July 7, 2023 |
FY 2023 GAA |
WIN3E02975 |
FY 2023 GAA RA 11936 |
January 1, 2023 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Access Road Leading to Mati Fish Port, Phase 1, Mati City, Davao Oriental
Physical Target:
CW1: 3.299 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Construction of Concrete Road)
EAO: P 5,250,000.00
TO: Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Access Road Leading to Mati Fish Port, Phase 1, Mati City, Davao Oriental
Physical Target:
CW1: 0.869 lane km (Construction of Concrete Road)
CW2: 807.531 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 75,333,625.78 (Construction of Concrete Road)
CW2: P 69,416,374.22 (Construction of Road Slope Protection Structure)
EAO: P 5,250,000.00 |
July 6, 2023 |
FY 2023 |
WIN3E02650 |
310201101093000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310201101093000
Project ID: P00705504MN
OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads
Pagadian City-Zamboanga City Rd - K1894 + 936 - K1897 + 120
CW1- Road Widening/4.37 Lane-km
Unit Cost: ₱ 29,221,967.96/lane-km
ROW Acquisition - 14,632.8 sq.m.
Unit Cost: ₱ 505.71/ sq.m.
EAO: ₱4,900,000.00
Allocation: ₱140,000,000.00 |
July 6, 2023 |
FY 2023 |
WIN3E02628 |
310201101095000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310201101095000
Project ID: P00705506MN
OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads
Pagadian City-Zamboanga City Rd – K1905 + 883.35 – K1907 + 301.03, K1907 + 337.61 – K1907 + 372.13, K1907 + 403.00 – K1908 + 840.00
CW1- Road Widening/5.78 Lane-km
Unit Cost: ₱ 15,800,173.01/lane-km
ROW Acquisition 19,357.64 sq.m.
Unit Cost: ₱ 516.59/sq.m.
EAO: ₱ 3,675,000.00
Allocation: ₱105,000,000.00 |
July 6, 2023 |
FY 2023 |
WIN3E02798 |
310204102131000 |
March 16, 2023 |
Region IX |
Regional Office IX |
UACS No. 310204102131000
Project ID: P00705511MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads
Vitali - Sibulao - Bypass Road Project (Alternate Road of N1), Package 3, Zamboanga City
CW1- Road Widening/3.38 lane-km
Unit Cost: ₱ 27,019,230.77 /Lane-km
ROW Acquisition 33,333.33 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00 |
July 6, 2023 |
FY 2023 |
WIN3E02733 |
310204102132000 |
March 16, 2023 |
Region IX |
Regional Office IX |
UACS No. 310204102132000
Project ID: P00705512MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads
NRJ Lapakan-Lamisahan-Victoria By-Pass Road, Zamboanga City
CW1- Construction of Concrete Road/3.00 lane-km
Unit Cost: ₱ 29,476,666.67 /Lane-km
ROW Acquisition 33,333.33 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 3,570,000.00
Allocation: ₱ 102,000,000.00 |
July 6, 2023 |
FY 2023 |
WIN3E02701 |
310204102133000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310204102133000
Project ID: P00705513MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads
NRJ Sangali Bypass Road, Zamboanga City
CW1- Construction of Concrete Road/1.06 lane-km
Unit Cost: ₱ 36,084,905.66 /Lane-km
ROW Acquisition 30,585.240 sq.m.
Unit Cost: ₱ 326.96/sq.m.
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00 |
July 6, 2023 |
FY 2023 |
WIN3E02938 |
310204102134000 |
May 8, 2023 |
Region IX |
Regional Office IX |
UACS No. 310204102134000
Project ID: P00705514MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads
Zamboanga City By-Pass Road, Zamboanga City
CW1- Road Widening/ 1.751 Lane-km
Unit Cost: ₱ 24,700,171.33 /Lane-km
ROW Acquisition 10,000.00 sq.m.
Unit Cost: ₱ 500.00/sq.m.
EAO: 1,750,000.00
Allocation: ₱ 50,000,000.00 |
July 6, 2023 |
FY 2023 |
WIN3E02897 |
310205101046000 |
April 25, 2023 |
Region IX |
Regional Office IX |
UACS No. 310205101046000
Project ID: P00705517MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Missing Links/ New Roads
Sindangan - Bayog - Lakewood Road, Zamboanga del Norte
CW1- Construction of Concrete Road/4.480 Lane-km
Unit Cost: ₱ 32,525,669.64/lane-km
EAO: ₱ 5,285,000.00
Allocation: ₱151,000,000.00 |
July 6, 2023 |
2023 |
WIN3E03034 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. : 310107100598000
Project ID: P00706547MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
FROM:
Daang Maharlika (Surigao-Agusan Sect) - K1171 + 786 - K1171 + 830
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 3000 Square meters
Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000
Unit Cost:
CW1: P 9,800.00/Square meters
TO:
Daang Maharlika (Surigao-Agusan Sect) - K1172 + 372.80 - K1172 + 408, K1172 + 433.20 - K1172 + 472
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 1650.2 Square meters
Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000
Unit Cost:
CW1: P 17,816.02/Square meters
|
July 6, 2023 |
2023 |
WIN3E03036 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 300221104509000
Project ID: P00734343MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program - BIP - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of San Luis - Bincalan - Zamboangauita Road, Bgy Angeles, La Paz, Agusan Del Sur (Package 16)
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 20.961 Lane Km
Allocation:
TOTAL: P 250,000,000
CW1: P 247,500,000
EAO: P 2,500,000
Unit Cost:
CW1: P 11,807,642.8/Lane Km
TO:
Construction of San Luis - Binicalan - Zamboanguita Road, Brgy Angeles, La Paz, Agusan Del Sur (Package 16)
Type of Work:
CW1- Construction of Gravel Road
Physical Target:
CW1- 7.760 Lane Km
Allocation:
TOTAL: P 250,000,000
CW1: P 247,500,000
EAO: P 2,500,000
Unit Cost:
CW1: P 31,894,329.90/Lane Km
|
July 6, 2023 |
FY 2023 |
WIN3E02663 |
310202101314000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310202101314000
Project ID: P00705522MN
OO1: Ensure Safe and Reliable National Road System –Network Development - Road Widening - Secondary Roads
Liloy-Siocon Rd - K1978 + 000.00 - K1979 + 003.27, K1979 + 249.22 - K1980 + 340.00
CW1- Road Widening/ 4.188 Lane-km
Unit Cost: ₱ 22,899,734.35 /Lane-km
ROW Acquisition 14,030.14 sq.m.
Unit Cost: ₱ 386.38/ sq.m.
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00 |
July 6, 2023 |
FY 2023 |
WIN3E02915 |
310204102135000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310204102135000
Project ID: P00705523MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads
Labason Bypass Road Package 1 (Kipit Section), Zamboanga del Norte
CW1- Construction of Concrete Road/1.52 lane-km
Unit Cost: ₱ 38,880,171.05 /Lane-km
ROW Acquisition 33,333.33 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 2,506,140.00
Allocation: ₱ 71,604,000.00 |
July 6, 2023 |
FY 2023 |
WIN3E02654 |
310211100096000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310211100096000
Project ID: P00705524MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Paving of Unpaved Roads - Secondary Roads
Liloy-Siocon Road - K2037+860.00 - K2039+960.00
CW1- Paving of Unpaved Roads/ 4.20 Lane-km
Unit Cost: ₱ 37,910,714.29 /Lane-km
EAO: ₱ 5,775,000.00
Allocation: ₱ 165,000,000.00 |
July 6, 2023 |
2023 |
WIN3F07456 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00713028LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Jct Tawad - Balud Rd - K0066 + 209 - K0067 + 216
Physical Target : CW1 - Rehabilitation of Paved Road - 2.082 Lane Km
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads
Jct Tawad - Balud Rd - K0065 + 565 - K0065 + 800
Physical Target : CW1 - Rehabilitation of Paved Road - 0.472 Lane Km, CW2 - Construction of Drainage Structure along Road - 572 Lineal meters |
July 6, 2023 |
FY 2023 |
WIN3E02709 |
310204102388000 |
March 16, 2023 |
Region IX |
Regional Office IX |
UACS No. 310204102388000
Project ID: P00705533MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads
Sominot-Mahayag Road, Zamboanga del Sur
CW1- Construction of Road Slope Protection Structure/ 2,268.00 Square Meters
Unit Cost: ₱ 21,274.25 /Square Meters
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00 |
July 6, 2023 |
2023 |
WIN3E03043 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 310107100517000
Project ID: P00706570MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1313 + 354 - K1313 + 420, K1313 + 690 - K1313 + 915
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 7000 Square meters
Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000
Unit Cost:
CW1: P 14,475.00/Square meters
TO:
Daang Maharlika (Agusan-Davao Sect) - K1316+630 - K1316+720.34, K1317+300 - K1317+480, K1320+932 - K1321+015.946
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 1480.32 Square meters
Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000
Unit Cost:
CW1: P 68,448.04/Square meters
|
July 6, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 2nd Engineering Office |
Project ID : P00726982LZ
FROM : OO2 Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control System along Purok 3, Bamban, Manito, Albay
Physical Target : CW1 - Construction of Dike - 573.003 Lineal meters
TO : OO2 Protection Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control System along Purok 3, Bamban - Balasbas, Minato, Albay
Physical Targe : CW1 - Construction of Dike 516 Lineal Meters |
July 6, 2023 |
FY 2023 |
WIN3E02699 |
310201101214000 |
March 9, 2023 |
Region IX |
Regional Office IX |
UACS No. 310201101214000
Project ID: P00705536MN
OO1: Ensure Safe and Reliable National Road System – Network Development - Road Widening - Primary Roads
Pagadian City-Zamboanga City Rd – K1712 + 960.00 – K1713 + 477.00, K1713 + 496.40 – K1715 + 560.00
CW1- Road Widening/ 5.161 lane-km
Unit Cost: ₱15,196,667.31 /lane-km
ROW Acquisition 17,290.02 sq.m.
Unit Cost: ₱ 1,156.740 / sq.m.
EAO: ₱ 3,570,000.00
Allocation: ₱ 102,000,000.00 |
July 4, 2023 |
CY 2023 |
|
UACS No. 300215102948000 |
March 15, 2023 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300215102948000
Project ID.: P00739940LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabiliation or Road along Ma. Clara Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.424 Lane Km
Unit Cost (P’000) = P 25,424.53/Lane Km.
Allocation (P,000) = P 10,780
EAO (P’000) = P 220.00
Total (P’000) = P 11,000.00
As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation or Road along Ma. Clara Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.424 Lane Km
Unit Cost (P’000) = P 25,424.53/Lane Km. P 50 M/Km
Allocation (P,000) = P 10,780
EAO (P’000) = P 220.00
Total (P’000) = P 11,000.00
|
July 4, 2023 |
CY 2023 |
|
UACS No. 300215102954000 |
March 14, 2023 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA/Original
UACS No. 300215102954000
Project ID.: P00739946LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabiliation or Road along 9th Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.436 Lane Km
Unit Cost (P’000) = P 35,963.30/Lane Km.
Allocation (P,000) = P 15,680
EAO (P’000) = P 320.00
Total (P’000) = P 16,000.00
As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation or Road along 9th Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.436 Lane Km
Unit Cost (P’000) = P 35,963.30/Lane Km. P 70 M/Km
Allocation (P,000) = P 15,680
EAO (P’000) = P 320.00
Total (P’000) = P 16,000.00
|
July 4, 2023 |
2023 |
WIN3F07470 |
FY 2023 GAA |
December 31, 2022 |
Region V |
Regional Office V |
Project ID : P00712764LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
Physical Target : CW1 - Preventive Maintenance of Road: Asphalt Overlay/ 13.46 Lane Km
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
Physical Target : CW1 - Preventive Maintenance of Road: Asphalt Overlay/ 6.73 Lane Km |
July 4, 2023 |
2023 |
WIN3F07461 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00712778LZ
FROM : OO1 Ensure safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Rolando A Andaya Highway - K0313 + 009 - K0314 + 000, K0324 + 462 - K0325 + 562, K0333 + 368.70 - K0333 + 948
Physical Target : CW1 - Rehabilitation of Paved Road - 3.349 Lane Km
TO : OO1 Ensure safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
Rolando A Andaya Highway - K0313 + 009 - K0313 + 920
Physical Target : CW1 - Rehabilitation of Paved Road - 1.822 Lane Km |
July 4, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. : 310305102085000
Project ID: P00706704MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges
FROM:
Baleguian Parallel Br. along Daang Maharlika (Surigao-Agusan Sect)
Type of Work:
CW1- Widening of Bridge
Physical Target:
CW1- 268.074 Square meters
Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000
Unit Cost:
CW1: P 109,671.21/Square meters
TO:
Baleguian Parallel Br. along Daang Maharlika (Surigao-Agusan Sect)
Type of Work:
CW1- Widening of Bridge
ROW - ROW Acquisition
Physical Target:
CW1- 268.074 Square meters
ROW – 2000 Square meters
Allocation:
TOTAL: P 30,000,000
CW1: P 24,500,000
ROW: P 4,900,000
EAO: P 600,000
Unit Cost:
CW1: P 91,392.68/Square meters
CW2: P 2,450/Square meters |
July 4, 2023 |
2023 |
320101108798000 |
GAA 2023 |
January 3, 2023 |
Region II |
Cagayan 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Flood Control Structure, Baraccaoit, Gattaran, Cagayan Package II - Sta. 0+293 - Sta. 0+777 |
July 4, 2023 |
2023 |
320101108799000 |
GAA 2023 |
January 3, 2023 |
Region II |
Cagayan 1st District Engineering Office |
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Rehabilitation of Flood Control Structure, Baraccaoit, Gattaran, Cagayan Package III - Sta. 0+777 - Sta. 1+253 |
July 4, 2023 |
2023 |
320102105715000 |
GAA 2023 |
January 3, 2023 |
Region II |
Cagayan 1st District Engineering Office |
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Rehabilitation of Flood Control Structure along Cagayan River (Phase 2), Gattaran, Cagayan |
July 4, 2023 |
2023 |
320101108797000 |
GAA 2023 |
January 3, 2023 |
Region II |
Cagayan 1st District Engineering Office |
Construction/ Maintenance of Flood Control Mitigation Structures and Drainage Systems
Rehabilitation of Flood Control Structure, Baraccaoit, Gattaran, Cagayan Package I - Sta. 0+000 - Sta. 0+050.37, Sta.0+158.91 - Sta. 0+280, Sta. 0+000 Sta. 0+293 |
July 4, 2023 |
2023 |
320101108797000 |
GAA 2023 |
January 3, 2023 |
Region II |
Cagayan 1st District Engineering Office |
Construction/ Maintenance of Flood Control Mitigation Structures and Drainage Systems
Rehabilitation of Flood Control Structure, Baraccaoit, Gattaran, Cagayan Package I - Sta. 0+000 - Sta. 0+050.37, Sta.0+158.91 - Sta. 0+280, Sta. 0+000 Sta. 0+293 |
July 4, 2023 |
2023 |
WIN3F07463 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00713008LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Milaor - Minalabac Pili Rd - K0441 + 970 - K0443 + 179
Physical Target : CW1 - Rehabilitation of Paved Road - 2.418
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Milaor - Minalabac - Pili Rd - K00441 + 570 - K0442 + 250
Physical Target : CW1 - Reconstruction to Concrete Pavement |
July 3, 2023 |
2023 |
WIN3E03026 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. : 310104100509000
Project ID: P00706322MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1324 + 375 - K1324 + 898, K1325 + 098 - K1325 + 163, K1325 + 238 - K1326 + 818, K1327 + 345 - K1328 + 400, K1330 + 586 - K1330 + 669, K1330 + 802 - K1330 + 958, K1335 + 000 - K1335 + 300, K1336 + 700 - K1337 + 000, K1337 + 785 - K1338 + 146, K1348 + 896 - K1349 + 487, K1356 + 441 - K1356 + 790, K1356 + 805 - K1356 + 859, K1357 + 636 - K1357 + 759, K1357 + 800 - K1358 + 000
Type of Work:
CW1- Reconstruction to Concrete Pavement
Physical Target:
CW1- 11.480 Lane Km
Allocation:
TOTAL: P 86,469,000
CW1: P 83,442,585
EAO: P 3,026,415
Unit Cost:
CW1: P 7,268,517.86/ Lane Km
TO:
Daang Maharlika (Agusan-Davao Sect) - K1324 + 375 - K1324 + 898, K1325 + 098 - K1325 + 158, K1325 + 243 - K1326 + 300, K1327 + 345 - K1328 + 200, K1330 + 669 - K1330 + 953, K1333 + 960 - K1334 + 130, K1341 + 560 - K1341 + 638, K1341 + 800 - K1341 + 840
Type of Work:
CW1- Reconstruction to Concrete Pavement
Physical Target:
CW1- 6.194 Lane Km
Allocation:
TOTAL: P 86,469,000
CW1: P 83,442,585
EAO: P 3,026,415
Unit Cost:
CW1: P 13,471,518.4/ Lane Km
|
July 3, 2023 |
2023 |
WIN3F07467 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads
Sto. Tomas - Minalin Rd (Minalin Tail Dike Sect) - K0068+(-800) - K0068+(-751), K0068+(-625) - K0068+(-471.50), K0069+800 - K0070+018.6, K0070+105 - K0070+375 |
July 3, 2023 |
2023 |
WIN3F07448 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads
Sto. Tomas - Minalin Rd (Minalin - Macabebe Sect), K0064+140.5 - K0064+238 |
July 3, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads
Baliwag - Candaba - Sta. Ana Rd - K0068+120 - K0068+175, K0069+102 - K0069+230 |
June 27, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Regional Office III |
Network Development Program - Road Widening - Primary Roads
Along Bigaa Plaridel via Bulacan and Malolos RD, Malolos Section, Bulacan - K0043+650 - K0044+723, K0044+728 - K0045+775, K0045+782 - K0045+811, K0045+845 - K0047+813, K0047+813 - K0049+268 |
June 26, 2023 |
2023 |
WIN3E03001 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. : 310107100596000
Project ID: P00706545MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
FROM:
Daang Maharlika (Surigao-Agusan Sect) - K1169 + 858 - K1169 + 890
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 666.67 Square meters
Allocation:
TOTAL: P 12,000,000
CW1: P 11,760,000
EAO: P 240,000
Unit Cost:
CW1: P 17,639.91/Square meters
TO:
Daang Maharlika (Surigao-Agusan Sect) - K1169 + 763.40 - K1169 + 793
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 458.8 Square meters
Allocation:
TOTAL: P 12,000,000
CW1: P 11,760,000
EAO: P 240,000
Unit Cost:
CW1: P 25,632.08/Square meters
|
June 26, 2023 |
2023 |
WIN3E03020 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 320101109476000
Project ID: P00721335MN
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Flood Mitigation Structures at NRJ Villa Paraiso Section to Barangay Antongalon, Butuan City, Agusan del Norte
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 1041.811 Lineal meters
Allocation:
TOTAL: P 150,000,000
CW1: P 144,750,000
EAO: P 5,250,000
Unit Cost:
CW1: P 138,940.75/Lineal meters
TO:
Construction of Flood Mitigation Structures at NRJ Villa Paraiso Section to Barangay Antongalon, Butuan City, Agusan del Norte
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 835.200 Lineal meters
Allocation:
TOTAL: P 150,000,000
CW1: P 144,750,000
EAO: P 5,250,000
Unit Cost:
CW1: P 173,311.78/Lineal meters
|
June 26, 2023 |
2023 |
WIN3E03020 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 320101109476000
Project ID: P00721335MN
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Flood Mitigation Structures at NRJ Villa Paraiso Section to Barangay Antongalon, Butuan City, Agusan del Norte
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 1041.811 Lineal meters
Allocation:
TOTAL: P 150,000,000
CW1: P 144,750,000
EAO: P 5,250,000
Unit Cost:
CW1: P 138,940.75/Lineal meters
TO:
Construction of Flood Mitigation Structures at NRJ Villa Paraiso Section to Barangay Antongalon, Butuan City, Agusan del Norte
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 835.200 Lineal meters
Allocation:
TOTAL: P 150,000,000
CW1: P 144,750,000
EAO: P 5,250,000
Unit Cost:
CW1: P 173,311.78/Lineal meters
|
June 26, 2023 |
2023 |
WIN3E03020 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 320101109476000
Project ID: P00721335MN
ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
FROM:
Construction of Flood Mitigation Structures at NRJ Villa Paraiso Section to Barangay Antongalon, Butuan City, Agusan del Norte
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 1041.811 Lineal meters
Allocation:
TOTAL: P 150,000,000
CW1: P 144,750,000
EAO: P 5,250,000
Unit Cost:
CW1: P 138,940.75/Lineal meters
TO:
Construction of Flood Mitigation Structures at NRJ Villa Paraiso Section to Barangay Antongalon, Butuan City, Agusan del Norte
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 835.200 Lineal meters
Allocation:
TOTAL: P 150,000,000
CW1: P 144,750,000
EAO: P 5,250,000
Unit Cost:
CW1: P 173,311.78/Lineal meters
|
June 26, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. : 300214100621000
Project ID: P00733797MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239
FROM:
Installation of LED Solar Streetlights at Purok 1 to Purok 5 Brgy. Pasta, San Francisco, Agusan del Sur
Type of Work:
CW1- Road Safety: Street Lighting
Physical Target:
CW1- 0.991 Km
Allocation:
TOTAL: P 5,000,000
CW1: P 4,900,000
EAO: P 100,000
Unit Cost:
CW1: P 4,944,500.51/Km
TO:
Installation of LED Solar Streetlights at Purok 1 to Purok 5 Brgy. Pasta, San Francisco, Agusan del Sur
Type of Work:
CW1- Road Safety: Street Lighting
Physical Target:
CW1- 23 Number of Units
Allocation:
TOTAL: P 5,000,000
CW1: P 4,900,000
EAO: P 100,000
Unit Cost:
CW1: P 213,043.48/Number of Units
|
June 26, 2023 |
GAA 2023 |
P00706025MN |
SR2023-01-002392 |
January 30, 2023 |
Region XII |
Regional Office XII |
Contract 23M00172-OFF-CARRIAGEWAY IMPROVEMENT - ALBERT MORROW BLVD, K1661+158 - K1665+960, GENERAL SANTOS CITY
|
June 26, 2023 |
GAA 2023 |
P00721319MN |
SR2023-01-002090 |
January 30, 2023 |
Region XII |
Regional Office XII |
CONTRACT 23M00095-CONSTRUCTION OF RIVERBANK PROTECTION (REVETMENT) ALONG TAMONTAKA RIVER, (SEMBA-LINEK RIVER SECTION- PHASE I), STA 0 + 000 - STA 0 + 706, DATU ODIN SINSUAT, MAGUINDANAO
|
June 26, 2023 |
GAA 2023 |
P00721320MN |
SR2023-01-002096 |
January 30, 2023 |
Region XII |
Regional Office XII |
CONTRACT 23M00096-CONSTRUCTION OF RIVERBANK PROTECTION (REVETMENT) ALONG TAMONTAKA RIVER, (SEMBA-LINEK RIVER SECTION- PHASE II), STA 0 + 706 - STA 1 + 411, DATU ODIN SINSUAT, MAGUINDANAO
|
June 22, 2023 |
2023 |
WIN3F07447 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Pampanga 2nd District Engineering Office |
Network Development Program - Road Widening - Primary Roads
Jose Abad Santos Ave (JASA) - K0077+652.50 - K0077+899.33, K0079+379.62 - K0079+642.30, K0079+800 - K0080+829.66, K0084+870 - K0084+961.88, K0085+798.66 - K0086+097.50, K0089+000 - K0089+188, K0089+773.17 - K0089+857, K0094+127 - K0094+443.61 |
June 22, 2023 |
2023 |
WIN3E03002 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. : 310107100599000
Project ID: P00706548MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
FROM:
Daang Maharlika (Surigao-Agusan Sect) - K1180 + 145 - K1180 + 201
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 2444.44 Square meters
Allocation:
TOTAL: P 44,000,000
CW1: P 43,120,000
EAO: P 880,000
Unit Cost:
CW1: P 17,640.03/Square meters
TO:
Daang Maharlika (Surigao-Agusan Sect) - K1180 + 145 - K1180 + 194
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 1510.89 Square meters
Allocation:
TOTAL: P 44,000,000
CW1: P 43,120,000
EAO: P 880,000
Unit Cost:
CW1: P 28,539.47/Square meters
|
June 21, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Bataan 2nd District Engineering Office |
Convergence and Special Support Program - Construction / Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
Construction of road leading to Mt. Samat National Shrine Project in Pilar, Bataan (Phase III) |
June 21, 2023 |
2023 |
310201101156000 |
GAA 2023 |
January 3, 2023 |
Region II |
Isabela 4th District Engineering Office |
Network Development - Road Widening - Primary Roads
Daang Maharlika (LZ) - K0367+440 - K0367+450, K0367+816 - K0368+525 |
June 21, 2023 |
2023 |
310203100671000 |
GAA 2023 |
January 3, 2023 |
Region II |
Isabela 4th District Engineering Office |
Network Development - Road Widening - Tertiary Road
Jct. Ipil-Quirino Brdy Rd - K0338+630 - K0339+299 |
June 21, 2023 |
2023 |
310207100248000 |
GAA 2023 |
January 3, 2023 |
Region II |
Isabela 4th District Engineering Office |
Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (LZ) - K0336+466 - K0337+042 |
June 21, 2023 |
2023 |
310110100386000 |
GAA 2023 |
January 3, 2023 |
Region II |
Isabela 4th District Engineering Office |
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Santiago - Tuguegarao Rd - K0330+215 - K0331+310 |
June 21, 2023 |
2023 |
310203100667000 |
GAA 2023 |
January 3, 2023 |
Region II |
Isabela 4th District Engineering Office |
Network Development: Road Widening - Tertiary Roads
Santiago-Baluarte-Quirino Bdry - K0333+872 - K0334+689 |
June 21, 2023 |
2023 |
300226105674000 |
GAA 2023 |
January 3, 2023 |
Region II |
Isabela 4th District Engineering Office |
Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/Facilities to Support Social Services
Completion of Multi-Purpose Buildings, Brgy. Caniguing, Echague, Isabela |
June 21, 2023 |
2023 |
310109101307000 |
GAA 2023 |
January 3, 2023 |
Region II |
Isabela 4th District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Jct.Ipil - Quirino Bdry. Rd - K0357+830 - K0358+498 |
June 17, 2023 |
2023 |
WIN3E02957 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 300222100135000
Project ID: P00732464MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities
FROM:
Construction of Road with Street Lights, Sitio Bokbokon, Barangay Lawan-Lawan, Las Nieves, Agusan del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.419 Lane Km
Allocation:
TOTAL: P 5,000,000
CW1: P 4,950,000
EAO: P 50,000
Unit Cost:
CW1: P 11,813,842.48/ Lane Km
TO:
Construction of Road with Street Lights, Sitio Bokbokon, Barangay Lawan-Lawan, Las Nieves, Agusan del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.340 Lane Km
Allocation:
TOTAL: P 5,000,000
CW1: P 4,950,000
EAO: P 50,000
Unit Cost:
CW1: P 14,558,823.53/ Lane Km
|
June 17, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 300215103490000
Project ID: P00733919MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road from P5 going to Masago Elementary School with Box Culvert across Masago River, Barangay Maguinda, Butuan City
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.587 Lane Km
Allocation:
TOTAL: P 7,000,000
CW1: P 6,860,000
EAO: P 140,000
Unit Cost:
CW1: P 11,686,541.74/ Lane Km
TO:
Construction of Road from P5 going to Masago Elementary School with Box Culvert across Masago River, Barangay Maguinda, Butuan City
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Drainage Structure along Road
Physical Target:
CW1- 0.508 Lane Km
CW2- 10.200 Lineal meters
Allocation:
TOTAL: P 7,000,000
CW1: P 4,601,100
CW2: P2,258,900
EAO: P 140,000
Unit Cost:
CW1: P 9,057,283.46/ Lane Km
CW2: P 221,460.78/ Lineal meters |
June 17, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 300221102408000
Project ID: P00733920MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road, Purok 15, 16, 18, 18A and 19, Barangay Baan, Butuan City
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 1.677 Lane Km
Allocation:
TOTAL: P 20,000,000
CW1: P 19,600,000
EAO: P 400,000
Unit Cost:
CW1: P 11,687,537.27/ Lane Km
TO:
Construction of Road, Purok 15, 16, 18, 18A and 19, Barangay Baan, Butuan City
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 2.044 Lane Km
Allocation:
TOTAL: P 20,000,000
CW1: P 19,600,000
EAO: P 400,000
Unit Cost:
CW1: P 9,589,041.10/ Lane Km |
June 17, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 300221102408000
Project ID: P00732383MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road with Street Lights, Barangay Consorcia, Las Nieves, Agusan del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.419 Lane Km
Allocation:
TOTAL: P 5,000,000
CW1: P 4,950,000
EAO: P 50,000
Unit Cost:
CW1: P 11,813,842.48/ Lane Km
TO:
Construction of Road with Street Lights, Barangay Consorcia, Las Nieves, Agusan del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.566 Lane Km
Allocation:
TOTAL: P 5,000,000
CW1: P 4,950,000
EAO: P 50,000
Unit Cost:
CW1: P 8,745,583.04/ Lane Km |
June 17, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 300215103493000
Project ID: P00733922MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road, Dankias-Danapa Road from Purok 3 going to Purok 7, Barangay Dankias, Butuan City
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.587 Lane Km
Allocation:
TOTAL: P 7,000,000
CW1: P 6,860,000
EAO: P 140,000
Unit Cost:
CW1: P 11,686,541.74/ Lane Km
TO:
Construction of Road, Dankias-Danapa Road from Purok 3 going to Purok 7, Barangay Dankias, Butuan City
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.776 Lane Km
Allocation:
TOTAL: P 7,000,000
CW1: P 6,860,000
EAO: P 140,000
Unit Cost:
CW1: P 8,840,206.19/ Lane Km
|
June 17, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 300215103494000
Project ID: P00733923MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road at Purok 2 and 2B, Barangay Baan Riverside, Butuan City
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 1.677 Lane Km
Allocation:
TOTAL: P 20,000,000
CW1: P 19,600,000
EAO: P 400,000
Unit Cost:
CW1: P 11,687,537.27/ Lane Km
TO:
Construction of Road at Purok 2 and 2B, Barangay Baan Riverside, Butuan City
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 2.155 Lane Km
Allocation:
TOTAL: P 20,000,000
CW1: P 19,600,000
EAO: P 400,000
Unit Cost:
CW1: P 9,095,127.61/ Lane Km |
June 17, 2023 |
2022 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Butuan City District Engineering Office |
UACS No. : 300219101795000
Project ID: P00734001MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities
FROM:
Construction of Flood Mitigation Structure, Barangay Marcos Calo, Las Nieves, Agusan del Norte
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 34.727 Lineal meters
Allocation:
TOTAL: P 5,000,000
CW1: P 4,825,000
EAO: P 175,000
Unit Cost:
CW1: P 138,940.88/ Lineal meters
TO:
Construction of Flood Mitigation Structure, Barangay Marcos Calo, Las Nieves, Agusan del Norte
Type of Work:
CW1- Construction of Flood Mitigation Structure
Physical Target:
CW1- 70.060 Lineal meters
Allocation:
TOTAL: P 5,000,000
CW1: P 4,825,000
EAO: P 175,000
Unit Cost:
CW1: P 68,869.54/ Lineal meters |
June 16, 2023 |
2023 |
WIN3F07161 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Tarlac District Engineering Office |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and / or Bridges from the National Road/s leading to Major / Strategic Public Buildings / Facilities
Construction of By-pass and Diversion Roads, Tarlac City - San Jose Diversion Road, Tarlac City, Tarlac |
June 16, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Zambales 1st District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Olongapo - Bugallon Rd - K0170+380 - K0172+025 |
June 16, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Zambales 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads
Amungan - Palauig - Banlog Road - K0217+457 - K0217+520, K0218+753 - K0220+035.70 |
June 16, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Zambales 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads
Olongapo - Bugallon Rd - K0198+000 - K0198+944.30 |
June 16, 2023 |
2023 |
WIN3F07107 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Zambales 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Amungan - Palauig - Banlog Road - K0211+(-411) - K0211+(-312.40) |
June 16, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Zambales 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Olongapo - Bugallon Rd - K0192+000 - K0192+324.20 |
June 16, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Zambales 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Olongapo - Bugallon Road - K0192+324.20 - K0193+403 |
June 16, 2023 |
2023 |
WIN3F07120 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Zambales 2nd District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Olongapo-Bugallon Road (OBR) - K0135+556 - K0136+000
|
June 16, 2023 |
2023 |
WIN3F06825 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Zambales 2nd District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Olongapo-Bugallon Rd (OBR) - K0-132+910 - K0133+185 |
June 16, 2023 |
2023 |
WIN3F07410 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00740267LZ
FROM : Physical Target : CW1 - Construction of Concrete Road - 11.555 Lane Km
TO : Physical Target : CW1 - Construction of Concrete Road - 0.916 Lane Km, CW2 - Construction of Road Slope Protection Structure - 3952.52 Square |
June 16, 2023 |
2023 |
WIN3F07158 |
FY 2022 GAA |
February 17, 2023 |
Region III |
Zambales 2nd District Engineering Office |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Olongapo - Bugallon Rd (OBR) - Kalaklan K0128+860 - K0128+980, K0129+060 - K0129+160 |
June 16, 2023 |
2023 |
WIN3F07064 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Zambales 2nd District Engineering Office |
Network Development Program - Off-Carriageway Improvement - Secondary Road
Olongapo-Bugallon Rd - K0139+000 - K0139+700, K0140+100- K0140+280, K0140+440 - K0140+600, K0141+981 - K0142+378, K0142+560 - K0142+660, K0145+976 - K01460+000, K0146+080 - K0146+200, K0146+260 - K0147+600, K0147+800 - K0148+000 |
June 16, 2023 |
2023 |
|
FY 2023 GAA |
February 17, 2023 |
Region III |
Zambales 2nd District Engineering Office |
Network Development Program - Off-Carriageway Improvement - Tertiary Roads
San Marcelino - Nagbayto Rd - K0151+(-999) - K0151+(-921.50) , K0151+040 - K0152+180 |
June 16, 2023 |
2023 |
WIN3F06824 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Zambales 2nd District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads
Olongapo -Bugallon Rd (OBR) - K0145+866 - K0146+180, K0146+942 - K0147+300, K0149+556 - K0149+818.75 |
June 16, 2023 |
2023 |
300221102734000 |
GAA FY 2023 |
December 26, 2022 |
Region II |
Cagayan 3rd District Engineering Office |
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities - Improvement of Road, Brgy. Culong - Brgy. Bugnay, Tuao, Cagayan |
June 16, 2023 |
2023 |
310101100780000 |
GAA FY 2023 |
December 26, 2022 |
Region II |
Cagayan 3rd District Engineering Office |
Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads - Cagayan Valley Rd - K0461+(-117) - K0461+000, K0462+000 - K0462+538, K0462+609 - K0462+897, K0465+000 - K0465+1003, K0467+000 - K0467+686, K0469+000 - K0469+709 |
June 16, 2023 |
2023 |
300221102736000 |
GAA FY 2023 |
December 26, 2022 |
Region II |
Cagayan 3rd District Engineering Office |
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities - Construction of Bulagao Purok 5 to Sitio Turud Road, Tuao, Cagayan |
June 15, 2023 |
2023 |
WIN3F07423 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 2nd Engineering Office |
Project ID : P00739856LZ
FROM : CSSP - SIPAG - Access Road and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Access Road to Calpi Port, Barangay Calpi, Rapu-Rapu, Albay
Physical Target : CW1 - Construction of Concrete Road - 6.419 Lane
TO : CSSP - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Construction of Access Road to Calpi Port, Barangay Calanaga, Rapu-Rapu, Albay
Physical Target : CW1 - Construction of Gravel Road - 2.04 Lane Km |
June 15, 2023 |
2023 |
WIN3E02973 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. : 310107100597000
Project ID: P00706546MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
FROM:
Daang Maharlika (Surigao-Agusan Sect) - K1171 + 700 - K1171 + 744
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 3000 Square meters
Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000
Unit Cost:
CW1: P 9,800/Square meters
TO:
Daang Maharlika (Surigao-Agusan Sect) - K1171+700 – K1171 + 744, K1171 + 780 – K1171 + 823.20
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 1944.56 Square meters
Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000
Unit Cost:
CW1: P 15,119.10/Square meters |
June 15, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Agusan del Norte District Engineering Office |
UACS No. : 310201101240000
Project ID: P00705648MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads
FROM:
Daang Maharlika (Surigao-Agusan Sect) - K1193 + 573 - K1193 + 881, K1199 + 341 - K1199 + 372, K1200 + 404 - K1200 + 413, K1200 + 919 - K1201 + 025
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 0.918 Lane Km
Allocation:
TOTAL: P 20,000,000
CW1: P 19,600,000
EAO: P 400,000
Unit Cost:
CW1: P 21,350,762.53/Lane Km
TO:
Daang Maharlika (Surigao-Agusan Sect) - K1193 + 573 - K1193 + 881, K1199 + 553 - K1199 + 572, K1200 + 404 - K1200 + 416, K1200 + 917 - K1201 + 025
Type of Work:
CW1- Road Widening
Physical Target:
CW1- 0.802 Lane Km
Allocation:
TOTAL: P 20,000,000
CW1: P 19,600,000
EAO: P 400,000
Unit Cost:
CW1: P 24,438,902.74/Lane Km
|
June 15, 2023 |
2023 |
WIN3E02982 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. : 310108101686000
Project ID: P00706571MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
FROM:
Asuncion-San Isidro-Laak-Veruela Rd - K1531 + 038 - K1531 + 100, K1535 + 302 - K1535 + 400
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 4363.530 Square meters
Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000
Unit Cost:
CW1: P 11,229.44/Square meters
TO:
Asuncion-San Isidro-Laak-Veruela Rd - K1530 + 971 - K1531 + 100, K1535 + 320 - K1535 + 400
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 3503.8 Square meters
Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000
Unit Cost:
CW1: P 13,984.82/Square meters
|
June 15, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. : 310101100921000
Project ID: P00707530MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1330 + 984 - K1331 + 759, K1331 + 774 - K1332 + 571, K1333 + 653 - K1334 + 135, K1334 + 157 - K1335 + 000, K1336 + 000 - K1336 + 234
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
Physical Target:
CW1- 6.262 Lane Km
Allocation:
TOTAL: P 99,993,000
CW1: P 96,493,245
EAO: P 3,499,755
Unit Cost:
CW1: P 15,409,333.28/Lane Km
TO:
Daang Maharlika (Agusan-Davao Sect) - K1326 + 300 - K1326 + 818, K1330 + 591 - K1330 + 669, K1331 + 095 - K1331 + 754, K1331 + 779 - K1332 + 571, K1333 + 653 - K1333 + 960, K1335 + 102 - K1335 + 320, K1336 + 500 - K1336 + 990, K1337 + 000 - K1338 + 146, K1348 + 896 - K1349 + 393
Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
CW2- Preventive Maintenance of Road: Concrete Reblocking
Physical Target:
CW1- 6.262 Lane Km
CW2- 3.6725 Lane Km
Allocation:
TOTAL: P 99,993,000
CW1: P 36,338,435.42
CW2: P 60,154,809.58
EAO: P 3,499,755
Unit Cost:
CW1: P 9,227,637.23/Lane Km
CW2: P 16,379,798.39/Lane Km
|
June 15, 2023 |
2023 |
WIN3E02979 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 310204102290000
Project ID: P00705705MN
ORGANIZATIONAL OUTCOME 1 : Network Development Program - Construction of By-Pass and Diversion Roads
FROM:
Surigao-Agusan West Coastal Road, Package G, Surigao del Norte
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 9.565 Lane Km
Allocation:
TOTAL: P 155,000,000
CW1: P 149,575,000
EAO: P 5,425,000
Unit Cost:
CW1: P 15,637,741.77/Lane Km
TO:
Surigao-Agusan West Coastal Road, Package G, Surigao del Norte
Type of Work:
CW1- Construction of Concrete Bridge 1
CW2- Construction of Concrete Bridge 2
ROW- ROW Acquisition
Physical Target:
CW1- 333.900 Square meters
CW2- 333.900 Square meters
ROW- 808.860 Square meters
Allocation:
TOTAL: P 155,000,000
CW1: P 73,836,010
CW2: P 74,773,990
ROW: P 965,000
EAO: P 5,425,000
Unit Cost:
CW1: P 221,132.110/ Square meters
CW2: P 223,941.27/ Square meters
ROW: P 1193.04/ Square meters
|
June 15, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 310108101451000
Project ID: P00706381MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
FROM:
Surigao-Davao Coastal Rd - K1262 + 210 - K1262 + 325
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 5555.56 Square meters
Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000
Unit Cost:
CW1: P 18,238.49/Square meters
TO:
Surigao-Davao Coastal Rd - K1262+220 - K1262+460 - K1264+340 - K1264+400
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 6858 Square meters
Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000
Unit Cost:
CW1: P 14,774.72/ Square meters
|
June 15, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 310108101455000
Project ID: P00707534MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
FROM:
Surigao-Davao Coastal Rd - K1265 + 022 - K1265 + 135
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 5833.333 Square meters
Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000
Unit Cost:
CW1: P 17,370 /Square meters
TO:
Surigao-Davao Coastal Rd - K1258+740 - K1258+995, K1259+410 - K1259+463
Type of Work:
CW1- Construction of Road Slope Protection Structure
Physical Target:
CW1- 7040.88 Square meters
Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000
Unit Cost:
CW1: P 14,390.96 /Square meters
|
June 15, 2023 |
2023 |
WIN3F07411 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00740268LZ
FROM : Physical Target : CW1 - Construction of Concrete Road - 9.629 Lane Km
TO : Physical Target : CW1 - Construction of Concrete Road - 0.68 Lane Km, CW2 - Construction of Road Slope Protection Structure - 2495.6 Square meters
|
June 15, 2023 |
2023 |
WIN3F07426 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Catanduanes District Engineering Office |
Project ID : P00741999LZ
FROM : Physical Target : CW1 - Construction of Concrete Road - 1.926 Lane Km
TO : Physical Target : CW1 - Construction of Concrete Road - 0.930 Lane Km |
June 15, 2023 |
2023 |
WIN3F07428 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Catanduanes District Engineering Office |
Project ID : P00742000LZ
FROM : Physical Target : CW1 - Construction of Concrete Road - 1.926 Lane Km
TO : Physical Target : CW1 - Construction of Concrete Road - 0.670 Lane Km |
June 15, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Sorsogon District Engineering Office |
Project ID : P007403960LZ
FROM : CSSP - Basic Infrastructure - Multi-Purpose Buildings/ Facilities to support Social Services
Construction of Multi-Purpose Building, (Sorsogon Pilot Elementary School), Brgy. Macabog, Sorsogon City, Sorsogon
TO : CSSP - Basic Infrastructure - Multi-Purpose Buildings/ Facilities to support Social Services
Construction of Multi-Purpose Building, (Sorsogon Pilot Elementary School), Brgy. Sirangan, Sorsogon City, Sorsogon
|
June 14, 2023 |
2023 |
WIN3F07438 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Regional Office III |
Network Development Program - Construction of By-Pass and Diversion Roads
Service Road (Alternative route to NLEX), Bulacan |
June 14, 2023 |
2023 |
WIN3F07390 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 2nd Engineering Office |
Project ID : P00712752LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
Daang Maharlika (LZ) - K0522 + 035 - K0522 + 434
Physical Target : CW1 - Preventive Maintenance of Road: Asphalt Overlay - 0.798 Lane Km
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads
Daang Maharlika (LZ) - K0519 + 092 - K0519 + 400
Physical Target : CW1 - Preventive Maintenance of Road: Concrete Reblocking 0.54 Lane Km |
June 14, 2023 |
CY 2023 |
|
UACS No. 300207100843000 |
May 2, 2023 |
National Capital Region |
NCR - Regional Office |
As per GAA/Original
UACS No. 300207100843000
Project ID.: P00732627LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Construction/Improvement of Various Infrastructures in Support of National Security (Tatag ng Imprastraktura para sa Kapayapaan at Seguridad Program – TIKAS)
Construction of Multi-Purpose Building PNPSAF Camp Bagong Diwa, Bicutan, Taguig City, Phase III
Physical Target: CW1 = Construction of Other Facilities 1 bldg.
Unit Cost (P’000) = P 9,650.00/no. of facilities
Allocation = P 9,650,000.00
EAO = P 350,000.00
Total = P 10,000,000.00
As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Construction/Improvement of Various Infrastructures in Support of National Security (Tatag ng Imprastraktura para sa Kapayapaan at Seguridad Program – TIKAS)
Construction of Multi-Purpose Building PNPSAF Camp Bagong Diwa, Bicutan, Taguig City, Phase II
Physical Target: CW1 = Construction of Other Facilities 1 bldg.
Unit Cost (P’000) = P 9,650.00/no. of facilities
Allocation = P 9,650,000.00
EAO = P 350,000.00
Total = P 10,000,000.00
|
June 14, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00713074LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slop Collapse, and Landslide - Secondary Roads
Catanduanes Cir Rd - K0143 + 660 - K0143 + 957
Physical Target : CW1 - Construction of Road Slope Protection Structure - 3896.1 Square meters
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Catanduanes Cir Rd - K0143 + 760.00 - K0143 + 1060.00
Physical Target : CW1 - Construction of Road Slope Protection Structure - 3585 Square meters |
June 14, 2023 |
2023 |
WIN3F07425 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 2nd Engineering Office |
Project ID : P00713294LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Daang Maharlika (LZ) - K0513 + 700 - K0513 + 730, K0514 + 200 - K0514 + 220, K0521 + 200 - K0522 + 000
Physical Target : CW1 - Construction Road Slope Protection Structure - 2547.33 Square Meters
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads
Daang Maharlika (LZ) - K0520 + 416 - K0520 + 543
Physical Target : CW1 - Construction Road Slope Protection Structure 1328 Square Meters |
June 14, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 2nd Engineering Office |
P00714086LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (LZ) - K0530 + (-054) - K0531 + 000
Physical Target : CW1 - Construction of Drainage Structure along Road 2126 Lineal Meters
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads
Daang Maharlika (LZ) - K0528 + 000 - K0531 + 000, K0532 + 000 - K0532 + 220
Physical Target : CW1 - Construction of Drainage Structure along Road - 2790 Lineal Meters |
June 14, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Sorsogon District Engineering Office |
Project ID : P00714800LZ
FROM : OO1 Ensure Safe and Reliable National Road System - National Development - Off-Carriageway Improvement - Tertiary Roads
Juban - Magallanes Rd - K0614 + 071 - K0614 + 233 (R/S), K014 + 330 - K0614 + 348 (R/S), K0614 + 348 - K0614 + 366 (B/S), K0614 + 366 - K0614 + 377 (R/S), K0614 + 452 - K0614 + 488 (R/S), K0615 + 084 (B/S), K0615 + 084 - K0615 + 376 (R/S), K0615 + 682 - K0615 + 904 (R/S), K0616 + 018 - K0616 + 061 (R/S), K0620 + 216 - K0620 + 409 (R/S)
Physical Target : CW1 - Off-Carriageway Improvement: Pavement of Shoulder 2416.5 Square Meters
TO : OO1 Ensure Safe and Reliable National Road System - Network Development - Off-Carriagway Improvement - Tertiary Roads
Juban - Magallanes Rd - K0614 + 071 - K0614 + 233 (R/S), K0614 + 330 - K0614 + 348 (R/S), K0614 + 348 - K0614 + 366 (B/S), K0614 + 366 - K0614 + 377 (R/S), K0614 + 452 - K0614 + 488 (R/S), K0614 + 534 - K0615 + 018 (R/S), K0615 + 018 - K0615 + 084 (B/S), K0615 + 084 - K0615 + 376 (R/S)
Physical Target : CW1 - Off-Carriageway Improvement : Paving of Shoulder - 2276.18 Square meters, CW2 - Construction of Road Slope Protection Structure - 1796.49 Square meters |
June 14, 2023 |
2023 |
RXII-112 |
GAA 2023 RA 11936 |
January 1, 2023 |
Region XII |
Cotabato 2nd District Engineering Office |
23MC0024 - Construction of Malasila River Flood Control, Sta. 39+600 - Sta. 40+770, Sta. 40+170 - Sta. 40+770, Barangay Bulacanon, Makilala, North Cotabato, Package 2 |
June 14, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Sorsogon District Engineering Office |
Project ID : P00726291LZ
FROM : OO2 Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment, Barangay Poblacion, Sta. 49 + 820.00 - Sta. 50 + 020.00, Lupi, Camarines Sur
Physical Target : CW1 - Construction of Revetment 105.00 Lineal meters
TO : OO2 Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment, Barangay Poblacion, Sta. 49 + 820.00 - Sta. 49 + 925.00, Lupi, Camarines Sur |
June 14, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 1st District Engineering Office |
Project ID : P00726606LZ
FROM : OO2 Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Sipocot River Flood Mitigation Structure (Barangay North Centro to Barangay Azucena), Sta. 38 + 060.00 - Sta. 38 + 335.00, Sipocot, Camarines Sur
Physical Target : CW1 - Construction of Revetment - 133.00 Lineal meters
TO : OO2 Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structure and Drainage Systems
Construction of Sipocot River Flood Mitigation Structure (Barangay North Centro to Barangay Azucena), Sta. 38 + 060.00 - Sta. 38 + 193.00, Sipocot, Camarines Sur
Physical Target : CW1 - Construction of Revetment 133.00 Lineal meters |
June 14, 2023 |
2023 |
WIN3F07421 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00732483LZ
FROM : Physical Target : CW1 - Construction of Concrete Road - 1.333 Lane Km
TO : Physical Target : CW1 - Construction of Concrete Road - 0.800 Lane Km |
June 14, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00732952LZ
FROM : Physical Target :
CW1 - Construction of Concrete Road - 0.400 Lane Km
TO : Physical Target :
CW1 - Construction of Concrete Road - 0.378 Lane Km |