Home Up

 

 

Davao City
Davao City 2nd
Davao City 3rd
Davao de Oro 1st
Davao de Oro 2nd
Davao del Norte
Davao del Norte 2nd
Davao del Sur
Davao Occidental
Davao Oriental 1st
Davao Oriental 2nd

DAVAO DEL NORTE

 

Department of Public Works and Highways
LIST OF NATIONAL BRIDGES WITH LENGTH, TYPE AND CONDITION
PER DISTRICT ENGINEERING OFFICE
As of 16 October 2024
             
Table 6
Source: RBIA Generated Report                      Unit of Measure: In Linear Meter 
Bdride No. Bridge ID Bridge Name Bridge Type Overall Condition Length
Davao del Norte District Engineering Office
1 B00015MN Liboganon Br. Permanent Concrete Fair 36.50
2 B00016MN Gov. Miranda Br. Permanent Concrete Fair 147.10
3 B02211MN Tagum City Flyover Permanent Concrete Fair 1034.62
4 B01570MN Cambaogo Br. Permanent Concrete Fair 10.60
5 B01571MN Bunawan Br. Permanent Concrete Fair 37.50
6 B02212MN Nanaga Parallel Br. 1 Permanent Concrete Fair 46.10
7 B00191MN Kipaliko Br. Permanent Concrete Fair 40.00
8 B00192MN Gabuyan Br. Permanent Concrete Fair 15.80
9 B00193MN Sto. Niņo Br. 1 Permanent Concrete Fair 30.10
10 B01120MN Sto. Niņo Br. 2 Permanent Concrete Fair 40.00
11 B01121MN Nanaga Br. 1 Permanent Steel Fair 46.70
12 B01122MN Nanaga Br. 2 Permanent Concrete Fair 25.30
13 B01123MN Mesolong Br. Permanent Concrete Fair 68.00
14 B01124MN Napisulan Br. Permanent Concrete Fair 47.40
15 B01622MN Lasang KTV Br. Permanent Concrete Good 30.60
16 B00179MN Pagsabangan Br. Permanent Concrete Fair 60.80
17 B00180MN Ilog Br. Permanent Concrete Poor 24.00
18 B01852MN Magatos Br. Permanent Concrete Poor 32.50
19 B00182MN Maniki Br. Permanent Steel Fair 179.40
20 B01904MN Pagsabangan Br. 2 Permanent Concrete Fair 70.00

 

 

 

Back Home Up Next

Davao City / Davao City 2nd / Davao City 3rd / Davao de Oro 1st / Davao de Oro 2nd / Davao del Norte / Davao del Norte 2nd / Davao del Sur / Davao Occidental / Davao Oriental 1st / Davao Oriental 2nd

Notes:
 

1.) Bridge data provided are as of  16 October 2024.

2.) The unit of measure for Bridge Data is linear meters.

3.) Further Assessment refers to Bridges that are either under the circumstances of on-going construction, under major maintenance work or washed-out.

4.) National Bridges are classified into:

        Permanent Bridges - are bridges that are composed of concrete and steel.

        Temporary Bridges - are bridges consisting of timber and bailey.

For questions regarding this Website contact feedback@dpwh.gov.ph

 

Last updated: 03/24/25.

Disclaimer