Modification and Realignment



Date Posted GAA Year Reference No SARO Number SARO Date Region Implementing Office Description
April 21, 2017 FY 2017 WIN7E01395 UACS No. 292003020401856 January 1, 2017 National Capital Region Metro Manila 3rd District Engineering Office
As Per GAA
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Wall along Meycauayan River, Sta. 1+745 to Sta. 1+960, Valenzuela (CW1-Construction of Revetment)
UACS No. 292003020401856
Physical Target/Cost (P’000):
Original: CW1 -215.00 lm
Unit Cost (P’000): CW1 P 232.55814/lm.
Allocation (P’000): P50,000.00 M
WIN7E01395

As Modified
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Wall along Meycauayan River, Sta. 1+985 to Sta. 2+200, Valenzuela (CW1-Construction of Revetment)
UACS No. 292003020401856
Physical Target/Cost:
New: CW1 – 215.00 LM
Unit Cost (P’000): CW1 P223.62657/lm
Estimated Cost (P’000): P48,079.00
WIN7E01395
April 21, 2017 FY 2017 WIN7E01401 UACS No. 2920030200401857 January 1, 2017 National Capital Region Metro Manila 3rd District Engineering Office
Per GAA
MFO 2 Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Wall along Meycauayan River, Sta. 1+960 to Sta. 2+175, Valenzuela
(CW1-Construction of Revetment)
UACS No.: 292003020401857
Physical Target/Cost:
Original: CW1 – 215.00 lm
Unit Cost (P’000): CW1-P232.55814/ lm
Allocation (P’000): P50,000.0
Ref. No. WIN7E01401

As Modified
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Wall along Meycauayan River, Sta.2+200 to Sta. 2+415, Valenzuela, (CW1 – Construction of Revetment)
UACS No.: 292003020401857
Physical Target/Cost:
New: CW1 – 215.00 lm
Unit Cost (P’000): CW1 P223.69060/lm
Estimated Cost : P48,093.0 M
Ref. No. WIN7E01401
April 21, 2017 FY 2017 WIN7E01406 UACS No. 292003020401858 January 1, 2017 National Capital Region Metro Manila 3rd District Engineering Office
As per GAA
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Wall along Meycauayan River, Sta. 2+175 to Sta. 2+390, Valenzuela
(CW1 – Construction of Revetment)
UACS No.: 292003020401858
Physical Target/Cost:
Original: CW1 – 215.00 lm
Unit Cost (P’000): CW1 – P232.55814/lm
Allocation (P’000): P50,000.0
Ref. No. WIN7E01406

As Modified
MF0 2 - Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Wall along Meycauayan River, Sta. 2+415 to Sta. 2+630, Valenzuela (CW1 – Construction of Revetment)
UACS No.: 292003020401858
Physical Target/Cost:
New: CW1 – 215.00 lm
Unit Cost (P’000): CW1 – P223.64307/lm
Estimated Cost : P48,083.00
Ref. No. WIN7E01406
April 21, 2017 2017 165003014300279 GAA FY 2017 January 1, 2017 Region II Cagayan 3rd District Engineering Office
Asset Preservation of National Roads
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management - 4 (HDM-4)
Tertiary Roads
Cagayan-Apayao Rd - K0488 + (-358) - K0488 + (-172.72)
April 21, 2017 2017 165003014100118 GAA FY 2017 January 1, 2017 Region II Cagayan 3rd District Engineering Office
Asset Preservation of National Roads
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management - 4 (HDM-4)
Primary Roads
Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0437+(-055) - K0438+010
April 21, 2017 2017 165003014900101 GAA FY 2017 January 1, 2017 Region II Cagayan 3rd District Engineering Office
Asset Preservation of National Roads
Construction/ Upgrading/ Rehabilitation of Drainage along National Roads
Tertiary Roads
CVR Regional Govt Center Rd Network - (S00708LZ) Chainage 000 - Chainage 200, Chainage 545 - Chainage 919, (S00709LZ) Chainage 000 - Chainage 278, (S00711LZ) Chainage 000 - Chainage 286, (S00713LZ) Chainage 118 - Chainage 733, (S00714LZ) Chainage 000 - Chainage 170, (S00716LZ) Chainage 000 - Chainage 101, (S00717LZ) Chainage 98.30 - Chainage 183.30, (S00762LZ), Chainage 415.50 - Chainage 799, (S00764LZ), Chainage 682.10 - Chainage 827.20, (S00726LZ), Tuguegarao bypass Rd. K0478+439.80 - K0478+495.20
April 21, 2017 2017 165003014900100 GAA FY 2017 January 1, 2017 Region II Cagayan 3rd District Engineering Office
Asset Preservation of National Roads
Construction/ Upgrading/ Rehabilitation of Drainage along National Roads
Tertiary Roads
CVR Regional Govt Center Rd Network - (S00707LZ) Chainage 920 - Chainage 1434, (S00712LZ) Chainage 0 - Chainage 363
April 21, 2017 2017 165003016500003 GAA FY 2017 January 1, 2017 Region II Cagayan 3rd District Engineering Office
Network Development
Improvement/Widening of National Roads: Primary Roads along N1
Cagayan Valley Rd - K0493 + 360 - K0494 + 440, K0496 + 867 - K0497 + 856, K0498 + 000 - K0499 + 080, K0499 + 120 - K0499 + 220
April 21, 2017 2017 WIN7E01251 RA 10924 January 2, 2017 Region III Nueva Ecija 2nd District Engineering Office
Asset Preservation of National Roads

Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads based on Pavement Management System/Highway Development Management-4 (HDM-4)

Tertiary

Bangad-Fort Magsaysay Road
K0132+026.10-K0135+538.29

(Reconstruction from Asphalt to Concrete)
April 21, 2017 2017 WIN7E01331 R.A. 10924 January 2, 2017 Region III Nueva Ecija 2nd District Engineering Office
Locally Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads

Concreting of Road, Brgy. Mabini Homesite, Cabanatuan City, Nueva Ecija

(Construction of Concrete Road)
April 21, 2017 2017 165003015200110 GAA FY 2017 January 1, 2017 Region II Cagayan 3rd District Engineering Office
Network Development: Improvement/Widening of National Roads
Tertiary Roads: Cagayan-Apayao Rd - K0503 + 887 - K0505+420 B/S,
K0505+420 - K0505+493 L/S, K0505+493 - K0506+800 B/S (S00741LZ)
April 21, 2017 2017 WIN7E01267 R.A. 10924 January 2, 2017 Region III Nueva Ecija 2nd District Engineering Office
Network Development
Improvement/Widening of National Roads
Secondary

Nueva Ecija-Aurora Rd
K0120+474.90-K0121+597, K0136+748.14-K0137+827.65

(CW-1: Road Widening)
(CW-2: Construction of Drainage Structure along Road)
April 21, 2017 FY 2017 WIN7F04551 FY 2017 APPROVED MODIFICATION March 28, 2017 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: MFO 2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Bugnay Creek Flood Control, Kalinga (Construction of Revetment) ; Physical Target = 800 Lm

To: MFO 2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Bugnay Creek Flood Control, Kalinga (Construction of Revetment) ; Physical Target = 231 Lm
April 21, 2017 FY 2017 WIN7E01261 FY 2017 APPROVED MODIFICATION April 10, 2017 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: MFO 2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Revetment - Construction of Poswoy Flood Control along Saltan River, Kalinga (Construction of Revetment) ; Physical Target = 597 Lm

To: MFO 2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Revetment - Construction of Poswoy Flood Control along Saltan River, Kalinga (Construction of Revetment) ; Physical Target = 106 Lm
April 21, 2017 FY 2017 WIN7E01207 FY 2017 APPROVED MODIFICATION March 29, 2017 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: MFO 1 - National Road Network Services - Network Development - Road Upgrading (unpaved to paved) - Secondary - Kalinga-Abra Road - K0487+1631 - K0489+000, K0489+000 - K0489+080, K0489+1649 - K0489+1715, K0491+354 - K0491+401, K0493+887 - K0494+000, K0494+000 - K0494+058, K0494+390 - K0494+469 (S00561LZ) [Road Upgrading Gravel to Paved] ; Physical Target = 1.35 ln-km

To: MFO 1 - National Road Network Services - Network Development - Road Upgrading (unpaved to paved) - Secondary - Kalinga-Abra Road - K0488+323 - K0488+494, K0488+694 - K0489+080, K0490+676 - K0490+720, K0491+354 - K0491+401, K0493+887 - K0494+000, K0494+000 - K0494+058, K0494+390 - K0494+414 (S00561LZ) [Road Upgrading Gravel to Paved] ; Physical Target = 1.428 ln-km
April 21, 2017 2017 165003015200109 GAA FY 2017 January 1, 2017 Region II Cagayan 3rd District Engineering Office
Network Development: Improvement/Widening of National Roads
Tertiary Roads: Cagayan-Apayao Rd - K0498 + 000 - K0500 + 500, K0502 + 800 - K0503 + 887 (S00741LZ)
April 21, 2017 2017 WIN7E01250 R.A. 10924 January 2, 2017 Region III Nueva Ecija 2nd District Engineering Office
Asset Preservation of National Roads
Preventive Maintenance based on PMS/HDM-4
Secondary

Nueva Ecija-Aurora Rd
K0121+603.70-K0124+055.25

(Preventive Maintenance of Road: Asphalt Overlay)
April 21, 2017 FY 2017 WIN7E01202 FY 2017 APPROVED MODIFICATION March 29, 2017 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: MFO 1 - National Road Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary - Mt. Province Bdry - Calanan - Pinukpuk - Abbut Road: K0421+100 - K0421+120, K0421+210 - K0421+240, K0422+600 - K0422+645, K0433+850 - K0433+895, K0435+320 - K0435+357, K0439+280 - K0439+360, K0439+965 - K0439+987, K0443+457 - K0443+537, K0446+800 - K0446+880, K0446+900 - K0446+950, K0447+830 - K0447+861, K0448+750 - K0448+810, K0449+750 - K0449+810, K0452+015 - K0452+110.6, K0454+450 - K0454+483, K0457+137 - K0457+157, K0458+748 - K0458+842, K0460+420 - K0460+461, K0461+027 - K0461+045, K0461+700 - K0461+725, K0462+400 - K0462+425 [Const. of Road Slope Protection Structure] ; Physical Target = 5,024.50 sq.m.

To: MFO 1 - National Road Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary - Mt. Province Bdry - Calanan - Pinukpuk - Abbut Road: K0421+193 - K0421+214, K0422+600 - K0422+645, K0423+284 - K0423+298, K0435+396.61 - K0435+419.61, K0435+320 - K0435+357, K0438+561 - K0438+620, K0438+709 - K0438+780, K0439+109 -K0439+195, K0439+965 - K0439+987, K0443+403.22 - K0443+457, K0446+900 - K0446+935, K0446+450 - K0446+500, K0447+825 - K0447+835.45, K0448+750 - K0448+810, K0449+417 - K0449+450, K0452+015 - K0452+110.6, K0463+554 - K0463+624, K0457+157 - K0457+170, K0458+760 - K0458+790, K0460+420 - K0460+461, K0461+027 - K0461+045, K0461+700 - K0461+725, K0462+400 - K0462+425 [Const. of Road Slope Protection Structure] ; Physical Target = 4,747.53 sq.m.
April 21, 2017 FY 2017 WIN7E01203 FY 2017 APPROVED MODIFICATION March 29, 2017 Cordillera Administrative Region Upper Kalinga District Engineering Office
From: MFO 1 - National Road Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary - Construction of Road Slope Protection Structure - Kalinga-Abra Road K0467+550 - K0467+587, K0478+800 - K0478+828, K0480+1500 - K0480+1515 (S00561LZ) [Construction of Road Slope Protection Structure] [Rehab/ Major Repair of Road Slope Protection Structure] ; Physical Target = 129.50 sq.m. (construction); 259.00 sq.m. (reconstruction)

To: MFO 1 - National Road Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary - Construction of Road Slope Protection Structure - Kalinga-Abra Road K0467+550 - K0467+587, K0478+800 - K0478+828, K0480+1500 - K0480+1515 (S00561LZ) [Construction of Road Slope Protection Structure] ; Physical Target = 269.09 sq.m. (construction)
April 21, 2017 2017 WIN7E01301 R.A. 10924 January 2, 2017 Region III Nueva Ecija 2nd District Engineering Office
Network Development
Off-Carriageway Improvement including drainage
Tertiary

Bangad - Fort Magsaysay Rd (S00960LZ)
K0129+405.30-K0131+760

(Off-Carriageway Improvement: Shoulder Paving/Construction)
April 21, 2017 2017 WIN7E01249 R.A. 10924 January 2, 2017 Region III Nueva Ecija 2nd District Engineering Office
Locally Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads

Concreting of Brgy. Road, Purok 7, Kalikid Norte, Cabanatuan City, Nueva Ecija

(Construction of Concrete Road)
April 21, 2017 2017 292003020402349 GAA FY 2017 January 1, 2017 Region II Cagayan 3rd District Engineering Office
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Minanga Norte Flood Control System (Upstream), Sta. 0+000 – Sta. 0+-143.60, Minanga Norte, Iguig, Cagayan
April 21, 2017 2017 WIN7E01302 R.A. 10924 January 2, 2017 Region III Nueva Ecija 2nd District Engineering Office
Network Development - Off-Carriageway Improvement including drainage - Tertiary

Sta. Rosa - Fort Magsaysay Rd
K0114+(-)300 - K0117+534.50

(Off-Carriageway Improvement: Shoulder Paving/Construction)
April 21, 2017 2017 268004010101375 GAA FY 2017 January 1, 2017 Region II Cagayan 3rd District Engineering Office
Locally-Funded Projects
Local Infrastructure Program
Buildings and Other Structures
School Buildings
Completion of 2-Storey 4 Classrooms at Sta. Teresa Elementary School, Iguig, Cagayan
April 21, 2017 2017 WIN7E01248 R.A. 10924 January 2, 2017 Region III Nueva Ecija 2nd District Engineering Office
Asset Preservation of National Roads

Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on PMS/HDM-4

Secondary

Jct Tablang-Gabaldon Rd
K0136+000-K0139+000, K0144+974.40-K0145+778.47

(Reconstruction from Asphalt to Concrete)
April 21, 2017 2017 WIN7F04568 R.A. 10924 January 2, 2017 Region III Bulacan 1st District Engineering Office
Locally Funded Projects - Local Infrastructure Program
Buildings and Other Structures - Multipurpose/Facilities

Construction of Multi-Purpose Building (Training Center), Cut-Cot, Pulilan, Bulacan Phase II

(Construction of Multipurpose Building)
April 21, 2017 2017 WIN7E01298 R.A. 10924 January 2, 2017 Region III Bulacan 1st District Engineering Office
Locally-Funded Projects: Local Infrastructure Program
Buildings and Other Structures - Multipurpose/Facilities

Construction/Improvement of Multipurpose Building, Brgy. Biñang 1st, Bocaue, Bulacan

(Construction/Improvement)
April 21, 2017 2017 WIN7F04567 R.A. 10924 January 2, 2017 Region III Bulacan 1st District Engineering Office
Locally-Funded Projects - Local Infrastructure Program
Buildings and Other Structures - Multipurpose/Facilities

Construction of Multi-Purpose Building, Barangay San Roque, Baliwag, Bulacan

(Construction of Multipurpose Building)
April 21, 2017 2017 WIN7F04569 R.A. 10924 January 2, 2017 Region III Bulacan 1st District Engineering Office
Locally-Funded Program: Local Infrastructure Program
Buildings and Other Structures - Multipurpose/Facilities

Construction of Multi-purpose Building, Barangay Look 1st, Malolos, Bulacan

(Construction of Multipurpose Building)
April 21, 2017 2017 WIN7E01211 R.A. 10924 January 2, 2017 Region III Bulacan 1st District Engineering Office
Locally-Funded Projects - Roads and Bridges - Local Roads

Construction/Improvement of Barangay Bagbaguin, Road, Pandi, Bulacan

(Construction of Concrete Road)
April 21, 2017 2017 WIN7E01303 R.A. 10924 January 2, 2017 Region III Nueva Ecija 2nd District Engineering Office
Locally-Funded Projects: Local Infrastructure Program
Roads and Bridges - Local Roads

Road Improvement of Local Road, Sitio Lawang Bato, Cacarong Matanda, Pandi, Bulacan

(Road Improvement)
April 21, 2017 2017 WIN7E01323 R.A. 10924 January 2, 2017 Region III Bulacan 1st District Engineering Office
Locally-Funded Projects: Local Infrastructure Program
Buildings and Other Structures - School Buildings

School Improvement, Bocaue Hills ES, Batia, Bocaue, Bulacan

(Improvement)
April 21, 2017 FY 2017 WIN7E01170 FY 2017 APPROVED MODIFICATION March 16, 2017 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Baguyos Flood Control, Baguyos, Benguet [Construction of Flood Mitigation Structure]
Physical Target = 331 lm

To: MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Baguyos Flood Control, Baguyos, Benguet [Construction of Flood Mitigation Structure]
Physical Target = 275 lm
April 21, 2017 2017 WIN7E01304 R.A. 10924 January 2, 2017 Region III Bulacan 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems

Construction of Road Dike along Angat River, Pulilan, Bulacan

(Construction of Dike)
April 21, 2017 FY 2017 WIN7E01167 FY 2017 APPROVED MODIFICATION March 16, 2017 Cordillera Administrative Region Benguet 2nd District Engineering Office
From: MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Amburayan Flood Control, Taba-ao, Kapangan, Benguet [Construction of Flood Mitigation Structure]
Physical Target = 1,000 lm

To: MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Amburayan Flood Control, Taba-ao, Kapangan, Benguet [Construction of Flood Mitigation Structure]
Physical Target = 298 lm

April 20, 2017 2017 WIN7G01282 FY 2017 (R.A. 10924) April 7, 2017 Region IX Zamboanga Sibugay 2nd District Engineering Office
Buildings and Other Structures - Multipurpose/Facilities
Rehabilitation/Major Repair of Multipurpose Building (Gymnasium), Poblacion, Siay, Zamboanga Sibugay
Allocation: P 2.50 Million
Physical Target: 1 no. of building
Unit Cost: P 2,500,000/no. of building
April 20, 2017 2017 WIN7G01280 FY 2017 (R.A. 10924) April 7, 2017 Region IX Zamboanga Sibugay 2nd District Engineering Office
Roads and Bridges - Local Roads
Construction of Local Roads for Mabini Street, Lower Taway, Ipil, Zamboanga Sibugay
Section A: Sta. 0+000.00 - 0+105.00,
Section B: Sta. 0+000.00 - 0+081.00
Allocation: P 2.0 Million
Physical Target: 0.372 lane km
Unit Cost: P 5,376,344.09/lane km
April 20, 2017 2017 WIN7G01277 FY 2017 (R.A. 10924) April 7, 2017 Region IX Zamboanga Sibugay 2nd District Engineering Office
Roads and Bridges - Local Roads
Construction/Rehabilitation of Local Road, Barangay Tigbangagan to Barangay Palinta, Kabasalan, Zamboanga Sibugay
Sta. 0+000.00 - 0+521.39
Allocation: P 5.0 Million
Physical Target: 1.04278 lane km.
Unit Cost: P 4,794,875.24/lane km.
April 20, 2017 2017 WIN7G01281 FY 2017 (R.A. 10924) April 7, 2017 Region IX Zamboanga Sibugay 2nd District Engineering Office
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Tertiary
Construction of Drainage Structure along Road - Ipil - Magdaup Wharf Rd
K2014+-422.7 - K2014+-150.7 L/S
K2014+-59.9 - K2014+133 L/S
K2014+000 - K2014+091.80 R/S
K2014+640.9 - K2014+685.1 L/S
K2014+675 - K2014+715 R/S
K2014+691.1 - K2014+752.1 L/S
K2014+758.1 - K2014+778.4 L/S
Allocation: P 10.00 Million
Physical Target: 687.90 lineal meter
Unit Cost: P 14,537.00/lineal meter
April 20, 2017 2017 WIN7E01311 FY 2017 GAA January 1, 2017 Region III Pampanga 3rd District Engineering Office
Locally Funded Projects - Roads and Bridges - Local Roads
Improvement / Rehabilitation of Ayala - Sto. Niño - Turu Road, Magalang, Pampanga
(Rehabilitation of Concrete Road)
April 19, 2017 2017 WIN7C01637 R.A 10924 January 12, 2017 Region VII Cebu 4th District Engineering Office
Locally-Funded Projects - Roads and Bridges
Local Roads

Concreting of Local Road, Lapay - Linot-od, Argao, Cebu

Allocation - ₱ 15.000 Million
Physical Target - 2.4427 km / 4.8854 Lane km
Unit Cost - ₱ 6.141 Million/ km
- ₱ 3.070 Million/ km
April 19, 2017 2017 WIN7C01636 R.A 10924 January 12, 2017 Region VII Cebu 4th District Engineering Office
Locally-Funded Projects - Roads and Bridges
Local Roads

Road Improvement of Poblacion to Calin-ay Road, Samboan, Cebu

Allocation - ₱ 5.000 Million
Physical Target - 0.6794 km. / 1.3588 lane km
Unit Cost - ₱ 7.359 Million/ km
- ₱ 3.680 Million/ km
April 19, 2017 2017 WIN7C01635 R.A 10924 January 12, 2017 Region VII Cebu 4th District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-4 (HDM-4) - Tertiary

Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-4 (HDM-4), Dalaguete-Mantalongon-Badian Rd - K0091+500 - K0092+138

Allocation - ₱ 19.845 Million
Physical Target - 0.620 km./ 1.240 lane km
Unit Cost - ₱ 32.008 Million/ km
- ₱ 16.004 Million/ lane km
April 19, 2017 2017 WIN7C01639 R.A 10924 January 12, 2017 Region VII Cebu 4th District Engineering Office
Asset Preservation of National Roads - Preventive Maintenance based on Pavement Management System/Highway Development -4 (HDM-4) - Secondary

Preventive Maintenance Based on Pavement Management System/Highway Development -4 (HDM-4), Santander-Barili-Toldeo Rd, K0144+000 - K0145+000

Allocation - ₱ 14.500 Million
Physical Target - 0.999 km./ 1.998 lane km
Unit Cost - ₱ 14.515 Million/km
- ₱ 7.257 Million/ km
April 19, 2017 2017 WIN7G01035 FY 2017 (R.A 10924) March 16, 2017 Region IX Zamboanga Sibugay 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, part of Sibuguey River,
K1763+219 - K1763+497,
Barangay Pilar, Diplahan, Zamboanga Sibugay - Construction of Flood Mitigation Structure
Allocation:
Php 30.215 Million
Physical Target:
278.00 lineal meters
Unit Cost:
Php 108,687.05/lm
April 19, 2017 2017 WIN7G01089 FY 2017 (R.A. 10924) March 13, 2017 Region IX Zamboanga Sibugay 2nd District Engineering Office
Roads and Bridges - Local Roads
Concreting of Labasan - Camanga Road, Siay, Zamboanga Sibugay,
K0+000.00 - K3+111.00
Allocation: P 50.00 Million
Physical Target: 6.222 lane km
Unit Cost: P 8,036,001.29/lane km
April 19, 2017 2017 WIN7G01088 FY 2017 (R.A. 10924) March 13, 2017 Region IX Zamboanga Sibugay 2nd District Engineering Office
Roads and Bridges - Local Roads
Construction of Poblacion Titay Dalangin - Dalangin Muslim - Achasol - San Antonio Tugop - Banco - Boundary Kalawit, Zamboanga Sibugay,
K2+460.00 - K2+933.67,
K3+934.39 - K5+532.00,
Allocation: P 50.00 Million
Physical Target: 4.143 lane km.
Unit Cost: P 12,068,549.36/lane km.
April 19, 2017 2017 WIN7G01042 FY 2017 (R.A 10924) March 16, 2017 Region IX Zamboanga Sibugay 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control along Junction Imelda - Alicia Road, part of Sibuguey River,
Sta. 00+335 - Sta. 00+696.50,
Barangay Bulawan, Payao, Zamboanga Sibuga -
Construction of Flood Mitigation Structure
Allocation: Php 33.427 Million
Physical Target: 361.50 lineal meters
Unit Cost: Php 92,467.50/lm
April 19, 2017 2017 WIN7G01080 FY 2017 (R.A. 10924) March 13, 2017 Region IX Zamboanga Sibugay 2nd District Engineering Office
Roads and Bridges - Local Roads
Road Concreting of Yakal St., Brgy. Tirso Babiera, Ipil, Zamboanga Sibugay,
Sta. 0+000.00 - Sta. 0+175.40,
Sta. 0+334.50 - Sta. 0+520.00,
Allocation: P 3.0 Million
Physical Target: 0.7198 lane km.
Unit Cost: P 4,167,824.40/lane km.
April 19, 2017 2017 WIN7G01027 FY 2017 (R.A 10924) March 16, 2017 Region IX Zamboanga Sibugay 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction/Extension of Flood Control Structure along Sibuguey River,
Sta. 01+320 - Sta. 01+841 (upstream),
Barangay Bulawan, Payao, Zamboanga Sibugay -
Construction of Flood Mitigation Structure
Allocation: Php 45.230 Million
Physical Target: 521.00 lineal meters
Unit Cost: Php 86,813.82/lm
April 19, 2017 2017 WIN7G01075 FY 2017 (R.A. 10924) March 13, 2017 Region IX Zamboanga Sibugay 2nd District Engineering Office
Buildings and Other Structures - Multipurpose/Facilities
Rehabilitation/Major Repair of Covered Court, Brgy. Malubal, R.T. Lim, Zamboanga Sibugay,
Allocation: P 2.00 Million
Physical Target: 1 no. of building
Unit Cost: P 2,000,000/no. of building
April 19, 2017 2017 WIN7G01030 FY 2017 (R.A 10924) March 16, 2017 Region IX Zamboanga Sibugay 1st District Engineering Office
Network Development - Improvement/Widening of National Roads - Tertiary -
Road Widening - Diplahan Jct. - Malangas Port Rd.,
K1747+400 - K1747+922
Allocation: Php 15.00 Million
Physical Target: 1.044 lane km
Unit Cost: Php 14,367,816.09/lane km
April 19, 2017 2017 WIN7G01086 FY 2017 (R.A. 10924) March 13, 2017 Region IX Zamboanga Sibugay 2nd District Engineering Office
Buildings and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building (Barangay Hall), Brgy. Coloran, Siay, Zamboanga Sibugay
Allocation: P 2.00 Million
Physical Target: 1 no. of building
Unit Cost: P 2,000,000/no. of building
April 19, 2017 2017 WIN7G01029 FY 2017 (R.A 10924) March 16, 2017 Region IX Zamboanga Sibugay 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control along Lanao - Pagadian - Zamboanga City Road, part of Sibuguey River,
Sta. 00+539 - Sta. 00+885.50,
Barangay Balugo, Imelda, Zamboanga Sibugay - Construction of Flood Mitigation Structure
Allocation: Php 34.470 Million
Physical Target: 346.50 lineal meters
Unit Cost: Php 99,480.52/ lm
April 19, 2017 2017 WIN7G01076 FY 2017 (R.A. 10924) March 13, 2017 Region IX Zamboanga Sibugay 2nd District Engineering Office
Buildings and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building (Barangay Hall), Brgy. Surabay, R.T. Lim, Zamboanga Sibugay
Allocation: P 2.00 Million
Physical Target: 1 no. of building
Unit Cost: P 2,000,000/no. of building
April 19, 2017 2017 WIN7G01036 FY 2017 (R.A 10924) March 16, 2017 Region IX Zamboanga Sibugay 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Structure along Lanao - Pagadian - Zamboanga City Road, part of Sibuguey River,
Sta. 00+(-002) - Sta. 00+539,
Barangay Balugo, Imelda, Zamboanga Sibuguey - Construction of Flood Mitigation Structure
Allocation: Php 40.075 Million
Physical Target: 541.00 lineal meters
Unit Cost: Php 74,075.79/lm
April 19, 2017 2017 WIN7G01037 FY 2017 (R.A 10924) March 16, 2017 Region IX Zamboanga Sibugay 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, part of Sibuguey River,
Sta. 00+384 - Sta. 00+689.50,
Barangay Paradise, Diplahan, Zamboanga Sibugay - Construction of Flood Mitigation Structure
Allocation: Php 33.905 Million
Physical Target: 305.50 lineal meters
Unit Cost: Php 110,982.00/lm
April 19, 2017 2017 WIN7C01516 FY 2017 (R.A. 10924) March 27, 2017 Region IX Zamboanga Sibugay 2nd District Engineering Office
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary
Construction of Drainage Structure along Road - Ipil - Liloy - Sindangan Road,
K1996+-033 - K1996+650 L/S
K1996+650 - K1997+230 R/S
K1997+600 - K1998+218 L/S
K2009+190 - K2009+287 L/S
K2009+303 - K2009+413 L/S
K2009+420 - K2009+627 R/S
K2010+027 - K2010+284 R/S
K2010+284 - K2010+352 B/S
K2010+352 - K2010+372 R/S
Allocation: P 10.00 Million
Physical Target: 2,708 lm
Unit Cost: P 3,692.76/lm
April 19, 2017 2017 WIN7G01041 FY 2017 (R.A 10924) March 16, 2017 Region IX Zamboanga Sibugay 1st District Engineering Office
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - To Seaports -
Construction of Concrete Road - Access Road leading to Malangas Port, Zamboanga Sibugay
Sta. 00+000 - Sta. 00+174.50
Allocation: Php 1.050 Million
Physical Target: 0.1745 lane km
Unit Cost: Php 6,017,191.98/lane km
April 19, 2017 2017 WIN7G01031 FY 2017 (R.A 10924) March 16, 2017 Region IX Zamboanga Sibugay 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems- Construction/Extension of Flood Control Structure along Sibuguey River,
Sta. 00+000 - Sta. 00+528 (downstream),
Barangay Bulawan, Payao, Zamboanga Sibugay - Construction of Flood Mitigation Structure
April 19, 2017 2017 WIN7G01033 FY 2017 (R.A 10924) March 16, 2017 Region IX Zamboanga Sibugay 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure (Revetment Wall) along Sibuguey River,
Sta. 00+696.50 - Sta. 00+838 (upstream)
Barangay Bulawan, Payao, Zamboanga Sibugay - Construction of Revetment
Allocation: Php 13.543 Million
Physical Target: 141.50 lineal meters
Unit Cost: Php 95,710.25/lm
April 19, 2017 2017 WIN7C01500 FY 2017 (R.A. 10924) March 28, 2017 Region IX Zamboanga del Sur 1st District Engineering Office
Roads and Bridges - Local Roads
Road Upgrading (Gravel to Concrete) from Junction National Highway leading to Alegria Falls, Pagadian City, Zamboanga Del Sur
Sta. 00+000.00 - 00+986.39.
Allocation: P 20.00 Million
Physical Target: 1.97 lane km.
Unit Cost: Php 10,152,284.26/lane km.
April 19, 2017 2017 WIN7G01039 FY 2017 (R.A 10924) March 16, 2017 Region IX Zamboanga Sibugay 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Rehabilitation of Flood Control Structure (Revetment Wall),
K1763+663 - K1763+750,
along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, Barangay Pilar, Diplahan, Zamboanga Sibugay - Construction of Flood Mitigation Structure
Allocation: Php 10.00 Million
Physical Target: 87.00 lineal meters
Unit Cost: Php 114,942.53/lm
April 19, 2017 2017 WIN7G01038 FY 2017 (R.A 10924) March 16, 2017 Region IX Zamboanga Sibugay 1st District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary -
Construction of Road Slope Protection Structure - Jct. Imelda - Alicia Road,
K1750+822 - K1750+900 (Left Side),
K1751+138 - K1751+240 (Right Side),
K1751+275 - K1751+612 (Left Side),
K1751+686 - K1751+884 (Left Side)
Allocation: Php 48.00 Million
Physical Target: 20,785.30 square meters
Unit Cost: Php 2,309.324/sq.m.
April 19, 2017 2017 WIN7C01504 FY 2017 (R.A. 10924) March 28, 2017 Region IX Zamboanga del Sur 1st District Engineering Office
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 Lanes
Widening of Bridge - Botel Br. (B01198MN) along Lanao - Pagadian - Zamboanga City Road
K1661+131 - K1661+161
Allocation: P 25.000 Million
Physical Target: 219.60 sq. m.
Unit Cost: Php 113,843.35/sq.m.
April 19, 2017 2017 WIN7G01032 FY 2017 (R.A 10924) March 16, 2017 Region IX Zamboanga Sibugay 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Rehabilitation of Flood Control Structure (Revetment Wall), along Sibuguey River,
K1763+497 - K1763+663,
Barangay Pilar, Zamboanga, Diplahan, Zamboanga Sibugay - Rehabilitation/Major Repair of Flood Control Structure
Allocation: Php 18.334 Million
Physical Target: 166.00 lineal meters
Unit Cost: Php 110,445.78/lm
April 19, 2017 2017 WIN7C01501 FY 2017 (R.A. 10924) March 28, 2017 Region IX Zamboanga del Sur 1st District Engineering Office
Construction and Maintenance of Bridges along National Roads - Replacement of Permanent Weak Bridges
Replacement of Bridge - Tukuran Br. (B01196MN) along Lanao - Pagadian - Zamboanga City Road
K1644+877 - K1644+946.84
Allocation: P 50.00 Million
Physical Target: 511.23 sq.m.
Unit Cost: Php 97,803.34/sq.m.
April 19, 2017 2017 WIN7G01028 FY 2017 (R.A 10924) March 16, 2017 Region IX Zamboanga Sibugay 1st District Engineering Office
Network Development - Improvement/Widening of National Roads - Tertiary -
Road Widening - Jct. Imelda - Alicia Rd,
K1766+550.40 - K1768+029
Allocation: php 49.701 Million
Physical Target: 2.9572 lane km
Unit Cost:Php 16,806,776.68/lane km
April 19, 2017 2017 WIN7C01496 FY 2017 (R.A. 10924) March 28, 2017 Region IX Zamboanga del Sur 1st District Engineering Office
Roads and Bridges - Local Roads
Road Upgrading (Gravel to Concrete) from Junction National Highway leading to Calolot Mountain Resort, Tambulig, Zamboanga Del Sur
Sta. 00+000 - Sta. 00+535.35
Allocation: P 10.00 Million
Physical Target: 1.07 lane km.
Unit Cost: Php 9,345,794.39/lane km
April 19, 2017 2017 WIN7G01024 FY 2017 (R.A 10924) March 16, 2017 Region IX Zamboanga Sibugay 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Structure (Revetment Wall) along Sibuguey River,
Sta. 00+(-002) - Sta. 00+384,
Barangay Paradise, Diplahan, Zamboanga Sibugay - Construction of Revetment
Allocation: Php 42.199 Million
Physical Target: 386.00 lineal meters
Unit Cost: Php 109,323.83/lm
April 19, 2017 2017 WIN7C01497 FY 2017 (R.A. 10924) March 28, 2017 Region IX Zamboanga del Sur 1st District Engineering Office
Network Development - Improvement/Widening of National Roads
Road Widening including Drainage along Sindangan - Siayan - Dumingag - Mahayag Road (S01449MN)
K1670+761 - K1671+760,
K1672+358.40 - K1672+749.62
Allocation: P 30.00 Million
Physical Target: 2.78 lane km.
Unit Cost: Php 10,791,366.91/lane km.
April 19, 2017 2017 WIN7C01498 FY 2017 (R.A. 10924) March 28, 2017 Region IX Zamboanga del Sur 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Usugan River, Brgy. Tungawan, Tambulig, Zamboanga Del Sur
Sta. 0+000 - Sta. 0+324
Allocation: P 45.00 Million
Physical Target: 324 lm.
Unit Cost: Php 138,888.89/lm
April 19, 2017 2017 WIN7C01503 FY 2017 (R.A. 10924) March 28, 2017 Region IX Zamboanga del Sur 1st District Engineering Office
Construction /Maintenance of Flood Mitigation Structures and Drainage System
Construction of Salug Daku Flood Control, Barangay Tumapic, Mahayag, Zamboanga Del Sur
Sta. 0+000 - Sta. 0+328 R/S
Allocation: P 45.00 Million
Physical Target: 328 lm.
Unit Cost: Php 137,195.12
April 19, 2017 2017 WIN7C01499 FY 2017 (R.A. 10924) March 28, 2017 Region IX Zamboanga del Sur 1st District Engineering Office
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Dipolo River Control, Barangay Katipunan, Ramon Magsaysay, Zamboanga Del Sur
Sta. 00+000 - Sta. 00+120
Allocation: P 20.00 Million
Physical Target: 120 lm.
Unit Cost: Php 166,666.67/lm.
April 19, 2017 2017 WIN7G01128 FY 2017 (R.A 10924) March 28, 2017 Region IX Zamboanga del Norte 3rd District Engineering Office
Road Upgrading (gravel to paved) including RROW of Ma. Cristina - Pob. Sibutad Road, Dapitan City and Municipality of Sibutad, Zamboanga del Norte,
Sta. 0+000 - Sta. 2+227
Allocation:
Php 50.00 Million (Total)
Php 49.00 Million (Road)
Php 1.00 Million (ROW Acquisition)
Physical Target:
4.454 lane km. (Road)
26,724 sq.m. (ROW Acquisition)
Unit Cost:
Php 11,001,347.10/lane km (Road)
Php 37.420/sq.m. (ROW Acquisition)
April 19, 2017 2017 WIN7C01502 FY 2017 (R.A. 10924) March 28, 2017 Region IX Zamboanga del Sur 1st District Engineering Office
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 Lanes
Widening of Lantian Bridge (B01202MN) along Lanao - Pagadian - Zamboanga City Road
Allocation: P 22.500 Million
K1655+806 - k1655+831
Physical Target: 183 sq.m.
Unit Cost: Php 122,950.82/sq.m.
April 19, 2017 2017 WIN7G01123 FY 2017 (R.A 10924) March 28, 2017 Region IX Zamboanga del Norte 3rd District Engineering Office
Roads and Bridges - Local Roads -
Construction of Dapitan Sunrise Bypass Road, (including RROW), Dapitan City, Zamboanga del Norte,
Sta. 0+224.20 - Sta. 1+165
Allocation:
Php 50.00 Million (Total)
Php 49.00 Million (Concrete Road)
Php 1.00 Million (ROW Acquisition)
Physical Target:
1.882 lane km (Concrete Road)
18,815 sq.m. (ROW Acquisition)
Unit Cost:
Php 26,036,131.77/lane km (Concrete Road)
Php 53.15/sq.m. (ROW Acquisition)
April 19, 2017 2017 WIN7C01518 FY 2017 (R.A 10924) March 28, 2017 Region IX Zamboanga del Norte 3rd District Engineering Office
Network Development - Improvement/Widening of National Roads - Tertiary Roads -
Road Widening - Dipolog - Polanco - Piñan - Jct. Oroquieta Rd including RROW
K1814+680 - k1815+694.50
Allocation:
Php 43.860 Million (Total)
Php 42,982,800.00 (Road)
Php 877,200.00 (ROW Acquisition)
Physical Target:
2.029 lane km (Road)
12,174 sq.m. (ROW Acquisition)
Unit Cost:
Php 21,184,228.68/ lane km (Road)
Php 72.06/sq.m. (ROW Acquisition)
April 19, 2017 2017 WIN7C01517 FY 2017 (R.A 10924) March 28, 2017 Region IX Zamboanga del Norte 3rd District Engineering Office
Roads and Bridges - Local Roads -
Construction/Rehabilitation of Concrete Road, Sunset boulevard, (including RROW), Dapitan City, Zamboanga del Norte,
Sta. 0+003.05 - Sta. 1+260
Allocation:
Php 50.00 Million (Total)
Php 49.00 Million (Concrete Road)
Php 1.00 Million (ROW Acquisition)
Physical Target:
2.514 lane km (Concrete Road)
6,089.50 sq.m. (ROW Acquisition)
Unit Cost:
Php 19,490,851.23/ lane km (Concrete Road)
Php 164.22/sq.m. (ROW Acquisition)
April 19, 2017 2017 WIN7G01336 FY 2017 (R.A 10924) February 10, 2017 Region IX Zamboanga del Norte 3rd District Engineering Office
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary Roads -
Road Upgrading Gravel to Paved - Ilaya - Isis - Polanco Rd including ROW -
K1819+218 - K1820+100
Allocation:
Php 19.075 Million (Total)
Php 18,884,250.00 (Road)
Php 190,750.00 (ROW Acquisition)
Physical Target:
1.764 lane km (Road)
10,584.00 sq.m. (ROW Acquisition)
Unit Cost:
Php 10,705,357.14/lane km (Road)
Php 18.02/sq.m. (ROW Acquisition)
April 19, 2017 2017 WIN7G01339 FY 2017 (R.A 10924) February 10, 2017 Region IX Zamboanga del Norte 3rd District Engineering Office
Roads and Bridges - Local Roads -
Concreting of Road including RROW, Barangay Bagong Baguio, Segio Osmeña, Zamboanga del Norte
Sta. 5+000 - Sta. 6+636
Allocation:
Php 30.00 Million (Total)
Php 29,400,000.00 (Road)
Php 600,000.00 (ROW Acquisition)
Physical Target:
3.272 lane km (Road)
6,544 sq.m. (ROW Acquisition)
Unit Cost:
Php 8,985,330.07/lane km (Road)
Php 91.69/sq.m. (ROW Acquisition)
April 19, 2017 2017 WIN7E01299 GAA FY 2017 January 2, 2017 Region III Nueva Ecija 1st District Engineering Office
Roads and Bridges - Local Roads:

Rehabiliattion of Pasong-Inchik-Pura Road, Guimba-Pura, Section, Guimba, Nueva Ecija
April 19, 2017 2017 WIN7G01341 FY 2017 (R.A 10924) February 10, 2017 Region IX Zamboanga del Norte 3rd District Engineering Office
Network Development - Improvement/Widening of National Roads - Other Primary Roads -
Road Widening - Dipolog - Oroquieta National Road including RROW
K1808+914 - K1809+843
Allocation:
Php 32.09 Million (Total)
Php 31,448,200.00 (Road)
Php 641,800.00 (ROW Acquisition)
Physical Target:
1.858 lane km (Road)
11,148 sq.m. (ROW Acquisition)
Unit Cost:
Php 16,925,834.23/ lane km (Road)
Php 57.57/sq.m. (ROW Acquisition)
April 19, 2017 2017 165003015100257 GAA FY 2017 January 1, 2017 Region II Isabela 4th District Engineering Office
MFO 1 : NATIONAL ROAD NETWORK SERVICES
Network Development
Improvement/Widening of National Roads
Secondary Roads
Cordon-Diffun Rd - K0317 + -105 - K0318 + 288, K0318 + 304 - K0318 + 372, K0318 + 380 - K0318 + 985, K0318 + 997 - K0318 + 1064
April 19, 2017 2017 WIN7G01337 FY 2017 (R.A 10924) February 10, 2017 Region IX Zamboanga del Norte 3rd District Engineering Office
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4) Project Analysis - Tertiary -
Road Upgrading Gravel to Paved including RROW Piñan - Mutia Rd -
K1833+940 - K1834+068,
K1834+320 - K1834+580,
K1838+340 - K1838+562,
K1823+115 - K1823+539
Allocation:
Php 43.403 Million (Total)
Php 42,968,970.00 (Road)
Php 434,030.00 (ROW Acquisition)
Physical Target:
2.068 lane km (Road)
13,128 sq.m. (ROW Acquisition)
Unit Cost:
Php 20,778,031.91/lane km (Road)
Php 33.06/sq.m. (ROW Acquisition)
April 19, 2017 2017 WIN7G01283 FY 2017 (R.A. 10924) April 7, 2017 Region IX Zamboanga Sibugay 2nd District Engineering Office
Buildings and Other Structures - Multipurpose/Facilities
Rehabilitation/Major Repair of Public Market Roofing at Brgy. Don Andres, Ipil, Zamboanga Sibugay
Allocation: P 2.00 Million
Physical Target: 1 no. of building
Unit Cost: P 2,000,000/no. of building
April 19, 2017 GAA FY 2017 WIN7G00995 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Secondary
Widening (4 into 6 Lanes) of Davao City Diversion Road including Slope Protection and RROW, Davao City,
K1511+950 - K1512+207,
K1512+207 - K1512+286,
K1512+286 - K1512+356,
K1512+356 - K1512+530,
K1512+530 - K1512+600

TO: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Secondary
Widening (4 into 6 Lanes) of Davao City Diversion Road including Slope Protection and RROW, Brgy. Matina Crossing, Davao City 1st LD,
K1511+950 - K1512+207,
K1512+207 - K1512+286,
K1512+286 - K1512+356,
K1512+356 - K1512+530,
K1512+530 - K1512+600,
(S00013MN)

ALLOCATION: Php 133.907 Million
April 19, 2017 2017 WIN7G01131 FY 2017 (R.A 10924) March 28, 2017 Region IX Zamboanga del Norte 3rd District Engineering Office
Roads and Bridges - Local Roads -
Construction of Road including RROW, Barangay Dampalan - Barangay San Isidro Road, Sergio Osmeña, Zamboanga del Norte
Sta. 7+880.6 - Sta. 9+120
Allocation:
Php 25.00 Million (Total)
Php 24,750,000.00 (Road)
Php 250,000.00 (ROW Acquisition)
Physical Target:
2.478 lane km. (Road)
14,872.80 sq.m. (ROW Acquisition)
Unit Cost:
Php 9,987,893.46/lane km (Road)
Php 16.81 sq.m. (ROW Acquisition)
April 19, 2017 2017 WIN7G01279 FY 2017 (R.A. 10924) April 7, 2017 Region IX Zamboanga Sibugay 2nd District Engineering Office
Buildings and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building (Barangay Hall), Brgy. Malungon, Tungawan, Zamboanga Sibugay
Allocation: P 2.00 Million
Physical Target: 1 no. of building
Unit Cost: P 2,000,000/no. of building
April 19, 2017 GAA FY 2017 WIN7G01106 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 3 - Construction and Maintenance Services of Other Infrastructures:
Construction/Improvement of Access Roads Leading to Airports, Seaports and Declared Tourism Destinations-to Declared Tourism Destinations
Construction of Concrete Road-Davao del Norte-Compostela Valley-Agusan Del Sur Road leading to Various Tourism Sites, San Isidro, Davao del Norte

TO: MFO 3 - Construction and Maintenance Services of Other Infrastructures:
Construction/Improvement of Access Roads Leading to Airports, Seaports and Declared Tourism Destinations-to Declared Tourism Destinations
Concreting of Davao del Norte-Compostela Valley-Agusan del Sur Road leading to Various Tourism Sites, San Isidro, Davao del Norte

ALLOCATION: Php 200.00 Million
April 19, 2017 2017 WIN7G01278 FY 2017 (R.A. 10924) April 7, 2017 Region IX Zamboanga Sibugay 2nd District Engineering Office
Buildings and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building (Gymnasium) Phase II, Poblacion, Kabasalan, Zamboanga Sibugay
Allocation: P 5.00 Million
Physical Target: 1 no. of building
Unit Cost: P 5,000,000/no. of building
April 19, 2017 GAA FY 2017 WIN7G01107 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 3 - Construction and Maintenance Services of Other Infrastructures:
Construction/Improvement of Access Roads Leading to Airports, Seaports and Declared Tourism Destinations-to Declared Tourism Destinations
Construction of Concrete Road-Kapatagan-Tibolo Road leading to Cultural/Tribal Communities and School of Living Tradition, Tibolo, Sta. Cruz, Davao del Sur

TO: MFO 3 - Construction and Maintenance Services of Other Infrastructures:
Construction/Improvement of Access Roads Leading to Airports, Seaports and Declared Tourism Destinations-to Declared Tourism Destinations
Concreting of Kapatagan-Tibolo Road Leading to Cultural/Tribal Communities and School of Living Tradition, Tibolo, Sta. Cruz, Davao del Sur

ALLOCATION: Php 94.000 Million
April 19, 2017 GAA FY 2017 WIN7G01125 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Network Development - Construction of By-passes/Diversion Roads, Including ROW
Construction of Concrete Road - Tagum City Bypass Road (Canocotan-San Miguel-Pagsabangan) Including RROW, Tagum City, Davao del Norte

TO: MFO 1 - National Road Network Services
Network Development - Construction of By-passes/Diversion Roads, Including RROW
Construction/Improvement of Tagum City Bypass Road (Canocotan-San Miguel-Pagsabangan) Including RROW, Tagum City, Davao del Norte

ALLOCATION: Php 487.000 Million
April 19, 2017 GAA FY 2017 WIN7G01178 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services:
Network Development - Construction of By-passes/Diversion Roads, including RROW
Concreting/Widening/Improvement of Bypass Road at Buhangin-Tigatto-Mandug-Callawa-Fatima Road Including Bridge and RROW, Davao City (Package 5)

TO: MFO 1 - National Road Network Services:
Network Development - Construction of By-passes/Diversion Roads, including RROW
Concreting/Widenig/Improvement of Bypass Road at Buhangin-Tigatto-Mandug-Callawa-Fatima Road Including RROW, Davao City 2nd LD (Package 5)

ALLOCATION: Php 237.804 Million
April 19, 2017 GAA FY 2017 WIN7G01315 GAA FY 2017 R.A. 10924 January 1, 2017 Region XI Regional Office XI
MODIFICATION:

FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary
Construction of Concrete Road and Construction of Road Slope Protection Structure - Compostela-Cateel Rd (Davao Or Side),
K1570+378 - K1570+838

TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary
Rehabilitation/Reconstruction of National Road with Slope Collapse and Landslides including Road Upgrading (Gravel to Concrete) of Compostela-Cateel Road (Davao Oriental Side), Davao Oriental,
K1570+289 - K1570+899

ALLOCATION: Php 150.00 Million
April 18, 2017 2017 WIN7C01544 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Secondary

Tagbilaran North Rd. (Tagbilaran-Jetafe Sect), S00030BH - K0028+838 - K0030+500, K0033+725 - K0033+775

Allocation - ₱ 49.90 Million
Physical Target - 3.428 lane km
Unit Cost - ₱ 14,556,592.77/ lane km.
April 18, 2017 2017 WIN7C01543 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary

Slope Protection Structure at Jct. (TNR) Maribojoc-Antequera-Catagbacan (Loon) - K0022+247.40 - K0022+630

Allocation - ₱ 9.565 Million
- ₱ 9.0724 Million (CW1)
- ₱ 0.4926 Million (CW2)
Physical Target - Slope Protection - 2,708.62 square meters
- Paved Shoulder - 197.80 square meters
Unit Cost - Slope Protection - ₱ 3,349.45/ square meters
- Paved Shoulder - ₱ 2,490.39/ square meters
April 18, 2017 2017 WIN7C01535 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Tertiary

Slope Protection Structure - Tagbilaran City-Corella-Sikatuna-Loboc Rd - K0013+950 - K0014+100, K0018+300 - K0018+500, K0018+850 - K0018+900

Allocation - ₱ 13.435 Million
₱ 6.903 Million (CW1)
₱ 6.532 Million (CW2)
Physical Target
- Slope Protection - 2,031.90 square meters
- Paved Shoulder - 1,528.00 square meters
Unit Cost
- Slope Protection - ₱ 3,397.31/square meters
- Paved Shoulder - ₱ 4,274.87/ square meters
April 18, 2017 2017 WIN7C01539 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Netwrok Development - Off-Carriageway Improvement including drainage - Tertiary

Off-Carriageway Improvement including drainage at Jct. (TNR) Maribojoc-Antequera-Catagbacan (Loon) K0012+000 - K0013+931
Allocation - ₱ 49.90 Million
Physical Target - 6,088 square meters
Unit Cost - ₱ 8,196.45/ square meter
April 18, 2017 2017 WIN7C01540 R.A 10924 January 12, 2017 Region VII Bohol 1st District Engineering Office
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Seaports

Construction of Concrete Road - Access Road leading to Baclayon Port, Bohol

Allocation - ₱ 1.10 Million
Physical Target - 0.1335 lane km
Unit Cost - ₱ 8,239,700.38/ lane km