June 2, 2022 |
2022 |
WIN2E02369 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1570+ 780 – K1570 + 880
Physical Target:
CW1: 5,555.56.00 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Asset Preservation – Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1568 + 160 – K1568 + 225
Physical Target:
CW1: 3,586.050 sq. m. (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00 |
June 2, 2022 |
FY 2022 GAA |
WIN2G02731 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310111100416000
Project ID : P00604071LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Construction/Upgrading/Rehabilitation of
Drainage along National Roads - Secondary Roads
FROM :
Calapan North Road
K0030+589 - K0030+969
Physical Target - CW1 - Construction of Drainage Structure
along Road : 760.00 Lineal Meters
Allocation - Php 9.836 Million
TO :
Calapan North Road
K0030+589 - K0030+975,
K0031+437 - K0031+519
Physical Target - CW1 - Construction of Drainage Structure
along Road : 936.00 Lineal Meters
Allocation - Php 9.836 Million |
June 2, 2022 |
FY 2022 GAA |
WIN2G02688 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310108101124000
Project ID : P00604384 LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and Landslide -
Secondary Roads
FROM :
Calapan North Road
K0035+854 - K0036+192
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,969.5 Square Meters
Allocation - Php 19.695 Million
To :
Calapan North Road
K0035+460 - K0035+587,
K0035+641 - K0035+669,
K0035+737 - K0035+766.50.
K0039+065 - K0039+181,
K0040+015 - K0040+091
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,694.25 Square meters
Allocation - Php 19.695 Million
|
June 2, 2022 |
2022 |
WIN2E02121 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO2: Protect Lives and Properties – Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Drainage Structure Along Batasan Creek, Sta. 0+000 – Sta. 1+500, Brgy. Bagumbayan, Lupon, Davao Oriental
Physical Target:
CW1: 881.61 Lineal Meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Drainage Structure)
EAO: P 1,000,000.00
TO: OO2: Protect Lives and Properties – Flood Management – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Drainage Structure Along Batasan Creek, Sta. 0+000 – Sta. 1+440, Brgy. Bagumbayan, Lupon, Davao Oriental
Physical Target:
CW1: 1,415.00 Lineal Meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Construction of Drainage Structure)
EAO: P 1,000,000.00 |
June 2, 2022 |
FY 2022 GAA |
WIN2G02760 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310108101125000
Project ID : P00604385LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and Landslide -
Secondary Roads
FROM :
Calapan North Road
K0036+900 - K0037+100
Physical Target - CW1 Construction of Road Slope Protection
Structure : 1,280.80 Square Meters
Allocation - Php 12.808 Million
TO :
Calapan North Road
K0023+300 - K0023+320.40,
K0023+420 - K0023+452,
K0037+000 - K0037+090
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 487.00 Square Meters
Allocation - Php 12.808 Million |
June 2, 2022 |
FY 2022 GAA |
WIN2G02666 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310108101126000
Project ID : P00604387LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and Landslide -
Secondary Roads
FROM :
Calapan North Road
K0043+611 - K0043+684
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 441.00 Square Meters
Allocation - Php 4.410 Million
TO :
Calapan North Road
K0043+616.40 - K0043+684
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 338.00 Square Meters
Allocation - Php 4.410 Million |
June 2, 2022 |
FY 2022 GAA |
WIN2G0667 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310108101127000
Project ID : P00604388LZ
001 : Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and Landslide -
Secondary Roads
FROM :
Calapan North Road
K0043+738 - K0043+796
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 350.40 Square Meters
Allocation - Php 3.504 million
TO :
Calapan North Road
K0043+738 - K0043+790.40
Physical Target - CW1 - Construction of Rod Slope Protection
Structure - 262.00 Square Meters
Allocation - Php 3.504 Million
|
June 2, 2022 |
FY 2022 GAA |
WIN2G02679 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310202101121000
Project ID : P00606183LZ
001 : Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
FROM ;
Calapan South Road
K0062+647 - K0062+649,
K0062+662 - K0063+015
Physical Target - CW1 - Network Development - Road Widening :
0.728 Lane Km
Allocation - Php 9.425 Million
TO :
Calapan South Road
K0062+649 - K0062+926.50
Physical Target - CW1 - Network Development - Road Widening ;
0.555 Lsne Km
Allocation - Php 9.425 million
|
June 1, 2022 |
FY 2022 GAA |
WIN2G02854 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS NO. : 310109100869000
Project ID : P00604406LZ
001 : Ensure Safe and Reliable National Road System
Asset preservation - Rehabilitation/Reconstruction of Roads
with Slips, Slope Collapse, and Landslide - Tertiary Road
FROM :
Calapan South Road
K0189+566 - K0189+602,
K0189+888 - K0190+011
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1873.33 sq.m.
Allocation - Php 28.100 Million
TO :
Calapan South Road
K0189+488 - K0189+753.20,
K0189+936 - K0190+011.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure - 1627.61 sq.m.
Allocation - Php 28.100 Million |
June 1, 2022 |
2022 |
WIN2G02706 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 4th District Engineering Office |
UACS No. 310103100997000
Project ID: P00603748VS
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Jct Sn Enrique-Pontevedra By-Pass Rd (S00203NR) - K0040 + (-664) - K0040 + (-240), K0040 + 000 - K0040 + 189
CW1 - Preventive Maintenance of Road: Asphalt Overlay:
1.226 lane km - 6,178.90
EAO - 126.10
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Jct Sn Enrique-Pontevedra By-Pass Rd (S00203NR) – K0040 + (-557)- K0040+200
CW1 - Preventive Maintenance of Road: Asphalt Overlay:
1.51 Lane Km - 6,178.90
EAO - 126.10
|
June 1, 2022 |
2022 |
WIN2G02671 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 4th District Engineering Office |
UACS No. 310101100695000
Project ID: P00603749VS
FROM:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Bacolod South Rd (S00127NR) - K0032 + 000 - K0032 + 003.20, K0032 + 021.30 - K0032 + 043.80, K0032 + 061.70 - K0032 + 066.30, K0032 + 070.70 - K0032 + 075.30, K0032 + 091.70 - K0032 + 392, K0032 + 491.20 - K0032 + 558.80
CW1 - Preventive Maintenance of Road: Concrete Reblocking:
1.609 lane km - 7,216.72
EAO 147.28
TO:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Bacolod South Rd (S00127NR) - K0032 + 022 -K0032 + 049, K0032 + 067 - K0032 + 076, K0032 + 092 - K0032 + 393, K0032 + 303 -K0032 + 316, K0032 + 493 - K0032 + 974
CW1 - Preventive Maintenance of Road: Concrete Reblocking:
0.840 lane km - 7,216.72
EAO 147.28
|
June 1, 2022 |
FY 2022 GAA |
WIN2G02778 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 310105100696000
Project ID : P00603925LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgradingof Damaged Paved Roads - Secondary Roads
FROM :
Calapan North Road
K0036+000 - K037+540
Physical Target - CW1 - Reconstruction to Concrete Pavement :
3.104 Lane Km
Allocation - Php 20.186 Million
TO :
Calapan North Road
K0035+705 - K0037+000
Physical Target - CW1 - Reconstruction to Concrete Pavement :
2.590 Lane Km
Allocation - Php 20.186 Million
|
June 1, 2022 |
2022 |
WIN2G02698 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 4th District Engineering Office |
UACS No. 310104100413000
Project ID: P00603750VS
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads
Bacolod South Rd (S00127NR) - K0031 + 614 - K0031 + 633.30, K0031 + 669.50 - K0031 + 777.50, K0031 + 791.10 - K0031 + 868, K0031 + 890.50 - K0031 + 949.20, K0031 + 953.70 - K0032 + 000
CW1 - Reconstruction to Concrete Pavement:
1.257 lane km - 21,490.42
EAO - 438.58
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary
Roads
Bacolod South Rd (S00127NR) – K0027 + 288 – K0028 + 200
CW1- Reconstruction to Concrete Pavement:
1.83 lane km - 21,490.42
EAO - 438.58
|
June 1, 2022 |
2022 |
WIN2G02738 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 4th District Engineering Office |
UACS No. 310104100415000
Project ID: P00603752VS
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads
Bacolod South Rd (S00127NR) - K0037 + 050 - K0037 + 081, K0037 + 237 - K0037 + 285
CW1 - Reconstruction to Concrete Pavement:
0.212 Lane Km - 3,625.02
EAO - 73.98
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Primary Roads
Bacolod South Rd (S00127NR)- K0044+482-K0044+662
CW1- Reconstruction to Concrete Pavement:
0.360 Lane Km - 3,625.02
EAO - 73.98
|
June 1, 2022 |
FY 2022 GAA |
WIN2G02720 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310111100417000
Project ID : P00604064LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Construction/Upgrading/Rehabilitation
of Drainage along national Roads - Secondary Roads
FROm :
Calapan South Road
K0008+334 - K0008+630
Physical Target - CW1 - Construction of Drainage Structure
along Road : 296.00 Lineal meters
Allocation - Php 2.664 Million
TO :
Calapan South Road
K0058+224 - K0058+451
Physical Target - CW1 - Construction of Drainage Structure
along Road : 227.00 Lineal meters
Allocation - Php 2.664 Million
|
June 1, 2022 |
2022 |
WIN2G02865 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 4th District Engineering Office |
UACS No. 310102100999000
Project ID: P00603755VS
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Assert Preservation-
Preventive Maintenance- Secondary Roads
Don Jorge Araneta-Ayungon-Yungue-Gurrea-La Carlota City Rd (S00208NR) - Chainage 5792 - Chainage 5885, Chainage 6087 - Chainage 6155
CW1 – Preventive Maintenance of Road: Concrete Reblocking:
0.551 lane km - 2,471.56
EAO - 50.44
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Assert Preservation–
Preventive Maintenance- Secondary Roads
Don Jorge Araneta – Ayungon – Yungue – Gurrea – La Carlota City Rd (S00208NR) – Chainage 2362- Chainage 2531.8, Chainage 2362 - Chainage 2392, Chainage 2645 - Chainage 2663, Chainage 2843 - Chainage 2847
CW1 – Preventive Maintenance of Road: Concrete Reblocking:
0.2258 lane km - 2,471.56
EAO - 50.44
|
June 1, 2022 |
2022 |
WIN2G02737 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 4th District Engineering Office |
UACS No. 310105100736000
Project ID: P00603756VS
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Roads
Don Jorge Araneta-Ayungon-Yungue-Gurrea-La Carlota City Rd (S00208NR) - Chainage 5752 - Chainage 5792, Chainage 6155 - Chainage 6355
CW1 – Reconstruction to Concrete Pavement:
0.920 lane km - 15,625.12
EAO - 318.88
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Roads
Don Jorge Araneta – Ayungon – Yungue – Gurrea – La Carlota City Rd (S00208NR) – Chainage 4236 - Chainage 4290, Chainage 4418 - Chainage 4436 , Chainage 4459 - Chainage 4495 , Chainage 4509 - Chainage 4518, Chainage 4536 - Chainage 4567.50, Chainage 4618 - Chainage 4663, Chainage 4748 - Chainage 4758.50, Chainage 4772 - Chainage 4809.50, Chainage 4895 - Chainage 4989.50, Chainage 5374 - Chainage 5431, Chainage 5499 - Chainage 5521, Chainage 5521 - Chainage 5617, Chainage 5793 - Chainage 5868, Chainage 5868 - Chainage 5918, Chainage 6157 - Chainage 6209, Chainage 6231 - Chainage 6358
CW1 – Reconstruction to Concrete Pavement:
1.5185 lane km - 15,625.12
EAO - 318.88
|
June 1, 2022 |
FY 2022 GAA |
WIN2G02647 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No : 310111100418000
Project ID : P00604065LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Construction/Upgrading/Rehabilitation
of Drainage along National Roads - Secondary Roads
FROM :
Calapan South Road
K0021+000 - K0021+786
Physical Target - CW1 - Construction of Drainage Structure
along Road : 1,572.00 Lineal meters
Allocation - Php 20.339 Million
TO :
Calapan South Road
K0021+000 - K0022+345
Physical Target - CW1 - Construction of Drainage Structure
along Road : 2,197.00 Lineal meters
Allocation - Php 20.339 Million
|
June 1, 2022 |
2022 |
WIN2G02788 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 4th District Engineering Office |
UACS No. 310101100699000
Project ID: P00603759VS
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Bacolod South Rd (S00127NR) - K0032 + 003.20 - K0032 + 021.30, K0032 + 043.80 - K0032 + 061.70, K0032 + 066.30 - K0032 + 070.70, K0032 + 075.30 - K0032 + 091.70, K0032 + 392 - K0032 + 491.20, K0032 + 558.80 - K0032 + 596.30, K0032 + 804.90 - K0032 + 836.50, K0032 + 841 - K0032 + 849.80, K0032 + 971.30 - K0033 + 000, K0037 + 081 - K0037 + 237
CW1 - Preventive Maintenance of Road: Concrete Reblocking:
1.375 lane km - 6,167.14
EAO - 125.86
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Bacolod South Rd (S00127NR) - K0033 + 070 - K0033 + 079, K0033 + 102 - K0033 + 111, K0033 + 156 -K0033 + 174, K0033 + 201 - K0033 + 301, K0033 + 373 - K0033 + 423, K0033 + 531 - K0033 + 735, K0033 + 771 - K0033 + 942
CW1 - Preventive Maintenance of Road: Concrete Reblocking:
0.579 lane km - 6,167.14
EAO - 125.86
|
June 1, 2022 |
2022 |
WIN2G02811 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 4th District Engineering Office |
UACS No. 310110100307000
Project ID: P00604046VS
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Bacolod South Rd - K0024 + 180 - K0024 + 898, K0024 + 908 - K0026 + 000
CW1 – Construction of Drainage Structure along Road:
2,081 lineal meters - 19,375.58
EAO - 395.42
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Bacolod South Rd - K0024 + 450 - K0024 + 898, K0024 + 908 - K0026 + 000
CW1 – Construction of Drainage Structure along Road:
1,811 Lineal Meters - 19,375.58
EAO - 395.42
|
June 1, 2022 |
2022 |
WIN2G02797 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 4th District Engineering Office |
UACS No. 310112100337000
Project ID: P00604049VS
FROM:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads
Jct Sn Enrique-Pontevedra By-Pass Rd - K0045 + 025 - K0045 + 525
CW1 – Upgrading of Drainage Structure along Road:
500 lineal meters - 4,410.00
EAO - 90.00
TO:
ORGANIZATIONAL OUTCOME 1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads
Jct Sn Enrique-Pontevedra By-Pass Rd - K0044 + 025 - K0044 + 525
CW1 – Upgrading of Drainage Structure along Road:
500 lineal meters - 4,410.00
EAO - 90.00
|
June 1, 2022 |
2022 |
WIN2G02728 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Negros Occidental 4th District Engineering Office |
UACS No. 310110100306000
Project ID: P00604054VS
FROM:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Bacolod South Rd - K0024 + (-881) - K0024 + 180
CW1 – Construction of Drainage Structure along Road:
1061 lineal meters - 2,372.58
EAO - 48.42
TO:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Bacolod South Rd – K0024 + 235 - K0024 + 450
CW1 – Construction of Drainage Structure along Road:
215 lineal meters - 2,372.58
EAO - 48.42
|
June 1, 2022 |
FY 2022 GAA |
WIN2G02705 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310111100419000
Project ID : P00604066LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Construction/Upgrading/Rehabilitation of
Drainage along National Roads - Secondary Roads
FROM :
Calapan South Road
K0036+741 - K0037+200
Physical Target - CW1 - Construction of Drainage Structure
along Road : 432.00 Lineal meters
Allocation - Php 5.591 Million
TO :
Calapan South Road
K0036+490 - K0036+927
Physical Target - CW1 - Construction of Drainage Structure
along Road : 437.00 Lineal meters
Allocation - Php 5.591 Miilion |
June 1, 2022 |
2022 |
WIN2G02785 |
SARO-BMB-A-22-0002991 |
March 21, 2022 |
Region VI |
Negros Occidental 4th District Engineering Office |
UACS No. 310101100696000
Project ID: P00605962VS
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Bacolod South By-Pass Rd - K0019 + (-175) - K0022 + 110
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 13.38 Lane Km - 49,000.00
EAO 1,000.00
TO:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Primary Roads
Bacolod South By-Pass Rd - K0019 + 670 - K0022 + 110
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 10.00 Lane Km - 49,000.00
EAO 1,000.00
|
June 1, 2022 |
2022 |
WIN2G02775 |
SARO-BMB-A-22-0002991 |
March 21, 2022 |
Region VI |
Negros Occidental 4th District Engineering Office |
UACS No. 310101100697000
Project ID: P00605963VS
FROM:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Sum-ag-Abuanan Rd - K0015 + 560 - K0018 + 469
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 5.946 Lane Km - 49,000.00
EAO 1,000.00
TO:
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Sum-ag-Abuanan Rd - K0015 + 560 - K0020+597
CW1 - Preventive Maintenance of Road: Asphalt Overlay: 10.21 Lane Km- 49,000.00
EAO 1,000.00
|
June 1, 2022 |
FY 2022 GAA |
WIN2G02729 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310111100420000
Project ID : P00604067LZ
Asset Preservation - Construction/Upgrading/Rehabilitation
of Drainage along National Roads - Secondary Roads
FROM :
Calapan South Road
K0043+875 - K0044+421
Physical Target - CW1 - Construction of Drainage Structure
along Road : 1180.00 Lineal meters
Allocation - Php 15.270 million
TO :
Calapan South Road
K0020+964 - K0021+000,
K0043+907 - K0044+380
Physical Target - CW1 - Construction of Drainage Structure
along Road : 1066.00 Lineal meters
Allocation - Php 15.270 Million |
June 1, 2022 |
2022 |
WIN2E02393 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
Jct. Sulop (Along Digos - Makar Road) Waterfall - Labon - Osmeña - Banate (Along Digos - Makar Road), Package 3, Davao del Sur
Physical Target:
CW1: 10.609 Lane Km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00
TO: Convergence and Special Support Program – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
Jct. Sulop (Along Digos - Makar Road) Waterfall - Labon - Osmeña - Banate (Along Digos - Makar Road), Package 3, Davao del Sur
Physical Target:
CW1: 2.6845 Lane Km (Reconstruction to Concrete Road Pavement)
CW2: 13.732 Lane Km (Road Widening)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 64,819,659.00 (Reconstruction to Concrete Road Pavement)
CW2: P 31,680,341.00 (Road Widening)
EAO: P 3,500,000.00 |
June 1, 2022 |
2022 |
WIN2G02665 |
SR2022-02-001715 |
February 4, 2022 |
Region VI |
Regional Office VI |
UACS No. 300214100070000
Project ID: P00632376VS
FROM:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
Preventive Maintenance along Iloilo East Coast-Capiz Rd - K0131 + 400 - K0133 + 700, K0170 + 132 - K0171 + 773
CW1- Preventive Maintenance of Road: Concrete Reblocking
4.071 lane km - 48,250.00
EAO - 1,750.00
TO:
CONVERGENCE AND SPECIAL SUPPORT
PROGRAM
Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
Preventive Maintenance along Iloilo East Coast-Capiz Rd - K0131 + 400 - K0132 + 840, K0170 + 132 - K0171 + 773
CW1- Preventive Maintenance of Road: Asphalt Overlay:
9.854 lane km - 48,250.00
EAO - 1,750.00
|
June 1, 2022 |
FY 2022 GAA |
WIN2G02730 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310111100421000
Project ID : P00604068LZ
001 : Ensure Safe and Reliable National Road Road System
Asset Preservation - Construction/Upgrading/Rehabilitation
of Drainage along National Roads - Secondary Roads
FROM :
Calapan South Road
K0055+662 - K0056+251
Physical Target - CW1 - Construction of Drainage Structure
along Road : 1036.00 Lineal meters
Allocation - Php 13.408 Million
TO :
Calapan South Road
K0055+427 - K0056+142
Physical Target - CW1 - Construction of Drainage Structure
along Road : 1288.00 Lineal meters
Allocation - Php 13.408 Million
|
June 1, 2022 |
2022 |
WIN2G02805 |
SR2022-03-006816 |
March 22, 2022 |
Region VI |
Regional Office VI |
UACS No. 310204101557000
Project ID: P00606462VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of By-Pass and Diversion Roads
Construction of Iloilo River North Bank Road, Iloilo City
CW1- Construction of
Concrete Road: 4,000.00 lane km - 96,500.00
EAO - 3,500.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Network Development - Construction of By-Pass and Diversion Roads
Construction of Iloilo River North Bank Road, Iloilo City
CW1- Off-Carriageway Improvement: Construction of Bike Lanes: 4,327.91 sq.m. - 16,500.00
ROW Acquisition: 22,857 sq.m. - 80,000.00
EAO - 3,500.00
|
June 1, 2022 |
2022 |
WIN2G02981 |
SR2022-03-006763 |
March 22, 2022 |
Region VI |
Regional Office VI |
UACS No. 310108100904000
Project ID: P00606413VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Iloilo-Antique Rd - K0072 + (-248) - K0072 + 500
CW1- Construction of Road Slope Protection
Structure: 5,833.33 sq.m. - 101,325.00
EAO - 3,675.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Iloilo-Antique Rd - K0074+ 805 – K0075 + 914, K0075 + 986 – K0076 + 004, K0076 + 039 – K0076 + 058, K0076 + 133 – K0076 + 561, K0076 + 615 – K0076 + 645, K0076 + 746 – K0076 + 766, K0076 + 956 – K0076 + 978, K0077 + 180 – K0077 + 404, K0077 + 507 – K0077 + 688
CW1- Construction of Road Slope
Protection Structure:
12,637.06 sq.m. - 99,099.00
ROW Acquisition: 665 square meters - 2,226.00
EAO - 3,675.00
|
June 1, 2022 |
2022 |
WIN2G02980 |
SR2022-03-006762 |
March 22, 2022 |
Region VI |
Regional Office VI |
UACS No. 310108100902000
Project ID: P00606412VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Iloilo-Antique Rd - K0072 + 500 - K0073 + 200
CW1- Construction of Road Slope
Protection Structure:
5,833.33 sq.m. - 101,325.00
EAO - 3,675.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Iloilo-Antique Rd – K0077 + 688 – K0078 + 541, K0078 + 570 – K0078 + 770, K0079 + 002 – K0079 + 529, K0079 + 625 – K0079 +879
CW1- Construction of Road Slope
Protection
Structure:
8,911 sq.m. - 99,151.00
ROW Acquisition: 305 sq.m. - 2,174.00
EAO - 3,675.00
|
June 1, 2022 |
2022 |
WIN2G02949 |
SR2022-03-006761 |
March 22, 2022 |
Region VI |
Regional Office VI |
UACS No. 310107100328000
Project ID: P00606405VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0077 + 450 - K0077 + 700
CW1- Construction of Road Slope Protection Structure:
5,555.56 sq.m - 96,500.00
EAO - 3,500.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Bacolod-Murcia-DS Benedicto-Sn Carlos City Rd - K0077 + 520 - K0078 + 662
CW1- Construction of Road Slope Protection Structure:
9,757 sq.m - 96,500.00
EAO - 3,500.00
|
June 1, 2022 |
FY 2022 GAA |
WIN2G02733 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310111100422000
Project ID : P00604069LZ
001 : Ensure Safe and Reliable national Road System
Asset Preservation - Construction/Upgrading/Rehabilitation
of Drainage along national Roads - Secondary Roads
FROM :
Calapan South Road
K0058+523 - K0059+594
Physical Target - CW1 - Construction of Drainage Structure
along Road : 2110.00 Lineal meters
Allocation - Php 27.306 Million
TO :
Calapan South Road
K0056+142 - K0056+350,
K0058+523 - K0059+545
Physical Target - CW1 - Construction of Drainage Structure
along Road : 2228.00 Lineal meters
Allocation - Php 27.306 Million
|
June 1, 2022 |
2022 |
WIN2G02948 |
SR2022-03-006807 |
March 22, 2022 |
Region VI |
Regional Office VI |
UACS No. 310202100995000
Project ID: P00606039VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Iloilo-Antique Rd - K0073 + 200 - K0074 + 000
CW1- Road Widening:
1.634 lane km - 101,325.00
EAO - 3,675.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Network Development Program - Road Widening - Secondary Roads
Iloilo-Antique Rd - K0073 + 200 - K0074 + 805
CW1- Road Widening:
3.210 lane km - 99,325.00
ROW Acquisition: 16,050 square meters - 2,000.00
EAO - 3,675.00
|
June 1, 2022 |
2022 |
WIN2G02977 |
SR2022-03-006821 |
March 22, 2022 |
Region VI |
Regional Office VI |
UACS No. 310202100994000
Project ID: P00606038VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Anini-y-Tobias Fornier Rd - K0097 + 000 - K0097 + 890
CW1- Road Widening:
1.78 lane km - 101,325.00
EAO - 3,675.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Network Development Program - Road Widening - Secondary Roads
Anini-y-Tobias Fornier Rd - K0097 + 000 - K0098 + 297
CW1- Road Widening:
2.60 lane km - 98,325.00
ROW Acquisition: 13,000 square meters - 3,000.00
EAO - 3,675.00
|
June 1, 2022 |
2022 |
WIN2G02956 |
SR2022-03-006820 |
March 22, 2022 |
Region VI |
Regional Office VI |
UACS No. 310202100993000
Project ID: P00606037VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Anini-y-Tobias Fornier Rd - K0093 + 707 - K0094 + 191
CW1- Road Widening:
0.960 lane km - 101,325.00
EAO - 3,675.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Network Development Program - Road Widening - Secondary Roads
Anini-y-Tobias Fornier Rd - K0091 + 377 - K0094 + 190
CW1- Road Widening:
5.650 lane km - 98,226.00
ROW Acquisition: 28,250 square meters - 3,099.00
EAO - 3,675.00
|
June 1, 2022 |
2022 |
WIN2G02963 |
SR2022-03-006818 |
March 22, 2022 |
Region VI |
Regional Office VI |
UACS No. 310202100992000
Project ID: P00606036VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Anini-y-Tobias Fornier Rd - K0076 + 700 - K0077 + 377
CW1- Road Widening:
1.368 lane km - 101,325.00
EAO - 3,675.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Network Development Program - Road Widening - Secondary Roads
Anini-y-Tobias Fornier Rd - K0076 + 700 - K0077 + 564
CW1- Road Widening:
1.742 lane km - 98,453.43
ROW Acquisition: 8,710 square meters - 2,871.57
EAO - 3,675.00
|
June 1, 2022 |
2022 |
WIN2G02957 |
SR2022-03-006755 |
March 22, 2022 |
Region VI |
Regional Office VI |
UACS No. 310102100831000
Project ID: P00605972VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Iloilo-Antique Rd
CW1- Preventive
Maintenance of Road: Asphalt Overlay:
27.00 lane km - 144,750.00
EAO - 5,250.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Iloilo-Antique Rd
CW1- Preventive Maintenance of Road: Asphalt
Overlay:
21.424 lane km - 144,750.00
EAO - 5,250.00
|
June 1, 2022 |
2022 |
WIN2G02905 |
SR2022-03-006747 |
March 22, 2022 |
Region VI |
Regional Office VI |
UACS No. 310111100343000
Project ID: P00605706VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
President Corazon C. Aquino Ave. (S00094PN) - Chainage 000 - Chainage 1190, Chainage 3057
- Chainage 5307
CW1- Construction of Drainage
Structure along Road:
6,880.00 lineal meters - 135,100.00
EAO - 4,900.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
President Corazon C. Aquino Ave. (S00094PN) - Chainage 2736 - Chainage 3109, Chainage 3830
- Chainage 5223
CW1-
Construction of Drainage Structure along
Road:
3,578.00 lineal meters - 135,100.00
EAO - 4,900.00
|
June 1, 2022 |
2022 |
WIN2G02787 |
SR2022-02-001230 |
February 4, 2022 |
Region VI |
Regional Office VI |
UACS No. 310205100690000
Project ID: P00605265VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Construction of Missing Links/ New Roads
San Remigio - Bugo - Gen. Fullon - Valderrama Road, Antique
CW1- Construction of Concrete Road:
8.067 lane km - 116,765.00
EAO - 4,235.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Network Development - Construction of Missing Links/ New Roads
San Remigio - Bugo - Gen. Fullon - Valderrama Road, Antique
CW1- Construction of Gravel Road:
1.50 lane km - 115,765.00
ROW Acquisition: 7,500 square meters - 1,000.00
EAO - 4,235.00
|
June 1, 2022 |
2022 |
WIN2G02727 |
SR2022-02-000538 |
February 3, 2022 |
Region VI |
Regional Office VI |
UACS No. 310202101010000
Project ID: P00604801VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Secondary Roads
Jaime Cardinal Sin Ave - K0283 + 408 - K0283 + 500, K0283 + 568 - K0283 + 570, K0284 + 032 - K0287 + 595, K0288 + (-618) - K0290 + 164
CW1- Road Widening:
12.708 lane km - 178,763.355
EAO - 6,483.645
TO:
OO1: Ensure Safe and Reliable National Road
System
Network Development Program - Road Widening - Secondary Roads
Jaime Cardinal Sin Ave - K0286 + 600 - K0287 + 595, K0288 + (-618) - K0290 + 493
CW1- Road Widening:
8.150 lane km - 172,763.355
ROW Acquisition: 40,750 square meters - 6,000.00
EAO - 6,483.645
|
June 1, 2022 |
2022 |
WIN2G02664 |
SR2022-02-000240 |
February 3, 2022 |
Region VI |
Regional Office VI |
UACS No. 310108100905000
Project ID: P00604068VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Guimaras Circumferential Rd - K0020 + 600 - K0021 + 100
CW1- Construction of Road Slope Protection Structure:
4,444.44 sq.m - 77,200.00
EAO - 2,800.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Guimaras Circumferential Rd - K0020 + 415 - K0020 + 833
CW1- Construction of Road Slope Protection Structure:
4,619.035 sq.m - 70,161.90
ROW Acquisition: 4,180 square meters 1-
EAO - 2,800.00
|
June 1, 2022 |
2022 |
WIN2G02722 |
FY 2022 GAA RA 11639 |
January 2, 2022 |
Region VI |
Iloilo City District Engineering Office |
UACS No. 310103100988000
Project ID: P00603702VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Arroyo St (S00077PN) - Chainage 0 - Chainage 77.8, Chainage 127 - Chainage 201, Chainage 77.8 - Chainage 127
CW1- Preventive Maintenance of Road: Asphalt Overlay: 2.046 Lane Km - 10,308.62
EAO - 210.38
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Arroyo St (S00077PN) Chainage 7 – Chainage 194
CW1- Preventive Maintenance of Road: Asphalt Overlay: 0.374 Lane Km - 10,308.62
EAO - 210.38
|
June 1, 2022 |
2022 |
WIN2G02723 |
SR2022-02-001117 |
February 4, 2022 |
Region VI |
Iloilo City District Engineering Office |
UACS No. 310203100517000
Project ID: P00604808VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
Cubay-Balabago Rd - K0004 + (-162) - K0006 + 785
CW1 - Road Widening: 5.862 Lane Km - 42,470.615
ROW Acquisition: 2,750.00 sq.m. - 13,252.345
EAO - 2,021.04
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
Cubay-Balabago Rd - K0005 + (-305) - K0005 + 353
CW1-Road Widening : 1.29 Lane Km - 41,989.34406
ROW Acquisition: 2,750.00 sq.m. - 13,733.61594
EAO - 2,021.04
|
June 1, 2022 |
2022 |
WIN2G02774 |
FY 2022 GAA RA 11639 |
January 2, 2022 |
Region VI |
Iloilo City District Engineering Office |
UACS No. 310208100447000
Project ID: P00604974VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Secondary Roads
JM Basa-Gen Hughes Port-Sn Pedro Rd - (S00064PN) K0001 + 865 - K0001 + 940, K0002 + 137 - K0002 + 198, K0002 + 233 - K0002 + 246, K0002 + 457 - K0002 + 474, K0002 + 687 - K0002 + 715, (S00067PN) K0002 + (-437) - K0002 + 141
CW1 - Off-Carriageway Improvement: Construction of Sidewalk: 1,249.656 sq.m. - 6,244.56
EAO - 127.44
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Secondary Roads
JM Basa-Gen Hughes Port-Sn Pedro Rd – (S000067PN) K0002 + (-437) – K0002 + (-057)
CW1 - Off-Carriageway Improvement: Construction of Sidewalk: 1,390.04 sq.m. - 6,244.56
EAO - 127.44
|
June 1, 2022 |
2022 |
WIN2G02719 |
FY 2022 GAA RA 11639 |
January 2, 2022 |
Region VI |
Iloilo City District Engineering Office |
UACS No. 310208100448000
Project ID: P00604975VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Secondary Roads
La Paz Deep Sea Water Port Rd - K0003 + (-306) - K0003 + 448
CW1 - Off-Carriageway Improvement: Construction of Sidewalk: 904.80 sq.m. - 4,166.96
EAO - 85.04
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Secondary Roads
La Paz Deep Sea Water Port Rd – K0003 + (-226) – K0003 + 448
CW1 - Off-Carriageway Improvement: Construction of Sidewalk: 967.82 sq.m. - 4,166.96
EAO - 85.04
|
June 1, 2022 |
2022 |
WIN2G02920 |
SARO-BMB-A-22-0002724 |
March 17, 2022 |
Region VI |
Iloilo City District Engineering Office |
UACS No. 300226102800000
Project ID: P00630948VS
FROM:
Convergence and Special Support Program
Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services
Construction of Multi-Purpose Building in Molo District, Barangay Molo, Iloilo City, Iloilo
CW1 - Construction of Multi-Purpose Building: 1 Number of Building, - 4,950.00
EAO - 50.00
TO:
Convergence and Special Support Program
Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services
Construction of Multi-Purpose Building in Molo District, Iloilo City, Iloilo
CW1 - Construction of Multi-Purpose Building: 1 Number of Building - 4,950.00
EAO - 50.00
|
June 1, 2022 |
2022 |
WIN2G02826 |
SARO-BMB-A-22-0002724 |
March 17, 2022 |
Region VI |
Iloilo City District Engineering Office |
UACS No. 300220100852000
Project ID: P00633053VS
FROM:
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Multi-Purpose Buildings/ Facilities to support Social Services
Construction of Multi-purpose Building, Camp Martin Delado, Fort San Pedro Drive, Iloilo City, Iloilo
CW1 - Construction of Multi-Purpose Building: 1 Number of Building - 29,400.00
EAO - 600.00
TO:
Convergence and Special Support Program
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Multi-Purpose Buildings/ Facilities to support Social Services
Construction of Multi-purpose Building Camp Martin Delgado, Fort San Pedro Drive, Iloilo City, Iloilo
CW1 - Construction of Multi-Purpose Building: 1 Number of Building - 29,400.00
EAO - 600.00
|
June 1, 2022 |
2022 |
WIN2G02802 |
SARO-BMB-A-22-0002727 |
March 17, 2022 |
Region VI |
Regional Office VI |
UACS No.: 300219101071000
Project ID: P00634051VS
FROM:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Control Structure along Imbang River (Upstream), Sta. 2 + 335 - Sta. 2 + 780, Negros Occidental
CW1- Construction of Flood Mitigation Structure:
393.381 lineal meters - 43,425.00
EAO - 1,575.00
TO:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Control Structure along Imbang River (Upstream), Sta. 2 + 209.30 - Sta. 2 + 598.50, Negros Occidental
CW1- Construction of Flood Mitigation Structure:
389.20 lineal meters - 43,425.00
EAO - 1,575.00
|
June 1, 2022 |
2022 |
WIN2G02825 |
SARO-BMB-A-22-0002727 |
March 17, 2022 |
Region VI |
Regional Office VI |
UACS No.: 300219101070000
Project ID: P00634050VS
FROM:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Control Structure along Imbang River (Upstream), Sta. 1 + 901 - Sta. 2 + 335, Negros Occidental
CW1- Construction of Flood Mitigation Structure:
393.381 lineal meters - 43,425.00
EAO - 1,575.00
TO:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Control Structure along Imbang River (Upstream), Sta. 1 + 830.40 - Sta. 2 + 209.3, Negros Occidental
CW1- Construction of Flood Mitigation Structure:
378.90 lineal meters - 43,425.00
EAO - 1,575.00
|
June 1, 2022 |
2022 |
WIN2G02806 |
SARO-BMB-A-22-0002727 |
March 17, 2022 |
Region VI |
Regional Office VI |
UACS No.: 300219101065000
Project ID: P00634049VS
FROM:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Control Structure along Imbang River (Upstream), Sta. 1 + 456 - Sta. 1 + 901, Negros Occidental
CW1- Construction of Flood Mitigation Structure:
393.381 lineal meters - 43,425.00
EAO - 1,575.00
TO:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Control Structure along Imbang River (Upstream), Sta. 1 + 456 - Sta. 1 + 830.40, Negros Occidental
CW1- Construction of Flood Mitigation Structure:
374.40 lineal meters - 43,425.00
EAO - 1,575.00
|
June 1, 2022 |
2022 |
WIN2G02657 |
FY 2022 GAA RA 11639 |
January 15, 2021 |
Region VI |
Guimaras District Engineering Office |
UACS No. 310208100445000
Project ID: P00604795VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Secondary Roads
Guimaras Circumferential Rd - K0023 + 654 - K0023 + 951, K0024 + 537 - K0025 + 335
CW1 - Off-Carriageway Improvement: Paving of Shoulders:
3,016.50 sq.m - 27,838.86
EAO - 568.14
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Secondary Roads
Guimaras Circumferential Rd - K0024 + 1010 - K0025 + 356, K0025 + 540 - K0025 + 800
CW1 - Off-Carriageway Improvement: Paving of Shoulders:
2,394.00 sq.m - 26,838.86
ROW Acquisition:
3,325.00 sq.m - 1,000.00
EAO - 568.14
|
May 31, 2022 |
FY 2022 GAA |
WIN2G02790 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310102100949000
Project ID : P00603921LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
FROM :
Calapan South Road
K0041+250 - K0041+486
Physical Target - CW1 - Preventive Maintenance Of Road :
Asphalt Overlay - 0.934 Lane Km
Allocation - Php 5.730 Million
TO :
Calapan South Road
K0041+250 - K0041+486,
K0042+080 - K0042+137
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 1.172 Lane Km
Allocation - Php 5.730 Million
|
May 31, 2022 |
FY 2022 GAA |
WIN2G02734 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310102100950000
Project ID : P00603922LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
FROM :
Calapan South Road
K0045+198 - K0045+462
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 1.045 Lane Km
Allocation - Php 6.410 Million
TO :
Calapan South Road
K0042+137 - K0042+198,
K0045+198 - K0045+462
Physical Target - CW1 - Preventive Maintenance of Road :
Asphalt Overlay - 1.300 Lane Km
Allocation - Php 6.410 Million |
May 31, 2022 |
2022 |
WIN2G02951 |
SARO-BMB-A-22-0002952 |
March 21, 2022 |
Region VI |
Antique District Engineering Office |
UACS No. 310101100676000
Project ID: P00605961VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program- Preventive Maintenance - Primary Roads
Iloilo-Antique Road - K0094 + 700 - K0095 + 385, K0088 + 626 - K0089 + 961
CW1- Preventive
Maintenance of Road: Asphalt
Overlay:
5.430 lane km - 45,080.00
EAO - 920.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation Program- Preventive Maintenance - Primary Roads
Iloilo-Antique Rd- K0092 + 960 – K0094 + 700, K0099 + 870 - K0100 + 060, K0110 + 760 -K0110 + 970
CW1- Preventive
Maintenance of Road: Asphalt
Overlay:
7.00 lane km - 33,382.83
CW2- Reconstruction to Concrete Pavement:
0.800 lane km - 11,697.17
EAO - 920.00
|
May 31, 2022 |
2022 |
WIN2G02693 |
FY 2022 GAA RA 11639 |
January 3, 2022 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 310101100680000
Project ID: P00603639VS
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Iloilo-Capiz Rd (New Route) (S00254PN) - K0064 + (-040) - K0064 + 153, K0064 + 444 - K0065 + 040.60
CW1- Preventive Maintenance of Road: Asphalt Overlay:
3.146 lane km - 15,856.40
EAO - 323.60
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Preventive Maintenance - Primary Roads
Iloilo-Capiz Rd (New Route) (S00254PN) - K0064 + 150 - K0065 + 377
CW1- Preventive Maintenance of Road: Asphalt Overlay:
2.447 lane km - 15,856.40
EAO - 323.60
|
May 31, 2022 |
2022 |
WIN2G02672 |
FY 2022 GAA RA 11639 |
January 3, 2022 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 310101100681000
Project ID: P00603640VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Iloilo-Capiz Rd (New Route) (S00254PN) - K0083 + 244 - K0084 + 000
CW1- Preventive Maintenance of Road: Asphalt Overlay:
3.056 lane km - 15,680.00
EAO - 320.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
Iloilo-Capiz Rd (New Route) (S00254PN) - K0083 + 303 - K0084 + 100
CW1- Preventive Maintenance of Road: Asphalt Overlay:
1.591 lane km - 15,680.00
EAO - 320.00
|
May 31, 2022 |
2022 |
WIN2G02772 |
FY 2022 GAA RA 11639 |
January 3, 2022 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 310105100724000
Project ID: P00603643VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Jct Natl Rd Cuartero-Tapulang-Maayon Rd (S00464PN) - K0106 + 000 - K0107 + 000
CW1- Reconstruction to Concrete Pavement:
2.148 lane km - 35,749.42
EAO - 729.58
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Jct Natl Rd Cuartero-Tapulang-Maayon Rd (S00464PN) - K0106 + 000 - K0106 + 460
CW1- Reconstruction to Concrete Pavement:
0.920 lane km - 14,749.42
CW2- Construction of Road Slope Protection Structure
2,270.10 sq.m. -. 21,000.00
EAO - 729.58
|
May 31, 2022 |
2022 |
WIN2G02766 |
FY 2022 GAA RA 11639 |
January 3, 2022 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 310106100779000
Project ID: P00603645VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Iloilo-Capiz Rd (Old Route) (S00280PN) - K0080 + 617 - K0080 + 798, K0081 + 661 - K0082 + 000, K0083 + 000 - K0083 + 782
CW1- Reconstruction to Concrete Pavement:
2.524 lane km - 42,985.74
EAO - 877.26
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads –
Tertiary Roads
Iloilo-Capiz Rd (Old Route) (S00280PN) - K0077 + 541 - K0077 + 771, K0077 + 901 - K0078 + 249, K0080 + 617 - K0080 + 670
CW1- Reconstruction to Concrete Pavement:
1.148 lane km - 15,385.74
CW2- Construction of Road Slope Protection Structure:
1,743.16 sq.m - 27,600.00
EAO - 877.26
|
May 31, 2022 |
2022 |
WIN2G02673 |
FY 2022 GAA RA 11639 |
January 3, 2022 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 310106100782000
Project ID: P00603648VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Tapaz-Jamindan-Altavaz Rd (S00294PN) - K0096 + 818 - K0097 + 000, K0101 + 742 - K0102 + 000, K0113 + 197 - K0113 + 646
CW1- Reconstruction to Concrete Pavement:
1.708 lane km - 28,426.86
EAO - 580.14
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Tapaz-Jamindan-Altavaz Rd (S00294PN) - K0096 + 818 - K0097 + 000, K0101 + 000 - K0101
CW1- Reconstruction to Concrete Pavement:
1.712 lane km - 28,426.86
EAO - 580.14
|
May 31, 2022 |
FY 2022 GAA |
WIN2G02690 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310105100697000
Project ID : P00603923LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads - Secondary Roads
FROM :
Calapan South Road
K0052+220 - K0052+258
Physical Target - CW1 - Reconstruction to Concrete Pavement :
0.126 Lane Km
Allocation - Php 1.396 Million
TO :
Calapan South Road
K0052+220 - K0052+289
Physical Target - CW1 - Reconstruction to Concrete Pavement :
0.138 Lane Km
Allocation - Php 1.396 Million
|
May 31, 2022 |
2022 |
WIN2G02692 |
SR2022-02-000220 |
February 3, 2022 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 310106100672000
Project ID: P00603650VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Tapaz-Jamindan-Altavaz Rd (S00294PN) - K0079 + 000 - K0079 + 755, K0079 + 924 - K0080 + 206, K0082 + 655 - K0083 + 000, K0085 + 000 - K0085 + 288
CW1- Reconstruction to Concrete Pavement:
3.182 lane km - 53,566.185
EAO - 1,942.815
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Tapaz-Jamindan-Altavaz Rd (S00294PN) - K0078 + (-465) - K0078 + (-078), K0078 + 788 - K0078 + 973, K0079 + 445 - K0079 + 840, K0079 + 916 - K0080 + 202, K0082 + 483 - K0082 + 627
CW1- Reconstruction to Concrete Pavement:
2.70 lane km - 53,566.185
EAO - 1,942.815
|
May 31, 2022 |
2022 |
WIN2G02841 |
FY 2022 GAA RA 11639 |
January 3, 2022 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 310106100781000
Project ID: P00603651VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Tapaz-Jamindan-Altavaz Rd (S00294PN) - K0093 + 004 - K0094 + 470
CW1- Reconstruction to Concrete Pavement:
2.802 lane km - 47,902.40
EAO - 977.60
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Tapaz-Jamindan-Altavaz Rd (S00294PN) - K0097 + 599 - K0099 + 295
CW1- Reconstruction to Concrete Pavement:
3.2074 lane km - 47,902.40
EAO - 977.60
|
May 31, 2022 |
2022 |
WIN2G02751 |
FY 2022 GAA RA 11639 |
January 3, 2022 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 310111100442000
Project ID: P00603972VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Capiz-Aklan Rd - K0327 + 610 - K0328 + 742
CW1- Construction of Drainage Structure along Road:
2,172 lineal meters - 10,642.80
EAO - 217.20
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
Capiz-Aklan Rd - K0327 + 610 - K0328 + 109
CW1- Construction of Drainage Structure along Road:
898 Lineal Meters - 10,642.80
EAO - 217.20
|
May 31, 2022 |
2022 |
WIN2G02795 |
FY 2022 GAA RA 11639 |
January 3, 2022 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 310201100991000
Project ID: P00604841VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
Iloilo-Capiz Rd (New Route) - K0100 + 438.70 - K0101 + 486
CW1 - Road Widening:
2.079 lane km - 38,718.82
EAO - 790.18
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
Iloilo-Capiz Rd (New Route) - K0100 + 642 - K0101 + 483
CW1 - Road Widening:
1.668 lane km - 26,118.82
ROW Acquisition:
3,711.03 sq.m - 12,600.00
EAO - 790.18
|
May 31, 2022 |
2022 |
WIN2G02768 |
FY 2022 GAA RA 11639 |
January 3, 2022 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 310203100589000
Project ID: P00604842VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Tertiary Roads
Dao By-Pass Rd - K0084 + (-315) - K0085 + 000
CW1- Road Widening:
2.234 lane km - 37,538.90
EAO - 766.10
TO:
OO1: Ensure Safe and Reliable National Road
System
Network Development - Road Widening - Tertiary Roads
Dao By-Pass Rd - K0084 + (-315) - K0084 + 404
CW1- Road Widening:
1.444 lane km - 31,538.90
ROW Acquisition:
2,800.41 sq.m - 6,000.00
EAO - 766.10
|
May 31, 2022 |
2022 |
WIN2G02930 |
SR2022-02-001135 |
February 4, 2022 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 310204101558000
Project ID: P00605351VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Construction of By-Pass and Diversion Roads
Guintas-Pinamalatican Road, Capiz
CW1 - Construction of Concrete Road:
EAO - 3,220.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Construction of By-Pass and Diversion Roads
Guintas-Pinamalatican Road, Capiz
CW1 – Construction of Concrete Road:
4.290 lane km 1- 52,110.00
CW2- Construction of Road Slope Protection Structure:
1,187.32 sq.m- 36,670.00
EAO - 3,220.00
|
May 31, 2022 |
2022 |
WIN2G02872 |
SARO-BMB-A-22-0002966 |
March 21, 2022 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 320102105028000
Project ID: P00620460VS
FROM:
OO2: Protect Lives and Properties Against Major Floods
Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of River Control along Panay River Basin, Brgy. Sto. Angel, Sta. 0+000 - Sta. 0+500, Dumalag, Capiz
CW1- Construction of Flood Mitigation Structure:
272.80 lineal meters - 44,100.00
EAO - 900.00
TO:
OO2: Protect Lives and Properties Against Major Floods
Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of River Control along Panay River Basin, Brgy. Sto. Angel, Sta. 0+000 - Sta. 0+-272.80, Dumalag, Capiz
CW1- Construction of Flood Mitigation Structure:
272.80 lineal meters - 44,100.00
EAO - 900.00
|
May 31, 2022 |
2022 |
WIN2G02822 |
SARO-BMB-A-22-0002966 |
March 21, 2022 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 320102105029000
Project ID: P00620461VS
FROM:
OO2: Protect Lives and Properties Against Major Floods
Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of River Control along Panay River Basin, Brgy. Sto. Niño, Sta. 0+000 - Sta. 0+500, Dumalag, Capiz
CW1- Construction of Flood Mitigation Structure:
291.00 lineal meters - 44,100.00
EAO - 900.00
TO:
OO2: Protect Lives and Properties Against Major Floods
Flood Management - Construction/ Rehabilitation of Flood Mitigation Facilities along Major River Basins and Principal Rivers
Construction of River Control along Panay River Basin, Brgy. Sto. Niño, Sta. 0+000 - Sta. 0+-291, Dumalag, Capiz
CW1- Construction of Flood Mitigation Structure:
291.00 lineal meters - 44,100.00
EAO - 900.00
|
May 31, 2022 |
2022 |
WIN2G02735 |
SR2022-02-001733 |
February 4, 2022 |
Region VI |
Capiz 2nd District Engineering Office |
UACS No. 300219100235000
Project ID: P00630182VS
FROM:
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of River Control along Panay River Basin, Brgy. Sto. Angel, Sta. 0+000 - Sta. 0+500, Dumalag, Capiz
CW1 - Construction of Flood Mitigation Structure:
308.915 lineal meters - 53,075.00
EAO - 1,925.00
TO:
CONVERGENCE AND SPECIAL SUPPORT
PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of River Control along Panay River Basin, Brgy. Sto. Angel, Sta. 0+000 - Sta. 0+308.915, Dumalag, Capiz
CW1 - Construction of Flood Mitigation Structure:
308.915 lineal meters - 53,075.00
EAO - 1,925.00
|
May 31, 2022 |
2022 |
WIN2G02689 |
FY 2022 GAA RA 11639 |
January 3, 2022 |
Region VI |
Iloilo 1st District Engineering Office |
UACS No. 310106100787000
Project ID: P00603660VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Oton-Mambog-Cabolo-an-Abilay-Sn Jose Rd (S00470PN) - K0016 + 000 - K0016 + 300, K0018 + 383 - K0018 + 472
CW1- Reconstruction to Concrete Pavement:
0.778 lane Km - 12,948.74
EAO - 264.26
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Oton-Mambog-Cabolo-an-Abilay-Sn Jose Rd (S00470PN) - K0015 + 810 - K0016 + 300, K0018 + 094 - K0018 + 286
CW1- Reconstruction to Concrete Pavement:
1.468 lane Km - 12,948.74
EAO - 264.26
|
May 31, 2022 |
2022 |
WIN2G02877 |
FY 2022 GAA RA 11639 |
January 3, 2022 |
Region VI |
Iloilo 1st District Engineering Office |
UACS No. 310103100976000
Project ID: P00603661VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Guimbal – Igbaras – Tubungan – Leon Rd (S00411PN) - K0035 + 000 - K0035 + 116, K0045 + 201 - K0046 + 000
CW1- Preventive Maintenance of Road: Asphalt Overlay
1.77 lane Km - 7,537.18
EAO - 153.82
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation – Preventive Maintenance – Tertiary Roads
Guimbal – Igbaras – Tubungan – Leon Rd (S00411PN)- K0033 + 055 - K0033 + 396, K0035 + 000 - K0035 + 116
CW1- Preventive Maintenance of Road: Asphalt Overlay
0.914 lane Km - 7,537.18
EAO - 153.82
|
May 31, 2022 |
FY 2022 GAA |
WIN2G02680 |
DPWH Infra Program FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 310105100695000
Project ID : P00603924LZ
001 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction/Upgrading
of Damaged Paved Roads - Secondary Roads
FROM :
Calapan North Road
K0033+046 - K0033+458
Physical Target - CW1 - Reconstruction to Concrete Pavement :
0.824 lane Km
Allocation - Php 15.379 Million
TO :
Calapan North Road
K0033+046 - K0034+253
Physical Target - CW1 - Reconstruction to Concrete Pavement :
2.048 Lane Km
Allocation - Php 15.379 Million |
May 31, 2022 |
2022 |
WIN2G02685 |
FY 2022 GAA RA 11639 |
January 3, 2022 |
Region VI |
Iloilo 1st District Engineering Office |
UACS No. 310106100786000
Project ID: P00603664VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Oton-Buray-Sta Monica-Sn Antonio-Sn Miguel Rd (S00468PN) - K0018 + 936 - K0019 + 040
CW1- Reconstruction to Concrete Pavement:
0.208 lane Km - 3,461.36
EAO - 70.64
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Oton-Buray-Sta Monica-Sn Antonio-Sn Miguel Rd (S00468PN) - K0018 + 844 - K0019 + 040
CW1- Reconstruction to Concrete Pavement:
0.392 lane Km - 3,461.36
EAO - 70.64
|
May 31, 2022 |
2022 |
WIN2G026713 |
FY 2022 GAA RA 11639 |
January 3, 2022 |
Region VI |
Iloilo 1st District Engineering Office |
UACS No. 310106100784000
Project ID: P00603671VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Guimbal – Igbaras – Tubungan – Leon Rd (S00411PN) - K0057 + 687 - K0058 + 008, K0060 + 000 - K0060 + 486
CW1- Reconstruction to Concrete Pavement:
1.342 lane Km - 22,335.18
EAO - 455.82
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Guimbal – Igbaras – Tubungan – Leon Rd (S00411PN) - K0057 + 512 - K0058 + 008, K0059 + 786 - K0060 + 340, K0060 + 440 - K0060 + 604
CW1- Reconstruction to Concrete Pavement:
1.900 lane Km - 22,335.18
EAO - 455.82
|
May 31, 2022 |
2022 |
WIN2G02828 |
FY 2022 GAA RA 11639 |
January 3, 2022 |
Region VI |
Iloilo 1st District Engineering Office |
UACS No. 310111100444000
Project ID: P00603975VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Secondary
Iloilo-Antique Rd - K0037+530-K0037+850, K0038+180-K0038+823, K0038+870-K0038+883
CW1- Construction of Drainage Structure along Road:
1,952 l.m. - 9,564.80
EAO - 195.20
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation – Construction/ Upgrading/ Rehabilitation of Drainage along National Roads – Secondary
Iloilo-Antique Rd - K0038+180-K0038+655.5
CW1- Construction of Drainage Structure along Road:
796.5 l.m. - 8,291.005
ROW -. 1,273.795
EAO - 195.20
|
May 31, 2022 |
2022 |
WIN2G02752 |
FY 2022 GAA RA 11639 |
January 3, 2022 |
Region VI |
Iloilo 1st District Engineering Office |
UACS No. 310109101004000
Project ID: P00604069VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slip, Slope Collapse – Tertiary Roads
Guimbal- Igbaras- Tubungan-Leon Rd – K0035+220 - K0035+290, K0043+450 -K0043+510
CW1- Construction of Road Slope Protection Structure:
3,212 sq. m. - 31,477.60
EAO - 642.40
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation – Rehabilitation/ Reconstruction of National Roads with Slip, Slope Collapse – Tertiary Roads
Guimbal- Igbaras- Tubungan-Leon Rd – K0035+220 - K0035+290, K0048+158 - K0048+230
CW1- Construction of Road Slope Protection Structure:
1,493.96 sq. m. -. 31,477.60
EAO - 642.40
|
May 31, 2022 |
2022 |
WIN2G02655 |
FY 2022 GAA RA 11639 |
January 3, 2022 |
Region VI |
Iloilo 1st District Engineering Office |
UACS No. 310106100786000
Project ID: P00603664VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Iloilo-Antique Rd – K0068+445 – K0068+512, K0069+000 – K0069+020, K0069+020 – K0069+050
CW1- Construction of Road Slope Protection Structure:
2,340 sq. m. - 45,864.00
EAO - 936.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Iloilo-Antique Rd – K0067+180 – K0067+230, K0068+445 – K0068+512, K0069+000 - K0069+075
CW1- Construction of Road Slope Protection Structure:
2,612.34 sq. m. - 45,864.00
EAO - 936.00
|
May 31, 2022 |
2022 |
WIN2G02954 |
SARO-BMB-A-SS-0002720 |
March 17, 2022 |
Region VI |
Iloilo 1st District Engineering Office |
TO FOLLOW |
May 31, 2022 |
2022 |
WIN2G02950 |
SARO-BMB-A-SS-0002720 |
March 17, 2022 |
Region VI |
Iloilo 1st District Engineering Office |
TO FOLLOW |
May 31, 2022 |
2022 |
WIN2G02952 |
SARO-BMB-A-SS-0002720 |
March 17, 2022 |
Region VI |
Iloilo 1st District Engineering Office |
TO FOLLOW |
May 31, 2022 |
2022 |
WIN2G02812 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Iloilo 3rd District Engineering Office |
UACS No. 310102100987000
Project ID: P00603686VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Secondary Roads
Iloilo East Coast-Capiz Rd (S00228PN) - K0221 + 600 - K0222 + 219
CW1- Preventive Maintenance of Road: Asphalt Overlay:
2.508 lane km - 20,043.94
EAO - 409.06
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Preventive Maintenance - Secondary Roads
Iloilo East Coast-Capiz Rd (S00228PN) - K0206 + 547 - K0207 + 544
CW1- Preventive Maintenance of Road: Asphalt Overlay:
4.0 lane km - 20,043.94
EAO - 409.06
|
May 31, 2022 |
2022 |
WIN2G02786 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Iloilo 3rd District Engineering Office |
UACS No. 310105100729000
Project ID: P00603690VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Estancia Wharf Rd (S00231PN) - K0178 + (-817) - K0178 + (-722)
CW1- Reconstruction to Concrete Pavement:
0.380 lane km - 6,170.08
EAO - 125.92
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Iloilo East Coast-Estancia Wharf Rd (S00231PN) - K0178 + (-817) - K0178 + (-576), K0178 + (-554) - K0178 + (-449)
CW1- Reconstruction to Concrete Pavement:
0.692 lane km - 6,170.08
EAO - 125.92
|
May 31, 2022 |
2022 |
WIN2G02736 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Iloilo 3rd District Engineering Office |
UACS No. 310106100795000
Project ID: P00603693VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Balasan-Carles Rd (S00229PN) - K0175 + 798 - K0176 + 000
CW1- Reconstruction to Concrete Pavement:
0.816 lane km - 12,832.12
EAO - 261.88
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads –
Tertiary Roads
Balasan-Carles Rd (S00229PN) - K0175 + 798 - K0176 + 261
CW1- Reconstruction to Concrete Pavement:
0.930 lane km - 12,832.12
EAO - 261.88
|
May 31, 2022 |
2022 |
WIN2G02708 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Iloilo 3rd District Engineering Office |
UACS No. 310112100332000
Project ID: P00603997VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads
Sara-Sn Dionisio Rd - K0207 + 396 - K0207 + 598
CW1- Construction of Drainage Structure along Road:
202 lineal meters - 1,383.76
EAO - 28.42
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads
Sara-Sn Dionisio Rd - K0204 + 718.00
CW1- Construction of Drainage Structure along Road:
17 lineal meters - 1,383.76
EAO - 28.24
|
May 31, 2022 |
2022 |
WIN2G02669 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Iloilo 3rd District Engineering Office |
UACS No. 310108101169000
Project ID: P00604083VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Iloilo East Coast-Capiz Rd - K0238 + 300 - K0238 + 353
CW1- Construction of Road Slope Protection Structure:
2,155.56 sq.m. -. 38,024.00
EAO - 776.00
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Iloilo East Coast-Capiz Rd - K0238 + 420 - K0238 + 580
CW1- Construction of Road Slope Protection Structure:
1,772.328 sq.m. - 38,024.00
EAO - 776.00
|
May 31, 2022 |
2022 |
WIN2G02839 |
SR2022-02-000418 |
February 9, 2022 |
Region VI |
Iloilo 3rd District Engineering Office |
UACS No. 310202101007000
Project ID: P00604879VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Iloilo East Coast-Capiz Rd - K0186 + 955 - K0188 + 635
CW1- Road Widening:
3.380 lane km - 63,120.65
EAO - 2,289.35
TO:
OO1: Ensure Safe and Reliable National Road
System
Network Development - Road Widening - Secondary Roads
Iloilo East Coast-Capiz Rd - K0186 + 700 - K0188 + 287
CW1- Road Widening:
2.939 lane km - 61,120.65
ROW Acquisition: 19,838.25 sq.m. - 2,000.00
EAO - 2,289.35
|
May 31, 2022 |
2022 |
WIN2G02850 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Iloilo 3rd District Engineering Office |
UACS No. 310208100446000
Project ID: P00604885VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Secondary Roads
Iloilo East Coast-Capiz Rd - K0198 + 935 - K0200 + 215
CW1- Off-Carriageway Improvement: Paving of Shoulders:
3,879 sq.m. - 24,313.80
EAO - 496.20
TO:
OO1: Ensure Safe and Reliable National Road
System
Network Development - Off-Carriageway Improvement - Secondary Roads
Iloilo East Coast-Capiz Rd - K0198 + 935 - K0200 + 947
CW1- Off-Carriageway Improvement: Paving of Shoulders:
6,164.572 sq.m. - 24,313.80
EAO - 496.20
|
May 31, 2022 |
2022 |
WIN2G02823 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Iloilo 3rd District Engineering Office |
UACS No. 310209100378000
Project ID: P00604887VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Off-Carriageway Improvement - Tertiary Roads
Concepcion-Sn Dionisio Rd - K0224 + 480 - K0225 + 269
CW1- Off-Carriageway Improvement: Paving of Shoulders:
1,602 sq.m. - 10,044.02
EAO - 204.98
TO:
OO1: Ensure Safe and Reliable National Road
System
Network Development - Off-Carriageway Improvement - Tertiary Roads
Concepcion-Sn Dionisio Rd - K0224 + 480 - K0225 + 659
CW1- Off-Carriageway Improvement: Paving of Shoulders:
2,772 sq.m. - 10,044.02
EAO - 204.98
|
May 31, 2022 |
2022 |
WIN2G02833 |
SR2022-02-001364 |
February 8, 2022 |
Region VI |
Iloilo 3rd District Engineering Office |
UACS No. 320101107607000
Project ID: P00620005VS
FROM:
OO2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure, Barotac Viejo River, Sta. 4 + 414.1 - Sta. 3 + 514.1, Brgy. Natividad, Barotac Viejo, Iloilo
CW1- Construction of Flood Mitigation Structure:
900 lineal meters - 96,500.00
EAO - 3,500.00
OO2: Protect Lives and Properties Against Major Floods
Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure, Barotac Viejo River, Sta. 4 + 324.44 - Sta. 3 + 514.10, Brgy. Natividad, Barotac Viejo, Iloilo
CW1- Construction of Flood Mitigation Structure:
810.33 lineal meters - 96,500.00
EAO - 3,500.00
|
May 31, 2022 |
2022 |
WIN2G02709 |
SR2022-02-000215 |
February 3, 2022 |
Region VI |
Iloilo 4th District Engineering Office |
UACS No.: 310106100671000
Project ID: P00603696VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Jct Bancal-Leon-Antique Bdry Rd (S00114PN) - K0026 + 000 - K0027 + 000, K0032 + 125 - K0032 + 835, K0040 + 994 - K0041 + 000
CW1-Reconstruction to Concrete Pavement:
3.164 lane km - 52,859.805
EAO - 1,917.195
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Jct Bancal-Leon-Antique Bdry Rd (S00114PN) - K0023 + 198 - K0023 + 208, K0023 + 225 - K0023 + 257, K0025 + 817 - K0026 + 320, K0032 + 125 - K0032 + 835
CW1-Reconstruction to Concrete Pavement:
2.566 lane km - 52,859.805
EAO - 1,917.195
|
May 31, 2022 |
2022 |
WIN2G02707 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Iloilo 4th District Engineering Office |
UACS No.: 310110100304000
Project ID: P00604042VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Iloilo-Capiz Rd (New Route) - K0020 + 718 - K0021 + 626
CW1- Construction of Drainage Structure along Road:
1,826.00 lineal meters - 28,910.00
EAO - 590.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Iloilo-Capiz Rd (New Route) - K0020 + 718 - K0021 + 478
CW1- Construction of Drainage Structure along Road:
1,442.30 lineal meters - 28,910.00
EAO - 590.00
|
May 31, 2022 |
2022 |
WIN2G02656 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Iloilo 4th District Engineering Office |
TO FOLLOW |
May 31, 2022 |
2022 |
WIN2G02721 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Iloilo 4th District Engineering Office |
UACS No.: 310202101184000
Project ID: P00604971VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Cabatuan-New Lucena-Banga-Bante Rd - K0046+283 – K0047+620
CW1- Road Widening:
2.688 Lane Km - 49,000.00
EAO - 1,000.00
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Secondary Roads
Cabatuan-New Lucena-Banga-Bante Rd - K0046+820 – K0047+620
CW1- Road Widening:
1.614 Lane Km - 49,000.00
EAO - 1,000.00
|
May 31, 2022 |
2022 |
WIN2G02808 |
FY 2022 GAA RA 11639 |
January 1, 2022 |
Region VI |
Iloilo 4th District Engineering Office |
UACS No.: 310209100380000
Project ID: P00604973VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Tertiary Roads
Mandurriao-Sn Miguel-Alimodian-Maasin-Cabatuan Rd - K0021 + 500 - K0022 + 626
CW1- Off-Carriageway Improvement: Paving of Shoulders:
3,354.00 sq.m. - 26,182.66
EAO - 534.34
TO:
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Off-Carriageway Improvement - Tertiary Roads
Mandurriao-Sn Miguel-Alimodian-Maasin-Cabatuan Rd, K0021+523 – K0022+302
CW1- Off-Carriageway Improvement: Paving of Shoulders:
2,836.61 sq.m. - 26,182.66
EAO - 534.34
|
May 31, 2022 |
2022 |
WIN2G02918 |
SR2022-03-006751 |
March 22, 2022 |
Region VI |
Iloilo 4th District Engineering Office |
UACS No.: 310101100568000
Project ID: P00605956VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Iloilo-Capiz Rd (New Route) - K0010 + (-845) - K0010 + 084, K0010 + 868 - K0014 + 000
CW1 - Preventive Maintenance of Road: Asphalt Overlay:
16.096 lane km - 69,480.00
EAO - 2,520.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Iloilo-Capiz Rd (New Route) - K0010 + (-845) - K0010 + 084, K0010 + 868 - K0012 + 993
CW1- Preventive Maintenance of Road: Asphalt Overlay:
11.8896 lane km - 69,480.00
EAO - 2,520.00
|
May 31, 2022 |
2022 |
WIN2G02919 |
SR2022-03-006753 |
March 22, 2022 |
Region VI |
Iloilo 4th District Engineering Office |
UACS No.: 310101100569000
Project ID: P00605957VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Iloilo-Capiz Rd (New Route) - K0016 + 000 - K0021 + 500
CW1 - Preventive Maintenance of Road: Asphalt Overlay:
22.088 lane km - 95,342.00
EAO - 3,458.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Primary Roads
Iloilo-Capiz Rd (New Route) - K0016 + 000 – K0019 + 951
CW1- Preventive Maintenance of Road: Asphalt Overlay:
15.848 lane km - 95,342.00
EAO - 3,458.00
|
May 31, 2022 |
2022 |
WIN2G02885 |
SR2022-03-006757 |
March 22, 2022 |
Region VI |
Iloilo 4th District Engineering Office |
UACS No.: 310102100832000
Project ID: P00605973VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Sen. Benigno S. Aquino, Jr. Ave - K0014 + 000 - K0012 + 398
CW1 - Preventive Maintenance of Road: Asphalt Overlay:
7.245 lane km - 96,500.00
EAO - 3,500.00
TO:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Sen. Benigno S. Aquino, Jr. Ave - K0014 + (-617) - K0012 + 767
CW1- Preventive Maintenance of Road: Asphalt Overlay:
10.203 lane km - 96,500.00
EAO - 3,500.00
|
May 31, 2022 |
2022 |
WIN2G02971 |
SR2022-03-006758 |
March 22, 2022 |
Region VI |
Iloilo 4th District Engineering Office |
UACS No.: 310102100835000
Project ID: P00605975VS
FROM:
OO1: Ensure Safe and Reliable National Road System
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Sen. Benigno S. Aquino, Jr. Ave - K0013 + 874 - K0014 + 617, K0015 + 506 - K0015 + 552, K0015
+ (-552) - K0015 + 504, K0014 + (-617) - K0014 + 000, K0012 + 398 - K0010 + 792, K0009 + 512 - K0007 + 000
CW1 - Preventive Maintenance of Road: Asphalt Overlay:
14.714 lane km - 83,439.69
EAO - 3,026.31
TO:
OO1: Ensure Safe and Reliable National Road
System
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Sen. Benigno S. Aquino, Jr. Ave - (S00131PN) K0012 + 123 - K0014 + 593, (S00552PN) K0012 + 767 - K0011 + 613
CW1- Preventive Maintenance of Road: Asphalt Overlay:
10.02 lane km - 83,439.69
EAO - 3,026.31
|