Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
April 11, 2017 2017 WIN7G01119 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Construction/Improvement of Access Roads leading to Airports, Seaports, and declared Tourism Destinations - to declared Tourism Destinations -
Concreting of Road from Junction Highway to Ayala - La Paz Road leading to La Paz Resort (Package I), Zamboanga City, (1st LD)
Sta. 1961+897.50 - Sta. 1964+600.00
Allocation:
Php 100.000 M (Total)
Physical Target:
5.405 lane km (Road Concreting)
Unit Cost:
Php 18,501,387.60/lane km. (Road Concreting)
April 11, 2017 2017 165003014600172 GAA FY 2017 January 1, 2017 Region II Nueva Vizcaya 2nd District Engineering Office
MFO 1 : NATIONAL ROAD NETWORK SERVICES
Asset Preservation of National Roads
Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide
Jct Natl Road-Bitnong-Blance-N Vizcaya Bdry Rd - K0265+598.10 - K0265+611.60
April 11, 2017 2017 WIN7G01097 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Structure (Poblacion Side) along Layawan River, Polanco, Zamboanga del Norte
K1+047.00 - K1+571.30
Allocation:
Php 100.000 Million (Total)
Php 99,583,018.22 (Const. of Flood Control Structure)
Php 416,981.78 (ROW Acquisition)
Physical Target:
524.30 lm (Const. of Flood Control Structure)
416.98 sq.m. (ROW Acquisition)
Unit Cost:
Php 189,935.19/ln.m. (Const. of Flood Control Structure)
Php 1,000/sq.m. (ROW Acquisition)
April 11, 2017 2017 WIN7G01094 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Network Development - Improvement/Widening of National Roads - Other Primary Roads:
Road Widening including Drainage of Dipolog - Oroquieta National Road, Zamboanga del Norte 3rd DEO
K1796+480.00 - K1801+000.00,
K1801+000.00 - K1805+214.00
Allocation:
Php 262.710 Million (Total)
Php 260,709,999.90 (Road Widening)
Php 2,000,000.10 (ROW Acquisition)
Physical Target:
17.514 lane km (Road Widening)
8,757 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,885,805.64/ lane km (Road Widening)
Php 228.39/sq.m. (ROW Acquisition)
April 11, 2017 2017 WIN7G01093 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Network Development - Improvement/Widening of National Roads - Other Primary Roads -
Road Widening including Drainage of Liloy - Ipil Road, Zamboanga del Norte 2nd DEO
K1970+859.00 - K1975+860.00
Allocation:
Php 150.000 Million (Total)
Php 145,020,095.50 (Road Widening)
Php 4,979,904.50 (ROW Acquisition)
Physical Target:
10.002 lane km (Road Widening)
16,599.68 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,499,109.73/lane km (Road Widening)
Php 300.00/sq.m. (ROW Acquisition)
April 10, 2017 FY 2017 WIN7E01188 UACS No. 165003014300244 January 1, 2017 National Capital Region North Manila District Engineering Office
As per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Upgrading of Damaged Paved National Roads including Drainage based on PMS/HDM-4 – Tertiary – Reconstruction from Concrete to Concrete – Delpan Ext. Road – Chainage 200 – Chainage 318.30 (Reconstruction from Concrete to Concrete) 280mm
UACS No. 165003014300244
As Per GAA
Original: 0.237 ln-km
Unit Cost (‘000): P63,291.139/ln-km
Alloc. (‘000): P15,000.0
WIN7E01188

New
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including Drainage based on PMS/HDM-4 – Tertiary – Reconstruction from Concrete to Concrete – Delpan Ext. Road – Chainage 010.80-Chainage 347.78 (S02380LZ); Chainage (-)24.60 – Chainage 309.15 (S02381LZ) (Reconstruction from Concrete to Concrete) 300mm
UACS No. 165003014300244
Physical Target / Cost (‘000)
New: 0.711 ln-km
Unit Cost (‘000): P21,097.046 ln-km
Est. Cost (‘000): p15,000.0
WIN7E01188
April 10, 2017 2017 165003013800086 GAA FY 2017 January 1, 2017 Region II Isabela 3rd District Engineering Office
MFO 1: National Road Network Services

Asset Preservetion of National Roads Preventive Maintenance based on Pavement Management System/ Highway Development and Management - 4 (HDM-4) – Primary

Cauayan – Cabatuan Road (LZ) – K0370+(-090.20) – K0371+000, K0377+436 – K0377+511, K0377+549 – K0377+624
April 10, 2017 2017 165004050307212 GAA FY 2017 January 1, 2017 Region II Isabela 3rd District Engineering Office
LIP – Roads and Bridges – Local Roads
Concreting of Local Road, Barangay Sinamar Norte - Villa Fuerte, San Mateo, Isabela 0+000 – 0+673.50
April 10, 2017 2017 165004050307211 GAA FY 2017 January 1, 2017 Region II Isabela 3rd District Engineering Office
LIP – Roads and Bridges – Local Roads
Concreting of Dingading - Guam Local Road of Barangay Dingading - Guam, San Guillermo,Isabela 3rd LD 0+000 – 0+603
April 10, 2017 GAA FY 2017 WIN7G01207 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City 2nd District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage on Pavement Management System/Highway Development Management-4 (HDM-4) - Tertiary
Reconstruction from Concrete to Concrete - Calinan-Baguio-Cadalian Rd.
K1684+(-)020 - K1684+099,
K1684+288 - K1684+985,
K1695+570 - K1696+084,
K1696+949 - K1697+260

TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Tertiary
Rehab./Reconst./Upgrading of Damaged Paved along Calinan-Baguio-Cadalian Road including Drainage, Calinan Dist., Davao City
K1684+(-)020 - K1684+099,
K1684+288 - K1685+049.90,
K1695+570 - K1696+084,
K1696+513.18 - K1698+162.193

ALLOCATION: Php 49.500 Million
April 10, 2017 GAA FY 2017 WIN7G01208 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City 2nd District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4
(HDM-4) - Tertiary
Reconstruction from Concrete to Concrete - Inawayan-Baracatan Rd-
K1540+385 - K1540+825

TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Tertiary
Rehab./Reconst./Upgrading of Damaged Paved along Inawayan-Baracatan Road including Drainage -
K1540+385 - K1540+820.77

ALLOCATION: Php 15.000 Million
April 10, 2017 FY 2017 WIN7E01208 FY 2017 APPROVED MODIFICATION March 28, 2017 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: MFO 1 - National Road Network Services: Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management - 4 (HDM-4) - Tertiary, Abatan-Mankayan-Cervantes Rd - K0334+-500 - K0334+-250, K0337+400 - K0338+000, K0340+270 - K0340+470, K0341+010 - K0341+210, K0344+000 - K0345+000 (Rehabilitation of Concrete Road)
Physical Target = 4.5 Lane Km

To: MFO 1 - National Road Network Services: Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management - 4 (HDM-4) - Tertiary, Abatan-Mankayan-Cervantes Rd - K0334+-500 - K0334+-250, K0337+400 - K0338+000, K0340+270 - K0340+470, K0341+010 - K0341+210, K0344+000 - K0344+850 (Rehabilitation of Concrete Road)
Physical Target = 4.10 Lane Km


April 10, 2017 FY 2017 WIN7E01175 FY 2017 APPROVED MODIFICATION March 28, 2017 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Guinaoang Flood Control, Guinaoang, Mankayan, Benguet [Construction of Flood Mitigation Structure]
Physical Target = 1,000 Lm

To: MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Guinaoang Flood Control, Guinaoang, Mankayan, Benguet [Construction of Flood Mitigation Structure]
Physical Target = 448 Lm


April 10, 2017 FY 2017 WIN7E01176 FY 2017 APPROVED MODIFICATION March 28, 2017 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Tublay Central Flood Control, Tublay, Benguet [Construction of Flood Mitigation Structure]
Physical Target = 667 Lm

To: MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Tublay Central Flood Control, Tublay, Benguet [Construction of Flood Mitigation Structure]
Physical Target = 463 Lm


April 10, 2017 FY 2017 WIN7F04552 FY 2017 APPROVED MODIFICATION March 28, 2017 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: Locally Funded Projects: Local Infrastructure Program - Roads and Bridges - Local Roads - Improvement of Ambongdolan Road, Ba-ayan, Tublay, Benguet (Rehabilitation of Concrete Road)

To: Locally Funded Projects: Local Infrastructure Program - Roads and Bridges - Local Roads - Improvement of Ambongdolan Road, Ambongdolan, Tublay, Benguet (Rehabilitation of Concrete Road)
Physical Target = 242 Lm



April 10, 2017 2017 165003030700066 SR2017-02-003014 February 3, 2017 Region XIII Regional Office XIII
Modified:
Construction/Improvement of Access Roads leading to Airports. Seaports and declared Tourism Destinations - To Seaports - Construction/Improvement of Access Road leading to Seaports, Dapa Port-Consuelo-Corazon-Sta. Cruz-Sta. Fe-Libertad-Cabitoonan-Catangnan-General Luna, Surigao del Norte

Allocation - Php 58.00 Million
Physical Target - 3.29 lane km
April 10, 2017 2017 165003030700065 SR2017-02-003009 February 3, 2017 Region XIII Regional Office XIII
Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Seaports - Dapa Port-Consuelo-Corazon-Sta. Cruz-Sta. Fe-Libertad-Cabitoonan-Catangnan-General Luna Road (Cabitoonan-Catangnan Br. - Phase II), Surigao del Norte

Allocation - Php 200 Million
Physical Target - 1,888.92 sq.m.
April 10, 2017 2017 165003030700067 SR2017-02-003017 February 3, 2017 Region XIII Regional Office XIII
Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Seaports - Construction/Improvement of Access Road leading to Seaports, Dapa Port-Consuelo-Corazon-Sta. Cruz-Sta. Fe-Libertad-Cabitoonan-Catangnan-General Luna Road (Construction of Bridge 1 and Bridge 2), Surigao del Norte

Allocation:
- Php 70.00 Million (total)
- Php 51.62 Million (Br. 1)
- Php 18.38 Million (Br. 2)

Physical Target:
- 723.13 sq.m. (Br. 1)
- 351.07 sq.m. (Br. 2)
April 10, 2017 2017 165003017100103 SR2017-02-002967 February 3, 2017 Region XIII Regional Office XIII
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes, including ROW - Tandag Bridge along Surigao-Davao Coastal Road (Construction of Parallel Bridge)

Allocation:
- Php 150.00 Million (Total)
- Php 149.50 Million (Bridge)
- Php 0.50 Million (ROW)

Physical Target:
- 1,103.033 sq.m. (Bridge)
- 260.417 sq.m. (ROW)
April 10, 2017 GAA FY 2017 WIN7G01210 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City 2nd District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including drainage - Tertiary
Off-Carriageway Improvement: Shoulder Paving/Construction - Calinan-Baguio-Cadalian Rd -
K1698+515 - K1700+660

TO: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including drainage - Tertiary
Paving of Shoulders at Calinan-Baguio-Cadalian Road, Calinan District, Davao City -
K1698+461.43 - K1700+664.922

ALLOCATION: Php 30.560 Million
April 10, 2017 2017 165003015400137 SR2017-02-002706 February 3, 2017 Region XIII Regional Office XIII
Modified;
Network Development - Construction of Missing Gaps connecting National Roads, including ROW - Completion of the East-West Lateral Road connecting Agusan del Sur/Agusan del Norte to Bukidnon, San Miguel Proper (Surigao del Sur)-Calaitan 9Bayugan), Package 1, Surigao del Sur

Allocation - Php 200.00 Million

Physical Target - 11.56 lane km
April 10, 2017 GAA FY 2017 WIN7G01211 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City 2nd District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including drainage - Tertiary
Off-Carriageway Improvement: Shoulder Paving/Construction - Eden-Tagurano Rd -
K1537+575 - K1537+813,
K1537+(-)689 - K1537+562

TO: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including drainage - Tertiary
Paving of Shoulder with Drainage Improvement at Eden-Tagurano Rd, Toril District, Davao City
K1537+(-)689 - K1537+460.090,
K1537+804 - K1538+092.070

ALLOCATION: Php 20.100 Million
April 10, 2017 2017 165003015300141 SR2017-02-003065 February 3, 2017 Region XIII Regional Office XIII
Modified;
Network Development - Construction of Bypasses/Diversion Roads, including ROW - Construction of Bypass Road at Bislig City-San Isidro-San Antonio-San Jose, Bislig City incl. ROW, Surigao del Sur

Allocation:
- Php 200.00 Million (Total)
- Php 195.00 Million (Concrete Road)
- Php 5.00 Million (ROW)

Physical Target:
- 8.648 lane km (Concrete Road)
- 7,500.00 sq.m. (ROW)
April 10, 2017 GAA FY 2017 WIN7G01215 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City 2nd District Engineering Office
MODIFICATION:

FROM: MFO 1- National Road Network Services
Network Development - Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary
Road Upgrading Gravel to Paved - Inawayan-Baracatan Rd -
K1544+960 - K1544+987,
K1545+320 - K1546+135

TO: MFO 1- National Road Network Services
Network Development - Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary
Road Upgrading (unpaved to paved) at Inawayan-Baracatan Road, Toril District, Davao City -
K1544+172.862 - K1544+990,
K1545+320 - K1546+140

ALLOCATION: Php 32.840 Million
April 10, 2017 2017 165003015400133 SR2017-02-002669 February 3, 2017 Region XIII Regional Office XIII
Modified;
Network Development - Construction of Missing Gaps connecting National Roads, including ROW - Completion of the East-West lateral road connecting Agusan Del Sur/Agusan del Norte to Bukidnon Sampaguita-Makilos (Agusan del Sur/Bukidnon Boundary) including bridge, Agusan del Sur, Package 2

Allocation:
- Php 150.00 Million
- Php 43,124,558.90 (Gravel Road)
- Php 106,875,441.10 (Concrete Bridge)

Physical Target:
- 2.20 lane km (Gravel Road)
- 961.632 sq.m. (Concrete Bridge)
April 10, 2017 FY 2017 WIN7C01576 UACS NO. 165003014400070 January 1, 2017 Region VII Cebu 3rd District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Roads Network Services.
Construction of Road Slope Protection Structure - Naga-Uling Road, K0037+(-145)-K0037+026
K0037+120-K0037+156

TO: MFO 1 - National Roads Network Services.
Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary Roads- Naga-Uling Road, Sitio Apid, Brgy. Cantabaco, Toledo City
1. K0037+120-K0037+156
2. K0037+(-137)-K0037+026
April 10, 2017 FY 2017 WIN7C01587 UACS NO. 292003020403148 January 1, 2017 Region VII Cebu 3rd District Engineering Office
MODIFICATION:

FROM: MFO 2: Flood Management Service
Construction of Flood Control (Revetment) at Guinabasan River Basin along Toledo-Tabuelan-San Remegio Road, Santa. Lucia, Asturias, Cebu
Physical Target - 900 l.m.


TO: MFO 2: Flood Management Service
Construction of Revetment (Rubble Concrete) at Guinabasan River Basin along Toledo-Tabuelan-San Remegio Rd, Sta. 01+515 - Sta. 02+110, Brgy. Sta. Lucia, Asturias, Cebu
Physical Target - 1,190.00 l.m.
April 10, 2017 2017 165003015400132 SR2017-02-002661 February 3, 2017 Region XIII Regional Office XIII
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW - Completion of the East-West lateral road connecting Agusan del Sur/Agusan del Norte to Bukidnon Sampaguita-Makilos (Agusan del Sur/Bukidnon Boundary), Agusan del Sur, Package 3

Allocation - Php 150.00 Million

Physical Target - 7.35 lane km
April 10, 2017 FY 2017 WIN7C01591 UACS NO. 165003014700094 January 1, 2017 Region VII Cebu 3rd District Engineering Office
MODIFICATION:

FROM: MFO 1: National Roads Network Services
Construction of Drainage Structure along Road - Cebu-Toledo Wharf Rd (Uling-Toledo Wharf), K0048 + 716 - K0048 + 900, K0054 + 894 - K0054 + 950
Physical Target - 480 l.m.

TO: MFO 1: National Roads Network Services
Construction/Upgrading/Rehabilitation of Drainage along National Roads-Primary, Cebu-Toledo Wharf Rd (Uling-Toledo Wharf), K0054+317-K0055+000, Brgy. Luray 2, Toledo City, Cebu
Physical Target - 509 l.m.
April 10, 2017 FY 2017 WIN7C01560 UACS NO. 165003016800113 January 1, 2017 Region VII Cebu 3rd District Engineering Office
MODIFICATION:

FROM: MFO 1: National Road Network Services
Off-Carriageway Improvement: Shoulder paving/Construction - Toledo-Tabuelan-San Remegio Rd, K0048+055 - K0048+441, K0048+454 - K0048+882, K0049+000 - K0049+510, K0055+361 - K0057+640, K0055+732 - K0059+929
Physical Target - 11,415.00 sq.m.

TO: MFO 1: National Road Network Services
Off-Carriageway Improvement along Toledo-
Tabuelan-San Remegio Rd (S00245CB) with Drainage, Section 1: K0048+(-409) - K0048+024, Section 2: K0048+055 - K0048+441, Section 3: K0048+454 - K0048+882, Section 4 : K0049+000 - K0050+361, Section 5 : K0055+361 - K0057+640
Physical Target - 14,526.00 sq.m.
April 10, 2017 2017 165003015300162 Sr2017-02-002521 February 2, 2017 Region XIII Regional Office XIII
Modified:
Network Development - Construction of Bypasses/Diversion Roads, including ROW - Daang Maharlika (Alternate Route) (NRJ-Mayor Democrito D. Plaza II Avenue-Las Nieves-Sibagat), (Don Francisco-Bilay Section) including bridge (Bilay Br.), Agusan Del Norte, Package 2

Allocation:
- Php 200.000 Million (Total)
- Php 40.896 Million (Concrete Road)
- Php 144.539 Million (Bridge)
- Php 14.065 Million (Gravel Road)
- Php 0.500 Million (ROW)

Physical Target:
- 0.582 lane km (Concrete Road)
- 1,152.430 sq.m. (Bridge)
- 0.360 lane km (Gravel Road)
- 162.000 sq.m. (ROW)
April 10, 2017 FY 2017 WIN7C01602 UACS NO. 292003020403151 January 1, 2017 Region VII Cebu 3rd District Engineering Office
MODIFICATION:

FROM: MFO 2: Flood Management Service
Construction of Flood Control Sta. Ana River, K0060+564, Brgy. Sta. Ana, Poblacion, Barili, Cebu


TO: MFO 2: Flood Management Service
Construction of Revetment (Rubble Concrete) w/ Rechanneling at Sta. Ana River, Sta. 2+068 - Sta. 2+220, Brgy. Sta. Ana, Barili, Cebu
April 10, 2017 FY 2017 WIN7C01575 UACS NO. 292003020403144 January 1, 2017 Region VII Cebu 3rd District Engineering Office
MODIFICATION:

FROM: MFO 2: Flood Management Service
Construction of Flood Control (Revetment) along Cebu 3rd LD-Toledo Wharf Road (Uling-Toledo Wharf Road), K0054+295, Luray, Toledo City, Cebu
Physical Target - 164 l.m.

TO: MFO 2: Flood Management Service
Construction of Flood Control (Revetment) along Cebu- Toledo Wharf Road (Uling-Toledo Wharf Road), K0054+295 (Sta. 00+910 - Sta. 01+025), Brgy. Luray 2, Toledo City, Cebu
Physical Target - 230 l.m.
April 10, 2017 2017 165003016600080 SR2017-02-002476 February 2, 2017 Region XIII Regional Office XIII
Modified:
Construction/Improvement of Access Roads leading to Airports, seaports and Declared Tourism Destinations - To Seaports - Construction/Improvement of Access Roads leading to Seaports, NRJ to Consuelo Port, Cantilan, Surigao del Sur

Allocation:
- Php 67.00 Million (Total)
- Php 55.923 Million (Concrete Road)
- Php 11.077 Million (Gravel Road)

Physical Target:
- 4.686 lane km (Concrete Road)
- 1.454 lane km (Gravel Road)
April 10, 2017 FY 2017 WIN7C01556 UACS NO. 165003014500222 January 1, 2017 Region VII Cebu 3rd District Engineering Office
MODIFICATION:

FROM: MFO 1: National Road Network Service
Construction of Road Slope Protection Structure - Toledo-Pinamungahan-Aloguinsan-Mantalongon Rd - K0078+023-K0078+048
Physical Target - 1,250 sq.m.

TO: MFO 1. National Road Network Service
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads w/ Slips, Slope Collapse and Landslide - Secondary Road, Toledo-Pinamungajan-Aloguinsan-Mantalongon Road (S00235CB), K0078+023-K0078+186, Aloguinsan, Cebu
Physical Target - 978.00 sq.m.-CW1
- 0.054 lane.km.-CW2
April 10, 2017 FY 2017 WIN7C01570 UACS NO. 292003020403150 January 1, 2017 Region VII Cebu 3rd District Engineering Office
MODIFICATION:

FROM; MFO 2: Flood Management Service
Construction of Flood Control (Rubble Concrete) at Sta. Ana River, Sta. 1+250 - Sta. 1+560, Brgy. Poblacion, Sta. Ana, Barili, Cebu
Physical Target - 620 l.m.

TO; MFO 2: Flood Management Service
Construction of Revetment (Rubble concrete) w/ Rechanneling at Sta. Ana River, Sta. 2+762 - Sta. 3+182, Brgy. Sta. Ana, Barili, Cebu
Physical Target - 840 l.m.
April 10, 2017 2017 165003016600080 SR2017-02-002476 February 2, 2017 Region XIII Regional Office XIII
Modified:
Network development - Improvement/Widening of National Roads - Other Primary - Improvement/Widening of National Roads, NRJ Cuevas - Bislig Rd - K1376+000 - K1378+600

Allocation - Php 100.148 Million

Physical Target - 5.20 lane km
April 10, 2017 FY 2017 WIN7C01572 UACS NO. 165003015100302 January 1, 2017 Region VII Cebu 3rd District Engineering Office
MODIFICATION:

FROM; MFO 1: National Road Network Service
Road Widening -Toledo-Tabuelan-Sn Remegio Rd including ROW, K0048+(-863) - K0048+(-619)
Physical Target - 0.976 lane km. - CW1
- 2,440 sq.m. - ROW

TO; MFO 1: National Road Network Service
Improvement/ Road Widening (4 lanes) of Toledo-Tabuelan-Sn Remegio Rd, C.Y. 2017,
K0048+(-863) - K0048+(-570), Brgy. Sangi, Toledo City, Cebu
Physical Target - 1.172 lane km.-CW1
- 2,440 sq.m.-ROW
April 10, 2017 FY 2014 WIN7C01604 UACS NO. 165003014800162 January 1, 2017 Region VII Cebu 3rd District Engineering Office
MODIFICATION:

FROM; MFO 1: National Road Network Service
Construction of Drainage Structure along Road - Toledo-Pinamungajan-Aloguinsan-Mantalongon Rd - K0059+087, K0064+000
Physical Target - 56 l.m.

TO; MFO 1: National Road Network Service
Construction of Drainage Structure (1 unit Triple Barrel Box Culvert and 2 units Single Barrel Box Culvert) along Toledo-Pinamungajan-Aloguinsan-Mantalongon Road
Section 1 : K0059+087, Section 2 : K0064+000
Section 3 : K0063+915
Physical Target - 46.57 l.m. – CW1
- 174 sq.m. – CW2
- 147 l.m. – CW3
April 10, 2017 2017 165003015700164 SR2017-02-002917 February 3, 2017 Region XIII Regional Office XIII
Modified:
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary - Road Upgrading (Unpaved to Paved), Dinagat-Loreto Road, K0065+200 - K0066+880, K0068+380 - K0068+716

Allocation - Php 123.456 Million

Physical Target - 4.00 lane km
April 10, 2017 FY 2017 WIN7C01545 UACS NO. 292003020403153 January 1, 2017 Region VII Cebu 3rd District Engineering Office
MODIFICATION:

FROM; MFO 2: Flood Management Service
Construction of Flood Control Structure (Rubble Concrete) w/ Rechanneling Sta. Ana River, Sta. 0+600 - Sta. 2+250, Barili, Cebu
Physical Target - 1,300 l.m.

TO; MFO 2: Flood Management Service
Construction of Flood Control (Rubble Concrete) w/ Rechanneling at Sta. Ana River, Sta. 1+623-Sta. 1+936, Barili, Cebu 3rd LD
Physical Target - 626 l.m. – CW1
- 7,719.55 cu.m. – CW2
April 10, 2017 2017 165003015400131 SR2017-02-002654 February 3, 2017 Region XIII Regional Office XIII
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW - Completion of the East-West lateral road connecting Agusan del Sur/Agusan del Norte to Bukidnon Sampaguita-Makilos (Agusan del Sur/Bukidnon Boundary), Agusan del Sur, Package 1

Allocation - Php 150.00 Million

Physical Target - 7.36 lane km
April 10, 2017 FY 2017 WIN7C01571 UACS NO. 292003020403145 January 1, 2017 Region VII Cebu 3rd District Engineering Office
MODIFICATION:

FROM; MFO 2: Flood Management Service
Construction of Flood Control (Revetment) at Camanchilles River along Toledo-Tabuelan-San Remegio Road, K0048+864, Sitio Camanchilles, Talavera, Toledo City, Cebu
Physical Target - 1,350 l.m.

TO; MFO 2: Flood Management Service
Construction of Flood Control (Revetment) at Camanchilles River along Toledo-Tabuelan-San Remegio Road, K0048+864 (Sta. 00+720-Sta. 01+280), Sitio Camanchilles, Talavera, Toledo City, Cebu
Physical Target - 1,120 l.m. - CW1
- 20,941.50 cu.m. - CW2
April 10, 2017 FY 2017 WIN7C01558 UACS NO. 165003014500225 January 1, 2017 Region VII Cebu 3rd District Engineering Office
MODIFICATION:

FROM: MFO 1: National Road Network Service
Construction of Road Slope Protection Structure - Cebu-Balamban Transcentral Highway - K0038+300 - K0038+500
Physical Target - 1,000 sq.m.

TO: MFO 1: National Road Network Service
- Construction of Road Slope Protection Structure along Cebu-Balamban Transcentral Highway (S00266CB) - K0038+737 - K0038+960, Brgy. Cansumoroy, Balamban, Cebu
Physical Target - 3,345 sq.m.
April 10, 2017 2017 165003030700081 SR2017-02-003023 February 3, 2017 Region XIII Regional Office XIII
Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Seaports - Construction/Improvement of Access Roads leading to seaports, Socorro Port-Jct. Songkoy-Sudlon-Sohoton Cove, Siargao, Surigao del Norte

Allocation - Php 100.00 Million

Physical Target - 5.34 lane km
April 10, 2017 FY 2017 WIN7C01564 UACS NO. 292003020403146 January 1, 2017 Region VII Cebu 3rd District Engineering Office
MODIFICATION:

FROM: MFO 2: Flood Management Service
Construction of Flood Control (Revetment) at Cantabaco-Ilag River along Cebu 3rd LD-Toledo Wharf Road(Jct. Naga-Uling), K0030+782-K0081+0, Brgy. Cantabaco, Toledo City, Cebu
Physical Target - 218 l.m.

TO: MFO 2: Flood Management Service
Construction of Flood Control (Revetment) at Cantabaco-Ilag River along Cebu-Toledo Wharf Road (Jct. Naga-Uling), Sta. 18+440-Sta. 18+690, Brgy. Cantabaco, Toledo City, Cebu
Physical Target - 290 l.m.
April 8, 2017 2017 WIN7G00988 FY 2017 (R.A 10924) March 1, 2017 Region IX Regional Office IX
Network Development - Improvement/Widening of National Roads - Other Primary Roads -
Road Widening including Drainage and RROW of Dipolog - Oroquieta National Road, Zamboanga del Norte 3rd DEO, (S01316MN),
K1820+113 - K1820+342,
K1820+363 - K1825+300
Allocation:
Php 155.490 Million (Total)
Php 149,515,367.51 (Road Widening)
Php 5,974,632.49 (ROW Acquisition)
Physical Target:
10.332 lane km (Road Widening)
5,974.63 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,515,367.51/lane km (Road Widening)
Php 1,000/sq.m. (ROW Acquisition)
April 8, 2017 2017 WIN7G01127 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary
Road Upgrading (Gravel to Paved) of Sindangan - Bayog - Lakewood Rd., Zamboanga del Norte 1st DEO, (S01059MN)
Chainage 9969 - Chainage 13489
(Sta. 1938+810 - Sta. 1942+330)
Allocation:
Php 150.000 Million (Total)
Php 149,632,131.60 (Road Concreting)
Php 367,868.36 (ROW Acquisition)
Physical Target:
7.04 lane km (Road Concreting)
1,226.22 sq.m. (ROW Acquisition)
Unit Cost:
Php 21,254,564.15/lane km (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition)
April 8, 2017 2017 WIN7G01144 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary
Road Upgrading (Gravel to Paved) of Liloy - Siocon Road, Zamboanga del Norte 2nd DEO, (S01146MN)
K2027+000.00 - K2029+550.00
Allocation:
Php 150.000 Million (Total)
Php 149,660,916.70 (Road Concreting)
Php 339,083.30 (ROW Acquisition)
Physical Target:
5.10 lane km (Road Concreting)
1,130 sq.m. (ROW Acquisition)
Unit Cost:
Php 29,345,277.78/lane km (Road Concreting)
Php 300.07/sq.m. (ROW Acquisition)
April 8, 2017 2017 WIN7G00971 FY 2017 (R.A 10924) March 1, 2017 Region IX Regional Office IX
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (Unpaved to Paved of Eastern bobongan - Sominot - Midsalip - Dumingag Road,
(Chainage 7028 - Chainage 9368)
K1670+440.00 - K1672+780.00,
(Chainage 4334 - Chainage 6168)
K1667+746.00 - K1669+580.00
Allocation:
Php 150.000 Million (Total)
Php 149,581,756.60 (Road Concreting)
Php 418,243.37 (ROW Acquisition)
Physical Target:
8.348 lane km (Road Concreting)
1,394 sq.m. (ROW Acquisition)
Unit Cost:
Php 17,918,274.63/lane km (Road Concreting)
Php 300.03/sq.m. (ROW Acquisition)
April 8, 2017 2017 WIN7G00970 FY 2017 (R.A 10924) March 1, 2017 Region IX Regional Office IX
Network Development - Improvement/Widening of National Roads - Other Primary Roads -
Improvement/Widening of National Roads of Zamboanga City - Labuan - Limpapa Road, Zamboanga City 1st LD (S01185MN)
Sect. 1: K1966+780 - K1967+588,
Sect. 2: K1967+633 - K1969+027,
Sect. 3: K1969+170 - K1970+180
Allocation:
Php 79.270 Million (Total)
Php 77,985.193.11 (Road Widening)
Php 1,284,806.89 (Road Acquisition)
Physical Target:
6.424 lane km (Road Widening)
1,284.81 sq.m. (ROW Acquisition)
Unit Cost:
Php 12,139,662.69/lane km (Road Widening)
Php 1,000/sq.m. (ROW Acquisition)
April 8, 2017 2017 WIN7C01507 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Structure along Dapitan River, Tutua - Polo Section along Dipolog - Oroquieta Road, Dapitan City, Zamboanga del Norte 1st LD
Left Side:
Beg. of Proj.: K0+000.00
End of Proj.: K0+642.00
Allocation:
Php 100.000 Million (Total)
Php 99,759,879.05 (Const. of Flood Control Structure)
Php 240,120.95 (ROW Acquisition)
Physical Target:
642.00 ln.m. (Const. of Flood Control Structure)
240.12 sq.m. (ROW Acquisition)
Unit Cost:
Php 155,389.22/ln.m. (Const. of Flood Control Structure)
Php 1,000/sq.m. (ROW Acquisition)
April 8, 2017 2017 WIN7C01508 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary -
Road Upgrading (Gravel to Paved) Siocon - Sirawai - Sibuco - Limpapa Rd, Zamboanga del Norte 2nd DEO (S01165MN)
Chainage 3680 - Chainage 4280,
(K2114+680.00 - K2115+280.00)
Chainage 7880 - Chainage 8130
(K2118+880.00 - K2119+130.00)
Allocation:
Php 84.000 Million (Road Concreting)
Php 1,528,199.65 (ROW Acquisition)
Physical Target:
1.70 lane km (Road Concreting)
5,093 sq.m. (ROW Acquisition)
Unit Cost:
Php 48,512,823.74/lane km (Road Concreting)
Php 300.06/sq.m. (ROW Acquisition)
April 8, 2017 2017 WIN7G01140 FY 2017 (R.A 10924) March 27, 2017 Region IX Regional Office IX
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Revetment along Mapangi River Basin, Kapalaran - Salug River, Tambulig, Zamboanga del Sur
Sta. 0+000.00 - Sta. 0+950.00
Allocation:
Php 100.000 Million (Total)
Php 99,733,444.65 (Const. of Flood Control Structure)
Php 266,555.35 (ROW Acquisition)
Physical Target:
950.00 ln.m. (Const. of Flood Control Structure)
888.51 sq.m. (ROW Acquisition)
Unit Cost:
Php 104,982.57/ln.m. (Const. of Flood Control Structure)
Php 300.00/sq.m. (ROW Acquisition)
April 7, 2017 FY 2017 WIN7E01206 UACS No. 165003014200189 January 1, 2017 National Capital Region North Manila District Engineering Office
Per GAA
MFO-1 National Road Network Services: Asset Preservation of National Roads – Rehabilitation/ Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4)-Secondary: Reconstruction from Concrete to Concrete: C-2 Road (S02319LZ) Chainage 537 – Chainage 1344.20 (Reconstruction from Concrete to Concrete)
UACS No. 165003014200189
Physical Target / Cost
Per GAA / Original
Physical Target: 1.614 lane.km
Unit Cost: P18,587.36M/lane.km
Allocation: P30M
WIN7E01206
As Modified
MFO-1 National Road Network Services: Asset Preservation of National Roads – Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) – Secondary: Reconstruction from Concrete to Concrete including Drainage: C-2 Road (S02319LZ) Chainage 960.0 – Chainage 1344.0 Manila City (Reconstruction from Concrete to Concrete including Drainage)
UACS No. 165003014200189
As Modified
Per GAA / Original
Physical Target: 1.53 lane.km
Unit Cost: P19,607.84M/lane.km
Estimated Cost: P30M
WIN7E01206
April 6, 2017 2017 WIN7G00954 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Network Development - Construction of By-Passes/Diversion Roads including ROW -
Road Upgrading (Gravel to Paved) including ROW of Ipil Circumferential Road: Veterans - Tiayon - Don Andres Section, Zamboanga Sibugay 2nd LD,
K10+496.20 - K10+760.00,
K11+020.00 - K11+140.00,
K11+160.00 - K12+900.00
Allocation:
Php 91.200 Million (Total)
Php 82,549,172.60 (Road Concreting)
Php 8,650,827.40 (ROW Acquisition)
Physical Target:
4.248 lane km (Road Concreting)
28,836 sq.m. (ROW Acquisition)
Unit Cost:
Php 19,432,479.43/lane km (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition)
April 6, 2017 2017 WIN7G00960 FY 2017 (R.A 10924) March 1, 2017 Region IX Regional Office IX
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary -
Road Upgrading (unpaved to paved) of Rizal - Dakak - Dapitan Coastal Loop Road, Zamboanga del Norte 3rd DEO, (S01038MN)
K1844+200 - K1844+828,
K1844+903 - K1845+419,
K1845+518 - K1846+107,
K1846+390 - K1846+570,
K1846+630 - K1846+812,
K1847+043 - K1848+245,
K1848+286 - K1848+966,
K1849+069 - K1849+540
Allocation:
Php 125.850 Million (Total)
Php 123,850,000.00 (Road Concreting)
Php 2.000 Million (ROW Acquisition)
Physical Target:
8.898 lane km (Road Concreting)
2,000 sq.m. (ROW Acquisition)
Unit Cost:
Php 13,918,858.16/lane km (Road Concreting)
Php 1,000/sq.m. (ROW Acquisition)
April 6, 2017 2017 WIN7G00930 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Network Development - Construction of By-Passes/Diversion Roads including ROW -
Construction of Bypasses/Diversion Roads including ROW, Construction of Airport - Turno - Sinaman By-Pass Road, Zamboanga del Norte 1st DEO,
Sta. 8+089.00 - Sta. 9+613.80
Allocation:
Php 100.000 Million (Total)
Php 95,132,569.69 (Gravel Road)
Php 4,867,430.31 (ROW Acquisition)
Physical Target:
3.0496 lane km (Gravel Road)
4,867 sq.m. (ROW Acquisition)
Unit Cost:
Php 31,195,084.50/lane km (Gravel Road)
Php 1,000.09/sq.m. (ROW Acquisition)
April 6, 2017 2017 WIN7G00952 FY 2017 (R.A 10924) March 1, 2017 Region IX Regional Office IX
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (Unpaved to Paved) of Zamboanga del Sur Coastal Road, Zamboanga del Sur 2nd DEO, (S01169MN)
Chainage 14610 - Chainage 16160,
Chainage 22024 - Chainage 23508.16
Allocation:
Php 100.000 M (Total)
Php 98.000 M (Road Concreting)
Php 2.000 M (ROW Acquisition)
Physical Target:
6.068 lane km (Road Concreting)
6,666 sq.m. (ROW Acquisition)
Unit Cost:
Php 16,150,296.64/lane km (Road Concreting)
Php 300.03/sq.m. (ROW Acquisition)
April 6, 2017 2017 WIN7G00949 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Network Development - Improvement/Widening of National Roads - Other Primary -
Road Widening including Drainage of National Roads at Ipil - Liloy - Sindangan Road, Zamboanga Sibugay 2nd DEO, (S01139MN)
K1998+120 - K1999+905.51
Allocation:
Php 52.298 Million (Total)
Php 48,865,245.02 (Road Widening)
Php 3,432,754.98 (ROW Acquisition)
Physical Target:
3.57102 lane km (Road Widening)
11,442 sq.m. (ROW Acquisition)
Unit Cost:
Php 13,683,834.04/lane km. (Road Widening)
Php 300.01/sq.m. (ROW Acquisition)
April 6, 2017 2017 WIN7G00964 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Network Development - Improvement/Widening of National Roads - Other Primary -
Road Widening including Drainage Dipolog - Sindangan - Liloy Road, Zamboanga del Norte 1st DEO, (S01057MN)
K1848+877.00 - K1852+971.70,
K1852+979.82 - K1853+220.53
Allocation:
Php 130.414 Million (Total)
Php 128,458,518.15 (Widening of Road)
Php 1,955,481.85 (ROW Acquisition)
Physical Target:
8.67 lane km (Widening of Road)
6,518 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,816,438.08/lane km (Widening of Road)
Php 300.01/sq.m. (ROW Acquisition)
April 6, 2017 2017 WIN7G00962 FY 2017 (R.A 10924) March 1, 2017 Region IX Regional Office IX
Network Development - Improvement/Widening of National Roads - Other Primary Roads -
Improvement/Widening of National Roads, Zamboanga City - Labuan - Limpapa Rd., Zamboanga City 1st LD, (S01185MN)
Sect. 1: K1970+180.00 - K1971+130.00,
Sect. 2: K1971+433.00 - K1972+065.92
Allocation:
Php 58.121 Million (Total)
Php 44,940,148.92 (Road Widening)
Php 13,180,851.08 (ROW Acquisition)
Physical Target:
3.16548 lane km (Road Widening)
13,180 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,196,946.09/lane km (Road Widening)
Php 1,000.06/sq.m. (ROW Acquisition)
April 6, 2017 2017 WIN7G00963 FY 2017 (R.A 10924) March 1, 2017 Region IX Regional Office IX
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary -
Road Upgrading (Unpaved to Paved) of Siocon - Sirawai - Sibuco - Limpapa Road, Zamboanga del Norte 2nd DEO, (S01165MN)
Chainage 9380 - Chainage 9995
(K2120+380.00 - K2120+995.00)
Allocation:
Php 98.400 M (Total)
Php 98,004,621.72 (Road Concreting)
Php 395,378.28 (ROW Acquisition)
Physical Target:
1.23 lane km (Road Concreting)
1,317 sq.m. (ROW Acquisition)
Unit Cost:
Php 79,678,554.24/lane km (Road Concreting)
Php 300.21/sq.m. (ROW Acquisition)
April 5, 2017 FY 2017 WIN7E01142 UACS No.165003014300245 January 1, 2017 National Capital Region North Manila District Engineering Office
As per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on PMS/HDM-4 – Tertiary/ Reconstruction from Concrete to Concrete – H. Lopez Blvd – K0006+379 – K0007+020 (Reconstruction from concrete to concrete)
UACS No. 165003014300245
Physical Target/Cost (P’000)
Original: 0.19 ln-km
Unit Cost (P’000): P105,263.16/ln-km
Allocation (P’000): P20,000.0
Reference No.: WIN7E01142

As Modified
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on PMS-HDM-4 – Tertiary – H. Lopez Blvd – K0006+383.50 – K0006+611.25 (Reconstruction from Concrete to Concrete)
UACS No. 165003014300245
Physical Target/Cost (P’000)
New: 0.227/km; 0.911ln-km (4-lanes)
Unit Cost (P’000): P21,953.89/ln-km
Allocation (P’000): P20,000.0
Reference No.: WIN7E01142
April 5, 2017 FY 2017 WIN7E01139 UACS No. 292003020401923 January 1, 2017 National Capital Region North Manila District Engineering Office
As per GAA
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Riverwall including pumping station at North Estero de Maypajo, Tondo (Construction of Flood Mitigation Structure)
UACS No.: 292003020401923
Physical Target/Cost (P’000)
Original: 111 lm
Unit Cost (P’000): P360.36/lm
Allocation: (P’000): P40,000.0
Reference No.: WIN7E01139

New
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Riverwall at North Estero de Maypajo, Tondo (Construction of Revetment)
UACS No.: 292003020401923
Physical Target/Cost (P’000)
Original: 110.6 lm
Unit Cost (P’000): P361.664/lm
Allocation: (P’000): P40,000.0
Reference No.: WIN7E01139
April 5, 2017 FY 2017 WIN7E01137 UACS No. 165003014200188 January 1, 2017 National Capital Region North Manila District Engineering Office
As per GAA
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/Upgrading – Secondary – Reconstruction from Concrete to Concrete – Blumentritt Street (LZ) – Chainage 000 – Chainage 301.90 (Reconstruction from Concrete to concrete)
UACS No.: 165003014200188
Physical Target/Cost (P’000)
Original: 1.812 ln-km
Unit Cost (P’000): P4,415.01/ln-km
Allocation: (P’000): P8,000.0
Reference No.: WIN7E01137
New
MFO 1 – National Road Network Services – Asset Preservation of National Roads – Rehabilitation/ Reconstruction/Upgrading of Damaged Paved National Roads including Drainage Based on PMS/HDM-4- Secondary – Reconstruction from Concrete to Concrete – Blumentritt Street (LZ) – Chainage 000 – Chainage 255 (Reconstruction from concrete to concrete)
UACS No.: 165003014200188
Physical Target/Cost (P’000)
New: 1.53 ln-km
Unit Cost (P’000): P5,228.76/ln-km
Estimated Cost (P’000): P8,000.0
Reference No.: WIN7E01137
April 5, 2017 FY 2017 WIN7E01180 UACS No. 16004050306740 January 1, 2017 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA
Locally-Funded Projects: Local Infrastructure Program: Roads and Bridges: Local Roads: Improvement of Road including Drainage, Pulang Lupa 1, Las Piñas City (Improvement)
UACS No. 165004050306740
Physical Target/Cost (P’000):
Original: 1.0 km
Unit Cost (P’000): P 10M/km
Allocation (P’000): P10M
Ref. No. WIN7E01180

As Modified
Locally-Funded Projects: Local Infrastructure Program: Roads and Bridges: Local Roads: Improvement of Road including Drainage at (Mapayapa), Pulang Lupa 1, Las Piñas City (Improvement/Upgrading of Drainage Structure along Road)
UACS No. 165004050306740
Physical Target/Cost (P’000):
As modified .553 lane.km
Unit Cost (P’000): P 18,083.18M/lane.km
Allocation (P’000): P10M
Ref. No. WIN7E01180
April 5, 2017 2017 WIN7G00902 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary
Road Upgrading (Gravel to Paved) of Eastern Bobongan - Sominot - Midsalip - Dumingag Rd., Zamboanga del Sur 1st DEO, (S01325MN),
K1677+410.00 - K1679+740.00,
K1672+780.00 - K1674+230.00,
Allocation:
Php 150.000 M (Total)
Php 149,390,948.50 (Road Concreting)
Php 609,051.49 (ROW Acquisition)
Physical Target:
7.56 lane km. (Road Concreting)
2,030.17 sq.m. (ROW Acquisition)
Unit Cost:
Php 19,760,707.47/lane km. (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition)
April 5, 2017 2017 WIN7G00951 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Network Development - Improvement/Widening of National Roads - along N1: Road Widening including Drainage of National Roads along N1 of Lanao - Pagadian - Zamboanga City Road, Zamboanga Sibugay 2nd DEO, (S01113MN),
K1770+539.00 - K1773+295.87,
K1773+323.83 - K1775+094.29
Allocation:
Php 136.168 Million (Total)
Php 131,167,999.90 (Road Widening)
Php 5,000,000.00 (ROW Acquisition)
Physical Target:
9.054 lane km. (Road Widening)
16,666 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,487,298.42/lane km. (Road Widening)
Php 300.01/sq.m. (ROW Acquisition)
April 5, 2017 2017 WIN7G00928 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Road Upgrading (Unpaved to Paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (Gravel to Paved) of Sindangan - Bayog - Lakewood Road, Zamboanga del Norte 1st DEO (S01059MN),
Chainage 15799 - Chainage 16899
(Sta. 1944+640 - Sta. 1945+740)
Allocation:
Php 120.00 Million (Total)
Php 119,532,198.60 (Road)
Php 467,801.37 (ROW Acquisition)
Physical Target:
2.20 lane km. (Road)
1,559.33 sq.m. (ROW Acquisition)
Unit Cost:
Php 54,332,817.55/lane km. (Road)
Php 300.00 sq.m. (ROW Acquisition)
April 5, 2017 2017 WIN7G00929 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Network Development - Asset Preservation of National Roads Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development and Management-4 (HDM-4) - Primary -
Upgrading (Asphalt to Concrete) including Drainage of Sindangan - Liloy Road, Zamboanga del Norte 2nd DEO, (S01142MN),
K1936+955.60 - K1937+779.11,
K1937+819.49 - K1938+030.02,
K1938+970.07 - K1941+015.65,
K1941+995.51 - K1943+485.54
Allocation:
Php 119.081 Million (Total)
Php 118,265,737.80 (Road Concreting)
Php 815,262.20 (ROW Acquisition)
Physical Target:
9.06 lane km. (Road Concreting)
2,717.54 sq.m. (ROW Acquisition)
Unit Cost:
Php 13,053,613.44/lane km. (Road Conreting)
Php 300/sq.m. (ROW Acquisition)
April 5, 2017 2017 WIN7G00965 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Network Development - Construction of By-Passes/Diversion Roads, including ROW:
Road Upgrading (Gravel to Paved) of Jct. Nat'l Highway Siocon - Jct. Nat'l Highway R.T. Lim, Poblacion Siocon - Brgy. Tagaytay Section, Zamboanga del Norte 2nd DEO,
Sect. 1: Sta. 0+000.00 - Sta. 3+279.38,
Sect. 2: Sta. 4+683.45 - Sta. 6+640.00
Allocation:
Php 150.000 Million (Total)
Php 147,954,500.40 (Road Concreting)
Php 2,045,499.60 (ROW Acquisition)
Physical Target:
10.472 lane km. (Road Concreting)
6,818 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,128,581.02/lane km. (Road Concreting)
Php 300.01 sq.m. (ROW Acquisition)
April 5, 2017 2017 WIN7G00938 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary -
Road Upgrading (Gravel to Paved) of Liloy – Siocon Road, Zamboanga del Norte 2nd DEO, (S01146MN)
K2029+550.00 – K2030+253.74,
K2030+386.83 – K2031+957.31,
K2032+367.31 – K2033+520.00,
Allocation:
Php 150.000 Million (Total)
Php 149,727,250.24 (Road Concreting)
Php 272,749.76 (ROW Acquisition)
Physical Target:
6.854 lane km (Road Concreting)
909.17 sq.m. (ROW Acquisition)
Unit Cost:
Php 21,845,236.39/lane km (Road Concreting)
Php 300.00/sq.m. (ROW Acquisition)
April 5, 2017 2017 WIN7G00906 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Labason River Control, Poblacion, Labason, Zamboanga del Norte 3rd LD,
Right Side - K0+000.00 - K0+441.32, K0+752.84 - K0+884.40,
Left Side - K0+540.00 - K0+878.28
Allocation:
Php 100.00 Million (Total)
Php 97,823,648.49 (Flood Mitigation Structure)
Php 2,176,351.51 (ROW Acquisition)
Physical Target:
911.16 lm (Flood Mitigation Structure)
7,254.50 sq.m. (ROW Acquisition)
Unit Cost:
Php 107,361.66/lm (Flood Mitigation Structure)
Php 300.00/sq.m. (ROW Acquisition)
April 5, 2017 2017 WIN7G00905 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of River Control along Kipit River, Brgy. Kipit, Labason, Zamboanga del Norte 3rd LD,
Upstream-Left Side - K0+270.00 - K0+785.00,
Downstream-Right Side - K0+000.00 - K0+400.00
Allocation:
Php 95.00 Million (Total)
Php 94,810,985.74 (Flood Mitigation Structure)
Php 189,014.26 (ROW Acquisition)
Physical Target:
915.00 lm (Flood Mitigation Structure)
630.05 sq.m. (ROW Acquisition)
Unit Cost:
Php 103,618.56/lm (Flood Mitigation Structure)
Php 300.00/sq.m. (ROW Acquisition)
April 5, 2017 2017 WIN7G00948 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Network Development - Improvement/Widening of National Roads - Other Primary Roads:
Road Widening including Drainage of Liloy - Ipil Road, Zamboanga del Norte, 2nd DEO, (S01153MN)
K1975+860 - K1978+860,
Allocation:
Php 89.711 Million (Total)
Php 87,994,572.86 (Road Widening)
Php 1,716,427.14 (ROW Acquisition)
Physical Target:
6.00 lane km. (Road Widening)
5,721.42 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,665,762.14/lane km. (Road Widening)
Php 300.00/sq.m. (ROW Acquisition)
April 5, 2017 2017 WIN7G00904 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Network Development - Improvement/Widening of National Roads - Secondary Road -
Improvements/Widening of National Roads of Zamboanga City - Labuan - Limpapa Rd., Zamboanga City 1st LD, (S01185MN)
K1957+427.00 - K1957+674.80,
K1957+750.00 - K1957+980.00,
K1964+400.00 - K1966+780.00
Allocation:
Php 71.73 Million (Total)
Php 69,395,311.78 (Road Widening)
Php 2,334,688.22 (ROW Acquisition)
Physical Target:
5.7156 lane kms. (Road Widening)
2,334.68 sq.m. (ROW Acquisition)
Unit Cost:
Php 12,141,387.04/lane km. (Road Widening)
Php 1,000.00/sq.m. (ROW Acquisition)
April 5, 2017 2017 WIN7G00945 FY 2017 (R.A 10924) February 28, 2017 Region IX Regional Office IX
Network Development - Improvement/Widening of National Roads - Primary Roads:
Road Widening including Drainage of National Roads - N1 of Lanao - Pagadian - Zamboanga City Road, Zamboanga Sibugay 2nd DEO, (S01113MN),
K1775+158.78 - K1776+923.25,
K1776+950.55 - K1777+366.00
Allocation:
Php 63.832 Million (Total)
Php 58,911,369.76 (Road Widening)
Php 4,920,630.24 (ROW Acquisition)
Physical Target:
4.36 lane km. (Road Widening)
16,402 sq.m. (ROW Acquisition)
Unit Cost:
Php 13,511,782.06/ lane km. (Road Widening)
Php 300/sq.m. (ROW Acquisition)
April 5, 2017 GAA FY 2017 WIN7G01195 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City 2nd District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Tertiary
Road Widening - Davao-Cotabato Old Road including RROW -
K1526+(-)432 - K1526+301

TO: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Tertiary
Road Widening including Drainage and RROW at Davao-Cotabato Old Road, Toril District, Davao City
K1526+(-)432 - K1526+301

ALLOCATION: Php 33.00 Million
April 5, 2017 GAA FY 2017 WIN7G01196 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City 2nd District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary
Construction of Road Slope Protection Structure - Davao-Bukidnon Rd -
K1641+782 - K1641+792,
K1645+115 - K1645+135,
K1664+150 - K1664+190,
K1655+830 - K1655+850

TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Primary
Rehab./Reconstruction of National Roads with Slips, Slope Collapses and Landslide along Davao-Bukidnon Road -
K1641+890 - K1641+990(L/S),
K1645+090 - K1645+160(R/S),
K1645+120 - K1645+170(L/S),
K1655+890 - K1655+930(R/S),
K1664+130 - K1664+218(L/S)

ALLOCATION: Php 42.652 Million
April 5, 2017 GAA FY 2017 WIN7G01197 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City 2nd District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including drainage - Tertiary
Off-Carriageway Improvement: Shoulder Paving/Construction - Bayabas-Eden Rd -
K1528+393 - K1530+295

TO: MFO 1 - National Road Network Services
Network Development - Off-Carriageway Improvement including drainage - Tertiary
Paving of Shoulder with Drainage Improvement at Bayabas-Eden Road, Toril District, Davao City
K1528+393 - K1530+280.715

ALLOCATION: Php 30.786 Million
April 5, 2017 GAA FY 2017 WIN7G01198 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Davao City 2nd District Engineering Office
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Tertiary
Road Widening - Bayabas-Eden Rd,
K1526+(-)368 - K1526+198

TO: MFO1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Tertiary
Road Widening including Drainage at Bayabas-Eden Road, Toril District, Davao City
K1526+(-)320 - K1526+035

ALLOCATION: Php 15.00 Million
April 4, 2017 FY 2017 WIN7E01120 FY 2017 APPROVED MODIFICATION March 16, 2017 Cordillera Administrative Region Benguet 2nd District Engineering Office
From : MFO 1 - National Road Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide along Gurel-Bokod-Kabayan-Buguias-Abatan Road. - K0351+970 - K0352+035, K0351+950 - K0352+055 [Construction of Slope Protection Structure] ; Physical Target = 2,565 sq.m.

To : MFO 1 - National Road Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide along Gurel-Bokod-Kabayan-Buguias-Abatan Road. - K0351+950 - K0352+363 [Construction of Slope Protection Structure] ; Physical Target = 4,706 sq.m.
April 4, 2017 FY 2017 WIN7E01121 FY 2017 APPROVED MODIFICATION March 16, 2017 Cordillera Administrative Region Benguet 2nd District Engineering Office
From : MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Datakan Flood Control, Datakan, Kapangan, Benguet [Construction of Flood Mitigation Structure] ; Physical Target = 500 lm

To : MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Datakan Flood Control, Datakan, Kapangan, Benguet [Construction of Flood Mitigation Structure] ; Physical Target = 406 lm
April 3, 2017 FY 2017 WIN7E01145 UACS No. 103004010310027 January 1, 2017 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As Per GAA
Locally-Funded Projects: Buildings and Other Structures: Multipurpose/Facilities: Construction of Multipurpose Building, (Police and Fire Station), and Other Improvements Ilaya, Las Piñas City
UACS No. 103004010310027
Physical Target/Cost (P’000):
Original: 1 bldg
Allocation (P’000): P4.000 M
Unit Cost (P’000): P 4,000/bldg..
Ref. No. WIN7E01145

As Modified
Locally-Funded Projects: Buildings/Other Structures: Multipurpose/Facilities: Completion of Multi-Purpose Building (Police and Fire Station) and Other Improvements Ilaya, Las Piñas City
UACS No. 103004010310027
Physical Target/Cost:
New: 1 bldg
Estimated Cost (P’000): P4.000 M
Unit Cost (P’000): P4,000/bldg.
Ref. No. WIN7E01145
April 3, 2017 FY 2017 WIN7E01143 UACS No. 103004010310029 January 1, 2017 National Capital Region Las Piñas - Muntinlupa District Engineering Office
Per GAA
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-purpose Building, Pulanglupa 2, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010310029
Physical Target/Cost:
Original: 1 bldg
Unit Cost (P’000): P4,000.0
Allocation (P’000): P4,000.0
Ref. No. WIN7E01143

As Modified
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building at Doña Julita, Pulang Lupa 2, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010310029
Physical Target/Cost:
New: 1 bldg
Unit Cost (P’000): P4,000.0
Estimated Cost : P4,000.0 M
Ref. No. WIN7E01143
April 3, 2017 FY 2017 WIN7E01134 UACS No. 103004010310031 January 1, 2017 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building (Covered Court), Talon 2, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010310031
Physical Target/Cost:
Original: 1 Bldg.
Unit Cost (P’000): P4,000.0/Bldg
Allocation (P’000): P4,000.0
Ref. No. WIN7E01134

As Modified
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building at BF Phase 3, West Talon 2, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010310031
Physical Target/Cost:
New: 1 bldg
Unit Cost (P’000): P4,000.0
Estimated Cost : P4,000.0 M
Ref. No. WIN7E01134
April 3, 2017 FY 2017 WIN7E01135 UACS No. 103004010310033 January 1, 2017 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building (Covered Court), Talon 5, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010310033
Physical Target/Cost:
Original: 1 Bldg.
Unit Cost (P’000): P4,000.0/Bldg
Allocation (P’000): P4,000.0
Ref. No. WIN7E01135

As Modified
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building at Moonwalk Phase 2, Talon 5, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010310033
Physical Target/Cost:
New: 1 bldg
Unit Cost (P’000): P4,000.0/Bldg.
Estimated Cost : P4,000.0 M
Ref. No. WIN7E01135
April 3, 2017 FY 2017 WIN7E01138 UACS No. 103004010309894 January 1, 2017 National Capital Region Las Piñas - Muntinlupa District Engineering Office
As per GAA
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building (Covered Court), Barangay Almanza Dos, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010309894
Physical Target/Cost:
Original: 1 Bldg
Unit Cost (P’000): P5,000/Bldg.
Estimated Cost : P5,000.0 M
Ref. No. WIN7E01138

As Modified
Locally-Funded Projects – Buildings and Other Structures – Multipurpose/Facilities – Construction of Multi-Purpose Building (Phase I), Barangay Almanza Dos, Las Piñas City (Construction of Multi-Purpose Building)
UACS No.: 103004010309894
Physical Target/Cost:
New: 1 Bldg
Unit Cost (P’000): P5,000/Bldg.
Estimated Cost : P5,000.0 M
Ref. No. WIN7E01138
April 3, 2017 2017 165003014100119 GAA FY 2017 January 1, 2017 Region II Isabela 1st District Engineering Office
MFO 1 : NATIONAL ROAD NETWORK SERVICES, Asset Preservation of National Roads, Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management - 4 (HDM-4) , SANTIAGO-TUGUEGARAO RD - K0 424+142 – K0424+670, K0425+000 - K0 425+721, K0 430+000 – K0 431+000, K0 431+298.4 - K0 431+ 348.4, K0 431+360 –K0431+400, K0 431+430 - K0 431+506, K0 431+520 - K0 431+ 542.50, K0 431+620 – K0 432+000, K0 432+240- K0 432+316, K0 432+379 – K0 432+430, K0 433+193.5- K0 433+260
April 3, 2017 2017 165003014700074 GAA FY 2017 January 1, 2017 Region II Isabela 1st District Engineering Office
Construction of Drainage Structure along Road-Daang Maharlika (LZ)- K0427+327-K0428+005 (R/S); K0427+327-K0427+617 (L/S)
April 3, 2017 2017 165003015100256 GAA FY 2017 January 1, 2017 Region II Isabela 1st District Engineering Office
MFO1: National Road Network Services, Network Development, Improvement/Widening of National Roads-Secondary, Road Widening and Reconstruction of Existing PCCP (thk. = 0.15m), Cabagan-Sta. Maria Road, K0452+282-K0452+400
April 3, 2017 2017 103004010310715 GAA FY 2017 January 1, 2017 Region II Isabela 1st District Engineering Office Completion of Multi-Purpose Building, Calinaoan Centro, Sto. Tomas, Isabela
March 31, 2017 2017 103004010310800 GAA FY 2017 January 1, 2017 Region II Nueva Vizcaya District Engineering Office
Locally Funded Project:
Local Infrastructure Program:
Buildings and Other Structures: Multipurpose/Facilities:
Construction of MultiPurpose Bldg., Ambaguio Central School, Ambaguio, Nueva Vizcaya
March 31, 2017 2017 WIN7E01102 GAA FY 2017 January 2, 2017 Region III Zambales 1st District Engineering Office
Asset Preservation of National Roads

Construction/Upgrading/Rehabilitation of Drainage along National Roads

Secondary Roads

Rehabilitation/Major Repair of Drainage Structure along Road - Olongapo - Bugallon Rd

K0181+563 - K0182+160
Cabangan, Zamabales

(Rehabilitation/Major Repair of Drainage Structure along Road)
March 31, 2017 2017 WIN7E01047 GAA FY 2017 January 2, 2017 Region III Zambales 1st District Engineering Office
Flood Control and Drainage

Drainage/Protection Works

Construction of Slope Protection/Flood Control at Sto. Niño River Dike,

Sta. 0+469 to Sta. 0+721
Cabangan, Zambales

(Construction of Slope Protection)
March 31, 2017 2017 WIN7E01104 GAA FY 2017 January 2, 2017 Region III Zambales 1st District Engineering Office
Roads and Bridges - Local Roads

Concreting of Namanaan Road located at San Narciso, Zambales

(Construction of Concrete Road)
March 31, 2017 2017 165003015200106 GAA FY 2017 January 1, 2017 Region II Cagayan 2nd District Engineering Office
Network Development - Improvement/Widening of National Roads - Tertiary – (Tuao-Rizal Section) K0530+(-1771)-K0531+499
March 31, 2017 2017 165003015800420 GAA FY 2017 January 1, 2017 Region II Cagayan 2nd District Engineering Office
MFO-1 National Road Network Services- Network Development - Road Upgrading (unpaved to paved) - Tertiary Road Upgrading Gravel to Paved- Ayaga-Sta. Marcela-Flora- Lasam Rd. K0670 +(-806) – K0670+311,K0670+314-K0671 + 047, Chainage 1292-Chainage 2368, Chainage 2388- Chainage 3472
March 31, 2017 2017 165003030800329 GAA FY 2017 January 1, 2017 Region II Cagayan 2nd District Engineering Office
Construction/ Improvement of Access Roads Leading to Declared Tourism Destination - Our Lady of Piat Diversion Road including Bridge and Approaches, Piat, Cagayan

Pages