April 21, 2017 |
FY 2017 |
WIN7E01395 |
UACS No. 292003020401856 |
January 1, 2017 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As Per GAA
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Wall along Meycauayan River, Sta. 1+745 to Sta. 1+960, Valenzuela (CW1-Construction of Revetment)
UACS No. 292003020401856
Physical Target/Cost (P’000):
Original: CW1 -215.00 lm
Unit Cost (P’000): CW1 P 232.55814/lm.
Allocation (P’000): P50,000.00 M
WIN7E01395
As Modified
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Wall along Meycauayan River, Sta. 1+985 to Sta. 2+200, Valenzuela (CW1-Construction of Revetment)
UACS No. 292003020401856
Physical Target/Cost:
New: CW1 – 215.00 LM
Unit Cost (P’000): CW1 P223.62657/lm
Estimated Cost (P’000): P48,079.00
WIN7E01395
|
April 21, 2017 |
FY 2017 |
WIN7E01401 |
UACS No. 2920030200401857 |
January 1, 2017 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
Per GAA
MFO 2 Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Wall along Meycauayan River, Sta. 1+960 to Sta. 2+175, Valenzuela
(CW1-Construction of Revetment)
UACS No.: 292003020401857
Physical Target/Cost:
Original: CW1 – 215.00 lm
Unit Cost (P’000): CW1-P232.55814/ lm
Allocation (P’000): P50,000.0
Ref. No. WIN7E01401
As Modified
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Wall along Meycauayan River, Sta.2+200 to Sta. 2+415, Valenzuela, (CW1 – Construction of Revetment)
UACS No.: 292003020401857
Physical Target/Cost:
New: CW1 – 215.00 lm
Unit Cost (P’000): CW1 P223.69060/lm
Estimated Cost : P48,093.0 M
Ref. No. WIN7E01401
|
April 21, 2017 |
FY 2017 |
WIN7E01406 |
UACS No. 292003020401858 |
January 1, 2017 |
National Capital Region |
Metro Manila 3rd District Engineering Office |
As per GAA
MFO 2 – Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Wall along Meycauayan River, Sta. 2+175 to Sta. 2+390, Valenzuela
(CW1 – Construction of Revetment)
UACS No.: 292003020401858
Physical Target/Cost:
Original: CW1 – 215.00 lm
Unit Cost (P’000): CW1 – P232.55814/lm
Allocation (P’000): P50,000.0
Ref. No. WIN7E01406
As Modified
MF0 2 - Flood Management Services – Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems – Construction of Flood Control Wall along Meycauayan River, Sta. 2+415 to Sta. 2+630, Valenzuela (CW1 – Construction of Revetment)
UACS No.: 292003020401858
Physical Target/Cost:
New: CW1 – 215.00 lm
Unit Cost (P’000): CW1 – P223.64307/lm
Estimated Cost : P48,083.00
Ref. No. WIN7E01406
|
April 21, 2017 |
2017 |
165003014300279 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 3rd District Engineering Office |
Asset Preservation of National Roads
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management - 4 (HDM-4)
Tertiary Roads
Cagayan-Apayao Rd - K0488 + (-358) - K0488 + (-172.72)
|
April 21, 2017 |
2017 |
165003014100118 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 3rd District Engineering Office |
Asset Preservation of National Roads
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management - 4 (HDM-4)
Primary Roads
Kalinga-Cagayan Rd (Calanan-Enrile Section) - K0437+(-055) - K0438+010
|
April 21, 2017 |
2017 |
165003014900101 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 3rd District Engineering Office |
Asset Preservation of National Roads
Construction/ Upgrading/ Rehabilitation of Drainage along National Roads
Tertiary Roads
CVR Regional Govt Center Rd Network - (S00708LZ) Chainage 000 - Chainage 200, Chainage 545 - Chainage 919, (S00709LZ) Chainage 000 - Chainage 278, (S00711LZ) Chainage 000 - Chainage 286, (S00713LZ) Chainage 118 - Chainage 733, (S00714LZ) Chainage 000 - Chainage 170, (S00716LZ) Chainage 000 - Chainage 101, (S00717LZ) Chainage 98.30 - Chainage 183.30, (S00762LZ), Chainage 415.50 - Chainage 799, (S00764LZ), Chainage 682.10 - Chainage 827.20, (S00726LZ), Tuguegarao bypass Rd. K0478+439.80 - K0478+495.20
|
April 21, 2017 |
2017 |
165003014900100 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 3rd District Engineering Office |
Asset Preservation of National Roads
Construction/ Upgrading/ Rehabilitation of Drainage along National Roads
Tertiary Roads
CVR Regional Govt Center Rd Network - (S00707LZ) Chainage 920 - Chainage 1434, (S00712LZ) Chainage 0 - Chainage 363 |
April 21, 2017 |
2017 |
165003016500003 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 3rd District Engineering Office |
Network Development
Improvement/Widening of National Roads: Primary Roads along N1
Cagayan Valley Rd - K0493 + 360 - K0494 + 440, K0496 + 867 - K0497 + 856, K0498 + 000 - K0499 + 080, K0499 + 120 - K0499 + 220
|
April 21, 2017 |
2017 |
WIN7E01251 |
RA 10924 |
January 2, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Asset Preservation of National Roads
Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads based on Pavement Management System/Highway Development Management-4 (HDM-4)
Tertiary
Bangad-Fort Magsaysay Road
K0132+026.10-K0135+538.29
(Reconstruction from Asphalt to Concrete) |
April 21, 2017 |
2017 |
WIN7E01331 |
R.A. 10924 |
January 2, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Road, Brgy. Mabini Homesite, Cabanatuan City, Nueva Ecija
(Construction of Concrete Road) |
April 21, 2017 |
2017 |
165003015200110 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 3rd District Engineering Office |
Network Development: Improvement/Widening of National Roads
Tertiary Roads: Cagayan-Apayao Rd - K0503 + 887 - K0505+420 B/S,
K0505+420 - K0505+493 L/S, K0505+493 - K0506+800 B/S (S00741LZ) |
April 21, 2017 |
2017 |
WIN7E01267 |
R.A. 10924 |
January 2, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Network Development
Improvement/Widening of National Roads
Secondary
Nueva Ecija-Aurora Rd
K0120+474.90-K0121+597, K0136+748.14-K0137+827.65
(CW-1: Road Widening)
(CW-2: Construction of Drainage Structure along Road) |
April 21, 2017 |
FY 2017 |
WIN7F04551 |
FY 2017 APPROVED MODIFICATION |
March 28, 2017 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: MFO 2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Bugnay Creek Flood Control, Kalinga (Construction of Revetment) ; Physical Target = 800 Lm
To: MFO 2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Bugnay Creek Flood Control, Kalinga (Construction of Revetment) ; Physical Target = 231 Lm
|
April 21, 2017 |
FY 2017 |
WIN7E01261 |
FY 2017 APPROVED MODIFICATION |
April 10, 2017 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: MFO 2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Revetment - Construction of Poswoy Flood Control along Saltan River, Kalinga (Construction of Revetment) ; Physical Target = 597 Lm
To: MFO 2 : Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Revetment - Construction of Poswoy Flood Control along Saltan River, Kalinga (Construction of Revetment) ; Physical Target = 106 Lm
|
April 21, 2017 |
FY 2017 |
WIN7E01207 |
FY 2017 APPROVED MODIFICATION |
March 29, 2017 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: MFO 1 - National Road Network Services - Network Development - Road Upgrading (unpaved to paved) - Secondary - Kalinga-Abra Road - K0487+1631 - K0489+000, K0489+000 - K0489+080, K0489+1649 - K0489+1715, K0491+354 - K0491+401, K0493+887 - K0494+000, K0494+000 - K0494+058, K0494+390 - K0494+469 (S00561LZ) [Road Upgrading Gravel to Paved] ; Physical Target = 1.35 ln-km
To: MFO 1 - National Road Network Services - Network Development - Road Upgrading (unpaved to paved) - Secondary - Kalinga-Abra Road - K0488+323 - K0488+494, K0488+694 - K0489+080, K0490+676 - K0490+720, K0491+354 - K0491+401, K0493+887 - K0494+000, K0494+000 - K0494+058, K0494+390 - K0494+414 (S00561LZ) [Road Upgrading Gravel to Paved] ; Physical Target = 1.428 ln-km
|
April 21, 2017 |
2017 |
165003015200109 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 3rd District Engineering Office |
Network Development: Improvement/Widening of National Roads
Tertiary Roads: Cagayan-Apayao Rd - K0498 + 000 - K0500 + 500, K0502 + 800 - K0503 + 887 (S00741LZ)
|
April 21, 2017 |
2017 |
WIN7E01250 |
R.A. 10924 |
January 2, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Asset Preservation of National Roads
Preventive Maintenance based on PMS/HDM-4
Secondary
Nueva Ecija-Aurora Rd
K0121+603.70-K0124+055.25
(Preventive Maintenance of Road: Asphalt Overlay) |
April 21, 2017 |
FY 2017 |
WIN7E01202 |
FY 2017 APPROVED MODIFICATION |
March 29, 2017 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: MFO 1 - National Road Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary - Mt. Province Bdry - Calanan - Pinukpuk - Abbut Road: K0421+100 - K0421+120, K0421+210 - K0421+240, K0422+600 - K0422+645, K0433+850 - K0433+895, K0435+320 - K0435+357, K0439+280 - K0439+360, K0439+965 - K0439+987, K0443+457 - K0443+537, K0446+800 - K0446+880, K0446+900 - K0446+950, K0447+830 - K0447+861, K0448+750 - K0448+810, K0449+750 - K0449+810, K0452+015 - K0452+110.6, K0454+450 - K0454+483, K0457+137 - K0457+157, K0458+748 - K0458+842, K0460+420 - K0460+461, K0461+027 - K0461+045, K0461+700 - K0461+725, K0462+400 - K0462+425 [Const. of Road Slope Protection Structure] ; Physical Target = 5,024.50 sq.m.
To: MFO 1 - National Road Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary - Mt. Province Bdry - Calanan - Pinukpuk - Abbut Road: K0421+193 - K0421+214, K0422+600 - K0422+645, K0423+284 - K0423+298, K0435+396.61 - K0435+419.61, K0435+320 - K0435+357, K0438+561 - K0438+620, K0438+709 - K0438+780, K0439+109 -K0439+195, K0439+965 - K0439+987, K0443+403.22 - K0443+457, K0446+900 - K0446+935, K0446+450 - K0446+500, K0447+825 - K0447+835.45, K0448+750 - K0448+810, K0449+417 - K0449+450, K0452+015 - K0452+110.6, K0463+554 - K0463+624, K0457+157 - K0457+170, K0458+760 - K0458+790, K0460+420 - K0460+461, K0461+027 - K0461+045, K0461+700 - K0461+725, K0462+400 - K0462+425 [Const. of Road Slope Protection Structure] ; Physical Target = 4,747.53 sq.m.
|
April 21, 2017 |
FY 2017 |
WIN7E01203 |
FY 2017 APPROVED MODIFICATION |
March 29, 2017 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: MFO 1 - National Road Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary - Construction of Road Slope Protection Structure - Kalinga-Abra Road K0467+550 - K0467+587, K0478+800 - K0478+828, K0480+1500 - K0480+1515 (S00561LZ) [Construction of Road Slope Protection Structure] [Rehab/ Major Repair of Road Slope Protection Structure] ; Physical Target = 129.50 sq.m. (construction); 259.00 sq.m. (reconstruction)
To: MFO 1 - National Road Network Services - Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary - Construction of Road Slope Protection Structure - Kalinga-Abra Road K0467+550 - K0467+587, K0478+800 - K0478+828, K0480+1500 - K0480+1515 (S00561LZ) [Construction of Road Slope Protection Structure] ; Physical Target = 269.09 sq.m. (construction)
|
April 21, 2017 |
2017 |
WIN7E01301 |
R.A. 10924 |
January 2, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Network Development
Off-Carriageway Improvement including drainage
Tertiary
Bangad - Fort Magsaysay Rd (S00960LZ)
K0129+405.30-K0131+760
(Off-Carriageway Improvement: Shoulder Paving/Construction) |
April 21, 2017 |
2017 |
WIN7E01249 |
R.A. 10924 |
January 2, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Brgy. Road, Purok 7, Kalikid Norte, Cabanatuan City, Nueva Ecija
(Construction of Concrete Road) |
April 21, 2017 |
2017 |
292003020402349 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 3rd District Engineering Office |
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Minanga Norte Flood Control System (Upstream), Sta. 0+000 – Sta. 0+-143.60, Minanga Norte, Iguig, Cagayan
|
April 21, 2017 |
2017 |
WIN7E01302 |
R.A. 10924 |
January 2, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Network Development - Off-Carriageway Improvement including drainage - Tertiary
Sta. Rosa - Fort Magsaysay Rd
K0114+(-)300 - K0117+534.50
(Off-Carriageway Improvement: Shoulder Paving/Construction) |
April 21, 2017 |
2017 |
268004010101375 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 3rd District Engineering Office |
Locally-Funded Projects
Local Infrastructure Program
Buildings and Other Structures
School Buildings
Completion of 2-Storey 4 Classrooms at Sta. Teresa Elementary School, Iguig, Cagayan
|
April 21, 2017 |
2017 |
WIN7E01248 |
R.A. 10924 |
January 2, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Asset Preservation of National Roads
Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on PMS/HDM-4
Secondary
Jct Tablang-Gabaldon Rd
K0136+000-K0139+000, K0144+974.40-K0145+778.47
(Reconstruction from Asphalt to Concrete) |
April 21, 2017 |
2017 |
WIN7F04568 |
R.A. 10924 |
January 2, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Locally Funded Projects - Local Infrastructure Program
Buildings and Other Structures - Multipurpose/Facilities
Construction of Multi-Purpose Building (Training Center), Cut-Cot, Pulilan, Bulacan Phase II
(Construction of Multipurpose Building) |
April 21, 2017 |
2017 |
WIN7E01298 |
R.A. 10924 |
January 2, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Locally-Funded Projects: Local Infrastructure Program
Buildings and Other Structures - Multipurpose/Facilities
Construction/Improvement of Multipurpose Building, Brgy. Biñang 1st, Bocaue, Bulacan
(Construction/Improvement) |
April 21, 2017 |
2017 |
WIN7F04567 |
R.A. 10924 |
January 2, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Buildings and Other Structures - Multipurpose/Facilities
Construction of Multi-Purpose Building, Barangay San Roque, Baliwag, Bulacan
(Construction of Multipurpose Building) |
April 21, 2017 |
2017 |
WIN7F04569 |
R.A. 10924 |
January 2, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Locally-Funded Program: Local Infrastructure Program
Buildings and Other Structures - Multipurpose/Facilities
Construction of Multi-purpose Building, Barangay Look 1st, Malolos, Bulacan
(Construction of Multipurpose Building) |
April 21, 2017 |
2017 |
WIN7E01211 |
R.A. 10924 |
January 2, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Locally-Funded Projects - Roads and Bridges - Local Roads
Construction/Improvement of Barangay Bagbaguin, Road, Pandi, Bulacan
(Construction of Concrete Road) |
April 21, 2017 |
2017 |
WIN7E01303 |
R.A. 10924 |
January 2, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects: Local Infrastructure Program
Roads and Bridges - Local Roads
Road Improvement of Local Road, Sitio Lawang Bato, Cacarong Matanda, Pandi, Bulacan
(Road Improvement) |
April 21, 2017 |
2017 |
WIN7E01323 |
R.A. 10924 |
January 2, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Locally-Funded Projects: Local Infrastructure Program
Buildings and Other Structures - School Buildings
School Improvement, Bocaue Hills ES, Batia, Bocaue, Bulacan
(Improvement) |
April 21, 2017 |
FY 2017 |
WIN7E01170 |
FY 2017 APPROVED MODIFICATION |
March 16, 2017 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Baguyos Flood Control, Baguyos, Benguet [Construction of Flood Mitigation Structure]
Physical Target = 331 lm
To: MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Baguyos Flood Control, Baguyos, Benguet [Construction of Flood Mitigation Structure]
Physical Target = 275 lm |
April 21, 2017 |
2017 |
WIN7E01304 |
R.A. 10924 |
January 2, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Road Dike along Angat River, Pulilan, Bulacan
(Construction of Dike) |
April 21, 2017 |
FY 2017 |
WIN7E01167 |
FY 2017 APPROVED MODIFICATION |
March 16, 2017 |
Cordillera Administrative Region |
Benguet 2nd District Engineering Office |
From: MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Amburayan Flood Control, Taba-ao, Kapangan, Benguet [Construction of Flood Mitigation Structure]
Physical Target = 1,000 lm
To: MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Amburayan Flood Control, Taba-ao, Kapangan, Benguet [Construction of Flood Mitigation Structure]
Physical Target = 298 lm
|
April 20, 2017 |
2017 |
WIN7G01282 |
FY 2017 (R.A. 10924) |
April 7, 2017 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
Buildings and Other Structures - Multipurpose/Facilities
Rehabilitation/Major Repair of Multipurpose Building (Gymnasium), Poblacion, Siay, Zamboanga Sibugay
Allocation: P 2.50 Million
Physical Target: 1 no. of building
Unit Cost: P 2,500,000/no. of building |
April 20, 2017 |
2017 |
WIN7G01280 |
FY 2017 (R.A. 10924) |
April 7, 2017 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
Roads and Bridges - Local Roads
Construction of Local Roads for Mabini Street, Lower Taway, Ipil, Zamboanga Sibugay
Section A: Sta. 0+000.00 - 0+105.00,
Section B: Sta. 0+000.00 - 0+081.00
Allocation: P 2.0 Million
Physical Target: 0.372 lane km
Unit Cost: P 5,376,344.09/lane km |
April 20, 2017 |
2017 |
WIN7G01277 |
FY 2017 (R.A. 10924) |
April 7, 2017 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
Roads and Bridges - Local Roads
Construction/Rehabilitation of Local Road, Barangay Tigbangagan to Barangay Palinta, Kabasalan, Zamboanga Sibugay
Sta. 0+000.00 - 0+521.39
Allocation: P 5.0 Million
Physical Target: 1.04278 lane km.
Unit Cost: P 4,794,875.24/lane km. |
April 20, 2017 |
2017 |
WIN7G01281 |
FY 2017 (R.A. 10924) |
April 7, 2017 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Tertiary
Construction of Drainage Structure along Road - Ipil - Magdaup Wharf Rd
K2014+-422.7 - K2014+-150.7 L/S
K2014+-59.9 - K2014+133 L/S
K2014+000 - K2014+091.80 R/S
K2014+640.9 - K2014+685.1 L/S
K2014+675 - K2014+715 R/S
K2014+691.1 - K2014+752.1 L/S
K2014+758.1 - K2014+778.4 L/S
Allocation: P 10.00 Million
Physical Target: 687.90 lineal meter
Unit Cost: P 14,537.00/lineal meter |
April 20, 2017 |
2017 |
WIN7E01311 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 3rd District Engineering Office |
Locally Funded Projects - Roads and Bridges - Local Roads
Improvement / Rehabilitation of Ayala - Sto. Niño - Turu Road, Magalang, Pampanga
(Rehabilitation of Concrete Road) |
April 19, 2017 |
2017 |
WIN7C01637 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 4th District Engineering Office |
Locally-Funded Projects - Roads and Bridges
Local Roads
Concreting of Local Road, Lapay - Linot-od, Argao, Cebu
Allocation - ₱ 15.000 Million
Physical Target - 2.4427 km / 4.8854 Lane km
Unit Cost - ₱ 6.141 Million/ km
- ₱ 3.070 Million/ km |
April 19, 2017 |
2017 |
WIN7C01636 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 4th District Engineering Office |
Locally-Funded Projects - Roads and Bridges
Local Roads
Road Improvement of Poblacion to Calin-ay Road, Samboan, Cebu
Allocation - ₱ 5.000 Million
Physical Target - 0.6794 km. / 1.3588 lane km
Unit Cost - ₱ 7.359 Million/ km
- ₱ 3.680 Million/ km |
April 19, 2017 |
2017 |
WIN7C01635 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 4th District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-4 (HDM-4) - Tertiary
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management-4 (HDM-4), Dalaguete-Mantalongon-Badian Rd - K0091+500 - K0092+138
Allocation - ₱ 19.845 Million
Physical Target - 0.620 km./ 1.240 lane km
Unit Cost - ₱ 32.008 Million/ km
- ₱ 16.004 Million/ lane km |
April 19, 2017 |
2017 |
WIN7C01639 |
R.A 10924 |
January 12, 2017 |
Region VII |
Cebu 4th District Engineering Office |
Asset Preservation of National Roads - Preventive Maintenance based on Pavement Management System/Highway Development -4 (HDM-4) - Secondary
Preventive Maintenance Based on Pavement Management System/Highway Development -4 (HDM-4), Santander-Barili-Toldeo Rd, K0144+000 - K0145+000
Allocation - ₱ 14.500 Million
Physical Target - 0.999 km./ 1.998 lane km
Unit Cost - ₱ 14.515 Million/km
- ₱ 7.257 Million/ km |
April 19, 2017 |
2017 |
WIN7G01035 |
FY 2017 (R.A 10924) |
March 16, 2017 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, part of Sibuguey River,
K1763+219 - K1763+497,
Barangay Pilar, Diplahan, Zamboanga Sibugay - Construction of Flood Mitigation Structure
Allocation:
Php 30.215 Million
Physical Target:
278.00 lineal meters
Unit Cost:
Php 108,687.05/lm |
April 19, 2017 |
2017 |
WIN7G01089 |
FY 2017 (R.A. 10924) |
March 13, 2017 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
Roads and Bridges - Local Roads
Concreting of Labasan - Camanga Road, Siay, Zamboanga Sibugay,
K0+000.00 - K3+111.00
Allocation: P 50.00 Million
Physical Target: 6.222 lane km
Unit Cost: P 8,036,001.29/lane km |
April 19, 2017 |
2017 |
WIN7G01088 |
FY 2017 (R.A. 10924) |
March 13, 2017 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
Roads and Bridges - Local Roads
Construction of Poblacion Titay Dalangin - Dalangin Muslim - Achasol - San Antonio Tugop - Banco - Boundary Kalawit, Zamboanga Sibugay,
K2+460.00 - K2+933.67,
K3+934.39 - K5+532.00,
Allocation: P 50.00 Million
Physical Target: 4.143 lane km.
Unit Cost: P 12,068,549.36/lane km. |
April 19, 2017 |
2017 |
WIN7G01042 |
FY 2017 (R.A 10924) |
March 16, 2017 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control along Junction Imelda - Alicia Road, part of Sibuguey River,
Sta. 00+335 - Sta. 00+696.50,
Barangay Bulawan, Payao, Zamboanga Sibuga -
Construction of Flood Mitigation Structure
Allocation: Php 33.427 Million
Physical Target: 361.50 lineal meters
Unit Cost: Php 92,467.50/lm |
April 19, 2017 |
2017 |
WIN7G01080 |
FY 2017 (R.A. 10924) |
March 13, 2017 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
Roads and Bridges - Local Roads
Road Concreting of Yakal St., Brgy. Tirso Babiera, Ipil, Zamboanga Sibugay,
Sta. 0+000.00 - Sta. 0+175.40,
Sta. 0+334.50 - Sta. 0+520.00,
Allocation: P 3.0 Million
Physical Target: 0.7198 lane km.
Unit Cost: P 4,167,824.40/lane km. |
April 19, 2017 |
2017 |
WIN7G01027 |
FY 2017 (R.A 10924) |
March 16, 2017 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction/Extension of Flood Control Structure along Sibuguey River,
Sta. 01+320 - Sta. 01+841 (upstream),
Barangay Bulawan, Payao, Zamboanga Sibugay -
Construction of Flood Mitigation Structure
Allocation: Php 45.230 Million
Physical Target: 521.00 lineal meters
Unit Cost: Php 86,813.82/lm |
April 19, 2017 |
2017 |
WIN7G01075 |
FY 2017 (R.A. 10924) |
March 13, 2017 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
Buildings and Other Structures - Multipurpose/Facilities
Rehabilitation/Major Repair of Covered Court, Brgy. Malubal, R.T. Lim, Zamboanga Sibugay,
Allocation: P 2.00 Million
Physical Target: 1 no. of building
Unit Cost: P 2,000,000/no. of building |
April 19, 2017 |
2017 |
WIN7G01030 |
FY 2017 (R.A 10924) |
March 16, 2017 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
Network Development - Improvement/Widening of National Roads - Tertiary -
Road Widening - Diplahan Jct. - Malangas Port Rd.,
K1747+400 - K1747+922
Allocation: Php 15.00 Million
Physical Target: 1.044 lane km
Unit Cost: Php 14,367,816.09/lane km |
April 19, 2017 |
2017 |
WIN7G01086 |
FY 2017 (R.A. 10924) |
March 13, 2017 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
Buildings and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building (Barangay Hall), Brgy. Coloran, Siay, Zamboanga Sibugay
Allocation: P 2.00 Million
Physical Target: 1 no. of building
Unit Cost: P 2,000,000/no. of building |
April 19, 2017 |
2017 |
WIN7G01029 |
FY 2017 (R.A 10924) |
March 16, 2017 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control along Lanao - Pagadian - Zamboanga City Road, part of Sibuguey River,
Sta. 00+539 - Sta. 00+885.50,
Barangay Balugo, Imelda, Zamboanga Sibugay - Construction of Flood Mitigation Structure
Allocation: Php 34.470 Million
Physical Target: 346.50 lineal meters
Unit Cost: Php 99,480.52/ lm |
April 19, 2017 |
2017 |
WIN7G01076 |
FY 2017 (R.A. 10924) |
March 13, 2017 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
Buildings and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building (Barangay Hall), Brgy. Surabay, R.T. Lim, Zamboanga Sibugay
Allocation: P 2.00 Million
Physical Target: 1 no. of building
Unit Cost: P 2,000,000/no. of building |
April 19, 2017 |
2017 |
WIN7G01036 |
FY 2017 (R.A 10924) |
March 16, 2017 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Structure along Lanao - Pagadian - Zamboanga City Road, part of Sibuguey River,
Sta. 00+(-002) - Sta. 00+539,
Barangay Balugo, Imelda, Zamboanga Sibuguey - Construction of Flood Mitigation Structure
Allocation: Php 40.075 Million
Physical Target: 541.00 lineal meters
Unit Cost: Php 74,075.79/lm |
April 19, 2017 |
2017 |
WIN7G01037 |
FY 2017 (R.A 10924) |
March 16, 2017 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, part of Sibuguey River,
Sta. 00+384 - Sta. 00+689.50,
Barangay Paradise, Diplahan, Zamboanga Sibugay - Construction of Flood Mitigation Structure
Allocation: Php 33.905 Million
Physical Target: 305.50 lineal meters
Unit Cost: Php 110,982.00/lm |
April 19, 2017 |
2017 |
WIN7C01516 |
FY 2017 (R.A. 10924) |
March 27, 2017 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary
Construction of Drainage Structure along Road - Ipil - Liloy - Sindangan Road,
K1996+-033 - K1996+650 L/S
K1996+650 - K1997+230 R/S
K1997+600 - K1998+218 L/S
K2009+190 - K2009+287 L/S
K2009+303 - K2009+413 L/S
K2009+420 - K2009+627 R/S
K2010+027 - K2010+284 R/S
K2010+284 - K2010+352 B/S
K2010+352 - K2010+372 R/S
Allocation: P 10.00 Million
Physical Target: 2,708 lm
Unit Cost: P 3,692.76/lm |
April 19, 2017 |
2017 |
WIN7G01041 |
FY 2017 (R.A 10924) |
March 16, 2017 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - To Seaports -
Construction of Concrete Road - Access Road leading to Malangas Port, Zamboanga Sibugay
Sta. 00+000 - Sta. 00+174.50
Allocation: Php 1.050 Million
Physical Target: 0.1745 lane km
Unit Cost: Php 6,017,191.98/lane km |
April 19, 2017 |
2017 |
WIN7G01031 |
FY 2017 (R.A 10924) |
March 16, 2017 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems- Construction/Extension of Flood Control Structure along Sibuguey River,
Sta. 00+000 - Sta. 00+528 (downstream),
Barangay Bulawan, Payao, Zamboanga Sibugay - Construction of Flood Mitigation Structure |
April 19, 2017 |
2017 |
WIN7G01033 |
FY 2017 (R.A 10924) |
March 16, 2017 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure (Revetment Wall) along Sibuguey River,
Sta. 00+696.50 - Sta. 00+838 (upstream)
Barangay Bulawan, Payao, Zamboanga Sibugay - Construction of Revetment
Allocation: Php 13.543 Million
Physical Target: 141.50 lineal meters
Unit Cost: Php 95,710.25/lm |
April 19, 2017 |
2017 |
WIN7C01500 |
FY 2017 (R.A. 10924) |
March 28, 2017 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
Roads and Bridges - Local Roads
Road Upgrading (Gravel to Concrete) from Junction National Highway leading to Alegria Falls, Pagadian City, Zamboanga Del Sur
Sta. 00+000.00 - 00+986.39.
Allocation: P 20.00 Million
Physical Target: 1.97 lane km.
Unit Cost: Php 10,152,284.26/lane km. |
April 19, 2017 |
2017 |
WIN7G01039 |
FY 2017 (R.A 10924) |
March 16, 2017 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Rehabilitation of Flood Control Structure (Revetment Wall),
K1763+663 - K1763+750,
along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road, Barangay Pilar, Diplahan, Zamboanga Sibugay - Construction of Flood Mitigation Structure
Allocation: Php 10.00 Million
Physical Target: 87.00 lineal meters
Unit Cost: Php 114,942.53/lm |
April 19, 2017 |
2017 |
WIN7G01038 |
FY 2017 (R.A 10924) |
March 16, 2017 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary -
Construction of Road Slope Protection Structure - Jct. Imelda - Alicia Road,
K1750+822 - K1750+900 (Left Side),
K1751+138 - K1751+240 (Right Side),
K1751+275 - K1751+612 (Left Side),
K1751+686 - K1751+884 (Left Side)
Allocation: Php 48.00 Million
Physical Target: 20,785.30 square meters
Unit Cost: Php 2,309.324/sq.m. |
April 19, 2017 |
2017 |
WIN7C01504 |
FY 2017 (R.A. 10924) |
March 28, 2017 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 Lanes
Widening of Bridge - Botel Br. (B01198MN) along Lanao - Pagadian - Zamboanga City Road
K1661+131 - K1661+161
Allocation: P 25.000 Million
Physical Target: 219.60 sq. m.
Unit Cost: Php 113,843.35/sq.m. |
April 19, 2017 |
2017 |
WIN7G01032 |
FY 2017 (R.A 10924) |
March 16, 2017 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Rehabilitation of Flood Control Structure (Revetment Wall), along Sibuguey River,
K1763+497 - K1763+663,
Barangay Pilar, Zamboanga, Diplahan, Zamboanga Sibugay - Rehabilitation/Major Repair of Flood Control Structure
Allocation: Php 18.334 Million
Physical Target: 166.00 lineal meters
Unit Cost: Php 110,445.78/lm |
April 19, 2017 |
2017 |
WIN7C01501 |
FY 2017 (R.A. 10924) |
March 28, 2017 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
Construction and Maintenance of Bridges along National Roads - Replacement of Permanent Weak Bridges
Replacement of Bridge - Tukuran Br. (B01196MN) along Lanao - Pagadian - Zamboanga City Road
K1644+877 - K1644+946.84
Allocation: P 50.00 Million
Physical Target: 511.23 sq.m.
Unit Cost: Php 97,803.34/sq.m. |
April 19, 2017 |
2017 |
WIN7G01028 |
FY 2017 (R.A 10924) |
March 16, 2017 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
Network Development - Improvement/Widening of National Roads - Tertiary -
Road Widening - Jct. Imelda - Alicia Rd,
K1766+550.40 - K1768+029
Allocation: php 49.701 Million
Physical Target: 2.9572 lane km
Unit Cost:Php 16,806,776.68/lane km |
April 19, 2017 |
2017 |
WIN7C01496 |
FY 2017 (R.A. 10924) |
March 28, 2017 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
Roads and Bridges - Local Roads
Road Upgrading (Gravel to Concrete) from Junction National Highway leading to Calolot Mountain Resort, Tambulig, Zamboanga Del Sur
Sta. 00+000 - Sta. 00+535.35
Allocation: P 10.00 Million
Physical Target: 1.07 lane km.
Unit Cost: Php 9,345,794.39/lane km |
April 19, 2017 |
2017 |
WIN7G01024 |
FY 2017 (R.A 10924) |
March 16, 2017 |
Region IX |
Zamboanga Sibugay 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Structure (Revetment Wall) along Sibuguey River,
Sta. 00+(-002) - Sta. 00+384,
Barangay Paradise, Diplahan, Zamboanga Sibugay - Construction of Revetment
Allocation: Php 42.199 Million
Physical Target: 386.00 lineal meters
Unit Cost: Php 109,323.83/lm |
April 19, 2017 |
2017 |
WIN7C01497 |
FY 2017 (R.A. 10924) |
March 28, 2017 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
Network Development - Improvement/Widening of National Roads
Road Widening including Drainage along Sindangan - Siayan - Dumingag - Mahayag Road (S01449MN)
K1670+761 - K1671+760,
K1672+358.40 - K1672+749.62
Allocation: P 30.00 Million
Physical Target: 2.78 lane km.
Unit Cost: Php 10,791,366.91/lane km. |
April 19, 2017 |
2017 |
WIN7C01498 |
FY 2017 (R.A. 10924) |
March 28, 2017 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Structure along Usugan River, Brgy. Tungawan, Tambulig, Zamboanga Del Sur
Sta. 0+000 - Sta. 0+324
Allocation: P 45.00 Million
Physical Target: 324 lm.
Unit Cost: Php 138,888.89/lm |
April 19, 2017 |
2017 |
WIN7C01503 |
FY 2017 (R.A. 10924) |
March 28, 2017 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
Construction /Maintenance of Flood Mitigation Structures and Drainage System
Construction of Salug Daku Flood Control, Barangay Tumapic, Mahayag, Zamboanga Del Sur
Sta. 0+000 - Sta. 0+328 R/S
Allocation: P 45.00 Million
Physical Target: 328 lm.
Unit Cost: Php 137,195.12 |
April 19, 2017 |
2017 |
WIN7C01499 |
FY 2017 (R.A. 10924) |
March 28, 2017 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Dipolo River Control, Barangay Katipunan, Ramon Magsaysay, Zamboanga Del Sur
Sta. 00+000 - Sta. 00+120
Allocation: P 20.00 Million
Physical Target: 120 lm.
Unit Cost: Php 166,666.67/lm. |
April 19, 2017 |
2017 |
WIN7G01128 |
FY 2017 (R.A 10924) |
March 28, 2017 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
Road Upgrading (gravel to paved) including RROW of Ma. Cristina - Pob. Sibutad Road, Dapitan City and Municipality of Sibutad, Zamboanga del Norte,
Sta. 0+000 - Sta. 2+227
Allocation:
Php 50.00 Million (Total)
Php 49.00 Million (Road)
Php 1.00 Million (ROW Acquisition)
Physical Target:
4.454 lane km. (Road)
26,724 sq.m. (ROW Acquisition)
Unit Cost:
Php 11,001,347.10/lane km (Road)
Php 37.420/sq.m. (ROW Acquisition) |
April 19, 2017 |
2017 |
WIN7C01502 |
FY 2017 (R.A. 10924) |
March 28, 2017 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 Lanes
Widening of Lantian Bridge (B01202MN) along Lanao - Pagadian - Zamboanga City Road
Allocation: P 22.500 Million
K1655+806 - k1655+831
Physical Target: 183 sq.m.
Unit Cost: Php 122,950.82/sq.m. |
April 19, 2017 |
2017 |
WIN7G01123 |
FY 2017 (R.A 10924) |
March 28, 2017 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
Roads and Bridges - Local Roads -
Construction of Dapitan Sunrise Bypass Road, (including RROW), Dapitan City, Zamboanga del Norte,
Sta. 0+224.20 - Sta. 1+165
Allocation:
Php 50.00 Million (Total)
Php 49.00 Million (Concrete Road)
Php 1.00 Million (ROW Acquisition)
Physical Target:
1.882 lane km (Concrete Road)
18,815 sq.m. (ROW Acquisition)
Unit Cost:
Php 26,036,131.77/lane km (Concrete Road)
Php 53.15/sq.m. (ROW Acquisition) |
April 19, 2017 |
2017 |
WIN7C01518 |
FY 2017 (R.A 10924) |
March 28, 2017 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
Network Development - Improvement/Widening of National Roads - Tertiary Roads -
Road Widening - Dipolog - Polanco - Piñan - Jct. Oroquieta Rd including RROW
K1814+680 - k1815+694.50
Allocation:
Php 43.860 Million (Total)
Php 42,982,800.00 (Road)
Php 877,200.00 (ROW Acquisition)
Physical Target:
2.029 lane km (Road)
12,174 sq.m. (ROW Acquisition)
Unit Cost:
Php 21,184,228.68/ lane km (Road)
Php 72.06/sq.m. (ROW Acquisition) |
April 19, 2017 |
2017 |
WIN7C01517 |
FY 2017 (R.A 10924) |
March 28, 2017 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
Roads and Bridges - Local Roads -
Construction/Rehabilitation of Concrete Road, Sunset boulevard, (including RROW), Dapitan City, Zamboanga del Norte,
Sta. 0+003.05 - Sta. 1+260
Allocation:
Php 50.00 Million (Total)
Php 49.00 Million (Concrete Road)
Php 1.00 Million (ROW Acquisition)
Physical Target:
2.514 lane km (Concrete Road)
6,089.50 sq.m. (ROW Acquisition)
Unit Cost:
Php 19,490,851.23/ lane km (Concrete Road)
Php 164.22/sq.m. (ROW Acquisition) |
April 19, 2017 |
2017 |
WIN7G01336 |
FY 2017 (R.A 10924) |
February 10, 2017 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary Roads -
Road Upgrading Gravel to Paved - Ilaya - Isis - Polanco Rd including ROW -
K1819+218 - K1820+100
Allocation:
Php 19.075 Million (Total)
Php 18,884,250.00 (Road)
Php 190,750.00 (ROW Acquisition)
Physical Target:
1.764 lane km (Road)
10,584.00 sq.m. (ROW Acquisition)
Unit Cost:
Php 10,705,357.14/lane km (Road)
Php 18.02/sq.m. (ROW Acquisition) |
April 19, 2017 |
2017 |
WIN7G01339 |
FY 2017 (R.A 10924) |
February 10, 2017 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
Roads and Bridges - Local Roads -
Concreting of Road including RROW, Barangay Bagong Baguio, Segio Osmeña, Zamboanga del Norte
Sta. 5+000 - Sta. 6+636
Allocation:
Php 30.00 Million (Total)
Php 29,400,000.00 (Road)
Php 600,000.00 (ROW Acquisition)
Physical Target:
3.272 lane km (Road)
6,544 sq.m. (ROW Acquisition)
Unit Cost:
Php 8,985,330.07/lane km (Road)
Php 91.69/sq.m. (ROW Acquisition) |
April 19, 2017 |
2017 |
WIN7E01299 |
GAA FY 2017 |
January 2, 2017 |
Region III |
Nueva Ecija 1st District Engineering Office |
Roads and Bridges - Local Roads:
Rehabiliattion of Pasong-Inchik-Pura Road, Guimba-Pura, Section, Guimba, Nueva Ecija |
April 19, 2017 |
2017 |
WIN7G01341 |
FY 2017 (R.A 10924) |
February 10, 2017 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
Network Development - Improvement/Widening of National Roads - Other Primary Roads -
Road Widening - Dipolog - Oroquieta National Road including RROW
K1808+914 - K1809+843
Allocation:
Php 32.09 Million (Total)
Php 31,448,200.00 (Road)
Php 641,800.00 (ROW Acquisition)
Physical Target:
1.858 lane km (Road)
11,148 sq.m. (ROW Acquisition)
Unit Cost:
Php 16,925,834.23/ lane km (Road)
Php 57.57/sq.m. (ROW Acquisition) |
April 19, 2017 |
2017 |
165003015100257 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 4th District Engineering Office |
MFO 1 : NATIONAL ROAD NETWORK SERVICES
Network Development
Improvement/Widening of National Roads
Secondary Roads
Cordon-Diffun Rd - K0317 + -105 - K0318 + 288, K0318 + 304 - K0318 + 372, K0318 + 380 - K0318 + 985, K0318 + 997 - K0318 + 1064
|
April 19, 2017 |
2017 |
WIN7G01337 |
FY 2017 (R.A 10924) |
February 10, 2017 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4) Project Analysis - Tertiary -
Road Upgrading Gravel to Paved including RROW Piñan - Mutia Rd -
K1833+940 - K1834+068,
K1834+320 - K1834+580,
K1838+340 - K1838+562,
K1823+115 - K1823+539
Allocation:
Php 43.403 Million (Total)
Php 42,968,970.00 (Road)
Php 434,030.00 (ROW Acquisition)
Physical Target:
2.068 lane km (Road)
13,128 sq.m. (ROW Acquisition)
Unit Cost:
Php 20,778,031.91/lane km (Road)
Php 33.06/sq.m. (ROW Acquisition) |
April 19, 2017 |
2017 |
WIN7G01283 |
FY 2017 (R.A. 10924) |
April 7, 2017 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
Buildings and Other Structures - Multipurpose/Facilities
Rehabilitation/Major Repair of Public Market Roofing at Brgy. Don Andres, Ipil, Zamboanga Sibugay
Allocation: P 2.00 Million
Physical Target: 1 no. of building
Unit Cost: P 2,000,000/no. of building |
April 19, 2017 |
GAA FY 2017 |
WIN7G00995 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Secondary
Widening (4 into 6 Lanes) of Davao City Diversion Road including Slope Protection and RROW, Davao City,
K1511+950 - K1512+207,
K1512+207 - K1512+286,
K1512+286 - K1512+356,
K1512+356 - K1512+530,
K1512+530 - K1512+600
TO: MFO 1 - National Road Network Services
Network Development - Improvement/Widening of National Roads - Secondary
Widening (4 into 6 Lanes) of Davao City Diversion Road including Slope Protection and RROW, Brgy. Matina Crossing, Davao City 1st LD,
K1511+950 - K1512+207,
K1512+207 - K1512+286,
K1512+286 - K1512+356,
K1512+356 - K1512+530,
K1512+530 - K1512+600,
(S00013MN)
ALLOCATION: Php 133.907 Million |
April 19, 2017 |
2017 |
WIN7G01131 |
FY 2017 (R.A 10924) |
March 28, 2017 |
Region IX |
Zamboanga del Norte 3rd District Engineering Office |
Roads and Bridges - Local Roads -
Construction of Road including RROW, Barangay Dampalan - Barangay San Isidro Road, Sergio Osmeña, Zamboanga del Norte
Sta. 7+880.6 - Sta. 9+120
Allocation:
Php 25.00 Million (Total)
Php 24,750,000.00 (Road)
Php 250,000.00 (ROW Acquisition)
Physical Target:
2.478 lane km. (Road)
14,872.80 sq.m. (ROW Acquisition)
Unit Cost:
Php 9,987,893.46/lane km (Road)
Php 16.81 sq.m. (ROW Acquisition) |
April 19, 2017 |
2017 |
WIN7G01279 |
FY 2017 (R.A. 10924) |
April 7, 2017 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
Buildings and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building (Barangay Hall), Brgy. Malungon, Tungawan, Zamboanga Sibugay
Allocation: P 2.00 Million
Physical Target: 1 no. of building
Unit Cost: P 2,000,000/no. of building |
April 19, 2017 |
GAA FY 2017 |
WIN7G01106 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 3 - Construction and Maintenance Services of Other Infrastructures:
Construction/Improvement of Access Roads Leading to Airports, Seaports and Declared Tourism Destinations-to Declared Tourism Destinations
Construction of Concrete Road-Davao del Norte-Compostela Valley-Agusan Del Sur Road leading to Various Tourism Sites, San Isidro, Davao del Norte
TO: MFO 3 - Construction and Maintenance Services of Other Infrastructures:
Construction/Improvement of Access Roads Leading to Airports, Seaports and Declared Tourism Destinations-to Declared Tourism Destinations
Concreting of Davao del Norte-Compostela Valley-Agusan del Sur Road leading to Various Tourism Sites, San Isidro, Davao del Norte
ALLOCATION: Php 200.00 Million |
April 19, 2017 |
2017 |
WIN7G01278 |
FY 2017 (R.A. 10924) |
April 7, 2017 |
Region IX |
Zamboanga Sibugay 2nd District Engineering Office |
Buildings and Other Structures - Multipurpose/Facilities
Construction of Multipurpose Building (Gymnasium) Phase II, Poblacion, Kabasalan, Zamboanga Sibugay
Allocation: P 5.00 Million
Physical Target: 1 no. of building
Unit Cost: P 5,000,000/no. of building
|
April 19, 2017 |
GAA FY 2017 |
WIN7G01107 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 3 - Construction and Maintenance Services of Other Infrastructures:
Construction/Improvement of Access Roads Leading to Airports, Seaports and Declared Tourism Destinations-to Declared Tourism Destinations
Construction of Concrete Road-Kapatagan-Tibolo Road leading to Cultural/Tribal Communities and School of Living Tradition, Tibolo, Sta. Cruz, Davao del Sur
TO: MFO 3 - Construction and Maintenance Services of Other Infrastructures:
Construction/Improvement of Access Roads Leading to Airports, Seaports and Declared Tourism Destinations-to Declared Tourism Destinations
Concreting of Kapatagan-Tibolo Road Leading to Cultural/Tribal Communities and School of Living Tradition, Tibolo, Sta. Cruz, Davao del Sur
ALLOCATION: Php 94.000 Million |
April 19, 2017 |
GAA FY 2017 |
WIN7G01125 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Network Development - Construction of By-passes/Diversion Roads, Including ROW
Construction of Concrete Road - Tagum City Bypass Road (Canocotan-San Miguel-Pagsabangan) Including RROW, Tagum City, Davao del Norte
TO: MFO 1 - National Road Network Services
Network Development - Construction of By-passes/Diversion Roads, Including RROW
Construction/Improvement of Tagum City Bypass Road (Canocotan-San Miguel-Pagsabangan) Including RROW, Tagum City, Davao del Norte
ALLOCATION: Php 487.000 Million |
April 19, 2017 |
GAA FY 2017 |
WIN7G01178 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services:
Network Development - Construction of By-passes/Diversion Roads, including RROW
Concreting/Widening/Improvement of Bypass Road at Buhangin-Tigatto-Mandug-Callawa-Fatima Road Including Bridge and RROW, Davao City (Package 5)
TO: MFO 1 - National Road Network Services:
Network Development - Construction of By-passes/Diversion Roads, including RROW
Concreting/Widenig/Improvement of Bypass Road at Buhangin-Tigatto-Mandug-Callawa-Fatima Road Including RROW, Davao City 2nd LD (Package 5)
ALLOCATION: Php 237.804 Million
|
April 19, 2017 |
GAA FY 2017 |
WIN7G01315 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary
Construction of Concrete Road and Construction of Road Slope Protection Structure - Compostela-Cateel Rd (Davao Or Side),
K1570+378 - K1570+838
TO: MFO 1 - National Road Network Services
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Secondary
Rehabilitation/Reconstruction of National Road with Slope Collapse and Landslides including Road Upgrading (Gravel to Concrete) of Compostela-Cateel Road (Davao Oriental Side), Davao Oriental,
K1570+289 - K1570+899
ALLOCATION: Php 150.00 Million |
April 18, 2017 |
2017 |
WIN7C01544 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Secondary
Tagbilaran North Rd. (Tagbilaran-Jetafe Sect), S00030BH - K0028+838 - K0030+500, K0033+725 - K0033+775
Allocation - ₱ 49.90 Million
Physical Target - 3.428 lane km
Unit Cost - ₱ 14,556,592.77/ lane km. |
April 18, 2017 |
2017 |
WIN7C01543 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary
Slope Protection Structure at Jct. (TNR) Maribojoc-Antequera-Catagbacan (Loon) - K0022+247.40 - K0022+630
Allocation - ₱ 9.565 Million
- ₱ 9.0724 Million (CW1)
- ₱ 0.4926 Million (CW2)
Physical Target - Slope Protection - 2,708.62 square meters
- Paved Shoulder - 197.80 square meters
Unit Cost - Slope Protection - ₱ 3,349.45/ square meters
- Paved Shoulder - ₱ 2,490.39/ square meters |
April 18, 2017 |
2017 |
WIN7C01535 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse and Landslide - Tertiary
Slope Protection Structure - Tagbilaran City-Corella-Sikatuna-Loboc Rd - K0013+950 - K0014+100, K0018+300 - K0018+500, K0018+850 - K0018+900
Allocation - ₱ 13.435 Million
₱ 6.903 Million (CW1)
₱ 6.532 Million (CW2)
Physical Target
- Slope Protection - 2,031.90 square meters
- Paved Shoulder - 1,528.00 square meters
Unit Cost
- Slope Protection - ₱ 3,397.31/square meters
- Paved Shoulder - ₱ 4,274.87/ square meters
|
April 18, 2017 |
2017 |
WIN7C01539 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Netwrok Development - Off-Carriageway Improvement including drainage - Tertiary
Off-Carriageway Improvement including drainage at Jct. (TNR) Maribojoc-Antequera-Catagbacan (Loon) K0012+000 - K0013+931
Allocation - ₱ 49.90 Million
Physical Target - 6,088 square meters
Unit Cost - ₱ 8,196.45/ square meter |
April 18, 2017 |
2017 |
WIN7C01540 |
R.A 10924 |
January 12, 2017 |
Region VII |
Bohol 1st District Engineering Office |
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Seaports
Construction of Concrete Road - Access Road leading to Baclayon Port, Bohol
Allocation - ₱ 1.10 Million
Physical Target - 0.1335 lane km
Unit Cost - ₱ 8,239,700.38/ lane km |