DPWH RO 8 Bares 36.85% Accomplishment of CY 2016 Infrastructure Program

In a report by OIC-Regional Director Edgar B. Tabacon, Department of Public Works and Highways (DPWH) Regional Office VIII bares 36.85% overall accomplishment versus 37.38% target of CY 2016 Infrastructure Program of DPWH Regional Office 8 as of June 2016.

Of the 13 District Engineering Offices (DEOs) of the Eastern Visayas Region, Biliran DEO is the TOP PERFORMER with 76.97% percent accomplishment.

DPWH-Installed Gabions Reduced Landslide Along Southern Leyte Highways to 40%

Landslide vulnerability along roadsides in Southern Leyte has reduced from 80 percent to 40 percent, with the Department of Public Works and Highways’ installation of gabions along critical areas.

DPWH Southern Leyte District Engineering Office (SLDEO) District Engineer Ma. Margarita C. Junia said about three-kilometer stretch of the province’s highway is now protected with gabions - an effective and economical long term solution to prevent soil erosions from blocking our roads, especially during rainy days.

DPWH Southern Leyte Reports 69% Completion Rate of 2016 Projects

It was a productive first semester for the Department of Public Works and Highways – Southern Leyte District Engineering Office (DPWH-SLDEO) with the attainment of 69 percent accomplishment for 2016 projects.

District Engineer Ma. Margarita C. Junia of the DPWH-SLDEO said the field office surpassed the 50 percent target set by the central office for the first six months of the year. The field office is tasked to carry out PHP1 billion worth of projects. About P941.46 million were obligated and P244.18 million has been disbursed during the first half of the year.

Pages

Subscribe to Department of Public Works and Highways RSS