April 11, 2017 |
2017 |
WIN7G01119 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Construction/Improvement of Access Roads leading to Airports, Seaports, and declared Tourism Destinations - to declared Tourism Destinations -
Concreting of Road from Junction Highway to Ayala - La Paz Road leading to La Paz Resort (Package I), Zamboanga City, (1st LD)
Sta. 1961+897.50 - Sta. 1964+600.00
Allocation:
Php 100.000 M (Total)
Physical Target:
5.405 lane km (Road Concreting)
Unit Cost:
Php 18,501,387.60/lane km. (Road Concreting) |
April 11, 2017 |
2017 |
165003014600172 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Nueva Vizcaya 2nd District Engineering Office |
MFO 1 : NATIONAL ROAD NETWORK SERVICES
Asset Preservation of National Roads
Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide
Jct Natl Road-Bitnong-Blance-N Vizcaya Bdry Rd - K0265+598.10 - K0265+611.60
|
April 11, 2017 |
2017 |
WIN7G01097 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Structure (Poblacion Side) along Layawan River, Polanco, Zamboanga del Norte
K1+047.00 - K1+571.30
Allocation:
Php 100.000 Million (Total)
Php 99,583,018.22 (Const. of Flood Control Structure)
Php 416,981.78 (ROW Acquisition)
Physical Target:
524.30 lm (Const. of Flood Control Structure)
416.98 sq.m. (ROW Acquisition)
Unit Cost:
Php 189,935.19/ln.m. (Const. of Flood Control Structure)
Php 1,000/sq.m. (ROW Acquisition) |
April 11, 2017 |
2017 |
WIN7G01094 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Network Development - Improvement/Widening of National Roads - Other Primary Roads:
Road Widening including Drainage of Dipolog - Oroquieta National Road, Zamboanga del Norte 3rd DEO
K1796+480.00 - K1801+000.00,
K1801+000.00 - K1805+214.00
Allocation:
Php 262.710 Million (Total)
Php 260,709,999.90 (Road Widening)
Php 2,000,000.10 (ROW Acquisition)
Physical Target:
17.514 lane km (Road Widening)
8,757 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,885,805.64/ lane km (Road Widening)
Php 228.39/sq.m. (ROW Acquisition) |
April 11, 2017 |
2017 |
WIN7G01093 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Network Development - Improvement/Widening of National Roads - Other Primary Roads -
Road Widening including Drainage of Liloy - Ipil Road, Zamboanga del Norte 2nd DEO
K1970+859.00 - K1975+860.00
Allocation:
Php 150.000 Million (Total)
Php 145,020,095.50 (Road Widening)
Php 4,979,904.50 (ROW Acquisition)
Physical Target:
10.002 lane km (Road Widening)
16,599.68 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,499,109.73/lane km (Road Widening)
Php 300.00/sq.m. (ROW Acquisition) |
April 10, 2017 |
FY 2017 |
WIN7E01188 |
UACS No. 165003014300244 |
January 1, 2017 |
National Capital Region |
North Manila District Engineering Office |
As per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Upgrading of Damaged Paved National Roads including Drainage based on PMS/HDM-4 – Tertiary – Reconstruction from Concrete to Concrete – Delpan Ext. Road – Chainage 200 – Chainage 318.30 (Reconstruction from Concrete to Concrete) 280mm
UACS No. 165003014300244
As Per GAA
Original: 0.237 ln-km
Unit Cost (‘000): P63,291.139/ln-km
Alloc. (‘000): P15,000.0
WIN7E01188
New
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including Drainage based on PMS/HDM-4 – Tertiary – Reconstruction from Concrete to Concrete – Delpan Ext. Road – Chainage 010.80-Chainage 347.78 (S02380LZ); Chainage (-)24.60 – Chainage 309.15 (S02381LZ) (Reconstruction from Concrete to Concrete) 300mm
UACS No. 165003014300244
Physical Target / Cost (‘000)
New: 0.711 ln-km
Unit Cost (‘000): P21,097.046 ln-km
Est. Cost (‘000): p15,000.0
WIN7E01188
|
April 10, 2017 |
2017 |
165003013800086 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 3rd District Engineering Office |
MFO 1: National Road Network Services
Asset Preservetion of National Roads Preventive Maintenance based on Pavement Management System/ Highway Development and Management - 4 (HDM-4) – Primary
Cauayan – Cabatuan Road (LZ) – K0370+(-090.20) – K0371+000, K0377+436 – K0377+511, K0377+549 – K0377+624
|
April 10, 2017 |
2017 |
165004050307212 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 3rd District Engineering Office |
LIP – Roads and Bridges – Local Roads
Concreting of Local Road, Barangay Sinamar Norte - Villa Fuerte, San Mateo, Isabela 0+000 – 0+673.50
|
April 10, 2017 |
2017 |
165004050307211 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 3rd District Engineering Office |
LIP – Roads and Bridges – Local Roads
Concreting of Dingading - Guam Local Road of Barangay Dingading - Guam, San Guillermo,Isabela 3rd LD 0+000 – 0+603
|
April 10, 2017 |
GAA FY 2017 |
WIN7G01207 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City 2nd District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage on Pavement Management System/Highway Development Management-4 (HDM-4) - Tertiary
Reconstruction from Concrete to Concrete - Calinan-Baguio-Cadalian Rd.
K1684+(-)020 - K1684+099,
K1684+288 - K1684+985,
K1695+570 - K1696+084,
K1696+949 - K1697+260
TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Tertiary
Rehab./Reconst./Upgrading of Damaged Paved along Calinan-Baguio-Cadalian Road including Drainage, Calinan Dist., Davao City
K1684+(-)020 - K1684+099,
K1684+288 - K1685+049.90,
K1695+570 - K1696+084,
K1696+513.18 - K1698+162.193
ALLOCATION: Php 49.500 Million |
April 10, 2017 |
GAA FY 2017 |
WIN7G01208 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City 2nd District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4
(HDM-4) - Tertiary
Reconstruction from Concrete to Concrete - Inawayan-Baracatan Rd-
K1540+385 - K1540+825
TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Tertiary
Rehab./Reconst./Upgrading of Damaged Paved along Inawayan-Baracatan Road including Drainage -
K1540+385 - K1540+820.77
ALLOCATION: Php 15.000 Million
|
April 10, 2017 |
FY 2017 |
WIN7E01208 |
FY 2017 APPROVED MODIFICATION |
March 28, 2017 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: MFO 1 - National Road Network Services: Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management - 4 (HDM-4) - Tertiary, Abatan-Mankayan-Cervantes Rd - K0334+-500 - K0334+-250, K0337+400 - K0338+000, K0340+270 - K0340+470, K0341+010 - K0341+210, K0344+000 - K0345+000 (Rehabilitation of Concrete Road)
Physical Target = 4.5 Lane Km
To: MFO 1 - National Road Network Services: Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management - 4 (HDM-4) - Tertiary, Abatan-Mankayan-Cervantes Rd - K0334+-500 - K0334+-250, K0337+400 - K0338+000, K0340+270 - K0340+470, K0341+010 - K0341+210, K0344+000 - K0344+850 (Rehabilitation of Concrete Road)
Physical Target = 4.10 Lane Km
|
April 10, 2017 |
FY 2017 |
WIN7E01175 |
FY 2017 APPROVED MODIFICATION |
March 28, 2017 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Guinaoang Flood Control, Guinaoang, Mankayan, Benguet [Construction of Flood Mitigation Structure]
Physical Target = 1,000 Lm
To: MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Guinaoang Flood Control, Guinaoang, Mankayan, Benguet [Construction of Flood Mitigation Structure]
Physical Target = 448 Lm
|
April 10, 2017 |
FY 2017 |
WIN7E01176 |
FY 2017 APPROVED MODIFICATION |
March 28, 2017 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Tublay Central Flood Control, Tublay, Benguet [Construction of Flood Mitigation Structure]
Physical Target = 667 Lm
To: MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Tublay Central Flood Control, Tublay, Benguet [Construction of Flood Mitigation Structure]
Physical Target = 463 Lm
|
April 10, 2017 |
FY 2017 |
WIN7F04552 |
FY 2017 APPROVED MODIFICATION |
March 28, 2017 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: Locally Funded Projects: Local Infrastructure Program - Roads and Bridges - Local Roads - Improvement of Ambongdolan Road, Ba-ayan, Tublay, Benguet (Rehabilitation of Concrete Road)
To: Locally Funded Projects: Local Infrastructure Program - Roads and Bridges - Local Roads - Improvement of Ambongdolan Road, Ambongdolan, Tublay, Benguet (Rehabilitation of Concrete Road)
Physical Target = 242 Lm
|
April 10, 2017 |
2017 |
165003030700066 |
SR2017-02-003014 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Modified:
Construction/Improvement of Access Roads leading to Airports. Seaports and declared Tourism Destinations - To Seaports - Construction/Improvement of Access Road leading to Seaports, Dapa Port-Consuelo-Corazon-Sta. Cruz-Sta. Fe-Libertad-Cabitoonan-Catangnan-General Luna, Surigao del Norte
Allocation - Php 58.00 Million
Physical Target - 3.29 lane km |
April 10, 2017 |
2017 |
165003030700065 |
SR2017-02-003009 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Seaports - Dapa Port-Consuelo-Corazon-Sta. Cruz-Sta. Fe-Libertad-Cabitoonan-Catangnan-General Luna Road (Cabitoonan-Catangnan Br. - Phase II), Surigao del Norte
Allocation - Php 200 Million
Physical Target - 1,888.92 sq.m. |
April 10, 2017 |
2017 |
165003030700067 |
SR2017-02-003017 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Seaports - Construction/Improvement of Access Road leading to Seaports, Dapa Port-Consuelo-Corazon-Sta. Cruz-Sta. Fe-Libertad-Cabitoonan-Catangnan-General Luna Road (Construction of Bridge 1 and Bridge 2), Surigao del Norte
Allocation:
- Php 70.00 Million (total)
- Php 51.62 Million (Br. 1)
- Php 18.38 Million (Br. 2)
Physical Target:
- 723.13 sq.m. (Br. 1)
- 351.07 sq.m. (Br. 2) |
April 10, 2017 |
2017 |
165003017100103 |
SR2017-02-002967 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes, including ROW - Tandag Bridge along Surigao-Davao Coastal Road (Construction of Parallel Bridge)
Allocation:
- Php 150.00 Million (Total)
- Php 149.50 Million (Bridge)
- Php 0.50 Million (ROW)
Physical Target:
- 1,103.033 sq.m. (Bridge)
- 260.417 sq.m. (ROW) |
April 10, 2017 |
GAA FY 2017 |
WIN7G01210 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City 2nd District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including drainage - Tertiary
Off-Carriageway Improvement: Shoulder Paving/Construction - Calinan-Baguio-Cadalian Rd -
K1698+515 - K1700+660
TO: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including drainage - Tertiary
Paving of Shoulders at Calinan-Baguio-Cadalian Road, Calinan District, Davao City -
K1698+461.43 - K1700+664.922
ALLOCATION: Php 30.560 Million |
April 10, 2017 |
2017 |
165003015400137 |
SR2017-02-002706 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Modified;
Network Development - Construction of Missing Gaps connecting National Roads, including ROW - Completion of the East-West Lateral Road connecting Agusan del Sur/Agusan del Norte to Bukidnon, San Miguel Proper (Surigao del Sur)-Calaitan 9Bayugan), Package 1, Surigao del Sur
Allocation - Php 200.00 Million
Physical Target - 11.56 lane km
|
April 10, 2017 |
GAA FY 2017 |
WIN7G01211 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City 2nd District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including drainage - Tertiary
Off-Carriageway Improvement: Shoulder Paving/Construction - Eden-Tagurano Rd -
K1537+575 - K1537+813,
K1537+(-)689 - K1537+562
TO: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including drainage - Tertiary
Paving of Shoulder with Drainage Improvement at Eden-Tagurano Rd, Toril District, Davao City
K1537+(-)689 - K1537+460.090,
K1537+804 - K1538+092.070
ALLOCATION: Php 20.100 Million |
April 10, 2017 |
2017 |
165003015300141 |
SR2017-02-003065 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Modified;
Network Development - Construction of Bypasses/Diversion Roads, including ROW - Construction of Bypass Road at Bislig City-San Isidro-San Antonio-San Jose, Bislig City incl. ROW, Surigao del Sur
Allocation:
- Php 200.00 Million (Total)
- Php 195.00 Million (Concrete Road)
- Php 5.00 Million (ROW)
Physical Target:
- 8.648 lane km (Concrete Road)
- 7,500.00 sq.m. (ROW)
|
April 10, 2017 |
GAA FY 2017 |
WIN7G01215 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City 2nd District Engineering Office |
MODIFICATION:
FROM: MFO 1- National Road Network Services
Network Development - Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary
Road Upgrading Gravel to Paved - Inawayan-Baracatan Rd -
K1544+960 - K1544+987,
K1545+320 - K1546+135
TO: MFO 1- National Road Network Services
Network Development - Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary
Road Upgrading (unpaved to paved) at Inawayan-Baracatan Road, Toril District, Davao City -
K1544+172.862 - K1544+990,
K1545+320 - K1546+140
ALLOCATION: Php 32.840 Million |
April 10, 2017 |
2017 |
165003015400133 |
SR2017-02-002669 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Modified;
Network Development - Construction of Missing Gaps connecting National Roads, including ROW - Completion of the East-West lateral road connecting Agusan Del Sur/Agusan del Norte to Bukidnon Sampaguita-Makilos (Agusan del Sur/Bukidnon Boundary) including bridge, Agusan del Sur, Package 2
Allocation:
- Php 150.00 Million
- Php 43,124,558.90 (Gravel Road)
- Php 106,875,441.10 (Concrete Bridge)
Physical Target:
- 2.20 lane km (Gravel Road)
- 961.632 sq.m. (Concrete Bridge) |
April 10, 2017 |
FY 2017 |
WIN7C01576 |
UACS NO. 165003014400070 |
January 1, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Roads Network Services.
Construction of Road Slope Protection Structure - Naga-Uling Road, K0037+(-145)-K0037+026
K0037+120-K0037+156
TO: MFO 1 - National Roads Network Services.
Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads- Naga-Uling Road, Sitio Apid, Brgy. Cantabaco, Toledo City
1. K0037+120-K0037+156
2. K0037+(-137)-K0037+026 |
April 10, 2017 |
FY 2017 |
WIN7C01587 |
UACS NO. 292003020403148 |
January 1, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
MODIFICATION:
FROM: MFO 2: Flood Management Service
Construction of Flood Control (Revetment) at Guinabasan River Basin along Toledo-Tabuelan-San Remegio Road, Santa. Lucia, Asturias, Cebu
Physical Target - 900 l.m.
TO: MFO 2: Flood Management Service
Construction of Revetment (Rubble Concrete) at Guinabasan River Basin along Toledo-Tabuelan-San Remegio Rd, Sta. 01+515 - Sta. 02+110, Brgy. Sta. Lucia, Asturias, Cebu
Physical Target - 1,190.00 l.m. |
April 10, 2017 |
2017 |
165003015400132 |
SR2017-02-002661 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW - Completion of the East-West lateral road connecting Agusan del Sur/Agusan del Norte to Bukidnon Sampaguita-Makilos (Agusan del Sur/Bukidnon Boundary), Agusan del Sur, Package 3
Allocation - Php 150.00 Million
Physical Target - 7.35 lane km |
April 10, 2017 |
FY 2017 |
WIN7C01591 |
UACS NO. 165003014700094 |
January 1, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
MODIFICATION:
FROM: MFO 1: National Roads Network Services
Construction of Drainage Structure along Road - Cebu-Toledo Wharf Rd (Uling-Toledo Wharf), K0048 + 716 - K0048 + 900, K0054 + 894 - K0054 + 950
Physical Target - 480 l.m.
TO: MFO 1: National Roads Network Services
Construction/Upgrading/Rehabilitation of Drainage along National Roads-Primary, Cebu-Toledo Wharf Rd (Uling-Toledo Wharf), K0054+317-K0055+000, Brgy. Luray 2, Toledo City, Cebu
Physical Target - 509 l.m. |
April 10, 2017 |
FY 2017 |
WIN7C01560 |
UACS NO. 165003016800113 |
January 1, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
MODIFICATION:
FROM: MFO 1: National Road Network Services
Off-Carriageway Improvement: Shoulder paving/Construction - Toledo-Tabuelan-San Remegio Rd, K0048+055 - K0048+441, K0048+454 - K0048+882, K0049+000 - K0049+510, K0055+361 - K0057+640, K0055+732 - K0059+929
Physical Target - 11,415.00 sq.m.
TO: MFO 1: National Road Network Services
Off-Carriageway Improvement along Toledo-
Tabuelan-San Remegio Rd (S00245CB) with Drainage, Section 1: K0048+(-409) - K0048+024, Section 2: K0048+055 - K0048+441, Section 3: K0048+454 - K0048+882, Section 4 : K0049+000 - K0050+361, Section 5 : K0055+361 - K0057+640
Physical Target - 14,526.00 sq.m. |
April 10, 2017 |
2017 |
165003015300162 |
Sr2017-02-002521 |
February 2, 2017 |
Region XIII |
Regional Office XIII |
Modified:
Network Development - Construction of Bypasses/Diversion Roads, including ROW - Daang Maharlika (Alternate Route) (NRJ-Mayor Democrito D. Plaza II Avenue-Las Nieves-Sibagat), (Don Francisco-Bilay Section) including bridge (Bilay Br.), Agusan Del Norte, Package 2
Allocation:
- Php 200.000 Million (Total)
- Php 40.896 Million (Concrete Road)
- Php 144.539 Million (Bridge)
- Php 14.065 Million (Gravel Road)
- Php 0.500 Million (ROW)
Physical Target:
- 0.582 lane km (Concrete Road)
- 1,152.430 sq.m. (Bridge)
- 0.360 lane km (Gravel Road)
- 162.000 sq.m. (ROW) |
April 10, 2017 |
FY 2017 |
WIN7C01602 |
UACS NO. 292003020403151 |
January 1, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
MODIFICATION:
FROM: MFO 2: Flood Management Service
Construction of Flood Control Sta. Ana River, K0060+564, Brgy. Sta. Ana, Poblacion, Barili, Cebu
TO: MFO 2: Flood Management Service
Construction of Revetment (Rubble Concrete) w/ Rechanneling at Sta. Ana River, Sta. 2+068 - Sta. 2+220, Brgy. Sta. Ana, Barili, Cebu |
April 10, 2017 |
FY 2017 |
WIN7C01575 |
UACS NO. 292003020403144 |
January 1, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
MODIFICATION:
FROM: MFO 2: Flood Management Service
Construction of Flood Control (Revetment) along Cebu 3rd LD-Toledo Wharf Road (Uling-Toledo Wharf Road), K0054+295, Luray, Toledo City, Cebu
Physical Target - 164 l.m.
TO: MFO 2: Flood Management Service
Construction of Flood Control (Revetment) along Cebu- Toledo Wharf Road (Uling-Toledo Wharf Road), K0054+295 (Sta. 00+910 - Sta. 01+025), Brgy. Luray 2, Toledo City, Cebu
Physical Target - 230 l.m. |
April 10, 2017 |
2017 |
165003016600080 |
SR2017-02-002476 |
February 2, 2017 |
Region XIII |
Regional Office XIII |
Modified:
Construction/Improvement of Access Roads leading to Airports, seaports and Declared Tourism Destinations - To Seaports - Construction/Improvement of Access Roads leading to Seaports, NRJ to Consuelo Port, Cantilan, Surigao del Sur
Allocation:
- Php 67.00 Million (Total)
- Php 55.923 Million (Concrete Road)
- Php 11.077 Million (Gravel Road)
Physical Target:
- 4.686 lane km (Concrete Road)
- 1.454 lane km (Gravel Road)
|
April 10, 2017 |
FY 2017 |
WIN7C01556 |
UACS NO. 165003014500222 |
January 1, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
MODIFICATION:
FROM: MFO 1: National Road Network Service
Construction of Road Slope Protection Structure - Toledo-Pinamungahan-Aloguinsan-Mantalongon Rd - K0078+023-K0078+048
Physical Target - 1,250 sq.m.
TO: MFO 1. National Road Network Service
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads w/ Slips, Slope Collapse and Landslide - Secondary Road, Toledo-Pinamungajan-Aloguinsan-Mantalongon Road (S00235CB), K0078+023-K0078+186, Aloguinsan, Cebu
Physical Target - 978.00 sq.m.-CW1
- 0.054 lane.km.-CW2 |
April 10, 2017 |
FY 2017 |
WIN7C01570 |
UACS NO. 292003020403150 |
January 1, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
MODIFICATION:
FROM; MFO 2: Flood Management Service
Construction of Flood Control (Rubble Concrete) at Sta. Ana River, Sta. 1+250 - Sta. 1+560, Brgy. Poblacion, Sta. Ana, Barili, Cebu
Physical Target - 620 l.m.
TO; MFO 2: Flood Management Service
Construction of Revetment (Rubble concrete) w/ Rechanneling at Sta. Ana River, Sta. 2+762 - Sta. 3+182, Brgy. Sta. Ana, Barili, Cebu
Physical Target - 840 l.m. |
April 10, 2017 |
2017 |
165003016600080 |
SR2017-02-002476 |
February 2, 2017 |
Region XIII |
Regional Office XIII |
Modified:
Network development - Improvement/Widening of National Roads - Other Primary - Improvement/Widening of National Roads, NRJ Cuevas - Bislig Rd - K1376+000 - K1378+600
Allocation - Php 100.148 Million
Physical Target - 5.20 lane km |
April 10, 2017 |
FY 2017 |
WIN7C01572 |
UACS NO. 165003015100302 |
January 1, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
MODIFICATION:
FROM; MFO 1: National Road Network Service
Road Widening -Toledo-Tabuelan-Sn Remegio Rd including ROW, K0048+(-863) - K0048+(-619)
Physical Target - 0.976 lane km. - CW1
- 2,440 sq.m. - ROW
TO; MFO 1: National Road Network Service
Improvement/ Road Widening (4 lanes) of Toledo-Tabuelan-Sn Remegio Rd, C.Y. 2017,
K0048+(-863) - K0048+(-570), Brgy. Sangi, Toledo City, Cebu
Physical Target - 1.172 lane km.-CW1
- 2,440 sq.m.-ROW
|
April 10, 2017 |
FY 2014 |
WIN7C01604 |
UACS NO. 165003014800162 |
January 1, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
MODIFICATION:
FROM; MFO 1: National Road Network Service
Construction of Drainage Structure along Road - Toledo-Pinamungajan-Aloguinsan-Mantalongon Rd - K0059+087, K0064+000
Physical Target - 56 l.m.
TO; MFO 1: National Road Network Service
Construction of Drainage Structure (1 unit Triple Barrel Box Culvert and 2 units Single Barrel Box Culvert) along Toledo-Pinamungajan-Aloguinsan-Mantalongon Road
Section 1 : K0059+087, Section 2 : K0064+000
Section 3 : K0063+915
Physical Target - 46.57 l.m. – CW1
- 174 sq.m. – CW2
- 147 l.m. – CW3 |
April 10, 2017 |
2017 |
165003015700164 |
SR2017-02-002917 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Modified:
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary - Road Upgrading (Unpaved to Paved), Dinagat-Loreto Road, K0065+200 - K0066+880, K0068+380 - K0068+716
Allocation - Php 123.456 Million
Physical Target - 4.00 lane km |
April 10, 2017 |
FY 2017 |
WIN7C01545 |
UACS NO. 292003020403153 |
January 1, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
MODIFICATION:
FROM; MFO 2: Flood Management Service
Construction of Flood Control Structure (Rubble Concrete) w/ Rechanneling Sta. Ana River, Sta. 0+600 - Sta. 2+250, Barili, Cebu
Physical Target - 1,300 l.m.
TO; MFO 2: Flood Management Service
Construction of Flood Control (Rubble Concrete) w/ Rechanneling at Sta. Ana River, Sta. 1+623-Sta. 1+936, Barili, Cebu 3rd LD
Physical Target - 626 l.m. – CW1
- 7,719.55 cu.m. – CW2
|
April 10, 2017 |
2017 |
165003015400131 |
SR2017-02-002654 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW - Completion of the East-West lateral road connecting Agusan del Sur/Agusan del Norte to Bukidnon Sampaguita-Makilos (Agusan del Sur/Bukidnon Boundary), Agusan del Sur, Package 1
Allocation - Php 150.00 Million
Physical Target - 7.36 lane km |
April 10, 2017 |
FY 2017 |
WIN7C01571 |
UACS NO. 292003020403145 |
January 1, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
MODIFICATION:
FROM; MFO 2: Flood Management Service
Construction of Flood Control (Revetment) at Camanchilles River along Toledo-Tabuelan-San Remegio Road, K0048+864, Sitio Camanchilles, Talavera, Toledo City, Cebu
Physical Target - 1,350 l.m.
TO; MFO 2: Flood Management Service
Construction of Flood Control (Revetment) at Camanchilles River along Toledo-Tabuelan-San Remegio Road, K0048+864 (Sta. 00+720-Sta. 01+280), Sitio Camanchilles, Talavera, Toledo City, Cebu
Physical Target - 1,120 l.m. - CW1
- 20,941.50 cu.m. - CW2 |
April 10, 2017 |
FY 2017 |
WIN7C01558 |
UACS NO. 165003014500225 |
January 1, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
MODIFICATION:
FROM: MFO 1: National Road Network Service
Construction of Road Slope Protection Structure - Cebu-Balamban Transcentral Highway - K0038+300 - K0038+500
Physical Target - 1,000 sq.m.
TO: MFO 1: National Road Network Service
- Construction of Road Slope Protection Structure along Cebu-Balamban Transcentral Highway (S00266CB) - K0038+737 - K0038+960, Brgy. Cansumoroy, Balamban, Cebu
Physical Target - 3,345 sq.m. |
April 10, 2017 |
2017 |
165003030700081 |
SR2017-02-003023 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Seaports - Construction/Improvement of Access Roads leading to seaports, Socorro Port-Jct. Songkoy-Sudlon-Sohoton Cove, Siargao, Surigao del Norte
Allocation - Php 100.00 Million
Physical Target - 5.34 lane km |
April 10, 2017 |
FY 2017 |
WIN7C01564 |
UACS NO. 292003020403146 |
January 1, 2017 |
Region VII |
Cebu 3rd District Engineering Office |
MODIFICATION:
FROM: MFO 2: Flood Management Service
Construction of Flood Control (Revetment) at Cantabaco-Ilag River along Cebu 3rd LD-Toledo Wharf Road(Jct. Naga-Uling), K0030+782-K0081+0, Brgy. Cantabaco, Toledo City, Cebu
Physical Target - 218 l.m.
TO: MFO 2: Flood Management Service
Construction of Flood Control (Revetment) at Cantabaco-Ilag River along Cebu-Toledo Wharf Road (Jct. Naga-Uling), Sta. 18+440-Sta. 18+690, Brgy. Cantabaco, Toledo City, Cebu
Physical Target - 290 l.m. |
April 8, 2017 |
2017 |
WIN7G00988 |
FY 2017 (R.A 10924) |
March 1, 2017 |
Region IX |
Regional Office IX |
Network Development - Improvement/Widening of National Roads - Other Primary Roads -
Road Widening including Drainage and RROW of Dipolog - Oroquieta National Road, Zamboanga del Norte 3rd DEO, (S01316MN),
K1820+113 - K1820+342,
K1820+363 - K1825+300
Allocation:
Php 155.490 Million (Total)
Php 149,515,367.51 (Road Widening)
Php 5,974,632.49 (ROW Acquisition)
Physical Target:
10.332 lane km (Road Widening)
5,974.63 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,515,367.51/lane km (Road Widening)
Php 1,000/sq.m. (ROW Acquisition) |
April 8, 2017 |
2017 |
WIN7G01127 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary
Road Upgrading (Gravel to Paved) of Sindangan - Bayog - Lakewood Rd., Zamboanga del Norte 1st DEO, (S01059MN)
Chainage 9969 - Chainage 13489
(Sta. 1938+810 - Sta. 1942+330)
Allocation:
Php 150.000 Million (Total)
Php 149,632,131.60 (Road Concreting)
Php 367,868.36 (ROW Acquisition)
Physical Target:
7.04 lane km (Road Concreting)
1,226.22 sq.m. (ROW Acquisition)
Unit Cost:
Php 21,254,564.15/lane km (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition) |
April 8, 2017 |
2017 |
WIN7G01144 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary
Road Upgrading (Gravel to Paved) of Liloy - Siocon Road, Zamboanga del Norte 2nd DEO, (S01146MN)
K2027+000.00 - K2029+550.00
Allocation:
Php 150.000 Million (Total)
Php 149,660,916.70 (Road Concreting)
Php 339,083.30 (ROW Acquisition)
Physical Target:
5.10 lane km (Road Concreting)
1,130 sq.m. (ROW Acquisition)
Unit Cost:
Php 29,345,277.78/lane km (Road Concreting)
Php 300.07/sq.m. (ROW Acquisition) |
April 8, 2017 |
2017 |
WIN7G00971 |
FY 2017 (R.A 10924) |
March 1, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (Unpaved to Paved of Eastern bobongan - Sominot - Midsalip - Dumingag Road,
(Chainage 7028 - Chainage 9368)
K1670+440.00 - K1672+780.00,
(Chainage 4334 - Chainage 6168)
K1667+746.00 - K1669+580.00
Allocation:
Php 150.000 Million (Total)
Php 149,581,756.60 (Road Concreting)
Php 418,243.37 (ROW Acquisition)
Physical Target:
8.348 lane km (Road Concreting)
1,394 sq.m. (ROW Acquisition)
Unit Cost:
Php 17,918,274.63/lane km (Road Concreting)
Php 300.03/sq.m. (ROW Acquisition) |
April 8, 2017 |
2017 |
WIN7G00970 |
FY 2017 (R.A 10924) |
March 1, 2017 |
Region IX |
Regional Office IX |
Network Development - Improvement/Widening of National Roads - Other Primary Roads -
Improvement/Widening of National Roads of Zamboanga City - Labuan - Limpapa Road, Zamboanga City 1st LD (S01185MN)
Sect. 1: K1966+780 - K1967+588,
Sect. 2: K1967+633 - K1969+027,
Sect. 3: K1969+170 - K1970+180
Allocation:
Php 79.270 Million (Total)
Php 77,985.193.11 (Road Widening)
Php 1,284,806.89 (Road Acquisition)
Physical Target:
6.424 lane km (Road Widening)
1,284.81 sq.m. (ROW Acquisition)
Unit Cost:
Php 12,139,662.69/lane km (Road Widening)
Php 1,000/sq.m. (ROW Acquisition) |
April 8, 2017 |
2017 |
WIN7C01507 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Structure along Dapitan River, Tutua - Polo Section along Dipolog - Oroquieta Road, Dapitan City, Zamboanga del Norte 1st LD
Left Side:
Beg. of Proj.: K0+000.00
End of Proj.: K0+642.00
Allocation:
Php 100.000 Million (Total)
Php 99,759,879.05 (Const. of Flood Control Structure)
Php 240,120.95 (ROW Acquisition)
Physical Target:
642.00 ln.m. (Const. of Flood Control Structure)
240.12 sq.m. (ROW Acquisition)
Unit Cost:
Php 155,389.22/ln.m. (Const. of Flood Control Structure)
Php 1,000/sq.m. (ROW Acquisition) |
April 8, 2017 |
2017 |
WIN7C01508 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary -
Road Upgrading (Gravel to Paved) Siocon - Sirawai - Sibuco - Limpapa Rd, Zamboanga del Norte 2nd DEO (S01165MN)
Chainage 3680 - Chainage 4280,
(K2114+680.00 - K2115+280.00)
Chainage 7880 - Chainage 8130
(K2118+880.00 - K2119+130.00)
Allocation:
Php 84.000 Million (Road Concreting)
Php 1,528,199.65 (ROW Acquisition)
Physical Target:
1.70 lane km (Road Concreting)
5,093 sq.m. (ROW Acquisition)
Unit Cost:
Php 48,512,823.74/lane km (Road Concreting)
Php 300.06/sq.m. (ROW Acquisition) |
April 8, 2017 |
2017 |
WIN7G01140 |
FY 2017 (R.A 10924) |
March 27, 2017 |
Region IX |
Regional Office IX |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Revetment along Mapangi River Basin, Kapalaran - Salug River, Tambulig, Zamboanga del Sur
Sta. 0+000.00 - Sta. 0+950.00
Allocation:
Php 100.000 Million (Total)
Php 99,733,444.65 (Const. of Flood Control Structure)
Php 266,555.35 (ROW Acquisition)
Physical Target:
950.00 ln.m. (Const. of Flood Control Structure)
888.51 sq.m. (ROW Acquisition)
Unit Cost:
Php 104,982.57/ln.m. (Const. of Flood Control Structure)
Php 300.00/sq.m. (ROW Acquisition) |
April 7, 2017 |
FY 2017 |
WIN7E01206 |
UACS No. 165003014200189 |
January 1, 2017 |
National Capital Region |
North Manila District Engineering Office |
Per GAA
MFO-1 National Road Network Services: Asset Preservation of National Roads – Rehabilitation/ Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4)-Secondary: Reconstruction from Concrete to Concrete: C-2 Road (S02319LZ) Chainage 537 – Chainage 1344.20 (Reconstruction from Concrete to Concrete)
UACS No. 165003014200189
Physical Target / Cost
Per GAA / Original
Physical Target: 1.614 lane.km
Unit Cost: P18,587.36M/lane.km
Allocation: P30M
WIN7E01206
As Modified
MFO-1 National Road Network Services: Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) – Secondary: Reconstruction from Concrete to Concrete including Drainage: C-2 Road (S02319LZ) Chainage 960.0 – Chainage 1344.0 Manila City (Reconstruction from Concrete to Concrete including Drainage)
UACS No. 165003014200189
As Modified
Per GAA / Original
Physical Target: 1.53 lane.km
Unit Cost: P19,607.84M/lane.km
Estimated Cost: P30M
WIN7E01206
|
April 6, 2017 |
2017 |
WIN7G00954 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Network Development - Construction of By-Passes/Diversion Roads including ROW -
Road Upgrading (Gravel to Paved) including ROW of Ipil Circumferential Road: Veterans - Tiayon - Don Andres Section, Zamboanga Sibugay 2nd LD,
K10+496.20 - K10+760.00,
K11+020.00 - K11+140.00,
K11+160.00 - K12+900.00
Allocation:
Php 91.200 Million (Total)
Php 82,549,172.60 (Road Concreting)
Php 8,650,827.40 (ROW Acquisition)
Physical Target:
4.248 lane km (Road Concreting)
28,836 sq.m. (ROW Acquisition)
Unit Cost:
Php 19,432,479.43/lane km (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition) |
April 6, 2017 |
2017 |
WIN7G00960 |
FY 2017 (R.A 10924) |
March 1, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary -
Road Upgrading (unpaved to paved) of Rizal - Dakak - Dapitan Coastal Loop Road, Zamboanga del Norte 3rd DEO, (S01038MN)
K1844+200 - K1844+828,
K1844+903 - K1845+419,
K1845+518 - K1846+107,
K1846+390 - K1846+570,
K1846+630 - K1846+812,
K1847+043 - K1848+245,
K1848+286 - K1848+966,
K1849+069 - K1849+540
Allocation:
Php 125.850 Million (Total)
Php 123,850,000.00 (Road Concreting)
Php 2.000 Million (ROW Acquisition)
Physical Target:
8.898 lane km (Road Concreting)
2,000 sq.m. (ROW Acquisition)
Unit Cost:
Php 13,918,858.16/lane km (Road Concreting)
Php 1,000/sq.m. (ROW Acquisition) |
April 6, 2017 |
2017 |
WIN7G00930 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Network Development - Construction of By-Passes/Diversion Roads including ROW -
Construction of Bypasses/Diversion Roads including ROW, Construction of Airport - Turno - Sinaman By-Pass Road, Zamboanga del Norte 1st DEO,
Sta. 8+089.00 - Sta. 9+613.80
Allocation:
Php 100.000 Million (Total)
Php 95,132,569.69 (Gravel Road)
Php 4,867,430.31 (ROW Acquisition)
Physical Target:
3.0496 lane km (Gravel Road)
4,867 sq.m. (ROW Acquisition)
Unit Cost:
Php 31,195,084.50/lane km (Gravel Road)
Php 1,000.09/sq.m. (ROW Acquisition) |
April 6, 2017 |
2017 |
WIN7G00952 |
FY 2017 (R.A 10924) |
March 1, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (Unpaved to Paved) of Zamboanga del Sur Coastal Road, Zamboanga del Sur 2nd DEO, (S01169MN)
Chainage 14610 - Chainage 16160,
Chainage 22024 - Chainage 23508.16
Allocation:
Php 100.000 M (Total)
Php 98.000 M (Road Concreting)
Php 2.000 M (ROW Acquisition)
Physical Target:
6.068 lane km (Road Concreting)
6,666 sq.m. (ROW Acquisition)
Unit Cost:
Php 16,150,296.64/lane km (Road Concreting)
Php 300.03/sq.m. (ROW Acquisition) |
April 6, 2017 |
2017 |
WIN7G00949 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Network Development - Improvement/Widening of National Roads - Other Primary -
Road Widening including Drainage of National Roads at Ipil - Liloy - Sindangan Road, Zamboanga Sibugay 2nd DEO, (S01139MN)
K1998+120 - K1999+905.51
Allocation:
Php 52.298 Million (Total)
Php 48,865,245.02 (Road Widening)
Php 3,432,754.98 (ROW Acquisition)
Physical Target:
3.57102 lane km (Road Widening)
11,442 sq.m. (ROW Acquisition)
Unit Cost:
Php 13,683,834.04/lane km. (Road Widening)
Php 300.01/sq.m. (ROW Acquisition) |
April 6, 2017 |
2017 |
WIN7G00964 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Network Development - Improvement/Widening of National Roads - Other Primary -
Road Widening including Drainage Dipolog - Sindangan - Liloy Road, Zamboanga del Norte 1st DEO, (S01057MN)
K1848+877.00 - K1852+971.70,
K1852+979.82 - K1853+220.53
Allocation:
Php 130.414 Million (Total)
Php 128,458,518.15 (Widening of Road)
Php 1,955,481.85 (ROW Acquisition)
Physical Target:
8.67 lane km (Widening of Road)
6,518 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,816,438.08/lane km (Widening of Road)
Php 300.01/sq.m. (ROW Acquisition) |
April 6, 2017 |
2017 |
WIN7G00962 |
FY 2017 (R.A 10924) |
March 1, 2017 |
Region IX |
Regional Office IX |
Network Development - Improvement/Widening of National Roads - Other Primary Roads -
Improvement/Widening of National Roads, Zamboanga City - Labuan - Limpapa Rd., Zamboanga City 1st LD, (S01185MN)
Sect. 1: K1970+180.00 - K1971+130.00,
Sect. 2: K1971+433.00 - K1972+065.92
Allocation:
Php 58.121 Million (Total)
Php 44,940,148.92 (Road Widening)
Php 13,180,851.08 (ROW Acquisition)
Physical Target:
3.16548 lane km (Road Widening)
13,180 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,196,946.09/lane km (Road Widening)
Php 1,000.06/sq.m. (ROW Acquisition) |
April 6, 2017 |
2017 |
WIN7G00963 |
FY 2017 (R.A 10924) |
March 1, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary -
Road Upgrading (Unpaved to Paved) of Siocon - Sirawai - Sibuco - Limpapa Road, Zamboanga del Norte 2nd DEO, (S01165MN)
Chainage 9380 - Chainage 9995
(K2120+380.00 - K2120+995.00)
Allocation:
Php 98.400 M (Total)
Php 98,004,621.72 (Road Concreting)
Php 395,378.28 (ROW Acquisition)
Physical Target:
1.23 lane km (Road Concreting)
1,317 sq.m. (ROW Acquisition)
Unit Cost:
Php 79,678,554.24/lane km (Road Concreting)
Php 300.21/sq.m. (ROW Acquisition) |
April 5, 2017 |
FY 2017 |
WIN7E01142 |
UACS No.165003014300245 |
January 1, 2017 |
National Capital Region |
North Manila District Engineering Office |
As per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on PMS/HDM-4 – Tertiary/ Reconstruction from Concrete to Concrete – H. Lopez Blvd – K0006+379 – K0007+020 (Reconstruction from concrete to concrete)
UACS No. 165003014300245
Physical Target/Cost (P’000)
Original: 0.19 ln-km
Unit Cost (P’000): P105,263.16/ln-km
Allocation (P’000): P20,000.0
Reference No.: WIN7E01142
As Modified
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on PMS-HDM-4 – Tertiary – H. Lopez Blvd – K0006+383.50 – K0006+611.25 (Reconstruction from Concrete to Concrete)
UACS No. 165003014300245
Physical Target/Cost (P’000)
New: 0.227/km; 0.911ln-km (4-lanes)
Unit Cost (P’000): P21,953.89/ln-km
Allocation (P’000): P20,000.0
Reference No.: WIN7E01142
|
April 5, 2017 |
FY 2017 |
WIN7E01139 |
UACS No. 292003020401923 |
January 1, 2017 |
National Capital Region |
North Manila District Engineering Office |
As per GAA
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Riverwall including pumping station at North Estero de Maypajo, Tondo (Construction of Flood Mitigation Structure)
UACS No.: 292003020401923
Physical Target/Cost (P’000)
Original: 111 lm
Unit Cost (P’000): P360.36/lm
Allocation: (P’000): P40,000.0
Reference No.: WIN7E01139
New
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Riverwall at North Estero de Maypajo, Tondo (Construction of Revetment)
UACS No.: 292003020401923
Physical Target/Cost (P’000)
Original: 110.6 lm
Unit Cost (P’000): P361.664/lm
Allocation: (P’000): P40,000.0
Reference No.: WIN7E01139
|
April 5, 2017 |
FY 2017 |
WIN7E01137 |
UACS No. 165003014200188 |
January 1, 2017 |
National Capital Region |
North Manila District Engineering Office |
As per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/Upgrading – Secondary – Reconstruction from Concrete to Concrete – Blumentritt Street (LZ) – Chainage 000 – Chainage 301.90 (Reconstruction from Concrete to concrete)
UACS No.: 165003014200188
Physical Target/Cost (P’000)
Original: 1.812 ln-km
Unit Cost (P’000): P4,415.01/ln-km
Allocation: (P’000): P8,000.0
Reference No.: WIN7E01137
New
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/Upgrading of Damaged Paved National Roads including Drainage Based on PMS/HDM-4- Secondary – Reconstruction from Concrete to Concrete – Blumentritt Street (LZ) – Chainage 000 – Chainage 255 (Reconstruction from concrete to concrete)
UACS No.: 165003014200188
Physical Target/Cost (P’000)
New: 1.53 ln-km
Unit Cost (P’000): P5,228.76/ln-km
Estimated Cost (P’000): P8,000.0
Reference No.: WIN7E01137
|
April 5, 2017 |
FY 2017 |
WIN7E01180 |
UACS No. 16004050306740 |
January 1, 2017 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA
Locally-Funded Projects: Local Infrastructure Program: Roads and Bridges: Local Roads: Improvement of Road including Drainage, Pulang Lupa 1, Las Piñas City (Improvement)
UACS No. 165004050306740
Physical Target/Cost (P’000):
Original: 1.0 km
Unit Cost (P’000): P 10M/km
Allocation (P’000): P10M
Ref. No. WIN7E01180
As Modified
Locally-Funded Projects: Local Infrastructure Program: Roads and Bridges: Local Roads: Improvement of Road including Drainage at (Mapayapa), Pulang Lupa 1, Las Piñas City (Improvement/Upgrading of Drainage Structure along Road)
UACS No. 165004050306740
Physical Target/Cost (P’000):
As modified .553 lane.km
Unit Cost (P’000): P 18,083.18M/lane.km
Allocation (P’000): P10M
Ref. No. WIN7E01180
|
April 5, 2017 |
2017 |
WIN7G00902 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary
Road Upgrading (Gravel to Paved) of Eastern Bobongan - Sominot - Midsalip - Dumingag Rd., Zamboanga del Sur 1st DEO, (S01325MN),
K1677+410.00 - K1679+740.00,
K1672+780.00 - K1674+230.00,
Allocation:
Php 150.000 M (Total)
Php 149,390,948.50 (Road Concreting)
Php 609,051.49 (ROW Acquisition)
Physical Target:
7.56 lane km. (Road Concreting)
2,030.17 sq.m. (ROW Acquisition)
Unit Cost:
Php 19,760,707.47/lane km. (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition) |
April 5, 2017 |
2017 |
WIN7G00951 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Network Development - Improvement/Widening of National Roads - along N1: Road Widening including Drainage of National Roads along N1 of Lanao - Pagadian - Zamboanga City Road, Zamboanga Sibugay 2nd DEO, (S01113MN),
K1770+539.00 - K1773+295.87,
K1773+323.83 - K1775+094.29
Allocation:
Php 136.168 Million (Total)
Php 131,167,999.90 (Road Widening)
Php 5,000,000.00 (ROW Acquisition)
Physical Target:
9.054 lane km. (Road Widening)
16,666 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,487,298.42/lane km. (Road Widening)
Php 300.01/sq.m. (ROW Acquisition) |
April 5, 2017 |
2017 |
WIN7G00928 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (Unpaved to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (Gravel to Paved) of Sindangan - Bayog - Lakewood Road, Zamboanga del Norte 1st DEO (S01059MN),
Chainage 15799 - Chainage 16899
(Sta. 1944+640 - Sta. 1945+740)
Allocation:
Php 120.00 Million (Total)
Php 119,532,198.60 (Road)
Php 467,801.37 (ROW Acquisition)
Physical Target:
2.20 lane km. (Road)
1,559.33 sq.m. (ROW Acquisition)
Unit Cost:
Php 54,332,817.55/lane km. (Road)
Php 300.00 sq.m. (ROW Acquisition) |
April 5, 2017 |
2017 |
WIN7G00929 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Network Development - Asset Preservation of National Roads Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development and Management-4 (HDM-4) - Primary -
Upgrading (Asphalt to Concrete) including Drainage of Sindangan - Liloy Road, Zamboanga del Norte 2nd DEO, (S01142MN),
K1936+955.60 - K1937+779.11,
K1937+819.49 - K1938+030.02,
K1938+970.07 - K1941+015.65,
K1941+995.51 - K1943+485.54
Allocation:
Php 119.081 Million (Total)
Php 118,265,737.80 (Road Concreting)
Php 815,262.20 (ROW Acquisition)
Physical Target:
9.06 lane km. (Road Concreting)
2,717.54 sq.m. (ROW Acquisition)
Unit Cost:
Php 13,053,613.44/lane km. (Road Conreting)
Php 300/sq.m. (ROW Acquisition) |
April 5, 2017 |
2017 |
WIN7G00965 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Network Development - Construction of By-Passes/Diversion Roads, including ROW:
Road Upgrading (Gravel to Paved) of Jct. Nat'l Highway Siocon - Jct. Nat'l Highway R.T. Lim, Poblacion Siocon - Brgy. Tagaytay Section, Zamboanga del Norte 2nd DEO,
Sect. 1: Sta. 0+000.00 - Sta. 3+279.38,
Sect. 2: Sta. 4+683.45 - Sta. 6+640.00
Allocation:
Php 150.000 Million (Total)
Php 147,954,500.40 (Road Concreting)
Php 2,045,499.60 (ROW Acquisition)
Physical Target:
10.472 lane km. (Road Concreting)
6,818 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,128,581.02/lane km. (Road Concreting)
Php 300.01 sq.m. (ROW Acquisition) |
April 5, 2017 |
2017 |
WIN7G00938 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary -
Road Upgrading (Gravel to Paved) of Liloy – Siocon Road, Zamboanga del Norte 2nd DEO, (S01146MN)
K2029+550.00 – K2030+253.74,
K2030+386.83 – K2031+957.31,
K2032+367.31 – K2033+520.00,
Allocation:
Php 150.000 Million (Total)
Php 149,727,250.24 (Road Concreting)
Php 272,749.76 (ROW Acquisition)
Physical Target:
6.854 lane km (Road Concreting)
909.17 sq.m. (ROW Acquisition)
Unit Cost:
Php 21,845,236.39/lane km (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition)
|
April 5, 2017 |
2017 |
WIN7G00906 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Labason River Control, Poblacion, Labason, Zamboanga del Norte 3rd LD,
Right Side - K0+000.00 - K0+441.32, K0+752.84 - K0+884.40,
Left Side - K0+540.00 - K0+878.28
Allocation:
Php 100.00 Million (Total)
Php 97,823,648.49 (Flood Mitigation Structure)
Php 2,176,351.51 (ROW Acquisition)
Physical Target:
911.16 lm (Flood Mitigation Structure)
7,254.50 sq.m. (ROW Acquisition)
Unit Cost:
Php 107,361.66/lm (Flood Mitigation Structure)
Php 300.00/sq.m. (ROW Acquisition)
|
April 5, 2017 |
2017 |
WIN7G00905 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of River Control along Kipit River, Brgy. Kipit, Labason, Zamboanga del Norte 3rd LD,
Upstream-Left Side - K0+270.00 - K0+785.00,
Downstream-Right Side - K0+000.00 - K0+400.00
Allocation:
Php 95.00 Million (Total)
Php 94,810,985.74 (Flood Mitigation Structure)
Php 189,014.26 (ROW Acquisition)
Physical Target:
915.00 lm (Flood Mitigation Structure)
630.05 sq.m. (ROW Acquisition)
Unit Cost:
Php 103,618.56/lm (Flood Mitigation Structure)
Php 300.00/sq.m. (ROW Acquisition) |
April 5, 2017 |
2017 |
WIN7G00948 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Network Development - Improvement/Widening of National Roads - Other Primary Roads:
Road Widening including Drainage of Liloy - Ipil Road, Zamboanga del Norte, 2nd DEO, (S01153MN)
K1975+860 - K1978+860,
Allocation:
Php 89.711 Million (Total)
Php 87,994,572.86 (Road Widening)
Php 1,716,427.14 (ROW Acquisition)
Physical Target:
6.00 lane km. (Road Widening)
5,721.42 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,665,762.14/lane km. (Road Widening)
Php 300.00/sq.m. (ROW Acquisition) |
April 5, 2017 |
2017 |
WIN7G00904 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Network Development - Improvement/Widening of National Roads - Secondary Road -
Improvements/Widening of National Roads of Zamboanga City - Labuan - Limpapa Rd., Zamboanga City 1st LD, (S01185MN)
K1957+427.00 - K1957+674.80,
K1957+750.00 - K1957+980.00,
K1964+400.00 - K1966+780.00
Allocation:
Php 71.73 Million (Total)
Php 69,395,311.78 (Road Widening)
Php 2,334,688.22 (ROW Acquisition)
Physical Target:
5.7156 lane kms. (Road Widening)
2,334.68 sq.m. (ROW Acquisition)
Unit Cost:
Php 12,141,387.04/lane km. (Road Widening)
Php 1,000.00/sq.m. (ROW Acquisition) |
April 5, 2017 |
2017 |
WIN7G00945 |
FY 2017 (R.A 10924) |
February 28, 2017 |
Region IX |
Regional Office IX |
Network Development - Improvement/Widening of National Roads - Primary Roads:
Road Widening including Drainage of National Roads - N1 of Lanao - Pagadian - Zamboanga City Road, Zamboanga Sibugay 2nd DEO, (S01113MN),
K1775+158.78 - K1776+923.25,
K1776+950.55 - K1777+366.00
Allocation:
Php 63.832 Million (Total)
Php 58,911,369.76 (Road Widening)
Php 4,920,630.24 (ROW Acquisition)
Physical Target:
4.36 lane km. (Road Widening)
16,402 sq.m. (ROW Acquisition)
Unit Cost:
Php 13,511,782.06/ lane km. (Road Widening)
Php 300/sq.m. (ROW Acquisition) |
April 5, 2017 |
GAA FY 2017 |
WIN7G01195 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City 2nd District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Tertiary
Road Widening - Davao-Cotabato Old Road including RROW -
K1526+(-)432 - K1526+301
TO: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Tertiary
Road Widening including Drainage and RROW at Davao-Cotabato Old Road, Toril District, Davao City
K1526+(-)432 - K1526+301
ALLOCATION: Php 33.00 Million |
April 5, 2017 |
GAA FY 2017 |
WIN7G01196 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City 2nd District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary
Construction of Road Slope Protection Structure - Davao-Bukidnon Rd -
K1641+782 - K1641+792,
K1645+115 - K1645+135,
K1664+150 - K1664+190,
K1655+830 - K1655+850
TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary
Rehab./Reconstruction of National Roads with Slips, Slope Collapses and Landslide along Davao-Bukidnon Road -
K1641+890 - K1641+990(L/S),
K1645+090 - K1645+160(R/S),
K1645+120 - K1645+170(L/S),
K1655+890 - K1655+930(R/S),
K1664+130 - K1664+218(L/S)
ALLOCATION: Php 42.652 Million |
April 5, 2017 |
GAA FY 2017 |
WIN7G01197 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City 2nd District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including drainage - Tertiary
Off-Carriageway Improvement: Shoulder Paving/Construction - Bayabas-Eden Rd -
K1528+393 - K1530+295
TO: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including drainage - Tertiary
Paving of Shoulder with Drainage Improvement at Bayabas-Eden Road, Toril District, Davao City
K1528+393 - K1530+280.715
ALLOCATION: Php 30.786 Million |
April 5, 2017 |
GAA FY 2017 |
WIN7G01198 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Davao City 2nd District Engineering Office |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Tertiary
Road Widening - Bayabas-Eden Rd,
K1526+(-)368 - K1526+198
TO: MFO1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Tertiary
Road Widening including Drainage at Bayabas-Eden Road, Toril District, Davao City
K1526+(-)320 - K1526+035
ALLOCATION: Php 15.00 Million |
April 4, 2017 |
FY 2017 |
WIN7E01120 |
FY 2017 APPROVED MODIFICATION |
March 16, 2017 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From : MFO 1 - National Road Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide along Gurel-Bokod-Kabayan-Buguias-Abatan Road. - K0351+970 - K0352+035, K0351+950 - K0352+055 [Construction of Slope Protection Structure] ; Physical Target = 2,565 sq.m.
To : MFO 1 - National Road Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide along Gurel-Bokod-Kabayan-Buguias-Abatan Road. - K0351+950 - K0352+363 [Construction of Slope Protection Structure] ; Physical Target = 4,706 sq.m. |
April 4, 2017 |
FY 2017 |
WIN7E01121 |
FY 2017 APPROVED MODIFICATION |
March 16, 2017 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From : MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Datakan Flood Control, Datakan, Kapangan, Benguet [Construction of Flood Mitigation Structure] ; Physical Target = 500 lm
To : MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Datakan Flood Control, Datakan, Kapangan, Benguet [Construction of Flood Mitigation Structure] ; Physical Target = 406 lm |
April 3, 2017 |
FY 2017 |
WIN7E01145 |
UACS No. 103004010310027 |
January 1, 2017 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As Per GAA
Locally-Funded Projects: Buildings and Other Structures: Multipurpose/Facilities: Construction of Multipurpose Building, (Police and Fire Station), and Other Improvements Ilaya, Las Piñas City
UACS No. 103004010310027
Physical Target/Cost (P’000):
Original: 1 bldg
Allocation (P’000): P4.000 M
Unit Cost (P’000): P 4,000/bldg..
Ref. No. WIN7E01145
As Modified
Locally-Funded Projects: Buildings/Other Structures: Multipurpose/Facilities: Completion of Multi-Purpose Building (Police and Fire Station) and Other Improvements Ilaya, Las Piñas City
UACS No. 103004010310027
Physical Target/Cost:
New: 1 bldg
Estimated Cost (P’000): P4.000 M
Unit Cost (P’000): P4,000/bldg.
Ref. No. WIN7E01145
|
April 3, 2017 |
FY 2017 |
WIN7E01143 |
UACS No. 103004010310029 |
January 1, 2017 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
Per GAA
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-purpose Building, Pulanglupa 2, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010310029
Physical Target/Cost:
Original: 1 bldg
Unit Cost (P’000): P4,000.0
Allocation (P’000): P4,000.0
Ref. No. WIN7E01143
As Modified
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building at Doña Julita, Pulang Lupa 2, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010310029
Physical Target/Cost:
New: 1 bldg
Unit Cost (P’000): P4,000.0
Estimated Cost : P4,000.0 M
Ref. No. WIN7E01143
|
April 3, 2017 |
FY 2017 |
WIN7E01134 |
UACS No. 103004010310031 |
January 1, 2017 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building (Covered Court), Talon 2, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010310031
Physical Target/Cost:
Original: 1 Bldg.
Unit Cost (P’000): P4,000.0/Bldg
Allocation (P’000): P4,000.0
Ref. No. WIN7E01134
As Modified
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building at BF Phase 3, West Talon 2, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010310031
Physical Target/Cost:
New: 1 bldg
Unit Cost (P’000): P4,000.0
Estimated Cost : P4,000.0 M
Ref. No. WIN7E01134
|
April 3, 2017 |
FY 2017 |
WIN7E01135 |
UACS No. 103004010310033 |
January 1, 2017 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building (Covered Court), Talon 5, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010310033
Physical Target/Cost:
Original: 1 Bldg.
Unit Cost (P’000): P4,000.0/Bldg
Allocation (P’000): P4,000.0
Ref. No. WIN7E01135
As Modified
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building at Moonwalk Phase 2, Talon 5, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010310033
Physical Target/Cost:
New: 1 bldg
Unit Cost (P’000): P4,000.0/Bldg.
Estimated Cost : P4,000.0 M
Ref. No. WIN7E01135
|
April 3, 2017 |
FY 2017 |
WIN7E01138 |
UACS No. 103004010309894 |
January 1, 2017 |
National Capital Region |
Las Piñas - Muntinlupa District Engineering Office |
As per GAA
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building (Covered Court), Barangay Almanza Dos, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010309894
Physical Target/Cost:
Original: 1 Bldg
Unit Cost (P’000): P5,000/Bldg.
Estimated Cost : P5,000.0 M
Ref. No. WIN7E01138
As Modified
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building (Phase I), Barangay Almanza Dos, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010309894
Physical Target/Cost:
New: 1 Bldg
Unit Cost (P’000): P5,000/Bldg.
Estimated Cost : P5,000.0 M
Ref. No. WIN7E01138
|
April 3, 2017 |
2017 |
165003014100119 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 1st District Engineering Office |
MFO 1 : NATIONAL ROAD NETWORK SERVICES, Asset Preservation of National Roads, Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management - 4 (HDM-4) , SANTIAGO-TUGUEGARAO RD - K0 424+142 – K0424+670, K0425+000 - K0 425+721, K0 430+000 – K0 431+000, K0 431+298.4 - K0 431+ 348.4, K0 431+360 –K0431+400, K0 431+430 - K0 431+506, K0 431+520 - K0 431+ 542.50, K0 431+620 – K0 432+000, K0 432+240- K0 432+316, K0 432+379 – K0 432+430, K0 433+193.5- K0 433+260 |
April 3, 2017 |
2017 |
165003014700074 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 1st District Engineering Office |
Construction of Drainage Structure along Road-Daang Maharlika (LZ)- K0427+327-K0428+005 (R/S); K0427+327-K0427+617 (L/S) |
April 3, 2017 |
2017 |
165003015100256 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 1st District Engineering Office |
MFO1: National Road Network Services, Network Development, Improvement/Widening of National Roads-Secondary, Road Widening and Reconstruction of Existing PCCP (thk. = 0.15m), Cabagan-Sta. Maria Road, K0452+282-K0452+400 |
April 3, 2017 |
2017 |
103004010310715 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 1st District Engineering Office |
Completion of Multi-Purpose Building, Calinaoan Centro, Sto. Tomas, Isabela |
March 31, 2017 |
2017 |
103004010310800 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Nueva Vizcaya District Engineering Office |
Locally Funded Project:
Local Infrastructure Program:
Buildings and Other Structures: Multipurpose/Facilities:
Construction of MultiPurpose Bldg., Ambaguio Central School, Ambaguio, Nueva Vizcaya |
March 31, 2017 |
2017 |
WIN7E01102 |
GAA FY 2017 |
January 2, 2017 |
Region III |
Zambales 1st District Engineering Office |
Asset Preservation of National Roads
Construction/Upgrading/Rehabilitation of Drainage along National Roads
Secondary Roads
Rehabilitation/Major Repair of Drainage Structure along Road - Olongapo - Bugallon Rd
K0181+563 - K0182+160
Cabangan, Zamabales
(Rehabilitation/Major Repair of Drainage Structure along Road) |
March 31, 2017 |
2017 |
WIN7E01047 |
GAA FY 2017 |
January 2, 2017 |
Region III |
Zambales 1st District Engineering Office |
Flood Control and Drainage
Drainage/Protection Works
Construction of Slope Protection/Flood Control at Sto. Niño River Dike,
Sta. 0+469 to Sta. 0+721
Cabangan, Zambales
(Construction of Slope Protection) |
March 31, 2017 |
2017 |
WIN7E01104 |
GAA FY 2017 |
January 2, 2017 |
Region III |
Zambales 1st District Engineering Office |
Roads and Bridges - Local Roads
Concreting of Namanaan Road located at San Narciso, Zambales
(Construction of Concrete Road) |
March 31, 2017 |
2017 |
165003015200106 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 2nd District Engineering Office |
Network Development - Improvement/Widening of National Roads - Tertiary – (Tuao-Rizal Section) K0530+(-1771)-K0531+499 |
March 31, 2017 |
2017 |
165003015800420 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 2nd District Engineering Office |
MFO-1 National Road Network Services- Network Development - Road Upgrading (unpaved to paved) - Tertiary Road Upgrading Gravel to Paved- Ayaga-Sta. Marcela-Flora- Lasam Rd. K0670 +(-806) – K0670+311,K0670+314-K0671 + 047, Chainage 1292-Chainage 2368, Chainage 2388- Chainage 3472 |
March 31, 2017 |
2017 |
165003030800329 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 2nd District Engineering Office |
Construction/ Improvement of Access Roads Leading to Declared Tourism Destination - Our Lady of Piat Diversion Road including Bridge and Approaches, Piat, Cagayan |