September 9, 2022 |
2022 |
WIN2XY00082 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 320101107788000
Project ID: P00620104MN
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Flood Mitigation Structure at Brgy. Camagong, Sta. 0+000.00 - Sta. 0+360.00, Nasipit, Agusan del Norte
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 416.667 Lineal meters
Allocation:
TOTAL: P 125,000,000
CW1: P 120,625,000
EAO: P 4,375,000
Unit Cost:
CW1: P 289,499.77/Lineal meters
TO:
Construction of Flood Mitigation Structure at Brgy. Camagong, Sta. 0+000.00 - Sta. 0+259.50, Nasipit, Agusan del Norte
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 519.000 Lineal meters
Allocation:
TOTAL: P 125,000,000
CW1: P 120,625,000
EAO: P 4,375,000
Unit Cost:
CW1: P 232,418.11/Lineal meters
|
September 9, 2022 |
2022 |
WIN2XY00079 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 300218100062000
Project ID: P00630470MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Coastal Roads/Causeway for environmental protection/conservation
FROM:
Construction of Causeway, Barangay Taft, Surigao City, Surigao del Norte
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 139.000 Lineal meters
Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000
Unit Cost:
CW1: P 352,517.99/Lineal meters
TO:
Construction of Causeway, Barangay Taft, Surigao City, Surigao del Norte
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 227.600 Lineal meters
Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000
Unit Cost:
CW1: P 215,289.98/Lineal meters
|
September 9, 2022 |
2022 |
WIN2F06326 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310102100965000
Project ID: P00603968LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance – Secondary Roads – Masbate -Milagros Rd – K0024 + 000 – K0025 + 240
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 2.536 Lane Km
Allocation: Php 16,511,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance – Secondary Roads – Masbate -Milagros Rd – K0024 + 000 – K0024 +274
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 1.096 Lane Km
Allocation: Php 16,511,000.00
|
September 9, 2022 |
2022 |
WIN2F06306 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310102100963000
Project ID: P00603969LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance – Secondary Roads – Jct Tawad-Balud Rd – K0028 + (-721) – K0028 + 944
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 3.33 Lane Km
Allocation: Php 21,681,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance – Secondary Roads – Jct Tawad-Balud Rd – K0028 + (-714) – K0028 + (-360)
Physical Target: CW1 – Preventive Maintenance of Road: Asphalt Overlay – 1.416 Lane Km
Allocation: Php 21,681,000.00
|
September 9, 2022 |
2022 |
WIN2F06303 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310105100715000
Project ID: P00603971LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction /Upgrading of Damage Paved Roads – Secondary Roads – Jct Tawad-Balud Rd – K0065 + 721 – K0065 + 800, K0065 + 891 – K0066 + 209
Physical Target: CW1 – Reconstruction to Concrete Pavement – 0.614Lane Km
Allocation: Php 10,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction /Upgrading of Damage Paved Roads – Secondary Roads – Jct Tawad-Balud Rd – K0065 + 981 – K0065 + 117
Physical Target: CW1 – Reconstruction to Concrete Pavement – 0.272 Lane Km
Allocation: Php 10,000,000.00
|
September 9, 2022 |
2022 |
WIN2F06226 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310105100717000
Project ID: P00603972LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction /Upgrading of Damage Paved Roads – Secondary Roads – Masbate-Milagros Rd – K0011 + 612 – K0012 + 340
Physical Target: CW1 – Reconstruction to Concrete Pavement – 3.17 Lane Km
Allocation: Php 50,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction /Upgrading of Damage Paved Roads – Secondary Roads – Masbate-Milagros Rd – K0011 + 554 – K0011 + 1004
Physical Target: CW1 – Reconstruction to Concrete Pavement – 0.9 Lane Km
CW2 - Construction of Slope Protection – 1,386.00 Square Meters
Allocation: Php 50,000,000.00
|
September 9, 2022 |
2022 |
WIN2F06248 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310108100898000
Project ID: P00604434LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide – Secondary Roads – Jct Milagros-Baleno-Lagta Rd – K0038 + 250 – K0038 + 350
Physical Target: CW1 – Construction of Road Slope Protection Structure – 5,555.56 Square meters
Allocation: Php 100,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slip, Slope Collapse and Landslide – Secondary Roads – Jct Milagros-Baleno-Lagta Rd – K0038 + 250 – K0038 + 350
Physical Target: CW1 – Construction of Road Slope Protection Structure – 4,000.00 Square meters
Allocation: Php 100,000,000.00
|
September 9, 2022 |
2022 |
WIN2F06328 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310202101144000
Project ID: P00606426LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Secondary Roads – Jct Milagros-Baleno-Lagta Rd – K0033 + 565 – K0034 + 000
Physical Target: CW1 – Road Widening – 0.718 Lane Km
Allocation: Php 10,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Secondary Roads – Jct Milagros-Baleno-Lagta Rd – K0033 + 193 – K0033 + 307
Physical Target: CW1 – Road Widening – 0.228 Lane Km
Allocation: Php 10,000,000.00
|
September 9, 2022 |
2022 |
WIN2F06245 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310202101146000
Project ID: P00606427LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Secondary Roads – Masbate-Cataingan-Placer Rd – K0009 + 625 – K0009 + 803
Physical Target: CW1 – Road Widening – 0.356 Lane Km
Allocation: Php 12,983,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Secondary Roads – Masbate-Cataingan-Placer Rd – K0008 + 859 – K0009 + 055
Physical Target: CW1 – Road Widening – 0.27 Lane Km
Allocation: Php 12,983,000.00
|
September 9, 2022 |
2022 |
WIN2F06327 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310202101145000
Project ID: P00606428LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Secondary Roads – Jct Tawad-Balud Rd – K0029 + 270 – K0029 + 910
Physical Target: CW1 – Road Widening – 1.28 Lane Km
Allocation: Php 10,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Secondary Roads – Jct Tawad-Balud Rd – K0029 + 064 – K0029 + 163
Physical Target: CW1 – Road Widening – 0.198 Lane Km
Allocation: Php 10,000,000.00
|
September 9, 2022 |
2022 |
WIN2F06307 |
FY 2022 GAA |
December 29, 2021 |
Region V |
Masbate 2nd District Engineering Office |
UACS No.: 310202101147000
Project ID: P00606429LZ
AS PER GAA:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Secondary Roads – Masbate-Milagros Rd – K0006 +365 – K0006 + 428
Physical Target: CW1 – Road Widening – 0.126 Lane Km
Allocation: Php 5,000,000.00
AS MODIFIED:
OO1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening – Secondary Roads – Masbate-Milagros Rd – K0005 + 840 – K0005 + 894
Physical Target: CW1 – Road Widening – 0.108 Lane Km
Allocation: Php 5,000,000.00
|
September 8, 2022 |
FY 2022 |
WIN2F06604 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215100201000
Project ID : P00638867LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide along Port Barton to Barangay Kemdeng Road,
Sta. 3+558 - Sta. 3+611,
Sta. 3+935 - Sta. 4+025,
Sta. 4+091 - Sta. 4+177,
Sta. 4+240 - Sta. 4+351,
Sta. 4+365 - Sta. 4+426,
Sta. 4+446 - Sta. 4+498
Physical Target - CW1 - Construction of Concrete Road :
14.649 Lane Km
Allocation - Php 176.80 Million
TO :
Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse,
and Landslide along Port Barton to Barangay Kemdeng Road,
Sta. 13+490.00 - Sta. 13+783.60,
Sta. 14+590.00 - Sta. 14+886.00
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 7,761.00 square meter
Allocation - Php 176.80 Million
|
September 8, 2022 |
FY 2022 |
WIN2F006599 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300225100022000
Project ID : P00641899LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Basic Infrastructure Program (BIP) - Flood Mitigation Structures
protecting Public Infrastructures/Facilities
FROM :
Construction of Espana Flood Control (Phase 2),
Brgy. Espana, San Fernando, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
623.976 lineal meter
Allocation - Php 75.00 Million
TO :
Construction of Espana Flood Control (Phase 2),
Brgy. Espana, San Fernando, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
426.00 lineal meter
Allocation - Php 75.00 Million
|
September 8, 2022 |
FY 2022 |
WIN2F06606 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310204101076000
Project ID : P00608635LZ
OO1 : Ensure Safe and Reliable National Road System
Network Development - Construction of Bypass and
Diversion Roads
FROM :
Odiongan Bypass Road, Romblon
Physical Target - CW1 - Construction of Concrete Road :
4.930 Lane Km
Allocation - Php 145.565 Million
TO :
Odiongan Bypass Road, Romblon
Physical Target - CW1 - Construction of Drainage Structure along
Road : 3,000.00 lineal meter
CW2 - Construction of Road Slope Protection
Structure : 4,471.02 square meter
CW3 - Road Safety : Pavement Markings :
3.00 Lane km
Allocation - Php 145.565 Million
|
September 7, 2022 |
FY 2022 |
WIN2F06598 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Marinduque District Engineering Office |
UACS No. : 300226101980000
Project ID : P00634212LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Basic Infrastructure Program (BIP) - Multi-Purpose Building/Facilities to Support Social Services
FROM :
Construction of Multi-Purpose Building,
Brgy. Boton, Mogpog, Marinduque
Physical Target - CW1 - Construction of Multi-Purpose Building :
1 Building
Allocation - Php 7.00 Million
TO :
Construction of Multi-Purpose Buildinh,
Brgy. Boton, Boac, Marinduque
Physical Target - CW1 - Construction of Multi-Purpose Building :
1 Building
Allocation - Php 7.00 Million |
September 7, 2022 |
FY 2022 |
WIN2F06600 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 310205100817000
Project ID : P00608158LZ
OO1 : Ensure Safe and Reliable National Road System
Network Development Program -
Construction of missing Links/New Roads
FROM :
Victoria Sablayan ( Mindoro Cross island Road ), package VIII,
Occidental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.869 lane Km
Allocation - Php 105.00 Million
TO :
Victoria Sablayan ( Mindoro Cross Island Road ), Package VIII
Occidental Mindoro
Physical Target - CW1 - Construction of Gravel Road :
2.200 lane Km
CW2 - Construction of Road Slope Protection
Structure : 12,757.00 Square Meter
CW3 - Construction of Drainage Structure along
Road : 2,200.00 Lineal Meters
Allocation - Php 105.00 Million |
September 5, 2022 |
2022 |
WIN2E02507 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Missing Links/ New Roads
Mawab-Maragusan-Caraga Road, Package J, Davao Oriental
Physical Target:
CW1: 5.452 Lane Km (Construction of Gravel Road)
ROW Acquisition: 27,260 sq. m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 137,384,155.00 (Construction of Gravel Road)
ROW Acquisition: P 7,365,845.00
EAO: P 5,250,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Missing Links/ New Roads
Mawab-Maragusan-Caraga Road, Package J, Davao Oriental
Physical Target:
CW1: 3.292 Lane Km (Construction of Gravel Road)
ROW Acquisition: 16,460 sq. m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 140,291,700.00 (Construction of Gravel Road)
ROW Acquisition: P 4,458,300.00
EAO: P 5,250,000.00 |
September 5, 2022 |
2022 |
WIN2E02508 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of By-Pass and Diversion Roads
Maragusan-Pantukan Road, Pantukan Section, Package P
Physical Target:
CW1: 2.000 Lane Km (Construction of Concrete Road)
ROW Acquisition: 36,944.000 sq. m.
Allocation:
TOTAL: P 90,000,000.00
CW1: P 82,025,000.00 (Construction of Concrete Road)
ROW Acquisition: P 4,825,000.00
EAO: P 3,150,000.00
TO: OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of By-Pass and Diversion Roads
Maragusan-Pantukan Road, Pantukan Section, Package P
Physical Target:
CW1: 1.41788 Lane Km (Construction of Concrete Road)
ROW Acquisition: 26,191.000 sq. m.
Allocation:
TOTAL: P 150,000,000.00
CW1: P 82,025,000.00 (Construction of Concrete Road)
ROW Acquisition: P 4,825,000.00
EAO: P 3,150,000.00 |
September 5, 2022 |
2022 |
WIN2E02509 |
FY 2022 GAA R.A. 11639 |
January 1, 2022 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Convergence and Special Support Program – Sustainable Infrastructure Projects alleviating Gaps (SIPAG) – Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
Construction of Tagum City – Sto. Tomas Diversion Road (Feeder Road 1 to Tagum City via Kinamayan), Package 1, Davao del Norte
Physical Target:
CW1: 0.200 Lane Km (Road Widening)
CW2: 0.398 Lane Km (Reconstruction to Concrete Pavement)
CW3: 0.094 Lane Km (Construction of Gravel Road)
CW4: 1,138.050 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 180,000,000.00
CW1: P 15,102,250.00 (Road Widening)
CW2: P 6,071,780.00 (Reconstruction to Concrete Pavement)
CW3: P 2,867,015.00 (Construction of Gravel Road)
CW4: P 149,658,955.00 (Construction of Concrete Bridge)
EAO: P 6,300,000.00
TO: Convergence and Special Support Program – Sustainable Infrastructure Projects alleviating Gaps (SIPAG) – Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
Construction of Tagum City – Sto. Tomas Diversion Road (Feeder Road 1 to Tagum City via Kinamayan), Package 1, Davao del Norte
Physical Target:
CW1: 1,095.900 sq. m. (Construction of Concrete Bridge)
Allocation:
TOTAL: P 180,000,000.00
CW1: P 173,700,000.00 (Construction of Concrete Bridge)
EAO: P 6,300,000.00 |
August 31, 2022 |
FY 2022 |
WIN2G03115 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300218100022000
Project ID : P00639304LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Preservation/Conservation
FROM :
Construction of Storm Surge Protection/Causeway/Baywalk
along Dona Juana leading to Tambuyungan Point,
San Agustin, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.310 Lane Km
Allocation - Php 97.00 Million
TO :
Construction of Storm Surge Protection/Causeway/Baywalk
along Dona Juana leading to Tambuyungan Point,
San Agustin, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.292 Lane Km
Allocation - Php 97.00 Million
|
August 31, 2022 |
FY 2022 |
WIN2G03150 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300218100024000
Project ID : P00639305LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating gaps (SIPAG) -
Coastal Roads/causeway for Environmental Preservation/Conservation
FROM :
Construction of Storm Surge Protection/Causeway
along Lanas, San Jose, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.320 Lane Km
Allocation - Php 100.00 Milliojn
TO :
Construction of Storm Surge Protection/causeway
along Lanas, San Jose, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.260 Lane Km
Allocation - Php 100.00 Million
|
August 31, 2022 |
FY 2022 |
WIN2G03057 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300225100433000
Project ID : P00640565LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Basic Infrastructure Program (BIP) - Flood Mitigation Structures
Protecting Public Infrastructures/Facilities
FROM :
Construction of Seawall, Brgy. Calabasahan, Concepcion,Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
120.0 Lineal meters
Allocation - Php 20.00 Million
TO :
Construction of Seawall, Brgy. Calabasahan, Concepcion, Romblon
Physical Target - CW1 - Construction of Flood Mitigation Structure :
228.20 Lineal meters
Allocation - Php 20.00 million
|
August 25, 2022 |
FY 2022 |
WIN2G03088 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300218100019000
Project ID : P00639301LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Protection/Conservation
FROM :
Construction of Shore Protection/Causeway,
Cajidiocan, Romblon (Phase 2)
Physical Target - CW1 - Construction of Concrete Road :
0.340 Lane Km
Allocation - Php 99.00 Million
TO :
Construction of Shore Protection/Causeway,
Cajidiocan, Romblon (Phase 2)
Physical Target - CW1 - Construction of Concrete Road :
0.320 Lane Km
Allocation - Php 99.00 Million
|
August 25, 2022 |
FY 2022 |
WIN2G03090 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UAVS No. : 300218100020000
Project ID : P00639302LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Coastal Roads. Causeway for Environmental Protection/Conservation
FROM :
Construction of Storm Surge Protection/Causeway along
Bachawan, San Agustin, Romblon (Phase 2)
Physical Target - CW1 - Construction of Concrete Road :
0.320 Lane Km
Allocation - Php 98.190 Lane Km
TO :
Construction of Storm Surge Protection/Causeway along
Bachawan, San Agustin, Romblon (Phase 2)
Physical Target - CW1 - Construction of Concrete Road :
0.304 Lane Km
Allocation - Php 98.190 Million
|
August 25, 2022 |
FY 2022 |
WIN2G03060 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300218100021000
Project ID : P00639303LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure projects Alleviating Gaps (SIPAG) -
coastal Roads/causeway for Environmental Protection/Conservation
FROM :
Construction of Storm Surge Protection/Causeway along
Carmen, San Agustin, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.370 Lane Km
Allocation - Php 100.00 Million
TO :
Construction of Storm Surge Protection/Causeway along
Carmen, San Agustin, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.350 Lane Km
Allocation - Php 100.00 Million
|
August 25, 2022 |
FY 2022 |
WIN2B00895 |
300221100053000 |
April 22, 2022 |
Region IX |
Regional Office IX |
UACS No. 300221100053000
Project ID: P00630774MN
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Road, Sapang road, Barangay Tandu-bato, Luuk, Sulu
CW1 - Construction of concrete road : 0.93 lane km
Unit Cost: P 10,645,160.00 /lane km
EAO: P 100,000.00
Allocation: P 10,000,000.00 |
August 25, 2022 |
FY 2022 |
WIN2B00891 |
310202101021000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 310202101021000
Project ID: P00602304MN
Network Development - Road Widening - Secondary Roads
Jolo - Indanan - Parang - Silangkan Road (Package 2) - Sta. 6+060 - Sta. 9+560
CW1 - Road Widening : 7.0 lane km
Unit Cost: P 16,857,142.86 /lane km
ROW Acquisition : 50,000.00 sq.m.
Unit Cost : 300.00 /sq.m.
EAO: P 4,900,000.00
EXCESS : P 2,100,000.00
Allocation: P 140,000,000.00 |
August 25, 2022 |
FY 2022 |
WIN2B00888 |
300225100047000 |
April 22, 2022 |
Region IX |
Regional Office IX |
UACS No. 300225100047000
Project ID: P00631071MN
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Shore Protection at Maimbung Tourism Site at Barangay Poblacion (Phase 2), Maimbung, Sulu
CW1 - Construction of Flood Mitigation Structure : 72.52 ln.m
Unit Cost: P 95,559.00 /ln.m
EAO: P 70,000.00
Allocation: P 7,000,000.00 |
August 25, 2022 |
FY2022 |
WIN2B00887 |
300225100048000 |
April 22, 2022 |
Region IX |
Regional Office IX |
UACS No. 300225100048000
Project ID: P00631072MN
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Shore Protection of Maimbung Tourism Site, Barangay Poblacion, Maimbung, Sulu (Phase 1)
CW1 - Construction of Flood Mitigation Structure : 72.60 ln.m
Unit Cost: P 95,454.54 /ln.m
EAO: P 70,000.00
Allocation: P 7,000,000.00 |
August 25, 2022 |
FY 2022 |
WIN2B00898 |
300221100052000 |
March 23, 2022 |
Region IX |
Regional Office IX |
UACS No. 300221100052000
Project ID: P00630773MN
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Road (Phase 2), Barangay Jakarta, Languyan, Tawi-Tawi
CW1 - Construction of Concrete Road : 2.78 lane km
Unit Cost: P 17,086,330.94 /lane km
EAO: P 500,000.00
EXCESS : P 2,000,000.00
Allocation: P 50,000,000.00 |
August 25, 2022 |
FY 2022 |
WIN2B00911 |
300221100065000 |
July 1, 2022 |
Region IX |
Regional Office IX |
UACS No. 300221100065000
Project ID: P00630786MN
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Rehabilitation of Laum Maimbung - Kanjal Access Road from Parang - Maimbung - Talipao Road, Barangay Bualo Lipid, Maimbung, Sulu
CW1 - Rehabilitation of Concrete Road : 0.92 lane km
Unit Cost: P 9,684,780.00 /lane km
EAO: P 90,000.00
Allocation: P 9,000,000.0 |
August 25, 2022 |
FY 2022 |
WIN2B00915 |
300221100062000 |
July 1, 2022 |
Region IX |
Regional Office IX |
UACS No. 300221100062000
Project ID: P00630783MN
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Rehabilitation of Barangay Matatal Road leading to Matatal Elementary School, Barangay Matatal, Maimbung, Sulu
CW1 - Rehabilitation of Concrete Road : 0.91 lane km
Unit Cost: P 10,879,120.00 /lane km
EAO: P 100,000.00
Allocation: P 10,000,000.00 |
August 25, 2022 |
FY 2022 |
WIN2B00910 |
300222100010000 |
July 1, 2022 |
Region IX |
Regional Office IX |
UACS No. 300222100010000
Project ID: P00631051MN
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities
Rehabilitation of Kulasi Junction - Batu Ugis - Lapa Road connecting to Badjao Indigenous People (IP) Community, Barangay Lapa, Maimbung, Sulu
CW1 - Rehabilitation of Concrete Road : 0.89 lane km
Unit Cost: P 10,011,230.00 /lane km
EAO: P 90,000.00
Allocation: P 9,000,000.00 |
August 25, 2022 |
FY 2022 |
WIN2B00906 |
300222100007000 |
July 1, 2022 |
Region IX |
Regional Office IX |
UACS No. 300222100007000
Project ID: P00631048MN
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities
Improvement of Maimbung - Kanjal Road from Parang - Maimbung - Talipao Road connecting to Badjao Indigenous People (IP) Community, Barangay Bualo Lipid, Maimbung, Sulu
CW1 - Construction of concrete road : 0.84 lane km
Unit Cost: P 10,607,140.00 /lane km
EAO: P 90,000.00
Allocation: P 9,000,000.00 |
August 25, 2022 |
FY 2022 |
WIN2B00923 |
300221100050000 |
July 1, 2022 |
Region IX |
Regional Office IX |
UACS No. 300221100050000
Project ID: P00630771MN
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Concreting of Lahing-lahing- Junction National Road, KM 55+180-56+300 Luuk, Sulu
CW1 - Construction of concrete road : 2.24 lane km
Unit Cost: P 16,964,285.00 /lane km
EAO: P 400,000.00
EXCESS: P 1,600,000.00
Allocation: P 40,000,000.00 |
August 23, 2022 |
2022 |
WIN2XY00018 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Dinagat Islands District Engineering Office |
UACS No. : 300215102367000
Project ID: P00634952MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Rehabilitation of Roads with Slips, Slope Collapse and Landslide - K0047 + 590 - K0047 + 625, K0037 + 500 - K0037 + 550, Garcia, Libjo, Dinagat Islands
Type of Work:
CW1- Rehabilitation / Major Repair of Road Slope Protection Structure
Physical Target:
CW1- 837.541 Square meters
Allocation:
TOTAL: P 19,500,000
CW1: P 19,110,000
EAO: P 390,000
Unit Cost:
CW1: P 22,816.82/Square meters
TO:
Rehabilitation of Roads with Slips, Slope Collapse and Landslide - K0051 + 860 - K0051+ 935, K0052 + 500 - K0052 + 535, Garcia, Libjo, Dinagat Islands
Type of Work:
CW1- Rehabilitation / Major Repair of Road Slope Protection Structure
Physical Target:
CW1- 1,615.900 Square meters
Allocation:
TOTAL: P 19,500,000
CW1: P 19,110,000
EAO: P 390,000
Unit Cost:
CW1: P 11,826.23/Square meters |
August 22, 2022 |
FY 2022 |
WIN2G03059 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300218100014000
Project ID : P00639296LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Protection/Conservation
FROM :
Construction of Promade Seawall/Causeway along Poctoy
leading to Poblacion, Odiongan, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.424 Lane Km
Allocation - Php 97.00 Million
TO :
Construction of Promade Seawall/Causeway along Poctoy
leading to Poblacion, Odiongan, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.398 Lane Km
Allocation - Php 97.00 Million |
August 22, 2022 |
FY 2022 |
WIN2G03096 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300218100015000
Project ID : P00639297LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Protection/Conservation
FROM :
Construction of Seawall/Causeway at
Lanas, San Jose, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.320 Lane Km
Allocation - Php 100.00 Million
TO :
Construction of Seawall/Causeway at
Lanas, San Jose, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.270 Lane Km
Allocation - Php 100.00 Million |
August 22, 2022 |
FY 2022 |
WIN2G03092 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300218100016000
Project ID : P00639298LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Protection/Conservation
FROM :
Construction of Seawall/Causeway/Baywalk along
Poblacion leading to Ambulong, Magdiwang, Romblon
Physical Target - CW1 - Construction of Concrete Road:
0.400 Lane Km
Allocation - Php 97.800 Million
TO :
Construction of Seawall/Causeway/Baywalk along
Poblacion leading to Ambulong, Magdiwang, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.376 Lane Km
Allocation - Php 97.80 Million
; |
August 22, 2022 |
FY 2022 |
WIN2G03104 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300218100018000
Project ID : P00639300LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Protection/Conservation
FROM :
Construction of Shore Protection/Causeway,
Brgy. Sampong, Concepcion, Romblon
Physical Target - CW1 - Construction of Concrete Road ;
0.380 Lane Km
Allocation - Php 99.50 Million
TO :
Construction of Shore Protection/causeway,
Brgy. Sampong, Concepcion, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.342 Lane Km
Allocation - Php 99.50 Million
|
August 16, 2022 |
FY 2022 |
WIN2G03100 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300218100010000
Project ID : P00639292LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Protection/Conservation
FROM :
Construction of Causeway,
Poblacion Calatrava, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.320 Lane Km
Allocation - Php 97.00 Million
TO :
Construction of Causeway,
Poblacion Calatrava, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.310 Lane Km
Allocation - Php 97.00 Million |
August 16, 2022 |
FY 2022 |
WIN2G03091 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300218100011000
Project ID : P00639293LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Protection/Conservation
FROM :
Construction of Causeway,
Pobalcion Ferrol, Ferrol, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.370 Lane Km
Allocation - Php 99.00 Million
TO :
Construction of Causeway,
Poblacion Ferrol, Ferrol, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.344 Lane Km
Allocation - Php 99.00 Million |
August 16, 2022 |
2022 |
WIN2XY00031 |
SR2022-02-001394 |
February 4, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Flood Control Structure, Mariis Main Canal (San Jose Section), Sta. 3+616 - Sta. 5+000, San Jose, Alfonso Lista, Ifugao;
Physical Target: 1,344.000 Lineal meters;
Allocation: Php 68,166,000.000
To: Construction of Flood Control Structure, Mariis Main Canal (San Jose Section), Sta. 3+616 - Sta. 4+503, San Jose, Alfonso Lista, Ifugao;
Physical Target: 694.300 Lineal meters;
Allocation: Php 68,166,000.000
|
August 16, 2022 |
2022 |
WIN2XY00033 |
SR2022-03-007765 |
March 23, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Flood Control Structure along Lagawe River, Sta. 0+000-1+060, (Tungngod Side) Lagawe, Ifugao;
Physical Target: 1,200.000 Lineal meters;
Allocation: Php 76,400,000.000
To: Construction of Flood Control Structure along Lagawe River, Sta. 0+000- Sta. 1+219, (Tungngod Side) Lagawe, Ifugao;
Physical Target: 1,244.000 Lineal meters;
Allocation: Php 76,400,000.000
|
August 16, 2022 |
2022 |
WIN2XY00039 |
SARO-BMB-A-22-0002937 |
March 21, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Boliwong Flood Control Structure, Sta. 3+750-Sta. 3+900 and Sta. 4+782-Sta. 5+182, Lagawe, Ifugao;
Physical Target: 590.000 Lineal meters;
Allocation: Php 40,660,000.000
To: Construction of Boliwong Flood Control Structure, Sta. 3+858-Sta. 3+900 and Sta. 4+869-Sta. 5+182, Lagawe, Ifugao;
Physical Target: 380.000 Lineal meters;
Allocation: Php 40,660,000.000
|
August 16, 2022 |
2022 |
WIN2XY00035 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Flood Control Structure along Lamut River, Sta. 18+300 - Sta. 18+850 (Pieza Side), Lamut, Ifugao;
Physical Target: 550.000 Lineal meters;
Allocation: Php 39,500,000.000
To: Construction of Flood Control Structure along Lamut River, Sta. 18+300 - Sta. 18+800 and Sta. 18+985 - Sta. 19+111 (Pieza Side), Lamut, Ifugao;
Physical Target: 629.000 Lineal meters;
Allocation: Php 39,500,000.000
|
August 16, 2022 |
2022 |
WIN2XY00032 |
SR2022-03-007776 |
March 23, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Guinzadan-Cagubatan-Balili (Mankayan) Road leading to Mogao Mountain and Gawaan Lake, Phase I, Tubo, Mankayan, Benguet;
Physical Target: 6.666 Lane Km;
Allocation: Php 100,000,000.000
To: Guinzadan-Cagubatan-Balili (Mankayan) Road leading to Mogao Mountain and Gawaan Lake, Phase I, Tubo, Mankayan, Benguet;
Physical Target: 5.440 Lane Km;
Allocation: Php 100,000,000.000
|
August 16, 2022 |
2022 |
WIN2XY00040 |
SR2022-03-007825 |
March 23, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Road, Poblacion - Dalingaoan - Sinacbat, Bakun, Benguet;
Physical Target: 10.070 Lane Km;
Allocation: Php 100,000,000.000
To: Construction of Road, Poblacion - Dalingaoan - Sinacbat, Bakun, Benguet;
Physical Target: 4.020 Lane Km;
Allocation: Php 100,000,000.000
|
August 16, 2022 |
2022 |
WIN2XY00034 |
SR2022-03-007835 |
March 23, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Road, Ubanga - Cayapas - Balintag - Decan Road, Baculongan Sur, Buguias, Benguet;
Physical Target: 10.070 Lane Km;
Allocation: Php 100,000,000.000
To: Construction of Road, Ubanga - Cayapas - Balintag - Decan Road, Baculongan Sur, Buguias, Benguet;
Physical Target: 6.840 Lane Km;
Allocation: Php 100,000,000.000
|
August 16, 2022 |
2022 |
WIN2XY00038 |
SR2022-03-007818 |
March 23, 2022 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Road, Guioeng - Lawad - Selac Road, Amlimay, Buguias, Benguet;
Physical Target: 10.070 Lane Km;
Allocation: Php 100,000,000.000
To: Construction of Road, Guioeng - Lawad - Selac Road, Amlimay, Buguias, Benguet;
Physical Target: 6.480 Lane Km;
Allocation: Php 100,000,000.000
|
August 16, 2022 |
2022 |
WIN2XY00037 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Preventive Maintenance (Asphalt Overlay) along Abra-Kalinga Rd - K0431 + 500 - K0437 + 000;
Physical Target: 3.769 Lane Km;
Allocation: Php 50,000,000.000
To: Preventive Maintenance (Asphalt Overlay) along Abra-Kalinga Rd - K0431 + 500 - K0435 + 254;
Physical Target: 7.406 Lane Km;
Allocation: Php 50,000,000.000
|
August 16, 2022 |
2022 |
WIN2XY00030 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Preventive Maintenance (Asphalt Overlay) along Abra-Kalinga Rd - K0456 + 000 - K0456 + 600, K0458 + 100 - K0463 + 200;
Physical Target: 3.769 Lane Km;
Allocation: Php 50,000,000.000
To: Preventive Maintenance (Asphalt Overlay) along Abra-Kalinga Rd - K0456 + 000 - K0456 + 600, K0458 + 100 - K0461 + 360;
Physical Target: 7.400 Lane Km;
Allocation: Php 50,000,000.000
|
August 16, 2022 |
2022 |
WIN2XY00036 |
GAA 2022 |
January 2, 2022 |
Cordillera Administrative Region |
Abra District Engineering Office |
From: Preventive Maintenance (Asphalt Overlay) along Abra-Kalinga Rd - K0463 + 200 - K0467 + 000;
Physical Target: 2.412 Lane Km;
Allocation: Php 50,000,000.000
To: Preventive Maintenance (Asphalt Overlay) along Abra-Kalinga Rd - K0463 + 200 - K0465 + 680;
Physical Target: 4.716 Lane Km;
Allocation: Php 32,000,000
|
August 16, 2022 |
2022 |
WIN2XY00029 |
SARO-BMB-A-22-0002937 |
March 21, 2022 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: Construction Of Access Road In Brgy. Maggok, Hungduan, Ifugao;
Physical Target: 0.504 Lane Km;
Allocation: Php 5,000,000.000
To: Construction Of Access Road In Brgy. Maggok, Hungduan, Ifugao;
Physical Target: 0.304 Lane Km;
Allocation: Php 5,000,000.000
|
August 16, 2022 |
FY 2022 |
WIN2G03094 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300218100013000
Project ID : P00639295LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure projects Alleviating Gaps (SIPAG) -
Coastal Roads/Causeway for Environmental Protection/Conservation
FROM :
Construction of Poblacion Shore Protection/Causeway (Phase II),
Banton, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.320 Lane Km
Allocation - Php 98.750 Million
TO :
Construction of Poblacion Shore/Causeway (Phase II),
Banton, Romblon
Physical Target - CW1 - Construction of Concrete Road :
0.346 Lane Km
Allocation - Php 98.750 Million |
August 15, 2022 |
FY 2022 |
WIN2G03095 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300215101653000
Project ID : P00639248LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Construction of Sugod - Cawayan Road leading to Blue Holes,
Sta. 11+450 - Sta. 11+510, San Agustin, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,776 square meters
Allocation - Php 36.00 Million
TO :
Construction of Sugod - Cawayan Road leading to Blue Holes,
Sta. 11+466 - Sta. 11+510, San Agustin, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,584.76 square meters
Allocation - Php 36.00 Million
|
August 15, 2022 |
FY 2022 |
WIN2G03154 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300215101656000
Project ID : P00639249LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road, Panique to Bolinganay - Palate (Phase 2)
Sta. 1+460.00 - Sta. 2+847.58,
Romblon
Physical Target - CW1 - Rehabilitation of Concrete Road :
4.486 Lane Km
Allocation - Php 50.00 Million
TO :
Rehabilitation of Road, Panique to Bolinganay - Palate (Phase 2)
Sta. 1+460.00 - Sta. 2+240.00,
Romblon
Physical Target - CW1 - Rehabilitation of Paved Road :
0.640 Lane Km
- CW2 - Rehabilitation of gravel Road :
0.920 Lane Km
Allocation - Php 50.00 Million
|
August 11, 2022 |
2022 |
WIN2F06289 |
FY 2022 GAA |
December 30, 2021 |
Region III |
Zambales 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Olongapo-Bugallon Rd - K0219 + 230 - K0219 + 740
|
August 11, 2022 |
2022 |
WIN2F06124 |
FY 2022 GAA |
November 30, 2021 |
Region III |
Zambales 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads
Amungan - Palauig - Banlog Rd - K0215 + 551 - K0216 + 530 |
August 11, 2022 |
2022 |
WIN2XY00026 |
FY 2022 GAA RA 11639 |
January 20, 2022 |
Region XIII |
Surigao del Norte 1st District Engineering Office |
UACS No. : 300225100061000
Project ID: P00634126MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
FROM:
Construction of Slope Protection Works, Union-Butong-Consuelo Road, Surigao del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 4.300 Lane Km
Allocation:
TOTAL: P 90,000,000
CW1: P 89,100,000
EAO: P 900,000
Unit Cost:
CW1: P 20,720,930.23/Lane Km
TO:
Construction of Slope Protection Works, Union-Butong-Consuelo Road, Surigao del Norte
Type of Work:
CW1- Construction of Slope Protection Structure
Physical Target:
CW1- 5,033.000 Square meters
Allocation:
TOTAL: P 90,000,000
CW1: P 89,100,000
EAO: P 900,000
Unit Cost:
CW1: P 17,703.16/Square meters
|
August 10, 2022 |
FY 2022 |
WIn2G03190 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300215100215000
Project ID : P00638881LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Corcuera Circumferential Road,
Poblacion-Mabini-Mangansag-Alegria Road,
Corcuera, Romblon
Physical Target - CW1 - Rehabilitation of Concrete Road :
8.881 Lane Km
Allocation - Php 99.00 Million
TO :
Rehabilitation of Corcuera Circumferential Road,
Poblacion-Mabini-Mangansag-Alegria Road,
Corcuera, Romblon
Physical Target - CW1 - Rehabilitation of Concrete Road :
1.60 Lane Km
- CW2 - Construction of Gravel Road :
3.20 Lane Km
Allocation - Php 99.00 Million |
August 10, 2022 |
FY 2022 |
WIN2G03109 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300215100216000
Project ID : P00638882LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from Nhe national Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Labnig - Alegria leading to Colong-Colong Road,
Corcuera, Romblon
Physical Target - CW1 - Rehabilitation of Concrete Road :
8.881 Lane Km
Allocation - Php 99.00 Million
TO :
Rehabilitation of Labnig - Alegria leading to Colong-Colong Road,
Corcuera, Romblon
Physical Target - CW1 - Rehabilitation of Concrete Road :
1.60 Lane Km
- CW2 - Construction of Gravel Road :
3.20 Lane Km
Allocation - Php 99.00 Million |
August 10, 2022 |
FY 2022 |
WIN2G03191 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300215100226000
Project ID : P00638892LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Building/Facilities
FROM :
Rehabilitation of Road, Brgy. Masadya - Brgy. Masudsud
leading to Brgy. Bachawan Road, Concepcion, Romblon
Physical Target - CW1 - Rehabilitation of Concrete Road :
8.888 Lane Km
Allocation - Php 99.075 Million
TO :
Rehabilitation of Road, Brgy. Masadya - Brgy. Masudsud leading
to Brgy. Bachawan Road, Concepcion, Romblon
Physical Target - CW1 - Rehabilitation of Paved Road :
1.00 Lane Km
- CW2 - Construction of Gravel Road :
2.28 Lane Km
Allocation - Php 99.075 Million
|
August 10, 2022 |
FY 2022 |
WIN2G03099 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300215100260000
Project ID : P00638899LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Structures
FROM :
Improvement of Road,
Jct. Alcantara - Comid-om - Guinbirayan Road,
Alcantara, Romblon
Physical Target - CW1 - Rehabilitation of Concrete Road :
2.240 Lane Km
Allocation - Php 80.00 Million
TO :
Improvement of Road,
Jct. Alcantara - Comod-om - Guinbirayan Road,
Alcantara, Romblon
Physical Target - CW1 - Rehabilitation of Concrete Road ;
4.072 Lane Km
Allocation - Php 80.00 Million |
August 10, 2022 |
FY 2022 |
WIN2G03058 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300215100404000
Project ID : P00638960LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide -
along Access Road
Malbog Jct. - Sta. Fe Guimbirayan Provincial Road leading to
San Jose Beaches, Sta. 7+280 - Sta. 7+400
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,344.55 square meters
Allocation - Php 60.00 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Access Road
Malbog Jct. - Sta Fe Guinbirayan Provincial Road leading to
San Jose Beaches, Sta. 7+334.80 - Sta. 7+486.20
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,639.48 square meters
Allocation - Php 60.00 Million
|
August 10, 2022 |
FY 2022 |
WIN2G03097 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300215100405000
Project ID : P00638961LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of road with slips, Slope Collapse, and Landslide
along Access Road
Malbog Jct. - Sta. Fe Guimbirayan Provincial Road leading to
San Jose Beaches, Sta. 7+560 - Sta. 7+740
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,016.824 square maters
Allocation - Php 90.00 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Access Road
Malbog Jct. - Sta. Fe Guinbirayan Provincial Road leading to
San Jose Beaches, Sta. 7+486.20 - Sta. 7+634.80
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 4,064.21 square meters
Allocation - Php 90.00 Million |
August 10, 2022 |
FY 2022 |
WIN2G03098 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300215101652000
Project ID : P00639247LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Construction of Sugod - Cawayan Road leading to Blue Holes,
Sta. 10+940 - Sta. 11+040,
San Agustin, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,505 square meters
Allocation - Php 50.00 Million
TO :
Construction of Sugod - Cawayan Road leading to Blue Holes,
Sta. 10+920 - Sta. 11+031.60,
San Agustin, Romblon
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,223.67 square meters
Allocation - Php 50.00 Million
|
August 9, 2022 |
FY 2022 |
WIN2G03188 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300215101591000
Project ID : P00639213LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the national Road/s leading
to major/Strategic public Buildings/Facilities
FROM :
Concreting of Road,
Brgy Burbuli-Water, Baco, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
1.600 Lane Km
Allocation - Php 10.00 Million
TO :
Concreting of Road,
Brgy Burbuli-Water, Baco, Oriental Mindoro
Physical Target - CW1 - Concreting of Road :
0.658 Lane Km
Allocation - Php 10.00 Million |
August 9, 2022 |
FY 2022 |
WIN2G03102 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Palawan 3rd District Engineering Office |
UACS No. : 310108101142000
Project ID : P00609311LZ
OO1 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and Landslide -
Secondary Roads
FROM :
Puerto Princesa North Road
K0016+485 - K0016+520
Physical Target - CW1 - Construction Of Road Slope Protection
Structure : 431 square meters
Allocation - Php 12.542 Million
TO :
Puerto Princesa North Road
K0027+430 - K0027+474
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 636 square meters
Allocation - Php 12.342 Million
|
August 9, 2022 |
FY 2022 |
WIN2G03127 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Palawan 3rd District Engineering Office |
UACS No. : 310108101143000
Project ID : P00609313LZ
OO1 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and Landslide -
Secondary Roads
FROM:
Puerto Princesa North Road
K0018+615 - K0018+675
Physical Target - CW1 - Construction of Road Slope Protection
Structures : 858 square meters
Allocation - Php 18.879 Million
TO :
Puerto Princesa North Rd (S00025PW)
K0017+240 - K0017+360,
K0019+280 - K0019+320,
K0019+360 - K0019+400
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,875 square meter
Allocation - Php 18.879 Million
|
August 9, 2022 |
FY 2022 |
WIN2G03128 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 320102105009000
Project ID : P00621120LZ
OO2 : Protect Lives and Properties Against Major Floods
Construction/Rehabilitation of Flood Mitigation Facilities within
Major River Basins and Principal Rivers
FROM :
Construction of Baroc River Control,
Villa Celestial Section,
Sta. 0+000 - Sta. 0+680,
Mansalay, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
415.984 Lineal Meter
Allocation - Php 50.00 Million
TO :
Construction of Baroc River Control,
Villa Celestial Section,
Sta. 0+000 - Sta. 0+680,
Mansalay, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
725.00 Lineal Meter
Allocation - Php 50.00 Million |
August 9, 2022 |
FY 2022 |
WIN2G03081 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Southern Mindoro Engineering District Office |
UACS No. : 300225100439000
Project ID : P00640567LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Basic Infrastructure Program (BIP) -
Flood Mitigation Structures protecting Public Infrastructures/Facilities
FROM :
Construction of Flood Mitigation Structure
Cagancan River, Brgy. Don Pedro, Mansalay, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
398.00 lineal meter
Allocation - Php 25.00 Million
TO :
Construction of Flood Mitigation Structure
Cagancan River, Brgy. Don Pedro, Mansalay, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
385.00 Lineal Meter
Allocation - Php 25.00 Million |
August 9, 2022 |
FY 2022 |
WIN2G03149 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 310204101535000
Project ID : P00611474LZ
OO1 : Ensure Safe and Reliable National Road System
Network Development - Construction of Bypass and
Diversion Roads
FROM :
Construction of Ferrol By-Pass Road
Physical Target - CW1 - Construction of Concrete Road :
5.0 Lane Km
Allocation - Php 100.00 Million
TO :
Construction of Ferrol By-Pass Road
Physical Target - CW1 - Construction of Concrete Road :
0.360 Lane Km
Allocation - Php 100.00 Million
|
August 9, 2022 |
FY 2022 |
WIN2G03195 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300215101657000
Project ID : P00630737LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Concepcion Circumferential Road,
Poblacion - San Pedro - Sampong -Bachawan Road,
Concepcion, Romblon
Physical Target - CW1 - Rehabilitation of Concrete Road :
4.942 Lane Km
Allocation - Php 45.00 Million
TO :
Rehabilitation of Concepcion Circumferential Road,
Poblacion - San Pedro - Sampong - Bachawan Road,
Concepcion, Romblon
Physical Target - CW1 - Rehabilitation of Paved Road :
0.680 Lane Km
CW2 - Construction of Gravel Road :
0.760 lane Km
Allocation - Php 45.00 Million
|
August 9, 2022 |
FY 2022 |
WIN2G03155 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS No. : 300215100213000
Project ID : P00638879LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Brgy. Jun Carlo to Marigondon Norte Road
leading to Little Baguio, San Andres, Romblon
Physical Target - CW1 - Rehabilitation of Concrete Road :
8.971 Lane Km
Allocation - Php 100.00 Million
TO :
Rehabilitation of Brgy. Jun Carlo to Marigondon Norte Road,
leading to Little Baguio, San Andres, Romblon
Physical Target - CW1 - Rehabilitation of Concrete Road :
1.60 Lane Km
- CW2 - Construction of Gravel Road :
3.64 Lane Km
Allocation - Php 100.00 Million |
August 9, 2022 |
FY 2022 |
WIN2G03156 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Romblon District Engineering Office |
UACS NO. : 300215100214000
Project ID : P00638880LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Brgy. Jun Carlo to Marigondon Norte Road
leading to Little Baguio, San Andres, Romblon (Phase 2)
Physical Target - CW1- Rehabilitation of Concrete Road :
8.971 Lane Km
Allocation - Php 100.00 Million
TO :
Rehabilitation of Brgy. Jun Carlo to Marigondon Norte Road
leading to Little Baguio, San Andres, Romblon (Phase 2)
Physical Target - CW1 - Rehabilitation of Paved Road :
1.600 Lane Km
- CW2 - Construction of Gravel Road :
2.520 lane Km
Allocation - Php 100.00 Million
|
August 8, 2022 |
FY 2022 |
WIN2G03193 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300215101595000
Project ID : P00639217LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges From the National Roads leading
to Major/Strategic Public Buildings/Facilities
FROM :
Construction of Road at Balatero Municipal Ground,
Brgy. Balatero, Puerto Galera, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
1.600Lane Km
Allocation - Php 10.000 Million
TO :
Construction of Road at Balatero Municipal Ground,
Brgy. Balatero, Puerto Galera, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.257 Lane Km
Allocation - Php 10.00 Million
|
August 8, 2022 |
FY 2022 |
WIN2G03077 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300215101602000
Project ID : P00639224LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major Strategic Public Buildings/Facilities
FROM :
Concreting of Roads,
Victoria, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
1.820 Lane Km
Allocation - Php 13.00 Million
TO :
Concreting of Roads,
Victoria, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.359 Lane Km
Allocation - Php 13.00 Million |
August 8, 2022 |
FY 2022 |
WIN2G03072 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300215101603000
Project ID : P00639225LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Concreting of Roads,
Baco, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
1.680 Lane Km
Allocation - Php 12.00 Million
TO :
Concreting of Roads,
Baco, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.917 Lane Km
Allocation - Php 12.00 Million |
August 8, 2022 |
FY 2022 |
WIN2G03196 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300219100867000
Project ID : P00639520LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating gaps (SIPAG) -
Flood Mitigation Structures protecting Public Infrastructures/Facilities
FROM :
Construction of Calapan City River Control,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure:
1000 Lineal Meters
Allocation - Php 100.00 Million
TO :
Construction of Calapan City River Control,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure:
270.60 Lineal Meters
Allocation - Php 100.00 Million
|
August 8, 2022 |
FY 2022 |
WIN2G03118 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300215101601000
Project ID : P00639223LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Concreting of Roads,
Calapan City, Palawan
Physical Target - CW1 - Construction of Concrete Road :
10.360 Lane Km
Allocation - Php 74.00 Million
TO :
Concreting of Roads,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
10.944 Lane km
Allocation - Php 74.00 Million
|
August 8, 2022 |
FY 2022 |
WIN2G03120 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300219100872000
Project ID : P00639525LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Flood Mitigation Structures protecting Public Infrastructures/Facilities
FROM :
Construction of Casiligan River Control,
Brgy. Zone 2, Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure:
32.800 Lineal meters
Allocation - Php 8.00 Million
TO :
Construction of Casiligan River Control,
Brgy. Zone 2, Pola, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure:
134.40 Lineal Meters
Allocation - Php 8.00 Million |
August 8, 2022 |
FY 2022 |
WIN2G03078 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300219100873000
Project ID : P00639526LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Flood Mitigation Structures protecting Public Infrastructures/Facilities
FROM :
Construction of Various Drainage,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Drainage Structure :
4,400.00 Lineal Meters
Allocation - Php 44.00 Million
TO :
Construction of Various Drainage,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Drainage Structure :
4,703.50 Lineal Meters
Allocation - Php 44.00 Million
|
August 8, 2022 |
FY 2022 |
WIN2G03129 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300215101605000
Project ID : P00639227LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Concreting of Roads,
Socorro, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
4.092 Lane Km
Allocation - Php 29.223 Million
TO :
Concreting of Roads,
Socorro, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
5.203 lane Km
Allocation - Php 29.223 Million |
August 8, 2022 |
FY 2022 |
WIN2G03129 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300221101194000
Project ID : P00640357LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Basic Infrastructure Program (BIP) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Construction of Road with drainage,
Sitio Interior-Kalayaan, Barangay Balatero,
Puerto Galera, Oriental, Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.400 Lane Km
Allocation - Php 15.00 Million
TO :
Construction of Road with Drainage,
Sitio Interior-Kalayaan, Barangay Balatero,
Puerto Galera, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.258 Lane Km
Allocation - Php 15.00 Million
|
August 8, 2022 |
FY 2022 |
WIN2G03071 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Palawan 2nd District Engineering Office |
UACS No. : 310108eliabl101137000
Project ID : P00604397LZ
OO1 : Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and Landslide -
Secondary Roads
FROM :
Quezon - Punta Baja Road
K0149+315 - K0149+490
Physical Target - CW1 - Asset Preservation - Rehabilitation/Reconstruction of national Roads with Slips, Slope Collapse, and Landslide - Secondary Roads : 946 square meters
Allocation - Php 5.00 Million
TO :
Quezon - Punta Baja Road
K0148+874 - K0148+994
Physical Target - CW1 - Asset Preservation -
Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads : 296.80 square meters
Allocation - Php 5.00 Million
|
August 6, 2022 |
FY 2022 |
WIN2G03073 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 320102104995000
Project ID : P00621113LZ
OO2 : Protect Lives and Properties
Flood Management - Construction/Rehabilitation of Flood Mitigation
Facilities along Major River basins and Principal Rivers
FROM :
Construction of Mag-Asawang Tubig River Control along
Brgy. San Carlos, Sta. 0+000 - Sta. 0+360,
Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation
Structures: 360.00 Lineal Meters
Allocation - Php 50.00 Million
TO :
Construction of Mag-Asawang Tubig River Control along
Brgy. San Carlos, Sta. 0+000 - Sta. 0+248.00,
Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure:
248.00 Lineal Meter
Allocation - Php 50.00 Million |
August 6, 2022 |
FY 2022 |
WIN2G03186 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300215101589000
Project ID : P00639211LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Concreting of Suqui - Parang Road,
Calapan City, oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
2.40 Lane Km
Allocation - Php 15.00 Million
TO :
Concreting Of Suqui - Parang road,
Calapan City, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
0.978 Lane Km
Allocation - Php 15.00 Million
|
August 6, 2022 |
FY 2022 |
WIn2G03125 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Mindoro Oriental District Engineering Office |
UACS No. : 300215101590000
Project ID : P00639212LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Concreting of Inarawan - San Andres Putik Road,
Naujan, Oriental Mindoro
Physical Target - CW1 - Construction of Concrete Road :
9.700 Lane Km
Allocation - Php 50.00 Million
TO :
Concreting of Inarawan - San Andres Putik Road,
Naujan, Oriental Mindoro
Physical Target - CW1 - Concreting of Concrete Road :
6.883 Lane Km
Allocation - Php 50.00 Million
|
August 5, 2022 |
FY 2022 |
WIn2G03179 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300219100887000
P00639530LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Flood Mitigation Structures protecting Public Infrastructures/Facilities
FROM :
Construction of Cawacat River Control, Tabuk Section,
Bulalacao, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
660.00 Lineal Meters
Allocation - Php 50.00 Million
TO :
Construction of Cawacat River Control, Tabuk Section
Bulalacao, Oriental Mindoro
Sta. 0+000 - Sta. 0+324.30
Physical Target - CW1 - Construction of Flood Mitigation
Structures : 324.30 Lineal meters
Allocation - Php 50.00 Million
|
August 5, 2022 |
FY 2022 |
WIN2G03204 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300219100891000
Project ID : P00639534LZ
CONVERGENCE AND SPECIAL SUPPORT
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Flood Mitigation Structures protecting Public Infrastructures/Facilities
FROM :
Construction of Sumagui River Control Structure,
Brgy. Villa pag-asa, Sitio Catmon Section,
Bansud, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
Allocation - Php 818.00 Million
TO :
Construction of Sumagui River Control Structure,
Brgy. Villa Pag-asa, Sitio Catmon Section,
Bansud, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
325.20 Lineal meter
Allocation - Php 50.00 Miilion |
August 5, 2022 |
FY 2022 |
WIN2G03205 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300221101197000
Project ID : P00640359LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Basic Infrastructure Program (BIP) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Improvement of Road, Barangay Guadalupe Road,
Coron, Palawan
Physical Target - CW1 - Rehabilitation of Concrete Road :
4.486 Lane Km
Allocation - Php 50.00 Million
TO :
Improvement of Road, Barangay Guadalupe Road
Coron, Palawan
Physical Target - CW1 - Rehabilitation of Concrete Road :
2.364 Lane Km
Allocation - Php 50.00 Million |
August 5, 2022 |
FY 2022 |
WIN2F06584 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215100184000
Project ID : P00638850LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the national Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Construction of Road from Kabaliwan - Victoria Road,
San Agustin and San Andres, Romblon
Physical Target - CW1 - Construction of Concrete Road :
11.60 Lane Km
Allocation - Php 140.00 Million
TO :
Construction of Road from Kabaliwan - Victoria Road,
San Agustin and San Andres, Romblon
Physical Target - CW1 - Construction of Concrete Road :
1.99 Lane Km
Allocation - Php 140.00 Million |
August 4, 2022 |
FY 2022 |
WIN2G03113 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215100224000
Project ID : P00638890LZ
CONVERGENCE AND SPECIAL SUPPORT SYSTEM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road,
Sta. 170+851.00 - Sta. 170+982.00
San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,210.34 square meter
Allocation - Php 54.011 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road,
Sta. 170+851.00 - Sta. 170+982.00
San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 2,193.76 square meter
Allocation - Php 54.011 Million |
August 4, 2022 |
FY 2022 |
WIN2G03175 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215101614000
Project ID : P00639233LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope, and Landslide along
Itabiak - San Vicente Road,
Sta. 1+454.00 - Sta. 166 +183.00,
Sta. 165+428.00 - Sta. 165+466.00
San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 854.08 square meter
Allocation - Php 38.113 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road,
Sta. 165+428.00 - Sta. 165+486.00,
San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,629.20 square meter
Allocation - Php 38.113 Million
|
August 4, 2022 |
FY 2022 |
WIN2G03180 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215101615000
Project ID : P00636975LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road,
Sta. 170+642.00 - Sta. 170+689.00,
San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 914.204 square meter
Allocation - Php 40.796 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Itabiak - San Vicente Road
Sta. 170+642.00 - Sta. 170+701.00
San Vicente, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,749.730 square meter
Allocation - Php 40.796 Million |
August 4, 2022 |
FY 2022 |
WIN5G03148 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300215101617000
Project ID : P00639236LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Access Roads and/or Bridges from the National Road/s leading
to Major/Strategic Public Buildings/Facilities
FROM :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Taytay - Bantulan - Sta. Cruz Port Road
Sta. 1+026.00 - Sta. 1+149.00,
Taytay, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,046.709 square meter
Allocation - Php 46.709 Million
TO :
Rehabilitation of Road with Slips, Slope Collapse, and Landslide
along Taytay - Bantulan - Sta. Cruz Port Road
Sta. 1+026.00 - Sta. 1+161.00,
Taytay, Palawan
Physical Target - CW1 - Construction of Road Slope Protection
Structure : 1,902.530 square meter
Allocation - Php 46.709 Million
|
August 4, 2022 |
FY 2022 |
WIN2G03181 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 3002191005866000
Project ID : P00639234LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG ) -
Flood Mitigation Structures Protecting Public Infrastructure/Facilities
FROM :
Construction of Balite River Control Structure,
Brgy. Buong Lupa Section, Gloria, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure:
788.00 Lineal meters
Allocation - Php 50.00 Million
TO :
Construction of Balite River Control,
Brgy. Buong Lupa Section, Gloria, Oriental Mindoro
Sta. 0+000 - Sta. 0+323.55
Physical Target - CW1 - Construction of Flood Mitigation Structure :
326.55 Lineal meters
Allocation - Php 50.00 Million
|
August 4, 2022 |
FY 2022 |
WIn2G03178 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300219100869000
Project ID : P00639522LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Flood Mitigation Structures protecting Public Infrastructures/Facilities
FROM :
Construction of Balite River Control Structure,
Brgy. Malamig Section, Gloria, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
674.00 Lineal Meters
Allocation - Php 50.00 Million
TO :
Construction of Balite River Control Structure
Brgy. Malamig Section, Gloria, Oriental Mindoro
Sta. 0+000 - Sta. 0+308.60
Physical Target - CW1 - Construction of Flood Mitigation Structure :
308.60 Lineal meters
Allocation - Php 50.00 Million
|
August 4, 2022 |
FY 2022 |
WIN2G03172 |
DPWH Infra Projects FY 2022 |
December 30, 2021 |
Region IV-B |
Regional Office IV-B |
UACS No. : 300219100885000
Project ID : P00639528LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) -
Flood Mitigation Structures protecting Public Infrastructure/Facilities
FROM :
Construction of Flood Mitigation Structure -
Construction of Bansud River Control,
Brgy. Poblacion Section, Bansud, Oriental Mindoro
Physical Target - CW1 - Construction of Flood Mitigation Structure :
672.00 Lineal Meters
Allocation - Php 50.00 Million
TO :
Construction of Bansud River Control,
Brgy. Poblacion Section, Bansud, Oriental Mindoro
Sta. 0+000 - Sta. 0+330.70
Physical Target - CW1 - Construction of Flood Mitigation Structure :
330.70 Lineal Meters
Allocation - Php 50.00 Million |