May 24, 2017 |
2017 |
WIN7E01618 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Road, Brgy. Calaba, San Isidro Nueva Ecija (Phase II) |
May 24, 2017 |
2017 |
WIN7E01656 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Project-Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Road, Brgy. San Fernando Sur, Cabiao, Nueva Ecija
(Construction of Concrete Road) |
May 24, 2017 |
2017 |
WIN7E01642 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Road, Brgy. Luyos, San Antonio, Nueva Ecija
(Construction of Concrete Road) |
May 24, 2017 |
2017 |
WIN7E01680 |
UACS No. 103004010310217 |
January 1, 2017 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Construction of Covered Court, Brgy. Sta. Monica, Aguardiente, Novaliches, Quezon City (Construction of Multipurpose Building)
UACS No. 103004010310217
Physical Target/Cost
Per GAA/Original: 1 Building
Unit Cost (P’000): P2,000/Bldg.
Allocation (P’000): Php 2,000
WIN7E01680
As Modified
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Construction of Multipurpose Building, Brgy. Sta. Monica, Aguardiente, Novaliches, Quezon City (Construction of Multipurpose Building)
UACS No. 103004010310217
Physical Target/Cost
As Modified: 1 Building
Unit Cost (P’000): P2,000/Bldg.
Estimated Cost (P’000): P 2,000
WIN7E01680
|
May 24, 2017 |
2017 |
WIN7E01614 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Road, Brgy. San Roque, San Leonardo, Nueva Ecija
(Construction of Concrete Road) |
May 24, 2017 |
2017 |
WIN7F04604 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally-Funded Projects - Building and Other Structures - Multipurpose/Facilities - Concreting of Multi-Purpose Pavement in Colacling National High School, Brgy. Colacling, Lupi, Camarines Sur [Construction of Multi-Purpose Building]
Physical target: 1 Building
Unit Cost (P'000): P1,000/Building
Allocation (P'000): P1,000.00
As MODIFIED:
Locally-Funded Projects - Building and Other Structures - Multipurpose/Facilities - construction of Multi-Purpose Building in Colacling National High School, Brgy. Colacling, Lupi, Camarines Sur [Construction of Multi-Purpose Building]
Physical target: 1 Building
Unit Cost (P'000): P1,000/Building
Allocation (P'000): P1,000.00 |
May 24, 2017 |
2017 |
WIN7E01613 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Road, Brgy. Castellano, San Leonardo, Nueva Ecija
(Construction of Concrete Road) |
May 24, 2017 |
2017 |
WIN7F04741 |
UACS No. 165004050306362 |
January 1, 2017 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA
Locally Funded Projects – Roads and Bridges – Local Roads: Rehabilitation/Concreting of Belfast, Brgy. Sta. Monica, Quezon City Sta. 0+000 – Sta. 0+490 (Construction of Concrete Road)
UACS No. 165004050306362
Physical Target/Cost
Per GAA/Original: 2.60 lane-km
Unit Cost (P’000): P11,538/lane-km
Allocation (P’000): Php 30,000
WIN7F04741
As Modified
Locally Funded Projects – Roads and Bridges – Local Roads: Rehabilitation of Belfast, Brgy. Sta. Monica, Quezon City Sta. 0+000 – Sta. 0+460, Sta. 0+562 – Sta. 0+932 (Rehabilitation/Drainage Improvement)
UACS No. 165004050306362
Physical Target/Cost
As Modified: 2.1384 lane-km
Unit Cost (P’000): P14,029/lane-km
Estimated Cost (P’000): P 30,000
WIN7F04741
|
May 24, 2017 |
FY2017 |
WIN7C01738 |
GAA2017 |
January 31, 2017 |
Region VIII |
Leyte 4th District Engineering Office |
As per GAA:
Preventive Maintenance of Road: Concrete Reblocking - Palompon-Isabel-Merida-Ormoc Road, K1095+000 - K1095+635
As Modified:
Preventive Maintenance based on Pavement Management System/Highways Development and Management - 4 (HDM-4) - Secondary, Palompon-Isabel-Merida-Ormoc Road, K1095+000 - K1095+635 |
May 24, 2017 |
2017 |
WIN7G01494 |
FY 2017 (R.A 10924) |
May 12, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading Gravel to Paved of Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road - (S01184MN), Zamboanga del Sur 2nd DEO
Chainage 7780 - Chainage 9480,
Chainage 11999 - Chainage 12500
Allocation:
Php 100.000 M (Total)
Php 99,845,039.37 (Road Concreting)
Php 154,960.63 (ROW Acquisition)
Physical Target:
4.402 lane km (Road Concreting)
154.961 sq.m. (ROW Acquisition)
Unit Cost:
Php 22,681,744.52/lane km (Road Concreting)
Php 1,000.00/sq.m. (ROW Acquisition) |
May 24, 2017 |
2017 |
WIN7E01721 |
UACS No. 292003020401929 |
January 1, 2017 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA
MFO – 2 Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Slope Protection Structure – Construction of Slope Protection Marikina River, Phase IV, Brgy. Batasan Hills, Quezon City (Construction of Slope Protection)
UACS No. 292003020401929
Physical Target/Cost
Per GAA/Original: 1,100 m2
Unit Cost (P’000): P27.273T/m2
Allocation (P’000): Php 30,000
WIN7E01721
As Modified
MFO – 2 Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Rehabilitation of Flood Control Structures and Tributaries of Brgy. Batasan Hills, Phase III, Quezon City (Rehabilitation of Flood Control Structures and Tributaries)
UACS No. 292003020401929
Physical Target/Cost
As Modified: 648 lm
Unit Cost (P’000): P46,296T/lm
Estimated Cost (P’000): P 30,000
WIN7E01721
|
May 24, 2017 |
2017 |
WIN7E01647 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage systems
Concrete of Concrete River Wall along Pampanga River, Sta. 2+248.00 - Sta. 2+400.00, Sta. 3+960.00 - Sta, 4+088.80, San Roque, San Leonardo, Nueva Ecija
(Construction of Flood Mitigation Structure) |
May 24, 2017 |
2017 |
WIN7G01508 |
FY 2017 (R.A 10924) |
May 12, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (DHM-4 Project Analysis) - Tertiary -
Road Upgrading (Gravel to Paved) of Sindangan - Bayog - Lakewood Road, Zamboanga del Norte 1st DEO,
Chainage 13489 - Chainage 15799
(Sta. 1942+330 - Sta. 1944+640)
Allocation:
Php 150.000 Million
Physical Target: 4.620 lane km
Unit Cost: Php 32,467,532.47/lane km |
May 24, 2017 |
2017 |
WIN7E01652 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage systems
Construction of Concrete River wall along Pampanga River, Sta. 8+480-Sta. 8+714.80, Brgy. Adorable, San Leonardo, Nueva Ecija
(Construction of Flood Mitigation Structure) |
May 24, 2017 |
2017 |
WIN7E01646 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage systems
Construction of Concrete River Wall, Sta. 0+000 to Sta. 224.80, Brgy. San Josef, Peñaranda, Nueva Ecija
(Construction of Flood Mitigation Structure) |
May 24, 2017 |
2017 |
WIN7G01521 |
FY 2017 (R.A 10924) |
May 16, 2017 |
Region IX |
Regional Office IX |
Network Development - Construction of By-Passes/Diversion Road, including ROW -
Road Widening and Construction of Four (4) Lanes Concreting Road, Zamboanga City By-Pass Road (Culianan - Patalon Section), Zamboanga City
Sta. 1983+780.00 - Sta. 1985+750.36 (Widening)
Sta. 1985+750.36 - Sta. 1986+470.71 (BK)/ Sta. 1935+617.23 (AH 4-lanes)
Allocation:
Php 150.000 M (Total)
Php 101,746,850.31 (Civil Works)
(Php 42,973,939.84 - 4 lane road)
(Php 58,772,910.47 - Road Widening)
Php 48,253,149.69 (ROW Acquisition)
Physical Tatget:
6.82212 lane km (Civil Works)
(2.8814 lane km - 4-lane road)
(3.94072 lane km - Road Widening)
24,126.56 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,914,256.90/lane km (Civil Works)
Php 2,000.00/sq.m. (ROW Acquisition) |
May 24, 2017 |
2017 |
WIN7E01655 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage systems
Coronel River Flood Control, Calabasa, Sta. 20+732.22-Sta. 20+894.22, Gabaldon, Nueva Ecija
(Construction of Flood Mitigation Structure) |
May 24, 2017 |
2017 |
WIN7E01525 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Norte District Engineering Office |
As per GAA:
MFO 2 - Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Revetment - Construction of Danao River Flood Control Structure, Sta. 0+000 - Sta. 0+580 (R/S) and Sta. 0+210 - Sta. 0+580 (L/S), Brgys. Parang and Plaridel, Jose Panganiban, Camarines Norte
(Construction of Revetment)
Physical Target: 950 lm
Unit Cost (P'000): P42.528T/lm
Allocation Cost (P'000): P40,402
As MODIFIED:
MFO 2 - Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Revetment - Construction of Danao River Flood Control Structure, Sta. 0+155.10 - Sta. 0+835.10(L/S) and Sta. 0+000 - Sta. 0+055 & Sta. 0+252.27 - Sta. 0+392.27(R/S), Brgy. Parang and Plaridel, Jose Panganiban, Camarines Norte
(Construction of Revetment)
Physical Target: 875 lm
Unit Cost (P'000): P46.174T/lm
Estimated Cost (P'000): P40,402 |
May 24, 2017 |
2017 |
WIN7E01525 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Norte District Engineering Office |
As per GAA:
MFO 2 - Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Revetment - Construction of Danao River Flood Control Structure, Sta. 0+000 - Sta. 0+580 (R/S) and Sta. 0+210 - Sta. 0+580 (L/S), Brgys. Parang and Plaridel, Jose Panganiban, Camarines Norte
(Construction of Revetment)
Physical Target: 950 lm
Unit Cost (P'000): P42.528T/lm
Allocation Cost (P'000): P40,402
As MODIFIED:
MFO 2 - Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Revetment - Construction of Danao River Flood Control Structure, Sta. 0+155.10 - Sta. 0+835.10(L/S) and Sta. 0+000 - Sta. 0+055 & Sta. 0+252.27 - Sta. 0+392.27(R/S), Brgy. Parang and Plaridel, Jose Panganiban, Camarines Norte
(Construction of Revetment)
Physical Target: 875 lm
Unit Cost (P'000): P46.174T/lm
Estimated Cost (P'000): P40,402 |
May 24, 2017 |
2017 |
WIN7E01648 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage systems
Rehabilitation/Improvement of Pampanga River Control, Magpapalayok Section, Sta. 0+154.00-Sta. 0+232.00, Sta. 0+250.00-Sta. 0+258.00, San Leonardo, Nueva Ecija
(Rehabilitation/Major Repair of Flood Control Structure) |
May 24, 2017 |
2017 |
WIN7E01653 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage systems
Rehabilitation/Improvement of Pampanga River Control, Sta. 0+000.00 - Sta. 0+265.20, Bagong Sikat, Cabiao, Nueva Ecija
(Rehabilitation/Major Repair of Flood Control Structure) |
May 24, 2017 |
2017 |
WIN7E01551 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Norte District Engineering Office |
As per GAA:
MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems : Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Anahaw Section, Labo, Camarines Norte (Construction of Flood Mitigation Structure)
Physical Target: 315 lm
Unit Cost (P'000): P63.49T/lm
Allocation Cost: P20,000
As per GAA:
MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems : Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Anahaw Section, Labo, Camarines Norte (Construction of Flood Mitigation Structure)
Physical Target: 194 lm
Unit Cost (P'000): P103.09/lm
Estimated Cost: P20,000 |
May 24, 2017 |
2017 |
WIN7E01650 |
RA 10924 |
January 27, 2016 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage systems
Rehabilitation/Improvement of Pampanga River Control, San Anton section, Sta. 0+092.00-Sta. 0+160.00 & Sta. 0+253.90-Sta.0+363.90, San Leonardo, Nueva Ecija
(Rehabilitation/Major Repair of Flood Control Structure) |
May 24, 2017 |
2017 |
WIN7E01552 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Norte District Engineering Office |
As per GAA:
MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems : Construction of Flood Mitigation Structure - Construction of Flood Control Structure, , Poblacion Sur Section, Paracale, Camarines Norte
(Construction of Flood Mitigation Structure)
Physical Target: 650 lm
Unit Cost (P'000): P30.77T/lm
Allocation Cost: P20,000
As MODIFIED:
MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems : Construction of Flood Mitigation Structure - Construction of Flood Control Structure, , Poblacion Sur Section, Paracale, Camarines Norte
(Construction of Flood Mitigation Structure)
Physical Target: 470 lm
Unit Cost (P'000): P42.55T/lm
Estimated Cost: P20,000
|
May 24, 2017 |
2017 |
WIN7E01654 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Flood Control and Drainage -Flood Control Structures/Facilities
Construction/Maintenance of Flood Mitigation Structures and Drainage system, Pampanga River Control Sta. 47+670.20-Sta. 47+967.80 (297.60 lm), San Josef, Cabanatuan City, Nueva Ecija
(Construction of Flood Mitigation Structure) |
May 24, 2017 |
2017 |
WIN7E01628 |
FY 2017 GAA RA 10924 |
December 28, 2016 |
Region V |
Camarines Norte District Engineering Office |
As per GAA:
MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems : Construction of Revetment - Extension /Rehabilitation/Construction of Talisay River Control Structure, Brgy. Poblacion, Talisay, Camarines Norte (Construction of Revetment)
Physical Target: 850 lm
Unit Cost (P'000): P35.29T/lm
Allocation Cost: P30,000
As MODIFIED:
MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems : Construction of Revetment - Extension /Rehabilitation/Construction of Talisay River Control Structure, Brgy. Poblacion, Talisay, Camarines Norte (Construction of Revetment)
Physical Target: 470 lm
Unit Cost (P'000): P63.82T/lm
Estimated Cost: P30,000 |
May 24, 2017 |
2017 |
WIN7E01628 |
FY 2017 GAA RA 10924 |
December 28, 2016 |
Region V |
Camarines Norte District Engineering Office |
As per GAA:
MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems : Construction of Revetment - Extension /Rehabilitation/Construction of Talisay River Control Structure, Brgy. Poblacion, Talisay, Camarines Norte (Construction of Revetment)
Physical Target: 850 lm
Unit Cost (P'000): P35.29T/lm
Allocation Cost: P30,000
As MODIFIED:
MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems : Construction of Revetment - Extension /Rehabilitation/Construction of Talisay River Control Structure, Brgy. Poblacion, Talisay, Camarines Norte (Construction of Revetment)
Physical Target: 470 lm
Unit Cost (P'000): P63.82T/lm
Estimated Cost: P30,000 |
May 24, 2017 |
2017 |
WIN7E01518 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Norte District Engineering Office |
As per GAA:
MFO-2 Flood Management Services: Construction / Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Revetment — Extension / Rehabilitation / Construction of Basud River Control Structures Sta.0+000 -Sta.0+700 Brgy. Poblacion, Basud, Camarines Norte (Construction of Revetment)
Physical Target: 700 lm
Unit Cost (P'000): P42.86T/lm
Allocation Cost: P30,000
As per GAA:
MFO-2 Flood Management Services: Construction / Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Revetment — Extension / Rehabilitation / Construction of Basud River Control Structures Sta.0+000 -Sta.0+700 Brgy. Poblacion, Basud, Camarines Norte (Construction of Revetment)
Physical Target: 456 lm
Unit Cost (P'000): P65.79T/lm
Estimated Cost: P30,000 |
May 24, 2017 |
2017 |
WIN7E01548 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Norte District Engineering Office |
As per GAA:
MFO 2 - Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems : Construction of Revetment Extension/Rehabilitation/ Construction of Daet River Control Structure, Brgy. San Isidro, Daet, Camarines Norte (Construction of Revetment)
Physical Target: 385 lm
Unit Cost (P'000): P77.92T/lm
Allocation Cost: P30,000
As per GAA:
MFO 2 - Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems : Construction of Revetment Extension/Rehabilitation/ Construction of Daet River Control Structure, Brgy. San Isidro, Daet, Camarines Norte (Construction of Revetment)
Physical Target: 600 lm
Unit Cost (P'000): P50.00T/lm
Estimated Cost: P30,000 |
May 24, 2017 |
GAA FY 2017 |
WIN7G01505 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary
Construction of Road Slope Protection Structure Including Off-Carriageway Improvement: Shoulder Paving/Construction - Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G)
K1663+225 - K1663+590, K1656+216 - K1657+526, K1658+279 - K1659+000
TO: MFO 1 - National Road Network Services:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide -
Rehabilitation/Reconstruction of National Road with Slips, Slope Collapse and Landslide along Davao-Sarangani Coastal Road (Malalag-Malita-JAS-Glan Road) including Paving of Shoulder (Talagutong Section), Davao Occidental
K1656+216 - K1657+526, K1658+279 - K1659+000, K1663+225 - K1663+590
ALLOCATION: Php 143.054 Million |
May 23, 2017 |
CY 2017 |
WIN7E01621 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and
Landslide
- Tertiary Road
Bulalacao - San Jose - Jct Mapaya Rd
K0222+300 - K0222+400
CW1 = 462.60 sq m
Php 5,536,874.00 million
( Construction of Road Slope
Protection Structure ) |
May 23, 2017 |
CY 2017 |
WIN7E01605 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Construction/Upgrading/rehabilitation of
Drainage along National Roads
- Tertiary Road
Jct. MWCR ( San Isidro ) -
Penal Colony - Jct. Yapang Road
K0307+318 - K0310+049
L = 5,388 lm
Php 38,389,544.48 Million
( Construction of Drainage Structure
along Road )
|
May 23, 2017 |
CY 2017 |
WIN7E01623 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Construction/Upgrading/Rehabilitation of
Drainage along National Roads
- Tertiary Road
Construction of Drainage Structure
along Road
Jct. TLLR - Tumibo - Lubang -
Binacas Road
K0001+(-071) - K0001+323,
K0003+080 - K0003+090,
K0003+090 - K0003+860,
K0001+(-998) - K0001+(-872)
L = 2,600 lm
Php 26.265 Million
( Construction of Drainage Structure
along Road ) |
May 23, 2017 |
CY 2017 |
WIN7E01623 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Construction/Upgrading/Rehabilitation of
Drainage along National Roads
- Tertiary Road
Construction of Drainage Structure
along Road
Jct. TLLR - Tumibo - Lubang -
Binacas Road
K0001+(-071) - K0001+323,
K0003+080 - K0003+090,
K0003+090 - K0003+860,
K0001+(-998) - K0001+(-872)
L = 2,600 lm
Php 26.265 Million
( Construction of Drainage Structure
along Road ) |
May 23, 2017 |
2017 |
WIN7E01633 |
SR2017-01-000246 |
January 27, 2017 |
Region III |
Regional Office III |
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes, Doña Josefa Br. (B01310LZ) along Daang Maharlika (LZ) |
May 23, 2017 |
2017 |
WIN7E01596 |
SR2017-01-000291 |
January 28, 2017 |
Region III |
Regional Office III |
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - to Declared Tourism Destinations, Clark Green City - Mac Arthur Access Road leading to Clark Green City, including bridges, Tarlac
(Construction of Concrete Road)
(Construction of Concrete Bridge) |
May 23, 2017 |
FY2017 |
WIN7C01579 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
LIP-Roads and Bridges-National Road
Repair/Rehabilitation/Improvement along Leyte-Samar Road (via Guintigi-an), K0899+(-864) - K0904+676 Justice Romualdez(0+000 - 0+872), Rizal Avenue (S00006LT, S0009LT) Trece Martirez (0+000 - 0+533), Daang Maharlika (San Juanico Bridge, Naga-naga-Anibong Road
As Modified:
LIP-Roads and Bridges-National Road
Repair/Rehabilitation/Improvement along Avenida Veteranos (S00004LT)-Chainage 0 to Chainage 91 and Justice Romualdez Street (S00005LT)-Chainage 0 to Chainage 382, Tacloban City
|
May 23, 2017 |
FY2017 |
WIN7C01581 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Tacloban-Baybay South Road (including drainage) K0913+413 - K0914+017, Tacloban City
As Modified:
Improvement/Widening of Tacloban-Baybay South Road (S00244LT) K0913+413 - K0914+017, Tacloban City |
May 23, 2017 |
FY2017 |
WIN7C01580 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Road Widening - Daang Maharlika (LT) - K0901+211 - K0901+699, K0901+699 - K0901+970
As Modified:
Improvement/Widening of Daang Maharlika Road (S00002LT) K0901+220 - K0901+699, K0901+699 - K0901+960, Tacloban City |
May 23, 2017 |
FY2017 |
WIN7C01578 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Road Widening - Daang Maharlika -
K0897+000 - K0897+820, K0903+(-077) - K0903+133
As Modified:
Improvement/Widening of Daang Maharlika Road (S00013LT) K0897+000 - K0897+820, (S00002LT) K0903+(-077) - K0903+133, Tacloban City |
May 23, 2017 |
FY2017 |
WIN7C01584 |
GAA2017 |
January 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Road Widening - Daang Maharlika Road (including drainage) K0898+(-178) - K0898+462
As Modified:
Improvement/Widening of Daang Maharlika Road (S00002LT), Tacloban City K0898+(-178) - K0898+462 |
May 23, 2017 |
FY2017 |
WIN7C01583 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Road Widening of Leyte-Samar Road (via Guintigui-an) (S00001LT), Tacloban City, Leyte (K0903+226 - K0904+676)
As Modified:
Road Widening of Leyte-Samar (via Guintigui-an)(S00001LT), (K0902+358 - K0903+254), Tacloban City |
May 23, 2017 |
FY2017 |
WIN7C01582 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Improvement/Widening of National Roads - Tertiary
Road Widening - Leyte-Samar Road (via Guintigui-an) K0901+199 - K0902+208, K0901+(-540) - K0901+(-160)
As Modified:
Improvement/Widening of Leyte-Samar Road (via Guintigui-an)(S00001LT) K0901+(-540) - K0901+(-160), K0901+214 - K0902+208
|
May 23, 2017 |
FY2017 |
WIN7U01451 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Road Widening - Picas San Jose DZR Airport Road - K0910+(-926) - K0910+(-545)
As Modified:
Improvement/Widening of Picas San Jose DZR Airport Road (S00257LT), Tacloban City K0910+(-926) - K0910+(-545) |
May 23, 2017 |
2017 |
WIN7E01597 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Primary - Jose Abad Santos Ave (JASA), K0110+678 - K0111+681.70, K0108+248 - K0108+300
(Reconstruction from Asphalt to Concrete) |
May 23, 2017 |
FY2017 |
WIN7C01585 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Repair/Rehabilitation/Improvement along Avenida Veteranos (0+000 - 0+641) & (0+000 - 0+228), Picas-San Jose DZR Airport Road (K0910+(-664) - K0913+722) Tacloban_Baybay South Road (0+000 - 0+456), Apitong Paterno Road (K0908+(-922) - K0909+442), Calanipawan Road
As Modified:
Repair/Rehabilitation/Improvement along Tacloban-Baybay South Road (S00244LT) K0912+(-207) to K0912+000 and K0913+000 to K0913+230, Tacloban City |
May 23, 2017 |
FY2017 |
WIN7C01537 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Road Widening - Tacloban-Baybay South Road - K0912+789 - K0912+1108
As Modified:
Improvement/Widening of Tacloban Baybay South Road (S00244LT), Tacloban City K0912+789 - K0912+1108 |
May 23, 2017 |
FY2017 |
WIN7C01632 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Road Widening of Leyte-Samar Road (via Guintigui-an) (S00001LT), Tacloban City, Leyte (K0903+110 - K0904+264)
As Modified:
Road Widening of Leyte-Samar Road (via Guintigui-an)(S00001LT), (k0902+208 - K0902+358), Tacloban City |
May 23, 2017 |
FY2017 |
WIN7C01628 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Construction/Rehabilitation of Flood Control Structure at Burayan River along Picas San Jose DZR Airport Nat'l. Road, Tacloban City, Leyte
As Modified:
Construction/Rehabilitation of Flood Control Structure at Burayan River along Picas San Jose DZR Airport Nat'l. Road, Tacloban City
|
May 23, 2017 |
2017 |
WIN7F04583 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bataan 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Pentor - Balsik River (Balsik Section), Hermosa, Bataan |
May 23, 2017 |
FY2017 |
WIN7C01798 |
SR2017-01-001517 |
January 31, 2017 |
Region VIII |
Regional Office VIII |
As per GAA:
Reconstruction from Concrete to Concrete - Palo-Carigara-Ormoc Rd - K0979+105 - K0979+571, K0980+000 - K0981+000, K0981+000 - K0982+000
As Modified:
Palo-Carigara-Ormoc Road, K0979+105 - K0979+751, K0980+000 - K0981+000, K0981+000 - K0982+000, Leyte 2nd LD |
May 23, 2017 |
FY2017 |
WIN7C01745 |
SR2017-02-002020 |
February 1, 2017 |
Region VIII |
Regional Office VIII |
As per GAA:
Road Widening -Allen-Catarman Rd - K0729+000 -K0731+300, K0731+350 - K0732+949, K0772+751 - K0723+480
As Modified:
Improvement/Widening of National Roads -
Allen-Catarman Road (S00005SM) - K0729+000 - K0731+300, K0731+350 - K0732+949, K0722+751 - K0723+480, Northern Samar 1st LD
|
May 23, 2017 |
FY 2017 |
WIN7C01821 |
GAA2017 |
February 1, 2017 |
Region VIII |
Regional Office VIII |
As per GAA:
Widening of Bridge - Anas Br. (B00033BR) along Biliran Circumferential Road
As Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes, including ROW, Anas Bridge (B00033BR) along Biliran Circumferential Rd. Biliran (Lone District) |
May 23, 2017 |
FY2017 |
WIN7C01790 |
SR2017-02-002049 |
February 1, 2017 |
Region VIII |
Regional Office VIII |
As per GAA:
Construction of Concrete Road - Arteche, Brgy. Catumsan-Jipapad-Las Navas-Catubig-Rawis Road incl. Bridge and ROW, Package 1, Northern Samar
As Modified:
Construction of Missing Gaps connecting National Roads, including ROw
Arteche, Brgy. Catumsan-Jipapad-Las Navas-Catubig-Rawis Road including Bridge, Northern Samar 2nd LD, Package 1 |
May 22, 2017 |
2017 |
WIN7F04597 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Locally Funded Projects - Roads and Bridges - Local Roads
Road Concreting in Rizal, Guagua, Pampanga |
May 22, 2017 |
2017 |
WIN7F04598 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Locally Funded Projects - Roads and Bridges - Local Roads
Road Concreting in San Roque, Dau, Lubao, Pampanga |
May 22, 2017 |
CY 2017 |
WIN7E04593 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Off-Carriageway Improvement including Drainage
- Tertiary ,
Sablayan Penal Colony Road
K0 331+736 - K0333+512
CW1 = 9,945.60 sq.m.
Php 49.980 Million
( Off-Carriageway Improvement:
Shoulder Paving/Construction )
|
May 22, 2017 |
2017 |
WIN7F04603 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 1st District Engineering Office |
As per GAA:
Locally-Funded Projects: Local Infrastructure Program, Roads and Bridges, Local Roads, Construction of Local Road, Phase II, San Fernando, Camarines Sur (Construction of Concrete Road)
Physical Target: 0.40 Lane-km
Unit Cost (P'000): P7,500/Lane-km
Allocation: Php 3.0M
As MODIFIED:
Locally-Funded Projects: Local Infrastructure Program, Roads and Bridges, Local Roads, Construction of Local Road at Brgy. Alianza, San Fernando, Camarines Sur (Construction of Concrete Road)
Physical Target: 0.310 Lane-km
Unit Cost (P'000): P9,677.42/Lane-km
Estimated Cost: Php 3.0M |
May 22, 2017 |
2017 |
WIN7F04605 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 1st District Engineering Office |
As per GAA:
Locally Funded Projects: Local Infrastructure Program - Roads and Bridges - Local Roads, Construction of Local Road, Phase II, Pamplona, Camarines Sur, (Construction of Concrete Road)
Physical Target: 0.40 Lane-km
Unit Cost (P'000): P10,000.00/Lane-km
Allocation: Php 4M
As MODIFIED:
Locally Funded Projects: Local Infrastructure Program - Roads and Bridges - Local Roads, Construction of Local Roads at Brgy. Cagbibi and Brgy. Del Rosario, Pamplona, Camarines Sur, (Construction of Concrete Road)
Physical Target: 0.534 Lane-km
Unit Cost (P'000): P7,490.64/Lane-km
Estimated Cost: Php 4M
|
May 22, 2017 |
2017 |
WIN7F04602 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 1st District Engineering Office |
As per GAA:
Locally Funded Projects: Local Infrastructure Program - Roads and Bridges - Local Roads, Construction of Local Road, Phase II, Milaor, Camarines Sur, (Construction of Concrete Road)
Physical Target: 0.40 Lane-km
Unit Cost (P'000): P7,500.00/Lane-km
Allocation: Php 4M
As MODIFIED:
Locally Funded Projects: Local Infrastructure Program - Roads and Bridges - Local Roads, Construction of Local Roads, Construction/Rehabilitation of Local Roads at Brgy. Cabugao and Brgy. Sto Domingo, Milaor, Camarines Sur, (Construction of Concrete Road / Rehabilitation of Concrete Road)
Physical Target: CW1 - Const. of Concrete Road:
0.399 Lane-km
CW2 - Rehab. of Concrete Road:
0.300 Lane-km
Unit Cost (P'000): CW1 - Const. of Concrete Road:
P 5,012.53/Lane-km
CW2 - Rehab. of Concrete Road:
P 3,333.33/Lane-km
Estimated Cost: Php 3M
|
May 22, 2017 |
CY 2017 |
WIN7E04593 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
MF01 - Asset Preservation Of National Roads
- Construction/Upgrading/Rehabilitation of
Drainage along National Roads
- Tertiary road
Bulalacao - San Jose - Jct. Mapaya Road
K0220+488 ,
K0220+689 ,
K0223+450 ,
K0224+684 - K0227+607
CW1 = 86 lm
Construction of Drainage Structure along Road
( Box Culvert )
CW2 = 5,828 lm
Construction of Drainage Structure along Road
( Lined Canal )
Php 49.811 Million |
May 22, 2017 |
CY 2017 |
WIN7E01636 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and
Landslide
- Secondary Road,
Mindoro oriental/Occidental East
Coastal Road
K0209+250 - K0209+350
CW1 = 390 sq.m.
Php 20,277,216.00 Million
( Construction of Road Slope
Protection Structure )
|
May 22, 2017 |
CY 2017 |
WIN7E01582 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED :
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Rehabilitation/Reconstruction of
National Roads with Slips, Slope Collapse,
and Landslide
- Tertiary Road
Jct. MWCR (Labangan) - Murtha -
Jct. Iriron Road
K0248+250 -K0248+420
CW1 = 510 sq.m.
Php 24,184,172.00 Million
( Construction of Road Slope
Protection Structure ) |
May 22, 2017 |
GAA FY 2017 |
WIN7G01473 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads With Slips, Slope Collapse, and Landslide - Secondary
Construction of Slope Protection Structure Including Off-Carriageway Improvement: Shoulder Paving/Construction - Davao-Sarangani Coastal Road (Malalag-Malita-JAS-G) -
K1665+388 - K1666+016, K1668+300 - K1669+180
TO: MFO 1 - National Road Network Services:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads With Slips, Slope Collapse, and Landslide - Secondary
Rehabilitation/Reconstruction of National Road With Slips, Slope Collapse and Landslide Along Davao-Sarangani Coastal Road (Malalag-Malita-JAS-Glan Road) Including Paving of Shoulder (Kinanga-Biton Section), Davao Occidental -
K1665+599 - K1666+023, K1668+300 - K1669+180
ALLOCATION: Php 138.337 Million |
May 22, 2017 |
GAA FY 2017 |
WIN7G01491 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services:
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction of Concrete Road - Mati-Tarragona By-Pass (Tagabakid-Lucatan Road), including ROW, Davao Oriental
TO: MFO 1 - National Road Network Services:
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction/Improvement of Mati-Tarragona Bypass Road (Tagabakid-Lucatan Road) including ROW, Davao Oriental
ALLOCATION: Php 200.00 Million |
May 22, 2017 |
GAA FY 2017 |
WIN7G01511 |
GAA FY 2017 R.A. 10924 |
January 1, 2016 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services:
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction of Concrete Road - Bypass Road at Jct. Mamay Road-La Verna-Davao City Diversion incl. ROW, Davao City
TO: FROM: MFO 1 - National Road Network Services:
Network Development - Construction of By-Passes/Diversion Roads, including ROW
Construction/Concreting of Bypass Road at Jct. Mamay-La Verna-Davao City Diversion Including RROW, Davao City
ALLOCATION: Php 207.256 Million
|
May 19, 2017 |
2017 |
WIN7E01562 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Rehabilitation/Improvement of Bungang Guinto River, Sta. 0+300 - Sta. 0+760, San Lorenzo, Mexico, Pampanga |
May 19, 2017 |
2017 |
WIN7E01561 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 1st District Engineering Office |
Construction/Repair/Rehabilitation/Improvement of Various Infrastructure including Local Roads, Rehabilitation / Improvement of Mesalipit-Talba Road, Bacolor, Pampanga, Km 0+342 to Km 1+272 (R.A. 9506-Bacolor Rehabilitation Act) |
May 19, 2017 |
2017 |
WIN7E01564 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation / Reconstruction / Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management - 4 (HDM-4) - Primary - Manila North Road, K0058+076+K0058+171, K0058+184 - K0058+279, K0059+978 - K0060+084, K0060+096 - K0060+191, K0061+220 - K0061+308, K0061+360 - K0061+454, K0062+460 - K0062+546, K0062+603 - K0062+690 |
May 19, 2017 |
2017 |
WIN7E01575 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads - Concreting of Roads and Pathway, Masile, City of Malolos, Bulacan |
May 19, 2017 |
2017 |
WIN7E01612 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction of Health Center/Day Care Building, Bunlo, Bocaue, Bulacan |
May 19, 2017 |
2017 |
WIN7E04611 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads, Construction of Roads, San Francisco, Bulakan, Bulacan |
May 19, 2017 |
2017 |
WIN7E01574 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads, Construction of Brgy. Road, Bungahan, Malolos, Bulacan |
May 19, 2017 |
GAA FY 2017 |
WIN7G01497 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services:
Rehabilitation/Reconstruction/Upgrading - Secondary
Reconstruction from Asphalt to Concrete, Construction of Road Slope Protection Structure and Off-Carriageway Improvement: Shoulder Paving/Construction - Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G) -
K1624+000 - K1625+795, K1625+813 - K1626+780, K1626+780 - K1627+177, K1627+177 - K1628+000,
K1630+100 - K1630+345, K1630+800 - K1631+600, K1632+630 - K1632+707, K1633+075 - K1633+165
TO: MFO 1 - National Road Network Services:
Rehabilitation/Reconstruction/Upgrading - Secondary
Rehabilitation/Reconstruction (Asphalt to Concrete) of Davao-Sarangani Coastal Road (Malalag-Malita-JAS-Glan Road) Including Slope Protection and Paving of Shoulders (Lacaron-Kidalapong Section), Davao Occidental -
K1624+000 - K1625+440, K1626+000 - K1626+780, K1626+780 - K1627+177, K1627+177 - K1628+000,
K1630+100 - K1630+345, K1630+800 - K1631+600, K1632+630 - K1632+707, K1633+075 - K1633+165
ALLOCATION: Php 168.241 Million |
May 19, 2017 |
2017 |
WIN7E01598 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Control Structure with outfall going to Angat River, Cambaog Section, Bustos, Bulacan |
May 18, 2017 |
2017 |
WIN7E01641 |
UACS No. 292004020200500 |
January 1, 2017 |
National Capital Region |
North Manila District Engineering Office |
As per GAA
Locally Funded Projects – Flood Control and Drainage – Drainage/Protection Works: Rehabilitation of Drainage System Brgy. 310 Zone 31, Sta. Cruz, Manila City (Rehabilitation/Major Repair of Drainage Structure)
UACS No. 292004020200500
Physical Target / Cost
Original: 170 lm
Unit Cost (P’000): P52,941T/lm
Allocation Cost (P’000): P9,000
WIN7E01641
As Modified
Locally Funded Projects – Flood Control and Drainage – Drainage/Protection Works: Rehabilitation of Drainage System Brgy. 310 and Brgy. 312, Zone 31, Sta. Cruz, Manila City (Rehabilitation/Major Repair of Drainage Structure)
UACS No. 292004020200500
Modified: 643.52 lm
Unit Cost: P13,986T/lm
Estimated Cost (P’000): P9,000
WIN7E01641
|
May 18, 2017 |
2017 |
WIN7C01724 |
FY 2017 (R.A 10924) |
April 25, 2017 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
Buildings and Other Structure - Multipurpose/Facilities -
Construction of Multipurpose Building at Rebokon Elementary School, Brgy. Rebokon, Dumalinao, Zamboanga del Sur,
Allocation: P 2.50 Million
Physical Target: 1 building
Unit Cost: 2.50 Million/building |
May 18, 2017 |
2017 |
WIN7C01728 |
FY 2017 (R.A 10924) |
April 25, 2017 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
Buildings and Other Structure - Multipurpose/Facilities -
Construction of Multipurpose Building at Antonio National High School, Brgy. Begong, Tigbao, Zamboanga del Sur
Allocation: P2.50 Million
Physical Target: 1 building
Unit Cost: 2.50 Million/building |
May 18, 2017 |
2017 |
WIN7G01458 |
FY 2017 (R.A 10924) |
April 25, 2017 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Rd (Datu Lumok Section) S01184MN, Lapuyan, Zamboanga del Sur
Sta. 17+000 - Sta. 18+199
Allocation: P37.48 Million
Physical Target: 2.398 lane km
Unit Cost: P15,629,691.41/lane km. |
May 18, 2017 |
2017 |
WIN7G01465 |
FY 2017 (R.A 10924) |
April 25, 2017 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Rd (Salambuyan Section) S01184MN, Lapuyan, Zamboanga del Sur, Sta. 22+415 - Sta. 23+063
Allocation: P17.50 Million
Physical Target: 1.296 lane km
Unit Cost: P13,503,086.42/lane km |
May 18, 2017 |
2017 |
WIN7G01467 |
FY 2017 (R.A 10924) |
April 25, 2017 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading (unpaved to paved) along Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Rd - (S01175MN)
K1717+020 - K1717+369 (with exception)
K1718+109 - K1718+253,
K1724+020 - K1724+720,
K1724+720 - K1724+883
Allocation: P45.00 Million
Physical Target: 2.684 lane km
Unit Cost: P16,766,020.86/lane km |
May 18, 2017 |
2017 |
WIN7G01466 |
FY 2017 (R.A 10924) |
April 25, 2017 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Sibuguey River Flood Control (Phase I), Poblacion, Bayog, Zamboanga del Sur,
Sta. 0+000 - Sta. 0+442.20
Allocation: P 45.00 Million
Physical Target: 442.20 lm.
Unit Cost: P101,763.91/lm |
May 18, 2017 |
2017 |
WIN7G01495 |
FY 2017 (R.A 10924) |
May 12, 2017 |
Region IX |
Zamboanga del Sur 2nd District Engineering Office |
Buildings and Other Structure - Multipurpose/Facilities
Construction of Multipurpose Building at Tipasan Elementary School, Brgy. Tipasan, Lapuyan, Zamboanga del Sur
Allocation: P2.50 Million
Physical Target: 1 building
Unit Cost: 2.50 Million/building |
May 17, 2017 |
CY 2017 |
WIN7E01476 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Buildings and other Structures
- Multipurpose/Facilities
Construction of Multi-Purpose Building
Brgy. Tangal, Lubang, Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building ) |
May 17, 2017 |
CY 2017 |
WIN7E01478 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities
Construction of Multi-Purpose Building
Brgy. Santa Teresa, Magsaysay
Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building )
|
May 17, 2017 |
Cy 2017 |
WIN7E01487 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally - Funded projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities
Construction of Multi-Purpose Building
Brgy. Araw at Bituin (Poblacion ),
Lubang, Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building ) |
May 17, 2017 |
CY 2017 |
WIN7E01488 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities
Construction of Multi-Purpose Building
Brgy. San Agustin, Sablayan
Occidental Mindoro
1 Bldg.
Php 2.0 Million
( Construction of Multi-Purpose Building ) |
May 17, 2017 |
CY 2017 |
WIN7E01498 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities
Construction of Multi-Purpose Building
Brgy. Bansalay, Mamburao
Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building ) |
May 17, 2017 |
2017 |
165003014100085 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 4th District Engineering Office |
Asset Preservation of National Roads
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management - 4 (HDM-4)
Primary Roads
Daang Maharlika (LZ) - K0315 + 488 - K0315 + 761, K0320 + 962, K0321 + 055, K0321 + 055 - K0321 + 080, K0321 + 258 - K0321 + 304, K0321 + 328 - K0321 + 431, K0321 + 445 - K0321 + 500, K0321 + 500 - K0321 + 566, K0321 + 580 - K0321 + 589, K0321 + 605 - K0321 + 618.5, K0321 + 680 - K0321 + 760, K0321 + 984.50 - K0322 + 008, K0322 + 129 - K0322 + 164, K0329 + 418 - K0330 + 417, K0335 + 897 - K0336 + 333, K0339 + 110 - K0339 + 332, K0339 + 398 - K0339 + 468, K0339 + 468 - K0339 + 515.5, K0339 + 538.7 - K0339 + 579, K0339 + 570 - K0339 + 588, K0339 + 830 - K0339 + 848, K0339 + 848 - K0339 + 900, K0339 + 900 - K0339 + 928, K0339 + 928 - K0340 + 000, K0340 + 000 - K0340 + 240, K0341 + 411 - K0342 + 042, (S00812LZ)
|
May 17, 2017 |
2017 |
103004010310718 |
GAA FY 2017 |
January 31, 2017 |
Region II |
Isabela 1st District Engineering Office |
Locally-Funded Projects
Buildings and Other Structures
Multipurpose/Facilities: Construction of Barangay Health Center, Barangay Manaring, Ilagan, Isabela
|
May 17, 2017 |
2017 |
292004020200517 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Isabela 1st District Engineering Office |
Locally Funded Projects: Flood Control and Drainage- Drainage/Protection Works: Construction of Riverbank Protection and Extention of Training Dike along Cagayan River |
May 16, 2017 |
FY 2017 |
WIN7F04610 |
UACS No. 103004010310215 |
January 1, 2017 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA
Locally Funded Projects:
Local Infrastructure Program – Buildings and Other Structures – Multipurpose/Facilities, Construction of Barangay Hall, Masambong, Quezon City (Construction of Multi-Purpose Building)
UACS No. 103004010310215
Physical Target/Cost
Per GAA/Original: 1 Bldg.
Unit Cost: P10,000.00/Bldg.
Allocation: Php 10M
WIN7F04610
As Modified
Locally Funded Projects: Local Infrastructure Program – Buildings and Other Structures – Multi-Purpose Building, Brgy. Masambong, Quezon City (Construction of Multi Purpose Building)
UACS No. 103004010310215
Physical Target/Cost
As Modified: 1 Bldg.
Unit Cost: P10,000.00/Bldg.
Estimated Cost: Php 10M
WIN7F04610
|
May 16, 2017 |
2017 |
WIN7G01479 |
GAA FY2017 RA 10924 |
December 29, 2016 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
Modified:
LFP: LIP - Buildings and Other Structures
Completion of Multi-Purpose Bldg. - Brgy. Sumo-sumo, Tago, Surigao del Sur (Phase II)
Allocation : Php 2.00 Million
Physical Target : 1 Number of Building |
May 16, 2017 |
2017 |
WIN7G01476 |
GAA FY2017 RA 10924 |
December 29, 2016 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
Modified:
LFP: LIP - Buildings and Other Structures - Multipurpose / Facilities
Completion of Multi-Purpose Bldg. - Brgy. Pakwan, Lanuza, Surigao del Sur
Allocation : Php 2.00 Million
Physical Target: 1 Number of Building |
May 16, 2017 |
2017 |
WIN7G01478 |
GAA FY2017 RA 10924 |
December 29, 2016 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and declared Tourism Destinations - To Declared Tourism Destinations
Construction/Improvement of Access Roads leading to Declared Tourist Destination, NRJ Cagwait White Beach Road (WHITE BEACH RESORT), Cagwait, Surigao del Sur, Sta. 0+465.50 - Sta. 1+480
Allocation: Php 30.00 Million
Physical Target: 2.0201 lane km |
May 16, 2017 |
2017 |
WIN7G01477 |
GAA FY2017 RA 10924 |
December 29, 2016 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
Modified:
LIP - Buildings and Other Structures - Multipurpose / Facilities
Completion of Multi-Purpose Bldg. - Brgy. San Isidro, Marihatag, Surigao del Sur (Phase III)
Allocaion : Php 2.00 Million
Physical Target: 1 Number of Building |
May 16, 2017 |
2017 |
WIN7G01483 |
GAA FY2017 RA 10924 |
December 29, 2016 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
Modified:
Network Development : Construction of Bypasses/Diversion Roads, including ROW
Construction of Tago-La Paz By-Pass Road, Tago, Surigao del Sur, Sta. 1302+700 - Sta. 1303+020
Allocation: Php 3.63 Million
Physical Target : 0.5045 lane km |
May 16, 2017 |
2017 |
WIN7G01475 |
GAA FY2017 RA 10924 |
December 29, 2016 |
Region XIII |
Surigao del Sur 1st District Engineering Office |
Modified:
LFP: VIILP - Roads and Bridges - Local Roads
Concreting of Cagbo-Awasian Road with Construction of Bridge, Tandag City, Surigao del Sur, Sta. 0+000 - Sta. 1+280
Allocation:
- Php 35.00 Million (Total)
- Php 30,611,295.49 (Construction of Concrete Road)
- Php 4,388,704.51 (Construction of Bridge)
Physical Target:
- 2.56 lane km (Construction of Concrete Road)
- 114.48 sq.m. (Construction of Bridge) |
May 15, 2017 |
CY 2017 |
WIN7E01509 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally - Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multipurpose/Facilities
Construction of Multi-Purpose Building,
Brgy. Labangan Iling, San Jose,
Occidental Mindoro
1 Bldg
Php 1.00 Million
( Construction of Multi-Purpose Building ) |
May 15, 2017 |
CY 2017 |
WIN7E01504 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
Locally Funded Projects
- Local Infrastructure Program
- Buildings and Other Structures
- Multi-Purpose/Facilities
Construction of Multi-Purpose Building
Brgy. Cabra, ubang, Occidental Mindoro
1 Bldg.
Php 1.00 Million
( Construction of Multi-Purpose Building )
|