May 31, 2022 |
2022 |
WIN2G02916 |
SARO-BMB-A-22-0002723 |
March 17, 2022 |
Region VI |
Iloilo 4th District Engineering Office |
UACS No.: 310102100990000
Project ID: P00605979VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Iloilo City-Leganes-Dumangas Coastal Rd - K0009 + 000 - K0010 + 344
CW1 - Preventive Maintenance of Road: Asphalt Overlay:
5.376 lane km - 23,520.00
EAO - 480.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Iloilo City-Leganes-Dumangas Coastal Rd - K0009 + 390 - K0010 + 344
CW1- Preventive Maintenance of Road: Asphalt Overlay:
3.816 lane km - 23,520.00
EAO - 480.00
|
May 31, 2022 |
2022 |
WIN2G02917 |
SARO-BMB-A-22-0002723 |
March 22, 2022 |
Region VI |
Iloilo 4th District Engineering Office |
UACS No.: 310103100986000
Project ID: P00605985VS
FROM
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance – Tertiary Roads
Iloilo-Capiz Rd (Pavia Diversion) - K0009 + 072 - K0009 + 834, K0010 + 297 - K0010 + 816
CW1 - Preventive Maintenance of Road: Asphalt Overlay:
2.562 lane km - 11,368.00
EAO - 232.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Iloilo-Capiz Rd (Pavia Diversion) - K0009 + 072 - K0009 + 875
CW1- Preventive Maintenance of Road: Asphalt Overlay:
1.606 lane km - 11,368.00
EAO - 232.00
|
May 31, 2022 |
2022 |
WIN2G02923 |
SARO-BMB-A-22-0002723 |
March 17, 2022 |
Region VI |
Iloilo 4th District Engineering Office |
UACS No.: 310103100987000
Project ID: P00605986VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Mandurriao-Sn Miguel-Alimodian-Maasin-Cabatuan Rd, K0010 + (-499) - K0012 + 200
CW1 - Preventive Maintenance of Road: Asphalt Overlay:
10.594 lane km - 47,530.00
EAO - 970.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Mandurriao-Sn Miguel-Alimodian-Maasin-Cabatuan Rd, K0010 + (-499) - K0011 + 421.5
CW1- Preventive Maintenance of Road: Asphalt Overlay:
7.71 lane km - 47,530.00
EAO - 970.00
|
May 31, 2022 |
2022 |
WIN2G02909 |
SR2022-03-006766 |
March 22, 2022 |
Region VI |
Iloilo 4th District Engineering Office |
UACS No.: 310109100875000
Project ID: P00606440VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Jct Bancal-Leon-Antique Bdry Rd - K0041 + 448 - K0041 + 558
CW1 - Construction of Road Slope Protection Structure:
5,111.11 sq.m - 88,780.00
EAO - 3,220.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Jct Bancal-Leon-Antique Bdry Rd - K0041 + 500 - K0041 + 593
CW1 - Construction of Road Slope Protection Structure:
3,949.00 sq.m. - 88,780.00
EAO - 3,220.00
|
May 31, 2022 |
2022 |
WIN2G02925 |
SR2022-03-006775 |
March 22, 2022 |
Region VI |
Iloilo 4th District Engineering Office |
UACS No.: 310109100879000
Project ID: P00606444VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Jct Bancal-Leon-Antique Bdry Rd - K0044 + 800 - K0044 + 900
CW1 - Construction of Road Slope Protection Structure:
5,166.67 sq.m. - 89,745.00
EAO - 3,255.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Jct Bancal-Leon-Antique Bdry Rd - K0044 + 500 - K0044 + 600
CW1 - Construction of Road Slope Protection Structure:
4,266.52 sq.m. - 89,745.00
EAO - 3,255.00
|
May 31, 2022 |
2022 |
WIN2G02762 |
FY 2022 GAA RA 11639 |
January 2, 2022 |
Region VI |
Iloilo City District Engineering Office |
UACS No. 310101100683000
Project ID: P00603697VS
FROM:
OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Primary Roads
Iloilo-Capiz Rd (Old Route) (S00491PN) – K0001 + 101 – K0002 + 220
CW1- Preventive Maintenance of Road: Asphalt Overlay: 4.316 Lane Km - 21,750.12
EAO - 443.88
TO:
OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Primary Roads
Iloilo-Capiz Rd (Old Route) (S00491PN) – K0002 + (-540) – K0002 + 220
CW1- Preventive Maintenance of Road: Asphalt Overlay:
3.040 Lane Km - 21,750.12
EAO - 443.88
|
May 31, 2022 |
2022 |
WIN2G02700 |
FY 2022 GAA RA 11639 |
January 2, 2022 |
Region VI |
Iloilo City District Engineering Office |
UACS No. 310103100989000
Project ID: P00603701VS
FROM:
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Tertiary Roads
Mandurriao-Sn Miguel Rd (S00044PN) K0008 + 117 – K0009 + 274.44
CW1- Preventive Maintenance of Road –
3.006 Lane Km - 15,148.79
EAO - 309.16
TO:
OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Mandurriao-Sn Miguel Rd (S00044PN) – K0008 + 117 – K0009 + 126
Preventive Maintenance of Road –
4.056 Lane Km - 15,148.79
EAO - 309.16
|
May 31, 2022 |
2022 |
WIN2G02654 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 1st District Engineering Office |
UACS No. 310101100690000
Project ID: P00603704VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod North Rd (S00408NR) - K0083 + 000 - K0083 + 188
CW1- Preventive Maintenance of Road: Asphalt Overlay:
0.752 lane km - 6,009.36
EAO - 122.64
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod North Rd (S00408NR) - K0082 + 1002 - K0083 + 284, K0083 + 318 - K0083 + 340, K0083 + 340 - K0083 + 563
CW1- Preventive Maintenance of Road: Asphalt Overlay:
0.759 lane km - 6,009.36
EAO - 122.64
|
May 31, 2022 |
2022 |
WIN2G02974 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 1st District Engineering Office |
UACS No. 310101100689000
Project ID: P00603705VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod North Rd (S00406NR) - K0066 + 000 - K0066 + 170
CW1- Preventive Maintenance of Road: Asphalt Overlay:
0.580 lane km - 4,635.40
EAO - 94.60
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Bacolod North Rd (S00406NR) - K0066 + 000 - K0066 + 120
CW1- Preventive Maintenance of Road: Asphalt Overlay:
0.480 lane km - 4,635.40
EAO - 94.60
|
May 31, 2022 |
2022 |
WIN2G02973 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 1st District Engineering Office |
UACS No. 310102100995000
Project ID: P00603724VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Jct Natl Rd Sagay-Bato-Dian-Marcelo-Balea Jct Rd (S00019NR) - K0090 + 000 - K0091 + 267
CW1- Preventive Maintenance of Road: Asphalt Overlay:
2.482 lane km - 30,407.44
EAO - 620.56
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Jct Natl Rd Sagay-Bato-Dian-Marcelo-Balea Jct Rd (S00019NR) - K0090 + 000 - K0091 + 348
CW1- Preventive Maintenance of Road: Asphalt Overlay:
5.288 lane km - 30,407.44
EAO - 620.56
|
May 31, 2022 |
2022 |
WIN2G02701 |
SR2022-02-000301 |
February 3, 2022 |
Region VI |
Negros Occidental 1st District Engineering Office |
UACS No. 310110100267000
Project ID: P00604044VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Bacolod North Rd - K0007 + (-343) - K0007 + 387, K0007 + (-793) - K0007 + (-378)
CW1- Construction of Drainage Structure along Road:
2,290 lineal meters - 56,182.30
EAO - 2,037.70
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Bacolod North Rd - K0007 + (-793) - K0008 + 224
CW1- Construction of Drainage Structure along Road:
2,664.40 lineal meters - 56,182.30
EAO - 2,037.70
|
May 31, 2022 |
2022 |
WIN2G02702 |
SR2022-02-000328 |
February 3, 2022 |
Region VI |
Negros Occidental 1st District Engineering Office |
UACS No. 310201100875000
Project ID: P00604976VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Primary Roads
Bacolod North Rd - K0078 + 401 - K0079 + 000, K0081 + 558 - K0082 + 366
CW1- Road Widening:
2.408 lane km - 52,198.78
EAO - 1,893.22
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Primary Roads
Bacolod North Rd - K0078 + 401 - K0078 + 968, K0081 + 558 - K0081 + 819, K0086 + 358 - K0091 + 457
CW1- Road Widening:
1.656 lane km - 39,872.513
ROW Acquisition: 22,680 sq.m. - 12,326.267
EAO - 1,893.22
|
May 31, 2022 |
2022 |
WIN2G02804 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 1st District Engineering Office |
UACS No. 310202101188000
Project ID: P00604978VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Vito Port Rd - K0095 + 201 - K0096 + 000
CW1- Road Widening:
1.588 lane km - 30,792.58
EAO - 628.42
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Vito Port Rd - K0094 + 498 - K0095 + 319
CW1- Road Widening:
1.588 lane km - 16,792.58
ROW Acquisition: 5,558 sq.m - 14,000.00
EAO - 628.42
|
May 31, 2022 |
2022 |
WIN2G02972 |
SR2022-02-001113 |
February 4, 2022 |
Region VI |
Negros Occidental 1st District Engineering Office |
UACS No. 310203100516000
Project ID: P00604980VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Tertiary Roads
Bacolod North Rd (Old Route) - K0074 + 000 - K0075 + 314
CW1- Road Widening:
2.640 lane km - 56,611.725
EAO - 2,053.275
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Tertiary Roads
Bacolod North Rd (Old Route) - K0074 + 000 - K0076 + 666
CW1- Road Widening:
1.877 lane km - 44,611.725
ROW Acquisition: 15,932 square meters - 12,000.00
EAO - 2,053.275
|
May 31, 2022 |
2022 |
WIN2G02694 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 3rd District Engineering Office |
UACS No. 310102100998000
Project ID: P00603737VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Bacolod South Rd (Kabankalan-Hinobaan Section) (S00224NR) - K0149 + 095 - K0149 + 875, K0150 + 774 - K0151 + 000
CW1- Preventive Maintenance of Road: Asphalt Overlay:
2.024 lane km - 16,174.90
EAO - 330.10
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Bacolod South Rd (Kabankalan-Hinobaan Section) (S00224NR) - K0148 + 348 – K0149 + 358
CW1- Preventive Maintenance of Road: Asphalt Overlay:
2.024 lane km - 16,174.90
EAO - 330.10
|
May 31, 2022 |
2022 |
WIN2G02667 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 3rd District Engineering Office |
UACS No. 310103100993000
Project ID: P00603741VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Dancalan-Candoni-Damutan Valley Rd (S00247NR) - K0108 + 541 - K0109 + 030, K0110 + 959 - K0113 + 000
CW1- Preventive Maintenance of Road: Asphalt Overlay:
4.996 lane km - 25,767.14
EAO - 525.86
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Dancalan-Candoni-Damutan Valley Rd (S00247NR) - K0108 + 541 – K0111 + 058
CW1- Preventive Maintenance of Road: Asphalt Overlay:
4.996 lane km - 25,767.14
EAO - 525.86
|
May 31, 2022 |
2022 |
WIN2G02703 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 3rd District Engineering Office |
UACS No. 310201100993000
Project ID: P00604984VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Primary Roads
Kabankalan-Bais Rd - K0111 + 763 - K0112 + 508
CW1- Road Widening:
1.454 lane km - 28,498.40
EAO - 581.60
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Primary Roads
Kabankalan-Bais Rd - K0111 + 421 – K0112 + 319
CW1- Road Widening:
1.760 lane km - 28,498.40
EAO - 581.60
|
May 31, 2022 |
2022 |
WIN2G02814 |
SARO-BMB-A-22-0002990 |
March 21, 2022 |
Region VI |
Negros Occidental 3rd District Engineering Office |
UACS No. 310202101191000
Project ID: P00606030VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Bacolod South Rd (Kabankalan - Hinobaan Section) - K0091 + 700 - K0092 + 127, K0100 + 134 - K0100 + 194, K0100 + 210 - K0100 + 270, K0106 + 914 - K0107 + 056, K0107 + 069 - K0107 + 209
CW1- Road Widening:
2,290 lane km - 24,243.24
EAO - 494.76
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Bacolod South Rd (Kabankalan - Hinobaan Section) - K0091 + 700 – K0092 + 127, K0100 + 079 – K0100 + 190, K0100 + 215 – K0100 + 229, K0106 + 837 – K0106 + 995, K0107 + 069 – K0107 + 149
CW1- Road Widening:
2,290 lane km - 24,243.24
EAO - 494.76
|
May 31, 2022 |
2022 |
WIN2G02810 |
SR2022-02-000131 |
February 3, 2022 |
Region VI |
Negros Occidental 5th District Engineering Office |
UACS No. 310101100564000
Project ID: P00603716VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Bacolod North Rd (S00425NR) - K0097 + 000 - K0098 + 000
CW1- Preventive Maintenance of Road: Asphalt Overlay:
4.072 lane km - 32,237.755
EAO - 1,169.245
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Bacolod North Rd (S00425NR) - K0097 + 000 - K0097 + 850
CW1- Preventive Maintenance of Road: Asphalt Overlay:
3.400 lane km - 32,237.755
EAO - 1,169.245
|
May 31, 2022 |
2022 |
WIN2G02748 |
SR2022-02-000244 |
February 3, 2022 |
Region VI |
Negros Occidental 5th District Engineering Office |
UACS No. 310108100906000
Project ID: P00604092VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Jct DS Benedicto-Spur 16-Calatrava Rd - K0068 + 719 - K0068 + 749, K0069 + 018 - K0069 + 034, K0082 + 112 - K0082 + 140, K0082 + 821 - K0082 + 840, K0084 + 683 - K0084 + 703, K0086 + 761 - K0086 + 779
CW1- Construction of Road Slope Protection Structure:
857.01 sq.m - 7,450.765
EAO - 270.235
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Secondary Roads
Jct DS Benedicto-Spur 16-Calatrava Rd - K0068 + 719 - K0068 + 746, K0069 + 018 - K0069 + 031.50, K0082 + 112 - K0082 + 148, K0082 + 821 - K0082 + 834.50, K0084 + 683 - K0084 + 703, K0085 + 869 - K0086 + 042, K0086 + 761 - K0086 + 779
CW1- Construction of Road Slope Protection Structure:
909.87 sq.m - 7,450.765
EAO - 270.235
|
May 30, 2022 |
2022 |
WIN2G02724 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Capiz 1st District Engineering Office |
UACS No.: 310101100679000
Project ID: P00603632VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Iloilo-Capiz Rd (New Route) (S00253PN) - K0106 + (-610) - K0106 + (-543), K0106 + (-993) - K0106 + (-610), K0113 + 632 - K0114 + 875, K0115 + 345 - K0115 + 459
CW1- Preventive Maintenance of Road: Asphalt Overlay:
6.899 lane km - 34,766.48
EAO - 709.52
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Iloilo-Capiz Rd (New Route) (S00253PN) - K0106 + (-993) – K0106 + (-543), K0110 + 775 – K0110 + 995, K0113 + 504 – K0114 + 830
CW1- Preventive Maintenance of Road: Asphalt Overlay:
8.04 lane km - 34,766.48
EAO - 709.52
|
May 30, 2022 |
2022 |
WIN2G02699 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Capiz 1st District Engineering Office |
UACS No.: 310111100441000
Project ID: P00603971VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Roxas City-Cagay-Sibaguan-Balijuagan-Cudian-Ivisan Rd - K0104 + 400 - K0105 + 100, K0105 + 400 - K0105 + 892, K0105 + 910 - K0106 + 416
CW1- Construction of Drainage Structure along Road:
1,698 lineal meters - 29,400.00
EAO - 600.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Roxas City-Cagay-Sibaguan-Balijuagan-Cudian-Ivisan Rd - K0104 + 400 - K0105 + 500, K0105 + 910 - K0106 + 500, K0109 + 258.98 - K0109 + 466.98
CW1-
Construction of Drainage Structure along Road:
958 lineal meters - 23,178.60
CW2 - Off-Carriageway Improvement: Paving of Shoulders:
4,197.59 sq.m. - 6,221.40
EAO - 600.00
|
May 30, 2022 |
2022 |
WIN2G02879 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Capiz 1st District Engineering Office |
UACS No.: 310102100975000
Project ID: P00603635VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Iloilo East Coast-Capiz Rd (S00273PN) - K0128 + 488 - K0129 + 000, K0129 + 913 - K0130 + 519
CW1- Preventive Maintenance of Road: Asphalt Overlay:
3.392 lane km - 17,093.16
EAO - 348.84
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Iloilo East Coast-Capiz Rd (S00273PN) - K0128 + 488 - K0129 + 402
CW1- Preventive Maintenance of Road: Asphalt Overlay:
3.759 lane km - 17,093.16
EAO - 348.84
|
May 30, 2022 |
2022 |
WIN2G02829 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Capiz 1st District Engineering Office |
UACS No.: 310105100722000
Project ID: P00603638VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Capiz Rd (S00273PN) - K0122 + 865 - K0123 + 000
CW1- Reconstruction to Concrete Pavement:
0.184 lane km - 3,145.80
EAO - 64.20
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Capiz Rd (S00273PN) - K0122 + 774 - K0123 + 000
CW1- Reconstruction to Concrete Pavement:
0.366 lane km - 3,145.80
EAO - 64.20
|
May 30, 2022 |
2022 |
WIN2G02668 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Capiz 1st District Engineering Office |
UACS No.: 310108101165000
Project ID: P00604064VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Iloilo East Coast-Capiz Rd - K0127 + 513 - K0127 + 777, K0128 + 290 - K0128 + 405, K0140 + 694 - K0140 + 749, K0153 + 030 - K0153 + 210, K0158 + 490 - K0158 + 700, K0164 + 130 - K0164 + 181, K0164 + 221 - K0164 + 434, K0165 + 620 - K0165 + 681, K0166 + 528 - K0166 + 611, K0167 + 308 - K0167 + 357
CW1- Construction of Road Slope Protection Structure:
5,971.51 sq.m - 14,700.00
EAO - 300.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Iloilo East Coast-Capiz Rd - K0128 + 290 - K0128 + 405, K0140 + 694 - K0140 + 749, K0158 + 490 - K0158 + 680, K0162 + 302 - K0162 + 338, K0164 + 130 - K0164 + 200, K0164 + 221 - K0164 + 420
CW1- Construction of Road Slope Protection Structure:
2,045.11 sq.m - 14,700.00
EAO - 300.00
|
May 30, 2022 |
2022 |
WIN2G02773 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Capiz 1st District Engineering Office |
UACS No.: 310202101167000
Project ID: P00604834VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Maayon-Jct Bailan Rd - K0123 + 400 - K0124 + 000
CW1- Road Widening:
1.210 lane km - 12,320.56
EAO - 251.44
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Maayon-Jct Bailan Rd - K0123 + 565 - K0124 + 200
CW1- Road Widening:
1.213 lane km - 12,320.56
EAO - 251.44
|
May 30, 2022 |
2022 |
WIN2G02710 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Capiz 1st District Engineering Office |
UACS No.: 310202101163000
Project ID: P00604837VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Iloilo East Coast-Capiz Rd - K0141 + 140 - K0141 + 547
CW1- Road Widening:
0.814 lane km - 10,370.36
EAO - 211.64
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Iloilo East Coast-Capiz Rd - K0141 + 140 - K0141 + 437, K0148 + 170 - K0148 + 300
CW1- Road Widening:
0.854 lane km - 10,370.36
EAO - 211.64
|
May 30, 2022 |
2022 |
WIN2G02796 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Capiz 1st District Engineering Office |
UACS No.: 310105100721000
Project ID: P00603634VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Capiz Rd (S00273PN) - K0117 + 465 - K0117 + 531, K0117 + 803 - K0117 + 883
CW1- Reconstruction to Concrete Pavement:
0.372 lane km - 6,191.64
EAO - 126.36
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Capiz Rd (S00273PN) - K0116 + 220 - K0116 + 400, K0117 + 000 – K0117 + 093
CW1- Reconstruction to Concrete Pavement:
0.546 lane km - 6,191.64
EAO - 126.36
|
May 30, 2022 |
2022 |
WIN2G02776 |
FY 2022 GAA RA 11639 |
January 15, 2022 |
Region VI |
Guimaras District Engineering Office |
UACS No. 310111100443000
Project ID: P00603974VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Guimaras Circumferential Rd - K0008 + 110 - K0008 + 265, K0000 + 216 - K0000 + 389
CW1 - Construction of Drainage Structure along Road:
483 lineal meters - 18,192.72
EAO - 371.28
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Guimaras Circumferential Rd - K0008 + 165 - K0008 + 235, K0000 + 211 - K0000 + 375
CW1 - Construction of Drainage Structure along Road:
311.86 lineal meters - 17,187.72
ROW Acquisition:
585.00 sq.m - 1,005.00
EAO - 371.28
|
May 30, 2022 |
2022 |
WIN2G02670 |
SR2022-02-000360 |
February 3, 2022 |
Region VI |
Guimaras District Engineering Office |
UACS No. 310202100999000
Project ID: P00604843VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Guimaras Circumferential Rd - K0030 + 000 - K0031 + 388
CW1 - Road Widening:
2.79 lane Km - 80,636.365
EAO - 2,924.635
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Guimaras Circumferential Rd - K0030 + 000 - K0031 + 000
CW1 - Road Widening:
2.014 lane km - 76,636.365
ROW Acquisition:
5,035 sq.m - 4,000.00
EAO - 2,924.635
|
May 30, 2022 |
2022 |
WIN2G02662 |
FY 2022 GAA RA 11639 |
January 15, 2022 |
Region VI |
Guimaras District Engineering Office |
UACS No. 310202101168000
Project ID: P00604846VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Central Rd (Sn Miguel-Constancia-Cabano-Igcawayan) - K0062 + 000 - K0063 + 000
CW1 - Road Widening:
2.012 lane Km - 29,451.94
EAO - 601.06
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Central Rd (Sn Miguel-Constancia-Cabano-Igcawayan) - K0062 + 000 - K0062 + 630
CW1 - Road Widening:
1.260 lane km - 27,974.94
ROW Acquisition:
3,150.00 sq.m - 1,477.00
EAO - 601.06
|
May 30, 2022 |
2022 |
WIN2G02749 |
SR2022-02-000355 |
February 3, 2022 |
Region VI |
Guimaras District Engineering Office |
UACS No. 310202100997000
Project ID: P00604847VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Central Rd (Sn Miguel-Constancia-Cabano-Igcawayan) - K0051 + (-1127) - K0051 + 140
CW1 - Road Widening:
2.534 lane Km - 75,101.125
EAO - 2,723.875
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Central Rd (Sn Miguel-Constancia-Cabano-Igcawayan) - K0051 + (-1127) - K0051 + 386
CW1 - Road Widening:
3.026 lane km - 72,869.125
ROW Acquisition:
7,565.00 sq.m - 2,232.00
EAO - 2,723.875
|
May 30, 2022 |
2022 |
WIN2G02770 |
SR2022-02-000376 |
February 3, 2022 |
Region VI |
Guimaras District Engineering Office |
UACS No. 310202101003000
Project ID: P00604848VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Guimaras Circumferential Rd - K0055 + 000 - K0056 + 372
CW1 - Road Widening:
2.744 lane Km - 82,549.96
EAO - 2,994.04
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Guimaras Circumferential Rd - K0055 + 000 - K0056 + 600
CW1 - Road Widening:
3.200 lane km - 79,188.96
ROW Acquisition:
8,000 sq.m - 3,361.00
EAO - 2,994.04
|
May 30, 2022 |
2022 |
WIN2G02848 |
SR2022-03-007967 |
March 23, 2022 |
Region VI |
Guimaras District Engineering Office |
UACS No. 310102100834000
Project ID: P00605974VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Guimaras Circumferential Rd - K0000 + 451 - K0005 + 732
CW1 - Preventive Maintenance of
Road: Asphalt
Overlay:
20.909 lane km - 95,438.50
EAO - 3,461.50
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Guimaras Circumferential Rd - K0000 + 451 - K0001 + 000, K0001 + 800 - K0002 + 081, K0002 + 750 - K0005 + 732
CW1 - Preventive Maintenance of
Road: Asphalt
Overlay:
15.24 lane km - 95,438.50
EAO - 3,461.50
|
May 30, 2022 |
2022 |
WIN2G02801 |
SR2022-03-007975 |
March 23, 2022 |
Region VI |
Guimaras District Engineering Office |
UACS No. 310102100836000
Project ID: P00605976VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Guimaras Circumferential Rd - K0006 + 797 - K0033 + 000
CW1 - Preventive Maintenance of
Road: Asphalt
Overlay:
52.406 lane km - 91,675.00
EAO - 3,325.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Guimaras Circumferential Rd - K0006 +797 – K0007 +209, K0011 + 909 – K0012 + 216, K0013 + 000 – K0013 + 637, K0018 + 000 – K00019 + 345, K0024 + 000 – K0025 + 403, K0028 + 889 – K0029 + 508, K0029 + 802 – K0030 + 000, K0031 + 388 – K0031 + 602, K0032 + 629 – K0033 + 000
CW1 - Preventive Maintenance of
Road: Asphalt
Overlay:
16.048 lane km - 91,675.00
EAO - 3,325.00
|
May 26, 2022 |
FY 2022 GAA |
WIN2G02990 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 310109100996000
Project ID : P00611442LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
FROM :
Odiongan - East - West Road
K0009+128.00 - K0009+193.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,801.00 Square Meters
Allocation - Php 40.00 Million
TO :
Odiongan - East - West Road
K0009+128.00 - K0009+157.70
Physical Target - CW1- Construction of Road Slope Protection
Structure : 1,801.00 Square Meters
Allocation - php 40.00 Million
|
May 26, 2022 |
FY 2022 GAA |
WIN2G02996 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 320102105003000
Project ID : P00621492LZ
002 : Protect Lives and Properties
Flood Management - Construction/Rehabilitation of Flood Mitigation
Facilities along Major Basins and Principal Rivers
FROM :
Construction of Jun Carlo, Flood Control Structure (Upstream),
San Fernando, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure
149.20 lane Km
Allocation - Php 25.00 Million
TO :
Construction of Jun Carlo, Flood Control Structure (Upstream),
San Andres, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure
149.20 lane Km
Allocation - Php 25.00 Million
|
May 26, 2022 |
FY 2022 GAA |
WIN2G02991 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 3002151002592000
Project ID : P00638898LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or bridges from the National Road/s
leading to major/Strategic Public Buildings/Facilities
FROM :
Construction of Tugdan to Cahayagan Alcantara Road (Phase 2),
Sta. 2+800.00 - Sta. 4+780.00,
Odiongan, Romblon
Physical Target - CW1 - Construction of Gravel Road :
3.960 lane Km
Allocation - Php 100.00 Million
TO :
Construction of Tugdan to cahayagan Road (Phase),
Sta. 2+800.00 - Sta. 4+780.00,
Alcantara, Romblon
Physical Target - CW1 - Construction of Gravel Road :
3.960 Lane Km
Allocation - Php 100.00 Million
|
May 26, 2022 |
FY 2022 GAA |
WIN2G02985 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310109100861000
Project ID : P00609320LZ
001: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse, and Landslide - Tertiary Roads
FROM :
Palawan Circ. Road (Panalingaan-Tagbita-Latud)
K0263+580.30 - K0263+912.40
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 5,805.28 square meter
Allocation - Php 104.495 Million
TO :
Palawan Circ. Road (Panalingaan-Tagbita-Latud)
K0263+580 - K0263+832
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 4,666.70 square meter
Allocation - Php 104.495 Million |
May 26, 2022 |
FY 2022 GAA |
WIN2G02993 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310102100816000
Project ID : P00609333LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
FROM :
Puerto Princesa North Road
K0203+500 - K0208+890
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt overlay - 10.688 lane km
Allocation - Php 104.270 Million
TO :
Puerto Princesa North Road
K0203+500 - K0208+238
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 9.384 lane Km
Allocation - Php 104.270 Million
|
May 26, 2022 |
2022 |
WIN2C03576 |
GAA FY 2022 |
January 1, 2022 |
Region VIII |
Northern Samar 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd-K0815 + 300 - K0816 + 000, K0828 + 700 - K0828 + 850
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 12,750 Square meters
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd-K0815+840 - K0815+880, K0828+540 - K0828+690
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 49.00 M
Structure: 2,240 Square meters
EAO P 1.00 M
Total P 50.00 M
|
May 26, 2022 |
FY 2022 GAA |
WIN2G02984 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310108100886000
Project ID : P00611362LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
FROM :
Tablas Circumferential Road
K0042+340 - K0042+742
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 12,666.67 square meter
Allocation - Php 228.00 Million
TO :
Tablas Circumferential Road
K0042+340 - K0042+632
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 10,424.40 square meter
Allocation - Php 228.00 Million
|
May 26, 2022 |
FY 2022 GAA |
WIN2G02994 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. ; 300215101638000
Project ID : P00636970LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide,
Port Barton - Kemdeng Road, San Vicente, Palawan
Sta. 1+089.00 - Sta. 1+166.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 720.791 Square meter
Allocation - Php 32.165 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Port Barton - Kemdeng Road, San Vicente, Palawan
Sta. 0+633.00 - Sta. 0+770.00
Physical Target - Php 32.165 Million
|
May 26, 2022 |
FY 2022 GAA |
WIN2G02995 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215101612000
Project ID : P00639231LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Building/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vicente, Palawan
Sta. 172+286.00 - Sta. 172+417.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 849.15 Square meter
Allocation - Php 37.893 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vivente, Palawan
Sta. 172+286.00 - Sta. 172+417.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1,651.15 Square meter
Allocation - Php 37.893 Million |
May 25, 2022 |
FY 2022 GAA |
WIN2G02860 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 320101108194000
Project ID : P00620676Lz
002 : Protect Lives and Properties
Flood Management Program - Construction/Maintenance of Flood
Mitigation Structures and Drainage System
FROM :
Construction of Flood Mitigation Structure,
Brgy. Hagan, Sta. 0+000 - Sta. 0+250,
Bongabong, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation
Structure - 118.897 l.m.
Allocation - Php 14.291 Million
TO :
Construction of Flood Mitigation Structure,
Brgy. Hagan, Sta. 0+000 - Sta. 0+112,
Bongabong, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation
Structure - 224.00 l.m.
Allocation - Php 14.291 Million
|
May 25, 2022 |
FY 2022 GAA |
WIN2G02853 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 320102105013000
Project ID : P00621116LZ
002 : Protect Lives and Properties
Flood Management Program - Construction/Rehabilitation of
Flood Mitigation Facilities within major Basins and Principal Rivers
FROM :
Construction of Bansud River Control,
Sta. 0+000 - Sta. 0+560,
Bansud, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation
Structure - 415.984 l.m.
Allocation - Php 50.00 Million
TO :
Construction of Bansud River Control,
Sta. 0+000 - Sta. 670,
Bansud, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation
Structure - 670.00 l.m.
Allocation - Php 50.00 Million
|
May 25, 2022 |
FY 2022 GAA |
WIN2G02852 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 320102105008000
Project ID : P00621119LZ
002 : Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/Rehabilitation of
Flood Mitigation Facilities within Major River Basins and
Principal Rivers
FROM :
Construction of Baroc River Control,
Brgy. Sta. Brigida Section, Sta. 0+000 - Sta. 0+680,
Mansalay, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
415.98 Lane Km
Allocation - Php 50.00 Million
TO :
Construction of Baroc River Control,
Brgy. Sta. Brigida Section, Sta. 0+000 - Sta. 0+770,
Mansalay, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
770.0 Lane Km
Allocation - Php 50.00 Million
|
May 25, 2022 |
2022 |
WIN2C03566 |
SARO-BMB-A-22-0003173 |
March 21, 2022 |
Region VIII |
Eastern Samar District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Wright-Taft-Borongan
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 48.485500 M
Structure: 2,748.610 Square meters
EAO P 0.989500 M
Total P 49.475 M
AS MODIFIED:
Wright-Taft-Borongan Rd - K0872 + 808 - K0872 + 858
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 48.485500 M
Structure: 1,741.05 Square meters
EAO P 0.989500 M
Total P 49.475 M |
May 25, 2022 |
FY 2022 GAA |
WIN2G02845 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 320102105013000
Project ID : P00621124LZ
002 ; Protect Lives and Properties
Flood Mitigation Program - Construction/Rehabilitation of Flood
Mitigation Facilities within Major Basins and Principal Rivers
FROM :
Construction of Pula River Control,
Brgy. Sto. Nino Section, Sta. 0+000 - Sta. 0+440,
Pinamalaym.an, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
415.984 l.m.
Allocation - Php 50.00 Million
TO :
Construction of Pula River Control,
Brgy. Sto. Nino Section, Sta. 0+000 - Sta. 0+468.8,
Pinamalayan, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
468.80 l.m.
Allocation - Php 50.00 Million
|
May 25, 2022 |
2022 |
WIN2C03564 |
SR2022-03-007930 |
March 23, 2022 |
Region VIII |
Eastern Samar District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Wright-Taft-Borongan Rd - K0871 + 400 - K0871 + 700
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 91.134600 M
Structure: 5,246.670 Square meters
EAO P 3.305400 M
Total P 94.440 M
AS MODIFIED:
Wright-Taft-Borongan Rd - K0872 + 558 - K0872 + 658
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 91.134600 M
Structure: 3,383.40 Square meters
EAO P 3.305400 M
Total P 94.440 M |
May 25, 2022 |
FY 2022 GAA |
WIN2G02792 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 320102105012000
Project ID : P00621123LZ
002 : Protect Lives and Properties
Flood management Program - Construction/Rehabilitation of
Flood Mitigation Facilities within major basins and Principal Rivers
FROM :
Construction of Pula River Control,
Brgy. Pagalagala Section,
Sta. 0+000 - Sta. 0+480
Physical Target - CW1 - Construction of Flood Mitigation Structure
415.98 l.m.
Allocation - Php 50.00 Million
TO :
Construction of Pula River Control,
Brgy. Pagalagala Section,
Sta. 0+000 - Sta. 0+480,
Sta. 0+000 - Sta. 0+086
Physical Target - CW1 - Construction of Flood Mitigation Structure
566.00 l.m.
Allocation - Php 50.00 Million |
May 25, 2022 |
2022 |
WIN2C03562 |
SR2022-03-007938 |
March 23, 2022 |
Region VIII |
Eastern Samar District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Wright-Taft-Borongan Rd - K0871 + 700 - K0872 + 000
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 93.384015 M
Structure: 5,376.170 Square meters
EAO P 3.386985 M
Total P 96.771 M
AS MODIFIED:
Wright-Taft-Borongan Rd - K0872 + 358 - K0872 + 458
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 93.384015 M
Structure: 3,493 Square meters
EAO P 3.386985 M
Total P 96.771 M
|
May 25, 2022 |
2022 |
WIN2E02386 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 300217100099000
Project ID: P00630445MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
FROM:
Agusan del Norte / Agusan del Sur North - South Lateral Road, (Las Nieves, Agusan del Norte - Kapalong, Davao del Norte), La Paz - Loreto Section, Package 1, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Bridge
Physical Target:
CW1- 6.380 Lane Km
CW2- 286.200 Square meters
Allocation:
TOTAL: P 180,000,000
CW1: P 133,392,713
CW2: P 40,307,287
EAO: P 6,300,000
Unit Cost:
CW1: P 20,907,948.75/ Lane Km
CW2: P 140,836.08/ Square meters
TO:
Agusan del Norte / Agusan del Sur North - South Lateral Road, (Las Nieves, Agusan del Norte - Kapalong, Davao del Norte), La Paz - Loreto Section, Package 1, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Gravel Road
Physical Target:
CW1- 0.600 Lane Km
CW2- 14.100 Lane Km
Allocation:
TOTAL: P 180,000,000
CW1: P 14,135,628.62
CW2: P 159,564,371.38
EAO: P 6,300,000
Unit Cost:
CW1: P 23,559,381.03/ Lane Km
CW2: P 11,316,622.08/ Lane Km |
May 25, 2022 |
2022 |
WIN2C03567 |
SR2022-03-007943 |
March 23, 2022 |
Region VIII |
Eastern Samar District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Wright-Taft-Borongan Rd - K0872 + 000 - K0872 + 300
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 96.075400 M
Structure: 5,531.110 Square meters
EAO P 3.484600 M
Total P 99.560 M
AS MODIFIED:
Wright-Taft-Borongan Rd - K0872 + 258 - K0872 + 358
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 96.075400 M
Structure: 3,621 Square meters
EAO P 3.484600 M
Total P 99.560 M
|
May 25, 2022 |
2022 |
WIN2C03555 |
SR2022-03-007957 |
March 23, 2022 |
Region VIII |
Eastern Samar District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Wright-Taft-Borongan Rd - K0872 + 300 - K0872 + 600
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 94.241900 M
Structure: 5,425.560 Square meters
EAO P 3.418100 M
Total P 97.660 M
AS MODIFIED:
Wright-Taft-Borongan Rd - K0872 + 458 - K0872 + 558
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 94.241900 M
Structure: 3,534.50 Square meters
EAO P 3.418100 M
Total P 97.660 M |
May 25, 2022 |
2022 |
WIN2C03563 |
SR2022-03-007960 |
March 23, 2022 |
Region VIII |
Eastern Samar District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Wright-Taft-Borongan Rd - K0872 + 600 - K0872 + 900
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 94.782300 M
Structure: 5,456.670 Square meters
EAO P 3.437700 M
Total P 98.220 M
AS MODIFIED:
Wright-Taft-Borongan Rd - K0872 + 658 - K0872 + 758
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 94.782300 M
Structure: 3,559.80 Square meters
EAO P 3.437700 M
Total P 98.220 M |
May 25, 2022 |
2022 |
WIN2E02317 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. : 300215102369000
Project ID: P00630409MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road in Sudlon Mountain Farm at Barangay Binocaran, Malimono, Surigao del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.983 Lane Km
Allocation:
TOTAL: P 10,000,000
CW1: P 9,800,000
EAO: P 200,000
Unit Cost:
CW1: P 9,969,481.18/ Lane Km
TO:
Construction of Road in Sudlon Mountain Farm at Barangay Binocaran, Malimono, Surigao del Norte
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 0.469 Lane Km
CW1- 960.225 Square meters
Allocation:
TOTAL: P 10,000,000
CW1: P 4,171,661.5
CW2: P 5,628,338.5
EAO: P 200,000
Unit Cost:
CW1: P 8,894,800.64/ Lane Km
CW2: P 5,861.48/ Square meters |
May 25, 2022 |
2022 |
WIN2E02313 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Surigao del Norte 2nd District Engineering Office |
UACS No. : 310202101248000
Project ID: P00602517MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads
FROM:
Surigao-Davao Coastal Rd - K1201 + 000 - K1201 + 567
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 1.134 Lane Km
Allocation:
TOTAL: P 31,369,000
CW1: P 30,741,620
EAO: P 627,380
Unit Cost:
CW1: P 27,109,012.35/ Lane Km
TO:
Surigao-Davao Coastal Rd - K1200 + 454.10 - K1201 + 900
Type of Work:
CW1- Road Widening
CW2- Construction of Drainage Structure along Road
Physical Target:
CW1- 1.7979 Lane Km
CW2- 1,139.680 Lineal meters
Allocation:
TOTAL: P 31,369,000
CW1: P 25,425,058.22
CW2: P 5,316,561.78
EAO: P 627,380
Unit Cost:
CW1: P 14,141,530.8/ Lane Km
CW2: P 4,664.96/ Lineal meters |
May 25, 2022 |
FY 2022 GAA |
WIN2G02726 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 300201100085000
Project ID : P00635454LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAMM
FROM ;
Construction/Improvement of Access Roads leading to Airports
(Kalsada Tungo sa Paliparan, Riles at Daungan Program - KATUPARAN), Pinamalayan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Bridge
230.955 sq.m.
Allocation - Php 24.264 Million
TO :
Construction/Improvement of Access Roads leading to Airports -
(Kalsada Tungo sa Paliparan, Riles at Daungan Program -
KATUPARAN0, Pinamalayan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Bridge :
73 sq.m.
CW2 - Rehabilitation of Paved Road :
0.7344 lane km
Allocation - Php 24.264 Million
73 sq.m.
|
May 25, 2022 |
2022 |
WIN2C03557 |
SR2022-03-008098 |
March 23, 2022 |
Region VIII |
Eastern Samar District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Arteche-Jipapad-Las Navas-Rawis Rd
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 89.630165 M
Structure: 5,160.060 Square meters
EAO P 3.250835 M
Total P 92.881 M
AS MODIFIED:
Arteche-Jipapad-Las Navas-Rawis Rd- (S00137SM) K0968 + 985 – K0970 + 060, (S00174SM) K0974 + 442 – K0977 + 428, (S00189SM) K0978 + 083 – K0979 + 437
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 89.630165 M
Structure: 11,785.20 Square meters
EAO P 3.250835 M
Total P 92.881 M
|
May 25, 2022 |
2022 |
WIN2C03565 |
GAA FY 2022 |
January 2, 2022 |
Region VIII |
Eastern Samar District Engineering Office |
Convergence and Special Support Program
Convergence and Special Support - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations
AS PER GAA/ORIGINAL:
Access Road leading to Tourist Destination from Borongan Airport to Hilangagan Beach, Borongan City, Eastern Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 16.599240 M
: 1.129 Lane Km
EAO P 0.338760 M
Total P 16.938 M
AS MODIFIED:
Access Road leading to Tourist Destination from Borongan Airport to Hilangagan Beach, Borongan City, Eastern Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 16.599240 M
: 0.58 Lane Km
EAO P 0.338760 M
Total P 16.938 M
|
May 24, 2022 |
FY 2022 GAA |
WIN2G02906 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 310202101135000
Project ID : P00606216LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Calapan South Road
K0140+000 - K0140+405
Physical Target - CW1 - Road Widening - 0.810 Lane Km
Allocation - Php 12.00 Million
TO :
Calapan South Road
K0140+000 - K0140+283
Physical Target - CW1 - Road Widening - 0.566 Lane Km
Allocation - Php 12.00 Million |
May 24, 2022 |
FY 2022 GAA |
WIN2G02683 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 310202101134000
Project ID : P00606227LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM :
Calapan South Road
K0138+458 - K0138+910
Physical Target - CW1 - Road Widening - 0.904 Lane Km
Allocation - Php 15.00 Million
TO :
Calapan South Road
K0138+458 - K0138+908.70
Physical Target - CW1 - Road Widening - 0.9014 Lane Km
Allocation - Php 15.00 Million |
May 24, 2022 |
FY 2022 GAA |
WIN2G02747 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 310202101136000
Project ID : P00606268LZ
001 : Ensure Safe and Reliable national Road System
Network Development - Road Widening - Secondary Roads
FROM :
Calapan South Road
K0145+637 - K0146+750
Physical Target - CW1 - Road Widening : 2.326 Lane Km
Allocation - Php 38.00 Million
TO :
Calapan South Road
K0145+637 - K0146+530
Physical Target - CW1 - Road Widening : 1.855 Lane Km
Allocation - Php 38.00 Million |
May 24, 2022 |
2022 |
WIN2C03566 |
GAA FY 2022 |
January 3, 2022 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL:
Tacloban-Baybay South Rd - K0998 + 400 - K0998 + 700
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 19.600 M
Structure: 1,111.10 Square meters
EAO P 0.400 M
Total P 20.00 M
AS MODIFIED:
Tacloban-Baybay South Rd - K0996 + 160 - K0996 + 200, K0998 + 325 - K0998 + 425
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 19.600 M
Structure: 550 Square meters
EAO P 0.400 M
Total P 20.00 M
|
May 24, 2022 |
FY 2022 GAA |
WIN2G02992 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 310108100893000
Project ID : P00611271LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of Roads with
Slips, Slope Collapse, and Landslide - Secondary Roads
FROM :
Calapan South Road
K0192+100 - K0192+151,
K0192+288 - K0192+334,
K0192+362 - K0192+415
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 966.66 sq. m.
Allocation - Php 17.40 Million
TO :
Calapan South Road
K0192+100.0 - K0192+150,
K0192+280.0 - K0192+332,
K0192+362.2 - K0192+415
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1030.97 sq.m.
Allocation - Php 17.40 Million
|
May 24, 2022 |
2022 |
WIN2C03570 |
SARO-BMB-A-22-0003170 |
March 23, 2022 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (LT) - K0996 + 900 - K0997 + 100, K0997 + 200 - K0997 + 400
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 96.500 M
Structure: 5,555.560 Square meters
EAO P 3.500 M
Total P 100.00 M
AS MODIFIED:
Daang Maharlika (LT) - K0979 + 915 - K0979 + 985
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 96.500 M
Structure: 2,534.00 Square meters
EAO P 3.500 M
Total P 100.00 M |
May 24, 2022 |
2022 |
WIN2C03559 |
SARO-BMB-A-22-0003177 |
March 21, 2022 |
Region VIII |
Leyte 5th District Engineering Office |
Convergence and Special Support Program
Construction/ Rehabilitation of Water Supply/ Septage and Sewerage/ Rainwater Collector System - Water Supply
AS PER GAA/ORIGINAL:
Construction of Level III Water Supply System, Abuyog, Leyte
Physical Target: Allocation:
CW1-Construction of Water Supply Systems P 49.00 M
: 1.00 Number of Water Supply Systems
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Construction of Level III Water Supply System, Abuyog, Leyte
Physical Target: Allocation:
CW1-Construction of Water Supply Systems P 49.00 M
: 15.00 Number of Water Supply Systems
EAO P 1.00 M
Total P 50.00 |
May 24, 2022 |
2022 |
WIN2C03558 |
SARO-BMB-A-22-0003177 |
March 21, 2022 |
Region VIII |
Leyte 5th District Engineering Office |
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
AS PER GAA/ORIGINAL:
Construction (Completion) of Baybay City Boardwalk, Baybay City Reclamation Area, Poblacion, Baybay City, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road P 49.00 M
: 4.262 Lane Km
EAO P 1.00 M
Total P 50.00 M
AS MODIFIED:
Construction (Completion) of Baybay City Boardwalk, Baybay City Reclamation Area, Poblacion, Baybay City, Leyte
Physical Target: Allocation:
CW1-Construction of Other Facilities P 49.00 M
: 5.00 Number of Facilities
EAO P 1.00 M
Total P 50.00 M
|
May 24, 2022 |
2022 |
WIN2F06366 |
SARO-BMB-A-22-0002929 |
March 21, 2022 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: Construction of Cacuduran Flood Control, Nawal, Bokod, Benguet;
Physical Target: 176.929 Lineal Meters;
Allocation: Php 20,000,000.000
To: Construction of Cacuduran Flood Control, Nawal, Bokod, Benguet;
Physical Target: 323.000 Lineal Meters;
Allocation: Php 20,000,000.000
|
May 24, 2022 |
2022 |
WIN2F06367 |
SARO-BMB-A-22-0002929 |
March 21, 2022 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: Construction of Poblacion Flood Control, Bokod, Benguet;
Physical Target: 88.464 Lineal Meters;
Allocation: Php 10,000,000.000
To: Construction of Poblacion Flood Control, Bokod, Benguet;
Physical Target: 169.000 Lineal Meters;
Allocation: Php 10,000,000.000
|
May 24, 2022 |
2022 |
WIN2C03568 |
SARO-BMB-A-22-0003173 |
March 21, 2022 |
Region VIII |
Eastern Samar District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Wright-Taft-Borongan Rd - K0867 + 150 - K0867 + 450
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 48.486480 M
Structure: 2,748.670 Square meters
EAO P 0.989520 M
Total P 49.476 M
AS MODIFIED:
Wright-Taft-Borongan Rd - K0872 + 758 - K0872 + 808
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 48.486480 M
Structure: 1,738 Square meters
EAO P 0.989520 M
Total P 49.476 M |
May 24, 2022 |
FY 2022 |
WIN2C03556 |
UACS No. 320101107911000 |
March 21, 2022 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA/Original
UACS No. 320101107911000
Project ID.: P00621436LZ
OO2: Protect Lives and Properties Against Major Floods
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Flood Control Structure, Laguna Creek, Barangay Kristong Hari, Quezon City
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 412.53 lineal meters
Unit Cost = P 71,267,540/lineal meters
Allocation = P 29,400,000
EAO = P 600,000
Total = P 30,000,000
As Modified
OO2: Protect Lives and Properties Against Major Floods
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Flood Control Structure, Lagarian Creek, Barangay Kristong Hari, Quezon City
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 370.00 lineal meters
Unit Cost = P 79,459,460/lineal meters
Allocation = P 29,400,000
EAO = P 600,000
Total = P 30,000,000
WIN2C03556
|
May 24, 2022 |
FY 2022 |
WIN2C03569 |
UACS No. 310102100792000 |
March 1, 2022 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA/Original
UACS No. 310102100792000
Project ID.: P00610107LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Fairview Ave – K0024+820 – K0023+300
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay - 13.16 lane km
Unit Cost = P 7,332,820/lane km
Allocation = P 96,500,000
EAO = P 3,500,000
Total = P 100,000,000
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Fairview Ave – K0024+(-550) – K0023+300
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay – 6.94 lane km
Unit Cost = P 13,904,900/lane km
Allocation = P 96,500,000
EAO = P 3,500,000
Total = P 100,000,000
WIN2C03569
|
May 24, 2022 |
FY 2022 |
WIN2C03572 |
UACS No. 310103100854000 |
March 1, 2022 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA/Original
UACS No. 310103100854000
Project ID.: P00603593LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Dapitan St – K0006+(-326) – K0006+225
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay - 1.476 lane km
Unit Cost = P 2,433,400/lane km
Allocation = P 3,591,700
EAO = P 73,300
Total = P 3,665,000
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Dapitan St – K0006+(-326) – K0006+225
Physical Target: CW1- Preventive Maintenance of Road: Concrete Reblocking – 0.177 lane km
Unit Cost = P 20,290,430/lane km
Allocation = P 3,591,700
EAO = P 73,300
Total = P 3,665,000
WIN2C03572
|
May 24, 2022 |
FY 2022 |
WIN2C03571 |
UACS No. 310103100778000 |
March 1, 2022 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA/Original
UACS No. 310103100778000
Project ID.: P00610134LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Visayas Ave – K0013+1068 – K0014+(-399), K0013+900 – K0014+000
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay - 13.431 lane km
Unit Cost = P 7,184,870/lane km
Allocation = P 96,500,000
EAO = P 3,500,000
Total = P 100,000,000
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Visayas Ave – K0012+(-079) – K0014+328
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay - 6.756 lane km
Unit Cost = P 14,283,490/lane km
Allocation = P 96,500,000
EAO = P 3,500,000
Total = P 100,000,000
WIN2C03571
|
May 24, 2022 |
FY 2022 |
WIN2C03573 |
UACS No. 310101100603000 |
March 1, 2022 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA/Original
UACS No. 310101100603000
Project ID.: P00603595LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Cloverleaf (S05131LZ) – Chainage 0 – Chainage 234
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay - 0.47 lane km
Unit Cost = P 7,800,380/lane km
Allocation = P 3,666,180
EAO = P 74,820
Total = P 3,741,000
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Cloverleaf (S05131LZ) – Chainage 0 – Chainage 234
Physical Target: CW1- Preventive Maintenance of Road: Concrete Reblocking - 0.184 lane km
Unit Cost = P 19,923,060/lane km
Allocation = P 3,666,180
EAO = P 74,820
Total = P 3,741,000
WIN2C03573
|
May 24, 2022 |
2022 |
WIN2F06258 |
SARO-BMB-A-22-0002937 |
March 21, 2022 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: Kiangan-Tinoc-Buguias Rd - K0341+093 - K0341+114, K0341+133 - K0341+163, K0341+427 - K0341+445, K0341+488 - K0341+507, K0342+583 - K0342+621, K0342+736 - K0342+760, K0344+724 - K0344+776, K0348+122 - K0348+163, K0348+313 - K0348+335, K0348+618 - K0348+638, K0350+888 - K0350+919, K0351+860 - K0351+894, K0352+333 - K0352+414, K0355+703 - K0355+733, K0358+460 - K0358+520;
Physical Target: 3,023.000 Square Meters;
Allocation: Php 30,230,000.000
To: Kiangan-Tinoc-Buguias Rd - K0341+093 - K0341+114, K0341+427 - K0341+445, K0341+488 - K0341+507, K0348+122 - K0348+163, K0348+313 - K0348+335, K0348+618 - K0348+638, K0350+888 - K0350+919, K0355+703 - K0355+733, K0358+460 - K0358+520;
Physical Target: 2,098.700 Square Meters;
Allocation: Php 30,230,000.000
|
May 23, 2022 |
FY 2022 GAA |
WIN2G02869 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 310106100772000
Project ID : P00603931LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads - Tertiary Roads
FROM :
Calapan South Road
K0187+398 - K0187+740,
K0187+846 - K0188+000
Physical Target - CW1 - Asset Preservation - Rehabilitation of
Paved Road : 0.992 Lane Km
Allocation - Php 18.00 Million
TO :
Calapan South Road
K0187+380 - K0187+501.60
Physical Target - CW1 - Asset Preservation - Rehabilitation of
Paved Road : 0.243 Lane Km
Allocation - Php 18.00 Million |
May 23, 2022 |
2022 |
WIN2F06347 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Jose Abad Santos Ave (JASA) - K0075+279 - K0075+596
|
May 23, 2022 |
2022 |
WIN2F06344 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Pampanga 1st District Engineering Office |
Network Development Program - Road Widening - Primary Roads
Jose Abad Santos Ave (JASA) - K0072+465 - K0073+346, K0082+916 - K0084+540 |
May 23, 2022 |
FY 2022 GAA |
WIN2G02842 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 310111100429000
Project ID : P00604078LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Construction/Upgrading/Rehabilitation of
Drainage along national Roads - Secondary Roads
FROM :
Calapan South Road
K0070+181 - K0071+184,
K0071+236 - K0072+004
Physical Target - CW1 - Construction of Drainage Structure
along Road : 3,572.00 l.m.
Allocation - Php 50.00 Million
TO :
Calapan South Road
K0069+476 - K0071+167.10,
K0071+300 - K071+775
Physical Target - CW1 - Construction of Drainage Structure
along Road : 3,638.70 l.m.
Allocation - Php 50.00 Million
|
May 23, 2022 |
FY 2022 GAA |
WIN2G02716 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 310111100428000
Project ID : P00604079LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along national Roads - Secondary Roads
FROM :
Calapan South Road
K0064+(-249) - K0064+950,
K0064+(-289) - K0064+(-269)
Physical Target - CW1 - Construction of Drainage Structure
along Road - 2,438.00 l.m.
Allocation - Php 35.00 Million
TO :
Calapan South Road
K0064+(-249) - K0064+833
Physical Target - CW1 - Construction of Drainage Structure
along Road - 1,082.00 l.m.
Allocation - Php 35.00 Million |
May 23, 2022 |
2022 |
320101107354000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Isabela 2nd District Engineering Office |
Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Siffu River Flood Control Project (Sinait Section), Quirino, Isabela |
May 23, 2022 |
2022 |
320101107355000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Isabela 2nd District Engineering Office |
Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Siffu River Flood Control Project (Rang-Ayan Section), Roxas, Isabela |
May 23, 2022 |
2022 |
320101107358000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Isabela 2nd District Engineering Office |
Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Mallig River Flood Control Project (Holy Friday Section), Mallig, Isabela |
May 23, 2022 |
2022 |
320101107359000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Isabela 2nd District Engineering Office |
Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Mallig River Flood Control Project (Olango Section), Mallig, Isabela |
May 23, 2022 |
2022 |
310201100972000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Isabela 4th District Engineering Office |
Organizational Outcome 1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0309+(-496) - K0309+(-413), K0309+(-423) - K0309+(-284), K0323+200 - K0323+505 |
May 23, 2022 |
2022 |
320101107356000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Isabela 2nd District Engineering Office |
Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Siffu River Flood Control Project (San Luis Section), Roxas, Isabela |
May 23, 2022 |
2022 |
320101107357000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Isabela 2nd District Engineering Office |
Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Mallig River Flood Control Project (Luna Section), Quirino, Isabela |
May 23, 2022 |
2022 |
310112100297000 |
GAA FY 2022 |
January 3, 2022 |
Region II |
Batanes District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads - San Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd- (S00003ST) K0020+670 - K0020+782 |
May 23, 2022 |
FY 2022 GAA |
WIN2G02851 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 310109100859000
Project ID : p00604404Lz
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse, and Landslide - Tertiary Roads
FROM :
Calapan South Road
K0184+902 - K0184+948
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 366.67 sq.m.
Allocation - Php 5.50 Million
TO :
Calapan South Road
K0184+902 - K0184+966.80
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 339.55 sq.m.
Allocation - Php 5.50 Million
|
May 23, 2022 |
FY 2022 GAA |
WIN2G02871 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 310109100860000
Project ID : P00604405LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse, and Landslide - Tertiary Roads
FROM :
Calapan South Road
K0187+348 - K0187+505
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1886.67 sq. m.
Allocation - Php 28.300 million
TO :
Calapan South Road
K0187+690 - K0187+934.8
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1282.75 sq.m.
Allocation - Php 28.30 Million |
May 21, 2022 |
FY 2022 |
WIN2E02315 |
310204101795000 |
May 4, 2022 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 310204101795000
Project ID: P00604221MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
Bagalupa-Labangan-Gubang Road, Zamboanga del Sur
CW1- Construction of Concrete Road
Physical Target: 3.8719 Lane km
Unit Cost: ₱ 12,526,149.95/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 5,807.85 sq.m.
Unit Cost: ₱ 86.09/sq.m.
EAO: ₱ 1,000,000.00
Total Allocation: ₱ 50,000,000.00 |
May 21, 2022 |
FY 2022 |
WIN2E02316 |
310204101799000 |
May 4, 2022 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 310204101799000
Project ID: P00604222MN
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads
NRJ Molave-Tambulig-Don Victoriano Diversion Road, Zamboanga del Sur
CW1- Construction of Concrete Road
Physical Target: 3.575 Lane km
Unit Cost: ₱ 13,706,293.71/Lane km
EAO: ₱ 1,000,000.00
Total Allocation: ₱ 50,000,000.00 |
May 21, 2022 |
FY 2022 |
WIN2E02302 |
300215102015000 |
May 4, 2022 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
UACS No. 300215102015000
Project ID : P00630163MN
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities
Construction of Alang-Alang-Lower Tiparak-Tungawan By-Pass Road, Zamboanga del Sur
CW1 - Construction of Concrete Road
Physical Target: 1.064 Lane km
Unit Cost : P 18,421,052.63/Lane km
EAO : P 400,000.00
Allocation : P 20,000,000.00 |
May 21, 2022 |
FY 2022 |
WIN2E02180 |
310104100360000 |
March 21, 2022 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
UACS No. 310104100360000
Project ID: P00601149MN
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Dipolog-Sindangan-Liloy Rd (S01057MN) K1861 + 698.00 - K1863 + 556.00, K1863 + 834.84 - K1865 + 911.66, K1865 + 952.00 - K1866 + 867.23
CW1 : Reconstruction to Concrete Pavement
Physical Target: 9.58904 Lane km
Unit Cost : P 8,273.77/Lane km
EAO : P 2,877,525.00
Allocation : P 82,215,000.00 |
May 20, 2022 |
FY 2022 GAA |
WIN2G02827 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 3201011081820000
Project ID : P00620660LZ
002 : Protect Lives and Properties
Flood Management - Construction/maintenance of Flood
Mitigation Structures and Drainage Systems
FROM :
Construction of Marangas River Flood Control Structure,
Sta. 0+000 - Sta. 1+080,
Bataraza, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
610 LM
Allocation - Php 30.00 Million
TO :
Construction of Marangas River Flood Control Structure,
Sta. 0+800 - Sta. 1+250, Left Bank
Sta. 1+080 - Sta.1+240
Bataraza, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
610.0 LM
Allocation - Php 30.00 Million |
May 20, 2022 |
FY 2022 GAA |
WIN2G02789 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 3201011081830000
Project ID : P00620661LZ
002 : Protect Lives and Properties Against Major Floods
Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage Systems
FROM :
Construction of Narra Poblacion Flood Control,
Sta. 0+000 - Sta. 2+000,
Narra, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
1,790 LM
Allocation - Php 48.00 Million
TO :
Construction of Narra Poblacion Flood Control,
Sta. 0+000 - Sta. 1+790
Narra, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
1,790 LM
Allocation - 48.00 Million |
May 20, 2022 |
2022 |
WIN2E02351 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. : 310107100437000
Project ID: P00601522MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
FROM:
Daang Maharlika (Surigao-Agusan Sect) - K1169 + 793 - K1169 + 875
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 2,310.50 Square meters
Allocation:
TOTAL: P 23,105,000
CW1: P 22,642,900
EAO: P 462,100
Unit Cost:
CW1: P 9,800/ Square meters
TO:
Daang Maharlika (Surigao-Agusan Sect) - K1169 + 793 - K1169 + 858
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 984.500 Square meters
Allocation:
TOTAL: P 23,105,000
CW1: P 22,642,900
EAO: P 462,100
Unit Cost:
CW1: P 22,999.39055/ Square meters
|