Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
August 2, 2023 2023 WIN3E02965 SR2023-03-005645 March 2, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0466 + 317 - K0466 + 500;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000

To:
Abra-Kalinga Rd - K0466 + 317 - K0466 + 500;
Physical Target: 3577.5 Square meters;
Allocation: Php 100,000,000.000

August 2, 2023 2023 WIN3E02944 SR2023-03-005646 March 2, 2023 Cordillera Administrative Region Abra District Engineering Office
From:
Abra-Kalinga Rd - K0467 + 200 - K0467 + 320;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000

To:
Abra-Kalinga Rd - K0467 + 200 - K0467 + 320;
Physical Target: 3577.5 Square meters;
Allocation: Php 100,000,000.000

August 2, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 310212100239000
Project ID: P00705684MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System -Network Development Program - Paving of Unpaved Roads - Tertiary Roads

FROM:

Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1317 + 164 - K1317 + 287, K1317 + 620 - K1318 + 719, K1319 + 066 - K1319 + 519

Type of Work:
CW1- Paving of Unpaved Roads

Physical Target:
CW1- 3.368 Lane Km

Allocation:
TOTAL: P 126,180,000
CW1: P 121,763,700
EAO: P 4,416,300

Unit Cost:
CW1: P 36,153,117.58/Lane Km

TO:

Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1317 + 164 - K1317 + 287, K1317 + 620 - K1318 + 719, K1319 + 066 - K1319 + 380

Type of Work:
CW1- Paving of Unpaved Roads

Physical Target:
CW1- 3.040 Lane Km
CW2- 540 Square meters

Allocation:
TOTAL: P 126,180,000
CW1: P 107,650,930
CW2: P 14.112,770
EAO: P 4,416,300

Unit Cost:
CW1: P 35,411,490.13/Lane Km
CW2: P 26,134.759/Square meters
August 2, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 310212100239000
Project ID: P00705684MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System -Network Development Program - Paving of Unpaved Roads - Tertiary Roads

FROM:

Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1317 + 164 - K1317 + 287, K1317 + 620 - K1318 + 719, K1319 + 066 - K1319 + 519

Type of Work:
CW1- Paving of Unpaved Roads

Physical Target:
CW1- 3.368 Lane Km

Allocation:
TOTAL: P 126,180,000
CW1: P 121,763,700
EAO: P 4,416,300

Unit Cost:
CW1: P 36,153,117.58/Lane Km

TO:

Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1317 + 164 - K1317 + 287, K1317 + 620 - K1318 + 719, K1319 + 066 - K1319 + 380

Type of Work:
CW1- Paving of Unpaved Roads

Physical Target:
CW1- 3.040 Lane Km
CW2- 540 Square meters

Allocation:
TOTAL: P 126,180,000
CW1: P 107,650,930
CW2: P 14.112,770
EAO: P 4,416,300

Unit Cost:
CW1: P 35,411,490.13/Lane Km
CW2: P 26,134.759/Square meters
August 2, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Sur 1st District Engineering Office
UACS No. : 310212100238000
Project ID: P00705683MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Network Development Program - Paving of Unpaved Roads - Tertiary Roads

FROM:

Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K1314 + 819 - K1316 + 975

Type of Work:
CW1- Paving of Unpaved Roads

Physical Target:
CW1- 4.160 Lane Km

Allocation:
TOTAL: P 124,800,000
CW1: P 120,432,000
EAO: P 4,368,000

Unit Cost:
CW1: P 28,950,000/Lane Km

TO:

Butuan City-Talacogon-Loreto-Veruela-Sta Josefa Rd - K314 + 819.00 - K1316 + 930.00, K1319 + 380.00 - K1319 + 519.00

Type of Work:
CW1- Paving of Unpaved Roads
CW2- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4.140 Lane Km
CW2- 3000 Square meters

Allocation:
TOTAL: P 124,800,000
CW1: P 63,768,620
CW2: P 56,663,380
EAO: P 4,368,000

Unit Cost:
CW1: P 15,403,048.31/Lane Km
CW2: P 18,887.79/Square meters
August 1, 2023 2023 310204101962000 GAA FY 2023 December 26, 2022 Region II Regional Office II
OO1: Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads - Tuguegarao-Solana Diversion Road (Tuguegarao-Solana Bridge and Approaches) - Phase I
July 31, 2023 CY 2023 UACS No. 300215102946000 March 14, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300215102946000
Project ID.: P00739938LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabiliation or Road along F. Roxas Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.127 Lane Km
Unit Cost (P’000) = P 61,732.28/Lane Km.
Allocation (P,000) = P 7,840
EAO (P’000) = P 160.00
Total (P’000) = P 8,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM

CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabilitation or Road along F. Roxas Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.127 Lane Km
Unit Cost (P’000) = P 61,732.28/Lane Km. P 122 M/Km
Allocation (P,000) = P 7,840
EAO (P’000) = P 160.00
Total (P’000) = P 8,000.00
July 31, 2023 CY 2023 WIN3F07497 UACS No. 300215102951000 March 14, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300215102951000
Project ID.: P00739943LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabiliation or Road along Nadurata Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.141 Lane Km
Unit Cost (P’000) = P 83,404.26/Lane Km.
Allocation (P,000) = P 11,760
EAO (P’000) = P 240.00
Total (P’000) = P 12,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM

CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabilitation or Road along Nadurata Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.141 Lane Km
Unit Cost (P’000) = P 83,404.26/Lane Km. P 166 M/Km
Allocation (P,000) = P 11,760
EAO (P’000) = P 240.00
Total (P’000) = P 12,000.00
WIN3F07497
July 31, 2023 CY 2023 WIN3F07518 UACS No. 300215102947000 March 14, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300215102947000
Project ID.: P00739939LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabiliation or Road along J. Teodoro Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.117 Lane Km
Unit Cost (P’000) = P 58,632.48/Lane Km.
Allocation (P,000) = P 6,860
EAO (P’000) = P 140.00
Total (P’000) = P 7,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM

CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabilitation or Road along J. Teodoro Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.117 Lane Km
Unit Cost (P’000) = P 58,632.48/Lane Km. P 116 M/Km
Allocation (P,000) = P 6,860
EAO (P’000) = P 140.00
Total (P’000) = P 7,000.00
WIN3F07518
July 31, 2023 CY 2023 WIN3F07518 UACS No. 300215102947000 March 14, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300215102947000
Project ID.: P00739939LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabiliation or Road along J. Teodoro Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.117 Lane Km
Unit Cost (P’000) = P 58,632.48/Lane Km.
Allocation (P,000) = P 6,860
EAO (P’000) = P 140.00
Total (P’000) = P 7,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM

CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabilitation or Road along J. Teodoro Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.117 Lane Km
Unit Cost (P’000) = P 58,632.48/Lane Km. P 116 M/Km
Allocation (P,000) = P 6,860
EAO (P’000) = P 140.00
Total (P’000) = P 7,000.00
WIN3F07518
July 31, 2023 CY 2023 WIN3F07518 UACS No. 300215102947000 March 14, 2023 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA/Original
UACS No. 300215102947000
Project ID.: P00739939LZ

CONVERGENCE AND SPECIAL SUPPORT PROGRAM

CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabiliation or Road along J. Teodoro Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.117 Lane Km
Unit Cost (P’000) = P 58,632.48/Lane Km.
Allocation (P,000) = P 6,860
EAO (P’000) = P 140.00
Total (P’000) = P 7,000.00

As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM

CONVERGENCE AND SPECIAL SUPPORT PROGRAM – Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabilitation or Road along J. Teodoro Street, Caloocan City
Physical Target: CW1 = Rehabilitation of Paved Road 0.117 Lane Km
Unit Cost (P’000) = P 58,632.48/Lane Km. P 116 M/Km
Allocation (P,000) = P 6,860
EAO (P’000) = P 140.00
Total (P’000) = P 7,000.00
WIN3F07518
July 22, 2023 GAA 2023 P00721476MN SR2023-01-000540 January 30, 2023 Region XII Regional Office XII
23M00002 CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PULANGI RIVER, BARANGAY NABUNDAS SECTION - PHASE II, STA. 001+500 - STA. 001+755.5, PIKIT, COTABATO
July 22, 2023 GAA 2023 P00721451MN SR2023-01-000559 January 30, 2023 Region XII Regional Office XII
23M00004 CONSTRUCTION OF FLOOD CONTROL STRUCTURE, RIO GRANDE DE MINDANAO (LIBUNGAN TORETA SECTION) LIBUNGAN TORETA, STA 0+000 - STA 0+238, PIGCAWAYAN, COTABATO
July 22, 2023 GAA 2023 P00732143MN SR2023-01-000594 January 30, 2023 Region XII Regional Office XII
23M00023 CONSTRUCTION OF MAGPET (PANGAO-AN - DON PANACA) TO DAVAO CITY VIA SALAYSAY (INDAWHONG-BALLAH-MASAWANG) TO LUMONDAO (JUNCTION BUKIDNON TO DAVAO) ROAD, COTABATO, STA. 1+874 - STA. 3+990.27, MAGPET, NORTH COTABATO
July 22, 2023 GAA 2023 P00732142MN SR2023-001-000606 January 30, 2023 Region XII Regional Office XII
23M00025 CONSTRUCTION OF ROAD, NAPANLAHAN-DALLAG ROAD, STA. 7+439 - STA. 8+369, STA. 8+394 - STA. 10+259, ARAKAN, NORTH COTABATO
July 22, 2023 GAA 2023 P00721585MN SR2023-03-006448 March 3, 2023 Region XII Regional Office XII
23M00042 CONSTRUCTION OF RIVER CONTROL, PACKAGE A, STA. 0+000 - STA. 0+767.5, ALABEL, SARANGANI
July 22, 2023 GAA 2023 P00721303MN SR2023-01-002279 January 30, 2023 Region XII Regional Office XII
23M00047 CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SITIO BUENAVISTA, BARANGAY PAG- ASA, STA. 0+000 - STA. 0+353, ALABEL, SARANGANI
July 22, 2023 GAA 2023 P00721471MN SR2023-01-002618 January 30, 2023 Region XII Regional Office XII
23M00083 CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ALA RIVER ROAD DIKE, PACKAGE A - PHASE 4, STA. 0+000 - STA. 0+555, LAMBAYONG, SULTAN KUDARAT
July 22, 2023 GAA 2023 P00721304MN SR2023-01-002282 January 30, 2023 Region XII Regional Office XII
23M00048 CONSTRUCTION OF GLAN RIVER CONTROL, PACKAGE A, STA 0+000 - STA 0+413, GLAN, SARANGANI
July 22, 2023 GAA 2023 P00721305MN SR2023-01-002285 January 30, 2023 Region XII Regional Office XII
23M00049 CONSTRUCTION OF TAMADANG RIVER CONTROL, PACKAGE B, STA 0+000-STA 0+548, KIAMBA, SARANGANI
July 22, 2023 GAA 2023 P00721468MN SR2023-01-002537 January 30, 2023 Region XII Regional Office XII
23M00072 CONSTRUCTION OF RIVER BANK PROTECTION ALONG ALA RIVER, PUROK RIZAL II, STA. 001+257.5 - STA. 001+504.5, BARANGAY PANAY, SANTO NIÑO, SOUTH COTABATO
July 22, 2023 2023 P00721467MN SR2023-01-002541 January 30, 2023 Region XII Regional Office XII
23M00073 CONSTRUCTION OF RIVER BANK PROTECTION ALONG ALA RIVER, STA. 001+504.5 - STA. 002+050, SANTO NIÑO, SOUTH COTABATO
July 22, 2023 2023 P00721472MN SR2023-01-002615 January 30, 2023 Region XII Regional Office XII
23M00082 CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ALA RIVER ROAD DIKE, PACKAGE A - PHASE 3, STA. 0+000 - STA. 0+606, LAMBAYONG, SULTAN KUDARAT
July 22, 2023 2023 P00707256MN SR2023-03-006423 March 3, 2023 Region XII Regional Office XII
23M00175 ROAD WIDENING - COTABATO-ALLAH VALLEY-MARBEL RD, K1848 + 511 - K1848 + 615 & K1852 + 770 - K1852 + 900, COTABATO CITY
July 22, 2023 2023 P00705721MN SR2023-01-000941 January 30, 2023 Region XII Regional Office XII
23M00017 CONSTRUCTION OF MISSING LINKS/ NEW ROADS - DOROLUMAN-ARAKAN-PRES. ROXAS-KADINGILAN ROAD PACKAGE 2, STA. 0+990 - STA. 1+098, ARAKAN, NORTH COTABATO
July 22, 2023 2023 P00734034MN SR2023-06-011477 June 26, 2023 Region XII Regional Office XII
23M00174 CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE, STA.49+884.00 - STA. 49+950.23,STA. 49+972.00 -STA. 50+117.35, STA. 51+162.00 - STA. 51+208.90, STA. 51+491.00 - STA. 51+604.09, BANGA-TUPI-MALUNGON, TUPI, SOUTH COTABATO
July 22, 2023 2023 P00706206MN SR2023-01-002476 January 30, 2023 Region XII Regional Office XII
23M00064 PREVENTIVE MAINTENANCE - COTABATO-MARBEL RD, K1724+054 - K1725+452, BANGA, SOUTH COTABATO
July 22, 2023 2023 P00733173MN SR2023-01-002289 January 30, 2023 Region XII Regional Office XII
23M00062 CONSTRUCTION OF CONCRETE ROAD - BLAGAN-DATAL LAGUH SAN JOSE-PAO PAO SINAWAL ROAD CONNECTING TO GENSAN DIVERSION ROAD IN SUPPORT OF THE AGRIBUSINESS INDUSTRY, STA. 0+000 - STA. 0+196, STA. 0+356 - STA. 2+142.9, GENERAL SANTOS CITY, SOUTH COTABATO
July 22, 2023 2023 P00705752MN SR2023-01-002603 January 30, 2023 Region XII Regional Office XII
23M00080 CONSTRUCTION OF MISSING LINKS/NEW ROADS - COLUMBIO - LUTAYAN - KORONADAL ROAD, PACKAGE D, STA.1682+470.00 - STA.1682+520.00 ; STA. 1683+080.00 - STA.1683+147.00, COLUMBIO, SULTAN KUDARAT
July 22, 2023 2023 P00721583MN SR2023-03-006642 March 3, 2023 Region XII Regional Office XII
23M00152 CONSTRUCTION OF MALITUBOG RIVER BANK PROTECTION (DOWNSTREAM OF MALITUBOG BRIDGE, LEFT BANK), STA 0+000 - STA 0+244.56, BARANGAY POBLACION, BANISILAN, NORTH COTABATO
July 22, 2023 2023 P00734168MN SR2023-03-008630 March 27, 2023 Region XII Regional Office XII
23M00214 CONSTRUCTION OF ROAD, BRGY. GUINIBON-BRGY. MALATIMON (PHASE 2), STA 0+000 - STA 0+758, DATU ABDULLAH SANGKI, MAGUINDANAO
July 22, 2023 2023 P00734169MN SR2023-03-008631 March 27, 2023 Region XII Regional Office XII
23M00215 CONSTRUCTION OF ROAD, BRGY. KAKAL TO CROSSING GUINIBON ROAD, DATU ABDULLAH SANGKI, MAGUINDANAO (PHASE 1), STA 0+000 - STA 1+120, DATU ABDULLAH SANGKI, MAGUINDANAO
July 22, 2023 2023 P00734167MN SR2023-03-008629 March 27, 2023 Region XII Regional Office XII
23M00213 CONSTRUCTION OF ROAD IN BRGY. MAITUMAIG TO BRGY. MACALAG, IN THE MUNICIPALITY OF DATU UNSAY, MAGUINDANAO
July 22, 2023 2023 P00734170MN SR2023-01-008632 March 27, 2023 Region XII Regional Office XII
23M00216 "CONSTRUCTION OF TUKANALUGONG TO MALANDING ROAD, STA. 0+000 - STA. 0+755, DATU ABDULLAH SANGKI, MAGUINDANAO "
July 22, 2023 2023 P00721473MN SR2023-01-002623 January 30, 2023 Region XII Regional Office XII
23M00084 CONSTRUCTION OF FLOOD CONTROL STRUCTURE, ALA RIVER ROAD DIKE, PACKAGE B - PHASE 3, STA. 0+000 - STA. 0+600, LAMBAYONG, SULTAN KUDARAT
July 21, 2023 2023 WIN3F07517 FY 2023 GAA February 17, 2023 Region III Regional Office III
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and / or Bridges from the National Road/s leading to Major / Strategic Public Buildings / Facilities

Construction of Road, Barangay Liyang, Pilar to Barangay Bilolo, Orion, Bataan (Package 1)
July 21, 2023 2023 WIN3F07522 FY 2023 GAA February 17, 2023 Region III Regional Office III
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads

Jose Abad Santos Ave (JASA) - K0109+467 - K0110+000; K0115+600 - K0116+353; K0110+900 - K0111+170
July 17, 2023 2023 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Regional Office XIII
UACS No. : 300215102840000
Project ID: P00733875MN

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities

FROM:

Construction of Bugta - Balatakan Road, Buenavista, Agusan del Norte

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Gravel Road

Physical Target:
CW1- 4.440 Lane Km
CW2- 2.440 Lane Km

Allocation:
TOTAL: P 200,000,000
CW1: P 111,693,925
CW2: P 81,306,075
EAO: P 7,000,000

Unit Cost:
CW1: P 25,156,289.41/Lane Km
CW2: P 36,297,354.91/Lane Km

TO:

Construction of Bugta - Balatakan Road, Buenavista, Agusan del Norte

Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Gravel Road
CW3- Construction of Road Slope Protection Structure

Physical Target:
CW1- 2.000 Lane Km
CW2- 2.932 Lane Km
CW3- 1,936 Square meters

Allocation:
TOTAL: P 200,000,000
CW1: P 59,864,740
CW2: P 84,797,445
CW3: P 48,337,815
EAO: P 7,000,000

Unit Cost:
CW1: P 29,932,370/Lane Km
CW2: P 28,921,365.96/Lane Km
CW3: P 24,967.88/Square meters
July 14, 2023 2023 WIN3F07478 FY 2023 GAA February 17, 2023 Region III Pampanga 2nd District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road /s leading to Major/Strategic Public Buildings / Facilities

Construction of Bridge including road approaches, Brgy. Jalung, Porac, Pampanga
July 13, 2023 FY 2023 WIN3E02891 310101100860000 April 25, 2023 Region IX Regional Office IX
UACS No. 310101100860000
Project ID: P00707600MN

OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Preventive Maintenance - Primary Roads

Pagadian City-Zamboanga City Rd - K1910 + 832.69 - K1911 + 140.00, K1911 + 160.80 - K1915 + 484.75

CW1- Preventive Maintenance of Road: Asphalt Overlay / 9.26 lane-km
Unit Cost: ₱ 15,631,749.46 /lane-km
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
July 13, 2023 FY 2023 WIN3E02912 310102101178000 April 25, 2023 Region IX Regional Office IX
UACS No. 310102101178000
Project ID: P00707601MN

OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Preventive Maintenance - Secondary Roads

Liloy-Siocon Rd - K1980 + 535.69 - K1984 + 575.75

CW1- Preventive Maintenance of Road: Asphalt Overlay / 8.080 lane-km
Unit Cost: ₱ 17,765,315.59 /lane-km
EAO: ₱ 5,206,250.00
Allocation: ₱ 148,750,000.00
July 13, 2023 FY 2023 WIN3E02913 310107100488000 April 25, 2023 Region IX Regional Office IX
UACS No. 310107100488000
Project ID: P00707606MN

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Pagadian City-Zamboanga City Rd - K1878 + 550.00 - K1878 + 610.00

CW1- Construction of Road Slope Protection Structure/ 4,546.00 sq. m.
Unit Cost: ₱ 31,841.18/sq. m.
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
July 13, 2023 FY 2023 WIN3E02987 310107100489000 May 8, 2023 Region IX Regional Office IX
UACS No. 310107100489000
Project ID: P00707607MN

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Pagadian City-Zamboanga City Rd - Package 2, K1871 + 020 - K1871 + 060.00

CW1- Construction of Road Slope Protection Structure/ 4,503.00
sq. m.
Unit Cost: ₱ 32,145.24 /sq. m.
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
July 13, 2023 FY 2023 WIN3E03025 310107100490000 May 8, 2023 Region IX Regional Office IX
UACS No. 310107100490000
Project ID: P00707608MN

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Pagadian City-Zamboanga City Rd - Package 3, K1858+940.00 - K1858+960.00, K1859+170.00 – K1859+200.00, K1860+120.00 – K1860+300.00, K1860+487.01 – K1860+520.00

CW1- Construction of Road Slope Protection Structure/ 4,537.00 sq. m.
Unit Cost: ₱ 31,904.34 /sq. m.
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00

July 13, 2023 FY 2023 WIN3E02989 310107100491000 April 25, 2023 Region IX Regional Office IX
UACS No. 310107100491000
Project ID: P00707609MN

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads


Pagadian City-Zamboanga City Rd - K1868 + 400 - K1868 + 540, K1868 + 560 – K1868 + 672.82

CW1- Construction of Road Slope Protection Structure/ 3,627.00 sq. m.
Unit Cost: ₱ 31,927.21 /sq. m.
EAO: ₱ 4,200,000.00
Allocation: ₱ 120,000,000.00
July 13, 2023 FY 2023 WIN3E02980 310107100492000 April 25, 2023 Region IX Regional Office IX
UACS No. 310107100492000
Project ID: P00707610MN

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Pagadian City-Zamboanga City Rd - K1869 + 037.04 - K1869 + 140.00

CW1- Construction of Road Slope Protection Structure/ 3,627.00
sq. m.
Unit Cost: ₱ 31,927.21 /sq. m.
EAO: ₱ 4,200,000.00
Allocation: ₱ 120,000,000.00
July 13, 2023 2023 P00706063MN SR2023-01-002024 January 30, 2023 Region XII Regional Office XII
23M00092-PREVENTIVE MAINTENANCE - COTABATO-LANAO RD, K1882+424- K1882+860, K1882+880 - K1883+260, PARANG, MAGUINDANAO DEL NORTE
July 13, 2023 2023 P00706531MN SR2023-01-00681 January 30, 2023 Region XII Regional Office XII
23M00013-CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - KIDAPAWAN-MAGPET-PANGAOAN RD, K1630+760.00 - K1630+857.3, MAGPET, NORTH COTABATO
July 13, 2023 2023 P007055753MN SR2023-01-002607 January 30, 2023 Region XII Regional Office XII
23M00081-CONSTRUCTION OF MISSING LINKS/NEW ROADS - DATU PAGLAS - COLUMBIO - MATANAO ROAD, STA. 0+000 - STA. 0+030, STA. 0+095 - STA. 0+185, STA. 4+585 - STA. 4+630, COLUMBIO, SULTAN KUDARAT
July 13, 2023 2023 P00706202MN SR2023-01-001321 January 30, 2023 Region XII Regional Office XII
23M00026-PREVENTIVE MAINTENANCE - DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT) - K1639+000-K1639+780, K1639+780-K1640+288, MATALAM, NORTH COTABATO
July 13, 2023 2023 P00707690MN SR2023-03-0016417 March 3, 2023 Region XII Regional Office XII
23M00168-ROAD WIDENING OF COTABATO-LANAO ROAD, K1878+800 - K1880+340, PARANG, MAGUINDANAO PROVINCE
July 13, 2023 2023 P00721469MN SR2023-01-002533 January 30, 2023 Region XII Regional Office XII
23M00071-CONSTRUCTION OF RIVER BANK PROTECTION ALONG ALA RIVER, STA. 000+995 - STA. 001+257, PUROK BONIFACIO, BARANGAY PANAY, SANTO NIÑO, SOUTH COTABATO
July 13, 2023 2023 P00705741MN SR2023-01-002498 January 30, 2023 Region XII Regional Office XII
23M00141-CONSTRUCTION OF MISSING LINKS/NEW ROADS - SURALLAH - T’BOLI - SAN JOSE ROAD, STA.0+000-STA.0+040, STA.4+860-STA.4+982, (GEN.SANTOS CITY), PACKAGE 1, T’BOLI, SOUTH COTABATO
July 13, 2023 2023 P00706065MN SR2023-01-002037 January 30, 2023 Region XII Regional Office XII
23M00114-PREVENTIVE MAINTENANCE - KIDAPAWAN-ALLAH JUNCTION RD, K1654 + 629 - K1655 + 268, BULUAN, MAGUINDANAO DEL SUR
July 13, 2023 2023 P007055750MN SR2023-01-002388 January 30, 2023 Region XII Regional Office XII
23M00059-CONSTRUCTION OF MISSING LINKS/NEW ROADS - SURALLAH - T’BOLI - SAN JOSE ROAD, STA 0+000- STA.0+025, STA.0+965-STA.0+983, (GEN.SANTOS CITY), SOUTH COTABATO
July 13, 2023 2023 P00706064MN SR2023-01-002030 January 30, 2023 Region XII Regional Office XII
23M00163-PREVENTIVE MAINTENANCE - SURALLAH-LAKE SEBU-MAITUM ROAD, K1806+894 - K1812+695, LAKE SEBU, SOUTH COTABATO
July 13, 2023 2023 P00721580MN SR2023-03-006426 March 3, 2023 Region XII Regional Office XII
23M00177-CONSTRUCTION OF RIVER BANK PROTECTION (REVETMENT) ALONG MATAMPAY RIVER, STA 0 + 000 - STA 0 + 243, BRGY. POBLACION 5, COTABATO CITY

July 13, 2023 2023 P00721586MN SR2023-03-006472 March 3, 2023 Region XII Regional Office XII
23M00043-CONSTRUCTION OF RIVER CONTROL, PACKAGE B, STA. 0+000 - STA. 0+904, ALABEL, SARANGANI
July 13, 2023 2023 P00733293MN SR2023-01-002631 January 30, 2023 Region XII Regional Office XII
23M00088-CONSTRUCTION OF CONCRETE ROAD - BRGY. BASAK-VILLAMONTE-CAPILAN CONNECTING TO NEW CALINOG IN SUPPORT OF BAMBOO AND COFFEE PLANTATION, STA. 6+307 - STA. 9+407, LEBAK, SULTAN KUDARAT
July 13, 2023 2023 P0070528MN SR2023-06-011480 June 6, 2023 Region XII Regional Office XII
23M00161-PREVENTIVE MAINTENANCE - MARBEL-MAKAR RD, K1690+449 - K1691+953.43, TUPI, SOUTH COTABATO
July 12, 2023 FY 2023 GAA P00731989MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
Jct. Road Tuganay-Dujali-Kinamayan to Pob New Casay, RJS Purok 5, Pob Cabayangan to Purok Sampaguita leading to Palayamanan, Brgy. Cabay-angan, B.E. Dujali, Davao del Norte
Physical Target:
CW1: 0.167 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 2,500,000.00
CW1: P 2,412,500.00 (Construction of Concrete Road)
EAO: P 87,500.00

TO: Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
Jct. Road Tuganay-Dujali-Kinamayan to Pob New Casay, RJS Purok 5, Pob Cabayangan to Purok Sampaguita leading to Palayamanan, Brgy. Cabay-angan, B.E. Dujali, Davao del Norte
Physical Target:
CW1: 0.180 lane km (Construction of Concrete Road)
CW2: 160.00 meters (Road Safety: Guardrails)
Allocation:
TOTAL: P 2,500,000.00
CW1: P 1,463,440.00 (Construction of Concrete Road)
CW2: P 949,060.00 (Road Safety: Guardrails)
EAO: P 87,500.00
July 12, 2023 FY 2023 GAA WIN3E03022 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
Sitio Pasog-Licup-Tagbitan-ag-Sitio Tagluno Road leading to Puting Bato and Canibad Resort, Brgy. Aundanao, Island Garden City of Samal, Davao del Norte
Physical Target:
CW1: 0.156 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 2,500,000.00
CW1: P 2,412,500.00 (Construction of Concrete Road)
EAO: P 87,500.00

TO: Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
Sitio Pasog-Licup-Tagbitan-ag-Sitio Tagluno Road leading to Puting Bato and Canibad Resort, Brgy. Aundanao, Island Garden City of Samal, Davao del Norte
Physical Target:
CW1: 0.084 lane km (Construction of Concrete Road)
CW2: 42.00 meters (Road Safety: Guardrails)
Allocation:
TOTAL: P 2,500,000.00
CW1: P 2,130,750.00 (Construction of Concrete Road)
CW2: P 281,750.00 (Road Safety: Guardrails)
EAO: P 87,500.00
July 12, 2023 FY 2023 GAA P00721437MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Regional Office XI
MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Dike and Drainage Canal along Barangay Kinamayan to Tuganay River, Sto. Tomas, Davao del Norte
Physical Target:
CW1: 1,360.000 lineal meters (Construction of Flood Mitigation Structure)
ROW: 1,000.00 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 80,000,000.00
CW1: P 62,200,000.00 (Construction of Dike)
ROW: P 15,000,000.00 (ROW Acquisition)
EAO: P 2,800,000.00

TO: OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Dike and Drainage Canal along Barangay Kinamayan to Tuganay River, Sto. Tomas, Davao del Norte
Physical Target:
CW1: 1,440.00 lineal meters (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 80,000,000.00
CW1: P 77,200,000.00 (Construction of Flood Mitigation Structure)
EAO: P 2,800,000.00
July 11, 2023 FY 2023 WIN3E02926 310107100569000 April 25, 2023 Region IX Regional Office IX
UACS No. 310107100569000
Project ID: P00706404MN

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Pagadian City-Zamboanga City Rd - K1703 + 320 - K1703 + 353.77

CW1- Construction of Road Slope Protection Structure/ 2,983.00 sq. m.
Unit Cost: ₱ 33,320.48/sq. m.
EAO: ₱ 3,605,000.00
Allocation: ₱ 103,000,000.00
July 11, 2023 2023 WIN3E03054 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Norte District Engineering Office
UACS No. : 310107100601000
Project ID: P00706550MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

FROM:

Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1278 + 800 - K1279 + 100

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4502.37 Square meters

Allocation:
TOTAL: P 38,000,000
CW1: P 37,240,000
EAO: P760,000

Unit Cost:
CW1: P 8,271.20/Square meters

TO:

Butuan City-Cagayan de Oro City-Iligan City Road (Agusan-Misamis Or Rd) - K1277 + 300 - K1277 + 340

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 1284.31 Square meters

Allocation:
TOTAL: P 38,000,000
CW1: P 37,240,000
EAO: P760,000

Unit Cost:
CW1: P 28,996.11/Square meters
July 11, 2023 2023 WIN3E03053 FY 2023 GAA R.A 11936 December 26, 2022 Region XIII Agusan del Norte District Engineering Office
UACS No. : 310107100600000
Project ID: P00706549MN

ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse, and Landslide - Primary Roads

FROM:

Daang Maharlika (Surigao-Agusan Sect) - K1178 + 826 - K1179 + 150

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 4859.09 Square meters

Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000

Unit Cost:
CW1: P 10,084.19/Square meters

TO:

Daang Maharlika (Surigao-Agusan Sect) - K1178 + 826 - K1178 + 978

Type of Work:
CW1- Construction of Road Slope Protection Structure

Physical Target:
CW1- 1349.14 Square meters

Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000

Unit Cost:
CW1: P 36,319.43/Square meters
July 11, 2023 FY 2023 GAA P00707714MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao de Oro 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Secondary Roads
Benigno S. Aquino Jr. National Highway (S00133MN) - K1417+000 - K1425+088
Physical Target:
CW1: 7,980.00 sq. m. (Off-Carriageway Improvement: Construction of Traffic Island)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Off-Carriageway Improvement: Construction of Traffic Island)
EAO: P 3,500,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Secondary Roads
Benigno S. Aquino Jr. National Highway (S00133MN) - K1418+418 - K1426+023
Physical Target:
CW1: 7,783.00 sq. m. (Off-Carriageway Improvement: Construction of Traffic Island)
CW2: 176.00 no. of units (Road Safety: Roadway Lighting)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 76,636,476.19 (Off-Carriageway Improvement: Construction of Traffic Island)
CW2: P 19,863,523.81 (Road Safety: Roadway Lighting)
EAO: P 3,500,000.00
July 11, 2023 FY 2023 GAA P00707713MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao de Oro 2nd District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) (S01475MN) - K1399+000 - K1403+529
Physical Target:
CW1: 13,644.00 sq. m. (Off-Carriageway Improvement: Paving of Shoulders)
Allocation:
TOTAL: P 80,000,000.00
CW1: P 77,200,000.00 (Off-Carriageway Improvement: Paving of Shoulders)
EAO: P 2,800,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads
Daang Maharlika (MN) (S01475MN) - K1395+776 - K1401+776
Physical Target:
CW1: 6,030.00 sq. m. (Off-Carriageway Improvement: Construction of Traffic Island)
CW2: 286.00 no. of units (Road Safety: Street Lighting)
Allocation:
TOTAL: P 80,000,000.00
CW1: P 44,727,943.00 (Off-Carriageway Improvement: Construction of Traffic Island)
CW2: P 32,472,057.00 (Road Safety: Street Lighting)
EAO: P 2,800,000.00
July 11, 2023 FY 2023 GAA WIN3E03019 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao de Oro 2nd District Engineering Office
MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Protection Dike at Cambaong Creek, Poblacion, Compostela, Davao de Oro
Physical Target:
CW1: 2,773.056 lineal meters (Construction of Dike)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Dike)
EAO: P 3,500,000.00

TO: OO2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Protection Dike at Cambaong Creek, Poblacion, Compostela, Davao de Oro
Physical Target:
CW1: 1,206.500 lineal meters (Construction of Flood Mitigation Structure)
CW2: 268.00 lineal meters (Construction of Drainage Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 52,312,945.36 (Construction of Flood Mitigation Structure)
CW2: P 44,187,054.64 (Construction of Drainage Structure)
EAO: P 3,500,000.00
July 11, 2023 FY 2023 GAA P00733763MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Regional Office XI
MODIFICATION:

FROM: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of Road Safety Facilities along Digos-Makar Road, Davao del Sur - K1572+006 - K1581+000
Physical Target:
CW1: 9.026 km (Road Safety: Street Lighting)
Allocation:
TOTAL: P 140,000,000.00
CW1: P 135,100,000.00 (Road Safety: Street Lighting)
EAO: P 4,900,000.00

TO: Convergence and Special Support Program - Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of Road Safety Facilities along Digos-Makar Road, Davao del Sur - K1572+006 - K1572+100, K1573+124.757 - K1576+349, K1577+297 - K1580+586, K1581+419 - K1583+540
Physical Target:
CW1: 380.00 no. of units (Road Safety: Street Lighting)
CW2: 2 no. of pedestrian overpass (Road Safety: Pedestrian Overpass)
CW3: 9,205.31 sq. m. (Off-Carriageway: Construction of Median/Center Island)
Allocation:
TOTAL: P 140,000,000.00
CW1: P 59,186,877.42 (Road Safety: Street Lighting)
CW2: P 19,941,984.70 (Road Safety: Pedestrian Overpass)
CW3: P 55,971,137.88 (Off-Carriageway: Construction of Median/Center Island)
EAO: P 4,900,000.00
July 11, 2023 FY 2023 GAA P00733974MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Sur District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Coastal Roads/Causeway for environmental protection/conservation
Construction of Coastal Road including Bike Lanes with Solar Lights (Aplaya-Dawis Section, Phase-1), Digos, Davao del Sur
Physical Target:
CW1: 0.200 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00

TO: Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Coastal Roads/Causeway for environmental protection/conservation
Construction of Coastal Road including Bike Lanes with Solar Lights (Aplaya-Dawis Section, Phase-1), Digos, Davao del Sur
Physical Target:
CW1: 0.880 lane km (Construction of Concrete Road)
CW2: 2,332.00 sq. m. (Construction of Roads Slope Protection Structure)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 53,533,608.03 (Construction of Concrete Road)
CW2: P 42,966,391.97 (Construction of Roads Slope Protection Structure)
EAO: P 3,500,000.00
July 11, 2023 FY 2023 WIN3E02868 310107100493000 April 17, 2023 Region IX Regional Office IX
UACS No. 310107100493000
Project ID: P00706405MN


OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Lanao-Pagadian-Zamboanga City Rd - K1767 + 000 - K1767 + 180, K1771 + 220 - K1771 + 300, K1772 + 020 - K1772 + 160, K1772 + 220 - K1772 + 260, K1775 + 317 - K1775 + 419, K1775 + 820- K1775 + 840, K1775 + 992 - K1776 + 056.90, K1777 + 020 - K1777 + 080

CW1- Construction of Road Slope Protection Structure/ 2,186.00 Square Meters
Unit Cost: ₱ 46,351.78 /Square Meters
EAO: ₱ 3,675,000.00
Allocation: ₱ 105,000,000.00
July 11, 2023 FY 2023 WIN3E02910 310204102144000 April 25, 2023 Region IX Regional Office IX
UACS No. 310204102144000
Project ID: P00706816MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads

NRJ Lapakan-Lamisahan-Victoria By-Pass Road, Package 2, Zamboanga City

CW1- Construction of Concrete Road/ 3.06 lane-km
Unit Cost: ₱ 32,751,633.99 /Lane-km
ROW Acquisition 13,333.33 sq.m.
Unit Cost: ₱ 300.00/sq.m.
EAO: ₱ 3,780,000.00
Allocation: ₱ 108,000,000.00
July 11, 2023 FY 2023 WIN3E02945 310204102145000 April 25, 2023 Region IX Regional Office IX
UACS No. 310204102145000
Project ID: P00706817MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads

NRJ Sangali Bypass Road, Package 2, Zamboanga City

CW1- Construction of Concrete Road/2.858 lane-km
Unit Cost: ₱ 47,470,007.98 /Lane-km
ROW Acquisition 9,080.72 sq.m.
Unit Cost: ₱ 1,000.00/sq.m.
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
July 11, 2023 FY 2023 WIN3E02857 310107100494000 April 17, 2023 Region IX Regional Office IX
UACS No. 310107100494000
Project ID: P00706818MN

OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Primary Roads

Pagadian City-Zamboanga City Rd - K1896 + 300 - K1896 + 370.32

CW1: Construction of Road Slope Protection Structure/ 3,285.0 sq.m.
Unit Cost: 32,313.55 sq.m.
EAO: 3,850,000.00
Allocation: 110,000,000.00
July 11, 2023 FY 2023 GAA P00731988MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao del Norte 2nd District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
Jct. City Road Sitio Buhangin leading to Magongawong Falls, Brgy. Tagbaobo, Island Garden City of Samal, Davao del Norte
Physical Target:
CW1: 0.185 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 2,500,000.00
CW1: P 2,412,500.00 (Construction of Concrete Road)
EAO: P 87,500.00

TO: Convergence and Special Support Program - Construction/Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
Jct. City Road Sitio Buhangin leading to Magongawong Falls, Brgy. Tagbaobo, Island Garden City of Samal, Davao del Norte
Physical Target:
CW1: 0.122 lane km (Construction of Concrete Road)
CW2: 122.00 meters (Road Safety: Guardrails)
Allocation:
TOTAL: P 2,500,000.00
CW1: P 1,620,962.00 (Construction of Concrete Road)
CW2: P 791,538.00 (Road Safety: Guardrails)
EAO: P 87,500.00
July 11, 2023 2023 WIN3F07496 FY 2023 GAA February 17, 2023 Region III Regional Office III
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions)

Construction of Dingalan-Doña Remedios Trinidad Road, Aurora
July 10, 2023 2023 FY 2023 GAA December 26, 2022 Region V Masbate 2nd District Engineering Office
Project ID : P00732951LZ

FROM : Physical Target : CW1 - Construction of Concrete Road - 3.692 Lane Km

TO : Physical Target : CW1 - Construction of Concrete Road - 3.320 Lane Km
July 10, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00740493LZ

From : Physical Target : CW1 - Construction of Flood Mitigation Structure - 369.8 Lineal meters

TO : Physical Target : CW1 - Construction of Flood Mitigation Structure - 356.2 Lineal meters
July 10, 2023 2023 WIN3F07494 FY 2023 GAA December 26, 2022 Region V Sorsogon 2nd District Engineering Office
Project ID : P00712768LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads

Irosin - Sn Roque - Bulusan Lake Rd - K0630 + 222 - K0630 + 914

Physical Target : CW1 - Preventive Maintenance of Road: Asphalt Overlay/ 1.384 Lane Km


FROM : Irosin - Sn Roque - Bulusan Lake Rd - K0630 + 499.2 - K0630 + 914

Physical Target : CW1 - Preventive Maintenance of Road: Asphalt Overlay/ - 0.828 Lane Km
July 10, 2023 2023 WIN3F07493 FY 2023 GAA December 22, 2022 Region V Sorsogon 2nd District Engineering Office
Project ID : P00712766LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads

Gate - Bulan Airport Rd - K0640 + 336 - K0642 + 000

Physical Target : CW1 - Preventive Maintenance of Road : Asphalt Overlay - 3.33 Lane Km


TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads

Gate - Bulan Airport Rd - K0641 + 046.7 - K0642 + 000

Physical Target : CW1 - Preventive Maintenance of Roads: Asphalt Overlay 1.969 Lane Km
July 10, 2023 2023 FY 2023 GAA December 26, 2022 Region V Albay 3rd Engineering Office
Project ID : P00712329LZ

FROM : OO1 Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads

Daang Maharlika (LZ) - K0495 + 530 - K0495 + 990

Physical Target : CW1 - Shoulder Paving/ Construction - 1840 Square meters


TO : OO1 Ensure Safe and Reliable National Road System - Network Development - Off-Carriageway Improvement - Primary Roads

Daang Maharlika (LZ) - K0501 + 313 - K0501 + 720

Physical Target : CW1 - Shoulder Paving/ Construction 1960.55 Square meters, CW2 - Construction of Drainage Structure along Road - 540 lineal meters
July 10, 2023 2023 FY 2023 GAA December 26, 2022 Region V Regional Office V
Project ID : P00740451LZ

FROM : Physical Target : CW1 - Construction of Flood Mitigation Structure - 364.3 Lineal meters

TO : Physical Target : CW1 - Construction of Flood Mitigation Structure - 351.4 Lineal meters
July 10, 2023 2023 300221102739000 GAA FY 2023 December 26, 2022 Region II Cagayan 3rd District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities - Construction (Concreting) of Bulagao Road, Tuao, Cagayan
July 10, 2023 2023 300223100165000 GAA FY 2023 December 26, 2022 Region II Cagayan 3rd District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Interjurisdictional Roads and/or Bridges (or, roads that traverse multiple LGU jurisdictions) - Construction of Barangay Road, Brgy. Mambacag (Sitio Turod), Tuao - Brgy. Alimanao, Peñablanca, Cagayan
July 10, 2023 2023 310204102310000 GAA FY 2023 December 26, 2022 Region II Cagayan 3rd District Engineering Office
Organizational Outcome 1: Ensure Safe and Reliable National Road System - Network Development - Construction of Bypass and Diversion Roads - Solana Diversion Rd - Phase I
July 10, 2023 2023 300221102735000 GAA FY 2023 December 26, 2022 Region II Cagayan 3rd District Engineering Office
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities - Construction of Mambacag Road along Mambacag Elementary School, Tuao, Cagayan
July 7, 2023 FY 2023 WIN3E03027 310204102118000 May 24, 2023 Region IX Regional Office IX
UACS No. 310204102118000
Project ID: P00705492MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Bypass and Diversion Roads

Eastside - Binuangan Coastal By-Pass Road, Basilan

CW1- Construction of Concrete Road/1.930 Lane Km
Unit Cost: ₱ 34,909,326.42/Lane Km
ROW Acquisition 36,268.68 Square Meters
Unit Cost: ₱ 137.86 /Square Meters
EAO: ₱ 2,625,000.00
Allocation: ₱ 75,000,000.00
July 7, 2023 FY 2023 WIN3E02992 310212100228000 May 12, 2023 Region IX Regional Office IX
UACS No. 310212100228000
Project ID: P00705538MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Paving of Unpaved Roads - Tertiary Roads

Sindangan-Bayog-Lakewood Rd - K1745 +230.00 – K1745 + 280.70, K1745 + 820.00 – K1745 + 881.65, K1746 + 738.50 – K1746 + 900.00

CW1- Paving of Unpaved Roads/0.5477 lane km
Unit Cost: ₱ 141,975,597.73 /lane km
CW2 – Construction of Road Slope Protection Structure/ 12,081.83 sq.m.
Unit Cost: ₱ 3,707.63 /square meter
EAO: ₱ 4,445,000.00
Allocation: ₱ 127,000,000.00
July 7, 2023 FY 2023 WIN3E02695 310212100256000 March 9, 2023 Region IX Regional Office IX
UACS No. 310212100256000
Project ID: P00705539MN


OO1: Ensure Safe and Reliable National Road System – Network Development - Paving of Unpaved Roads - Tertiary Roads

Zamboanga Del Sur Coastal Rd - (S01167MN) Chainage 7434 - Chainage 7667.53, Chainage 15000- Chainage 15770.00

CW1- Paving of Unpaved Roads/ 2.007 lane-km
Unit Cost: ₱25,995,859.49 /lane-km
EAO: ₱ 1,892,310.00
Allocation: ₱ 54,066,000.00
July 7, 2023 FY 2023 WIN3E02700 310205101144000 March 9, 2023 Region IX Regional Office IX
UACS No. 310205101144000
Project ID: P00705540MN

OO1: Ensure Safe and Reliable National Road System – Network Development - Construction of Missing Links/ New Roads

Zamboanga del Sur Coastal Road, Zamboanga del Sur

CW1- Construction of Concrete Road 0.790 lane-km
Unit Cost: ₱24,430,379.75 /lane-km
EAO: ₱ 700,000.00
Allocation: ₱ 20,000,000.00
July 7, 2023 FY 2023 WIN3E02731 310204102139000 March 9, 2023 Region IX Regional Office IX
UACS No. 310204102139000
Project ID: P00705939MN

OO1: Ensure Safe and Reliable National Road System –
Network Development - Construction of Bypass and Diversion Roads

NRJ Bogayo-Bolisong-New Tuburan-Datagan-Mating-Pob Guipos, Zamboanga Del Sur

CW1- Construction of Concrete Road /0.807 lane-km
Unit Cost: ₱ ₱17,719,950.43 /lane-km
ROW Acquisition 16,666.67 sq.m.
Unit Cost: ₱ 300.00 /sq.m.
EAO: ₱ 700,000.00
Allocation: ₱ 20,000,000.00
July 7, 2023 FY 2023 WIN3E02858 310108101417000 April 17, 2023 Region IX Regional Office IX
UACS No. 310108101417000
Project ID: P00706401MN

OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads

Zamboanga West Coastal Rd (Limpapa-Sibuco Sect) - K1989 + 760.00 - K1989 + 780.00, K1990 + 060.00 -K1990 + 169.00

CW1- Construction of Road Slope Protection Structure/ 4,283.0 sq. m.
Unit Cost: ₱ 33,796.40 sq. m.
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00
July 7, 2023 FY 2023 WIN3E02856 310107100564000 April 17, 2023 Region IX Regional Office IX
UACS No. 310107100564000
Project ID: P00706402MN

OO1: Ensure Safe and Reliable National Road System –
Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads

Lanao-Pagadian-Zamboanga City Rd – K1638 + 300.00 – K1638 + 320.00, K1638 + 420.00 – K1638 + 500.00, K1639 + 120.00 – K1639 + 210.00

CW1- Construction of Road Slope Protection Structure: 2,451.45 sq. m.
Unit Cost: ₱ 34,115.9946 /sq. m.
EAO: ₱ 3,033,345.00
Allocation: ₱ 86,667,000.00
July 7, 2023 FY 2023 GAA P00721436MN FY 2023 GAA RA 11936 January 1, 2023 Region XI Regional Office XI
MODIFICATION:

FROM: OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Dike and Drainage Canal along Barangay San Miguel to Tuganay River, Sto. Tomas, Davao del Norte
Physical Target:
CW1: 3,174.00 ln. m. (Construction of Flood Mitigation Structure)
ROW: 286.200 sq. m. (ROW Acquisition)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 76,850,000.00 (Construction of Flood Mitigation Structure)
ROW: P 10,000,000.00 (ROW Acquisition)
EAO: P 3,150,000.00

TO: OO2: Protect Lives and Properties Against Major Floods - Construction/Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Dike and Drainage Canal along Barangay San Miguel to Tuganay River, Sto. Tomas, Davao del Norte
Physical Target:
CW1: 3,174.00 ln. m. (Construction of Flood Mitigation Structure)
Allocation:
TOTAL: P 90,000,000.00
CW1: P 86,850,000.00 (Construction of Flood Mitigation Structure)
EAO: P 3,150,000.00
July 7, 2023 FY 2023 GAA WIN3E02954 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao de Oro 2nd District Engineering Office
MODIFICATION:

FROM: Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation of Road with Slips, Slope Collapse and Landslides along DNAS Road at Tabunan-Tribal Village, Prosperidad, Montevista, Davao de Oro
Physical Target:
CW1: 10,581.862 square meters (Rehabilitation/Major Repair of Road Slope Protection Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Rehabilitation/Major Repair of Road Slope Protection Structure)
EAO: P 1,750,000.00

TO: Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Rehabilitation of Road with Slips, Slope Collapse and Landslides along DNAS Road at Tabunan-Tribal Village, Prosperidad, Montevista, Davao de Oro
Physical Target:
CW1: 852.00 square meters (Rehabilitation/Major Repair of Road Slope Protection Structure)
Allocation:
TOTAL: P 50,000,000.00
CW1: P 48,250,000.00 (Rehabilitation/Major Repair of Road Slope Protection Structure)
EAO: P 1,750,000.00
July 7, 2023 GAA 2023 P00707527MN SR2023-03-06380 March 3, 2023 Region XII Regional Office XII
23M00162-PREVENTIVE MAINTENANCE - MARBEL MAKAR ROAD, K1706+055 - K1708+000, K1708+337 - K1708+593, KORONADAL CITY
July 7, 2023 FY 2023 GAA WIN3E02990 FY 2023 GAA RA 11936 January 1, 2023 Region XI Davao de Oro 1st District Engineering Office
MODIFICATION:

FROM: OO1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads
Surigao-Davao Coastal Rd (S01376MN) - K1784+190 - K1785+455,
K1786+154 - K1788+619, K1790+466 - K1792+703
Physical Target:
CW1: 11.816 lane km (Road Widening)
Allocation:
TOTAL: P 95,000,000.00
CW1: P 91,675,000.00 (Road Widening)
EAO: P 3,325,000.00

TO: OO1: Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Primary Roads
Surigao-Davao Coastal Rd (S01376MN) -
K1778+819 - K1790+039, K1790+466 - K1791+354
Physical Target:
CW1: 4.154 lane km (Road Widening)
CW2: 885.00 lineal meters (Construction of Drainage Structure along Road)
ROW: 41,540.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 95,000,000.00
CW1: P 68,115,224.20 (Road Widening)
CW2: P 20,559,775.80 (Construction of Drainage Structure along Road)
ROW: P 3,000,000.00 (ROW Acquisition)
EAO: P 3,325,000.00
July 7, 2023 FY 2023 GAA WIN3E02974 FY 2023 GAA RA 11936 January 1, 2023 Region XI Regional Office XI
MODIFICATION:

FROM: Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Access Road Leading to Mati Fish Port, Phase 3, Mati City, Davao Oriental
Physical Target:
CW1: 3.299 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Construction of Concrete Road)
EAO: P 5,250,000.00

TO: Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Access Road Leading to Mati Fish Port, Phase 3, Mati City, Davao Oriental
Physical Target:
CW1: 0.816 lane km (Construction of Concrete Road)
CW2: 758.472 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 76,958,758.00 (Construction of Concrete Road)
CW2: P 67,791,242.00 (Construction of Road Slope Protection Structure)
EAO: P 5,250,000.00
July 7, 2023 FY 2023 GAA WIN3E02977 FY 2023 GAA RA 11936 January 1, 2023 Region XI Regional Office XI
MODIFICATION:

FROM: Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Access Road Leading to Mati Fish Port, Phase 2, Mati City, Davao Oriental
Physical Target:
CW1: 3.299 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Construction of Concrete Road)
EAO: P 5,250,000.00

TO: Convergence and Special Support Program (CSSP) - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Access Road Leading to Mati Fish Port, Phase 2, Mati City, Davao Oriental
Physical Target:
CW1: 0.854 lane km (Construction of Concrete Road)
CW2: 793.793 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 73,708,493.28 (Construction of Concrete Road)
CW2: P 71,041,506.72 (Construction of Road Slope Protection Structure)
EAO: P 5,250,000.00