Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
August 28, 2024 2024 320102106233000 GAA 2024 January 3, 2024 Region II Isabela 3rd District Engineering Office
FROM:

Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Magat River Flood Control Project, Barangay Ambatali (Sta. 0+000 - Sta. 1+500), Ramon, Isabela

TO:

Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Magat River Flood Control Project, Barangay Ambatali (Sta. 0+000 - Sta. 0+520.80), Ramon, Isabela
August 28, 2024 2024 WIN4E03606 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Regional Office XIII
UACS No. : 310201101373000
Project ID: P00800153MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads

FROM:

Daang Maharlika (Surigao-Agusan Sect) - K1183 + 843 - K1183 + 881, K1185 + 053 - K1185 + 154

Type of Work:
CW1: Road Widening

Physical Target:
CW1- 0.278 Lane Km

Allocation:
TOTAL: P 5,560,000
CW1: P 5,365,400
EAO: P 194,6000

Unit Cost:
CW1: P 19,300,000/Lane Km

TO:

Daang Maharlika (Surigao-Agusan Sect) - K1176 + 655 - K1176 + 750

Type of Work:
CW1: Road Widening

Physical Target:
CW1- 0.190 Lane Km

Allocation:
TOTAL: P 5,560,000
CW1: P 5,365,400
EAO: P 194,6000

Unit Cost:
CW1: P 28,328,947.37/Lane Km
August 28, 2024 2024 WIN4E03582 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 320102106736000
Project ID: P00821204MN

ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

FROM:

Construction of Gibong River Bank Protection along Barangay La Suerte, Prosperidad, Agusan del Sur

Type of Work:
CW1: Construction of Flood Mitigation Structure

Physical Target:
CW1- 416.724 Lineal meters

Allocation:
TOTAL: P 60,000,000
CW1: P 57,900,000
EAO: P 2,100,000

Unit Cost:
CW1: P 138,940.88/Lineal meters

TO:

Construction of Gibong River Bank Protection along Barangay La Suerte, Prosperidad, Agusan del Sur

Type of Work:
CW1: Construction of Flood Mitigation Structure

Physical Target:
CW1- 91.600 Lineal meters

Allocation:
TOTAL: P 60,000,000
CW1: P 57,900,000
EAO: P 2,100,000

Unit Cost:
CW1: P 632,096.07/Lineal meters

August 28, 2024 2024 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Agusan del Sur 2nd District Engineering Office
UACS No. : 300225102255000
Project ID: P00836196MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Flood Mitigation Structures protecting Major/ Strategic Public Buildings/ Facilities
FROM:

Construction of Riverbank Protection of Gibong River at Brgy. Ebro, San Francisco, Agusan del Sur

Type of Work:
CW1: Construction of Flood Mitigation Structure

Physical Target:
CW1- 138.908 Lineal meters

Allocation:
TOTAL: P 20,000,000
CW1: P 19,800,000
EAO: P 200,000

Unit Cost:
CW1: P 142,540.39/Lineal meters

TO:

Construction of Riverbank Protection of Gibong River at Brgy. Ebro, San Francisco, Agusan del Sur

Type of Work:
CW1: Construction of Flood Mitigation Structure

Physical Target:
CW1- 52 Lineal meters

Allocation:
TOTAL: P 20,000,000
CW1: P 19,800,000
EAO: P 200,000

Unit Cost:
CW1: P 380,769.23/Lineal meters


August 28, 2024 2024 WIN4E03581 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 320102107025000
Project ID: P00820426MN

ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

FROM:

Construction of Bank Protection along Agusan River (Poblacion-Sibagat Section) Sibagat, Agusan del Sur

Type of Work:
CW1: Construction of Flood Mitigation Structure

Physical Target:
CW1- 242.547 Lineal meters

Allocation:
TOTAL: P 34,922,000
CW1: P 34,223,560
EAO: P 698,440

Unit Cost:
CW1: P 141,100.735/Lineal meters

TO:

Construction of Bank Protection along Agusan River (Poblacion-Sibagat Section) Sibagat, Agusan del Sur

Type of Work:
CW1: Construction of Flood Mitigation Structure

Physical Target:
CW1- 87.01 Lineal meters

Allocation:
TOTAL: P 34,922,000
CW1: P 34,223,560
EAO: P 698,440

Unit Cost:
CW1: P 393,329,0426/Lineal meters
August 28, 2024 2024 WIN4E03587 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Dinagat Islands District Engineering Office
UACS No. : 310102101935000
Project ID: P00801071MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Preventive Maintenance - Secondary Roads

FROM:

Dinagat-Loreto Rd - K0018 + 552 - K0019 + 000

Type of Work:
CW1: Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 0.826 Lane Km

Allocation:
TOTAL: P 13,703,000
CW1: P 13,428,940
EAO: P 274,060,000

Unit Cost:
CW1: P 16,257,796.61/Lane Km

TO:

Dinagat-Loreto Rd - K0018 + 552 - K0019 + 000

Type of Work:
CW1: Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 0.826 Lane Km

Allocation:
TOTAL: P 13,703,000
CW1: P 13,428,940
EAO: P 274,060,000

Unit Cost:
CW1: P 16,257,796.61/Lane Km
August 28, 2024 2024 320102106901000 GAA 2024 January 3, 2024 Region II Isabela 3rd District Engineering Office
FROM:

Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Ganano River Flood Control Project, Barangay Apanay (Sta 0 + 398 - Sta 0 + 796, Alicia, Isabela

TO:

Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Ganano River Flood Control Project, Barangay Apanay (Sta 0 + 000 - Sta 0 + 188.30), Alicia, Isabela
August 28, 2024 2024 320102106143000 GAA 2024 January 3, 2024 Region II Isabela 3rd District Engineering Office
FROM:

Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Cagayan River Flood Control Project, Barangay Minanga Upstream, Sta.0+000 - Sta. 0+600, Naguillian, Isabela

TO:

Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Cagayan River Flood Control Project, Barangay Minanga Upstream, Sta.0+000 - Sta. 0+398.30, Naguillian, Isabela
August 28, 2024 2024 WIN4E03632 SR2024-01-003973 January 29, 2024 Cordillera Administrative Region Benguet 2nd District Engineering Office
"From:
Installation of Roadway Lighting Structures along Abatan - Mankayan - Cervantes Road K0334 + (-889) - K0355 + 467;
Type of Work:
Road Safety: Roadway Lighting;
Physical Target:
894 Number of Units;
Allocation:
Php 125,000,000"

"To:
Installation of Roadway Lighting Structures along Abatan - Mankayan - Cervantes Road K0334 + (-889) - K0347+000;
Type of Work:
Road Safety: Roadway Lighting;
Physical Target:
539 Number of Units;
Allocation:
Php 125,000,000"
August 28, 2024 2024 WIN4XW00132 SR2024-01-004588 January 29, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Malalao Nat'l RD (Agbannawag-Malalao-Bulo Sect) Road, K0514 + 000 -K0056 + 000, K0512 + 716 - K0513 + 000, K0516 + 415 - K0520 + 000, Tabuk City, Kalinga;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
27.214 Lane Km;
Allocation:
Php 150,000,000"

"To:
Malalao Nat'l RD (Agbannawag-Malalao-Bulo Sect) Road, K0514 + 000 -K0516 + 000, K0512 + 716 - K0513 + 000, K0516 + 415 - K0520 + 000, Tabuk City, Kalinga;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
8.03063 Lane Km;
Allocation:
Php 150,000,000"
August 28, 2024 2024 310205101188000 GAA 2024 January 3, 2024 Region II Cagayan 3rd District Engineering Office
Network Development - Construction of Missing Links/ New Roads - Sampaguita-Warat-La Suerte-Catarauan-Afusing Rd Phase II
August 28, 2024 2024 WIN4XW00131 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Bulanao-Paracelis Rd, K0508 + 645 - K0513 + 1105;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
21.768 Lane Km;
Allocation:
Php 125,000,000"

"To:
Bulanao-Paracelis Rd, K0508 + 645 - K0513 + 1105;
Type of Work:
CW1: Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
6.93154 Lane Km;
Allocation:
Php 125,000,000"
August 28, 2024 2024 WIN4E03643 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect), K0512+000- K0513+398, K0514+000-K0515+000, K0515+265-K0518+000, Tabuk City, Kalinga;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
15.204 Lane Km;
Allocation:
Php 150,000,000"

"To:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect), K0512+000- K0513+398, K0514+000-K0515+000, K0515+265-K0518+000, Tabuk City, Kalinga;
Type of Work:
CW1: Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
8.13557 Lane Km;
Allocation:
Php 150,000,000"
August 28, 2024 2024 310106101031000 GAA 2024 January 3, 2024 Region II Cagayan 1st District Engineering Office
FROM:

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Baybayog-Baggao-Dalin-Sta. Margarita Rd - K0519+330 - K0519+591, K0521+518 - K0521+803, K0522+469 - K0523+300 ,K0525+513 - K0525+720, K0533+222 - K0533+308, K0533+394 - K0533+508, K0541+123 - K0542+000, K0545+950 - K0548+000

TO:

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Baybayog-Baggao-Dalin-Sta. Margarita Rd - K0519+331 - K0519+600.5, K0521+381 - K0521+795, K0522+466.5 - K0523+322, K0531+375 - K0531+470, K0533+130 - K0533+290.46, K0533+376.14 - K0533+538.62, K0541+(-195.5) - K0541+1001.5, K0546+000 - K0547+1012.5
August 28, 2024 2024 310204102442000 GAA 2024 January 3, 2024 Region II Regional Office II
Network Development - Construction of By-Pass and Diversion Roads - Ramon-Cordon-Diadi Bypass Road, Diadi, Nueva Vizcaya
August 27, 2024 2024 WIN4F08105 SR2024-02-008173 February 1, 2024 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0702 + 483 - K0702 + 795, K0706 + 447 - K0706 + 504, K0707 + 108 - K0708 + 000, K0712 + 000 - K0712 + 050, K0718 + 637 - K0718 + 734, K0727 + (-355) - K0727 + 280, K0734 + 150 - K0734 + 558, K0734 + 595 - K0734 + 650, K0735 + 000 - K0735 + 526

Physical Target: Allocation:

CW1- Reconstruction to Concrete Pavement: P 76.578540 M
6.064 Lane Km

EAO P 2.777460 M

Total P 79.356 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0707 + 108 - K0707 + 808, K0734 + 137 - K0734 + 539, K0777 + 389 - K0778 + 000, K0781 + 240 - K0781 + 780

Physical Target: Allocation:
CW1- Reconstruction to Concrete Pavement: P 76.578540 M
4.516 Lane Km

EAO P 2.777460 M

Total P 79.356 M
August 22, 2024 FY 2024 GAA WIN4XW00118 FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Rehabilitation of Davao-Cotabato Rd (Jct. Digos-Cotabato Sect) - K1576 + 768 - K1578 + 158
Physical Target:
CW1: 2.800 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Reconstruction to Concrete Pavement)
EAO: P 1,750,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Rehabilitation of Davao-Cotabato Rd (Jct. Digos-Cotabato Sect) - K1578 + 634 - K1578 + 929,
K1589 + 046 - K1589 + 096, K1590 + 000 - K1591 + 173, K1591 + 300 - K1591 + 522.50,
K1591 + 545 - K1591 + 600, K1591 + 654 - K1591 + 880
Physical Target:
CW1: 3.445 lane km (Reconstruction to Concrete Pavement)
CW2: 1.180 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 29,037,760.00 (Reconstruction to Concrete Pavement)
CW2: P 19,212,240.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00
August 22, 2024 FY 2024 GAA P00835786MN FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/Strategic Public Buildings/Facilities
Construction of Bank Protection Structure long Lasana River protecting Panabo City Coastal Road, Carmen
Physical Target:
CW1: 450.00 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Construction of Revetment)
EAO: P 5,250,000.00

TO: Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Major/Strategic Public Buildings/Facilities
Construction of Bank Protection Structure along Lasana River protecting Panabo City Coastal Road, Carmen
Physical Target:
CW1: 855.00 lineal meters (Construction of Revetment)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Construction of Revetment)
EAO: P 5,250,000.00
August 21, 2024 FY 2024 GAA P00803806MN FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Preventive Maintenance of Road Asphalt Overlay with Road Safety Devices along Babak-Samal-Kaputian Road,
K1519 + 000 - K1522 + 000, Davao del Norte
Physical Target:
CW1: 6.558 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Preventive Maintenance of Road Asphalt Overlay with Road Safety Devices along Babak-Samal-Kaputian Road,
K1501 + 825 - K1504 + 140, Davao del Norte
Physical Target:
CW1: 6.852 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
August 21, 2024 FY 2024 GAA WIN4XW00120 FY 2024 GAA RA 11975 January 1, 2024 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Rehabilitation of Davao-Cotabato Rd (Jct. Digos-Cotabato Sect) - K1572 + 000 - K1573 + 400
Physical Target:
CW1: 2.810 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Reconstruction to Concrete Pavement)
EAO: P 1,750,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Rehabilitation of Davao-Cotabato Rd (Jct. Digos-Cotabato Sect) - K1578 + 339 - K1578 + 634,
K1583 + 237 - K1583 + 597, K1583 + 900 - K1584 + 058,
K1584 + 118 - K1584 + 763, K1588 + 009 - K1588 + 426
Physical Target:
CW1: 3.204 lane km (Reconstruction to Concrete Pavement)
CW2: 1.180 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 28,800,868.00 (Reconstruction to Concrete Pavement)
CW2: P 19,449,132.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00
August 16, 2024 2024 GAA FY 2024 January 15, 2024 Region VIII Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

AS PER GAA/ORIGINAL:

Basey-Marabut-Pinamitinan Rd - K0944 + 000 - K0945 + 000

Physical Target: Allocation:
CW1- Reconstruction to Concrete P 37.730 M
Pavement: 2.002 Lane Km

EAO P .770 M

Total P 38.50 M

AS MODIFIED:

Basey-Marabut-Pinamitinan Rd - K0947 + 240 - K0947 + 835, K0948 + 240 - K0948 + 1000

Physical Target: Allocation:

CW1- Reconstruction to Concrete P 37.730 M
Pavement: 2.71 Lane Km

EAO P .770 M

Total P 38.50 M
August 16, 2024 2024 SR2024-01-005072 January 30, 2024 Region VIII Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

AS PER GAA/ORIGINAL:

Basey-Marabut-Pinamitinan Rd - K0926 + 428 - K0927 + 700, K0928 + 524 - K0930 + 000

Physical Target: Allocation:
CW1- Reconstruction to Concrete P 53.075 M
Pavement: 5.36 Lane Km

EAO P 1.925 M

Total P 55.00 M

AS MODIFIED:

Basey-Marabut-Pinamitinan Rd – Basey-Marabut-Pinamitinan Rd - K0915 + 958 - K0916 + 020, K0916 + 580 - K0916 + 651, K0917 + 039 - K0917 + 055, K0917 + 384 - K0917 + 412, K0917 + 503 - K0917 + 512, K0917 + 538 - K0917 + 602, K0927 + 005 - K0927 + 180, K0927 + 220 - K0927 + 260, K0927 + 374 - K0927 + 460, K0927 + 620 - K0927 + 700, K0927 + 780 - K0928 + 400, K0928 + 420 - K0928 + 500, K0929 + 020 - K0929 + 414, K0929 + 420 - K0929 + 724, K0929 + 770 - K0929 + 994
Physical Target: Allocation:

CW1- Reconstruction to Concrete P 53.075 M
Pavement: 4.522 Lane Km

EAO P 1.925 M

Total P 55.00 M
August 16, 2024 2024 GAA FY 2024 January 15, 2024 Region VIII Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

AS PER GAA/ORIGINAL:
Sn Juanico-Basey-Sohoton Rd - K0916 + 000 - K0916 + 1009, K0914 + 000 - K0914 + 066

Physical Target: Allocation:

CW1- Reconstruction to Concrete P 34.30 M
Pavement: 2.15 Lane Km

EAO P .700 M

Total P 35.00 M

AS MODIFIED:

Sn Juanico-Basey-Sohoton Rd - K0913 + 480 - K0913 + 540, K0913 + 623 - K0913 + 663, K0913 + 740 - K0913 + 800, K0916 +180 - K0916 + 280, K0916 +360 - K0916 + 480, K0916 + 560 - K0916 + 951, K0917 + 849 - K0917 + 970, K0918 + 080 - K0918 + 340, K0918 + 420 - K0918 + 580, K0918 + 600 - K0918 + 620, K0918 + 640 - K0918 + 680, K0918 + 820 - K0918 + 860, K0918 + 940 - K0918 + 1013

Physical Target: Allocation:

CW1- Reconstruction to Concrete P 34.30 M
Pavement: 2.97 Lane Km

EAO P .700 M

Total P 35.00 M
August 16, 2024 2024 GAA FY 2024 January 15, 2024 Region VIII Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

AS PER GAA/ORIGINAL:

Basey-Marabut-Pinamitinan Rd - K0942 + 000 - K0943 + 000

Physical Target: Allocation:

CW1- Reconstruction to Concrete P 39.20 M
Pavement: 2.158 Lane Km

EAO P .800 M

Total P 40.00 M

AS MODIFIED:

Basey-Marabut-Pinamitinan Rd - K0936 + 803 - K0936 + 840, K0936 + 867 - K0936 + 1266, K0942 + 000 - K0942 + 634, K0946 + 078 - K0946 + 090, K0946 + 382 - K0946 + 434, K0947 +119 - K0947 + 240

Physical Target: Allocation:

CW1- Reconstruction to Concrete P 39.20 M
Pavement: 2.510 Lane Km

EAO P .800 M

Total P 40.00 M
August 16, 2024 2024 GAA FY 2024 January 15, 2024 Region VIII Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

AS PER GAA/ORIGINAL:

Basey-Marabut-Pinamitinan Rd - K0943 + 000 - K0944 + 000

Physical Target: Allocation:

CW1- Reconstruction to Concrete P 37.240 M
Pavement: 2.012 Lane Km

EAO P .760 M

Total P 38.00 M

AS MODIFIED:

Basey-Marabut-Pinamitinan Rd - K0932 + 028 - K0932 + 180, K0932 + 185 - K0932 + 286, K0932 + 317 - K0932 + 612, K0936 + 000 - K0936 + 803

Physical Target: Allocation:

CW1- Reconstruction to Concrete P 37.240 M
Pavement: 2.706 Lane Km

EAO P .760 M

Total P 38.00 M
August 16, 2024 2024 WIN4XY00354 SR2024-01-002132 January 24, 2024 Region VIII Leyte 1st District Engineering Office
OO2: Protect Lives and Properties Against Major Floods

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Flood Control Structure along Binahaan River, Phase 2, barangay Balud to barangay Sta. Elena, Tanauan, Leyte

Physical Target: Allocation:

CW1- Construction of Flood Mitigation P 144.750 M
Structure: 1,068.952 Lineal Meters

EAO P 5.250 M

Total P 150.00 M

AS MODIFIED:

Construction of Flood Control Structure along Binahaan River, Phase 2, barangay Balud to barangay Sta. Elena, Tanauan, Leyte

Physical Target: Allocation:

CW1- Construction of Flood Mitigation P 144.750 M
Structure: 637.00 Lineal Meters

EAO P 5.250 M

Total P 150.00 M
August 16, 2024 2024 WIN4XY00355 SR2024-02-008114 February 1, 2024 Region VIII Regional Office VIII
Convergence and Special Support Program (CSSP)

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:
Construction of Road, Sitio Kalawit - Barangay Cadian, Oras, Eastern Samar

Physical Target: Allocation:

CW1- Construction of Concrete P 168.875 M
Road: 3.439 Lane Km

EAO P 6.125 M

Total P 175.00 M

AS MODIFIED:

Construction of Road, Sitio Kalawit - Barangay Cadian, Oras, Eastern Samar

Physical Target: Allocation:

CW1- Construction of Concrete P 94.48471399 M
Road: 6.34 Lane Km

CW2- Construction of Road Slope Protection P 53.79930409 M
Structure: 31,891.80 Square Meters

CW3- Construction of Drainage Structure P 20.59098192 M
Along Road: 3,000 Lineal Meters

EAO P 6.125 M

Total P 175.00 M
August 16, 2024 2024 WIN4XY00358 SR2024-01-002141 January 27, 2024 Region VIII Leyte 1st District Engineering Office
OO2: Protect Lives and Properties Against Major Floods

Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

AS PER GAA/ORIGINAL:

Construction of Flood Control Structure along Calogcog River (Left Bank - Upstream), Brgy. Calogcog and Brgy. Atipolo, Tanauan, Leyte

Physical Target: Allocation:

CW1- Construction of Flood Mitigation P 144.750 M
Structure: 1,068.952 Lineal Meters

EAO P 5.520 M

Total P 150.00 M

AS MODIFIED:

Construction of Flood Control Structure along Calogcog River (Left Bank - Upstream), Brgy. Calogcog and Brgy. Atipolo, Tanauan, Leyte

Physical Target: Allocation:

CW1- Construction of Flood Mitigation P 144.750 M
Structure: 658.00 Lineal Meters

EAO P 5.520 M

Total P 150.00 M
August 16, 2024 2024 WIN4F08100 SR2024-02-008228 February 1, 2024 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) – K0908 + 605 – K0909 + 274
Physical Target: Allocation:

CW1- Construction of Drainage Structure P 26.502760 M
Along Road: 1,556 Lineal Meters

EAO P .961240 M

Total P 27.464 M

AS MODIFIED:

Daang Maharlika (LT) – K0908 + 605 – K0909 + 017

Physical Target: Allocation:

CW1- Construction of Drainage Structure P 26.502760 M
Along Road: 1,042 Lineal Meters

EAO P .961240 M

Total P 27.464 M
August 15, 2024 2024 WIN4XY00352 FY 2024 GAA December 20, 2023 Region III Regional Office III
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)

Construction of Dingalan-Doña Remedios Trinidad Road (Phase III), Aurora
August 15, 2024 2024 WIN4XY00353 FY 2024 GAA December 20, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Road - K0077+617 - K0078+990
August 15, 2024 2024 WIN4XY00356 FY 2024 GAA December 20, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Rd - K0074+537 K0075+983, K0076+162 - K0076+374
August 15, 2024 2024 FY 2024 GAA December 20, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Road - K0069+410 - K0069+746, K0071+384 - K0071+614, K0074+351 - K0074+537, K0080+443.50 - K0080+837.60
August 15, 2024 FY 2024 P00820100MN GAA 2024 January 1, 2024 Region XII Cotabato 3rd District Engineering Office
Construction of M'lang River Flood Control Project (Downstream of M'lang Bridge, Left Side), Barangay Poblacion A, M'lang, Cotabato
Amount: ₱ 132,000,000.00
August 15, 2024 2024 FY 2024 GAA December 20, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Road - K0078+990 - K0080+024
August 15, 2024 FY 2024 P00821224MN GAA 2024 January 1, 2024 Region XII Regional Office XII
Construction of Riverbank Protection along Matampay River at Barangay Kabuntulan, Sultan Kudarat, Maguindanao del Norte
Amount: 50,000,000.00
August 15, 2024 2024 WIN4XY08080 FY 2024 GAA December 20, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads

Sto. Tomas - Minalin Rd (Minalin-Macabebe Section) - K0064+748 - K0065+39350, K0065+740 - K0066+037.50
August 15, 2024 FY 2024 P00834938MN GAA 2024 January 1, 2024 Region XII Regional Office XII
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Buluan Bridge, Buluan, Maguindanao del Sur
Amount: ₱ 80,000,000.00
August 15, 2024 FY 2024 P00834939MN GAA 2024 January 1, 2024 Region XII Regional Office XII
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Kabulnan Bridge, Datu Hoffer Ampatuan, Maguindanao del Sur
Amount: ₱ 80,000,000.00
August 15, 2024 2024 WIN4XW00116 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Rizal Natl Rd (Liwan West-Babalag-Macutay Sect) - K0522 + (-569) - K0522 + 088;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
1.314 Lane Km;
Allocation:
Php 12,000,000"

"To:
Rizal Natl Rd (Liwan West-Babalag-Macutay Sect) - K0522 + (-569) - K0522 + (-092.871);
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
CW1: 0.96292 Lane Km;
Allocation:
Php 12,000,000"
August 15, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Construction of Pantar Road, Tabuk City, Kalinga;
Type of Work:
Construction of Concrete Road;
Physical Target:
0.087 Lane Km;
Allocation:
Php 5,000,000"

"To:
Construction of Pantar Road, Tabuk City, Kalinga;
Type of Work:
CW1: Construction of Concrete Road
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 0.552 Lane Km
CW2: 365 Square meters;
Allocation:
Php 5,000,000"
August 15, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Construction of Cudal River Flood Control Mitigation Structure along Magabangon Bridge, Sta.0+000 -Sta.0+500 (R/S Upstream) Sta.00+000-Sta.00+500(R/S), Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
820.497 Lineal meters;
Allocation:
Php 100,000,000"

"To:
Construction of Cudal River Flood Control Mitigation Structure along Magabangon Bridge, Sta.1+865 - Sta.2+228.33 (R/S Upstream), Sta. 0+915 - Sta. 1+833.87 (R/S), Sta. 1+862-Sta. 2+259.56 (L/S), Sta. 0+915 - Sta. 1+105 (L/S), Sta. 1+075 - Sta. 1+820 (L/S), Kalinga;
Type of Work:
CW1: Construction of Flood Mitigation Structure;
Physical Target:
2518.39 Lineal meters;
Allocation:
Php 100,000,000"
August 14, 2024 2024 WIN4E03606 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Regional Office XIII
UACS No. : 310201101373000
Project ID: P00800153MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads

FROM:

Daang Maharlika (Surigao-Agusan Sect) - K1183 + 843 - K1183 + 881, K1185 + 053 - K1185 + 154

Type of Work:
CW1: Road Widening

Physical Target:
CW1- 0.278 Lane Km

Allocation:
TOTAL: P 5,560,000
CW1: P 5,365,400
EAO: P 194,6000

Unit Cost:
CW1: P 19,300,000/Lane Km

TO:

Daang Maharlika (Surigao-Agusan Sect) - K1176 + 655 - K1176 + 750

Type of Work:
CW1: Road Widening

Physical Target:
CW1- 0.190 Lane Km

Allocation:
TOTAL: P 5,560,000
CW1: P 5,365,400
EAO: P 194,6000

Unit Cost:
CW1: P 28,328,947.37/Lane Km
August 14, 2024 2024 WIN4E03580 FY 2024 GAA, R.A 11975 December 25, 2023 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 320101112264000
Project ID: P00820210MN

ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

FROM:

Construction of Andanan RIS Flood Control Structure, Bayugan City, Agusan del Sur

Type of Work:
CW1: Construction of Flood Mitigation Structure

Physical Target:
CW1- 208.362 Lineal meters

Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000,000

Unit Cost:
CW1: P 141,100.58/Lineal meters

TO:

Construction of Andanan RIS Flood Control Structure, Bayugan City, Agusan del Sur

Type of Work:
CW1: Construction of Flood Mitigation Structure

Physical Target:
CW1- 74.80 Lineal meters

Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000,000

Unit Cost:
CW1: P 393,048.13/Lineal meters


August 12, 2024 2024 WIN4E03633 SR2024-01-005298 January 30, 2024 Cordillera Administrative Region CAR - Regional Office
"From:
Construction of Dalimuno, Bantay Flood Control Along Chico River (Sta. 1+160 - Sta. 2+110), Bantay, Tabuk City, Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
869 Lineal meters;
Allocation:
Php 100,000,000"

"To:
Construction of Dalimuno, Bantay Flood Control along Chico River (Sta. 100+023 - Sta. 100+430) Bantay, Tabuk City, Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
449 Lineal meters;
Allocation:
Php 100,000,000"
August 12, 2024 2024 WIN4XY00346 GAA FY 2024 January 31, 2024 Region VIII Samar 1st District Engineering Office
Convergence and Special Support Program

SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:
Construction of Road, Brgy. San Agustin-Brgy. Hinogacan Road, Gandara, Samar

Physical Target: Allocation:

CW1- Construction of Gravel Road: P 20.7475 M
1.300 Lane Km

EAO P .7525 M

Total P 21.50 M

AS MODIFIED:

Construction of Road, Brgy. San Agustin-Brgy. Hinogacan Road, Gandara, Samar

Physical Target: Allocation:

CW1- Construction of Concrete Road: P 17.28461259 M
1.258 Lane Km

CW2- Construction of Road Slope Protection: P 3.46288741 M
Structure: 1,736.00 Square Meters

EAO P .75250 M

Total P 21.50 M
August 10, 2024 2024 310204102804000 GAA 2024 January 3, 2024 Region II Cagayan 3rd District Engineering Office
Network Development - Construction of By-Pass and Diversion Roads - Solana Diversion Road Phase II, Solana, Cagayan
August 9, 2024 2024 300215104469000 GAA 2024 January 3, 2024 Region II Cagayan 3rd District Engineering Office
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road , Brgy. Sitio San Juan, Brgy. Villa Maria- Brgy. Batu, Enrile, Cagayan
August 9, 2024 2024 300215104478000 GAA 2024 January 3, 2024 Region II Cagayan 3rd District Engineering Office
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Bridge and Approaches, Brgy. Maguirig, Solana, Cagayan
August 9, 2024 2024 310204102444000 GAA 2024 January 3, 2024 Region II Cagayan 3rd District Engineering Office
Network Development - Construction of By-Pass and Diversion Roads - Construction of Bypass/Diversion Road, Tuguegarao North Diversion Road
August 9, 2024 2024 310203100761000 GAA 2024 January 3, 2024 Region II Cagayan 3rd District Engineering Office
FROM:

Network Development - Road Widening - Tertiary Roads - Peñablanca-Callao Cave Rd - K0475 + (-582) - K0477 + 040

TO:

Network Development - Road Widening - Tertiary Roads - Peñablanca-Callao Cave Rd - K0475 + (-582) - K0476 + 220, K0476 + 220 - K0476 + 300
August 9, 2024 2024 310205101189000 GAA 2024 January 3, 2024 Region II Cagayan 3rd District Engineering Office
Network Development - Construction of Missing Links/ New Roads - Sampaguita-Warat-La Suerte-Catarauan-Afusing Rd Phase III
August 9, 2024 2024 GAA FY 2024 January 1, 2024 Region VIII Tacloban City District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Bridge – Widening of Permanent Bridges

AS PER GAA/ORIGINAL:
Apitong Br. (B00030LT) along Apitong – Paterno Rd

Physical Target: Allocation:

CW1- Widening of Bridge: P 19.6 M
24 Square Meters

EAO P .400 M

Total P 20.00 M

AS MODIFIED:
Apitong Br. (B00030LT) along Apitong – Paterno Rd

Physical Target: Allocation:

CW1- Widening of Bridge: P 19.6 M
123.84 Square Meters

EAO P .400 M

Total P 20.00 M
August 8, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Manuel S. Agyao Boulevard - K0496 + 501 - K0496 + 523, K0497 + 135 - K0497 + 469, K0497 + 497 - K0498 + 344, K0502 + 000 - K0503 + 104;
Type of Work:
Road Widening;
Physical Target:
4.566 Lane Km;
Allocation:
Php 74,648,000"

"To:
Manuel S. Agyao Boulevard - K0496 + 501 - K0496 + 638, K0497 + 135 - K0497 + 469, K0497 + 497 - K0498 + 344, K0502 + 000 - K0503 + 104;
Type of Work:
CW1: Road Widening
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 5.444 Lane Km
CW2: 2658 Square meters;
Allocation:
Php 74,648,000"
August 8, 2024 2024 WIN4E03592 GAA 2024 January 1, 2024 Cordillera Administrative Region Mountain Province 1st District Engineering Office
"From:
Construction of Multi-Purpose Building, Barangay Payeo, Sagada, Mountain Province;
Type of Work:
Construction of Multi Purpose Building;
Physical Target:
1.0 Number of Building;
Allocation:
Php 5,000,000"

"To:
Construction of Multi-Purpose Building, Barangay Payeo, Besao, Mountain Province;
Type of Work:
Construction of Multi Purpose Building;
Physical Target:
1.0 Number of Building;
Allocation:
Php 5,000,000"
August 8, 2024 2024 WIN4E03627 SR2024-01-003964 January 1, 2024 Cordillera Administrative Region Benguet 2nd District Engineering Office
"From:
Installation of Road Safety Devices along Gov. Bado Dangwa (Palina-Poblacion Section) K0328+(-085)-K0338+731, Bakun, Benguet;
Type of Work:
Road Safety: Pavement Markings;
Physical Target:
11,442 Lineal meters;
Allocation:
Php 125,000,000"

"To:
Installation of Road Safety Devices along Gov. Bado Dangwa (Palina-Poblacion Section) K0328+(-085)-K0338+731, Bakun, Benguet;
Type of Work:
Road Safety: Roadway Lighting;
Physical Target:
536 Number of units;
Allocation:
Php 125,000,000"


August 8, 2024 2024 WIN4E03626 SR2024-01-003953 January 1, 2024 Cordillera Administrative Region Benguet 2nd District Engineering Office
"From:
Installation of Road Safety Devices along Abatan - Mankayan - Cervantes Road, K0334 + (-889) - K0353+2495 (S00387LZ);
Type of Work:
Road Safety: Pavement Markings;
Physical Target:
22,351 Lineal meters;
Allocation:
Php 100,000,000"

"To:
Installation of Road Safety Devices along Abatan - Mankayan - Cervantes Road, K0348 + 000 - K0351+000 (S00378LZ);
Type of Work:
Road Safety: Roadway Lighting;
Physical Target:
387 Number of Units;
Allocation:
Php 100,000,000"
August 8, 2024 2024 WIN4E03625 SR2024-01-003967 January 29, 2024 Cordillera Administrative Region Benguet 2nd District Engineering Office
"From:
Installation of Road Safety Devices along Abatan - Mankayan - Cervantes Road K0334 + (-889) - K0355 + 467, Mankayan, Benguet;
Type of Work:
Road Safety: Pavement Markings;
Physical Target:
22,351 Lineal meters;
Allocation:
Php 125,000,000"

"To:
Installation of Road Safety Devices along Abatan - Mankayan - Cervantes Road K0351+000 - K0353 + 2495, Mankayan, Benguet;
Type of Work:
Road Safety: Roadway Lighting;
Physical Target:
539 Number of units;
Allocation:
Php 125,000,000"
August 8, 2024 2024 WIN4E03607 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Manuel S. Agyao Boulevard - K0507 + 360 - K0507 + 737, K0510 + 015 - K0510 + 084;
Type of Work:
Road Widening;
Physical Target:
0.892 Lane Km;
Allocation:
Php 65,054,000"

"To:
Manuel S. Agyao Boulevard - K0507 + 360 - K0507 + 075;
Type of Work:
CW1: Road Widening
CW2: Construction of Drainage Structure along Road;
Physical Target:
CW1: 5.566 Lane Km
CW2: 1500 Lineal meters;
Allocation:
Php 65,054,000"
August 8, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Construction of Mallig River Flood Control Mitigation Structure along Cassag Bridge, Tabuk-Paracelis Mun. Baoundary (Tabuk Side), Sta.0+000 -Sta.0+930 (LS), Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
820.467 Lineal meters;
Allocation:
Php 100,000,000"

"To:
Construction of Mallig River Flood Control Mitigation Structure along Cassag Bridge, Tabuk-Paracelis Mun. Baoundary (Tabuk Side), Sta.0+000 -Sta.0+930 (LS), Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
930 Lineal meters;
Allocation:
Php 100,000,000"
August 8, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Tabuk-Banawe via Tanudan-Barlig Rd, Kalinga;
Type of Work:
Construction of Concrete Road;
Physical Target:
3.552 Lane Km;
Allocation:
Php 80,000,000"

"To:
Tabuk-Banawe via Tanudan-Barlig Rd, Kalinga;
Type of Work:
CW1: Construction of Gravel Road
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 5.2 Lane Km
CW2: 4566 Square meters;
Allocation:
Php 80,000,000"
August 8, 2024 2024 P00835023MN GAA FY 2024 January 1, 2024 Region X Misamis Occidental 1st District Engineering Office
P00835023MN
300215105056000
Convergence and Special Support System - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities


FROM:
Construction of Barangay Libertad Road, Sapang Dalaga, Misamis Occidental
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 2.50 Lane Km
Allocation:
CW1: Php 14,435,400.00
EAO: Php 736,500.00

TO:
Construction of Barangay Libertad Road, Sapang Dalaga, Misamis Occidental
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 1.40 Lane Km
CW2- 928.30 Square Meters
Allocation:
CW1: Php 26,594,164.94
CW2: Php 9,494,335.06
EAO: Php 736,500.00
August 8, 2024 2024 WIN4E03536 GAA 2024 January 1, 2024 Cordillera Administrative Region Mountain Province 2nd District Engineering Office
"From:
Construction of Drainage Structure, Barangay Alunogan, Natonin, Mountain Province;
Type of Work:
Construction of Drainage Structure;
Physical Target:
482.603 Lineal meters;
Allocation:
Php 5,000,000"

"To:
Construction of Drainage Structure, Barangay Alunogan, Natonin, Mountain Province;
Type of Work:
Construction of Drainage Structure;
Physical Target:
89 Linear Meters;
Allocation:
Php 5,000,000"
August 8, 2024 2024 WIN4E03598 SR2024-03-012867 March 5, 2024 Cordillera Administrative Region Benguet 2nd District Engineering Office
"From:
Construction of Conacon - Deckan - Payeo Road, Barangay Bedbed, Mankayan, Benguet;
Type of Work:
Construction of Gravel Road;
Physical Target:
16.938 Lane Km;
Allocation:
Php 153,000,000"

"To:
Construction of Conacon - Deckan - Payeo Road, Barangay Bedbed, Mankayan, Benguet;
Type of Work:
Construction of Gravel Road;
Physical Target:
8.154 Lane Km;
Allocation:
Php 153,000,000"
August 8, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Benguet 2nd District Engineering Office
"From:
Application of Pavement Markings along Baguio-Bontoc Road - K0262 + 000- K0263 + 183, Barangay Caponga, Tublay, Benguet;
Type of Work:
Road Safety: Pavement Markings;
Physical Target:
1200 Lineal meters;
Allocation:
Php 2,700,000"

"To:
Application of Pavement Markings along Baguio-Bontoc Road - K0262 + 000- K0265 + 353, Barangay Caponga, Tublay, Benguet;
Type of Work:
CW1: Road Safety: Pavement Markings
CW2: Road Safety: Guardrails;
Physical Target:
CW1: 3400 Lineal meters
CW2: 451 Lineal meters;
Allocation:
Php 2,700,000"
August 8, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Ifugao 1st District Engineering Office
"From:
Construction of Flood Control Structure along Nayon River, Sta. 12+350 - Sta. 13+115 (Left Side), Nayon, Lamut, Ifugao;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
765 Lineal meters;
Allocation:
Php 50,000,000"

"To:
Construction of Flood Control Structure along Nayon River, Sta. 12+350 - Sta. 13+200, Nayon, Lamut, Ifugao;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
827 Lineal meters;
Allocation:
Php 50,000,000"
August 7, 2024 2024 WIN4XY00331 GAA 2024 January 19, 2024 Region V Masbate 2nd District Engineering Office
Project ID : P00800184LZ
UACS No : 310202101697000

FROM :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Masbate - Cataingan - Placer Rd - K0009 + 055 - K0009 + 159

Physical Target :
CW1 - Road Widening - 0.208 Lane Km


TO :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening Development - Road Widening - Secondary Roads - Masbate - Cataingan - Placer Rd - K0009 + 055 - K0009 + 076

Physical Target :
CW1 - Road Widening - 0.042 Lane Km
CW2 - Construction of Drainage Structure along Road - 42 Lineal meters
August 7, 2024 2024 WIN4XY00330 GAA 2024 January 19, 2024 Region V Masbate 2nd District Engineering Office
Project ID : P00800186LZ
UACS No : 310202101699000

FROM :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Masbate - Cataingan - Placer Rd - K0009 + 264 - K0009 + 367

Physical Target :
CW1 - Road Widening - 0.103 Lane Km


TO :
OO1 - Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads - Masbate - Cataingan - Placer Rd - K0009 + 091 - K0009 + 101.5

Physical Target :
CW1 - Road Widening - 0.021 Lane Km
CW2 - Construction of Drainage Structure along Road - 21 Linear meters
August 7, 2024 2024 GAA 2024 January 19, 2024 Region V Masbate 2nd District Engineering Office
Project ID : P00802553LZ
UACS No : 310106101181000

FROM :
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstructure/ Upgrading of Damaged Paved Roads - Tertiary Roads - Masbate Circumferential Rd - K0004 + 000 - K0004 + 175

Physical Target :
CW1 - Rehabilitation of Paved Road - 0.7 Lane Km


TO :
OO1 - Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstructure/ Upgrading of Damaged Paved Roads - Tertiary Roads - Masbate Circumferential Rd - K0004 + 444 - K0004 + 884

Physical Target :
CW1 - Rehabilitation of Paved Road - 0.88 Lane Km
CW2 - Road Safety - Street Lighting - 32 Number of Units
August 7, 2024 2024 WIN4XY00339 GAA 2024 January 19, 2024 Region V Catanduanes District Engineering Office
Project ID : P00824785LZ
UACS No : 320101112028000

FROM :
ORGANIZATIONAL OUTCOME 2 - Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage System - Construction of Flood Control Structure at Brgy. Benticayan, Baras, Catanduanes

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 186 Lineal meters


TO :
ORGANIZATIONAL OUTCOME 2 - Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage System - Construction of Flood Control Structure at Brgy. Benticayan, Baras, Catanduanes

Physical Target :
CW1 - Construction of Flood Mitigation Structure - 149 Lineal meters
August 7, 2024 2024 WIN4XY00337 GAA 2024 January 19, 2024 Region V Regional Office V
Project ID : P00839453LZ
UACS ID : 3000224100036000

FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Coastal Roads/ Causeway for environmental protection/ conservation - Construction of Coastal Road, Barangay Población, Rapu-Rapu, Albay

Physical Target :
CW1 - Construction of Concrete Road - 1.968 Lane Km
CW2 - Construction of Road Slope Protection - 2,601.40


TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Coastal Roads/ Causeway for environmental protection/ conservation - Construction of Coastal Road, Barangay Población, Rapu-Rapu, Albay

Physical Target :
CW1 - Construction of Concrete Road - 1.38 Lane Km
CW2 - Construction of Road Slope Protection - 2,033.20 Square meters
August 7, 2024 2024 WIN4XY00338 WIN4XY00338 January 19, 2024 Region V Camarines Norte Sub-District Engineering Office
Project ID : P00848239LZ
UACS No : 300226113504000

FROM :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multipurpose Buildings, Brgy. Mambungalon, Basud, Camarines Norte

Physical Target :
CW1 - Construction of Multi Purpose Building - 1 Number of Buildings


TO :
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multipurpose Buildings, Brgy. Mambungalon, Mercedes, Camarines Norte

Physical Target :
CW1 - Construction of Multi Purpose Building - 1 Number of Buildings
August 7, 2024 2024 SR2024-01-008076 January 31, 2024 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation – Preventive Maintenance – Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) – K0906 + 569 – K0906 + 915

Physical Target: Allocation:
CW1- Preventive Maintenance of Road: P 14.94206 M
Asphalt Overlay: 1.384 Lane Km

EAO P 0.54194 M

Total P 15.484 M

AS MODIFIED:

Daang Maharlika (LT) – K0906 + 520 – K0906 + 915

Physical Target: Allocation:

CW1- Preventive Maintenance of Road: P 14.94206 M
Asphalt Overlay: 1.58 Lane Km

EAO P 0.54194 M

Total P 15.484 M
August 7, 2024 2024 SR2024-04-014756 April 12, 2024 Region VIII Regional Office VIII
Convergence and Special Support Program

Special Road Fund – Motor Vehicle Users Charge (MVUC) as per R.A. 11239

AS PER GAA/ORIGINAL:

Installation of Solar LED Street Lights, and Signages along Tacloban City Bypass Road Extension, Phase 1, Barangay Tigbao, Tacloban City

Physical Target: Allocation:

CW1- Road Safety: P 46.575435 M
Road Lighting: 268.00 Number of Units

CW2- Road Safety:
Guardrails: 1,760.00 Lineal Meters P 49.924565 M

EAO P 3.5 M

Total P 100.00 M

AS MODIFIED:

Installation of Solar LED Street Lights, and Signages along Tacloban City Bypass Road Extension, Phase 1, Barangay Tigbao, Tacloban City

Physical Target: Allocation:

CW1- Road Safety: P 73.16921039 M
Road Lighting: 442.00 Number of Units

CW2- Road Safety:
Guardrails: 3,100.00 Lineal Meters P 23.33078961 M

EAO P 3.5 M

Total P 100.00 M
August 7, 2024 2024 WIN4E03584 SR2024-01-003732 January 29, 2024 Cordillera Administrative Region Benguet 1st District Engineering Office
"From:
Installation of Road Safety Devices along Shilan-Beckel Road, K0261+(-392) - K0266+403, La Trinidad, Benguet;
Type of Work:
Road Safety: Pavement Markings;
Physical Target:
5514 Lineal Meter;
Allocation:
Php 125,000,000"

"To:
Installation of Road Safety Devices along Shilan-Beckel Road, K0261+(-392) - K0266+403, La Trinidad, Benguet;
Type of Work:
Road Safety: Roadway Lighting;
Physical Target:
535 Number of units;
Allocation:
Php 125,000,000"
August 7, 2024 2024 WIN4E03507 GAA 2024 January 1, 2024 Cordillera Administrative Region CAR - Regional Office
"From:
Construction of Bultot, Balawag Flood Control along Chico River Balawag, Tabuk City, Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
802 Lineal meters;
Allocation:
Php 100,000,000"

"To:
Construction of Bultot, Balawag Flood Control along Chico River Balawag, Tabuk City, Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
386 Lineal meters;
Allocation:
Php 100,000,000"
August 7, 2024 2024 WIN4E03515 GAA 2024 January 1, 2024 Cordillera Administrative Region CAR - Regional Office
"From:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta 28 + 310 - Sta 31 + 250 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
518 Lineal meters;
Allocation:
Php 50,000,000"

"To:
Construction of Apayao-Abulog River Basin River Flood Control Structure (Bagutong Section), Apayao Sta. 29 + 760 - Sta 30 + 110 (R/S);
Type of Work:
Construction of Revetment;
Physical Target:
218 Lineal meters;
Allocation:
Php 50,000,000"
August 7, 2024 2024 GAA FY 2024 January 1, 2024 Region VIII Leyte 1st District Engineering Office
Convergence and Special Support Program

SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of Road, Barangay Binolo, Tanauan Leyte

Physical Target: Allocation:

CW1- Construction of Concrete Road: P 12.250 M
0.246 Lane Km

EAO P .250 M

Total P 12.50 M

AS MODIFIED:

Construction of Road, Barangay Binolo, Tanauan Leyte

Physical Target: Allocation:

CW1- Construction of Concrete Road: P 12.250 M
1.20 Lane Km

EAO P .250 M

Total P 12.250 M
August 7, 2024 2024 GAA FY 2024 January 1, 2024 Region VIII Leyte 1st District Engineering Office
Convergence and Special Support Program

SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

AS PER GAA/ORIGINAL:

Construction of Road, San Antonio to Camire, Tanauan Leyte

Physical Target: Allocation:

CW1- Construction of Concrete Road: P 12.250 M
0.246 Lane Km

EAO P .250 M

Total P 12.50 M

AS MODIFIED:

Construction of Road, San Antonio to Camire, Tanauan Leyte

Physical Target: Allocation:

CW1- Construction of Concrete Road: P 12.250 M
1.50 Lane Km

EAO P .250 M

Total P 12.250 M
August 7, 2024 2024 WIN4XY00325 GAA FY 2024 January 1, 2024 Region VIII Leyte 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development – Road Widening – Tertiary Roads

AS PER GAA/ORIGINAL:

Tacloban-Baybay South Rd (Tanauan Sect) - K0921 + (-108.87) - K0921 + 356.69, K0921 + (-697) - K0921 + (-132)

Physical Target: Allocation:

CW1- Road Widening: P 23.69248 M
2.061 Lane Km

EAO P 0.48352 M

Total P 24.176 M

AS MODIFIED:

Tacloban-Baybay South Rd (Tanauan Sect) - K0921 + (-697) - K0921 + (-132)

Physical Target: Allocation:

CW1- Road Widening: P 13.20771917 M
1.130 Lane Km

CW2 – Construction of Drainage Structure: P 10.48476082 M
Along Road: 174 Lineal Meters

EAO P 0.48352 M

Total P 24.176 M
August 6, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Benguet 2nd District Engineering Office
"From:
Baguio-Bontoc Rd - K0317 + 468 - K0317 + 566;
Type of Work:
Rehabilitation /Major Repair of Road Slope Protection Structure;
Physical Target:
392.17 Square meters;
Allocation:
Php 4,310,000"

"To:
Baguio-Bontoc Rd - K0322+860 - K0323+037;
Type of Work:
Construction of Road Slope Protection Structure;
Physical Target:
716 Square meters;
Allocation:
Php 4,310,000"
August 6, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Benguet 2nd District Engineering Office
"From:
Baguio-Bontoc Rd - K0317 + 468 - K0317 + 566;
Type of Work:
Rehabilitation /Major Repair of Road Slope Protection Structure;
Physical Target:
392.17 Square meters;
Allocation:
Php 4,310,000"

"To:
Baguio-Bontoc Rd - K0322+860 - K0323+037;
Type of Work:
Construction of Road Slope Protection Structure;
Physical Target:
716 Square meters;
Allocation:
Php 4,310,000"
August 6, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Benguet 2nd District Engineering Office
"From:
Baguio-Bontoc Rd - K0317 + 468 - K0317 + 566;
Type of Work:
Rehabilitation /Major Repair of Road Slope Protection Structure;
Physical Target:
392.17 Square meters;
Allocation:
Php 4,310,000"

"To:
Baguio-Bontoc Rd - K0322+860 - K0323+037;
Type of Work:
Construction of Road Slope Protection Structure;
Physical Target:
716 Square meters;
Allocation:
Php 4,310,000"
August 6, 2024 2024 WIN4E03556 SR2024-03-012873 March 5, 2024 Cordillera Administrative Region Benguet 2nd District Engineering Office
"From:
Construction of Sagpat, Kibungan, Benguet to Santol, La Union Road (Phase II), Kibungan, Benguet;
Type of Work:
Construction of Gravel Road;
Physical Target:
16.938 Lane Km;
Allocation:
Php 153,000,000"

"To:
Construction of Sagpat, Kibungan, Benguet to Santol, La Union Road (Phase II), Kibungan, Benguet;
Type of Work:
Construction of Gravel Road;
Physical Target:
6.858 Lane Km;
Allocation:
Php 153,000,000"
August 6, 2024 2024 WIN4E03557 SR2024-03-012871 March 5, 2024 Cordillera Administrative Region Benguet 2nd District Engineering Office
"From:
Construction of Poblacion Dalingoan - Sinacbat Road (Phase II), Bakun, Benguet;
Type of Work:
Construction of Gravel Road;
Physical Target:
16.938 Lane Km;
Allocation:
Php 153,000,000"

"To:
Construction of Poblacion Dalingoan - Sinacbat Road (Phase II), Bakun, Benguet;
Type of Work:
Construction of Gravel Road;
Physical Target:
6.30 Lane Km;
Allocation:
Php 153,000,000"
August 6, 2024 2024 WIN4E03559 SR2024-02-008368 February 2, 2024 Cordillera Administrative Region Benguet 2nd District Engineering Office
"From:
Construction of Flood Mitigation Structure along Agno River, Loo Section, Sta. 0+432 - Sta. 1+836 (R.S), Buguias, Benguet;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
1404 Lineal meters;
Allocation:
Php 65,000,000"

"To:
Construction of Flood Mitigation Structure along Agno River, Loo Section, Sta. 0+432 - Sta. 1+043 (LS), Sta. 0+767 - Sta. 1+021 (RS), Buguias, Benguet;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
865 Lineal meters;
Allocation:
Php 65,000,000"
August 6, 2024 2024 SR2024-05-016179 May 20, 2024 Cordillera Administrative Region Benguet 1st District Engineering Office
"From:
Rehabilitation of Road, Bayabas Central - Calamay Road, Barangay Bayabas, Sablan, Benguet;
Type of Work:
CW1: Construction of Concrete Road
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 0.240 Lane Km
CW2: 341.8 Square meter;
Allocation:
Php 5,000,000"

"To:
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National
Road/s leading to Major/ Strategic Public Buildings/ Facilities;
Type of Work:
CW1: Construction of Concrete Road
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 0.240 Lane Km
CW2: 416.14 Square meters;
Allocation:
Php 5,000,000"
August 6, 2024 2024 WIN4E03541 GAA 2024 January 1, 2024 Cordillera Administrative Region Mountain Province 2nd District Engineering Office
"From:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0426 + 280 - K0426 + 580;
Type of Work:
Reconstruction to Concrete Pavement;
Physical Target:
0.6 Lane Km;
Allocation:
Php 6,008,000"

"To:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0426 + 280 - K0426 + 400;
Type of Work:
CW1: Reconstruction of Concrete Pavement
CW2: Construction of Road Slope Protection Structures;
Physical Target:
CW1: 0.240 Lane Km
CW2: 360 Square meters;
Allocation:
Php 6,008,000"
August 6, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Tabuk-Banawe via Tanudan-Barlig Rd, Kalinga;
Type of Work:
Construction of Concrete Road;
Physical Target:
3.552 Lane Km;
Allocation:
Php 80,000,000"

"To:
Tabuk-Banawe via Tanudan-Barlig Rd, Kalinga;
Type of Work:
CW1: Construction of Gravel Road
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 5.2 Lane Km
CW2: 4566 Square meters;
Allocation:
Php 80,000,000"
August 6, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect) - K0505 + 722 - K0505 + 899, K0514 + 521 - K0514 + 621;
Type of Work:
Construction of Drainage Structure along Road;
Physical Target:
277 Lineal meters;
Allocation:
Php 10501000"

"To:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect) - K0505 + 722 - K0506 + 044 & K0506 + 080 - K0506 + 280, K0514 + 521 - K0514 + 621;
Type of Work:
Construction of Drainage Structure along Road;
Physical Target:
652 Lineal meters;
Allocation:
Php 10,501,000"
August 6, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Rizal Natl Rd (Liwan West-Babalag-Macutay Sect) - K0522 + 321 - K0523 + 100;
Type of Work:
Construction of Drainage Structure along Road;
Physical Target:
760 Lineal meters;
Allocation:
Php 38,257,000"

"To:
Rizal Natl Rd (Liwan West-Babalag-Macutay Sect) - K0522 + 321 - K0523 + 640, K0522 + 121 - K0523 + 220;
Type of Work:
Construction of Drainage Structure along Road;
Physical Target:
2418 Lineal Meters;
Allocation:
Php 38,257,000"
August 6, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Construction of Flood Control Structure at Liwan East-Calaocan along Pangol Creek, Sta. 11+060-Sta. 11+160, Barangay Liwan East, Calaocan, Arsenio, Rizal, Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
82.05 Lineal meter;
Allocation:
Php 10,000,000"

"To:
Construction of Flood Control Structure at Liwan East-Calaocan along Pangol Creek, Sta. 11+060-Sta. 11+320, Barangay Liwan East, Calaocan, Arsenio, Rizal, Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
260 Lineal meters;
Allocation:
Php 10,000,000"
August 6, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Rehabilitation of Flood Control Structure, Purok Riverside, Poblacion Taga, Pinukpuk, Kalinga;
Type of Work:
Construction of Flood Mitigation Structure;
Physical Target:
205.124 Lineal meters;
Allocation:
Php 25,000,000"

"To:
Rehabilitation of Flood Control Structure, Purok Riverside, Poblacion Taga, Pinukpuk, Kalinga;
Type of Work:
Rehabilitation/ Major Repair of Flood Control Structure;
Physical Target:
322 Lineal Meters;
Allocation:
Php 25,000,000"
August 6, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Construction of Bulo-Makilo Road (Bulo Section), Barangay Bulo, Tabuk City, Kalinga;
Type of Work:
Construction of Concrete Road;
Physical Target:
0.871 Lane Km;
Allocation:
Php 50,000,000"

"To:
Construction of Bulo-Makilo Road (Bulo Section), Barangay Bulo, Tabuk City, Kalinga;
Type of Work:
Construction of Concrete Road;
Physical Target:
6.032 Lane Km;
Allocation:
Php 50,000,000"
August 6, 2024 2024 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Construction of Seet-Mabaca-Taloctoc-Mangali Road, Tanudan, Kalinga;
Type of Work:
Construction of Concrete Road;
Physical Target:
0.644 Lane Km;
Allocation:
Php 37,000,000"

"To:
Construction of Seet-Mabaca-Taloctoc-Mangali Road, Tanudan, Kalinga;
Type of Work:
CW1: Construction of Concrete Road
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 2.124 Lane Km
CW2: 1112 Square meters;
Allocation:
Php 37,000,000"
August 6, 2024 2024 WIN4E03544 GAA 2024 January 1, 2024 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Construction of Banagao-Mangali Road, Tanudan, Kalinga;
Type of Work:
Construction of Concrete Road;
Physical Target:
0.348 Lane Km;
Allocation:
Php 20,000,000"

"To:
Construction of Banagao-Mangali Road, Tanudan, Kalinga;
Type of Work:
CW1: Construction of Concrete Road
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: .2 Lane Km
CW2: 9.858 Square meters;
Allocation:
Php 20,000,000"
August 6, 2024 2024 WIN4E03578 SR2024-01-005186 January 30, 2024 Cordillera Administrative Region CAR - Regional Office
"From:
Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0345 + 240 - K0345 + 445;
Type of Work:
Construction of Road Slope Protection Structure;
Physical Target:
5882.353 Square meters;
Allocation:
Php 100,000,000"

"To:
Banaue-Mayoyao-A Lista-Isabela Bdry Rd - K0345 + 240 - K0345 + 340;
Type of Work:
Construction of Road Slope Protection Structure;
Physical Target:
3850 Square meters;
Allocation:
Php 100,000,000"
August 6, 2024 2024 WIN4E03596 SR2024-01-003715 January 29, 2024 Cordillera Administrative Region Benguet 1st District Engineering Office
"From:
Installation of Road Safety Devices along Pico-Lamtang Road, K0256 + 000 - K0261 + 000 - K0261 + 1965, La Trinidad, Benguet;
Type of Work:
Road Safety: Pavement Markings;
Physical Target:
6928 Lineal Meter;
Allocation:
Php 125,000,000"

"To:
Installation of Road Safety Devices along Pico-Lamtang Road, K0255+(-555) - K0261 + 000 - K0261 + 1965, La Trinidad, Benguet;
Type of Work:
Road Safety: Roadway Lighting;
Physical Target:
525 Number of units;
Allocation:
Php 125,000,000"
August 5, 2024 2024 WIN4XY00332 FY 2024 GAA December 20, 2023 Region III Bulacan 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Road - K0018+541 - K0018+1059, K0019+000 - K0019+329
August 5, 2024 2024 WIN4XY00336 FY 2024 GAA December 20, 2023 Region III Bulacan 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Road - K0021+587 - K0021+877, K0022+000- K0022+060, K0022+125 - K0022+492, K0023+801 - K0023+931