Department of Public Works and Highways
SUMMARY OF BRIDGE CONDITION  BY REGION
Table 3
                         
RBIA Generated Report as of October 16, 2024                  
Region Good Fair Poor Bad Further Assessment Grand Total
Total % Total % Total % Total % Total % Total %
BARMM 48 0.53% 81 0.90% 48 0.53% 7 0.08% 0 0.00% 184 2.04%
CAR 166 1.84% 159 1.77% 28 0.31% 0 0.00% 0 0.00% 353 3.92%
NCR 45 0.50% 241 2.68% 20 0.22% 1 0.01% 0 0.00% 307 3.41%
NIR 197 2.19% 189 2.10% 40 0.44% 6 0.07% 0 0.00% 432 4.80%
I 289 3.21% 280 3.11% 17 0.19% 0 0.00% 0 0.00% 586 6.51%
II 299 3.32% 189 2.10% 24 0.27% 9 0.10% 0 0.00% 521 5.78%
III 424 4.71% 301 3.34% 31 0.34% 2 0.02% 0 0.00% 758 8.42%
IV-A 264 2.93% 395 4.39% 21 0.23% 2 0.02% 0 0.00% 682 7.57%
IV-B 183 2.03% 389 4.32% 71 0.79% 12 0.13% 0 0.00% 655 7.27%
IX 161 1.79% 165 1.83% 27 0.30% 15 0.17% 0 0.00% 368 4.09%
V 253 2.81% 392 4.35% 85 0.94% 5 0.06% 0 0.00% 735 8.16%
VI 223 2.48% 268 2.98% 20 0.22% 3 0.03% 0 0.00% 514 5.71%
VII 203 2.25% 210 2.33% 17 0.19% 4 0.04% 0 0.00% 434 4.82%
VIII 400 4.44% 466 5.17% 60 0.67% 2 0.02% 0 0.00% 928 10.30%
X 265 2.94% 173 1.92% 16 0.18% 2 0.02% 0 0.00% 456 5.06%
XI 134 1.49% 162 1.80% 9 0.10% 1 0.01% 0 0.00% 306 3.40%
XII 188 2.09% 129 1.43% 8 0.09% 1 0.01% 0 0.00% 326 3.62%
XIII 251 2.79% 189 2.10% 21 0.23% 1 0.01% 0 0.00% 462 5.13%
Grand Total 3,993 44.33% 4,378 48.61% 563 6.25% 73 0.81% 0 0.00% 9,007 100.00%


 

Notes:
 

1.) Bridge data provided are as of  16 October 2024.

2.) The unit of measure for Bridge Data is linear meters.

3.) Further Assessment refers to Bridges that are either under the circumstances of on-going construction, under major maintenance work or washed-out.

4.) National Bridges are classified into:

        Permanent Bridges - are bridges that are composed of concrete and steel.

        Temporary Bridges - are bridges consisting of timber and bailey.