April 24, 2023 |
FY 2023 |
WIN3F06869 |
SARO-BMB-A-23-0013274 |
February 20, 2023 |
Region IV-B |
Mindoro Oriental District Engineering Office |
Construction of Bucayao Flood Control Structure along Barangay Buhuan, Sta. 0+000 - Sta. 0+161.70, Calapan City, Oriental Mindoro |
April 24, 2023 |
FY 2023 |
WIN3F06868 |
SARO-BMB-A-23-0013274 |
February 20, 2023 |
Region IV-B |
Mindoro Oriental District Engineering Office |
Construction of Bucayao Flood Control Structure along Brgy. Camansihan, Section 1 - Sta. 0+000 - Sta. 0+060, Section 2 - Sta. 0+000 - Sta. 0+107.86, Calapan City, Oriental Mindoro |
April 24, 2023 |
FY 2023 |
|
SARO-BMB-A-23-0013274 |
February 20, 2023 |
Region IV-B |
Mindoro Oriental District Engineering Office |
Construction of Bucayao River Control along Brgy. Managpi, Sta. 0+000 - Sta. 0+172.48, Calapan City, Oriental Mindoro |
April 24, 2023 |
FY 2023 |
|
SARO-BMB-A-23-0013274 |
February 20, 2023 |
Region IV-B |
Mindoro Oriental District Engineering Office |
Construction of Flood Control Structure along Sitio Bagong Pook, Barangay Gutad, Sta. 0+000 - Sta. 0+182.49, Calapan City, Oriental Mindoro |
April 24, 2023 |
FY 2023 GAA |
P00706511MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Mati-Maragusan Rd - K1499+(-211) - K1499+(-193),
K1499+(-333) - K1499+(-306), K1499+(-662) - K1499+(-618),
K1501+253 - K1501+290, K1502+745 - K1502+771,
K1503+049 - K1503+067, K1505+648 - K1505+667
Physical Target:
CW1: 2,429.38 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 34,988,000.00
CW1: P 34,288,240.00 (Construction of Road Slope Protection Structure)
EAO: P 699,760.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Mati-Maragusan Rd -
K1500+270 - K1500+330, K1501+060 - K1501+130
Physical Target:
CW1: 2,080.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 34,988,000.00
CW1: P 34,288,240.00 (Construction of Road Slope Protection Structure)
EAO: P 699,760.00 |
April 20, 2023 |
2023 |
300225101004000 |
GAA 2023 |
December 26, 2022 |
Region II |
Cagayan 2nd District Engineering Office |
Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
Construction of River Control along Langgangan River in Sta. Praxedes, Cagayan |
April 20, 2023 |
2023 |
WIN3F06972 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Bataan 2nd District Engineering Office |
Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure along Talisay River, (6+164 - 6+369), Pilar, Bataan |
April 20, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Bataan 2nd District Engineering Office |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Multi-Purpose Buildings / Facilities to Support Social Services
Construction of Multi-Purpose Building at Limay Polytechnic College, Barangay Kitang II & Luz, Limay, Bataan |
April 20, 2023 |
2023 |
WIN3F06970 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Bataan 2nd District Engineering Office |
Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure along Talisay River, (6+369 - 6+574), Pilar, Bataan |
April 20, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Bataan 2nd District Engineering Office |
Construction/Improvement of Various Infrastructures in Support of National Security (Tatag ng Imprastraktura para sa Kapayapaan at Seguridad Program - TIKAS)
Construction of Multi-Purpose Building (with Perimeter Fence), PNP, Brgy. Sto. Domingo, Orion, Bataan |
April 20, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Bataan 2nd District Engineering Office |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Multi-Purpose Buildings / Facilities to Support Social Services
Construction of Multi-Purpose Building (New Municipal Hall), Barangay San Vicente, Orion, Bataan |
April 20, 2023 |
2023 |
300105201004000 |
GAA 2023 |
December 26, 2022 |
Region II |
Cagayan 2nd District Engineering Office |
Local Program (LP) - Buildings and Other Structures - Multipurpose / Facilities - National Building Program
Construction(Completion) of DOJ Building (National Prosecution Service, Provincial Prosecution Office, Ballesteros, Cagayan Satellite Office) at Centro East, Ballesteros, Cagayan |
April 20, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Nueva Ecija 1st District Engineering Office |
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings / Facilities to Support Social Services
Construction of Legislative Bldg., Talugtug, Nueva Ecija |
April 20, 2023 |
2023 |
WIN3F07172 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Nueva Ecija 1st District Engineering Office |
Network Development Program - Construction of By-Pass and Diversion Roads
San Jose City Bypass Road, Package 4, Nueva Ecija |
April 20, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Nueva Ecija 1st District Engineering Office |
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings / Facilities to Support Social Services
Rehabilitation of Multipurpose Building (Danding N. Joson Gym) at Barangay Dos, Quezon, Nueva Ecija |
April 20, 2023 |
2023 |
310102101285000 |
GAA 2023 |
December 26, 2022 |
Region II |
Cagayan 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads - Bangag-Magapit Road (S04636LZ) K0699+147-K0699+449, K0700+242-K0701+358, K0702+828-K0703+734, Allacapan, Cagayan |
April 20, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Pampanga 2nd District Engineering Office |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures / Facilities
Construction of Slope Protection with Road Dike along GPDC, Sta. Rita - San Pedro, Lubao, Pampanga
|
April 20, 2023 |
2023 |
310201101146000 |
GAA 2023 |
December 26, 2022 |
Region II |
Cagayan 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Manila North Road K0663+000 -K0663+500 |
April 20, 2023 |
FY 2023 |
WIN3F07110 |
SR2023-01-003460 |
January 31, 2023 |
Region IV-B |
Regional Office IV-B |
Tablas Circumferential Rd - K0036+778 - K0037+990, K0041+000 - K0041+445.00, K0042+000 - K0042+375 |
April 20, 2023 |
FY 2023 |
|
SR2023-01-003475 |
January 31, 2023 |
Region IV-B |
Regional Office IV-B |
Mindoro West Coastal Rd - K0320+624 - K0324+403 |
April 20, 2023 |
FY 2023 |
WIN3F07152 |
SR2023-01-003535 |
January 31, 2023 |
Region IV-B |
Regional Office IV-B |
Puerto Princesa North Rd - K0183 + 000 - K0183 + 816, K0183 + 952 - K0184 + 629 |
April 20, 2023 |
FY 2023 |
WIN3F07153 |
SR2023-01-003541 |
January 31, 2023 |
Region IV-B |
Regional Office IV-B |
Puerto Princesa North Rd - K0184 + 629 - K0184 + 1007 |
April 20, 2023 |
FY 2023 |
WIN3F07145 |
MODIFICATION MODIFICATION 100% 11 F23 SR2023-01-003554 SR2023-01-003554 Turn on screen reader support To enable screen |
January 31, 2023 |
Region IV-B |
Regional Office IV-B |
Puerto Princesa North Rd. - K0186+ 903 - K0187 + 406 |
April 20, 2023 |
FY 2023 |
WIN3F07109 |
SR2023-01-003680 |
January 31, 2023 |
Region IV-B |
Regional Office IV-B |
Coron-Busuanga Rd - K0059 + 866 - K0061 + 527 |
April 20, 2023 |
FY 2023 |
WIN3F07146 |
SR2023-01-003628 |
January 31, 2023 |
Region IV-B |
Regional Office IV-B |
Construction of Flood Control Structure at Lumintao River, Sitio Lumintao, Barangay Malawaan, Sta. 0+000 - Sta. 0+300, Rizal, Occidental Mindoro |
April 20, 2023 |
FY 2023 |
WIN3F07150 |
SARO-BMB-A-23-0014057 |
March 9, 2023 |
Region IV-B |
Regional Office IV-B |
Construction of Dike along Dulangan River, Paitan Section, Naujan, Oriental Mindoro |
April 20, 2023 |
FY 2023 |
WIN3F07148 |
SR2023-01-003919 |
January 31, 2023 |
Region IV-B |
Regional Office IV-B |
Construction of Road Dike/Esplanade along Patrick River, Barangay Paetan Section, Sablayan, Occidental Mindoro |
April 20, 2023 |
FY 2023 |
WIN3F07149 |
MODIFICATION MODIFICATION 100% 11 F33 SR2023-01-003931 SR2023-01-003931 Turn on screen reader support To enable screen |
January 31, 2023 |
Region IV-B |
Regional Office IV-B |
Construction of Paetan-Victoria Riverbank Protection Structure with Road Component, Sablayan, Occidental Mindoro |
April 20, 2023 |
FY 2023 |
WIN3F07147 |
SARO-BMB-A-23-0014229 |
March 13, 2023 |
Region IV-B |
Regional Office IV-B |
Construction of Road Dike Brgy. Dulangan, Puerto Galera, Oriental Mindoro |
April 20, 2023 |
FY 2023 |
|
SR2023-03-005660 |
March 2, 2023 |
Region IV-B |
Mindoro Oriental District Engineering Office |
Calapan South Road K0033+545 – K0034+965 |
April 20, 2023 |
FY 2023 |
|
SR2023-03-005665 |
March 2, 2023 |
Region IV-B |
Mindoro Oriental District Engineering Office |
Calapan North Road K0008+000 – K0010+469 |
April 20, 2023 |
FY 2023 |
|
GAA-RA-11936 |
January 1, 2023 |
Region IV-B |
Mindoro Oriental District Engineering Office |
Calapan South Road K0053+511 – K0054+231.5 |
April 20, 2023 |
2023 |
23MB0133 |
FY 2023 GAA |
March 21, 2023 |
Region XII |
South Cotabato 1st District Engineering Office |
23MB0133 - Construction of Road, Balakayo, Barangay Olympog, General Santos City, South Cotabato |
April 20, 2023 |
2023 |
23MB0120 |
FY 2023 GAA |
March 6, 2023 |
Region XII |
South Cotabato 1st District Engineering Office |
Construction of Road, Balakayo, Barangay Olympog, General Santos City, South Cotabato |
April 20, 2023 |
2023 |
23MB0005 |
FY 2023 GAA |
January 30, 2023 |
Region XII |
South Cotabato 1st District Engineering Office |
23MB0005 - Preventive Maintenance - Primary Roads-Marbel-Makar Rd - K1680 + 000 - K1681 + 175.5 |
April 20, 2023 |
2023 |
23MB0048 |
FY 2023 GAA |
March 3, 2023 |
Region XII |
South Cotabato 1st District Engineering Office |
23MB0048 - Asset Preservation Program-Preventive Maintenance - Primary Roads-Makar-Marbel Rd - K1658 + 214 - K1658 +389, K1658 +449 - K1659 + 301, K1659 + 424 - K1660 + 453 |
April 20, 2023 |
2023 |
23MB0070 |
FY 2023 GAA |
March 20, 2023 |
Region XII |
South Cotabato 1st District Engineering Office |
23MB0070 - Off-Carriageway Improvement - Secondary Roads -Albert Morrow Blvd - K1653 + 059 - K1653 + 485, K1653 + 863 - K1654 + 300 |
April 19, 2023 |
CY 2023 |
|
UACS No. 310102101083000 |
March 9, 2023 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA/Original
UACS No. 310102101083000
Project ID.: P00714636LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary
Commonwealth Ave. (S05439LZ) Asphalt Overlay w/ Concrete Reblocking K0020+000 – K0020+382
Physical Target: CW1 = Preventive Maintenance of Road: Concrete Reblocking 3.438 lane km
Unit Cost (P’000) = P 17,800.90 lane/km
Allocation = P 96,500,000.00
EAO = P 3,500,000.00
Total = P 100,000,000.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Preventive Maintenance – Secondary
Commonwealth Ave. (S05439LZ) Asphalt Overlay w/ Concrete Reblocking K0019+732 – K0020+382
Physical Target: CW1 = Preventive Maintenance of Road: Concrete Reblocking 3.900 lane km
Unit Cost (P’000) = P 24,743.590 lane/km P 48 m/km
Allocation = P 96,500,000.00
EAO = P 3,500,000.00
Total = P 100,000,000.00
|
April 18, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
From: Claveria - Calanasan-Kabugao Rd - K0634 + 300 - K0634 + 400;
Type of Work: Rehabilitation of Paved Road ;
Physical Target: 0.2 Lane Km;
Allocation: Php 3,335,000.000
To: Claveria – Calanasan - Kabugao Rd - K0651 + 467.5 - K0651 + 541.5;
Type of Work:
CW1 - Reconstruction to Concrete Pavement
CW2 - Construction of Road Slope Protection Structure
CW3 - Construction of Drainage Structure along Road;
Physical Target:
CW1: 0.1355 Lane Km
CW2: 100.8 Square meters
CW3: 63 Lineal Meters ;
Allocation: Php 3,335,000.000
|
April 18, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
From: Claveria-Calanasan-Kabugao Rd - K0671 + 900 - K0671 + 960;
Type of Work: Rehabilitation of Paved Road ;
Physical Target: 0.12 Lane Km;
Allocation: Php 2,000,000.000
To: Claveria – Calanasan - Kabugao Rd - K0651 + 009 - K0651 + 040, K0651 + 144 - K0651 + 266;
Type of Work:
CW1 - Reconstruction to Concrete Pavement
CW2 - Construction of Drainage Structure along Road;
Physical Target:
CW1: 0.076 Lane Km
CW2: 102 Lineal Meters ;
Allocation: Php 2,000,000.000
|
April 18, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
From: Claveria-Calanasan-Kabugao Rd - K0672 + 1100 - K0672 + 1140;
Type of Work: Rehabilitation of Paved Road ;
Physical Target: 0.08 Lane Km;
Allocation: Php 1,334,000.000
To: Claveria – Calanasan - Kabugao Rd - K0656 + 008 - K0656 + 057.5, K0656 + 066 - K0656 + 154.5;
Type of Work: Reconstruction to Concrete Pavement;
Physical Target: 0.147 Lane Km;
Allocation: Php 1,334,000.000
|
April 18, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
From: Claveria-Calanasan-Kabugao Rd - K0672 + 1180 - K0672 + 1300;
Type of Work: Rehabilitation of Paved Road ;
Physical Target: 0.24 Lane Km;
Allocation: Php 4,001,000.000
To: Claveria – Calanasan - Kabugao Rd - K0662 + 895 - K0663 + 133;
Type of Work:
CW1 - Reconstruction to Concrete Pavement
CW2 - Construction of Drainage Structure along Road;
Physical Target:
CW1: 0.2404 Lane Km
CW2: 50 Lineal Meters ;
Allocation: Php 4,001,000.000
|
April 18, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
From: Apayao (Calanasan)-Ilocos Norte Rd - K0617 + 740 - K0617 + 810;
Type of Work: Rehabilitation of Paved Road ;
Physical Target: 0.14 Lane Km;
Allocation: Php 2,334,000.000
To: Apayao (Calanasan)-Ilocos Norte Rd - K0627+268- K0627+373, K0628+250-K0628+282, K0628+400-K0628+418, K0629+336-K0629+358.5;
Type of Work: Reconstruction to Concrete Pavement;
Physical Target: 0.232 Lane Km;
Allocation: Php 2,334,000.000
|
April 18, 2023 |
2023 |
|
SR2023-01-001443 |
January 30, 2023 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
From: Construction of Apayao - Abulug River Basin Flood Control Structure, Capannikian Section, Sta. 34 + 440 - Sta. 35 + 060 (R/S), Pudtol, Apayao;
Physical Target: 620 Lineal Meters;
Allocation: Php 100,000,000.000
To: Construction of Apayao-Abulug River Basin Flood Control Structure, Capannikian Section, Sta. 34 + 440 - Sta. 34 + 995 (R/S), Pudtol, Apayao;
Physical Target: 555 Lineal Meters;
Allocation: Php 100,000,000.000
|
April 18, 2023 |
2023 |
|
SR2023-01-001464 |
January 30, 2023 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
From:
Construction of Apayao-Abulug River basin Flood Control Structure, San Sebastian Section, Sta. 28+085 - Sta.28+705 (R/S), Luna, Apayao;
Type of Work: Construction of Flood Mitigation Structure;
Physical Target: 620 Lineal Meters;
Allocation: Php 100,000,000.000
To:
Construction of Apayao-Abulug River Basin Flood Control Structure, San Sebastian Section, Sta. 28 + 085 - Sta. 28 + 635 (R/S), Luna, Apayao;
Physical Target: 550;
Allocation: Php 100,000,000.000
|
April 18, 2023 |
2023 |
WIN3E02702 |
SR2023-01-001455 |
January 30, 2023 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
From:
Construction of Apayao - Abulug River Basin Flood Control Structure, San Mariano Section, Sta. 24 + 264 - Sta. 24 + 884 (L/S), Sta. Marcela, Apayao;
Physical Target: 620 Lineal Meters;
Allocation: Php 90,000,000.000
To:
Construction of Apayao - Abulug River Basin Flood Control Structure, San Mariano Section, Sta. 24 + 384 - Sta. 24 + 884 (L/S), Sta. Marcela, Apayao;
Physical Target: 500;
Allocation: Php 90,000,000.000
|
April 18, 2023 |
2023 |
|
SARO-BMB-A-23-0014667 |
March 21, 2023 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
From:
Construction of Multi-Purpose Building (Apayao Sports Complex) Barangay San Gregorio, Luna, Cagayan;
Type of Work: Construction of Multi Purpose Building;
Physical Target: 1 Number of Buildings;
Allocation: Php 10,000,000.000
To:
Construction of Multi-Purpose Building (Apayao Sports Complex) Barangay San Gregorio, Luna, Apayao;
Physical Target: 1 Number of Buildings;
Allocation: Php 10,000,000.000
|
April 18, 2023 |
2023 |
|
GAA FY 2023 |
March 21, 2023 |
Region VIII |
Eastern Samar District Engineering Office |
Convergence and Special Support Program
Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services
AS PER GAA/ORIGINAL:
Construction of Multi-Purpose Building, Pedro Candido Memorial National High School (PECMNHS), Brgy. Nagaja, Hermani, Eastern Samar
Physical Target: Allocation:
CW1-Construction of Multi Purpose Building: P 9.900 M
1.00 Number of Buildings
EAO P 0.100 M
Total P 10.00 M
AS MODIFIED:
Construction of Multi-Purpose Building, Pedro Candido Memorial National High School (PECMNHS), Brgy. Nagaja, Hernani, Eastern Samar
Physical Target: Allocation:
CW1-Construction of Multi Purpose Building: P 9.900 M
1.00 Number of Buildings
EAO P 0.100 M
Total P 10.00 M
|
April 18, 2023 |
2023 |
|
GAA FY 2023 |
January 2, 2023 |
Region VIII |
Eastern Samar District Engineering Office |
Convergence and Special Support Program
Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services
AS PER GAA/ORIGINAL:
Construction of Oras District Hospital (ODH) in Borongan City, Eastern Samar
Physical Target: Allocation:
CW1-Construction of Multi Purpose Building: P 19.800 M
1.00 Number of Buildings
EAO P 0.200 M
Total P 20.00 M
AS MODIFIED:
Construction of Oras District Hospital (ODH) in Oras, Eastern Samar
Physical Target: Allocation:
CW1-Construction of Multi Purpose Building: P 19.800 M
1.00 Number of Buildings
EAO P 0.200 M
Total P 20.00 M
|
April 18, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From:
Balbalan-Pinukpuk Rd - K0483 + 596 - K0485 + 000;
Physical Target: 1.512 Lane Km;
Allocation: Php 37,000,000.000
To:
Balbalan-Pinukpuk Rd - K0483 + 596 - K0484 + 347;
Physical Target: 1.512 Lane Km;
Allocation: Php 37,000,000.000
|
April 18, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From:
Kalinga-Abra Rd - K0464 + (-030) - K0464 + 000, K0465 + 264 - K0465 + 354, K0469 + 836 - K0469 + 954, K0469 + 915 - K0469 + 962, K0471 + 359 - K0471 + 437, K0473 + 068 - K0473 + 100, K0473 + 404 - K0473 + 526, K0473 + 567 - K0473 + 661, K0482 + 715 - K0482 + 814;
Physical Target: 5555.56 Square Meters;
Allocation: Php 41,766,000.000
To:
Kalinga-Abra Rd - K0464 + (-030) - K0464 + 000, K0465 + 264 - K0465 + 354, K0469 + 913 - K0469 + 954, K0469 + 915 - K0469 + 962, K0471 + 359 - K0471 + 437, K0473 + 068 - K0473 + 100, K0473 + 404 - K0473 + 526, K0473 + 567 - K0473 + 661, K0482 + 715 - K0482 + 814, K0493+493 - K0493+515 ;
Physical Target: 3759 Square Meters;
Allocation: Php 41,766,000.000
|
April 18, 2023 |
2023 |
WIN3F07170 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0703 + 000 - K0703 + 591
Physical Target: Allocation:
CW1-Road Widening: 1.182 Lane Km P 28.959 M
EAO P 0.591 M
Total P 29.550 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0703 + 000 - K0703 + 157.8, K0703 + 206.12 – K0703 + 324.77, K0703 + 354 - K0703 + 584.4
Physical Target: Allocation:
CW1-Road Widening: 0.63651 Lane Km P 12.2426958 M
CW2-Construction of Road Slope Protection P 7.74224367 M
Structure: 496.5 Square meters
CW3-Preventive Maintenance of Road: P 5.59855225 M
Concrete Reblocking: 0.4798 Lane Km
ROW-ROW Acquisition: 516.83 Square meters P 3.37550828 M
EAO P 0.591 M
Total P 29.550 M
|
April 18, 2023 |
2023 |
|
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development - Road Widening - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0697 + 000 - K0697 + 202, K0698 + 720 - K0699 + 034
Physical Target: Allocation:
CW1-Road Widening: 1.086 Lane Km P 26.607 M
EAO P 0.543 M
Total P 27.150 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0697 + 000 - K0697 + 202, K0698 + 720 - K0699 + 026
Physical Target: Allocation:
CW1-Road Widening: 0.710 Lane Km P 16.86697480 M
CW2-Construction of Drainage Structure P 6.64002520 M
along Road: 306 Lineal meters
ROW-ROW Acquisition: 1,065 Square meters P 3.100000 M
EAO P 0.543 M
Total P 27.150 M
|
April 18, 2023 |
2023 |
|
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0729 + 475 - K0731 + 000
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 39.225480 M
along Road: 1,531 Lineal meters
EAO P 0.800520 M
Total P 40.026 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0729 + 550 - K0730 + 801
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 35.647430 M
along Road: 1,257 Lineal meters
ROW-ROW Acquisition: 1,240.83 Square meters P 3.578050 M
EAO P 0.800520 M
Total P 40.026 M
|
April 18, 2023 |
2023 |
|
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads
AS PER GAA/ORIGINAL:
Calbayog-Catarman Rd - K0787 + 693 - K0788 + 250
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 25.705400 M
along Road: 512 Lineal meters
EAO P 0.524600 M
Total P 26.230 M
AS MODIFIED:
Calbayog-Catarman Rd - K0787 + 718 - K0788 + 173
Physical Target: Allocation:
CW1-Construction of Drainage Structure P 20.86115914 M
along Road: 747 Lineal meters
CW2-Road Widening: 0.292 Lane Km P 4.84424086 M
EAO P 0.524600 M
Total P 26.230 M
|
April 18, 2023 |
2023 |
|
SR2023-01-002253 |
January 31, 2023 |
Region VIII |
Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads
AS PER GAA/ORIGINAL:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0774 + 000 - K0775 + 000
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 67.550 M
Structure: 4,563.230 Square meters
EAO P 2.450 M
Total P 70.00 M
AS MODIFIED:
Daang Maharlika (SM) (Sn Isidro-Sn Juanico Br) - K0774 + 118 - K0774 + 263, K0774 + 555 – K0774 + 641
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 67.550 M
Structure: 4,620 Square meters
EAO P 2.450 M
Total P 70.00 M
|
April 18, 2023 |
2023 |
WIN3F07154 |
GAA FY 2023 |
January 1, 2023 |
Region VIII |
Samar 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
AS PER GAA/ORIGINAL:
Calbayog-Catarman Rd - K0803 + 892 - K0803 + 942
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 29.400 M
Structure: 2,000 Square meters
EAO P 0.600 M
Total P 30.00 M
AS MODIFIED:
Calbayog-Catarman Rd - K0803 + 853 - K0803 + 942
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 29.400 M
Structure: 1,217.52 Square meters
EAO P 0.600 M
Total P 30.00 M
|
April 18, 2023 |
FY 2023 GAA |
P00706375MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads
Tibanban-Lavigan Rd - K1785+854 - K1786+003
Physical Target:
CW1: 5,555.560 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads
Tibanban-Lavigan Rd - K1786+308 - K1786+597
Physical Target:
CW1: 4,946.637 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00 |
April 18, 2023 |
FY 2023 GAA |
WIN3E02720 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Mati-Maragusan Rd -
K1499+292 - K1499+302, K1499+462 - K1499+582,
K1499+617 - K1499+630, K1501+324 - K1501+336,
K1502+670 - K1502+800, K1503+060 - K1503+073,
K1505+676 - K1505+690, K1505+740 - K1505+754,
K1507+851 - K1507+867, K1511+830 - K1511+843
Physical Target:
CW1: 7,961.860 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Mati-Maragusan Rd - K1501+130 - K1501+240,
K1502+577 - K1502+620, K1502+657 - K1502+755,
K1502+850 - K1502+918, K1505+648 - K1505+675,
K1507+780 - K1507+811, K1507+817 - K1507+830
Physical Target:
CW1: 6,408.608 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00 |
April 18, 2023 |
FY 2023 GAA |
WIN3E02708 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way - K1774+838 - K1774+918
Physical Target:
CW1: 5,555.56 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Primary Roads
Pres. Diosdado P. Macapagal Natl Hi-way - K1774+021 - K1774+330
Physical Target:
CW1: 4,439.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00 |
April 18, 2023 |
2023 |
23MB0121 |
FY 2023 GAA |
March 6, 2023 |
Region XII |
South Cotabato 1st District Engineering Office |
23MB0121 - Concreting of Road with Drainage System, Purok Kabuling, Brgy. Tinagacan to Purok Lower Labay, Brgy. Tinagacan, General Santos City |
April 18, 2023 |
2023 |
23MB0109 |
FY 2023 GAA |
March 16, 2023 |
Region XII |
South Cotabato 1st District Engineering Office |
23MB0109 - Concreting of Jct. NWH Crossing Repolyo, Barangay Lamcaliaf - Barangay Kinilis Road, Municipality of Polomolok |
April 18, 2023 |
2023 |
23MB0081 |
FY 2023 GAA |
March 13, 2023 |
Region XII |
South Cotabato 1st District Engineering Office |
23MB0081 - Construction of Road, Barangay Tinagacan, General Santos City |
April 18, 2023 |
2023 |
23MB0001 |
FY 2023 GAA |
March 3, 2023 |
Region XII |
South Cotabato 1st District Engineering Office |
23MB0001 -Preventive Maintenance - Primary Roads-Marbel-Makar Rd - K1661+(-551) - K1661+348, K1663+104.70 - K1663+790, K1663+825 - K1663+896
|
April 17, 2023 |
2023 |
WIN3F07131 |
SR2023-01-000920 |
January 30, 2023 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Tigbao-Sta Fe-Sn Miguel Rd - K0908+418 - K0908+555
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 111.841570 M
Structure: 6,438.78 Square meters
EAO P 4.056430 M
Total P 115.898 M
AS MODIFIED:
Tigbao-Sta Fe-Sn Miguel Rd - K0908+060 - K0908+160 (R/S), K0908+418 - K0908+555
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 111.841570 M
Structure: 4,572.23 Square meters
EAO P 4.056430 M
Total P 115.898 M
|
April 17, 2023 |
2023 |
WIN3F07134 |
SR2023-01-000927 |
January 30, 2023 |
Region VIII |
Regional Office VIII |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
AS PER GAA/ORIGINAL:
Tigbao-Sta Fe-Sn Miguel Rd - K0908+739 - K0908+814
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 57.923160 M
Structure: 3,334.67 Square meters
EAO P 2.100840 M
Total P 60.024 M
AS MODIFIED:
Tigbao-Sta Fe-Sn Miguel Rd - K0908+140 (L/S) - K0908+240, K0908+739 - K0908+814
Physical Target: Allocation:
CW1-Construction of Road Slope Protection P 57.923160 M
Structure: 2,228.79 Square meters
EAO P 2.100840 M
Total P 60.024 M
|
April 17, 2023 |
FY 2023 GAA |
P00734711MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/Facilities to Support Social Services
Construction of Multi-Purpose Building, Brgy. Gov. Vicente Duterte, Ardao District, Davao City
Physical Target:
CW1: 1 number of building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,800,000.00 (Construction of Multi-Purpose Building)
EAO: P 200,000.00
TO: Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/Facilities to Support Social Services
Construction of Multi-Purpose Building, Brgy. Gov. Vicente Duterte, Agdao District, Davao City
Physical Target:
CW1: 1 number of building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 20,000,000.00
CW1: P 19,800,000.00 (Construction of Multi-Purpose Building)
EAO: P 200,000.00 |
April 17, 2023 |
FY 2023 GAA |
P00734366MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao City District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
Construction of Road, Purok Sagittarius 2, Barangay Lasung, Davao City
Physical Target:
CW1: 1.470 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 7,000,000.00
CW1: P 6,930,000.00 (Construction of Concrete Road)
EAO: P 70,000.00
TO: Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)
Construction of Road, Purok Sagittarius 2, Barangay Lasang, Davao City
Physical Target:
CW1: 1.470 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 7,000,000.00
CW1: P 6,930,000.00 (Construction of Concrete Road)
EAO: P 70,000.00 |
April 17, 2023 |
2023 |
WIN3F06818 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Tarlac District Engineering Office |
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road /s leading to Major/Strategic Public Buildings / Facilities
Concreting of Road at Brgy. Mapalad, Tarlac City |
April 17, 2023 |
FY 2023 GAA |
P00707212MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao City 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Davao-Bukidnon Rd - K1624+724 - K1625+321,
K1625+773 - K1626+231, K1626+750 - K1627+168,
K1627+558 - K1627+915, K1644+000 - K1644+122
Physical Target:
CW1: 3.918 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 82,000,000.00
CW1: P 79,130,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,870,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Davao-Bukidnon Rd -
K1624+724 - K1625+321, K1625+773 - K1626+231,
K1626+750 - K1627+168, K1627+558 - K1627+781
Physical Target:
CW1: 6.812 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 82,000,000.00
CW1: P 79,130,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,870,000.00 |
April 17, 2023 |
FY 2023 GAA |
P00707218MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao City 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Davao-Cotabato Old Rd -
K1526+301 - K1526+711, K1529+(-721) - K1529+831
Physical Target:
CW1: 3.924 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Davao-Cotabato Old Rd -
K1526+301 - K1526+576, K1529+(-721) - K1529+831
Physical Target:
CW1: 6.758 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 49,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,000,000.00 |
April 17, 2023 |
2023 |
|
SR2023-01-002226 |
January 24, 2023 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Kennon Rd - K0228 + 804 - K0228 + 874;
Physical Target: 1,750 Square meters;
Allocation: Php 42,875,000.000
To: Kennon Rd - K0216 + 000 - K0216 + 115, K0224 + 037 - K0224 + 100;
Physical Target: 1,858.400 Square meters;
Allocation: Php 42,875,000.000
|
April 17, 2023 |
2023 |
|
SR2023-01-002231 |
January 24, 2023 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Kennon Rd - K0239 + 380 - K0239 + 518;
Physical Target: 1,837.550 Square meters;
Allocation: Php 45,020,000.000
To: Kennon Rd - K0218 + 480 - K0218 + 835;
Physical Target: 2,869 Square meters;
Allocation: Php 45,020,000.000
|
April 17, 2023 |
2023 |
|
SR2023-01-002221 |
January 24, 2023 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Kennon Rd - K0224 + 110 - K0224 + 210;
Physical Target: 2,666.670 Square meters;
Allocation: Php 48,000,000.000
To: Kennon Rd - K0223 + 050 - K0223 + 126;
Physical Target: 2,956.400 Square meters;
Allocation: Php 48,000,000.000
|
April 17, 2023 |
2023 |
WIN3E02682 |
SR2023-01-002223 |
January 24, 2023 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Kennon Rd - K0224 + 280 - K0224 + 505;
Physical Target: 2,666.670 Square meters;
Allocation: Php 48,000,000.000
To: Kennon Rd - K0232 + 535 - K0232 + 580;
Physical Target: 1,715 Square meters;
Allocation: Php 48,000,000.000
|
April 17, 2023 |
FY 2023 GAA |
WIN3E02722 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Mati-Maragusan Rd -
K1522+572 - K1522+586, K1525+188 - K1525+194,
K1525+381 - K1525+393, K1533+387 - K1533+397
Physical Target:
CW1: 303.980 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,900,000.00 (Construction of Road Slope Protection Structure)
EAO: P 100,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Mati-Maragusan Rd -
K1525+177 - K1525+192, K1533+378 - K1533+388
Physical Target:
CW1: 179.000 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 5,000,000.00
CW1: P 4,900,000.00 (Construction of Road Slope Protection Structure)
EAO: P 100,000.00 |
April 17, 2023 |
2023 |
WIN3E02670 |
SR2023-03-005846 |
March 2, 2023 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Gov. Bado Dangwa National Road, K0286+840 - K0286+980, Kapangan, Benguet;
Physical Target: 7,777.778 Square meters;
Allocation: Php 140,000,000.000
To: Gov. Bado Dangwa National Road, K0286+750 - K0286+900, Kapangan, Benguet;
Physical Target: 5,210 Square meters;
Allocation: Php 140,000,000.000
|
April 17, 2023 |
2023 |
WIN3E02683 |
SR2023-03-005802 |
March 2, 2023 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Baguio-Bontoc Rd - K0359 + 398 - K0359 + 605;
Physical Target: 8,333.330 Square meters;
Allocation: Php 150,000,000.000
To: Baguio-Bontoc Rd - K0359 + 510 - K0359 + 580;
Physical Target: 5,585 Square meters;
Allocation: Php 150,000,000.000
|
April 17, 2023 |
FY 2023 GAA |
P00734710MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao City 2nd District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/Facilities to Support Social Services
Convergence of Multi-Purpose Building, Barangay Inayangan, Tugbok District, Davao City, Region 11
Physical Target:
CW1: 1 number of building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 2,000,000.00
CW1: P 1,980,000.00 (Construction of Multi-Purpose Building)
EAO: P 20,000.00
TO: Convergence and Special Support Program (CSSP) - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/Facilities to Support Social Services
Convergence of Multi-Purpose Building, Barangay Inayangan, Calinan District, Davao City, Region 11
Physical Target:
CW1: 1 number of building (Construction of Multi-Purpose Building)
Allocation:
TOTAL: P 2,000,000.00
CW1: P 1,980,000.00 (Construction of Multi-Purpose Building)
EAO: P 20,000.00 |
April 17, 2023 |
2023 |
WIN3E02669 |
SR2023-03-005804 |
March 2, 2023 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Baguio-Bontoc Rd - K0359 + 605 - K0359 + 752;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000
To: Baguio-Bontoc Rd - K0359 + 610 - K0359 + 693;
Physical Target: 3,679 Square meters;
Allocation: Php 100,000,000.000
|
April 17, 2023 |
2023 |
WIN3E02676 |
SR2023-03-005832 |
March 2, 2023 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Benguet-Nueva Vizcaya Rd - K0278 + 250 - K0278 + 320, K0278 + 540 - K0278 + 595;
Physical Target: 8,333.340 Square meters;
Allocation: Php 150,000,000.000
To: Benguet-Nueva Vizcaya Rd - K0278 + 250 - K0278 + 320, K0278 + 685 - K0278 + 725;
Physical Target: 5,675 Square meters;
Allocation: Php 150,000,000.000
|
April 17, 2023 |
2023 |
WIN3E02666 |
SR2023-03-005835 |
March 2, 2023 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Benguet-Nueva Vizcaya Rd - K0283 + 690 - K0283 + 755, K0283 + 800 - K0283 + 930;
Physical Target: 13,888.890 Square meters;
Allocation: Php 250,000,000.000
To: Benguet-Nueva Vizcaya Rd - K0283 + 368 - K0283 + 475; Physical Target: 9,695 Square meters;
Allocation: Php 250,000,000.000
|
April 17, 2023 |
2023 |
WIN3E02678 |
SR2023-03-005840 |
March 2, 2023 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Benguet-Nueva Vizcaya Rd - K0291 + 000 - K0291 + 060, K0292 + 100 - K0292 + 195;
Physical Target: 8,333.340 Square meters;
Allocation: Php 150,000,000.000
To: Benguet-Nueva Vizcaya Rd - K0292 + 100 - K0292 + 350;
Physical Target: 6,003 Square meters;
Allocation: Php 150,000,000.000
|
April 17, 2023 |
2023 |
WIN3E02677 |
SR2023-03-005843 |
March 2, 2023 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Cong. Andres Acop Cosalan Rd - K0321 + 290 - K0321 + 390;
Physical Target: 11,111.110 Square meters;
Allocation: Php 200,000,000.000
To: Cong. Andres Acop Cosalan Rd - K0321 + 250 - K0321 + 515;
Physical Target: 7,885 Square meters;
Allocation: Php 200,000,000.000
|
April 17, 2023 |
2023 |
WIN3E02669 |
SR2023-03-005820 |
March 2, 2023 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Banaue-Mayoyao-Alfonso Lista-Isabela Bndry Rd, K0353 + 740 - K0353 + 848, Banaue, Ifugao;
Physical Target: 5,555.560 Square meters;
Allocation: Php 100,000,000.000
To: Banaue-Mayoyao-Alfonso Lista-Isabela Bndry Rd, K0346 + 880 - K0347 + 130, Banaue, Ifugao;
Physical Target: 3,678 Square meters;
Allocation: Php 100,000,000.000
|
April 17, 2023 |
2023 |
WIN3E02671 |
SR2023-03-005825 |
March 2, 2023 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Banaue-Mayoyao-Alfonso Lista-Isabela Bndry Rd, K0358 + 880 - K0359 + 047, Banaue, Ifugao;
Physical Target: 6,666.670 Square meters;
Allocation: Php 120,000,000.000
To: Banaue-Mayoyao-Alfonso Lista-Isabela Bndry Rd, K0361 + 090 - K0361 + 380, Banaue, Ifugao;
Physical Target: 4,421 Square meters;
Allocation: Php 120,000,000.000
|
April 17, 2023 |
2023 |
WIN3E02675 |
SR2023-03-005851 |
March 2, 2023 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Gov. Bado Dangwa National Road, K0328+1019 - K0328+1094, K0328+1119 - K0329+000, Kibungan, Benguet; Physical Target: 11,111.110 Square meters;
Allocation: Php 200,000,000.000
To: Gov. Bado Dangwa National Road, K0328+844 - K0329+000, Kibungan, Benguet;
Physical Target: 7,810 Square meters;
Allocation: Php 200,000,000.000
|
April 17, 2023 |
2023 |
WIN3E02680 |
SR2023-03-008056 |
March 23, 2023 |
Cordillera Administrative Region |
CAR - Regional Office |
From: Construction of Barren River (Downstream) Flood Control within Chico River Basin, Sta. 36+675 - Sta. 38+200 (R/S), Conner, Apayao;
Physical Target: 1,525 Lineal meters;
Allocation: Php 120,000,000.000
To: Construction of Barren River (Downstream) Flood Control within Chico River Basin, Sta. 37+995 - Sta. 39+300 (R/S), Conner, Apayao;
Physical Target: 1,213 Lineal meters;
Allocation: Php 120,000,000.000
|
April 17, 2023 |
2023 |
|
SR2023-01-001557 |
January 30, 2023 |
Cordillera Administrative Region |
Baguio City District Engineering Office |
From: Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads - Marcos Hi-way - K0280 + (-313) - K0280 + (-036), K0282 + 876 - K0283 + 454;
Type of Work: Construction of Road Slope Protection Structure;
Physical Target: 6,600 Square meters;
Allocation: Php 99,000,000.000
To: Marcos Hi-way - K0280+(-313) - K0280 + (-036), K0280 + 430 - K0280 + 870, K0282 + 876 - K0283 + 454;
Type of Work:
CW1: Construction of Road Slope Protection Structure
CW2: Road Widening;
Physical Target:
CW1: 5,210 Square meters
CW2: 1.292 Lane Km ;
Allocation: Php 99,000,000.000
|
April 17, 2023 |
FY 2023 GAA |
P00706497MN |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1680+550 - K1680+560
Physical Target:
CW1: 68.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 1,020,000.00
CW1: P 999,600.00 (Construction of Road Slope Protection Structure)
EAO: P 20,400.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1680+450 - K1680+460
Physical Target:
CW1: 104.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 1,020,000.00
CW1: P 999,600.00 (Construction of Road Slope Protection Structure)
EAO: P 20,400.00 |
April 17, 2023 |
2023 |
WIN3E02716 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: Kennon Rd - K0223+054 - K0223+104;
Type of Work: Construction of Road Slope Protection Structure;
Physical Target: 2000 Square Meters;
Allocation: Php 34,000,000.000
To: Kennon Rd - K0221+252 - K0221+279, K0223+000 - K0223+130;
Physical Target: 1587.5 Square Meters;
Allocation: Php 34,000,000.000
|
April 17, 2023 |
2023 |
WIN3E02721 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Benguet 1st District Engineering Office |
From: Marcos Hi-way - K0269+930 - K0269+980;
Type of Work: Construction of Road Slope Protection Structure;
Physical Target: 600.13 Square Meters;
Allocation: Php 9,230,000.000
To: Marcos Hi-way - K0269+895 - K0269+930;
Physical Target: 455.8 Square Meters;
Allocation: Php 9,230,000.000
|
April 17, 2023 |
FY 2023 GAA |
WIN3E02704 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1692+087 - K1692+600
Physical Target:
CW1: 5,555.560 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1688+554 - K1688+959
Physical Target:
CW1: 3,546.000 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00 |
April 17, 2023 |
FY 2023 GAA |
WIN3E02681 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Benigno S. Aquino, Jr. National Highway - K1583+375 - K1583+675
Physical Target:
CW1: 5,555.560 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Benigno S. Aquino, Jr. National Highway - K1583+300 - K1583+600
Physical Target:
CW1: 5,670.000 square meters (Construction of Road Slope Protection Structure)
ROW: 13,135.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 95,300,000.00 (Construction of Road Slope Protection Structure)
ROW: P 1,200,000.00 (ROW Acquisition)
EAO: P 3,500,000.00 |
April 17, 2023 |
2023 |
WIN3E02730 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: Lubuagan-Batong Buhay-Abra Bdry Rd - K0470 + 573 - K0471 + 400;
Physical Target: 1.662 Lane Km;
Allocation: Php 17,368,000.000
To: Lubuagan-Batong Buhay-Abra Bdry Rd - K0470 + 573 - K0470 + 953;
Physical Target: 0.76 Lane Km;
Allocation: Php 17,368,000.000
|
April 17, 2023 |
2023 |
WIN3E02727 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: Lubuagan-Batong Buhay-Abra Bdry Rd - K0475 + 823 - K0476 + 426;
Physical Target: 0.599 Lane Km;
Allocation: Php 6,260,000.000
To: Lubuagan-Batong Buhay-Abra Bdry Rd - K0476 + 296 - K0476 + 426;
Physical Target: 0.26 Lane Km;
Allocation: Php 6,260,000.000
|
April 17, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0423 + 054;
Physical Target: 1 Lineal Meters;
Allocation: Php 3,000,000.000
To: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0423 + 645;
Physical Target: 12 Lineal Meters;
Allocation: Php 3,000,000.000
|
April 17, 2023 |
2023 |
WIN3E02714 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: Kalinga-Abra Rd - K0485+1394 - K0487+1230;
Physical Target: 3.594 Lane Km;
Allocation: Php 21,000,000.000
To: Kalinga-Abra Rd - K0485+1394 - K0487+708;
Physical Target: 2.55 Lane Km;
Allocation: Php 21,000,000.000
|
April 17, 2023 |
FY 2023 GAA |
WIN3E02758 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd -
K1670+206 - K1670+417, K1670+501 - K1670+589
Physical Target:
CW1: 5,555.560 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Road Slope Protection Structure)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslides - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1689+070 - K1689+130
Physical Target:
CW1: 2,125.000 square meters (Construction of Road Slope Protection Structure)
ROW: 7,525.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 95,500,000.00 (Construction of Road Slope Protection Structure)
ROW: P 1,000,000.00 (ROW Acquisition)
EAO: P 3,500,000.00 |
April 17, 2023 |
2023 |
WIN3E02717 |
SR2023-01-002050 |
January 30, 2023 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0428 + 047 - K0428 + 120;
Physical Target: 5555.56 Square Meters;
Allocation: Php 100,000,000.000
To: Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd - K0428 + 047 - K0428 + 145 ;
Physical Target: 4367.86 Square Meters;
Allocation: Php 100,000,000.000
|