June 6, 2024 |
2024 |
WIN4E03395 |
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Apayao 1st District Engineering Office |
"From:
Abbut-Conner Rd - K0548 + 913 - K0549 + 852;
Type of Work:
CW1: Off-Carriageway Improvement: Paving of Shoulders
CW2: Upgrading of Drainage Structure along Road;
Physical Target:
CW1: 3756 Square meters
CW2: 1878 Lineal meters;
Allocation:
Php 8,662,000"
"To:
Abbut-Conner Rd - K0548 + 796 - K0549 + 140;
Type of Work:
CW1: Off-Carriageway Improvement: Paving of Shoulders;
Physical Target:
CW1: 1555 Square meters;
Allocation:
Php 8,662,000"
|
June 6, 2024 |
2024 |
WIN4E03396 |
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Mountain Province 2nd District Engineering Office |
"From:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - (S04030LZ) Chainage 1680 - Chainage 2130, Chainage 2586 - Chainage 3000;
Type of Work:
Paving of Unpaved Roads;
Physical Target:
0.864 Lane Km;
Allocation:
Php 9,029,000"
"To:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - (S04030LZ) Chainage 563 - Chainage 763;
Type of Work:
CW1: Paving of Unpaved Roads
CW2: Construction of Road Slope Protection Structures;
Physical Target:
CW1: 0.400 Lane Km
CW2: 798 Square meters;
Allocation:
Php 9,029,000"
|
June 6, 2024 |
2024 |
300215104472000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities - Concreting of Brgy. Liwan Norte- San Antonio, Enrile- Ubong, Solana, Cagayan |
June 6, 2024 |
2024 |
WIN4E03416 |
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Mountain Province 2nd District Engineering Office |
"From:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0440 + 968 - K0441 + 262;
Type of Work:
Reconstruction to Concrete Pavement;
Physical Target:
1.056 Lane Km;
Allocation:
Php 10,574,000"
"To:
Jct Talubin-Barlig-Natonin-Paracelis-Calaccad Rd - K0440 + 1002 - K0441 + 041;
Type of Work:
CW1: Reconstruction of Concrete Pavement
CW2: Construction of Road Slope Protection Structures;
Physical Target:
CW1: 0.546 Lane Km
CW2: 540 Square meters;
Allocation:
Php 10,574,000"
|
June 5, 2024 |
2024 |
WIN4XY00238 |
GAA 2024 |
December 29, 2023 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Network Development Program - Road Widening - Primary Roads
AS PER GAA/ORIGINAL:
Ormoc-Baybay-Southern Leyte Bdry Rd - K1053 + 114 - K1053 + 168, K1055 + 080 - K1055 + 693, K1055 + 772 - K1056 + 070, K1057 + 708 - K1058 + 100
Physical Target: Allocation:
CW1-Road Widening: 2.508 Lane Km P 42.979860 M
EAO P 0.877140 M
Total P 43.857 M
AS MODIFIED:
Ormoc-Baybay Southern Leyte Bdry. Road - K1053+111-K1053+165 (R), K1055+107-K1055+684, K1055+768-K1056+052, K1056+052-K1056+070 (R), K1057+708-K1057+815 (L), K1057+815-K1057+945
Physical Target: Allocation:
CW1-Road Widening: 2.087 Lane Km P 27.54841134 M
CW2- Construction of Road Slope Protection P 9.52463802 M
Structure: 2,084 Square meters:
CW3-Construction of Drainage Structure P 5.90681064 M
along Road: 552 Lineal meters
EAO P 0.877140 M
Total P 43.857 M
|
June 5, 2024 |
2024 |
|
GAA 2024 |
January 23, 2024 |
Region VIII |
Leyte 4th District Engineering Office |
Convergence and Special Support Program
Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services
AS PER GAA/ORIGINAL:
Rehabilitation (Completion) of Multi-Purpose Building, Barangay Guiana II, Palompon, Leyte
Physical Target: Allocation:
CW1-Construction of Multi Purpose Building P 12.341340 M
: 1.00 Number of Building
EAO P 0.124660 M
Total P 12.466 M
AS MODIFIED:
Rehabilitation (Completion) of Multi-Purpose Building, Barangay Guiwan II, Palompon, Leyte
Physical Target: Allocation:
CW1-Construction of Multi Purpose Building P 12.341340 M
: 1.00 Number of Building
EAO P 0.124660 M
Total P 12.466 M
|
June 5, 2024 |
2024 |
310201101249000 |
GAA 2024 |
January 3, 2024 |
Region II |
Regional Office II |
FROM:
Network Development - Road Widening - Primary Roads - Cagayan Valley Rd - K0529 + 809 - K0530 + 864, K0535 + 325 - K0536 + 521
TO:
Network Development - Road Widening - Primary Roads - Cagayan Valley Rd - K0529 + 809 - K0530 + 811, K0535 + 325 - K0535 + 400
|
June 5, 2024 |
2024 |
310110100455000 |
GAA 2024 |
January 3, 2024 |
Region II |
Regional Office II |
FROM:
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads - Daang Maharlika (LZ) - K0325 + 000 - K0326 + 537
TO
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads - Daang Maharlika (LZ) - K0325 + 040 - K0326 + 227.77 |
June 5, 2024 |
2024 |
310207100305000 |
GAA 2024 |
January 3, 2024 |
Region II |
Regional Office II |
FROM:
Network Development - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0382 + 961 - K0382 + 973, K0382 + 989 - K0383 + 003, K0383 + 005 -
K0383 + 162, K0385 + 049 - K0385 + 098, K0385 + 120 - K0385 + 220, K0386 + 000 - K0386 + 167, K0386 + 291 - K0386 + 292, K0386 + 331 - K0386 + 374, K0389 + 000 - K0389 + 153, K0391
+ 271 - K0391 + 343, K0391 + 371 - K0391 + 400, K0391 + 960 - K0392 + 080, K0392 + 859 - K0392 + 939
TO:
Network Development - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0392+261.00 - K0392+476.90 |
June 4, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads
Calaguiman Vicinal Rd - K0117+515 - K0118+759 |
June 4, 2024 |
2024 |
WIN4XY00229 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads
Tulauc- Sto. Domingo Rd - K0061+158 - K0061+558
|
June 4, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads
Sn Simon - Baliwag Rd - K0069+000 - K0069+525 |
June 4, 2024 |
FY 2024 GAA |
P00800467MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads
Bansalan-Mt. Apo Natl Rd - K1602 + 754 - K1602 + 792, K1603 + 000 - K1603 + 102
Physical Target:
CW1: 1,400.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Road Slope Protection Structure)
EAO: P 700,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction of Roads with Slips, Slope Collapse, and Landslides - Tertiary Roads
Bansalan-Mt. Apo Natl Rd - K1602 + 754 - K1602 + 792, K1603 + 000 - K1603 + 177
Physical Target:
CW1: 1,400.00 square meters (Construction of Road Slope Protection Structure)
Allocation:
TOTAL: P 35,000,000.00
CW1: P 34,300,000.00 (Construction of Road Slope Protection Structure)
EAO: P 700,000.00 |
June 4, 2024 |
FY 2024 GAA |
P00802411MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Digos-Makar Rd - K1564 + (-495) - K1564 + 805
Physical Target:
CW1: 2.600 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Digos-Makar Rd - K1564 + 099 - K1565 + 246
Physical Target:
CW1: 6.184 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00 |
June 4, 2024 |
CY 2024 |
WIN4XY00228 |
UACS No. 310106101076000 |
January 31, 2024 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA/Original
UACS No. 310106101076000
Project ID.: P00805513LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Tertiary Roads
Corregidor St. (S05159LZ)-Chainage 140 – Chainage 272
Physical Target: CW1 = Reconstruction to Concrete Pavement = 1.320 lane km
Unit Cost (P’000) = P 18,560.61/lane km
Allocation = P 24,500,000.00
EAO = P 500,000.00
Total = P 25,000,000.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Tertiary Roads
Corregidor St. (S05159LZ)-Chainage 0 – Chainage 272
Physical Target: CW1 = Reconstruction to Concrete Pavement = 1.088 lane km
Unit Cost (P’000) = P 22,518.38/lane km
Allocation = P 24,500,000.00
EAO = P 500,000.00
Total = P 25,000,000.00
WIN4XY00228
|
June 4, 2024 |
CY 2024 |
|
UACS No. 310105101004000 |
January 31, 2024 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA/Original
UACS No. 310105101004000
Project ID.: P00805507LZ
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Roads
Commonwealth Avenue (S05453LZ)-K0020+(-357) – K0020+305
Physical Target: CW1 = Reconstruction to Concrete Pavement = 1.324 lane km
Unit Cost (P’000) = P 109,327.79/lane km
Allocation = P 144,750,000.00
EAO = P 5,250,000.00
Total = P 150,000,000.00
As Modified
OO1: Ensure Safe and Reliable National Road System
Asset Preservation – Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads – Secondary Roads
Commonwealth Avenue (S05646LZ)-K0018 + (730) – K0017+550
Physical Target: CW1 = Reconstruction to Concrete Pavement = 5.456 lane km
Unit Cost (P’000) = P 26,530.42/lane km
Allocation = P 144,750,000.00
EAO = P 5,250,00.00
Total = P 150,000,000.0
|
June 4, 2024 |
FY 2024 GAA |
P00800185MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao del Norte 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Saturnino R. Silva Rd - K1474 + 087 - K1474 + 537
Physical Target:
CW1: 0.900 lane km (Road Widening)
CW2: 0.900 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 44,000,000.00
CW1: P 23,160,000.00 (Road Widening)
CW2: P 19,300,000.00 (Reconstruction to Concrete Pavement)
EAO: P 1,540,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Network Development - Road Widening - Secondary Roads
Saturnino R. Silva Rd - K1474 + 087 - K1474 + 657
Physical Target:
CW1: 1.140 lane km (Road Widening)
CW2: 1.140 lane km (Reconstruction to Concrete Pavement)
ROW: 7,980.00 square meters (ROW Acquisition)
Allocation:
TOTAL: P 44,000,000.00
CW1: P 20,800,141.00 (Road Widening)
CW2: P 19,659,859.00 (Reconstruction to Concrete Pavement)
ROW: P 2,000,000.00 (ROW Acquisition)
EAO: P 1,540,000.00 |
June 4, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Bulacan 1st District Engineering Office |
Network Development Program - Off-Carriageway Improvement - Tertiary Roads
Baliwag-Bustos Rd - K0051+485 - K0051+1235 |
June 4, 2024 |
FY 2024 GAA |
P00803818MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao de Oro 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd - K1515 + 895 - K1517 + 487
Physical Target:
CW1: 3.184 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 800,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Asuncion-San Isidro-Laak-Veruela Rd - K1515 + 895 - K1518 + 000
Physical Target:
CW1: 4.388 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 40,000,000.00
CW1: P 39,200,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 800,000.00 |
June 4, 2024 |
FY 2024 GAA |
P00803778MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Digos-Makar Rd - K1585 + 370 - K1586 + 879
Physical Target:
CW1: 6.000 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Digos-Makar Rd - K1581 + 011 - K1584 + 066
Physical Target:
CW1: 6.140 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00 |
June 4, 2024 |
2024 |
WIN4E03388 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
UACS No. : 300215105140000
Project ID: P00835094MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Coastal Road from Sitio Hinaplian Balete to Purok 2, Bayabas, Surigao de Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 3.081 Lane Km
Allocation:
TOTAL: P 35,000,000
CW1: P 34,300,000
EAO: P 700,000
Unit Cost:
CW1: P 11,132,749.11/Lane Km
TO:
Construction of Coastal Road from Sitio Hinaplian Balete to Purok 2, Bayabas, Surigao de Sur
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 1.692 Lane Km
CW2- 7478.640 Square meters
Allocation:
TOTAL: P 35,000,000
CW1: P 25,919,847.68
CW2: P8,380,152.32
EAO: P 700,000
Unit Cost:
CW1: P 15,319,058.91/Lane Km
CW2: P 1,120.55/Square meters
|
June 4, 2024 |
FY 2024 GAA |
P00801269MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Daang Maharlika (MN) - K1452 + 263 - K1452 + 654
Physical Target:
CW1: 1.176 lane km (Reconstruction to Concrete Pavement)
Allocation:
TOTAL: P 24,338,000.00
CW1: P 23,486,170.00 (Reconstruction to Concrete Pavement)
EAO: P 851,830.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads - Primary Roads
Daang Maharlika (MN) - K1449 + 882 - K1450 + 681, K1454 + 617 - K1454 + 730
Physical Target:
CW1: 1.560 lane km (Reconstruction to Concrete Pavement)
CW2: 0.678 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 24,338,000.00
CW1: P 14,185,703.00 (Reconstruction to Concrete Pavement)
CW1: P 9,300,467.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 851,830.00 |
June 4, 2024 |
FY 2024 |
P00820923MN |
SR2024-03-013796 |
March 20, 2024 |
Region XII |
Regional Office XII |
Contract ID: 24M00219
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Project Name: Construction of River Bank Protection, Lusanes, Brgy. Sulit, Polomolok, South Cotabato
Amount: ₱ 125,000,000.00
Physical target:
From: 595.000 Lineal Meters
To: 745.000 Lineal Meters |
June 4, 2024 |
FY 2024 |
P00801063MN |
GAA 2024 |
January 1, 2024 |
Region XII |
Regional Office XII |
From: Marbel-Allah Valley-Cotabato Rd - K1768 + 743 - K1769 + 130
TOW: CW-1- Preventive Maintenance of Road: Asphalt Overlay: 2.436 lane-km
To: Marbel-Allah Valley-Cotabato Rd - K1768 + 743 - K1769 + 152 |
June 3, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect) - K0505 + 000 - K0505 + 719, K0506 + 293 - K0508 + 008;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
4.814 Lane Km;
Allocation:
Php 41,739,000"
"To:
Mt Province Bdry-Calanan-Pinukpuk-Abbut Rd (Calanan-Pinukpuk Sect) - K0505 + 000 - K0505 + 719, K0506 + 293 - K0507 + 616.115;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
4.11423;
Allocation:
Php 41,739,000"
|
June 3, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Babalag West-Liwan West-Alibangbang Access Road connecting Enrile-Tabuk National Road and Alibangbang Access Road in support to Veggie Noodles/Chips Processing and Sugarcane Processing, Rizal, Kalinga;
Type of Work:
Construction of Concrete Road;
Physical Target:
1.2 Lane Km;
Allocation:
Php 20,000,000"
"To:
Babalag West-Liwan West-Alibangbang Access Road connecting Enrile-Tabuk National Road and Alibangbang Access Road in support to Veggie Noodles/Chips Processing and Sugarcane Processing, Rizal, Kalinga;
Type of Work:
CW1: Construction of Drainage Structure;
Physical Target:
2.08 Lane Km;
Allocation:
Php 20,000,000"
|
June 3, 2024 |
2024 |
|
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Construction of Manuel S. Agyao Boulevard-Ileb junc. -Dilag-San Julian-Balong-Tuao Circumferential Road;
Type of Work:
Construction of Concrete Road;
Physical Target:
0.522 Lane Km;
Allocation:
Php 30,000,000"
"To:
Construction of Manuel S. Agyao Boulevard-Ileb junc. -Dilag-San Julian-Balong-Tuao Circumferential Road;
Type of Work:
Construction of Concrete Road;
Physical Target:
4 Lane Km;
Allocation:
Php 30,000,000"
|
June 3, 2024 |
2024 |
|
SR2024-01-004552 |
January 29, 2024 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
"From:
Manuel S. Agyao Boulevard - K0502 + 022 - K0503 + 140, K0506 + 000 - K0506 + 846, K0510 + 800 - K0512 + 444;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
7.252 Lane Km;
Allocation:
Php 78,132,000"
"To:
Manuel S. Agyao Boulevard - K0502 + 022 - K0503 + 140, K0506 + 000 - K0506 + 846, K0510 + 800 - K0511 + 311;
Type of Work:
Preventive Maintenance of Road: Asphalt Overlay;
Physical Target:
6.924 Lane Km;
Allocation:
Php 78,132,000"
|
June 3, 2024 |
2024 |
WIN4XY00231 |
SR2024-01-007913 |
January 31, 2024 |
Region VIII |
Regional Office VIII |
Convergence and Special Support Program (CSSP)
Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Construction of Barangay Tebalawon to Barangay Tawagan, Arteche, Eastern Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 45.355 M
:3.694 Lane Km
EAO P 1.645M
Total P 47.00 M
AS MODIFIED:
Construction of Barangay Tebalawon to Barangay Tawagan, Arteche, Eastern Samar
Physical Target: Allocation:
CW1-Construction of Concrete Road P 24.49412523 M
:1.440060Lane Km
CW2-Construction of Road Slope Protection P 10.53578141 M
Structure: 1,240.69 Square meters
CW3-Construction of Drainage Structure P 10.32509336 M
along Road: 1,440.060 Lineal meters
EAO P 1.645M
Total P 47.00 M
|
June 3, 2024 |
2024 |
WIN4XY00232 |
GAA 2024 |
January 1, 2024 |
Region VIII |
Leyte 1st District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Preventive Maintenance - Primary Roads
AS PER GAA/ORIGINAL:
Palo-Carigara-Ormoc Rd - K0937 + 000 - K0938 + 076
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 26.924520 M
Asphalt Overlay : 4.324 Lane Km
EAO P 0.549480 M
Total P 27.474 M
AS MODIFIED:
Palo-Carigara-Ormoc Rd - K0937 + 231 - K0938 + 076
Physical Target: Allocation:
CW1-Preventive Maintenance of Road: P 26.924520 M
Asphalt Overlay : 3.400 Lane Km
EAO P 0.549480 M
Total P 27.474 M
|
June 3, 2024 |
2024 |
|
GAA 2024 |
December 29, 2023 |
Region VIII |
Leyte 5th District Engineering Office |
OO1: Ensure Safe and Reliable National Road System
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads- Primary Roads
AS PER GAA/ORIGINAL:
Tacloban-Baybay South Rd - K0992 + 207 - K0992 + 268, K0992 + 330 - K0992 + 334.5, K0992 + 334.5 - K0992 + 339, K0992 + 339 - K0992 + 348, K0992 + 470 - K0992 + 505.5, K0992 + 550 - K0992 + 559, K0992 + 998.5 - K0993 + 000
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 2.163840 M
: 0.203 Lane Km
EAO P 0.44160 M
Total P 2.208 M
AS MODIFIED:
Tacloban - Baybay South Rd. - K0992+214.60 - K0992+261.90, K0992+406.20 - K0992+415.7, K0992+420.20 - K0992+434, K0992+530 - K0992+545.80, K0992+545.80 - K0992+554.10, K0992+563 - K0992+571.30, K0992+580 - K0992+584.20, K0992+678 - K0992+709.20, K0992+837.25 - K0992+846.25, K0992+850.75 - K0992+855.25, K0992+914.68 - K0992+926.88, K0992+998.60 - K0993+000
Physical Target: Allocation:
CW1-Reconstruction to Concrete Pavement P 2.163840 M
: 0.2331 Lane Km
EAO P 0.44160 M
Total P 2.208 M
|
June 3, 2024 |
2024 |
|
GAA 2024 |
December 29, 2023 |
Region VIII |
Leyte 5th District Engineering Office |
Convergence and Special Support Program
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
AS PER GAA/ORIGINAL:
Construction of Road, Sitio Caraga, Barangay Libertad, Hilongos, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road P 4.950 M
: 0.500 Lane Km
EAO P 0.050 M
Total P 5.00 M
AS MODIFIED:
Construction of Road, Sitio Carnaga, Barangay Libertad, Hilongos, Leyte
Physical Target: Allocation:
CW1-Construction of Concrete Road P 4.950 M
: 0.500 Lane Km
EAO P 0.050 M
Total P 5.00 M
|
June 3, 2024 |
FY 2024 GAA |
P00802413MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Digos-Makar Rd - K1569 + 215 - K1570 + 708
Physical Target:
CW1: 3.000 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Digos-Makar Rd - K1569 + 240 - K1570 + 263
Physical Target:
CW1: 6.180 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00 |
June 3, 2024 |
FY 2024 GAA |
P00803777MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Davao-Cotabato Rd (Jct. Digos-Cotabato Sect) - K1585 + 700 - K1586 + 700
Physical Target:
CW1: 3.928 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 75,000,000.00
CW1: P 72,375,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,625,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Davao-Cotabato Rd (Jct. Digos-Cotabato Sect) - K1585 + 700 - K1586 + 945
Physical Target:
CW1: 4.908 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 75,000,000.00
CW1: P 72,375,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,625,000.00 |
June 3, 2024 |
FY 2024 GAA |
P00803822MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao de Oro 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Montevista-Compostela-Mati Bdry Rd - K1434 + 018 - K1438 + 000 (Section 2)
Physical Target:
CW1: 7.912 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,250,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Tertiary Roads
Montevista-Compostela-Mati Bdry Rd - K1434 + 000 - K1438 + 002,
K1470 + 773 - K1473 + 000, K1477 + 000 - K1478 + 794 (Section 2)
Physical Target:
CW1: 18.805 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 150,000,000.00
CW1: P 144,750,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 5,250,000.00 |
June 3, 2024 |
FY 2024 GAA |
P00803791MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao del Sur District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Asphalt Overlay - Davao-Cotabato Road, Davao del Sur
Physical Target:
CW1: 6.000 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 98,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,000,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Asphalt Overlay - Davao-Cotabato Road, Davao del Sur
Physical Target:
CW1: 6.560 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 98,000,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 2,000,000.00 |
June 3, 2024 |
FY 2024 GAA |
P00802409MN |
FY 2024 GAA RA 11975 |
January 1, 2023 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Davao-Cotabato Rd (Davao City-Jct. Digos Sect) - K1526 + 385 - K1527 + 714.50
Physical Target:
CW1: 2.633 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Davao-Cotabato Rd (Davao City-Jct. Digos Sect) - K1526 + 385 - K1527 + 418
Physical Target:
CW1: 6.120 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00 |
June 3, 2024 |
FY 2024 GAA |
P00803805MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao de Oro 2nd District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Nabunturan-Maragusan Rd - K1466 + 025 - K1466 + 527,
K1466 + 539 - K1473 + 093, K1473 + 118 - K1473 + 587
Physical Target:
CW1: 15.050 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Nabunturan-Maragusan Rd - K1466 + 025 - K1466 + 527, K1466 + 539 - K1472 + 264
Physical Target:
CW1: 12.130 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00 |
May 31, 2024 |
2024 |
300226111464000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
FROM:
Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building, Barangay Parug- Parug, Peñablanca, Cagayan-
Package 2
TO:
Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/ Facilities to support Social Services - Construction of Multi-Purpose Building, Barangay Parug- Parug, Solana, Cagayan-
Package 2 |
May 31, 2024 |
2024 |
310101101182000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
Asset Preservation - Preventive Maintenance - Primary Roads - Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0437 + (-055) - K0441 + 576, K0441 + 600 - K0444 + 214, K0444 + 315 - K0445 + 676 |
May 31, 2024 |
2024 |
310101101183000 |
FY 2024 GAA |
January 3, 2023 |
Region II |
Cagayan 3rd District Engineering Office |
Asset Preservation - Preventive Maintenance - Primary Roads - Santiago - Tuguegarao Rd (S00724LZ) -K0434 + (-754) - K0436 + 971 |
May 30, 2024 |
FY 2024 |
P00800009MN |
SR2024-01-005237 |
January 30, 2024 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Maguindanao 2nd District Engineering Office |
Contract ID:
Amount: ₱120,000,000.00
From: Marbel-Allah Valley- Cotabato Rd- K1814 + 000 - K1815 + 833, K1817 + 940 - K1821 + 800
To: Marbel-Allah Valley- Cotabato Rd- K1814 + 000 - K1815 + 000, K1817 + 940 - K1821 + 682 |
May 30, 2024 |
FY 2024 |
P00800011MN |
SR2024-01-000917 |
January 26, 2024 |
Bangsamoro Autonomous Region in Muslim Mindanao |
Maguindanao 2nd District Engineering Office |
Contract ID:
Amount: ₱ 74,351,000.00
From: Marbel-Allah Valley-Cotabato Rd- K1781+598 - K1784+495
To: Marbel-Allah Valley-Cotabato Rd- K1781+598 - K1784+200 |
May 29, 2024 |
FY 2024 |
P00837257MN |
GAA 2024 |
January 24, 2024 |
Region XII |
Saranggani District Engineering Office |
Contract ID:
Amount: ₱ 40,000,000.00
From: Construction of Road, Alkikan-Datal Bila-Datal Batong Road, Malungon, Sarangani
CW-1- Construction of Concrete Road: 3.352 lane km
To: Construction of Road, Alkikan-Datal Bila-Datal Batong Road, Malungon, Sarangani
CW-1- Construction of Concrete Road: 4.149 lane km |
May 29, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Zambales 2nd District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Olongapo - Bugallon Rd - K0133+040, K0133+223.30, K0133+305.15, K0133+353.70, K0133+404.45, K0133+550, K0135+300, K0135+332, K0135+372.70
|
May 29, 2024 |
2024 |
WIN4XY00182 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Sta. Ignacia- Gerona - Pura - Guimba Rd - K0150+176 - k0151+680 |
May 29, 2024 |
2024 |
WIN4XY00181 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Tarlac District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads
Capas - San Jose -Mayantoc - Malacampa Road, Tarlac - K0162+070, K0163+508 - K0006+460 |
May 29, 2024 |
2024 |
WIN4F07942 |
FY 2024 GAA |
November 20, 2023 |
Region III |
Tarlac District Engineering Office |
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings / Facilities to Support Social Services
Construction (Completion) of Multi-Purpose Building at Barangay San Jacinto, Victoria, Tarlac |
May 29, 2024 |
2024 |
WIN4F07941 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Tarlac District Engineering Office |
Convergence and Special Support Program - Basic Infrastructure Program (BIP) - Multi-Purpose Buildings / Facilities to Support Social Services
Construction (Completion) of Multi-Purpose Building at Barangay Maluid, Victoria, Tarlac |
May 29, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Tarlac 2nd District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Tertiary Roads
Tarlac - Zambales Rd - K0117+780 - K0118+631, K0121+000 - K0121+636 |
May 29, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Zambales 1st District Engineering Office |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Secondary Roads
Olongapo - Bugallon Rd - K0233+000 - K0233+530, K0243+900- K0244+619, K0245+619 - K0246+950
|
May 29, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Zambales 1st District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Amungan - Palauig - Banlog Rd - K0213+878 - K0215+551, K0216+532 - K0217+077, K0223+000 - K0223+550 |
May 29, 2024 |
2024 |
|
FY 2024 GAA |
November 20, 2023 |
Region III |
Zambales 2nd District Engineering Office |
Network Development Program - Road Widening - Secondary Roads
Olongapo - Bugallon Rd - K0151+047 - K0151+069, K0151+131 - K0151+380 |
May 29, 2024 |
2024 |
310209100481000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Batanes District Engineering Office |
FROM:
Network Development - Off-Carriageway Improvement - Tertiary Roads - Mayan-Mauyen Port Rd - K0001 + 273 - K0002 + 120
TO:
Network Development - Off-Carriageway Improvement - Tertiary Roads - Mayan-Mauyen Port Rd - K0001 + 176.70 - K0001 + 626 |
May 29, 2024 |
2024 |
310106101101000 |
FY 2024 GAA |
January 4, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
FROM:
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Peñablanca-Callao Cave Rd - K0481+166 - K0482+558
TO:
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads - Peñablanca-Callao Cave Rd - Peñablanca- Callao Cave Rd- K0480+500- K0481+076, K0481+180- K0481+360, K0481+423- K0481+765, K0481+887- K0482+292, K0482+342- K0482+558 |
May 29, 2024 |
2024 |
310110100499000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Cagayan 3rd District Engineering Office |
FROM:
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads - Santiago-Tuguegarao Rd (Jct Kalinga-Tuguegarao Sect) - K0437 + 500 - K0438 + 000
TO:
Asset Preservation - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Primary Roads - Santiago-Tuguegarao Rd (Jct Kalinga-Tuguegarao Sect) - K0437 + 440 – K0438 + 010 |
May 29, 2024 |
2024 |
310203100803000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Nueva Vizcaya District Engineering Office |
FROM:
Network Development - Road Widening - Tertiary Roads - Bagabag Div Rd -K0284 + (-565) - K284 + (-134)
TO:
Network Development - Road Widening - Tertiary Roads - Bagabag Div Rd - K0284 + 205 – K0284 + 480, K0285 + 472 – K0286 + 000 |
May 29, 2024 |
FY 2024 |
P00803751MN |
GAA 2024 |
January 24, 2024 |
Region XII |
Saranggani District Engineering Office |
Contract ID:
Amount: ₱ 35,000,000.00
From: Widening of Aquino Bridge (B01053MN) along Sarangani - Sultan Kudarat Coastal Road
CW-1- Widening of Bridge 280.795 square meter
To: Widening of Aquino Bridge (B01053MN) along Sarangani - Davao del Sur Coastal Road
CW-1- Widening of Bridge 280.795 square meter |
May 28, 2024 |
CY 2024 |
|
SR2024-01-005842 |
January 30, 2024 |
National Capital Region |
South Manila District Engineering Office |
As per GAA/Original
UACS No. 320101110325000
Project ID.: P00823255LZ
OO2: Protect Lives and Properties Against Major Floods
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement Of Laagus Nilad Pumping Station, Manila City Phase 2
Physical Target: CW1 = Construction of Flood Mitigation Facility = 1 Facility
Unit Cost (P’000) = P 96,500,000.00/no. of facility
Allocation = P 96,500,000.00
EAO = P 3,500,000.00
Total = P 100,000,000.00
As Modified
OO2: Protect Lives and Properties Against Major Floods
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement Of Lagusnilad Pumping Station, Manila City Phase 2
Physical Target: CW1 = Construction of Flood Mitigation Facility = 1 Facility
Unit Cost (P’000) = P 96,500,000.00/no. of facility
Allocation = P 96,500,000.00
EAO = P 3,500,000.00
Total = P 100,000,000.00
|
May 28, 2024 |
CY 2024 |
|
UACS No. 320101110324000 |
January 30, 2024 |
National Capital Region |
South Manila District Engineering Office |
As per GAA/Original
UACS No. 320101110324000
Project ID.: P00823254LZ
OO2: Protect Lives and Properties Against Major Floods
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection at Baseco Compound, Port Area Manila, Sta. 00 + 294.50 to Sa. 0 + 589, Phase 2, Manila San Andres, Manila
Physical Target: CW1 = Construction of Slope Protection Structure = 3,534.00 Square meters
Unit Cost (P’000) = P 27,306.17/square meters
Allocation = P 96,500,000.00
EAO = P 3,500,000.00
Total = P 100,000,000.00
As Modified
OO2: Protect Lives and Properties Against Major Floods
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Slope Protection at Baseco Compound, Port Area Manila, Sta. 0 + 294.50 to Sta. 0 + 589, Phase 2
Physical Target: CW1 = Construction of Slope Protection Structure = 3,534.00 Square meters
Unit Cost (P’000) = P 27,306.17/square meters
Allocation = P 96,500,000.00
EAO = P 3,500,000.00
Total = P 100,000,000.00
|
May 28, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Bataan 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Tertiary Roads
Enrique A. Garcia Ave. (S01421LZ), K0124+242 - K0125+338, (S01422LZ), K0125+(-332) - K0125+764 |
May 28, 2024 |
2024 |
WIN4XY00203 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bataan 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Roman Expressway - K0122+1007 - K0123+249 |
May 28, 2024 |
2024 |
WIN4XY00205 |
FY 2024 GAA |
December 20, 2023 |
Region III |
Bataan 2nd District Engineering Office |
Asset Preservation Program - Preventive Maintenance - Secondary Roads
Roman Expressway - K0120+688 - K0121+200, K0121+400 - K0121+855, K0122+946 - K0122+1007 |
May 28, 2024 |
2024 |
WIN4E03344 |
GAA 2024 |
January 1, 2024 |
Cordillera Administrative Region |
Baguio City District Engineering Office |
"From:
Kennon Rd - K0241 + 328 - K0241 + 529, K0242 + 850 - K0242 + 890;
Type of Work:
CW1: Construction of Road Slope Protection Structure
CW2: Road Widening;
Physical Target:
CW1: 1978 Square meters
CW2: 0.442 Lane Km ;
Allocation:
Php 44,376,000"
"To:
Kennon Rd - K0241 + 007 - K0241 + 192, K0241 + 328 - K0241 + 476;
Type of Work:
CW1: Construction of Road Slope Protection Structure
CW2: Road Widening;
Physical Target:
CW1: 1487 Square meters
CW2: 0.319 Lane Km;
Allocation:
Php 44,376,000"
|
May 28, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Zambales 2nd District Engineering Office |
Asset Preservation Program - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary Roads
Olongapo-Bugallon Rd- K0144+200 - K0144+340, K0144+560 - K0145+380 |
May 28, 2024 |
FY 2024 GAA |
P00802412MN |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Digos-Makar Rd - K1565 + 636 - K1567 + 400
Physical Target:
CW1: 3.266 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads
Digos-Makar Rd - K1565 + 636 - K1566 + 561
Physical Target:
CW1: 5.580 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00 |
May 27, 2024 |
2024 |
310104100638000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Regional Office II |
FROM:
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Manila North Rd - K0680 + 000 - K0682 + 000, K0684 + 817 - K0685 + 000, K0685 + 000 - K0685 + 495
TO:
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads - Manila North Rd - K0680 + 000 - K0682 + 000, K0684 + 000 - K0684 + 740, K0684 + 817 - K0685 + 495
|
May 27, 2024 |
2024 |
310101101188000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Regional Office II |
FROM:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0366 + 000 - K0366 + 481
TO:
OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Primary Roads - Daang Maharlika (LZ) - K0366 + 000 - K0366 + 337
|
May 27, 2024 |
2024 |
310104100637000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Regional Office II |
FROM:
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved - Roads - Primary Roads - Manila North Rd - K0595 + 000 - K0599 + 690
TO:
Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved - Roads - Primary Roads - Manila North Rd - K0595 + 000 - K0599 + 810, K0600 + 000 - K0600 + 979.7 |
May 27, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Regional Office III |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Manila North Road - K0048+720 - K0048+824, K0048+836 - K0048+960, K0048+972 - K0049+049, K0049+066 - K0049+142, K0049+169 - K0049+243, K0049+271 - K0049+544, K0049+668 - K0049+833 |
May 27, 2024 |
FY 2024 |
|
320102106992000 |
April 15, 2024 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
UACS No. 320102106992000 Project ID: P00821213MN OO2: Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure along Zamboanga del Sur Coastal Rd (Saloagan Bridge Section) Barangay Saloagan, Dimataling, Zamboanga del Sur
CW1 - Construction of Flood Mitigation Structure: 177.0 Lineal Meters
Unit Cost: ₱ 110,734.46/ Lineal Meters
EAO: ₱ 400,000.00
Allocation: ₱ 20,000,000.00 |
May 27, 2024 |
FY 2024 |
|
320102106993000 |
April 15, 2024 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
UACS No. 320102106993000 Project ID: P00821214MN OO2: Protect Lives and Properties Against Major Floods - Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers
Construction of Flood Control Structure along Dipili River, Barangay Dipili, Bayog, Zamboanga del Sur
CW1 - Construction of Flood Mitigation Structure: 247.80 Lineal Meters
Unit Cost: ₱ 158,192.09/ Lineal Meters
EAO: ₱ 800,000.00
Allocation: ₱ 40,000,000.00 |
May 27, 2024 |
FY 2024 |
|
300215104000000 |
April 4, 2024 |
Region IX |
Regional Office IX |
UACS No. 300215104000000
Project ID: P00834834MN
Convergence and Special Support Program (CSSP)– Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/Facilities
Construction of Road, Kabasalan (Buayan-Lacnapan), Godod Road, Zamboanga Sibugay
CW1- Construction of Concrete Road: 8.075 Lane km
Unit Cost: ₱ 19,120,743.03/ Lane km
EAO: ₱ 5,600,000.00
Allocation: ₱ 160,000,000.00 |
May 27, 2024 |
FY 2024 |
|
310203100784000 |
April 25, 2024 |
Region IX |
Regional Office IX |
UACS No. 310203100784000
Project ID: P00802691MN
OO1: Ensure Safe and Reliable National Road System – Network Development – Road Widening – Primary Roads
Jct Blancia - Molave - Josefina Road - K1652+(-843) - K1652+980, K1657+398.86 - K1658+005.02, K1665+000 - K1665+720
CW1- Road Widening: 6.25 Lane km
Unit Cost: ₱ 14,640,000.00/ Lane km ROW Acquisition: 10,000.00 Sq.m. Unit Cost: ₱ 500.00/sq.m.
EAO: ₱ 3,500,000.00
Allocation: ₱ 100,000,000.00 |
May 27, 2024 |
FY 2024 |
|
300224100045000 |
April 4, 2024 |
Region IX |
Regional Office IX |
UACS No. 300224100045000
Project ID: P00837281MN
Convergence and Special Support Program (CSSP)– Basic Infrastructure Program (BIP) - Coastal Roads/ Causeway for environmental protection/conservation
Construction of Mampang-Rio Hondo Coastal Road, Zamboanga City (Package 4)
CW1- Construction of Concrete Bridge: 569.538 Square meters
Unit Cost: ₱ 134,674.473/ Square meters
CW2- Construction of Road Slope Protection Structure/3,843.6 sq.m. Unit Cost: ₱ 5,816.09/sq.m.
ROW Acquisition - 9,600.00 sq.m.
EAO: ₱1,000,000.00
Allocation: ₱100,000,000.00 |
May 27, 2024 |
2024 |
|
FY 2024 GAA |
December 20, 2023 |
Region III |
Regional Office III |
Asset Preservation Program – Rehabilitation / Reconstruction / Upgrading of Damaged Paved Roads - Primary Roads
Daang Maharlika (LZ) - K0123+000 - K0123+338 |
May 27, 2024 |
2024 |
300214100661000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Regional Office II |
FROM:
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0271 + 522 - K0272 + 379, K0284 + 533 - K0285 + 000, K0286 + 202 - K0286 + 277, K0286 + 317 - K0287 + 000
TO:
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0249 + 000 - K0251 + 000, K0284 + 542.70 - K0286 + 525.70, K0286 + 565.60 - K0287 + 229.80, K0299 + 000 - K0300 + 603
|
May 27, 2024 |
FY 2024 GAA |
WIN4E03361 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao Oriental 1st District Engineering Office |
MODIFICATION:
FROM: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1647 + 000 - K1647 + 297, K1647 + 429 - K1647 + 497,
K1647 + 550 - K1647 + 750, K1647 + 750 - K1647 + 897, K1648 + 069 - K1648 + 443, K1648 + 443 - K1649 + 000,
K1649 + 000 - K1649 + 338, K1649 + 338 - K1649 + 404, K1640 + 466 - K1649 + 516, K1649 + 516 - K1649 + 616
Physical Target:
CW1: 22.368 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00
TO: OO1: Ensure Safe and Reliable National Road System - Asset Preservation - Preventive Maintenance - Secondary Roads
Surigao del Sur Bdry-Davao Or Coastal Rd - K1647 + 000 - K1647 + 297, K1647 + 429 - K1647 + 497,
K1647 + 550 - K1647 + 750, K1647 + 750 - K1647 + 897, K1648 + 069 - K1648 + 443, K1648 + 443 - K1649 + 000,
K1649 + 000 - K1649 + 338, K1649 + 338 - K1649 + 404, K1649 + 466 - K1649 + 516, K1649 + 516 - K1649 + 616
Physical Target:
CW1: 8.756 lane km (Preventive Maintenance of Road: Asphalt Overlay)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Preventive Maintenance of Road: Asphalt Overlay)
EAO: P 3,500,000.00 |
May 27, 2024 |
2024 |
310207100307000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Regional Office II |
FROM:
Network Development - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0330 + 000 - K0331 + 925
TO:
Network Development - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0330 + 002.70 - K0331 + 000.00, K0 331 + 503.00 - K0331 + 700
|
May 27, 2024 |
FY 2024 GAA |
WIN4E03362 |
FY 2024 GAA RA 11975 |
January 1, 2024 |
Region XI |
Davao Oriental 2nd District Engineering Office |
MODIFICATION:
FROM: Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Concrete Road: Brgy. Poblacion-Santos Baybay, Banaybanay, Davao Oriental
Physical Target:
CW1: 7.000 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00
TO: Convergence and Special Support Program - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/Facilities
Construction of Concrete Road: Brgy. Poblacion-Santos Baybay, Banaybanay, Davao Oriental
Physical Target:
CW1: 5.600 lane km (Construction of Concrete Road)
Allocation:
TOTAL: P 100,000,000.00
CW1: P 96,500,000.00 (Construction of Concrete Road)
EAO: P 3,500,000.00 |
May 27, 2024 |
2024 |
300214100660000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Regional Office II |
FROM:
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0249 + 801 - K0249 + 905, K0266 + 595 - K0267 + 042, K0268 + 473 - K0268 + 790
TO:
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0266 + (-008.20) - K0266 + 570, K0266 + 595 - K0267 + 298, K0267 + 312 - K0269 + 005 |
May 27, 2024 |
2024 |
300214100665000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Regional Office II |
FROM:
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0412 + 000 - K0413 + 836
TO:
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Daang Maharlika (LZ) - K0411 + 138 - K0411 + 965, K0415 + 177 - K0417 + 760 |
May 27, 2024 |
FY 2024 |
|
310106101061000 |
April 17, 2024 |
Region IX |
Regional Office IX |
UACS No. 310106101061000
Project ID: P00801257MN
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads
Tungusog-Tubig Indangan Rd - Chainage 4000 - Chainage 8470
CW1- Road Widening: 8.940 Lane km
Unit Cost: ₱ 14,191,275.17.00/ Lane km
EAO: ₱ 5,250,000.00
Allocation: ₱ 150,000,000.00 |
May 27, 2024 |
FY 2024 |
|
300221104865000 |
April 17, 2024 |
Region IX |
Regional Office IX |
UACS No. 300221104865000
Project ID: P00835919MN
Convergence and Special Support Program (CSSP)– Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Road/s leading to Major/Strategic Public Buildings/ Facilities
Rehabilitation of Junction Timbangan-Romandier Road Chainage 316 - 1516, Chainage 2286 - 3037, Indanan, Sulu
CW1- Rehabilitation of Paved Road: 3.902 Lane-km
Unit Cost: ₱ 12,685,802.15/ Lane-km
EAO: ₱500,000.00
Allocation: ₱50,000,000.00 |
May 27, 2024 |
2024 |
300214100658000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Regional Office II |
FROM:
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Cagayan Valley Rd - K0514 + 356 - K0514 + 880, K0538 + 093 - K0539 + 000, K0539 + 767 - K0539 + 795, K0529 + 606 - K0529 + 782, K0534 + 485 - K0535 + 000
TO:
Special Road Fund - Motor Vehicle Users Charge (MVUC) as per R.A. 11239 - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads along Cagayan Valley Rd - K0514 + 356 - K0514 + 878.30, K0515 + 274 - K0515 + 910, K0525 + 000 - K0525 + 432, K0529 + 600.9 - K0529 + 702, K0532 + 000 - K0532 + 703, K0534 + 483 - K0534 + 991, K0538 + 093 - K0539 + 000, K0539 + 767 - K0539 +795, K0543 + 527 - K0544 + 500.2, K0549 + 940 - K0550 + 094, K0551 + 427.90 - K0552 + 021, K0552 + 360.80 - K0552 + 821.10 |
May 27, 2024 |
FY 2024 |
P00833155MN |
GAA 2024 |
January 1, 2024 |
Region XII |
South Cotabato 2nd District Engineering Office |
Convergence and Special Support Program – Special Road Fund – Motor Vehicle Users Charge(MVUC) as per RA 11239
Amount: ₱2,720,000.00
From: Installation/ Application of Signage, Pavement Markings, and Street Lights along Midsayap – Marbel Rd – K1788 + 200 – K1789 + 200, Tantangan, South Cotabato
Road Safety: Pavement markings:1004.00 Ln.m.
To: Installation/ Application of Signage, Pavement Markings, and Street Lights along Midsayap – Marbel Rd – K1788 + 300 – K1788 + 970, Tantangan, South Cotabato
Road Safety: Road Signs - 25 Number of units
CW-2 – Road Safety: Roadway Lighting 24Number of units
|
May 27, 2024 |
FY 2024 |
P00833154MN |
GAA 2024 |
January 1, 2024 |
Region XII |
South Cotabato 2nd District Engineering Office |
Convergence and Special Support Program – Special Road Fund – Motor Vehicle Users Charge(MVUC) as per RA 11239
Amount: ₱2,590,000.00
From: Installation/ Application/Construction of Signage, Pavement Markings, Bollards, Sidewalk, and Street Lights along Midsayap-Marbel Rd - K1791 + 360 - K1792 + 360, Koronadal City, South Cotabato
Road Safety: Pavement markings 927.00 Ln.m.
To: Installation/ Application/Construction of Signage, Pavement Markings, Bollards, Sidewalk, and Street Lights along Midsayap-Marbel Rd - K1791 + 700 - K1792 + 700, Koronadal City, South Cotabato
Road Safety: Pavement markings - 927.00 ln.m
|
May 27, 2024 |
FY 2024 |
P00833146MN |
GAA 2024 |
January 1, 2024 |
Region XII |
South Cotabato 2nd District Engineering Office |
Convergence and Special Support Program – Special Road Fund – Motor Vehicle Users Charge(MVUC) as per RA 11239
Amount: ₱ 1,660,000.00
From: Installation of Road Safety Devices/ Facilities along Midsayap-Marbel Rd - K1781 + 000 - K1782 + 000, Dumadalig, Tantangan, South Cotabato
CW-1 -Road Safety: Solar / Reflectorized Pavement Studs:
200 Number of Units
To:Installation of Road Safety Devices/ Facilities along Midsayap-Marbel Rd - K1781 + 000 - K1781+600, Dumadalig, Tantangan, South Cotabato
CW-1-Road Safety: Road Signs=18.00 Number of units
CW-2 Road Safety: Roadway Lighting=11.00 Number of units
|
May 27, 2024 |
FY 2024 |
P00800501MN |
GAA 2024 |
January 1, 2024 |
Region XII |
South Cotabato 2nd District Engineering Office |
OO1: Ensure Safe and Reliable National Road System – Asset Preservation - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary Roads
Amount: ₱30,000,000.00
From: Construction of Road Slope Protection Structure - Surallah-Lake Sebu-Maitum Rd - K1785 + 624 - K1786 + 000
CW-1- Construction of Road Slope Protection Structure:
1,879.700Square Meters (m2)
To: Construction of Road Slope Protection Structure - Surallah-Lake Sebu-Maitum Rd - K1787+100 – K1787+260, K1787+340 – K1787+380, K1787+440 – K1787+640
CW-1- Construction of Road Slope Protection Structure:
3,412.00 Square Meters (m2)
|
May 27, 2024 |
FY 2024 |
P00800139MN |
GAA 2024 |
January 1, 2024 |
Region XII |
South Cotabato 2nd District Engineering Office |
OO1:Ensure Safe and Reliable National Road System– Network Development Program - Road Widening - Tertiary Roads
Amount: ₱ 35,000,000.00
From: Surallah-Lake Sebu-Maitum Rd- 1742+848 -1743+782, K1743+822 - K1744+126
CW1- Road Widening: 2.20 lane-km
To: Surallah-Lake Sebu-Maitum Rd - K1742 + 848 - K1743 + 768
CW1- Road Widening: 1.572 lane-km
|
May 27, 2024 |
FY 2024 |
P00837262MN |
300221106946000 |
January 2, 2024 |
Region XII |
South Cotabato 1st District Engineering Office |
Convergence and Special Support Program – Basic Infrastructure Program (BIP) - BIP - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
Amount: ₱ 10,000,000.00
From: Concreting of Road from Barangay Crossing Rubber to Barangay Palian, Tupi, South Cotabato, Sta. 0+000 - 1+500
To: Concreting of Road from Barangay Crossing Rubber to Barangay Palian, Tupi, South Cotabato, Sta. 0+000 – 0+760 |
May 25, 2024 |
2024 |
WIN4E03340 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. : 300204101502000
Project ID: P00832749MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading to Trades, Industries and Economic Zones (Roads Leveraging Linkages for Industry and Trade Infrastructure Program - ROLL-IT)
FROM:
Simulao - Imelda - Libertad Road connecting Oil Palm Plantation Sites and National Highway in support to Oil Palm IC, Bunawan, Agusan Del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.669 Lane Km
Allocation:
TOTAL: P 15,000,000
CW1: P 14,700,000
EAO: P 300,000,000
Unit Cost:
CW1: P 21,973,094.17/Lane Km
TO:
Simulao - Imelda - Libertad Road connecting Oil Palm Plantation Sites and National Highway in support to Oil Palm IC, Bunawan, Agusan Del Sur
Type of Work:
CW1- Construction of Concrete Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 0.412 Lane Km
CW2- 1,415.93 Square meters
Allocation:
TOTAL: P 15,000,000
CW1: P 12,167,156
CW2: P 2,532,844
EAO: P 300,000
Unit Cost:
CW1: P 29,531,932.04/Lane Km
CW2: P 1,788.82/Square meters
|
May 25, 2024 |
2024 |
WIN4E03333 |
FY 2024 GAA, R.A 11975 |
December 25, 2024 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. : 300221106983000
Project ID: P00837272MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Concreting of Purok 10 Agpangon to Purok 11 Barangay Poblacion, La Paz, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 2.641 Lane Km
Allocation:
TOTAL: P 30,000,000
CW1: P 29,700,000
EAO: P 300,000,000
Unit Cost:
CW1: P 11,245,740.25/Lane Km
TO:
Concreting of Purok 10 Agpangon to Purok 11 Barangay Poblacion, La Paz, Agusan del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 1.880 Lane Km
Allocation:
TOTAL: P 30,000,000
CW1: P 29,700,000
EAO: P 300,000,000
Unit Cost:
CW1: P 15,797,872.34/Lane Km
|
May 25, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Agusan del Sur 2nd District Engineering Office |
UACS No. : 300226116138000
Project ID: P00836926MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Multi-Purpose Buildings/ Facilities to support Social Services
FROM:
Construction of Multi-Purpose Building (Classrooms), West Bunawan National High School Building, Barangay Poblacion, Bunawa, Agusan del Sur
Type of Work:
CW1- Construction of Multi Purpose Building
Physical Target:
CW1- 1 Number of Buildings
Allocation:
TOTAL: P 5,000,000
CW1: P 4,950,000
EAO: P 50,000
Unit Cost:
CW1: P 4,950,000/ Number of Buildings
TO:
Construction of Multi-Purpose Building (Classrooms), West Bunawan National High School Building, Barangay Poblacion, Bunawan, Agusan del Sur
Type of Work:
CW1- Construction of Multi Purpose Building
Physical Target:
CW1- 1 Number of Buildings
Allocation:
TOTAL: P 5,000,000
CW1: P 4,950,000
EAO: P 50,000
Unit Cost:
CW1: P 4,950,000/ Number of Buildings
|
May 25, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Regional Office XIII |
UACS No. : 310104100705000
Project ID: P00801251MN
ORGANIZATIONAL OUTCOME 1 : Ensure Safe and Reliable National Road System - Asset Preservation Program - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads
- Primary Roads
FROM:
Daang Maharlika (Agusan-Davao Sect) - K1304 + (-404) - K1304 + (-200), K1312 + 690 - K1313 + 783, K1314 + 406 - K1314 + 501, K1314 + 525 - K1314 + 930, K1315 + 012 - K1315 + 085, K1316 + 000 - K1316 + 550, K1316 + 573 - K1317 + 629, K1320 + 439 - K1320 + 544, K1320 + 566 - K1320 + 666
Type of Work:
CW1- Rehabilitation of Paved Road
Physical Target:
CW1- 7.362 Lane Km
Allocation:
TOTAL: P 273,620,000
CW1: P 264,043,300
EAO: P 9,576,700
Unit Cost:
CW1: P 35,865,702.25/Lane Km
TO:
Daang Maharlika (Agusan-Davao Sect) - K1304 + (-404) - K1304 + (-200), K1312 + 690 - K1313 + 783, K1314 + 406 - K1314 + 501, K1314 + 525 - K1314 + 930, K1315 + 012 - K1315 + 085, K1316 + 000 - K1316 + 550, K1316 + 573 - K1317 + 629, K1320 + 439 - K1320 + 544, K1320 + 566 - K1320 + 666
Type of Work:
CW1- Rehabilitation of Paved Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 7.362 Lane Km
CW2- 4731.75 Square meters
Allocation:
TOTAL: P 273,620,000
CW1: P 200,946,775
CW2: P 63,096,525
EAO: P 9,576,700
Unit Cost:
CW1: P 23,017,958.19/Lane Km
CW2: P 13,334.71/ Square meters
|
May 25, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
UACS No. : 300203102827000
Project ID: P00830099MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Construction/ Improvement of Access Roads leading to Declared Tourism Destinations (Tourism Road Infrastructure Program - TRIP)
FROM:
NRJ Purok 3 Talisay Access Road leading to Cagwait White Beach, Lactudan, Cagwait, Surigao del Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 0.900 Lane Km
Allocation:
TOTAL: P 20,000,000
CW1: P 19,600,000
EAO: P 400,000
Unit Cost:
CW1: P 21,777,777.78/Lane Km
TO:
NRJ Purok 3 Talisay Access Road leading to Cagwait White Beach, Lactudan, Cagwait, Surigao del Sur
Type of Work:
CW1- Construction of Gravel Road
CW2- Construction of Road Slope Protection Structure
Physical Target:
CW1- 0.900 Lane Km
CW2- 4,199.200 Square meters
Allocation:
TOTAL: P 20,000,000
CW1: P 15,324,630
CW2: P 4,275,370
EAO: P 400,000
Unit Cost:
CW1: P 8,383,276.21/Lane Km
CW2: P 1,018.14/Square meters
|
May 25, 2024 |
2024 |
|
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
UACS No. : 300221107008000
Project ID: P00837278MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Basic Infrastructure Program (BIP) - BIP - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction of Road Networks, NEMSU-San Miguel Campus, San Miguel, Surigao del Norte Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 2.984 Lane Km
Allocation:
TOTAL: P 20,000,000
CW1: P 19,800,000
EAO: P 200,000
Unit Cost:
CW1: P 6,635,388.74/Lane Km
TO:
Construction of Road Networks, NEMSU-San Miguel Campus, San Miguel, Surigao del Norte Sur
Type of Work:
CW1- Construction of Concrete Road
Physical Target:
CW1- 2.754 Lane Km
Allocation:
TOTAL: P 20,000,000
CW1: P 19,800,000
EAO: P 200,000
Unit Cost:
CW1: P 7,189,542.48/Lane Km
|
May 25, 2024 |
2024 |
WIN4E03360 |
FY 2024 GAA, R.A 11975 |
December 25, 2023 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
UACS No. : 300215105139000
Project ID: P00835093MN
CONVERGENCE AND SPECIAL SUPPORT PROGRAM - Sustainable Infrastructure Projects Alleviating Gaps (SIPAG) - SIPAG - Access Roads and/or Bridges from the National Road/s leading to Major/ Strategic Public Buildings/ Facilities
FROM:
Construction/Completion of Bridge at Sitio Batas, Barangay San Roque, San Miguel, Surigao del Sur
Type of Work:
CW1- Construction of Bridge
Physical Target:
CW1- 286.351 Square meters
Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000
Unit Cost:
CW1: P 171,118.66/Square meters
TO:
Construction/Completion of Bridge at Sitio Batas, Barangay San Roque, San Miguel, Surigao del Sur
Type of Work:
CW1- Construction of Bridge
Physical Target:
CW1- 228.960 Square meters
Allocation:
TOTAL: P 50,000,000
CW1: P 49,000,000
EAO: P 1,000,000
Unit Cost:
CW1: P 214,011.18/Square meters
|
May 24, 2024 |
2024 |
310207100306000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Regional Office II |
FROM:
Network Development - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0322 + 164 - K0323 + 200, K0323 + 1017 - K0323 + 1073, K0323 + 505 - K0323 + 1017
TO:
Network Development - Off-Carriageway Improvement - Primary Roads - Daang Maharlika (LZ) - K0322 + 200.50 - K0322 + 590, K0323 + 000 – K0323 + 229.15 |
May 24, 2024 |
2024 |
310203100760000 |
FY 2024 GAA |
January 3, 2024 |
Region II |
Regional Office II |
FROM:
Network Development Program – Road Widening – Tertiary Roads
Naguilian - San Mariano Rd – K0384 + (-155) – K0385 + 565
TO:
Network Development Program – Road Widening – Tertiary Roads
Naguilian - San Mariano Rd – K0384 + (-155) – K0385 + 780 |