Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
September 9, 2022 2022 WIN2XY00082 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 320101107788000
Project ID: P00620104MN

ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

FROM:

Construction of Flood Mitigation Structure at Brgy. Camagong, Sta. 0+000.00 - Sta. 0+360.00, Nasipit, Agusan del Norte

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 416.667 Lineal meters

Allocation:
TOTAL: P 125,000,000
CW1: P 120,625,000
EAO: P 4,375,000

Unit Cost:
CW1: P 289,499.77/Lineal meters

TO:

Construction of Flood Mitigation Structure at Brgy. Camagong, Sta. 0+000.00 - Sta. 0+259.50, Nasipit, Agusan del Norte

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 519.000 Lineal meters

Allocation:
TOTAL: P 125,000,000
CW1: P 120,625,000
EAO: P 4,375,000

Unit Cost:
CW1: P 232,418.11/Lineal meters
September 9, 2022 2022 WIN2XY00079 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Regional Office XIII
UACS No. : 300218100062000
Project ID: P00630470MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Coastal Roads/Causeway for environmental protection/conservation

FROM:

Construction of Causeway, Barangay Taft, Surigao City, Surigao del Norte

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 139.000 Lineal meters

Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000

Unit Cost:
CW1: P 352,517.99/Lineal meters

TO:

Construction of Causeway, Barangay Taft, Surigao City, Surigao del Norte

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 227.600 Lineal meters

Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000

Unit Cost:
CW1: P 215,289.98/Lineal meters

September 9, 2022 2022 WIN2F06326 FY 2022 GAA December 29, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 310102100965000
Project ID: P00603968LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance – Secondary Roads – Masbate -Milagros Rd – K0024 + 000 – K0025 + 240
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 2.536 Lane Km
Allocation: Php 16,511,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance – Secondary Roads – Masbate -Milagros Rd – K0024 + 000 – K0024 +274
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 1.096 Lane Km
Allocation: Php 16,511,000.00
September 9, 2022 2022 WIN2F06306 FY 2022 GAA December 29, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 310102100963000
Project ID: P00603969LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance – Secondary Roads – Jct Tawad-Balud Rd – K0028 + (-721) – K0028 + 944
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 3.33 Lane Km
Allocation: Php 21,681,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance – Secondary Roads – Jct Tawad-Balud Rd – K0028 + (-714) – K0028 + (-360)
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 1.416 Lane Km
Allocation: Php 21,681,000.00
September 9, 2022 2022 WIN2F06303 FY 2022 GAA December 29, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 310105100715000
Project ID: P00603971LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction /Upgrading of Damage Paved Roads – Secondary Roads – Jct Tawad-Balud Rd – K0065 + 721 – K0065 + 800, K0065 + 891 – K0066 + 209
Physical Target: CW1 – Reconstruction to Concrete Pavement – 0.614Lane Km
Allocation: Php 10,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction /Upgrading of Damage Paved Roads – Secondary Roads – Jct Tawad-Balud Rd – K0065 + 981 – K0065 + 117
Physical Target: CW1 – Reconstruction to Concrete Pavement – 0.272 Lane Km
Allocation: Php 10,000,000.00
September 9, 2022 2022 WIN2F06226 FY 2022 GAA December 29, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 310105100717000
Project ID: P00603972LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction /Upgrading of Damage Paved Roads – Secondary Roads – Masbate-Milagros Rd – K0011 + 612 – K0012 + 340
Physical Target: CW1 – Reconstruction to Concrete Pavement – 3.17 Lane Km
Allocation: Php 50,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction /Upgrading of Damage Paved Roads – Secondary Roads – Masbate-Milagros Rd – K0011 + 554 – K0011 + 1004
Physical Target: CW1 – Reconstruction to Concrete Pavement – 0.9 Lane Km
CW2 - Construction of Slope Protection – 1,386.00 Square Meters
Allocation: Php 50,000,000.00
September 9, 2022 2022 WIN2F06248 FY 2022 GAA December 29, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 310108100898000
Project ID: P00604434LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide – Secondary Roads – Jct Milagros-Baleno-Lagta Rd – K0038 + 250 – K0038 + 350
Physical Target: CW1 – Construction of Road Slope Protection Structure – 5,555.56 Square meters
Allocation: Php 100,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide – Secondary Roads – Jct Milagros-Baleno-Lagta Rd – K0038 + 250 – K0038 + 350
Physical Target: CW1 – Construction of Road Slope Protection Structure – 4,000.00 Square meters
Allocation: Php 100,000,000.00
September 9, 2022 2022 WIN2F06328 FY 2022 GAA December 29, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 310202101144000
Project ID: P00606426LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Secondary Roads – Jct Milagros-Baleno-Lagta Rd – K0033 + 565 – K0034 + 000
Physical Target: CW1 – Road Widening – 0.718 Lane Km
Allocation: Php 10,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Secondary Roads – Jct Milagros-Baleno-Lagta Rd – K0033 + 193 – K0033 + 307
Physical Target: CW1 – Road Widening – 0.228 Lane Km
Allocation: Php 10,000,000.00
September 9, 2022 2022 WIN2F06245 FY 2022 GAA December 29, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 310202101146000
Project ID: P00606427LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Secondary Roads – Masbate-Cataingan-Placer Rd – K0009 + 625 – K0009 + 803
Physical Target: CW1 – Road Widening – 0.356 Lane Km
Allocation: Php 12,983,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Secondary Roads – Masbate-Cataingan-Placer Rd – K0008 + 859 – K0009 + 055
Physical Target: CW1 – Road Widening – 0.27 Lane Km
Allocation: Php 12,983,000.00
September 9, 2022 2022 WIN2F06327 FY 2022 GAA December 29, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 310202101145000
Project ID: P00606428LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Secondary Roads – Jct Tawad-Balud Rd – K0029 + 270 – K0029 + 910
Physical Target: CW1 – Road Widening – 1.28 Lane Km
Allocation: Php 10,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Secondary Roads – Jct Tawad-Balud Rd – K0029 + 064 – K0029 + 163
Physical Target: CW1 – Road Widening – 0.198 Lane Km
Allocation: Php 10,000,000.00
September 9, 2022 2022 WIN2F06307 FY 2022 GAA December 29, 2021 Region V Masbate 2nd District Engineering Office
UACS No.: 310202101147000
Project ID: P00606429LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Secondary Roads – Masbate-Milagros Rd – K0006 +365 – K0006 + 428
Physical Target: CW1 – Road Widening – 0.126 Lane Km
Allocation: Php 5,000,000.00

AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Secondary Roads – Masbate-Milagros Rd – K0005 + 840 – K0005 + 894
Physical Target: CW1 – Road Widening – 0.108 Lane Km
Allocation: Php 5,000,000.00
September 8, 2022 FY 2022 WIN2F06604 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100201000
Project ID : P00638867LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide along Port Barton to Barangay Kemdeng Road,
Sta. 3+558 - Sta. 3+611,
Sta. 3+935 - Sta. 4+025,
Sta. 4+091 - Sta. 4+177,
Sta. 4+240 - Sta. 4+351,
Sta. 4+365 - Sta. 4+426,
Sta. 4+446 - Sta. 4+498
Physical Target - CW1 - Construction of Concrete Road :
14.649 Lane Km
Allocation - Php 176.80 Million

TO :

Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse,
and Landslide along Port Barton to Barangay Kemdeng Road,
Sta. 13+490.00 - Sta. 13+783.60,
Sta. 14+590.00 - Sta. 14+886.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 7,761.00 square meter
Allocation - Php 176.80 Million

September 8, 2022 FY 2022 WIN2F006599 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300225100022000
Project ID : P00641899LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Basic Infrastructure Program (BIP) - Flood Mitigation Structures
protecting Public Infrastructures/Facilities

FROM :

Construction of Espana Flood Control (Phase 2),
Brgy. Espana, San Fernando, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
623.976 lineal meter
Allocation - Php 75.00 Million

TO :

Construction of Espana Flood Control (Phase 2),
Brgy. Espana, San Fernando, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
426.00 lineal meter
Allocation - Php 75.00 Million

September 8, 2022 FY 2022 WIN2F06606 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310204101076000
Project ID : P00608635LZ

OO1 : Ensure Safe and Reliable National Road System

Network Development - Construction of Bypass and
Diversion Roads

FROM :

Odiongan Bypass Road, Romblon
Physical Target - CW1 - Construction of Concrete Road :
4.930 Lane Km
Allocation - Php 145.565 Million

TO :

Odiongan Bypass Road, Romblon
Physical Target - CW1 - Construction of Drainage Structure along
Road : 3,000.00 lineal meter
CW2 - Construction of Road Slope Protection
Structure : 4,471.02 square meter
CW3 - Road Safety : Pavement Markings :
3.00 Lane km
Allocation - Php 145.565 Million
September 7, 2022 FY 2022 WIN2F06598 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Marinduque District Engineering Office
UACS No. : 300226101980000
Project ID : P00634212LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Basic Infrastructure Program (BIP) - Multi-Purpose Building/Facilities to Support Social Services

FROM :

Construction of Multi-Purpose Building,
Brgy. Boton, Mogpog, Marinduque
Physical Target - CW1 - Construction of Multi-Purpose Building :
1 Building
Allocation - Php 7.00 Million

TO :

Construction of Multi-Purpose Buildinh,
Brgy. Boton, Boac, Marinduque
Physical Target - CW1 - Construction of Multi-Purpose Building :
1 Building
Allocation - Php 7.00 Million
September 7, 2022 FY 2022 WIN2F06600 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 310205100817000
Project ID : P00608158LZ

OO1 : Ensure Safe and Reliable National Road System

Network Development Program -
Construction of missing Links/New Roads

FROM :

Victoria Sablayan ( Mindoro Cross island Road ), package VIII,
Occidental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.869 lane Km
Allocation - Php 105.00 Million

TO :

Victoria Sablayan ( Mindoro Cross Island Road ), Package VIII
Occidental Mindoro
Physical Target - CW1 - Construction of Gravel Road :
2.200 lane Km
CW2 - Construction of Road Slope Protection
Structure : 12,757.00 Square Meter
CW3 - Construction of Drainage Structure along
Road : 2,200.00 Lineal Meters
Allocation - Php 105.00 Million
September 5, 2022 2022 WIN2E02507 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Missing Links/ New Roads
Mawab-Maragusan-Caraga Road, Package J, Davao Oriental
Physical Target:
CW1: 5.452 Lane Km (Construction of Gravel Road)
ROW Acquisition: 27,260 sq. m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 137,384,155.00 (Construction of Gravel Road)
ROW Acquisition: P 7,365,845.00
EAO: P 5,250,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Missing Links/ New Roads
Mawab-Maragusan-Caraga Road, Package J, Davao Oriental
Physical Target:
CW1: 3.292 Lane Km (Construction of Gravel Road)
ROW Acquisition: 16,460 sq. m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 140,291,700.00 (Construction of Gravel Road)
ROW Acquisition: P 4,458,300.00
EAO: P 5,250,000.00
September 5, 2022 2022 WIN2E02508 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Regional Office XI
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of By-Pass and Diversion Roads
Maragusan-Pantukan Road, Pantukan Section, Package P
Physical Target:
CW1: 2.000 Lane Km (Construction of Concrete Road)
ROW Acquisition: 36,944.000 sq. m.
Allocation:
TOTAL: P 90,000,000.00
CW1: P 82,025,000.00 (Construction of Concrete Road)
ROW Acquisition: P 4,825,000.00
EAO: P 3,150,000.00

TO: OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of By-Pass and Diversion Roads
Maragusan-Pantukan Road, Pantukan Section, Package P
Physical Target:
CW1: 1.41788 Lane Km (Construction of Concrete Road)
ROW Acquisition: 26,191.000 sq. m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 82,025,000.00 (Construction of Concrete Road)
ROW Acquisition: P 4,825,000.00
EAO: P 3,150,000.00
September 5, 2022 2022 WIN2E02509 FY 2022 GAA R.A. 11639 January 1, 2022 Region XI Regional Office XI
MODIFICATION:

FROM: Convergence and Special Support Program – Sustainable Infrastructure Projects alleviating Gaps (SIPAG) – Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
Construction of Tagum City – Sto. Tomas Diversion Road (Feeder Road 1 to Tagum City via Kinamayan), Package 1, Davao del Norte
Physical Target:
CW1: 0.200 Lane Km (Road Widening)
CW2: 0.398 Lane Km (Reconstruction to Concrete Pavement)
CW3: 0.094 Lane Km (Construction of Gravel Road)
CW4: 1,138.050 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 180,000,000.00
CW1: P 15,102,250.00 (Road Widening)
CW2: P 6,071,780.00 (Reconstruction to Concrete Pavement)
CW3: P 2,867,015.00 (Construction of Gravel Road)
CW4: P 149,658,955.00 (Construction of Concrete Bridge)
EAO: P 6,300,000.00

TO: Convergence and Special Support Program – Sustainable Infrastructure Projects alleviating Gaps (SIPAG) – Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
Construction of Tagum City – Sto. Tomas Diversion Road (Feeder Road 1 to Tagum City via Kinamayan), Package 1, Davao del Norte
Physical Target:
CW1: 1,095.900 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 180,000,000.00
CW1: P 173,700,000.00 (Construction of Concrete Bridge)
EAO: P 6,300,000.00
August 31, 2022 FY 2022 WIN2G03115 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300218100022000
Project ID : P00639304LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Preservation/Conservation

FROM :

Construction of Storm Surge Protection/Causeway/Baywalk
along Dona Juana leading to Tambuyungan Point,
San Agustin, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.310 Lane Km
Allocation - Php 97.00 Million

TO :

Construction of Storm Surge Protection/Causeway/Baywalk
along Dona Juana leading to Tambuyungan Point,
San Agustin, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.292 Lane Km
Allocation - Php 97.00 Million


August 31, 2022 FY 2022 WIN2G03150 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300218100024000
Project ID : P00639305LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating gaps (SIPAG) -
Coastal Roads/causeway for Environmental Preservation/Conservation

FROM :

Construction of Storm Surge Protection/Causeway
along Lanas, San Jose, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.320 Lane Km
Allocation - Php 100.00 Milliojn

TO :
Construction of Storm Surge Protection/causeway
along Lanas, San Jose, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.260 Lane Km
Allocation - Php 100.00 Million
August 31, 2022 FY 2022 WIN2G03057 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300225100433000
Project ID : P00640565LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Basic Infrastructure Program (BIP) - Flood Mitigation Structures
Protecting Public Infrastructures/Facilities

FROM :

Construction of Seawall, Brgy. Calabasahan, Concepcion,Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
120.0 Lineal meters
Allocation - Php 20.00 Million

TO :

Construction of Seawall, Brgy. Calabasahan, Concepcion, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
228.20 Lineal meters
Allocation - Php 20.00 million


August 25, 2022 FY 2022 WIN2G03088 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300218100019000
Project ID : P00639301LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Protection/Conservation

FROM :

Construction of Shore Protection/Causeway,
Cajidiocan, Romblon (Phase 2)
Physical Target - CW1 - Construction of Concrete Road :
0.340 Lane Km
Allocation - Php 99.00 Million

TO :

Construction of Shore Protection/Causeway,
Cajidiocan, Romblon (Phase 2)
Physical Target - CW1 - Construction of Concrete Road :
0.320 Lane Km
Allocation - Php 99.00 Million
August 25, 2022 FY 2022 WIN2G03090 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UAVS No. : 300218100020000
Project ID : P00639302LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Coastal Roads. Causeway for Environmental Protection/Conservation

FROM :

Construction of Storm Surge Protection/Causeway along
Bachawan, San Agustin, Romblon (Phase 2)
Physical Target - CW1 - Construction of Concrete Road :
0.320 Lane Km
Allocation - Php 98.190 Lane Km

TO :

Construction of Storm Surge Protection/Causeway along
Bachawan, San Agustin, Romblon (Phase 2)
Physical Target - CW1 - Construction of Concrete Road :
0.304 Lane Km
Allocation - Php 98.190 Million



August 25, 2022 FY 2022 WIN2G03060 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300218100021000
Project ID : P00639303LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure projects Alleviating Gaps (SIPAG) -
coastal Roads/causeway for Environmental Protection/Conservation

FROM :

Construction of Storm Surge Protection/Causeway along
Carmen, San Agustin, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.370 Lane Km
Allocation - Php 100.00 Million

TO :

Construction of Storm Surge Protection/Causeway along
Carmen, San Agustin, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.350 Lane Km
Allocation - Php 100.00 Million


August 25, 2022 FY 2022 WIN2B00895 300221100053000 April 22, 2022 Region IX Regional Office IX
UACS No. 300221100053000
Project ID: P00630774MN

Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Road, Sapang road, Barangay Tandu-bato, Luuk, Sulu

CW1 - Construction of concrete road : 0.93 lane km
Unit Cost: P 10,645,160.00 /lane km

EAO: P 100,000.00
Allocation: P 10,000,000.00
August 25, 2022 FY 2022 WIN2B00891 310202101021000 March 23, 2022 Region IX Regional Office IX
UACS No. 310202101021000
Project ID: P00602304MN

Network Development - Road Widening - Secondary Roads

Jolo - Indanan - Parang - Silangkan Road (Package 2) - Sta. 6+060 - Sta. 9+560

CW1 - Road Widening : 7.0 lane km
Unit Cost: P 16,857,142.86 /lane km

ROW Acquisition : 50,000.00 sq.m.
Unit Cost : 300.00 /sq.m.

EAO: P 4,900,000.00
EXCESS : P 2,100,000.00
Allocation: P 140,000,000.00
August 25, 2022 FY 2022 WIN2B00888 300225100047000 April 22, 2022 Region IX Regional Office IX
UACS No. 300225100047000
Project ID: P00631071MN

Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Shore Protection at Maimbung Tourism Site at Barangay Poblacion (Phase 2), Maimbung, Sulu


CW1 - Construction of Flood Mitigation Structure : 72.52 ln.m
Unit Cost: P 95,559.00 /ln.m

EAO: P 70,000.00
Allocation: P 7,000,000.00
August 25, 2022 FY2022 WIN2B00887 300225100048000 April 22, 2022 Region IX Regional Office IX
UACS No. 300225100048000
Project ID: P00631072MN

Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Shore Protection of Maimbung Tourism Site, Barangay Poblacion, Maimbung, Sulu (Phase 1)


CW1 - Construction of Flood Mitigation Structure : 72.60 ln.m
Unit Cost: P 95,454.54 /ln.m

EAO: P 70,000.00
Allocation: P 7,000,000.00
August 25, 2022 FY 2022 WIN2B00898 300221100052000 March 23, 2022 Region IX Regional Office IX
UACS No. 300221100052000
Project ID: P00630773MN

Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Road (Phase 2), Barangay Jakarta, Languyan, Tawi-Tawi

CW1 - Construction of Concrete Road : 2.78 lane km
Unit Cost: P 17,086,330.94 /lane km

EAO: P 500,000.00
EXCESS : P 2,000,000.00
Allocation: P 50,000,000.00
August 25, 2022 FY 2022 WIN2B00911 300221100065000 July 1, 2022 Region IX Regional Office IX
UACS No. 300221100065000
Project ID: P00630786MN

Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Rehabilitation of Laum Maimbung - Kanjal Access Road from Parang - Maimbung - Talipao Road, Barangay Bualo Lipid, Maimbung, Sulu


CW1 - Rehabilitation of Concrete Road : 0.92 lane km
Unit Cost: P 9,684,780.00 /lane km

EAO: P 90,000.00
Allocation: P 9,000,000.0
August 25, 2022 FY 2022 WIN2B00915 300221100062000 July 1, 2022 Region IX Regional Office IX
UACS No. 300221100062000
Project ID: P00630783MN

Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Rehabilitation of Barangay Matatal Road leading to Matatal Elementary School, Barangay Matatal, Maimbung, Sulu


CW1 - Rehabilitation of Concrete Road : 0.91 lane km
Unit Cost: P 10,879,120.00 /lane km

EAO: P 100,000.00
Allocation: P 10,000,000.00
August 25, 2022 FY 2022 WIN2B00910 300222100010000 July 1, 2022 Region IX Regional Office IX
UACS No. 300222100010000
Project ID: P00631051MN

Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities

Rehabilitation of Kulasi Junction - Batu Ugis - Lapa Road connecting to Badjao Indigenous People (IP) Community, Barangay Lapa, Maimbung, Sulu

CW1 - Rehabilitation of Concrete Road : 0.89 lane km
Unit Cost: P 10,011,230.00 /lane km

EAO: P 90,000.00
Allocation: P 9,000,000.00
August 25, 2022 FY 2022 WIN2B00906 300222100007000 July 1, 2022 Region IX Regional Office IX
UACS No. 300222100007000
Project ID: P00631048MN

Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities

Improvement of Maimbung - Kanjal Road from Parang - Maimbung - Talipao Road connecting to Badjao Indigenous People (IP) Community, Barangay Bualo Lipid, Maimbung, Sulu

CW1 - Construction of concrete road : 0.84 lane km
Unit Cost: P 10,607,140.00 /lane km

EAO: P 90,000.00
Allocation: P 9,000,000.00
August 25, 2022 FY 2022 WIN2B00923 300221100050000 July 1, 2022 Region IX Regional Office IX
UACS No. 300221100050000
Project ID: P00630771MN

Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Concreting of Lahing-lahing- Junction National Road, KM 55+180-56+300 Luuk, Sulu

CW1 - Construction of concrete road : 2.24 lane km
Unit Cost: P 16,964,285.00 /lane km

EAO: P 400,000.00
EXCESS: P 1,600,000.00
Allocation: P 40,000,000.00
August 23, 2022 2022 WIN2XY00018 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Dinagat Islands District Engineering Office
UACS No. : 300215102367000
Project ID: P00634952MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Rehabilitation of Roads with Slips, Slope Collapse and Landslide - K0047 + 590 - K0047 + 625, K0037 + 500 - K0037 + 550, Garcia, Libjo, Dinagat Islands

Type of Work:
CW1- Rehabilitation / Major Repair of Road Slope Protection Structure

Physical Target:
CW1- 837.541 Square meters

Allocation:
TOTAL: P 19,500,000
CW1: P 19,110,000
EAO: P 390,000

Unit Cost:
CW1: P 22,816.82/Square meters

TO:

Rehabilitation of Roads with Slips, Slope Collapse and Landslide - K0051 + 860 - K0051+ 935, K0052 + 500 - K0052 + 535, Garcia, Libjo, Dinagat Islands

Type of Work:
CW1- Rehabilitation / Major Repair of Road Slope Protection Structure

Physical Target:
CW1- 1,615.900 Square meters

Allocation:
TOTAL: P 19,500,000
CW1: P 19,110,000
EAO: P 390,000

Unit Cost:
CW1: P 11,826.23/Square meters
August 22, 2022 FY 2022 WIN2G03059 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300218100014000
Project ID : P00639296LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Protection/Conservation

FROM :

Construction of Promade Seawall/Causeway along Poctoy
leading to Poblacion, Odiongan, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.424 Lane Km
Allocation - Php 97.00 Million

TO :

Construction of Promade Seawall/Causeway along Poctoy
leading to Poblacion, Odiongan, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.398 Lane Km
Allocation - Php 97.00 Million
August 22, 2022 FY 2022 WIN2G03096 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300218100015000
Project ID : P00639297LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Protection/Conservation

FROM :

Construction of Seawall/Causeway at
Lanas, San Jose, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.320 Lane Km
Allocation - Php 100.00 Million

TO :

Construction of Seawall/Causeway at
Lanas, San Jose, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.270 Lane Km
Allocation - Php 100.00 Million
August 22, 2022 FY 2022 WIN2G03092 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300218100016000
Project ID : P00639298LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Protection/Conservation

FROM :

Construction of Seawall/Causeway/Baywalk along
Poblacion leading to Ambulong, Magdiwang, Romblon
Physical Target - CW1 - Construction of Concrete Road:
0.400 Lane Km
Allocation - Php 97.800 Million

TO :

Construction of Seawall/Causeway/Baywalk along
Poblacion leading to Ambulong, Magdiwang, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.376 Lane Km
Allocation - Php 97.80 Million




;
August 22, 2022 FY 2022 WIN2G03104 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300218100018000
Project ID : P00639300LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Protection/Conservation

FROM :

Construction of Shore Protection/Causeway,
Brgy. Sampong, Concepcion, Romblon
Physical Target - CW1 - Construction of Concrete Road ;
0.380 Lane Km
Allocation - Php 99.50 Million

TO :

Construction of Shore Protection/causeway,
Brgy. Sampong, Concepcion, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.342 Lane Km
Allocation - Php 99.50 Million


August 16, 2022 FY 2022 WIN2G03100 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300218100010000
Project ID : P00639292LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Protection/Conservation

FROM :

Construction of Causeway,
Poblacion Calatrava, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.320 Lane Km
Allocation - Php 97.00 Million

TO :

Construction of Causeway,
Poblacion Calatrava, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.310 Lane Km
Allocation - Php 97.00 Million
August 16, 2022 FY 2022 WIN2G03091 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300218100011000
Project ID : P00639293LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Protection/Conservation

FROM :

Construction of Causeway,
Pobalcion Ferrol, Ferrol, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.370 Lane Km
Allocation - Php 99.00 Million

TO :

Construction of Causeway,
Poblacion Ferrol, Ferrol, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.344 Lane Km
Allocation - Php 99.00 Million
August 16, 2022 2022 WIN2XY00031 SR2022-02-001394 February 4, 2022 Cordillera Administrative Region CAR - Regional Office
From: Construction of Flood Control Structure, Mariis Main Canal (San Jose Section), Sta. 3+616 - Sta. 5+000, San Jose, Alfonso Lista, Ifugao;
Physical Target: 1,344.000 Lineal meters;
Allocation: Php 68,166,000.000

To: Construction of Flood Control Structure, Mariis Main Canal (San Jose Section), Sta. 3+616 - Sta. 4+503, San Jose, Alfonso Lista, Ifugao;
Physical Target: 694.300 Lineal meters;
Allocation: Php 68,166,000.000

August 16, 2022 2022 WIN2XY00033 SR2022-03-007765 March 23, 2022 Cordillera Administrative Region CAR - Regional Office
From: Construction of Flood Control Structure along Lagawe River, Sta. 0+000-1+060, (Tungngod Side) Lagawe, Ifugao;
Physical Target: 1,200.000 Lineal meters;
Allocation: Php 76,400,000.000

To: Construction of Flood Control Structure along Lagawe River, Sta. 0+000- Sta. 1+219, (Tungngod Side) Lagawe, Ifugao;
Physical Target: 1,244.000 Lineal meters;
Allocation: Php 76,400,000.000

August 16, 2022 2022 WIN2XY00039 SARO-BMB-A-22-0002937 March 21, 2022 Cordillera Administrative Region CAR - Regional Office
From: Construction of Boliwong Flood Control Structure, Sta. 3+750-Sta. 3+900 and Sta. 4+782-Sta. 5+182, Lagawe, Ifugao;
Physical Target: 590.000 Lineal meters;
Allocation: Php 40,660,000.000

To: Construction of Boliwong Flood Control Structure, Sta. 3+858-Sta. 3+900 and Sta. 4+869-Sta. 5+182, Lagawe, Ifugao;
Physical Target: 380.000 Lineal meters;
Allocation: Php 40,660,000.000

August 16, 2022 2022 WIN2XY00035 GAA 2022 January 2, 2022 Cordillera Administrative Region CAR - Regional Office
From: Construction of Flood Control Structure along Lamut River, Sta. 18+300 - Sta. 18+850 (Pieza Side), Lamut, Ifugao;
Physical Target: 550.000 Lineal meters;
Allocation: Php 39,500,000.000

To: Construction of Flood Control Structure along Lamut River, Sta. 18+300 - Sta. 18+800 and Sta. 18+985 - Sta. 19+111 (Pieza Side), Lamut, Ifugao;
Physical Target: 629.000 Lineal meters;
Allocation: Php 39,500,000.000

August 16, 2022 2022 WIN2XY00032 SR2022-03-007776 March 23, 2022 Cordillera Administrative Region CAR - Regional Office
From: Guinzadan-Cagubatan-Balili (Mankayan) Road leading to Mogao Mountain and Gawaan Lake, Phase I, Tubo, Mankayan, Benguet;
Physical Target: 6.666 Lane Km;
Allocation: Php 100,000,000.000

To: Guinzadan-Cagubatan-Balili (Mankayan) Road leading to Mogao Mountain and Gawaan Lake, Phase I, Tubo, Mankayan, Benguet;
Physical Target: 5.440 Lane Km;
Allocation: Php 100,000,000.000

August 16, 2022 2022 WIN2XY00040 SR2022-03-007825 March 23, 2022 Cordillera Administrative Region CAR - Regional Office
From: Construction of Road, Poblacion - Dalingaoan - Sinacbat, Bakun, Benguet;
Physical Target: 10.070 Lane Km;
Allocation: Php 100,000,000.000

To: Construction of Road, Poblacion - Dalingaoan - Sinacbat, Bakun, Benguet;
Physical Target: 4.020 Lane Km;
Allocation: Php 100,000,000.000


August 16, 2022 2022 WIN2XY00034 SR2022-03-007835 March 23, 2022 Cordillera Administrative Region CAR - Regional Office
From: Construction of Road, Ubanga - Cayapas - Balintag - Decan Road, Baculongan Sur, Buguias, Benguet;
Physical Target: 10.070 Lane Km;
Allocation: Php 100,000,000.000

To: Construction of Road, Ubanga - Cayapas - Balintag - Decan Road, Baculongan Sur, Buguias, Benguet;
Physical Target: 6.840 Lane Km;
Allocation: Php 100,000,000.000

August 16, 2022 2022 WIN2XY00038 SR2022-03-007818 March 23, 2022 Cordillera Administrative Region CAR - Regional Office
From: Construction of Road, Guioeng - Lawad - Selac Road, Amlimay, Buguias, Benguet;
Physical Target: 10.070 Lane Km;
Allocation: Php 100,000,000.000

To: Construction of Road, Guioeng - Lawad - Selac Road, Amlimay, Buguias, Benguet;
Physical Target: 6.480 Lane Km;
Allocation: Php 100,000,000.000

August 16, 2022 2022 WIN2XY00037 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Preventive Maintenance (Asphalt Overlay) along Abra-Kalinga Rd - K0431 + 500 - K0437 + 000;
Physical Target: 3.769 Lane Km;
Allocation: Php 50,000,000.000

To: Preventive Maintenance (Asphalt Overlay) along Abra-Kalinga Rd - K0431 + 500 - K0435 + 254;
Physical Target: 7.406 Lane Km;
Allocation: Php 50,000,000.000

August 16, 2022 2022 WIN2XY00030 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Preventive Maintenance (Asphalt Overlay) along Abra-Kalinga Rd - K0456 + 000 - K0456 + 600, K0458 + 100 - K0463 + 200;
Physical Target: 3.769 Lane Km;
Allocation: Php 50,000,000.000

To: Preventive Maintenance (Asphalt Overlay) along Abra-Kalinga Rd - K0456 + 000 - K0456 + 600, K0458 + 100 - K0461 + 360;
Physical Target: 7.400 Lane Km;
Allocation: Php 50,000,000.000

August 16, 2022 2022 WIN2XY00036 GAA 2022 January 2, 2022 Cordillera Administrative Region Abra District Engineering Office
From: Preventive Maintenance (Asphalt Overlay) along Abra-Kalinga Rd - K0463 + 200 - K0467 + 000;
Physical Target: 2.412 Lane Km;
Allocation: Php 50,000,000.000

To: Preventive Maintenance (Asphalt Overlay) along Abra-Kalinga Rd - K0463 + 200 - K0465 + 680;
Physical Target: 4.716 Lane Km;
Allocation: Php 32,000,000

August 16, 2022 2022 WIN2XY00029 SARO-BMB-A-22-0002937 March 21, 2022 Cordillera Administrative Region Ifugao 1st District Engineering Office
From: Construction Of Access Road In Brgy. Maggok, Hungduan, Ifugao;
Physical Target: 0.504 Lane Km;
Allocation: Php 5,000,000.000

To: Construction Of Access Road In Brgy. Maggok, Hungduan, Ifugao;
Physical Target: 0.304 Lane Km;
Allocation: Php 5,000,000.000

August 16, 2022 FY 2022 WIN2G03094 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300218100013000
Project ID : P00639295LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure projects Alleviating Gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Protection/Conservation

FROM :

Construction of Poblacion Shore Protection/Causeway (Phase II),
Banton, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.320 Lane Km
Allocation - Php 98.750 Million

TO :

Construction of Poblacion Shore/Causeway (Phase II),
Banton, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.346 Lane Km
Allocation - Php 98.750 Million
August 15, 2022 FY 2022 WIN2G03095 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300215101653000
Project ID : P00639248LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Construction of Sugod - Cawayan Road leading to Blue Holes,
Sta. 11+450 - Sta. 11+510, San Agustin, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,776 square meters
Allocation - Php 36.00 Million

TO :

Construction of Sugod - Cawayan Road leading to Blue Holes,
Sta. 11+466 - Sta. 11+510, San Agustin, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,584.76 square meters
Allocation - Php 36.00 Million

August 15, 2022 FY 2022 WIN2G03154 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300215101656000
Project ID : P00639249LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road, Panique to Bolinganay - Palate (Phase 2)
Sta. 1+460.00 - Sta. 2+847.58,
Romblon
Physical Target - CW1 - Rehabilitation of Concrete Road :
4.486 Lane Km
Allocation - Php 50.00 Million

TO :

Rehabilitation of Road, Panique to Bolinganay - Palate (Phase 2)
Sta. 1+460.00 - Sta. 2+240.00,
Romblon
Physical Target - CW1 - Rehabilitation of Paved Road :
0.640 Lane Km
- CW2 - Rehabilitation of gravel Road :
0.920 Lane Km
Allocation - Php 50.00 Million
August 11, 2022 2022 WIN2F06289 FY 2022 GAA December 30, 2021 Region III Zambales 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Olongapo-Bugallon Rd - K0219 + 230 - K0219 + 740
August 11, 2022 2022 WIN2F06124 FY 2022 GAA November 30, 2021 Region III Zambales 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Amungan - Palauig - Banlog Rd - K0215 + 551 - K0216 + 530
August 11, 2022 2022 WIN2XY00026 FY 2022 GAA RA 11639 January 20, 2022 Region XIII Surigao del Norte 1st District Engineering Office
UACS No. : 300225100061000
Project ID: P00634126MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities

FROM:

Construction of Slope Protection Works, Union-Butong-Consuelo Road, Surigao del Norte

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 4.300 Lane Km

Allocation:
TOTAL: P 90,000,000
CW1: P 89,100,000
EAO: P 900,000

Unit Cost:
CW1: P 20,720,930.23/Lane Km

TO:

Construction of Slope Protection Works, Union-Butong-Consuelo Road, Surigao del Norte

Type of Work:
CW1- Construction of Slope Protection Structure

Physical Target:
CW1- 5,033.000 Square meters

Allocation:
TOTAL: P 90,000,000
CW1: P 89,100,000
EAO: P 900,000

Unit Cost:
CW1: P 17,703.16/Square meters
August 10, 2022 FY 2022 WIn2G03190 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300215100215000
Project ID : P00638881LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Corcuera Circumferential Road,
Poblacion-Mabini-Mangansag-Alegria Road,
Corcuera, Romblon
Physical Target - CW1 - Rehabilitation of Concrete Road :
8.881 Lane Km
Allocation - Php 99.00 Million

TO :

Rehabilitation of Corcuera Circumferential Road,
Poblacion-Mabini-Mangansag-Alegria Road,
Corcuera, Romblon
Physical Target - CW1 - Rehabilitation of Concrete Road :
1.60 Lane Km
- CW2 - Construction of Gravel Road :
3.20 Lane Km
Allocation - Php 99.00 Million
August 10, 2022 FY 2022 WIN2G03109 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300215100216000
Project ID : P00638882LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from Nhe national Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Labnig - Alegria leading to Colong-Colong Road,
Corcuera, Romblon
Physical Target - CW1 - Rehabilitation of Concrete Road :
8.881 Lane Km
Allocation - Php 99.00 Million

TO :

Rehabilitation of Labnig - Alegria leading to Colong-Colong Road,
Corcuera, Romblon
Physical Target - CW1 - Rehabilitation of Concrete Road :
1.60 Lane Km
- CW2 - Construction of Gravel Road :
3.20 Lane Km
Allocation - Php 99.00 Million
August 10, 2022 FY 2022 WIN2G03191 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300215100226000
Project ID : P00638892LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Building/Facilities

FROM :

Rehabilitation of Road, Brgy. Masadya - Brgy. Masudsud
leading to Brgy. Bachawan Road, Concepcion, Romblon
Physical Target - CW1 - Rehabilitation of Concrete Road :
8.888 Lane Km
Allocation - Php 99.075 Million

TO :

Rehabilitation of Road, Brgy. Masadya - Brgy. Masudsud leading
to Brgy. Bachawan Road, Concepcion, Romblon
Physical Target - CW1 - Rehabilitation of Paved Road :
1.00 Lane Km
- CW2 - Construction of Gravel Road :
2.28 Lane Km
Allocation - Php 99.075 Million
August 10, 2022 FY 2022 WIN2G03099 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300215100260000
Project ID : P00638899LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Structures

FROM :

Improvement of Road,
Jct. Alcantara - Comid-om - Guinbirayan Road,
Alcantara, Romblon
Physical Target - CW1 - Rehabilitation of Concrete Road :
2.240 Lane Km
Allocation - Php 80.00 Million

TO :

Improvement of Road,
Jct. Alcantara - Comod-om - Guinbirayan Road,
Alcantara, Romblon
Physical Target - CW1 - Rehabilitation of Concrete Road ;
4.072 Lane Km
Allocation - Php 80.00 Million
August 10, 2022 FY 2022 WIN2G03058 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300215100404000
Project ID : P00638960LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide -
along Access Road
Malbog Jct. - Sta. Fe Guimbirayan Provincial Road leading to
San Jose Beaches, Sta. 7+280 - Sta. 7+400
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,344.55 square meters
Allocation - Php 60.00 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Access Road
Malbog Jct. - Sta Fe Guinbirayan Provincial Road leading to
San Jose Beaches, Sta. 7+334.80 - Sta. 7+486.20
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,639.48 square meters
Allocation - Php 60.00 Million
August 10, 2022 FY 2022 WIN2G03097 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300215100405000
Project ID : P00638961LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of road with slips, Slope Collapse, and Landslide
along Access Road
Malbog Jct. - Sta. Fe Guimbirayan Provincial Road leading to
San Jose Beaches, Sta. 7+560 - Sta. 7+740
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,016.824 square maters
Allocation - Php 90.00 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Access Road
Malbog Jct. - Sta. Fe Guinbirayan Provincial Road leading to
San Jose Beaches, Sta. 7+486.20 - Sta. 7+634.80
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 4,064.21 square meters
Allocation - Php 90.00 Million
August 10, 2022 FY 2022 WIN2G03098 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300215101652000
Project ID : P00639247LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Construction of Sugod - Cawayan Road leading to Blue Holes,
Sta. 10+940 - Sta. 11+040,
San Agustin, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,505 square meters
Allocation - Php 50.00 Million

TO :

Construction of Sugod - Cawayan Road leading to Blue Holes,
Sta. 10+920 - Sta. 11+031.60,
San Agustin, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,223.67 square meters
Allocation - Php 50.00 Million

August 9, 2022 FY 2022 WIN2G03188 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 300215101591000
Project ID : P00639213LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the national Road/s leading
to major/Strategic public Buildings/Facilities

FROM :

Concreting of Road,
Brgy Burbuli-Water, Baco, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
1.600 Lane Km
Allocation - Php 10.00 Million

TO :

Concreting of Road,
Brgy Burbuli-Water, Baco, Oriental Mindoro
Physical Target - CW1 - Concreting of Road :
0.658 Lane Km
Allocation - Php 10.00 Million
August 9, 2022 FY 2022 WIN2G03102 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Palawan 3rd District Engineering Office
UACS No. : 310108101142000
Project ID : P00609311LZ

OO1 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and Landslide -
Secondary Roads

FROM :

Puerto Princesa North Road
K0016+485 - K0016+520
Physical Target - CW1 - Construction Of Road Slope Protection
Structure : 431 square meters
Allocation - Php 12.542 Million

TO :

Puerto Princesa North Road
K0027+430 - K0027+474
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 636 square meters
Allocation - Php 12.342 Million

August 9, 2022 FY 2022 WIN2G03127 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Palawan 3rd District Engineering Office
UACS No. : 310108101143000
Project ID : P00609313LZ

OO1 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and Landslide -
Secondary Roads

FROM:

Puerto Princesa North Road
K0018+615 - K0018+675
Physical Target - CW1 - Construction of Road Slope Protection
Structures : 858 square meters
Allocation - Php 18.879 Million

TO :

Puerto Princesa North Rd (S00025PW)
K0017+240 - K0017+360,
K0019+280 - K0019+320,
K0019+360 - K0019+400
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,875 square meter
Allocation - Php 18.879 Million
August 9, 2022 FY 2022 WIN2G03128 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 320102105009000
Project ID : P00621120LZ

OO2 : Protect Lives and Properties Against Major Floods

Construction/Rehabilitation of Flood Mitigation Facilities within
Major River Basins and Principal Rivers

FROM :

Construction of Baroc River Control,
Villa Celestial Section,
Sta. 0+000 - Sta. 0+680,
Mansalay, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
415.984 Lineal Meter
Allocation - Php 50.00 Million

TO :

Construction of Baroc River Control,
Villa Celestial Section,
Sta. 0+000 - Sta. 0+680,
Mansalay, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
725.00 Lineal Meter
Allocation - Php 50.00 Million
August 9, 2022 FY 2022 WIN2G03081 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Southern Mindoro Engineering District Office
UACS No. : 300225100439000
Project ID : P00640567LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Basic Infrastructure Program (BIP) -
Flood Mitigation Structures protecting Public Infrastructures/Facilities

FROM :

Construction of Flood Mitigation Structure
Cagancan River, Brgy. Don Pedro, Mansalay, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
398.00 lineal meter
Allocation - Php 25.00 Million

TO :

Construction of Flood Mitigation Structure
Cagancan River, Brgy. Don Pedro, Mansalay, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
385.00 Lineal Meter
Allocation - Php 25.00 Million
August 9, 2022 FY 2022 WIN2G03149 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 310204101535000
Project ID : P00611474LZ

OO1 : Ensure Safe and Reliable National Road System

Network Development - Construction of Bypass and
Diversion Roads

FROM :

Construction of Ferrol By-Pass Road
Physical Target - CW1 - Construction of Concrete Road :
5.0 Lane Km
Allocation - Php 100.00 Million

TO :

Construction of Ferrol By-Pass Road
Physical Target - CW1 - Construction of Concrete Road :
0.360 Lane Km
Allocation - Php 100.00 Million

August 9, 2022 FY 2022 WIN2G03195 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300215101657000
Project ID : P00630737LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Concepcion Circumferential Road,
Poblacion - San Pedro - Sampong -Bachawan Road,
Concepcion, Romblon
Physical Target - CW1 - Rehabilitation of Concrete Road :
4.942 Lane Km
Allocation - Php 45.00 Million

TO :

Rehabilitation of Concepcion Circumferential Road,
Poblacion - San Pedro - Sampong - Bachawan Road,
Concepcion, Romblon
Physical Target - CW1 - Rehabilitation of Paved Road :
0.680 Lane Km
CW2 - Construction of Gravel Road :
0.760 lane Km
Allocation - Php 45.00 Million
August 9, 2022 FY 2022 WIN2G03155 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS No. : 300215100213000
Project ID : P00638879LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Brgy. Jun Carlo to Marigondon Norte Road
leading to Little Baguio, San Andres, Romblon
Physical Target - CW1 - Rehabilitation of Concrete Road :
8.971 Lane Km
Allocation - Php 100.00 Million

TO :

Rehabilitation of Brgy. Jun Carlo to Marigondon Norte Road,
leading to Little Baguio, San Andres, Romblon
Physical Target - CW1 - Rehabilitation of Concrete Road :
1.60 Lane Km
- CW2 - Construction of Gravel Road :
3.64 Lane Km
Allocation - Php 100.00 Million
August 9, 2022 FY 2022 WIN2G03156 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Romblon District Engineering Office
UACS NO. : 300215100214000
Project ID : P00638880LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Brgy. Jun Carlo to Marigondon Norte Road
leading to Little Baguio, San Andres, Romblon (Phase 2)
Physical Target - CW1- Rehabilitation of Concrete Road :
8.971 Lane Km
Allocation - Php 100.00 Million

TO :

Rehabilitation of Brgy. Jun Carlo to Marigondon Norte Road
leading to Little Baguio, San Andres, Romblon (Phase 2)
Physical Target - CW1 - Rehabilitation of Paved Road :
1.600 Lane Km
- CW2 - Construction of Gravel Road :
2.520 lane Km
Allocation - Php 100.00 Million
August 8, 2022 FY 2022 WIN2G03193 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 300215101595000
Project ID : P00639217LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges From the National Roads leading
to Major/Strategic Public Buildings/Facilities

FROM :

Construction of Road at Balatero Municipal Ground,
Brgy. Balatero, Puerto Galera, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
1.600Lane Km
Allocation - Php 10.000 Million

TO :

Construction of Road at Balatero Municipal Ground,
Brgy. Balatero, Puerto Galera, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.257 Lane Km
Allocation - Php 10.00 Million
August 8, 2022 FY 2022 WIN2G03077 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 300215101602000
Project ID : P00639224LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major Strategic Public Buildings/Facilities

FROM :

Concreting of Roads,
Victoria, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
1.820 Lane Km
Allocation - Php 13.00 Million

TO :

Concreting of Roads,
Victoria, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.359 Lane Km
Allocation - Php 13.00 Million
August 8, 2022 FY 2022 WIN2G03072 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 300215101603000
Project ID : P00639225LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Concreting of Roads,
Baco, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
1.680 Lane Km
Allocation - Php 12.00 Million

TO :

Concreting of Roads,
Baco, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.917 Lane Km
Allocation - Php 12.00 Million
August 8, 2022 FY 2022 WIN2G03196 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 300219100867000
Project ID : P00639520LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating gaps (SIPAG) -
Flood Mitigation Structures protecting Public Infrastructures/Facilities

FROM :

Construction of Calapan City River Control,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure:
1000 Lineal Meters
Allocation - Php 100.00 Million

TO :

Construction of Calapan City River Control,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure:
270.60 Lineal Meters
Allocation - Php 100.00 Million
August 8, 2022 FY 2022 WIN2G03118 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 300215101601000
Project ID : P00639223LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Concreting of Roads,
Calapan City, Palawan
Physical Target - CW1 - Construction of Concrete Road :
10.360 Lane Km
Allocation - Php 74.00 Million

TO :

Concreting of Roads,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
10.944 Lane km
Allocation - Php 74.00 Million
August 8, 2022 FY 2022 WIN2G03120 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 300219100872000
Project ID : P00639525LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Flood Mitigation Structures protecting Public Infrastructures/Facilities

FROM :

Construction of Casiligan River Control,
Brgy. Zone 2, Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure:
32.800 Lineal meters
Allocation - Php 8.00 Million

TO :

Construction of Casiligan River Control,
Brgy. Zone 2, Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure:
134.40 Lineal Meters
Allocation - Php 8.00 Million
August 8, 2022 FY 2022 WIN2G03078 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 300219100873000
Project ID : P00639526LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Flood Mitigation Structures protecting Public Infrastructures/Facilities

FROM :

Construction of Various Drainage,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Drainage Structure :
4,400.00 Lineal Meters
Allocation - Php 44.00 Million

TO :

Construction of Various Drainage,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Drainage Structure :
4,703.50 Lineal Meters
Allocation - Php 44.00 Million
August 8, 2022 FY 2022 WIN2G03129 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 300215101605000
Project ID : P00639227LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Concreting of Roads,
Socorro, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
4.092 Lane Km
Allocation - Php 29.223 Million

TO :

Concreting of Roads,
Socorro, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
5.203 lane Km
Allocation - Php 29.223 Million
August 8, 2022 FY 2022 WIN2G03129 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 300221101194000
Project ID : P00640357LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Basic Infrastructure Program (BIP) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Construction of Road with drainage,
Sitio Interior-Kalayaan, Barangay Balatero,
Puerto Galera, Oriental, Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.400 Lane Km
Allocation - Php 15.00 Million

TO :

Construction of Road with Drainage,
Sitio Interior-Kalayaan, Barangay Balatero,
Puerto Galera, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.258 Lane Km
Allocation - Php 15.00 Million

August 8, 2022 FY 2022 WIN2G03071 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Palawan 2nd District Engineering Office
UACS No. : 310108eliabl101137000
Project ID : P00604397LZ

OO1 : Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and Landslide -
Secondary Roads

FROM :

Quezon - Punta Baja Road
K0149+315 - K0149+490
Physical Target - CW1 - Asset Preservation - Rehabilitation/Reconstruction of national Roads with Slips, Slope Collapse, and Landslide - Secondary Roads : 946 square meters
Allocation - Php 5.00 Million

TO :

Quezon - Punta Baja Road
K0148+874 - K0148+994
Physical Target - CW1 - Asset Preservation -
Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads : 296.80 square meters
Allocation - Php 5.00 Million


August 6, 2022 FY 2022 WIN2G03073 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 320102104995000
Project ID : P00621113LZ

OO2 : Protect Lives and Properties

Flood Management - Construction/Rehabilitation of Flood Mitigation
Facilities along Major River basins and Principal Rivers

FROM :

Construction of Mag-Asawang Tubig River Control along
Brgy. San Carlos, Sta. 0+000 - Sta. 0+360,
Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation
Structures: 360.00 Lineal Meters
Allocation - Php 50.00 Million

TO :

Construction of Mag-Asawang Tubig River Control along
Brgy. San Carlos, Sta. 0+000 - Sta. 0+248.00,
Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure:
248.00 Lineal Meter
Allocation - Php 50.00 Million
August 6, 2022 FY 2022 WIN2G03186 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 300215101589000
Project ID : P00639211LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Concreting of Suqui - Parang Road,
Calapan City, oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.40 Lane Km
Allocation - Php 15.00 Million

TO :

Concreting Of Suqui - Parang road,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.978 Lane Km
Allocation - Php 15.00 Million
August 6, 2022 FY 2022 WIn2G03125 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Mindoro Oriental District Engineering Office
UACS No. : 300215101590000
Project ID : P00639212LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Concreting of Inarawan - San Andres Putik Road,
Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
9.700 Lane Km
Allocation - Php 50.00 Million

TO :

Concreting of Inarawan - San Andres Putik Road,
Naujan, Oriental Mindoro
Physical Target - CW1 - Concreting of Concrete Road :
6.883 Lane Km
Allocation - Php 50.00 Million
August 5, 2022 FY 2022 WIn2G03179 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300219100887000
P00639530LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Flood Mitigation Structures protecting Public Infrastructures/Facilities

FROM :

Construction of Cawacat River Control, Tabuk Section,
Bulalacao, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
660.00 Lineal Meters
Allocation - Php 50.00 Million

TO :

Construction of Cawacat River Control, Tabuk Section
Bulalacao, Oriental Mindoro
Sta. 0+000 - Sta. 0+324.30
Physical Target - CW1 - Construction of Flood Mitigation
Structures : 324.30 Lineal meters
Allocation - Php 50.00 Million

August 5, 2022 FY 2022 WIN2G03204 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300219100891000
Project ID : P00639534LZ

CONVERGENCE AND SPECIAL SUPPORT

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Flood Mitigation Structures protecting Public Infrastructures/Facilities

FROM :

Construction of Sumagui River Control Structure,
Brgy. Villa pag-asa, Sitio Catmon Section,
Bansud, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
Allocation - Php 818.00 Million

TO :

Construction of Sumagui River Control Structure,
Brgy. Villa Pag-asa, Sitio Catmon Section,
Bansud, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
325.20 Lineal meter
Allocation - Php 50.00 Miilion
August 5, 2022 FY 2022 WIN2G03205 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300221101197000
Project ID : P00640359LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Basic Infrastructure Program (BIP) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Improvement of Road, Barangay Guadalupe Road,
Coron, Palawan
Physical Target - CW1 - Rehabilitation of Concrete Road :
4.486 Lane Km
Allocation - Php 50.00 Million

TO :

Improvement of Road, Barangay Guadalupe Road
Coron, Palawan
Physical Target - CW1 - Rehabilitation of Concrete Road :
2.364 Lane Km
Allocation - Php 50.00 Million
August 5, 2022 FY 2022 WIN2F06584 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100184000
Project ID : P00638850LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the national Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Construction of Road from Kabaliwan - Victoria Road,
San Agustin and San Andres, Romblon
Physical Target - CW1 - Construction of Concrete Road :
11.60 Lane Km
Allocation - Php 140.00 Million

TO :

Construction of Road from Kabaliwan - Victoria Road,
San Agustin and San Andres, Romblon
Physical Target - CW1 - Construction of Concrete Road :
1.99 Lane Km
Allocation - Php 140.00 Million
August 4, 2022 FY 2022 WIN2G03113 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215100224000
Project ID : P00638890LZ

CONVERGENCE AND SPECIAL SUPPORT SYSTEM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road,
Sta. 170+851.00 - Sta. 170+982.00
San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,210.34 square meter
Allocation - Php 54.011 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road,
Sta. 170+851.00 - Sta. 170+982.00
San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,193.76 square meter
Allocation - Php 54.011 Million
August 4, 2022 FY 2022 WIN2G03175 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215101614000
Project ID : P00639233LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope, and Landslide along
Itabiak - San Vicente Road,
Sta. 1+454.00 - Sta. 166 +183.00,
Sta. 165+428.00 - Sta. 165+466.00
San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 854.08 square meter
Allocation - Php 38.113 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road,
Sta. 165+428.00 - Sta. 165+486.00,
San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,629.20 square meter
Allocation - Php 38.113 Million
August 4, 2022 FY 2022 WIN2G03180 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215101615000
Project ID : P00636975LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road,
Sta. 170+642.00 - Sta. 170+689.00,
San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 914.204 square meter
Allocation - Php 40.796 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road
Sta. 170+642.00 - Sta. 170+701.00
San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,749.730 square meter
Allocation - Php 40.796 Million
August 4, 2022 FY 2022 WIN5G03148 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300215101617000
Project ID : P00639236LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities

FROM :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Taytay - Bantulan - Sta. Cruz Port Road
Sta. 1+026.00 - Sta. 1+149.00,
Taytay, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,046.709 square meter
Allocation - Php 46.709 Million

TO :

Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Taytay - Bantulan - Sta. Cruz Port Road
Sta. 1+026.00 - Sta. 1+161.00,
Taytay, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,902.530 square meter
Allocation - Php 46.709 Million
August 4, 2022 FY 2022 WIN2G03181 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 3002191005866000
Project ID : P00639234LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG ) -
Flood Mitigation Structures Protecting Public Infrastructure/Facilities

FROM :

Construction of Balite River Control Structure,
Brgy. Buong Lupa Section, Gloria, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure:
788.00 Lineal meters
Allocation - Php 50.00 Million

TO :

Construction of Balite River Control,
Brgy. Buong Lupa Section, Gloria, Oriental Mindoro
Sta. 0+000 - Sta. 0+323.55
Physical Target - CW1 - Construction of Flood Mitigation Structure :
326.55 Lineal meters
Allocation - Php 50.00 Million

August 4, 2022 FY 2022 WIn2G03178 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300219100869000
Project ID : P00639522LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Flood Mitigation Structures protecting Public Infrastructures/Facilities

FROM :

Construction of Balite River Control Structure,
Brgy. Malamig Section, Gloria, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
674.00 Lineal Meters
Allocation - Php 50.00 Million

TO :

Construction of Balite River Control Structure
Brgy. Malamig Section, Gloria, Oriental Mindoro
Sta. 0+000 - Sta. 0+308.60
Physical Target - CW1 - Construction of Flood Mitigation Structure :
308.60 Lineal meters
Allocation - Php 50.00 Million

August 4, 2022 FY 2022 WIN2G03172 DPWH Infra Projects FY 2022 December 30, 2021 Region IV-B Regional Office IV-B
UACS No. : 300219100885000
Project ID : P00639528LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Flood Mitigation Structures protecting Public Infrastructure/Facilities

FROM :

Construction of Flood Mitigation Structure -
Construction of Bansud River Control,
Brgy. Poblacion Section, Bansud, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
672.00 Lineal Meters
Allocation - Php 50.00 Million

TO :

Construction of Bansud River Control,
Brgy. Poblacion Section, Bansud, Oriental Mindoro
Sta. 0+000 - Sta. 0+330.70
Physical Target - CW1 - Construction of Flood Mitigation Structure :
330.70 Lineal Meters
Allocation - Php 50.00 Million