September 15, 2023 |
2023 |
WIN3F06975 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00726626LZ
UACS : 320102105469000
From :
OO2 Protect Lives and Properties Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Quinale A River Mitigation Structure (Polangui and Libon Section), Polangui, Albay
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 993.205 Lineal Meters
TO :
OO2 Protect Lives and Properties Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Quinale A River Mitigation Structure (Polangui and Libon Section), Polangui and Libon, Albay
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 569.67 Lineal Meters |
September 15, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Masbate 3rd District Engineering Office |
Project ID : P00727223LZ
UACS : 320101110061000
From :
OO2 Protect Lives and Properties - Flood Management - Construction// Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Mawig Creek Flood Control, Sta. 0+000 - Sta. 0+050.00, Upstream Right Side, Sta. 0+000 - Sta, 030, Upstream Left Side, Sta. 0+000 - Sta. 0+085, Both Sides Downstream, Barangay Poblacion, Dimasalang, Masbate
Physical Target :
CW1 - Construction of Flood Mitigation Structure
TO :
OO2 Protect Lives and Properties - Flood Management - Construction// Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Mawig Creek Flood Control, Upstream Bothsides - Sta. 0+000 - Sta. 0+126.00, Downstream Bothsides - Sta. 0+000 - Sta. 0+122.00, Barangay Poblacion, Dimasalang, Masbate
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 496 lineal meter |
September 14, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00711509LZ
UACS : 310204102077000
From :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Camarines Sur Expressway Package 8, Camarines Sur
Physical Target :
CW1 - Construction of Concrete - 2.41 Lane Km
TO :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Camarines Sur Expressway Package 8, Camarines Sur
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 5,126.34 Square meters |
September 14, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00712049LZ
UACS : 310205101026000
From :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads - San Fernando - San Jacinto - Monreal Road, Package 2, Masbate
Physical Target :
CW1 - Construction of Concrete Road/ 1.05 Lane Km
TO :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of Missing Links/ New Roads - San Fernando - San Jacinto - Monreal Road, Package 2, Masbate
Physical Target :
CW1 - Construction of Concrete Road - 0.628 Lane Km
CW2 - Construction of Drainage Structure along Road - 512.66 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 2410,8 Square meters |
September 14, 2023 |
2023 |
WIN3F06971 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00712066LZ
UACS : 310201101071000
From :
OO1 Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Rolando A Andaya Highway - K0282 +758 - K0283 + 000, K0296 + 842 - K0296 + 974. K0297 + 582 - K0300 + 000, K0301 + 840 - K0302 + 250, K0302 + 283 - K0303 + 280
Physical Target :
CW1 - Road Widening - 8.228 Lane Km
TO :
OO1 Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Rolando A Andaya Highway - K0301 + 840 - K0302 + 250, K0302 + 283 - K0303 + 185
Physical Target :
CW1 - Road Widening - 2.636 Lane Km
CW2 - Construction of Drainage Structure along Road - 2628.02 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 1083.85 Square meters |
September 14, 2023 |
2023 |
WIN3F07979 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00712067LZ
UACS : 310201101072000
From :
OO1 Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Rolando A. Andaya Highway - K0304 + 941 - K308 + 241, K0308 + 345 - K0308 + 942, K0308 +970 - K0309 + 162
Physical Target :
CW1 - Road Widening - 8.114 Lane Km
TO :
OO1 Ensure Safe and Reliable National Road System - Network Development - Road Widening - Primary Roads - Rolando A. Andaya Highway - K0307 + 032 - K0308 + 000
Physical Target :
CW1 - Road Widening - 1.936 Lane Km
CW2 - Construction of Drainage Structure along Road - 1913.2 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 6119.48 |
September 14, 2023 |
2023 |
P00705729MN |
SR2023-01-002172 |
January 30, 2023 |
Region XII |
Regional Office XII |
Paving of Unpaved Roads - Demoloc-Little Baguio-Alabel Rd, K1695+057 - K1695+146.50, Alabel, Sarangani |
September 13, 2023 |
2023 |
WIN3F07565 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00741235LZ
UACS : 300221102303000
From :
CSSP - BIP - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Sta. Rosa Norte - San Rafael - Sitio Sugsugin - Parang Road, Jose Panganiban, Camarines Norte
Physical Target :
CW1 - Construction of Concrete Road - 6.419 Lane Km
TO :
CSSP - BIP - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Sta. Rosa Norte - San Rafael - Sitio Sugsugin - Parang Road, Jose Panganiban, Camarines Norte
Physical Target :
CW1 - Construction of Concrete Road - 2.4288 Lane Km |
September 13, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00741978LZ
UACS : 300221103579000
From :
CSSP - BIP - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road Samaka, Barangay Camambugan, Daet, Camarines Norte
Physical Target :
CW1 - Construction of Concrete Road - 3.21 Lane Km
TO :
CSSP - BIP - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Road Samaka, Barangay Camambugan, Daet, Camarines Norte
Physical Target :
CW1 - Construction of Concrete Road - 1.7933 Lane Km
CW2 - Construction of Drainage Structure along Road - 1610.86 Lineal meters |
September 13, 2023 |
2023 |
WIN3F07529 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00742105LZ
UACS : 300224100021000
From :
CSSP - BIP - Coastal Roads/ Causeway for environmental protection/ conservation - Construction of Talisay Coastal Road, Masbate
Physical Target :
CW1 - Construction of Concrete Road - 6.419 Lane Km
TO :
CSSP - BIP - Coastal Roads/ Causeway for environmental protection/ conservation - Construction of Talisay Coastal Road, Masbate
Physical Target :
CW1 - Construction of Concrete Road - 0.8044 Lane Km
CW2 - Construction of Road Slope Protection Structure - 1467.1 Square meters |
September 13, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Sorsogon District Engineering Office |
Project ID : P00743960LZ
UACS : 300226107236000
From :
CSSP - BIP - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building, (Sorsogon Pilot Elementary School), Brgy. Macabog, Sorsogon City, Sorsogon
Physical Target :
CW1 - Construction of Multi-Purpose Building - 1 Number of Buildings
TO :
CSSP - BIP - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building, (Sorsogon Pilot Elementary School), Brgy. Sirangan, Sorsogon City, Sorsogon
Physical Target :
CW1 - Construction of Multi-Purpose Building - 1 Number of Buildings |
September 13, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00744154LZ
UACS : 300229100277000
From :
CSSP - BIP - Public Water Supply System (Level II or III) - Construction of Solar Water System Level II at Barangay Cagbungan (Zone 4), Pamplona, Camarines Sur
Physical Target :
CW1 - Construction of Water Supply System - 1 Number of Water Supply System
TO :
CSSP - BIP - Public Water Supply System (Level II or III) - Construction of Solar Water System Level II at Barangay Cagbungan, Pamplona, Camarines Sur
Physical Target :
CW1 - Construction of Water Supply System - 1 Number of Water Supply System |
September 12, 2023 |
2023 |
WIN3F07533 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00736096
UACS : 300219101597000
From :
CSSP - SIPAG - Flood Mitigation Structure protecting Public Infrastructure/ Facilities - Construction of Dike along Bicol River (Phase 2), Brgy. Bagongbong, Minalabac, Camarines Sur
Physical Target :
CW1 - Construction of Dike - 1,377.565 Lineal meters
TO :
CSSP - SIPAG - Flood Mitigation Structure protecting Public Infrastructure/ Facilities - Construction of Dike along Bicol River (Phase 2), Brgy. Bagongbong, Minalabac, Camarines Sur
Physical Target :
CW1 - Construction of Dike - 200 Lineal meters |
September 12, 2023 |
2023 |
WIN3F07539 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00736128LZ
UACS : 300219101629000
From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Construction of Revetment along Libmanan River, Barangay Mambalite, Libmanan, Camarines Sur
Physical Target :
CW1 - Construction of Revetment - 534.803 Lineal meters
TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Construction of Revetment along Libmanan River, Barangay Mambalite, Libmanan, Camarines Sur
Physical Target :
CW1 - Construction of Revetment - 85.000 Lineal meters |
September 12, 2023 |
2023 |
WIN3F07538 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00736362LZ
UACS : 300215102641000
From :
CSSP - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Rehabilitation of Road, Brgy. Sta. Rosa Del Sur, Pasacao, Camarines Sur
Physical Target :
CW1 - Rehabilitation of Paved Road - 16.536 Lane Km
TO :
CSSP - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Rehabilitation of Road, Brgy. Sta. Rosa Del Sur, Pasacao, Camarines Sur
Physical Target :
CW1 - Reconstruction to Concrete Pavement - 1.800 Lane Km |
September 12, 2023 |
2023 |
WIN3F07532 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00736594LZ
UACS : 300215103314000
From :
CSSP - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Libmanan Cabusao Pump Irrigation System (LCPIS) Main Canal Service Road, Libmanan, Camarines Sur (KATUBIGAN - Kalsada Tungo sa Patubigan)
Physical Target :
CW1 - Construction of Concrete Road - 0.770 Lane km
TO :
CSSP - SIPAG - Access Roads and/ or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Construction of Libmanan Cabusao Pump Irrigation System (LCPIS) Main Canal Service Road, Libmanan, Camarines Sur (KATUBIGAN - Kalsada Tungo sa Patubigan)
Physical Target :
CW1 - Construction Concrete Road - 0.400 Lane km |
September 12, 2023 |
2023 |
WIN3F07534 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00737563LZ
UACS : 300225101280000
From :
CSSP - BIP - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Rehabilitation of Box Culvert, Barangay Alimbuyog, Milaor, Camarines Sur
Physical Target :
CW1 - Rehabilitation/ Major Repair of Flood Control Structure
TO :
CSSP - BIP - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Rehabilitation of Box Culvert, Barangay Alimbuyog, Milaor, Camarines Sur
Physical Target :
CW1 - Rehabilitation/ Major Repair of Drainage Structure - 6.100 Lineal meters
|
September 12, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00740452LZ
UACS : 300219101534000
From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Talisay River Control Structure, San Francisco Section, Talisay, Camarines Norte
Physical Target :
CW1 - Construction of Flood Mitigation/ Structure - 377.7 Lineal meters
TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructures/ Facilities - Construction of Talisay River Control Structure, San Francisco Section, Talisay, Camarines Norte
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 356.2 Lineal meters
|
September 12, 2023 |
2023 |
WIN3F07511 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Catanduanes District Engineering Office |
Project ID : P00740683LZ
UACS : 300219102036000
From :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Construction of Seawall, Comagaycay, San Andres, Catanduanes
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 382.002 Lineal meters
TO :
CSSP - SIPAG - Flood Mitigation Structures protecting Public Infrastructure/ Facilities - Construction of Seawall, Comagaycay, San Andres, Catanduanes
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 169 Lineal meters |
September 12, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00740747LZ
UACS : 300220101152000
From :
CSSP - SIPAG - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building, Various Super Health Centers in the province of Albay
Physical Target :
CW1 - Construction of Multi Purpose Building - 1 Number of Buildings
TO :
CSSP - SIPAG - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building, Various Super Health Centers in the province of Albay
Physical Target :
CW1 - Construction of Multi-Purpose Buildings - 5 Number of Buildings |
September 11, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 3rd Engineering Office |
Project ID : P00711995LZ
UACS : 310202101419000
From :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads - Ligao - Pio Duran Rd - K0537 + 160 - K0538 + 120
Physical Target :
CWL1 - Road Wiidening 1.932 Lane Km
TO :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Road Widening - Secondary Roads - Ligao - Pio Duran Rd - K0537 + 201 - K0538 + 110
Physical Target :
CW1 - Road Widening - 1.830 Lane Km |
September 11, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00712063LZ
UACS : 310204102067000
From :
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Mabolo - Almeda Bypass Rd (Package 2), Camarines Sur
Physical Target :
CW1 - Construction of Concrete Road - 2.88 Lane Km
TO:
OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Mabolo - Almeda Bypass Rd (Package 2), Camarines Sur
Physical Target :
CW1 - Construction of Concrete Road - 1.944 Lane Km
CW2 - Construction of Gravel Road - 0.496 Lane Km
CW3 - Construction of Road Slope Protection Structure - 6860.82 Square meters |
September 11, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00713718LZ
UACS : 310305101816000
From :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridge - Impig Br. 1 (B00378LZ) along Daang Maharlika (LZ)
Physical Target :
CW1 - Widening of Bridge - 209.88 Square meters
TO :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridge - Impig Br. 1 (B00378LZ) along Daang Maharlika (LZ)
Physical Target :
CW1 - Widening of Bridge - 232.34 Square meters |
September 11, 2023 |
2023 |
WIN3F07479 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00713719LZ
UACS : 310305101817000
From :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges - Panaytayan Br. (B00438LZ) along Rolando A Andaya Highway (Phase II)
Physical Target :
CW1 - Widening of Bridge - 389.2 Square meters
TO :
OO1 Ensure Safe and Reliable National Road System - Bridge Program - Widening of Permanent Bridges - Panaytayan Br. (B00438LZ) along Rolando A Andaya Highway (Phase II) |
September 11, 2023 |
2023 |
WIN3F07306 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Sorsogon District Engineering Office |
Project ID : P00714704LZ
UACS : 310106100846000
From :
OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Construction of Jct Donsol - Banuang Gurang Rd - K0571 + 163 - K0572 + 161, K0576 + 827- K0576 + 890, K0588 + 140 - K0589 + 000, K0589 + 658 - K0590 + 000, K0590 + 388 - K0590 + 571
Physical Target :
CW1 - Reconstruction to Concrete Pavement - 4.026 Lane Km
TO :
OO1 Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Construction of Jct Donsol - Banuang Gurang Rd - K0588 + 140 - K0589 + 000
Physical Target :
CW1 - Reconstruction to Concrete Pavement - 1.551 Lane Km
CW2 - Construction Drainage along Road - 1197.23 Lineal Meters
CW3 - Construction of Road Slope Protection Structure - 1212.54 Square Meters |
September 11, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00726772LZ
UACS : 320102105455000
From :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Daet River Flood Control Structure Phase II, Brgy. Bibirao and Calasgasan, Daet, Camarines Norte
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 307 Lineal meters
TO :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Daet River Flood Control Structure Phase II, Barangay Bibirao, Daet, Daet, Camarines Norte
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 307 Linea meters |
September 11, 2023 |
2023 |
WIN3F07530 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00726965LZ
UACS : 320101109085000
From :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage System - Construction of Shore PRotection and Seawall along Brgy. Caranan - Brgy. Sta. Rosa del Sur, Pasacao, Camarines Sur
Pysical Target:
CW1 - Construction of Flood Mitigation Structure - 1184.206 Lineal meters
TO:
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage System - Construction of Shore Protection and Seawall along Brgy. Caranan - Brgy. Sta. Rosa del Sur, Pasacao, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 557.9 Lineal meters |
September 11, 2023 |
2023 |
WIN3F07512 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00726966LZ
UACS : 320101109086000
From :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage - Construction of Shore Protection and Seawall along Brgy. Caranan - Brgy. Dalupaon, Pasacao, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 1184.206 Lineal meters
TO :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage - Construction of Shore Protection and Seawall along Brgy. Caranan - Brgy. Dalupaon, Pasacao, Camarines Sur
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 546.6 Lineal meters |
September 11, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00727321LZ
UACS : 320102105441000
From :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Daet River Flood Control (Dogongan Section), Daet, Camarines Norte
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 611.51 Lineal meters
TO :
OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers - Construction of Daet River Flood Control (Dogongan Section), Daet, Camarines Norte
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 555.91 Lineal meters |
September 11, 2023 |
2023 |
WIN3F07234 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00732950LZ
UACS : 300203102274000
From:
CSSP - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP) - Virac - Bato - Batalay - Bote - Bitaogan - Cororian - Cagraray - Radar Station Roads leading to Maribina Falls, Balongbong Falls, Mangrove Eco-Park, Sacahon Beach, Bote Lightdouse, Japanese Garrision (Mt. Arinawan), Bitaogan Beach, Carorian Wonders, Brgy. Cagraray, Bato, Catanduanes
Physical Target :
CW1 - Construction of Concrete Road - 0.25 Lane Km
TO :
CSSP - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP) - Virac - Bato - Batalay - Bote - Bitaogan - Cororian - Cagraray - Radar Station Roads leading to Maribina Falls, Balongbong Falls, Mangrove Eco-Park, Sacahon Beach, Bote Lighthouse, Japanese Garrision (Mt. Arinawan), Bitaogan Beach, Carorian Wonders, Brgy. Cagraray, Bato, Catanduanes
Physical Target :
CW1 - Construction of Concrete Road - 0.18 Lane Km |
September 11, 2023 |
2023 |
WIN3F07042 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00732972LZ
UACS : 300204101247000
From :
CSSP - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - Roll-IT) - Brgy. 3 - Brgy. 5 Road connecting Ligao - Pioduran Road and Albay West Coast Road in support to Agribusiness (Food Resources Based Processing), Pio-Duran, Albay
Physical Target :
CW1 - Construction of Concrete Road - 1.5 Lane Km
TO :
CSSP - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - Roll-IT) - Brgy. 3 - Brgy. 5 Road connecting Ligao - Pioduran Road and Albay West Coast Road in support to Agribusiness (Food Resources Based Processing), Pio-Duran, Albay
Physical Target :
CW1 - Construction of Concrete Road - 0.3266 Lane Km
CW2 - Construction of Road Slope Protection Structure - 2,011.95 Square meters
|
September 8, 2023 |
2023 |
WIN3E02960 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd – K0472 + 780 – K0474 + 000;
Physical Target: 4.376 Lane Km;
Allocation: Php 26,789,000.000
To:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd – K0472 + 350 – K0472 + 1830;
Physical Target: 2.96 Lane Km;
Allocation: Php 26,789,000.000
|
September 8, 2023 |
2023 |
WIN3E02970 |
GAA 2023 |
January 24, 2024 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd- K0408 + 741 - K0408 + 939, K0410 + 816 - K0410 + 942, K0416 + 126 - K0416 + 301;
Physical Target: 0.998 Lane Km;
Allocation: Php 24,950,000.000
To:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd- K0408 + 741 - K0408 + 939, K0410 + 816 - K0410 + 942;
Physical Target: CW1: 0.571 Lane Km
CW2: 583 Square meters
CW3: 957 Square meters Lane Km;
Allocation: Php 24,950,000.000
|
September 8, 2023 |
2023 |
WIN3E02996 |
SR2023-03-0007128 |
March 15, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From:
Improvement of Paracelis-Tabuk-Malig Road, Paracelis, Mountain Province;
Type of Work: Rehabilitation of Concrete Road;
Physical Target: 11.384 Lane Km;
Allocation: Php 100,000,000.000
To:
Improvement of Paracelis-Tabuk-Malig Road, Paracelis, Mountain Province;
Type of Work:
CW1: Construction of
Gravel Road
CW2: Construction of
Concrete Road;
Physical Target:
CW1: 8.480 Lane Km
CW2: 1.200 Lane Km ;
Allocation: Php 100,000,000.000
|
September 8, 2023 |
2023 |
WIN3E03010 |
SR2023-03-007131 |
March 15, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From:
Improvement of Aguinaldo-Natonin Road, Natonin, Mountain Province;
Type of Work: Rehabilitation of Concrete Road;
Physical Target: 11.384 Lane Km;
Allocation: Php 100,000,000.000
To:
Improvement of Aguinaldo-Natonin Road, Natonin, Mountain Province;
Type of Work: Paving of Unpaved Roads;
Physical Target: 2.4 Lane Km;
Allocation: Php 100,000,000.000
|
September 8, 2023 |
2023 |
WIN3E02998 |
SR2023-01-001690 |
March 28, 2024 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From:
Construction of Flood Mitigation Structure along Agno River, Poblacion Buguias Section, Sta. 7+724 - Sta. 8+724 (B.S), Buguias, Benguet;
Physical Target: 1920 Lineal meters;
Allocation: Php 100,000,000.000
To:
Construction of Flood Mitigation Structure along Agno River, Poblacion Buguias Section, Sta. 10+451 - 10+888 (L.S), STA. 10+506 - 10+689 (RS), Sta. 10+917 - 11+039 (L.S), Sta. 0+000 - 0+056 (LS), Sta. 0+000 - 0+075 (RS) and Sta. 11+152 - 11+392 (LS), Buguias, Benguet;
Physical Target: 1113 Lineal meters;
Allocation: Php 100,000,000.000
|
September 7, 2023 |
2023 |
WIN3F07522 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Regional Office III |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Jose Abad Santos Ave (JASA) - K0109+467 - K0110+000, K0115+600 - K0116+353, K0110+900 - K0111+170 |
September 7, 2023 |
2023 |
WIN3F07619 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Regional Office III |
Asset Preservation Program - Rehabilitation / Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary Roads
Madella-Dinadiawan Rd - K0418+600 - K0418+690, K0418+790 - K0418+920, K0419+000 - K0419+120
|
September 7, 2023 |
2023 |
WIN3F07575 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Regional Office III |
Network Development Program - Construction of Missing Links / New Roads
Capas - Botolan Road, Package 2, Tarlac |
September 7, 2023 |
2023 |
WIN3F07517 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Regional Office III |
Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and / or Bridges from the National Road/s leading to Major / Strategic Public Buildings / Facilities
Construction of Road, Barangay Liyang, Pilar to Barangay Bilolo, Orion, Bataan (Package 1) |
September 6, 2023 |
2023 |
WIN3F07593 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Apalit-Macabebe-Masantol Rd - K0055+(-207) - K0055+475 |
September 5, 2023 |
CY 2023 |
|
UACS No. 300215102964000 |
February 22, 2023 |
National Capital Region |
Quezon City 2nd Engineering District Office |
As per GAA/Original
UACS No. 300215102964000
Project ID.: P00739952LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major / Strategic Public Buildings/Facilities
Rehabilitation of Road, Maharlika St., Barangay Old Balara Capitol Site, Phase II, Quezon City
Physical Target: CW1 = Rehabilitation of Paved Road 0.205 lane km
Unit Cost (P’000) = P 95,609.76/lane km.
Allocation (P,000) = P 19,600.00
EAO (P’000) = P 400.00
Total (P’000) = P 20,000.00
As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) – Access Roads and/or Bridges from the National Road/s leading to Major / Strategic Public Buildings/Facilities
Rehabilitation of Road, Maharlika St., Barangay Old Capitol Site, Phase II, Quezon City
Physical Target: CW1 = Rehabilitation of Paved Road 0.562 lane km
CW2 = Construction of Drainage Structure along Road – 537 lineal meter
CW3 = Road Safety – Street Lighting – 21 units
Unit Cost (P’000) = P 15,565.836/lane km. P 31 M/Km
P 14,546.00/lineal meter
P 144,810/unit
Allocation (P,000) = P 8,748.00
P 7,811.00
P 3,041.00
EAO (P’000) = P 400.00
Total (P’000) = P 20,000.00
|
September 4, 2023 |
2023 |
WIN3E03094 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From:
Construction of Dao Balbalan-Bullaguian Road, Tabuk City, Kalinga;
Type of Work: Construction of
Concrete Road;
Physical Target: 6.82 Lane Km;
Allocation: Php 100,000,000.000
To:
Construction of Dao Balbalan-Bullaguian Road, Balbalan, Kalinga;
Type of Work:
CW1: Construction of
Concrete Road
CW2: Construction of Road Slope Protection Structure;
Physical Target:
CW1: 4.0 Lane Km
CW2: 2,172.58 Square meters ;
Allocation: Php 100,000,000.000
|
September 4, 2023 |
2023 |
|
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From:
Lacnog Br. (B00987LZ) along Nambaran-Isabela Rd;
Type of Work: Widening of Bridge;
Physical Target: 409.92 Square Meters;
Allocation: Php 48,800,000.00
To:
Lacnog Br. (B00987LZ) along Nambaran-Isabela Rd;
Type of Work: Construction of Parallel Bridge;
Physical Target: 667.8 Square Meters;
Allocation: Php 48,800,000.00
|
September 4, 2023 |
2023 |
|
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 310104100506000
Project ID: P00706318MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1265 + 605 - K1266 + 000, K1266 + 284 - K1267 + 569, K1268 + 003 - K1268 + 200, K1270 + 520 - K1271 + 580, K1271 + 629 - K1272 + 000, K1276 + 672 - K1276 + 994, K1278 + 000 - K1278 + 073
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 12.756 Lane Km
Allocation:
TOTAL: P 156,304,000
CW1: P 150,833,360
EAO: P 5,470,640
Unit Cost:
CW1: P 11,824,502.98/Lane Km
TO:
Daang Maharlika (Agusan-Davao Sect) – K1270 + 520 – K1271 + 007, K1271 + 007 – K1271 + 580, K1271 + 629 – K1272 + 000, K1273 + 043 – K1273 + 892, K1276 + 672 – K1276 + 994, K1277 + 678 – K1278 + 000, K1278 + 000 – K1278 + 073, K1278 + 862 – K1279 + 800, K1292 + 000 – K1293 + 000, K1293 + 000 – K1294 + 000, K1298 + 912 – K1299 + 000, K1303 + 446 – K1303 + 600
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 12.2745 Lane Km
Allocation:
TOTAL: P 156,304,000
CW1: P 150,833,360
EAO: P 5,470,640
Unit Cost:
CW1: P 12,288,350.64/Lane Km
|
September 1, 2023 |
2023 |
WIN3E03097 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
UACS No. : 310104100619000
Project ID: P00706319MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1292 + 763 - K1293 + 089
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 1.304 Lane Km
Allocation:
TOTAL: P 15,955,000
CW1: P 15,635,900
EAO: P 319,100
Unit Cost:
CW1: P 11,990,720.86/Lane Km
TO:
Daang Maharlika (Agusan-Davao Sect) - K1250+098.00 - K1250+589.50
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 1.00373 Lane Km
Allocation:
TOTAL: P 15,955,000
CW1: P 15,635,900
EAO: P 319,100
Unit Cost:
CW1: P 15,577,794.83/Lane Km
|
August 31, 2023 |
2023 |
300214100506000 |
GAA 2023 |
January 3, 2023 |
Region II |
Cagayan 3rd District Engineering Office |
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239
Installation of LED Integrated Solar Streetlights along Municipality and Barangay Roads in Enrile, Cagayan |
August 31, 2023 |
2023 |
300221102731000 |
GAA 2023 |
January 3, 2023 |
Region II |
Cagayan 3rd District Engineering Office |
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Bridge at Barangay Mangga, Peñablanca, Cagayan |
August 30, 2023 |
2023 |
P00721300MN |
SR2023-01-001425 |
December 30, 2023 |
Region XII |
Regional Office XII |
23M00154 CONSTRUCTION OF REVETMENT ALONG BUAL RIVER, STA 0+000-STA0+303.7, BARANGAY MINAPAN, TULUNAN, NORTH COTABATO
|
August 30, 2023 |
2023 |
P00733163MN |
SR2023-01-000575 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00020 CONSTRUCTION OF CONCRETE ROAD - BONGOLANON-KINARUM ROAD LEADING TO KIRUNGDONG WATERFALLS AND WILDLIFE RESCUE CENTER, STA. 1+642.0 - STA. 3+460, BRGY. KINARUM, MAGPET, NORTH COTABATO
|
August 30, 2023 |
2023 |
P00733168MN |
SR2023-01-002106 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00050 CONSTRUCTION OF CONCRETE ROAD - MALALAG-KIAYAP-ZION-BATIAN ROAD LEADING TO ZION-BATIAN ECOSITES, STA. 10+460 - STA. 12+340, BRGY. BATI-AN, MAITUM, SARANGANI
|
August 29, 2023 |
2023 |
WIN3F07525 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00714721LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads
Daang Maharlika Jct - Legazpi - Sto Domingo - Tabaco - Camarines Sur Bdry Rd - K0580 + 040.00 - K0580 + 233.00
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 13611.11 Square meters
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads
Daang Maharlika Jct - Legazpi - Sto Domingo - Tabaco - Camarines Sur Bdry Rd - K0575 - 099.35 - K0575 + 242.89; K0583 + 244.50 - K0583 + 359.50
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 9530.03 Square meters |
August 29, 2023 |
2023 |
WIN3F07513 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00714722LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads
Daang Maharlika Jct - Legazpi - Sto Domingo - Tabaco - Camarines Sur Bdry Rd - K0580 + 640.00 - K0580 + 840.00
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 13611.11 Square meters
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads
Daang Maharlika Jct - Legazpi - Sto Domingo - Tabaco - Camarines Sur Bdry Rd - K0583 + 359.50 - K0583 + 575.50
Physical Target :
CW1 - Construction of Road Slope Protection Structure - 9735.2 Square meters |
August 29, 2023 |
2023 |
WIN3F07510 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00725889LZ
FROM : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage System
Construction of Milagros Seawall, Sta. 0 + 208.00 - Sta. 0 + 487.00, Milagros, Masbate
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 123,500 Lineal meters
TO : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage System
Construction of Milagros Seawall, Sta. 0 + 217.00 - Sta. 0 + 340.50, Milagros, Masbate
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 123,500 Linea meters |
August 29, 2023 |
2023 |
WIN3F07506 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00725890LZ
FROM : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Calasuche Seawall, Sta. 0 + 642.00 - Sta. 0 + 921.00, Milagros, Masbate
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 75 Lineal meters
TO : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Calasuche Seawall, Sta. 1 - + 286.90 - Sta. 1 + 361.90, Milagros, Masbate
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 75 Lineal meters |
August 29, 2023 |
2023 |
WIN3F07519 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Masbate 2nd District Engineering Office |
Project ID : P00725891LZ
FROM : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Poblacion East Seawall, Sta. 0 + 363.00 - Sta. 0 + 642, Milagros, Masbate
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 72 Lineal meters
TO : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Poblacion East Seawall, Sta. 0 + 250.00 - Sta. 0 + 322.00, Milagros, Masbate
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 72 Lineal meters |
August 29, 2023 |
2023 |
WIN3F07514 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID: P00725892LZ
FROM : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Poblacion East Seawall, Sta. 0 + 487.00 - Sta. 0 + 766.00, Milagros, Masbate
Physical Target :
CW1 - Construction of Flood Mitigation Structure - 103 Lineal meters
TO : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Poblacion East Seawall, Sta. 0 + 114.00 - Sta. 0 + 217.00, Milagros, Masbate |
August 29, 2023 |
2023 |
WIN3F07535 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Camarines Sur 2nd District Engineering Office |
Project ID : P00726292LZ
FROM : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment, Barangay San Gabriel, Pamplona, Camarines Sur
Physical Target :
CW1 - Construction of Revetment - 382.002 Lineal meters
TO : OO2 Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Revetment, Barangay San Gabriel, Pamplona, Camarines Sur
Physical Target :
CW1 - Construction of Revetment - 205.00 Lineal meters |
August 25, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00712062LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Mabolo - Almeda Bypass Rd (Package 1), Camarines Sur
Physical Target :
CW1 - Construction of Concrete Bridge - 979 Square meters
TO : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Mabolo - Almeda Bypass Rd (Package 1), Camarines Sur
Physical Target :
CW1 - Construction of Concrete Bridge - 1642.25 Square meters |
August 25, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 2nd Engineering Office |
Project ID : P00712230LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads - Daang Maharlika (LZ) - K0528 + 000 - K0528 + 284
Physical Target :
CW1 - Construction of Drainage Structure along Road - 284 Lineal Meters
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads - Daang Maharlika (LZ) - K0519 + 844 - K0520 + 073, K0521 + 600, K0522 + 160 - K0522 + 330
Physical Target
CW1 - Rehabilitation/ Major Repair of Drainage Structure along Road - 558 Lineal Meters |
August 25, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Albay 2nd Engineering Office |
Project ID : P00712232LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads - Legazpi Access Rd - (S05853LZ) Chainage 000 - Chainage 181
Physical Target :
CW1 - Construction of Drainage Structure along Road - 362 Lineal Meters
TO : OO1 Ensure Safe and Reliable National Road System - Asset Preservation Program - Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads - Legazpi Access Rd - (S05853LZ) Chainage 000 - Chainage 415
Physical Target :
CW1 - Rehabilitation/ Maj or Repairr of Drainage Structures along road - 415 Lineal Meters |
August 25, 2023 |
2023 |
P00705736MN |
SR2023-01-002516 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00065 ROAD WIDENING - SURALLAH-LAKE SEBU-MAITUM RD, K1745+221 - K1747+084, LAKE SEBU, SOUTH COTABATO |
August 24, 2023 |
2023 |
|
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00711498LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Daraga - Urban Tourism Eco Route Road, Albay
Physical Target :
CW1 - Construction of Concrete Road - 1.97 Lane Km
Row Acquisition - 39300.299 Square meters
TO : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Daraga - Urban Tourism Eco Route Road, Albay
Physical Target :
CW1 - Construction of Concrete Road - 1.1216 Lane Km
CW2 - Construction of Drainage Structure along Road - 388.9 Lineal meters
CW3 - Construction of Road Slope Protection Structure - 3829.02 Square meters
Row Acquisition - 5608 Square Meters |
August 24, 2023 |
2023 |
WIN3F07556 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00711499LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Legazpi City Coastal Road, Access Road, Albay
Physical Target :
CW1 - Construction of Concrete Road - 0.304 Lane Km
TO : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Legazpi City Coastal Road, Access Road, Albay
Physical Target :
CW1 - Construction of Concrete Road - 1.23 Lane Km
|
August 24, 2023 |
2023 |
WIN3F07541 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00712006LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads - Milaor - Pili Bypass Road, Package 1, Camarines Sur
Physical Target :
CW1 - Construction of Concrete Road - 2.664 Lane Km
TO : OO1 Ensure Safe and Reliable National Road System - Network Development - Construction of By-Pass and Diversion Roads - Milaor - Pili Bypass Road, Package 1, Camarines Sur
Physical Target :
CW1 - Construction of Concret Road - 2.080 Lane Km
|
August 24, 2023 |
2023 |
WIN3F07540 |
FY 2023 GAA |
December 26, 2022 |
Region V |
Regional Office V |
Project ID : P00712009LZ
FROM : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Pamplona - San Fernando Bypass Road, Package 2, Camarines Sur
Physical Target :
CW1 - Construction of Concrete Road - 3.000 Lane Km
TO : OO1 Ensure Safe and Reliable National Road System - Network Development Program - Construction of By-Pass and Diversion Roads - Pamplona - San Fernando Bypass Road, Package 2, Camarines Sur
Physical Target :
CW1 - Construction of Concrete Road - 2.000 Lane Km |
August 22, 2023 |
2023 |
WIN3F07571 |
FY 2023 GAA |
February 17, 2022 |
Region III |
Regional Office III |
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road /s leading to Major/Strategic Public Buildings / Facilities
Construction of bypass road at Donia Remedios Trinidad to San Jose Del Monte Bulacan (Phase 5) |
August 22, 2023 |
2023 |
WIN3F07570 |
FY 2023 GAA |
February 17, 2023 |
Region III |
Regional Office III |
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road /s leading to Major/Strategic Public Buildings / Facilities
Construction of Road, Barangay Liyang, Pilar to Barangay Bilolo, Orion, Bataan (Package 2) |
August 11, 2023 |
CY 2023 |
WIN3F07495 |
UACS No. 300221102455000 |
March 14, 2023 |
National Capital Region |
Metro Manila 1st District Engineering Office |
As per GAA/Original
UACS No. 300221102455000
Project ID.: P00741280LZ
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Basic Infrastructure Program (BIP) – Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Rehabilitation or Road including Alleys and Drainages along T Sulit Street and Laterals (Pascual Area, Kalye Otso, Sarap Buhay, Aguho Boundary, and Tangco Area) Barangay Aguho Pateros
Physical Target: CW1 = Rehabilitation of Paved Road 2.445 lane km
Unit Cost (P’000) = P 4,032.59/lane km.
Allocation (P,000) = P 9,900.00
EAO (P’000) = P 100.00
Total (P’000) = P 10,000.00
As Modified
CONVERGENCE AND SPECIAL SUPPORT PROGRAM
Basic Infrastructure Program (BIP) – Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Rehabilitation of Road including Alleys and Drainages along T Sulit Street and Laterals (Pascual Area, Kalye Otso, Sarap Buhay, Aguho Boundary, and Tangco Area) Barangay Aguho Pateros
Physical Target: CW1 = Rehabilitation of Paved Road 0.375 lane km
CW2 = Rehabilitation/Major Repair of Drainage Structure along Road 0.349 lane km
Unit Cost (P’000) = P 14,180.35/lane km. P 28.2 M/Km
= P 13.13 Lane Km
Allocation (P’000) = P 5,317.63
= P 4,582.37
EAO (P’000) = P 100.00
Total (P’000) = P 10,000.00
WIN3F07495
|
August 8, 2023 |
2023 |
310204101961000 |
GAA 2023 |
January 3, 2023 |
Region II |
Cagayan 3rd District Engineering Office |
Network Development - Construction of Bypass and Diversion Roads
Tuguegarao North Diversion Road, Tuguegarao City, Cagayan |
August 8, 2023 |
2023 |
310104100460000 |
GAA 2023 |
January 3, 2023 |
Region II |
Cagayan 3rd District Engineering Office |
Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Santiago- Tuguegarao Rd (Jct Kalinga- Tuguegarao Sect)- K0437+047- K0437+092, K0437+286- K0437+350, K0438+197- K0438+350, K0438+444- K0438+480, K0438+590- K0438+635, K0438+673- K0438+700, K0438+900- K0438+913.5, K0438+950- K0438+968, K0439+315- K0439+450, K0439+480- K0439+609, K0440+083- K0440+137, K0440+250- K0440+277, K0440+470- K0440+488, K0440+550- K0440+604, K0440+680- K0440+689, K0441+000- K0441+009, K0441+095- K0441+122, K0441+150- K0441+159, K0441+160- K0441+178, K0442+130- K0442+166, K0442+234- K0442+511, K0442+811- K0442+833.5, K0443+000- K0443+383, K0443+390- K0443+403.5, K0443+427- K0443+440.5, K0443+452- K0443+465.5, K0443+472- K0443+494.5, K0443+498- K0443+516, K0443+541- K0443+580, K0443+753- K0444+018, K0444+049- K0444+076, K0444+381- K0446+000, K0446+400- K0446+505, K0446+592- K0448+298 |
August 7, 2023 |
2023 |
WIN3E03100 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 300215102829000
Project ID: P00733870MN
CSSP - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of NRJ Barangay Sta. Fe - Barangay Osmeña Bypass Road, Package 1
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 25.153 Lane Km
Allocation:
TOTAL: P 300,000,000
CW1: P 289,500,000
EAO: P 10,500,000
Unit Cost:
CW1: P 11,509,561.48/Lane Km
TO:
Construction of NRJ Barangay Sta. Fe - Barangay Osmeña Bypass Road, Package 1
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 7.88 Lane Km
CW2- 23901.27 Square meters
Allocation:
TOTAL: P 300,000,000
CW1: P 250,815,080
CW1: P 38,684,920
EAO: P 10,500,000
Unit Cost:
CW1: P 31,829,324.87/Lane Km
CW1: P 1,618.53/Square meters
|
August 7, 2023 |
2023 |
WIN3E03096 |
FY 2023 GAA R.A 11936 |
December 26, 2022 |
Region XIII |
Regional Office XIII |
UACS No. : 300215102830000
Project ID: P00733871MN
CSSP - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of NRJ Barangay Sta. Fe - Barangay Osmeña Bypass Road, Package 2
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 25.153 Lane Km
Allocation:
TOTAL: P 300,000,000
CW1: P 289,500,000
EAO: P 10,500,000
Unit Cost:
CW1: P 11,509,561.48/Lane Km
TO:
Construction of NRJ Barangay Sta. Fe - Barangay Osmeña Bypass Road, Package 2
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 7.620 Lane Km
CW2- 23,225.67 Square meters
Allocation:
TOTAL: P 300,000,000
CW1: P 251,708,670
CW1: P 37,791,330
EAO: P 10,500,000
Unit Cost:
CW1: P 33,032,633.86/Lane Km
CW1: P 1,627.14/Square meters
|
August 3, 2023 |
2023 |
WIN3E03066 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From:
Sagada-Besao-Quirino (via Laylaya) Road, Mountain Province;
Type of Work: Construction of Concrete Road;
Physical Target: 2.838 Lane Km;
Allocation: Php 35,000,000.000
To:
Sagada-Besao-Quirino (via Laylaya) Road, Mountain Province;
Type of Work:
CW1:Construction of Concrete Road
CW2: Construction of Road Slope Protection Structure ;
Physical Target:
CW1: 0.936 Lane Km
CW2: 1,545.19 Square Meters ;
Allocation: Php 35,000,000.000
|
August 2, 2023 |
2023 |
WIN3E02997 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From:
Dantay-Sagada Rd – K0390+1026 – K0391+036, K0390+874 – K0390+1026, K0394+500 – K0394+728, K0397+024 – K0397+078;
Type of Work: Off-Carriageway Improvement: Paving of Shoulders;
Physical Target: 1180.5 Square Meters;
Allocation: Php 14,525,000.000
To:
Dantay-Sagada Rd – K0390+1026 – K0391+036, K0390+874 – K0390+1026, K0394+500 – K0394+728, K0397+024 – K0397+078;
Type of Work:
CW1: Off-Carriageway Improvement: Paving of Shoulders
CW2: Construction of Road Slope Protection Structure ;
Physical Target:
CW1: 515.10 Square Meters
CW2: 823.00 Square Meters ;
Allocation: Php 14,525,000.000
|
August 2, 2023 |
2023 |
WIN3E03012 |
SR2023-01-002118 |
January 1, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From:
Construction of Caluttit-Pakkil Flood Control, Sta. 28+350 - Sta. 28+850 (LS) along Chico River, Bontoc, Mountain Province;
Physical Target: 500 Lineal meters;
Allocation: Php 80,000,000.000
To:
Construction of Caluttit-Pakkil Flood Control, Sta. 28+242 - Sta. 28+440 (LS) along Chico River, Bontoc, Mountain Province;
Physical Target: 198 Lineal meters;
Allocation: Php 80,000,000.000
|
August 2, 2023 |
2023 |
WIN3E03021 |
GAA 2023 |
January 24, 2023 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From:
Besao-Tubo (via Tamboan), Mountain Province;
Type of Work: Construction of Concrete Road;
Physical Target: 0.857 Lane Km;
Allocation: Php 20,000,000.000
To:
Besao-Tubo (via Tamboan), Mountain Province;
Type of Work:
CW1:Construction of Concrete Road
CW2: Construction of Road Slope Protection Structure
CW3: Construction of Drainage Structure along Road;
Physical Target:
CW1: 0.482 Lane Km
CW2: 758.19 Square Meters
CW2: 242.40 Lineal Meters ;
Allocation: Php 20,000,000.000
|
August 2, 2023 |
2023 |
|
SR2023-01-001510 |
January 30, 2023 |
Cordillera Administrative Region |
Apayao 2nd District Engineering Office |
From:
Construction of Flood Control Structure along Apayao River Basin, Cadaclan Section, Calanasan, Apayao;
Physical Target: 820.497 Lineal Meters;
Allocation: Php 10,000,000.000
To:
Construction of Flood Control Structure along Apayao River Basin, Cadaclan Section, Calanasan, Apayao;
Physical Target: 1080 Lineal Meters;
Allocation: Php 10,000,000.000
|
August 2, 2023 |
2023 |
WIN3E02904 |
SR2023-01-001791 |
January 30, 2023 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
From:
Construction of Mapacopaco Flood Control, Sta. 41 + 670 - Sta. 42 + 170 (RS), Sta. 42 + 667 - Sta 43+527(RS), Posnaan, Aguinaldo, Ifugao;
Physical Target: 1,360 Linear Meters;
Allocation: Php 60,000,000.000
To:
Construction of Mapacopaco Flood Control, Sta. 41 + 902 - Sta. 42 + 170 (RS), Sta. 42 + 667 - Sta 43+527(RS), Posnaan, Aguinaldo, Ifugao;
Physical Target: 1,128 Linear Meters;
Allocation: Php 60,000,000.000
|
August 2, 2023 |
2023 |
WIN3E02949 |
SR2023-01-000702 |
January 30, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0472 + 967 - K0473 + 090;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000
To:
Abra-Kalinga Rd - K0472 + 967 - K0473 + 090;
Physical Target: 3575 Square meters;
Allocation: Php 99,980,000.000
|
August 2, 2023 |
2023 |
WIN3E02952 |
SR2023-01-000707 |
January 30, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0473 + 120 - K0473 + 250;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000
To:
Abra-Kalinga Rd - K0473 + 120 - K0473 + 250;
Physical Target: 3575 Square meters;
Allocation: Php 99,980,000.000
|
August 2, 2023 |
2023 |
WIN3E02948 |
SR2023-01-000719 |
January 30, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0473 + 300 - K0473 + 400;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000
To:
Abra-Kalinga Rd - K0473 + 300 - K0473 + 400;
Physical Target: 3575 Square meters;
Allocation: Php 99,980,000.000
|
August 2, 2023 |
GAA 2023 |
P00705724MN |
SR2023-01-001398 |
January 30, 2023 |
Region XII |
Regional Office XII |
23M00027 ROAD WIDENIG - MATALAM-LAMPAYAN-ANTIPAS RD, K1646+739 - K1649+907, K1649+1057 - K1649+1344, MATALAM, NORTH COTABATO
|
August 2, 2023 |
2023 |
WIN3E02936 |
SR2023-01-000722 |
January 30, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0473 + 450 - K0473 + 600;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000
To:
Abra-Kalinga Rd - K0473 + 450 - K0473 + 600;
Physical Target: 3575 Square meters;
Allocation: Php 99,980,000.000
|
August 2, 2023 |
GAA 2023 |
P00705718MN |
SR2023-03-006413 |
March 3, 2023 |
Region XII |
Regional Office XII |
23M00014 ROAD WIDENING - DAVAO-COTABATO RD (JCT DIGOS-COTABATO SECT) - K1629 + 000 - K1630 + 986.05, KIDAPAWAN CITY
|
August 2, 2023 |
2023 |
WIN3E02971 |
SR2023-01-000726 |
January 30, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0474 + 000 - K0474 + 100;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000
To:
Abra-Kalinga Rd - K0474 + 000 - K0474 + 100;
Physical Target: 3575 Square meters;
Allocation: Php 99,980,000.000
|
August 2, 2023 |
2023 |
WIN3E02946 |
SR2023-01-000729 |
January 30, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0474 + 600 - K0474 + 700;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000
To:
Abra-Kalinga Rd - K0474 + 600 - K0474 + 700;
Physical Target: 3575 Square meters;
Allocation: Php 99,980,000.000
|
August 2, 2023 |
2023 |
WIN3E02967 |
SR2023-01-000734 |
January 30, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0474 + 720 - K0474 + 850;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000
To:
Abra-Kalinga Rd - K0474 + 720 - K0474 + 850;
Physical Target: 3575 Square meters;
Allocation: Php 99,980,000.000
|
August 2, 2023 |
2023 |
WIN3E02932 |
SR2023-01-000741 |
January 30, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0474 + 900 - K0475 + 090;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000
To:
Abra-Kalinga Rd - K0474 + 900 - K0475 + 090;
Physical Target: 3575 Square meters;
Allocation: Php 99,980,000.000
|
August 2, 2023 |
2023 |
WIN3E02972 |
SR2023-01-000692 |
January 30, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0466 + 550 - K0466 + 700;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000
To:
Abra-Kalinga Rd - K0466 + 550 - K0466 + 700;
Physical Target: 3576 Square meters;
Allocation: Php 99,980,000.000
|
August 2, 2023 |
2023 |
WIN3E02950 |
SR2023-01-000697 |
January 30, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0466 + 800 - K0466 + 950;
Physical Target: 5554.44 Square meters;
Allocation: Php 99,980,000.000
To:
Abra-Kalinga Rd - K0466 + 800 - K0466 + 950;
Physical Target: 3576 Square meters;
Allocation: Php 99,980,000.000
|
August 2, 2023 |
2023 |
|
SR2023-01-000750 |
January 30, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0483 + 500 - K0483 + 575;
Physical Target: 3036.77 Square meters;
Allocation: Php 74,735,000.000
To:
Abra-Kalinga Rd - K0483 + 500 - K0483 + 575;
Physical Target: 2662 Square meters;
Allocation: Php 74,735,000.000
|
August 2, 2023 |
2023 |
WIN3E02947 |
SR2023-03-005656 |
March 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0484 + 340 - K0484 + 440;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000
To:
Abra-Kalinga Rd - K0484 + 340 - K0484 + 440;
Physical Target: 3576.6 Square meters;
Allocation: Php 100,000,000.000
|
August 2, 2023 |
2023 |
WIN3E02935 |
SR2023-03-005658 |
March 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0487 + 650 - K0487 + 800;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000
To:
Abra-Kalinga Rd - K0487 + 650 - K0487 + 800;
Physical Target: 3576.6 Square meters;
Allocation: Php 100,000,000.000
|
August 2, 2023 |
2023 |
WIN3E02981 |
SR2023-03-005649 |
March 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0468 + 736 - K0468 + 800;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000
To:
Abra-Kalinga Rd - K0468 + 736 - K0468 + 800;
Physical Target: 3577.5 Square meters;
Allocation: Php 100,000,000.000 |
August 2, 2023 |
2023 |
WIN3E02937 |
SR2023-03-005652 |
March 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0482 + 450 - K0482 + 600;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000
To:
Abra-Kalinga Rd - K0482 + 450 - K0482 + 600;
Physical Target: 3577.5 Square meters;
Allocation: Php 100,000,000.000
|
August 2, 2023 |
2023 |
WIN3E02966 |
SR2023-03-005654 |
March 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0482 + 650 - K0482 + 750;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000
To:
Abra-Kalinga Rd - K0482 + 650 - K0482 + 750;
Physical Target: 3577.5 Square meters;
Allocation: Php 100,000,000.000
|
August 2, 2023 |
2023 |
WIN3E02953 |
SR2023-03-005636 |
March 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0459 + 650 - K0459 + 800;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000
To:
Abra-Kalinga Rd - K0459 + 650 - K0459 + 800;
Physical Target: 3577.5 Square meters;
Allocation: Php 100,000,000.000
|
August 2, 2023 |
2023 |
WIN3E02955 |
SR2023-03-005638 |
March 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0466 + 031 - K0466 + 168;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000
To:
Abra-Kalinga Rd - K0466 + 031 - K0466 + 168;
Physical Target: 3577.5 Square meters;
Allocation: Php 100,000,000.000
|
August 2, 2023 |
2023 |
WIN3E02964 |
SR2023-03-005643 |
March 2, 2023 |
Cordillera Administrative Region |
Abra District Engineering Office |
From:
Abra-Kalinga Rd - K0466 + 188 - K0466 + 267;
Physical Target: 5555.56 Square meters;
Allocation: Php 100,000,000.000
To:
Abra-Kalinga Rd - K0466 + 188 - K0466 + 267;
Physical Target: 3577.5 Square meters;
Allocation: Php 100,000,000.000
|