May 26, 2017 |
2017 |
WIN7E01709 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads
Road Concreting in Consuelo, Floridablanca, Pampanga |
May 26, 2017 |
FY2017 |
WIN7C01673 |
GAA2017 |
February 1, 2017 |
Region VIII |
Eastern Samar District Engineering Office |
As per GAA:
Construction of Gravel Road - Borongan-Llorente Closed Canopy Forest Area (including Slope Protection and drainage) along Tagaslian-Brgy. Del Pilar, Maydolong, Eastern Samar
As Modified:
Construction/Improvement of Access Roads to Borongan-Llorente Closed Canopy Forest Area (including Slope Protection and drainage) along Brgy. Tagaslian-Brgy. Del Pilar, Maydolong, Eastern Samar Lone District
|
May 26, 2017 |
2017 |
WIN7E01679 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Local Infrastructure Program - Flood Control and Drainage - Flood Control Structures/Facilities, Construction of Line Canal in Carmencita, Floridablanca, Pampanga |
May 26, 2017 |
2017 |
WIN7E01687 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads
Road Concreting in San Pablo, Guagua, Pampanga |
May 26, 2017 |
FY2017 |
WIN7C01678 |
GAA2017 |
February 1, 2017 |
Region VIII |
Eastern Samar District Engineering Office |
As per GAA:
Construction of Missing Gaps connecting National Roads, including ROW
Construction of Concrete Road - Arteche Brgy. Catumsan-Jipapad-Las Navas-Catubig-Rawis Road including ROW, Package 2, Eastern Samar
As Modified:
Construction of Missing Gaps connecting National Roads, including ROW
Arteche Brgy. Catumsan-Jipapad-Las Navas-Catubig-Rawis Road Eastern Samar Lone District, Package 2, Eastern Samar Lone District
Construction of Concrete Road - Arteche Brgy. Catumsan-Jipapad-Las Navas-Catubig-Rawis Road including ROW, Package 2, Eastern Samar
|
May 26, 2017 |
2017 |
WIN7E01660 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Local Infrastructure Program - Local Roads and Bridges - Local Roads
Road Concreting in Mancatian, Porac, Pampanga |
May 26, 2017 |
2017 |
WIN7E01674 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads
Road Concreting in Nabuclud, Floridablanca, Pampanga |
May 26, 2017 |
FY2017 |
WIN7C01677 |
GAA2017 |
February 1, 2017 |
Region VIII |
Eastern Samar District Engineering Office |
As per GAA:
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations
Construction of Concrete Road - Borongan-Llorente Closed Canopy Forest Area (including Construction of Bridge, Slope Protection and drainage), Brgy. Lapgap-Brgy. Maytigbao, Maydolong, Eastern Samar
As Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations
Construction/Improvement of Access Roads to Borongan-Llorente Closed Canopy Forest Area (including Construction of Bridge, Slope Protection and drainage), Brgy. Lapgap-Brgy. Maytigbao, Maydolong, Eastern Samar
Lone District
|
May 26, 2017 |
2017 |
WIN7E01659 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads
Road Concreting/Upgrading with Drainage in San Jose, Mitla, Porac, Pampanga |
May 26, 2017 |
2017 |
WIN7E01697 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads
Road Concreting in Diladila, Sta. Rita, Pampanga |
May 26, 2017 |
FY2017 |
WIN7C01679 |
GAA2017 |
February 1, 2017 |
Region VIII |
Eastern Samar District Engineering Office |
As per GAA:
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations
Construction of Gravel Road - Borongan-Llorente closed canopy Forest Area, Brgy. Del Pilar (Maydolong, Eastern Samar) to Boundary Basey (Samar)
As Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations
Construction/Improvement of Access Roads to Borongan-Llorente closed canopy Forest Area, Brgy. Del Pilar (Maydolong, Eastern Samar) to Boundary Basey (Samar), Eastern Samar Lone District
|
May 26, 2017 |
FY2017 |
WIN7C01672 |
GAA2017 |
February 1, 2017 |
Region VIII |
Eastern Samar District Engineering Office |
As per GAA:
Construction of Missing Gaps connecting National Roads, including ROW
Construction of Concrete Road - Arteche, Brgy. Catumsan-Jipapad-Las Navas-Catubig-Rawis Road, including ROW,Package 1, Eastern Samar
As Modified:
Construction of Missing Gaps connecting National Roads, including ROW
Construction of Missing Gaps Connecting National Roads along Arteche, Brgy. Catumsan-Jipapad-Las Navas-Catubig-Rawis Road, Eastern Samar Lone District Package 1
|
May 26, 2017 |
2017 |
WIN7G01506 |
FY 2017 (R.A 10924) |
May 12, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Asset Preservation of National Roads - Construction/Upgrading/Rehabilitation of Drainage along National Roads - Primary -
Construction/Upgrading/Rehabilitation of Drainage along National Road, Pagadian - Zamboanga City Road, Putik Section, Zamboanga City,
K1932+390 - K1933+466
Allocation: P 20.00 Million
Physical Target: 1,532 lm.
Unit Cost: P 13,054.83/lm.
|
May 26, 2017 |
2017 |
WIN7E01662 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Pampanga 2nd District Engineering Office |
Local Infrastructure Program - Roads and Bridges - Local Roads
Road Concreting in Sitio Pigulot, Sta. Lucia, Lubao, Pampanga |
May 26, 2017 |
FY2017 |
WIN7C01674 |
GAA2017 |
February 1, 2017 |
Region VIII |
Eastern Samar District Engineering Office |
As per GAA:
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4(HDM-4) - Tertiary
Reconstruction from Concrete to Conrete - Arteche-Jipapad-Las Navas-Rawis Road K0968+(-088) - K0969+539
As Modified:
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4(HDM-4) - Tertiary
Along Arteche-Jipapad-Las Navas-Rawis Road K0968+(-088) - K0969+539
|
May 26, 2017 |
FY2017 |
WIN7C01675 |
GAA2017 |
February 1, 2017 |
Region VIII |
Eastern Samar District Engineering Office |
As per GAA:
Construction and Maintenance of Bridges along National Roads
Retrofitting/Strengthening of Permanent Bridges
Dalid Br. (B00520SM) along Wright-Taft-Borongan Road
As Modified:
Construction and Maintenance of Bridges along National Roads
Retrofitting/Strengthening of Permanent Bridges
Dalid Br. (B00520SM) along Jct.Taft-Oras-San Policarpo-Arteche Road
|
May 26, 2017 |
FY2017 |
WIN7C01746 |
GAA2017 |
February 1, 2017 |
Region VIII |
Southern Leyte District Engineering Office |
As per GAA:
Road Widening - Bdry. Southern Leyte-Maasin-Macrohon-Sogod-Jct. Daang Maharlika - K1127+980 -K1132+694
As Modified:
Network Development - Improvement/Widening of National Roads along Bdry. Southern Leyte-Maasin-Macrohon-Sogod-Jct. Daang Maharlika - K1127+980 -K1132+694, Maasin, Southern Leyte
|
May 26, 2017 |
FY2017 |
WIN7C01748 |
GAA2017 |
February 1, 2017 |
Region VIII |
Southern Leyte District Engineering Office |
As per GAA:
Off-carriageway Improvement: Shoulder Paving/Construction - Abuyog-Silago Rd - K0996+000 - K1001+753
As Modified:
Network Development - Off-Carriageway Improvement including drainage along Abuyog-Silago Road - K0996+000 - K1001+753
Silago, Southern Leyte |
May 26, 2017 |
FY2017 |
WIN7C01731 |
GAA2017 |
February 1, 2017 |
Region VIII |
Southern Leyte District Engineering Office |
As per GAA:
Off-Carriageway Improvement Shoulder Paving/Construction - Bato-Bontoc Rd - K1127+000 - K1127+369, K1127+390 - K1128+609
As Modified:
Off-Carriageway Improvement including drainage along Bato-Bontoc Rd - K1127+000 - K1127+369, K1127+390 - K1128+609
Bontoc, Southern Leyte
|
May 26, 2017 |
FY2017 |
WIN7C01730 |
GAA2017 |
January 31, 2017 |
Region VIII |
Southern Leyte District Engineering Office |
As per GAA:
Off-Carriageway Improvement; Shoulder Paving/Construction Liloan-S Ricardo Rd - K1070+685 - K1072+000
As Modified:
Off-Carriageway Improvement including drainage along Liloan-San Ricardo Road(S00218LT) - K1070+685 - K1072+000
Southern Leyte
|
May 26, 2017 |
FY2017 |
WIN7C01743 |
GAA2017 |
January 31, 2017 |
Region VIII |
Leyte 5th District Engineering Office |
As per GAA:
Local Infrastructure Program Water Management - Water Supply
Construction of Water System, Inopacan, Leyte
As Modified:
Local Infrastructure Program Water Management - Water Supply
Construction of Water Supply, Inopacan, Leyte
|
May 26, 2017 |
2017 |
WIN7G01539 |
RA 10924 |
December 29, 2016 |
Region XIII |
Regional Office XIII |
Modified:
Construction of Various Infrastructure including Local Project: Roads and Bridges - Local Roads
Construction of NRJ Rizal-Togbongon-Mat-I-Mabini-Trinidad including Bridge, Surigao del Norte
Allocation:
- Php 176.60 Million (Total)
- Php 140,770,950.00 (Construction of Concrete Road)
- Php 35,829,050.00 (Construction of Bridge)
Physical Target:
- 9.50 lane km (Construction of Concrete Road)
- 381.60 sq.m. (Construction of Bridge) |
May 26, 2017 |
2017 |
WIN7G01481 |
SR2017-02-003001 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Modified:
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Lower Agusan Development Project, Flood Control Component, Stage I, Phase I & II, Urban Drainage System, Construction of Relief Pumping Station at CD1 & CD2, Butuan City
Allocation - Php 100.00 Million
Physical Target - 2 number of building |
May 26, 2017 |
2017 |
WIN7G01486 |
SR2017-02-002724 |
February 3, 2017 |
Region XIII |
Regional Office XIII |
Modified:
Network Development - Construction of Missing Gaps connecting National Roads, including ROW
Completion of the East-West Lateral road connecting Agusan del Sur/Agusan del Norte to Bukidnon, Bilay-Dulag Section incl. Bridge (Agusan Bridge) and ROW, Agusan del Norte
Allocation:
- Php 238.00 Million (Total)
- Php 237.00 Million (Concrete Bridge, Partial Construction
of Substructure only)
- Php 1.00 Million (ROW Acquisition)
Physical Target:
- 1 number of Bridge (Concrete Bridge, Partial
Construction of Substructure only)
- 480.74 sq.m. (ROW Acquisition)
|
May 26, 2017 |
2017 |
WIN7E01610 |
RA 10924 |
January 27, 2017 |
Region III |
Bataan 2nd District Engineering Office |
Construction/Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations
- To Seaports
Access Roads leading to Capinpin Port, Orion, Bataan
(CW-1: Construction of Concrete Road)
(CW-2: Construction of Drainage Structure along Road) |
May 26, 2017 |
2017 |
WIN7E01688 |
RA 10924 |
January 27, 2017 |
Region III |
Aurora District Engineering Office |
Locally-Funded Projects - Roads and Bridges - Local Roads
Construction of Road, Brgy. Dinlog to Dimabiton Falls, Dilasag, Aurora
(Construction of Road) |
May 26, 2017 |
2017 |
WIN7E01684 |
RA 10924 |
January 27, 2017 |
Region III |
Aurora District Engineering Office |
Locally-Funded Projects - Buildings and Other Structures
Multipurpose/Facilities
Construction of Multi-Purpose Building (Covered Court), Brgy. Diaman, Maria Aurora, Aurora Province
(Construction of Multi-Purpose Building) |
May 26, 2017 |
2017 |
WIN7E01689 |
RA 10924 |
January 27, 2017 |
Region III |
Aurora District Engineering Office |
Locally-Funded Projects - Buildings and Other Structures
Multipurpose/Facilities
Construction of Multi-Purpose Building, Brgy. Calaocan, Dipaculao, Aurora province
(Construction of Multi-Purpose Building) |
May 26, 2017 |
2017 |
WIN7E01693 |
RA 10924 |
January 27, 2017 |
Region III |
Aurora District Engineering Office |
Locally-Funded Projects- Roads and Bridges
Local Roads
Concreting of Bulawan Road, Sitio Bulawan, Brgy. Paleg, Dinalungan Aurora
(Construction of Concrete Road)
|
May 26, 2017 |
2017 |
WIN7E01672 |
RA 10924 |
January 27, 2017 |
Region III |
Aurora District Engineering Office |
Locally-Funded Projects - Buildings and Other Structures
Multipurpose/Facilities
Construction of Multi-Purpose Building (Covered Court), Brgy. Reserva, Baler, Aurora Province
(Construction of Multi-Purpose Building)
|
May 26, 2017 |
2017 |
WIN7E01686 |
RA 10924 |
January 27, 2017 |
Region III |
Aurora District Engineering Office |
Locally-Funded Projects - Buildings and Other Structures
Multipurpose/Facilities
Construction of Multi-Purpose Building (Covered Court), Brgy. Baubo, Maria Aurora, Aurora Province
(Construction of Multi-Purpose Building) |
May 26, 2017 |
2017 |
WIN7E01685 |
RA 10924 |
January 27, 2017 |
Region III |
Aurora District Engineering Office |
Locally-Funded Projects - Roads and Bridges -Local Roads
Construction of Road, Sitio Aguang, Barangay Buhangin, Baler, Aurora
(Construction of Concrete Road) |
May 26, 2017 |
2017 |
RA 10924 |
RA 10924 |
January 27, 2017 |
Region III |
Aurora District Engineering Office |
Locally-Funded Projects - Buildings and Other Structures
Multipurpose/Facilities
Construction of 2-Storey Multi-Purpose Building (Brgy. Hall), Brgy. Diniog, Dilasag, Aurora Province
(Construction of Multi-Purpose Building) |
May 26, 2017 |
2017 |
WIN7E01677 |
RA 10924 |
January 27, 2017 |
Region III |
Aurora District Engineering Office |
Locally-Funded Projects - Buildings and Other Structures
School Buildings
Construction of 2 Classroom School Building, Zarah Elementary School, Brgy. Zarah, San Luis, Aurora Province
(Construction of Classrooms) |
May 26, 2017 |
2017 |
WIN7E01704 |
RA 10924 |
January 27, 2017 |
Region III |
Aurora District Engineering Office |
Locally-Funded Projects - Buildings and Other Structures
School Buildings
Construction of 2 Classroom School Building, Diniog High School, Brgy. Diniog, Dilasag, Aurora Province
(Construction of Classrooms) |
May 26, 2017 |
2017 |
WIN7E01626 |
RA 10924 |
January 27, 2017 |
Region III |
Bataan 2nd District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved national Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Tertiary
Junction Layac-Balanga-Mariveles Port Road
K0128+048-K0128+162, K0128+706-K0128+842
(Reconstruction from Asphalt to Concrete) |
May 26, 2017 |
2017 |
WIN7G01442 |
RA 10924 |
December 29, 2016 |
Region XIII |
Surigao del Norte 1st District Engineering Office |
Modified:
LFP: LIP - Roads & Bridges - Local Roads
Concreting of Songkoy-Mahucdam Road, Songkoy, Tubod, Surigao del Norte
Allocation : ₱ 5.000 Million
Physical Target : 0.504 lane km
|
May 26, 2017 |
2017 |
RG7XP00756 |
RA 10924 |
December 29, 2016 |
Region XIII |
Surigao del Norte 1st District Engineering Office |
Modified:
Construction/Maintenance of Flood Mitigation Structure and Drainage Systems
Construction of Flood Mitigation Structures and Drainage System, Kinabutan River Control, Surigao City, Surigao del Norte
Allocation : ₱ 20.000 Million
Physical Target : 215.60 lm
|
May 26, 2017 |
2017 |
WIN7G01452 |
RA 10924 |
December 29, 2016 |
Region XIII |
Surigao del Norte 1st District Engineering Office |
Modified:
LFP: LIP - Buildings and Other Structures - Multipurpose /Facilities
Construction of Covered Court at Municipal Grounds in Brgy. Poblacion, Poblacion, Bacuag, Surigao del Norte
Allocation : ₱ 3.000 Million
Physical Target : 1 Number of Multipurpose Building
|
May 26, 2017 |
2017 |
WIN7G01469 |
RA 10924 |
December 29, 2016 |
Region XIII |
Surigao del Norte 1st District Engineering Office |
Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinatiosn - To Airports
Bonifacio-Poctoy Road leading to Surigao Airport, Surigao City, Surigao del Norte
Allocation : ₱ 25.000 Million (Total)
: ₱ 20,248,000.00 (Concrete Road)
: ₱ 4,502,000.00 (Gravel Road)
: ₱ 250,000.00 (ROW Acquisition)
Physical Target :
Physical Target : 0.642 lane km (Concrete Road)
: 0.798 lane km (Gravel Road)
: 9,944.00 sq.m. (ROW Acquisition)
|
May 26, 2017 |
2017 |
WIN7G01547 |
RA 10924 |
December 29, 2016 |
Region XIII |
Surigao del Norte 1st District Engineering Office |
Modified:
Network Devlopment - Construction of By-passes/Diversion Roads, including ROW
Construction of By-passes/Diversion Roads including ROW - Surigao West Coastal (Package 1), San Francisco-Malimono Road, Surigao del Norte
Allocation : ₱ 100.000 Million (Total)
: ₱ 99.00 Million (Concrete Road)
: ₱ 1.00 Million (ROW Acquisition)
Physical Target :
Physical Target : 5.3715 lane km (Concrete Road)
: 35,112.00 sq.m. (ROW Acquisition)
|
May 26, 2017 |
2017 |
WIN7G01548 |
RA 10924 |
December 29, 2016 |
Region XIII |
Surigao del Norte 1st District Engineering Office |
Modified:
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - To Seaports
NRJ Cagniog-Cayutan-Canlanipa Port Area Road, Surigao City, Surigao del Norte
Allocation : ₱ 45.000 Million (Total)
: ₱ 41,661,000.00 (Concrete Road)
: ₱ 2,326,500.00 (Gravel Road)
: ₱ 1,012,500.00 (ROW Acquisition)
Physical Target :
Physical Target : 1.502 lane km (Concrete Road)
: 0.704 lane km (Gravel Road)
: 14,010.00 sq.m. (ROW Acquisition)
|
May 26, 2017 |
2017 |
WIN7G01528 |
RA 10924 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LFP: LIP - roads and Bridges _ National Roads
Repair/Rehabilitation/Improvement along SDCR, K1478+054 - K1478+669.60, K1479+085.50 - K1479+131.10, K1479+470 - K1479+506, K1479+745 - K1480+025.20, K1480+085.20 - K1480+094, K1480+913 - K1481+216, K1481+976 - K1482+057.60, K1482+114 - K1482+150, K1482+114 - K1482+183.60, K1482+495 - K1482+581.40, K1482+876 - K1482+907.20, Lingig, Surigao del Sur
Allocation:
: ₱ 5.000 Million (Total)
: ₱ 1,608,746.29 (Rehabilitation of Concrete Road)
: ₱ 3,391,253.71 (Road Safety: Guardrails)
Physical Target:
: 0.1605 lane km (Rehabilitation of Concrete Road)
: 547.20 m (Road Safety: Guardrails)
|
May 26, 2017 |
2017 |
WIN7G01532 |
RA 10924 |
December 29, 2016 |
Region XIII |
Surigao del Sur 2nd District Engineering Office |
Modified:
LFP: LIP - Roads and Bridges - National Roads
Repair/Rehabilitation/Improvement along SDCR, K1491+540 - K1491+600, K1491+620.60 - K1491+709.40, K1491+629.80 - K1491+685, K1492+082.70 - K1492+135.50, K1492+237.50 - K1492+379.10, K1492+403 - K1492+833, Lingig, Surigao del Sur
Allocation
: ₱ 5.000 Million (Total)
: ₱ 1,930,587.47 (Rehabilitation of Concrete Road)
: ₱ 3,069,412.53 (Road Safety: Guardrails)
Physical Target
: 0.189 lane km (Rehabilitation of Concrete Road)
: 496.80 m (Road Safety: Guardrails)
|
May 25, 2017 |
2017 |
WIN7E01718 |
RA 10924 |
January 27, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Buildings and Other Structures - Mulitpurpose/Facilities
Construction of Multi-Purpose Building Bambang, Bocaue, Bulacan
(Construction of Multi-Purpose Building) |
May 25, 2017 |
2017 |
WIN7E01726 |
RA 10924 |
January 27, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Buildings and Other Structures - Multipurpose/Facilities
Construction/Improvement of Multi-Purpose Building at Balagtas Central School, Brgy. Wawa, Balagtas, Bulacan
(Construction of Multi-Purpose Building) |
May 25, 2017 |
2017 |
WIN7E01724 |
RA 10924 |
January 27, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of roads, Brgy. Catacte, Bustos, Bulacan
(Construction of Concrete Road) |
May 25, 2017 |
2017 |
WIN7E01730 |
RA 10924 |
January 27, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Roads and Bridges- Local Roads
Concreting of Roads, Malamig, Bustos, Bulacan
(Construction of Concrete Road) |
May 25, 2017 |
2017 |
WIN7E01729 |
RA 10924 |
January 27, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Buildings and Other Structures - Multipurpose/Facilities
Construction of Multi-Purpose Building, Brgy. Calantipay, Baliuag, Bulacan
(Construction of Multi-Purpose Building) |
May 25, 2017 |
2017 |
WIN7E01678 |
RA 10924 |
January 27, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Locally-Funded Project - Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Roads, Brgy. San Pedro, Bustos, Bulacan
(Construction of Concrete Road) |
May 25, 2017 |
2017 |
WIN7E01725 |
RA 10924 |
January 27, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Rehabilitation of Revetment, Brgy. San Agustin, Hagonoy, Bulacan
(Construction of Revetment) |
May 25, 2017 |
2017 |
WIN7E01670 |
RA 10924 |
January 27, 2017 |
Region III |
Bulacan 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction/Rehabilitation of Revetment Brgy. Tampok-Taytayin, Hagonoy, Bulacan
(Construction of Revetment) |
May 25, 2017 |
2017 |
WIN7G01520 |
FY 2017 (R.A 10924) |
May 15, 2017 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
Buildings and Other Structures - Multipurpose Building/Facilities -
Construction of Multi-Purpose Building, Barangay Cabgan, Tambulig, Zamboanga del Sur
Allocation: P 2.0 Million
Physical Target: 1.0 Building
Unit Cost: Php 2.0 MIllion/Building |
May 25, 2017 |
2017 |
WIN7F04600 |
SR2017-01-000371 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO 1- National Road Network Services -Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges, including ROW - to more than 2 lanes - Widening of Bridge - Yabo Br. (B00373LZ) along Daang Maharlika (LZ) (CW1 - Widening of Bridge)
Physical Target: 408.36 sq.m.
Unit Cost (P'000): P136.614/sq.m.
Allocation (P'000): P55,788.00
As MODIFIED:
MFO 1- National Road Network Services -Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges, including ROW - to more than 2 lanes - Widening of Bridge - Yabo Br. (B00373LZ) along Daang Maharlika (LZ)
Bridge: K0378+868.70 - K0378+913.25
Approaches: K0378+660 - K0379+170
(Widening-additional 2-lanes)
(CW1 - Widening of Bridge)
(CW2 -Road Widening)
Physical Target: CW1 - 436.52 sq.m.
CW2 - 2,242 sq.m.
Unit Cost (P'000): CW1 - P68.077/sq.m.
CW2 - P6.145/sq.m.
Estimated (P'000): P55,788.00 |
May 25, 2017 |
2017 |
WIN7G01514 |
FY 2017 (R.A 10924) |
May 15, 2017 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
Buildings and Other Structures - Multipurpose/Facilities -
Construction of Activity Center/Covered Court, Barangay Dao, Pagadian City, Zamboanga del Sur
Allocation: P 5.0 Million
Physical Target: 1.0 Building
Unit Cost: Php 5.0 Million/Building |
May 25, 2017 |
2017 |
WIN7F04595 |
SR2017-01-00284 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO 1 - National Road Network Services - Network Development - Construction of Missing Gaps connecting National Roads, including ROW - Construction of Concrete Road - Asid-Tigbao-Bara-Malbug Road, Masbate [Construction of Concrete Road]
Physical Target: 3.247 ln-km
Unit Cost (P'000): P30,797.66/ln-km
Allocation (P'000): P100,000.00
As MODIFIED:
MFO 1 - National Road Network Services - Network Development - Construction of Missing Gaps connecting National Roads, including ROW - Construction of Concrete Road - Asid-Tigbao-Bara-Malbug Road, Masbate [Construction of Concrete Road]
Physical Target: 6.08 ln-km
Unit Cost (P'000): P16,447.37/ln-km
Estimated Cost (P'000): P100,000.00 |
May 25, 2017 |
2017 |
WIN7G01515 |
FY 2017 (R.A 10924) |
May 15, 2017 |
Region IX |
Zamboanga del Sur 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Tertiary -
Slope Protection along Eastern - Bobongan - Sominot - Midsalip - Dumingag Road (S01351MN), Sominot, Zamboanga del Sur - K1655+600 - K1656+000
Allocation: P 4.078 Million
Physical Target: 923 sq.m.
Unit Cost: Php 4,418.20/sq.m. |
May 25, 2017 |
2017 |
WIN7F04589 |
SR2017-01-000293 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO 1 - National Road Network Services - Network Development - Off-Carriageway Improvement including drainage - Primary Roads - Off-Carriageway Improvement: Shoulder Paving/Construction: Daang Maharlika (LZ) - K0556 + 000 - K0557 + 084, K0558 + 000 - K0559 + 777, K0559 + 819 - K0560 + 024, K0565 + 750 - K0565 + 811, K0565 + 845 - K0566 + 071, K0574 + 047 - K0574+147, K0574 + 173 - K0576 + 000, K0576 + 500 - K0576 + 577, K0577 + 562 - K0579 + 000, K0580 + 699 - K0581 + 571, K0584 + 950 - K0585 + 129, K0585 + 153 - K0585 + 287, K0595 + 473 - K0595 + 873, K0595 + 885 - K0596 + 093, K0597 + 240 - K0597 + 411, K0597 + 430 - K0597 + 535, K0598 + 347 - K0599 + 294 [Shoulder Paving/Construction]
Physical Target: 30,270 sq.m.
Unit Cost (P'000): P4.955/sq.m.
Allocation (P'000): P150,000.00
As per GAA:
MFO 1 - National Road Network Services - Network Development - Off-Carriageway Improvement including drainage - Primary Roads - Off-Carriageway Improvement: Shoulder Paving/Construction: Daang Maharlika (LZ) - K0556 + 000 - K0557 + 084, K0558 + 000 - K0559 + 777, K0559 + 819 - K0560 + 024, K0565 + 750 - K0565 + 811, K0565 + 845 - K0566 + 071, K0574 + 047 - K0574+147, K0574 + 173 - K0576 + 000, K0576 + 500 - K0576 + 577, K0577 + 562 - K0579 + 000, K0580 + 699 - K0581 + 571, K0584 + 950 - K0585 + 129, K0585 + 153 - K0585 + 287, K0595 + 473 - K0595 + 873, K0595 + 885 - K0596 + 093, K0597 + 240 - K0597 + 411, K0597 + 430 - K0597 + 535, K0598 + 347 - K0599 + 294 [Shoulder Paving/Construction]
Physical Target: 37,657 sq.m.
Unit Cost (P'000): P3.9833/sq.m.
Estimated Cost(P'000): P150,000.00
|
May 25, 2017 |
2017 |
WIN7E01593 |
SR2017-01-000228 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO 1 - National Road Network Services: Network Development - Improvement/Widening of National Roads - Primary Roads - Daang Maharlika (LZ) - K0488+400 - K0488+900, K0488+941 - K0489+984, K0497+930 - K0498+450, K0500+272 - K0500+700
(Road Widening)
Physical Target: 5.006 lane-km
Unit Cost: P15,100.67T/lane-km
Allocation: P75.594M
As MODIFIED:
MFO 1 - National Road Network Services: Network Development - Improvement/Widening of National Roads - Primary Roads - Daang Maharlika (LZ) - K0488+400 - K0488+900, K0488+941.72 - K0489+380, K0497+930 - K0498+450, K0500+272 - K0500+700
(Road Widening)
Physical Target: Road Widening: 3.79398 lane-km
Const. of Drainage Structure: 1.887 lm
Unit Cost: Road Widening: P12,996.52T/lane-km
Const. of Drainage Structure: P13.92T/lm
Estimated Cost: P75.594M
|
May 25, 2017 |
2017 |
WIN7F04596 |
SR2017-01000251 |
January 27, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO 1 - National Road Network Services - Network Development - Improvement/Widening of National Roads - Secondary - Baao-Iriga City-Nabua Rd including RROW - K0466 + -415 - K0466 + 693, K0475 + 000 - K0476 + 635
[CW1 - Road Widening]
[ROW - ROW Acquisition]
Physical Target: CW1 - 5.33 ln.km ,
ROW - 26,650 sq.m.
Unit Cost (P'000): CW1 - P14,390.24/ln.km ,
ROW - P2.0/sq.m.
Allocation (P'000): P130,000.00
As per GAA:
MFO 1 - National Road Network Services - Network Development - Improvement/Widening of National Roads - Secondary - Baao-Iriga City-Nabua Rd including RROW - K0466 + -415 - K0466 + 693, K0475 + 000 - K0476 + 635
[CW1 - Road Widening]
[ROW - ROW Acquisition]
Physical Target: CW1 - 5.33 ln.km ,
ROW - 15,970.43 sq.m.
Unit Cost (P'000): CW1 - P19,421.83/ln.km ,
ROW - P1.659/sq.m.
Estimated Cost (P'000): P130,000.00 |
May 25, 2017 |
2017 |
WIN7G01512 |
FY 2017 (R.A 10924) |
May 12, 2017 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
Roads and Bridges - Local Roads -
Concreting of Pangalalan - Bago - Dalongdong Provincial Road in Sindangan, Zamboanga del Norte
Allocation: P 5.00 Million
Physical Target: 0.6050 lane km
Unit Cost: 8,264,462.81/lane km |
May 25, 2017 |
2017 |
WIN7G01464 |
FY 2017 (R.A 10924) |
April 29, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Tertiary -
Rehabilitation/Reconstruction of Damaged Paved National Road Old Road (Ayala - Talisayan), Zamboanga City
K1956+(-597) - K1956+386,
K1958+136 - K1958+640
Allocation: P 9.00 Million
Physical Target: 0.72672 lane km
Unit Cost: P 12,384,412.15/lane km |
May 25, 2017 |
2017 |
WIN7G01460 |
FY 2017 (R.A 10924) |
April 29, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control, Labuan River, Labuan Section (including Right of Way), Zamboanga City
Sta. 0+000 - Sta. 0+400
(Left Side, Upstream),
Sta. 0+000 - Sta. 0+108.68
(Right Side, Upstream),
Sta. 0+124.54 - Sta. 0+400
(Right Side, Upstream)
Allocation: P 28.50 Million
Physical Target: 784.14 lm.
Unit Cost: P 36,345.55/lm. |
May 25, 2017 |
2017 |
WIN7G01456 |
FY 2017 (R.A 10924) |
April 29, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction/Extension of Flood Control at Saaz River, San Ramon (including Right of Way Acquisition), Zamboanga City
Sta. 0+005 - Sta. 0+220 (Both Side, Downstream),
Sta. 0+063.69 - Sta. 0+520 (Left Side, Upstream),
Sta. 0+180 - Sta. 0+240 (Right Side, Upstream),
Sta. 0+396.77 - Sta. 0+520 (Right Side, Upstream)
Allocation: P 30.00 Million
Physical Target: 1,069.54 lm.
Unit Cost: P28,049.44/lm. |
May 25, 2017 |
2017 |
WIN7C01725 |
FY 2017 (R.A 10924) |
April 29, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Asset Preservation of National Roads - Preventive Maintenance based on Pavement Management System/Highway Development and Management-4 (HDM-4) - Tertiary -
Preventive Maintenance of Edwin Andrews Airbase Road, Zamboanga City 1st Lone District
Chainage 546.8 - Chainage 1290.30
Allocation: P 3.50 Million
Physical Target: 0.7433 lane km
Unit Cost: P4,708,731.33/lane km |
May 25, 2017 |
2017 |
WIN7E01731 |
SR2017-01-000255 |
January 27, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-1 National Road Network Services: Network Development - Improvement/Widening of National Roads - Secondary - Road Widening - Catanduanes Cir Rd - K0002 + 250 - K0003 + 546, K0198 + 000 - K0200 + 000 (Road Widening)
Physical Target 6.646 Lane-km
Unit Cost: P15,046.64/Lane-km
Allocation: Php 100M
As MODIFIED:
MFO-1 National Road Network Services: Network Development - Improvement/Widening of National Roads - Secondary - Road Widening - Catanduanes Cir Rd - K0002 + 250 - K0003 + 060, K0198 + 000 - K0200 + 000 (Road Widening)
Physical Target 5.372 Lane-km
Unit Cost: P18,615.04/Lane-km
Estimated Cost: Php 100M |
May 25, 2017 |
2017 |
WIN7G01459 |
FY 2017 (R.A 10924) |
April 29, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Structure at Vitali River, Vitali Section, Zamboanga City,
Sta. 0+000 - Sta. 0+960
Allocation: P 30.00 Million
Physical Target: 960.00 lm.
Unit Cost: P31,250.00/lm |
May 25, 2017 |
2017 |
WIN7G01455 |
FY 2017 (R.A 10924) |
April 29, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Structure Ayala River, Tulungatung Section including Right of Way Acquisition, Zamboanga City
Sta. 0+000 - Sta. 0+180 (Right Side)
Sta. 0+300 - Sta. 0+720 (Both Side)
Allocation: P 40.00 Million
Physical Target: 1,020.00 lm
Unit Cost: P 39,215.69/lm |
May 25, 2017 |
2017 |
WIN7G01461 |
FY 2017 (R.A 10924) |
April 29, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control at Busugan River, Sinubong, (including Right of Way Acquisition), Zamboanga City
Sta. 0+000 - Sta. 0+340 (both sides)
Allocation: P 20.00 Million
Physical Target: 680.00 lm.
Unit Cost: P 29,411.76/lm. |
May 25, 2017 |
2017 |
WIN7E01668 |
SR2017-01-000343 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary - Road Upgrading Gravel to Paved - Baras-Gigmoto-Viga Rd - K0054 + 004 - K0054 + 034, K0063 + 200 - K0063 + 993, K0067 + 900 - K0069 + 008, K0073 + 427 - K0073 + 444, K0076 + 740 - K0077 + 340 (Road Upgrading Gravel to Paved)
Physical Target: 5.128 Lane-km
Unit Cost (P'000): P18,834.81/Lane-km
Allocation: Php 97.150M
As MODIFIED:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary - Road Upgrading Gravel to Paved - Baras-Gigmoto-Viga Rd - K0063 + 200 - K0064 + 135.65, K0067 + 900 - K0069 + 039.38(Road Upgrading Gravel to Paved)
Physical Target: 4.12086 Lane-km
Unit Cost (P'000): P23,575.17/Lane-km
Estimated Cost: Php 97.150M |
May 25, 2017 |
2017 |
WIN7G01487 |
FY 2017 (R.A 10924) |
May 12, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control at Patalon River, Patalon Section (including Right of Way), Zamboanga City,
Sta. 0+157.30 - Sta. 0+344 (Left Side, Downstream),
Sta. 0+116.9 - Sta. 0+344 (Right Side, Downstream)
Allocation: P 10.00 Million
Physical Target: 413.80 lm.
Unit Cost: P 24,166.26/lm. |
May 25, 2017 |
2017 |
WIN7E01640 |
SR2017-01-000350 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary: Road Upgrading Gravel to Paved - Sn Pascual-Claveria Rd - K0041 + 400 - K0042 + 204, K0025 + 900 - K0026 + 402, K0032 + 720 - K0033 + 876 (Road Upgrading Gravel to Paved)
Physical Target: 4.938 Lane-km
Unit Cost (P'000): P16,200.89/Lane km
Allocation: Php 80M
As MODIFIED:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary: Road Upgrading Gravel to Paved - Sn Pascual-Claveria Rd - K0025 + 900 - K0026 + 402, K0032 + 720 - K0033 + 876, K0041 + 400 - K0041 + 980, (Road Upgrading Gravel to Paved)
Physical Target: RU Gravel to Paved-4.2292Lane-km
Const. of Drainage: 1,238 lm.
Unit Cost (P'000): RU Gravel to Paved - P14,189.42/lane km
Const. of Drainage: P13.92T/lm
Estimated Cost: P80M |
May 25, 2017 |
2017 |
WIN7G01493 |
FY 2017 (R.A 10924) |
May 12, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control at Maasin Creek (including Right of Way), Zamboanga City
Seg. A Sta. 0+000 - Sta. 0+280 (LS),
Seg. B Sta. 0+000 - Sta. 0+280 (RS),
Seg. C Sta. 0+290 - Sta. 0+490 (LS),
Seg. D Sta. 0+360 - Sta. 0+400 (RS),
Seg. E Sta. 0+460 - Sta. 0+500 (RS),
Allocation: P 25.00 Million
Physical Target: 840.00 lm.
Unit Cost: P 29,761.90/lm. |
May 25, 2017 |
2017 |
WIN7E01581 |
SR2017-01-000539 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-3 Construction and Maintenance Services of Other Infra: Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Seaports: Construction of Concrete Road - Daraga, Placer-Divisoria, Cawayan Road, Masbate (Construction of Concrete Road)
Physical Target: 15.60 lane-km
Unit Cost (P'000): P12,820.51/lane-km
Allocation: Php 200M
As MODIFIED:
MFO-3 Construction and Maintenance Services of Other Infra: Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Seaports: Construction of Concrete Road - Daraga, Placer-Divisoria, Cawayan Road, Masbate K0103+509 - K0110+330(Construction of Concrete Road)
Physical Target: 13.536 lane-km
Unit Cost (P'000): P14,774.78/lane-km
Estimated Cost: Php 200M
|
May 25, 2017 |
2017 |
WIN7E01692 |
SR2017-01-000546 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-3 Construction and Maintenance Services of Other Infra: Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations: Construction of Concrete Road - Matnog-Sta. Magdalena-Bulusan Road leading to Bulusan National Park (Section III), Sorsogon (Construction of Concrete Road)
Physical Target: 4.38 lane-km
Unit Cost (P'000): P13,698.63/lane-km
Allocation: Php 60M
As MODIFIED:
MFO-3 Construction and Maintenance Services of Other Infra: Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations: Construction of Concrete Road - Matnog-Sta. Magdalena-Bulusan Road leading to Bulusan National Park (Section III), Sorsogon (Construction of Concrete Road)
Physical Target: 3.57118 lane-km
Unit Cost (P'000): P16,801.16/lane-km
Estimated Cost: Php 60M |
May 24, 2017 |
CY 2017 |
WIN7E01508 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Off-Carriageway Improvement including
Drainage
- Tertiary road
CSR - Jct Minas Road
K0035+(-526) - K0035+000,
K0040+950 - K0041+765,
K0042+000 - K0042+615,
K0042+791 - K0043+656,
K0043+740 - K0043+756.60
CW1 = 17,760.0 sq m.
Php 49.00 Million
( Shoulder Paving/Construction ) |
May 24, 2017 |
CY 2017 |
WIN7E01413 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED :
MF03 - Construction and Maintenance Services
of Other Infrastructure
- Construction/Improvement of Access Roads
Leading to Seaports
- Construction/Improvement of
Access Road leading to Balatero Port,
Puerto Galera
L = 0.426 lane km
Php 3.771 Million
( Construction of Concrete Road ) |
May 24, 2017 |
CY 2017 |
WIN7E1510 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED:
Locally Funded Projects
- Local Infrastructure Program
- Roads and Bridges
- Local Roads
Concreting of Local Road,
Urdaneta, Victoria, Oriental Mindoro
L = 0.716 lane km
Php 2.00M
( Construction of Concrete Road ) |
May 24, 2017 |
CY 2017 |
WIN7E01416 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Rehabilitation/Reconstruction of National
Roads with Slipsa, Sloe Collapse, and
Landslide
- Secondary Road
Calapan North Road
K0034+674 - K0034+874,
K0038+200 - K0038+400,
K0043+900 - K0043+990
( S00008MR )
CW1 = 2900.0 sq.m.
Php 25.808 Million
( Construction of Road Slope
Protection Structure )
|
May 24, 2017 |
CY 2017 |
WIN7E01415 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Rehabilitation/Reconstruction/Upgrading
of Damaged Paved National Roads
including Drainage based on Pavement
Management System/Highway
Development Management-4 (HDM-4)
- Secondary Road
Calapan North Road
K0012+135 - K0012+642
( S00008MR )
L = 1.014 lane km
Php 12.857 Million
( Road Upgrading Asphalt to Concrete ) |
May 24, 2017 |
CY 2017 |
WIN7E01559 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Off-Carriageway Improvement
including Drainage
- Secondary Road
Calapan South Road
K0016+121 - K0016+980,
K0017+000 - K0017+210
( S00007MR )
CW1 = 3,555.50 sq.m.
Php 19.312 Million
( Shoulder Paving/Construction )
|
May 24, 2017 |
CY 2017 |
WIN7E01558 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED:
MF01 - National Road Network Development
- Network Development
- Off-Carriageway Improvement
including Drainage
- Tertiary Road
CSR Jct - Pola Road
K0062+559 - K0064+187.50
CW1 = 9,801 sq.m.
Php 32.00Million
( Shoulder Paving/ Construction )
|
May 24, 2017 |
2017 |
WIN7F04591 |
SR2017-01-000186 |
January 27, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-1 National Road Network Services: Asset Preservation of National Roads- Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary: Construction of Road Slope Protection Structure - Legazpi City-Punta de Jesus Rd - K0560+380 - K0560+640, K0574+020 - K0574+175, K0574+195 - K0574+315, K0578+360 - K0578+445, K0578+550 - K0578+650, K0578+690 - K0578+780, K0578+805 - K0578+835
(Construction of Road Slope Protection Structure)
Physical Target: 8,913.75 sq.m.
Unit Cost: P12.24T/sq.m.
Allocation: P108.176M
As MODIFIED:
MFO-1 National Road Network Services: Asset Preservation of National Roads- Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary: Construction of Road Slope Protection Structure - Legazpi City-Punta de Jesus Rd - K0560+380 - K0560+640, K0574+020 - K0574+175, K0574+195 - K0574+315, K0578+360 - K0578+445, K0578+550 - K0578+650, K0578+690 - K0578+780, K0578+805 - K0578+835
(Construction of Road Slope Protection Structure)
Physical Target: 9,463 sq.m.
Unit Cost: P11.43T/sq.m.
Estimated Cost: P108.176M |
May 24, 2017 |
2017 |
WIN7E01607 |
R.A. No. 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Asset Preservation of National Roads
Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System / Highway Development Management-4 (HDM-4) - Tertiary Roads
Gapan-Fort Magsaysay Rd
K0110+272.30-K0110+632.50,
K0111+048.60-K0113+-073.20
CW-1: Rehabilitation of Concrete Road
CW-2: Construction of Drainage Structure along Road |
May 24, 2017 |
2017 |
WIN7E01651 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Roads and Bridges - Local Roads
Construction of Slope Protection, Barangay San Carlos, Cabiao, Nueva Ecija
(Construction of Road Slope Protection Structure) |
May 24, 2017 |
2017 |
WIN7E01594 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Road, Brgy. Marawa, Jaen. Nueva Ecija
(Construction of Concrete Road) |
May 24, 2017 |
2017 |
WIN7E01611 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Road, Brgy. San Jose, Jaen, Nueva Ecija
(Construction of Concrete Road) |
May 24, 2017 |
2017 |
WIN7E01643 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Road, Brgy. Sto. Tomas South, Jaen, Nueva Ecija
(Construction of Concrete Road) |
May 24, 2017 |
FY 2017 |
WIN7E01554 |
FY 2017 APPROVED MODIFICATION |
April 17, 2017 |
Cordillera Administrative Region |
Abra District Engineering Office |
From : Locally Funded Projects, VIILP - Roads and Bridges - Local Roads - Improvement/ Rehabilitation of Vira-Caganayan Road, Tineg, Abra
To : Locally Funded Projects, VIILP - Roads and Bridges - Local Roads - Improvement/ Rehabilitation of Vira-Caganayan Road, Tineg, Abra (Construction of Road Slope Protection Structure Stone Masonry and Grouted Riprap/ Construction of Drainage Strructure/ Construction of Gravel Road)
Physical Target = Constr. Of Road Slope Protection Structure = 4,500 Lm; Const. of Drainage Structure = 270.00 Lm; Construction of Gravel Road = 4.50 Lane-Km |
May 24, 2017 |
FY 2017 |
WIN7E01696 |
FY 2017 APPROVED MODIFICATION |
May 11, 2017 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From : MFO-3 Construction and Maintenance Services of Other Infra, Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations – to Declared Tourism Destinations
Construction of Concrete Road – Cudog-Mungayang-Kiangan Road leading to Ambuaya Lake, Yamashita Shrine, and Kiyangan Settlement, Kiangan and Lagawe, Ifugao
(Construction of Concrete Road)
Physical Target = 2.34 Lane Km
To : MFO-3 Construction and Maintenance Services of Other Infra, Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations – to Declared Tourism Destinations
Construction of Concrete Road – Cudog-Mungayang-Kiangan Road leading to Ambuaya Lake, Yamashita Shrine, and Kiyangan Settlement, Kiangan and Lagawe, Ifugao
(Construction of Concrete Road/ Construction of Slope Protection Structure)
Physical Target : Construction of Concrete Road = 1.121 Lane Km; Construction of Slope Protection Structure = 5,205.35 Sq.m. |
May 24, 2017 |
FY 2017 |
WIN7E01661 |
FY 2017 APPROVED MODIFICATION |
May 11, 2017 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: MFO-2 Flood Management Services, Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Ibulao Flood Control, Lagawe, Ifugao
(Construction of Flood Mitigation Structure)
Physical Target = 1,162 Lm
To: MFO-2 Flood Management Services, Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Ibulao Flood Control, Lagawe, Ifugao
(Construction of Flood Mitigation Structure)
Physical Target = 529 Lm |
May 24, 2017 |
FY 2017 |
WIN7E01683 |
FY 2017 APPROVED MODIFICATION |
May 11, 2017 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: MFO-2 Management Services, Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Banao Flood Control (Tungngod Side), Lagawe, Ifugao
(Construction of Flood Mitigation)
Physical Target = 581 Lm
To: MFO-2 Management Services, Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Banao Flood Control (Tungngod Side), Lagawe, Ifugao
(Construction of flood Mitigation)
Physical Target = 394 Lm
|
May 24, 2017 |
FY 2017 |
WIN7E01572 |
FY 2017 APPROVED MODIFICATION |
April 21, 2017 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: MFO 1 – National Road Network Services – Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary
Construction of Road Slope Protection Structure – Kiangan-Tinoc-Buguias Rd – K0328+000 – K0328+030, K0328+600 – K0328+620, K0329+700 – K0329+820, K0330+300 – K0330+420, K0333+600 – K0333+800
(Construction of Road Slope Protection Structure)
Physical Target = 6,286 sq.m.
To: MFO 1 – National Road Network Services – Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide along Kiangan-Tinoc-Buguias Rd – K0324+870 – K0324+920, K0328+000 – K0328+030, K0328+600 – K0328+620, K0329+700 – K0329+721, K0329+766 – K0329+820, K0333+640 – K0333+690.50 (LS), K0333+660 – K0333+690 (RS)
(Construction of Road Slope Protection Structure)
Physical Target = 1,578 sq.m. |
May 24, 2017 |
FY 2017 |
WIN7E01664 |
FY 2017 APPROVED MODIFICATION |
May 9, 2017 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: Locally-Funded Projects, LIP-Buildings and Other Structures – Multipurpose/ Facilities
Construction of Barangay Hall, Multi-Purpose Building, Barangay Poblacion, Hungduan, Ifugao
(Construction of Multi-Purpose Building)
To: Locally-Funded Projects, LIP-Buildings and Other Structures – Multipurpose/ Facilities
Completion of Multipurpose Building (Senior Citizen’s Office), Poblacion, Hungduan
(Construction of Multi-Purpose Building) |
May 24, 2017 |
2017 |
WIN7E01666 |
UACS No. 292003020401924 |
January 1, 2017 |
National Capital Region |
North Manila District Engineering Office |
As per GAA
MFO – 2 Flood Management Services- Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Flood Mitigation Facility – Installation of Additional Pump, Bacood Pumping Station, North Manila (Construction of Flood Mitigation)
UACS No. 292003020401924
Physical Target / Cost
Original:
Unit Cost (P’000): P20,000
Allocation Cost (P’000): P20,000
WIN7E01666
As Modified
MFO – 2 Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Installation of Additional Pump at Bacood Pumping including Drainage Improvement at the Vicinity, Manila City (Construction of Flood Mitigation)
UACS No. 292003020401924
Modified: 425 lineal meters
Unit Cost: P47.059T/lineal meters
Estimated Cost (P’000): P20,000
WIN7E01666
|
May 24, 2017 |
FY 2017 |
WIN7E01573 |
FY 2017 APPROVED MODIFICATION |
April 20, 2017 |
Cordillera Administrative Region |
CAR - Regional Office |
From: MFO 1: National Road Network Services - Asset Preservation of National Roads – Rehabilitation/Reconstruction
of National Roads with Slips, Slope Collapse, and Landslide – Secondary
Nueva Vizcaya-Ifugao-Mt Province Rd - K0336+315 - K0336+341, K0341+402 - K0341+440, K0344+676 - K0344+706, K0351+129 - K0351+139, K0351+151 - K0351+187, K0351+201 - K0351+215, K0351+423 - K0351+437, K0352+635 - K0352+710, K0355+448 - K0355+488, K0356+154 - K0356+169, K0357+815 - K0357+976, K0358+226 - K0358+322, K0358+336 - K0358+413, K0358+565 - K0358+600, K0359+394 - K0359+468, K0359+493 - K0359+559, K0359+564 - K0359+654, K0360+090 - K0360+153, K0360+321 - K0360+337, K0360+345 - K0360+372, K0360+354 - K0360+371, K0360+480 - K0360+527, K0360+480 - K0360+530, K0360+925 - K0360+943, K0361+000 - K0361+062, K0361+000 - K0361+116
Physical Target = 6,069.24 sq.m.
To: MFO 1: National Road Network Services - Asset Preservation of National Roads – Rehabilitation/Reconstruction
of National Roads with Slips, Slope Collapse, and Landslide –
Nueva Vizcaya-Ifugao-Mt Province Rd - K0336+315 - K0336+341, K0341+402 - K0341+442, K0344+676 - K0344+706, K0351+201 - K0351+215, K0351+350 - K0351+360, K0351+371 - K0351+409, K0351+423 - K0351+436, K0352+635 - K0352+710, K0356+154 - K0356+169, K0357+815 - K0358+025, K0358+226 - K0358+322, K0358+336 - K0358+413, K0358+565 - K0358+600, K0359+394 - K0359+468, K0359+493 - K0359+559, K0359+564 - K0359+654, K0360+090 - K0360+153, K0360+321 - K0360+337, K0360+345 - K0360+372, K0360+354 - K0360+371, K0360+480 - K0360+527, K0360+480 - K0360+530, K0360+925 - K0360+943, K0361+000 - K0361+062, K0361+000 - K0361+116
Physical Target = 6,141.50 sq.m. |
May 24, 2017 |
FY 2017 |
WIN7E01595 |
FY 2017 APPROVED MODIFICATION |
April 20, 2017 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
From: Locally-Funded Projects: Local Infrastructure Program - Buildings and Other Structures – Multipurpose/Facilities
Construction of Gymnasium, Multi-Purpose Building, Barangay Laya, Alfonso Vista, Ifugao
To: Locally-Funded Projects: Local Infrastructure Program - Buildings and Other Structures – Multipurpose/Facilities
Construction of Gymnasium, Multi-Purpose Building, Barangay Laya, Alfonso Lista, Ifugao
|
May 24, 2017 |
FY 2017 |
WIN7E01617 |
FY 2017 APPROVED MODIFICATION |
April 20, 2017 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
From: Locally-Funded Projects: Local Infrastructure Program - Buildings and Other Structures – Multipurpose/Facilities
Improvement of Barangay Hall, Multi-Purpose Building, Barangay Sta. Maria, Alfonso Vista, Ifugao
To: Locally-Funded Projects: Local Infrastructure Program - Buildings and Other Structures – Multipurpose/Facilities
Improvement of Barangay Hall, Multi-Purpose Building, Barangay Sta. Maria, Alfonso Lista, Ifugao |
May 24, 2017 |
FY 2017 |
WIN7E01569 |
FY 2017 APPROVED MODIFICATION |
April 20, 2017 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
From: Locally-Funded Projects: Local Infrastructure Program - Buildings and Other Structures – Multipurpose/Facilities
Construction of Barangay Hall, Multi-Purpose Building, Barangay
Dolowog, Alfonso Vista, Ifugao
To: Locally-Funded Projects: Local Infrastructure Program - Buildings and Other Structures – Multipurpose/Facilities
Construction of Barangay Hall, Multi-Purpose Building, Barangay
Dolowog, Alfonso Lista, Ifugao |
May 24, 2017 |
FY 2017 |
WIN7E01173 |
FY 2017 APPROVED MODIFICATION |
March 27, 2017 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Locally Funded Projects - Roads and Bridges - Local Bridges - Construction of Dongyaran Footbridge [Construction of Bridge]
To: Locally Funded Projects - Roads and Bridges - Local Bridges - Construction of Dongrayan Footbridge [Construction of Bridge]
Physical Target = 62 sq.m. |