June 13, 2017 |
2017 |
WIN7F04835 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Revetment along Angat River, Caniogan Section, Calumpit, Bulacan |
June 13, 2017 |
2017 |
WIN7F04842 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction / Rehabilitation of Revetment, Brgy. Tampok, Hagonoy, Bulacan |
June 13, 2017 |
2017 |
WIN7F04843 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction / Improvement of Classroom, Bambang, Bocaue, Bulacan |
June 9, 2017 |
2017 |
165004050307383 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Macabaklay, Gapan City, Nueva Ecija |
June 9, 2017 |
2017 |
165004050307382 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Mabuga, Gapan City, Nueva Ecija |
June 9, 2017 |
2017 |
165004050307383 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Macabaklay, Gapan City, Nueva Ecija |
June 9, 2017 |
2017 |
165004050307380 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Las Pinas, Peñaranda, Nueva Ecija |
June 9, 2017 |
2017 |
165004050307379 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Dampulan, Jaen, Nueva Ecija |
June 9, 2017 |
2017 |
165004050307375 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Bonifacio, San Leonardo, Nueva Ecija |
June 9, 2017 |
2017 |
165004050307376 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Buliran, San Antonio, Nueva Ecija |
June 9, 2017 |
2017 |
165004050306464 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads – Rehabilitation/Concreting of Access Road with drainage and Slope Protection going to San Antonio Terminal, Brgy. Maugat, San Antonio, Nueva Ecija |
June 9, 2017 |
2017 |
165003017100192 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes - Baluarte Bridge 2 (B01307LZ) along Daang Maharlika (LZ) |
June 9, 2017 |
2017 |
165004050307393 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. San Roque, Cabiao, Nueva Ecija |
June 9, 2017 |
2017 |
165004050307392 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. San Mariano, Peñaranda, Nueva Ecija |
June 9, 2017 |
2017 |
165004050307394 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Sapang, Jaen, Nueva Ecija |
June 9, 2017 |
FY 2017 |
WIN7F04834 |
UACS No. 103004010310197 |
January 1, 2017 |
National Capital Region |
North Manila District Engineering Office |
As Per GAA
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Construction of Multi-Purpose Building (OFW Center) Brgy. 191, Tondo, Manila (Construction of Multi-Purpose Building)
UACS No. 103004010310197
Physical Target/Cost
Original: 1 building
Unit Cost (P’000): P3,000
Allocation Cost (P’000): P3,000
WIN7F04834
As Modified
Locally Funded Projects – Buildings and Other Strucrtures – Multipurpose/Facilities: Construction of Multi-Purpose Building (OFW Center) Brgy. 91, Tondo, Manila (Construction of Multi-Purpose Building)
UACS No. 103004010310197
Physical Target/Cost
Modified: 1 building
Unit Cost (P’000): P3,000/building
Estimated Cost (P’000): P3,000
WIN7F04834
|
June 9, 2017 |
2017 |
165004050307396 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Sto. Cristo Norte, Gapan City, Nueva Ecija |
June 9, 2017 |
2017 |
165004050307397 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Sto. Cristo Sur, Gapan City, Nueva Ecija |
June 9, 2017 |
FY 2017 |
WIN7F04833 |
UACS No. 103004010310212 |
January 1, 2017 |
National Capital Region |
North Manila District Engineering Office |
As per GAA
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Construction of Multi-Purpose Building, Barangay 105, City of Manila (Construction of Multi-Purpose Building)
UACS No. 103004010310212
Physical Target
Original: 1 building
Unit Cost (P’000): P6,500
Allocation Cost (P’000): P6,500
WIN7F04833
As Modified
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Construction of Multi-Purpose Building, J.P. Rizal Elementary School. Manila City (Construction of Multi-Purpose Building)
UACS No. 103004010310212
Physical Target
Modified: 1 building
Unit Cost (P’000): P6,500/building
Allocation Cost (P’000): P6,500
WIN7F04833
|
June 9, 2017 |
FY 2017 |
WIN7F04808 |
UACS No. 103004010310196 |
January 1, 2017 |
National Capital Region |
North Manila District Engineering Office |
s per GAA
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Construction of Multipurpose Building (Center), Barangay 441, Manila City (Construction of Multi-Purpose Building)
UACS No. 103004010310196
Physical Target
Original: 1 building
Unit Cost (P’000): P5,000
Allocation Cost (P’000): P5,000
WIN7F04808
As Modified
Locally Funded Projects – Buildings and Other Structures Multipurpose/Facilities: Construction of Multipurpose Building (Center), Barangay 497, Manila City (Construction of Multi-Purpose Building)
UACS No. 103004010310196
Physical Target
Modified: 1 building
Unit Cost (P’000): P5,000/building
Estimated Cost (P’000): P5,000
WIN7F04808
|
June 9, 2017 |
FY 2017 |
WIN7F04831 |
UACS No. 103004010310187 |
January 1, 2017 |
National Capital Region |
North Manila District Engineering Office |
As per GAA
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Renovation of Day Care, District 4, Zone 53, Brgy. 541, Manila City (Construction of Multi-Purpose Building)
UACS No. 103004010310187
Physical Target
Original: 1 building
Unit Cost (P’000): P2,000
Allocation Cost (P’000): P2,000
WIN7F04831
As Modified
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Construction of Day Care Center, District 4, Zone 53, Brgy. 541, Manila City (Construction of Multi-Purpose Building)
UACS No. 103004010310187
Physical Target
Modified: 1 building
Unit Cost (P’000): P2,000/building
Estimated Cost (P’000): P2,000
WIN7F04831
|
June 9, 2017 |
2017 |
292004020200529 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures/Facilities - Construction of Drainage Canal, Brgy. Sto. Tomas, Peñaranda, Nueva Ecija |
June 9, 2017 |
2017 |
165004050307449 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads - Concreting of Road - Brgy. San Roque Labac, Floridablanca, Pampanga
|
June 9, 2017 |
2017 |
165004050307449 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Retaining Wall at Malusac, Sasmuan, Pampanga
|
June 9, 2017 |
2017 |
292003020402570 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Dike - Construction / Rehabilitation of Dike Slope Protection along Porac River, Sta. Rita Section, Lubao, Pampanga
|
June 9, 2017 |
2017 |
292003020402563 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Slope Protection along Gumain River, Sta. 0+000 to Sta. 0+200, San Pedro Section, Floridablanca, Pampanga
|
June 9, 2017 |
2017 |
292003020402565 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Slope Protection along San Jose Creek, San Juan 1 Section, to Sapang Matulid San Isidro Section, Guagua, Pampanga |
June 9, 2017 |
2017 |
292003020402566 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Slope Protection along San Jose Creek, San Vicente (EBUS) Section, Guagua, Pampanga |
June 9, 2017 |
2017 |
165003014300310 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation of National Roads - Rehabilitation / Reconstruction / Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System / Highway Development Management - 4 (HDM-4) – Tertiary - San Antonio - Floridablanca Rd - K0081+(-149.20) - K0081+(-059.20), K0081+047.40 - K0081+(-022.60) |
June 9, 2017 |
2017 |
165003014800119 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Asset Preservation of National Roads - Construction / Upgrading / Rehabilitation of Drainage along National Roads - Secondary - Construction of Drainage Structure along Road - Angeles - Porac - Floridablanca - Dinalupihan Road, K0096+698.50 - K0097+679
|
June 9, 2017 |
2017 |
WIN7F04767 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bataan 2nd District Engineering Office |
Network Development - Improvement/Widening of National Roads - Secondary - Roman Expressway, K0132+786 - K0133+000, K0133+600 - K0134+000 |
June 9, 2017 |
2017 |
WIN7F04650 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bataan 2nd District Engineering Office |
Network Development - Off-Carriageway Improvement including drainage - Tertiary - Enrique A. Garcia Ave.
K0124+-937 - K0125+345, K0125+-339 - K0124+936 |
June 9, 2017 |
2017 |
WIN7F04768 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bataan 2nd District Engineering Office |
Construction and Maintenance of Bridges along National Roads - Replacement of Permanent Weak Bridges - Replacement of Bridge - Tuyo Bridge (B01593LZ) along Roman Expressway |
June 9, 2017 |
2017 |
WIN7E01706 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bataan 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure with channel excavation of Talisay River, Cupang Section, Sta. 0+000 to Sta. 0+405, Balanga city, Bataan |
June 9, 2017 |
2017 |
WIN7F04648 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bataan 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure and Channel Excavation of Talisay River, Diwa Nagwaling Section, Sta. 0+000 to Sta. 0+425, Pilar, Bataan |
June 9, 2017 |
2017 |
WIN7E01663 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bataan 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads - Concreting of Roads, Sitio Damulog, Brgy. Daan Pare, Orion, Bataan
|
June 8, 2017 |
2017 |
165004050307390 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. San Anton, San Leonardo, Nueva Ecija |
June 8, 2017 |
2017 |
165004050307388 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Pulong Matong, General, Tinio, Nueva Ecija |
June 8, 2017 |
2017 |
165004050307387 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Poblacion West, General Tinio, Nueva Ecija |
June 8, 2017 |
2017 |
165004050307386 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Pakul, Jaen, Nueva Ecija |
June 8, 2017 |
2017 |
165004050307384 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads – Concreting of Road, Brgy. Magsalisi, Jaen, Nueva Ecija |
June 8, 2017 |
2017 |
WIN7G01482 |
RA 10924 |
December 29, 2016 |
Region XIII |
Butuan City District Engineering Office |
Modified:
LFP: LIP - Roads and Bridges - Local Roads
Concreting of Local Road, Mahogany Bridge to Purok 6-A, Brgy. Mahogany, Sta. 0+000-Sta. 0+231.50 w/exception
Allocation : ₱ 2.000 Million
Physical Target : 0.402 lane km
|
June 8, 2017 |
2017 |
WIN7G01541 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Network Development - Improvement/Widening of National Roads - N1
Improvement/Widening of National Roads, N1, Daang Maharlika (Agusan-Davao Sect), Prosperidad, Agusan del Sur, K1283+973 - K1284+200
Allocation : ₱ 17.499 Million (Total)
: ₱ 9,097,896.15 (Road Widening)
: ₱ 8,401,103.85 (Construction of Road Slope Protection Structure)
Physical Target : 0.462 lane km (Road Widening)
: 1,513.60 sq.m. (Construction of Road Slope Protection Structure)
|
June 8, 2017 |
2017 |
WIN7G01542 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Network Development: Improvement/Widening of National Roads - N1
Improvement/Widening of National Roads, N1, Daang Maharlika (Agusan-Davao Sect), Prosperidad, Agusan del Sur, K1266+620 - K1268+003
Allocation : ₱ 29.931 Million
Physical Target : 2.804 lane km
|
June 8, 2017 |
2017 |
WIN7G01544 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Network Development: Improvement/Widening of National Roads - N1
Improvement/Widening of National Roads, N1, Daang Maharlika (Agusan-Davao Sect), Prosperidad, Agusan del Sur, K1272+000 - K1272+584
Allocation : ₱ 17.57 Million
Physical Target : 1.168 lane km
|
June 8, 2017 |
2017 |
WIN7G01525 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW
Construction of Gravel Road - Completion of the East-West Lateral Road connecting Agusan del Sur/Agusan del Norte to Bukidnon, Agusan-Malaybalay Road, Esperanza, Package 2, Agusan del Sur, Sta. 1306+420 - Sta. 1307+520
Allocation : ₱ 20.000 Million
Physical Target : 2.20 lane km
|
June 8, 2017 |
2017 |
WIN7G01530 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW
Construction of Gravel Road - Completion of the East-West Lateral Road connecting Agusan del Sur/Agusan del Norte to Bukidnon, Agusan-Malaybalay Road, Esperanza, Package 1, Agusan del Sur, Sta. 1305+420.90 - Sta. 1306+420
Allocation : ₱ 20.000 Million
Physical Target : 1.9982 lane km
|
June 8, 2017 |
2017 |
WIN7G01531 |
Ra 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW
Construction of Gravel Road - Completion of the East-West Lateral Road connecting Agusan del Sur/Agusan del Norte to Bukidnon, Agusan-Malaybalay Road, Esperanza, Package 3, Agusan del Sur, Sta. 1307+520 - Sta. 1308+568
Allocation : ₱ 20.000 Million
Physical Target : 2.096 lane km
|
June 8, 2017 |
2017 |
WIN7G01538 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Sur 1st District Engineering Office |
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW
Construction of Gravel Road - Butuan City - Pianing - Tandag Rd (Brgy. Kolambogan - Padiay, Sibagat), Sta. 1257+600 - Sta. 1258+300
Allocation : ₱ 20.000 Million
Physical Target : 1.400 lane km
|
June 8, 2017 |
2017 |
WIN7G01557 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified;
Network Development: Construction of Missing Gaps connecting National Roads, including ROW
Construction of Missing Gaps connecting National Roads including ROW, along Bdry. Bukidnon/Agusan del Norte, Buenavista, (Lawan-lawan Section), Agusan del Norte, Sta. 0+000 - Sta. 1+1776
Allocation : ₱ 44.40 Million (Total)
: ₱ 43,684,605.87 (Construction of Concrete Road)
: ₱ 715,394.13 (ROW Acquisition)
Physical Target : 3.552 lane km (Construction of Concrete Road)
: 35,520.00 sq.m. (ROW Acquisition)
|
June 8, 2017 |
2017 |
WIN7G01554 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW
Construction of Missing Gaps connecting National Roads including ROW, along Agusan-Bukidnon Road, Agusan del Norte, Sta. 2+733 - Sta. 2+958
Allocation : ₱ 5.50 Million (Total)
: ₱ 5,140,692.66 (Construction of Concrete Road)
: ₱ 359,307.34 (ROW Acquisition)
Physical Target : 0.45 lane km (Construction of Concrete Road)
: 4,500.00 sq.m. (ROW Acquisition)
|
June 8, 2017 |
2017 |
WIN7G01558 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes
Widening of Permanent Bridges to more than 2 lanes at Sanghan Br. (B00845MN) along Daang Maharlika (Surigao-Agusan Section), Cabadbaran, Agusan del Norte
Allocation : ₱ 32.00 Million (Total)
: ₱ 29,811,415.26 (Bridge)
: ₱ 2,188,584.74 (ROW)
Physical Target : 238.00 sq.m. (Bridge)
: 266.00 sq.m. (ROW)
|
June 8, 2017 |
2017 |
WIN7G01552 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes
Widening of Permanent Bridges to more than 2 lanes, including ROW, Sta. Ana Bridge (B00838MN) along Daang Maharlika (Surigao-Agusan Section)
Allocation : ₱ 99.00 Million (Total) : ₱ 98,700,000.00 (Bridge)
: ₱ 300,500.00 (ROW)
Physical Target : 943.00 sq.m. (Bridge)
: 200.00 sq.m. (ROW)
|
June 8, 2017 |
2017 |
WIN7G01562 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes
Widening of Permanent Bridges to more than 2 lanes at Baleguian Br. (B00830MN) along Daang Maharlika (Surigao-Agusan Section), Jabonga, Agusan del Norte
Allocation : ₱ 27.96 Million (Total)
: ₱ 23,856,721.46 (Bridge)
: ₱ 4,103,278.54 (ROW)
Physical Target : 256.00 sq.m. (Bridge)
: 200.00 sq.m. (ROW)
|
June 8, 2017 |
2017 |
WIN7G01556 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes
Widening of Permanent Bridges to more than 2 lanes at Sayadion Br. (B00831MN) along Daang Maharlika (Surigao-Agusan Section), Jabonga, Agusan del Norte
Allocation : ₱ 18.00 Million (Total)
: ₱ 15,280,602.74 (Bridge)
: ₱ 2,719,397.26 (ROW)
Physical Target : 165.00 sq.m. (Bridge)
: 200.00 sq.m. (ROW)
|
June 8, 2017 |
2017 |
WIN7G01560 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement of Sta. Ana River, Tubay, Agusan del Norte, Sta. 0+000 - Sta. 0+500
Allocation : ₱ 40.00 Million (Total)
: ₱ 39,958,714.27 (Construction of Flood Mitigation Structure)
: ₱ 41,285.73 (ROW Acquisition)
Physical Target : 500.00 l.m. (Construction of Flood Mitigation Structure)
: 5,000.00 sq.m. (ROW Acquisition)
|
June 8, 2017 |
2017 |
WIN7G01559 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Rehabilitation/Improvement of Magallanes River Dike, Magallanes, Agusan del Norte
Allocation : ₱ 45.00 Million (Total)
: ₱ 44,249,250.00 (Construction of Dike)
: ₱ 750,750.00 (ROW Acquisition)
Physical Target : 301.00 l.m. (Construction of Dike)
: 3,010.00 sq.m. (ROW Acquisition)
|
June 8, 2017 |
2017 |
WIN7G01555 |
Ra 10924 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Improvement/Construction of River Dike along Cabadbaran River, City of Cabadbaran, Agusan del Norte, Sta. 0+000 - Sta. 0+194
Allocation : ₱ 50.00 Million (Total)
: ₱ 49,842,843.17 (Construction of Dike)
: ₱ 157,156.83 (ROW Acquisition)
Physical Target : 194.00 l.m. (Construction of Dike)
: 1,940.00 sq.m. (ROW Acquisition)
|
June 8, 2017 |
2017 |
WIN7G01553 |
RA 10924 |
December 29, 2016 |
Region XIII |
Agusan del Norte District Engineering Office |
Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Flood Control Project in Karak-an River, City of Cabadbaran, Agusan del Norte, Sta. 0+000 - Sta. 0+180
Allocation : ₱ 45.00 Million (Total)
: ₱ 44,848,605.00 (Construction of Flood Mitigation Structure)
: ₱ 151,395.00 (ROW Acquisition)
Physical Target : 180.00 l.m. (Construction of Flood Mitigation Structure)
: 1,800.00 sq.m. (ROW Acquisition)
|
June 7, 2017 |
2017 |
WIN7F04776 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 3rd District Engineering Office |
As per GAA:
Locally-Funded Projects - Buildings and Other Structures Multipurpose/Facilities : Construction of Multi-Purpose
Building (Covered Court), Brgy. Sumaoy, Garchitorena,
Camarines Sur ( Construction of Multi-Purpose Building)
Physical Target: 1 building
Unit Cost (P'000): P1,500/ building
Allocation Cost (P'000): P1,500
As MODIFIED:
Locally-Funded Projects - Buildings and Other Structures Multipurpose/Facilities : Construction of Multi-Purpose
Building, Brgy. Sumaoy, Garchitorena, Camarines Sur (Construction of Multi-Purpose Building)
Physical Target: 1 building
Unit Cost (P'000): P1,500/ building
Estimated Cost (P'000): P1,500 |
June 7, 2017 |
2017 |
WIN7F04599 |
SR2017-01-000420 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-3 Construction and Maintenance Services of Other
Infra: Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations to Seaports: Construction Of Concrete Road - Cumadcad-Macalaya Port Road, Castilla, Sorsogon
(Construction of Concrete Road)
Physical target: 7.47 lane-km
Unit Cost (P'000): P18,741.63/lane-km
Allocation: P140M
As MODIFIED:
MFO-3 Construction and Maintenance Services of Other
Infra: Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations to Seaports: Construction Of Concrete Road - Cumadcad-Macalaya Port Road, Castilla, Sorsogon
(Construction of Concrete Road)
Physical target: 6.9582 lane-km
Unit Cost (P'000): P20,120.15/lane-km
Estimated Cost: P140M |
June 7, 2017 |
2017 |
WIN7E01695 |
SR2017-01-000403 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-2 Flood Management Services: Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Drainage Structure - Legaspi City
Urban Drainage Project (Construction of Drainage Structure)
Physical Target: 500 Lm
Unit Cost: P200.00/lm
Allocation: Php 100M
As MODIFIED:
MFO-2 Flood Management Services: Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Drainage Structure - Legaspi City
Urban Drainage Project Sta. 2+100 - Sta. 2+539.60 (Construction of Drainage Structure)
Physical Target: 439.60 Lm
Unit Cost: P227.479/lm
Estimated Cost: Php 100M |
June 7, 2017 |
2017 |
WIN7F04594 |
SR2017-01-000317 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-1 National Road Network Services: Network
Development - Off-Carriageway Improvement including drainage — Secondary: Off-Carriageway Improvement:
Shoulder Paving / Construction - Masbate-Cataingan-Placer Rd K0036 + 862 - K0037 + 526, K0040 + 715 - K0041 + 478, K0041 + 491 - K0041 + 621, K0080 + 000 - K0081+ 521 (Off-Carriageway Improvement: Shoulder Paving / Construction)
Physical Target: 3,110 sq.m.
Unit Cost: P27.04T/sq.m.
Allocation: P84.107M
As MODIFIED:
MFO-1 National Road Network Services: Network
Development - Off-Carriageway Improvement including drainage — Secondary: Off-Carriageway Improvement:
Shoulder Paving / Construction - Masbate-Cataingan-Placer Rd K0036 + 862 - K0037 + 526, K0040 + 715 - K0041 + 478, K0041 + 491 - K0041 + 621, K0080 + 000 - K0081+ 521 (Shoulder Paving / Construction)
Physical Target: 24,535 sq.m.
Unit Cost: P3.428T/sq.m.
Estimated Cost: P84.107M |
June 7, 2017 |
2017 |
WIN7F04606 |
SR2017-01-000308 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-1 National Road Network Services: Network
Development - Off-Carriageway Improvement including drainage — Secondary: Off-Carriageway Improvement:
Shoulder Paving / Construction - Masbate-Cataingan-Placer Rd - K0025 + 420 - K0026 + 160, K0027 + 040 - K0028 + 568, K0032 + 000 - K0032 + 686, K0032 + 723 - K0033 + 527, K0036 + 000 - K0036 + 850 (Off-Carriageway Improvement: Shoulder Paving / Construction)
Physical Target: 4,646 sq.m.
Unit Cost: P29.57T/sq.m.
Allocation: P137.408M
As MODIFIED:
MFO-1 National Road Network Services: Network
Development - Off-Carriageway Improvement including drainage — Secondary: Off-Carriageway Improvement:
Shoulder Paving / Construction - Masbate-Cataingan-Placer Rd - K0025 + 420 - K0026 + 160, K0027 + 040 - K0028 + 568, K0032 + 000 - K0032 + 686, K0032 + 723 - K0033 + 527, K0036 + 000 - K0036 + 850 (Shoulder Paving / Construction)
Physical Target: 34,292 sq.m.
Unit Cost: P4.0T/sq.m.
Estimated Cost: P137.408M |
June 7, 2017 |
2017 |
WIN7E01703 |
SR2017-01-000248 |
January 27, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-1 National Road Network Services -Network
Development - Improvement / Widening Of National Roads
- Other Primary: Road Widening - Rolando A Andaya Highway - K0336 + 496 - K0338 + 000, K0339 + 000 - K0341 + 637 (Road Widening)
Physical target: 9.174 lane-km
Unit Cost (P'000): P14,768.80/lane km
Allocation: P135.489M
As MODIFIED:
MFO-1 National Road Network Services -Network
Development - Improvement / Widening Of National Roads
- Other Primary: Road Widening - Rolando A Andaya Highway - K0336 + 496 - K0337 + 700, K0340 + 520 - K0341 + 637(Road Widening / Construction of Drainage Structure)
Physical target:
Road Widening: 4.94080 lane-km
Const. of Drainage Structure: 2,064 lm
Unit Cost (P'000):
Road Widening: P18,182.76/lane-km
Const. of Drainage Structure: P22.11/lm
Estimated Cost: P135.489M
|
June 7, 2017 |
2017 |
WIN7E01702 |
SR2017-01-000244 |
January 27, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-1 National Road Network Services -Network
Development - Improvement / Widening Of National Roads
- Other Primary: Road Widening - Rolando A Andaya Highway - K0319+938 - K0320+961, K0320+992 - K0321+376, K0322 + 592 - K0324+000, K0324+000 - K0325+00, K0325+000 - K0326 + 196 (Road Widening)
Physical target: 10.076 lane-km
Unit Cost (P'000): P15,334.55/lane km
Allocation: P154.511M
As MODIFIED:
MFO-1 National Road Network Services -Network
Development - Improvement / Widening Of National Roads
- Other Primary: Road Widening - Rolando A Andaya Highway - K0319+938 - K0320+961, K0320+992 - K0321+376, K0322 + 592 - K0324+300 (Road Widening / Construction of Drainage Structure along Road)
Physical target:
Road Widening: 6.2604 lane-km
Const. of Drainage Structure: 1,659 lm
Unit Cost (P'000):
Road Widening: P18,576.91/lane-km
Const. of Drainage Structure: P23.03/lm
Estimated Cost: P154.511M |
June 7, 2017 |
2017 |
WIN7F04607 |
SR2017-01-000152 |
January 27, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-1 National Road Network Services: Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) - Tertiary: Reconstruction from Concrete to Concrete - Sn PascuaI-CIaveria Rd - K0001+548 - K0001+706, K0001+776 - K0002+000, K0042+204 - K0042+927, K0044+523 - K0045+000, K0049+000 - K0049+025, K0049+130 - K0049+212, K0054+000 - K0055+310, K0014+407 - K0014+486, K0014+516 - K0014+521, K0014+536 - K0014+541, K0014+571 - K0014+617, K0022+854 - K0023+000(Reconstruction from Concrete to Concrete)
Physical Target: 6.99 lane-km
Unit Cost (P'000): P14,306.15/lane km
Allocation: P100M
As MODIFIED:
MFO-1 National Road Network Services: Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) - Tertiary: Reconstruction from Concrete to Concrete - Sn PascuaI-CIaveria Rd - K0001+548 - K0001+706, K0001+776 - K0002+000, K0014+407 - K0014+486, K0014+516 - K0014+521, K0014+536 - K0014+541, K0014+571 - K0014+617, K0022+854 - K0023+000, K0042+204 - K0042+927, K0044+523 - K0045+000, K0049+000 - K0049+025, K0049+130 - K0049+212, K0054+000 - K0054+320,
(Reconstruction from Concrete to Concrete)
Physical Target: 4.6332 lane-km
Unit Cost (P'000): P21,583.35/lane km
Estimated Cost: P100M |
June 7, 2017 |
2017 |
WIN7E01583 |
SR2017-01-000170 |
January 27, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-1 National Road Network Services: Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) - Tertiary: Reconstruction from Concrete to Concrete - Sn Pascual-Claveria Rd - K0004+482 - K0005+017, K0049+212 - K0051+805, K0014+617 - K0015+000 (Reconstruction from Concrete to Concrete)
Physical Target: 7.062 lane-km
Unit Cost (P'000): P15,073.92/lane km
Allocation: P106.452M
As MODIFIED:
MFO-1 National Road Network Services: Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4) - Tertiary: Reconstruction from Concrete to Concrete - Sn PascuaI-CIaveria Rd - Sn Pascual-Claveria Rd - K0004+482 - K0005+017, K0014+617 - K0015+000, K0049+212 - K0051+780 (Reconstruction from Concrete to Concrete / Construction of Drainange Structure)
Physical Target:
Reconst. form Concrete to Concrete: 4.6332 lane-km
Construction of Drainage: 2,095.70 lm.
Unit Cost (P'000):
Reconst. form Concrete to Concrete: P15,653.34/lane-km
Construction of Drainage: P13.21/ lm.
Estimated Cost: P106.452M |
June 7, 2017 |
2017 |
WIN7F04623 |
SR2017-01-000196 |
January 27, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO 1 - National Road Network Services - Asset preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary - Construction of Road Slope Protection Structure — Masbate-Cataingan-Placer Rd - K0019+-258 - K0019+100, K0022+330 - K0022+667, K0023+500 - K0023+650, K0054+440 - K0054+510, K0062+900 - K0062+1000, K0064+400 - K0064+540, K0073+488 - K0073+538, K0075+496 - K0075+596, K0078+631 - K0078+681, K0086+227 - K0086+277[Construction of Slope Protection]
Physical Target: 8,037 sq.m.
Unit Cost (P'000): P9.283/sq.m.
Allocation (P'000): P74,563.00
As MODIFIED:
MFO 1 - National Road Network Services - Asset preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary - Construction of Road Slope Protection Structure — Masbate-Cataingan-Placer Rd - K0019+-258 - K0019+100, K0022+330 - K0022+667, K0023+500 - K0023+650, K0054+440 - K0054+510, K0062+900 - K0062+1000, K0064+400 - K0064+540, K0073+488 - K0073+538, K0075+496 - K0075+596, K0078+631 - K0078+681, K0086+227 - K0086+277[Construction of Slope Protection]
Physical Target: 5,143 sq.m.
Unit Cost (P'000): P14.50/sq.m.
Estimated Cost (P'000): P74,563.00
|
June 6, 2017 |
2017 |
165003030600040 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Aurora District Engineering Office |
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Airports - Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism - Baler Airport Access Road, San Luis, Aurora |
June 6, 2017 |
2017 |
165003015200115 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Tarlac District Engineering Office |
Network Development - Improvement/Widening of National Roads - Tertiary - Road Widening including Slope Protection Capas - San Jose - Mayantoc - Malacampa Road
K0125+436 - K0128+000, K0141+000 - K0144+175 |
June 6, 2017 |
2017 |
WIN7F04626 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Sorsogon District Engineering Office |
As per GAA:
Locally Funded Projects: Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures/Facilities, Construction of Aguada Norte River Control, Barangay Aguada Norte, Magallanes, Sorsogon (Construction of Flood Mitigation Structure)
Physical Target: 50 Lm.
Unit Cost: P60T/Lm
Allocation: Php 3M
As MODIFIED:
Locally Funded Projects: Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures/Facilities, Construction of Aguada Norte Seawall, Barangay Aguada Norte, Magallanes, Sorsogon (Construction of Flood Mitigation Structure)
Physical Target: 35 Lm.
Unit Cost: P85.71T/Lm
Estimated Cost: Php 3M |
June 6, 2017 |
2017 |
165003016900042 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Tarlac District Engineering Office |
Network Development - Off-Carriageway Improvement including drainage - Tertiary - Off-Carriageway Improvement including drainage Victoria - La Paz Rd
K0141+-433 - K0143+693 |
June 6, 2017 |
2017 |
WIN7F04627 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Sorsogon District Engineering Office |
As per GAA:
Locally Funded Projects: Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures/Facilities, Construction of Aguada Sur River Control, Barangay Aguada Sur, Magallanes, Sorsogon (Construction of Flood Mitigation Structure)
Physical Target: 50 Lm.
Unit Cost: P60T/Lm
Allocation: Php 3M
As MODIFIED:
Locally Funded Projects: Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures/Facilities, Construction of Aguada Sur Seawall, Barangay Aguada Sur, Magallanes, Sorsogon (Construction of Flood Mitigation Structure)
Physical Target: 65 Lm.
Unit Cost: P46.15T/Lm
Estimated Cost: Php 3M |
June 6, 2017 |
2017 |
165003016800048 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Tarlac District Engineering Office |
Network Development - Off-Carriageway Improvement including drainage - Secondary - Paniqui - Camiling - Wawa Rd
K0157+650 - K0158+000, K0158+320 - K0159+855, K0167+745 - K0168+328, K0171+014 - K0171+867 |
June 6, 2017 |
2017 |
165003015200137 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Tarlac District Engineering Office |
Network Development - Improvement/Widening of National Roads - Tertiary - Victoria - Pura Rd
K0148+675 - K0151+336, K0151+431 - K0152+471, K0153+281 - K0153+611 |
June 6, 2017 |
2017 |
165003016900009 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Tarlac District Engineering Office |
Network Development - Off-Carriageway Improvement including drainage - Tertiary - Tarlac City - Sn Jose via Tibag - Burgos Rd
K0129+827 - K0129+202, K0129+214 - K0129+284, K0129+290 - K0131+000, K0131+000 - K0132+038, K0135+533 - K0136+464, K0136+476 - K0136+983 |
June 6, 2017 |
2017 |
WIN7E01698 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Albay 3rd Engineering Office |
As per GAA:
MFO 1: National Road Services Construction and Maintenance of Bridges along National Roads Retrofitting/Strengthening of Permanent Bridges, Retrofitting / Strengthening of Bridge - Guinobatan Br. (30029212) along Daang Maharlika (LZ) (Retrofitting/Strengthening of Bridge)
Physical Target:
CW-1 Retrofitting/Strengthening of Bridge : 1 Bridge
Unit Cost:CW-1 Retrofitting/Strengthening of Bridge : P16,500.00/Bridge
Allocation: Php 16.500M
As MODIFIED:
MFO 1: National Road
Network Services Construction and
Maintenance of Bridges along National Roads Retrofitting/Strengthening of Permanent Bridges, Retrofitting / Strengthening of Bridge - Guinobatan Br. (B00292LZ) along Daang Maharlika (LZ)
(Retrofitting/Strengthening of Bridge)
(Construction of Slope Protectjon Structure)
Physical Target:
CW-1 Retrofitting/Strengthening of Bridge : 1 Bridge
CW-2 Cost. of Slope Protection Structure: 1,519.95 Sq.m.
Unit Cost:CW-1 Retrofitting/Strengthening of Bridge : P5,979.00/Bridge
CW-2 Cost. of Slope Protection Structure: P6.92T/ Sq.m.
Estiamted Cost: Php 16.500M |
June 6, 2017 |
2017 |
165003014200225 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Tarlac 2nd District Engineering Office |
Asset Preservation of National Roads - Rehabilitation / Reconstruction / Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System / Highway Development Management - 4 (HDM-4) – Secondary - PCWR
K0151+880 - K0153+196
|
June 6, 2017 |
2017 |
WIN7E01699 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Albay 3rd Engineering Office |
As per GAA:
MFO-2 Flood Management Services: Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Mitigation Structure - Rehabilitation of Cabilogan Dam, Retaining Dike (Cavasi-Tagpo Section) and Bridge Elements, Ligao, Albay
(Construction of Flood Mitigation Structure)
Physical target: 100 Lm
Unit Cost: P400T/Lm
Allocation: Php 40M
As MODIFIED:
MFO-2 Flood Management Services: Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Construction of Flood Mitigation Structure - Rehabilitation of Cabilogan Dam, Retaining Dike (Cavasi-Tagpo Section) and Bridge Elements, Ligao, Albay
(Construction of Flood Mitigation Structure)
Physical target: 410 Lm
Unit Cost: P97.56T/Lm
Estimated Cost: Php 40M |
June 6, 2017 |
2017 |
165003014300316 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Tarlac District Engineering Office |
Asset Preservation of National Roads - Rehabilitation / Reconstruction / Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System / Highway Development Management - 4 (HDM-4) – Tertiary - Capas - San Jose - Mayantoc - Malacampa Rd
K0154+000 - K0156+000 |
June 6, 2017 |
2017 |
103004010311170 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Tarlac District Engineering Office |
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction of Multi-Purpose Building (Municipal Hall), Anao, Tarlac
|
June 6, 2017 |
2017 |
103001040311172 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Tarlac District Engineering Office |
Local Infrastructure Program - Buildings and Other Structures - Multipurpose/Facilities - Construction of 2 - Storey Multi-Purpose Building Hall, Barangay Quezon, Gerona, Tarlac |
June 6, 2017 |
2017 |
268004010101408 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Tarlac District Engineering Office |
Local Infrastructure Program - Buildings and Other Structures - School Buildings - Construction of Classrooms for the Balanti Integrated School, Brgy. Balanti, Tarlac City, Tarlac |
June 6, 2017 |
2017 |
WIN7F04777 |
SR2017-01-000560 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO 3 - Construction and Maintenance of Other Infrastructures - Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations: Construction of concrete Road Matnog-Sta. Magdalena-Bulusan Road leading to Bulusan National Park (Section Il), Sorsogon (Construction of Concrete Road)
Physical Target: 5.000 lane-km
Unit Cost (P'000): P30,000/lane-km
Allocation Cost (P'000): P150,000
As MODIFIED:
MFO 3 - Construction and Maintenance of Other Infrastructures - Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations: Construction of concrete Road Matnog-Sta. Magdalena-Bulusan Road leading to Bulusan National Park (Section Il), Sorsogon (Construction of Concrete Road)
Physical Target: Road: 4.85584 lane-km
Drainage Structure: 3774.74 lm
Unit Cost (P'000): Road: P21,727/lane-km
Drainage Structure: P11.79T/ lm
Estiamated Cost (P'000): P150,000
|
June 6, 2017 |
2017 |
WIN7F04788 |
SR2017-01-000551 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO 3 - Construction and Maintenance of Other Infrastructures - Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations: Construction of concrete Road Matnog-Sta. Magdalena-Bulusan Road leading to Bulusan National Park (Section I), Sorsogon (Construction of Concrete Road)
Physical Target: 10.940 lane-km
Unit Cost (P'000): P13,711.15/lane-km
Allocation Cost (P'000): P150,000
As MODIFIED:
MFO 3 - Construction and Maintenance of Other Infrastructures - Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations: Construction of concrete Road Matnog-Sta. Magdalena-Bulusan Road leading to Bulusan National Park (Section l), Sorsogon (Construction of Concrete Road)
Physical Target:
CW1-Road: 6.21778 lane-km
CW2-Drainage Structure: 4059.12lm
Unit Cost (P'000):
CW1-Road: P16,909.38/ lane-km
CW2-Drainage Structure: p11.05T/ lm
Estimated Cost (P'000): P150,000 |
June 6, 2017 |
2017 |
WIN7F04783 |
SR2017-01-000567 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO 3 - Construction and Maintenance of Other Infrastructures - Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations: Construction of Concrete Road San Juan Alas-Tagpu-Dayao Road leading to Mandaon Ecotourism Sites, Mandaon, Masbate (Construction of Concrete Road)
Physical Target: 6.240 lane-km
Unit Cost (P'000): P16,025.64/lane-km
Allocation Cost (P'000): P100,000
As MODIFIED:
MFO 3 - Construction and Maintenance of Other Infrastructures - Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations: Construction of Concrete Road San Juan Alas-Tagpu-Dayao Road leading to Mandaon Ecotourism Sites including Bridge, Mandaon, Masbate
(Construction of Concrete Road)
(Construction of Concrete Bridge)
Physical Target:
CW1-Road: 3.87848 Lane-km
CW2-Bridge: 721.224 Sq.m.
Unit Cost (P'000):
CW1-Road: P12,389.04/ Lane-km
CW2-Bridge: P72.029T/ Sq.m.
Estimated Cost (P'000): P100,000 |
June 6, 2017 |
2017 |
WIN7F04789 |
SR2017-01-000337 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary, Road Upgrading Gravel to Paved - Jct Catanduanes Cir Rd-Panganiban-Sabloyon Rd - K0078 + 647 - K0082 + 000 (Road Upgrading Gravel to Paved)
Physical Target: 6.404 Lane-km
Unit Cost: P14,996.88/lane-km
Allocation: Php 96.040M
As MODIFIED:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary, Road Upgrading Gravel to Paved - Jct Catanduanes Cir Rd-Panganiban-Sabloyon Rd - K0078 + 647 - K0080 + 810 (Road Upgrading Gravel to Paved)
Physical Target: 4.30502 Lane-km
Unit Cost: P22,308.84/lane-km
Estimated Cost: Php 96.040M |
June 6, 2017 |
2017 |
WIN7F04771 |
SR2017-01-000325 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary, Road Upgrading Gravel to Paved - Jct Catanduanes Cir Rd-Panganiban-Sabloyon Rd - K0066 + 585 - K0067 + 275, K0068 + 312 - K0068 + 352, K0069 + 000 - K0069 + 560, K0069 + 609 - K0071 + 191, K0071 + 245 - K0072 + 037, K0072 + 058 - K0072 + 338 (Road Upgrading Gravel to Paved)
Physical Target: 7.806 Lane-km
Unit Cost: P15,373/lane-km
Allocation: Php 120.00M
As MODIFIED:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary, Road Upgrading Gravel to Paved - Jct Catanduanes Cir Rd-Panganiban-Sabloyon Rd - K0069 + 086.00 - K0071 + 600 (Road Upgrading Gravel to Paved)
Physical Target: 4.84578 Lane-km
Unit Cost: P24,764/lane-km
Estimated Cost: Php 120.00M |
June 6, 2017 |
2017 |
WIN7F04738 |
SR2017-01-000330 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary, Road Upgrading Gravel to Paved - Jct Catanduanes Cir Rd-Panganiban-Sabloyon Rd - K0073 + 481 - K0074 + 010, K0074 + 037 - K0074 + 826, K0074 + 855 - K0075 + 310 (S00037CN) (Road Upgrading Gravel to Paved)
Physical Target: 7.806 Lane-km
Unit Cost: P15,373/lane-km
Allocation: Php 50.960M
As MODIFIED:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Secondary, Road Upgrading Gravel to Paved - Jct Catanduanes Cir Rd-Panganiban-Sabloyon Rd -K0073 + 481 - K0074 + 150 (S00037CN) (Road Upgrading Gravel to Paved)
Physical Target: 1.302 Lane-km
Unit Cost: P38,932.41/lane-km
Estimated Cost: Php 50.690M |
June 6, 2017 |
2017 |
WIN7F046147 |
SR2017-01-000357 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary, Road Upgrading Gravel to Paved - Sta. Elena-Capalonga By Pass Coastal Rd - Chainage 8453 - Chainage 12410 (Road Upgrading Gravel to Paved)
Physical Target: 7.914 Lane-km
Unit Cost: P14,404.85/lane-km
Allocation: Php 114.0M
As MODIFIED:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary, Road Upgrading Gravel to Paved - Sta. Elena-Capalonga By Pass Coastal Rd - Chainage 3800 - Chainage 5120, K0287+332.50 - K0289+500 (Road Upgrading Gravel to Paved)
Physical Target: 6.975 Lane-km
Unit Cost: P16,344.09/lane-km
Estimated Cost: Php 114.0M |
June 6, 2017 |
2017 |
WIN7F04784 |
SR2017-01-000146 |
January 27, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-1 National Road Network Services: Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management - 4 (HDM-4) - Primary, Rehabilitation of Concrete Road - Daang Maharlika (LZ) - K0634 + 500 - K0635 + 000 (Rehabilitation of Concrete Road)
Physical Target: 0.976 Lane-km
Unit Cost: P153,688.52/Lane-km
Allocation: Php 150M
As MODIFIED:
MFO-1 National Road Network Services: Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development and Management - 4 (HDM-4) - Primary, Rehabilitation of Asphalt Road - Daang Maharlika (LZ) - K0610+127.70 - K0611+000, K0631+500 - K0632+000, K0634+000 - K0635+480, K0641+000 - K0641+873, K0642+000 - K0644+136 (Rehabilitation of Asphalt Road)
Physical Target: 11.7926 Lane-km
Unit Cost: P12,719.84/Lane-km
Estimated Cost: Php 150M
|
June 6, 2017 |
2017 |
WIN7E01705 |
SR2017-01-000240 |
January 27, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO 1 - National Road Network Services - Network Development - Improvement/Widening of National Roads - N1 - Road Widening - Daang Maharlika (LZ) - K0613 + 498 - K0615 + 500, K0615 + 700 - K0616 + 290, K0616 + 514 - K0618 + 000, K0629 + 170 - K0629 + 402, K0629+600 - K0629+912.77, K0635+686 - K0636+164 (Road Widening)
Physical Target: 10.16 lane-km
Unit Cost (P'000): P17,816.93/ lane km
Allocation (P'000): P181,020.00
As MODIFIED:
MFO 1 - National Road Network Services - Network Development - Improvement/Widening of National Roads - N1 - Road Widening - Daang Maharlika (LZ) - K0613 + 498 - K0615 + 500, K0615 + 700 - K0616 + 290, K0616 + 514 - K0618 + 000, K0629 + 170 - K0629 + 402, (Road Widening)
Physical Target: 8.6057 lane-km
Unit Cost (P'000): P21,034.90/ lane km
Estimated Cost (P'000): P181,020.00 |
June 6, 2017 |
2017 |
WIN7F04621 |
SR2017-01-000267 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO 1 - National Road Network Services - Network Development - Improvement/ Widening of National Roads - Tertiary - Masbate Circumferential Rd including RROW - K0004 + 000 - K0005 + 559 [CW1 - Road Widening] [ROW - ROW Acquisition]
Physical Target: CW1 - 3.024 ln-km
ROW - 18,144 sq.m.
Unit Cost (P'000): CW1 - P15,068.78/ln-km
ROW - P3.0/sq.m.
Allocation (P'000): P100,000.00
As per GAA:
MFO 1 - National Road Network Services - Network Development - Improvement/ Widening of National Roads - Tertiary - Masbate Circumferential Rd including RROW - K0004 + 000 - K0005 + 480 [CW1 - Road Widening] [ROW - ROW Acquisition]
Physical Target: CW1 - 2.862 ln-km
ROW - 7,770 sq.m.
Unit Cost (P'000): CW1 - P33,130.60/ln-km
ROW - P0.6667/sq.m.
Estimated Cost (P'000): P100,000.00
|
June 6, 2017 |
2017 |
WIN7F04759 |
SR2017-01-000300 |
January 28, 2016 |
Region V |
Regional Office V |
As per GAA:
MFO 1 - National Road Network Services - Network Development - Off-Carriageway Improvement of National Roads including drainage - Secondary - Off-Carriageway Improvement: Shoulder paving / Construction -Jct Sorsogon-Bacon-Manito Rd - K0582 + 400 - K0584 + 000, K0585 + 000 - K0585 + 259, K0585 + 277 - K0587 + 003, K0587 + 012 - K0588 + 000 (Shoulder paving / Construction)
Physical Target: 13,332 sq.m.
Unit Cost (P'000): P8.64T/sq.m.
Allocation : P115.193M
As MODIFIED:
MFO 1 - National Road Network Services - Network Development - Off-Carriageway Improvement of National Roads including drainage - Secondary - Off-Carriageway Improvement: Shoulder paving / Construction -Jct Sorsogon-Bacon-Manito Rd - K0582 + 400 - K0584 + 000, K0585 + 000 - K0585 + 259, K0585 + 277 - K0587 + 003, K0587 + 012 - K0588 + 000 (Shoulder paving / Construction)
Physical Target: 30,157 sq.m.
Unit Cost (P'000): P3.82T/sq.m.
Estimated Cost: P115.193M |
June 6, 2017 |
2017 |
WIN7F04735 |
SR2017-01-000278 |
January 28, 2017 |
Region V |
Regional Office V |
As MODIFIED:
MFO 1 - National Road Network Services - Network Development - Construction of By-Passes/ Diversion Roads, including ROW - Daraga Albay Diversion Road, including ROW, Road Concreting, Slope Protection and Bridge, Albay (Construction of Concrete Bridge)
(Construction of Concrete Road)
(Construction of Road Slope Protection Structure)
(ROW Acquisition)
Physical Target:
CW-1: 600.72 Sq.m.
CW-2: 5.48084 Lane-km
CW-3: 5,777 Sq.m.
ROW Acquisition: 7,082 Sq.m.
Unit Cost :
CW-1: P87.714T/Sq.m.
CW-2: P16,849.00/Lane-km
CW-3: P8.944T/ Sq.m.
ROW Acquisition: P0.42361/Sq.m.
Estimated Cost : P200M
|
June 5, 2017 |
2017 |
165003015100259 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 1st District Engineering Office |
Network Development - Improvement/Widening of National Roads - Secondary: Road Widening - Cagayan Valley Rd (Magapit-Jct Aparri Airport Sect) K0571+000 - K0572+427.90 (L/S), K0572+431.90 - K0572+577.90 (L/S), K0572+581.90 - K0572+749 (L/S), K0572+753 - K0573+497.10 (L/S), K0573+499.60 - K0574+332.60 (L/S), K0574+336.60 - K0574+794 (L/S), K0571+000 - K0572+756.40 (R/S), K0572+760.40 - K0573+493.10 (R/S), K0573+495.60 - K0574+794 (R/S), (S00662LZ) |
June 5, 2017 |
2017 |
165003016500103 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 1st District Engineering Office |
Network Development - Improvement/Widening of National Roads - N1: Road Widening - Jct Logac-Magapit Rd - K0708+580 - K0711+633.40 |
June 5, 2017 |
2017 |
165003016800004 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 1st District Engineering Office |
Network Development - Off-Carriageway Improvement including Drainage - Secondary: Off-Carriageway Improvement: Shoulder Paving/Construction - Cagayan Valley Rd (Magapit-Jct Aparri Airport Sect) - K0554+(-240) - K0557+000, K0559+000 - K0560+012.90, (S00662LZ) |
June 5, 2017 |
2017 |
165003014600163 |
GAA FY 2017 |
January 1, 2017 |
Region II |
Cagayan 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary: Construction of Road Slope Protection - San Vicente-Gutan-Lubac-Anguib Rd - K0648+361 - K0648+394.10 (L/S), K0648+641 - K0648+690 (L/S), K0648+830 - K0648+930 (L/S), K0648+930 - K0648+945 (B/S) |