HOME BARMM CAR NCR NIR Region I Region II Region III Region IV-A Region IV-B Region V Region VI Region VII Region VIII Region IX Region X Region XI Region XII Region XIII

 

  PHILIPPINES

SUMMARY OF EXISTING NATIONAL BRIDGES (LENGTH AND NUMBER) by TYPE - PER REGION
                             
Table 1
RBIA Generated Report as of October 16, 2024                             Unit of Measure: Linear Meter (lm) 
Region Permanent Bridges Temporary Bridges Grand Total
Concrete Steel Total Bailey Timber Total
Number Length Number Length Number Length Number Length Number Length Number Length Number Length
BARMM 155           5,452.55 29         1,424.68 184           6,877.23 0            -   0         -   0            -   184           6,877.23
CAR 255           8,300.87 96         6,358.55 351          14,659.42 2        62.22 0         -   2        62.22 353         14,721.64
NCR 288          28,389.70 19         2,542.35 307          30,932.05 0            -   0         -   0            -   307         30,932.05
NIR 353          12,637.80 79         3,933.44 432          16,571.24 0            -   0         -   0            -   432         16,571.24
I 496          24,928.03 90       11,298.79 586          36,226.82 0            -   0         -   0            -   586         36,226.82
II 452          23,498.80 69         6,659.72 521          30,158.52 0            -   0         -   0            -   521         30,158.52
III 664          31,669.14 93         7,326.14 757          38,995.28 1        14.50 0         -   1        14.50 758         39,009.78
IV-A 614          17,739.09 68         2,784.38 682          20,523.47 0            -   0         -   0            -   682         20,523.47
IV-B 583          21,244.30 72         2,984.45 655          24,228.75 0            -   0         -   0            -   655         24,228.75
V 638          20,756.91 96         4,091.17 734          24,848.08 1        36.80 0         -   1        36.80 735         24,884.88
VI 430          19,300.29 83         5,711.22 513          25,011.51 1        20.50 0         -   1        20.50 514         25,032.01
VII 352          16,192.61 82         4,519.53 434          20,712.14 0            -   0         -   0            -   434         20,712.14
VIII 764          28,341.87 164         9,140.17 928          37,482.04 0            -   0         -   0            -   928         37,482.04
IX 289          12,915.66 79         3,527.47 368          16,443.13 0            -   0         -   0            -   368         16,443.13
X 364          15,299.56 89         4,417.31 453          19,716.87 3        98.25 0         -   3        98.25 456         19,815.12
XI 259          13,338.65 46         2,861.57 305          16,200.22 1        91.65 0         -   1        91.65 306         16,291.87
XII 282          11,710.98 42         1,466.91 324          13,177.89 2        53.05 0         -   2        53.05 326         13,230.94
XIII 352          14,403.84 110         7,352.52 462          21,756.36 0            -   0         -   0            -   462         21,756.36
Grand Total 7,590      326,120.65 1,406      88,400.37 8,996      414,521.02 11     376.97 0          -   11     376.97 9,007      414,897.99

 

Notes:

1.) Bridge data provided are as of  16 October 2024.

2.) The unit of measure for Bridge Data is linear meters.

3.) Further Assessment refers to Bridges that are either under the circumstances of on-going construction, under major maintenance work or washed-out.

4.) National Bridges are classified into:

        Permanent Bridges - are bridges that are composed of concrete and steel.

        Temporary Bridges - are bridges consisting of timber and bailey.

For questions regarding this Website contact feedback@dpwh.gov.ph

 

Last updated: 02/26/25.