500,000.00 (ROW Acquisition)
EAO: P 3,500,000.00
May 19, 2022 2022 WIN2E02378 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way – K1764 + 184 – K1764 + 632
Physical Target:
CW1: 0.896 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 10,699,000.00
CW1: P 10,485,020.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 213,980.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way – K1759 + 889.129 – K1759 + 976.871
Physical Target:
CW1: 0.526 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 10,669,000.00
CW1: P 10,485,020.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 213,980.00
May 19, 2022 2022 WIN2E02376 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
Mati-Maragusan – K1523 + 953 – K1524 + 228
Physical Target:
CW1: 1.540 Lane Km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 24,500,000.00 (Reconstruction to Concrete Pavement)
EAO: P 500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Secondary Roads
Mati-Maragusan – K1524 + 083 – K1524 + 228
Physical Target:
CW1: 0.045 Lane Km (Reconstruction to Concrete Pavement)
CW2: 540 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 25,000,000.00
CW1: P 14,655,690.00 (Reconstruction to Concrete Pavement)
CW2: P 9,844,310.00 (Construction of Road Slope Protection Structure)
EAO: P 500,000.00
May 19, 2022 2022 WIN2E02380 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties – Flood Management – Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Flood Mitigation Structure along Bitanagan River,
Sta. 0+000 - Sta. 0+500, Mati City, Davao Oriental
Physical Target:
CW1: 500.00 Lineal Meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Drainage Structure)
EAO: P 600,000.00

TO: OO2: Protect Lives and Properties – Flood Management – Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of Flood Mitigation Structure along Bitanagan River, Sta. 0+054 – Sta. 0+136,
Sta. 0+057 – Sta. 0+232, Mati City, Davao Oriental
Physical Target:
CW1: 261.00 Lineal Meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 30,000,000.00
CW1: P 29,400,000.00 (Construction of Drainage Structure)
EAO: P 600,000.00
May 19, 2022 2022 WIN2E02379 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program – Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program – ROLL-IT)
Road from Junction Brgy. Sainz connecting to Sitio Licop in support of Cacao, Coffee, Corn,
and Mango Industries, Mati City, Davao Oriental
Physical Target:
CW1: 0.654 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 14,726,000.00
CW1: P 14,431,480.00 (Construction of Concrete Road)
EAO: P 294,520.00

TO: Convergence and Special Support Program – Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program – ROLL-IT)
Road from Junction Brgy. Sainz connecting to Sitio Licop in support of Cacao, Coffee, Corn,
and Mango Industries, Mati City, Davao Oriental
Physical Target:
CW1: 0.300 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 14,726,000.00
CW1: P 14,431,480.00 (Construction of Concrete Road)
EAO: P 294,520.00
May 19, 2022 FY 2022 GAA WIN2G02864 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 320101108179000
Project ID : P00620657LZ

002 : Protect Lives and Properties Against major Floods

Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage System

FROM :

Construction of Lanadio Flood Control Structure,
Sta. 0+000 - Sta. 0+150,
Brooke's Point, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
760 LM
Allocation - Php 30.00 Million

TO :

Construction of Lanadio Flood Control Structure,
Sta. 0+000 - Sta. 0+760
Brooke's Point, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
760 LM
Allocation - Php 30.00 Million
May 19, 2022 FY 2022 GAA WIN2G02847 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 320101108180000
Project ID : P00620658LZ

002 : Protect Lives and Properties Against Major Floods

Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage System

FROM :

Construction of Malatgao River Flood Control Structure,
Sta. 0+000 - Sta. 0+150,
Quezon, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
168 LM
Allocation - Php 10.00 Million

TO :

Construction of Malatgao River Flood Control Structure,
Sta. 0+000 - Sta. 0+094 Left Riverbank,
Sta. 0+020 - Sta. 0+094 Right Riverbank,
Quezon, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
168 LM
Allocation - Php 10.00 Million
May 19, 2022 FY 2022 GAA WIn2G02809 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 320101108181000
Project ID : P00620659LZ

002: Protect Lives and Properties Against Major Floods

Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage System\

FROM :

Construction of Malinao River Flood Control Structure,
Sta. 0+000 - Sta. 0+125,
Narra, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
434 LM
Allocation - Php 30.00 Million

TO :

Construction of Malinao River Flood Control Structure
Sta. 0+000 - Sta. 0+234 Right Bank,
Sta. 0+040 - Sta. 0+240 Left Bank,
Narra, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
434 LM
Allocation - Php 30.00 Million


May 19, 2022 2022 WIN2E02361 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (MN) – (S01460MN) Chainage 760 – Chainage 1204
Physical Target:
CW1: 1.332 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 16,048,000.00
CW1: P 15,727,040.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 320,960.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Preventive Maintenance – Primary Roads
Daang Maharlika (MN) – K1499 + 015 – K1499 + 325, K1499 + 344 – K1499 + 386, K1499 + 971 – K1500+000
Physical Target:
CW1: 0.782 lane km (Off Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 16,048,000.00
CW1: P 15,727,040.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 320,960.00
May 19, 2022 2022 WIN2E02353 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Davao City Div Rd - K1511 + 360 - K1511 + 420
Physical Target:
CW1: 3,208.440 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 57,752,000.00
CW1: P 55,730,680.00 (Construction of Road Slope Protection Structure)
EAO: P 2,021,320.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Davao City Div Rd – K1511 + 810 – K1511 + 837
Physical Target:
CW1: 1,702.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 57,752,000.00
CW1: P 55,730,680.00 (Construction of Road Slope Protection Structure)
EAO: P 2,021,320.00
May 19, 2022 2022 WIN2E02354 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Davao City Div Rd – K1511 + 848 – K1511 + 956
Physical Target:
CW1: 5,310.000 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 79,650,000.00
CW1: P 76,862,250.00 (Construction of Road Slope Protection Structure)
EAO: P 2,787,750.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Davao City Div Rd – K1511 + 837 – K1511 + 890
Physical Target
CW1: 2,277.000 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 79,650,000.00
CW1: P 76,862,250.00 (Construction of Road Slope Protection Structure)
EAO: P 2,787,750.00
May 19, 2022 2022 WIN2E02358 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads
Davao-Bukidnon Rd - K1698 + 541 - K1698 + 552, K1698 + 624 - K1698 + 649, K1698 + 918 - K1699 + 020, K1701 + 000 - K1701 + 029, K1701 + 093 - K1701 + 104
Physical Target:
CW1: 0.148 Lane Km (Road Widening)
Allocation:
TOTAL: P 4,908,000.00
CW1: P 4,809,840.00 (Road Widening)
EAO: P 98,160.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads
Davao–Bukidnon Rd – K1698 + 541 – K1698 + 552, K1698 + 624 – K1698 + 649, K1698 + 918 – K1699 + 020
Physical Target:
CW1: 0.108 Lane Km (Road Widening)
Allocation:
TOTAL: P 4,908,000.00
CW1: P 4,809,840.00 (Road Widening)
EAO: P 98,160.00
May 19, 2022 2022 WIN2E02367 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Secondary Roads
ABS-CBN-Quimpo Blvd Div. Rd - K1512 + 145 - K1512 + 444
Physical Target:
CW1: 0.598 lane km (Road Widening)
ROW Acquisition: 2,098.98 square meters
Allocation:
TOTAL: P 135,729,000.00
CW1: P 75,976,380.00 (Road Widening)
ROW Acquisition: P 55,002,105.00
EAO: P 4,750,515.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Secondary Roads
ABS-CBN-Quimpo Blvd Div. Rd - K1512 + 120 - K1512 + 220, K1512 + 280 - K1512 + 442, K1512 + 600 - K1513 + 630, K1515 + 291- K1515 + 343
Physical Target:
CW1: 1.876 lane km (Road Widening)
ROW Acquisition: 1,067.386 square meters
Allocation:
TOTAL: P 135,729,000.00
CW1: P 73,949,880.00 (Road Widening)
ROW Acquisition: P 57,028,605.00
EAO: P 4,750,515.00
May 19, 2022 2022 WIN2E02359 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development – Off-Carriageway Improvement – Secondary Roads
Davao City Div Rd – K1509 + 000 - K1509 + 320, K1509 + 575 - K1509 + 940, K1511 + 045 - K1511 + 445, K1511 + 961 - K1511 + 983, K1512 + 172 - K1512 + 294, K1512 + 350 - K1512 + 408, K1514 + 893 - K1514 + 901, K1515 + 015 - K1515 + 030
Physical Target:
CW1: 1,140.00 square meters (Off-Carriageway Improvement: Construction of Traffic Island)
CW2: 432.00 square meters (Off-Carriageway Improvement: Construction of Sidewalk)
ROW Acquisition: 189.60 square meters
Allocation:
TOTAL: P 23,858,000.00
CW1: P 13,918,940.00 (Off-Carriageway Improvement: Construction of Traffic Island)
CW2: P 7,600,880.00 (Off-Carriageway Improvement: Construction of Sidewalk)
ROW Acquisition: P 1,861,020.00
EAO: P 477,160.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development – Off-Carriageway Improvement – Secondary Roads
Davao City Div Rd – K1507 + 311 – K1507 + 352, K1510 + 470 – K1510 + 850, K1512 + 528 – K1512 + 565, K1512 + 572 – K1512 + 595, K1512 + 820 – K1512 + 860, K1514 + 581 – K1514 + 646, K1514 + 992 – K1515 + 012
Physical Target:
CW1: 384.00 square meters (Construction of Road Slope Protection Structure)
CW2: 1,247.04 square meters (Off-Carriageway Improvement: Construction of Sidewalk)
ROW Acquisition: 395.431 square meters
Allocation:
TOTAL: P 23,858,000.00
CW1: P 4,932,798.91 (Construction of Road Slope Protection Structure)
CW2: P 14,185,531.09 (Off-Carriageway Improvement: Construction of Sidewalk)
ROW Acquisition: P 4,262,510.00
EAO: P 477,160.00
May 19, 2022 2022 WIN2E02362 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Quezon Blvd (MN) - K1509+ (-214) - K1510 + 799
Physical Target:
CW1: 4.010 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 40,100,000.00
CW1: P 39,298,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 802,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Quezon Blvd (MN) - K1509+ 819 - K1510 + 711
Physical Target:
CW1: 1.768 Lane Km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 40,100,000.00
CW1: P 39,298,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 802,000.00
May 19, 2022 2022 WIN2E02364 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Davao City Div Rd - K1509 + 360 - K1509 + 400
Physical Target:
CW1: 5,555.56 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Davao City Div Rd – K1509 + 340 – K1509 + 440
Physical Target:
CW1: 1,410.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
May 19, 2022 2022 WIN2E02360 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program – Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Installation of Road Safety Facilities - ABS-CBN-Quimpo Blvd Div. Rd - K1514 + 000 - K1515 + 343, Davao City
Physical Target:
CW1: 10.048 Lane Km (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 12,500,000.00
CW1: P 12,250,000.00 (Road Safety: Pavement Markings)
EAO: P 250,000.00

TO: Convergence and Special Support Program – Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Installation of Road Safety Facilities - ABS-CBN-Quimpo Blvd Div. Rd - K1513 + 620 - K1514 + 470, Davao City
Physical Target:
CW1: 0.871 Km (Road Safety: Street Lighting)
Allocation:
TOTAL: P 12,500,000.00
CW1: P 12,250,000.00 (Road Safety: Street Lighting)
EAO: P 250,000.00
May 19, 2022 2022 WIN2E02363 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program – Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Installation of Road Safety Facilities – Davao-Cotabato Rd (Davao City – Jct Digos Sect), K1516 + 000 – K1517 + 000
Physical Target:
CW1: 8.039 Lane Km (Road Safety: Pavement Markings)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Road Safety: Pavement Markings)
EAO: P 200,000.00

TO: Convergence and Special Support Program – Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Installation of Road Safety Facilities – Davao-Cotabato Rd (Davao City – Jct Digos Sect), K1516 + 000 – K1517 + 000
Physical Target:
CW1: 0.975 km (Road Safety: Street Lighting)
Allocation:
TOTAL: P 10,000,000.00
CW1: P 9,800,000.00 (Road Safety: Street Lighting)
EAO: P 200,000.00
May 19, 2022 2022 WIN2E02368 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads
Montevista – Compostela – Mati Bdry Rd - K1455 + 800 – K1455 + 920, K1456 + 300 – K1456 + 400, K1468 + 000 – K1468 + 060
Physical Target:
CW1: 3,100.000 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 15,400,000.00
CW1: P 15,092,000.00 (Construction of Road Slope Protection Structure)
EAO: P 308,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation – Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary Roads
Montevista – Compostela – Mati Bdry Rd - K1460 + 320 – K1460 + 395
Physical Target:
CW1: 450.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 15,400,000.00
CW1: P 15,092,000.00 (Construction of Road Slope Protection Structure)
EAO: P 308,000.00
May 19, 2022 2022 WIN2E02377 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of By-Pass and Diversion Roads
Matina Crossing Road (Jct. Davao - Cotabato Road - Jct. Davao City Diversion Road), Davao City
Physical Target:
CW1: 0.674 Lane Km (Construction of Concrete Road)
CW2: 1.051 Lane Km (Construction of Concrete Road)
CW3: 2,899.038 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 159,235,000.00
CW1: P 17,823,550.00 (Construction of Concrete Road)
CW2: P 59,007,820.00 (Construction of Concrete Road)
CW3: P 76,830,405.00 (Construction of Concrete Bridge)
EAO: P 5,573,225.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of By-Pass and Diversion Roads
Matina Crossing Road (Jct. Davao - Cotabato Road - Jct. Davao City Diversion Road), Davao City
Physical Target:
CW1: 0.916 Lane Km (Reconstruction to Concrete Pavement)
CW2: 139.000 ln. m. (Construction of Drainage Structure along Road)
ROW Acquisition: 2,899.038 sq. m.
Allocation:
TOTAL: P 159,235,000.00
CW1: P 35,119,482.83 (Reconstruction to Concrete Pavement)
CW2: P 22,298,017.17 (Construction of Drainage Structure along Road)
ROW Acquisition: P 57,417,500.00
EAO: P 4,165,000.00
EXCESS: P 40,235,000.00
May 18, 2022 FY 2022 GAA WIN2G02965 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300214100067000
Project ID : P00635854LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Special Road Fund - Motor Vehicle Motor's Charge (MVUC)
as per R.A. 11239

FROM :

Preventive Maintenance (Asphalt Overlay) along
Sn Jose - Caminawit Port Road
K0237+(-663) - K0240+209
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 5.187 Lane Km
Allocation - Php 75.549 Million

TO :

Preventive Maintenance (Asphalt Overlay) along
Sn Jose - Caminawit Port Road
K0237+(-663) - K0239+522
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 6.366 Lane Km
Allocation - Php 75.549 Million


May 18, 2022 FY 2022 GAA WIN2G02947 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100243000
Project ID : P00636845LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s
leading to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Sta. 7+163.00 - Sta. 7+571.00,
Kemdeng, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 7,672.202 Square Meter
Allocation - Php 342.369 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Sta. 7+163.00 - Sta. 7+646.00,
Kemdeng, San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 15,785.230 Square Meter
Allocation - Php 342.369 Million
May 18, 2022 FY 2022 GAA WIN2G02944 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 3002151016360000
Project ID : P00636958LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s
leading to Major/Strategic public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Port barton - Kemdeng Road,
San Vicente, Palawan
Sta. 0+373.00 - Sta. 0+443.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 723.35 Square Meter
Allocation - Php 32.279 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Port Barton - Kemdeng Road
Sta. 0+218.00 - Sta. 0+250.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1,346.93 Square Meter
Allocation - Php 32.279 Million

May 18, 2022 FY 2022 GAA WIn2G02945 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215101641000
Project ID : P00636973LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation Road with Slips, Slope Collapse, and Landslide
Port Barton - Kemdeng Road
San Vicente, Palawan
Sta. 1+527.00 - Sta. 1+573.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 503.31 Square Meter
Allocation - Php 22.460 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Port Barton - Kemdeng Road,
San Vicente, Palawan
Sta. 1+070.00 - Sta. 0+105.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 913.12 Square Meter
Allocation - Php 22.460 Million
May 18, 2022 FY 2022 GAA WIN2G02817 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215101609000
Project ID : P00639228LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vicente, Palawan
Sta. 171+039.00 - Sta. 171+062.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 272.11 Square Meter
Allocation - Php 12.143 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vicente, Palawan
Sta. 171+0.9.00 - Sta. 171+062.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 527.03 Square Meter
Allocation - Php 12.143 Million
May 18, 2022 FY 2022 GAA WIN2G02884 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300219100142000
Project ID : P00639383LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Flood Mitigation Structures protecting
Public Infrastructures/Facilities

FROM :

Construction (Completion) of River Control Structure and
Drainage System,
Bangon River Control, Tablas Island, Romblon
Physical Target - CW1 - Construction of Flood mitigation Structure :
915.165 Lineal Meter
Allocation - 110.000 million

TO :

Construction (Completion) of River Control Structure
and Drainage System,
Bangon River Control, Tablas Island, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
542.65 Lineal Meter
Allocation - Php 110.00 Million
May 18, 2022 2022 WIN2F06359 FY 2022 GAA December 30, 2021 Region III Regional Office III
Network Development Program - Construction of By-Pass and Diversion Roads

Concepcion - Mabalacat Bypass Road
May 18, 2022 2022 WIN2F06354 FY 2022 GAA December 30, 2021 Region III Regional Office III
Network Development Program - Construction of By-Pass and Diversion Roads

Lubao - Guagua - Minalin - Sto. Tomas Road (Sto. Tomas - Minalin Section), Package 2, Pampanga
May 18, 2022 2022 WIN2F06358 FY 2022 GAA December 30, 2021 Region III Regional Office III
Network Development Program - Construction of By-Pass and Diversion Roads

Lubao - Guagua - Minalin - Sto. Tomas Road (Sto. Tomas - Minalin Section) Package 1, Pampanga
May 18, 2022 2022 WIN2E02324 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 310101100598000
Project ID: P00604689MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads

FROM:

Daang Maharlika (Surigao-Agusan Section) - K1199 + 435 - K1203 + 571, K1208 + 328 - K1210 + 404

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 22.827 Lane Km

Allocation:
TOTAL: P 150,000,000
CW1: P 144,750,000
EAO: P 5,250,000

Unit Cost:
CW1: P 6,341,174.9244/ Lane Km

TO:

Daang Maharlika (Surigao-Agusan Section) - K1182+812 - K1183+780, K1183+820-K1184+892, K1199+435-K1199+709, K1200+291-K1200+318, K1200+318-K1200+683, K1202+627-K1203+000, K1203+231-K1203+249.50 ,K1203+249.50 -K1203+258.5, K1203+258.5-K1203+328, K1204+912-K1205+089, K1208+121-K1208+130

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 9.118 Lane Km

Allocation:
TOTAL: P 150,000,000
CW1: P 144,750,000
EAO: P 5,250,000

Unit Cost:
CW1: P 15,875,191.928/ Lane Km
May 18, 2022 2022 WIN2E02323 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 320101107783000
Project ID: P00620100MN

ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

FROM:

Construction of Dike Revetment along Hubo River Basin Protecting Hubo Bridge Abutment "A" Upstream, Brgy. Buhisan, Sta. 0+000.00 - Sta. 0+346.00, San Agustin, Surigao del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 819.920 Lineal meters

Allocation:
TOTAL: P 104,000,000
CW1: P 100,360,000
EAO: P 3,640,000

Unit Cost:
CW1: P 122,402.186/ Lineal meters

TO:

Construction of Dike Revetment along Hubo River Basin Protecting Hubo Bridge Abutment "A" Upstream, Brgy. Buhisan, Sta. 0+000.00 - Sta. 0+305.098, San Agustin, Surigao del Sur

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 305.098 Lineal meters

Allocation:
TOTAL: P 104,000,000
CW1: P 100,360,000
EAO: P 3,640,000

Unit Cost:
CW1: P 328,943.487/ Lineal meters
May 18, 2022 2022 WIN2E02325 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 320102104750000
Project ID: P00620257MN

ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

FROM:

Construction of Flood Mitigation Structure, Agusan River Basin (Bit-os Section), Sta. 0+000.00 - Sta. 0+157.00, Butuan City, Agusan del Norte

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 465.116 Lineal meters

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 207,475.12/ Lineal meters

TO:

Construction of Flood Mitigation Structure, Agusan River Basin (Bit-os Section), Sta. 0+124.935 - Sta. 0+244.00, Butuan City, Agusan del Norte

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 119.065 Lineal meters

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 810,481.67/ Lineal meters
May 18, 2022 2022 WIN2E02321 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 310205100950000
Project ID: P00603819MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads

FROM:

Bdry. Bukidnon/Agusan del Norte, Lawan-Lawan Section, Package I, Las Nieves, Butuan City

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 2.800 Lane Km

Allocation:
TOTAL: P 98,000,000
CW1: P 94,570,000
EAO: P 3,430,000

Unit Cost:
CW1: P 33,775,000/ Lane Km

TO:

Bdry. Bukidnon/Agusan del Norte, Lawan-Lawan Section, Package I, Las Nieves, Butuan City

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 2.760 Lane Km

Allocation:
TOTAL: P 98,000,000
CW1: P 94,570,000
EAO: P 3,430,000

Unit Cost:
CW1: P 34,264,492.75/ Lane Km

May 18, 2022 2022 WIN2E02321 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 310205100950000
Project ID: P00603819MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads

FROM:

Bdry. Bukidnon/Agusan del Norte, Lawan-Lawan Section, Package I, Las Nieves, Butuan City

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 2.800 Lane Km

Allocation:
TOTAL: P 98,000,000
CW1: P 94,570,000
EAO: P 3,430,000

Unit Cost:
CW1: P 33,775,000/ Lane Km

TO:

Bdry. Bukidnon/Agusan del Norte, Lawan-Lawan Section, Package I, Las Nieves, Butuan City

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 2.760 Lane Km

Allocation:
TOTAL: P 98,000,000
CW1: P 94,570,000
EAO: P 3,430,000

Unit Cost:
CW1: P 34,264,492.75/ Lane Km

May 18, 2022 2022 WIN2E02320 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 310205100951000
Project ID: P00603820MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads

FROM:

Bdry. Bukidnon/Agusan del Norte, Lawan-Lawan Section, Package J, Las Nieves, Butuan City

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4,679.560 Square meters

Allocation:
TOTAL: P 68,000,000
CW1: P 65,620,000
EAO: P 2,380,000

Unit Cost:
CW1: P 14,022.69/ Square meters

TO:

Bdry. Bukidnon/Agusan del Norte, Lawan-Lawan Section, Package J, Las Nieves, Butuan City

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4,559.925 Square meters

Allocation:
TOTAL: P 68,000,000
CW1: P 65,620,000
EAO: P 2,380,000

Unit Cost:
CW1: P 14,390.59/ Square meters

May 18, 2022 2022 WIN2E02291 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 310104100453000
Project ID: P00601313MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

FROM:

Daang Maharlika (Agusan-Davao Sect) - K1250 + 098 - K1250 + 960

Type of Work:
CW1- Reconstruction to Concrete Pavement

Physical Target:
CW1- 1.528 Lane Km

Allocation:
TOTAL: P 14,297,000
CW1: P 14,011,060
EAO: P 285,940

Unit Cost:
CW1: P 9,169,541.88/ Lane Km

TO:

Daang Maharlika (Agusan-Davao Sect) - K1244 + 671.00 - K1244 + 684.50, K1246 + 980.00 - K1247 + 030.00, K1247 + 260.00 - K1247 + 570.00, K1248 + 196.00 - K1248 + 256.00, K1248 + 378.00 - K1248 + 550.00

Type of Work:
CW1- Reconstruction to Concrete Pavement

Physical Target:
CW1- 1.225 Lane Km

Allocation:
TOTAL: P 14,297,000
CW1: P 14,011,060
EAO: P 285,940

Unit Cost:
CW1: P 11,437,600/ Lane Km

May 18, 2022 FY 2022 WIN2E02341 310102101055000 March 31, 2022 Region IX Zamboanga del Norte 3rd District Engineering Office
UACS No. 310102101055000
Project ID : P00601154MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads

Jct. Polo-Dapitan Park Natl Rd - K1826+920 - K1827+021.10, K1827+371.43 - K1827+672.30

CW1 - Preventive Maintenance of Road: Asphalt Overlay
Physical Target: 1.58674 Lane km
Unit Cost : P 9,264,277.70/Lane km
EAO : P 300,000.00
Allocation : P 15,000,000.00
May 18, 2022 FY 2022 WIN2E02299 310204101580000 March 23, 2022 Region IX Regional Office IX
UACS No. 310204101580000
Project ID: P00604255MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Ipil Circumferential Road, Veterans-Tiayon-Don Andres Section, Package I, including Bridge, Zamboanga Sibugay

CW1- Road Widening
Physical Target: 5.976 Lane Km
Unit Cost: ₱ 11,971,473.07/Lane km
CW2- Widening of Bridge
Physical Target: 294.214 sq.m
Unit Cost: ₱ 52,201.72/sq.m.
ROW- Right-Of-Way Acquisition
Physical Target: 33,333.33 sq.m.
Unit Cost: ₱ 345.90/sq.m.
EAO: ₱ 3,570,000.00
Allocation: ₱ 102,000,000.00
May 18, 2022 FY 2022 WIN2E02297 310204101598000 March 23, 2022 Region IX Regional Office IX
UACS No. 310204101598000
Project ID: P00604240MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Zamboanga City Diversion Road, Package 3, Zamboanga City

CW1- Construction of Concrete Bridge
Physical Target: 1,734.372 sq.m.
Unit Cost: ₱ 54,630.73/sq.m.
ROW- Right-Of-Way Acquisition
Physical Target: 16,666.67 sq.m.
Unit Cost: ₱ 394.50/sq.m.
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00
May 18, 2022 FY 2022 WIN2E02303 10204101592000 March 23, 2022 Region IX Regional Office IX
UACS No. 310204101592000
Project ID: P00604242MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Vitali - Sibulao - Bypass Road Project (Alternate Road of N1), Package 2, Zamboanga City

CW1- Construction of Concrete Road
Physical Target: 5.95 Lane Km
Unit Cost: ₱ 15,882,352.94/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 33,333.33 sq.m.
Unit Cost: ₱ 349.50/sq.m.
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00
May 18, 2022 FY 2022 WIN2E02310 320101107695000 March 23, 2022 Region IX Regional Office IX
UACS No. 320101107695000
Project ID: P00620019MN

OO2: Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Structure including Pumping Station (Package 1 & 2), Zamboanga City

CW1- Construction of Flood Mitigation Structure
Physical Target: 1,193.00 Lineal Meters
Unit Cost: ₱ 95,557.41/ Lineal Meters
EAO: ₱ 4,200,000.00
Excess: ₱ 1,800,000.00
Allocation: ₱ 120,000,000.00
May 18, 2022 FY 2022 WIN2E02298 310204101593000 March 22, 2022 Region IX Regional Office IX
UACS No. 310204101593000
Project ID: P00604233MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Zamboanga City By-Pass Road, (West Coast Section), Phase I, Zamboanga City

CW1- Construction of Concrete Road
Physical Target: 6.097 Lane Km
Unit Cost: ₱ 15,499,425.96/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 33,333.33 sq.m.
Unit Cost: ₱ 349.50/sq.m.
EAO: ₱ 3,850,000.00
Allocation: ₱ 110,000,000.00
May 18, 2022 FY 2022 WIN2E02308 310204101586000 March 22, 2022 Region IX Regional Office IX
UACS No. 310204101586000
Project ID: P00604247MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

NRJ Biasong - Minaog Bypass Road, Zamboanga del Norte

CW1- Construction of Concrete Bridge
Physical Target: 1,156.248 sq.m
Unit Cost: ₱ 85,660.40/sq.m.
ROW- Right-Of-Way Acquisition
Physical Target: 33,333,330 sq.m.
Unit Cost: ₱ 357.91/sq.m
EAO: ₱ 4,025,000.00
Allocation: ₱ 115,000,000.00
May 18, 2022 FY 2022 WIN2E02311 310104100359000 March 23, 2022 Region IX Regional Office IX
UACS No. 310104100359000
Project ID: P00601148MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads

Dipolog-Sindangan-Liloy Rd - K1850 + 000.00 – K1851 + 000.00, K1851 + 000.00 – K1852 + 985.68, K1853 + 002.34 – K1853 + 236.00, K1853 + 267.58 – K1854 + 299.16, K1854 + 369.40 – K1855 + 103.45, K1855 + 199.00 – K1855 + 342.00, K1859 + 968.00 – K1861 + 633.00

CW1- Reconstruction to Concrete Pavement
Physical target: 13.739 Lane Km
Unit Cost: ₱ 7,467,439.06/Lane Km
EAO: ₱ 3,731,000.00
Excess: ₱ 273,854.73
Allocation: ₱ 106,600,000.00
May 17, 2022 FY 2022 GAA WIN2G02967 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 320102104986000
Project ID : P00621622LZ

002 : Protect Lives and Properties Against Major Floods

Flood Management Program - Construction/Rehabilitation of
Flood mitigation facilities within Major River Basins and
Principal Rivers

FROM ;

Construction of Tiguion River Flood Control,
Gasan, Marinduque (Package 1)
Physical Target - CW1 - Construction of Flood Mitigation
Structure : 166.39 lineal meter
Allocation - Php 20.00 Million

TO :

Construction of Tiguion River Flood Control,
Gasan, Marinduque (Package1)
Physical Target - CW1 - Construction of Flood Mitigation
Structure ; 140.60 Lineal Meter
Allocation - Php 20.00 Million
May 17, 2022 FY 2022 GAA WIn2G02968 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No : 300215100241000
Project ID : P00636843LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s
leading to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along TDC - Pagdanan Road, San Vicente, Palawan
Sta. 14+747 - Sta. 14+896
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,358.533 square meter
Allocation - Php 60.624 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along TDC - Pagdanan Road, San Vicente, Palawan
Sta. 14+747 - Sta. 14+896
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,489.53 square meter
Allocation - Php 60.624 Million
May 17, 2022 FY 2022 GAA WIN2G02955 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. :300215101648000
Project ID : P00636978LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the national Road/s
leading to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Tabon Cave Road,
Sta. 7+100 - Sta. 7+154
Quezon, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 402.56 Square Meter
Allocation - Php 17.64 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Tabon Cave Road
Sta. 7+100 - Sta. 7+154
Quezon, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 813.27 Square Meter
Allocation - Php 17.964 Million
May 17, 2022 FY 2022 GAA WIN2G02911 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100234000
Project ID : P00630102LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s
leading to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
San Jose - Port Barton Road,
Sta. 13+000 - Sta 13+060,
Sta. 13+129 - Sta. 13+140,
Sta. 13+210 - Sta. 13+250,
Sta. 13+393 - Sta. 13+573
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,352.96 Square Meter
Allocation - Php 105.00 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
San jose - Port Barton Road,
Sta. 13+000 - Sta. 13+060,
Sta. 13+129 - Sta. 13+140,
Sta. 13+210 - Sta. 13+250,
Sta. 13+393 - Sta. 13+465.40
Physical Target - CW1 - Construction of Road Slope Protection
Structure ; 4,934.80 Square Meter
Allocation - Php 105.00 Million
May 17, 2022 FY 2022 GAA WIN2G02962 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100231000
Project ID : P00630099LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from National Road/s leading to
Major/Strategic Public Buildings/Facilities

FROM :

Construction of Road,
Barangay Poblacion, Narra, Palawan
Physical Target - CW1 - Construction of Concrete Road :
4.958 Lane Km
Allocation - Php 55.00 Million

TO :

Construction of Road,
Barangay Poblacion, Narra, Palawan
Physical Target - CW1 - Construction of Concrete Road :
5.906 Lane Km
Allocation - 55.00 Million

May 17, 2022 FY 2022 WIN2C03529 UACS No. 300214100105000 March 1, 2022 National Capital Region Quezon City 1st Engineering District Office
As per GAA/Original
UACS No. 300214100105000
Project ID.: P00635866LZ
Convergence and Special Support Program
Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Preventive Maintenance along Fairview Ave – K0023+638 – K0021+000
Physical Target: CW1- Preventive Maintenance of Road: Concrete Re-blocking - 3.02 lane km
Unit Cost = P 9,735.10/lane km
Allocation = P 29,400,000
EAO = P 600,000
Total = P 30,000,000

As Modified
Convergence and Special Support Program
Special Road Fund – Motor Vehicle User’s Charge (MVUC) as per R.A. 11239
Preventive Maintenance along Fairview Ave – K0023+638 – K0024+620
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay – 3.387 lane km
Unit Cost = P 8,680.25/lane km
Allocation = P 29,400,000
EAO = P 600,000
Total = P 30,000,000
WIN2C03529
May 17, 2022 FY 2022 GAA WIN2G02960 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300203102047000
Project ID : P00635433LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Construction/Improvement of Access Roads leading to Declared
Tourism Destinations
(Tourism Road infrastructure Program - TRIP)

FROM :

New Agutaya Tourism Road leading to San Vicente Long Beach,
San Vicente, Palawan
Physical Target - CW1 - Construction of Concrete Road :
1.660 Lane Km
Allocation - php 24.900 Million

TO :

New Agutaya Tourism Road leading to San Vicente Long beach,
San Vicente, Palawan
Physical Target - CW1 - Construction of Concrete Road :
2.842 Lane Km
Allocation - php 24.900 Million

May 16, 2022 2022 WIN2F06299 FY 2022 GAA December 30, 2021 Region III Bataan 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Bataan Technical Park Inc Rd (BTPI) - K0175+(-506) - K0175+506
May 16, 2022 2022 WIN2F06169 FY 2022 GAA December 30, 2021 Region III Bataan 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Calaguiman Vicinal Rd - K0127+260 - K0127+460.20, K0127+517 - K0127+997, K0128+041 - K0128+176.40
May 16, 2022 2022 WIN2F06150 FY 2022 GAA December 30, 2021 Region III Bataan 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads

Roman Expressway - K0101+(-158) - K0101+100, K0101+230 - K0101+849
May 16, 2022 2022 WIN2F06298 FY 2022 GAA December 30, 2021 Region III Bataan 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads

Gov JJ Linao Rd - K0166+300 - K0166+501
May 16, 2022 2022 WIN2F06228 FY 2022 GAA December 30, 2021 Region III Bataan 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Jose Abad Santos Ave (JASA) - K0109+455 - K0109+514, K0110+445 - K0110+489, K0112+846.50 - K0112+970
May 16, 2022 FY 2022 GAA WIN2G02953 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310202100964000
Project ID : P00606196LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

El Nido - Jct New Ibahay Road
K0277+000 - K0280+000
Physical Target - CW1 - Road Widening : 5.808 Lane Km
Allocation - Php 87.120 Million

TO :
El Nido - Jct New Ibahay Road
K0277+000 - K0279+767
Physical Target - CW1 - Road Widening : 5.416 Lane Km
Allocation - Php 87.120 Million
May 16, 2022 2022 WIN2F06312 FY 2022 GAA December 30, 2021 Region III Bataan 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Nuclear Power Plant Rd - K0166+101 - K0166+414
May 16, 2022 2022 WIN2F06322 FY 2022 GAA December 30, 2021 Region III Bataan 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Calaguiman Vicinal Rd - K0124+320 - K0124+826.30
May 16, 2022 2022 WIN2F06311 FY 2022 GAA December 30, 2021 Region III Bataan 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Gov JJ Linao Rd - K0166+072 - K0166+300, K0168+000 - K0168+515
May 16, 2022 2022 WIN2F06189 FY 2022 GAA December 30, 2021 Region III Bataan 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Tabacan Poblacion Rd - K0102+593 - K0102+930
May 16, 2022 FY 2022 GAA WIN2G02969 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310202100965000
Project ID : P00606197LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

El Nido - Jct New Ibahay Road
K0280+000 - K0283+000
Physical Target - CW1 - Road Widening : 5.644 Lane Km
Allocation - Php 84.660 Million

TO :

El Nido - Jct Ibahay Road
K0279+767 - K0283+000
Physical Target - CW1 - Road Widening : 6.036 Lane Km
- CW2 - Road Safety : Pavement Markings :
6.036 Lane Km
Allocation - php 84.660 Million
May 16, 2022 FY 2022 GAA Win2G02964 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310205100813000
Project ID : P00608163LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Construction of Missing Links/New Roads

FROM :

Sofronio Espanola - Quezon Cross Country Road
(Pulot Interior - Tagusao Section), Package D
Palawan
Physical Target - CW1 - Construction of Concrete Road :
5.102 Lane Km
Allocation - Php 50.00 Million

TO :

Sofronio Espanola - Quezon Cross Country Road
(Pulot Interior - Tagusao Section), Package D
Palawan
Physical Target - CW1 - Construction of Concrete Road :
5.370 Lane Km
Allocation - Php 50.00 Million

May 16, 2022 FY 2022 GAA WIN2G02961 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310102100819000
Project ID : P00609336LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

FROM :

Puerto Princesa North Road
K0227+000 - K0232+385
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 10.850 Lane Km
Allocation - Php 105.851 Million

TO :

Puerto Princesa North Road
K0227+000 - K0231+698
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt overlay - 9.464 Lane Km
- CW2 - Road Safety : Pavement Markings :
9.464 Lane Km
Allocation - Php 105.851 Million
May 16, 2022 FY 2022 GAA WIN2G02970 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310108100882000
Project ID : P00611358LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM :

PPSR Jct - napsan - Apurawan Road (S00033PW)
K0036+825 - K0036+976
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 3,154.72 square meter
Allocation - Php 56.785 Million

TO :

PPSr Jct - Napsan - Apurawan Road
K0036+825 - K0036+976,
K0037+469 - K0037+490
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 2,439.40 square meter
Allocation - Php 56.785 Million


May 16, 2022 FY 2022 GAA WIn2G02943 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 32010204626000
Project ID : P00621107LZ

002 : Protect Lives and Properties Against major Floods

Construction/Rehabilitation of Flood Mitigation Facilities
within Major River Basins and Principal Rivers

FROM :

Construction of Flood Control Structure,
Amnay River
Sta. 0+000 - Sta. 0+456,
Claudio Salgado Section
Sablayan Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
444 lineal meter
Allocation - php 45.00 Million

TO :

Construction of Flood Control Structure
Amnay River
Sta. 0+320 - Sta. 0+603,
Claudio Salgado Section,
Sablayan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
283 lineal meter
Allocation - Php 45.00 Million
May 16, 2022 FY 2022 GAA WIn2G02942 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 320102104628000
Project ID : P00621109LZ

002 ; Protect Lives and Properties Against Major Floods

Construction/Rehabilitation of Flood Mitigation Facilities
within Major River basins and Principal Rivers

FROM :

Construction of Flood Control Structure,
Amnay River,
Sta. 0+000 - Sta. 0+462,
Guitong Section,
Sablayan, occidental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
462 lineal meter
Allocation - Php 45.00 Million

TO :

Construction of Flood Control Structure
Amnay River,
Sta. 1+303 - Sta. 1+680,
Guitong Section,
Sablayan, Occidental Mindoro
Physical Target - CW1 - Construction of Flood mitigation Structure :
377 lineal meter
Allocation - Php 45.00 Million
May 13, 2022 FY 2022 GAA WIN2G02868 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300203101636000
Project ID : P00635431LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Construction/Improvement of Access Roads leading to
Declared Tourism Destinations
(Tourism Road Infrastructure Program - TRIP)

FROM :

New Agutaya - Alimanguan Tourism Road leading to
San Vicente Long Beach, San Vicente, Palawan
Physical Target - CW1 - Construction of Concrete Road :
1.333 lane Km
Allocation - 20.00 Million

TO :

New Agutaya - Alimanguan Tourism Road leading to
San Vicente Long Beach, San Vicente, Palawan
Physical Target - CW1 - Construction of Concrete Road :
1.280 Lane Km
Allocation - Php 20.00 Million
May 13, 2022 FY 2022 GAA WIN2G02887 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300203102048000
Project ID : P00635434LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Construction/Improvement of Access Roads leading to
Declared Tourism Destinations
(Tourism Road Infrastructure Program - TRIP)

FROM :

Purok 4 Sto. Nino Road leading to Ombo Falls via
Bato Ningning Site, Palawan
Physical Target - CW1 - Construction of Concrete Road :
1.142 Lane Km
Allocation - Php 20.00 Million

TO :

Purok 4, Sto. Nino leading to Ombo Falls via
Bato Ningning Site, Palawan
Physical Target - CW1 - Construction of Concrete Road :
0.850 Lane Km
Allocation - Php 20.00 Million

Pages