Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
July 7, 2023 FY 2023 GAA WIN3E02975 FY 2023 GAA RA 11936 January 1, 2023 Region XI Regional Office XI
MODIFICATION:

FROM: Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Access Road Leading to Mati Fish Port, Phase 1, Mati City, Davao Oriental
Physical Target:
CW1: 3.299 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Construction of Concrete Road)
EAO: P 5,250,000.00

TO: Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Access Road Leading to Mati Fish Port, Phase 1, Mati City, Davao Oriental
Physical Target:
CW1: 0.869 lane km (Construction of Concrete Road)
CW2: 807.531 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 75,333,625.78 (Construction of Concrete Road)
CW2: P 69,416,374.22 (Construction of Road Slope Protection Structure)
EAO: P 5,250,000.00
July 6, 2023 FY 2023 WIN3E02650 310201101093000 March 9, 2023 Region IX Regional Office IX
UACS No. 310201101093000
Project ID: P00705504MN

OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads

Pagadian City-Zamboanga City Rd - K1894 + 936 - K1897 + 120

CW1- Road Widening/4.37 Lane-km
Unit Cost: ₱ 29,221,967.96/lane-km
ROW Acquisition - 14,632.8 sq.m.
Unit Cost: ₱ 505.71/ sq.m.
EAO: ₱4,900,000.00
Allocation: ₱140,000,000.00
July 6, 2023 FY 2023 WIN3E02628 310201101095000 March 9, 2023 Region IX Regional Office IX
UACS No. 310201101095000
Project ID: P00705506MN

OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads

Pagadian City-Zamboanga City Rd – K1905 + 883.35 – K1907 + 301.03, K1907 + 337.61 – K1907 + 372.13, K1907 + 403.00 – K1908 + 840.00

CW1- Road Widening/5.78 Lane-km
Unit Cost: ₱ 15,800,173.01/lane-km
ROW Acquisition 19,357.64 sq.m.
Unit Cost: ₱ 516.59/sq.m.
EAO: ₱ 3,675,000.00
Allocation: ₱105,000,000.00
July 6, 2023 FY 2023 WIN3E02798 310204102131000 March 16, 2023 Region IX Regional Office IX
UACS No. 310204102131000
Project ID: P00705511MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads

Vitali - Sibulao - Bypass Road Project (Alternate Road of N1), Package 3, Zamboanga City

CW1- Road Widening/3.38 lane-km
Unit Cost: ₱ 27,019,230.77 /Lane-km
ROW Acquisition 33,333.33 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00
July 6, 2023 FY 2023 WIN3E02733 310204102132000 March 16, 2023 Region IX Regional Office IX
UACS No. 310204102132000
Project ID: P00705512MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads

NRJ Lapakan-Lamisahan-Victoria By-Pass Road, Zamboanga City

CW1- Construction of Concrete Road/3.00 lane-km
Unit Cost: ₱ 29,476,666.67 /Lane-km
ROW Acquisition 33,333.33 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 3,570,000.00
Allocation: ₱ 102,000,000.00
July 6, 2023 FY 2023 WIN3E02701 310204102133000 March 9, 2023 Region IX Regional Office IX
UACS No. 310204102133000
Project ID: P00705513MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads

NRJ Sangali Bypass Road, Zamboanga City

CW1- Construction of Concrete Road/1.06 lane-km
Unit Cost: ₱ 36,084,905.66 /Lane-km
ROW Acquisition 30,585.240 sq.m.
Unit Cost: ₱ 326.96/sq.m.
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00
July 6, 2023 FY 2023 WIN3E02938 310204102134000 May 8, 2023 Region IX Regional Office IX
UACS No. 310204102134000
Project ID: P00705514MN


OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads

Zamboanga City By-Pass Road, Zamboanga City

CW1- Road Widening/ 1.751 Lane-km
Unit Cost: ₱ 24,700,171.33 /Lane-km
ROW Acquisition 10,000.00 sq.m.
Unit Cost: ₱ 500.00/sq.m.
EAO: 1,750,000.00
Allocation: ₱ 50,000,000.00
July 6, 2023 FY 2023 WIN3E02897 310205101046000 April 25, 2023 Region IX Regional Office IX
UACS No. 310205101046000
Project ID: P00705517MN


OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Missing Links/ New Roads

Sindangan - Bayog - Lakewood Road, Zamboanga del Norte

CW1- Construction of Concrete Road/4.480 Lane-km
Unit Cost: ₱ 32,525,669.64/lane-km
EAO: ₱ 5,285,000.00
Allocation: ₱151,000,000.00
July 6, 2023 2023 WIN3E03034 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Norte District Engineering Office
UACS No. : 310107100598000
Project ID: P00706547MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

FROM:

Daang Maharlika (Surigao-Agusan Sect) - K1171 + 786 - K1171 + 830

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 3000 Square meters

Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000

Unit Cost:
CW1: P 9,800.00/Square meters

TO:

Daang Maharlika (Surigao-Agusan Sect) - K1172 + 372.80 - K1172 + 408, K1172 + 433.20 - K1172 + 472

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 1650.2 Square meters

Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000

Unit Cost:
CW1: P 17,816.02/Square meters

July 6, 2023 2023 WIN3E03036 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 300221104509000
Project ID: P00734343MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program - BIP - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of San Luis - Bincalan - Zamboangauita Road, Bgy Angeles, La Paz, Agusan Del Sur (Package 16)

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 20.961 Lane Km

Allocation:
TOTAL: P 250,000,000
CW1: P 247,500,000
EAO: P 2,500,000

Unit Cost:
CW1: P 11,807,642.8/Lane Km

TO:

Construction of San Luis - Binicalan - Zamboanguita Road, Brgy Angeles, La Paz, Agusan Del Sur (Package 16)

Type of Work:
CW1- Construction of Gravel Road

Physical Target:
CW1- 7.760 Lane Km

Allocation:
TOTAL: P 250,000,000
CW1: P 247,500,000
EAO: P 2,500,000

Unit Cost:
CW1: P 31,894,329.90/Lane Km


July 6, 2023 FY 2023 WIN3E02663 310202101314000 March 9, 2023 Region IX Regional Office IX
UACS No. 310202101314000
Project ID: P00705522MN


OO1: Ensure Safe and Reliable National Road System –Network Development - Road Widening - Secondary Roads

Liloy-Siocon Rd - K1978 + 000.00 - K1979 + 003.27, K1979 + 249.22 - K1980 + 340.00

CW1- Road Widening/ 4.188 Lane-km
Unit Cost: ₱ 22,899,734.35 /Lane-km
ROW Acquisition 14,030.14 sq.m.
Unit Cost: ₱ 386.38/ sq.m.
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00
July 6, 2023 FY 2023 WIN3E02915 310204102135000 March 9, 2023 Region IX Regional Office IX
UACS No. 310204102135000
Project ID: P00705523MN


OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads

Labason Bypass Road Package 1 (Kipit Section), Zamboanga del Norte

CW1- Construction of Concrete Road/1.52 lane-km
Unit Cost: ₱ 38,880,171.05 /Lane-km
ROW Acquisition 33,333.33 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 2,506,140.00
Allocation: ₱ 71,604,000.00
July 6, 2023 FY 2023 WIN3E02654 310211100096000 March 9, 2023 Region IX Regional Office IX
UACS No. 310211100096000
Project ID: P00705524MN


OO1: Ensure Safe and Reliable National Road System – Network Development - Paving of Unpaved Roads - Secondary Roads

Liloy-Siocon Road - K2037+860.00 - K2039+960.00

CW1- Paving of Unpaved Roads/ 4.20 Lane-km
Unit Cost: ₱ 37,910,714.29 /Lane-km
EAO: ₱ 5,775,000.00
Allocation: ₱ 165,000,000.00
July 6, 2023 2023 WIN3F07456 FY 2023 GAA December 26, 2022 Region V Masbate 2nd District Engineering Office
Project ID : P00713028LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Jct Tawad - Balud Rd - K0066 + 209 - K0067 + 216

Physical Target : CW1 - Rehabilitation of Paved Road - 2.082 Lane Km



TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads

Jct Tawad - Balud Rd - K0065 + 565 - K0065 + 800

Physical Target : CW1 - Rehabilitation of Paved Road - 0.472 Lane Km, CW2 - Construction of Drainage Structure along Road - 572 Lineal meters
July 6, 2023 FY 2023 WIN3E02709 310204102388000 March 16, 2023 Region IX Regional Office IX
UACS No. 310204102388000
Project ID: P00705533MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads

Sominot-Mahayag Road, Zamboanga del Sur

CW1- Construction of Road Slope Protection Structure/ 2,268.00 Square Meters
Unit Cost: ₱ 21,274.25 /Square Meters
EAO: ₱ 1,750,000.00
Allocation: ₱ 50,000,000.00
July 6, 2023 2023 WIN3E03043 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 310107100517000
Project ID: P00706570MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System – Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

FROM:

Daang Maharlika (Agusan-Davao Sect) - K1313 + 354 - K1313 + 420, K1313 + 690 - K1313 + 915

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 7000 Square meters

Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000

Unit Cost:
CW1: P 14,475.00/Square meters

TO:

Daang Maharlika (Agusan-Davao Sect) - K1316+630 - K1316+720.34, K1317+300 - K1317+480, K1320+932 - K1321+015.946

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 1480.32 Square meters

Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000

Unit Cost:
CW1: P 68,448.04/Square meters
July 6, 2023 2023 FY 2023 GAA December 26, 2022 Region V Albay 2nd Engineering Office
Project ID : P00726982LZ

FROM : OO2 Protect Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control System along Purok 3, Bamban, Manito, Albay

Physical Target : CW1 - Construction of Dike - 573.003 Lineal meters


TO : OO2 Protection Lives and Properties Against Major Floods - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Flood Control System along Purok 3, Bamban - Balasbas, Minato, Albay

Physical Targe : CW1 - Construction of Dike 516 Lineal Meters
July 6, 2023 FY 2023 WIN3E02699 310201101214000 March 9, 2023 Region IX Regional Office IX
UACS No. 310201101214000
Project ID: P00705536MN


OO1: Ensure Safe and Reliable National Road System – Network Development - Road Widening - Primary Roads

Pagadian City-Zamboanga City Rd – K1712 + 960.00 – K1713 + 477.00, K1713 + 496.40 – K1715 + 560.00

CW1- Road Widening/ 5.161 lane-km
Unit Cost: ₱15,196,667.31 /lane-km
ROW Acquisition 17,290.02 sq.m.
Unit Cost: ₱ 1,156.740 / sq.m.
EAO: ₱ 3,570,000.00
Allocation: ₱ 102,000,000.00
July 4, 2023 CY 2023 UACS No. 300215102948000 March 15, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300215102948000
Project ID.: P00739940LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabiliation or Road along Ma. Clara Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.424 Lane Km
Unit Cost (P’000) = P 25,424.53/Lane Km.
Allocation (P,000) = P 10,780
EAO (P’000) = P 220.00
Total (P’000) = P 11,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation or Road along Ma. Clara Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.424 Lane Km
Unit Cost (P’000) = P 25,424.53/Lane Km. P 50 M/Km
Allocation (P,000) = P 10,780
EAO (P’000) = P 220.00
Total (P’000) = P 11,000.00
July 4, 2023 CY 2023 UACS No. 300215102954000 March 14, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300215102954000
Project ID.: P00739946LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabiliation or Road along 9th Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.436 Lane Km
Unit Cost (P’000) = P 35,963.30/Lane Km.
Allocation (P,000) = P 15,680
EAO (P’000) = P 320.00
Total (P’000) = P 16,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation or Road along 9th Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.436 Lane Km
Unit Cost (P’000) = P 35,963.30/Lane Km. P 70 M/Km
Allocation (P,000) = P 15,680
EAO (P’000) = P 320.00
Total (P’000) = P 16,000.00
July 4, 2023 2023 WIN3F07470 FY 2023 GAA December 31, 2022 Region V Regional Office V
Project ID : P00712764LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads

Physical Target : CW1 - Preventive Maintenance of Road: Asphalt Overlay/ 13.46 Lane Km


TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads

Physical Target : CW1 - Preventive Maintenance of Road: Asphalt Overlay/ 6.73 Lane Km
July 4, 2023 2023 WIN3F07461 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00712778LZ

FROM : OO1 Ensure safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

Rolando A Andaya Highway - K0313 + 009 - K0314 + 000, K0324 + 462 - K0325 + 562, K0333 + 368.70 - K0333 + 948

Physical Target : CW1 - Rehabilitation of Paved Road - 3.349 Lane Km


TO : OO1 Ensure safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

Rolando A Andaya Highway - K0313 + 009 - K0313 + 920

Physical Target : CW1 - Rehabilitation of Paved Road - 1.822 Lane Km
July 4, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Norte District Engineering Office
UACS No. : 310305102085000
Project ID: P00706704MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges

FROM:

Baleguian Parallel Br. along Daang Maharlika (Surigao-Agusan Sect)

Type of Work:
CW1- Widening of Bridge

Physical Target:
CW1- 268.074 Square meters

Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000

Unit Cost:
CW1: P 109,671.21/Square meters

TO:

Baleguian Parallel Br. along Daang Maharlika (Surigao-Agusan Sect)

Type of Work:
CW1- Widening of Bridge
ROW - ROW Acquisition

Physical Target:
CW1- 268.074 Square meters
ROW – 2000 Square meters

Allocation:
TOTAL: P 30,000,000
CW1: P 24,500,000
ROW: P 4,900,000
EAO: P 600,000

Unit Cost:
CW1: P 91,392.68/Square meters
CW2: P 2,450/Square meters
July 4, 2023 2023 320101108798000 GAA 2023 January 3, 2023 Region II Cagayan 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation of Flood Control Structure, Baraccaoit, Gattaran, Cagayan Package II - Sta. 0+293 - Sta. 0+777
July 4, 2023 2023 320101108799000 GAA 2023 January 3, 2023 Region II Cagayan 1st District Engineering Office
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Rehabilitation of Flood Control Structure, Baraccaoit, Gattaran, Cagayan Package III - Sta. 0+777 - Sta. 1+253
July 4, 2023 2023 320102105715000 GAA 2023 January 3, 2023 Region II Cagayan 1st District Engineering Office
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers

Rehabilitation of Flood Control Structure along Cagayan River (Phase 2), Gattaran, Cagayan
July 4, 2023 2023 320101108797000 GAA 2023 January 3, 2023 Region II Cagayan 1st District Engineering Office
Construction/ Maintenance of Flood Control Mitigation Structures and Drainage Systems

Rehabilitation of Flood Control Structure, Baraccaoit, Gattaran, Cagayan Package I - Sta. 0+000 - Sta. 0+050.37, Sta.0+158.91 - Sta. 0+280, Sta. 0+000 Sta. 0+293
July 4, 2023 2023 320101108797000 GAA 2023 January 3, 2023 Region II Cagayan 1st District Engineering Office
Construction/ Maintenance of Flood Control Mitigation Structures and Drainage Systems

Rehabilitation of Flood Control Structure, Baraccaoit, Gattaran, Cagayan Package I - Sta. 0+000 - Sta. 0+050.37, Sta.0+158.91 - Sta. 0+280, Sta. 0+000 Sta. 0+293
July 4, 2023 2023 WIN3F07463 FY 2023 GAA December 26, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00713008LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Milaor - Minalabac Pili Rd - K0441 + 970 - K0443 + 179

Physical Target : CW1 - Rehabilitation of Paved Road - 2.418


TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads

Milaor - Minalabac - Pili Rd - K00441 + 570 - K0442 + 250

Physical Target : CW1 - Reconstruction to Concrete Pavement
July 3, 2023 2023 WIN3E03026 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Sur 2nd District Engineering Office
UACS No. : 310104100509000
Project ID: P00706322MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads

FROM:

Daang Maharlika (Agusan-Davao Sect) - K1324 + 375 - K1324 + 898, K1325 + 098 - K1325 + 163, K1325 + 238 - K1326 + 818, K1327 + 345 - K1328 + 400, K1330 + 586 - K1330 + 669, K1330 + 802 - K1330 + 958, K1335 + 000 - K1335 + 300, K1336 + 700 - K1337 + 000, K1337 + 785 - K1338 + 146, K1348 + 896 - K1349 + 487, K1356 + 441 - K1356 + 790, K1356 + 805 - K1356 + 859, K1357 + 636 - K1357 + 759, K1357 + 800 - K1358 + 000

Type of Work:
CW1- Reconstruction to Concrete Pavement

Physical Target:
CW1- 11.480 Lane Km

Allocation:
TOTAL: P 86,469,000
CW1: P 83,442,585
EAO: P 3,026,415

Unit Cost:
CW1: P 7,268,517.86/ Lane Km

TO:

Daang Maharlika (Agusan-Davao Sect) - K1324 + 375 - K1324 + 898, K1325 + 098 - K1325 + 158, K1325 + 243 - K1326 + 300, K1327 + 345 - K1328 + 200, K1330 + 669 - K1330 + 953, K1333 + 960 - K1334 + 130, K1341 + 560 - K1341 + 638, K1341 + 800 - K1341 + 840

Type of Work:
CW1- Reconstruction to Concrete Pavement

Physical Target:
CW1- 6.194 Lane Km

Allocation:
TOTAL: P 86,469,000
CW1: P 83,442,585
EAO: P 3,026,415

Unit Cost:
CW1: P 13,471,518.4/ Lane Km

July 3, 2023 2023 WIN3F07467 FY 2023 GAA February 17, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Sto. Tomas - Minalin Rd (Minalin Tail Dike Sect) - K0068+(-800) - K0068+(-751), K0068+(-625) - K0068+(-471.50), K0069+800 - K0070+018.6, K0070+105 - K0070+375
July 3, 2023 2023 WIN3F07448 FY 2023 GAA February 17, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Sto. Tomas - Minalin Rd (Minalin - Macabebe Sect), K0064+140.5 - K0064+238
July 3, 2023 2023 FY 2023 GAA February 17, 2023 Region III Pampanga 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Baliwag - Candaba - Sta. Ana Rd - K0068+120 - K0068+175, K0069+102 - K0069+230
June 27, 2023 2023 FY 2023 GAA February 17, 2023 Region III Regional Office III
Network Development Program - Road Widening - Primary Roads

Along Bigaa Plaridel via Bulacan and Malolos RD, Malolos Section, Bulacan - K0043+650 - K0044+723, K0044+728 - K0045+775, K0045+782 - K0045+811, K0045+845 - K0047+813, K0047+813 - K0049+268
June 26, 2023 2023 WIN3E03001 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Norte District Engineering Office
UACS No. : 310107100596000
Project ID: P00706545MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

FROM:

Daang Maharlika (Surigao-Agusan Sect) - K1169 + 858 - K1169 + 890

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 666.67 Square meters

Allocation:
TOTAL: P 12,000,000
CW1: P 11,760,000
EAO: P 240,000

Unit Cost:
CW1: P 17,639.91/Square meters

TO:

Daang Maharlika (Surigao-Agusan Sect) - K1169 + 763.40 - K1169 + 793

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 458.8 Square meters

Allocation:
TOTAL: P 12,000,000
CW1: P 11,760,000
EAO: P 240,000

Unit Cost:
CW1: P 25,632.08/Square meters
June 26, 2023 2023 WIN3E03020 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 320101109476000
Project ID: P00721335MN

ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

FROM:

Construction of Flood Mitigation Structures at NRJ Villa Paraiso Section to Barangay Antongalon, Butuan City, Agusan del Norte

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 1041.811 Lineal meters

Allocation:
TOTAL: P 150,000,000
CW1: P 144,750,000
EAO: P 5,250,000

Unit Cost:
CW1: P 138,940.75/Lineal meters

TO:

Construction of Flood Mitigation Structures at NRJ Villa Paraiso Section to Barangay Antongalon, Butuan City, Agusan del Norte

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 835.200 Lineal meters

Allocation:
TOTAL: P 150,000,000
CW1: P 144,750,000
EAO: P 5,250,000

Unit Cost:
CW1: P 173,311.78/Lineal meters
June 26, 2023 2023 WIN3E03020 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 320101109476000
Project ID: P00721335MN

ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

FROM:

Construction of Flood Mitigation Structures at NRJ Villa Paraiso Section to Barangay Antongalon, Butuan City, Agusan del Norte

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 1041.811 Lineal meters

Allocation:
TOTAL: P 150,000,000
CW1: P 144,750,000
EAO: P 5,250,000

Unit Cost:
CW1: P 138,940.75/Lineal meters

TO:

Construction of Flood Mitigation Structures at NRJ Villa Paraiso Section to Barangay Antongalon, Butuan City, Agusan del Norte

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 835.200 Lineal meters

Allocation:
TOTAL: P 150,000,000
CW1: P 144,750,000
EAO: P 5,250,000

Unit Cost:
CW1: P 173,311.78/Lineal meters
June 26, 2023 2023 WIN3E03020 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 320101109476000
Project ID: P00721335MN

ORGANIZATIONAL OUTCOME 2 : Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

FROM:

Construction of Flood Mitigation Structures at NRJ Villa Paraiso Section to Barangay Antongalon, Butuan City, Agusan del Norte

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 1041.811 Lineal meters

Allocation:
TOTAL: P 150,000,000
CW1: P 144,750,000
EAO: P 5,250,000

Unit Cost:
CW1: P 138,940.75/Lineal meters

TO:

Construction of Flood Mitigation Structures at NRJ Villa Paraiso Section to Barangay Antongalon, Butuan City, Agusan del Norte

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 835.200 Lineal meters

Allocation:
TOTAL: P 150,000,000
CW1: P 144,750,000
EAO: P 5,250,000

Unit Cost:
CW1: P 173,311.78/Lineal meters
June 26, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Sur 2nd District Engineering Office
UACS No. : 300214100621000
Project ID: P00733797MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Special Road Fund - Motor Vehicle User's Charge (MVUC) as per R.A. 11239

FROM:

Installation of LED Solar Streetlights at Purok 1 to Purok 5 Brgy. Pasta, San Francisco, Agusan del Sur

Type of Work:
CW1- Road Safety: Street Lighting

Physical Target:
CW1- 0.991 Km

Allocation:
TOTAL: P 5,000,000
CW1: P 4,900,000
EAO: P 100,000

Unit Cost:
CW1: P 4,944,500.51/Km

TO:

Installation of LED Solar Streetlights at Purok 1 to Purok 5 Brgy. Pasta, San Francisco, Agusan del Sur

Type of Work:
CW1- Road Safety: Street Lighting

Physical Target:
CW1- 23 Number of Units

Allocation:
TOTAL: P 5,000,000
CW1: P 4,900,000
EAO: P 100,000

Unit Cost:
CW1: P 213,043.48/Number of Units

June 26, 2023 GAA 2023 P00706025MN SR2023-01-002392 January 30, 2023 Region XII Regional Office XII
Contract 23M00172-OFF-CARRIAGEWAY IMPROVEMENT - ALBERT MORROW BLVD, K1661+158 - K1665+960, GENERAL SANTOS CITY
June 26, 2023 GAA 2023 P00721319MN SR2023-01-002090 January 30, 2023 Region XII Regional Office XII
CONTRACT 23M00095-CONSTRUCTION OF RIVERBANK PROTECTION (REVETMENT) ALONG TAMONTAKA RIVER, (SEMBA-LINEK RIVER SECTION- PHASE I), STA 0 + 000 - STA 0 + 706, DATU ODIN SINSUAT, MAGUINDANAO
June 26, 2023 GAA 2023 P00721320MN SR2023-01-002096 January 30, 2023 Region XII Regional Office XII
CONTRACT 23M00096-CONSTRUCTION OF RIVERBANK PROTECTION (REVETMENT) ALONG TAMONTAKA RIVER, (SEMBA-LINEK RIVER SECTION- PHASE II), STA 0 + 706 - STA 1 + 411, DATU ODIN SINSUAT, MAGUINDANAO
June 22, 2023 2023 WIN3F07447 FY 2023 GAA February 17, 2023 Region III Pampanga 2nd District Engineering Office
Network Development Program - Road Widening - Primary Roads

Jose Abad Santos Ave (JASA) - K0077+652.50 - K0077+899.33, K0079+379.62 - K0079+642.30, K0079+800 - K0080+829.66, K0084+870 - K0084+961.88, K0085+798.66 - K0086+097.50, K0089+000 - K0089+188, K0089+773.17 - K0089+857, K0094+127 - K0094+443.61
June 22, 2023 2023 WIN3E03002 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Norte District Engineering Office
UACS No. : 310107100599000
Project ID: P00706548MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

FROM:

Daang Maharlika (Surigao-Agusan Sect) - K1180 + 145 - K1180 + 201

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 2444.44 Square meters

Allocation:
TOTAL: P 44,000,000
CW1: P 43,120,000
EAO: P 880,000

Unit Cost:
CW1: P 17,640.03/Square meters

TO:

Daang Maharlika (Surigao-Agusan Sect) - K1180 + 145 - K1180 + 194

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 1510.89 Square meters

Allocation:
TOTAL: P 44,000,000
CW1: P 43,120,000
EAO: P 880,000

Unit Cost:
CW1: P 28,539.47/Square meters

June 21, 2023 2023 FY 2023 GAA February 17, 2023 Region III Bataan 2nd District Engineering Office
Convergence and Special Support Program - Construction / Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)

Construction of road leading to Mt. Samat National Shrine Project in Pilar, Bataan (Phase III)
June 21, 2023 2023 310201101156000 GAA 2023 January 3, 2023 Region II Isabela 4th District Engineering Office
Network Development - Road Widening - Primary Roads

Daang Maharlika (LZ) - K0367+440 - K0367+450, K0367+816 - K0368+525
June 21, 2023 2023 310203100671000 GAA 2023 January 3, 2023 Region II Isabela 4th District Engineering Office
Network Development - Road Widening - Tertiary Road

Jct. Ipil-Quirino Brdy Rd - K0338+630 - K0339+299
June 21, 2023 2023 310207100248000 GAA 2023 January 3, 2023 Region II Isabela 4th District Engineering Office
Network Development - Off-Carriageway Improvement - Primary Roads

Daang Maharlika (LZ) - K0336+466 - K0337+042
June 21, 2023 2023 310110100386000 GAA 2023 January 3, 2023 Region II Isabela 4th District Engineering Office
Asset Preservation - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

Santiago - Tuguegarao Rd - K0330+215 - K0331+310
June 21, 2023 2023 310203100667000 GAA 2023 January 3, 2023 Region II Isabela 4th District Engineering Office
Network Development: Road Widening - Tertiary Roads

Santiago-Baluarte-Quirino Bdry - K0333+872 - K0334+689
June 21, 2023 2023 300226105674000 GAA 2023 January 3, 2023 Region II Isabela 4th District Engineering Office
Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/Facilities to Support Social Services

Completion of Multi-Purpose Buildings, Brgy. Caniguing, Echague, Isabela
June 21, 2023 2023 310109101307000 GAA 2023 January 3, 2023 Region II Isabela 4th District Engineering Office
Asset Preservation - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads

Jct.Ipil - Quirino Bdry. Rd - K0357+830 - K0358+498
June 17, 2023 2023 WIN3E02957 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Butuan City District Engineering Office
UACS No. : 300222100135000
Project ID: P00732464MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program - Access Roads and/or Bridges from the National Roads connecting to Indigenous People (IP) Communities

FROM:

Construction of Road with Street Lights, Sitio Bokbokon, Barangay Lawan-Lawan, Las Nieves, Agusan del Norte

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 0.419 Lane Km

Allocation:
TOTAL: P 5,000,000
CW1: P 4,950,000
EAO: P 50,000

Unit Cost:
CW1: P 11,813,842.48/ Lane Km

TO:

Construction of Road with Street Lights, Sitio Bokbokon, Barangay Lawan-Lawan, Las Nieves, Agusan del Norte

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 0.340 Lane Km

Allocation:
TOTAL: P 5,000,000
CW1: P 4,950,000
EAO: P 50,000

Unit Cost:
CW1: P 14,558,823.53/ Lane Km

June 17, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Butuan City District Engineering Office
UACS No. : 300215103490000
Project ID: P00733919MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of Road from P5 going to Masago Elementary School with Box Culvert across Masago River, Barangay Maguinda, Butuan City

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 0.587 Lane Km

Allocation:
TOTAL: P 7,000,000
CW1: P 6,860,000
EAO: P 140,000

Unit Cost:
CW1: P 11,686,541.74/ Lane Km

TO:

Construction of Road from P5 going to Masago Elementary School with Box Culvert across Masago River, Barangay Maguinda, Butuan City

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Drainage Structure along Road

Physical Target:
CW1- 0.508 Lane Km
CW2- 10.200 Lineal meters

Allocation:
TOTAL: P 7,000,000
CW1: P 4,601,100
CW2: P2,258,900
EAO: P 140,000

Unit Cost:
CW1: P 9,057,283.46/ Lane Km
CW2: P 221,460.78/ Lineal meters
June 17, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Butuan City District Engineering Office
UACS No. : 300221102408000
Project ID: P00733920MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of Road, Purok 15, 16, 18, 18A and 19, Barangay Baan, Butuan City

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 1.677 Lane Km

Allocation:
TOTAL: P 20,000,000
CW1: P 19,600,000
EAO: P 400,000

Unit Cost:
CW1: P 11,687,537.27/ Lane Km

TO:

Construction of Road, Purok 15, 16, 18, 18A and 19, Barangay Baan, Butuan City

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 2.044 Lane Km

Allocation:
TOTAL: P 20,000,000
CW1: P 19,600,000
EAO: P 400,000

Unit Cost:
CW1: P 9,589,041.10/ Lane Km
June 17, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Butuan City District Engineering Office
UACS No. : 300221102408000
Project ID: P00732383MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of Road with Street Lights, Barangay Consorcia, Las Nieves, Agusan del Norte

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 0.419 Lane Km

Allocation:
TOTAL: P 5,000,000
CW1: P 4,950,000
EAO: P 50,000

Unit Cost:
CW1: P 11,813,842.48/ Lane Km

TO:

Construction of Road with Street Lights, Barangay Consorcia, Las Nieves, Agusan del Norte

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 0.566 Lane Km

Allocation:
TOTAL: P 5,000,000
CW1: P 4,950,000
EAO: P 50,000

Unit Cost:
CW1: P 8,745,583.04/ Lane Km
June 17, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Butuan City District Engineering Office
UACS No. : 300215103493000
Project ID: P00733922MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of Road, Dankias-Danapa Road from Purok 3 going to Purok 7, Barangay Dankias, Butuan City

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 0.587 Lane Km

Allocation:
TOTAL: P 7,000,000
CW1: P 6,860,000
EAO: P 140,000

Unit Cost:
CW1: P 11,686,541.74/ Lane Km

TO:

Construction of Road, Dankias-Danapa Road from Purok 3 going to Purok 7, Barangay Dankias, Butuan City

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 0.776 Lane Km

Allocation:
TOTAL: P 7,000,000
CW1: P 6,860,000
EAO: P 140,000

Unit Cost:
CW1: P 8,840,206.19/ Lane Km
June 17, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Butuan City District Engineering Office
UACS No. : 300215103494000
Project ID: P00733923MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of Road at Purok 2 and 2B, Barangay Baan Riverside, Butuan City

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 1.677 Lane Km

Allocation:
TOTAL: P 20,000,000
CW1: P 19,600,000
EAO: P 400,000

Unit Cost:
CW1: P 11,687,537.27/ Lane Km

TO:

Construction of Road at Purok 2 and 2B, Barangay Baan Riverside, Butuan City

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 2.155 Lane Km

Allocation:
TOTAL: P 20,000,000
CW1: P 19,600,000
EAO: P 400,000

Unit Cost:
CW1: P 9,095,127.61/ Lane Km
June 17, 2023 2022 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Butuan City District Engineering Office
UACS No. : 300219101795000
Project ID: P00734001MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Flood Mitigation Structures protecting Public Infrastructures/Facilities

FROM:

Construction of Flood Mitigation Structure, Barangay Marcos Calo, Las Nieves, Agusan del Norte

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 34.727 Lineal meters

Allocation:
TOTAL: P 5,000,000
CW1: P 4,825,000
EAO: P 175,000

Unit Cost:
CW1: P 138,940.88/ Lineal meters

TO:

Construction of Flood Mitigation Structure, Barangay Marcos Calo, Las Nieves, Agusan del Norte

Type of Work:
CW1- Construction of Flood Mitigation Structure

Physical Target:
CW1- 70.060 Lineal meters

Allocation:
TOTAL: P 5,000,000
CW1: P 4,825,000
EAO: P 175,000

Unit Cost:
CW1: P 68,869.54/ Lineal meters
June 16, 2023 2023 WIN3F07161 FY 2023 GAA February 17, 2023 Region III Tarlac District Engineering Office
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and / or Bridges from the National Road/s leading to Major / Strategic Public Buildings / Facilities

Construction of By-pass and Diversion Roads, Tarlac City - San Jose Diversion Road, Tarlac City, Tarlac
June 16, 2023 2023 FY 2023 GAA February 17, 2023 Region III Zambales 1st District Engineering Office
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads

Olongapo - Bugallon Rd - K0170+380 - K0172+025
June 16, 2023 2023 FY 2023 GAA February 17, 2023 Region III Zambales 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads

Amungan - Palauig - Banlog Road - K0217+457 - K0217+520, K0218+753 - K0220+035.70
June 16, 2023 2023 FY 2023 GAA February 17, 2023 Region III Zambales 1st District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads

Olongapo - Bugallon Rd - K0198+000 - K0198+944.30
June 16, 2023 2023 WIN3F07107 FY 2023 GAA February 17, 2023 Region III Zambales 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Tertiary Roads

Amungan - Palauig - Banlog Road - K0211+(-411) - K0211+(-312.40)
June 16, 2023 2023 FY 2023 GAA February 17, 2023 Region III Zambales 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Olongapo - Bugallon Rd - K0192+000 - K0192+324.20
June 16, 2023 2023 FY 2023 GAA February 17, 2023 Region III Zambales 1st District Engineering Office
Asset Preservation Program - Preventive Maintenance - Secondary Roads

Olongapo - Bugallon Road - K0192+324.20 - K0193+403
June 16, 2023 2023 WIN3F07120 FY 2023 GAA February 17, 2023 Region III Zambales 2nd District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Olongapo-Bugallon Road (OBR) - K0135+556 - K0136+000

June 16, 2023 2023 WIN3F06825 FY 2023 GAA February 17, 2023 Region III Zambales 2nd District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Olongapo-Bugallon Rd (OBR) - K0-132+910 - K0133+185
June 16, 2023 2023 WIN3F07410 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00740267LZ

FROM : Physical Target : CW1 - Construction of Concrete Road - 11.555 Lane Km

TO : Physical Target : CW1 - Construction of Concrete Road - 0.916 Lane Km, CW2 - Construction of Road Slope Protection Structure - 3952.52 Square
June 16, 2023 2023 WIN3F07158 FY 2022 GAA February 17, 2023 Region III Zambales 2nd District Engineering Office
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Olongapo - Bugallon Rd (OBR) - Kalaklan K0128+860 - K0128+980, K0129+060 - K0129+160
June 16, 2023 2023 WIN3F07064 FY 2023 GAA February 17, 2023 Region III Zambales 2nd District Engineering Office
Network Development Program - Off-Carriageway Improvement - Secondary Road

Olongapo-Bugallon Rd - K0139+000 - K0139+700, K0140+100- K0140+280, K0140+440 - K0140+600, K0141+981 - K0142+378, K0142+560 - K0142+660, K0145+976 - K01460+000, K0146+080 - K0146+200, K0146+260 - K0147+600, K0147+800 - K0148+000
June 16, 2023 2023 FY 2023 GAA February 17, 2023 Region III Zambales 2nd District Engineering Office
Network Development Program - Off-Carriageway Improvement - Tertiary Roads

San Marcelino - Nagbayto Rd - K0151+(-999) - K0151+(-921.50) , K0151+040 - K0152+180
June 16, 2023 2023 WIN3F06824 FY 2023 GAA February 17, 2023 Region III Zambales 2nd District Engineering Office
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads

Olongapo -Bugallon Rd (OBR) - K0145+866 - K0146+180, K0146+942 - K0147+300, K0149+556 - K0149+818.75
June 16, 2023 2023 300221102734000 GAA FY 2023 December 26, 2022 Region II Cagayan 3rd District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities - Improvement of Road, Brgy. Culong - Brgy. Bugnay, Tuao, Cagayan
June 16, 2023 2023 310101100780000 GAA FY 2023 December 26, 2022 Region II Cagayan 3rd District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads - Cagayan Valley Rd - K0461+(-117) - K0461+000, K0462+000 - K0462+538, K0462+609 - K0462+897, K0465+000 - K0465+1003, K0467+000 - K0467+686, K0469+000 - K0469+709
June 16, 2023 2023 300221102736000 GAA FY 2023 December 26, 2022 Region II Cagayan 3rd District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities - Construction of Bulagao Purok 5 to Sitio Turud Road, Tuao, Cagayan
June 15, 2023 2023 WIN3F07423 FY 2023 GAA December 26, 2022 Region V Albay 2nd Engineering Office
Project ID : P00739856LZ

FROM : CSSP - SIPAG - Access Road and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Access Road to Calpi Port, Barangay Calpi, Rapu-Rapu, Albay

Physical Target : CW1 - Construction of Concrete Road - 6.419 Lane


TO : CSSP - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

Construction of Access Road to Calpi Port, Barangay Calanaga, Rapu-Rapu, Albay

Physical Target : CW1 - Construction of Gravel Road - 2.04 Lane Km
June 15, 2023 2023 WIN3E02973 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Norte District Engineering Office
UACS No. : 310107100597000
Project ID: P00706546MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

FROM:

Daang Maharlika (Surigao-Agusan Sect) - K1171 + 700 - K1171 + 744

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 3000 Square meters

Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000

Unit Cost:
CW1: P 9,800/Square meters

TO:

Daang Maharlika (Surigao-Agusan Sect) - K1171+700 – K1171 + 744, K1171 + 780 – K1171 + 823.20

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 1944.56 Square meters

Allocation:
TOTAL: P 30,000,000
CW1: P 29,400,000
EAO: P 600,000

Unit Cost:
CW1: P 15,119.10/Square meters
June 15, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Norte District Engineering Office
UACS No. : 310201101240000
Project ID: P00705648MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads

FROM:

Daang Maharlika (Surigao-Agusan Sect) - K1193 + 573 - K1193 + 881, K1199 + 341 - K1199 + 372, K1200 + 404 - K1200 + 413, K1200 + 919 - K1201 + 025

Type of Work:
CW1- Road Widening

Physical Target:
CW1- 0.918 Lane Km

Allocation:
TOTAL: P 20,000,000
CW1: P 19,600,000
EAO: P 400,000

Unit Cost:
CW1: P 21,350,762.53/Lane Km

TO:

Daang Maharlika (Surigao-Agusan Sect) - K1193 + 573 - K1193 + 881, K1199 + 553 - K1199 + 572, K1200 + 404 - K1200 + 416, K1200 + 917 - K1201 + 025

Type of Work:
CW1- Road Widening

Physical Target:
CW1- 0.802 Lane Km

Allocation:
TOTAL: P 20,000,000
CW1: P 19,600,000
EAO: P 400,000

Unit Cost:
CW1: P 24,438,902.74/Lane Km
June 15, 2023 2023 WIN3E02982 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Sur 2nd District Engineering Office
UACS No. : 310108101686000
Project ID: P00706571MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM:

Asuncion-San Isidro-Laak-Veruela Rd - K1531 + 038 - K1531 + 100, K1535 + 302 - K1535 + 400

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4363.530 Square meters

Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000

Unit Cost:
CW1: P 11,229.44/Square meters

TO:

Asuncion-San Isidro-Laak-Veruela Rd - K1530 + 971 - K1531 + 100, K1535 + 320 - K1535 + 400

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 3503.8 Square meters

Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000

Unit Cost:
CW1: P 13,984.82/Square meters

June 15, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Sur 2nd District Engineering Office
UACS No. : 310101100921000
Project ID: P00707530MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads

FROM:

Daang Maharlika (Agusan-Davao Sect) - K1330 + 984 - K1331 + 759, K1331 + 774 - K1332 + 571, K1333 + 653 - K1334 + 135, K1334 + 157 - K1335 + 000, K1336 + 000 - K1336 + 234

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay

Physical Target:
CW1- 6.262 Lane Km

Allocation:
TOTAL: P 99,993,000
CW1: P 96,493,245
EAO: P 3,499,755

Unit Cost:
CW1: P 15,409,333.28/Lane Km

TO:

Daang Maharlika (Agusan-Davao Sect) - K1326 + 300 - K1326 + 818, K1330 + 591 - K1330 + 669, K1331 + 095 - K1331 + 754, K1331 + 779 - K1332 + 571, K1333 + 653 - K1333 + 960, K1335 + 102 - K1335 + 320, K1336 + 500 - K1336 + 990, K1337 + 000 - K1338 + 146, K1348 + 896 - K1349 + 393

Type of Work:
CW1- Preventive Maintenance of Road: Asphalt Overlay
CW2- Preventive Maintenance of Road: Concrete Reblocking

Physical Target:
CW1- 6.262 Lane Km
CW2- 3.6725 Lane Km

Allocation:
TOTAL: P 99,993,000
CW1: P 36,338,435.42
CW2: P 60,154,809.58
EAO: P 3,499,755

Unit Cost:
CW1: P 9,227,637.23/Lane Km
CW2: P 16,379,798.39/Lane Km
June 15, 2023 2023 WIN3E02979 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 310204102290000
Project ID: P00705705MN

ORGANIZATIONAL OUTCOME 1 : Network Development Program - Construction of By-Pass and Diversion Roads

FROM:

Surigao-Agusan West Coastal Road, Package G, Surigao del Norte

Type of Work:
CW1- Construction of Concrete Road

Physical Target:
CW1- 9.565 Lane Km

Allocation:
TOTAL: P 155,000,000
CW1: P 149,575,000
EAO: P 5,425,000

Unit Cost:
CW1: P 15,637,741.77/Lane Km

TO:

Surigao-Agusan West Coastal Road, Package G, Surigao del Norte

Type of Work:
CW1- Construction of Concrete Bridge 1
CW2- Construction of Concrete Bridge 2
ROW- ROW Acquisition

Physical Target:
CW1- 333.900 Square meters
CW2- 333.900 Square meters
ROW- 808.860 Square meters

Allocation:
TOTAL: P 155,000,000
CW1: P 73,836,010
CW2: P 74,773,990
ROW: P 965,000
EAO: P 5,425,000

Unit Cost:
CW1: P 221,132.110/ Square meters
CW2: P 223,941.27/ Square meters
ROW: P 1193.04/ Square meters
June 15, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 310108101451000
Project ID: P00706381MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM:

Surigao-Davao Coastal Rd - K1262 + 210 - K1262 + 325

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 5555.56 Square meters

Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000

Unit Cost:
CW1: P 18,238.49/Square meters

TO:

Surigao-Davao Coastal Rd - K1262+220 - K1262+460 - K1264+340 - K1264+400

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 6858 Square meters

Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000

Unit Cost:
CW1: P 14,774.72/ Square meters

June 15, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 310108101455000
Project ID: P00707534MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

FROM:

Surigao-Davao Coastal Rd - K1265 + 022 - K1265 + 135

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 5833.333 Square meters

Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000

Unit Cost:
CW1: P 17,370 /Square meters

TO:

Surigao-Davao Coastal Rd - K1258+740 - K1258+995, K1259+410 - K1259+463

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 7040.88 Square meters

Allocation:
TOTAL: P 105,000,000
CW1: P 101,325,000
EAO: P 3,675,000

Unit Cost:
CW1: P 14,390.96 /Square meters

June 15, 2023 2023 WIN3F07411 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00740268LZ

FROM : Physical Target : CW1 - Construction of Concrete Road - 9.629 Lane Km

TO : Physical Target : CW1 - Construction of Concrete Road - 0.68 Lane Km, CW2 - Construction of Road Slope Protection Structure - 2495.6 Square meters

June 15, 2023 2023 WIN3F07426 FY 2023 GAA December 26, 2022 Region V Catanduanes District Engineering Office
Project ID : P00741999LZ

FROM : Physical Target : CW1 - Construction of Concrete Road - 1.926 Lane Km

TO : Physical Target : CW1 - Construction of Concrete Road - 0.930 Lane Km
June 15, 2023 2023 WIN3F07428 FY 2023 GAA December 26, 2022 Region V Catanduanes District Engineering Office
Project ID : P00742000LZ

FROM : Physical Target : CW1 - Construction of Concrete Road - 1.926 Lane Km

TO : Physical Target : CW1 - Construction of Concrete Road - 0.670 Lane Km
June 15, 2023 2023 FY 2023 GAA December 26, 2022 Region V Sorsogon District Engineering Office
Project ID : P007403960LZ

FROM : CSSP - Basic Infrastructure - Multi-Purpose Buildings/ Facilities to support Social Services

Construction of Multi-Purpose Building, (Sorsogon Pilot Elementary School), Brgy. Macabog, Sorsogon City, Sorsogon



TO : CSSP - Basic Infrastructure - Multi-Purpose Buildings/ Facilities to support Social Services

Construction of Multi-Purpose Building, (Sorsogon Pilot Elementary School), Brgy. Sirangan, Sorsogon City, Sorsogon
June 14, 2023 2023 WIN3F07438 FY 2023 GAA February 17, 2023 Region III Regional Office III
Network Development Program - Construction of By-Pass and Diversion Roads

Service Road (Alternative route to NLEX), Bulacan
June 14, 2023 2023 WIN3F07390 FY 2023 GAA December 26, 2022 Region V Albay 2nd Engineering Office
Project ID : P00712752LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads

Daang Maharlika (LZ) - K0522 + 035 - K0522 + 434

Physical Target : CW1 - Preventive Maintenance of Road: Asphalt Overlay - 0.798 Lane Km


TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Preventive Maintenance - Primary Roads

Daang Maharlika (LZ) - K0519 + 092 - K0519 + 400

Physical Target : CW1 - Preventive Maintenance of Road: Concrete Reblocking 0.54 Lane Km
June 14, 2023 CY 2023 UACS No. 300207100843000 May 2, 2023 National Capital Region NCR - Regional Office
As per GAA/Original
UACS No. 300207100843000
Project ID.: P00732627LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Construction/Improvement of Various Infrastructures in Support of National Security (Tatag ng Imprastraktura para sa Kapayapaan at Seguridad Program – TIKAS)
Construction of Multi-Purpose Building PNPSAF Camp Bagong Diwa, Bicutan, Taguig City, Phase III
Physical Target: CW1 = Construction of Other Facilities 1 bldg.
Unit Cost (P’000) = P 9,650.00/no. of facilities
Allocation = P 9,650,000.00
EAO = P 350,000.00
Total = P 10,000,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Construction/Improvement of Various Infrastructures in Support of National Security (Tatag ng Imprastraktura para sa Kapayapaan at Seguridad Program – TIKAS)
Construction of Multi-Purpose Building PNPSAF Camp Bagong Diwa, Bicutan, Taguig City, Phase II
Physical Target: CW1 = Construction of Other Facilities 1 bldg.
Unit Cost (P’000) = P 9,650.00/no. of facilities
Allocation = P 9,650,000.00
EAO = P 350,000.00
Total = P 10,000,000.00
June 14, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00713074LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slop Collapse, and Landslide - Secondary Roads

Catanduanes Cir Rd - K0143 + 660 - K0143 + 957

Physical Target : CW1 - Construction of Road Slope Protection Structure - 3896.1 Square meters


TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Catanduanes Cir Rd - K0143 + 760.00 - K0143 + 1060.00

Physical Target : CW1 - Construction of Road Slope Protection Structure - 3585 Square meters
June 14, 2023 2023 WIN3F07425 FY 2023 GAA December 26, 2022 Region V Albay 2nd Engineering Office
Project ID : P00713294LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Daang Maharlika (LZ) - K0513 + 700 - K0513 + 730, K0514 + 200 - K0514 + 220, K0521 + 200 - K0522 + 000

Physical Target : CW1 - Construction Road Slope Protection Structure - 2547.33 Square Meters


TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Daang Maharlika (LZ) - K0520 + 416 - K0520 + 543

Physical Target : CW1 - Construction Road Slope Protection Structure 1328 Square Meters
June 14, 2023 2023 FY 2023 GAA December 26, 2022 Region V Albay 2nd Engineering Office
P00714086LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

Daang Maharlika (LZ) - K0530 + (-054) - K0531 + 000

Physical Target : CW1 - Construction of Drainage Structure along Road 2126 Lineal Meters



TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads

Daang Maharlika (LZ) - K0528 + 000 - K0531 + 000, K0532 + 000 - K0532 + 220

Physical Target : CW1 - Construction of Drainage Structure along Road - 2790 Lineal Meters
June 14, 2023 2023 FY 2023 GAA December 26, 2022 Region V Sorsogon District Engineering Office
Project ID : P00714800LZ

FROM : OO1 Ensure Safe and Reliable National Road System - National Development - Off-Carriageway Improvement - Tertiary Roads

Juban - Magallanes Rd - K0614 + 071 - K0614 + 233 (R/S), K014 + 330 - K0614 + 348 (R/S), K0614 + 348 - K0614 + 366 (B/S), K0614 + 366 - K0614 + 377 (R/S), K0614 + 452 - K0614 + 488 (R/S), K0615 + 084 (B/S), K0615 + 084 - K0615 + 376 (R/S), K0615 + 682 - K0615 + 904 (R/S), K0616 + 018 - K0616 + 061 (R/S), K0620 + 216 - K0620 + 409 (R/S)

Physical Target : CW1 - Off-Carriageway Improvement: Pavement of Shoulder 2416.5 Square Meters



TO : OO1 Ensure Safe and Reliable National Road System - Network Development - Off-Carriagway Improvement - Tertiary Roads

Juban - Magallanes Rd - K0614 + 071 - K0614 + 233 (R/S), K0614 + 330 - K0614 + 348 (R/S), K0614 + 348 - K0614 + 366 (B/S), K0614 + 366 - K0614 + 377 (R/S), K0614 + 452 - K0614 + 488 (R/S), K0614 + 534 - K0615 + 018 (R/S), K0615 + 018 - K0615 + 084 (B/S), K0615 + 084 - K0615 + 376 (R/S)

Physical Target : CW1 - Off-Carriageway Improvement : Paving of Shoulder - 2276.18 Square meters, CW2 - Construction of Road Slope Protection Structure - 1796.49 Square meters
June 14, 2023 2023 RXII-112 GAA 2023 RA 11936 January 1, 2023 Region XII Cotabato 2nd District Engineering Office
23MC0024 - Construction of Malasila River Flood Control, Sta. 39+600 - Sta. 40+770, Sta. 40+170 - Sta. 40+770, Barangay Bulacanon, Makilala, North Cotabato, Package 2
June 14, 2023 2023 FY 2023 GAA December 26, 2022 Region V Sorsogon District Engineering Office
Project ID : P00726291LZ

FROM : OO2 Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Revetment, Barangay Poblacion, Sta. 49 + 820.00 - Sta. 50 + 020.00, Lupi, Camarines Sur

Physical Target : CW1 - Construction of Revetment 105.00 Lineal meters



TO : OO2 Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Revetment, Barangay Poblacion, Sta. 49 + 820.00 - Sta. 49 + 925.00, Lupi, Camarines Sur
June 14, 2023 2023 FY 2023 GAA December 26, 2022 Region V Camarines Sur 1st District Engineering Office
Project ID : P00726606LZ

FROM : OO2 Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Sipocot River Flood Mitigation Structure (Barangay North Centro to Barangay Azucena), Sta. 38 + 060.00 - Sta. 38 + 335.00, Sipocot, Camarines Sur

Physical Target : CW1 - Construction of Revetment - 133.00 Lineal meters


TO : OO2 Protect Lives and Properties Against Major Floods - Flood Management - Construction/ Maintenance of Flood Mitigation Structure and Drainage Systems

Construction of Sipocot River Flood Mitigation Structure (Barangay North Centro to Barangay Azucena), Sta. 38 + 060.00 - Sta. 38 + 193.00, Sipocot, Camarines Sur

Physical Target : CW1 - Construction of Revetment 133.00 Lineal meters
June 14, 2023 2023 WIN3F07421 FY 2023 GAA December 26, 2022 Region V Camarines Sur 2nd District Engineering Office
Project ID : P00732483LZ

FROM : Physical Target : CW1 - Construction of Concrete Road - 1.333 Lane Km

TO : Physical Target : CW1 - Construction of Concrete Road - 0.800 Lane Km
June 14, 2023 2023 FY 2023 GAA December 26, 2022 Region V Masbate 2nd District Engineering Office
Project ID : P00732952LZ

FROM : Physical Target :
CW1 - Construction of Concrete Road - 0.400 Lane Km

TO : Physical Target :
CW1 - Construction of Concrete Road - 0.378 Lane Km

Pages