Home Up

 

 

Bohol 1st
Bohol 2nd
Bohol 3rd
Cebu 1st
Cebu 2nd
Cebu 3rd
Cebu 4th
Cebu 5th
Cebu 6th
Cebu 7th
Cebu City

CEBU 6TH

 

 

 
Department of Public Works and Highways
LIST OF NATIONAL BRIDGES WITH LENGTH, TYPE AND CONDITION
PER DISTRICT ENGINEERING OFFICE
As of 16 October 2024
             
Table 6
Source: RBIA Generated Report                      Unit of Measure: In Linear Meter 
Bdride No. Bridge ID Bridge Name Bridge Type Overall Condition  Length 
Cebu 6th District Engineering Office
1 B00587CB Mandaue-Mactan Br. 1 Permanent Steel Poor        854.00
2 B00070CB Tipolo Br. Permanent Concrete Fair          22.00
3 B00589CB Butuanon Br. 2 Permanent Concrete Fair          49.10
4 B00659CB Butuanon Br. 1 Permanent Concrete Fair          42.60
5 B00586CB Cansaga Br. Permanent Concrete Fair          16.80
6 B00585CB Pitogo Br. Permanent Concrete Poor          16.00
7 B00641CB Pitogo Br. 2 Permanent Concrete Fair            8.00
8 B00642CB Pitogo Br. 3 Permanent Concrete Fair            8.00
9 B00590CB Mandaue Fly-over Permanent Concrete Poor        175.40
10 B00613CB Cansaga Bay Br. Permanent Steel Fair        640.35
11 B00003LP Gabi Br. Permanent Concrete Fair          22.00
12 B00001LP Pilipog Br. 1 Permanent Concrete Good            8.00
13 B00002LP Pilipog Br. 2 Permanent Concrete Fair            8.00
14 B00643LP Marcelo B. Fernan Viaduct Permanent Concrete Fair     2,220.00
15 B00619CB Marcelo Fernan Br. Permanent Concrete Poor     1,008.20
16 B00617CB Pakna-an Br. 2.  Permanent Concrete Fair          15.80
17 B00618CB Pakna-an Br. 1 Permanent Concrete Fair          26.10
18 B00615CB Ouano Br. 1 Permanent Concrete Fair          12.80
19 B00616CB Ouano Br. 2 Permanent Concrete Fair          13.20
20 B00041CB M. Logarta Br. Permanent Concrete Fair          50.40
21 B00046CB Subang Daku Flyover Permanent Concrete Fair        245.40

 

 

Back Home Up Next

Bohol 1st / Bohol 2nd / Bohol 3rd / Cebu 1st / Cebu 2nd / Cebu 3rd / Cebu 4th / Cebu 5th / Cebu 6th / Cebu 7th / Cebu City

Notes:
 

1.) Bridge data provided are as of  16 October 2024.

2.) The unit of measure for Bridge Data is linear meters.

3.) Further Assessment refers to Bridges that are either under the circumstances of on-going construction, under major maintenance work or washed-out.

4.) National Bridges are classified into:

        Permanent Bridges - are bridges that are composed of concrete and steel.

        Temporary Bridges - are bridges consisting of timber and bailey.

For questions regarding this Website contact feedback@dpwh.gov.ph

 

Last updated: 03/24/25.

Disclaimer