Home Up

 

 

Batangas 1st
Batangas 2nd
Batangas 3rd
Batangas 4th
Cavite 1st
Cavite 2nd
Cavite 3rd
Laguna 1st
Laguna 2nd
Laguna 3rd
Quezon 1st
Quezon 2nd
Quezon 3rd
Quezon 4th
Rizal 1st
Rizal 2nd

RIZAL 1ST

 

 

 
Department of Public Works and Highways
LIST OF NATIONAL BRIDGES WITH LENGTH, TYPE AND CONDITION
PER DISTRICT ENGINEERING OFFICE
As of 16 October 2024
             
Table 6
Source: RBIA Generated Report                      Unit of Measure: In Linear Meter 
Bdride No. Bridge ID Bridge Name Bridge Type Overall Condition  Length 
Rizal 1st District Engineering Office
1 B02860LZ Mapandan Br. Permanent Concrete Good          25.60
2 B02859LZ Cainta Br. Permanent Concrete Good          40.70
3 B04529LZ Kaytikling Br. Permanent Concrete Good            9.25
4 B01869LZ Buli Br. Permanent Concrete Fair          40.50
5 B02837LZ Cainta Br. Permanent Concrete Fair          18.90
6 B04735LZ Taytay Br. Permanent Concrete Good          12.50
7 B04736LZ Bangiad Br. 1 Permanent Concrete Good            7.10
8 B04737LZ Bangiad Br. 2 Permanent Concrete Good            7.30
9 B04527LZ Angono Br. Permanent Concrete Good          22.65
10 B04738LZ Bilibiran Br. Permanent Concrete Fair          34.00
11 B02843LZ Darangan Br. Permanent Concrete Good          34.07
12 B04528LZ San Juan Br. Permanent Concrete Fair            6.40
13 B02845LZ Lazo Br. Permanent Concrete Fair            7.00
14 B02846LZ Layunan Br. Permanent Concrete Good            7.00
15 B02870LZ Colocob Br. Permanent Concrete Fair          20.15
16 B04739LZ Angono Br. Permanent Concrete Fair          48.20
17 B03117LZ Langhaya Br. Permanent Concrete Fair          29.70
18 B03118LZ Padilla Br. Permanent Concrete Fair          70.00
19 B03119LZ Third Br. Permanent Concrete Good          40.00
20 B03120LZ Fourth Br. Permanent Concrete Fair          45.23

 

 

Back Home Up Next

Batangas 1st / Batangas 2nd / Batangas 3rd / Batangas 4th / Cavite 1st / Cavite 2nd / Cavite 3rd / Laguna 1st / Laguna 2nd / Laguna 3rd / Quezon 1st / Quezon 2nd / Quezon 3rd / Quezon 4th / Rizal 1st / Rizal 2nd

Notes:
 

1.) Bridge data provided are as of  16 October 2024.

2.) The unit of measure for Bridge Data is linear meters.

3.) Further Assessment refers to Bridges that are either under the circumstances of on-going construction, under major maintenance work or washed-out.

4.) National Bridges are classified into:

        Permanent Bridges - are bridges that are composed of concrete and steel.

        Temporary Bridges - are bridges consisting of timber and bailey.

For questions regarding this Website contact feedback@dpwh.gov.ph

 

Last updated: 03/24/25.

Disclaimer