Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
June 14, 2023 2023 RXII-111 GAA 2023 RA 11936 January 1, 2023 Region XII Cotabato 2nd District Engineering Office
23MC0073 Construction of Road Slope Protection along Davao-Cotabato Rd (Jct Digos-Cotabato Sect) K1608 + 410 - K1609 + 758, Makilala, North Cotabato
June 14, 2023 2023 WIN3F07388 FY 2023 GAA December 26, 2022 Region V Masbate 2nd District Engineering Office
Project ID : P00732953LZ

FROM : Physical Target :
CW1 - Construction of Concrete Road - 1.702 Lane Km

TO : Physical Target :
CW1 - Construction of Concrete Road - 1.200 Lane Km
June 14, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00732964LZ

FROM : Physical Target :
CW1 - Construction of Concrete Road - 0.064 Lane Km

TO : Physical Target :
CW1 - Construction of Concrete Road - 0.086 Lane Km
June 14, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00736380LZ

FROM : Physical Target :
CW1 - Construction of Concrete Road - 2.093 Lane Km,
CW2 - Construction of Drainage Structure along Road - 2093.48 Lineal maters,
CW3 - Construction of Road Slope Protection Structure - 6799.36 Square meters



TO : Physical Target :
CW1 - Construction of Concrete Road - 2.06608 Lane Km,
CW2 - Construction of Drainage Structure along Road - 2066.08,
CW3 - Construction of Road Slope Protection Structure - 6740.39 Square meters
June 13, 2023 2023 FY 2023 GAA December 26, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00712762LZ

FROM : Physical Target : CW1 - Preventive Maintenance of Road: Asphalt Overlay - 1.824 Lane Km

TO : Physical Target : CW1 - Preventive Maintenance of Road: Asphalt Overlay - 1.596 Lane Km
June 13, 2023 2023 WIN3F07389 FY 2023 GAA December 26, 2022 Region V Albay 2nd Engineering Office
Project ID : P00711989LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads

Legazpi City - Punta de Jesus Rd - K0571 + 110 - K0571 + 370

Physical Target : CW1 - Road Widening - 0.52 Lane Km

TO : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads

Legazpi City - Punta de Jesus Rd - K0571 + 227 - K0571 + 346

Physical Target : CW1 - Road Widening - 0.238 Lane Km, RROW - ROW Acquisition - 1148 Square Meters
June 13, 2023 2023 WIN3F07391 FY 2023 GAA December 26, 2022 Region V Albay 2nd Engineering Office
Project ID : P00711993LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads

Legazpi City - Punta de Jesus Rd - K0549 + 650 - K0549 + 884

Physical Target : CW1 - Road Widening - 0.468 Lane Km


TO : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads

Legazpi City - Punta de Jesus Road - K0563 + 053 - K0563 + 163

Physical Target : CW1 - Road Widening - 0.22 Lane Km
June 13, 2023 2023 FY 2023 GAA December 26, 2022 Region V Albay 2nd Engineering Office
Project ID : P00712233LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads

Comun - Inarado - Peñafrancia Rd - K0520 + 020 - K0520 + 400, K0522 + 300 - K0522 + 310

Physical Target : CW1 - Construction of Drainage Structure along Road - 400 Lineal Meters



TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads

Comun - Inarado - Peñafrancia Rd - K0528 + 883 - K0529 + 230

Physical Target : CW1 - Construction of Drainage Structure along Road - 351 Lineal Meters
June 13, 2023 2023 FY 2023 GAA December 26, 2022 Region V Albay 2nd Engineering Office
Project ID : P00712234LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

Legazpi City - Punta de Jesus Rd - K0533 + 607 - K0533 + 700, K0539 + 800 - K0539 + 900, K0540 + 150 - K0540 + 290

Physical Target : CW1 - Construction of Drainage Structure along Road 333 Lineal Meters


TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

Legazpi City - Punta de Jesus Rd - K0533 + 607 - K0533 + 787

Physical Target : CW1 - Construction of Drainage Structure along Road - 360 Lineal Meters
June 13, 2023 2023 FY 2023 GAA December 26, 2022 Region V Masbate 2nd District Engineering Office
Project ID : P00712241LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

Masbate - Milagros Rd - K0002 + (-489) - K0002 + (-082), K0022 + 930 - K0022 + 981

Physical Target : CW1 - Construction of Drainage Structure along Road - 509 Lineal meters


TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

Masbate - Milagros Rd - K0002 + (-489) - K0002 + (-082)

Physical Target : CW1 - Construction of Drainage Structure along Road - 484 Lineal meters, CW2 - Off-Carriageway Improvement Construction of Bike Lanes - 1904.75 Square meters, EAO
June 8, 2023 CY 2023 UACS No. 300215102950000 March 14, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300215102950000
Project ID.: P00739942LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major Strategic Public Buildings/Facilities
Rehabiliation of Road along P. Sevilla Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.450 Lane Km
Unit Cost (P’000) = P 26,133.33/Lane Km
Allocation (P’000) = P 11,760.00
EAO = P 240,000.00
Total = P 12,000,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major Strategic Public Buildings/Facilities
Rehabilitation of Road along P. Sevilla Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.450 Lane Km
Unit Cost (P’000) = P 26,133.33/Lane Km P 52 m Km.
Allocation (P’000) = P 11,760.00
EAO = P 240,000.00
Total = P 12,000,000.00
June 7, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 310302100405000
Project ID: P00706720MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Bridge Program - Replacement of Permanent Weak Bridges

FROM:

Wawa Br. (B00896MN) along Daang Maharlika (Agusan-Davao Sect)

Type of Work:
CW1- Replacement of Bridge

Physical Target:
CW1- 2128.173 Square meters

Allocation:
TOTAL: P 150,000,000
CW1: P 144,750,000
EAO: P 5,250,000

Unit Cost:
CW1: P 68,016.09/Square meters

TO:

Wawa Br. (B00896MN) along Daang Maharlika (Agusan-Davao Sect)

Type of Work:
CW1- Replacement of Bridge

Physical Target:
CW1- 2289.6 Square meters

Allocation:
TOTAL: P 150,000,000
CW1: P 144,750,000
EAO: P 5,250,000

Unit Cost:
CW1: P 63,220.65/Square meters
June 7, 2023 2023 WIN3F07365 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00740251LZ

FROM : Physical Target :
CW1 - Construction of Concrete Road - 9.269 Lane Km

TO : Physical Target :
CW1 - Construction of Concrete Road - 4.52558 Lane Km,
CW2 - Construction of Drainage Structure along Road 3496,55 Lineal meters
June 7, 2023 2023 WIN3F07076 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00736134LZ

FROM : CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities

Construction of Flood Mitigation Structure along Brgy. Sta. Rosa and Brgy. Burgos, San Jacinto, Masbate

Physical Target : CW1 - Construction of Flood Mitigation Structure - 382.002 Lineal meters


TO : CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities

Construction of Flood Mitigation Structure along Brgy. Sta. Rosa and Brgy. Burgos, San Jacinto, Masbate

Physical Target : CW1 - Structure of Flood Mitigation Structure - 222.8 Lineal meters
June 6, 2023 2023 WIN3F06916 FY 2023 GAA December 26, 2022 Region V Masbate 1st District Engineering Office
Project ID : P00713034LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Sn Fernando - Talisay Rd - K0004 + 007 - K0004 + 163

Physical Target : CW1 - Rehabilitation of Paved Road - 0.312 Lane Km


TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Sn Fernando - Talisay Rd - K0004 + 007 - K0004 + 121

Physical Target : CW1 - Rehabilitation of Paved Road - 0.228 Lane Km
June 6, 2023 2023 WIN3F06892 FY 2023 GAA December 26, 2022 Region V Masbate 1st District Engineering Office
Project ID : P00713035LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Sn Pascual - Claveria Rd - K0003 + 099 - K0003 + 140, K0003 + 884 - K0004 + 000

Physical Target : CW1 - Rehabilitation of Paved Road - 0.318 Lane Km

TO : OO1 Ensure Safe and Reliable Nation Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Sn Pascual - Claveria Rd - K0003 + 099 - K0003 + 140, K0003 + 929 - K0004 + 000

Physical Target : CW1 - Rehabilitation of Paved Road - 0.228 Lane Km
June 6, 2023 2023 WIN3F06890 FY 2023 GAA December 26, 2022 Region V Masbate 1st District Engineering Office
Project ID : P00713036LZ

FROM : OO1 Ensure Safe and Reliable National Road - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Sn Pascual - Claveria Rd - K0005 + 368 - K0005 + 524

Physical Target : CW1 - Rehabilitation of Paved Road - 0.312 Lane Km

TO: OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Sn Pascual - Claveria Rd - K0005 + 410 - K0005 + 524

Physical Target : CW1 - Rehabilitation of Paved Road - 0.228 Lane Km
June 6, 2023 2023 WIN3F06895 FY 2023 GAA December 26, 2022 Region V Masbate 1st District Engineering Office
Project ID : P00713037LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Sn Pascual - Claveria Rd - K0006 + 909 - K0007 + 000, K0008 + 596 - K0008 + 654

Physical Target : CW1 - Rehabilitation of Paved Road - 0.310 Lane Km



TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads


Sn Pascual - Claveria Rd - K0006 + 909 - K0007 + 000, K0008 + 596 - K0008 + 612

CW1 - Rehabilitation of Paved Road - 0.226 Lane Km
June 6, 2023 2023 WIN3F06893 FY 2023 GAA December 26, 2022 Region V Masbate 1st District Engineering Office
Project ID : P00714182LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Sn Fernando North Rd - K0006 + 132 - K0006 + 538, K0009 + 846 - K0010 + 650, K0011 + 678 - K0011 + 1010

Physical Target : CW1 - Rehabilitation of Paved Road - 3.098 Lane Km

TO: OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Sn Fernando North Rd - K0006 + 132 - K0006 + 538, K0009 + 000 - K0009 + 356, K0009 + 966 - K0010 + 238, K0010 + 586 - K0010 + 686

Physical Target : CW1 - Rehabilitation of Paved Road - 2.282 Lane Km
June 6, 2023 2023 FY 2023 GAA December 26, 2022 Region V Masbate 1st District Engineering Office
Project ID : P00714185LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Sn Fernando South Rd - K0001 + 170 - K0002 + 000, K0006 + 249 K0006 + 299

Physical Target : CW1 - Rehabilitation of Paved Road 1.724 Lane Km


TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Sn Fernando South Rd - K0001 + 282 - K0002 + 000, K0006 + 060 - K0006 + 130, K0006 + 200 + 200 - K0006 + 320, K0006 + 390 - K0006 + 432

Physical Target : CW1 - Rehabilitation of Paved Road - 1.858 Lane Km
June 6, 2023 2023 WIN3F07380 FY 2023 GAA December 26, 2022 Region V Masbate 3rd District Engineering Office
Project ID : P00726303LZ

FROM : OO2 Protect Lives and Properties Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Concrete Revetment at Marcella River, Upstream Leftside, Barangay Marcella, Sta. 0+000.00 - Sta. 0+300.00, Uson, Masbate

Physical Target : CW1 Construction of Flood Mitigation Structure - 305.602 lineal meter


TO : OO2 Protect Lives and Properties Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control Concrete Revetment at Marcella River, Upstream leftside, Barangay Marcella, Sta. 0+000.00 - Sta.0+165.00 Uson, Masbate

Physical Target : CW1 Construction of Flood Mitigation Structure - 165 lineal meter
June 6, 2023 2023 WIN3F07350 FY 2023 GAA December 26, 2022 Region V Masbate 3rd District Engineering Office
Project ID : P00727224LZ

FROM : OO2 Protect Lives and Properties Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Gaid Flood Constrol, Sta. 0 + 796.00 - Sta. 1 + 100.00, Upstream left side, Barangay Gaid, Dimasalang, Masbate

Physical Target : CW1 - Construction of Flood Mitigation Structure Structure - 290.322 lineal meter


TO : OO2 Protect Lives and Properties Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Gaid Flood Control, Sta. 0 + 0796.00 - Sta. 0 + 937.00, Upstream Left Side, Barangay Gaid, Dimasalang, Masbate

Physical Target : CW1 - Construction of Flood Mitigation Structure - 141 lineal meter
June 6, 2023 2023 WIN3F07059 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00732973LZ

FROM : CSSP - Construction/ Improvement of Access Roads leading to Seaports (Kalsada Tungo sa Paliparan, Riles at Daungan Program - KATUPARAN)

Guinobatan - Jovellar - Donsol Road leading to Pilar Port, Guinobatan and Jovellar, Albay

Physical Target : CW1 - Reconstruction to Concrete Pavement - 4.417 Lane Km


TO : CCSSP - Construction/ Improvement of Access Roads leading to Seaports (Kalsada Tungo sa Paliparan, Riles at Daungan Program - KATUPARAN)

Guinobatan - Jovellar - Donsol Road leading to Pilar Port, Guinabatan and Jovellar, Albay

Physical Target :
CW1 - Construction of Concrete Road - 2.14834 Lane Km,
CW2 - Off-Carriageway Improvement: Paving of Shoulders - 2715 Square meters,
CW3 - Construction of Road Slope Protection Structure 3674.7 Square meters
June 6, 2023 2023 310201101064000 GAA 2023 January 3, 2023 Region II Isabela 3rd District Engineering Office
Network Development - Road Widening - Primary Roads

Daang Maharlika (LZ) - K0376+616 -K0378+000
June 6, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00732978LZ

FROM : Physical Target :
CW1 - Construction of Concrete Road - 5.3 Lane Km

TO : Physical Target :
CW1 - Construction of Concrete Road - 5.84 Lane Km
June 6, 2023 2023 WIN3F07048 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00732980LZ

FROM : Physical Target :
CW1 - Construction of Concrete Road - 1.582 Lane Km

TO : Physical Target :
CW1 - Construction of Concrete Road - 0.487 Lane Km,
CW2 - Construction of Road Slope Protection Structure - 1804.34 Square meters
June 6, 2023 2023 WIN3F07363 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID P00736334LZ

FROM : Physical Target :
CW1 - Construction of Concrete Road - 12.839 Lane Km

TO : Physical Target :
CW1 - Construction of Gravel Road - 4.42562 Lane Km,
CW2 - Construction of Drainage Structure along Road - 3756,2 Lineal meters
June 6, 2023 2023 FY 2023 GAA December 26, 2022 Region V Catanduanes District Engineering Office
Project ID : P0073732LZ

FROM : Physical Target :
CW1 - Construction of Concrete Road 3.21 Lane Kilometers

TO : Physical Target :
CW1 - Construction of Concrete Road - 0.807 Lane Kilometers,
CW2 - Widening of Bridge - 131.76 Square meters,
CW3 - Construction of Drainage Structure 774 Lineal-meters
June 6, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00739859LZ

FROM : Physical Target :
CW1 - Construction of Concrete Road - 6.419 Lane Km

TO : Physical Target :
CW1 - Construction of Concrete Road - 2.55 Lane Km,
CW2 - Construction of Drainage Structure along Road - 1387.6 Lineal meters,
CW3 - Construction of Road Slope Protection Structure - 4149.43 Square meters
June 6, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00740250LZ

FROM : Physical Target :
CW1 - Construction of Concrete Road - 9.629 Lane Km

TO : Physical Target :
CW1 - Construction of Concrete Road - 5.9 Lane Km,
CW2 - Construction of Drainage Structure along Road - 2732.88 Lineal meters
June 6, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Surigao del Norte 1st District Engineering Office
UACS No. : 310105100832000
Project ID: P00706327MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

FROM:

Dapa-Gen Luna Rd - K0001 + (-990) - K0001 + (-946), K0006 + 104 - K0007 + 520, K0011 + 900 - K0012 + 000

Type of Work:
CW1- Reconstruction to Concrete Pavement

Physical Target:
CW1- 3.160 Lane Km

Allocation:
TOTAL: P 52,663,000
CW1: P 50,819,795
EAO: P 1,843,205

Unit Cost:
CW1: P 16,082,213.61/Lane Km

TO:

Dapa-Gen Luna Rd - K0001 + (-960) - K0001 + (-946), K0006 + 104 - K0007 + 520, K0011 + 900 - K0012 + 000

Type of Work:
CW1- Reconstruction to Concrete Pavement

Physical Target:
CW1- 3.100 Lane Km

Allocation:
TOTAL: P 52,663,000
CW1: P 50,819,795
EAO: P 1,843,205

Unit Cost:
CW1: P 16,393,482.26/Lane Km
June 5, 2023 FY 2023 GAA P00707740MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1471+468 - K1472+048
Physical Target:
CW1: 1.168 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) -
K1469+098 - K1469+231, K1471+468 - K1471+864,
K1471+864 - K1472+048, K1473+994 - K1472+140
Physical Target:
CW1: 4.302 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00
June 5, 2023 FY 2023 GAA P00706139MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1478+833 - K1479+384
Physical Target:
CW1: 2.406 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 28,872,000.00
CW1: P 27,861,480.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,010,520.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1479+013 - K1479+145,
K1479+(-145) - K1479+(-013), K1479+145 - K1479+384
Physical Target:
CW1: 2.226 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 28,872,000.00
CW1: P 27,861,480.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,010,520.00
June 5, 2023 FY 2023 GAA WIN3E02885 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1479+002 - K1479+179
Physical Target:
CW1: 0.531 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 6,372,000.00
CW1: P 6,148,980.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 223,020.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1480+(-330) - K1480+(-220)
Physical Target:
CW1: 0.330 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 6,372,000.00
CW1: P 6,148,980.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 223,020.00
June 5, 2023 FY 2023 GAA WIN3E02903 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1480+(-411) - K1480+339,
K1480+(-956) - K1480+(-665), K1480+339 - K1480+455
Physical Target:
CW1: 3.471 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 41,652,000.00
CW1: P 40,194,180.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,457,820.00

TO OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1480+(-220) - K1480+455
Physical Target:
CW1: 2.025 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 41,652,000.00
CW1: P 40,194,180.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,457,820.00
June 5, 2023 FY 2023 GAA P00705592MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Tagum-Panabo Circum Rd -
K1501+180 - K1501+345, K1502+001 - K1502+059,
K1502+239 - K1502+358, K1502+540 - K1502+597,
K1504+606 - K1504+905, K1510+950 - K1511+227
Physical Target:
CW1: 1.884 lane km (Road Widening)
Allocation:
TOTAL: P 24,963,000.00
CW1: P 24,089,295.00 (Road Widening)
EAO: P 873,705.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Tagum-Panabo Circum Rd -
K1492+474 - K1492+528, K1482+806 - K1492+899,
K1501+180 - K1501+345, K1502+001 - K1502+133,
K1502+300 - K1502+423, K1502+540 - K1502+597,
K1504+606 - K1504+906, K1510+935 - K1511+227
Physical Target:
CW1: 2.045 lane km (Road Widening)
Allocation:
TOTAL: P 24,963,000.00
CW1: P 24,089,295.00 (Road Widening)
EAO: P 873,705.00
June 5, 2023 FY 2023 GAA WIN3E02911 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges
Pilan Parallel Br. along Davao-Cotabato Rd (Davao City-Jct Digos Section)
Physical Target:
CW1: 238.500 sq. m. (Widening of Bridge)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Widening of Bridge)
EAO: P 300,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Bridge - Widening of Permanent Bridges
Pilan Parallel Br. along Davao-Cotabato Rd (Davao City-Jct Digos Section)
Physical Target:
CW1: 119.250 sq. m. (Widening of Bridge)
Allocation:
TOTAL: P 15,000,000.00
CW1: P 14,700,000.00 (Widening of Bridge)
EAO: P 300,000.00
June 5, 2023 FY 2023 GAA WIN3E02900 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd -
K1504+905 - K1504+989, K1505+800 - K1506+500
Physical Target:
CW1: 1.524 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 12,000,000.00
CW1: P 11,580,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 420,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1504+000 - K1504+216
Physical Target:
CW1: 0.864 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 12,000,000.00
CW1: P 11,580,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 420,000.00
June 5, 2023 2023 GAA 2023 January 24, 2023 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0470 + 671 - K0470 + 707, K0471 + 961 - K0472 + 095, K0472 + 207 - K0472 + 232, K0472 + 480 - K0472 + 535, K0474 + 117 - K0474 + 130, K0474 + 584 - K0474 + 684, K0478 + 502 - K0478 + 522, K0492 + 635 - K0492 + 771;
Physical Target: 2433.89 Square Meters;
Allocation: Php 33,000,000.000"

"To:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0470 + 671 - K0470 + 707, K0471 + 961 - K0472 + 095, K0472 + 480 - K0472 + 535, K0474 + 117 - K0474 + 130, K0474 + 584 - K0474 + 684, K0478 + 502 - K0478 + 522, K0492 + 635 - K0492 + 771;
Physical Target: 2731 Square Meters;
Allocation: Php 33,000,000.000"

June 5, 2023 2023 GAA 2023 January 24, 2023 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Bulanao-Paracelis Rd - K0500 + (-965) - K0500 + 135;
Physical Target: 682 Square Meters;
Allocation: Php 12,167,000.000"

"To:
Bulanao-Paracelis Rd - K0500 + (-1035) - K0500 + 135;
Physical Target: 882.9 Square Meters;
Allocation: Php 12,167,000.000"
June 5, 2023 2023 SR2023-01-001876 January 30, 2023 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Installation and Furnishing of Safety Devices Solar Studs along Kalinga-Cagayan Road (Calanan-Enrile Section) K0499 + (-593)- K0499 + 900, Tabuk City, Kalinga;
Physical Target: 17.012 Lane Km;
Allocation: Php 85,062,000.000"

"To:
Installation and Furnishing of Safety Devices Solar Studs along Kalinga-Cagayan Road (Calanan-Enrile Section) K0496 + (-593) - K0499 + 900, Tabuk City, Kalinga;
Physical Target: 23.971 Lane Km;
Allocation: Php 85,062,000.000"
June 5, 2023 2023 SR2023-03-005742 March 2, 2023 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0529 + 152 - K529 + 192;
Physical Target: 5000 Square Meters;
Allocation: Php 90,000,000.000"

"To:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0529 +212 - K529 + 269;
Physical Target: 4182.09 Square Meters;
Allocation: Php 90,000,000.000"
June 5, 2023 2023 SR2023-03-005743 March 2, 2023 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0529 + 192 - K529 + 232;
Physical Target: 5277.78 Square Meters;
Allocation: Php 95,000,000.000"

"To:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0529 + 262 - K529 + 365;
Physical Target: 4412.5 Square Meters;
Allocation: Php 95,000,000.000"
June 5, 2023 2023 SR2023-01-001832 January 30, 2023 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0529 + 272 - K0529 + 312;
Physical Target: 5555.56 Square Meters;
Allocation: Php 100,000,000.000"

"To:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Pinukpuk-Abbut Sect) - K0529 + 164 - K0529 + 212;
Physical Target: 4650 Square Meters;
Allocation: Php 100,000,000.000"
June 2, 2023 2023 WIN3F07368 FY 2023 GAA December 26, 2022 Region V Albay 2nd Engineering Office
Project ID : P00739857LZ

FROM : Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Calanga Bridge Road, Barangay Calanga, Rapu-Rapu Albay

Physical Target :
CW1 - Construction of Bridge 1152.415 Square Meters

TO : Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Calanga Ridge Road, Barangay Calanga, Rapu-Rapu Albay

Physical Target :
CW1 - Construction of Gravel Road 1.88 Lane Km
June 2, 2023 2023 FY 2023 GAA December 26, 2022 Region V Albay 3rd Engineering Office
Project ID : P00711996LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Tertiary Road

Guinobatan Poblacion Rd - K0511 + (-212) - K0511 + 261

Physical Target :
CW1 - Road Widening - 0.946 Lane Km

TO : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Tertiary Road

Guinobatan Poblacion Rd - K0511 + (-459) - K0511 + 041

Physical Target :
CW1 - Road Widening - 1 Lane Km
June 2, 2023 2023 FY 2023 GAA December 26, 2022 Region V Albay 3rd Engineering Office
Project ID : P00713320LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Albay West Coast Rd. - K0508 + 189 - K0508 + 326

Physical Target :
CW1 - Construction of Road Slope Protection Structure - 561.56 Square Meters

TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Albay West Coast Rd. - K0508 + 189 - K0508 + 297

Physical Target :
CW1 - Construction of Road Slope Protection Structure - 529.2 Square Meters
June 2, 2023 2023 WIN3F07324 FY 2023 GAA December 26, 2022 Region V Catanduanes District Engineering Office
Project ID : P00737572LZ

FROM : Physical target :
CW1 - Construction of Flood Mitigation Structure 68.878 Lineal meters

TO : Physical target :
CW1 - Construction of Flood Mitigation Structure 40.00 Lineal meters
June 2, 2023 2023 FY 2023 GAA December 26, 2022 Region V Catanduanes District Engineering Office
Project ID : P00741997LZ

FROM : Physical Target :
CW1 - Construction of Concrete Road 0.963 Lane Km

TO : Physical Target :
CW1 - Construction of Concrete Road 0.822 Lane Km
June 2, 2023 2023 P00706061mn SR2023-01-002045 January 30, 2023 Region XII Regional Office XII
CONTRACT 23M00115 - PREVENTIVE MAINTENANCE - KIDAPAWAN-ALLAH JUNCTION RD - K1646+475-K1647+434, DATU PAGLAS, MAGUINDANAO
June 2, 2023 2023 P00707691MN SR2023-03-006420 March 3, 2023 Region XII Regional Office XII
CONTRACT 23M00169 - ROAD WIDENING - COTABATO-LANAO ROAD, K1901+290 - K1903+280, MATANOG, MAGUINDANAO
June 2, 2023 2023 P00707750MN SR2023-03-006387 March 3, 2023 Region XII Regional Office XII
CONTRACT 23M00164 - PREVENTIVE MAINTENANCE - COTABATO-LANAO ROAD, K1856+226 - K1857+346, SULTAN KUDARAT, MAGUINDANAO
June 2, 2023 2023 P00706066MN SR2023-01-002063 January 30, 2023 Region XII Regional Office XII
CONTRACT 23M00094 - PREVENTIVE MAINTENANCE - SIMUAY LANDASAN-PARANG RD, K1876 + 210 - K1876 + 390, PARANG, MAGUINDANAO
June 2, 2023 2023 FY 2023 GAA December 26, 2022 Region V Camarines Norte District Engineering Office
Project ID : P00713007LZ

FROM : OO1 Ensure Safe and Reliable Nation Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Bagong Silang - Capalonga Rd - K0308 + 260 - K0309 + 776

Physical Target :
CW1 - Rehabilitation of Paved Road 2.806 Lane Km

TO : OO1 Ensure Safe and Reliable Nation Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Bagong Silang - Capalonga Rd - K0306 + 105 - K0306 + 929, K0308 + 260 - K0309 + 776

Physical Target :
CW1 - Rehabilitation of Paved Road 4.276 Lane Km
June 2, 2023 2023 GAA 2023 January 24, 2023 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Nambaran-Isabela Rd - K0510 + 447 - K0511 + 030;
Physical Target: 588 Lineal Meters;
Allocation: Php 29,601,000.000"

"To:
Nambaran-Isabela Rd - K0510 + 347 - K0511 + 408;
Physical Target: 793 Lineal Meters;
Allocation: Php 29,601,000.000"

June 2, 2023 2023 WIN3E02908 GAA 2023 January 24, 2023 Cordillera Administrative Region Lower Kalinga District Engineering Office
"From:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0473 + 400 - K0473 + 473, K0473 + 534 - K0473 + 551;
Physical Target: 1595.7 Square Meters;
Allocation: Php 15,957,000.000"

"To:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Cagaluan-Calanan Sect) - K0473 + 456- K0473 + 551;
Physical Target: 885 Square Meters;
Allocation: Php 15,957,000.000"
June 2, 2023 2023 FY 2023 GAA December 26, 2022 Region V Camarines Norte District Engineering Office
Project ID : P00713328LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Daang Maharlika (LZ) - K0281 + 485 - K0281 + 515, K0283 + 210 - K0283 + 250


TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Daang Maharlika (LZ) - K0281 + 530 - K0281 + 556
June 2, 2023 2023 WIN3F06897 FY 2023 GAA December 26, 2022 Region V Camarines Norte District Engineering Office
Project ID : P00736374LZ

FROM : (CSSP) - (SIPAG) - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Road, Brgy. Dahican, Capalonga, Camarines Norte

Physical Target :
CW1 - Construction of Concrete Road 6.419 Lane Km

TO : (CSSP) - (SIPAG) - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Road, Brgy. Dahican Jose Panganiban, Camarines Norte

Physical Target :
CW1 - Construction of Gravel Road - 7.89306 Lane Km,
CW2 - Construction of Road Slope Protection Structure - 7,278.61 sq.m.
June 2, 2023 2023 FY 2023 GAA December 26, 2022 Region V Camarines Norte Sub-District Engineering Office
Project ID : P00712759LZ

FROM : Physical Target : CW1 - Preventive Maintenance of Road : Asphalt Overlay - 2.766 Lane Km

TO : Physical Target : CW1 - Preventive Maintenance of Road : Asphalt Overlay - 2.764 Lane Km
June 2, 2023 2023 FY 2023 GAA December 26, 2022 Region V Camarines Norte Sub-District Engineering Office
Project ID : P00712761LZ

FROM : OO1 Ensure Safe and Reliable Nation Road System - Asset Preservation - Preventive Maintenance Secondary Roads

Tagas - Daet Poblacion - Magang Rd - K0341 + 000 - K0342 + 049


TO : OO1 Ensure Safe and Reliable Nation Road System - Asset Preservation - Preventive Maintenance Primary Roads

Tagas - Daet Poblacion - Magang Rd - K0341 + 000 - K0341 + 784
June 2, 2023 FY 2023 GAA WIN3E02873 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1482+547 - K1482+1017
Physical Target:
CW1: 2.400 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 28,836,000.00
CW1: P 27,826,740.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,009,260.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1482+547 - K1482+686,
K1482+686 - K1482+828, K1482+(-686) - K1482+(-547)
Physical Target:
CW1: 1.686 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 28,836,000.00
CW1: P 27,826,740.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,009,260.00
June 2, 2023 2023 FY 2023 GAA December 26, 2022 Region V Camarines Norte Sub-District Engineering Office
Project ID : P00738988LZ

FROM : CSSP - Construction/ Rehabilitation of Water Supply/ Septage and Sewerage/ Rain Water Collectors - Water Supply System

Construction of Solar Water System Municipality of Vinzon, Camarines Norte


TO : CSSP - Construction/ Rehabilitation of Water Supply/ Septage and Sewerage/ Rain Water Collectors - Water Supply System

Construction of Solar Water System, Municipality of Vinzons, Camarines Norte
June 2, 2023 2023 FY 2023 GAA December 26, 2022 Region V Camarines Norte Sub-District Engineering Office
Project ID : P00741236LZ

FROM : CSSP - BIP - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Road at Barangay Pambuhan, Mercedez, Camarines Norte - (Phase 3)

TO : CSSP - BIP - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Road at Barangay Pambuhan, Mercedes, Camarines Norte - (Phase 3)
June 2, 2023 2023 FY 2023 GAA December 26, 2022 Region V Camarines Norte Sub-District Engineering Office
Project ID : P00743885LZ

FROM : CSSP - BIP - Multi-Purpose Building/ Facilities to support Social Services

Construction of Multi-Purpose Building with Evacuation Center, Vinzon, Camarines Norte


TO : CSSP - BIP - Multi-Purpose Building/ Facilities to support Social Services

Construction of Multi-Purpose Building with Evacuation Center, Vinzons, Camarines Norte
June 2, 2023 2023 WIN3F07374 FY 2023 GAA February 17, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Sn Simon-Baliwag Rd - K0059+(-520.75) - K0059+(-176)
June 2, 2023 2023 WIN3F06943 FY 2023 GAA February 17, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Tertiary Roads

Arayat - Magalang Rd - K0089+283 - K0090+900
June 2, 2023 2023 WIN3F07168 FY 2023 GAA February 17, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Arayat - Magalang Rd - K0088+(-965) - K0088+(-111)
June 2, 2023 2023 FY 2023 GAA February 17, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Sto. Tomas - Minalin Rd - (Minalin-Macabebe Sect) - K0072+060.40 - K0072+647.60
June 2, 2023 FY 2023 GAA WIN3E02898 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1467+504 - K1468+000
Physical Target:
CW1: 1.014 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 12,024,000.00
CW1: P 11,603,160.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 420,840.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1467+744 - K1468+000
Physical Target:
CW1: 0.522 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 12,024,000.00
CW1: P 11,603,160.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 420,840.00
June 2, 2023 2023 FY 2023 GAA December 26, 2022 Region V Camarines Norte Sub-District Engineering Office
Project ID : P00743889LZ

FROM : CSSP - BIP - Multi-Purpose Building/ Facilities to support Social Services

Construction of Multi-Purpose Building (Covered Court) Barangay Agit-it, Vinzon, Camarines Norte


TO : CSSP - BIP - Multi-Purpose Building/ Facilities to support Social Services

Construction of Multi-Purpose Building (Covered Court) Barangay Barangay Aguit-it, Vinzons, Camarines Norte
June 2, 2023 FY 2023 GAA WIN3E02886 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1494+711 - K1496+963
Physical Target:
CW1: 4.300 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1493+316 - K1494+177
Physical Target:
CW1: 3.576 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00
June 2, 2023 2023 FY 2023 GAA December 26, 2022 Region V Camarines Norte Sub-District Engineering Office
Project ID : P00743890LZ

FROM : CSSP - BIP - Multi-Purpose Building/ Facilities to support Social Services

Construction/ Completion of Multi-Purpose Building (Covered Court) Lazaro Lebezudo High School, Barangay Calintaan, Talisay, Camarines Norte


TO : CSSP - BIP - Multi-Purpose Building/ Facilities to support Social Services

Construction/Completion of Multi-Purpose Building (Covered Court) Lazaro Cabezudo High School, Barangay Calintaan, Talisay, Camarines Norte
June 2, 2023 2023 FY 2023 GAA December 26, 2022 Region V Camarines Norte Sub-District Engineering Office
Project ID : P00744124LZ

FROM : CSSP - BIP - Public Water Supply System (Level II or III)

Construction of Water System, Barangay Guinatingan, Vinzons, Camarines Norte

TO : CSSP - BIP - Public Water Supply System (Level II or III) Construction of Water System, Barangay Guinacutan, Vinzons, Camarines Norte
June 2, 2023 2023 FY 2023 GAA December 26, 2022 Region V Camarines Norte Sub-District Engineering Office
Project ID : P00744107LZ

FROM : CSSP - BIP - Evacuation Centers/ Quarantine Facilities/ Public Health Facilities

Construction of Multi-Purpose Building (Evacuation Center), Brgy. Mat-I, Vinzons, Camarines Norte



TO : CSSP - BIP - Evacuation Centers/ Quarantine Facilities/ Public Health Facilities

Construction of Multi-Purpose Building (Evacuation Center), Brgy. Sto. Domingo, Vinzons, Camarines Norte
June 2, 2023 2023 FY 2023 GAA December 26, 2022 Region V Camarines Sur 5th District Engineering Office
Project ID : P00712019LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Road

Daang Maharlika (LZ) - K0476 + 114 - K0476 + 219, K0479 + 080 - K0479 + 146


TO : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Road

Daang Maharlika (LZ) - K0474 + 435 - K0474 + 555, K0476 + 114 - K0476 + 219
June 2, 2023 FY 2023 GAA WIN3E02859 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1487+906 - K1490+000
Physical Target:
CW1: 4.072 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1487+906 - K1489+422
Physical Target:
CW1: 2.872 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00
June 2, 2023 2023 FY 2023 GAA December 26, 2022 Region V Camarines Sur 5th District Engineering Office
Project ID : P00712765LZ

FROM : OO1 Ensure Safe and Reliable Nation Road System - Asset Preservation - Preventive Maintenance Secondary Roads

Iriga City - Sn Isidro - Sagrada - Sn Ramon - Hanawan Rd - K0475 + 664 - K0476 + 000, K0476 + 563 - K0476 + 658, K0476 + 908 - K0476 + 910, K0477 + 575 - K0478 + 470

TO : OO1 Ensure Safe and Reliable Nation Road System - Asset Preservation - Preventive Maintenance Secondary Roads

Iriga City - Sn Isidro - Sagrada - Sn Ramon - Hanawan Rd - K0475 + 805 - K0476 + 000, K0476 + 563 - K0476 + 910, K0477 + 575 - K0478 + 470
June 2, 2023 2023 WIN3F06980 FY 2023 GAA December 26, 2022 Region V Masbate 1st District Engineering Office
Project ID : P00712048LZ

FROM : Physical Target : CW1 - Construction of Steel Bridge - 200 Square Meters

TO : Physical Target : CW1 - Construction of Concrete Road - 0.16 Lane Km, CW2 - Construction of Slope Protection Structure - 980 Square meters
June 2, 2023 2023 WIN3F06931 FY 2023 GAA December 26, 2022 Region V Masbate 1st District Engineering Office
Project ID : P00712244LZ

FROM : OO1 Ensure Safe and Reliable Nation Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

Sn Fernando North Rd - K0012 + 000 - K0012 + 203


TO : OO1 Ensure Safe and Reliable Nation Road System - Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads

Sn Fernando North Rd - K0012 + 000 - K0012 + 120
June 2, 2023 FY 2023 GAA P00707769MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1497+000 - K1498+500
Physical Target:
CW1: 2.998 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Tagum-Panabo Circum Rd - K1494+177 - K1495+194
Physical Target:
CW1: 3.920 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00
June 2, 2023 2023 WIN3F06869 FY 2023 GAA December 26, 2022 Region V Masbate 1st District Engineering Office
Project ID : P00713030LZ

FROM : OO1 Ensure Safe and Reliable Nation Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Sn Fernando North Rd - K0003 + 081 - K0003 + 185, K0003 + 624 - K0003 + 674

Physical Target : CW1 - Rehabilitation of Paved Road - 0.308 Lane Km

TO : OO1 Ensure Safe and Reliable Nation Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Sn Fernando North Rd - K0003 + 081 - K0003 + 185

Physical Target : CW1 - Rehabilitation of Paved Road - 0.208 Lane Km
June 2, 2023 FY 2023 GAA P00707744MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1468+000 - K1469+596
Physical Target:
CW1: 1.230 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Daang Maharlika (MN) - K1468+444 - K1469+098
Physical Target:
CW1: 4.038 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,750,000.00
June 2, 2023 FY 2023 GAA P00707546MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Daang Maharlika (MN) - K1481+446 - K1482+326
Physical Target:
CW1: 3.412 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 41,081,000.00
CW1: P 39,643,165.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,437,835.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads
Daang Maharlika (MN) - K1481+446 - K1482+326, K1482+(-326) - K1482+527
Physical Target:
CW1: 3.412 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 41,081,000.00
CW1: P 39,643,165.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 1,437,835.00
June 2, 2023 2023 WIN3F06891 FY 2023 GAA December 26, 2022 Region V Masbate 1st District Engineering Office
Project ID : P00713031LZ

FROM : OO1 Ensure Safe and Reliable Nation Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Sn Fernando North Rd - K0009 + 850 - K0010 + 000

Physical Target : CW1 - Rehabilitation of Paved Road - 0.314 Lane Km


TO : OO1 Ensure Safe and Reliable Nation Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Sn Fernando North Rd - K0009 + 850 - K0009 + 966

Physical Target : CW1 - Rehabilitation of Paved Road - 0.232 Lane Km
June 2, 2023 2023 WIN3F06891 FY 2023 GAA December 26, 2022 Region V Masbate 1st District Engineering Office
Project ID : P00713032LZ

FROM : OO1 Ensure Safe and Reliable Nation Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Sn Fernando North Rd - K0019 + 611 - K0019 + 766

Physical target : CW1 - Rehabilitation of Paved Road - 0.31 Lane Km


TO : OO1 Ensure Safe and Reliable Nation Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Sn Fernando North Rd - K0019 + 611 - K0019 + 726

Physical Target : CW1 - Rehabilitation of Paved Road - 0,23 Lane Km
June 2, 2023 2023 FY 2023 GAA December 26, 2022 Region V Masbate 1st District Engineering Office
Project ID : P00713033LZ

FROM : OO1 Ensure Safe and Reliable Nation Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Sn Fernando South Rd - K0001 + 170 - K0001 + 296

Physical Target : CW1 - Rehabilitation of Paved Road - 0.252 Lane Km


TO : OO1 Ensure Safe and Reliable Nation Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Sn Fernando South Rd - K0001 + 170 - K0001 + 285

Physical Target : CW1 - Rehabilitation of Paved Road - 0.23 Lane Km
June 1, 2023 2023 WIN3F07182 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00736122LZ

FROM : Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Project Alleviating Gaps (SIPAG) - Flood Mitigation Structure protecting Public Infrastructure/ Facilities

Construction of Daet River Flood Control Structure with Road, Brgy. Bibirao - Brgy. Calasagan, Daet, Camarines Norte


TO : Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Project Alleviating Gaps (SIPAG) - Flood Mitigation Structure protecting Public Infrastructure/ Facilities

Construction of Daet River Flood Control Structure with Road, Brgy. Bibirao, Daet, Camarines Norte
June 1, 2023 2023 WIN3F07127 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00736391LZ

FROM : Physical Target :
CW1 - Construction of Concrete Road - 3.21 Lane Km

TO : Physical Target :
CW1 - Reconstruction to Concrete Pavement - 1.2359 Lane Km,
CW2 - Construction of Drainage Structure along Road - 1228.54 Lineal meters,
CW3 - Construction of Road Slope Protection Structure - 1036 Square meters
June 1, 2023 2023 WIN3F06865 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00711504LZ

FROM : OO1 - Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Camarines Sur Expressway Package 1, Camarines Sur


TO : OO1 - Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads

Camarines Sur Expressway Package 9, Camarines Sur
June 1, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project : P00711505LZ

FROM : OO1 Ensure Safe and Reliable National Road System Network Development - Construction of Bypass and Diversion Roads

Camarines Sur Expressway Package 2, Camarines Sure


TO : OO1 Ensure Safe and Reliable National Road System Network Development - Construction of Bypass and Diversion Roads

Camarines Sur Expressway Package 10, Camarines Sur
June 1, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00712771LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads

Daang Maharlika (LZ) - K0604 + 097 - K0605 + 297



TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads

Daang Maharlika (LZ) - K0604 + 097 - K0605 + 223
June 1, 2023 2023 WIN3F07044 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00712031LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program Road Widening - Tertiary Roads

Sipocot - Cabusao Rd - K0408 + 351 - K0410 + 381


TO : OO1 Ensure Safe and Reliable National Road System - Network Development Program Road Widening - Tertiary Roads

Sipocot - Cabusao Rd - K0408 + 351 - K0409 + 363.39
June 1, 2023 2023 WIN3F07067 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00732971LZ

FROM : Physical Target :
CW1 - Construction of Concrete Road/ 1.96 Lane Km

TO: Physical Target :
CW1 - Construction of Concrete Road/ 0.2796 Lane Km,
CW2 - Construction of Road Slope Protection Structure/ 1,438.97 Square meters
June 1, 2023 2023 WIN3F07014 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P007115060LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of Bypass and Diversion Roads

Camarines Sur Expressway Package 3, Camarines Sur


TO : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of Bypass and Diversion Roads

Camarines Sur Expressway Package 11, Camarines Sur
June 1, 2023 2023 WIN3F07013 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00712059LZ

FROM : Physical Target :
CW1 - Construction of concrete Bridge/ 159.509 Square meters

TO : Physical Target :
CW1 - Construction of Concrete Road/ 11.52258 Lane Km
June 1, 2023 2023 WIN3F06949 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00712770LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads

Daang Maharlika (LZ) - K0256 + 000 - K0259 + 000. K0259 + 956 - K0263 + 535



TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads

Daang Maharlika (LZ) - K0256 + 000 - K0258 + 716
June 1, 2023 2023 WIN3F07366 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00713073LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Catanduanes Cir Rd - K0012 + 900 - K0013 + 000, K0123 + 600 - K0123 + 700


TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Catanduanes Cir Rd - K0013 + 000 - K0013 + 100, K0013 + 450 - K0013 + 580
June 1, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P0071371LZ

FROM : Physical Target :
CW1 - Widening of Bridge - 209.88 Square meters

TO : Physical Target :
CW1 - Widening of Bridge - 232.34 Square meters
June 1, 2023 2023 WIN3F07356 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00714707LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Albay West Coast Road, K0551 + 880 - K0552 + 000, K05252 + 559 - K0552 + 707.5


TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Albay West Coast Road, K0551 + 880 - K0552 + 000, K0552 + 559 - K0552 + 707.5
June 1, 2023 2023 WIN3F07362 FY 2023 GAA December 26, 2022 Region IV-A Regional Office IV-A
Project ID : P00714708LZ

FROM : Physical Target :
CW1 - Construction of Road Slope Protection Structure - 8333.33 Square meters

TO : Physical Target :
CW1 - Construction of Road Slope Protection Structure - 5763.46 Square meters