Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
April 24, 2023 FY 2023 WIN3F06869 SARO-BMB-A-23-0013274 February 20, 2023 Region IV-B Mindoro Oriental District Engineering Office
Construction of Bucayao Flood Control Structure along Barangay Buhuan, Sta. 0+000 - Sta. 0+161.70, Calapan City, Oriental Mindoro
April 24, 2023 FY 2023 WIN3F06868 SARO-BMB-A-23-0013274 February 20, 2023 Region IV-B Mindoro Oriental District Engineering Office
Construction of Bucayao Flood Control Structure along Brgy. Camansihan, Section 1 - Sta. 0+000 - Sta. 0+060, Section 2 - Sta. 0+000 - Sta. 0+107.86, Calapan City, Oriental Mindoro
April 24, 2023 FY 2023 SARO-BMB-A-23-0013274 February 20, 2023 Region IV-B Mindoro Oriental District Engineering Office
Construction of Bucayao River Control along Brgy. Managpi, Sta. 0+000 - Sta. 0+172.48, Calapan City, Oriental Mindoro
April 24, 2023 FY 2023 SARO-BMB-A-23-0013274 February 20, 2023 Region IV-B Mindoro Oriental District Engineering Office
Construction of Flood Control Structure along Sitio Bagong Pook, Barangay Gutad, Sta. 0+000 - Sta. 0+182.49, Calapan City, Oriental Mindoro
April 24, 2023 FY 2023 GAA P00706511MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Mati-Maragusan Rd - K1499+(-211) - K1499+(-193),
K1499+(-333) - K1499+(-306), K1499+(-662) - K1499+(-618),
K1501+253 - K1501+290, K1502+745 - K1502+771,
K1503+049 - K1503+067, K1505+648 - K1505+667
Physical Target:
CW1: 2,429.38 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 34,988,000.00
CW1: P 34,288,240.00 (Construction of Road Slope Protection Structure)
EAO: P 699,760.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Mati-Maragusan Rd -
K1500+270 - K1500+330, K1501+060 - K1501+130
Physical Target:
CW1: 2,080.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 34,988,000.00
CW1: P 34,288,240.00 (Construction of Road Slope Protection Structure)
EAO: P 699,760.00
April 20, 2023 2023 300225101004000 GAA 2023 December 26, 2022 Region II Cagayan 2nd District Engineering Office
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities

Construction of River Control along Langgangan River in Sta. Praxedes, Cagayan
April 20, 2023 2023 WIN3F06972 FY 2023 GAA February 17, 2023 Region III Bataan 2nd District Engineering Office
Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control Structure along Talisay River, (6+164 - 6+369), Pilar, Bataan
April 20, 2023 2023 FY 2023 GAA February 17, 2023 Region III Bataan 2nd District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Multi-Purpose Buildings / Facilities to Support Social Services

Construction of Multi-Purpose Building at Limay Polytechnic College, Barangay Kitang II & Luz, Limay, Bataan
April 20, 2023 2023 WIN3F06970 FY 2023 GAA February 17, 2023 Region III Bataan 2nd District Engineering Office
Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Construction of Flood Control Structure along Talisay River, (6+369 - 6+574), Pilar, Bataan
April 20, 2023 2023 FY 2023 GAA February 17, 2023 Region III Bataan 2nd District Engineering Office
Construction/Improvement of Various Infrastructures in Support of National Security (Tatag ng Imprastraktura para sa Kapayapaan at Seguridad Program - TIKAS)

Construction of Multi-Purpose Building (with Perimeter Fence), PNP, Brgy. Sto. Domingo, Orion, Bataan
April 20, 2023 2023 FY 2023 GAA February 17, 2023 Region III Bataan 2nd District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Multi-Purpose Buildings / Facilities to Support Social Services

Construction of Multi-Purpose Building (New Municipal Hall), Barangay San Vicente, Orion, Bataan
April 20, 2023 2023 300105201004000 GAA 2023 December 26, 2022 Region II Cagayan 2nd District Engineering Office
Local Program (LP) - Buildings and Other Structures - Multipurpose / Facilities - National Building Program

Construction(Completion) of DOJ Building (National Prosecution Service, Provincial Prosecution Office, Ballesteros, Cagayan Satellite Office) at Centro East, Ballesteros, Cagayan
April 20, 2023 2023 FY 2023 GAA February 17, 2023 Region III Nueva Ecija 1st District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings / Facilities to Support Social Services

Construction of Legislative Bldg., Talugtug, Nueva Ecija
April 20, 2023 2023 WIN3F07172 FY 2023 GAA February 17, 2023 Region III Nueva Ecija 1st District Engineering Office
Network Development Program - Construction of By-Pass and Diversion Roads

San Jose City Bypass Road, Package 4, Nueva Ecija
April 20, 2023 2023 FY 2023 GAA February 17, 2023 Region III Nueva Ecija 1st District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings / Facilities to Support Social Services

Rehabilitation of Multipurpose Building (Danding N. Joson Gym) at Barangay Dos, Quezon, Nueva Ecija
April 20, 2023 2023 310102101285000 GAA 2023 December 26, 2022 Region II Cagayan 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads - Bangag-Magapit Road (S04636LZ) K0699+147-K0699+449, K0700+242-K0701+358, K0702+828-K0703+734, Allacapan, Cagayan
April 20, 2023 2023 FY 2023 GAA February 17, 2023 Region III Pampanga 2nd District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures / Facilities

Construction of Slope Protection with Road Dike along GPDC, Sta. Rita - San Pedro, Lubao, Pampanga
April 20, 2023 2023 310201101146000 GAA 2023 December 26, 2022 Region II Cagayan 2nd District Engineering Office
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads

Manila North Road K0663+000 -K0663+500
April 20, 2023 FY 2023 WIN3F07110 SR2023-01-003460 January 31, 2023 Region IV-B Regional Office IV-B
Tablas Circumferential Rd - K0036+778 - K0037+990, K0041+000 - K0041+445.00, K0042+000 - K0042+375
April 20, 2023 FY 2023 SR2023-01-003475 January 31, 2023 Region IV-B Regional Office IV-B Mindoro West Coastal Rd - K0320+624 - K0324+403
April 20, 2023 FY 2023 WIN3F07152 SR2023-01-003535 January 31, 2023 Region IV-B Regional Office IV-B Puerto Princesa North Rd - K0183 + 000 - K0183 + 816, K0183 + 952 - K0184 + 629
April 20, 2023 FY 2023 WIN3F07153 SR2023-01-003541 January 31, 2023 Region IV-B Regional Office IV-B Puerto Princesa North Rd - K0184 + 629 - K0184 + 1007
April 20, 2023 FY 2023 WIN3F07145 MODIFICATION MODIFICATION 100% 11 F23 SR2023-01-003554 SR2023-01-003554 Turn on screen reader support To enable screen January 31, 2023 Region IV-B Regional Office IV-B Puerto Princesa North Rd. - K0186+ 903 - K0187 + 406
April 20, 2023 FY 2023 WIN3F07109 SR2023-01-003680 January 31, 2023 Region IV-B Regional Office IV-B Coron-Busuanga Rd - K0059 + 866 - K0061 + 527
April 20, 2023 FY 2023 WIN3F07146 SR2023-01-003628 January 31, 2023 Region IV-B Regional Office IV-B
Construction of Flood Control Structure at Lumintao River, Sitio Lumintao, Barangay Malawaan, Sta. 0+000 - Sta. 0+300, Rizal, Occidental Mindoro
April 20, 2023 FY 2023 WIN3F07150 SARO-BMB-A-23-0014057 March 9, 2023 Region IV-B Regional Office IV-B
Construction of Dike along Dulangan River, Paitan Section, Naujan, Oriental Mindoro
April 20, 2023 FY 2023 WIN3F07148 SR2023-01-003919 January 31, 2023 Region IV-B Regional Office IV-B
Construction of Road Dike/Esplanade along Patrick River, Barangay Paetan Section, Sablayan, Occidental Mindoro
April 20, 2023 FY 2023 WIN3F07149 MODIFICATION MODIFICATION 100% 11 F33 SR2023-01-003931 SR2023-01-003931 Turn on screen reader support To enable screen January 31, 2023 Region IV-B Regional Office IV-B
Construction of Paetan-Victoria Riverbank Protection Structure with Road Component, Sablayan, Occidental Mindoro
April 20, 2023 FY 2023 WIN3F07147 SARO-BMB-A-23-0014229 March 13, 2023 Region IV-B Regional Office IV-B Construction of Road Dike Brgy. Dulangan, Puerto Galera, Oriental Mindoro
April 20, 2023 FY 2023 SR2023-03-005660 March 2, 2023 Region IV-B Mindoro Oriental District Engineering Office Calapan South Road K0033+545 – K0034+965
April 20, 2023 FY 2023 SR2023-03-005665 March 2, 2023 Region IV-B Mindoro Oriental District Engineering Office Calapan North Road K0008+000 – K0010+469
April 20, 2023 FY 2023 GAA-RA-11936 January 1, 2023 Region IV-B Mindoro Oriental District Engineering Office Calapan South Road K0053+511 – K0054+231.5
April 20, 2023 2023 23MB0133 FY 2023 GAA March 21, 2023 Region XII South Cotabato 1st District Engineering Office
23MB0133 - Construction of Road, Balakayo, Barangay Olympog, General Santos City, South Cotabato
April 20, 2023 2023 23MB0120 FY 2023 GAA March 6, 2023 Region XII South Cotabato 1st District Engineering Office
Construction of Road, Balakayo, Barangay Olympog, General Santos City, South Cotabato
April 20, 2023 2023 23MB0005 FY 2023 GAA January 30, 2023 Region XII South Cotabato 1st District Engineering Office
23MB0005 - Preventive Maintenance - Primary Roads-Marbel-Makar Rd - K1680 + 000 - K1681 + 175.5
April 20, 2023 2023 23MB0048 FY 2023 GAA March 3, 2023 Region XII South Cotabato 1st District Engineering Office
23MB0048 - Asset Preservation Program-Preventive Maintenance - Primary Roads-Makar-Marbel Rd - K1658 + 214 - K1658 +389, K1658 +449 - K1659 + 301, K1659 + 424 - K1660 + 453
April 20, 2023 2023 23MB0070 FY 2023 GAA March 20, 2023 Region XII South Cotabato 1st District Engineering Office
23MB0070 - Off-Carriageway Improvement - Secondary Roads -Albert Morrow Blvd - K1653 + 059 - K1653 + 485, K1653 + 863 - K1654 + 300
April 19, 2023 CY 2023 UACS No. 310102101083000 March 9, 2023 National Capital Region Quezon City 1st Engineering District Office
As per GAA/Original
UACS No. 310102101083000
Project ID.: P00714636LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary
Commonwealth Ave. (S05439LZ) Asphalt Overlay w/ Concrete Reblocking K0020+000 – K0020+382
Physical Target: CW1 = Preventive Maintenance of Road: Concrete Reblocking 3.438 lane km
Unit Cost (P’000) = P 17,800.90 lane/km
Allocation = P 96,500,000.00
EAO = P 3,500,000.00
Total = P 100,000,000.00

As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary
Commonwealth Ave. (S05439LZ) Asphalt Overlay w/ Concrete Reblocking K0019+732 – K0020+382
Physical Target: CW1 = Preventive Maintenance of Road: Concrete Reblocking 3.900 lane km
Unit Cost (P’000) = P 24,743.590 lane/km P 48 m/km
Allocation = P 96,500,000.00
EAO = P 3,500,000.00
Total = P 100,000,000.00
April 18, 2023 2023 GAA 2023 January 24, 2023 Cordillera Administrative Region Apayao 2nd District Engineering Office
From: Claveria - Calanasan-Kabugao Rd - K0634 + 300 - K0634 + 400;
Type of Work: Rehabilitation of Paved Road ;
Physical Target: 0.2 Lane Km;
Allocation: Php 3,335,000.000

To: Claveria – Calanasan - Kabugao Rd - K0651 + 467.5 - K0651 + 541.5;
Type of Work:
CW1 - Reconstruction to Concrete Pavement
CW2 - Construction of Road Slope Protection Structure
CW3 - Construction of Drainage Structure along Road;
Physical Target:
CW1: 0.1355 Lane Km
CW2: 100.8 Square meters
CW3: 63 Lineal Meters ;
Allocation: Php 3,335,000.000


April 18, 2023 2023 GAA 2023 January 24, 2023 Cordillera Administrative Region Apayao 2nd District Engineering Office
From: Claveria-Calanasan-Kabugao Rd - K0671 + 900 - K0671 + 960;
Type of Work: Rehabilitation of Paved Road ;
Physical Target: 0.12 Lane Km;
Allocation: Php 2,000,000.000

To: Claveria – Calanasan - Kabugao Rd - K0651 + 009 - K0651 + 040, K0651 + 144 - K0651 + 266;
Type of Work:
CW1 - Reconstruction to Concrete Pavement
CW2 - Construction of Drainage Structure along Road;
Physical Target:
CW1: 0.076 Lane Km
CW2: 102 Lineal Meters ;
Allocation: Php 2,000,000.000

April 18, 2023 2023 GAA 2023 January 24, 2023 Cordillera Administrative Region Apayao 2nd District Engineering Office
From: Claveria-Calanasan-Kabugao Rd - K0672 + 1100 - K0672 + 1140;
Type of Work: Rehabilitation of Paved Road ;
Physical Target: 0.08 Lane Km;
Allocation: Php 1,334,000.000

To: Claveria – Calanasan - Kabugao Rd - K0656 + 008 - K0656 + 057.5, K0656 + 066 - K0656 + 154.5;
Type of Work: Reconstruction to Concrete Pavement;
Physical Target: 0.147 Lane Km;
Allocation: Php 1,334,000.000

April 18, 2023 2023 GAA 2023 January 24, 2023 Cordillera Administrative Region Apayao 2nd District Engineering Office
From: Claveria-Calanasan-Kabugao Rd - K0672 + 1180 - K0672 + 1300;
Type of Work: Rehabilitation of Paved Road ;
Physical Target: 0.24 Lane Km;
Allocation: Php 4,001,000.000

To: Claveria – Calanasan - Kabugao Rd - K0662 + 895 - K0663 + 133;
Type of Work:
CW1 - Reconstruction to Concrete Pavement
CW2 - Construction of Drainage Structure along Road;
Physical Target:
CW1: 0.2404 Lane Km
CW2: 50 Lineal Meters ;
Allocation: Php 4,001,000.000

April 18, 2023 2023 GAA 2023 January 24, 2023 Cordillera Administrative Region Apayao 2nd District Engineering Office
From: Apayao (Calanasan)-Ilocos Norte Rd - K0617 + 740 - K0617 + 810;
Type of Work: Rehabilitation of Paved Road ;
Physical Target: 0.14 Lane Km;
Allocation: Php 2,334,000.000

To: Apayao (Calanasan)-Ilocos Norte Rd - K0627+268- K0627+373, K0628+250-K0628+282, K0628+400-K0628+418, K0629+336-K0629+358.5;
Type of Work: Reconstruction to Concrete Pavement;
Physical Target: 0.232 Lane Km;
Allocation: Php 2,334,000.000

April 18, 2023 2023 SR2023-01-001443 January 30, 2023 Cordillera Administrative Region Apayao 2nd District Engineering Office
From: Construction of Apayao - Abulug River Basin Flood Control Structure, Capannikian Section, Sta. 34 + 440 - Sta. 35 + 060 (R/S), Pudtol, Apayao;
Physical Target: 620 Lineal Meters;
Allocation: Php 100,000,000.000

To: Construction of Apayao-Abulug River Basin Flood Control Structure, Capannikian Section, Sta. 34 + 440 - Sta. 34 + 995 (R/S), Pudtol, Apayao;
Physical Target: 555 Lineal Meters;
Allocation: Php 100,000,000.000

April 18, 2023 2023 SR2023-01-001464 January 30, 2023 Cordillera Administrative Region Apayao 2nd District Engineering Office

From:
Construction of Apayao-Abulug River basin Flood Control Structure, San Sebastian Section, Sta. 28+085 - Sta.28+705 (R/S), Luna, Apayao;
Type of Work: Construction of Flood Mitigation Structure;
Physical Target: 620 Lineal Meters;
Allocation: Php 100,000,000.000

To:
Construction of Apayao-Abulug River Basin Flood Control Structure, San Sebastian Section, Sta. 28 + 085 - Sta. 28 + 635 (R/S), Luna, Apayao;
Physical Target: 550;
Allocation: Php 100,000,000.000

April 18, 2023 2023 WIN3E02702 SR2023-01-001455 January 30, 2023 Cordillera Administrative Region Apayao 2nd District Engineering Office
From:
Construction of Apayao - Abulug River Basin Flood Control Structure, San Mariano Section, Sta. 24 + 264 - Sta. 24 + 884 (L/S), Sta. Marcela, Apayao;
Physical Target: 620 Lineal Meters;
Allocation: Php 90,000,000.000


To:
Construction of Apayao - Abulug River Basin Flood Control Structure, San Mariano Section, Sta. 24 + 384 - Sta. 24 + 884 (L/S), Sta. Marcela, Apayao;
Physical Target: 500;
Allocation: Php 90,000,000.000

April 18, 2023 2023 SARO-BMB-A-23-0014667 March 21, 2023 Cordillera Administrative Region Apayao 2nd District Engineering Office
From:
Construction of Multi-Purpose Building (Apayao Sports Complex) Barangay San Gregorio, Luna, Cagayan;
Type of Work: Construction of Multi Purpose Building;
Physical Target: 1 Number of Buildings;
Allocation: Php 10,000,000.000

To:
Construction of Multi-Purpose Building (Apayao Sports Complex) Barangay San Gregorio, Luna, Apayao;
Physical Target: 1 Number of Buildings;
Allocation: Php 10,000,000.000

April 18, 2023 2023 GAA FY 2023 March 21, 2023 Region VIII Eastern Samar District Engineering Office
Convergence and Special Support Program

Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services

AS PER GAA/ORIGINAL:

Construction of Multi-Purpose Building, Pedro Candido Memorial National High School (PECMNHS), Brgy. Nagaja, Hermani, Eastern Samar

Physical Target: Allocation:

CW1-Construction of Multi Purpose Building: P 9.900 M
1.00 Number of Buildings

EAO P 0.100 M

Total P 10.00 M

AS MODIFIED:

Construction of Multi-Purpose Building, Pedro Candido Memorial National High School (PECMNHS), Brgy. Nagaja, Hernani, Eastern Samar

Physical Target: Allocation:

CW1-Construction of Multi Purpose Building: P 9.900 M
1.00 Number of Buildings

EAO P 0.100 M

Total P 10.00 M
April 18, 2023 2023 GAA FY 2023 January 2, 2023 Region VIII Eastern Samar District Engineering Office
Convergence and Special Support Program

Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services

AS PER GAA/ORIGINAL:

Construction of Oras District Hospital (ODH) in Borongan City, Eastern Samar

Physical Target: Allocation:

CW1-Construction of Multi Purpose Building: P 19.800 M
1.00 Number of Buildings

EAO P 0.200 M

Total P 20.00 M

AS MODIFIED:

Construction of Oras District Hospital (ODH) in Oras, Eastern Samar

Physical Target: Allocation:

CW1-Construction of Multi Purpose Building: P 19.800 M
1.00 Number of Buildings

EAO P 0.200 M

Total P 20.00 M
April 18, 2023 2023 GAA 2023 January 24, 2023 Cordillera Administrative Region Upper Kalinga District Engineering Office
From:
Balbalan-Pinukpuk Rd - K0483 + 596 - K0485 + 000;
Physical Target: 1.512 Lane Km;
Allocation: Php 37,000,000.000

To:
Balbalan-Pinukpuk Rd - K0483 + 596 - K0484 + 347;
Physical Target: 1.512 Lane Km;
Allocation: Php 37,000,000.000

April 18, 2023 2023 GAA 2023 January 24, 2023 Cordillera Administrative Region Upper Kalinga District Engineering Office
From:
Kalinga-Abra Rd - K0464 + (-030) - K0464 + 000, K0465 + 264 - K0465 + 354, K0469 + 836 - K0469 + 954, K0469 + 915 - K0469 + 962, K0471 + 359 - K0471 + 437, K0473 + 068 - K0473 + 100, K0473 + 404 - K0473 + 526, K0473 + 567 - K0473 + 661, K0482 + 715 - K0482 + 814;
Physical Target: 5555.56 Square Meters;
Allocation: Php 41,766,000.000

To:
Kalinga-Abra Rd - K0464 + (-030) - K0464 + 000, K0465 + 264 - K0465 + 354, K0469 + 913 - K0469 + 954, K0469 + 915 - K0469 + 962, K0471 + 359 - K0471 + 437, K0473 + 068 - K0473 + 100, K0473 + 404 - K0473 + 526, K0473 + 567 - K0473 + 661, K0482 + 715 - K0482 + 814, K0493+493 - K0493+515 ;
Physical Target: 3759 Square Meters;
Allocation: Php 41,766,000.000

April 18, 2023 2023 WIN3F07170 GAA FY 2023 January 1, 2023 Region VIII Samar 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0703 + 000 - K0703 + 591

Physical Target: Allocation:

CW1-Road Widening: 1.182 Lane Km P 28.959 M

EAO P 0.591 M

Total P 29.550 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0703 + 000 - K0703 + 157.8, K0703 + 206.12 – K0703 + 324.77, K0703 + 354 - K0703 + 584.4

Physical Target: Allocation:

CW1-Road Widening: 0.63651 Lane Km P 12.2426958 M

CW2-Construction of Road Slope Protection P 7.74224367 M
Structure: 496.5 Square meters

CW3-Preventive Maintenance of Road: P 5.59855225 M
Concrete Reblocking: 0.4798 Lane Km

ROW-ROW Acquisition: 516.83 Square meters P 3.37550828 M

EAO P 0.591 M

Total P 29.550 M
April 18, 2023 2023 GAA FY 2023 January 1, 2023 Region VIII Samar 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Network Development - Road Widening - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0697 + 000 - K0697 + 202, K0698 + 720 - K0699 + 034

Physical Target: Allocation:

CW1-Road Widening: 1.086 Lane Km P 26.607 M

EAO P 0.543 M

Total P 27.150 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0697 + 000 - K0697 + 202, K0698 + 720 - K0699 + 026

Physical Target: Allocation:

CW1-Road Widening: 0.710 Lane Km P 16.86697480 M

CW2-Construction of Drainage Structure P 6.64002520 M
along Road: 306 Lineal meters

ROW-ROW Acquisition: 1,065 Square meters P 3.100000 M

EAO P 0.543 M

Total P 27.150 M
April 18, 2023 2023 GAA FY 2023 January 1, 2023 Region VIII Samar 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0729 + 475 - K0731 + 000

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 39.225480 M
along Road: 1,531 Lineal meters

EAO P 0.800520 M

Total P 40.026 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0729 + 550 - K0730 + 801

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 35.647430 M
along Road: 1,257 Lineal meters

ROW-ROW Acquisition: 1,240.83 Square meters P 3.578050 M

EAO P 0.800520 M

Total P 40.026 M
April 18, 2023 2023 GAA FY 2023 January 1, 2023 Region VIII Samar 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

AS PER GAA/ORIGINAL:

Calbayog-Catarman Rd - K0787 + 693 - K0788 + 250

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 25.705400 M
along Road: 512 Lineal meters

EAO P 0.524600 M

Total P 26.230 M

AS MODIFIED:

Calbayog-Catarman Rd - K0787 + 718 - K0788 + 173

Physical Target: Allocation:

CW1-Construction of Drainage Structure P 20.86115914 M
along Road: 747 Lineal meters

CW2-Road Widening: 0.292 Lane Km P 4.84424086 M

EAO P 0.524600 M

Total P 26.230 M
April 18, 2023 2023 SR2023-01-002253 January 31, 2023 Region VIII Samar 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

AS PER GAA/ORIGINAL:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0774 + 000 - K0775 + 000

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 67.550 M
Structure: 4,563.230 Square meters

EAO P 2.450 M

Total P 70.00 M

AS MODIFIED:

Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0774 + 118 - K0774 + 263, K0774 + 555 – K0774 + 641

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 67.550 M
Structure: 4,620 Square meters

EAO P 2.450 M

Total P 70.00 M
April 18, 2023 2023 WIN3F07154 GAA FY 2023 January 1, 2023 Region VIII Samar 1st District Engineering Office
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

AS PER GAA/ORIGINAL:

Calbayog-Catarman Rd - K0803 + 892 - K0803 + 942

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 29.400 M
Structure: 2,000 Square meters

EAO P 0.600 M

Total P 30.00 M

AS MODIFIED:

Calbayog-Catarman Rd - K0803 + 853 - K0803 + 942

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 29.400 M
Structure: 1,217.52 Square meters

EAO P 0.600 M

Total P 30.00 M
April 18, 2023 FY 2023 GAA P00706375MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads
Tibanban-Lavigan Rd - K1785+854 - K1786+003
Physical Target:
CW1: 5,555.560 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads
Tibanban-Lavigan Rd - K1786+308 - K1786+597
Physical Target:
CW1: 4,946.637 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
April 18, 2023 FY 2023 GAA WIN3E02720 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Mati-Maragusan Rd -
K1499+292 - K1499+302, K1499+462 - K1499+582,
K1499+617 - K1499+630, K1501+324 - K1501+336,
K1502+670 - K1502+800, K1503+060 - K1503+073,
K1505+676 - K1505+690, K1505+740 - K1505+754,
K1507+851 - K1507+867, K1511+830 - K1511+843
Physical Target:
CW1: 7,961.860 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Mati-Maragusan Rd - K1501+130 - K1501+240,
K1502+577 - K1502+620, K1502+657 - K1502+755,
K1502+850 - K1502+918, K1505+648 - K1505+675,
K1507+780 - K1507+811, K1507+817 - K1507+830
Physical Target:
CW1: 6,408.608 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
April 18, 2023 FY 2023 GAA WIN3E02708 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way - K1774+838 - K1774+918
Physical Target:
CW1: 5,555.56 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way - K1774+021 - K1774+330
Physical Target:
CW1: 4,439.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
April 18, 2023 2023 23MB0121 FY 2023 GAA March 6, 2023 Region XII South Cotabato 1st District Engineering Office
23MB0121 - Concreting of Road with Drainage System, Purok Kabuling, Brgy. Tinagacan to Purok Lower Labay, Brgy. Tinagacan, General Santos City
April 18, 2023 2023 23MB0109 FY 2023 GAA March 16, 2023 Region XII South Cotabato 1st District Engineering Office
23MB0109 - Concreting of Jct. NWH Crossing Repolyo, Barangay Lamcaliaf - Barangay Kinilis Road, Municipality of Polomolok
April 18, 2023 2023 23MB0081 FY 2023 GAA March 13, 2023 Region XII South Cotabato 1st District Engineering Office 23MB0081 - Construction of Road, Barangay Tinagacan, General Santos City
April 18, 2023 2023 23MB0001 FY 2023 GAA March 3, 2023 Region XII South Cotabato 1st District Engineering Office
23MB0001 -Preventive Maintenance - Primary Roads-Marbel-Makar Rd - K1661+(-551) - K1661+348, K1663+104.70 - K1663+790, K1663+825 - K1663+896
April 17, 2023 2023 WIN3F07131 SR2023-01-000920 January 30, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Tigbao-Sta Fe-Sn Miguel Rd - K0908+418 - K0908+555

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 111.841570 M
Structure: 6,438.78 Square meters

EAO P 4.056430 M

Total P 115.898 M

AS MODIFIED:

Tigbao-Sta Fe-Sn Miguel Rd - K0908+060 - K0908+160 (R/S), K0908+418 - K0908+555

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 111.841570 M
Structure: 4,572.23 Square meters

EAO P 4.056430 M

Total P 115.898 M
April 17, 2023 2023 WIN3F07134 SR2023-01-000927 January 30, 2023 Region VIII Regional Office VIII
OO1: Ensure Safe and Reliable National Road System

Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

AS PER GAA/ORIGINAL:

Tigbao-Sta Fe-Sn Miguel Rd - K0908+739 - K0908+814

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 57.923160 M
Structure: 3,334.67 Square meters

EAO P 2.100840 M

Total P 60.024 M

AS MODIFIED:

Tigbao-Sta Fe-Sn Miguel Rd - K0908+140 (L/S) - K0908+240, K0908+739 - K0908+814

Physical Target: Allocation:

CW1-Construction of Road Slope Protection P 57.923160 M
Structure: 2,228.79 Square meters

EAO P 2.100840 M

Total P 60.024 M
April 17, 2023 FY 2023 GAA P00734711MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/Facilities to Support Social Services
Construction of Multi-Purpose Building, Brgy. Gov. Vicente Duterte, Ardao District, Davao City
Physical Target:
CW1: 1 number of building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,800,000.00 (Construction of Multi-Purpose Building)
EAO: P 200,000.00

TO: Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/Facilities to Support Social Services
Construction of Multi-Purpose Building, Brgy. Gov. Vicente Duterte, Agdao District, Davao City
Physical Target:
CW1: 1 number of building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,800,000.00 (Construction of Multi-Purpose Building)
EAO: P 200,000.00
April 17, 2023 FY 2023 GAA P00734366MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao City District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
Construction of Road, Purok Sagittarius 2, Barangay Lasung, Davao City
Physical Target:
CW1: 1.470 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 7,000,000.00
CW1: P 6,930,000.00 (Construction of Concrete Road)
EAO: P 70,000.00

TO: Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
Construction of Road, Purok Sagittarius 2, Barangay Lasang, Davao City
Physical Target:
CW1: 1.470 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 7,000,000.00
CW1: P 6,930,000.00 (Construction of Concrete Road)
EAO: P 70,000.00
April 17, 2023 2023 WIN3F06818 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road /s leading to Major/Strategic Public Buildings / Facilities

Concreting of Road at Brgy. Mapalad, Tarlac City
April 17, 2023 FY 2023 GAA P00707212MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao City 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Davao-Bukidnon Rd - K1624+724 - K1625+321,
K1625+773 - K1626+231, K1626+750 - K1627+168,
K1627+558 - K1627+915, K1644+000 - K1644+122
Physical Target:
CW1: 3.918 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 82,000,000.00
CW1: P 79,130,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,870,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Davao-Bukidnon Rd -
K1624+724 - K1625+321, K1625+773 - K1626+231,
K1626+750 - K1627+168, K1627+558 - K1627+781
Physical Target:
CW1: 6.812 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 82,000,000.00
CW1: P 79,130,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,870,000.00
April 17, 2023 FY 2023 GAA P00707218MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao City 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Davao-Cotabato Old Rd -
K1526+301 - K1526+711, K1529+(-721) - K1529+831
Physical Target:
CW1: 3.924 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Davao-Cotabato Old Rd -
K1526+301 - K1526+576, K1529+(-721) - K1529+831
Physical Target:
CW1: 6.758 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00
April 17, 2023 2023 SR2023-01-002226 January 24, 2023 Cordillera Administrative Region CAR - Regional Office
From: Kennon Rd - K0228 + 804 - K0228 + 874;
Physical Target: 1,750 Square meters;
Allocation: Php 42,875,000.000

To: Kennon Rd - K0216 + 000 - K0216 + 115, K0224 + 037 - K0224 + 100;
Physical Target: 1,858.400 Square meters;
Allocation: Php 42,875,000.000

April 17, 2023 2023 SR2023-01-002231 January 24, 2023 Cordillera Administrative Region CAR - Regional Office
From: Kennon Rd - K0239 + 380 - K0239 + 518;
Physical Target: 1,837.550 Square meters;
Allocation: Php 45,020,000.000

To: Kennon Rd - K0218 + 480 - K0218 + 835;
Physical Target: 2,869 Square meters;
Allocation: Php 45,020,000.000

April 17, 2023 2023 SR2023-01-002221 January 24, 2023 Cordillera Administrative Region CAR - Regional Office
From: Kennon Rd - K0224 + 110 - K0224 + 210;
Physical Target: 2,666.670 Square meters;
Allocation: Php 48,000,000.000

To: Kennon Rd - K0223 + 050 - K0223 + 126;
Physical Target: 2,956.400 Square meters;
Allocation: Php 48,000,000.000

April 17, 2023 2023 WIN3E02682 SR2023-01-002223 January 24, 2023 Cordillera Administrative Region CAR - Regional Office
From: Kennon Rd - K0224 + 280 - K0224 + 505;
Physical Target: 2,666.670 Square meters;
Allocation: Php 48,000,000.000

To: Kennon Rd - K0232 + 535 - K0232 + 580;
Physical Target: 1,715 Square meters;
Allocation: Php 48,000,000.000

April 17, 2023 FY 2023 GAA WIN3E02722 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao Oriental 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Mati-Maragusan Rd -
K1522+572 - K1522+586, K1525+188 - K1525+194,
K1525+381 - K1525+393, K1533+387 - K1533+397
Physical Target:
CW1: 303.980 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,900,000.00 (Construction of Road Slope Protection Structure)
EAO: P 100,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Mati-Maragusan Rd -
K1525+177 - K1525+192, K1533+378 - K1533+388
Physical Target:
CW1: 179.000 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,900,000.00 (Construction of Road Slope Protection Structure)
EAO: P 100,000.00
April 17, 2023 2023 WIN3E02670 SR2023-03-005846 March 2, 2023 Cordillera Administrative Region CAR - Regional Office
From: Gov. Bado Dangwa National Road, K0286+840 - K0286+980, Kapangan, Benguet;
Physical Target: 7,777.778 Square meters;
Allocation: Php 140,000,000.000

To: Gov. Bado Dangwa National Road, K0286+750 - K0286+900, Kapangan, Benguet;
Physical Target: 5,210 Square meters;
Allocation: Php 140,000,000.000

April 17, 2023 2023 WIN3E02683 SR2023-03-005802 March 2, 2023 Cordillera Administrative Region CAR - Regional Office
From: Baguio-Bontoc Rd - K0359 + 398 - K0359 + 605;
Physical Target: 8,333.330 Square meters;
Allocation: Php 150,000,000.000

To: Baguio-Bontoc Rd - K0359 + 510 - K0359 + 580;
Physical Target: 5,585 Square meters;
Allocation: Php 150,000,000.000

April 17, 2023 FY 2023 GAA P00734710MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao City 2nd District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/Facilities to Support Social Services
Convergence of Multi-Purpose Building, Barangay Inayangan, Tugbok District, Davao City, Region 11
Physical Target:
CW1: 1 number of building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 2,000,000.00
CW1: P 1,980,000.00 (Construction of Multi-Purpose Building)
EAO: P 20,000.00

TO: Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/Facilities to Support Social Services
Convergence of Multi-Purpose Building, Barangay Inayangan, Calinan District, Davao City, Region 11
Physical Target:
CW1: 1 number of building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 2,000,000.00
CW1: P 1,980,000.00 (Construction of Multi-Purpose Building)
EAO: P 20,000.00
April 17, 2023 2023 WIN3E02669 SR2023-03-005804 March 2, 2023 Cordillera Administrative Region CAR - Regional Office
From: Baguio-Bontoc Rd - K0359 + 605 - K0359 + 752;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000

To: Baguio-Bontoc Rd - K0359 + 610 - K0359 + 693;
Physical Target: 3,679 Square meters;
Allocation: Php 100,000,000.000

April 17, 2023 2023 WIN3E02676 SR2023-03-005832 March 2, 2023 Cordillera Administrative Region CAR - Regional Office
From: Benguet-Nueva Vizcaya Rd - K0278 + 250 - K0278 + 320, K0278 + 540 - K0278 + 595;
Physical Target: 8,333.340 Square meters;
Allocation: Php 150,000,000.000

To: Benguet-Nueva Vizcaya Rd - K0278 + 250 - K0278 + 320, K0278 + 685 - K0278 + 725;
Physical Target: 5,675 Square meters;
Allocation: Php 150,000,000.000


April 17, 2023 2023 WIN3E02666 SR2023-03-005835 March 2, 2023 Cordillera Administrative Region CAR - Regional Office
From: Benguet-Nueva Vizcaya Rd - K0283 + 690 - K0283 + 755, K0283 + 800 - K0283 + 930;
Physical Target: 13,888.890 Square meters;
Allocation: Php 250,000,000.000

To: Benguet-Nueva Vizcaya Rd - K0283 + 368 - K0283 + 475; Physical Target: 9,695 Square meters;
Allocation: Php 250,000,000.000

April 17, 2023 2023 WIN3E02678 SR2023-03-005840 March 2, 2023 Cordillera Administrative Region CAR - Regional Office
From: Benguet-Nueva Vizcaya Rd - K0291 + 000 - K0291 + 060, K0292 + 100 - K0292 + 195;
Physical Target: 8,333.340 Square meters;
Allocation: Php 150,000,000.000

To: Benguet-Nueva Vizcaya Rd - K0292 + 100 - K0292 + 350;
Physical Target: 6,003 Square meters;
Allocation: Php 150,000,000.000

April 17, 2023 2023 WIN3E02677 SR2023-03-005843 March 2, 2023 Cordillera Administrative Region CAR - Regional Office
From: Cong. Andres Acop Cosalan Rd - K0321 + 290 - K0321 + 390;
Physical Target: 11,111.110 Square meters;
Allocation: Php 200,000,000.000

To: Cong. Andres Acop Cosalan Rd - K0321 + 250 - K0321 + 515;
Physical Target: 7,885 Square meters;
Allocation: Php 200,000,000.000

April 17, 2023 2023 WIN3E02669 SR2023-03-005820 March 2, 2023 Cordillera Administrative Region CAR - Regional Office
From: Banaue-Mayoyao-Alfonso Lista-Isabela Bndry Rd, K0353 + 740 - K0353 + 848, Banaue, Ifugao;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000

To: Banaue-Mayoyao-Alfonso Lista-Isabela Bndry Rd, K0346 + 880 - K0347 + 130, Banaue, Ifugao;
Physical Target: 3,678 Square meters;
Allocation: Php 100,000,000.000
April 17, 2023 2023 WIN3E02671 SR2023-03-005825 March 2, 2023 Cordillera Administrative Region CAR - Regional Office
From: Banaue-Mayoyao-Alfonso Lista-Isabela Bndry Rd, K0358 + 880 - K0359 + 047, Banaue, Ifugao;
Physical Target: 6,666.670 Square meters;
Allocation: Php 120,000,000.000

To: Banaue-Mayoyao-Alfonso Lista-Isabela Bndry Rd, K0361 + 090 - K0361 + 380, Banaue, Ifugao;
Physical Target: 4,421 Square meters;
Allocation: Php 120,000,000.000

April 17, 2023 2023 WIN3E02675 SR2023-03-005851 March 2, 2023 Cordillera Administrative Region CAR - Regional Office
From: Gov. Bado Dangwa National Road, K0328+1019 - K0328+1094, K0328+1119 - K0329+000, Kibungan, Benguet; Physical Target: 11,111.110 Square meters;
Allocation: Php 200,000,000.000

To: Gov. Bado Dangwa National Road, K0328+844 - K0329+000, Kibungan, Benguet;
Physical Target: 7,810 Square meters;
Allocation: Php 200,000,000.000
April 17, 2023 2023 WIN3E02680 SR2023-03-008056 March 23, 2023 Cordillera Administrative Region CAR - Regional Office
From: Construction of Barren River (Downstream) Flood Control within Chico River Basin, Sta. 36+675 - Sta. 38+200 (R/S), Conner, Apayao;
Physical Target: 1,525 Lineal meters;
Allocation: Php 120,000,000.000

To: Construction of Barren River (Downstream) Flood Control within Chico River Basin, Sta. 37+995 - Sta. 39+300 (R/S), Conner, Apayao;
Physical Target: 1,213 Lineal meters;
Allocation: Php 120,000,000.000

April 17, 2023 2023 SR2023-01-001557 January 30, 2023 Cordillera Administrative Region Baguio City District Engineering Office
From: Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Marcos Hi-way - K0280 + (-313) - K0280 + (-036), K0282 + 876 - K0283 + 454;
Type of Work: Construction of Road Slope Protection Structure;
Physical Target: 6,600 Square meters;
Allocation: Php 99,000,000.000

To: Marcos Hi-way - K0280+(-313) - K0280 + (-036), K0280 + 430 - K0280 + 870, K0282 + 876 - K0283 + 454;
Type of Work:
CW1: Construction of Road Slope Protection Structure
CW2: Road Widening;
Physical Target:
CW1: 5,210 Square meters
CW2: 1.292 Lane Km ;
Allocation: Php 99,000,000.000
April 17, 2023 FY 2023 GAA P00706497MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1680+550 - K1680+560
Physical Target:
CW1: 68.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 1,020,000.00
CW1: P 999,600.00 (Construction of Road Slope Protection Structure)
EAO: P 20,400.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1680+450 - K1680+460
Physical Target:
CW1: 104.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 1,020,000.00
CW1: P 999,600.00 (Construction of Road Slope Protection Structure)
EAO: P 20,400.00
April 17, 2023 2023 WIN3E02716 GAA 2023 January 24, 2023 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Kennon Rd - K0223+054 - K0223+104;
Type of Work: Construction of Road Slope Protection Structure;
Physical Target: 2000 Square Meters;
Allocation: Php 34,000,000.000

To: Kennon Rd - K0221+252 - K0221+279, K0223+000 - K0223+130;
Physical Target: 1587.5 Square Meters;
Allocation: Php 34,000,000.000

April 17, 2023 2023 WIN3E02721 GAA 2023 January 24, 2023 Cordillera Administrative Region Benguet 1st District Engineering Office
From: Marcos Hi-way - K0269+930 - K0269+980;
Type of Work: Construction of Road Slope Protection Structure;
Physical Target: 600.13 Square Meters;
Allocation: Php 9,230,000.000

To: Marcos Hi-way - K0269+895 - K0269+930;
Physical Target: 455.8 Square Meters;
Allocation: Php 9,230,000.000

April 17, 2023 FY 2023 GAA WIN3E02704 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1692+087 - K1692+600
Physical Target:
CW1: 5,555.560 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1688+554 - K1688+959
Physical Target:
CW1: 3,546.000 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
April 17, 2023 FY 2023 GAA WIN3E02681 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Benigno S. Aquino, Jr. National Highway - K1583+375 - K1583+675
Physical Target:
CW1: 5,555.560 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Benigno S. Aquino, Jr. National Highway - K1583+300 - K1583+600
Physical Target:
CW1: 5,670.000 square meters (Construction of Road Slope Protection Structure)
ROW: 13,135.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 95,300,000.00 (Construction of Road Slope Protection Structure)
ROW: P 1,200,000.00 (ROW Acquisition)
EAO: P 3,500,000.00
April 17, 2023 2023 WIN3E02730 GAA 2023 January 24, 2023 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: Lubuagan-Batong Buhay-Abra Bdry Rd - K0470 + 573 - K0471 + 400;
Physical Target: 1.662 Lane Km;
Allocation: Php 17,368,000.000

To: Lubuagan-Batong Buhay-Abra Bdry Rd - K0470 + 573 - K0470 + 953;
Physical Target: 0.76 Lane Km;
Allocation: Php 17,368,000.000

April 17, 2023 2023 WIN3E02727 GAA 2023 January 24, 2023 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: Lubuagan-Batong Buhay-Abra Bdry Rd - K0475 + 823 - K0476 + 426;
Physical Target: 0.599 Lane Km;
Allocation: Php 6,260,000.000

To: Lubuagan-Batong Buhay-Abra Bdry Rd - K0476 + 296 - K0476 + 426;
Physical Target: 0.26 Lane Km;
Allocation: Php 6,260,000.000

April 17, 2023 2023 GAA 2023 January 24, 2023 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0423 + 054;
Physical Target: 1 Lineal Meters;
Allocation: Php 3,000,000.000

To: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0423 + 645;
Physical Target: 12 Lineal Meters;
Allocation: Php 3,000,000.000

April 17, 2023 2023 WIN3E02714 GAA 2023 January 24, 2023 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: Kalinga-Abra Rd - K0485+1394 - K0487+1230;
Physical Target: 3.594 Lane Km;
Allocation: Php 21,000,000.000


To: Kalinga-Abra Rd - K0485+1394 - K0487+708;
Physical Target: 2.55 Lane Km;
Allocation: Php 21,000,000.000
April 17, 2023 FY 2023 GAA WIN3E02758 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao Oriental 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd -
K1670+206 - K1670+417, K1670+501 - K1670+589
Physical Target:
CW1: 5,555.560 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1689+070 - K1689+130
Physical Target:
CW1: 2,125.000 square meters (Construction of Road Slope Protection Structure)
ROW: 7,525.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 95,500,000.00 (Construction of Road Slope Protection Structure)
ROW: P 1,000,000.00 (ROW Acquisition)
EAO: P 3,500,000.00
April 17, 2023 2023 WIN3E02717 SR2023-01-002050 January 30, 2023 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0428 + 047 - K0428 + 120;
Physical Target: 5555.56 Square Meters;
Allocation: Php 100,000,000.000

To: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0428 + 047 - K0428 + 145 ;
Physical Target: 4367.86 Square Meters;
Allocation: Php 100,000,000.000