Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
April 17, 2023 2023 WIN3E02712 SR2023-01-002060 January 30, 2023 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0429 + 071 - K0429 + 155;
Physical Target: 5555.56 Square Meters;
Allocation: Php 100,000,000.000

To: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0429 + 071 - K0429 + 130 ;
Physical Target: 4350.66 Square Meters;
Allocation: Php 100,000,000.000

April 17, 2023 2023 WIN3E02715 SR2023-01-002029 January 30, 2023 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: Kalinga-Abra Rd - K0512 + 200 - K0512 + 310;
Physical Target: 5555.56 Square Meters;
Allocation: Php 100,000,000.000

To: Kalinga-Abra Rd - K0511 + 1815 - K0511 + 1925;
Physical Target: 4365.05 Square Meters;
Allocation: Php 100,000,000.000

April 17, 2023 2023 WIN3E02710 SR2023-03-005759 March 2, 2023 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: Kalinga-Abra Rd - K0471 + 050 - K0471 + 100;
Physical Target: 5555.56 Square Meters;
Allocation: Php 100,000,000.000

To: Kalinga-Abra Rd - K0471 + 016 - K0471 + 100;
Physical Target: 4446.96 Square Meters;
Allocation: Php 100,000,000.000
April 17, 2023 2023 WIN3E02713 SR2023-03-005763 March 2, 2023 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: Kalinga-Abra Rd - K0480 + 179 - K0480 + 219;
Physical Target: 3888.89 Square Meters;
Allocation: Php 70,000,000.000

To: Kalinga-Abra Rd - K0467 + 720 - K0467 + 752, K0480 + 179 - K0480 + 220, K0480 + 360 - K0480 + 431;
Physical Target: 2723.3 Square Meters;
Allocation: Php 70,000,000.000

April 17, 2023 2023 GAA 2023 January 24, 2023 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: Construction of Flood Control along Chico River, Sta. 175 + 270 - Sta. 175 + 350 (R.S.), Barangay Mabongtot, Lubuagan, Kalinga;
Physical Target: 80 Lineal Meters;
Allocation: Php 5,000,000.000

To: Construction of Flood Control along Chico River, Sta. 174 + 270 - Sta. 174 + 350 (R.S.), Barangay Mabongtot, Lubuagan, Kalinga;
Physical Target: 80 Lineal Meters;
Allocation: Php 5,000,000.000

April 17, 2023 FY 2023 GAA WIN3E02760 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads
Tibanban-Lavigan Rd - K1786+143 - K1786+213
Physical Target:
CW1: 5,555.560 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads
Tibanban-Lavigan Rd - K1786+597 - K1786+886
Physical Target:
CW1: 4,541.120 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
April 17, 2023 FY 2023 GAA WIN3E02750 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads
Tibanban-Lavigan Rd - K1780+242 - K1780+381
Physical Target:
CW1: 5,555.560 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads
Tibanban-Lavigan Rd - K1785+816.5 - K1786+008.5
Physical Target:
CW1: 3,387.450 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
April 17, 2023 2023 WIN3F07173 SR2023-01-000824 January 30, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - (S00066LT) Chainage 1640 - Chainage 1723

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 154.400 M
Structure: 8,888.89 Square meters

EAO P 5.600 M

Total P 160.00 M

AS MODIFIED:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - (S00066LT) K0927+132 - K0927+168, K0927+414 - K0927+502, K0927+813 - K0927+830, K0927+889 - K0927+923, K0928+153-K0928+236

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 154.400 M
Structure: 6,259.37 Square meters

EAO P 5.600 M

Total P 160.00 M
April 17, 2023 2023 WIN3F06934 SR2023-01-000858 January 30, 2023 Region VIII Leyte 4th District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Secondary Roads

AS PER GAA/ORIGINAL:

Palompon-Isabel-Merida-Ormoc Rd – K1109 + 421 – K1111 + 000

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 53.075 M
Asphalt Overlay: 6.132 Lane Km

EAO P 1.925 M

Total P 55.00 M

AS MODIFIED:

Palompon-Isabel-Merida-Ormoc Road, K1109 + 421 – K1110 + 535

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 53.075 M
Asphalt Overlay: 4.292 Lane Km

EAO P 1.925 M

Total P 55.00 M
April 17, 2023 2023 WIN3Q49017 SR2023-01-001290 January 30, 2023 Cordillera Administrative Region Apayao 1st District Engineering Office
From: Apayao-Cagayan Road (Ili-Guinamgamman-Rizal Road) - (S00694LZ) Chainage 0 - Chainage 3027;
Physical Target: 6.054 Lane Km;
Allocation: Php 75,000,000.000

To: Cagayan-Apayao Road (Ili-Guinamgamman-Rizal Sect) - (S00694LZ) Chainage 4548- Chainage 6448;
Physical Target: 3.8 Lane Km;
Allocation: Php 75,000,000.000

April 17, 2023 2023 WIN3F07010 SR2023-01-001296 January 30, 2023 Cordillera Administrative Region Apayao 1st District Engineering Office
From: Apayao-Cagayan Road (Ili-Guinamgamman-Rizal Road) - (S00694LZ) Chainage 3027 - Chainage 6054;
Physical Target: 6.054 Lane Km;
Allocation: Php 75,000,000.000

To: Cagayan-Apayao Road (Ili-Guinamgamman-Rizal Sect) - (S00694LZ) Chainage 6448- Chainage 8048;
Physical Target: 3.2 Lane Km;
Allocation: Php 75,000,000.000

April 17, 2023 2023 WIN3E02621 GAA 2023 January 24, 2023 Cordillera Administrative Region Apayao 1st District Engineering Office
From: Construction of Revetment - Construction of Badduat River Flood Control along Apayao-Abulug River Basin (Upstream), Sta. 83 + 232 - Sta. 83 + 292, Kabugao, Apayao;
Physical Target: 410.428 Lineal meters;
Allocation: Php 50,000,000.000

To: Construction of Revetment - Construction of Badduat River Flood Control along Apayao-Abulug River Basin (Upstream), Sta. 82+980 - Sta.83+120 (L/S), Sta.82+934 - Sta.83+120 (R/S) , Kabugao, Apayao;
Physical Target: 326 Lineal meters;
Allocation: Php 50,000,000.000

April 17, 2023 FY 2023 GAA WIN3E02751 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Mitigation Structure along Bunawan River Sta. 3+150 - Sta. 3+750, West Side, Left Bank, Davao City
Physical Target:
CW1: 600.000 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 99,000,000.00 (Construction of Multi-Purpose Building)
EAO: P 1,000,000.00

TO: Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of Flood Mitigation Structure along Bunawan River Sta. 3+091 - Sta. 3+456, West Side, Left Bank, Davao City
Physical Target:
CW1: 365.000 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 99,000,000.00 (Construction of Multi-Purpose Building)
EAO: P 1,000,000.00
April 17, 2023 FY 2023 GAA WIN3E02703 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads
Tibanban-Lavigan Rd - K1786+213 - K1786+261
Physical Target:
CW1: 5,555.560 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads
Tibanban-Lavigan Rd - K1786+008.5 - K1786+308
Physical Target:
CW1: 3,510.490 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
April 15, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 310108101685000
Project ID: P00706553MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM:

NJR Bah-Bah-Talacogon Rd - K1303 + 244.20 - K1303 + 306.60

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 2666.67 Square meters

Allocation:
TOTAL: P 40,000,000
CW1: P 39,200,000
EAO: P 800,000

Unit Cost:
CW1: P 14,699.698/ Square meters

TO:

NJR Bah-Bah-Talacogon Rd - K1303 + 244.20 - K1303 + 370

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4025.600 Square meters

Allocation:
TOTAL: P 40,000,000
CW1: P 39,200,000
EAO: P 800,000

Unit Cost:
CW1: P 9,737.68/ Square meters
April 15, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 310108101685000
Project ID: P00706553MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM:

NJR Bah-Bah-Talacogon Rd - K1303 + 244.20 - K1303 + 306.60

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 2666.67 Square meters

Allocation:
TOTAL: P 40,000,000
CW1: P 39,200,000
EAO: P 800,000

Unit Cost:
CW1: P 14,699.698/ Square meters

TO:

NJR Bah-Bah-Talacogon Rd - K1303 + 244.20 - K1303 + 370

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4025.600 Square meters

Allocation:
TOTAL: P 40,000,000
CW1: P 39,200,000
EAO: P 800,000

Unit Cost:
CW1: P 9,737.68/ Square meters
April 15, 2023 2023 WIN3E02660 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Dinagat Islands District Engineering Office
UACS No. : 310202101335000
Project ID: P00705661MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads

FROM:

Dinagat-Loreto Rd - K0003 + 000 - K0004 + 769, K0004 + 795.74 - K0006 + 000

Type of Work:
CW1- Road Widening

Physical Target:
CW1- 6.005 Lane Km

Allocation:
TOTAL: P 90,870,000
CW1: P 87,689,550
EAO: P 3,180,450

Unit Cost:
CW1: P 14,602,756.04/ Lane Km

TO:

Dinagat-Loreto Rd – K0056 + 000 – K0058 + 240

Type of Work:
CW1- Road Widening

Physical Target:
CW1- 4.216 Lane Km

Allocation:
TOTAL: P 90,870,000
CW1: P 87,689,550
EAO: P 3,180,450

Unit Cost:
CW1: P 20,799,229.13/ Lane Km
April 15, 2023 2023 WIN3E02662 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Dinagat Islands District Engineering Office
UACS No. : 310202101336000
Project ID: P00705662MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads

FROM:

Dinagat-Loreto Rd - K0006 + 000 - K0007 + 142, K0007 + 158 - K0008 + 000

Type of Work:
CW1- Road Widening

Physical Target:
CW1- 3.606 Lane Km

Allocation:
TOTAL: P 63,700,000
CW1: P 61,470,500
EAO: P 2,229,500

Unit Cost:
CW1: P 17,046,727.68/ Lane Km

TO:

Dinagat-Loreto Rd – K0032 + 480 – K0033 + 533.54

Type of Work:
CW1- Road Widening
CW2- Construction of Road Slope Protection Structure

Physical Target:
CW1- 1.930 Lane Km
CW2- 1863.700 Square meters

Allocation:
TOTAL: P 63,700,000
CW1: P 44,522,142.50
CW2: P 16,948,357.50
EAO: P 2,229,500

Unit Cost:
CW1: P 23,068,467.61/ Lane Km
CW2: P 9,093.93/ Square meters
April 15, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Butuan City District Engineering Office
UACS No. : 300215103495000
Project ID: P00733924MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of Road from Highway to Maningalao, Barangay Maningalao, Butuan City

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 0.543 Lane Km

Allocation:
TOTAL: P 5,000,000
CW1: P 4,900,000
EAO: P 100,000

Unit Cost:
CW1: P 9,023,941.07/ Lane Km

TO:

Construction of Road from Highway to Maningalao, Barangay Maningalao, Las Nieves, Agusan del Norte

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 0.543 Lane Km

Allocation:
TOTAL: P 5,000,000
CW1: P 4,900,000
EAO: P 100,000

Unit Cost:
CW1: P 9,023,941.07/ Lane Km
April 15, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Sur 2nd District Engineering Office
UACS No. : 310104100620000
Project ID: P00706338MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

FROM:

Daang Maharlika (Agusan-Davao Sect) - K1358 + 000 - K1359 + 000

Type of Work:
CW1- Rehabilitation of Paved Road

Physical Target:
CW1- 2.000 Lane Km

Allocation:
TOTAL: P 24,288,000
CW1: P 23,802,240
EAO: P 485,760

Unit Cost:
CW1: P 11,901,120/ Lane Km

TO:

Daang Maharlika (Agusan-Davao Sect) - K1358 + 000 - K1358 + 900

Type of Work:
CW1- Rehabilitation of Paved Road

Physical Target:
CW1- 1.800 Lane Km

Allocation:
TOTAL: P 24,288,000
CW1: P 23,802,240
EAO: P 485,760

Unit Cost:
CW1: P 13,223,466.67/ Lane Km
April 15, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Sur 2nd District Engineering Office
UACS No. : 310104100620000
Project ID: P00706338MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

FROM:

Daang Maharlika (Agusan-Davao Sect) - K1358 + 000 - K1359 + 000

Type of Work:
CW1- Rehabilitation of Paved Road

Physical Target:
CW1- 2.000 Lane Km

Allocation:
TOTAL: P 24,288,000
CW1: P 23,802,240
EAO: P 485,760

Unit Cost:
CW1: P 11,901,120/ Lane Km

TO:

Daang Maharlika (Agusan-Davao Sect) - K1358 + 000 - K1358 + 900

Type of Work:
CW1- Rehabilitation of Paved Road

Physical Target:
CW1- 1.800 Lane Km

Allocation:
TOTAL: P 24,288,000
CW1: P 23,802,240
EAO: P 485,760

Unit Cost:
CW1: P 13,223,466.67/ Lane Km
April 15, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Sur 2nd District Engineering Office
UACS No. : 310211100099000
Project ID: P00705654MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Paving of Unpaved Roads - Secondary Roads

FROM:

Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1355 + 921 - K1356 + 427, K1356 + 493 - K1357 + 000, K1358 + 229 - K1358 + 759

Type of Work:
CW1- Paving of Unpaved Roads

Physical Target:
CW1- 3.152 Lane Km

Allocation:
TOTAL: P 63,040,000
CW1: P 60,833,600
EAO: P 2,206,400

Unit Cost:
CW1: P 19,300,000/ Lane Km

TO:

Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1355 + 921 - K1356 + 427, K1356 + 493 - K1357 + 000, K1358 + 229 - K1358 + 708

Type of Work:
CW1- Paving of Unpaved RoadsRehabilitation of Paved Road

Physical Target:
CW1- 3.050 Lane Km

Allocation:
TOTAL: P 63,040,000
CW1: P 60,833,600
EAO: P 2,206,400

Unit Cost:
CW1: P 19,945,442.62/ Lane Km
April 14, 2023 2023 WIN3F07164 FY 2023 GAA February 17, 2023 Region III Pampanga 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Angeles-Porac-Floridablanca-Dinalupihan Rd - K0110+000 - K0110+856.80
April 14, 2023 2023 WIN3F07092 SR2023-01-002960 January 31, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Palompon-Isabel-Merida-Ormoc Rd - K1069 + 760 - K1069 + 820

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 98.430 M
Structure: 5,666.67 Square meters

EAO P 3.570 M

Total P 102.00 M

AS MODIFIED:

Palompon-Isabel-Merida-Ormoc Rd - K1111 + 880 - K1112 + 000, K1069 + 760 - K1069 + 820

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 98.430 M
Structure: 4,141.43 Square meters

EAO P 3.570 M

Total P 102.00 M
April 14, 2023 2023 WIN3F07167 FY 2023 GAA February 17, 2023 Region III Pampanga 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Angeles-Porac-Floridablanca-Dinalupihan Rd - K0108+000 - K0108+248.75
April 14, 2023 2023 FY 2023 GAA February 17, 2023 Region III Pampanga 2nd District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road /s leading to Major/Strategic Public Buildings / Facilities

Construction of Road Sitio Zaputi, Barangay San Pablo 2nd, Lubao, Pampanga
April 14, 2023 2023 WIN3F07093 SR2023-01-002962 January 31, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Palompon-Isabel-Merida-Ormoc Rd - K1069 + 820 - K1069 + 880

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 101.325 M
Structure: 5,833.33 Square meters

EAO P 3.675 M

Total P 105.00 M

AS MODIFIED:

Palompon-Isabel-Merida-Ormoc Rd - K1112 + 000 - K1112 + 090, K1069 + 820 - K1069 + 880

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 101.325 M
Structure: 4,268.34 Square meters

EAO P 3.675 M

Total P 105.00 M
April 14, 2023 2023 WIN3F07090 SR2023-01-000756 January 31, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - (S00066LT) Chainage 1478 - Chainage 1876

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 96.500 M
Structure: 5,555.56 Square meters

EAO P 3.500 M

Total P 100.00 M

AS MODIFIED:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - (S00066LT) K0927+(-310) - K0927+(-252)

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 96.500 M
Structure: 3.791.83 Square meters

EAO P 3.500 M

Total P 100.00 M
April 14, 2023 2023 SR2023-01-002917 January 30, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K1008 + 215 - K1008 + 290

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 3.377500 M
Structure: 299.910 Square meters

EAO P 0.122500 M

Total P 3.500 M

AS MODIFIED:

Daang Maharlika (LT) - K1008 + 195 - K1008 + 290

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 3.377500 M
Structure: 2,128 Square meters

EAO P 0.122500 M

Total P 3.500 M
April 14, 2023 CY 2023 WIN3F07163 UACS No. 310106100863000 March 16, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 310106100863000
Project ID.: P00712831LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Tertiary Roads
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Tertiary Roads, A Mabini St., K0008+200 – K0008+602, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 1.608 Lane Km
Unit Cost (P’000) = P 17,800.90 Lane/Km
Allocation (P’000) = P 28,623.84
EAO (P’000) = P 584.16
Total (P’000) = P 29,208

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Tertiary Roads
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads – Tertiary Roads, A Mabini St., K0009+765 – K0010+158, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 1.200 Lane Km
Unit Cost (P’000) = P 23,853.20 Lane/Km
Allocation (P’000) = P 28,623.84
EAO (P’000) = P 584.16
Total (P’000) = P 29,208
WIN3F07163
April 14, 2023 2023 WIN3F06864 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads

Romulo H-way - K0126+500 - K0127+050
April 14, 2023 2023 WIN3F07124 SR2023-01-00765 January 31, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - (S00066LT) Chainage 1560 - Chainage 1640, Chainage 1940 - Chainage 1989, Chainage 2080 Chainage 2116

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 149.575 M
Structure: 11,492.81 Square meters

EAO P 5.425 M

Total P 155.00 M

AS MODIFIED:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - (S00066LT) K0927+923 - K0928+023, K0928+073 - K0928+153

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 149.575 M
Structure: 6,323.68 Square meters

EAO P 5.425 M

Total P 155.00 M
April 14, 2023 2023 WIN3F07130 SR2023-01-000830 January 31, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - (S00066LT) Chainage 1723 - Chainage 1800

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 154.400 M
Structure: 8,888.89 Square meters

EAO P 5.600 M

Total P 160.00 M

AS MODIFIED:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - (S00066LT) K0927+173 - K0927+193, K0927+228 - K0927+283, K0928+236 - K0928+314

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 154.400 M
Structure: 6,508.24 Square meters

EAO P 5.600 M

Total P 160.00 M
April 14, 2023 2023 WIN3F07080 SR2023-01-000838 January 30, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0924 + 060 - K0924 + 243

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 144.750 M
Structure: 8,333.33 Square meters

EAO P 5.250 M

Total P 150.00 M

AS MODIFIED:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0924 + 060 - K0924 + 190

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 144.750 M
Structure: 6,194.45 Square meters

EAO P 5.250 M

Total P 150.00 M
April 14, 2023 2023 WIN3F07084 SR2023-01-000847 January 30, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0924 + 243 - K0924 + 423

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 144.750 M
Structure: 8,333.33 Square meters

EAO P 5.250 M

Total P 150.00 M

AS MODIFIED:

Bagahupi-Babatngon-Sta Cruz-Barugo-Carigara Rd - K0924 + 190 - K0924 + 274

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 144.750 M
Structure: 6,211.73 Square meters

EAO P 5.250 M

Total P 150.00 M
April 14, 2023 2023 23MB0002 FY 2023 GAA February 20, 2023 Region XII South Cotabato 1st District Engineering Office
Preventive Maintenance - Primary Roads -Marbel-Makar Rd - K1668 + 563 - K1668 + 694
April 14, 2023 2023 23MB0003 FY 2023 GAA March 3, 2023 Region XII South Cotabato 1st District Engineering Office
Preventive Maintenance - Primary Roads - Marbel-Makar Rd - K1669 + 812 - K1674 + 000
April 14, 2023 2023 23MB0004 FY 2023 GAA March 20, 2023 Region XII South Cotabato 1st District Engineering Office
Preventive Maintenance - Primary Roads - Marbel-Makar Rd - K1674 + 000 - K1676 + 247
April 14, 2023 2023 23MB0045 FY 2023 GAA February 20, 2023 Region XII South Cotabato 1st District Engineering Office
Preventive Maintenance - Secondary Roads - Digos-Makar Rd - K1650 + 445 - K1650 + 593, K1650 + 745 - K1651 + 135, K1651 + 221 - K1651 + 293, K1651 + 293 - K1651 + 432
April 14, 2023 2023 23MB0053 FY 2023 GAA March 20, 2023 Region XII South Cotabato 1st District Engineering Office
Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads-Digos-Makar Rd - K1635 + 290 - K1635 + 377
April 14, 2023 2023 23MB0054 FY 2023 GAA January 20, 2023 Region XII South Cotabato 1st District Engineering Office
Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads-Digos-Makar Rd - K1647 + 010 - K1648 + 360
April 14, 2023 23MB0056 23MB0056 FY 2023 GAA March 20, 2023 Region XII South Cotabato 1st District Engineering Office
Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads-Makar-Marbel Rd - K1655 + 205 - K1656 + 625
April 14, 2023 2023 23MB0057 FY 2023 GAA February 20, 2023 Region XII South Cotabato 1st District Engineering Office
Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads-Makar-Marbel Rd - K1656 + 625 - K1658 + 045
April 14, 2023 2023 23MB0062 FY 2023 GAA March 20, 2023 Region XII South Cotabato 1st District Engineering Office
Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads-Makar-Marbel Rd - K1656 + (-190) - K1656 + 769
April 14, 2023 2023 23MB0059 FY 2023 GAA January 30, 2023 Region XII South Cotabato 1st District Engineering Office
Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads-Jct Digos-Buayan Airport Rd - K1652 + 220 - K1653 + 229
April 13, 2023 2023 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Network Development Program - Road Widening - Tertiary Roads

Sta. Ignacia-Gerona-Pura-Guimba Rd (S05056LZ) - Chainage 19255 - Chainage 21115, Chainage 21795 - Chainage 22211
April 13, 2023 2023 SR2023-01-001056 January 30, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (LT) - K1014 + 727 - K1015 + 687, K1015 + 788 - K1016 + 385

Physical Target: Allocation:

CW1-Road Widening: 3.126 Lane Km P 48.250 M

EAO P 1.750 M

Total P 50.00 M

AS MODIFIED:

Daang Maharlika (LT) - K1015 + 320 - K1015 + 687, K1015 + 788 - K1016 + 865

Physical Target: Allocation:

CW1-Road Widening: 2.884 Lane Km P 48.250 M

EAO P 1.750 M

Total P 50.00 M
April 13, 2023 2023 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Network Development Program - Road Widening - Secondary Roads

Paniqui-Camiling-Wawa Rd - K0155+000 - K0156+172
April 13, 2023 2023 WIN3F06828 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads

Tarlac - Sn Miguel via Macabulos Rd - K0119+(-530) - K0119+(-340)
April 13, 2023 2023 WIN3F06835 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads

Romulo H-way - K0148+395 - K0148+968
April 13, 2023 2023 WIN3F06811 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Paniqui-Camiling-Wawa Rd - K0158+000 - K0159+916
April 13, 2023 2023 WIN3F06822 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Rd - K0129+910 - K0130+500
April 13, 2023 2023 WIN3F06833 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Rd - K0161+609 - K0161+963
April 13, 2023 2023 WIN3F06810 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Rd - K0147+822 - K0148+077
April 13, 2023 2023 WIN3F06827 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Rd - K0132+073 -K0132+933
April 13, 2023 2023 WIN3F06838 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Rd - K0154+790 - K0155+876
April 13, 2023 2023 WIN3F06823 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office

Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Rd - K0150+522 - K0151+355
April 13, 2023 2023 WIN3F06821 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Romulo H-way - K0151+068 - K0152+112
April 13, 2023 2023 WIN3F07091 SR2023-01-002782 January 31, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Preventive Maintenance - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0684 + 000 - K0685 + 000, K0686 + 000 -K0687 + 000, K0691 + 000 - K0691 + 286, K0694 + 470 - K0696 + 321

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 101.325 M
Asphalt Overlay: 15.122 Lane Km

EAO P 3.675 M

Total P 105.00 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0684 + 000 - K0685 + 000, K0686 + 000 -K0687 + 000, K0694 + 470 - K0694 + 726

Physical Target: Allocation:

CW1-Preventive Maintenance of Road: P 101.325 M
Asphalt Overlay: 4.52 Lane Km

EAO P 3.675 M

Total P 105.00 M
April 13, 2023 2023 WIN3F06834 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Romulo H-way - K0145+843 - K0146+865
April 13, 2023 2023 WIN3F06819 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Romulo H-way - K0161+206 - K0162+770
April 13, 2023 2023 WIN3F06836 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Asset Preservation Program - Preventive Maintenance - Primary Roads

Manila North Rd - K0149+565 - K0150+522
April 13, 2023 2023 WIN3F07077 SR2023-01-002892 January 30, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

AS PER GAA/ORIGINAL:

Jct Himay-angan-Silago-Abuyog Bdry Rd - K1099 + 000 - K1099 + 809

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 24.759005 M
1.618 Lane Km

EAO P 897.995 M

Total P 25.657 M

AS MODIFIED:

Jct Himay-angan-Silago-Abuyog Bdry Rd - K1099 + 000 - K1100 + 050

Physical Target: Allocation:

CW1-Rehabilitation of Paved Road: P 24.759005 M
2.086 Lane Km

EAO P 897.995 M

Total P 25.657 M
April 13, 2023 2023 WIN3F07115 SR2023-01-002952 January 31, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Palompon-Isabel-Merida-Ormoc Rd - K1069 + 697 - K1069 + 760

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 106.150 M
Structure: 6,111.11 Square meters

EAO P 3.850 M

Total P 110.00 M

AS MODIFIED:

Palompon-Isabel-Merida-Ormoc Rd - K1111 +811 - K1111 + 880, K1069 + 697 - K1069 + 760

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 106.150 M
Structure: 4,454.06 Square meters

EAO P 3.850 M

Total P 110.00 M
April 13, 2023 2023 310109101127000 GAA FY 2023 December 26, 2022 Region II Nueva Vizcaya 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads - Papaya-Malabing-Wangal-Binugawan-Tadji-Runruno Rd - K0307+430 - K0307+665
April 12, 2023 CY 2023 WIN3F07160 UACS No. 320101109570000 March 16, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 320101109570000
Project ID.: P00727014LZ
OO2: Protect Lives and Properties
Construction/Maintenance of Flood Mitigation Structure and Drainage Systems
Construction of Flood Control Wall along Camarin Creek (Right Side) Brgy. 178 and 180, Sta. 0+000 to Sta. 0+027, Caloocan City
Physical Target: CW1 = Construction of Flood Mitigation Structure 270.00 Lineal Meters
Unit Cost (P’000) = P 181.48 Lineal Meters
Allocation (P’000) = P 49,000
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00

As Modified
OO2: Protect Lives and Properties
Construction/Maintenance of Flood Mitigation Structure and Drainage Systems
Construction of Flood Control Wall along Camarin Creek (Left Side) Brgy. 178 and 180, Sta. 0+000 to Sta. 0+223, Caloocan City
Physical Target: CW1 = Construction of Flood Mitigation Structure 223.00 Lineal Meters
Unit Cost (P’000) = P 219.73 Lineal Meters
Allocation (P’000) = P 49,000
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
WIN3F07160
April 12, 2023 CY 2023 UACS No. 300215102953000 March 14, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300215102953000
Project ID.: P00739945LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabiliation of Road along Macabagdal Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.864 Lane Km
Unit Cost (P’000) = P 13,611.11 Lane/Km
Allocation (P’000) = P 11,760.00
EAO (P’000) = P 240.00
Total (P’000) = P 12,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation of Road along Macabagdal Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.864 Lane Km
Unit Cost (P’000) = P 13,611.11 Lane/Km P 27.2 m/km
Allocation (P’000) = P 11,760.00
EAO (P’000) = P 240.00
Total (P’000) = P 12,000.00
April 12, 2023 CY 2023 WIN3F07156 UACS No. 320101109569000 March 16, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 320101109569000
Project ID.: P00727013LZ
OO2: Protect Lives and Properties
Construction/Maintenance of Flood Mitigation Structure and Drainage Systems
Construction of Flood Control Wall along Camarin Creek (Left Side) Brgy. 178 and 180, Sta. 0+000 to Sta. 0+027, Caloocan City
Physical Target: CW1 = Construction of Flood Mitigation Structure 270.00 Lineal Meters
Unit Cost (P’000) = P 181.48 Lineal Meters
Allocation (P’000) = P 49,000
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00

As Modified
OO2: Protect Lives and Properties
Construction/Maintenance of Flood Mitigation Structure and Drainage Systems
Construction of Flood Control Wall along Camarin Creek (Left Side) Brgy. 178 and 180, Sta. 0+000 to Sta. 0+223, Caloocan City
Physical Target: CW1 = Construction of Flood Mitigation Structure 223.00 Lineal Meters
Unit Cost (P’000) = P 219.73 Lineal Meters
Allocation (P’000) = P 49,000
EAO (P’000) = P 1,000.00
Total (P’000) = P 50,000.00
WIN3F07156
April 12, 2023 CY 2023 UACS No. 300215102945000 March 14, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300215102945000
Project ID.: P00739937LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabiliation of Road along Cordero Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.230 Lane Km
Unit Cost (P’000) = P 34,086.96 Lane/Km
Allocation (P’000) = P 7,840.00
EAO (P’000) = P 160.00
Total (P’000) = P 8,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation of Road along Cordero Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.230 Lane Km
Unit Cost (P’000) = P 34,086.96 Lane/Km P 68 m/km
Allocation (P’000) = P 7,840.00
EAO (P’000) = P 160.00
Total (P’000) = P 8,000.00
April 12, 2023 CY 2023 UACS No. 300215102944000 March 14, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300215102944000
Project ID.: P00739936LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabiliation of Road along San Diego St., 4th St. and 3rd St. Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 1.208 Lane Km
Unit Cost (P’000) = P 7,301.32 Lane/Km
Allocation (P’000) = P 8,820.00
EAO (P’000) = P 180.00
Total (P’000) = P 9,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation of Road along San Diego St., 4th St. and 3rd St. Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 1.208 Lane Km
Unit Cost (P’000) = P 7,301.32 Lane/Km P 14.6 m/km
Allocation (P’000) = P 8,820.00
EAO (P’000) = P 180.00
Total (P’000) = P 9,000.00
April 12, 2023 CY 2023 UACS No. 300215102949000 March 14, 2022 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300215102949000
Project ID.: P00739941LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabiliation of Road along A. Del Mundo Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.486 Lane Km
Unit Cost (P’000) = P 24,197.53 Lane/Km
Allocation (P’000) = P 11,760.00
EAO (P’000) = P 240.00
Total (P’000) = P 12,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation of Road along A. Del Mundo Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.486 Lane Km
Unit Cost (P’000) = P 24,197.53 Lane/Km P 48 m/km
Allocation (P’000) = P 11,760.00
EAO (P’000) = P 240.00
Total (P’000) = P 12,000.00
April 12, 2023 CY 2023 UACS No. 300215102952000 March 14, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300215102952000
Project ID.: P00739944LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabiliation of Road along William Shaw Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.780 Lane Km
Unit Cost (P’000) = P 16,333.33 Lane/Km
Allocation (P’000) = P 12,740.00
EAO (P’000) = P 260.00
Total (P’000) = P 13,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation of Road along William Shaw Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.780 Lane Km
Unit Cost (P’000) = P 16,333.33 Lane/Km P 32.6 m/km
Allocation (P’000) = P 12,740.00
EAO (P’000) = P 260.00
Total (P’000) = P 13,000.00
April 12, 2023 CY 2023 UACS No. 300215102897000 March 14, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300215102897000
Project ID.: P00739924LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Roads and Drainage, Brgy. 52 and Vrgy. 56 Phase 2, Caloocan City
Physical Target: CW1 = Construction of Concrete Road 0.588 Lane Km
Unit Cost (P’000) = P 16,666.67 Lane/Km
Allocation (P’000) = P 9,800.00
EAO (P’000) = P 200.00
Total (P’000) = P 10,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM-Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Roads and Drainage, Brgy. 52 and Brgy. 56 Phase 2, Caloocan City
Physical Target: CW1 = Construction of Concrete Road 0.588 Lane Km
Unit Cost (P’000) = P 16,666.67 Lane/Km P 33.2 m/km
Allocation (P’000) = P 9,800.00
EAO (P’000) = P 200.00
Total (P’000) = P 10,000.00
April 11, 2023 2023 WIN3F07141 FY 2023 GAA February 17, 2023 Region III Tarlac 2nd District Engineering Office
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation of Dike along O'Donnell River, Sta. 9+983 - Sta. 10+303, Downstream of Bueno Bridge 1, Left Bank, Capas, Tarlac
April 11, 2023 2023 WIN3F07139 FY 2023 GAA February 17, 2023 Region III Tarlac 2nd District Engineering Office
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation of Dike along O'Donnell River, Sta. 10+303 - Sta. 10+614.20, Downstream of Bueno Bridge 1, Left Bank, Capas, Tarlac
April 11, 2023 2023 WIN3F07140 FY 2023 GAA February 17, 2023 Region III Tarlac 2nd District Engineering Office
Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation of Dike along O'Donnell River, Sta.8+264.80 - Sta. 8+564, Downstream of Bueno Bridge 1, Left Bank, Capas, Tarlac
April 11, 2023 2023 WIN3F07108 FY 2023 GAA February 17, 2023 Region III Tarlac 2nd District Engineering Office
Network Development Program - Road Widening - Primary Roads

Manila North Road - K0101+203.20 - K0101+843.20
April 4, 2023 CY 2023 WIN3F07122 UACS No. 310103101122000 February 2, 2023 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 310103101122000
Project ID.: P00712243LZ
OO1: Ensure Safe and Reliable National Road
Asset Preservation – Preventive Maintenance – Tertiary Roads
Parañaque-Sucat Rd – (S03295LZ) Chainage 0 – Chainage 55
Physical Target: CW1 = Preventive Maintenance of Maintenance of Road: Asphalt Overlay 0.438 lane km
Unit Cost (P’000) = P 8,114.22/lane km.
Allocation = P 3,537,800.00
EAO = P 72,200.00
Total = P 3,610,000.00

As Modified
OO1: Ensure Safe and Reliable National Road
Asset Preservation – Preventive Maintenance – Tertiary Roads
Parañaque-Sucat Rd – (S03295LZ) Chainage 0 – Chainage 152
Physical Target: CW1 = Preventive Maintenance of Maintenance of Road: Asphalt Overlay 0.122 lane km
Unit Cost (P’000) = P 28,998.36/lane km.
Allocation = P 3,537,800.00
EAO = P 72,200.00
Total = P 3,610,000.00
WIN3F07122
April 4, 2023 CY 2023 WIN3F07118 UACS No. 310103101124000 February 2, 2023 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 310103101124000
Project ID.: P00712439LZ
OO1: Ensure Safe and Reliable National Road
Asset Preservation – Preventive Maintenance – Tertiary Roads
South Super H-way West Service Rd – K0020+(-764) – K0020+576
Physical Target: CW1 = Preventive Maintenance of Maintenance of Road: Asphalt Overlay 2.892 lane km
Unit Cost (P’000) = P 10,492.64/lane km.
Allocation = P 30,344,720.00
EAO = P 619,280.00
Total = P 30,964,000.00

As Modified
OO1: Ensure Safe and Reliable National Road
Asset Preservation – Preventive Maintenance – Tertiary Roads
South Super H-way West Service Rd – K0020+(-764) – K0020+(-578), K0020+(-544)-K0020+(-087)
Physical Target: CW1 = Preventive Maintenance of Maintenance of Road: Asphalt Overlay 1.408 lane km
Unit Cost (P’000) = P 21,551.65/lane km.
Allocation = P 30,344,720.00
EAO = P 619,280.00
Total = P 30,964,000.00
WIN3F07118
April 4, 2023 CY 2023 WIN3F07125 UACS No. 310102101219000 January 26, 2023 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA/Original
UACS No. 310102101219000
Project ID.: P00712359LZ
OO1: Ensure Safe and Reliable National Road
Asset Preservation – Preventive Maintenance – Secondary Roads
Zapote – Alabang Rd – K0023+(-426.53) – K0023+178
Physical Target: CW1 = Preventive Maintenance of Maintenance of Road: Asphalt Overlay 2.943 lane km
Unit Cost (P’000) = P 8,327.17/lane
Allocation = P 24,506,860.00
EAO = P 500,140.00
Total = P 25,007,000.00

As Modified
OO1: Ensure Safe and Reliable National Road
Asset Preservation – Preventive Maintenance – Secondary Roads
Zapote – Alabang Rd – K0023+(-427) – K0023+(-152)
Physical Target: CW1 = Preventive Maintenance of Maintenance of Road: Asphalt Overlay 1.375 lane km
Unit Cost (P’000) = P 17,823.17/lane km. P 35.6 m/km
Allocation = P 24,506,860.00
EAO = P 500,140.00
Total = P 25,007,000.00
WIN3F07125
April 3, 2023 2023 FY 2023 GAA February 17, 2023 Region III Pampanga 3rd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Old Manila North Rd (Dau, San Nicolas, Lourdes North West, Agapito Del Rosario) - K0082+(-364.20) - K0082+988.40, K0084+171.70 - K0084+326.10
April 3, 2023 2023 WIN3F07087 FY 2023 GAA February 17, 2023 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Daang Maharlika (LZ) - K0205+000 - K0205+681
April 3, 2023 2023 WIN3F07049 FY 2023 GAA February 17, 2023 Region III Regional Office III
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Baler - Casiguran Rd (Baler - Dinadiawan) - K0249+194 - K0251+282
April 3, 2023 2023 WIN3F07047 FY 2023 GAA February 17, 2023 Region III Regional Office III
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Baler - Casiguran Rd (Baler - Dinadiawan) - K0253+041 - K0253+881, K0254+234 - K0255+440
April 3, 2023 FY 2023 GAA WIN3E02690 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1569+500 - K1569+780
Physical Target:
CW1: 5,555.56 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1570+450 - K1570+700
Physical Target:
CW1: 5,502.00 square meters (Construction of Road Slope Protection Structure)
ROW: 10,218.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 95,300,000.00 (Construction of Road Slope Protection Structure)
ROW: P 1,200,000.00 (ROW Acquisition)
EAO: P 3,500,000.00
April 3, 2023 FY 2023 GAA WIN3E02689 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1574+500 - K1574+830
Physical Target:
CW1: 5,555.56 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Benigno S. Aquino Jr. National Highway -
K1574+100 - K1574+250, K1574+350 - K1574+580
Physical Target:
CW1: 5,700.00 square meters (Construction of Road Slope Protection Structure)
ROW: 13,350.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 95,500,000.00 (Construction of Road Slope Protection Structure)
ROW: P 1,000,000.00 (ROW Acquisition)
EAO: P 3,500,000.00
April 3, 2023 FY 2023 GAA WIN3E02698 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1569+100 - K1569+430
Physical Target:
CW1: 5,555.56 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Benigno S. Aquino Jr. National Highway - K1569+960 - K1570+260
Physical Target:
CW1: 5,582.00 square meters (Construction of Road Slope Protection Structure)
ROW: 10,800.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 95,300,000.00 (Construction of Road Slope Protection Structure)
ROW: P 1,200,000.00 (ROW Acquisition)
EAO: P 3,500,000.00
April 1, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 310101100918000
Project ID: P00706044MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads

FROM:

Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1250 + 000 - K1254 + 000

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 16.024 Lane Km

Allocation:
TOTAL: P 200,000,000
CW1: P 193,000,000
EAO: P 7,000,000

Unit Cost:
CW1: P 12,044,433.35/Lane Km

TO:

Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1250 + (-542) - K1254 + 670

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 20.872 Lane Km

Allocation:
TOTAL: P 200,000,000
CW1: P 193,000,000
EAO: P 7,000,000

Unit Cost:
CW1: P 9,246,837.87/Lane Km
April 1, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 310104100508000
Project ID: P00706321MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

FROM:

Daang Maharlika (Agusan-Davao Sect) - K1360 + 000 - K1360 + 952, K1361 + 000 - K1361 + 907, K1363 + 611 - K1364 + 000

Type of Work:
CW1- Rehabilitation of Paved Road

Physical Target:
CW1- 7.088 Lane Km

Allocation:
TOTAL: P 131,863,000
CW1: P 127,247,795
EAO: P 4,615,205

Unit Cost:
CW1: P 17,952,57.01/Lane Km

TO:

Daang Maharlika (Agusan-Davao Sect) - K1360 + 519 - K1361 + 907, K1363 + 611 - K1366 + 000, K1371 + 088 - K1371 + 500, K1372 + 400 - K1373 + 220

Type of Work:
CW1- Rehabilitation of Paved Road

Physical Target:
CW1- 9.862 Lane Km

Allocation:
TOTAL: P 131,863,000
CW1: P 127,247,795
EAO: P 4,615,205

Unit Cost:
CW1: P 12,902,838.67/Lane Km
April 1, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 310102101216000
Project ID: P00706200MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Secondary Roads

FROM:

Surigao-Davao Coastal Rd - K1431 + 365 - K1434 + 399

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 12.066 Lane Km

Allocation:
TOTAL: P 107,385,000
CW1: P 103,626,525
EAO: P 3,758,475

Unit Cost:
CW1: P 8,588,308.06/Lane Km

TO:

Surigao-Davao Coastal Rd - K1431 + 365 - K1434 + 075

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 10.79 Lane Km

Allocation:
TOTAL: P 107,385,000
CW1: P 103,626,525
EAO: P 3,758,475

Unit Cost:
CW1: P 9,603,941.15/Lane Km

April 1, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Dinagat Islands District Engineering Office
UACS No. : 310108101452000
Project ID: P00707701MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM:

Dinagat-Loreto Rd K0072 + 322 - K0072.623 + 301, K0073 + 327 - K0073 + 312

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 5555.550 Square meters

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 17,370.00/ Square meters

TO:

Dinagat-Loreto Rd – K0072 + 428.30 – K0072 + 758.61, K0073 + 672.60 – K0073 + 900

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 7250.230 Square meters

Allocation:
TOTAL: P 100,000,000
CW1: P 96,500,000
EAO: P 3,500,000

Unit Cost:
CW1: P 13,310.00/ Square meters
April 1, 2023 2023 WIN3E02613 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Dinagat Islands District Engineering Office
UACS No. : 300221104529000
Project ID: P00734351MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program - BIP - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of Road, Brgy. Maridel, Libjo going to Brgy. Montag, Basilisa, Dinagat, Matridel Dinagat Island

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 2.096 Lane Km

Allocation:
TOTAL: P 25,000,000
CW1: P 24,750,000
EAO: P 250,000

Unit Cost:
CW1: P 11,808,206/ Lane Km

TO:

Construction of Road, Brgy. Plaridel, Libjo going to Brgy. Montag, Basilisa, Dinagat Islands

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 1.200 Lane Km

Allocation:
TOTAL: P 25,000,000
CW1: P 24,750,000
EAO: P 250,000

Unit Cost:
CW1: P 20,625,000/ Lane Km
April 1, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 300228100480000
Project ID: P00734962MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program - BIP - Evacuation Centers/ Quarantine Facilities/ Public Health Facilities

FROM:

Construction of Mutli-Purpose Building (Evacuation Center) in Brgy. Libertad, Municipality of Prosperidad, Agusan Del Sur

Type of Work:
CW1- Construction of Multi Purpose Building

Physical Target:
CW1- 1 Number of Buildings

Allocation:
TOTAL: P 5,000,000
CW1: P 4,950,000
EAO: P 50,000

Unit Cost:
CW1: P 4,950,000/ Number of Buildings

TO:

Construction of Multi-Purpose Building (Evacuation Center) in Brgy. Libertad, Municipality of Prosperidad, Agusan Del Sur

Type of Work:
CW1- Construction of Multi Purpose Building

Physical Target:
CW1- 1 Number of Buildings

Allocation:
TOTAL: P 5,000,000
CW1: P 4,950,000
EAO: P 50,000

Unit Cost:
CW1: P 4,950,000/ Number of Buildings
April 1, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 310212100237000
Project ID: P00705652MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Paving of Unpaved Roads - Tertiary Roads

FROM:

NRJ Bayugan-Calaitan-Tandag Rd - K1282 + 484 - K1283 + 1032

Type of Work:
CW1- Paving of Unpaved Roads

Physical Target:
CW1- 3.256 Lane Km

Allocation:
TOTAL: P 66,220,000
CW1: P 63,902,300
EAO: P 2,317,700

Unit Cost:
CW1: P 19,626,013.51/ Lane Km

TO:

NRJ Bayugan-Calaitan-Tandag Rd - K1282 + 484 - K1284 + 450.59

Type of Work:
CW1- Paving of Unpaved Roads

Physical Target:
CW1- 3.870 Lane Km

Allocation:
TOTAL: P 66,220,000
CW1: P 63,902,300
EAO: P 2,317,700

Unit Cost:
CW1: P 16,512,222.22/ Lane Km
April 1, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 310107100516000
Project ID: P00706552MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

FROM:

Daang Maharlika (Agusan-Davao Sect) - K1272 + 292.50 - K1272 + 338, K1277 + 490 - K1277 + 522, K1279 + 176.50 - K1279 + 458.50

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 5340.070 Square meters

Allocation:
TOTAL: P 80,101,000
CW1: P 77,297,465
EAO: P 2,803,535

Unit Cost:
CW1: P 14,474.99/ Square meters

TO:

Daang Maharlika (Agusan-Davao Sect) – K1272 + 297.00 - K1272 + 338.00, K1277 + 490.00 - K1277 + 530.00, K1279 + 176.50 - K1279 + 455.94, K1284 + 822.40 - K1284 + 845.00, K1289 + 431.00 - K1289 + 467.00, K1297 + 672.20 - K1297 + 712.46

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 5970.900 Square meters

Allocation:
TOTAL: P 80,101,000
CW1: P 77,297,465
EAO: P 2,803,535

Unit Cost:
CW1: P 12,945.70/ Square meters
April 1, 2023 2023 WIN3E02679 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 310103101120000
Project ID: P00706052MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Tertiary Roads

FROM:

Preventive Maintenance (Asphalt Overlay) along Butuan City - Malaybalay Road - K1247 + 000 - K1266 + 000

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 49.512 Lane Km

Allocation:
TOTAL: P 180,000,000
CW1: P 173,700,000
EAO: P 6,300,000

Unit Cost:
CW1: P 3,508,240.43/ Square meters

TO:

Preventive Maintenance (Asphalt Overlay) along Butuan City - Malaybalay Road - K1247 + 775 - K1250 + 742, K1250 + 839 - K1255 + 022.5

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 20.253 Lane Km

Allocation:
TOTAL: P 180,000,000
CW1: P 173,700,000
EAO: P 6,300,000

Unit Cost:
CW1: P 8,576,507.18/ Square meters
March 31, 2023 2023 FY 2023 GAA February 17, 2023 Region III Pampanga 2nd District Engineering Office
Network Development Program - Off-Carriageway Improvement - Primary Roads

Jose Abad Santos Ave (JASA) - K0083+973 - K0084+380, K0085+052 - K0086+260.24, K0086+478.06 - K0086+952
March 31, 2023 2023 FY 2023 GAA February 17, 2023 Region III Pampanga 2nd District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads

Angeles - Porac - Floridablanca - Dinalupihan Rd - K0087+444 - K0087+943.50
March 31, 2023 2023 WIN3F06954 FY 2023 GAA February 17, 2023 Region III Pampanga 2nd District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Angeles - Porac- Floridablanca - Dinalupihan Rd - K0096+829.66 - K0098+687.43, K0099+000 - K0099+382.00
March 31, 2023 2023 FY 2023 GAA February 17, 2023 Region III Pampanga 2nd District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities

Construction of Slope Protection along Porac River Paguiruan Section, Floridablanca, Pampanga

Pages