May 25, 2017 |
2017 |
WIN7F04596 |
SR2017-01000251 |
January 27, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO 1 - National Road Network Services - Network Development - Improvement/Widening of National Roads - Secondary - Baao-Iriga City-Nabua Rd including RROW - K0466 + -415 - K0466 + 693, K0475 + 000 - K0476 + 635
[CW1 - Road Widening]
[ROW - ROW Acquisition]
Physical Target: CW1 - 5.33 ln.km ,
ROW - 26,650 sq.m.
Unit Cost (P'000): CW1 - P14,390.24/ln.km ,
ROW - P2.0/sq.m.
Allocation (P'000): P130,000.00
As per GAA:
MFO 1 - National Road Network Services - Network Development - Improvement/Widening of National Roads - Secondary - Baao-Iriga City-Nabua Rd including RROW - K0466 + -415 - K0466 + 693, K0475 + 000 - K0476 + 635
[CW1 - Road Widening]
[ROW - ROW Acquisition]
Physical Target: CW1 - 5.33 ln.km ,
ROW - 15,970.43 sq.m.
Unit Cost (P'000): CW1 - P19,421.83/ln.km ,
ROW - P1.659/sq.m.
Estimated Cost (P'000): P130,000.00 |
May 25, 2017 |
2017 |
WIN7G01512 |
FY 2017 (R.A 10924) |
May 12, 2017 |
Region IX |
Zamboanga del Norte 1st District Engineering Office |
Roads and Bridges - Local Roads -
Concreting of Pangalalan - Bago - Dalongdong Provincial Road in Sindangan, Zamboanga del Norte
Allocation: P 5.00 Million
Physical Target: 0.6050 lane km
Unit Cost: 8,264,462.81/lane km |
May 25, 2017 |
2017 |
WIN7G01464 |
FY 2017 (R.A 10924) |
April 29, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including Drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Tertiary -
Rehabilitation/Reconstruction of Damaged Paved National Road Old Road (Ayala - Talisayan), Zamboanga City
K1956+(-597) - K1956+386,
K1958+136 - K1958+640
Allocation: P 9.00 Million
Physical Target: 0.72672 lane km
Unit Cost: P 12,384,412.15/lane km |
May 25, 2017 |
2017 |
WIN7G01460 |
FY 2017 (R.A 10924) |
April 29, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control, Labuan River, Labuan Section (including Right of Way), Zamboanga City
Sta. 0+000 - Sta. 0+400
(Left Side, Upstream),
Sta. 0+000 - Sta. 0+108.68
(Right Side, Upstream),
Sta. 0+124.54 - Sta. 0+400
(Right Side, Upstream)
Allocation: P 28.50 Million
Physical Target: 784.14 lm.
Unit Cost: P 36,345.55/lm. |
May 25, 2017 |
2017 |
WIN7G01456 |
FY 2017 (R.A 10924) |
April 29, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction/Extension of Flood Control at Saaz River, San Ramon (including Right of Way Acquisition), Zamboanga City
Sta. 0+005 - Sta. 0+220 (Both Side, Downstream),
Sta. 0+063.69 - Sta. 0+520 (Left Side, Upstream),
Sta. 0+180 - Sta. 0+240 (Right Side, Upstream),
Sta. 0+396.77 - Sta. 0+520 (Right Side, Upstream)
Allocation: P 30.00 Million
Physical Target: 1,069.54 lm.
Unit Cost: P28,049.44/lm. |
May 25, 2017 |
2017 |
WIN7C01725 |
FY 2017 (R.A 10924) |
April 29, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Asset Preservation of National Roads - Preventive Maintenance based on Pavement Management System/Highway Development and Management-4 (HDM-4) - Tertiary -
Preventive Maintenance of Edwin Andrews Airbase Road, Zamboanga City 1st Lone District
Chainage 546.8 - Chainage 1290.30
Allocation: P 3.50 Million
Physical Target: 0.7433 lane km
Unit Cost: P4,708,731.33/lane km |
May 25, 2017 |
2017 |
WIN7E01731 |
SR2017-01-000255 |
January 27, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-1 National Road Network Services: Network Development - Improvement/Widening of National Roads - Secondary - Road Widening - Catanduanes Cir Rd - K0002 + 250 - K0003 + 546, K0198 + 000 - K0200 + 000 (Road Widening)
Physical Target 6.646 Lane-km
Unit Cost: P15,046.64/Lane-km
Allocation: Php 100M
As MODIFIED:
MFO-1 National Road Network Services: Network Development - Improvement/Widening of National Roads - Secondary - Road Widening - Catanduanes Cir Rd - K0002 + 250 - K0003 + 060, K0198 + 000 - K0200 + 000 (Road Widening)
Physical Target 5.372 Lane-km
Unit Cost: P18,615.04/Lane-km
Estimated Cost: Php 100M |
May 25, 2017 |
2017 |
WIN7G01459 |
FY 2017 (R.A 10924) |
April 29, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Structure at Vitali River, Vitali Section, Zamboanga City,
Sta. 0+000 - Sta. 0+960
Allocation: P 30.00 Million
Physical Target: 960.00 lm.
Unit Cost: P31,250.00/lm |
May 25, 2017 |
2017 |
WIN7G01455 |
FY 2017 (R.A 10924) |
April 29, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control Structure Ayala River, Tulungatung Section including Right of Way Acquisition, Zamboanga City
Sta. 0+000 - Sta. 0+180 (Right Side)
Sta. 0+300 - Sta. 0+720 (Both Side)
Allocation: P 40.00 Million
Physical Target: 1,020.00 lm
Unit Cost: P 39,215.69/lm |
May 25, 2017 |
2017 |
WIN7G01461 |
FY 2017 (R.A 10924) |
April 29, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control at Busugan River, Sinubong, (including Right of Way Acquisition), Zamboanga City
Sta. 0+000 - Sta. 0+340 (both sides)
Allocation: P 20.00 Million
Physical Target: 680.00 lm.
Unit Cost: P 29,411.76/lm. |
May 25, 2017 |
2017 |
WIN7E01668 |
SR2017-01-000343 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary - Road Upgrading Gravel to Paved - Baras-Gigmoto-Viga Rd - K0054 + 004 - K0054 + 034, K0063 + 200 - K0063 + 993, K0067 + 900 - K0069 + 008, K0073 + 427 - K0073 + 444, K0076 + 740 - K0077 + 340 (Road Upgrading Gravel to Paved)
Physical Target: 5.128 Lane-km
Unit Cost (P'000): P18,834.81/Lane-km
Allocation: Php 97.150M
As MODIFIED:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary - Road Upgrading Gravel to Paved - Baras-Gigmoto-Viga Rd - K0063 + 200 - K0064 + 135.65, K0067 + 900 - K0069 + 039.38(Road Upgrading Gravel to Paved)
Physical Target: 4.12086 Lane-km
Unit Cost (P'000): P23,575.17/Lane-km
Estimated Cost: Php 97.150M |
May 25, 2017 |
2017 |
WIN7G01487 |
FY 2017 (R.A 10924) |
May 12, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control at Patalon River, Patalon Section (including Right of Way), Zamboanga City,
Sta. 0+157.30 - Sta. 0+344 (Left Side, Downstream),
Sta. 0+116.9 - Sta. 0+344 (Right Side, Downstream)
Allocation: P 10.00 Million
Physical Target: 413.80 lm.
Unit Cost: P 24,166.26/lm. |
May 25, 2017 |
2017 |
WIN7E01640 |
SR2017-01-000350 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary: Road Upgrading Gravel to Paved - Sn Pascual-Claveria Rd - K0041 + 400 - K0042 + 204, K0025 + 900 - K0026 + 402, K0032 + 720 - K0033 + 876 (Road Upgrading Gravel to Paved)
Physical Target: 4.938 Lane-km
Unit Cost (P'000): P16,200.89/Lane km
Allocation: Php 80M
As MODIFIED:
MFO-1 National Road Network Services: Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (HDM-4 Project Analysis) - Tertiary: Road Upgrading Gravel to Paved - Sn Pascual-Claveria Rd - K0025 + 900 - K0026 + 402, K0032 + 720 - K0033 + 876, K0041 + 400 - K0041 + 980, (Road Upgrading Gravel to Paved)
Physical Target: RU Gravel to Paved-4.2292Lane-km
Const. of Drainage: 1,238 lm.
Unit Cost (P'000): RU Gravel to Paved - P14,189.42/lane km
Const. of Drainage: P13.92T/lm
Estimated Cost: P80M |
May 25, 2017 |
2017 |
WIN7G01493 |
FY 2017 (R.A 10924) |
May 12, 2017 |
Region IX |
Zamboanga City 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems -
Construction of Flood Control at Maasin Creek (including Right of Way), Zamboanga City
Seg. A Sta. 0+000 - Sta. 0+280 (LS),
Seg. B Sta. 0+000 - Sta. 0+280 (RS),
Seg. C Sta. 0+290 - Sta. 0+490 (LS),
Seg. D Sta. 0+360 - Sta. 0+400 (RS),
Seg. E Sta. 0+460 - Sta. 0+500 (RS),
Allocation: P 25.00 Million
Physical Target: 840.00 lm.
Unit Cost: P 29,761.90/lm. |
May 25, 2017 |
2017 |
WIN7E01581 |
SR2017-01-000539 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-3 Construction and Maintenance Services of Other Infra: Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Seaports: Construction of Concrete Road - Daraga, Placer-Divisoria, Cawayan Road, Masbate (Construction of Concrete Road)
Physical Target: 15.60 lane-km
Unit Cost (P'000): P12,820.51/lane-km
Allocation: Php 200M
As MODIFIED:
MFO-3 Construction and Maintenance Services of Other Infra: Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Seaports: Construction of Concrete Road - Daraga, Placer-Divisoria, Cawayan Road, Masbate K0103+509 - K0110+330(Construction of Concrete Road)
Physical Target: 13.536 lane-km
Unit Cost (P'000): P14,774.78/lane-km
Estimated Cost: Php 200M
|
May 25, 2017 |
2017 |
WIN7E01692 |
SR2017-01-000546 |
January 28, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-3 Construction and Maintenance Services of Other Infra: Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations: Construction of Concrete Road - Matnog-Sta. Magdalena-Bulusan Road leading to Bulusan National Park (Section III), Sorsogon (Construction of Concrete Road)
Physical Target: 4.38 lane-km
Unit Cost (P'000): P13,698.63/lane-km
Allocation: Php 60M
As MODIFIED:
MFO-3 Construction and Maintenance Services of Other Infra: Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations - to Declared Tourism Destinations: Construction of Concrete Road - Matnog-Sta. Magdalena-Bulusan Road leading to Bulusan National Park (Section III), Sorsogon (Construction of Concrete Road)
Physical Target: 3.57118 lane-km
Unit Cost (P'000): P16,801.16/lane-km
Estimated Cost: Php 60M |
May 24, 2017 |
CY 2017 |
WIN7E01508 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Off-Carriageway Improvement including
Drainage
- Tertiary road
CSR - Jct Minas Road
K0035+(-526) - K0035+000,
K0040+950 - K0041+765,
K0042+000 - K0042+615,
K0042+791 - K0043+656,
K0043+740 - K0043+756.60
CW1 = 17,760.0 sq m.
Php 49.00 Million
( Shoulder Paving/Construction ) |
May 24, 2017 |
CY 2017 |
WIN7E01413 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED :
MF03 - Construction and Maintenance Services
of Other Infrastructure
- Construction/Improvement of Access Roads
Leading to Seaports
- Construction/Improvement of
Access Road leading to Balatero Port,
Puerto Galera
L = 0.426 lane km
Php 3.771 Million
( Construction of Concrete Road ) |
May 24, 2017 |
CY 2017 |
WIN7E1510 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED:
Locally Funded Projects
- Local Infrastructure Program
- Roads and Bridges
- Local Roads
Concreting of Local Road,
Urdaneta, Victoria, Oriental Mindoro
L = 0.716 lane km
Php 2.00M
( Construction of Concrete Road ) |
May 24, 2017 |
CY 2017 |
WIN7E01416 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Rehabilitation/Reconstruction of National
Roads with Slipsa, Sloe Collapse, and
Landslide
- Secondary Road
Calapan North Road
K0034+674 - K0034+874,
K0038+200 - K0038+400,
K0043+900 - K0043+990
( S00008MR )
CW1 = 2900.0 sq.m.
Php 25.808 Million
( Construction of Road Slope
Protection Structure )
|
May 24, 2017 |
CY 2017 |
WIN7E01415 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Rehabilitation/Reconstruction/Upgrading
of Damaged Paved National Roads
including Drainage based on Pavement
Management System/Highway
Development Management-4 (HDM-4)
- Secondary Road
Calapan North Road
K0012+135 - K0012+642
( S00008MR )
L = 1.014 lane km
Php 12.857 Million
( Road Upgrading Asphalt to Concrete ) |
May 24, 2017 |
CY 2017 |
WIN7E01559 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Network Development
- Off-Carriageway Improvement
including Drainage
- Secondary Road
Calapan South Road
K0016+121 - K0016+980,
K0017+000 - K0017+210
( S00007MR )
CW1 = 3,555.50 sq.m.
Php 19.312 Million
( Shoulder Paving/Construction )
|
May 24, 2017 |
CY 2017 |
WIN7E01558 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Oriental District Engineering Office |
as MODIFIED:
MF01 - National Road Network Development
- Network Development
- Off-Carriageway Improvement
including Drainage
- Tertiary Road
CSR Jct - Pola Road
K0062+559 - K0064+187.50
CW1 = 9,801 sq.m.
Php 32.00Million
( Shoulder Paving/ Construction )
|
May 24, 2017 |
2017 |
WIN7F04591 |
SR2017-01-000186 |
January 27, 2017 |
Region V |
Regional Office V |
As per GAA:
MFO-1 National Road Network Services: Asset Preservation of National Roads- Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary: Construction of Road Slope Protection Structure - Legazpi City-Punta de Jesus Rd - K0560+380 - K0560+640, K0574+020 - K0574+175, K0574+195 - K0574+315, K0578+360 - K0578+445, K0578+550 - K0578+650, K0578+690 - K0578+780, K0578+805 - K0578+835
(Construction of Road Slope Protection Structure)
Physical Target: 8,913.75 sq.m.
Unit Cost: P12.24T/sq.m.
Allocation: P108.176M
As MODIFIED:
MFO-1 National Road Network Services: Asset Preservation of National Roads- Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary: Construction of Road Slope Protection Structure - Legazpi City-Punta de Jesus Rd - K0560+380 - K0560+640, K0574+020 - K0574+175, K0574+195 - K0574+315, K0578+360 - K0578+445, K0578+550 - K0578+650, K0578+690 - K0578+780, K0578+805 - K0578+835
(Construction of Road Slope Protection Structure)
Physical Target: 9,463 sq.m.
Unit Cost: P11.43T/sq.m.
Estimated Cost: P108.176M |
May 24, 2017 |
2017 |
WIN7E01607 |
R.A. No. 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Asset Preservation of National Roads
Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System / Highway Development Management-4 (HDM-4) - Tertiary Roads
Gapan-Fort Magsaysay Rd
K0110+272.30-K0110+632.50,
K0111+048.60-K0113+-073.20
CW-1: Rehabilitation of Concrete Road
CW-2: Construction of Drainage Structure along Road |
May 24, 2017 |
2017 |
WIN7E01651 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Roads and Bridges - Local Roads
Construction of Slope Protection, Barangay San Carlos, Cabiao, Nueva Ecija
(Construction of Road Slope Protection Structure) |
May 24, 2017 |
2017 |
WIN7E01594 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Road, Brgy. Marawa, Jaen. Nueva Ecija
(Construction of Concrete Road) |
May 24, 2017 |
2017 |
WIN7E01611 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Road, Brgy. San Jose, Jaen, Nueva Ecija
(Construction of Concrete Road) |
May 24, 2017 |
2017 |
WIN7E01643 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Road, Brgy. Sto. Tomas South, Jaen, Nueva Ecija
(Construction of Concrete Road) |
May 24, 2017 |
FY 2017 |
WIN7E01554 |
FY 2017 APPROVED MODIFICATION |
April 17, 2017 |
Cordillera Administrative Region |
Abra District Engineering Office |
From : Locally Funded Projects, VIILP - Roads and Bridges - Local Roads - Improvement/ Rehabilitation of Vira-Caganayan Road, Tineg, Abra
To : Locally Funded Projects, VIILP - Roads and Bridges - Local Roads - Improvement/ Rehabilitation of Vira-Caganayan Road, Tineg, Abra (Construction of Road Slope Protection Structure Stone Masonry and Grouted Riprap/ Construction of Drainage Strructure/ Construction of Gravel Road)
Physical Target = Constr. Of Road Slope Protection Structure = 4,500 Lm; Const. of Drainage Structure = 270.00 Lm; Construction of Gravel Road = 4.50 Lane-Km |
May 24, 2017 |
FY 2017 |
WIN7E01696 |
FY 2017 APPROVED MODIFICATION |
May 11, 2017 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From : MFO-3 Construction and Maintenance Services of Other Infra, Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations – to Declared Tourism Destinations
Construction of Concrete Road – Cudog-Mungayang-Kiangan Road leading to Ambuaya Lake, Yamashita Shrine, and Kiyangan Settlement, Kiangan and Lagawe, Ifugao
(Construction of Concrete Road)
Physical Target = 2.34 Lane Km
To : MFO-3 Construction and Maintenance Services of Other Infra, Construction/ Improvement of Access Roads leading to Airports, Seaports, and Declared Tourism Destinations – to Declared Tourism Destinations
Construction of Concrete Road – Cudog-Mungayang-Kiangan Road leading to Ambuaya Lake, Yamashita Shrine, and Kiyangan Settlement, Kiangan and Lagawe, Ifugao
(Construction of Concrete Road/ Construction of Slope Protection Structure)
Physical Target : Construction of Concrete Road = 1.121 Lane Km; Construction of Slope Protection Structure = 5,205.35 Sq.m. |
May 24, 2017 |
FY 2017 |
WIN7E01661 |
FY 2017 APPROVED MODIFICATION |
May 11, 2017 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: MFO-2 Flood Management Services, Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Ibulao Flood Control, Lagawe, Ifugao
(Construction of Flood Mitigation Structure)
Physical Target = 1,162 Lm
To: MFO-2 Flood Management Services, Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Ibulao Flood Control, Lagawe, Ifugao
(Construction of Flood Mitigation Structure)
Physical Target = 529 Lm |
May 24, 2017 |
FY 2017 |
WIN7E01683 |
FY 2017 APPROVED MODIFICATION |
May 11, 2017 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: MFO-2 Management Services, Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Banao Flood Control (Tungngod Side), Lagawe, Ifugao
(Construction of Flood Mitigation)
Physical Target = 581 Lm
To: MFO-2 Management Services, Construction/Maintenance of Flood Mitigation Structures and Drainage Systems
Construction of Banao Flood Control (Tungngod Side), Lagawe, Ifugao
(Construction of flood Mitigation)
Physical Target = 394 Lm
|
May 24, 2017 |
FY 2017 |
WIN7E01572 |
FY 2017 APPROVED MODIFICATION |
April 21, 2017 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: MFO 1 – National Road Network Services – Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary
Construction of Road Slope Protection Structure – Kiangan-Tinoc-Buguias Rd – K0328+000 – K0328+030, K0328+600 – K0328+620, K0329+700 – K0329+820, K0330+300 – K0330+420, K0333+600 – K0333+800
(Construction of Road Slope Protection Structure)
Physical Target = 6,286 sq.m.
To: MFO 1 – National Road Network Services – Asset Preservation of National Roads - Rehabilitation/ Reconstruction of National Roads with Slips, Slope Collapse, and Landslide – Tertiary
Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide along Kiangan-Tinoc-Buguias Rd – K0324+870 – K0324+920, K0328+000 – K0328+030, K0328+600 – K0328+620, K0329+700 – K0329+721, K0329+766 – K0329+820, K0333+640 – K0333+690.50 (LS), K0333+660 – K0333+690 (RS)
(Construction of Road Slope Protection Structure)
Physical Target = 1,578 sq.m. |
May 24, 2017 |
FY 2017 |
WIN7E01664 |
FY 2017 APPROVED MODIFICATION |
May 9, 2017 |
Cordillera Administrative Region |
Ifugao 1st District Engineering Office |
From: Locally-Funded Projects, LIP-Buildings and Other Structures – Multipurpose/ Facilities
Construction of Barangay Hall, Multi-Purpose Building, Barangay Poblacion, Hungduan, Ifugao
(Construction of Multi-Purpose Building)
To: Locally-Funded Projects, LIP-Buildings and Other Structures – Multipurpose/ Facilities
Completion of Multipurpose Building (Senior Citizen’s Office), Poblacion, Hungduan
(Construction of Multi-Purpose Building) |
May 24, 2017 |
2017 |
WIN7E01666 |
UACS No. 292003020401924 |
January 1, 2017 |
National Capital Region |
North Manila District Engineering Office |
As per GAA
MFO – 2 Flood Management Services- Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Flood Mitigation Facility – Installation of Additional Pump, Bacood Pumping Station, North Manila (Construction of Flood Mitigation)
UACS No. 292003020401924
Physical Target / Cost
Original:
Unit Cost (P’000): P20,000
Allocation Cost (P’000): P20,000
WIN7E01666
As Modified
MFO – 2 Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Installation of Additional Pump at Bacood Pumping including Drainage Improvement at the Vicinity, Manila City (Construction of Flood Mitigation)
UACS No. 292003020401924
Modified: 425 lineal meters
Unit Cost: P47.059T/lineal meters
Estimated Cost (P’000): P20,000
WIN7E01666
|
May 24, 2017 |
FY 2017 |
WIN7E01573 |
FY 2017 APPROVED MODIFICATION |
April 20, 2017 |
Cordillera Administrative Region |
CAR - Regional Office |
From: MFO 1: National Road Network Services - Asset Preservation of National Roads – Rehabilitation/Reconstruction
of National Roads with Slips, Slope Collapse, and Landslide – Secondary
Nueva Vizcaya-Ifugao-Mt Province Rd - K0336+315 - K0336+341, K0341+402 - K0341+440, K0344+676 - K0344+706, K0351+129 - K0351+139, K0351+151 - K0351+187, K0351+201 - K0351+215, K0351+423 - K0351+437, K0352+635 - K0352+710, K0355+448 - K0355+488, K0356+154 - K0356+169, K0357+815 - K0357+976, K0358+226 - K0358+322, K0358+336 - K0358+413, K0358+565 - K0358+600, K0359+394 - K0359+468, K0359+493 - K0359+559, K0359+564 - K0359+654, K0360+090 - K0360+153, K0360+321 - K0360+337, K0360+345 - K0360+372, K0360+354 - K0360+371, K0360+480 - K0360+527, K0360+480 - K0360+530, K0360+925 - K0360+943, K0361+000 - K0361+062, K0361+000 - K0361+116
Physical Target = 6,069.24 sq.m.
To: MFO 1: National Road Network Services - Asset Preservation of National Roads – Rehabilitation/Reconstruction
of National Roads with Slips, Slope Collapse, and Landslide –
Nueva Vizcaya-Ifugao-Mt Province Rd - K0336+315 - K0336+341, K0341+402 - K0341+442, K0344+676 - K0344+706, K0351+201 - K0351+215, K0351+350 - K0351+360, K0351+371 - K0351+409, K0351+423 - K0351+436, K0352+635 - K0352+710, K0356+154 - K0356+169, K0357+815 - K0358+025, K0358+226 - K0358+322, K0358+336 - K0358+413, K0358+565 - K0358+600, K0359+394 - K0359+468, K0359+493 - K0359+559, K0359+564 - K0359+654, K0360+090 - K0360+153, K0360+321 - K0360+337, K0360+345 - K0360+372, K0360+354 - K0360+371, K0360+480 - K0360+527, K0360+480 - K0360+530, K0360+925 - K0360+943, K0361+000 - K0361+062, K0361+000 - K0361+116
Physical Target = 6,141.50 sq.m. |
May 24, 2017 |
FY 2017 |
WIN7E01595 |
FY 2017 APPROVED MODIFICATION |
April 20, 2017 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
From: Locally-Funded Projects: Local Infrastructure Program - Buildings and Other Structures – Multipurpose/Facilities
Construction of Gymnasium, Multi-Purpose Building, Barangay Laya, Alfonso Vista, Ifugao
To: Locally-Funded Projects: Local Infrastructure Program - Buildings and Other Structures – Multipurpose/Facilities
Construction of Gymnasium, Multi-Purpose Building, Barangay Laya, Alfonso Lista, Ifugao
|
May 24, 2017 |
FY 2017 |
WIN7E01617 |
FY 2017 APPROVED MODIFICATION |
April 20, 2017 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
From: Locally-Funded Projects: Local Infrastructure Program - Buildings and Other Structures – Multipurpose/Facilities
Improvement of Barangay Hall, Multi-Purpose Building, Barangay Sta. Maria, Alfonso Vista, Ifugao
To: Locally-Funded Projects: Local Infrastructure Program - Buildings and Other Structures – Multipurpose/Facilities
Improvement of Barangay Hall, Multi-Purpose Building, Barangay Sta. Maria, Alfonso Lista, Ifugao |
May 24, 2017 |
FY 2017 |
WIN7E01569 |
FY 2017 APPROVED MODIFICATION |
April 20, 2017 |
Cordillera Administrative Region |
Ifugao 2nd District Engineering Office |
From: Locally-Funded Projects: Local Infrastructure Program - Buildings and Other Structures – Multipurpose/Facilities
Construction of Barangay Hall, Multi-Purpose Building, Barangay
Dolowog, Alfonso Vista, Ifugao
To: Locally-Funded Projects: Local Infrastructure Program - Buildings and Other Structures – Multipurpose/Facilities
Construction of Barangay Hall, Multi-Purpose Building, Barangay
Dolowog, Alfonso Lista, Ifugao |
May 24, 2017 |
FY 2017 |
WIN7E01173 |
FY 2017 APPROVED MODIFICATION |
March 27, 2017 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Locally Funded Projects - Roads and Bridges - Local Bridges - Construction of Dongyaran Footbridge [Construction of Bridge]
To: Locally Funded Projects - Roads and Bridges - Local Bridges - Construction of Dongrayan Footbridge [Construction of Bridge]
Physical Target = 62 sq.m. |
May 24, 2017 |
FY 2017 |
WIN7E01166 |
FY 2017 APPROVED MODIFICATION |
March 27, 2017 |
Cordillera Administrative Region |
Lower Kalinga District Engineering Office |
From: Locally Funded Projects - Roads and Bridges - Local Roads - (Completion) of Sotto-Agbannawa Barangay Road [Road Upgrading Gravel to Paved]
To: Locally Funded Projects - Roads and Bridges - Local Roads - (Completion) of Sotto-Agbannawag Barangay Road [Road Upgrading Gravel to Paved]
Physical Target = 0.348 ln-km |
May 24, 2017 |
FY 2017 |
WIN7E01711 |
FY 2017 APPROVED MODIFICATION |
May 15, 2017 |
Cordillera Administrative Region |
Upper Kalinga District Engineering Office |
From: MFO 2: Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Rehabilitation of Bonog Bridge Flood Control along Chico River, Kalinga (Construction of Revetment)
Physical Target = 400 Lm
To: MFO 2: Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems, Rehabilitation of Bonog Bridge Flood Control along Chico River, Kalinga (Construction of Revetment)
Physical Target = 143 Lm |
May 24, 2017 |
2017 |
WIN7F04740 |
UACS No. 292003020401898 |
January 1, 2017 |
National Capital Region |
North Manila District Engineering Office |
As per GAA
MFO – 2 Flood Management Services- Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Pumping Station at Hermosa, Tondo, Manila City (Construction of Flood Mitigation Facility)
UACS No. 292003020401898
Physical Target / Cost
Original: 1 project
Unit Cost (P’000):
Allocation Cost (P’000): P50,000
WIN7F04740
As Modified
MFO – 2 Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Revetment Adjacent to Pump Station at Hermosa, Tondo, Manila City Sta. 0+049.40 – Sta. 0+160.20 & Sta. 0+217.40 – Sta. 229.40 (Construction of Revetment and Dredging/Desilting)
UACS No. 292003020401898
Modified: 122.80 lineal meters 4,450.00 cubic meters
Unit Cost: P371.57T/lineal meters, P982.28T/cubic meters
Estimated Cost (P’000): P50,000
WIN7F04740
|
May 24, 2017 |
FY 2017 |
WIN7E01715 |
FY 2017 APPROVED MODIFICATION |
May 16, 2017 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: MFO 1: National Road Network Services - Network Development - Improvement/Widening of National Roads–Secondary
Dantay-Sagada Rd - K0395+477-K0395+882 (Road Widening)
To: MFO 1: National Road Network Services - Network Development - Improvement/Widening of National Roads–Secondary
Dantay-Sagada Rd - K0393+910-K0394+040, K0394+415-K0394+555, K0394+760-K0394+820, K0395+665-K0395+700, K0395+1870-K0395+1922, K0395+2070-K0395+2120 (Road Widening)
Physical Target = 0.360 Lane-km
|
May 24, 2017 |
FY 2017 |
WIN7E01710 |
FY 2017 |
May 16, 2017 |
Cordillera Administrative Region |
Mountain Province 1st District Engineering Office |
From: MFO 1: National Road Network Services –
Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4)-Secondary
Mt Province-N Vizcaya Rd - K0385+337 - K0385+921, K0385+921 - K0385+1083
(Reconstruction from Concrete to Concrete)
To: MFO 1: National Road Network Services –
Asset Preservation of National Roads - Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/ Highway Development Management-4 (HDM-4)-Secondary
Mt Province-N Vizcaya Rd - K0385+337 - K0385+899, K0376+400 - K0376+576
(Rehabilitation of Concrete Road)
Physical Target = 1.476 Lane-km |
May 24, 2017 |
2017 |
WIN7E01599 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Road, Brgy. Lawang Kupang, San Antonio, Nueva Ecija
(Construction of Concrete Road) |
May 24, 2017 |
2017 |
WIN7E01707 |
UACS No. 292003020401925 |
January 1, 2017 |
National Capital Region |
North Manila District Engineering Office |
As per GAA
MFO – 2 Flood Management Services- Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Installation of Additional Pump, Estero de Aviles, Sta. Mesa, North Manila (Construction of Flood Mitigation Structure)
UACS No. 292003020401925
Physical Target / Cost
Original: 1 project
Unit Cost (P’000): P30,000
Allocation Cost (P’000): P30,000
WIN7E01707
As Modified
MFO – 2 Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Riverwall/Revetment Estero de Aviles, Sta. Mesa, Manila City. Sta. 0+041.10 – Sta. 0+083.10 (Both Sides) (Construction of Revetment)
UACS No. 292003020401925
Modified: 84 lineal meters
Unit Cost: P357.143T/lineal meters
Estimated Cost (P’000): P30,000
WIN7E01707
|
May 24, 2017 |
2017 |
WIN7E01649 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally- Funded Projects- Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Road, Brgy. Mahipon, Gapan City, Nueva Ecija
(Construction of Concrete Road) |
May 24, 2017 |
2017 |
WIN7E01600 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Project - Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Road, Brgy. Sta. Rita, Cabiao, Nueva Ecija (Phase I)
(Construction of Concrete Road) |
May 24, 2017 |
2017 |
WIN7E01618 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Road, Brgy. Calaba, San Isidro Nueva Ecija (Phase II) |
May 24, 2017 |
2017 |
WIN7E01656 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Project-Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Road, Brgy. San Fernando Sur, Cabiao, Nueva Ecija
(Construction of Concrete Road) |
May 24, 2017 |
2017 |
WIN7E01642 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Road, Brgy. Luyos, San Antonio, Nueva Ecija
(Construction of Concrete Road) |
May 24, 2017 |
2017 |
WIN7E01680 |
UACS No. 103004010310217 |
January 1, 2017 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Construction of Covered Court, Brgy. Sta. Monica, Aguardiente, Novaliches, Quezon City (Construction of Multipurpose Building)
UACS No. 103004010310217
Physical Target/Cost
Per GAA/Original: 1 Building
Unit Cost (P’000): P2,000/Bldg.
Allocation (P’000): Php 2,000
WIN7E01680
As Modified
Locally Funded Projects – Buildings and Other Structures – Multipurpose/Facilities: Construction of Multipurpose Building, Brgy. Sta. Monica, Aguardiente, Novaliches, Quezon City (Construction of Multipurpose Building)
UACS No. 103004010310217
Physical Target/Cost
As Modified: 1 Building
Unit Cost (P’000): P2,000/Bldg.
Estimated Cost (P’000): P 2,000
WIN7E01680
|
May 24, 2017 |
2017 |
WIN7E01614 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Road, Brgy. San Roque, San Leonardo, Nueva Ecija
(Construction of Concrete Road) |
May 24, 2017 |
2017 |
WIN7F04604 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Sur 5th District Engineering Office |
As per GAA:
Locally-Funded Projects - Building and Other Structures - Multipurpose/Facilities - Concreting of Multi-Purpose Pavement in Colacling National High School, Brgy. Colacling, Lupi, Camarines Sur [Construction of Multi-Purpose Building]
Physical target: 1 Building
Unit Cost (P'000): P1,000/Building
Allocation (P'000): P1,000.00
As MODIFIED:
Locally-Funded Projects - Building and Other Structures - Multipurpose/Facilities - construction of Multi-Purpose Building in Colacling National High School, Brgy. Colacling, Lupi, Camarines Sur [Construction of Multi-Purpose Building]
Physical target: 1 Building
Unit Cost (P'000): P1,000/Building
Allocation (P'000): P1,000.00 |
May 24, 2017 |
2017 |
WIN7E01613 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Roads and Bridges - Local Roads
Concreting of Road, Brgy. Castellano, San Leonardo, Nueva Ecija
(Construction of Concrete Road) |
May 24, 2017 |
2017 |
WIN7F04741 |
UACS No. 165004050306362 |
January 1, 2017 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA
Locally Funded Projects – Roads and Bridges – Local Roads: Rehabilitation/Concreting of Belfast, Brgy. Sta. Monica, Quezon City Sta. 0+000 – Sta. 0+490 (Construction of Concrete Road)
UACS No. 165004050306362
Physical Target/Cost
Per GAA/Original: 2.60 lane-km
Unit Cost (P’000): P11,538/lane-km
Allocation (P’000): Php 30,000
WIN7F04741
As Modified
Locally Funded Projects – Roads and Bridges – Local Roads: Rehabilitation of Belfast, Brgy. Sta. Monica, Quezon City Sta. 0+000 – Sta. 0+460, Sta. 0+562 – Sta. 0+932 (Rehabilitation/Drainage Improvement)
UACS No. 165004050306362
Physical Target/Cost
As Modified: 2.1384 lane-km
Unit Cost (P’000): P14,029/lane-km
Estimated Cost (P’000): P 30,000
WIN7F04741
|
May 24, 2017 |
FY2017 |
WIN7C01738 |
GAA2017 |
January 31, 2017 |
Region VIII |
Leyte 4th District Engineering Office |
As per GAA:
Preventive Maintenance of Road: Concrete Reblocking - Palompon-Isabel-Merida-Ormoc Road, K1095+000 - K1095+635
As Modified:
Preventive Maintenance based on Pavement Management System/Highways Development and Management - 4 (HDM-4) - Secondary, Palompon-Isabel-Merida-Ormoc Road, K1095+000 - K1095+635 |
May 24, 2017 |
2017 |
WIN7G01494 |
FY 2017 (R.A 10924) |
May 12, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading Paved Road Standards (HDM-4 Project Analysis) - Tertiary -
Road Upgrading Gravel to Paved of Imelda - Bayog - Kumalarang - Lapuyan - Margosatubig Road - (S01184MN), Zamboanga del Sur 2nd DEO
Chainage 7780 - Chainage 9480,
Chainage 11999 - Chainage 12500
Allocation:
Php 100.000 M (Total)
Php 99,845,039.37 (Road Concreting)
Php 154,960.63 (ROW Acquisition)
Physical Target:
4.402 lane km (Road Concreting)
154.961 sq.m. (ROW Acquisition)
Unit Cost:
Php 22,681,744.52/lane km (Road Concreting)
Php 1,000.00/sq.m. (ROW Acquisition) |
May 24, 2017 |
2017 |
WIN7E01721 |
UACS No. 292003020401929 |
January 1, 2017 |
National Capital Region |
Quezon City 1st Engineering District Office |
As per GAA
MFO – 2 Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Slope Protection Structure – Construction of Slope Protection Marikina River, Phase IV, Brgy. Batasan Hills, Quezon City (Construction of Slope Protection)
UACS No. 292003020401929
Physical Target/Cost
Per GAA/Original: 1,100 m2
Unit Cost (P’000): P27.273T/m2
Allocation (P’000): Php 30,000
WIN7E01721
As Modified
MFO – 2 Flood Management Services – Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Rehabilitation of Flood Control Structures and Tributaries of Brgy. Batasan Hills, Phase III, Quezon City (Rehabilitation of Flood Control Structures and Tributaries)
UACS No. 292003020401929
Physical Target/Cost
As Modified: 648 lm
Unit Cost (P’000): P46,296T/lm
Estimated Cost (P’000): P 30,000
WIN7E01721
|
May 24, 2017 |
2017 |
WIN7E01647 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage systems
Concrete of Concrete River Wall along Pampanga River, Sta. 2+248.00 - Sta. 2+400.00, Sta. 3+960.00 - Sta, 4+088.80, San Roque, San Leonardo, Nueva Ecija
(Construction of Flood Mitigation Structure) |
May 24, 2017 |
2017 |
WIN7G01508 |
FY 2017 (R.A 10924) |
May 12, 2017 |
Region IX |
Regional Office IX |
Road Upgrading (unpaved to paved) based on Gravel Road Strategies, Traffic Benchmark for Upgrading to Paved Road Standards (DHM-4 Project Analysis) - Tertiary -
Road Upgrading (Gravel to Paved) of Sindangan - Bayog - Lakewood Road, Zamboanga del Norte 1st DEO,
Chainage 13489 - Chainage 15799
(Sta. 1942+330 - Sta. 1944+640)
Allocation:
Php 150.000 Million
Physical Target: 4.620 lane km
Unit Cost: Php 32,467,532.47/lane km |
May 24, 2017 |
2017 |
WIN7E01652 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage systems
Construction of Concrete River wall along Pampanga River, Sta. 8+480-Sta. 8+714.80, Brgy. Adorable, San Leonardo, Nueva Ecija
(Construction of Flood Mitigation Structure) |
May 24, 2017 |
2017 |
WIN7E01646 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage systems
Construction of Concrete River Wall, Sta. 0+000 to Sta. 224.80, Brgy. San Josef, Peñaranda, Nueva Ecija
(Construction of Flood Mitigation Structure) |
May 24, 2017 |
2017 |
WIN7G01521 |
FY 2017 (R.A 10924) |
May 16, 2017 |
Region IX |
Regional Office IX |
Network Development - Construction of By-Passes/Diversion Road, including ROW -
Road Widening and Construction of Four (4) Lanes Concreting Road, Zamboanga City By-Pass Road (Culianan - Patalon Section), Zamboanga City
Sta. 1983+780.00 - Sta. 1985+750.36 (Widening)
Sta. 1985+750.36 - Sta. 1986+470.71 (BK)/ Sta. 1935+617.23 (AH 4-lanes)
Allocation:
Php 150.000 M (Total)
Php 101,746,850.31 (Civil Works)
(Php 42,973,939.84 - 4 lane road)
(Php 58,772,910.47 - Road Widening)
Php 48,253,149.69 (ROW Acquisition)
Physical Tatget:
6.82212 lane km (Civil Works)
(2.8814 lane km - 4-lane road)
(3.94072 lane km - Road Widening)
24,126.56 sq.m. (ROW Acquisition)
Unit Cost:
Php 14,914,256.90/lane km (Civil Works)
Php 2,000.00/sq.m. (ROW Acquisition) |
May 24, 2017 |
2017 |
WIN7E01655 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage systems
Coronel River Flood Control, Calabasa, Sta. 20+732.22-Sta. 20+894.22, Gabaldon, Nueva Ecija
(Construction of Flood Mitigation Structure) |
May 24, 2017 |
2017 |
WIN7E01525 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Norte District Engineering Office |
As per GAA:
MFO 2 - Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Revetment - Construction of Danao River Flood Control Structure, Sta. 0+000 - Sta. 0+580 (R/S) and Sta. 0+210 - Sta. 0+580 (L/S), Brgys. Parang and Plaridel, Jose Panganiban, Camarines Norte
(Construction of Revetment)
Physical Target: 950 lm
Unit Cost (P'000): P42.528T/lm
Allocation Cost (P'000): P40,402
As MODIFIED:
MFO 2 - Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Revetment - Construction of Danao River Flood Control Structure, Sta. 0+155.10 - Sta. 0+835.10(L/S) and Sta. 0+000 - Sta. 0+055 & Sta. 0+252.27 - Sta. 0+392.27(R/S), Brgy. Parang and Plaridel, Jose Panganiban, Camarines Norte
(Construction of Revetment)
Physical Target: 875 lm
Unit Cost (P'000): P46.174T/lm
Estimated Cost (P'000): P40,402 |
May 24, 2017 |
2017 |
WIN7E01525 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Norte District Engineering Office |
As per GAA:
MFO 2 - Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Revetment - Construction of Danao River Flood Control Structure, Sta. 0+000 - Sta. 0+580 (R/S) and Sta. 0+210 - Sta. 0+580 (L/S), Brgys. Parang and Plaridel, Jose Panganiban, Camarines Norte
(Construction of Revetment)
Physical Target: 950 lm
Unit Cost (P'000): P42.528T/lm
Allocation Cost (P'000): P40,402
As MODIFIED:
MFO 2 - Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Revetment - Construction of Danao River Flood Control Structure, Sta. 0+155.10 - Sta. 0+835.10(L/S) and Sta. 0+000 - Sta. 0+055 & Sta. 0+252.27 - Sta. 0+392.27(R/S), Brgy. Parang and Plaridel, Jose Panganiban, Camarines Norte
(Construction of Revetment)
Physical Target: 875 lm
Unit Cost (P'000): P46.174T/lm
Estimated Cost (P'000): P40,402 |
May 24, 2017 |
2017 |
WIN7E01648 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage systems
Rehabilitation/Improvement of Pampanga River Control, Magpapalayok Section, Sta. 0+154.00-Sta. 0+232.00, Sta. 0+250.00-Sta. 0+258.00, San Leonardo, Nueva Ecija
(Rehabilitation/Major Repair of Flood Control Structure) |
May 24, 2017 |
2017 |
WIN7E01653 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage systems
Rehabilitation/Improvement of Pampanga River Control, Sta. 0+000.00 - Sta. 0+265.20, Bagong Sikat, Cabiao, Nueva Ecija
(Rehabilitation/Major Repair of Flood Control Structure) |
May 24, 2017 |
2017 |
WIN7E01551 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Norte District Engineering Office |
As per GAA:
MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems : Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Anahaw Section, Labo, Camarines Norte (Construction of Flood Mitigation Structure)
Physical Target: 315 lm
Unit Cost (P'000): P63.49T/lm
Allocation Cost: P20,000
As per GAA:
MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems : Construction of Flood Mitigation Structure - Construction of Flood Control Structure, Anahaw Section, Labo, Camarines Norte (Construction of Flood Mitigation Structure)
Physical Target: 194 lm
Unit Cost (P'000): P103.09/lm
Estimated Cost: P20,000 |
May 24, 2017 |
2017 |
WIN7E01650 |
RA 10924 |
January 27, 2016 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage systems
Rehabilitation/Improvement of Pampanga River Control, San Anton section, Sta. 0+092.00-Sta. 0+160.00 & Sta. 0+253.90-Sta.0+363.90, San Leonardo, Nueva Ecija
(Rehabilitation/Major Repair of Flood Control Structure) |
May 24, 2017 |
2017 |
WIN7E01552 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Norte District Engineering Office |
As per GAA:
MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems : Construction of Flood Mitigation Structure - Construction of Flood Control Structure, , Poblacion Sur Section, Paracale, Camarines Norte
(Construction of Flood Mitigation Structure)
Physical Target: 650 lm
Unit Cost (P'000): P30.77T/lm
Allocation Cost: P20,000
As MODIFIED:
MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems : Construction of Flood Mitigation Structure - Construction of Flood Control Structure, , Poblacion Sur Section, Paracale, Camarines Norte
(Construction of Flood Mitigation Structure)
Physical Target: 470 lm
Unit Cost (P'000): P42.55T/lm
Estimated Cost: P20,000
|
May 24, 2017 |
2017 |
WIN7E01654 |
RA 10924 |
January 27, 2017 |
Region III |
Nueva Ecija 2nd District Engineering Office |
Locally-Funded Projects - Local Infrastructure Program
Flood Control and Drainage -Flood Control Structures/Facilities
Construction/Maintenance of Flood Mitigation Structures and Drainage system, Pampanga River Control Sta. 47+670.20-Sta. 47+967.80 (297.60 lm), San Josef, Cabanatuan City, Nueva Ecija
(Construction of Flood Mitigation Structure) |
May 24, 2017 |
2017 |
WIN7E01628 |
FY 2017 GAA RA 10924 |
December 28, 2016 |
Region V |
Camarines Norte District Engineering Office |
As per GAA:
MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems : Construction of Revetment - Extension /Rehabilitation/Construction of Talisay River Control Structure, Brgy. Poblacion, Talisay, Camarines Norte (Construction of Revetment)
Physical Target: 850 lm
Unit Cost (P'000): P35.29T/lm
Allocation Cost: P30,000
As MODIFIED:
MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems : Construction of Revetment - Extension /Rehabilitation/Construction of Talisay River Control Structure, Brgy. Poblacion, Talisay, Camarines Norte (Construction of Revetment)
Physical Target: 470 lm
Unit Cost (P'000): P63.82T/lm
Estimated Cost: P30,000 |
May 24, 2017 |
2017 |
WIN7E01628 |
FY 2017 GAA RA 10924 |
December 28, 2016 |
Region V |
Camarines Norte District Engineering Office |
As per GAA:
MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems : Construction of Revetment - Extension /Rehabilitation/Construction of Talisay River Control Structure, Brgy. Poblacion, Talisay, Camarines Norte (Construction of Revetment)
Physical Target: 850 lm
Unit Cost (P'000): P35.29T/lm
Allocation Cost: P30,000
As MODIFIED:
MFO 2 - Flood Management Services - Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems : Construction of Revetment - Extension /Rehabilitation/Construction of Talisay River Control Structure, Brgy. Poblacion, Talisay, Camarines Norte (Construction of Revetment)
Physical Target: 470 lm
Unit Cost (P'000): P63.82T/lm
Estimated Cost: P30,000 |
May 24, 2017 |
2017 |
WIN7E01518 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Norte District Engineering Office |
As per GAA:
MFO-2 Flood Management Services: Construction / Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Revetment — Extension / Rehabilitation / Construction of Basud River Control Structures Sta.0+000 -Sta.0+700 Brgy. Poblacion, Basud, Camarines Norte (Construction of Revetment)
Physical Target: 700 lm
Unit Cost (P'000): P42.86T/lm
Allocation Cost: P30,000
As per GAA:
MFO-2 Flood Management Services: Construction / Maintenance of Flood Mitigation Structures and Drainage Systems: Construction of Revetment — Extension / Rehabilitation / Construction of Basud River Control Structures Sta.0+000 -Sta.0+700 Brgy. Poblacion, Basud, Camarines Norte (Construction of Revetment)
Physical Target: 456 lm
Unit Cost (P'000): P65.79T/lm
Estimated Cost: P30,000 |
May 24, 2017 |
2017 |
WIN7E01548 |
FY 2017 GAA RA 10924 |
December 29, 2016 |
Region V |
Camarines Norte District Engineering Office |
As per GAA:
MFO 2 - Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems : Construction of Revetment Extension/Rehabilitation/ Construction of Daet River Control Structure, Brgy. San Isidro, Daet, Camarines Norte (Construction of Revetment)
Physical Target: 385 lm
Unit Cost (P'000): P77.92T/lm
Allocation Cost: P30,000
As per GAA:
MFO 2 - Flood Management Services - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems : Construction of Revetment Extension/Rehabilitation/ Construction of Daet River Control Structure, Brgy. San Isidro, Daet, Camarines Norte (Construction of Revetment)
Physical Target: 600 lm
Unit Cost (P'000): P50.00T/lm
Estimated Cost: P30,000 |
May 24, 2017 |
GAA FY 2017 |
WIN7G01505 |
GAA FY 2017 R.A. 10924 |
January 1, 2017 |
Region XI |
Regional Office XI |
MODIFICATION:
FROM: MFO 1 - National Road Network Services:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide - Secondary
Construction of Road Slope Protection Structure Including Off-Carriageway Improvement: Shoulder Paving/Construction - Davao-Sarangani Coastal Rd (Malalag-Malita-JAS-G)
K1663+225 - K1663+590, K1656+216 - K1657+526, K1658+279 - K1659+000
TO: MFO 1 - National Road Network Services:
Asset Preservation of National Roads - Rehabilitation/Reconstruction of National Roads with Slips, Slope Collapse, and Landslide -
Rehabilitation/Reconstruction of National Road with Slips, Slope Collapse and Landslide along Davao-Sarangani Coastal Road (Malalag-Malita-JAS-Glan Road) including Paving of Shoulder (Talagutong Section), Davao Occidental
K1656+216 - K1657+526, K1658+279 - K1659+000, K1663+225 - K1663+590
ALLOCATION: Php 143.054 Million |
May 23, 2017 |
CY 2017 |
WIN7E01621 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Rehabilitation/Reconstruction of National
Roads with Slips, Slope Collapse, and
Landslide
- Tertiary Road
Bulalacao - San Jose - Jct Mapaya Rd
K0222+300 - K0222+400
CW1 = 462.60 sq m
Php 5,536,874.00 million
( Construction of Road Slope
Protection Structure ) |
May 23, 2017 |
CY 2017 |
WIN7E01605 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Construction/Upgrading/rehabilitation of
Drainage along National Roads
- Tertiary Road
Jct. MWCR ( San Isidro ) -
Penal Colony - Jct. Yapang Road
K0307+318 - K0310+049
L = 5,388 lm
Php 38,389,544.48 Million
( Construction of Drainage Structure
along Road )
|
May 23, 2017 |
CY 2017 |
WIN7E01623 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Construction/Upgrading/Rehabilitation of
Drainage along National Roads
- Tertiary Road
Construction of Drainage Structure
along Road
Jct. TLLR - Tumibo - Lubang -
Binacas Road
K0001+(-071) - K0001+323,
K0003+080 - K0003+090,
K0003+090 - K0003+860,
K0001+(-998) - K0001+(-872)
L = 2,600 lm
Php 26.265 Million
( Construction of Drainage Structure
along Road ) |
May 23, 2017 |
CY 2017 |
WIN7E01623 |
GAA CY 2017 RA 10924 |
December 29, 2016 |
Region IV-B |
Mindoro Occidental District Engineering Office |
as MODIFIED:
MF01 - National Road Network Services
- Asset Preservation of National Roads
- Construction/Upgrading/Rehabilitation of
Drainage along National Roads
- Tertiary Road
Construction of Drainage Structure
along Road
Jct. TLLR - Tumibo - Lubang -
Binacas Road
K0001+(-071) - K0001+323,
K0003+080 - K0003+090,
K0003+090 - K0003+860,
K0001+(-998) - K0001+(-872)
L = 2,600 lm
Php 26.265 Million
( Construction of Drainage Structure
along Road ) |
May 23, 2017 |
2017 |
WIN7E01633 |
SR2017-01-000246 |
January 27, 2017 |
Region III |
Regional Office III |
Construction and Maintenance of Bridges along National Roads - Widening of Permanent Bridges to more than 2 lanes, Doña Josefa Br. (B01310LZ) along Daang Maharlika (LZ) |
May 23, 2017 |
2017 |
WIN7E01596 |
SR2017-01-000291 |
January 28, 2017 |
Region III |
Regional Office III |
Construction/Improvement of Access Roads leading to Airports, Seaports and Declared Tourism Destinations - to Declared Tourism Destinations, Clark Green City - Mac Arthur Access Road leading to Clark Green City, including bridges, Tarlac
(Construction of Concrete Road)
(Construction of Concrete Bridge) |
May 23, 2017 |
FY2017 |
WIN7C01579 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
LIP-Roads and Bridges-National Road
Repair/Rehabilitation/Improvement along Leyte-Samar Road (via Guintigi-an), K0899+(-864) - K0904+676 Justice Romualdez(0+000 - 0+872), Rizal Avenue (S00006LT, S0009LT) Trece Martirez (0+000 - 0+533), Daang Maharlika (San Juanico Bridge, Naga-naga-Anibong Road
As Modified:
LIP-Roads and Bridges-National Road
Repair/Rehabilitation/Improvement along Avenida Veteranos (S00004LT)-Chainage 0 to Chainage 91 and Justice Romualdez Street (S00005LT)-Chainage 0 to Chainage 382, Tacloban City
|
May 23, 2017 |
FY2017 |
WIN7C01581 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Tacloban-Baybay South Road (including drainage) K0913+413 - K0914+017, Tacloban City
As Modified:
Improvement/Widening of Tacloban-Baybay South Road (S00244LT) K0913+413 - K0914+017, Tacloban City |
May 23, 2017 |
FY2017 |
WIN7C01580 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Road Widening - Daang Maharlika (LT) - K0901+211 - K0901+699, K0901+699 - K0901+970
As Modified:
Improvement/Widening of Daang Maharlika Road (S00002LT) K0901+220 - K0901+699, K0901+699 - K0901+960, Tacloban City |
May 23, 2017 |
FY2017 |
WIN7C01578 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Road Widening - Daang Maharlika -
K0897+000 - K0897+820, K0903+(-077) - K0903+133
As Modified:
Improvement/Widening of Daang Maharlika Road (S00013LT) K0897+000 - K0897+820, (S00002LT) K0903+(-077) - K0903+133, Tacloban City |
May 23, 2017 |
FY2017 |
WIN7C01584 |
GAA2017 |
January 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Road Widening - Daang Maharlika Road (including drainage) K0898+(-178) - K0898+462
As Modified:
Improvement/Widening of Daang Maharlika Road (S00002LT), Tacloban City K0898+(-178) - K0898+462 |
May 23, 2017 |
FY2017 |
WIN7C01583 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Road Widening of Leyte-Samar Road (via Guintigui-an) (S00001LT), Tacloban City, Leyte (K0903+226 - K0904+676)
As Modified:
Road Widening of Leyte-Samar (via Guintigui-an)(S00001LT), (K0902+358 - K0903+254), Tacloban City |
May 23, 2017 |
FY2017 |
WIN7C01582 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Improvement/Widening of National Roads - Tertiary
Road Widening - Leyte-Samar Road (via Guintigui-an) K0901+199 - K0902+208, K0901+(-540) - K0901+(-160)
As Modified:
Improvement/Widening of Leyte-Samar Road (via Guintigui-an)(S00001LT) K0901+(-540) - K0901+(-160), K0901+214 - K0902+208
|
May 23, 2017 |
FY2017 |
WIN7U01451 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Road Widening - Picas San Jose DZR Airport Road - K0910+(-926) - K0910+(-545)
As Modified:
Improvement/Widening of Picas San Jose DZR Airport Road (S00257LT), Tacloban City K0910+(-926) - K0910+(-545) |
May 23, 2017 |
2017 |
WIN7E01597 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bataan 1st District Engineering Office |
Asset Preservation of National Roads - Rehabilitation/Reconstruction/Upgrading of Damaged Paved National Roads including drainage based on Pavement Management System/Highway Development Management-4 (HDM-4) - Primary - Jose Abad Santos Ave (JASA), K0110+678 - K0111+681.70, K0108+248 - K0108+300
(Reconstruction from Asphalt to Concrete) |
May 23, 2017 |
FY2017 |
WIN7C01585 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Repair/Rehabilitation/Improvement along Avenida Veteranos (0+000 - 0+641) & (0+000 - 0+228), Picas-San Jose DZR Airport Road (K0910+(-664) - K0913+722) Tacloban_Baybay South Road (0+000 - 0+456), Apitong Paterno Road (K0908+(-922) - K0909+442), Calanipawan Road
As Modified:
Repair/Rehabilitation/Improvement along Tacloban-Baybay South Road (S00244LT) K0912+(-207) to K0912+000 and K0913+000 to K0913+230, Tacloban City |
May 23, 2017 |
FY2017 |
WIN7C01537 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Road Widening - Tacloban-Baybay South Road - K0912+789 - K0912+1108
As Modified:
Improvement/Widening of Tacloban Baybay South Road (S00244LT), Tacloban City K0912+789 - K0912+1108 |
May 23, 2017 |
FY2017 |
WIN7C01632 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Road Widening of Leyte-Samar Road (via Guintigui-an) (S00001LT), Tacloban City, Leyte (K0903+110 - K0904+264)
As Modified:
Road Widening of Leyte-Samar Road (via Guintigui-an)(S00001LT), (k0902+208 - K0902+358), Tacloban City |
May 23, 2017 |
FY2017 |
WIN7C01628 |
GAA2017 |
February 1, 2017 |
Region VIII |
Tacloban City District Engineering Office |
As per GAA:
Construction/Rehabilitation of Flood Control Structure at Burayan River along Picas San Jose DZR Airport Nat'l. Road, Tacloban City, Leyte
As Modified:
Construction/Rehabilitation of Flood Control Structure at Burayan River along Picas San Jose DZR Airport Nat'l. Road, Tacloban City
|
May 23, 2017 |
2017 |
WIN7F04583 |
FY 2017 GAA |
January 1, 2017 |
Region III |
Bataan 1st District Engineering Office |
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Pentor - Balsik River (Balsik Section), Hermosa, Bataan |