Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
May 31, 2022 2022 WIN2G02916 SARO-BMB-A-22-0002723 March 17, 2022 Region VI Iloilo 4th District Engineering Office
UACS No.: 310102100990000
Project ID: P00605979VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Preventive Maintenance - Secondary Roads

Iloilo City-Leganes-Dumangas Coastal Rd - K0009 + 000 - K0010 + 344

CW1 - Preventive Maintenance of Road: Asphalt Overlay:
5.376 lane km - 23,520.00
EAO - 480.00

TO:

OO1: Ensure Safe and Reliable National Road
System

Asset Preservation Program - Preventive Maintenance - Secondary Roads

Iloilo City-Leganes-Dumangas Coastal Rd - K0009 + 390 - K0010 + 344
CW1- Preventive Maintenance of Road: Asphalt Overlay:
3.816 lane km - 23,520.00
EAO - 480.00
May 31, 2022 2022 WIN2G02917 SARO-BMB-A-22-0002723 March 22, 2022 Region VI Iloilo 4th District Engineering Office
UACS No.: 310103100986000
Project ID: P00605985VS

FROM

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Preventive Maintenance – Tertiary Roads

Iloilo-Capiz Rd (Pavia Diversion) - K0009 + 072 - K0009 + 834, K0010 + 297 - K0010 + 816

CW1 - Preventive Maintenance of Road: Asphalt Overlay:
2.562 lane km - 11,368.00
EAO - 232.00

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Iloilo-Capiz Rd (Pavia Diversion) - K0009 + 072 - K0009 + 875
CW1- Preventive Maintenance of Road: Asphalt Overlay:
1.606 lane km - 11,368.00
EAO - 232.00
May 31, 2022 2022 WIN2G02923 SARO-BMB-A-22-0002723 March 17, 2022 Region VI Iloilo 4th District Engineering Office
UACS No.: 310103100987000
Project ID: P00605986VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Mandurriao-Sn Miguel-Alimodian-Maasin-Cabatuan Rd, K0010 + (-499) - K0012 + 200

CW1 - Preventive Maintenance of Road: Asphalt Overlay:
10.594 lane km - 47,530.00
EAO - 970.00

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Mandurriao-Sn Miguel-Alimodian-Maasin-Cabatuan Rd, K0010 + (-499) - K0011 + 421.5

CW1- Preventive Maintenance of Road: Asphalt Overlay:
7.71 lane km - 47,530.00
EAO - 970.00
May 31, 2022 2022 WIN2G02909 SR2022-03-006766 March 22, 2022 Region VI Iloilo 4th District Engineering Office
UACS No.: 310109100875000
Project ID: P00606440VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Jct Bancal-Leon-Antique Bdry Rd - K0041 + 448 - K0041 + 558

CW1 - Construction of Road Slope Protection Structure:
5,111.11 sq.m - 88,780.00
EAO - 3,220.00

TO:

OO1: Ensure Safe and Reliable National Road
System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Jct Bancal-Leon-Antique Bdry Rd - K0041 + 500 - K0041 + 593

CW1 - Construction of Road Slope Protection Structure:
3,949.00 sq.m. - 88,780.00
EAO - 3,220.00
May 31, 2022 2022 WIN2G02925 SR2022-03-006775 March 22, 2022 Region VI Iloilo 4th District Engineering Office
UACS No.: 310109100879000
Project ID: P00606444VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Jct Bancal-Leon-Antique Bdry Rd - K0044 + 800 - K0044 + 900

CW1 - Construction of Road Slope Protection Structure:
5,166.67 sq.m. - 89,745.00
EAO - 3,255.00

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Jct Bancal-Leon-Antique Bdry Rd - K0044 + 500 - K0044 + 600

CW1 - Construction of Road Slope Protection Structure:
4,266.52 sq.m. - 89,745.00
EAO - 3,255.00
May 31, 2022 2022 WIN2G02762 FY 2022 GAA RA 11639 January 2, 2022 Region VI Iloilo City District Engineering Office
UACS No. 310101100683000
Project ID: P00603697VS

FROM:

OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Primary Roads

Iloilo-Capiz Rd (Old Route) (S00491PN) – K0001 + 101 – K0002 + 220

CW1- Preventive Maintenance of Road: Asphalt Overlay: 4.316 Lane Km - 21,750.12
EAO - 443.88

TO:

OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Preventive Maintenance – Primary Roads

Iloilo-Capiz Rd (Old Route) (S00491PN) – K0002 + (-540) – K0002 + 220

CW1- Preventive Maintenance of Road: Asphalt Overlay:
3.040 Lane Km - 21,750.12
EAO - 443.88

May 31, 2022 2022 WIN2G02700 FY 2022 GAA RA 11639 January 2, 2022 Region VI Iloilo City District Engineering Office
UACS No. 310103100989000
Project ID: P00603701VS

FROM:

OO1: Ensure Safe and Reliable National Road System –

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Tertiary Roads

Mandurriao-Sn Miguel Rd (S00044PN) K0008 + 117 – K0009 + 274.44

CW1- Preventive Maintenance of Road –
3.006 Lane Km - 15,148.79
EAO - 309.16

TO:

OO1: Ensure Safe and Reliable National Road System –

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads


Mandurriao-Sn Miguel Rd (S00044PN) – K0008 + 117 – K0009 + 126
Preventive Maintenance of Road –
4.056 Lane Km - 15,148.79
EAO - 309.16
May 31, 2022 2022 WIN2G02654 FY 2022 GAA RA 11639 January 1, 2022 Region VI Negros Occidental 1st District Engineering Office
UACS No. 310101100690000
Project ID: P00603704VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

Bacolod North Rd (S00408NR) - K0083 + 000 - K0083 + 188
CW1- Preventive Maintenance of Road: Asphalt Overlay:
0.752 lane km - 6,009.36
EAO - 122.64

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

Bacolod North Rd (S00408NR) - K0082 + 1002 - K0083 + 284, K0083 + 318 - K0083 + 340, K0083 + 340 - K0083 + 563
CW1- Preventive Maintenance of Road: Asphalt Overlay:
0.759 lane km - 6,009.36
EAO - 122.64
May 31, 2022 2022 WIN2G02974 FY 2022 GAA RA 11639 January 1, 2022 Region VI Negros Occidental 1st District Engineering Office
UACS No. 310101100689000
Project ID: P00603705VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

Bacolod North Rd (S00406NR) - K0066 + 000 - K0066 + 170
CW1- Preventive Maintenance of Road: Asphalt Overlay:
0.580 lane km - 4,635.40
EAO - 94.60

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

Bacolod North Rd (S00406NR) - K0066 + 000 - K0066 + 120

CW1- Preventive Maintenance of Road: Asphalt Overlay:
0.480 lane km - 4,635.40
EAO - 94.60
May 31, 2022 2022 WIN2G02973 FY 2022 GAA RA 11639 January 1, 2022 Region VI Negros Occidental 1st District Engineering Office
UACS No. 310102100995000
Project ID: P00603724VS


FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

Jct Natl Rd Sagay-Bato-Dian-Marcelo-Balea Jct Rd (S00019NR) - K0090 + 000 - K0091 + 267

CW1- Preventive Maintenance of Road: Asphalt Overlay:
2.482 lane km - 30,407.44
EAO - 620.56

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

Jct Natl Rd Sagay-Bato-Dian-Marcelo-Balea Jct Rd (S00019NR) - K0090 + 000 - K0091 + 348

CW1- Preventive Maintenance of Road: Asphalt Overlay:
5.288 lane km - 30,407.44
EAO - 620.56
May 31, 2022 2022 WIN2G02701 SR2022-02-000301 February 3, 2022 Region VI Negros Occidental 1st District Engineering Office
UACS No. 310110100267000
Project ID: P00604044VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

Bacolod North Rd - K0007 + (-343) - K0007 + 387, K0007 + (-793) - K0007 + (-378)

CW1- Construction of Drainage Structure along Road:
2,290 lineal meters - 56,182.30
EAO - 2,037.70

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

Bacolod North Rd - K0007 + (-793) - K0008 + 224

CW1- Construction of Drainage Structure along Road:
2,664.40 lineal meters - 56,182.30
EAO - 2,037.70
May 31, 2022 2022 WIN2G02702 SR2022-02-000328 February 3, 2022 Region VI Negros Occidental 1st District Engineering Office
UACS No. 310201100875000
Project ID: P00604976VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Primary Roads

Bacolod North Rd - K0078 + 401 - K0079 + 000, K0081 + 558 - K0082 + 366
CW1- Road Widening:
2.408 lane km - 52,198.78
EAO - 1,893.22

TO:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Primary Roads

Bacolod North Rd - K0078 + 401 - K0078 + 968, K0081 + 558 - K0081 + 819, K0086 + 358 - K0091 + 457

CW1- Road Widening:
1.656 lane km - 39,872.513

ROW Acquisition: 22,680 sq.m. - 12,326.267
EAO - 1,893.22
May 31, 2022 2022 WIN2G02804 FY 2022 GAA RA 11639 January 1, 2022 Region VI Negros Occidental 1st District Engineering Office
UACS No. 310202101188000
Project ID: P00604978VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Vito Port Rd - K0095 + 201 - K0096 + 000

CW1- Road Widening:
1.588 lane km - 30,792.58
EAO - 628.42

TO:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Vito Port Rd - K0094 + 498 - K0095 + 319
CW1- Road Widening:
1.588 lane km - 16,792.58
ROW Acquisition: 5,558 sq.m - 14,000.00
EAO - 628.42
May 31, 2022 2022 WIN2G02972 SR2022-02-001113 February 4, 2022 Region VI Negros Occidental 1st District Engineering Office
UACS No. 310203100516000
Project ID: P00604980VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Tertiary Roads

Bacolod North Rd (Old Route) - K0074 + 000 - K0075 + 314
CW1- Road Widening:
2.640 lane km - 56,611.725
EAO - 2,053.275

TO:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Tertiary Roads

Bacolod North Rd (Old Route) - K0074 + 000 - K0076 + 666

CW1- Road Widening:
1.877 lane km - 44,611.725
ROW Acquisition: 15,932 square meters - 12,000.00
EAO - 2,053.275
May 31, 2022 2022 WIN2G02694 FY 2022 GAA RA 11639 January 1, 2022 Region VI Negros Occidental 3rd District Engineering Office
UACS No. 310102100998000
Project ID: P00603737VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Preventive Maintenance - Secondary Roads

Bacolod South Rd (Kabankalan-Hinobaan Section) (S00224NR) - K0149 + 095 - K0149 + 875, K0150 + 774 - K0151 + 000
CW1- Preventive Maintenance of Road: Asphalt Overlay:
2.024 lane km - 16,174.90
EAO - 330.10

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Preventive Maintenance - Secondary Roads

Bacolod South Rd (Kabankalan-Hinobaan Section) (S00224NR) - K0148 + 348 – K0149 + 358
CW1- Preventive Maintenance of Road: Asphalt Overlay:
2.024 lane km - 16,174.90
EAO - 330.10
May 31, 2022 2022 WIN2G02667 FY 2022 GAA RA 11639 January 1, 2022 Region VI Negros Occidental 3rd District Engineering Office
UACS No. 310103100993000
Project ID: P00603741VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Dancalan-Candoni-Damutan Valley Rd (S00247NR) - K0108 + 541 - K0109 + 030, K0110 + 959 - K0113 + 000
CW1- Preventive Maintenance of Road: Asphalt Overlay:
4.996 lane km - 25,767.14
EAO - 525.86

TO:

OO1: Ensure Safe and Reliable National Road
System

Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Dancalan-Candoni-Damutan Valley Rd (S00247NR) - K0108 + 541 – K0111 + 058
CW1- Preventive Maintenance of Road: Asphalt Overlay:
4.996 lane km - 25,767.14
EAO - 525.86
May 31, 2022 2022 WIN2G02703 FY 2022 GAA RA 11639 January 1, 2022 Region VI Negros Occidental 3rd District Engineering Office
UACS No. 310201100993000
Project ID: P00604984VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Primary Roads

Kabankalan-Bais Rd - K0111 + 763 - K0112 + 508
CW1- Road Widening:
1.454 lane km - 28,498.40

EAO - 581.60

TO:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Primary Roads

Kabankalan-Bais Rd - K0111 + 421 – K0112 + 319
CW1- Road Widening:
1.760 lane km - 28,498.40
EAO - 581.60
May 31, 2022 2022 WIN2G02814 SARO-BMB-A-22-0002990 March 21, 2022 Region VI Negros Occidental 3rd District Engineering Office
UACS No. 310202101191000
Project ID: P00606030VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Bacolod South Rd (Kabankalan - Hinobaan Section) - K0091 + 700 - K0092 + 127, K0100 + 134 - K0100 + 194, K0100 + 210 - K0100 + 270, K0106 + 914 - K0107 + 056, K0107 + 069 - K0107 + 209

CW1- Road Widening:
2,290 lane km - 24,243.24
EAO - 494.76

TO:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Bacolod South Rd (Kabankalan - Hinobaan Section) - K0091 + 700 – K0092 + 127, K0100 + 079 – K0100 + 190, K0100 + 215 – K0100 + 229, K0106 + 837 – K0106 + 995, K0107 + 069 – K0107 + 149

CW1- Road Widening:
2,290 lane km - 24,243.24
EAO - 494.76
May 31, 2022 2022 WIN2G02810 SR2022-02-000131 February 3, 2022 Region VI Negros Occidental 5th District Engineering Office
UACS No. 310101100564000
Project ID: P00603716VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Preventive Maintenance - Primary Roads

Bacolod North Rd (S00425NR) - K0097 + 000 - K0098 + 000
CW1- Preventive Maintenance of Road: Asphalt Overlay:
4.072 lane km - 32,237.755
EAO - 1,169.245

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Preventive Maintenance - Primary Roads

Bacolod North Rd (S00425NR) - K0097 + 000 - K0097 + 850
CW1- Preventive Maintenance of Road: Asphalt Overlay:
3.400 lane km - 32,237.755
EAO - 1,169.245
May 31, 2022 2022 WIN2G02748 SR2022-02-000244 February 3, 2022 Region VI Negros Occidental 5th District Engineering Office
UACS No. 310108100906000
Project ID: P00604092VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Secondary Roads

Jct DS Benedicto-Spur 16-Calatrava Rd - K0068 + 719 - K0068 + 749, K0069 + 018 - K0069 + 034, K0082 + 112 - K0082 + 140, K0082 + 821 - K0082 + 840, K0084 + 683 - K0084 + 703, K0086 + 761 - K0086 + 779

CW1- Construction of Road Slope Protection Structure:
857.01 sq.m - 7,450.765
EAO - 270.235

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Secondary Roads

Jct DS Benedicto-Spur 16-Calatrava Rd - K0068 + 719 - K0068 + 746, K0069 + 018 - K0069 + 031.50, K0082 + 112 - K0082 + 148, K0082 + 821 - K0082 + 834.50, K0084 + 683 - K0084 + 703, K0085 + 869 - K0086 + 042, K0086 + 761 - K0086 + 779

CW1- Construction of Road Slope Protection Structure:
909.87 sq.m - 7,450.765
EAO - 270.235
May 30, 2022 2022 WIN2G02724 FY 2022 GAA RA 11639 January 1, 2022 Region VI Capiz 1st District Engineering Office
UACS No.: 310101100679000
Project ID: P00603632VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

Iloilo-Capiz Rd (New Route) (S00253PN) - K0106 + (-610) - K0106 + (-543), K0106 + (-993) - K0106 + (-610), K0113 + 632 - K0114 + 875, K0115 + 345 - K0115 + 459

CW1- Preventive Maintenance of Road: Asphalt Overlay:
6.899 lane km - 34,766.48

EAO - 709.52


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

Iloilo-Capiz Rd (New Route) (S00253PN) - K0106 + (-993) – K0106 + (-543), K0110 + 775 – K0110 + 995, K0113 + 504 – K0114 + 830

CW1- Preventive Maintenance of Road: Asphalt Overlay:
8.04 lane km - 34,766.48
EAO - 709.52
May 30, 2022 2022 WIN2G02699 FY 2022 GAA RA 11639 January 1, 2022 Region VI Capiz 1st District Engineering Office
UACS No.: 310111100441000
Project ID: P00603971VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

Roxas City-Cagay-Sibaguan-Balijuagan-Cudian-Ivisan Rd - K0104 + 400 - K0105 + 100, K0105 + 400 - K0105 + 892, K0105 + 910 - K0106 + 416
CW1- Construction of Drainage Structure along Road:
1,698 lineal meters - 29,400.00
EAO - 600.00

TO:
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

Roxas City-Cagay-Sibaguan-Balijuagan-Cudian-Ivisan Rd - K0104 + 400 - K0105 + 500, K0105 + 910 - K0106 + 500, K0109 + 258.98 - K0109 + 466.98
CW1-
Construction of Drainage Structure along Road:
958 lineal meters - 23,178.60
CW2 - Off-Carriageway Improvement: Paving of Shoulders:
4,197.59 sq.m. - 6,221.40
EAO - 600.00


May 30, 2022 2022 WIN2G02879 FY 2022 GAA RA 11639 January 1, 2022 Region VI Capiz 1st District Engineering Office
UACS No.: 310102100975000
Project ID: P00603635VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

Iloilo East Coast-Capiz Rd (S00273PN) - K0128 + 488 - K0129 + 000, K0129 + 913 - K0130 + 519

CW1- Preventive Maintenance of Road: Asphalt Overlay:
3.392 lane km - 17,093.16
EAO - 348.84

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

Iloilo East Coast-Capiz Rd (S00273PN) - K0128 + 488 - K0129 + 402

CW1- Preventive Maintenance of Road: Asphalt Overlay:
3.759 lane km - 17,093.16
EAO - 348.84
May 30, 2022 2022 WIN2G02829 FY 2022 GAA RA 11639 January 1, 2022 Region VI Capiz 1st District Engineering Office
UACS No.: 310105100722000
Project ID: P00603638VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Iloilo East Coast-Capiz Rd (S00273PN) - K0122 + 865 - K0123 + 000

CW1- Reconstruction to Concrete Pavement:
0.184 lane km - 3,145.80
EAO - 64.20

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Iloilo East Coast-Capiz Rd (S00273PN) - K0122 + 774 - K0123 + 000

CW1- Reconstruction to Concrete Pavement:
0.366 lane km - 3,145.80
EAO - 64.20
May 30, 2022 2022 WIN2G02668 FY 2022 GAA RA 11639 January 1, 2022 Region VI Capiz 1st District Engineering Office
UACS No.: 310108101165000
Project ID: P00604064VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Iloilo East Coast-Capiz Rd - K0127 + 513 - K0127 + 777, K0128 + 290 - K0128 + 405, K0140 + 694 - K0140 + 749, K0153 + 030 - K0153 + 210, K0158 + 490 - K0158 + 700, K0164 + 130 - K0164 + 181, K0164 + 221 - K0164 + 434, K0165 + 620 - K0165 + 681, K0166 + 528 - K0166 + 611, K0167 + 308 - K0167 + 357

CW1- Construction of Road Slope Protection Structure:
5,971.51 sq.m - 14,700.00
EAO - 300.00

TO:

OO1: Ensure Safe and Reliable National Road
System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Iloilo East Coast-Capiz Rd - K0128 + 290 - K0128 + 405, K0140 + 694 - K0140 + 749, K0158 + 490 - K0158 + 680, K0162 + 302 - K0162 + 338, K0164 + 130 - K0164 + 200, K0164 + 221 - K0164 + 420

CW1- Construction of Road Slope Protection Structure:
2,045.11 sq.m - 14,700.00
EAO - 300.00
May 30, 2022 2022 WIN2G02773 FY 2022 GAA RA 11639 January 1, 2022 Region VI Capiz 1st District Engineering Office
UACS No.: 310202101167000
Project ID: P00604834VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Maayon-Jct Bailan Rd - K0123 + 400 - K0124 + 000

CW1- Road Widening:
1.210 lane km - 12,320.56
EAO - 251.44

TO:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Maayon-Jct Bailan Rd - K0123 + 565 - K0124 + 200

CW1- Road Widening:
1.213 lane km - 12,320.56
EAO - 251.44
May 30, 2022 2022 WIN2G02710 FY 2022 GAA RA 11639 January 1, 2022 Region VI Capiz 1st District Engineering Office
UACS No.: 310202101163000
Project ID: P00604837VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Iloilo East Coast-Capiz Rd - K0141 + 140 - K0141 + 547

CW1- Road Widening:
0.814 lane km - 10,370.36
EAO - 211.64

TO:


OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Iloilo East Coast-Capiz Rd - K0141 + 140 - K0141 + 437, K0148 + 170 - K0148 + 300

CW1- Road Widening:
0.854 lane km - 10,370.36
EAO - 211.64
May 30, 2022 2022 WIN2G02796 FY 2022 GAA RA 11639 January 1, 2022 Region VI Capiz 1st District Engineering Office
UACS No.: 310105100721000
Project ID: P00603634VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Iloilo East Coast-Capiz Rd (S00273PN) - K0117 + 465 - K0117 + 531, K0117 + 803 - K0117 + 883

CW1- Reconstruction to Concrete Pavement:
0.372 lane km - 6,191.64
EAO - 126.36

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Iloilo East Coast-Capiz Rd (S00273PN) - K0116 + 220 - K0116 + 400, K0117 + 000 – K0117 + 093

CW1- Reconstruction to Concrete Pavement:
0.546 lane km - 6,191.64
EAO - 126.36

May 30, 2022 2022 WIN2G02776 FY 2022 GAA RA 11639 January 15, 2022 Region VI Guimaras District Engineering Office
UACS No. 310111100443000
Project ID: P00603974VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

Guimaras Circumferential Rd - K0008 + 110 - K0008 + 265, K0000 + 216 - K0000 + 389

CW1 - Construction of Drainage Structure along Road:
483 lineal meters - 18,192.72
EAO - 371.28


TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

Guimaras Circumferential Rd - K0008 + 165 - K0008 + 235, K0000 + 211 - K0000 + 375

CW1 - Construction of Drainage Structure along Road:
311.86 lineal meters - 17,187.72
ROW Acquisition:
585.00 sq.m - 1,005.00
EAO - 371.28
May 30, 2022 2022 WIN2G02670 SR2022-02-000360 February 3, 2022 Region VI Guimaras District Engineering Office
UACS No. 310202100999000
Project ID: P00604843VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Guimaras Circumferential Rd - K0030 + 000 - K0031 + 388

CW1 - Road Widening:
2.79 lane Km - 80,636.365
EAO - 2,924.635

TO:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Guimaras Circumferential Rd - K0030 + 000 - K0031 + 000

CW1 - Road Widening:
2.014 lane km - 76,636.365

ROW Acquisition:
5,035 sq.m - 4,000.00
EAO - 2,924.635
May 30, 2022 2022 WIN2G02662 FY 2022 GAA RA 11639 January 15, 2022 Region VI Guimaras District Engineering Office
UACS No. 310202101168000
Project ID: P00604846VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Central Rd (Sn Miguel-Constancia-Cabano-Igcawayan) - K0062 + 000 - K0063 + 000

CW1 - Road Widening:
2.012 lane Km - 29,451.94
EAO - 601.06

TO:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Central Rd (Sn Miguel-Constancia-Cabano-Igcawayan) - K0062 + 000 - K0062 + 630

CW1 - Road Widening:
1.260 lane km - 27,974.94

ROW Acquisition:
3,150.00 sq.m - 1,477.00
EAO - 601.06
May 30, 2022 2022 WIN2G02749 SR2022-02-000355 February 3, 2022 Region VI Guimaras District Engineering Office
UACS No. 310202100997000
Project ID: P00604847VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Central Rd (Sn Miguel-Constancia-Cabano-Igcawayan) - K0051 + (-1127) - K0051 + 140

CW1 - Road Widening:
2.534 lane Km - 75,101.125
EAO - 2,723.875

TO:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Central Rd (Sn Miguel-Constancia-Cabano-Igcawayan) - K0051 + (-1127) - K0051 + 386

CW1 - Road Widening:
3.026 lane km - 72,869.125
ROW Acquisition:
7,565.00 sq.m - 2,232.00
EAO - 2,723.875
May 30, 2022 2022 WIN2G02770 SR2022-02-000376 February 3, 2022 Region VI Guimaras District Engineering Office
UACS No. 310202101003000
Project ID: P00604848VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Guimaras Circumferential Rd - K0055 + 000 - K0056 + 372

CW1 - Road Widening:
2.744 lane Km - 82,549.96
EAO - 2,994.04

TO:

OO1: Ensure Safe and Reliable National Road System

Network Development Program - Road Widening - Secondary Roads

Guimaras Circumferential Rd - K0055 + 000 - K0056 + 600

CW1 - Road Widening:
3.200 lane km - 79,188.96

ROW Acquisition:
8,000 sq.m - 3,361.00
EAO - 2,994.04
May 30, 2022 2022 WIN2G02848 SR2022-03-007967 March 23, 2022 Region VI Guimaras District Engineering Office
UACS No. 310102100834000
Project ID: P00605974VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

Guimaras Circumferential Rd - K0000 + 451 - K0005 + 732

CW1 - Preventive Maintenance of
Road: Asphalt
Overlay:
20.909 lane km - 95,438.50
EAO - 3,461.50

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

Guimaras Circumferential Rd - K0000 + 451 - K0001 + 000, K0001 + 800 - K0002 + 081, K0002 + 750 - K0005 + 732

CW1 - Preventive Maintenance of
Road: Asphalt
Overlay:
15.24 lane km - 95,438.50
EAO - 3,461.50
May 30, 2022 2022 WIN2G02801 SR2022-03-007975 March 23, 2022 Region VI Guimaras District Engineering Office
UACS No. 310102100836000
Project ID: P00605976VS

FROM:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

Guimaras Circumferential Rd - K0006 + 797 - K0033 + 000

CW1 - Preventive Maintenance of
Road: Asphalt
Overlay:
52.406 lane km - 91,675.00
EAO - 3,325.00

TO:

OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

Guimaras Circumferential Rd - K0006 +797 – K0007 +209, K0011 + 909 – K0012 + 216, K0013 + 000 – K0013 + 637, K0018 + 000 – K00019 + 345, K0024 + 000 – K0025 + 403, K0028 + 889 – K0029 + 508, K0029 + 802 – K0030 + 000, K0031 + 388 – K0031 + 602, K0032 + 629 – K0033 + 000

CW1 - Preventive Maintenance of
Road: Asphalt
Overlay:
16.048 lane km - 91,675.00
EAO - 3,325.00
May 26, 2022 FY 2022 GAA WIN2G02990 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 310109100996000
Project ID : P00611442LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

FROM :

Odiongan - East - West Road
K0009+128.00 - K0009+193.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,801.00 Square Meters
Allocation - Php 40.00 Million

TO :

Odiongan - East - West Road
K0009+128.00 - K0009+157.70
Physical Target - CW1- Construction of Road Slope Protection
Structure : 1,801.00 Square Meters
Allocation - php 40.00 Million
May 26, 2022 FY 2022 GAA WIN2G02996 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 320102105003000
Project ID : P00621492LZ

002 : Protect Lives and Properties

Flood Management - Construction/Rehabilitation of Flood Mitigation
Facilities along Major Basins and Principal Rivers

FROM :

Construction of Jun Carlo, Flood Control Structure (Upstream),
San Fernando, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure
149.20 lane Km
Allocation - Php 25.00 Million

TO :

Construction of Jun Carlo, Flood Control Structure (Upstream),
San Andres, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure
149.20 lane Km
Allocation - Php 25.00 Million
May 26, 2022 FY 2022 GAA WIN2G02991 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 3002151002592000
Project ID : P00638898LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or bridges from the National Road/s
leading to major/Strategic Public Buildings/Facilities

FROM :

Construction of Tugdan to Cahayagan Alcantara Road (Phase 2),
Sta. 2+800.00 - Sta. 4+780.00,
Odiongan, Romblon
Physical Target - CW1 - Construction of Gravel Road :
3.960 lane Km
Allocation - Php 100.00 Million

TO :

Construction of Tugdan to cahayagan Road (Phase),
Sta. 2+800.00 - Sta. 4+780.00,
Alcantara, Romblon
Physical Target - CW1 - Construction of Gravel Road :
3.960 Lane Km
Allocation - Php 100.00 Million
May 26, 2022 FY 2022 GAA WIN2G02985 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310109100861000
Project ID : P00609320LZ

001: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse, and Landslide - Tertiary Roads

FROM :

Palawan Circ. Road (Panalingaan-Tagbita-Latud)
K0263+580.30 - K0263+912.40
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 5,805.28 square meter
Allocation - Php 104.495 Million

TO :

Palawan Circ. Road (Panalingaan-Tagbita-Latud)
K0263+580 - K0263+832
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 4,666.70 square meter
Allocation - Php 104.495 Million
May 26, 2022 FY 2022 GAA WIN2G02993 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310102100816000
Project ID : P00609333LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

FROM :

Puerto Princesa North Road
K0203+500 - K0208+890
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt overlay - 10.688 lane km
Allocation - Php 104.270 Million

TO :

Puerto Princesa North Road
K0203+500 - K0208+238
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 9.384 lane Km
Allocation - Php 104.270 Million
May 26, 2022 2022 WIN2C03576 GAA FY 2022 January 1, 2022 Region VIII Northern Samar 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd-K0815 + 300 - K0816 + 000, K0828 + 700 - K0828 + 850

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 49.00 M
Structure: 12,750 Square meters

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Pangpang-Palapag-Mapanas-Gamay-Lapinig Rd-K0815+840 - K0815+880, K0828+540 - K0828+690

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 49.00 M
Structure: 2,240 Square meters

EAO P 1.00 M

Total P 50.00 M
May 26, 2022 FY 2022 GAA WIN2G02984 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310108100886000
Project ID : P00611362LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM :

Tablas Circumferential Road
K0042+340 - K0042+742
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 12,666.67 square meter
Allocation - Php 228.00 Million

TO :

Tablas Circumferential Road
K0042+340 - K0042+632
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 10,424.40 square meter
Allocation - Php 228.00 Million
May 26, 2022 FY 2022 GAA WIN2G02994 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. ; 300215101638000
Project ID : P00636970LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide,
Port Barton - Kemdeng Road, San Vicente, Palawan
Sta. 1+089.00 - Sta. 1+166.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 720.791 Square meter
Allocation - Php 32.165 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
Port Barton - Kemdeng Road, San Vicente, Palawan
Sta. 0+633.00 - Sta. 0+770.00
Physical Target - Php 32.165 Million

May 26, 2022 FY 2022 GAA WIN2G02995 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215101612000
Project ID : P00639231LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG)
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Building/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vicente, Palawan
Sta. 172+286.00 - Sta. 172+417.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 849.15 Square meter
Allocation - Php 37.893 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road, San Vivente, Palawan
Sta. 172+286.00 - Sta. 172+417.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1,651.15 Square meter
Allocation - Php 37.893 Million
May 25, 2022 FY 2022 GAA WIN2G02860 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 320101108194000
Project ID : P00620676Lz

002 : Protect Lives and Properties

Flood Management Program - Construction/Maintenance of Flood
Mitigation Structures and Drainage System

FROM :

Construction of Flood Mitigation Structure,
Brgy. Hagan, Sta. 0+000 - Sta. 0+250,
Bongabong, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation
Structure - 118.897 l.m.
Allocation - Php 14.291 Million

TO :

Construction of Flood Mitigation Structure,
Brgy. Hagan, Sta. 0+000 - Sta. 0+112,
Bongabong, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation
Structure - 224.00 l.m.
Allocation - Php 14.291 Million
May 25, 2022 FY 2022 GAA WIN2G02853 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 320102105013000
Project ID : P00621116LZ

002 : Protect Lives and Properties

Flood Management Program - Construction/Rehabilitation of
Flood Mitigation Facilities within major Basins and Principal Rivers

FROM :

Construction of Bansud River Control,
Sta. 0+000 - Sta. 0+560,
Bansud, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation
Structure - 415.984 l.m.
Allocation - Php 50.00 Million

TO :

Construction of Bansud River Control,
Sta. 0+000 - Sta. 670,
Bansud, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation
Structure - 670.00 l.m.
Allocation - Php 50.00 Million
May 25, 2022 FY 2022 GAA WIN2G02852 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 320102105008000
Project ID : P00621119LZ

002 : Protect Lives and Properties Against Major Floods

Flood Management Program - Construction/Rehabilitation of
Flood Mitigation Facilities within Major River Basins and
Principal Rivers

FROM :

Construction of Baroc River Control,
Brgy. Sta. Brigida Section, Sta. 0+000 - Sta. 0+680,
Mansalay, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
415.98 Lane Km
Allocation - Php 50.00 Million

TO :

Construction of Baroc River Control,
Brgy. Sta. Brigida Section, Sta. 0+000 - Sta. 0+770,
Mansalay, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
770.0 Lane Km
Allocation - Php 50.00 Million



May 25, 2022 2022 WIN2C03566 SARO-BMB-A-22-0003173 March 21, 2022 Region VIII Eastern Samar District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Wright-Taft-Borongan

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 48.485500 M
Structure: 2,748.610 Square meters

EAO P 0.989500 M

Total P 49.475 M

AS MODIFIED:

Wright-Taft-Borongan Rd - K0872 + 808 - K0872 + 858

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 48.485500 M
Structure: 1,741.05 Square meters

EAO P 0.989500 M

Total P 49.475 M
May 25, 2022 FY 2022 GAA WIN2G02845 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 320102105013000
Project ID : P00621124LZ

002 ; Protect Lives and Properties

Flood Mitigation Program - Construction/Rehabilitation of Flood
Mitigation Facilities within Major Basins and Principal Rivers

FROM :

Construction of Pula River Control,
Brgy. Sto. Nino Section, Sta. 0+000 - Sta. 0+440,
Pinamalaym.an, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
415.984 l.m.
Allocation - Php 50.00 Million

TO :

Construction of Pula River Control,
Brgy. Sto. Nino Section, Sta. 0+000 - Sta. 0+468.8,
Pinamalayan, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure
468.80 l.m.
Allocation - Php 50.00 Million

May 25, 2022 2022 WIN2C03564 SR2022-03-007930 March 23, 2022 Region VIII Eastern Samar District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Wright-Taft-Borongan Rd - K0871 + 400 - K0871 + 700

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 91.134600 M
Structure: 5,246.670 Square meters

EAO P 3.305400 M

Total P 94.440 M

AS MODIFIED:

Wright-Taft-Borongan Rd - K0872 + 558 - K0872 + 658

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 91.134600 M
Structure: 3,383.40 Square meters

EAO P 3.305400 M

Total P 94.440 M
May 25, 2022 FY 2022 GAA WIN2G02792 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 320102105012000
Project ID : P00621123LZ

002 : Protect Lives and Properties

Flood management Program - Construction/Rehabilitation of
Flood Mitigation Facilities within major basins and Principal Rivers

FROM :

Construction of Pula River Control,
Brgy. Pagalagala Section,
Sta. 0+000 - Sta. 0+480
Physical Target - CW1 - Construction of Flood Mitigation Structure
415.98 l.m.
Allocation - Php 50.00 Million

TO :

Construction of Pula River Control,
Brgy. Pagalagala Section,
Sta. 0+000 - Sta. 0+480,
Sta. 0+000 - Sta. 0+086
Physical Target - CW1 - Construction of Flood Mitigation Structure
566.00 l.m.
Allocation - Php 50.00 Million
May 25, 2022 2022 WIN2C03562 SR2022-03-007938 March 23, 2022 Region VIII Eastern Samar District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Wright-Taft-Borongan Rd - K0871 + 700 - K0872 + 000

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 93.384015 M
Structure: 5,376.170 Square meters

EAO P 3.386985 M

Total P 96.771 M

AS MODIFIED:

Wright-Taft-Borongan Rd - K0872 + 358 - K0872 + 458

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 93.384015 M
Structure: 3,493 Square meters

EAO P 3.386985 M

Total P 96.771 M

May 25, 2022 2022 WIN2E02386 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 300217100099000
Project ID: P00630445MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)

FROM:

Agusan del Norte / Agusan del Sur North - South Lateral Road, (Las Nieves, Agusan del Norte - Kapalong, Davao del Norte), La Paz - Loreto Section, Package 1, Agusan del Sur

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Bridge

Physical Target:
CW1- 6.380 Lane Km
CW2- 286.200 Square meters

Allocation:
TOTAL: P 180,000,000
CW1: P 133,392,713
CW2: P 40,307,287
EAO: P 6,300,000

Unit Cost:
CW1: P 20,907,948.75/ Lane Km
CW2: P 140,836.08/ Square meters

TO:

Agusan del Norte / Agusan del Sur North - South Lateral Road, (Las Nieves, Agusan del Norte - Kapalong, Davao del Norte), La Paz - Loreto Section, Package 1, Agusan del Sur

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Gravel Road

Physical Target:
CW1- 0.600 Lane Km
CW2- 14.100 Lane Km

Allocation:
TOTAL: P 180,000,000
CW1: P 14,135,628.62
CW2: P 159,564,371.38
EAO: P 6,300,000

Unit Cost:
CW1: P 23,559,381.03/ Lane Km
CW2: P 11,316,622.08/ Lane Km
May 25, 2022 2022 WIN2C03567 SR2022-03-007943 March 23, 2022 Region VIII Eastern Samar District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Wright-Taft-Borongan Rd - K0872 + 000 - K0872 + 300

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 96.075400 M
Structure: 5,531.110 Square meters
EAO P 3.484600 M

Total P 99.560 M

AS MODIFIED:

Wright-Taft-Borongan Rd - K0872 + 258 - K0872 + 358

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 96.075400 M
Structure: 3,621 Square meters
EAO P 3.484600 M

Total P 99.560 M
May 25, 2022 2022 WIN2C03555 SR2022-03-007957 March 23, 2022 Region VIII Eastern Samar District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Wright-Taft-Borongan Rd - K0872 + 300 - K0872 + 600

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 94.241900 M
Structure: 5,425.560 Square meters

EAO P 3.418100 M

Total P 97.660 M

AS MODIFIED:

Wright-Taft-Borongan Rd - K0872 + 458 - K0872 + 558

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 94.241900 M
Structure: 3,534.50 Square meters

EAO P 3.418100 M

Total P 97.660 M
May 25, 2022 2022 WIN2C03563 SR2022-03-007960 March 23, 2022 Region VIII Eastern Samar District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Wright-Taft-Borongan Rd - K0872 + 600 - K0872 + 900

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 94.782300 M
Structure: 5,456.670 Square meters

EAO P 3.437700 M

Total P 98.220 M

AS MODIFIED:

Wright-Taft-Borongan Rd - K0872 + 658 - K0872 + 758

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 94.782300 M
Structure: 3,559.80 Square meters

EAO P 3.437700 M

Total P 98.220 M
May 25, 2022 2022 WIN2E02317 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 300215102369000
Project ID: P00630409MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of Road in Sudlon Mountain Farm at Barangay Binocaran, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 0.983 Lane Km

Allocation:
TOTAL: P 10,000,000
CW1: P 9,800,000
EAO: P 200,000

Unit Cost:
CW1: P 9,969,481.18/ Lane Km

TO:

Construction of Road in Sudlon Mountain Farm at Barangay Binocaran, Malimono, Surigao del Norte

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure

Physical Target:
CW1- 0.469 Lane Km
CW1- 960.225 Square meters

Allocation:
TOTAL: P 10,000,000
CW1: P 4,171,661.5
CW2: P 5,628,338.5
EAO: P 200,000

Unit Cost:
CW1: P 8,894,800.64/ Lane Km
CW2: P 5,861.48/ Square meters
May 25, 2022 2022 WIN2E02313 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Surigao del Norte 2nd District Engineering Office
UACS No. : 310202101248000
Project ID: P00602517MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads

FROM:

Surigao-Davao Coastal Rd - K1201 + 000 - K1201 + 567

Type of Work:
CW1- Road Widening

Physical Target:
CW1- 1.134 Lane Km

Allocation:
TOTAL: P 31,369,000
CW1: P 30,741,620
EAO: P 627,380

Unit Cost:
CW1: P 27,109,012.35/ Lane Km

TO:

Surigao-Davao Coastal Rd - K1200 + 454.10 - K1201 + 900

Type of Work:
CW1- Road Widening
CW2- Construction of Drainage Structure along Road

Physical Target:
CW1- 1.7979 Lane Km
CW2- 1,139.680 Lineal meters

Allocation:
TOTAL: P 31,369,000
CW1: P 25,425,058.22
CW2: P 5,316,561.78
EAO: P 627,380

Unit Cost:
CW1: P 14,141,530.8/ Lane Km
CW2: P 4,664.96/ Lineal meters
May 25, 2022 FY 2022 GAA WIN2G02726 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 300201100085000
Project ID : P00635454LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAMM

FROM ;

Construction/Improvement of Access Roads leading to Airports
(Kalsada Tungo sa Paliparan, Riles at Daungan Program - KATUPARAN), Pinamalayan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Bridge
230.955 sq.m.
Allocation - Php 24.264 Million

TO :

Construction/Improvement of Access Roads leading to Airports -
(Kalsada Tungo sa Paliparan, Riles at Daungan Program -
KATUPARAN0, Pinamalayan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Bridge :
73 sq.m.
CW2 - Rehabilitation of Paved Road :
0.7344 lane km
Allocation - Php 24.264 Million
73 sq.m.

May 25, 2022 2022 WIN2C03557 SR2022-03-008098 March 23, 2022 Region VIII Eastern Samar District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Arteche-Jipapad-Las Navas-Rawis Rd

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 89.630165 M
Structure: 5,160.060 Square meters

EAO P 3.250835 M

Total P 92.881 M

AS MODIFIED:

Arteche-Jipapad-Las Navas-Rawis Rd- (S00137SM) K0968 + 985 – K0970 + 060, (S00174SM) K0974 + 442 – K0977 + 428, (S00189SM) K0978 + 083 – K0979 + 437

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 89.630165 M
Structure: 11,785.20 Square meters

EAO P 3.250835 M

Total P 92.881 M
May 25, 2022 2022 WIN2C03565 GAA FY 2022 January 2, 2022 Region VIII Eastern Samar District Engineering Office
Convergence and Special Support Program

Convergence and Special Support - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations

AS PER GAA/ORIGINAL:

Access Road leading to Tourist Destination from Borongan Airport to Hilangagan Beach, Borongan City, Eastern Samar


Physical Target: Allocation:

CW1-Construction of Concrete Road P 16.599240 M
: 1.129 Lane Km

EAO P 0.338760 M

Total P 16.938 M

AS MODIFIED:

Access Road leading to Tourist Destination from Borongan Airport to Hilangagan Beach, Borongan City, Eastern Samar


Physical Target: Allocation:

CW1-Construction of Concrete Road P 16.599240 M
: 0.58 Lane Km

EAO P 0.338760 M

Total P 16.938 M
May 24, 2022 FY 2022 GAA WIN2G02906 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310202101135000
Project ID : P00606216LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Calapan South Road
K0140+000 - K0140+405
Physical Target - CW1 - Road Widening - 0.810 Lane Km
Allocation - Php 12.00 Million

TO :

Calapan South Road
K0140+000 - K0140+283
Physical Target - CW1 - Road Widening - 0.566 Lane Km
Allocation - Php 12.00 Million
May 24, 2022 FY 2022 GAA WIN2G02683 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310202101134000
Project ID : P00606227LZ

001 : Ensure Safe and Reliable National Road System

Network Development - Road Widening - Secondary Roads

FROM :

Calapan South Road
K0138+458 - K0138+910
Physical Target - CW1 - Road Widening - 0.904 Lane Km
Allocation - Php 15.00 Million

TO :

Calapan South Road
K0138+458 - K0138+908.70
Physical Target - CW1 - Road Widening - 0.9014 Lane Km
Allocation - Php 15.00 Million
May 24, 2022 FY 2022 GAA WIN2G02747 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310202101136000
Project ID : P00606268LZ

001 : Ensure Safe and Reliable national Road System

Network Development - Road Widening - Secondary Roads

FROM :

Calapan South Road
K0145+637 - K0146+750
Physical Target - CW1 - Road Widening : 2.326 Lane Km
Allocation - Php 38.00 Million

TO :
Calapan South Road
K0145+637 - K0146+530
Physical Target - CW1 - Road Widening : 1.855 Lane Km
Allocation - Php 38.00 Million
May 24, 2022 2022 WIN2C03566 GAA FY 2022 January 3, 2022 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Tacloban-Baybay South Rd - K0998 + 400 - K0998 + 700

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 19.600 M
Structure: 1,111.10 Square meters
EAO P 0.400 M

Total P 20.00 M

AS MODIFIED:

Tacloban-Baybay South Rd - K0996 + 160 - K0996 + 200, K0998 + 325 - K0998 + 425

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 19.600 M
Structure: 550 Square meters
EAO P 0.400 M

Total P 20.00 M
May 24, 2022 FY 2022 GAA WIN2G02992 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310108100893000
Project ID : P00611271LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of Roads with
Slips, Slope Collapse, and Landslide - Secondary Roads

FROM :

Calapan South Road
K0192+100 - K0192+151,
K0192+288 - K0192+334,
K0192+362 - K0192+415
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 966.66 sq. m.
Allocation - Php 17.40 Million

TO :

Calapan South Road
K0192+100.0 - K0192+150,
K0192+280.0 - K0192+332,
K0192+362.2 - K0192+415
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1030.97 sq.m.
Allocation - Php 17.40 Million


May 24, 2022 2022 WIN2C03570 SARO-BMB-A-22-0003170 March 23, 2022 Region VIII Leyte 5th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K0996 + 900 - K0997 + 100, K0997 + 200 - K0997 + 400

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 96.500 M
Structure: 5,555.560 Square meters
EAO P 3.500 M

Total P 100.00 M

AS MODIFIED:

Daang Maharlika (LT) - K0979 + 915 - K0979 + 985

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 96.500 M
Structure: 2,534.00 Square meters
EAO P 3.500 M

Total P 100.00 M
May 24, 2022 2022 WIN2C03559 SARO-BMB-A-22-0003177 March 21, 2022 Region VIII Leyte 5th District Engineering Office
Convergence and Special Support Program

Construction/ Rehabilitation of Water Supply/ Septage and Sewerage/ Rainwater Collector System - Water Supply

AS PER GAA/ORIGINAL:

Construction of Level III Water Supply System, Abuyog, Leyte

Physical Target: Allocation:

CW1-Construction of Water Supply Systems P 49.00 M
: 1.00 Number of Water Supply Systems

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Construction of Level III Water Supply System, Abuyog, Leyte

Physical Target: Allocation:

CW1-Construction of Water Supply Systems P 49.00 M
: 15.00 Number of Water Supply Systems

EAO P 1.00 M

Total P 50.00
May 24, 2022 2022 WIN2C03558 SARO-BMB-A-22-0003177 March 21, 2022 Region VIII Leyte 5th District Engineering Office
Convergence and Special Support Program

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities

AS PER GAA/ORIGINAL:

Construction (Completion) of Baybay City Boardwalk, Baybay City Reclamation Area, Poblacion, Baybay City, Leyte

Physical Target: Allocation:

CW1-Construction of Concrete Road P 49.00 M
: 4.262 Lane Km

EAO P 1.00 M

Total P 50.00 M

AS MODIFIED:

Construction (Completion) of Baybay City Boardwalk, Baybay City Reclamation Area, Poblacion, Baybay City, Leyte

Physical Target: Allocation:

CW1-Construction of Other Facilities P 49.00 M
: 5.00 Number of Facilities

EAO P 1.00 M

Total P 50.00 M
May 24, 2022 2022 WIN2F06366 SARO-BMB-A-22-0002929 March 21, 2022 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Construction of Cacuduran Flood Control, Nawal, Bokod, Benguet;
Physical Target: 176.929 Lineal Meters;
Allocation: Php 20,000,000.000

To: Construction of Cacuduran Flood Control, Nawal, Bokod, Benguet;
Physical Target: 323.000 Lineal Meters;
Allocation: Php 20,000,000.000

May 24, 2022 2022 WIN2F06367 SARO-BMB-A-22-0002929 March 21, 2022 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Construction of Poblacion Flood Control, Bokod, Benguet;
Physical Target: 88.464 Lineal Meters;
Allocation: Php 10,000,000.000

To: Construction of Poblacion Flood Control, Bokod, Benguet;
Physical Target: 169.000 Lineal Meters;
Allocation: Php 10,000,000.000

May 24, 2022 2022 WIN2C03568 SARO-BMB-A-22-0003173 March 21, 2022 Region VIII Eastern Samar District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Wright-Taft-Borongan Rd - K0867 + 150 - K0867 + 450

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 48.486480 M
Structure: 2,748.670 Square meters

EAO P 0.989520 M

Total P 49.476 M

AS MODIFIED:

Wright-Taft-Borongan Rd - K0872 + 758 - K0872 + 808

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 48.486480 M
Structure: 1,738 Square meters

EAO P 0.989520 M

Total P 49.476 M
May 24, 2022 FY 2022 WIN2C03556 UACS No. 320101107911000 March 21, 2022 National Capital Region Quezon City 2nd Engineering District Office
As per GAA/Original
UACS No. 320101107911000
Project ID.: P00621436LZ
OO2: Protect Lives and Properties Against Major Floods
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Flood Control Structure, Laguna Creek, Barangay Kristong Hari, Quezon City
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 412.53 lineal meters
Unit Cost = P 71,267,540/lineal meters
Allocation = P 29,400,000
EAO = P 600,000
Total = P 30,000,000

As Modified
OO2: Protect Lives and Properties Against Major Floods
Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Flood Control Structure, Lagarian Creek, Barangay Kristong Hari, Quezon City
Physical Target: CW1- Rehabilitation/Major Repair of Flood Control Structure – 370.00 lineal meters
Unit Cost = P 79,459,460/lineal meters
Allocation = P 29,400,000
EAO = P 600,000
Total = P 30,000,000
WIN2C03556
May 24, 2022 FY 2022 WIN2C03569 UACS No. 310102100792000 March 1, 2022 National Capital Region Quezon City 1st Engineering District Office
As per GAA/Original
UACS No. 310102100792000
Project ID.: P00610107LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Fairview Ave – K0024+820 – K0023+300
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay - 13.16 lane km
Unit Cost = P 7,332,820/lane km
Allocation = P 96,500,000
EAO = P 3,500,000
Total = P 100,000,000

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary Roads
Fairview Ave – K0024+(-550) – K0023+300
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay – 6.94 lane km
Unit Cost = P 13,904,900/lane km
Allocation = P 96,500,000
EAO = P 3,500,000
Total = P 100,000,000
WIN2C03569
May 24, 2022 FY 2022 WIN2C03572 UACS No. 310103100854000 March 1, 2022 National Capital Region Quezon City 1st Engineering District Office
As per GAA/Original
UACS No. 310103100854000
Project ID.: P00603593LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Dapitan St – K0006+(-326) – K0006+225
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay - 1.476 lane km
Unit Cost = P 2,433,400/lane km
Allocation = P 3,591,700
EAO = P 73,300
Total = P 3,665,000

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Dapitan St – K0006+(-326) – K0006+225
Physical Target: CW1- Preventive Maintenance of Road: Concrete Reblocking – 0.177 lane km
Unit Cost = P 20,290,430/lane km
Allocation = P 3,591,700
EAO = P 73,300
Total = P 3,665,000
WIN2C03572
May 24, 2022 FY 2022 WIN2C03571 UACS No. 310103100778000 March 1, 2022 National Capital Region Quezon City 1st Engineering District Office
As per GAA/Original
UACS No. 310103100778000
Project ID.: P00610134LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Visayas Ave – K0013+1068 – K0014+(-399), K0013+900 – K0014+000
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay - 13.431 lane km
Unit Cost = P 7,184,870/lane km
Allocation = P 96,500,000
EAO = P 3,500,000
Total = P 100,000,000

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Visayas Ave – K0012+(-079) – K0014+328
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay - 6.756 lane km
Unit Cost = P 14,283,490/lane km
Allocation = P 96,500,000
EAO = P 3,500,000
Total = P 100,000,000
WIN2C03571
May 24, 2022 FY 2022 WIN2C03573 UACS No. 310101100603000 March 1, 2022 National Capital Region Quezon City 1st Engineering District Office
As per GAA/Original
UACS No. 310101100603000
Project ID.: P00603595LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Cloverleaf (S05131LZ) – Chainage 0 – Chainage 234
Physical Target: CW1- Preventive Maintenance of Road: Asphalt Overlay - 0.47 lane km
Unit Cost = P 7,800,380/lane km
Allocation = P 3,666,180
EAO = P 74,820
Total = P 3,741,000

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Cloverleaf (S05131LZ) – Chainage 0 – Chainage 234
Physical Target: CW1- Preventive Maintenance of Road: Concrete Reblocking - 0.184 lane km
Unit Cost = P 19,923,060/lane km
Allocation = P 3,666,180
EAO = P 74,820
Total = P 3,741,000
WIN2C03573
May 24, 2022 2022 WIN2F06258 SARO-BMB-A-22-0002937 March 21, 2022 Cordillera Administrative Region Ifugao 1st District Engineering Office
From: Kiangan-Tinoc-Buguias Rd - K0341+093 - K0341+114, K0341+133 - K0341+163, K0341+427 - K0341+445, K0341+488 - K0341+507, K0342+583 - K0342+621, K0342+736 - K0342+760, K0344+724 - K0344+776, K0348+122 - K0348+163, K0348+313 - K0348+335, K0348+618 - K0348+638, K0350+888 - K0350+919, K0351+860 - K0351+894, K0352+333 - K0352+414, K0355+703 - K0355+733, K0358+460 - K0358+520;
Physical Target: 3,023.000 Square Meters;
Allocation: Php 30,230,000.000

To: Kiangan-Tinoc-Buguias Rd - K0341+093 - K0341+114, K0341+427 - K0341+445, K0341+488 - K0341+507, K0348+122 - K0348+163, K0348+313 - K0348+335, K0348+618 - K0348+638, K0350+888 - K0350+919, K0355+703 - K0355+733, K0358+460 - K0358+520;
Physical Target: 2,098.700 Square Meters;
Allocation: Php 30,230,000.000
May 23, 2022 FY 2022 GAA WIN2G02869 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310106100772000
Project ID : P00603931LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads - Tertiary Roads

FROM :

Calapan South Road
K0187+398 - K0187+740,
K0187+846 - K0188+000
Physical Target - CW1 - Asset Preservation - Rehabilitation of
Paved Road : 0.992 Lane Km
Allocation - Php 18.00 Million

TO :

Calapan South Road
K0187+380 - K0187+501.60
Physical Target - CW1 - Asset Preservation - Rehabilitation of
Paved Road : 0.243 Lane Km
Allocation - Php 18.00 Million
May 23, 2022 2022 WIN2F06347 FY 2022 GAA December 30, 2021 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Jose Abad Santos Ave (JASA) - K0075+279 - K0075+596
May 23, 2022 2022 WIN2F06344 FY 2022 GAA December 30, 2021 Region III Pampanga 1st District Engineering Office
Network Development Program - Road Widening - Primary Roads

Jose Abad Santos Ave (JASA) - K0072+465 - K0073+346, K0082+916 - K0084+540
May 23, 2022 FY 2022 GAA WIN2G02842 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310111100429000
Project ID : P00604078LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Construction/Upgrading/Rehabilitation of
Drainage along national Roads - Secondary Roads

FROM :

Calapan South Road
K0070+181 - K0071+184,
K0071+236 - K0072+004
Physical Target - CW1 - Construction of Drainage Structure
along Road : 3,572.00 l.m.
Allocation - Php 50.00 Million

TO :

Calapan South Road
K0069+476 - K0071+167.10,
K0071+300 - K071+775
Physical Target - CW1 - Construction of Drainage Structure
along Road : 3,638.70 l.m.
Allocation - Php 50.00 Million
May 23, 2022 FY 2022 GAA WIN2G02716 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310111100428000
Project ID : P00604079LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Construction/Upgrading/Rehabilitation of Drainage along national Roads - Secondary Roads

FROM :

Calapan South Road
K0064+(-249) - K0064+950,
K0064+(-289) - K0064+(-269)
Physical Target - CW1 - Construction of Drainage Structure
along Road - 2,438.00 l.m.
Allocation - Php 35.00 Million

TO :

Calapan South Road
K0064+(-249) - K0064+833
Physical Target - CW1 - Construction of Drainage Structure
along Road - 1,082.00 l.m.
Allocation - Php 35.00 Million
May 23, 2022 2022 320101107354000 GAA FY 2022 January 3, 2022 Region II Isabela 2nd District Engineering Office
Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Siffu River Flood Control Project (Sinait Section), Quirino, Isabela
May 23, 2022 2022 320101107355000 GAA FY 2022 January 3, 2022 Region II Isabela 2nd District Engineering Office
Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Siffu River Flood Control Project (Rang-Ayan Section), Roxas, Isabela
May 23, 2022 2022 320101107358000 GAA FY 2022 January 3, 2022 Region II Isabela 2nd District Engineering Office
Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Mallig River Flood Control Project (Holy Friday Section), Mallig, Isabela
May 23, 2022 2022 320101107359000 GAA FY 2022 January 3, 2022 Region II Isabela 2nd District Engineering Office
Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Mallig River Flood Control Project (Olango Section), Mallig, Isabela
May 23, 2022 2022 310201100972000 GAA FY 2022 January 3, 2022 Region II Isabela 4th District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads - Daang Maharlika (LZ) - K0309+(-496) - K0309+(-413), K0309+(-423) - K0309+(-284), K0323+200 - K0323+505
May 23, 2022 2022 320101107356000 GAA FY 2022 January 3, 2022 Region II Isabela 2nd District Engineering Office
Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Siffu River Flood Control Project (San Luis Section), Roxas, Isabela
May 23, 2022 2022 320101107357000 GAA FY 2022 January 3, 2022 Region II Isabela 2nd District Engineering Office
Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Mallig River Flood Control Project (Luna Section), Quirino, Isabela
May 23, 2022 2022 310112100297000 GAA FY 2022 January 3, 2022 Region II Batanes District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads - San Vicente-Savidug-Chavayan-Sumnanga-Nakanmuan Rd- (S00003ST) K0020+670 - K0020+782
May 23, 2022 FY 2022 GAA WIN2G02851 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310109100859000
Project ID : p00604404Lz

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse, and Landslide - Tertiary Roads

FROM :

Calapan South Road
K0184+902 - K0184+948
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 366.67 sq.m.
Allocation - Php 5.50 Million

TO :

Calapan South Road
K0184+902 - K0184+966.80
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 339.55 sq.m.
Allocation - Php 5.50 Million
May 23, 2022 FY 2022 GAA WIN2G02871 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 310109100860000
Project ID : P00604405LZ

001 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse, and Landslide - Tertiary Roads

FROM :

Calapan South Road
K0187+348 - K0187+505
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1886.67 sq. m.
Allocation - Php 28.300 million

TO :

Calapan South Road
K0187+690 - K0187+934.8
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1282.75 sq.m.
Allocation - Php 28.30 Million
May 21, 2022 FY 2022 WIN2E02315 310204101795000 May 4, 2022 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310204101795000
Project ID: P00604221MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Bagalupa-Labangan-Gubang Road, Zamboanga del Sur

CW1- Construction of Concrete Road
Physical Target: 3.8719 Lane km
Unit Cost: ₱ 12,526,149.95/Lane km
ROW- Right-Of-Way Acquisition
Physical Target: 5,807.85 sq.m.
Unit Cost: ₱ 86.09/sq.m.
EAO: ₱ 1,000,000.00
Total Allocation: ₱ 50,000,000.00
May 21, 2022 FY 2022 WIN2E02316 310204101799000 May 4, 2022 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 310204101799000
Project ID: P00604222MN

OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

NRJ Molave-Tambulig-Don Victoriano Diversion Road, Zamboanga del Sur

CW1- Construction of Concrete Road
Physical Target: 3.575 Lane km
Unit Cost: ₱ 13,706,293.71/Lane km
EAO: ₱ 1,000,000.00
Total Allocation: ₱ 50,000,000.00
May 21, 2022 FY 2022 WIN2E02302 300215102015000 May 4, 2022 Region IX Zamboanga del Sur 1st District Engineering Office
UACS No. 300215102015000
Project ID : P00630163MN

Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities

Construction of Alang-Alang-Lower Tiparak-Tungawan By-Pass Road, Zamboanga del Sur

CW1 - Construction of Concrete Road
Physical Target: 1.064 Lane km
Unit Cost : P 18,421,052.63/Lane km
EAO : P 400,000.00
Allocation : P 20,000,000.00
May 21, 2022 FY 2022 WIN2E02180 310104100360000 March 21, 2022 Region IX Zamboanga del Norte 1st District Engineering Office
UACS No. 310104100360000
Project ID: P00601149MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

Dipolog-Sindangan-Liloy Rd (S01057MN) K1861 + 698.00 - K1863 + 556.00, K1863 + 834.84 - K1865 + 911.66, K1865 + 952.00 - K1866 + 867.23

CW1 : Reconstruction to Concrete Pavement
Physical Target: 9.58904 Lane km
Unit Cost : P 8,273.77/Lane km
EAO : P 2,877,525.00
Allocation : P 82,215,000.00
May 20, 2022 FY 2022 GAA WIN2G02827 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 3201011081820000
Project ID : P00620660LZ

002 : Protect Lives and Properties

Flood Management - Construction/maintenance of Flood
Mitigation Structures and Drainage Systems

FROM :

Construction of Marangas River Flood Control Structure,
Sta. 0+000 - Sta. 1+080,
Bataraza, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
610 LM
Allocation - Php 30.00 Million

TO :

Construction of Marangas River Flood Control Structure,
Sta. 0+800 - Sta. 1+250, Left Bank
Sta. 1+080 - Sta.1+240
Bataraza, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
610.0 LM
Allocation - Php 30.00 Million
May 20, 2022 FY 2022 GAA WIN2G02789 DPWH Infra Program FY 2022 December 30, 2021 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 3201011081830000
Project ID : P00620661LZ

002 : Protect Lives and Properties Against Major Floods

Flood Management - Construction/Maintenance of Flood
Mitigation Structures and Drainage Systems

FROM :

Construction of Narra Poblacion Flood Control,
Sta. 0+000 - Sta. 2+000,
Narra, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
1,790 LM
Allocation - Php 48.00 Million

TO :

Construction of Narra Poblacion Flood Control,
Sta. 0+000 - Sta. 1+790
Narra, Palawan
Physical Target - CW1 - Construction of Flood Mitigation Structure
1,790 LM
Allocation - 48.00 Million
May 20, 2022 2022 WIN2E02351 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Agusan del Norte District Engineering Office
UACS No. : 310107100437000
Project ID: P00601522MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

FROM:

Daang Maharlika (Surigao-Agusan Sect) - K1169 + 793 - K1169 + 875

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 2,310.50 Square meters

Allocation:
TOTAL: P 23,105,000
CW1: P 22,642,900
EAO: P 462,100

Unit Cost:
CW1: P 9,800/ Square meters

TO:

Daang Maharlika (Surigao-Agusan Sect) - K1169 + 793 - K1169 + 858

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 984.500 Square meters

Allocation:
TOTAL: P 23,105,000
CW1: P 22,642,900
EAO: P 462,100

Unit Cost:
CW1: P 22,999.39055/ Square meters

Pages